JP2010248714A - Method for protecting pile hole wall - Google Patents

Method for protecting pile hole wall Download PDF

Info

Publication number
JP2010248714A
JP2010248714A JP2009096628A JP2009096628A JP2010248714A JP 2010248714 A JP2010248714 A JP 2010248714A JP 2009096628 A JP2009096628 A JP 2009096628A JP 2009096628 A JP2009096628 A JP 2009096628A JP 2010248714 A JP2010248714 A JP 2010248714A
Authority
JP
Japan
Prior art keywords
hole wall
filler
pile
pile hole
cylindrical tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009096628A
Other languages
Japanese (ja)
Other versions
JP5308895B2 (en
Inventor
Tadayoshi Ishibashi
忠良 石橋
Katsuhiko Osako
勝彦 大迫
Koichi Yoshida
宏一 吉田
Akira Oba
章 大庭
Yoshinori Taniguchi
善則 谷口
Tsutomu Takeya
勉 竹谷
Hirofumi Ikemoto
宏文 池本
Akiyuki Watanabe
明之 渡邊
Misa Taniguchi
美佐 谷口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2009096628A priority Critical patent/JP5308895B2/en
Publication of JP2010248714A publication Critical patent/JP2010248714A/en
Application granted granted Critical
Publication of JP5308895B2 publication Critical patent/JP5308895B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To perform the protection of a hole wall concurrently with the excavation of a pile hole for a cast-in-place pile. <P>SOLUTION: A plurality of cylindrical pipes (14), which are smaller in diameter than the pile hole and the lengths of which are smaller in dimension than or equal in dimension to the depth of an excavated section, are connected together and dropped in along the hole wall (15), concurrently with the operation of excavating the pile hole for the cast-in-place pile; and the hole wall and the cylindrical pipes are firmly attached to one another by filling a gap between the hole wall and the cylindrical pipes with a filler (16). <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は場所打ち杭の孔壁を防護する方法に関する。   The present invention relates to a method for protecting a hole wall of a cast-in-place pile.

従来、場所打ち杭工法における孔壁防護方法として、かご状フレームとその外周面を覆うスキンプレートからなる筒状の土留め壁組立体を単位要素として複数段に渡って継ぎ足し、最下段のスキンプレートのみかご状フレームに接合した状態で、かご状フレームを荷重手段として所定深度まで地中に圧入し、スキンプレートのみ土留め壁として残してかご状フレームを撤去する工法が提案されている(例えば、特許文献1)。   Conventionally, as a hole wall protection method in the cast-in-place pile method, a cylindrical earth retaining wall assembly consisting of a cage frame and a skin plate covering its outer peripheral surface is added as a unit element over multiple stages, and the bottom skin plate A method has been proposed in which the cage frame is pressed into the ground to a predetermined depth as a load means while being joined to the cage frame, and the cage frame is removed leaving only the skin plate as a retaining wall (for example, Patent Document 1).


特開2006−125055号公報Japanese Patent Laid-Open No. 2006-125055

特許文献1の工法では、土留め壁を圧入するための大掛かりな荷重手段が必要となって作業が大掛かりになってしまう。また、長いスタンドパイプを揺動しながら圧入することも行われているが、重機が必要となり、軌道間の作業等では駅舎の屋根を一旦撤去する必要もあって施工が難しい。また、短いパイプを溶接しながら圧入する工法もあるが、溶接に時間がかかるとともに、圧入の際の反力をとるためのカウンタ・ウエイトが必要になり、カウンタ・ウエイトがとれない場合にはアンカを打って地盤から反力をとることも必要となり、作業が大がかりになってしまっていた。   In the construction method of Patent Document 1, a large load means for press-fitting the retaining wall is required, and the work becomes large. In addition, press-fitting is performed while swinging a long standpipe, but heavy machinery is required, and in the work between tracks, the construction of the station building is difficult because it is necessary to remove the roof once. Although there is a method of press-fitting while welding a short pipe, it takes time to weld, and a counterweight is required to take the reaction force during press-fitting. It was also necessary to take a reaction force from the ground by hitting the ground, and the work became large.

本発明は上記課題を解決しようとするものであり、場所打ち杭の杭孔掘削と同時並行に孔壁保護を行えるようにすることを目的とする。
本発明は、場所打ち杭の杭孔掘削作業と同時並行して、杭孔よりも小径で、掘削した部分の深さより短い、もしくは同等の長さの短い円筒管を複数繋ぎ合わせて孔壁に沿って落とし込み、孔壁と円筒管との隙間に充填材を充填して密着させることを特徴とする。
また、本発明は、地上の杭口元に配置した注入ノズルより充填材を注入し、充填材の自重で充填するようにしたことを特徴とする。
また、本発明は、前記充填材は作業現場から離れた箇所で練り上げられ、前記注入ノズルまで圧送されることを特徴とする。
また、本発明は、前記充填材はその粘性により前記円筒管の落とし込まれる動きに自重で追随し、円筒管と地山とを密着させることを特徴とする。
また、本発明は、円筒管と地山との隙間に充填材を充填させて地山への泥水の漏水を防止することを特徴とする。
また、本発明は、杭掘削泥水と充填材との水頭差により、充填材の充填速度を調整することを特徴とする。
また、本発明は、前記円筒管の先端部周囲に、充填材の逸出防止用シール材を取り付けたことを特徴とする。
また、本発明は、前記充填材に逸泥水防止剤を混ぜたことを特徴とする。
The present invention is intended to solve the above-described problems, and an object of the present invention is to enable hole wall protection in parallel with excavation of a cast-in-place pile hole.
In parallel with the pile hole excavation work of cast-in-place pile, the present invention connects a plurality of cylindrical pipes having a diameter smaller than that of the pile hole and shorter than the depth of the excavated portion or a short equivalent length to the hole wall. It drops along, and it fills with the filler in the clearance gap between a hole wall and a cylindrical tube, It is characterized by the above-mentioned.
In addition, the present invention is characterized in that a filler is injected from an injection nozzle arranged at the base of a pile on the ground and is filled with its own weight.
Further, the present invention is characterized in that the filler is kneaded away from a work site and is pumped to the injection nozzle.
Further, the present invention is characterized in that the filler follows the movement of the cylindrical tube dropped due to its viscosity by its own weight, and the cylindrical tube and the natural ground are brought into close contact with each other.
In addition, the present invention is characterized in that the gap between the cylindrical tube and the ground is filled with a filler to prevent muddy water from leaking into the ground.
Moreover, this invention adjusts the filling speed | rate of a filler by the water head difference of a pile excavation mud and a filler.
Further, the present invention is characterized in that a sealing material for preventing escape of the filler is attached around the tip of the cylindrical tube.
In addition, the present invention is characterized in that an anti-sludge agent is mixed in the filler.

本発明は、掘削と同時に、杭径よりも小径で、掘削した部分の深さより短い、もしくは同等の長さの円筒管を複数接続しながら孔壁に沿って落としこみ、孔壁と円筒管の間に液状の充填材を流し込むことで、孔壁と円筒管を密着させ、掘進と同時並行で孔壁を保護することができる。   At the same time as excavation, the present invention is to drop a pipe along a hole wall while connecting a plurality of cylindrical pipes having a diameter smaller than the pile diameter and shorter than the depth of the excavated portion or the same length. By pouring a liquid filler in between, the hole wall and the cylindrical tube can be brought into close contact with each other, and the hole wall can be protected simultaneously with the excavation.

杭孔掘削と孔壁防護の同時施工を説明する図である。It is a figure explaining simultaneous construction of pile hole excavation and hole wall protection. 孔壁防護を説明する図である。It is a figure explaining a hole wall protection. 円筒管先端部の充填材の逸出防止シールを説明する図である。It is a figure explaining the escape prevention seal | sticker of the filler of a cylindrical tube front-end | tip part.

以下、本発明の実施の形態について説明する。なお、以下では軌道間等駅舎の付近に場所打ち杭を施工する例について説明するが、本発明は施工場所に限定されるものではないことは言うまでもない。
図1は場所打ち杭を施工する際の孔壁防護方法の例を説明する図で、図1(a)は側断面図、図1(b)は掘削機とライナープレートを説明する上面図である。
駅ホーム3の付近で杭孔を掘削する場合、仮囲い5を設置して掘削機地上装置10からロッド11の先端部に取り付けた掘削ビット12を回転駆動して地山1を掘削する。本実施形態では掘削と同時並行で、杭孔よりも小径のライナープレートなどの鋼製の円筒管14を孔壁15に沿って落とし込む。円筒管14は鋼製に限定されるものではなく、例えば、鉄筋コンクリート製、コンクリート製、樹脂製、木製等を用いてもよく、現場の状況に応じて適宜選択して用いればよい。円筒管14は掘削した部分の深さより短い、もしくは同等の長さの管をボルト等で複数段繋ぎ合わせ、支持用治具13によりワイヤーで吊り下げて順次落とし込んでいく。このとき円筒管14は杭孔よりも小径のため自重により容易に落とし込むことができる。なお、図では円筒管を繋ぎ合わせて杭底まで施工する例を示しているが、杭底の方の地盤が硬くてしっかりしている場合は、円筒管は地盤の軟らかい杭孔の途中までだけ施工するようにしてもよい。円筒管14を落とし込むのに合わせて円筒管14と孔壁15との間にセメントミルク、セメントミルクにエアーを混ぜたもの、粘土に固化材または固化剤を混ぜたもの等からなる粘性のある充填材(裏込め材)16を地上の杭の口元に配置した注入ノズル(図示せず)から注入し、地下水圧に抗して自重により充填していく。なお、充填材16は作業現場から離れた位置で練り上げ、杭の口元に配置した注入ノズルまで圧送し、自動で注入するか、半自動(充填の状況を監視しながら作業員がノズルを開けたり閉めたりする)で注入してもよく、このようにすることで狭隘な作業現場であっても対応することができる。掘削機の掘削ビット12は伸縮機構付になっていて、ビットを伸ばした状態で掘削することで円筒管14よりも大径で削孔し、作業終了時にはビットを縮小させて円投管と接触せずに引き上げられるようになっている。
Embodiments of the present invention will be described below. In addition, although the example which constructs a cast-in-place pile in the vicinity of station buildings, such as between tracks, is demonstrated below, it cannot be overemphasized that this invention is not limited to a construction place.
FIG. 1 is a diagram for explaining an example of a hole wall protection method when constructing a cast-in-place pile. FIG. 1 (a) is a side sectional view, and FIG. 1 (b) is a top view for explaining an excavator and a liner plate. is there.
When excavating a pile hole in the vicinity of the station platform 3, the temporary enclosure 5 is installed and the excavator ground device 10 is rotated to drive the excavating bit 12 attached to the tip of the rod 11 to excavate the natural ground 1. In this embodiment, simultaneously with excavation, a steel cylindrical tube 14 such as a liner plate having a smaller diameter than the pile hole is dropped along the hole wall 15. The cylindrical tube 14 is not limited to steel, and may be made of, for example, reinforced concrete, concrete, resin, wood, or the like, and may be appropriately selected and used depending on the situation at the site. The cylindrical tube 14 is formed by connecting a plurality of stages of tubes having a length shorter than or equal to the depth of the excavated portion with bolts or the like, suspended by a support jig 13 with wires, and sequentially dropped. At this time, since the cylindrical tube 14 has a smaller diameter than the pile hole, it can be easily dropped by its own weight. In addition, the figure shows an example in which the cylindrical pipes are connected to the bottom of the pile, but if the ground toward the bottom of the pile is hard and solid, the cylindrical pipe is only halfway through the soft pile hole in the ground. You may make it construct. Viscous filling consisting of cement milk, cement milk mixed with air, clay mixed with solidifying material or solidifying agent, etc. between the cylindrical tube 14 and the hole wall 15 as the cylindrical tube 14 is dropped. A material (backing material) 16 is injected from an injection nozzle (not shown) arranged at the mouth of the pile on the ground, and filled with its own weight against groundwater pressure. The filler 16 is kneaded away from the work site and pumped to the injection nozzle placed at the mouth of the pile and injected automatically or semi-automatically (an operator opens or closes the nozzle while monitoring the filling status). In this way, even a narrow work site can be handled. The excavator's excavator bit 12 is provided with an expansion / contraction mechanism. By excavating with the bit extended, the excavator drills with a diameter larger than that of the cylindrical tube 14, and when the operation is completed, the bit is reduced to contact the circular pipe Can be raised without

図2は円筒管を落とし込んで充填材を充填した状態を示す図である。
複数段の円筒管14と孔壁15との間は充填材16により密着し、充填材は時間の経過とともに固化し、孔壁からの土圧は充填材を介して円筒管14で支持できるため、地層によらず孔壁防護が可能となる。また、充填材16は粘性があるため円筒管14の落とし込みの動きに自重で追随し、常に円筒管と孔壁を密着させて、地山からの地盤反力、せん断抵抗を作用させて円筒管と地盤を安定させることができる。また、杭孔内には所定水位の掘削泥水18があるが、充填材16の比重が大きいため、泥水位の管理を必要とせずに、杭の口元からの注入のみで充填することができる。また、充填材の充填速度は掘削泥水と充填材との水頭差で変化し、掘削泥水の水位を下げると充填速度は速くなり、掘削泥水の水位を上げると充填速度は遅くなるので、掘削泥水の水位により充填速度を調整することができる。また、充填材が低比重の場合は、掘削泥水の水位を下げることで充填させることができる。
FIG. 2 is a view showing a state in which the cylindrical tube is dropped and filled with a filler.
The multi-stage cylindrical tube 14 and the hole wall 15 are in close contact with the filler 16, the filler is solidified over time, and the earth pressure from the hole wall can be supported by the cylindrical tube 14 via the filler. Hole walls can be protected regardless of the formation. Further, since the filler 16 is viscous, it follows the movement of dropping of the cylindrical tube 14 by its own weight, and the cylindrical tube and the hole wall are always brought into close contact with each other, and the ground reaction force and shear resistance from the natural ground are applied to the cylindrical tube. And can stabilize the ground. Moreover, although the drilling mud 18 of a predetermined water level exists in a pile hole, since the specific gravity of the filler 16 is large, it can be filled only by injection | pouring from the mouth of a pile, without requiring management of a muddy water level. In addition, the filling rate of the filling material changes depending on the head difference between the drilling mud and the filling material.If the drilling mud water level is lowered, the filling rate becomes faster, and if the drilling mud water level is raised, the filling rate becomes slower. The filling speed can be adjusted by the water level. Further, when the filler has a low specific gravity, it can be filled by lowering the level of the drilling mud.

図3は複数段接続される先端の円筒管に付けたシール材を説明する断面図である。
1段目(先端)の円筒管12の底面周縁部に沿って、底面から孔壁に接するように延びて、先端部を上方へ折り曲げるようにして取り付けられた充填材の逸出防止用シール材20がボルトナット等により取り付けられる。シール材は、不織布、ブラシ、ゴム板、鋼板等、もしくはその組み合わせからなる。シール材の先端部は上方へ折り曲げられて孔壁に接するようにしているため、円筒管14の落とし込み時に孔壁に接した状態が維持され、比重の大きい充填材が下方へ逸出するのを防止する。また、掘削泥水の水位(泥水圧)を高くすることでも充填材が杭の下方へ逃げるのを防ぐことが可能である。また、充填材中に、パルプ、レーヨン、ロックウール、おがくず、線実絞りかす、クルミ殻などの目詰まりを起こす成分(逸泥水防止剤)を混ぜることで泥水が逸水して孔壁が崩れるのを防止することが可能である。
FIG. 3 is a cross-sectional view illustrating a sealing material attached to a cylindrical tube at the tip connected in a plurality of stages.
A sealing material for preventing escape of the filler attached along the peripheral edge of the bottom surface of the first-stage (front end) cylindrical tube 12 so as to contact the hole wall from the bottom surface and bend the front end portion upward. 20 is attached by a bolt nut or the like. A sealing material consists of a nonwoven fabric, a brush, a rubber plate, a steel plate, or a combination thereof. Since the tip of the sealing material is bent upward so as to be in contact with the hole wall, the state in contact with the hole wall is maintained when the cylindrical tube 14 is dropped, and the filler having a large specific gravity escapes downward. To prevent. It is also possible to prevent the filler from escaping below the pile by increasing the level of the drilling mud (mud pressure). In addition, muddy water is lost due to the clogging of ingredients that cause clogging such as pulp, rayon, rock wool, sawdust, wire-drawn scum, walnut shell, etc. It is possible to prevent this.

1…地山、3…駅ホーム、5…仮囲い、10…掘削機地上装置10、11…ロッド,12…掘削ビット、13…支持用治具、14…円筒管、15…孔壁、16…充填材、18…掘削泥水、20…シール材。 DESCRIPTION OF SYMBOLS 1 ... Ground mountain, 3 ... Station platform, 5 ... Temporary enclosure, 10 ... Excavator ground apparatus 10, 11 ... Rod, 12 ... Excavation bit, 13 ... Supporting jig, 14 ... Cylindrical tube, 15 ... Hole wall, 16 ... filler, 18 ... drilling mud, 20 ... sealing material.

Claims (8)

場所打ち杭の杭孔掘削作業と同時並行して、杭孔よりも小径で、掘削した部分の深さより短い、もしくは同等の長さの短い円筒管を複数繋ぎ合わせて孔壁に沿って落とし込み、孔壁と円筒管との隙間に充填材を充填して密着させることを特徴とする杭孔壁防護方法。 Simultaneously with the drilling work of the cast-in-place pile, in parallel with the hole wall, a plurality of cylindrical pipes that are smaller in diameter than the pile hole and shorter than the depth of the excavated part or short of the equivalent length are connected together, A pile hole wall protection method characterized by filling a gap between a hole wall and a cylindrical tube with a filler. 地上の杭口元に配置した注入ノズルより充填材を注入し、充填材の自重で充填するようにしたことを特徴とする請求項1記載の杭孔壁防護方法。 2. The pile hole wall protection method according to claim 1, wherein a filler is injected from an injection nozzle disposed at a pile head on the ground and is filled with its own weight. 前記充填材は作業現場から離れた箇所で練り上げられ、前記注入ノズルまで圧送されることを特徴とする請求項2記載の杭孔壁防護方法。 3. The pile hole wall protection method according to claim 2, wherein the filler is kneaded at a location away from a work site and pumped to the injection nozzle. 前記充填材はその粘性により前記円筒管の落とし込まれる動きに自重で追随し、円筒管と地山とを密着させることを特徴とする請求項1記載の杭孔壁防護方法。 2. The pile hole wall protection method according to claim 1, wherein the filler follows the movement of the cylindrical tube dropped due to its viscosity by its own weight, and the cylindrical tube and the ground are brought into close contact with each other. 円筒管と地山との隙間に充填材を充填させて地山への泥水の漏水を防止することを特徴とする請求項1記載の杭孔壁防護方法。 2. The pile hole wall protection method according to claim 1, wherein the gap between the cylindrical tube and the natural ground is filled with a filler to prevent muddy water from leaking into the natural ground. 杭掘削泥水と充填材との水頭差により、充填材の充填速度を調整することを特徴とする請求項1記載の杭孔壁防護方法。 The pile hole wall protection method according to claim 1, wherein a filling speed of the filler is adjusted by a head difference between the pile excavation mud and the filler. 前記円筒管の先端部周囲に、充填材の逸出防止用シール材を取り付けたことを特徴とする請求項1記載の杭孔壁防護方法。 2. The pile hole wall protection method according to claim 1, wherein a sealing material for preventing escape of the filler is attached around the tip of the cylindrical tube. 前記充填材に逸泥水防止剤を混ぜたことを特徴とする請求項1記載の杭孔壁防護方法。 The pile hole wall protection method according to claim 1, wherein an anti-sludge agent is mixed in the filler.
JP2009096628A 2009-04-13 2009-04-13 Pile hole wall protection method Active JP5308895B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009096628A JP5308895B2 (en) 2009-04-13 2009-04-13 Pile hole wall protection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009096628A JP5308895B2 (en) 2009-04-13 2009-04-13 Pile hole wall protection method

Publications (2)

Publication Number Publication Date
JP2010248714A true JP2010248714A (en) 2010-11-04
JP5308895B2 JP5308895B2 (en) 2013-10-09

Family

ID=43311347

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009096628A Active JP5308895B2 (en) 2009-04-13 2009-04-13 Pile hole wall protection method

Country Status (1)

Country Link
JP (1) JP5308895B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012017581A (en) * 2010-07-07 2012-01-26 East Japan Railway Co Pile hole wall protection method
JP2012255289A (en) * 2011-06-08 2012-12-27 East Japan Railway Co Seal device of drilling hole wall protective pipe
CN115434308A (en) * 2022-10-19 2022-12-06 陕西正诚路桥工程研究院有限公司 Method for reducing negative friction resistance in backfill area of cast-in-situ bored pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04302693A (en) * 1991-03-29 1992-10-26 Mitsubishi Materials Corp Excavating engineering method
JPH06146771A (en) * 1992-11-11 1994-05-27 Nippon Steel Corp Construction method for shaft
JP2000248547A (en) * 1999-02-26 2000-09-12 Nippon Steel Corp Rotary press-in pile tip member, rotary press-in pile boring member, rotary press-in pile and execution work method of rotary press-in pile
JP2006336241A (en) * 2005-05-31 2006-12-14 Ohbayashi Corp Pile construction method and pile construction system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04302693A (en) * 1991-03-29 1992-10-26 Mitsubishi Materials Corp Excavating engineering method
JPH06146771A (en) * 1992-11-11 1994-05-27 Nippon Steel Corp Construction method for shaft
JP2000248547A (en) * 1999-02-26 2000-09-12 Nippon Steel Corp Rotary press-in pile tip member, rotary press-in pile boring member, rotary press-in pile and execution work method of rotary press-in pile
JP2006336241A (en) * 2005-05-31 2006-12-14 Ohbayashi Corp Pile construction method and pile construction system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012017581A (en) * 2010-07-07 2012-01-26 East Japan Railway Co Pile hole wall protection method
JP2012255289A (en) * 2011-06-08 2012-12-27 East Japan Railway Co Seal device of drilling hole wall protective pipe
CN115434308A (en) * 2022-10-19 2022-12-06 陕西正诚路桥工程研究院有限公司 Method for reducing negative friction resistance in backfill area of cast-in-situ bored pile

Also Published As

Publication number Publication date
JP5308895B2 (en) 2013-10-09

Similar Documents

Publication Publication Date Title
JP5339498B2 (en) Method of fixing shear reinforcement
JP5990214B2 (en) Reinforcement method of hole wall in construction method of cast-in-place concrete pile.
JP2007126846A (en) Reinforcing cage, construction method for cast-in-place concrete pile, and cast-in-place concrete pile
JP2009036010A (en) Method of building subsidence prevention pile and subsidence prevention pile
JP5308895B2 (en) Pile hole wall protection method
JP4593577B2 (en) Pneumatic caisson and its construction method
JP6319935B2 (en) Tubing pile driving method
JP4863120B2 (en) Foundation pile
KR100963880B1 (en) Excavating method for underground plaza using steel casing retaining wall
JP3940764B2 (en) Drain pipe method and ground drilling device
JP6336850B2 (en) Pile head reinforcement method for foundation pile
JP5523959B2 (en) Pile hole wall protection method
JPH08184058A (en) Landslide protection construction
JP4888293B2 (en) Earth retaining wall made of parent pile sheet pile, water stop structure of earth retaining wall made of parent pile side sheet pile, construction method of earth retaining wall made of parent pile side sheet pile, and retaining wall of earth retaining wall made of parent pile side sheet pile Water method
JP4311676B2 (en) Construction method using casing
JP6319942B2 (en) Steel pipe sheet pile press-in method and pipes
JP2005127095A (en) Open ended steel pipe pile for rotatingly jacking and rotatingly jacking method for open ended steel pipe pile
JP5463043B2 (en) Method for reinforcing concrete structures
JP2008223337A (en) Foundation pile construction method, and washing device of hollow pile inner peripheral wall used in construction method
JP6837364B2 (en) How to repair the culvert drainage pipe confluence drainage mass
JP6216526B2 (en) Steel pipe head attachment
JP2002138474A (en) Method and device for cutting and pulling out existing pile
JP5857555B2 (en) Water stop method for steel sheet pile joints
JP7191327B2 (en) How to remove steel pipe piles
JP2011043047A (en) Improved/reinforced structure of existing gravity type quay

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120301

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130215

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130409

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130614

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130701

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5308895

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250