JP2010066249A - Simplification method for survey map - Google Patents

Simplification method for survey map Download PDF

Info

Publication number
JP2010066249A
JP2010066249A JP2008270322A JP2008270322A JP2010066249A JP 2010066249 A JP2010066249 A JP 2010066249A JP 2008270322 A JP2008270322 A JP 2008270322A JP 2008270322 A JP2008270322 A JP 2008270322A JP 2010066249 A JP2010066249 A JP 2010066249A
Authority
JP
Japan
Prior art keywords
field
spot
height
survey
sectional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2008270322A
Other languages
Japanese (ja)
Inventor
Masuo Omae
益男 大前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2008270322A priority Critical patent/JP2010066249A/en
Publication of JP2010066249A publication Critical patent/JP2010066249A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Processing Or Creating Images (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a drawing method of a survey result when an engineer performs a field work in the field. <P>SOLUTION: In a longitudinal/cross-sectional survey, description on a level book (field notebook) is performed. As a desk work, map drawing is started. In order to acquire a drawing from the field notebook of the field work, first of all, a ground height of a reference point is to be known. The spot is required for starting survey, and when seeing-through by a level in the first place, the spot is used for erecting a staff (box scale) thereon and reading a gage rod on the staff for a start. This operation is called as backsight (BS), and an instrument height is calculated at that time. When the instrument height is known, it is illustrated and decided on a longitudinal section view or on a cross-sectional view as one height standard, and then a figure of foresight of the survey result is read from the field notebook based on the reference line, and downward plotting is performed by a scale from the reference line, to thereby determine the ground height of the spot. A longitudinal/cross-sectional view can be acquired by connecting each point on the determined spot. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

発明の詳細な説明Detailed Description of the Invention

外業における野帳の製作は、水準儀を据え付けて、始点の地盤高のわかっている所にスタフを立て、その読みをとり、(後視)を、のちに、次の地点の所へスタフを立て読みをとる(前視)そして読みを野帳え記入する。また測量の範囲が水準儀の読み取りに限界を越えた場合器械を据え治すのであるが据え治す所で

Figure 2010066249
を読み、後に、スタフを次地点の所へ立てスタフの読みをとり前視とし、測量作業を順次進めていく。やがて外業が終ると、内業にかかるのであるが、図面作成の段階で、野帳の計算において、測点の地盤高が解って居れば、それに後視を加えて、器械高として、これを基としてこの器械高を、図面上に、線を引き、測点2 3、4、5を図上にプロットして各測点の高さが決まれば、後は測点の標高をつなげて行けば、図面は作成される。又、器械高の線から、前視を、スケールで下方へ図示すれば、求める測点地盤高は求められる。この様な、図面の作成は、計算を省き、かつ正確なる地盤高が製図できる。In the field work in the outside business, the standard is installed, the staff is set up at a place where the ground height of the starting point is known, the reading is taken, (back-viewing), and then the staff is moved to the next place. Take a reading (foresight) and fill in the field. In addition, when the range of surveying exceeds the limit of level reading, the instrument is fixed.
Figure 2010066249
Afterwards, the stuff is placed at the next point and the stuff is read as a foresight, and the surveying work proceeds in sequence. Eventually, when the outside business is over, it will take on the internal business, but at the stage of drawing creation, if the ground height of the station is known in the calculation of the field book, add the backsight to it and add this as the instrument height. Based on this, draw the line on the drawing, plot the measurement points 2, 3, 4 and 5 on the drawing to determine the height of each measurement point, then connect the elevations of the measurement points. If you go, the drawing will be created. Moreover, if the foresight is illustrated downward on a scale from the line of the instrument height, the required ground height can be obtained. The creation of such a drawing eliminates the calculation and can produce an accurate ground height.

図面は、
この発明の実施例を第1図外業、 第2図内業とを説明して、示したものである。
The drawing
An embodiment of this invention is shown in FIG. FIG. 2 illustrates and shows the internal business.

Claims (1)

測量学に於ける水準測量は縱断測量と横断測量とに分れ、外業と内業としがある。外業である野外測量は、実測値を野帳に記入する。
内業は、記入された地盤高を図面化するのであるが、新しい方法は図化するのに、野帳を計算をはぶき、かつ正確なる地盤高を得て製図を仕上げるものである。
Leveling in surveying is divided into diagnostic surveying and cross-sectional surveying. For field surveying, which is an outside business, the actual values are entered in a field book.
In-house work is drawing the ground height that has been entered, but the new method is to create a map with the calculation of the field book and to obtain a precise ground height to make the drawing.
JP2008270322A 2008-09-08 2008-09-08 Simplification method for survey map Pending JP2010066249A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008270322A JP2010066249A (en) 2008-09-08 2008-09-08 Simplification method for survey map

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008270322A JP2010066249A (en) 2008-09-08 2008-09-08 Simplification method for survey map

Publications (1)

Publication Number Publication Date
JP2010066249A true JP2010066249A (en) 2010-03-25

Family

ID=42191945

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008270322A Pending JP2010066249A (en) 2008-09-08 2008-09-08 Simplification method for survey map

Country Status (1)

Country Link
JP (1) JP2010066249A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109751983A (en) * 2019-03-05 2019-05-14 淮南矿业(集团)有限责任公司 A method of emergency, which is surveyed, sets laser data and transmitting point height

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10332362A (en) * 1997-05-29 1998-12-18 Fukuzawa Kensetsu Kk Shape data computing device for building structure
JP2000081333A (en) * 1998-07-03 2000-03-21 Geographical Inst Japan Moc Verticality detection output device, measuring point indicating unit and surveying equipment
JP2001091255A (en) * 1999-07-19 2001-04-06 Topcon Corp Electronic level and focusing control method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10332362A (en) * 1997-05-29 1998-12-18 Fukuzawa Kensetsu Kk Shape data computing device for building structure
JP2000081333A (en) * 1998-07-03 2000-03-21 Geographical Inst Japan Moc Verticality detection output device, measuring point indicating unit and surveying equipment
JP2001091255A (en) * 1999-07-19 2001-04-06 Topcon Corp Electronic level and focusing control method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109751983A (en) * 2019-03-05 2019-05-14 淮南矿业(集团)有限责任公司 A method of emergency, which is surveyed, sets laser data and transmitting point height

Similar Documents

Publication Publication Date Title
EP2687817A3 (en) Method of correlating images with terrain elevation maps for navigation
EP2393076A3 (en) Navigable topological maps
ATE549645T1 (en) VH RESERVOIR ILLUSTRATION
CN103196417B (en) Method for performing shaft orientation measurement by adopting double-connection triangle
EP1672314A3 (en) Method for preparing a stereo image and three-dimensional data preparation system
JP2010128898A (en) Content position estimating device
CN103472472A (en) Navigation positioning method and navigation positioning apparatus
EP3910289A3 (en) Method, apparatus, device and medium for calibrating temperature drift
CN105547241A (en) A measuring method of a receiver provided with laser range finders
Jaud et al. Adequacy of pseudo-direct georeferencing of terrestrial laser scanning data for coastal landscape surveying against indirect georeferencing
JP5857508B2 (en) How to calculate construction error
CN109085656B (en) Feature-oriented high-precision gravity graph construction and interpolation method
JP2010066249A (en) Simplification method for survey map
CN103400498A (en) Accident spot map generation method based on electronic map and data acquisition system
JP2010151757A (en) Survey method using total station
RU2011103117A (en) METHOD FOR TRANSFORMING AND VISUALIZING ELECTROMAGNETIC EXPLORATION DATA FOR UNDERWATER HYDROCARBON RESERVOIRS
CN105806264B (en) A kind of method for measuring profound coaxiality of inner hole
Ampatzidis et al. The connection of an old geodetic datum with a new one using Least Squares Collocation: The Greek case
CN103853882A (en) Drawing method and system for engineering geological profile
Alfredsson et al. HMK–Swedish handbook in surveying and mapping
US10393625B2 (en) Method and device for generating allowed input data trajectories for a testing system
CN103148844B (en) A kind of take total powerstation as the forest land sample trees repositioning method of instrument
Bajtala et al. The reliability of parcel area
CN103542836B (en) A kind of method measuring control point settlement deformation of subway station
ES1135017U (en) Measuring instrument for determining an anatomical measuring point

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110913

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20120131