JP2009287174A - Fence or handrail structure - Google Patents

Fence or handrail structure Download PDF

Info

Publication number
JP2009287174A
JP2009287174A JP2008137557A JP2008137557A JP2009287174A JP 2009287174 A JP2009287174 A JP 2009287174A JP 2008137557 A JP2008137557 A JP 2008137557A JP 2008137557 A JP2008137557 A JP 2008137557A JP 2009287174 A JP2009287174 A JP 2009287174A
Authority
JP
Japan
Prior art keywords
column
fence
divided
unit
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008137557A
Other languages
Japanese (ja)
Other versions
JP5095502B2 (en
Inventor
Atsushi Abe
淳 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AKITO KK
Original Assignee
AKITO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AKITO KK filed Critical AKITO KK
Priority to JP2008137557A priority Critical patent/JP5095502B2/en
Publication of JP2009287174A publication Critical patent/JP2009287174A/en
Application granted granted Critical
Publication of JP5095502B2 publication Critical patent/JP5095502B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a fence or handrail structure capable of facilitating assembly and construction (installation), achieving excellent appearance and design, and facilitating replacement per unit. <P>SOLUTION: This fence structure is composed of core materials 2 for column erected at the predetermined interval on a construction face in advance and a unit member 3 whose four sides are framed by divided support column members 4, 5 arranged in both of side parts and horizontal members 6, 7 arranged in upper and lower parts, respectively. By dropping half-frame parts 4A, 5A of the unit member 3 into the core materials 2 for column from above, the divided support column members 4, 5 are engaged with the core materials 2 for column to attach the unit member 3. A pair of divided support column members 4, 5 surrounding the core materials 2 for column are mutually combined to constitute a support column 9 and are not directly and mutually engaged. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、区画境界や敷地境界を仕切ったり、マンション、ビルなどの構造物における落下防止設備として設置されるフェンス構造又は通路、屋上、階段、バルコニーなどに設置される手摺り構造に関する。   The present invention relates to a fence structure or a handrail structure installed on a passage, a roof, a staircase, a balcony, or the like that partitions partition boundaries or site boundaries, or is installed as a fall prevention facility in a structure such as an apartment or building.

従来より、例えば区画境界や敷地境界を仕切る柵やマンション、ビルなどの構造物における落下防止柵等として種々のフェンス構造が提案されている。   Conventionally, various fence structures have been proposed as, for example, a fence that partitions a partition boundary or a site boundary, or a fall prevention fence in a structure such as a condominium or a building.

例えば、下記特許文献1では、地面から立設された柱材と、この柱材に支持されたフェンスユニットとからなるフェンス構造が提案されている。前記フェンスユニットは、上下の横枠材および左右の縦枠材を四周枠組みした枠体と、この枠体の一方の側面に面材としてパンチングメタルを備えて構成され、施工に当たっては、前記柱材を所定間隔で立設し、柱材の一方面側に前記フェンスユニットを順次、固定する。   For example, Patent Document 1 below proposes a fence structure including a pillar material standing from the ground and a fence unit supported by the pillar material. The fence unit is configured to include a frame body in which four upper and lower horizontal frame members and left and right vertical frame members are framed, and a punching metal as a face material on one side surface of the frame body. Are installed at predetermined intervals, and the fence units are sequentially fixed to one side of the column member.

また、下記特許文献2では、互いに係合部で係合させられることにより一つの支柱となる分割支柱材を、係合部を互いに相手の係合部と係合する方向に向けて所定の間隔に保ち、両分割支柱材の上下間に夫々横材を渡設するとともに、これによって囲われた空間内に立子或いはパネルを取り付けて一ユニットを構成し、かくして構成したユニットの複数を、相係合する分割支柱材で一つの支柱が形成されるように組み立てて連結し、組立てられた支柱にはキャップを被せ、或いはバンドで回りから締めるとともにその支柱を施工面に建ててなるフェンス構造が提案されている。
特開2005−226265号公報 特開昭49−19643号公報
Further, in Patent Document 2 below, the divided strut materials that become one strut by being engaged with each other by the engaging portion are arranged at a predetermined interval in a direction in which the engaging portion is engaged with the mating engaging portion. The horizontal members are placed between the upper and lower parts of both divided struts, and a stand or panel is attached in the space enclosed thereby to constitute one unit. Assembling and connecting so that one strut is formed with split strut materials to be combined, a cap structure is put on the assembled strut, or a fence structure in which the strut is built on the construction surface while tightening from around with a band is proposed Has been.
JP 2005-226265 A Japanese Patent Laid-Open No. 49-19643

しかしながら、前記特許文献1に係るフェンス構造の場合は、柱材の片面側にフェンスユニットを順次固定していくものであるため、外観・意匠性に乏しいとともに、フェンスの幅(厚み)寸法が大きくなってしまう。また、柱材に対するフェンスユニットの固定作業に多くの手間と時間を要するなどの問題があった。   However, in the case of the fence structure according to Patent Document 1, since the fence unit is sequentially fixed to one side of the pillar material, the appearance and design are poor, and the width (thickness) dimension of the fence is large. turn into. In addition, there is a problem that much work and time are required for fixing the fence unit to the pillar material.

これに対して、前記特許文献2記載のフェンス構造の場合は、ユニットの両側に備えられた分割支柱材を互いに組み合せて支柱材を構成するものであり、外観・意匠性に優れるとともに、フェンスの幅(厚み)寸法も小さくできるなどの利点を有する。しかしながら、施工に当たっては、地面や床面等に寝かせながら長手方向に複数のユニットを組立てたならば、分割支柱材が分割するのを防止するため、キャップを被せたり、バンドで締め付けたりした後、施工面に建て込む必要があるため、建込み作業に当たって、組立て作業に多くの手間と時間が掛かるとともに、建込みに複数の作業員を必要とするなどの問題があった。   On the other hand, in the case of the fence structure described in Patent Document 2, the strut material is configured by combining the divided strut materials provided on both sides of the unit, and is excellent in appearance and design properties. This has the advantage that the width (thickness) can be reduced. However, in construction, if you assemble multiple units in the longitudinal direction while lying on the ground or floor, etc., to prevent the split strut material from splitting, after covering with a cap or tightening with a band, Since it is necessary to build in the construction surface, there are problems such as a lot of labor and time for the assembling work and the construction work requiring a plurality of workers.

また、分割支柱材同士を水平方向から噛み合わせるようにして結合する構造であるため、仮に一つのユニットに損傷が発生し、交換を余儀なくされた場合、一つのユニットのみを交換することが実質的に困難であるか、大掛かりな工事になってしまうなどの問題もあった。   In addition, because the structure is such that the divided strut members are joined together in the horizontal direction, if one unit is damaged and must be replaced, it is practical to replace only one unit. There are also problems such as being difficult or large construction.

そこで本発明の主たる課題は、組立ておよび施工(建込み)が容易で、かつ外観・意匠性に優れるとともに、ユニット単位の交換が簡易に行えるようにしたフェンス又は手摺り構造を提供することにある。   Therefore, a main problem of the present invention is to provide a fence or a handrail structure that is easy to assemble and construct (build), is excellent in appearance and design, and can be easily replaced in units. .

前記課題を解決するために請求項1に係る本発明として、施工面上に予め所定間隔で立設される柱用芯材と、両側部に配置された分割支柱材および上下部に配置された横材によって四周が枠組みされ、枠組内部にパネル又は複数の桟材が配置されたユニット材とから成るフェンス又は手摺り構造であって、
前記ユニット材の分割支柱材は、断面視で前記柱用芯材の略片側半分を囲む半枠部を有するとともに、該半枠部の両端部に夫々、前記柱用芯材に対する係合部を有し、前記柱用芯材は前記係合部に対応する部位に被係合部を有し、上方側から前記ユニット材の半枠部を柱用芯材に落とし込むことにより、前記分割支柱材を柱用芯材に係合させて前記ユニット材の取付けが行われ、前記柱用芯材を囲む一対の分割支柱材の組合せによって支柱が構成されているとともに、前記分割支柱材同士は直接的に係合していないことを特徴とするフェンス又は手摺り構造が提供される。
In order to solve the above-mentioned problem, as the present invention according to claim 1, the pillar core material erected in advance at a predetermined interval on the construction surface, the divided strut material arranged on both sides, and the upper and lower parts. A fence or handrail structure consisting of a unit material in which four sides are framed by a cross member and a panel or a plurality of crosspieces are arranged inside the frame,
The unit material split strut member has a half frame portion that encloses substantially one half of the pillar core member in a cross-sectional view, and an engagement portion for the pillar core member at each end of the half frame portion. The column core material has an engaged portion at a portion corresponding to the engagement portion, and the half-frame portion of the unit material is dropped into the column core material from above, whereby the divided strut material Is attached to the core material for the column, and the unit material is attached. The column is constituted by a combination of a pair of divided support materials surrounding the core material for the column. A fence or handrail structure is provided which is characterized by not being engaged.

上記請求項1記載の発明は、施工面上に予め所定間隔で立設される柱用芯材と、両側部に配置された分割支柱材および上下部に配置された横材によって四周が枠組みされ、枠組内部にパネル又は複数の桟材が配置されたユニット材とから成り、前記ユニット材の分割支柱材は、断面視で前記柱用芯材の略片側半分を囲む半枠部を有するとともに、該半枠部の両端部に夫々、前記柱用芯材に対する係合部を有し、前記柱用芯材は設置状態で前記係合部に対応する部位に被係合部を有する構造とする。そして、施工に当たっては、上方側から前記ユニット材の半枠部を柱用芯材に落とし込むことにより、前記分割支柱材を柱用芯材に係合させて前記ユニット材の取付けが行われる。設置完了状態では、前記柱用芯材を囲む一対の分割支柱材の組合せによって支柱が構成されているとともに、前記分割支柱材同士は直接的に係合していない構造となっている。   In the first aspect of the present invention, the four circumferences are framed by the pillar core members that are erected on the construction surface at predetermined intervals in advance, the divided strut members disposed on both sides, and the cross members disposed on the upper and lower portions. In addition, a unit material in which a panel or a plurality of crosspieces are arranged inside the frame, the divided support material of the unit material has a half frame part that surrounds a substantially half on one side of the pillar core material in a sectional view, Each half frame portion has an engaging portion with respect to the pillar core member, and the pillar core member has an engaged portion at a portion corresponding to the engaging portion in the installed state. . In construction, the half-frame portion of the unit material is dropped into the pillar core material from above, so that the divided pillar material is engaged with the pillar core material and the unit material is attached. In the installation completion state, the strut is configured by a combination of a pair of split strut members surrounding the pillar core member, and the split strut members are not directly engaged with each other.

従って、ユニットの両側に備えられた分割支柱材を互いに組合せて支柱材を構成するものであり、外観・意匠性に優れるとともに、フェンスの幅(厚み)寸法も小さくできるなどの利点を有する。また、柱用芯材を施工面上に予め所定間隔で立設し、これを支持材としてユニット材を落とし込みによって設置するようにしたため、組立ておよび施工が非常に容易となる。前記分割支柱材同士は直接的に係合しておらず、柱用芯材を介して単一の支柱材を構成するようにしてあるため、仮に一つのユニットに損傷が発生し、交換を余儀なくされた場合でも、当該損傷したユニットのみを上方に引き上げて簡単に撤去でき、かつ新規のユニット材を落とし込みによって簡単に設置できるようになる。さらに、前記柱用芯材を囲むようにユニットの分割支柱材が組み合わされ、単一の支柱材を構成するようになっているため、支柱材が破損した場合も容易に交換が可能である。   Therefore, the divided strut members provided on both sides of the unit are combined with each other to form the strut material, and it has advantages such as excellent appearance and design and reducing the width (thickness) dimension of the fence. In addition, since the column core is erected on the construction surface at a predetermined interval in advance and the unit material is installed by dropping it as a support material, the assembly and construction become very easy. The split strut members are not directly engaged with each other, and a single strut member is formed via a pillar core member. Therefore, if one unit is damaged, it must be replaced. Even in such a case, only the damaged unit can be lifted upward and removed easily, and a new unit material can be easily installed by dropping. Furthermore, since the divided strut members of the unit are combined so as to surround the core material for pillars to constitute a single strut material, it can be easily replaced even when the strut material is damaged.

一方、本フェンス又は手摺り構造では、ユニット材の枠組み内部にパネル又は複数の桟材(縦桟、横桟、ルーバー等)を組み込んで種々の形式を採用可能とするものであり、設計当初にパネル形式、縦格子形式、横格子形式、ルーバー形式等に任意に選択可能であるとともに、これら形式の組合せとすることも可能である。また、経年後の形式変更にも容易に対応可能となる。   On the other hand, this fence or handrail structure incorporates a panel or a plurality of crosspieces (vertical crosspieces, horizontal crosspieces, louvers, etc.) inside the frame of the unit material so that various types can be adopted. A panel format, a vertical grid format, a horizontal grid format, a louver format, and the like can be arbitrarily selected, and a combination of these formats is also possible. In addition, it is possible to easily cope with format changes after aging.

請求項2に係る本発明として、前記上部側横材の上面に長手通しの笠木部材を配設してある請求項1記載のフェンス又は手摺り構造が提供される。   According to a second aspect of the present invention, there is provided a fence or a handrail structure according to the first aspect, wherein a longitudinal through-head member is disposed on the upper surface of the upper side cross member.

上記請求項2記載の発明は、外観・意匠性を向上させるため、或いは手摺り材として、前記上部側横材の上面に長手通しの笠木部材を配設するようにしたものである。   According to the second aspect of the present invention, in order to improve the appearance and design, or as a handrail material, a longitudinal through-head member is disposed on the upper surface of the upper side cross member.

請求項3に係る本発明として、前記柱用芯材を囲む一対の分割支柱材の縦目地間に固形シール材を挟入してある請求項1、2いずれかに記載のフェンス又は手摺り構造が提供される。   A fence or a handrail structure according to any one of claims 1 and 2, wherein a solid sealing material is interposed between vertical joints of a pair of divided support columns surrounding the pillar core material as the present invention according to claim 3. Is provided.

上記請求項3記載の発明は、分割支柱材間の縦目地の隙間を封止するため、柱用芯材を囲む一対の分割支柱材の間に固形シール材を挟入するようにしたものである。   The invention described in claim 3 is configured such that a solid sealing material is inserted between a pair of divided strut members surrounding a column core material in order to seal a gap in a vertical joint between the divided strut members. is there.

以上詳説のとおり本発明によれば、組立ておよび施工(建込み)が容易で、かつ外観・意匠性に優れるとともに、ユニット単位の交換が簡易に行えるようになる。   As described above in detail, according to the present invention, assembly and construction (building) are easy, the appearance and design are excellent, and the unit unit can be easily replaced.

以下、本発明の実施の形態について図面を参照しながら詳述する。
図1は本発明に係るフェンス構造1の正面図、図2はその斜視図、図3は図1のIII−III線矢視図、図4は図1のIV−IV線矢視図である。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
1 is a front view of a fence structure 1 according to the present invention, FIG. 2 is a perspective view thereof, FIG. 3 is a view taken along line III-III in FIG. 1, and FIG. 4 is a view taken along line IV-IV in FIG. .

フェンス構造1は、図1に示されるように、施工面上に予め所定間隔で立設される柱用芯材2,2…と、これら柱用芯材2,2…によって支持されたユニット材3,3…とから成る。また、前記ユニット材3の上部側横材5の上面には長手通しの笠木部材8が配設されている。   As shown in FIG. 1, the fence structure 1 includes pillar core members 2, 2... Standing on a construction surface in advance at predetermined intervals, and unit members supported by the pillar core members 2, 2. It consists of three, three ... A longitudinal through-head member 8 is disposed on the upper surface of the upper side member 5 of the unit member 3.

前記ユニット材3は、詳細には図5〜図7に示されるように、両側部に配置された分割支柱材4、5と、上下部に配置された横材6,7とによって四周が枠組みされ、枠組内部にパネルP(又は後述する複数の桟材)が配置されたもので、基本的には工場製作され現場に搬入される。   As shown in detail in FIG. 5 to FIG. 7, the unit material 3 has a four-side frame by divided strut members 4 and 5 disposed on both sides and cross members 6 and 7 disposed on the upper and lower portions. A panel P (or a plurality of crosspieces to be described later) is arranged inside the framework. Basically, it is manufactured in a factory and carried to the site.

前記分割支柱材4は、押出し成型されたアルミ形材とされ、図7に示されるように、断面視で前記柱用芯材2の略片側半分を囲む略溝型形状の半枠部4Aを有するとともに、該半枠部4Aの両端部に夫々、前記柱用芯材2に対する係合部4a、4bを有する。また、前記半枠部4Aに隣接する前側位置に、内方側に開口溝を向けた断面略コ字状のパネル嵌合溝部4Bを備えている。さらに、前記半枠部4Aの内部には組立て用ビスポケット10が2箇所設けられている。   The split strut material 4 is an extruded aluminum shape, and as shown in FIG. 7, a substantially groove-shaped half-frame portion 4A surrounding a substantially half on one side of the pillar core material 2 in a cross-sectional view. And have engaging portions 4a and 4b for the pillar core member 2 at both ends of the half frame portion 4A. Further, a panel fitting groove 4B having a substantially U-shaped cross section with an opening groove facing inward is provided at a front position adjacent to the half frame 4A. Further, two assembly screw pockets 10 are provided in the half frame portion 4A.

一方の分割支柱材5も同様に、押出し成型されたアルミ形材とされ、図7に示されるように、断面視で前記柱用芯材2の略片側半分を囲む略溝型形状の半枠部5Aを有するとともに、該半枠部5Aの両端部に夫々、前記柱用芯材2に対する係合部5a、5bを有する。また、前記半枠部5Aに隣接する前側位置に、内方側に開口溝を向けた断面略コ字状のパネル嵌合溝部5Bを備えている。さらに、前記半枠部5Aの内部には組立て用ビスポケット10が2箇所設けられている。   Similarly, one of the divided strut members 5 is an extruded aluminum shape, and as shown in FIG. 7, a substantially groove-shaped half-frame surrounding the substantially half on one side of the pillar core member 2 in a sectional view. In addition to having a portion 5A, both end portions of the half frame portion 5A have engaging portions 5a and 5b for the pillar core material 2, respectively. In addition, a panel fitting groove portion 5B having a substantially U-shaped cross section with an opening groove facing inward is provided at a front side position adjacent to the half frame portion 5A. Further, two assembly screw pockets 10 are provided in the half frame portion 5A.

前記上部側横材6は、同じく押出し成型されたアルミ形材とされ、図6に示されるように、前記分割支柱材4、5の半枠部4A、5Aに対応する部分に平板状の天板部6Aを有し、この天板部6Aに隣接する前側位置に、内方側に開口溝を向けた断面略コ字状のパネル嵌合溝部6Bを備えている。また、前記天板部6Aに形成された長孔6a、6a…は後述の笠木部材8を固定するためのボルト孔である。   The upper side member 6 is an extruded aluminum member, and as shown in FIG. 6, a flat plate-like ceiling member is formed at a portion corresponding to the half-frame portions 4A and 5A of the divided strut members 4 and 5. A panel fitting groove portion 6B having a plate portion 6A and having a substantially U-shaped cross section with an opening groove facing inward is provided at a front side position adjacent to the top plate portion 6A. Further, the long holes 6a, 6a,... Formed in the top plate portion 6A are bolt holes for fixing a head member 8 described later.

前記下部側横材7も同じく押出し成型されたアルミ形材とされ、矩形状中空部7Aに隣接する前側位置に、内方側に開口溝を向けた断面略コ字状のパネル嵌合溝部7Bを備えている。また、前記矩形状中空部7Aの内部には組立て用ビスポケット10が2箇所設けられている。   The lower side member 7 is also an extruded aluminum shape, and a panel fitting groove portion 7B having a substantially U-shaped cross section with an opening groove facing inward at a front position adjacent to the rectangular hollow portion 7A. It has. Further, two assembly screw pockets 10 are provided inside the rectangular hollow portion 7A.

前記分割支柱材4,5及び横材6,7によって四周が枠組みされ、前記パネル嵌合溝4A、5B、6B、7Bが周方向に沿って連続形成され、このパネル嵌合溝4A、5B、6B、7Bにグレチャン11が嵌合されるとともに、このグレチャン11によってパネルPが嵌合支持され、ユニット材3が構成されている。なお、図示例では、図5に示されるように、分割支柱材4,5の下端部が下部側横材7よりも若干突出し、脚部17を有するように組立てられている。   Four divisions are framed by the divided strut members 4 and 5 and the cross members 6 and 7, and the panel fitting grooves 4A, 5B, 6B, and 7B are continuously formed along the circumferential direction. The panel fitting grooves 4A, 5B, The Grechan 11 is fitted to the 6B and 7B, and the panel P is fitted and supported by the Grechan 11 to constitute the unit material 3. In the illustrated example, as shown in FIG. 5, the lower ends of the divided strut members 4, 5 are slightly protruded from the lower side member 7 and are assembled to have leg portions 17.

一方、柱用芯材2は、詳細には図12に示されるように、断面略横H形状を成すアルミ形材であり、ウエブ2Aの前後2箇所にアンカーボルト通孔2a、2aを有し、一方側フランジ2Bの外面中央に凹状の切欠き2Dを有するとともに、他方側フランジ2Cの外面中央に凹状の切欠き2Eを有する。これら切欠き2D、2Eによって形成された右側のウエブ2Aを跨いだ前後対の段部が前記分割支柱材4のための被係合部2b、2cを構成し、左側のウエブ2Aを跨いだ前後対の段部が前記分割支柱材5のための被係合部2d、2eを構成する。   On the other hand, the pillar core member 2 is an aluminum member having a substantially horizontal H cross section as shown in detail in FIG. 12, and has anchor bolt through holes 2a and 2a at two front and rear portions of the web 2A. In addition, a concave notch 2D is provided at the center of the outer surface of the one side flange 2B, and a concave notch 2E is provided at the center of the outer surface of the other side flange 2C. A pair of front and rear stepped portions straddling the right web 2A formed by these notches 2D and 2E constitute engaged portions 2b and 2c for the divided strut material 4, and front and rear straddling the left web 2A. The pair of step portions constitute engaged portions 2d and 2e for the divided strut material 5.

前記柱用芯材2は、図11に示されるように、アンカーボルト通孔2a、2aの下端側にタップ加工を施すとともに、アンカーボルト12,12の上端側(ネジ部)を螺合接続しておき、アンカーボルト12の下端を施工面を構成しているコンクリート基礎Hに対して埋設固定することにより立設されている。   As shown in FIG. 11, the pillar core member 2 is tapped on the lower end sides of the anchor bolt through holes 2a and 2a, and screwed to the upper end sides (thread portions) of the anchor bolts 12 and 12. In addition, the anchor bolt 12 is erected by burying and fixing the lower end of the anchor bolt 12 to the concrete foundation H constituting the construction surface.

前記アンカーボルト12の設置に当たっては、図13に示されるアンカー用施工治具14を用いて、精度良くアンカーボルト設置孔をコンクリート基礎Hに対して穿孔する。前記アンカー用施工治具14は、部材長手方向に柱用芯材2の設置間隔に対応する間隔Lで、かつ柱用芯材2のアンカーボルト通孔2a、2aに対応する前後2箇所にボルトガイド孔14a、14aが形成されたプレート材であり、このアンカー用施工治具14をコンクリート基礎Hの上面に載置し、前記ボルトガイド孔14a、14aを通して鉛直に穿孔を行う。アンカーボルト12の固定は、公知の種々の方法を採用することができるが、例えば樹脂注入アンカー方式を好適に採用することができる。樹脂注入アンカー方式は、二液樹脂接着剤を穿孔内に充填し、アンカーボルト12を挿入し樹脂による固着によってアンカーボルト12の固定を図るものである。   When the anchor bolt 12 is installed, an anchor bolt installation hole is precisely drilled in the concrete foundation H using an anchor construction jig 14 shown in FIG. The anchor construction jig 14 has an interval L corresponding to the installation interval of the column core 2 in the longitudinal direction of the member, and bolts at two locations in front and rear corresponding to the anchor bolt through holes 2a, 2a of the column core 2. It is a plate material in which guide holes 14a and 14a are formed, and this anchor construction jig 14 is placed on the upper surface of the concrete foundation H, and drilled vertically through the bolt guide holes 14a and 14a. For fixing the anchor bolt 12, various known methods can be adopted. For example, a resin injection anchor method can be suitably adopted. In the resin-injection anchor method, a two-component resin adhesive is filled in a hole, the anchor bolt 12 is inserted, and the anchor bolt 12 is fixed by fixing with a resin.

この際、柱用芯材2の設置精度を確保するため、図14に示されるように、建込み用治具15,16を使用する。一方の建込み用治具15は、柱用芯材2,2…の通り芯の確保と、各柱用芯材2,2…の建込み方向を同方向に整列するための治具であり、他方の建込み用治具16は、前記建込み用治具15の倒れを調整するための位置決め治具である。   At this time, in order to ensure the installation accuracy of the column core 2, as shown in FIG. 14, erection jigs 15 and 16 are used. One of the erection jigs 15 is a jig for securing the cores of the pillar core members 2, 2,... And aligning the erection directions of the pillar core members 2, 2,. The other erection jig 16 is a positioning jig for adjusting the collapse of the erection jig 15.

前記建込み用治具15は、図18に示されるように、上部連結部材30と、該上部連結部材30から離間を空けて上部連結部材30に平行配置される下部連結部材31と、これらの間を連結するとともに、前記上部連結部材30、下部連結部材31に対して垂直方向に沿って配置され、柱用芯材2,2…に対して上部側から落し込みによって嵌合させる複数の、図示例では4つの芯材保持部材32,32…とからなる。前記上部連結部材30は下側に開口を向けた断面略コ字状部材が使用され、前記下部連結部材31は側面に開口を向けた断面略字状部材が使用されている。前記芯材保持部材32は、図15に示されるように、矩形断面の一隅部を切り欠いた断面形状を成し、フランジ2B(2C)の嵌合部を有するとともに、ウエブ2Aの側面に対して当接する2つのブラケット部32b、32cを有し、かつ前記ブラケット部32b、32cと対面する側の側壁面に前記ブラケット部32bとによって柱用芯材2のウエブ2Aを挟持するために螺設された挟持ボルト33を備える。   As shown in FIG. 18, the erection jig 15 includes an upper connecting member 30, a lower connecting member 31 that is spaced apart from the upper connecting member 30 and arranged in parallel with the upper connecting member 30, and A plurality of portions that are arranged along the vertical direction with respect to the upper connecting member 30 and the lower connecting member 31, and are fitted to the pillar core members 2, 2. In the illustrated example, it consists of four core material holding members 32, 32. The upper connecting member 30 uses a substantially U-shaped member with an opening facing downward, and the lower connecting member 31 uses an approximately cross-shaped member with an opening facing a side surface. As shown in FIG. 15, the core member holding member 32 has a cross-sectional shape in which one corner of a rectangular cross section is cut out, has a fitting portion of a flange 2B (2C), and has a side surface of the web 2A. And have two bracket portions 32b and 32c that come into contact with each other, and are screwed to sandwich the web 2A of the pillar core member 2 by the bracket portion 32b on the side wall surface facing the bracket portions 32b and 32c. The clamping bolt 33 is provided.

前記芯材保持部材32,32…を柱用芯材2,2…に落とし込みに嵌合させることにより、柱用芯材2,2…の通り芯が確保されるとともに、各柱用芯材2,2…が同方向に整列配置されるように規制することが可能である。なお、前記建込み用治具15は、1つの治具15を繰り返し使用しても良いが、予め複数用意しておき、連結部材によって長手方向に連続して配置するようにしてもよい。   The core material holding members 32, 32,... Are fitted into the column core materials 2, 2,... To secure the cores of the column core materials 2, 2,. , 2... Can be regulated so as to be aligned in the same direction. In addition, although the one jig | tool 15 may be repeatedly used for the said construction jig | tool 15, multiple may be prepared beforehand and you may make it arrange | position continuously in a longitudinal direction with a connection member.

前記建込み用治具15は、前記建込み用治具16によって支持されるとともに、該建込み用治具16によって倒れ方向の位置が調整可能となっている。建込み用治具16は、図17に示されるように、コンクリート基礎Hに固定される下向きに開口するコ字状断面の取付けベース34と、前記取付けベース34の上面に、対面して立設された支柱部材36,37とからなる。   The erection jig 15 is supported by the erection jig 16, and the position in the falling direction can be adjusted by the erection jig 16. As shown in FIG. 17, the erection jig 16 is erected so as to face a mounting base 34 having a U-shaped cross section that opens downward and is fixed to the concrete foundation H, and an upper surface of the mounting base 34. The post members 36 and 37 are formed.

前記支柱部材36,37の上部側には対向配置された上部位置決めボルト38,38が螺設され、下部側には対向配置された下部位置決めボルト39,39が螺設されている。また、前記取付けベース34の一方側側面には螺設された固定用ボルト40を備えている。   Upper positioning bolts 38, 38 arranged to face each other are screwed on the upper side of the column members 36, 37, and lower positioning bolts 39, 39 arranged to face each other are screwed to the lower side. The mounting base 34 is provided with a fixing bolt 40 screwed on one side surface.

図14に示されるように、前記取付けベース34をコンクリート基礎Hに被せるように取付け、固定用ボルト40を螺進させ、頭部をコンクリート基礎Hの側面に当接させることにより前記取付けベース34の固定を図る。上部位置決めボルト38,38は、前記建込み用治具15の上部連結部材30の側面位置に対応し、螺進させることにより前記上部連結部材30を挟持する。前記下部位置決めボルト39、39の一方側は、前記建込み用治具15の下部連結部材31の側面位置に対応し螺進させることにより先端を当接させ、下部位置決めボルト39、39の他方側は、図15に示されるように、螺進させて柱用芯材2のフランジ2A(2B)に当接させるようにする。前記上部位置決めボルト38,38及び下部位置決めボルト39,39の螺進量を調整することによって建込み用治具15の倒れを調整する。   As shown in FIG. 14, the mounting base 34 is mounted so as to cover the concrete foundation H, the fixing bolt 40 is screwed, and the head is brought into contact with the side surface of the concrete foundation H. Try to fix. The upper positioning bolts 38 and 38 correspond to the side surface position of the upper connecting member 30 of the erection jig 15 and clamp the upper connecting member 30 by being screwed. One side of the lower positioning bolts 39, 39 is screwed corresponding to the side surface position of the lower connecting member 31 of the erection jig 15, and the tip is brought into contact with the other side of the lower positioning bolts 39, 39. As shown in FIG. 15, the screw is made to abut on the flange 2 </ b> A (2 </ b> B) of the column core 2. By adjusting the screwing amounts of the upper positioning bolts 38 and 38 and the lower positioning bolts 39 and 39, the tilting of the erection jig 15 is adjusted.

次に、前記フェンス構造1の施工手順について図8〜図10に基づいて詳述する。   Next, the construction procedure of the fence structure 1 will be described in detail with reference to FIGS.

先ず、図8に示されるように、コンクリート基礎H面上に、所定の柱間隔Lの間隔で前記柱用芯材2,2…を立設する。立設方法は前述したとおりである。   First, as shown in FIG. 8, the pillar core members 2, 2... Are erected on the concrete foundation H surface at intervals of a predetermined pillar interval L. The standing method is as described above.

次いで、ユニット材3を持ち込み、両側部の分割支柱材4,5の半枠部4A、5Aを柱用芯材2,2に落とし込むことにより、前記分割支柱材4,5を柱用芯材2,2に係合させて前記ユニット材3の取付けが順次行われる。この際、ユニット材3,3…の上下方向位置を調整するために、図19及び図20に示される上下調整用治具40を使用し、上下の位置調整を行うようにすることが望ましい。前記上下調整用治具40は、ベース40の上面に全ネジボルト42を立設し、この全ネジボルト42に上下方向に位置調整される上下調整部材43を設けたものであり、前記上下調整部材43は、前記全ネジボルト42に螺合されるソケット43Aと、このソケットの上部に溶接固定され、横材7を支持する受け材43Bとからなる。この上下調整用治具40を所定間隔で配置し、各ユニット材3の上下位置を調整するとともに、図3に示されるように、横材6,6同士を繋ぎ材23によって連結し、レベル及び通りを確保した上で、前記ユニット材3と柱用芯材2とを結合するためにビス20,20を螺入する。また、前記柱用芯材2を囲む一対の分割支柱材4,5の縦目地間には隙間を封鎖するために固形シール材21を挟入する。   Next, by bringing the unit material 3 and dropping the half frame portions 4A and 5A of the divided support columns 4 and 5 on both sides into the column core materials 2 and 2, the divided support columns 4 and 5 are used as the column core material 2. , 2 and the unit material 3 is sequentially attached. At this time, in order to adjust the vertical position of the unit members 3, 3..., It is desirable to use the vertical adjustment jig 40 shown in FIGS. The vertical adjustment jig 40 is configured such that an entire screw bolt 42 is erected on the upper surface of the base 40, and an upward / downward adjustment member 43 whose vertical position is adjusted is provided on the entire screw bolt 42. Consists of a socket 43A that is screwed onto the entire screw bolt 42 and a receiving member 43B that is welded and fixed to the upper part of the socket and supports the cross member 7. The vertical adjustment jigs 40 are arranged at predetermined intervals to adjust the vertical position of each unit material 3, and as shown in FIG. 3, the horizontal members 6 and 6 are connected to each other by a connecting material 23. After securing the street, screws 20 and 20 are screwed into the unit material 3 and the pillar core material 2 to be coupled. Further, a solid sealing material 21 is inserted between the vertical joints of the pair of divided supporting columns 4 and 5 surrounding the column core material 2 in order to seal the gap.

ユニット材3の設置状態では、図4に示されるように、前記分割支柱材4の半枠部4Aの係合部4a、4bが柱用芯材2の被係合部2b、2cに係合し、前記分割支柱材5の半枠部5Aの係合部5a、5bが柱用芯材の被係合部2d、2eに係合するように取付けられ、前記柱用芯材2を囲む一対の分割支柱材4,5の組合せによって支柱9、9…が構成されているとともに、前記分割支柱材4,5同士は直接的に係合していない状態となっている。   In the installed state of the unit material 3, as shown in FIG. 4, the engaging portions 4 a and 4 b of the half frame portion 4 </ b> A of the divided strut material 4 are engaged with the engaged portions 2 b and 2 c of the pillar core material 2. Then, the engaging portions 5a and 5b of the half frame portion 5A of the divided strut member 5 are attached so as to engage with the engaged portions 2d and 2e of the pillar core member, and a pair surrounding the pillar core member 2 .. Are constituted by a combination of the divided strut members 4, 5, and the divided strut members 4, 5 are not directly engaged with each other.

各ユニット材3,3…の取付けが完了したならば、図10に示されるように、前記上部側横材6の上面に長手通しの笠木部材8を配設し、図3に示されるように笠木部材8をビス22、22…によって固定する。最後に、各支柱材9の基端部を囲むように付け根カバー24を設置して施工を完了する。なお、前記付け根カバー24は半割構造とされ、支柱材9の外側から設置可能となっている。   When the attachment of the unit members 3, 3,... Is completed, as shown in FIG. 10, a longitudinal through-head member 8 is arranged on the upper surface of the upper side member 6, and as shown in FIG. The headboard member 8 is fixed with screws 22, 22. Finally, the base cover 24 is installed so as to surround the base end portion of each support member 9, and the construction is completed. The root cover 24 has a half structure, and can be installed from the outside of the support material 9.

〔他の形態例〕
(1)上記形態例では、ユニット材3の枠組み内部にパネルPを嵌合支持させるようにしたが、図21に示されるように、枠組み内部に複数の桟材50…、51…を配設したユニット材3とすることも可能である。図21(A)は、縦桟50、50…を配置した例であり、図21(B)は、横桟51,51…を配置した例である。これ以外に、横/縦ルーバー等を配置した形式とすることもできる。更には、図21(C)に示されるように、これらの組合せとすることも可能である。
(2)上記形態例では、ユニット材3において、周方向を巡るパネル嵌合溝4A、5B、6B、7Bが形成され、グレチャン11を介してパネルPを嵌合支持するようにしたが、図22及び図23に示されるように、バックアップ材とシール材とによる支持としてもよい。図示例は、パネルPの上縁と下縁の2辺をバックアップ材25とシール材26とによって支持し、両側縁はパネルPと分割支柱材4,5との間の空間を、ガスケット27、バックアップ材25及びシール材26によって充填した構造としてある。
(3)上記形態例では、フェンス構造1として説明したが、手摺りとしても全く同様の構造を採用することが可能である。
[Other examples]
(1) In the above embodiment, the panel P is fitted and supported inside the frame of the unit material 3. However, as shown in FIG. 21, a plurality of crosspieces 50, 51,. It is also possible to use the unit material 3 as described above. 21A is an example in which vertical bars 50, 50... Are arranged, and FIG. 21B is an example in which horizontal bars 51, 51. In addition to this, it is also possible to adopt a form in which horizontal / vertical louvers are arranged. Furthermore, as shown in FIG. 21C, a combination of these can be used.
(2) In the above embodiment, panel fitting grooves 4A, 5B, 6B and 7B are formed in the unit material 3 in the circumferential direction, and the panel P is fitted and supported via the Grechann 11. As shown in FIG. 22 and FIG. 23, it may be supported by a backup material and a sealing material. In the illustrated example, the upper edge and the lower edge of the panel P are supported by the backup material 25 and the sealing material 26, and both side edges define the space between the panel P and the divided support columns 4, 5, the gasket 27, The structure is filled with the backup material 25 and the sealing material 26.
(3) In the above embodiment, the fence structure 1 has been described. However, the same structure can be adopted as a handrail.

本発明に係るフェンス構造1の正面図である。1 is a front view of a fence structure 1 according to the present invention. その斜視図である。FIG. 図1のIII−III線矢視図である。It is the III-III arrow directional view of FIG. 図1のIV−IV線矢視図である。It is the IV-IV arrow directional view of FIG. ユニット材3の正面図である。3 is a front view of a unit material 3. FIG. 図5のVI−VI線矢視図である。It is the VI-VI line arrow directional view of FIG. 図5のVII−VII線矢視図である。It is the VII-VII line arrow directional view of FIG. 施工要領図(その1)である。It is a construction procedure diagram (part 1). 施工要領図(その2)である。It is a construction procedure diagram (part 2). 施工要領図(その3)である。It is a construction procedure diagram (part 3). 柱用芯材2の建込み状態を示す側面図である。It is a side view which shows the erection state of the core material 2 for pillars. 柱用芯材2の断面図である。It is sectional drawing of the core material 2 for pillars. アンカー用施工治具14を示す平面図である。It is a top view which shows the construction jig | tool 14 for anchors. 建込み用治具15,16の取付け状態を示す柱用芯材2の側面図である。It is a side view of the core material 2 for pillars which shows the attachment state of the jigs 15 and 16 for construction. 図14のXV-XV線矢視図である。It is the XV-XV line arrow figure of FIG. 図14のXVI-XVI線矢視図である。It is the XVI-XVI line arrow figure of FIG. 建込み用治具16の斜視図Perspective view of erection jig 16 建込み用治具15の斜視図である。It is a perspective view of the jig 15 for erection. 上下調整用治具40によるユニット材3の上下調整要領を示す正面図である。It is a front view which shows the up-and-down adjustment point of the unit material 3 by the up-and-down adjustment jig | tool 40. FIG. その断面図である。FIG. フェンス形式を示す、(A)は縦桟形式、(B)は横桟形式、(C)は組合せ形式を示す正面図である。(A) is a vertical beam format, (B) is a horizontal beam format, and (C) is a front view illustrating a combination format. パネル支持構造を変形例を示す縦断面図である。It is a longitudinal cross-sectional view which shows a modification of a panel support structure. その横断面図である。FIG.

符号の説明Explanation of symbols

1…フェンス構造、2…柱用芯材、2A…ウエブ、2B・2C…フランジ、2D・2E…切欠き、2b〜2e…被係合部、3…ユニット材、4・5…分割支柱材、4A・5A…半枠部、4a・4b・5a・5b…係合部、6・7…横材、8…笠木部材、9…支柱、P…パネル   DESCRIPTION OF SYMBOLS 1 ... Fence structure, 2 ... Core material for pillars, 2A ... Web, 2B * 2C ... Flange, 2D * 2E ... Notch, 2b-2e ... Engaged part, 3 ... Unit material, 4 * 5 ... Divided support | pillar material 4A · 5A ... half frame part, 4a · 4b · 5a · 5b ... engagement part, 6 · 7 ... cross member, 8 ... head member, 9 ... post, P ... panel

Claims (3)

施工面上に予め所定間隔で立設される柱用芯材と、両側部に配置された分割支柱材および上下部に配置された横材によって四周が枠組みされ、枠組内部にパネル又は複数の桟材が配置されたユニット材とから成るフェンス又は手摺り構造であって、
前記ユニット材の分割支柱材は、断面視で前記柱用芯材の略片側半分を囲む半枠部を有するとともに、該半枠部の両端部に夫々、前記柱用芯材に対する係合部を有し、前記柱用芯材は前記係合部に対応する部位に被係合部を有し、上方側から前記ユニット材の半枠部を柱用芯材に落とし込むことにより、前記分割支柱材を柱用芯材に係合させて前記ユニット材の取付けが行われ、前記柱用芯材を囲む一対の分割支柱材の組合せによって支柱が構成されているとともに、前記分割支柱材同士は直接的に係合していないことを特徴とするフェンス又は手摺り構造。
Four corners are framed by pillar cores erected on the construction surface at predetermined intervals in advance, divided strut members arranged on both sides and cross members arranged on the upper and lower parts, and a panel or a plurality of rails is built inside the framework. A fence or handrail structure comprising a unit material on which the material is arranged,
The unit material split strut member has a half frame portion that encloses substantially one half of the pillar core member in a cross-sectional view, and an engagement portion for the pillar core member at each end of the half frame portion. The column core material has an engaged portion at a portion corresponding to the engagement portion, and the half-frame portion of the unit material is dropped into the column core material from above, whereby the divided strut material Is attached to the core material for the column, and the unit material is attached, and a column is constituted by a combination of a pair of divided column materials surrounding the column core material, and the divided column materials are directly connected to each other. A fence or a handrail structure characterized by not being engaged with.
前記上部側横材の上面に長手通しの笠木部材を配設してある請求項1記載のフェンス又は手摺り構造。   The fence or handrail structure according to claim 1, wherein a longitudinal through-head member is disposed on the upper surface of the upper side cross member. 前記柱用芯材を囲む一対の分割支柱材の縦目地間に固形シール材を挟入してある請求項1、2いずれかに記載のフェンス又は手摺り構造。   The fence or handrail structure according to any one of claims 1 and 2, wherein a solid sealing material is interposed between vertical joints of a pair of divided support columns surrounding the pillar core material.
JP2008137557A 2008-05-27 2008-05-27 Fence or handrail structure Active JP5095502B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008137557A JP5095502B2 (en) 2008-05-27 2008-05-27 Fence or handrail structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008137557A JP5095502B2 (en) 2008-05-27 2008-05-27 Fence or handrail structure

Publications (2)

Publication Number Publication Date
JP2009287174A true JP2009287174A (en) 2009-12-10
JP5095502B2 JP5095502B2 (en) 2012-12-12

Family

ID=41456658

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008137557A Active JP5095502B2 (en) 2008-05-27 2008-05-27 Fence or handrail structure

Country Status (1)

Country Link
JP (1) JP5095502B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011190631A (en) * 2010-03-16 2011-09-29 San Rail:Kk Device for attaching balustrade glass
JP2011190630A (en) * 2010-03-16 2011-09-29 San Rail:Kk Attachment device for balustrade
JP2016000900A (en) * 2014-06-11 2016-01-07 株式会社アキト Installation method for fence or handrail

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4919643A (en) * 1972-06-15 1974-02-21
JPS5864737U (en) * 1981-10-26 1983-05-02 住友軽金属工業株式会社 handrail post
JPS59173822U (en) * 1983-05-09 1984-11-20 株式会社ナカ技術研究所 handrail
JPH08209884A (en) * 1995-02-03 1996-08-13 Tateyama Alum Ind Co Ltd Handrail installing device
JP2002161622A (en) * 2000-11-24 2002-06-04 Takiron Co Ltd Fence
JP2007332747A (en) * 2006-06-14 2007-12-27 Kazuyuki Yahagi Method for pre-fitting post core material of aluminum handrail

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4919643A (en) * 1972-06-15 1974-02-21
JPS5864737U (en) * 1981-10-26 1983-05-02 住友軽金属工業株式会社 handrail post
JPS59173822U (en) * 1983-05-09 1984-11-20 株式会社ナカ技術研究所 handrail
JPH08209884A (en) * 1995-02-03 1996-08-13 Tateyama Alum Ind Co Ltd Handrail installing device
JP2002161622A (en) * 2000-11-24 2002-06-04 Takiron Co Ltd Fence
JP2007332747A (en) * 2006-06-14 2007-12-27 Kazuyuki Yahagi Method for pre-fitting post core material of aluminum handrail

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011190631A (en) * 2010-03-16 2011-09-29 San Rail:Kk Device for attaching balustrade glass
JP2011190630A (en) * 2010-03-16 2011-09-29 San Rail:Kk Attachment device for balustrade
JP2016000900A (en) * 2014-06-11 2016-01-07 株式会社アキト Installation method for fence or handrail

Also Published As

Publication number Publication date
JP5095502B2 (en) 2012-12-12

Similar Documents

Publication Publication Date Title
KR101931911B1 (en) truss
JP5095502B2 (en) Fence or handrail structure
JP3762689B2 (en) Connection structure of wall frame panel and floor slab foundation
JP6667940B2 (en) Exterior wall panel and column layout structure of exterior wall and layout construction method
JP4988631B2 (en) Outdoor structure
JP3181570U (en) Anchor bolt support device
JP2011202486A (en) Building
JP6552239B2 (en) Exterior wall construction method of house
JP2006214268A (en) Method of connecting foundation members, columns or beams in a wooden building
JP6313004B2 (en) Balcony handrail surface mounting structure and unit building
JP4465332B2 (en) Joints of struts and transverse members in handrails
JPH0354521Y2 (en)
JP2014091949A (en) Panel fitting structure
JP6064180B2 (en) Handrail and its assembly method
JP7365518B1 (en) Panel support material and formwork structure using it
JP7192153B1 (en) Anchor bolt construction method and level adjustment member
JP6332589B2 (en) Solar panel unit
JP2004156214A (en) Assembling structure of bracing frame for use in steel-framed framework structure
JP3119159U (en) Lattice handrail for outdoor facilities
JP5133184B2 (en) Free access floor mount
JP2010077645A (en) Joint structure in wooden building
JP2022114812A (en) Fixed structure and post unit between grid and frame member
JP6307359B2 (en) Fence or handrail construction method
JP2010159540A (en) Wall panel mounting fitting, wall panel mounting structure, and construction method for the same
JP6535238B2 (en) Column structure of the building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20091221

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120418

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120615

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120914

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120919

R150 Certificate of patent or registration of utility model

Ref document number: 5095502

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150928

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250