JP2009098093A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2009098093A5 JP2009098093A5 JP2007272310A JP2007272310A JP2009098093A5 JP 2009098093 A5 JP2009098093 A5 JP 2009098093A5 JP 2007272310 A JP2007272310 A JP 2007272310A JP 2007272310 A JP2007272310 A JP 2007272310A JP 2009098093 A5 JP2009098093 A5 JP 2009098093A5
- Authority
- JP
- Japan
- Prior art keywords
- module
- function
- present
- equipment
- reliability
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012423 maintenance Methods 0.000 description 28
- 238000010586 diagram Methods 0.000 description 20
- 238000012550 audit Methods 0.000 description 19
- 238000012544 monitoring process Methods 0.000 description 17
- 238000011156 evaluation Methods 0.000 description 15
- 238000004458 analytical method Methods 0.000 description 6
- 238000012502 risk assessment Methods 0.000 description 6
- 230000009471 action Effects 0.000 description 5
- 238000007726 management method Methods 0.000 description 4
- 238000012806 monitoring device Methods 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000033228 biological regulation Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2007272310A JP2009098093A (ja) | 2007-10-19 | 2007-10-19 | 設備の有効メンテナンスモニタ装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2007272310A JP2009098093A (ja) | 2007-10-19 | 2007-10-19 | 設備の有効メンテナンスモニタ装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2009098093A JP2009098093A (ja) | 2009-05-07 |
| JP2009098093A5 true JP2009098093A5 (enExample) | 2010-11-25 |
Family
ID=40701230
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2007272310A Pending JP2009098093A (ja) | 2007-10-19 | 2007-10-19 | 設備の有効メンテナンスモニタ装置 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2009098093A (enExample) |
Families Citing this family (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10557840B2 (en) | 2011-08-19 | 2020-02-11 | Hartford Steam Boiler Inspection And Insurance Company | System and method for performing industrial processes across facilities |
| US9069725B2 (en) | 2011-08-19 | 2015-06-30 | Hartford Steam Boiler Inspection & Insurance Company | Dynamic outlier bias reduction system and method |
| EP3129309A4 (en) * | 2014-04-11 | 2018-03-28 | Hartford Steam Boiler Inspection and Insurance Company | Improving future reliability prediction based on system operational and performance data modelling |
| US11636292B2 (en) | 2018-09-28 | 2023-04-25 | Hartford Steam Boiler Inspection And Insurance Company | Dynamic outlier bias reduction system and method |
| US11615348B2 (en) | 2019-09-18 | 2023-03-28 | Hartford Steam Boiler Inspection And Insurance Company | Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models |
| CN114298496A (zh) * | 2021-12-10 | 2022-04-08 | 大亚湾核电运营管理有限责任公司 | 核级电磁阀可靠性检测方法、系统、电子设备和存储介质 |
| CN116540941B (zh) * | 2023-05-08 | 2023-10-20 | 安徽国防科技职业学院 | 一种基于云计算的数据存储安全控制系统 |
| CN116506009B (zh) * | 2023-06-21 | 2023-09-19 | 深圳市知酷信息技术有限公司 | 一种基于5g网络的激光光纤通信用的性能监测系统 |
| CN116562855B (zh) * | 2023-06-27 | 2023-09-15 | 张家港保税区恒隆钢管有限公司 | 一种无缝钢管生产重点设备物联网维修管理系统 |
| CN117993895B (zh) * | 2024-04-03 | 2024-07-26 | 国网安徽省电力有限公司经济技术研究院 | 电网设备全生命周期管理系统 |
| CN118154170B (zh) * | 2024-05-08 | 2024-07-02 | 江苏中天互联科技有限公司 | 故障维护优化方法及相关设备 |
| CN118396605B (zh) * | 2024-06-28 | 2024-10-11 | 福建美舫时代科技有限公司 | 一种基于大数据的智慧城市管理系统及方法 |
| CN118656600B (zh) * | 2024-08-19 | 2024-11-08 | 长江三峡集团实业发展(北京)有限公司 | 一种缆机的监控方法、装置、电子设备和介质 |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01199194A (ja) * | 1988-02-04 | 1989-08-10 | Nippon Atom Ind Group Co Ltd | システムの信頼性評価装置 |
| JP2642438B2 (ja) * | 1988-09-05 | 1997-08-20 | 株式会社東芝 | プラント機器保守管理支援装置 |
| EP0411873A3 (en) * | 1989-08-02 | 1993-11-18 | Westinghouse Electric Corp | Improved plant operating system employing a deterministic, probabilistic and subjective modeling system |
| JP2002323921A (ja) * | 2001-04-25 | 2002-11-08 | Mitsubishi Heavy Ind Ltd | プラント保守支援システム及びプラント保守支援方法 |
| JP4550632B2 (ja) * | 2005-03-11 | 2010-09-22 | 株式会社東芝 | 設備保全計画支援システムおよびその支援方法 |
-
2007
- 2007-10-19 JP JP2007272310A patent/JP2009098093A/ja active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2009098093A (ja) | 設備の有効メンテナンスモニタ装置 | |
| CN103745293B (zh) | 一种rcm分析方法 | |
| US20190033945A1 (en) | Data center total resource utilization efficiency (true) system and method | |
| CN119691663A (zh) | 基于数字孪生的电力设备运行状态预测与异常仿真方法 | |
| CN104730458B (zh) | 发电机励磁系统状态监测方法 | |
| van der Weide et al. | A stochastic alternating renewal process model for unavailability analysis of standby safety equipment | |
| Kančev et al. | Statistical analysis of events related to emergency diesel generators failures in the nuclear industry | |
| CN111210032A (zh) | 一种维修策略经济有效性的评估方法 | |
| JP2022072653A (ja) | 保全支援方法および保全支援装置 | |
| CN112380641B (zh) | 一种应急柴油机健康状态评价方法及计算机终端 | |
| Grace et al. | Risk-based assessment of unplanned outage events and costs for combined-cycle plants | |
| Xu et al. | Real-time online risk monitoring and management method for maintenance optimization in nuclear power plant | |
| Vaurio | Safety-related decision making at a nuclear power plant | |
| Wiboonrat | Condition-Based Maintenance for Data Center Operations Management | |
| Ramesh et al. | Reliability assessment of cogeneration power plant in textile mill using fault tree analysis | |
| Ignat | Power plants maintenance optimization based on CBM techniques | |
| Nitoi et al. | Prioritization of components important for safety and sensitive to ageing. Application for TRIGA reactor | |
| CN113901652B (zh) | 核电厂强损仪控设备可靠性提升方法、系统和电子设备 | |
| Kharola et al. | Reliability modelling of a grid integration system with dual operational and quintuple critical systems | |
| CN109167357A (zh) | 一种优化电网静态安全分析时间的方法 | |
| Zhang et al. | Research on hidden failure reliability modeling of electric power system protection | |
| CN113869538B (zh) | 一种直流配网控保装置的价值评估方法及系统 | |
| Miller et al. | US Nuclear Power Plant Performance Assessment Using the Versatile Economic Risk Tool (VERT) | |
| Huang et al. | Using condition-based maintenance and reliability-centered maintenance to improve maintenance in nuclear power plants | |
| Sudadiyo | Surveillance Interval Determination for RSG-GAS Components Using Maintenance Priority Index and Weibull–Monte Carlo Simulation: Monitoring of the KLD-BRV10 Generator Set |