JP2009098093A5 - - Google Patents

Download PDF

Info

Publication number
JP2009098093A5
JP2009098093A5 JP2007272310A JP2007272310A JP2009098093A5 JP 2009098093 A5 JP2009098093 A5 JP 2009098093A5 JP 2007272310 A JP2007272310 A JP 2007272310A JP 2007272310 A JP2007272310 A JP 2007272310A JP 2009098093 A5 JP2009098093 A5 JP 2009098093A5
Authority
JP
Japan
Prior art keywords
module
function
present
equipment
reliability
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007272310A
Other languages
English (en)
Japanese (ja)
Other versions
JP2009098093A (ja
Filing date
Publication date
Application filed filed Critical
Priority to JP2007272310A priority Critical patent/JP2009098093A/ja
Priority claimed from JP2007272310A external-priority patent/JP2009098093A/ja
Publication of JP2009098093A publication Critical patent/JP2009098093A/ja
Publication of JP2009098093A5 publication Critical patent/JP2009098093A5/ja
Pending legal-status Critical Current

Links

JP2007272310A 2007-10-19 2007-10-19 設備の有効メンテナンスモニタ装置 Pending JP2009098093A (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007272310A JP2009098093A (ja) 2007-10-19 2007-10-19 設備の有効メンテナンスモニタ装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007272310A JP2009098093A (ja) 2007-10-19 2007-10-19 設備の有効メンテナンスモニタ装置

Publications (2)

Publication Number Publication Date
JP2009098093A JP2009098093A (ja) 2009-05-07
JP2009098093A5 true JP2009098093A5 (enExample) 2010-11-25

Family

ID=40701230

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007272310A Pending JP2009098093A (ja) 2007-10-19 2007-10-19 設備の有効メンテナンスモニタ装置

Country Status (1)

Country Link
JP (1) JP2009098093A (enExample)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10557840B2 (en) 2011-08-19 2020-02-11 Hartford Steam Boiler Inspection And Insurance Company System and method for performing industrial processes across facilities
US9069725B2 (en) 2011-08-19 2015-06-30 Hartford Steam Boiler Inspection & Insurance Company Dynamic outlier bias reduction system and method
EP3129309A4 (en) * 2014-04-11 2018-03-28 Hartford Steam Boiler Inspection and Insurance Company Improving future reliability prediction based on system operational and performance data modelling
US11636292B2 (en) 2018-09-28 2023-04-25 Hartford Steam Boiler Inspection And Insurance Company Dynamic outlier bias reduction system and method
US11615348B2 (en) 2019-09-18 2023-03-28 Hartford Steam Boiler Inspection And Insurance Company Computer-based systems, computing components and computing objects configured to implement dynamic outlier bias reduction in machine learning models
CN114298496A (zh) * 2021-12-10 2022-04-08 大亚湾核电运营管理有限责任公司 核级电磁阀可靠性检测方法、系统、电子设备和存储介质
CN116540941B (zh) * 2023-05-08 2023-10-20 安徽国防科技职业学院 一种基于云计算的数据存储安全控制系统
CN116506009B (zh) * 2023-06-21 2023-09-19 深圳市知酷信息技术有限公司 一种基于5g网络的激光光纤通信用的性能监测系统
CN116562855B (zh) * 2023-06-27 2023-09-15 张家港保税区恒隆钢管有限公司 一种无缝钢管生产重点设备物联网维修管理系统
CN117993895B (zh) * 2024-04-03 2024-07-26 国网安徽省电力有限公司经济技术研究院 电网设备全生命周期管理系统
CN118154170B (zh) * 2024-05-08 2024-07-02 江苏中天互联科技有限公司 故障维护优化方法及相关设备
CN118396605B (zh) * 2024-06-28 2024-10-11 福建美舫时代科技有限公司 一种基于大数据的智慧城市管理系统及方法
CN118656600B (zh) * 2024-08-19 2024-11-08 长江三峡集团实业发展(北京)有限公司 一种缆机的监控方法、装置、电子设备和介质

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01199194A (ja) * 1988-02-04 1989-08-10 Nippon Atom Ind Group Co Ltd システムの信頼性評価装置
JP2642438B2 (ja) * 1988-09-05 1997-08-20 株式会社東芝 プラント機器保守管理支援装置
EP0411873A3 (en) * 1989-08-02 1993-11-18 Westinghouse Electric Corp Improved plant operating system employing a deterministic, probabilistic and subjective modeling system
JP2002323921A (ja) * 2001-04-25 2002-11-08 Mitsubishi Heavy Ind Ltd プラント保守支援システム及びプラント保守支援方法
JP4550632B2 (ja) * 2005-03-11 2010-09-22 株式会社東芝 設備保全計画支援システムおよびその支援方法

Similar Documents

Publication Publication Date Title
JP2009098093A (ja) 設備の有効メンテナンスモニタ装置
CN103745293B (zh) 一种rcm分析方法
US20190033945A1 (en) Data center total resource utilization efficiency (true) system and method
CN119691663A (zh) 基于数字孪生的电力设备运行状态预测与异常仿真方法
CN104730458B (zh) 发电机励磁系统状态监测方法
van der Weide et al. A stochastic alternating renewal process model for unavailability analysis of standby safety equipment
Kančev et al. Statistical analysis of events related to emergency diesel generators failures in the nuclear industry
CN111210032A (zh) 一种维修策略经济有效性的评估方法
JP2022072653A (ja) 保全支援方法および保全支援装置
CN112380641B (zh) 一种应急柴油机健康状态评价方法及计算机终端
Grace et al. Risk-based assessment of unplanned outage events and costs for combined-cycle plants
Xu et al. Real-time online risk monitoring and management method for maintenance optimization in nuclear power plant
Vaurio Safety-related decision making at a nuclear power plant
Wiboonrat Condition-Based Maintenance for Data Center Operations Management
Ramesh et al. Reliability assessment of cogeneration power plant in textile mill using fault tree analysis
Ignat Power plants maintenance optimization based on CBM techniques
Nitoi et al. Prioritization of components important for safety and sensitive to ageing. Application for TRIGA reactor
CN113901652B (zh) 核电厂强损仪控设备可靠性提升方法、系统和电子设备
Kharola et al. Reliability modelling of a grid integration system with dual operational and quintuple critical systems
CN109167357A (zh) 一种优化电网静态安全分析时间的方法
Zhang et al. Research on hidden failure reliability modeling of electric power system protection
CN113869538B (zh) 一种直流配网控保装置的价值评估方法及系统
Miller et al. US Nuclear Power Plant Performance Assessment Using the Versatile Economic Risk Tool (VERT)
Huang et al. Using condition-based maintenance and reliability-centered maintenance to improve maintenance in nuclear power plants
Sudadiyo Surveillance Interval Determination for RSG-GAS Components Using Maintenance Priority Index and Weibull–Monte Carlo Simulation: Monitoring of the KLD-BRV10 Generator Set