JP2008267008A - Ground reinforcement structure, construction method for the ground reinforcement structure and ground reinforcing member - Google Patents

Ground reinforcement structure, construction method for the ground reinforcement structure and ground reinforcing member Download PDF

Info

Publication number
JP2008267008A
JP2008267008A JP2007112206A JP2007112206A JP2008267008A JP 2008267008 A JP2008267008 A JP 2008267008A JP 2007112206 A JP2007112206 A JP 2007112206A JP 2007112206 A JP2007112206 A JP 2007112206A JP 2008267008 A JP2008267008 A JP 2008267008A
Authority
JP
Japan
Prior art keywords
ground
hole
filler
ground reinforcing
reinforcement structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2007112206A
Other languages
Japanese (ja)
Other versions
JP5145757B2 (en
Inventor
Akira Yamamoto
山本  彰
Shinichi Takahashi
真一 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2007112206A priority Critical patent/JP5145757B2/en
Publication of JP2008267008A publication Critical patent/JP2008267008A/en
Application granted granted Critical
Publication of JP5145757B2 publication Critical patent/JP5145757B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

<P>PROBLEM TO BE SOLVED: To provide a ground reinforcement structure, a construction method for the ground reinforcement structure and a ground reinforcing member, enough resisting the bending load from the ground in simple constitution, and constructed to be bent or set into a curved shape. <P>SOLUTION: This ground reinforcing member 10 is an elongated bag body, formed by closing the tip part 10a of a cylindrical member having flexibility, and an injection port 16 is connected to the proximal end 10b thereof. The ground reinforcing member 10 is installed in the blank state of the bag body inside in a hole drilled to be bent in the ground; and after that, the interior of the bag body is filled with the filler material 26, and the filler material 26 is solidified to construct a ground reinforcement structure 40. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、地盤補強構造、その地盤補強構造の施工方法、及びそれに用いる地盤補強部材に関する。   The present invention relates to a ground reinforcing structure, a construction method of the ground reinforcing structure, and a ground reinforcing member used therefor.

従来より、軟弱な地盤の沈下や斜面の崩壊を防止するために、地盤を硬質安定化させて改良する地盤補強工法が行われており、例えば、特許文献1又は2に開示されるような工法が提案されている。   Conventionally, in order to prevent subsidence of soft ground and collapse of slopes, a ground reinforcement method for improving the ground by stabilizing the ground has been performed. For example, a method as disclosed in Patent Document 1 or 2 Has been proposed.

特許文献1には、ボーリングにより削孔した孔内に鋼棒等の補強材を挿入し、孔内面と補強材との間隙にモルタルやグラウトセメント等を注入して補強材と地盤を一体化させて地盤補強構造を構築する、いわゆるネイリングと呼ばれる工法が開示されている。   In Patent Document 1, a reinforcing material such as a steel rod is inserted into a hole drilled by boring, and mortar or grout cement is injected into the gap between the hole inner surface and the reinforcing material to integrate the reinforcing material and the ground. Thus, a so-called nailing method for constructing a ground reinforcing structure is disclosed.

また、特許文献2には、特殊な形状の混練オーガ機によって攪拌した地盤に、攪拌機の中空軸を通してセメントミルクを注入しながら攪拌混合を続けて地中にソイルセメント柱体を造設し、更に掘削攪拌した土砂範囲の先端の地盤に、前記中空軸の中空部に芯材を挿入して設置することにより、地盤補強構造を構築するソイルセメント工法が開示されている。
特開2004−27813号公報 特開平5−222733号公報
Further, in Patent Document 2, a soil cement column is built in the ground by continuing stirring and mixing while pouring cement milk through the hollow shaft of the stirrer into the ground stirred by a specially shaped kneading auger. A soil cement construction method is disclosed in which a ground reinforcing structure is constructed by inserting and installing a core material in the hollow portion of the hollow shaft on the ground at the end of the excavated and stirred earth and sand range.
JP 2004-27813 A JP-A-5-222733

ところで、上記地盤補強構造に曲げ荷重が作用して反りが生じようとする場合には、地盤補強構造の反りの凸側に引張り力が生じ、反りの凹側に圧縮力が生じる。   By the way, when a bending load acts on the ground reinforcing structure to cause warping, a tensile force is generated on the convex side of the warp of the ground reinforcing structure, and a compressive force is generated on the concave side of the warp.

しかしながら、特許文献1又は2に開示される地盤補強工法では、引張り力に抵抗するために設置される鋼棒や芯材が、地盤補強構造に曲げ荷重が作用した時に生ずる引張り力が小さい断面の図心に配置される。このため、鋼棒や芯材の保有する引張り強度を充分に発揮できないという問題がある。   However, in the ground reinforcement method disclosed in Patent Document 1 or 2, the steel rod or core material installed to resist the tensile force has a cross section with a small tensile force generated when a bending load is applied to the ground reinforcing structure. Located in the centroid. For this reason, there exists a problem that the tensile strength which a steel rod and a core material cannot fully exhibit.

また、図8(a)に示す土被りの浅いトンネルの上部地盤や、図8(b)に示す構造物下の軟弱地盤のように、鉛直下方向の変位が生じやすい地盤(以下、補強対象地盤70という)を補強する場合、同図に示すように、地盤補強構造40を補強対象地盤70に水平に構築することが効果的である。   In addition, the ground that is likely to be displaced in the vertically downward direction, such as the upper ground of a tunnel with a shallow earth covering shown in FIG. 8A and the soft ground under the structure shown in FIG. In the case of reinforcing the ground 70), it is effective to construct the ground reinforcing structure 40 horizontally on the ground to be reinforced 70 as shown in FIG.

しかしながら、特許文献1又は2に開示される地盤補強工法では、構築される地盤補強構造40が直線的な形状に限定されるために、地表から施工する場合には、例えば、図9に示すように、地盤補強構造40を、補強対象地盤70に対して両側から斜め方向(同図(a))又は直上から鉛直下方向(同図(b))に打設するしかない。この場合、地盤の鉛直下方向の変位を抑制するためには、水平構築時よりも多くの地盤補強構造40を構築する必要があり、施工コスト及び施工時間を要してしまう。また、図10に示すように、補強対象地盤70に隣接する位置に立坑80を形成し、この立坑80から水平方向に地盤補強構造40を構築することも考えられるが、この場合には立坑80を形成するための施工コスト及び時間を要するうえ、立坑80を構築するための用地を確保する必要がある。   However, in the ground reinforcement method disclosed in Patent Document 1 or 2, since the ground reinforcement structure 40 to be constructed is limited to a linear shape, when constructing from the ground surface, for example, as shown in FIG. In addition, the ground reinforcement structure 40 can only be placed diagonally from both sides with respect to the reinforcement target ground 70 (FIG. 1 (a)), or directly above and vertically downward (FIG. 1 (b)). In this case, in order to suppress the vertical downward displacement of the ground, it is necessary to construct a larger number of ground reinforcing structures 40 than in the horizontal construction, which requires construction cost and construction time. As shown in FIG. 10, it is conceivable to form a shaft 80 at a position adjacent to the ground to be reinforced 70, and to construct the ground reinforcing structure 40 from the shaft 80 in the horizontal direction. In addition to the construction cost and time required for forming the shaft, it is necessary to secure a site for constructing the shaft 80.

本発明は、上記の点に鑑みてなされたものであり、簡易な構成で、地盤からの曲げ荷重に対して充分に抵抗することができるとともに、屈曲又は湾曲形状で構築すること可能な地盤補強構造、その地盤補強構造の施工方法、及びそれに用いられる地盤補強部材を提供することを目的とする。   The present invention has been made in view of the above points, and has a simple configuration, can sufficiently resist bending load from the ground, and can be constructed in a bent or curved shape. It is an object of the present invention to provide a structure, a construction method for the ground reinforcing structure, and a ground reinforcing member used therefor.

上記の目的を達成するため、本発明は地盤の補強構造であって、
柔軟性を有するとともに、所定の引張り強度を有する筒体又は筒体の一端を閉塞してなる袋体を、地盤に形成された孔内に設置し、
前記筒体又は袋体の内部に、時間の経過とともに固化する充填材を流動状態で充填し、この充填材を固化させてなることを特徴とする(第1の発明)。
In order to achieve the above object, the present invention is a ground reinforcing structure,
Installed in a hole formed in the ground, having a flexible body and having a predetermined tensile strength, or a bag formed by closing one end of the cylinder,
The cylindrical body or the bag body is filled with a filler that solidifies over time in a fluidized state, and the filler is solidified (first invention).

本発明の地盤補強構造によれば、所定の引張り強度を有する筒体又は袋体を地盤に形成された孔内に設置し、時間の経過とともに固化する充填材を流動状態で充填し、この充填材を固化させて構築することにより、地盤補強構造の断面は、中央に固化した充填材が配置し、その周囲に引張り強度を有する袋体又は筒体が配置する。このため、袋体の断面の中心から最も離れた位置に引張強度を有する袋体又は筒体が配置されるので、地盤補強構造に曲げ荷重が作用したときに生じる引張力に対して、袋体又は筒体が効果的に抵抗する。また曲げ荷重によって生じる圧縮力にも、固化した充填材が抵抗することができる。   According to the ground reinforcement structure of the present invention, a cylindrical body or bag body having a predetermined tensile strength is installed in a hole formed in the ground, and a filler that solidifies with the passage of time is filled in a fluidized state. When the material is solidified and constructed, the ground reinforcing structure has a cross-section in which a solidified filler is disposed at the center, and a bag or a cylinder having tensile strength is disposed around the filler. For this reason, since the bag body or the cylinder having the tensile strength is arranged at the position farthest from the center of the cross section of the bag body, the bag body against the tensile force generated when a bending load acts on the ground reinforcing structure. Or a cylinder resists effectively. Moreover, the solidified filler can also resist the compressive force generated by the bending load.

また、本発明の地盤補強構造によれば、地盤補強構造を構築するための部材として用いられる筒体又は袋体が、柔軟性を有するので、例えば、自在ボーリング等を用いて地表から削孔開始し、削孔途中で屈曲又は湾曲させて水平部を有するように削孔した孔内に、これら筒体又は袋体を、ワイヤー等を用いて押し込んだり、又は地盤補強部材の内部に空気を吹き込んだりして設置することができ、その後、筒体又は袋体の内部に、時間の経過とともに固化して所定の圧縮強度を有する充填材を充填して固化させることにより、水平部を有するような屈曲又は湾曲形状の地盤補強構造を構築することができる。   Further, according to the ground reinforcing structure of the present invention, the cylindrical body or the bag body used as a member for constructing the ground reinforcing structure has flexibility, so that, for example, drilling is started from the ground surface using free boring or the like. Then, these cylinders or bags are pushed into the hole that is bent or curved in the middle of the drilling so as to have a horizontal portion, using a wire or the like, or air is blown into the ground reinforcing member. It can be installed in a slanted manner, and then has a horizontal portion by solidifying the tube or bag body with a filler having a predetermined compressive strength by solidifying with the passage of time. A ground reinforcing structure having a bent or curved shape can be constructed.

第2の発明は、第1の発明において、前記筒体又は袋体は、所定の引張り強度を有する索体を含んだ織布又は不織布により構成されていることを特徴とする。
本発明の地盤補強構造によれば、筒体又は袋体に流動状態で充填された充填材が、織布又は不織布の網目に浸透し、その後固化した時に、筒体又は袋体と一体になるので、引張力及び圧縮力の両方に抵抗する剛体となることができる。
According to a second invention, in the first invention, the cylindrical body or the bag body is configured by a woven fabric or a nonwoven fabric including a cord body having a predetermined tensile strength.
According to the ground reinforcing structure of the present invention, when the filler filled in the cylindrical body or the bag body in a fluid state penetrates the mesh of the woven fabric or the nonwoven fabric and then solidifies, it becomes integrated with the cylindrical body or the bag body. Therefore, it can be a rigid body that resists both tensile force and compressive force.

第3の発明は、第1又は2の発明において、所定の引張り強度を有する索体が、前記筒体又は袋体の周囲にその長手方向に沿って設けられていることを特徴とする。   A third invention is characterized in that, in the first or second invention, a cord having a predetermined tensile strength is provided around the cylindrical body or the bag body along a longitudinal direction thereof.

第4の発明は、第2又は3の発明において、前記索体は、アラミド繊維からなることを特徴とする。
本発明の地盤補強構造によれば、その地盤補強構造によって補強された地盤に、例えば杭打ち機等によって杭を打つ際、地盤補強構造を問題なく打ちぬくことができる。すなわち、上述の特許文献1又は2に記載される工法のように、地盤補強構造として鋼棒や芯材のような金属を用いた場合には、地盤補強構造を打ち抜く際に、鋼棒や芯材が杭へ絡みつくなどの問題が生じるが、本発明の地盤補強構造ではそのような問題は生じない。
According to a fourth invention, in the second or third invention, the cord body is made of an aramid fiber.
According to the ground reinforcement structure of the present invention, when a pile is driven on the ground reinforced by the ground reinforcement structure, for example, with a pile driving machine or the like, the ground reinforcement structure can be driven without problems. That is, when a metal such as a steel bar or a core material is used as the ground reinforcement structure as in the construction method described in Patent Document 1 or 2, the steel bar or the core is used when punching the ground reinforcement structure. Although problems such as tangling of the material to the piles occur, such problems do not occur in the ground reinforcement structure of the present invention.

第5の発明は、第1〜4のいずれかの発明において、前記孔は、屈曲部又は湾曲部を有することを特徴とする。   According to a fifth invention, in any one of the first to fourth inventions, the hole has a bent portion or a curved portion.

第6の発明は、第1〜5のいずれかの発明において、前記孔は、少なくともその一部に水平部分を有することを特徴とする。
本発明の地盤補強構造によれば、鉛直方向の曲げ荷重に対して効果的に抵抗し、水平部分を形成された孔周辺の上下領域の地盤の鉛直方向の変位を抑制することができる。
According to a sixth invention, in any one of the first to fifth inventions, the hole has a horizontal portion at least in a part thereof.
According to the ground reinforcement structure of the present invention, it is possible to effectively resist the bending load in the vertical direction, and to suppress the vertical displacement of the ground in the upper and lower regions around the hole in which the horizontal portion is formed.

第7の発明は、第1〜6のいずれかの発明において、前記充填材は、コンクリートミルクであることを特徴とする。   According to a seventh invention, in any one of the first to sixth inventions, the filler is concrete milk.

第8の発明は、第1〜7のいずれかの発明において、前記充填材には、引張補強材が混入されていることを特徴とする。
本発明による地盤補強構造によれば、地盤補強構造の引張り強度をさらに向上させることができる。
An eighth invention is characterized in that, in any one of the first to seventh inventions, a tensile reinforcing material is mixed in the filler.
According to the ground reinforcement structure of the present invention, the tensile strength of the ground reinforcement structure can be further improved.

第9の発明は、地盤補強構造の施工方法であって、柔軟性を有するとともに、所定の引張り強度を有する筒体又は筒体の一端を閉塞してなる袋体を、地盤に形成された孔内に設置し、前記筒体又は袋体の内部に、時間の経過とともに固化する充填材を流動状態で充填し、この充填材を固化させることを特徴とする。   A ninth invention is a construction method of a ground reinforcing structure, which has flexibility and a hole having a predetermined tensile strength or a bag formed by closing one end of a cylindrical body in the ground. The inside of the cylinder or the bag is filled with a filler that solidifies as time passes, and the filler is solidified.

第10の発明は、地盤の補強構造を構築するために用いられる地盤補強部材であって、柔軟性を有するとともに、所定の引張り強度を有する筒体又は筒体の一端を閉塞してなる袋体からなり、地盤に形成された孔内に設置されて、前記筒体又は袋体の内部に、時間の経過とともに固化する充填材を充填されて用いられることを特徴とする。   A tenth aspect of the present invention is a ground reinforcing member used for constructing a ground reinforcing structure, which is flexible and has a predetermined tensile strength, or a bag formed by closing one end of a cylindrical body. And is installed in a hole formed in the ground, and is filled with a filler that solidifies with the passage of time inside the cylinder or bag.

本発明によれば、簡易な構成で、地盤からの曲げ荷重に対して充分に抵抗することができるとともに、屈曲又は湾曲形状で構築すること可能な地盤補強構造、その地盤補強構造の施工方法、及びそれに用いられる地盤補強部材を提供できる。   According to the present invention, with a simple configuration, it can sufficiently resist bending load from the ground, and can be constructed in a bent or curved shape, a construction method of the ground reinforcing structure, And the ground reinforcement member used for it can be provided.

以下、本発明の好ましい一実施形態について図面に基づき詳細に説明する。
図1は、本実施形態に係る地盤補強部材を示し、同図(a)は側面図、同図(b)は(a)のA−A断面図である。
Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the drawings.
1A and 1B show a ground reinforcing member according to the present embodiment, in which FIG. 1A is a side view and FIG. 1B is a cross-sectional view taken along line AA in FIG.

図1に示すように、地盤補強部材10は、例えば、柔軟性を有する筒状部材の先端部10aが閉塞されてなる細長い袋体であり、その基端部10bには注入口16が形成されている。地盤補強部材10は、後述するような地盤に屈曲形状に削孔された孔内に、その袋体内部が空の状態で設置され、その後注入口16からその袋体内部にコンクリートミルク等の充填材を充填して固化させることにより地盤補強構造が構築される。   As shown in FIG. 1, the ground reinforcing member 10 is, for example, an elongated bag body in which a distal end portion 10a of a flexible cylindrical member is closed, and an injection port 16 is formed at the base end portion 10b. ing. The ground reinforcing member 10 is installed in a hole cut in a bent shape in the ground as will be described later with the inside of the bag body empty, and then filled with concrete milk or the like from the inlet 16 into the bag body. A ground reinforcement structure is constructed by filling and solidifying the material.

袋体の構成材料としては、例えば、柔軟性及び耐摩耗性を有する麻や合成繊維等からなる織布又は不織布に、例えば、アラミド糸や炭素繊維等の引張り強度の大きい補強索体14を混入したものや、地盤補強部材10の周囲に複数の補強索体14を長手方向に沿って設けたもの等を用いることができる。なお、後者の場合、地盤補強部材10を用いて構築された地盤補強構造に対して、いずれの方向から曲げ荷重が作用しても、均一に曲げ荷重に抵抗させるべく、図1(b)に示すように補強索体14は袋体の周囲に等間隔で設けられることが好ましい。   As a constituent material of the bag body, for example, a reinforcing cord 14 having a high tensile strength such as aramid yarn or carbon fiber is mixed into a woven fabric or a nonwoven fabric made of hemp or synthetic fiber having flexibility and wear resistance. Or a structure in which a plurality of reinforcing cords 14 are provided along the longitudinal direction around the ground reinforcing member 10 can be used. In the latter case, in order to evenly resist the bending load regardless of the direction from which direction the bending load is applied to the ground reinforcing structure constructed using the ground reinforcing member 10, FIG. As shown, the reinforcing cords 14 are preferably provided at equal intervals around the bag.

地盤補強部材10には、例えば、地盤補強部材10に注入させる充填材の圧力(例えば、0.1〜1Mpa)に耐え得る強度が要求される。これは、例えば、消防ホースと同等の強度である。   The ground reinforcing member 10 is required to have a strength that can withstand the pressure (for example, 0.1 to 1 Mpa) of the filler injected into the ground reinforcing member 10. This is, for example, as strong as a fire hose.

また、地盤補強部材10は、その内部に充填される充填材に含まれる水分のみを袋体外部の地盤に浸出させるような目の粗さを有する織布又は不織布からなることが好ましい。なお、上記織布又は不織布に限らず、微細な孔が設けられた不透水性の膜を用いてもよい。   In addition, the ground reinforcing member 10 is preferably made of a woven fabric or a nonwoven fabric having such a roughness that only the moisture contained in the filler filled therein is leached into the ground outside the bag body. In addition, you may use the water-impermeable film | membrane provided with the fine hole not only the said woven fabric or a nonwoven fabric.

さらに、地盤補強部材10は、孔内に設置後その内部に充填材が充填された時に、孔壁と密着するように、袋体が、ある程度膨張するように伸縮可能であることが好ましい。   Furthermore, it is preferable that the ground reinforcing member 10 can be expanded and contracted so that the bag body expands to some extent so that the ground reinforcing member 10 is in close contact with the hole wall when the inside thereof is filled with a filler.

また、地盤補強部材10には、地盤補強構造の一部となった際に、曲げ荷重等によって地盤補強構造に生じる引張力に、充分に抵抗できる程度の引張強度を有するものを使用する。また、充填材には、地盤補強構造の一部となった際に、曲げ荷重等によって地盤補強構造に生じる圧縮力に、充分に抵抗できる程度の圧縮強度を有するもの使用する。   Further, as the ground reinforcing member 10, a member having a tensile strength that can sufficiently resist the tensile force generated in the ground reinforcing structure due to a bending load or the like when it becomes a part of the ground reinforcing structure is used. In addition, a filler having a compressive strength that can sufficiently resist the compressive force generated in the ground reinforcing structure due to a bending load or the like when it becomes a part of the ground reinforcing structure is used.

次に、このような地盤補強部材10を用いて、例えば、軟弱地盤上に構築される盛土20下の基礎を補強するべく、地盤補強構造を構築する手順について説明する。
図2は、地盤補強部材10を用いて地盤補強構造を構築する第一の工法の手順を説明するための説明図である。
Next, a procedure for constructing a ground reinforcement structure in order to reinforce a foundation under the embankment 20 constructed on a soft ground, for example, using such a ground reinforcement member 10 will be described.
FIG. 2 is an explanatory diagram for explaining the procedure of the first construction method for constructing the ground reinforcing structure using the ground reinforcing member 10.

図2に示すように、第一の工法は、屈曲孔の削孔工程S110と、地盤補強部材の設置工程S120と、充填材の充填工程S130からなる。   As shown in FIG. 2, the first construction method includes a bending hole drilling step S110, a ground reinforcing member installation step S120, and a filler filling step S130.

屈曲孔の削孔工程S110では、地表に構築される盛土20に隣接する地表位置から、補強する盛土20の下方の基礎地盤に向けて斜め方向に削孔を開始し、その孔の先端が盛土20の縁部の下方位置に到達した時点で削孔方向を水平方向に変更し(工程S111)、その後、所定長の水平部を有するような屈曲形状の孔(屈曲孔22)を削孔する(工程S112)。   In the drilling step S110 of the bent hole, drilling is started obliquely from the surface position adjacent to the embankment 20 constructed on the ground surface toward the foundation ground below the embankment 20 to be reinforced, and the tip of the hole is embankment. When reaching the lower position of the edge of 20, the drilling direction is changed to the horizontal direction (step S111), and then a bent hole (bent hole 22) having a horizontal portion of a predetermined length is drilled. (Step S112).

屈曲孔の削孔工程S110には、地盤中でその削孔方向を自由に変更することが可能な公知の誘導式自在ボーリング機械(例えば、テラ・ジェット工法やアーバンノーディック工法による削孔機)を用いておこなうことができる。なお、屈曲孔22の削孔後には、削孔に使用されたボーリング機械のドリルビット21やボーリングロッド23を引き抜いて回収する。   In the drilling step S110 of the bent hole, a known induction-type universal boring machine capable of freely changing the drilling direction in the ground (for example, a drilling machine using a terra-jet method or an urban nodic method) Can be used. In addition, after drilling the bending hole 22, the drill bit 21 and the boring rod 23 of the boring machine used for drilling are pulled out and collected.

地盤補強部材の設置工程S120では、屈曲可能であるともに弾性を有する、例えば金属ワイヤー等の誘導棒24を、地盤補強部材10の袋体の基端部の注入口からその内部に挿入(工程S121)して、閉塞されている側の先端部10aを、工程S110で削孔された屈曲孔22の先端まで押し込むことにより、袋体を屈曲孔22内に挿入する(工程S122)。ここで、誘導棒24を用いて地盤補強部材10を屈曲孔22に挿入する際には、誘導棒24の先端が地盤補強部材10を破損させないように、例えば、クッション等の保護部材を誘導棒24の先端に設ける等の対策を講じておく。なお、地盤補強部材10の設置後には、誘導棒24を孔内から引き抜いて回収する。   In the ground reinforcing member installation step S120, a guide rod 24, such as a metal wire, which is bendable and elastic, is inserted into the inside of the base end portion of the bag body of the ground reinforcing member 10 (step S121). Then, the bag body is inserted into the bent hole 22 by pushing the closed end portion 10a to the tip of the bent hole 22 drilled in step S110 (step S122). Here, when the ground reinforcing member 10 is inserted into the bending hole 22 using the guide rod 24, for example, a protective member such as a cushion is attached to the guide rod so that the tip of the guide rod 24 does not damage the ground reinforcing member 10. Take measures such as providing it at the tip of 24. In addition, after installation of the ground reinforcement member 10, the guide rod 24 is pulled out from the hole and collected.

充填材の充填工程S130では、工程S120で屈曲孔22内に設置された地盤補強部材10の内部に充填材26を充填し、固化させることによって、地盤補強構造40を構築する。充填材26は上述した注入口16を通じて充填される。なお、充填材26には、固化後のコンクリートの引張り強度を向上させるために、例えば、鋼繊維やガラス繊維等の補強繊維材を混入したものを用いることが好ましい。   In the filling material filling step S130, the ground reinforcing structure 40 is constructed by filling and solidifying the inside of the ground reinforcing member 10 installed in the bent hole 22 in the step S120. The filler 26 is filled through the inlet 16 described above. In addition, in order to improve the tensile strength of the concrete after solidification, it is preferable to use a filler mixed with a reinforcing fiber material such as steel fiber or glass fiber.

充填材26を注入する際には、その注入圧が0.1〜1Mpa程度になるまで加圧する。そして、注入が終了後にその内圧が保持されるように注入口16を密封する。これにより、この後地盤補強部材10に充填された充填材26中の水分が圧搾されて地盤中に浸出し、ある程度の地盤補強部材10内の充填材26の固化成分が濃集されて固化することによって、地盤補強構造40が構築される。   When injecting the filler 26, pressurization is performed until the injection pressure becomes about 0.1 to 1 MPa. Then, the injection port 16 is sealed so that the internal pressure is maintained after the injection is completed. Thereby, the water in the filler 26 filled in the ground reinforcing member 10 is squeezed and leached into the ground, and a certain amount of the solidified component of the filler 26 in the ground reinforcing member 10 is concentrated and solidified. Thus, the ground reinforcement structure 40 is constructed.

なお、誘導棒24に、例えば注入ホースを沿わせておき、工程S120を実施する際に、地盤補強部材10の基端部10bから誘導棒24とともに注入ホースを挿入して、地盤補強部材10を屈曲孔22の先端まで押し込んで設置し、その後誘導棒24を孔内から引き抜きながら、注入ホースを介して充填材を袋体内に充填してもよい。   For example, when the injection hose is placed along the guide rod 24 and the step S120 is performed, the injection hose is inserted together with the guide rod 24 from the base end portion 10b of the ground reinforcement member 10, and the ground reinforcement member 10 is attached. The bag may be filled with a filling material via an injection hose while the guide rod 24 is pulled out from the hole and then pushed to the tip of the bent hole 22.

これにより、地盤補強部材の設置工程S120と充填材の充填工程S130とを同時に実施できる。加えて、屈曲孔22の先端部10aから充填材を袋体内に充填していくため、未充填時に袋体内にある空気を先端部10aから基端部10bまで円滑に送り出すことができるので、袋体内に空気が残存することを回避し、信頼性の高い剛性を有する地盤補強構造40を構築できる。   Thereby, the installation process S120 of the ground reinforcing member and the filling process S130 of the filler can be performed simultaneously. In addition, since the filling material is filled into the bag body from the distal end portion 10a of the bent hole 22, the air in the bag body can be smoothly sent from the distal end portion 10a to the proximal end portion 10b when not filled. The ground reinforcement structure 40 having a highly reliable rigidity can be constructed by avoiding air remaining in the body.

上記説明した地盤補強部材の設置工程S120については、図3に示すような空気圧入による設置方法を用いてもよい。   About the installation process S120 of the ground reinforcement member demonstrated above, you may use the installation method by pneumatic insertion as shown in FIG.

図3に示すように、空気圧入による設置方法では、例えば、屈曲孔22の孔口付近に蛇腹状に折りたたまれ、その先端部10aが孔口から孔内に向かって設置された地盤補強部材10の内部に、注入口16から空気を圧入(工程S123)することにより、袋体に推進力を与え又は袋体を膨張させることによって地盤補強部材10を孔底へ挿入させる(工程S124)。   As shown in FIG. 3, in the installation method by air pressure insertion, for example, the ground reinforcing member 10 is folded in the vicinity of the hole of the bent hole 22 in a bellows shape, and the tip 10a is installed from the hole toward the inside of the hole. The ground reinforcing member 10 is inserted into the bottom of the hole by injecting air from the inlet 16 into the interior of the container (step S123), thereby applying a propulsive force to the bag body or expanding the bag body (step S124).

なお、空気圧入による設置方法の実施にあたっては、地盤補強部材10を孔内に挿入させる際に、地盤補強部材10より前方の孔内空気を大気中へ逃がすための空気抜きホース28を、その先端が孔先端付近まで達するように予め設置しておくことが好ましい。これにより、地盤補強部材10を円滑に孔底へ挿入させることができる。   In carrying out the installation method by air pressure insertion, when the ground reinforcing member 10 is inserted into the hole, an air vent hose 28 for releasing the air in the hole forward from the ground reinforcing member 10 into the atmosphere is provided at the tip thereof. It is preferable to install in advance to reach the vicinity of the hole tip. Thereby, the ground reinforcement member 10 can be smoothly inserted into the hole bottom.

また、空気圧入による設置方法では、地盤補強部材10内に空気を圧入する代わりに充填材26を圧入してもよい。これにより、地盤補強部材の設置工程S120と充填材の充填工程S130(図2参照)とを同時に実施することができる。   Moreover, in the installation method by air pressure insertion, you may press-fit the filler 26 instead of press-fitting air in the ground reinforcement member 10. FIG. Thereby, the installation step S120 of the ground reinforcing member and the filling step S130 (see FIG. 2) of the filler can be performed simultaneously.

図4は、地盤補強部材10を用いて地盤補強構造を構築する第二の工法の手順を説明するための説明図である。なお、図4において、図2と同様の部位を示すものについては、同様の符号を付してその説明を省略する。   FIG. 4 is an explanatory diagram for explaining the procedure of the second construction method for constructing the ground reinforcing structure using the ground reinforcing member 10. In FIG. 4, the same reference numerals are given to the same parts as those in FIG. 2, and the description thereof is omitted.

図4に示すように、第二の工法は、屈曲貫通孔の削孔工程S210と、地盤補強部材の設置工程S220と、充填材の充填工程S230からなる。   As shown in FIG. 4, the second construction method includes a bending through hole drilling step S210, a ground reinforcing member installation step S220, and a filler filling step S230.

屈曲貫通孔の削孔工程S210では、図2で説明した屈曲孔の削孔工程S110と同様にして、所定長の水平部を有する屈曲孔を削孔(工程S211)した後、さらに地表へ向けて削孔方向を変更して地表まで貫通させた屈曲貫通孔30を削孔する(工程S212)。   In the bent through hole drilling step S210, in the same manner as in the bent hole drilling step S110 described with reference to FIG. 2, a bent hole having a horizontal portion of a predetermined length is drilled (step S211), and further toward the ground surface. Then, the bent through hole 30 that has been drilled to the ground surface by changing the drilling direction is drilled (step S212).

なお、屈曲貫通孔30も、第一の工法と同様の誘導式自在ボーリング機械を用いて削孔する。   The bent through hole 30 is also drilled using the same induction type boring machine as in the first construction method.

地盤補強部材の設置工程S220では、前工程S210で盛土20の両側間の地盤を貫通する際に用いた誘導式自在ボーリング機械のボーリングロッド23の先端部付近に、地盤補強部材10の基端部10bを取り付け、当該ボーリングロッド23を引き抜くことにより、地盤補強部材10を屈曲貫通孔30内に引き込む。   In the ground reinforcing member installation step S220, the base end portion of the ground reinforcing member 10 is disposed in the vicinity of the distal end portion of the boring rod 23 of the induction-type universal boring machine used when penetrating the ground between both sides of the embankment 20 in the previous step S210. The ground reinforcing member 10 is pulled into the bent through hole 30 by attaching 10 b and pulling out the boring rod 23.

また、同図中では地盤補強部材10が屈曲貫通孔30の領域の一部(第一の工法と同様に中央の水平部と図中右側の傾斜部)に配置されているが、これに限らず、削孔された屈曲貫通孔30の全領域に設置してもよい。ここで前者のような屈曲貫通孔30の領域の一部に配置する場合には、地盤補強部材10が設置されない孔の部分30cについては、コンクリートや土砂等で埋め戻しておくことが好ましい。   Further, in the figure, the ground reinforcing member 10 is arranged in a part of the region of the bent through hole 30 (the central horizontal portion and the inclined portion on the right side in the drawing as in the first method), but this is not limitative. Instead, it may be installed in the entire region of the bent through hole 30 that has been drilled. Here, when arranging in a part of the area of the bent through hole 30 as in the former, it is preferable to backfill the hole portion 30c where the ground reinforcing member 10 is not installed with concrete or earth and sand.

第二の工法で実施される充填材の充填工程S230は、第一の工法の充填材の充填工程S130と同様である。   The filler filling step S230 performed in the second method is the same as the filler filling step S130 in the first method.

以上説明した第一及び第二の工法は、削孔した孔(屈曲孔22或いは屈曲貫通孔30)が崩壊することなく自立する場合、又は孔にケーシングが設置できる場合に実施される。   The first and second construction methods described above are carried out when the drilled hole (the bent hole 22 or the bent through hole 30) is self-supporting without collapsing, or when a casing can be installed in the hole.

一方、地盤に削孔した孔が自立できずに崩壊したり、ケーシングを設置することが困難な場合には、削孔(工程S110又は工程S210)の際に、孔内に孔壁を保護して崩落から防止する泥水(例えば、ベントナイト)を注入しながら削孔を行う。また、地盤補強部材10の設置(工程S120又は工程S220)では、泥水で満たされた孔内に地盤補強部材10を挿入する。ここで、泥水は比重が大きいので、空気による圧入(工程S123及び工程S124)よりも、誘導棒24による押し込み(工程S121及び工程S122)や、ボーリングロッド23による引き込み(工程S221及び工程S222)の方が簡便に挿入できる。さらに袋体を萎ませると円滑に挿入しやすい。   On the other hand, when the hole drilled in the ground cannot be self-supported and collapses or it is difficult to install a casing, the hole wall is protected in the hole during drilling (step S110 or step S210). Drilling while injecting muddy water (for example, bentonite) to prevent collapse. Moreover, in installation of the ground reinforcement member 10 (process S120 or process S220), the ground reinforcement member 10 is inserted into the hole filled with muddy water. Here, since the specific gravity of the muddy water is large, the pushing by the guide rod 24 (step S121 and step S122) and the drawing by the boring rod 23 (step S221 and step S222) are more than the press-fitting by air (step S123 and step S124). Can be inserted more easily. Furthermore, if the bag is deflated, it is easy to insert smoothly.

充填材の充填(工程S130又は工程S230)では、充填材を地盤補強部材10内に充填させるにあたり、孔内の泥水を外部に排出する必要がある。   In filling the filler (step S130 or step S230), it is necessary to discharge the muddy water in the hole to fill the ground reinforcing member 10 with the filler.

図5は、孔内の泥水27を外部に排出しながら充填材26を地盤補強部材10内に充填する方法を説明するための説明図であり、同図(a)は屈曲孔22に設置された地盤補強部材10内に充填する場合、同図(b)は屈曲貫通孔30に設置された地盤補強部材10内に充填する場合を示す。   FIG. 5 is an explanatory view for explaining a method of filling the ground reinforcing member 10 with the filler 26 while discharging the muddy water 27 in the hole to the outside. FIG. 5A is installed in the bent hole 22. In the case where the ground reinforcing member 10 is filled, FIG. 4B shows the case where the ground reinforcing member 10 installed in the bent through hole 30 is filled.

屈曲孔22の場合には、図5(a)に示すように、先に工程S120で説明した注入ホース25を誘導棒24に沿わせて袋体の先端部10aまで挿入して地盤補強部材10を屈曲孔22内に設置し、その後誘導棒24を引き抜きながら先端部10aから注入ホース25を介して充填材26を充填していくことが好ましい。これにより、充填材26が袋体に充填されていくにつれて、泥水27が屈曲孔22の先端から孔口へと押し出されて排出されることになる。   In the case of the bent hole 22, as shown in FIG. 5 (a), the injection hose 25 previously described in step S120 is inserted along the guide rod 24 to the distal end portion 10a of the bag body, and the ground reinforcing member 10 is inserted. It is preferable to fill the filler 26 through the injection hose 25 from the distal end portion 10a while pulling out the guide rod 24. As a result, as the filling material 26 is filled into the bag body, the muddy water 27 is pushed out from the tip of the bent hole 22 to the hole and discharged.

一方、屈曲貫通孔30の場合には、図5(b)に示すように、先端部10a側の屈曲貫通孔30の孔口から泥水27を排出できるので、袋体の基端部10bである注入口16から充填材を注入してもよい。   On the other hand, in the case of the bent through hole 30, as shown in FIG. 5B, the muddy water 27 can be discharged from the hole of the bent through hole 30 on the distal end portion 10a side, so that it is the base end portion 10b of the bag body. A filler may be injected from the injection port 16.

以上説明した本実施形態の地盤補強構造40よれば、構成材料として補強索体14が混入された、或いは周囲に複数の補強索体14が長手方向に沿って設けられた織布又は不織布を用いることにより、袋体の引っ張り強度を高めることができる。これにより、この袋体を用いて構築した地盤補強構造40の断面は、中央に固化した充填材26が配置し、その周囲に引張り強度を高められた袋体が配置する。すなわち、袋体の断面の中心から最も離れた位置に補強索体14が配置されることになるので、地盤補強構造40に曲げ荷重が作用したときに生じる引張力に対して、補強索体14が効果的に抵抗する。また曲げ荷重によって生じる圧縮応力には、固化した充填材が抵抗することができる。   According to the ground reinforcing structure 40 of the present embodiment described above, a woven fabric or a nonwoven fabric in which the reinforcing cords 14 are mixed as a constituent material or a plurality of reinforcing cords 14 are provided along the longitudinal direction is used. Thus, the tensile strength of the bag can be increased. Thereby, in the cross section of the ground reinforcing structure 40 constructed by using this bag body, the solidified filler 26 is arranged at the center, and the bag body whose tensile strength is increased is arranged around it. That is, since the reinforcing rope 14 is arranged at the position farthest from the center of the cross section of the bag body, the reinforcing rope 14 against the tensile force generated when a bending load is applied to the ground reinforcing structure 40. Resists effectively. Moreover, the solidified filler can resist the compressive stress caused by the bending load.

また、本実施形態の地盤補強構造40よれば、地盤補強部材10の構成材料として織布又は不織布を用いることにより、地盤補強部材10に流動状態で充填された充填材26が、織布又は不織布の網目に浸透し、その後固化した時に、筒体又は袋体と一体になるので、引張力及び圧縮力の両方に抵抗する剛体となることができる。   Further, according to the ground reinforcing structure 40 of the present embodiment, by using a woven fabric or a non-woven fabric as a constituent material of the ground reinforcing member 10, the filler 26 filled in the ground reinforcing member 10 in a fluidized state is woven or non-woven fabric. When it is infiltrated into the mesh and then solidified, it becomes integral with the cylinder or bag, so that it can be a rigid body that resists both tensile and compressive forces.

また、本実施形態の地盤補強構造40によれば、地盤補強部材10を構成する袋体が柔軟性を有するので、水平部を有する屈曲孔22又は屈曲貫通孔30の孔内に、袋体を、誘導棒24を用いて押し込んだり、また地盤補強部材10内に空気を吹き込んだりして設置することができ、その後、袋体の内部に充填材26を充填して固化させることにより、水平部を有するような屈曲形状の補強構造を構築することができる。   Moreover, according to the ground reinforcement structure 40 of this embodiment, since the bag body which comprises the ground reinforcement member 10 has a softness | flexibility, a bag body is put in the hole of the bending hole 22 or the bending through-hole 30 which has a horizontal part. It is possible to install by pushing the guide rod 24 or blowing air into the ground reinforcing member 10 and then filling the inside of the bag body with the filler 26 and solidifying it. It is possible to construct a bending-shaped reinforcing structure having

また、地盤補強部材10は、引張り力に抵抗する補強索体14として、アラミド糸を用いることにより、地盤補強構造40によって補強された地盤に例えば杭を打つ際、杭打ち機等によって地盤補強構造40を問題なく打ちぬくことができる。すなわち、上述の特許文献1又は2に記載される工法のように、地盤補強構造として鋼棒や芯材のような金属部材を用いた場合には、地盤補強構造40を打ち抜く際に、鋼棒や芯材が杭へ絡みつくなどの問題が生じるが、本実施形態の地盤補強構造40ではそのような問題は生じない。   Further, the ground reinforcing member 10 uses an aramid yarn as the reinforcing rope body 14 that resists the tensile force, so that, for example, when a pile is hit on the ground reinforced by the ground reinforcing structure 40, a ground reinforcing structure is used by a pile driving machine or the like. 40 can be overcome without problems. That is, when a metal member such as a steel bar or a core material is used as the ground reinforcing structure as in the construction method described in Patent Document 1 or 2, the steel bar is punched when the ground reinforcing structure 40 is punched. However, the ground reinforcement structure 40 of the present embodiment does not cause such a problem that the core material is entangled with the pile.

また、地盤補強構造40は、地盤補強部材10内に充填する充填材26に、引張り強度を有する鋼繊維やガラス繊維等の補強繊維材を混合されたものを使用することにより、地盤補強構造40の引張り強度を、さらに向上させることができる。   Moreover, the ground reinforcement structure 40 uses the thing which mixed reinforcement fiber materials, such as steel fiber and glass fiber which have tensile strength, with the filler 26 with which the ground reinforcement member 10 is filled, The ground reinforcement structure 40 is used. The tensile strength of can be further improved.

また、地盤補強構造40は、盛土20の直下で水平方向に延びる形を設けるができるので鉛直方向の曲げ荷重に対して効果的に抵抗し、盛土20下の軟弱地盤の鉛直方向の変位を抑制することができる。ここで、地盤補強構造40が鉛直方向の曲げ荷重に対して充分に抵抗するためには、地盤補強構造40と地盤との間に滑りが生じないことが要されるので、地盤補強構造40を、盛土20が設けられる範囲の直下の両側に充分な長さとなるように施工することが好ましい。   In addition, since the ground reinforcing structure 40 can be provided with a shape extending in the horizontal direction directly below the embankment 20, it effectively resists the bending load in the vertical direction and suppresses the vertical displacement of the soft ground under the embankment 20. can do. Here, in order for the ground reinforcing structure 40 to sufficiently resist the bending load in the vertical direction, it is necessary that no slip occurs between the ground reinforcing structure 40 and the ground. It is preferable that the construction is performed so that the length is sufficient on both sides immediately below the range where the embankment 20 is provided.

なお、本実施形態の地盤補強部材10は、先端部10aが閉塞した袋状のものであるが、これに限らず、先端部10aが開口した筒体であってもよい。この場合、屈曲孔22への設置には、空気圧入による設置方法は適用できないので、誘導棒24を用いて設置する。   In addition, although the ground reinforcement member 10 of this embodiment is a bag-shaped thing with which the front-end | tip part 10a was obstruct | occluded, not only this but the cylinder body which the front-end | tip part 10a opened may be sufficient. In this case, the installation method using the air pressure cannot be applied to the bending hole 22, so the guide rod 24 is used for installation.

また、本実施形態の地盤補強部材10は、内部に充填される充填材26のうち、水分のみが袋体外部の地盤に浸出するような目の粗さを有する織布や不織布、又は微細な孔が設けられた不透水性の膜を用いることとしたが、これに限らず、水分が浸出しない袋体を用いてもよい。この場合、充填材26として、水分を含有したままで固化可能な水硬性のコンクリート等を用いる。   In addition, the ground reinforcing member 10 of the present embodiment is a woven or non-woven fabric having a fineness such that only moisture outflows into the ground outside the bag body, or a fine one of the fillers 26 filled therein. Although the water-impermeable film provided with holes is used, the present invention is not limited to this, and a bag body from which moisture does not leach may be used. In this case, hydraulic concrete or the like that can be solidified while containing moisture is used as the filler 26.

また、本実施形態では、地盤補強部材10を用いて盛土20下の軟弱地盤の補強する例を示したが、その他にも鉄道線路や道路等の直下を通過する土被りの浅いトンネルやシールドの補強に適用できる。   Moreover, in this embodiment, although the example which reinforces the soft ground under the embankment 20 using the ground reinforcement member 10 was shown, the tunnel of a shallow earth covering passing directly under a railroad track, a road, etc., or a shield Applicable for reinforcement.

図6は、鉄道線路と直交して横切るトンネル又はシールドの上部地盤への地盤補強構造の設置例を示し、同図(a)は平面図、同図(b)は横断面図、同図(c)は縦断面図である。   FIG. 6 shows an installation example of a ground reinforcement structure on the upper ground of a tunnel or shield that crosses at right angles to the railroad track. FIG. 6 (a) is a plan view, FIG. 6 (b) is a cross-sectional view, FIG. c) is a longitudinal sectional view.

図6に示すように、地盤補強構造40は、上述した地盤補強工法によって、盛土20とトンネル又はシールド50との間の地盤に、トンネル又はシールド50の伸延方向と同じ方向、かつ水平に配置され(同図(c)参照)、トンネル又はシールド50の周囲に複数に亘って構築される(同図(a)及び同図(b)参照)。   As shown in FIG. 6, the ground reinforcing structure 40 is disposed on the ground between the embankment 20 and the tunnel or shield 50 in the same direction as the extending direction of the tunnel or shield 50 and horizontally by the ground reinforcing method described above. (Refer to (c) in the figure), a plurality of structures are constructed around the tunnel or shield 50 (see (a) and (b) in the same figure).

また、図7は、鉄道線路と斜交して横切るトンネル又はシールドの上部地盤への地盤補強構造の設置例を示し、同図(a)は平面図、同図(b)は横断面図である。   FIG. 7 shows an example of the ground reinforcement structure installed on the upper ground of the tunnel or shield crossing obliquely with the railway track. FIG. 7 (a) is a plan view and FIG. 7 (b) is a cross-sectional view. is there.

図7に示すように、地盤補強構造40は、上述した図6の場合と異なり、トンネル又はシールド50の伸延方向と直交する方向に配置され(同図(a)及び同図(b)参照)、トンネル又はシールド50の伸延方向に複数に亘って構築される(同図(a)参照)。   As shown in FIG. 7, the ground reinforcing structure 40 is arranged in a direction orthogonal to the extending direction of the tunnel or shield 50 unlike the case of FIG. 6 described above (see FIG. 7A and FIG. 7B). The tunnel or shield 50 is constructed in a plurality of extending directions (see FIG. 5A).

これは、図6のトンネル又はシールド50が鉄道線路と直交する場合と比べ、図7ではトンネル又はシールド50が鉄道線路と斜交するので、鉄道線路を横切る部分の距離が長くなるため、図6と同様の配置で地盤補強構造40を構築しようとすると、長距離の屈曲孔の削孔と、その屈曲孔への地盤補強部材10の設置が必要となり、施工コスト及び施工時間を要することになることを考慮したためである。   Compared with the case where the tunnel or shield 50 in FIG. 6 is orthogonal to the railroad track, the tunnel or shield 50 is obliquely crossed with the railroad track in FIG. If it is going to construct the ground reinforcement structure 40 by the same arrangement | positioning, the drilling of a long distance bending hole and installation of the ground reinforcement member 10 to the bending hole will be needed, and construction cost and construction time will be needed. This is because of this.

また、本実施形態の地盤補強部材10は、屈曲形状の地盤補強構造40を補強することに用いたが、これに限らず、直線形状の地盤補強構造を補強することに用いてもよいことはいうまでもない。   In addition, the ground reinforcing member 10 of the present embodiment is used to reinforce the bent-shaped ground reinforcing structure 40, but is not limited thereto, and may be used to reinforce a linear ground reinforcing structure. Needless to say.

本実施形態に係る地盤補強部材を示し、同図(a)は側面図、同図(b)は(a)のA−A断面図である。The ground reinforcement member which concerns on this embodiment is shown, The figure (a) is a side view, The figure (b) is AA sectional drawing of (a). 地盤補強部材を用いて地盤補強構造を構築する第一の工法の手順を説明するための説明図である。It is explanatory drawing for demonstrating the procedure of the 1st construction method which builds a ground reinforcement structure using a ground reinforcement member. 地盤補強部材の空気圧入による設置方法を説明するための説明図である。It is explanatory drawing for demonstrating the installation method by the air pressure insertion of a ground reinforcement member. 地盤補強部材を用いて地盤補強構造を構築する第二の工法の手順を説明するための説明図である。It is explanatory drawing for demonstrating the procedure of the 2nd construction method which builds a ground reinforcement structure using a ground reinforcement member. 孔内の泥水27を外部に排出しながら充填材26を地盤補強部材10内に充填する方法を説明するための説明図であり、同図(a)は屈曲孔22に設置された地盤補強部材10内に充填する場合、同図(b)は屈曲貫通孔30に設置された地盤補強部材10内に充填する場合を示す。It is explanatory drawing for demonstrating the method of filling the filler 26 in the ground reinforcement member 10, discharging the muddy water 27 in a hole outside, The figure (a) is the ground reinforcement member installed in the bending hole 22. FIG. 10B shows a case where the ground reinforcing member 10 installed in the bent through hole 30 is filled. 鉄道線路と直交して横切るトンネル又はシールドの上部地盤への地盤補強構造の設置例を示し、同図(a)は平面図、同図(b)は横断面図、同図(c)は縦断面図である。The installation example of the ground reinforcement structure on the upper ground of the tunnel or shield crossing perpendicularly to the railway track is shown, (a) is a plan view, (b) is a cross-sectional view, and (c) is a longitudinal section. FIG. 鉄道線路と斜交して横切るトンネル又はシールドの上部地盤への地盤補強構造の設置例を示し、同図(a)は平面図、同図(b)は横断面図である。The example of installation of the ground reinforcement structure to the upper ground of the tunnel or shield crossing obliquely with the railroad track is shown, and the same figure (a) is a plan view and the same figure (b) is a cross-sectional view. 鉛直下方向の変位が生じやすい地盤を補強するための地盤補強構造の効果的な施工配置を示す断面図であり、同図(a)は土被りの浅いトンネルの場合、同図(b)は構造物下の軟弱地盤の場合である。It is sectional drawing which shows the effective construction arrangement of the ground reinforcement structure for reinforcing the ground which is easy to produce the displacement of the vertical downward direction. The figure (a) is the case of the shallow tunnel, and the figure (b) This is the case for soft ground under the structure. 従来の工法による鉛直下方向の変位が生じやすい地盤を補強するための地盤補強構造の施工配置を示す断面図であり、同図(a)は地盤補強構造を補強対象地盤に対して両側から斜め方向に打設した施工断面、同図(b)は地盤補強構造を補強対象地盤に対して直上から鉛直下方向に打設した施工断面を示す。It is sectional drawing which shows the construction arrangement of the ground reinforcement structure for reinforcing the ground which tends to generate the vertical downward displacement by the conventional construction method, and the figure (a) is a diagonal view of the ground reinforcement structure from both sides with respect to the ground to be reinforced. The construction cross section laid in the direction, FIG. 5 (b) shows the construction cross section in which the ground reinforcement structure is placed in the vertical downward direction from directly above the ground to be reinforced. 従来の工法による水平方向に地盤補強構造を構築する手順を説明するための断面図である。It is sectional drawing for demonstrating the procedure which builds a ground reinforcement structure in the horizontal direction by the conventional construction method.

符号の説明Explanation of symbols

10 地盤補強部材 14 補強索体
16 注入口 20 盛土
22 屈曲孔 23 ボーリングロッド
24 誘導棒 25 注入ホース
26 充填材 27 泥水
28 空気抜きホース 30 屈曲貫通孔
40 地盤補強構造 50 トンネル又はシールド
70 補強対象地盤 80 立坑
10a 先端部 10b 基端部
S110 屈曲孔の削孔工程 S120 地盤補強部材の設置工程
S130 充填材の充填工程 S210 屈曲貫通孔の削孔工程
S220 地盤補強部材の設置工程 S230 充填材の充填工程
DESCRIPTION OF SYMBOLS 10 Ground reinforcement member 14 Reinforcement cable body 16 Inlet 20 Filling 22 Bending hole 23 Boring rod 24 Guide rod 25 Injection hose 26 Filling material 27 Mud water 28 Air vent hose 30 Bending through-hole 40 Ground reinforcement structure 50 Tunnel or shield 70 Ground to be reinforced 80 Vertical shaft 10a Tip 10b Base end S110 Bending hole drilling process S120 Ground reinforcement member installation process S130 Filling material filling process S210 Bending through hole drilling process S220 Ground reinforcement member installation process S230 Filling material filling process

Claims (10)

地盤の補強構造であって、
柔軟性を有するとともに、所定の引張り強度を有する筒体又は筒体の一端を閉塞してなる袋体を、地盤に形成された孔内に設置し、
前記筒体又は袋体の内部に、時間の経過とともに固化する充填材を流動状態で充填し、この充填材を固化させてなることを特徴とする地盤補強構造。
It is a ground reinforcement structure,
Installed in a hole formed in the ground, having a flexible body and having a predetermined tensile strength, or a bag formed by closing one end of the cylinder,
A ground reinforcing structure characterized by filling the cylindrical body or bag body with a filler that solidifies with time, and solidifying the filler.
前記筒体又は袋体は、所定の引張り強度を有する索体を含んだ織布又は不織布により構成されていることを特徴とする請求項1に記載の地盤補強構造。   The ground reinforcing structure according to claim 1, wherein the cylindrical body or the bag body is configured by a woven fabric or a nonwoven fabric including a cord body having a predetermined tensile strength. 所定の引張り強度を有する索体が、前記筒体又は袋体の周囲にその長手方向に沿って設けられていることを特徴とする請求項1又は2に記載の地盤補強構造。   The ground reinforcement structure according to claim 1 or 2, wherein a cable body having a predetermined tensile strength is provided around the cylindrical body or bag body along a longitudinal direction thereof. 前記索体は、アラミド繊維からなることを特徴とする請求項2又は3に記載の地盤補強構造。   The ground reinforcement structure according to claim 2 or 3, wherein the cord is made of an aramid fiber. 前記孔は、屈曲部又は湾曲部を有することを特徴とする請求項1〜4のいずれかに記載の地盤補強構造。   The ground reinforcing structure according to any one of claims 1 to 4, wherein the hole has a bent portion or a curved portion. 前記孔は、少なくともその一部に水平部分を有することを特徴とする請求項1〜5のいずれかに記載の地盤補強構造。   The ground reinforcing structure according to any one of claims 1 to 5, wherein the hole has a horizontal portion at least in part. 前記充填材は、コンクリートミルクであることを特徴とする請求項1〜6のいずれかに記載の地盤補強構造。   The ground reinforcing structure according to any one of claims 1 to 6, wherein the filler is concrete milk. 前記充填材には、引張補強材が混入されていることを特徴とする請求項1〜7のいずれかに記載の地盤補強構造。   The ground reinforcing structure according to any one of claims 1 to 7, wherein a tensile reinforcing material is mixed in the filler. 地盤補強構造の施工方法であって、
柔軟性を有するとともに、所定の引張り強度を有する筒体又は筒体の一端を閉塞してなる袋体を、地盤に形成された孔内に設置し、
前記筒体又は袋体の内部に、時間の経過とともに固化する充填材を流動状態で充填し、この充填材を固化させることを特徴とする地盤補強構造の施工方法。
It is a construction method of ground reinforcement structure,
Installed in a hole formed in the ground, having a flexible body and having a predetermined tensile strength, or a bag formed by closing one end of the cylinder,
A construction method for a ground reinforcing structure, wherein a filler that solidifies over time is filled in the cylindrical body or bag body in a fluidized state, and the filler is solidified.
地盤の補強構造を構築するために用いられる地盤補強部材であって、
柔軟性を有するとともに、所定の引張り強度を有する筒体又は筒体の一端を閉塞してなる袋体からなり、
地盤に形成された孔内に設置されて、前記筒体又は袋体の内部に、時間の経過とともに固化する充填材を充填されて用いられることを特徴とする地盤補強部材。
A ground reinforcing member used to construct a ground reinforcing structure,
It consists of a bag formed by closing one end of a cylinder or a cylinder having flexibility and a predetermined tensile strength,
A ground reinforcing member that is installed in a hole formed in the ground and is used by filling the cylindrical body or bag body with a filler that solidifies over time.
JP2007112206A 2007-04-20 2007-04-20 Ground reinforcement structure, construction method of ground reinforcement structure Active JP5145757B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007112206A JP5145757B2 (en) 2007-04-20 2007-04-20 Ground reinforcement structure, construction method of ground reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007112206A JP5145757B2 (en) 2007-04-20 2007-04-20 Ground reinforcement structure, construction method of ground reinforcement structure

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2012123571A Division JP5696687B2 (en) 2012-05-30 2012-05-30 Ground reinforcement structure construction method

Publications (2)

Publication Number Publication Date
JP2008267008A true JP2008267008A (en) 2008-11-06
JP5145757B2 JP5145757B2 (en) 2013-02-20

Family

ID=40046857

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007112206A Active JP5145757B2 (en) 2007-04-20 2007-04-20 Ground reinforcement structure, construction method of ground reinforcement structure

Country Status (1)

Country Link
JP (1) JP5145757B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011226182A (en) * 2010-04-21 2011-11-10 Ohbayashi Corp Bag body, soil reinforcing method, and soil reinforcing structure
JP2013147855A (en) * 2012-01-19 2013-08-01 Kajima Corp Reinforcing structure and method for road

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62273319A (en) * 1986-05-21 1987-11-27 Asahi Chem Ind Co Ltd Formation of pile using cloth cylinder
JPH11181752A (en) * 1997-12-19 1999-07-06 Tekken Constr Co Ltd Structure and method for reinforcing natural ground
JPH11323924A (en) * 1998-05-19 1999-11-26 Kajima Corp Execution method for cast-in-place pile
JP2001207437A (en) * 2000-01-27 2001-08-03 Kajima Corp Reinforcing method for lower ground of existing structure
JP2002275927A (en) * 2001-03-13 2002-09-25 Shimizu Corp Method for strengthening reinforced concrete structure, and additionally strengthened reinforced concrete structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62273319A (en) * 1986-05-21 1987-11-27 Asahi Chem Ind Co Ltd Formation of pile using cloth cylinder
JPH11181752A (en) * 1997-12-19 1999-07-06 Tekken Constr Co Ltd Structure and method for reinforcing natural ground
JPH11323924A (en) * 1998-05-19 1999-11-26 Kajima Corp Execution method for cast-in-place pile
JP2001207437A (en) * 2000-01-27 2001-08-03 Kajima Corp Reinforcing method for lower ground of existing structure
JP2002275927A (en) * 2001-03-13 2002-09-25 Shimizu Corp Method for strengthening reinforced concrete structure, and additionally strengthened reinforced concrete structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011226182A (en) * 2010-04-21 2011-11-10 Ohbayashi Corp Bag body, soil reinforcing method, and soil reinforcing structure
JP2013147855A (en) * 2012-01-19 2013-08-01 Kajima Corp Reinforcing structure and method for road

Also Published As

Publication number Publication date
JP5145757B2 (en) 2013-02-20

Similar Documents

Publication Publication Date Title
JP5584542B2 (en) Ground deformation prevention method and underground structure construction method using the same
JP5696687B2 (en) Ground reinforcement structure construction method
JP2011179220A (en) Method of stabilizing slope and landslide control steel pipe pile
JP5145757B2 (en) Ground reinforcement structure, construction method of ground reinforcement structure
KR101649448B1 (en) An assembly for retaining sheet pile wall
JP3714395B2 (en) Reinforcement method for the ground below existing structures
JP3681902B2 (en) Seismic ground reinforcement method
US20120107049A1 (en) Tunnel reinforcement structure and tunnel construction method capable of controlling ground displacement using pressurization
US10233607B2 (en) Comprehensive excavation process
JP5333630B2 (en) Ground reinforcement structure, construction method of ground reinforcement structure
JP5217225B2 (en) Ground reinforcement structure, construction method of ground reinforcement structure
JP4223337B2 (en) Ground reinforcement method and ground reinforcement structure by the method
JP4208057B2 (en) Construction method of cast-in-place piles
JP4872561B2 (en) Construction method of ready-made piles
JP2007277830A (en) Core material, continuous underground wall, soil cement wall, continuous underground wall pile, soil cement wall pile, cast-in-place concrete pile, underground structure, and foundation structure of building
JP7032242B2 (en) Inserting member for filling grout material used in micropile method and micropile method
JP2007262811A (en) Pile structure and pile member driving method
KR100969352B1 (en) Geogrid fixing structure for retaining wall block
KR100914414B1 (en) Box capable of horizontal shift and method for forming underground contineous wall
JP4608418B2 (en) Tunnel connection water stop structure and tunnel connection water stop method
JPH11181752A (en) Structure and method for reinforcing natural ground
CN110185295A (en) A kind of the anti-floating underground garage and its construction method of only support pile
JP2006226058A (en) Grouting construction method and injection pipe device
JP2019052510A (en) Wall body construction method and wall body
KR102288469B1 (en) Underground structure construction method with double concrete tube and underground structure constructed using the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100319

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110524

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110531

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110727

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120403

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120530

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121030

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121112

R150 Certificate of patent or registration of utility model

Ref document number: 5145757

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151207

Year of fee payment: 3