JP2008257286A - Project progress management system and method - Google Patents

Project progress management system and method Download PDF

Info

Publication number
JP2008257286A
JP2008257286A JP2007095388A JP2007095388A JP2008257286A JP 2008257286 A JP2008257286 A JP 2008257286A JP 2007095388 A JP2007095388 A JP 2007095388A JP 2007095388 A JP2007095388 A JP 2007095388A JP 2008257286 A JP2008257286 A JP 2008257286A
Authority
JP
Japan
Prior art keywords
check
database
task
work procedure
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007095388A
Other languages
Japanese (ja)
Inventor
Muneatsu Okuda
宗篤 奥田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sharp Corp
Original Assignee
Sharp Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sharp Corp filed Critical Sharp Corp
Priority to JP2007095388A priority Critical patent/JP2008257286A/en
Publication of JP2008257286A publication Critical patent/JP2008257286A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a project progress management system and method for preventing a worker from failing to check all the required tasks, and reliably preventing the worker from omitting or failing in the work. <P>SOLUTION: A task required for an event is specified from an event management database 1 storing events of a project and a task database 4 storing tasks required before the event. The check results are registered in a check result database 5 based on the check items accumulated in the check item database 5. The check items which have not been checked in the check result database 5 and the check items which have not satisfied check determination are extracted from the check item database with a check item extraction part 10. A work procedure in which work contents of the tasks regarding the displayed check items are described is extracted from a work procedure database 7 and displayed. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、プロジェクトの日程とイベントの進捗状態をコンピュータ上で管理する進捗管理システムに関し、特に製品開発時のチェック項目のチェック漏れを防止するために好適に実施することができるプロジェクト進捗管理システムおよび方法に関する。   The present invention relates to a progress management system that manages a project schedule and an event progress state on a computer, and in particular, a project progress management system that can be suitably implemented to prevent check items from being checked during product development, and Regarding the method.

家電製品などの開発設計業務においては、製品化に必要な各種の検査・実験を関連部署あるいは外部企業と連携して行う必要がある。さらに近年は開発期間が短くなるとともに開発機種数が増加するなど、より短期間で漏れなく開発設計業務を行うことが求められている。しかし、複数の機種が並行して開発されている状況では、仕向け地違いやサイズ違いなどの開発が多く、このような製品は見た目が同じように見え、かつ実験室や検査道具が限られており共用する必要があるため、すでに実験検査済みの機種を再度検査してしまったり、実験検査する必要がある機種を検査済みと勘違いしてしまうミスが発生するおそれがある。   In development and design work such as home appliances, it is necessary to perform various inspections and experiments necessary for commercialization in cooperation with related departments or external companies. Furthermore, in recent years, development design work has been required to be completed in a shorter period of time, such as a shorter development period and an increased number of development models. However, in the situation where multiple models are being developed in parallel, there are many developments such as different destinations and different sizes, and such products look the same, and laboratories and inspection tools are limited. Therefore, there is a risk that a model that has already been experimentally inspected will be inspected again, or that a model that needs to be experimentally inspected will be mistaken for being inspected.

そこで、開発業務の節目となるマイルストーンとそのマイルストーンまでに必要な作業の進捗をコンピュータ上で管理し、最近終了したマイルストーンの作業終了に関する作業チェックリスト、次のマイルストーンの作業リスト、および予定を超えているマイルストーンの作業に関する定期的な警告を、指定されたメールアドレスへメール配信するシステムが提案されている。(たとえば特許文献1参照。)   Therefore, the milestones that become milestones in development work and the progress of the work required up to that milestone are managed on the computer, the work checklist for the work end of the recently completed milestone, the worklist of the next milestone, and A system has been proposed in which periodic warnings about work of milestones exceeding the schedule are delivered to a specified email address. (For example, refer to Patent Document 1.)

特開2002−236788号公報JP 2002-236788 A

前記従来の技術では、マイルストーン単位でチェックリストがメールで配信されるが、それらがチェックされたかどうかの確認を行ってはおらず、複数の機種が並行して開発される状況ではチェック作業にミスや漏れが発生する問題がある。また、チェックは行ったが判定がNGであった場合に、再度チェックを行うことを忘れてしまうという問題がある。さらに、そのチェックの作業手順を確認するために作業手順書を閲覧したい場合、チェック項目に該当する作業手順書が予めシステム側で把握できていないため、人が別途システム上で検索する必要があり、その作業手順書が正確に検索できない場合や、該当する作業手順書を検索するのに無駄な時間を要するという問題がある。   In the above-mentioned conventional technology, checklists are delivered by email in units of milestones, but it is not confirmed whether or not they are checked, and in the situation where multiple models are developed in parallel, there is a mistake in the check work. There is a problem that leaks. Further, there is a problem that when the check is performed but the determination is NG, forgetting to perform the check again. In addition, if you want to view the work procedure manual to confirm the work procedure of the check, the work procedure manual corresponding to the check item is not grasped in advance by the system side, so it is necessary for people to search on the system separately There is a problem that the work procedure manual cannot be accurately retrieved or that it takes time to retrieve the corresponding work procedure manual.

本発明の目的は、作業者が行う必要のあるすべてのタスクに対してチェック漏れを防止し、作業漏れや作業ミスを確実に防止する。   The object of the present invention is to prevent check omissions for all tasks that an operator needs to perform, and reliably prevent omissions and work errors.

本発明のプロジェクト進捗管理システムは、
プロジェクトの進捗を管理するプロジェクト進捗管理システムであって、
プロジェクトのイベントが保存されるイベント管理データベースと、
イベントまでに行う必要のあるタスクが保存されるタスクデータベースと、
イベント管理データベースおよびタスクデータベースから前記イベントに向けて必要なタスクを抽出して特定する対象タスク抽出部と、
各タスクにおいて確認すべきチェック項目が蓄積されるチェック項目データベースと、
前記チェック項目データベースの各チェック項目のチェック実績が蓄積されるチェック実績データベースと、
前記チェック実績データベースにチェック実績を登録するチェック実績登録部と、
各タスクの詳細な作業内容を記述した手順書が蓄積される作業手順書データベースと、
前記対象タスク抽出部によって特定されたタスクにおいて前記チェック実績データベースでチェックされていないチェック項目と、チェックの判定を満足していないチェック項目とを、前記チェック項目データベースから抽出するチェック項目抽出部と、
前記チェック項目抽出部によって抽出されたチェック項目を表示するチェック項目表示部と、
前記チェック項目表示部によって表示されたチェック項目に関するタスクの作業内容が記載された作業手順書を、前記作業手順書データベースから抽出する作業手順書抽出部と、
前記作業手順書抽出部によって抽出された作業手順書を表示する作業手順書表示部とを含むことを特徴とするプロジェクト進捗管理システムである。
The project progress management system of the present invention
A project progress management system for managing the progress of a project,
An event management database where project events are stored;
A task database that stores tasks that need to be done before the event,
A target task extraction unit that extracts and identifies a task necessary for the event from an event management database and a task database;
A check item database in which check items to be confirmed in each task are accumulated;
A check results database in which check results of each check item of the check item database are accumulated;
A check record registration unit for registering a check record in the check record database;
A work procedure manual database in which procedure manuals describing the detailed work contents of each task are stored;
A check item that is not checked in the check results database in the task specified by the target task extraction unit, and a check item that does not satisfy the check determination; a check item extraction unit that extracts from the check item database;
A check item display unit for displaying the check items extracted by the check item extraction unit;
A work procedure manual extracting unit that extracts a work procedure manual describing the work contents of a task related to the check item displayed by the check item display unit from the work procedure manual database;
A project progress management system comprising: a work procedure manual display unit that displays the work procedure manual extracted by the work procedure manual extraction unit.

また本発明は、
プロジェトの種類が保存されるプロジェクト管理データベースをさらに含み、複数のプロジェクトの進捗管理を行なうことを特徴とする。
The present invention also provides
It further includes a project management database in which the types of projects are stored, and the progress management of a plurality of projects is performed.

さらに本発明のプロジェクト進捗管理方法は、
プロジェクトの進捗を管理するプロジェクト進捗管理方法であって、
プロジェクトのイベントが保存されるイベント管理データベースと、イベントまでに行う必要のあるタスクが保存されるタスクデータベースとから前記イベントに向けて必要なタスクを特定する対象タスク抽出ステップと、
タスクにおいて確認すべきチェック項目が蓄積されるチェック項目データベースに基づいて、チェック項目のチェック実績をチェック実績データベースに登録するチェック実績登録ステップと、
前記対象タスクステップによって特定されたタスクにおいて前記チェック実績データベースでチェックされていないチェック項目と、チェックの判定を満足していないチェック項目とを、前記チェック項目データベースから抽出するチェック項目抽出ステップと、
前記チェック項目抽出部によって抽出されたチェック項目を表示するチェック項目表示ステップと、
前記チェック項目表示部によって表示されたチェック項目に関するタスクの作業内容が記載された作業手順書を、作業手順書が記憶された前記作業手順書データベースから抽出する作業手順書抽出ステップと、
前記作業手順書抽出部によって抽出された作業手順書を表示する作業手順書表示ステップとを含むことを特徴とするプロジェクト進捗管理方法である。
Furthermore, the project progress management method of the present invention includes:
A project progress management method for managing the progress of a project,
A target task extraction step for identifying a task necessary for the event from an event management database in which the project event is stored and a task database in which a task necessary to be performed by the event is stored;
Based on a check item database in which check items to be confirmed in a task are accumulated, a check result registration step for registering check results of check items in a check result database;
A check item extraction step for extracting from the check item database check items that are not checked in the check result database in the task identified by the target task step, and check items that do not satisfy the check determination;
A check item display step for displaying the check items extracted by the check item extraction unit;
A work procedure manual extraction step for extracting a work procedure manual in which work contents of a task related to the check item displayed by the check item display unit are described from the work procedure manual database storing the work procedure manual;
And a work procedure manual display step for displaying the work procedure manual extracted by the work procedure manual extraction unit.

さらに本発明のプログラムは、前記プロジェクト進捗管理方法をコンピュータに実行させる。   Furthermore, the program of the present invention causes a computer to execute the project progress management method.

さらに本発明の記録媒体は、前記プロジェクト進捗管理方法をコンピュータに実行させる。   Furthermore, the recording medium of the present invention causes a computer to execute the project progress management method.

本発明に従えば、プロジェクトのイベントが保存されるイベント管理データベースおよびイベントまでに行う必要のあるタスクが保存されるタスクデータベースからイベントに向けて必要なタスクを特定し、チェック項目データベースに蓄積されるチェック項目に基づいて、チェック実績をチェック実績データベースに登録する。チェック実績データベースでチェックされていないチェック項目と、チェックの判定を満足していないチェック項目とは、チェック項目データベースからチェック項目抽出部によって抽出して表示し、表示されたチェック項目に関するタスクの作業内容が記載された作業手順書を、作業手順書データベースから抽出して表示する。   According to the present invention, an event management database in which project events are stored and a task database in which tasks that need to be performed before the event are specified are identified for the event and accumulated in the check item database. Based on the check item, the check record is registered in the check record database. Check items that are not checked in the check results database and check items that do not satisfy the check judgment are extracted from the check item database by the check item extractor and displayed, and the task contents related to the displayed check items Is extracted from the work procedure manual database and displayed.

このようにチェック項目のチェック判定が満足された場合と満足していない場合と、チェックされていない場合の3通りが管理され、そのうちチェック判定がNGのものとチェックされていないものとを自動的に抽出して表示することができるため、作業者は自分が行う必要のあるチェック項目を入手でき、かつそのチェック項目の作業に必要な作業手順書をチェック項目から逆引きして閲覧できるため、効率的に作業を進めることができる。   In this way, three cases are managed, when the check judgment of the check item is satisfied, when it is not satisfied, and when it is not checked, among which the check judgment is NG and the check is not automatically checked Since the operator can obtain the check items that he / she needs to perform, and the work procedure manual necessary for the work of the check items can be reversely viewed from the check items, Work can be done efficiently.

本発明によれば、進捗計画の中で作業者が行う必要のあるタスクについて、作業に必要なチェック項目のうち、チェックされていないチェック項目と判定が満足されず、再度チェックする必要のあるチェック項目とが自動的に抽出されて表示されるので、チェック漏れを防止することができ、その手順についてチェック項目それぞれに対応する作業手順書が表示させるため、作業漏れや作業ミスを防止することができる。   According to the present invention, for a task that an operator needs to perform in a progress plan, a check item that is not checked among check items necessary for work is not satisfied, and a check that needs to be checked again. Since items are automatically extracted and displayed, check omissions can be prevented, and work procedure manuals corresponding to each check item are displayed for the procedure, preventing work omissions and work mistakes. it can.

図1は、本発明の実施の一形態に係るプロジェクト進捗管理システムの構成を示す図であり、図2Aは本発明の実施の形態に係るプロジェクト進捗管理システムのシステムフローを説明するためのフローチャートである。本実施の形態のプロジェクト進捗管理システムは、コンピュータによって実現され、決められた日程に基づいて開催する会議までに行うべきタスクの実施に関するチェックを漏れなく確実に行うよう提示することによって、製品の開発を支援するために用いられる。このプロジェクト進捗管理システムは、本発明のプロジェクト進捗管理方法がコンピュータによって読み取り可能なプログラムを実行することによって実現され、このプログラムはたとえばCD−ROMなどの記録媒体に記録される。   FIG. 1 is a diagram showing a configuration of a project progress management system according to an embodiment of the present invention, and FIG. 2A is a flowchart for explaining a system flow of the project progress management system according to the embodiment of the present invention. is there. The project progress management system according to the present embodiment is realized by a computer, and presents a product development by presenting the checks regarding the implementation of tasks to be performed before the meeting to be held based on a predetermined schedule without fail. Used to support. This project progress management system is realized by executing a program readable by a computer according to the project progress management method of the present invention, and this program is recorded on a recording medium such as a CD-ROM.

本実施の形態に係るプロジェクト進捗管理システムは、イベント管理データベース1、プロジェクト管理データベース2、進捗管理データベース3、タスクデータベース4、チェック項目データベース5、チェック実績データベース6、および作業手順書データベース7の7つのデータベースと、対象タスク抽出部8、チェック実績登録部9、チェック項目抽出部10、チェック項目表示部11、作業手順書抽出部12、および作業手順書表示部13の6つの主要部とによって構成されている。   The project progress management system according to the present embodiment includes seven event management databases 1, a project management database 2, a progress management database 3, a task database 4, a check item database 5, a check results database 6, and a work procedure manual database 7. The database is composed of six main parts: a target task extraction unit 8, a check result registration unit 9, a check item extraction unit 10, a check item display unit 11, a work procedure manual extraction unit 12, and a work procedure manual display unit 13. ing.

各種データベースに登録すべき情報をそれぞれ登録し(ステップa11)、登録された情報をもとにプロジェクトを作成し(ステップa12)、そのプロジェクトの予定を登録し(ステップa13)、実際のタスクを作業手順書を閲覧しながら作業し(ステップa14)、チェック項目のチェック実績を登録する(ステップa15)。なお、作業手順書には、図15に示されるように、各タスクで作業すべき作業内容が記載されており、その中で特にチェックすべき項目としてチェック項目が割り当てられ、タスク151に対して複数の作業手順書152が該当する可能性があり、また作業手順書152に対して複数のチェック項目153が該当する可能性がある。   Each information to be registered in various databases is registered (step a11), a project is created based on the registered information (step a12), a schedule of the project is registered (step a13), and an actual task is performed. Work while browsing the procedure manual (step a14) and register the check results of the check items (step a15). In the work procedure manual, as shown in FIG. 15, work contents to be worked on in each task are described, and check items are assigned as items to be checked in particular. There may be a plurality of work procedure manuals 152, and there may be a plurality of check items 153 corresponding to the work procedure manuals 152.

図2Bは、本発明の実施の形態に係るプロジェクト進捗管理システムの管理者の作業手順を示すフローチャートである。管理者はデータベースにそれぞれ登録すべき情報を登録し(ステップb1)、新規にプロジェクトを作成(ステップb2)し、進捗予定を作成して登録した後(ステップb3)、イベント進行を開始する(ステップb4)。そして、作業者によるタスクの進捗実績を確認・登録し(ステップb5)、すべてのイベントが完了したか否かを確認し(ステップb6)、完了していない場合には、次のイベントを開催し(ステップb4)してその実績を登録し(ステップb5)、プロジェクトに割り振られたイベントが完了すると、終了する。   FIG. 2B is a flowchart showing the work procedure of the administrator of the project progress management system according to the embodiment of the present invention. The administrator registers information to be registered in the database (step b1), creates a new project (step b2), creates and registers a progress schedule (step b3), and then starts event progress (step b1). b4). Then, confirm and register the progress of the task by the worker (step b5), check whether all events have been completed (step b6), and if not, hold the next event. The result is registered (step b4) (step b5), and the process ends when the event allocated to the project is completed.

図2Cは、プロジェクト進捗管理システムの作業者が利用する際の手順を示すフローチャートである。なお、作業者の作業手順の詳細について以下に説明する。プロジェクト管理データベース2内には、図3に示されるように、プロジェクト管理番号31に対応させて、プロジェクト名32が保存されている。   FIG. 2C is a flowchart showing a procedure when used by an operator of the project progress management system. Details of the operator's work procedure will be described below. In the project management database 2, a project name 32 is stored in association with the project management number 31, as shown in FIG.

イベント管理データベース1内には、図4に示されるように、イベント管理番号41に対応させて、各プロジェクトそれぞれで行われるイベント名42が保存されている。   In the event management database 1, as shown in FIG. 4, event names 42 performed in each project are stored in association with the event management number 41.

進捗管理データベース3内には、図5に示されるように、イベント管理番号54と、そのイベントの実施予定日52と、イベントの実績日53とが、進捗計画番号51を検索キーにして蓄積されている。なお、これは機種ごとに管理可能なように機種管理番号55ともに保存されている。   In the progress management database 3, as shown in FIG. 5, the event management number 54, the scheduled execution date 52 of the event, and the event actual date 53 are stored using the progress plan number 51 as a search key. ing. This is stored together with the model management number 55 so that it can be managed for each model.

作業手順書データベース7内には、図6に示されるように、作業手順書62がPDF形式やMS−Office(Word/Excel/PowerPoint)形式などの各種フォーマットで保存され、その各々の作業手順書に対して作業手順書番号61が検索キーとして割り振られている。なお、作業手順書の作業に当たるタスクについては、タスク番号63を検索キーにして関連付けされている。   In the work procedure manual database 7, as shown in FIG. 6, a work procedure manual 62 is stored in various formats such as PDF format and MS-Office (Word / Excel / PowerPoint) format. The work procedure manual number 61 is assigned as a search key. Note that tasks corresponding to work in the work procedure manual are associated using the task number 63 as a search key.

タスクデータベース4内には、図7に示されるように、タスク番号71を検索キーに、進捗管理データベース3を参照して各タスクが必要なイベント名を知るためのイベント管理番号72と、各タスクの作業に必要な標準的な日数73と、各タスクのタスク名74とが蓄積保存されている。なお、イベント管理番号72を検索キーにしてイベント管理データベース1のイベント名が検索され、イベント名を入手することが可能であり、同様にイベント管理番号72を検索キーにして、進捗管理データベース3からイベントの予定日を入手することが可能である。   In the task database 4, as shown in FIG. 7, an event management number 72 for knowing an event name necessary for each task by referring to the progress management database 3 using the task number 71 as a search key, and each task A standard number of days 73 required for the above work and a task name 74 of each task are stored and stored. The event name in the event management database 1 is searched using the event management number 72 as a search key, and the event name can be obtained. Similarly, from the progress management database 3 using the event management number 72 as the search key. It is possible to obtain the scheduled date of the event.

チェック項目データベース5には、図8に示されるように、チェック項目番号81を検索キーに、チェック項目の名称82と、チェック項目それぞれのチェックに必要な作業手順書を逆引きするための作業手順書番号83とが蓄積されている。   As shown in FIG. 8, the check item database 5 includes a check item number 81 as a search key, a check item name 82, and a work procedure for reversing a work procedure manual necessary for checking each check item. The book number 83 is stored.

なお、作業手順書番号83を検索キーにして、作業手順書データベース7の作業手順書番号61が検索され、作業手順書を入手することが可能であり、作業手順書データベース7内のタスク番号63からタスク名を入手可能である。   The work procedure manual number 61 in the work procedure manual database 7 is searched by using the work procedure manual number 83 as a search key, and the work procedure manual can be obtained. The task number 63 in the work procedure manual database 7 can be obtained. The task name is available from

チェック実績データベース6には、図9に示されるように、チェック項目番号91を検索キーにして、チェック項目の判定結果が済みであること表す「OK」の場合と、判定が満足されていないことを表す「NG」の場合と、チェックされていないことを表す「無し」とのいずれであるかの実績を登録したチェック実績92と、チェック実績92を登録したプロジェクト名を検索するための検索キーとしてプロジェクト管理番号93とを蓄積している。   In the check record database 6, as shown in FIG. 9, the check item number 91 is used as a search key and the check item determination result is “OK”, and the determination is not satisfied. A search result 92 for registering the result of “NG” indicating “no” or “none” indicating that the item is not checked, and a search key for searching for the project name in which the check result 92 is registered Project management number 93 is stored.

チェック実績登録前の規定値としては、チェックされていない「無し」が登録されているものとする。なお、チェック項目番号91を検索キーにしてチェック項目データベース5を検索し、チェック項目名82、作業手順書62、およびタスク名74が入手可能である。   It is assumed that “None” that is not checked is registered as the specified value before the check record registration. The check item database 5 is searched using the check item number 91 as a search key, and the check item name 82, the work procedure manual 62, and the task name 74 can be obtained.

これらのチェック項目名82、作業手順書62、およびタスク名74は、機種固有の情報は持っていないが、作業手順書62を区別することによって仕向け地ごとのタスクの違いを区別することが可能となる。例えば、A国向けとB国向けとの2種類の作業手順書62を登録し、それぞれ異なるタスクとプロジェクトに対応させることによって、該当するもののみを表示させることが可能である。   These check item names 82, work procedure manuals 62, and task names 74 do not have model-specific information, but by distinguishing the work procedure manuals 62, it is possible to distinguish the task differences for each destination. It becomes. For example, by registering two types of work procedure manuals 62 for Country A and Country B, and corresponding to different tasks and projects, it is possible to display only the corresponding ones.

対象タスク抽出部8の抽出手順は、図10に示されるように、進捗管理データベース3とタスクデータベース4とを用いて、ある会議に必要なタスクを特定するプロセスを説明する。たとえば家電製品のある機種の開発時には、まず進捗管理データベース3に登録されるイベントの開催予定日時に従ってスケジュールが決められる。   As shown in FIG. 10, the extraction procedure of the target task extraction unit 8 describes a process of specifying a task necessary for a certain meeting using the progress management database 3 and the task database 4. For example, when developing a model of home appliance, a schedule is first determined according to the scheduled date and time of an event registered in the progress management database 3.

次に、あるイベントに必要なタスクを進捗管理データベース3のイベント管理番号54からタスクデータベース4のイベント管理番号72を検索することによって抽出し、特定することが可能である。図10では、会議Dは2006年6月30日に開催され、その期日までには、タスクA〜タスクFの6つのタスクが必要であることを特定した結果を示している。   Next, a task necessary for a certain event can be extracted and specified by searching the event management number 72 of the task database 4 from the event management number 54 of the progress management database 3. In FIG. 10, the meeting D is held on June 30, 2006, and shows the result of specifying that six tasks, Task A to Task F, are required by the due date.

また、タスクデータベース4には、そのタスクに必要な標準的な日数も蓄積されていることから、会議の開催日を最終日として標準日数73分の差し引きしたタスクの開始時期の期日を知らせることも可能である。これによってタスクを開始する時期が遅延することを回避可能であり、各タスクの所要日数に対して余裕を持たせることによって、タスクの理想的な処理順序をシステム側から提示するようにすることも可能である。   In addition, since the standard number of days necessary for the task is also stored in the task database 4, it is possible to notify the due date of the start time of the task by subtracting the standard number of days of 73 minutes from the meeting date. Is possible. By doing this, it is possible to avoid delaying the time to start a task, and by providing a margin for the number of days required for each task, the ideal processing order of tasks can be presented from the system side. Is possible.

チェック実績登録部9では、チェック項目の作業結果の判定結果がOKの場合には「済み」、「NG」であり再チェックが必要な場合には「NG」を、作業者が行った入力指示に従ってチェック実績データベース6に登録する。具体的な操作手順について図14を用いて説明すると次のようになる。   In the check record registration unit 9, when the determination result of the check item work result is OK, “completed”, “NG”, and “NG” when re-check is necessary, an input instruction given by the operator In accordance with the check result database 6. A specific operation procedure will be described with reference to FIG.

作業者はInternet ExplorerのようなHTMLブラウザを利用して、図13に示されるように、確認ページ111を閲覧することによって、会議の予定を知ることができる(図2Cのステップc1)。そして、ある会議115までに行う必要のあるタスクのリスト116を知ることができる(図2Cのステップ2)。たとえばタスクAのタスク選択ボタン116を押した場合、その右隣のフレーム内にタスクAの作業に必要な作業手順書閲覧ボタン124と、チェック項目の内容およびそのチェック実績登録欄125とが表示されるため、作業者がタスクAの作業内容の詳細を確認したい場合には、手順書表示ボタン124を押すことで、詳細な作業手順書を閲覧しながら作業を進めることが可能である。   The worker can know the schedule of the meeting by browsing the confirmation page 111 as shown in FIG. 13 using an HTML browser such as Internet Explorer (step c1 in FIG. 2C). Then, a list 116 of tasks that need to be performed up to a certain conference 115 can be known (step 2 in FIG. 2C). For example, when the task selection button 116 of the task A is pressed, a work procedure manual browsing button 124 necessary for the work of the task A, the contents of the check items and the check result registration column 125 are displayed in the right adjacent frame. Therefore, when the operator wants to confirm the details of the work contents of task A, the user can proceed with the work while viewing the detailed work procedure manual by pressing the procedure manual display button 124.

作業終了後にチェック項目の実績登録を行うが、作業者が登録する前には規定値としてチェック有無欄に参照符127で示されるように「無し」が入力されており、作業者が実績を登録することによって、その値が変更される。たとえば、作業の結果チェック項目の判定が「OK」であり、チェック項目の実績として「済み」を登録したい場合、確認ページ111のチェック実績登録欄125の「OK」の下のチェック部分に対してマウスでクリックを行うことによって、チェック有無欄実績が参照符128で示されるようにデータベースに反映される。   The result of the check item is registered after the work is completed, but before the operator registers, “None” is input as a reference value in the check presence / absence column as indicated by reference numeral 127, and the worker registers the result. By doing so, the value is changed. For example, when the determination of the check result item of the work is “OK” and “completed” is to be registered as the check item result, the check portion under “OK” in the check result registration column 125 of the confirmation page 111 is checked. By clicking with the mouse, the check presence / absence column results are reflected in the database as indicated by reference numeral 128.

また作業の結果チェック項目の判定が「NG」であり、再度作業を行う必要があり、チェック項目の実績として「NG」を登録したい場合、確認ページ111のチェック実績登録欄126の「NG」の下のチェック部分に対してマウスでクリックを行うことによって、実績が参照符129で示されるようにデータベースに反映される。   If the result of the work check item is “NG” and the work needs to be performed again and “NG” is to be registered as the check item result, “NG” in the check result registration column 126 of the confirmation page 111 is displayed. By clicking with a mouse on the lower check portion, the result is reflected in the database as indicated by reference numeral 129.

チェック項目抽出部10がチェック項目を抽出する手順、図11に示されるように、チェック項目データベース5およびチェック実績データベース6からデータを抽出し、チェック項目表示部11によって表示すべき内容を示している。ここでは、チェック項目番号を検索キーとしてチェック項目データベース5からチェック項目82と作業手順書No83とを、チェック実績データベース6からチェック実績92のうち「無し」のものと、「NG」のものと、プロジェクト管理番号93とを抽出し、同一のチェック項目番号のもとにまとめ直す。   The procedure for the check item extraction unit 10 to extract check items, as shown in FIG. 11, shows data to be extracted from the check item database 5 and the check results database 6 and displayed by the check item display unit 11. . Here, using the check item number as a search key, the check item 82 from the check item database 5 and the work procedure manual No83, “none” of the check records 92 from the check record database 6, and “NG”, Project management number 93 is extracted and regrouped under the same check item number.

そして、チェック項目表示部11では、このうちチェック項目A2とそのチェック実績A3とプロジェクト名・タスク名とを表示し、作業手順書を閲覧するべく作業者から指示があった場合には、作業手順書番号A5を検索キーとして検索し、表示する。なお、作業順書データベース7内のタスク番号63を抽出することによって、同一のタスク番号ごとにグループ分けするとともに、異なるタスク番号間に対しては区切りを設けるなどを行うことも可能である。   Then, the check item display unit 11 displays the check item A2, the check result A3, the project name / task name, and when the operator gives an instruction to browse the work procedure manual, the work procedure is displayed. The book number A5 is searched as a search key and displayed. In addition, by extracting the task number 63 in the work order database 7, it is possible to divide into groups for the same task number and to set a delimiter between different task numbers.

作業手順書抽出部12では、作業者から手順書を閲覧すべく指示があった場合、作業手順書番号を検索キーとして、作業手順書データベース7の指定の作業手順書を特定する。そして、特定された作業手順書をそれぞれのファイル形式に関連付けられたアプリケーションにて作業者が閲覧することが可能である。たとえばファイル形式がPDF形式であれば、「Acrobat Reader」を起動し、MS−Office Excel形式であれば、「MS−Office Excel」を起動する。   The work procedure manual extraction unit 12 specifies a designated work procedure manual in the work procedure manual database 7 using the work procedure manual number as a search key when an instruction is given by the worker to view the procedure manual. Then, the worker can view the specified work procedure manual with an application associated with each file format. For example, if the file format is the PDF format, “Acrobat Reader” is activated, and if the file format is the MS-Office Excel format, “MS-Office Excel” is activated.

また、図12は、スケジュールに変更があった場合のデータ更新の手順を示しており、たとえば会議Dが当初予定の2006年6月30日から2006年7月8日に変更となった場合、その変更情報はイベント管理番号54および72を介してタスクデータベースの各タスクの終了日時も連動して更新される。また所要日数から開始日時の更新も同時に行うことも可能である。   FIG. 12 shows a data update procedure when the schedule is changed. For example, when the meeting D is changed from the originally scheduled date of June 30, 2006 to July 8, 2006, The change information is updated in conjunction with the end date and time of each task in the task database via the event management numbers 54 and 72. It is also possible to update the start date and time from the required number of days at the same time.

図13は、本発明による実施例を示す図である。作業者は、HTMLブラウザを利用して、タスクリストの確認ページ111を閲覧することによって、会議の予定を知ることができる(図2Cのステップc1)。そして、ある会議115までに行う必要のあるタスクのリストを知ることができる(図2Cのステップc1)。たとえば、タスクCの選択ボタン116を押した場合、その右隣のフレーム内にタスクCの作業に必要な作業手順書閲覧ボタン117と、チェック項目の内容およびそのチェック実績登録欄118とが表示され、作業者は作業手順書を閲覧しながらチェック作業を行い(図2Cのステップc3)、図12の前記手順のように実績を登録することができる(図2Cのステップc4)。   FIG. 13 is a diagram showing an embodiment according to the present invention. The worker can know the schedule of the conference by browsing the task list confirmation page 111 using an HTML browser (step c1 in FIG. 2C). Then, it is possible to know a list of tasks that need to be performed by a certain conference 115 (step c1 in FIG. 2C). For example, when the selection button 116 of the task C is pressed, a work procedure manual browsing button 117 necessary for the work of the task C, the contents of the check items, and the check result registration column 118 are displayed in the right adjacent frame. Then, the operator can perform the check work while browsing the work procedure manual (step c3 in FIG. 2C), and can register the results as in the procedure in FIG. 12 (step c4 in FIG. 2C).

ここで、さらに他のタスクの選択ボタン116を押すことによって、右隣のフレーム内の情報が入れ替わり(図2Cのステップc5)、新たに選択したタスクの作業手順書閲覧ボタン117と、チェック項目の内容およびそのチェック実績登録欄118とが表示され、作業者は作業手順書を閲覧しながらチェック作業を行い(図2Cのステップc3)、図13の前記手順のように実績を登録することができる(図2Cのステップc4)。   Here, by pressing the selection button 116 of another task, the information in the frame on the right is switched (step c5 in FIG. 2C), the work procedure manual browsing button 117 of the newly selected task, and the check item The contents and the check result registration column 118 are displayed, and the operator can perform the check work while browsing the work procedure manual (step c3 in FIG. 2C), and can register the result as in the procedure in FIG. (Step c4 in FIG. 2C).

そして、ある会議までに必要なチェック項目のうちまだチェックされていないチェック項目と、判定が「NG」登録されているチェック項目とを抽出したい場合、作業者が確認ボタン119を押すことによって、その会議に必要でかつチェックされていないチェック項目とチェック判定がNGのチェック項目とを抽出することができる(図2Cのステップc6)。   Then, when it is desired to extract check items that have not been checked yet and check items that are registered as “NG” among check items that are necessary until a certain meeting, the operator presses the confirmation button 119 to It is possible to extract check items that are necessary for the conference and are not checked, and check items whose check determination is NG (step c6 in FIG. 2C).

たとえば図13の確認ボタン119を押した場合、会議Dまでに必要なタスクのうちチェック実績が「無し」のものと「NG」のものとが参照符114のように抽出される。なお、確認ボタン119には、現在の会議を起点にした日程上で次の会議もしくは前の会議に移動することによって、その時点の会議に必要なタスクを表示することも可能である。   For example, when the confirmation button 119 in FIG. 13 is pressed, the tasks with the check record “None” and “NG” among the tasks required up to the meeting D are extracted as indicated by reference numeral 114. The confirmation button 119 can display a task necessary for the current conference by moving to the next conference or the previous conference on the schedule starting from the current conference.

確認ボタン119が押され、前述のようなプロセスを経て最終的に図11のA1〜A6のような一連のチェック項目のリストが抽出され、チェック項目表示部11によってチェックリスト112が表示される(図2Cのステップc7)。チェックリスト112には、機種名120、タスク名121とともに、会議までに必要でチェックされていないチェック項目と判定が「NG」であったチェック項目122とが表示される。   When the confirmation button 119 is pressed, a series of check items such as A1 to A6 in FIG. 11 is finally extracted through the above-described process, and the check list 112 is displayed by the check item display unit 11 ( Step c7) in FIG. 2C. The check list 112 displays a model name 120 and a task name 121 as well as a check item that is necessary and not checked before the meeting and a check item 122 whose determination is “NG”.

なお、チェック項目122では、判定が「NG」のチェック項目については赤字で表示させるなど、作業者がチェック無しのものと判定「NG」のものとが容易に区別可能な形で表示される。ここで、各チェック項目それぞれに対し、その作業を示した作業手順書を表示するための手順書表示ボタン123が用意されており(図2Cのステップc8)、作業者がそのボタン123を押すことによって、作業手順書が抽出され表示される(図2Cのステップc9,c10)。   In the check item 122, a check item with a determination of “NG” is displayed in red, for example, so that the operator can easily distinguish the check item with no check from the determination “NG”. Here, for each check item, a procedure manual display button 123 for displaying a work procedure manual indicating the work is prepared (step c8 in FIG. 2C), and the operator presses the button 123. Thus, the work procedure manual is extracted and displayed (steps c9 and c10 in FIG. 2C).

そして、その作業手順書に従って作業を進め、チェック判定が「OK」であることが確認できた場合には、チェック項目の実績登録欄122に対して図13と同様に、マウスでクリックすることによって、実績を登録することが可能である(図2Cのステップc11)。さらに、更新ボタン112Bを押すことによって、新たに登録されたチェック実績分を含むチェック実績データベース6の内容を更新し、まだチェックされていないチェック項目と判定が「NG」のチェック項目とがなくなるまで、抽出を繰り返す(図2Cのステップc12)、これらの項目がなくなれば、閉じるボタン112Aを押すことによって、抽出作業を終了させる。   Then, the work is proceeded according to the work procedure manual, and when it is confirmed that the check determination is “OK”, the check item result registration field 122 is clicked with the mouse as in FIG. The result can be registered (step c11 in FIG. 2C). Furthermore, by pressing the update button 112B, the contents of the check record database 6 including the newly registered check record are updated until there are no check items that have not yet been checked and check items that are judged “NG”. The extraction is repeated (step c12 in FIG. 2C). When these items disappear, the close operation button 112A is pressed to end the extraction operation.

以上の手順によって、チェック項目のチェック判定結果がOKであった場合とNGであった場合とチェックされていない場合との3通りが管理され、そのうちチェック判定が「NG」のものとチェックされていないものとを自動的に抽出して表示することができるため、作業者は自分が行う必要のあるチェック項目を入手でき、かつそのチェック項目の作業に必要な作業手順書をチェック項目から逆引きして閲覧できるため、効率的に作業を進めることができる。   According to the above procedure, three cases are managed: the case where the check determination result of the check item is OK, the case where it is NG, and the case where it is not checked, and the check determination is checked as “NG”. Since it is possible to automatically extract and display items that do not exist, the operator can obtain the check items that he / she needs to perform and reverse the work procedure manual necessary for the work of the check items from the check items. Since it can be browsed, it is possible to work efficiently.

また進捗計画の中で作業者が行う必要のあるタスクについて、作業に必要なチェック項目のうち、チェックされていないチェック項目と判定がNGであり再度チェックする必要のあるチェック項目が自動的に抽出されて表示されるので、チェック漏れを防止することができ、その手順についてチェック項目それぞれに対応する作業手順書が表示させるため、作業漏れや作業ミスを防止することができ、作業者が行う必要のあるすべてタスクのチェックを漏れなく確実に行うことが可能となる。   Also, for the tasks that the worker needs to perform in the progress plan, among the check items necessary for the work, the check items that are not checked and the determination items are NG and the check items that need to be checked again are automatically extracted. Since it is displayed, the check omission can be prevented, and the work procedure manual corresponding to each check item is displayed for the procedure, so it is possible to prevent work omissions and work mistakes, and the operator needs to do It is possible to reliably check all tasks with no omissions.

本発明のプロジェクト進捗管理システムおよび方法は、進捗計画をコンピュータ上で管理し、その進捗計画の節目となる会議を開催する日時までに単一もしくは複数のタスクが割り当てられており、それらのタスクに単一もしくは複数のチェック項目がある場合に漏れなくチェックすることが可能であり、その手順についてすばやく作業手順書を閲覧することが可能である。   In the project progress management system and method of the present invention, a progress plan is managed on a computer, and a single or a plurality of tasks are assigned by the date and time when a meeting as a milestone of the progress plan is held. It is possible to check without omission when there is a single or a plurality of check items, and it is possible to quickly browse the work procedure manual for the procedure.

本発明の実施の一形態に係るプロジェクト進捗管理システムの構成を示す図である。It is a figure which shows the structure of the project progress management system which concerns on one Embodiment of this invention. プロジェクト進捗管理システムのシステムフローを示すフローチャートである。It is a flowchart which shows the system flow of a project progress management system. プロジェクト進捗管理システムの管理者フローを示すフローチャートである。It is a flowchart which shows the administrator flow of a project progress management system. プロジェクト進捗管理システム作業者フローを示すフローチャートである。It is a flowchart which shows a project progress management system worker flow. プロジェクト管理データベース2の構成を示す図である。It is a figure which shows the structure of the project management database. イベント管理データベース1の構成を示す図である。2 is a diagram illustrating a configuration of an event management database 1. FIG. 進捗管理データベース3の構成を示す図である。It is a figure which shows the structure of the progress management database. 作業手順書データベース7の構成を示す図である。It is a figure which shows the structure of the work procedure manual database. タスクデータベース4の構成を示す図である。It is a figure which shows the structure of the task database. チェック項目データベース5の構成を示す図である。It is a figure which shows the structure of the check item database. チェック実績データベース6の構成を示す図である。It is a figure which shows the structure of the check performance database. 対象タスク抽出部8によるデータ処理を示す図である。It is a figure which shows the data processing by the target task extraction part. チェック項目抽出部10によるデータ処理を示す図である。It is a figure which shows the data processing by the check item extraction part. 進捗計画変更時のデータ更新を示す図である。It is a figure which shows the data update at the time of progress plan change. プロジェクト進捗管理システムによる作業手順を説明するための図である。It is a figure for demonstrating the work procedure by a project progress management system. プロジェクト進捗管理システムによる他の作業手順を説明するための図である。It is a figure for demonstrating the other work procedure by a project progress management system. タスクと作業手順書とチェック項目との関係を示す図である。It is a figure which shows the relationship between a task, a work procedure manual, and a check item.

符号の説明Explanation of symbols

1 イベント管理データベース
2 プロジェクト管理データベース
3 進捗管理データベース
4 タスクデータベース
5 チェック項目データベース
6 チェック実績データベース
7 作業手順書データベース
8 対象タスク抽出部
9 チェック実績登録部
10 チェック項目抽出部
11 チェック項目表示部
12 作業手順書抽出部
13 作業手順書表示部
31 プロジェクト管理番号(プロジェクト管理データベース検索キー)
32 プロジェクト名
41 イベント管理番号(イベント管理データベース検索キー)
42 イベント名
51 進捗計画番号
52 進捗予定日
53 進捗実績日
54 イベント管理番号(イベント管理データベース検索キー)
55 プロジェクト管理番号(プロジェクト管理データベース検索キー)
61 作業手順書番号(作業手順書データベース検索キー)
62 作業手順書名(作業手順書ファイル名)
63 タスク番号(タスクデータベース検索キー)
71 タスク番号
72 イベント管理番号(イベント管理データベース検索キー)
73 標準日数
74 タスク名
81 チェック項目番号
82 チェック項目名称
83 作業手順書番号(作業手順書データベース検索キー)
91 チェック項目番号
92 チェック項目の実績
93 プロジェクト管理番号(プロジェクト管理データベース検索キー)
111 会議Dまでに必要なタスクの一覧
112 判定が「NG」のものとチェックが無いチェック項目のリスト
112A チェック項目のリストを閉じるボタン
112B チェック項目リスト更新ボタン
113,152 作業手順書
114 チェック項目抽出部による抽出後のチェック項目
115 イベント名(会議D)
116 イベント(会議D)までに必要なタスク表示ボタン
117 タスク(タスクC)の作業手順書表示ボタン
118 タスクCのチェック項目とチェック実績登録欄
119 チェック項目のリスト抽出実行部
120 チェック項目の対象機種名
121 チェック項目の対象タスク名
122 チェック項目名およびチェック実績
123 チェック項目の作業手順書表示ボタン
124 タスク(タスクA)の作業手順書表示ボタン
125 タスクAのチェック項目とチェック実績登録欄(登録前)
126 タスクAのチェック項目とチェック実績登録欄(登録後)
127 チェック実績登録前
128 チェック実績登録後(判定OKの場合)
129 チェック実績登録後(判定NGの場合)
151 タスク
153 チェック項目
A1 チェック項目番号
A2 チェック項目名称
A3 チェック項目の実績
A4 プロジェクト管理番号(プロジェクト管理データベース検索キー)
A5 作業手順書番号(作業手順書データベース検索キー)
A6 タスク番号(タスクデータベース検索キー)
DESCRIPTION OF SYMBOLS 1 Event management database 2 Project management database 3 Progress management database 4 Task database 5 Check item database 6 Check result database 7 Work procedure document database 8 Target task extraction part 9 Check result registration part 10 Check item extraction part 11 Check item display part 12 Work Procedure Manual Extraction Unit 13 Work Procedure Manual Display Unit 31 Project Management Number (Project Management Database Search Key)
32 Project name 41 Event management number (event management database search key)
42 Event name 51 Progress plan number 52 Scheduled date 53 Progress result date 54 Event management number (event management database search key)
55 Project management number (Project management database search key)
61 Work procedure manual number (work procedure manual database search key)
62 Work procedure manual name (work procedure manual file name)
63 Task number (task database search key)
71 Task number 72 Event management number (event management database search key)
73 Standard days 74 Task name 81 Check item number 82 Check item name 83 Work procedure manual number (work procedure manual database search key)
91 Check Item Number 92 Check Item Performance 93 Project Management Number (Project Management Database Search Key)
111 List of Tasks Necessary until Meeting D 112 List of Check Items with “NG” and No Check 112A Button for Closing Check Item List 112B Check Item List Update Button 113, 152 Work Procedure Manual 114 Check Item Extraction Check items after extraction by department 115 Event name (Conference D)
116 Task Display Buttons Necessary to Event (Conference D) 117 Task Procedure Display Button for Task (Task C) 118 Check Item for Task C and Check Result Registration Field 119 Check Item List Extraction Execution Unit 120 Check Item Target Model Name 121 Target task name of check item 122 Check item name and check result 123 Check item work procedure manual display button 124 Task (task A) work procedure manual display button 125 Task A check item and check result registration field (before registration) )
126 Task A check items and check results registration field (after registration)
127 Before check result registration 128 After check result registration (in case of judgment OK)
129 After registering check results (in the case of judgment NG)
151 Task 153 Check item A1 Check item number A2 Check item name A3 Result of check item A4 Project management number (project management database search key)
A5 Work procedure manual number (work procedure manual database search key)
A6 Task number (task database search key)

Claims (5)

プロジェクトの進捗を管理するプロジェクト進捗管理システムであって、
プロジェクトのイベントが保存されるイベント管理データベースと、
イベントまでに行う必要のあるタスクが保存されるタスクデータベースと、
イベント管理データベースおよびタスクデータベースから前記イベントに向けて必要なタスクを抽出して特定する対象タスク抽出部と、
各タスクにおいて確認すべきチェック項目が蓄積されるチェック項目データベースと、
前記チェック項目データベースの各チェック項目のチェック実績が蓄積されるチェック実績データベースと、
前記チェック実績データベースにチェック実績を登録するチェック実績登録部と、
各タスクの詳細な作業内容を記述した手順書が蓄積される作業手順書データベースと、
前記対象タスク抽出部によって特定されたタスクにおいて前記チェック実績データベースでチェックされていないチェック項目と、チェックの判定を満足していないチェック項目とを、前記チェック項目データベースから抽出するチェック項目抽出部と、
前記チェック項目抽出部によって抽出されたチェック項目を表示するチェック項目表示部と、
前記チェック項目表示部によって表示されたチェック項目に関するタクスの作業内容が記載された作業手順書を、前記作業手順書データベースから抽出する作業手順書抽出部と、
前記作業手順書抽出部によって抽出された作業手順書を表示する作業手順表示部とを含むことを特徴とするプロジェクト進捗管理システム。
A project progress management system for managing the progress of a project,
An event management database where project events are stored;
A task database that stores tasks that need to be done before the event,
A target task extraction unit that extracts and identifies a task necessary for the event from an event management database and a task database;
A check item database in which check items to be confirmed in each task are accumulated;
A check results database in which check results of each check item of the check item database are accumulated;
A check record registration unit for registering a check record in the check record database;
A work procedure manual database in which procedure manuals describing the detailed work contents of each task are stored;
A check item that is not checked in the check results database in the task specified by the target task extraction unit, and a check item that does not satisfy the check determination; a check item extraction unit that extracts from the check item database;
A check item display unit for displaying the check items extracted by the check item extraction unit;
A work procedure manual extraction unit that extracts a work procedure manual that describes work contents of a task related to the check item displayed by the check item display unit from the work procedure manual database;
A project progress management system comprising: a work procedure display unit that displays the work procedure manual extracted by the work procedure manual extraction unit.
プロジェトの種類が保存されるプロジェクト管理データベースをさらに含み、複数のプロジェクトの進捗管理を行なうことを特徴とする請求項1記載のプロジェクト管理システム。   The project management system according to claim 1, further comprising a project management database in which project types are stored, and performing progress management of a plurality of projects. プロジェクトの進捗を管理するプロジェクト進捗管理方法であって、
プロジェクトのイベントが保存されるイベント管理データベースと、イベントまでに行う必要のあるタスクが保存されるタスクデータベースとから前記イベントに向けて必要なタスクを特定する対象タスク抽出ステップと、
タスクにおいて確認すべきチェック項目が蓄積されるチェック項目データベースに基づいて、チェック項目のチェック実績をチェック実績データベースに登録するチェック実績登録ステップと、
前記対象タスク抽出ステップによって特定されたタスクにおいて前記チェック実績データベースでチェックされていないチェック項目と、チェックの判定を満足していないチェック項目とを、前記チェック項目データベースから抽出するチェック項目抽出ステップと、
前記チェック項目抽出部によって抽出されたチェック項目を表示するチェック項目表示ステップと、
前記チェック項目表示部によって表示されたチェック項目に関するタスクの作業内容が記載された作業手順書を、作業手順書が記憶された前記作業手順書データベースから抽出する作業手順書抽出ステップと、
前記作業手順書抽出部によって抽出された作業手順書を表示する作業手順表示ステップとを含むことを特徴とするプロジェクト進捗管理方法。
A project progress management method for managing the progress of a project,
A target task extraction step for identifying a task necessary for the event from an event management database in which the project event is stored and a task database in which a task necessary to be performed by the event is stored;
Based on a check item database in which check items to be confirmed in a task are accumulated, a check result registration step for registering check results of check items in a check result database;
A check item extraction step for extracting from the check item database check items that are not checked in the check results database in the task identified by the target task extraction step, and check items that do not satisfy the check determination;
A check item display step for displaying the check items extracted by the check item extraction unit;
A work procedure manual extraction step for extracting a work procedure manual in which work contents of a task related to the check item displayed by the check item display unit are described from the work procedure manual database storing the work procedure manual;
A project progress management method, comprising: a work procedure display step for displaying the work procedure manual extracted by the work procedure manual extraction unit.
請求項3記載のプロジェクト進捗管理方法をコンピュータに実行させるためのプログラム。   A program for causing a computer to execute the project progress management method according to claim 3. 請求項3記載のプロジェクト進捗管理方法をコンピュータに実行させるためのプログラムを記録した記録媒体。   A recording medium storing a program for causing a computer to execute the project progress management method according to claim 3.
JP2007095388A 2007-03-30 2007-03-30 Project progress management system and method Pending JP2008257286A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007095388A JP2008257286A (en) 2007-03-30 2007-03-30 Project progress management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007095388A JP2008257286A (en) 2007-03-30 2007-03-30 Project progress management system and method

Publications (1)

Publication Number Publication Date
JP2008257286A true JP2008257286A (en) 2008-10-23

Family

ID=39980829

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007095388A Pending JP2008257286A (en) 2007-03-30 2007-03-30 Project progress management system and method

Country Status (1)

Country Link
JP (1) JP2008257286A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010038868A1 (en) 2008-10-02 2010-04-08 東ソー株式会社 Polyalkylene glycol producing catalyst, and method for producing polyalkylene glycol using same
WO2021049569A1 (en) * 2019-09-11 2021-03-18 株式会社テクノツリー Manual system
JP2021047834A (en) * 2019-09-11 2021-03-25 株式会社テクノツリー Manual system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010038868A1 (en) 2008-10-02 2010-04-08 東ソー株式会社 Polyalkylene glycol producing catalyst, and method for producing polyalkylene glycol using same
WO2021049569A1 (en) * 2019-09-11 2021-03-18 株式会社テクノツリー Manual system
JP2021047834A (en) * 2019-09-11 2021-03-25 株式会社テクノツリー Manual system
JP7078958B2 (en) 2019-09-11 2022-06-01 株式会社テクノツリー Manual system

Similar Documents

Publication Publication Date Title
JP4100156B2 (en) Data conversion system
JP2007304660A (en) Command execution result recording system and command execution result recording method
JPH1139292A (en) Document management method and document retrieval method and device
JP6152282B2 (en) Work support system and program
JP4978432B2 (en) Business specification understanding support system and method
US10592560B2 (en) Knowledge object and collaboration management system
JP2008257286A (en) Project progress management system and method
JPH1115646A (en) Technique information managing system
US10817362B1 (en) Automatic contextualization for in-situ data issue reporting, presentation and resolution
WO2020067531A1 (en) Help information display system, help information display method, and help information display program
JP2010140330A (en) Business management support device and program
JP2008015774A (en) Imitation document detection system and program
JP5831625B2 (en) Information analysis support device, information analysis support method, and information analysis support program
JP4809053B2 (en) Data linkage processing system, data linkage processing method, and data linkage processing program
JP2007183819A (en) Document file search system
JP5973191B2 (en) Regular sales management program, regular sales management device, and regular sales recording processing method
JP2005215857A (en) Resource assignment system for solution business
WO2023189440A1 (en) Information processing device and information processing method
JP4829707B2 (en) Business management system, business management method, and business management program
JP2002108875A (en) Electronic manual unit and electronic manual change method
CN106408151A (en) Work support system and work support method
JP2006309284A (en) Electronic tag retrieval system
JP2000082103A (en) Electronic document sending back device
JP2006172511A (en) Engineering information management system
JP2002140341A (en) Method and device for retrieving image, and database structure