JP2008255614A - Support structure of natural ground and support method of natural ground - Google Patents

Support structure of natural ground and support method of natural ground Download PDF

Info

Publication number
JP2008255614A
JP2008255614A JP2007097671A JP2007097671A JP2008255614A JP 2008255614 A JP2008255614 A JP 2008255614A JP 2007097671 A JP2007097671 A JP 2007097671A JP 2007097671 A JP2007097671 A JP 2007097671A JP 2008255614 A JP2008255614 A JP 2008255614A
Authority
JP
Japan
Prior art keywords
ground
shield tunnel
curved pipe
natural ground
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2007097671A
Other languages
Japanese (ja)
Other versions
JP5012149B2 (en
Inventor
Makoto Kanai
誠 金井
Keizo Miki
慶造 三木
Jun Ueda
潤 上田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2007097671A priority Critical patent/JP5012149B2/en
Publication of JP2008255614A publication Critical patent/JP2008255614A/en
Application granted granted Critical
Publication of JP5012149B2 publication Critical patent/JP5012149B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a support structure and a support method of the natural ground, capable of supporting an excavation expected part even under the ground of the deep depth. <P>SOLUTION: This support structure 1 supports the periphery of the excavation expected part 10 in advance when excavating the natural ground 8 between two shield tunnels 2 and 4, and has a circular arc-shaped bent pipe 16, a reinforcing steel material 26 arranged in this bent pipe 16, a solidifying material 30 filled in the bent pipe 16, the improved ground 8A of improving the ground around the bent pipe 16, and a support material 6 arranged in the natural ground 8 above and below the excavation expected part 10. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、並設された2つのシールドトンネル同士を連通するために、それらシールドトンネル間の地山を開削する際に予め開削予定部位の周囲を支持する地山の支持構造に関する。   The present invention relates to a ground support structure that supports the surroundings of a site to be excavated in advance when excavating a natural ground between the shield tunnels in order to communicate two shield tunnels arranged side by side.

地下鉄の駅構内や地下道の分岐・合流部の構築等に際して、並設された2つのシールドトンネルの間の地山を開削する工法が用いられている。ここで、シールドトンネル間の地山を開削する際にシールドトンネル間に地山を支持するために支持部材を一方のシールドトンネルから他方のシールドトンネルへ掛け渡す方法が用いられる。   The construction method of excavating the ground between two shield tunnels installed side by side is used for construction of subway station yard, underpass branching and confluence. Here, in order to support the ground between the shield tunnels when excavating the ground between the shield tunnels, a method is used in which a support member is passed from one shield tunnel to the other shield tunnel.

例えば、特許文献1には、一方のシールドトンネル内から他方のシールドトンネルへ開削予定部位の上方及び下方に鋼管を円弧状に掛け渡して設置し、この鋼管内に補強材を挿入設置して地山を支持する方法が開示されている。
特開2004−169474号公報
For example, in Patent Document 1, a steel pipe is installed in a circular arc shape above and below a site to be cut from one shield tunnel to the other shield tunnel, and a reinforcing material is inserted and installed in the steel pipe. A method for supporting a mountain is disclosed.
JP 2004-169474 A

しかしながら、特許文献1に記載の方法は、大深度地下においては、開削予定部位に作用する地山の載荷荷重が大きくなるので、鋼管及び補強材だけでは地山を十分に支持することができないという問題点があった。そこで、更に、シールドトンネル内の上方及び下方に梁を設置したり、開削予定部位の両側に柱を設置して地山を支持することが考えられるが、梁や柱などが建築限界内に位置するので、採用することができなかった。   However, in the method described in Patent Document 1, in the deep underground, the loading load of the natural ground acting on the planned excavation site becomes large, so that the natural ground cannot be sufficiently supported only by the steel pipe and the reinforcing material. There was a problem. Therefore, it is conceivable that beams are installed above and below the shield tunnel, or pillars are installed on both sides of the planned excavation site to support the natural ground, but the beams and columns are located within the building limits. So I couldn't adopt it.

そこで、本発明は、上記のような従来の問題点に鑑みなされたものであって、大深度地下であっても開削予定部位を支持することが可能な地山の支持構造及び支持方法を提供することを目的とする。   Therefore, the present invention has been made in view of the conventional problems as described above, and provides a ground support structure and a support method capable of supporting a planned excavation site even in a deep underground. The purpose is to do.

前記目的を達成するため、本発明の地山の支持構造は、並設された2つのシールドトンネルの間の地山を開削する際に予め開削予定部位の周囲を支持する地山の支持構造であって、一方のシールドトンネル内から他方のシールドトンネルを囲うように地山内に設置され、両端が前記一方のシールドトンネルの覆工体に固定された円弧状の補強材を備えることを特徴とする(第1の発明)。
本発明による地山の支持構造によれば、円弧状の補強材で他方のシールドトンネル及び開削予定部位を囲うので、地山による荷重はこの補強材によって支持される。したがって、他方のシールドトンネル及び開削予定部位に作用する地山の荷重が低減されるので、他方のシールドトンネル及び開削予定部位に作用する荷重は、補強材を設置しない場合に比べて著しく減少する。
In order to achieve the above-mentioned object, the ground support structure of the present invention is a ground support structure that supports the surroundings of the planned excavation site in advance when excavating the ground between two shield tunnels arranged side by side. And it is installed in a natural ground so as to surround the other shield tunnel from the inside of one shield tunnel, and both ends are provided with arc-shaped reinforcements fixed to the lining body of the one shield tunnel. (First invention).
According to the ground support structure of the present invention, the other shield tunnel and the part to be cut are surrounded by the arc-shaped reinforcing material, so that the load due to the natural ground is supported by the reinforcing material. Therefore, since the load of the ground which acts on the other shield tunnel and the planned cutting site is reduced, the load acting on the other shield tunnel and the planned cutting site is remarkably reduced as compared with the case where no reinforcing material is installed.

第2の発明は、第1の発明において、前記補強材は曲管であって、前記曲管内に固化材を充填してなることを特徴とする。
本発明による地山の支持構造によれば、補強材である曲管内に固化材が充填されているので、補強材のみが地山中に設置されている場合よりも大きな荷重を支持することができる。したがって、大深度地下でも地山を支持することが可能である。
According to a second invention, in the first invention, the reinforcing material is a curved pipe, and the curved pipe is filled with a solidifying material.
According to the support structure of the natural ground according to the present invention, since the solidified material is filled in the curved pipe that is the reinforcing material, it is possible to support a larger load than when only the reinforcing material is installed in the natural ground. . Therefore, it is possible to support natural ground even in deep underground.

第3の発明は、第1の発明において、前記補強材は曲管であって、前記曲管内に、一方のシールドトンネル内から他方のシールドトンネルを囲うように設置された円弧状の鋼材を更に備え、前記曲管内に固化材を充填してなることを特徴とする。
本発明による地山の支持構造によれば、補強材である曲管内に鋼材が設置されるとともに、固化材が充填されているので、さらに大きな荷重を支持することができる。したがって、大深度地下でも地山を支持することが可能である。
According to a third invention, in the first invention, the reinforcing material is a curved pipe, and an arcuate steel material further installed in the curved pipe so as to surround the other shield tunnel from within one shield tunnel is further provided. And the curved pipe is filled with a solidifying material.
According to the ground support structure of the present invention, the steel material is installed in the curved pipe as the reinforcing material and the solidified material is filled, so that a larger load can be supported. Therefore, it is possible to support natural ground even in deep underground.

第4の発明は、第1〜第3のいずれかの発明において、前記補強材の周囲に地盤改良された改良体が形成されてなることを特徴とする。
本発明による支持構造によれば、補強材の周囲に地盤改良された改良体が形成されているので、補強材に囲まれた内側に地下水は侵入することができない。したがって、開削予定部位を開削する際に地下水の流出が無いので、安全に、かつ、効率的に開削作業を実施することができる。
According to a fourth invention, in any one of the first to third inventions, an improved body having improved ground is formed around the reinforcing material.
According to the support structure of the present invention, since the improved body having improved ground is formed around the reinforcing material, the groundwater cannot enter the inside surrounded by the reinforcing material. Therefore, since there is no outflow of groundwater when the part to be cut is cut, the cutting work can be performed safely and efficiently.

第5の発明は、第1〜第4のいずれかの発明において、前記補強材に囲まれた内側で、かつ、開削予定部位の上方及び下方の地山中に、支持材が前記一方のシールドトンネルから前記他方のシールドトンネルに掛け渡すように設置されてなること特徴とする。
本発明による支持構造によれば、補強材に囲まれた内側に支持材を設置するので、支持材の大きさや厚さ等を小さくすることができる。したがって、支持材の設置作業が容易になるので、設置作業の効率が良くなり、施工期間を短くすることができる。また、小さい支持材を用いることができるので、連結して構築された空間の建築限界を広く確保することが可能となる。
According to a fifth invention, in any one of the first to fourth inventions, the support material is the one shield tunnel inside the ground surrounded by the reinforcing material and above and below the planned excavation site. It is installed so that it may span over the said other shield tunnel.
According to the support structure of the present invention, since the support material is installed on the inner side surrounded by the reinforcing material, the size and thickness of the support material can be reduced. Therefore, the installation work of the support material becomes easy, the efficiency of the installation work is improved, and the construction period can be shortened. Moreover, since a small support material can be used, it becomes possible to ensure a wide architectural limit of the space constructed by connecting them.

第6の発明の地山の支持方法は、並設された2つのシールドトンネル間の地山を開削する際に予め開削予定部位の周囲を支持する地山の支持方法において、一方のシールドトンネル内から他方のシールドトンネルを囲うように円弧状の曲管を設置して、該曲管の両端を前記一方のシールドトンネルの覆工体に固定し、前記曲管の周囲に地盤改良材を充填して改良体を形成し、前記曲管内に補強用鋼材を挿通し、前記曲管内に固化材を充填し、前記曲管に囲まれた内側で、かつ、開削予定部位の上方及び下方の地山中に、前記一方のシールドトンネルから前記他方のシールドトンネルに支持材を掛け渡すように設置し、前記開削予定部位の周囲の地山を支持することを特徴とする。
本発明による地山の支持方法によれば、円弧状の曲管、支持材等にて開削予定部の周囲が支持されるので、シールドトンネル間を連結して構築される空間を確実に支持することができる。
According to a sixth aspect of the present invention, there is provided a method for supporting a natural ground, in which the ground around a site to be cut is supported in advance when the ground between two shield tunnels arranged side by side is opened. An arc-shaped curved pipe is installed so as to surround the other shield tunnel, and both ends of the curved pipe are fixed to the shield body of the one shield tunnel, and a ground improvement material is filled around the curved pipe. Forming an improved body, inserting a reinforcing steel material into the curved pipe, filling the curved pipe with a solidifying material, and inside the ground surrounded by the curved pipe and above and below the planned cutting site In addition, a support material is installed from the one shield tunnel to the other shield tunnel so as to support a natural ground around the planned excavation site.
According to the ground support method according to the present invention, the circumference of the planned excavation portion is supported by the arcuate curved pipe, the support material, etc., so that the space constructed by connecting the shield tunnels is reliably supported. be able to.

本発明の地山の支持構造及び地山の支持方法を用いることにより、大深度地下であっても開削予定部位を安全に開削することができる。   By using the natural ground support structure and natural ground support method of the present invention, it is possible to safely excavate the planned excavation site even in a deep underground.

以下、本発明の好ましい実施形態について図面を用いて詳細に説明する。
図1は、本発明が適用される並設されたシールドトンネルを示す断面図である。図1に示すように、第1シールドトンネル2と、この第1シールドトンネル2よりも小さい円形断面の第2シールドトンネル4とが隣接して並設されている。このように隣接して並設された2つの円形断面のシールドトンネル2、4間の開削予定部位10を開削して両シールドトンネル2、4を連結する。なお、各シールドトンネル2、4の断面形状は図示する真円状のものに限定されるものではなく、楕円状のものであってもよい。
各シールドトンネル2、4の内周面には、その全周に亘って同一規格の鋼製セグメント12が環状に組み立てられて覆工体が形成されている。
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is a sectional view showing shield tunnels arranged in parallel to which the present invention is applied. As shown in FIG. 1, a first shield tunnel 2 and a second shield tunnel 4 having a circular cross section smaller than the first shield tunnel 2 are arranged adjacent to each other. In this way, the part 10 to be cut between the shield tunnels 2 and 4 having two circular cross-sections arranged adjacent to each other is cut to connect the shield tunnels 2 and 4. In addition, the cross-sectional shape of each shield tunnel 2 and 4 is not limited to the perfect circle shape shown in figure, An elliptical thing may be sufficient.
On the inner peripheral surface of each shield tunnel 2, 4, a steel segment 12 of the same standard is assembled in an annular shape over the entire periphery to form a covering body.

図2は、本発明を適用した地山の支持構造を示す図である。図2において、支持構造1は、2つのシールドトンネル2、4の間の地山8を開削する際に予め開削予定部位10の周囲を支持するものである。この支持構造1は、円弧状の補強材である曲管16と、この曲管16内に設置された補強用鋼材26と、曲管16内に充填された固化材30と、曲管16の周囲の地盤改良された改良地盤8Aと、開削予定部位10の上方及び下方の地山8中に設置される支持材6と、この支持材6内に設置された補強用鋼材28と、支持材6内に充填された固化材30と、支持材6の周囲の地盤改良された改良地盤8Bとを備える。
曲管16は、第1シールドトンネル2内から第2シールドトンネル4を取り囲むように地山8中に設置されている。
FIG. 2 is a diagram showing a ground support structure to which the present invention is applied. In FIG. 2, the support structure 1 supports the periphery of the planned cutting site 10 in advance when the ground 8 between the two shield tunnels 2 and 4 is cut. The support structure 1 includes a curved pipe 16 which is an arc-shaped reinforcing material, a reinforcing steel material 26 installed in the curved pipe 16, a solidified material 30 filled in the curved pipe 16, and the curved pipe 16. Improved ground 8A improved around the ground, support material 6 installed in the ground 8 above and below the planned excavation site 10, a reinforcing steel material 28 installed in the support material 6, and a support material 6 is provided with solidified material 30 filled in 6 and improved ground 8B with improved ground around support material 6.
The curved pipe 16 is installed in the natural ground 8 so as to surround the second shield tunnel 4 from within the first shield tunnel 2.

図3は、図2のA矢視図である。図3に示すように、曲管16は第1シールドトンネル2の長手方向に所定の間隔で設置されており、具体的には、セグメント12の主桁20間に設置される。本実施形態においては、曲管16として断面が円形の鋼管を用い、セグメント12は、例えば、幅1.2mの鋼製であって40cm間隔で主桁20が立設されており、この主桁20間に曲管16が約40cm間隔で設けられている。
曲管16の両端は第1シールドトンネル2のセグメント12に固定されている。なお、曲管16の両端はセグメント12に剛接合すれば良く、その接合構造は特に限定されるものではないが、例えば、溶接やボルト接合により接合される。
3 is a view taken in the direction of arrow A in FIG. As shown in FIG. 3, the curved pipes 16 are installed at predetermined intervals in the longitudinal direction of the first shield tunnel 2, specifically, installed between the main beams 20 of the segment 12. In this embodiment, a steel pipe having a circular cross section is used as the curved pipe 16, and the segment 12 is made of steel having a width of 1.2 m, for example, and the main beam 20 is erected at intervals of 40 cm. Bent tubes 16 are provided between 20 at intervals of about 40 cm.
Both ends of the curved pipe 16 are fixed to the segment 12 of the first shield tunnel 2. Note that both ends of the bent pipe 16 may be rigidly joined to the segment 12, and the joining structure is not particularly limited, but is joined by welding or bolt joining, for example.

図4は、図2のB−B’断面図である。図4に示すように、曲管16内には、補強用鋼材26が挿通設置され、この補強用鋼材26の両端は第1シールドトンネル2のセグメント12に固定されている。ただし、補強用鋼材26の両端は必ずしもセグメント12に接合しなくてもよい。なお、本実施形態においては、補強用鋼材26としてH型鋼を用いた
また、曲管16内には、モルタルやコンクリート等の固化材30が充填されており、補強用鋼材26は固化材30により固定されている。
4 is a cross-sectional view taken along the line BB ′ of FIG. As shown in FIG. 4, a reinforcing steel material 26 is inserted and installed in the curved pipe 16, and both ends of the reinforcing steel material 26 are fixed to the segment 12 of the first shield tunnel 2. However, both ends of the reinforcing steel material 26 do not necessarily have to be joined to the segment 12. In this embodiment, H-shaped steel is used as the reinforcing steel material 26. Further, the bent pipe 16 is filled with a solidifying material 30 such as mortar or concrete, and the reinforcing steel material 26 is formed by the solidifying material 30. It is fixed.

そして、曲管16の周囲は地盤改良材が充填され、改良地盤8Aが形成されている。   And the surroundings of the curved pipe 16 are filled with the ground improvement material, and the improved ground 8A is formed.

図2に示すように、支持材6は、開削予定部位10の上方及び下方の地山8中に、第1シールドトンネル2から第2シールドトンネル4にそれぞれ掛け渡されている。また、図3に示すように、支持用部材6は各第1シールドトンネル2、4の長手方向に所定の間隔で設置されており、例えば、曲管16と同様に、セグメント12の主桁20間に設置される。なお、本実施形態においては、支持材6として断面が円形の鋼管を用いた。   As shown in FIG. 2, the support material 6 is spanned from the first shield tunnel 2 to the second shield tunnel 4 in the natural ground 8 above and below the planned excavation site 10. As shown in FIG. 3, the supporting members 6 are installed at predetermined intervals in the longitudinal direction of the first shield tunnels 2, 4. For example, the main beam 20 of the segment 12 is the same as the curved pipe 16. Installed between. In the present embodiment, a steel pipe having a circular cross section is used as the support member 6.

図5は、図2のC−C’断面図である。図5に示すように、支持材6内には、補強用鋼材28が挿通設置され、この補強用鋼材28の両端はそれぞれ各シールドトンネル2、4のセグメント12に固定されている。なお、補強用鋼材28の両端も補強用鋼材26の場合と同様に、セグメント12に剛接合すれば良く、その接合構造は特に限定されるものではない。また、本実施形態においては、補強用鋼材28としてH型鋼を用いた。   FIG. 5 is a cross-sectional view taken along the line C-C ′ of FIG. 2. As shown in FIG. 5, a reinforcing steel material 28 is inserted and installed in the support material 6, and both ends of the reinforcing steel material 28 are fixed to the segments 12 of the shield tunnels 2 and 4, respectively. Note that both ends of the reinforcing steel material 28 may be rigidly joined to the segment 12 as in the case of the reinforcing steel material 26, and the joining structure is not particularly limited. In the present embodiment, H-shaped steel is used as the reinforcing steel material 28.

また、支持材6内には、モルタルやコンクリート等の固化材30が充填されており、補強用鋼材28は固化材30により固定されている。   The support material 6 is filled with a solidifying material 30 such as mortar or concrete, and the reinforcing steel material 28 is fixed by the solidifying material 30.

そして、支持材6の周囲は地盤改良材が充填され、改良地盤8Bが形成されている。   And the surroundings of the support material 6 are filled with the ground improvement material, and the improved ground 8B is formed.

以下に、この支持構造の構築方法について、施工手順にしたがって説明する。   Below, the construction method of this support structure is demonstrated according to a construction procedure.

図6は、本発明による支持構造1の構築工程を示す図である。
まず、図6(a)に示すように、第1シールドトンネル2内から第2シールドトンネル4を取り囲むように曲管16を推進管掘削機で地山8中に設置する。
FIG. 6 is a diagram showing a construction process of the support structure 1 according to the present invention.
First, as shown in FIG. 6A, the curved pipe 16 is installed in the ground 8 by a propulsion pipe excavator so as to surround the second shield tunnel 4 from the inside of the first shield tunnel 2.

図7は、推進管掘削機による掘削方法を示す図である。図7に示すように、推進管掘削機18は、推進管となる曲管16の先端に小型掘削機19を取り付けてなるものであり、第1シールドトンネル2内に設けた推進ジャッキ22によって曲管16を同一の湾曲形状を有するガイド24に沿わせて押し出して一定曲率の円弧状に推進させるようになっている。また、その推進と同時に曲管16の先端に取り付けた小型掘削機19で地山の土砂を掘削し、その掘削土砂を曲管16内を通じて第1シールドトンネル2内に排土しつつ、掘進する。図示する実施形態では、推進管掘削機18は、第1シールドトンネル2の下部に設けられているセグメント12に形成された発進口12aを通じて、第1シールドトンネル2の内部から側方の地山8中に向けて発進され、上方に向けて一定曲率の円弧状に掘進して行きながら第1シールドトンネル2の上部に設けられているセグメント12に形成された到達口12bである開口に到達する。曲管16はその掘進に伴って逐次に継ぎ足されていき、これにより発進口12aと到達口12bとの間を円弧状に結んで、第1シールドトンネル2の側方の地山8中に、第2シールドトンネル4を取り囲むように設置される。   FIG. 7 is a diagram showing a drilling method using a propulsion pipe excavator. As shown in FIG. 7, the propulsion pipe excavator 18 is formed by attaching a small excavator 19 to the tip of a curved pipe 16 serving as a propulsion pipe, and is bent by a propulsion jack 22 provided in the first shield tunnel 2. The tube 16 is pushed out along a guide 24 having the same curved shape and propelled into an arc having a constant curvature. At the same time as the propulsion, the small excavator 19 attached to the tip of the curved pipe 16 excavates the earth and sand, and excavates while excavating the excavated earth and sand into the first shield tunnel 2 through the curved pipe 16. . In the illustrated embodiment, the propulsion pipe excavator 18 passes through the starting port 12a formed in the segment 12 provided in the lower part of the first shield tunnel 2 and the ground 8 8 to the side from the inside of the first shield tunnel 2. It starts toward the inside and reaches an opening which is an arrival port 12b formed in the segment 12 provided at the upper part of the first shield tunnel 2 while digging upward in an arc shape with a constant curvature. The bent pipe 16 is successively added along with the excavation, thereby connecting the start port 12a and the arrival port 12b in an arc shape, and in the ground 8 on the side of the first shield tunnel 2, It is installed so as to surround the second shield tunnel 4.

次に、図6(b)に示すように、曲管16の周囲の地山8を地盤改良する。地盤改良作業は、曲管16内に地盤改良用注入管(図示しない)を挿入し、この注入管に凍結剤やセメントミルク等の改良材を供給して、曲管16に形成してある複数の吐出孔(図示しない)を介して周囲の地山8中に吐出させて、曲管16に沿った部分を固結改良して改良地盤8Aを形成する。   Next, as shown in FIG. 6B, the ground 8 around the curved pipe 16 is improved. In the ground improvement work, a ground improvement injection pipe (not shown) is inserted into the curved pipe 16, and an improved material such as a freezing agent or cement milk is supplied to the injection pipe to form a plurality of curved pipes 16. This is discharged into the surrounding natural ground 8 through a discharge hole (not shown), and the portion along the curved pipe 16 is consolidated and improved to form the improved ground 8A.

それから、曲管16内に補強用鋼材26を挿入設置する。補強用鋼材26の挿入作業は、曲管16の内部に補強用鋼材26を挿通し、両端をセグメント12に固着する。そして、曲管16内に固化材30を充填する。   Then, the reinforcing steel material 26 is inserted and installed in the curved pipe 16. In the insertion operation of the reinforcing steel material 26, the reinforcing steel material 26 is inserted into the bent pipe 16 and both ends are fixed to the segment 12. Then, the curved tube 16 is filled with the solidifying material 30.

なお、本実施形態においては、曲管16内に補強用鋼材26を設置して固化材30を充填した場合について説明したが、曲管16のみで地山8を支持できる場合には、補強用鋼材26及び固化材30を省略してもよく、また、固化材30は充填し、補強用鋼材28は省略することとしてもよい。   In the present embodiment, the case where the reinforcing steel material 26 is installed in the curved pipe 16 and the solidified material 30 is filled has been described. However, when the ground 8 can be supported only by the curved pipe 16, the reinforcing steel material 26 is used for reinforcement. The steel material 26 and the solidified material 30 may be omitted, the solidified material 30 may be filled, and the reinforcing steel material 28 may be omitted.

次に、図6(c)に示すように、地山8内に支持材6を設置する。第1シールドトンネル2から第2シールドトンネル4へ円弧状に湾曲した鋼管からなる支持材6を地山8中に、開削予定部位10の上方及び下方に向かってそれぞれ凸となるように推進管掘削機18を用い、上記と同様の方法で掛け渡す。
次に、図6(d)に示すように、支持材6の周囲の地山8を地盤改良する。
地盤改良作業は、上記と同様に、支持材6内に地盤改良用注入管(図示しない)を挿入し、この注入管に改良材を供給して、支持材6に形成してある複数の吐出孔(図示しない)を介して周囲の地山8中に吐出させて、支持材6に沿った部分を固結改良して改良地盤8Bを形成する。
Next, as shown in FIG.6 (c), the support material 6 is installed in the natural ground 8. As shown in FIG. The support pipe 6 made of a steel pipe curved in an arc shape from the first shield tunnel 2 to the second shield tunnel 4 is drilled into the ground 8 so as to protrude upward and downward from the planned excavation site 10 respectively. The machine 18 is used for the transfer in the same manner as described above.
Next, as shown in FIG. 6D, the ground 8 around the support material 6 is improved.
As in the above, the ground improvement work is performed by inserting a ground improvement injection pipe (not shown) into the support material 6, supplying the improvement material to the injection pipe, and discharging a plurality of discharges formed on the support material 6. It discharges in the surrounding natural ground 8 through a hole (not shown), and the part along the support material 6 is solidified and improved, and the improved ground 8B is formed.

それから、支持材6内に補強用鋼材28を挿入設置する。補強用鋼材28の挿入作業は、支持材6の内部に補強用鋼材28を挿通し、両端をセグメント12に固着する。そして、支持材6内に固化材30を充填する。   Then, the reinforcing steel material 28 is inserted and installed in the support material 6. In the operation of inserting the reinforcing steel material 28, the reinforcing steel material 28 is inserted into the support material 6 and both ends are fixed to the segment 12. Then, the solidifying material 30 is filled into the support material 6.

そして、固化材30の固化後に、図6(e)に示すように、開削予定部位10の開削を行い、両シールドトンネル2、4を連結する。   Then, after the solidifying material 30 is solidified, as shown in FIG. 6 (e), the planned excavation site 10 is excavated to connect both shield tunnels 2, 4.

なお、本実施形態においては、支持材6内に補強用鋼材28を設置して固化材30を充填した場合について説明したが、支持材6のみで曲管16に囲まれた内部の地山8を支持できる場合には、補強用鋼材28及び固化材30を省略してもよく、また、補強用鋼材28のみを省略してもよい。   In the present embodiment, the case where the reinforcing steel material 28 is installed in the support material 6 and the solidification material 30 is filled has been described. However, the natural ground 8 surrounded by the bent pipe 16 only by the support material 6. Can be omitted, the reinforcing steel material 28 and the solidifying material 30 may be omitted, or only the reinforcing steel material 28 may be omitted.

なお、本実施形態においては、曲管16、支持材6が円形状の断面を有する場合について説明したが、この断面形状に限定されるものではなく、断面テーパー状のテーパー部を有する形状(例えば、三角形や台形)や角形であってもよい。   In addition, in this embodiment, although the case where the curved pipe 16 and the support material 6 had a circular cross section was demonstrated, it is not limited to this cross-sectional shape, The shape (for example, taper part of a cross-section taper shape) , Triangles or trapezoids) or squares.

なお、本実施形態においては、補強用鋼材26、28としてH型鋼を用いる場合について説明したが、H型鋼に限定されるものではなく、I型鋼や鋼管等を用いてもよい。   In addition, in this embodiment, although the case where H-shaped steel was used as the steel materials 26 and 28 for reinforcement was demonstrated, it is not limited to H-shaped steel, I-type steel, a steel pipe, etc. may be used.

以上説明したように、本発明による地山の支持構造1によれば、円弧状の曲管16及び補強用鋼材26で第2シールドトンネル4及び開削予定部位10を囲うので、地山8による荷重はこの曲管16及び補強用鋼材26によって支持される。したがって、第2シールドトンネル4及び開削予定部位10に作用する地山8の荷重が低減されるので、第2シールドトンネル4及び開削予定部位10に作用する荷重は、曲管16及び補強用鋼材26を設置しない場合に比べて著しく減少する。   As described above, according to the ground support structure 1 according to the present invention, the arc-shaped curved pipe 16 and the reinforcing steel material 26 surround the second shield tunnel 4 and the planned excavation site 10, so Is supported by the bent pipe 16 and the reinforcing steel material 26. Accordingly, the load of the ground 8 that acts on the second shield tunnel 4 and the planned cutting site 10 is reduced. Therefore, the load that acts on the second shield tunnel 4 and the planned cutting site 10 includes the curved pipe 16 and the reinforcing steel material 26. Compared to the case where no is installed, it is significantly reduced.

また、曲管16内に補強用鋼材26が設置されるとともに、固化材30が充填されているので、曲管16のみが地山8中に設置されている場合よりも大きな荷重を支持することができる。したがって、大深度地下でも地山を支持することが可能である。   Further, since the reinforcing steel material 26 is installed in the curved pipe 16 and the solidified material 30 is filled, a larger load than that in the case where only the curved pipe 16 is installed in the ground 8 is supported. Can do. Therefore, it is possible to support natural ground even in deep underground.

そして、曲管16の周囲に地山を改良した改良地盤8Aが形成されているので、地下水が曲管16に囲まれた内側に侵入することがない。したがって、開削予定部位10を開削する際に地下水の流出が無いので、安全に、かつ、効率的に開削作業を実施することができる。   And since the improvement ground 8A which improved the natural ground around the curved pipe 16 is formed, groundwater does not penetrate | invade into the inner side surrounded by the curved pipe 16. Therefore, since there is no outflow of ground water when the planned cutting site 10 is cut, the cutting operation can be performed safely and efficiently.

さらに、曲管16に囲まれた内側に支持材6を設置するので、支持材6の大きさや厚さ等を小さくすることができる。したがって、支持材6の設置作業が容易になるので、設置作業の効率が良くなり、施工期間を短くすることができる。また、小さい支持材6を用いることができるので、連結して構築された空間の建築限界を広く確保することが可能となる。   Furthermore, since the support material 6 is installed on the inner side surrounded by the curved pipe 16, the size, thickness, and the like of the support material 6 can be reduced. Therefore, since the installation work of the support material 6 becomes easy, the efficiency of the installation work is improved and the construction period can be shortened. Moreover, since the small support material 6 can be used, it becomes possible to ensure widely the construction limit of the space constructed by connecting.

本発明が適用される並設されたシールドトンネルを示す図である。It is a figure which shows the parallel shield tunnel to which this invention is applied. 本発明を適用した地山の支持構造を示す図である。It is a figure which shows the support structure of the natural ground to which this invention is applied. 図2のA矢視図である。FIG. 3 is a view taken in the direction of arrow A in FIG. 2. 図2のB−B’断面図である。FIG. 3 is a B-B ′ sectional view of FIG. 2. 図2のC−C’断面図である。FIG. 3 is a C-C ′ sectional view of FIG. 2. 本発明による支持構造の構築工程を示す図である。It is a figure which shows the construction process of the support structure by this invention. 推進管掘削機による掘削方法を示す図である。It is a figure which shows the excavation method by a propulsion pipe excavator.

符号の説明Explanation of symbols

2 第1シールドトンネル
4 第2シールドトンネル
6 支持材
8 地山
8A、8B 改良地盤
10 開削予定部位
12 セグメント
16 曲管
18 推進管掘削機
19 小型掘削機
20 主桁
22 推進ジャッキ
24 ガイド
26、28 補強用鋼材
30 固化材
2 First shield tunnel 4 Second shield tunnel 6 Support material 8 Ground 8A, 8B Improved ground 10 Planned excavation site 12 Segment 16 Curved pipe 18 Propulsion pipe excavator 19 Small excavator 20 Main girder 22 Propulsion jack 24 Guides 26, 28 Reinforcing steel 30 Solidified material

Claims (6)

並設された2つのシールドトンネルの間の地山を開削する際に予め開削予定部位の周囲を支持する地山の支持構造であって、
一方のシールドトンネル内から他方のシールドトンネルを囲うように地山内に設置され、両端が前記一方のシールドトンネルの覆工体に固定された円弧状の補強材を備えることを特徴とする地山の支持構造。
It is a support structure of a natural ground that supports the surrounding of the site to be excavated in advance when excavating the natural ground between two shield tunnels arranged side by side,
It is installed in a natural ground so as to surround the other shield tunnel from the inside of one shield tunnel, and both ends thereof are provided with arc-shaped reinforcing members fixed to the lining body of the one shield tunnel. Support structure.
前記補強材は曲管であって、前記曲管内に固化材を充填してなることを特徴とする請求項1に記載の地山の支持構造。   2. The ground support structure according to claim 1, wherein the reinforcing material is a curved pipe, and the curved pipe is filled with a solidifying material. 前記補強材は曲管であって、前記曲管内に、一方のシールドトンネル内から他方のシールドトンネルを囲うように設置された円弧状の補強用鋼材を更に備え、
前記曲管内に固化材を充填してなることを特徴とする請求項1に記載の地山の支持構造。
The reinforcing material is a curved pipe, and further comprises an arc-shaped reinforcing steel material installed in the curved pipe so as to surround the other shield tunnel from within one shield tunnel,
The ground support structure according to claim 1, wherein the bent pipe is filled with a solidifying material.
前記補強材の周囲に地盤改良された改良体が形成されてなることを特徴とする請求項1〜3のいずれかに記載の地山の支持構造。   The ground support structure according to any one of claims 1 to 3, wherein an improved body whose ground is improved is formed around the reinforcing material. 前記補強材に囲まれた内側で、かつ、開削予定部位の上方及び下方の地山中に、支持材が前記一方のシールドトンネルから前記他方のシールドトンネルに掛け渡すように設置されてなること特徴とする請求項1〜4のいずれかに記載の地山の支持構造。   A support material is installed so as to span from the one shield tunnel to the other shield tunnel in the ground surrounded by the reinforcing material and above and below the planned excavation site. The support structure of the natural ground in any one of Claims 1-4 to do. 並設された2つのシールドトンネル間の地山を開削する際に予め開削予定部位の周囲を支持する地山の支持方法において、
一方のシールドトンネル内から他方のシールドトンネルを囲うように円弧状の曲管を設置して、該曲管の両端を前記一方のシールドトンネルの覆工体に固定し、
前記曲管の周囲に地盤改良材を充填して改良体を形成し、
前記曲管内に補強用鋼材を挿通し、
前記曲管内に固化材を充填し、
前記曲管に囲まれた内側で、かつ、開削予定部位の上方及び下方の地山中に、前記一方のシールドトンネルから前記他方のシールドトンネルに支持材を掛け渡すように設置し、
前記開削予定部位の周囲の地山を支持することを特徴とする地山の支持方法。
In the method of supporting the natural ground, which supports the surrounding of the site to be excavated in advance when excavating the natural ground between the two shield tunnels arranged side by side,
Installing an arc-shaped curved pipe so as to surround the other shield tunnel from within one shield tunnel, fixing both ends of the curved pipe to the lining body of the one shield tunnel,
Filling the ground improvement material around the curved pipe to form an improved body,
Inserting a reinforcing steel material into the curved pipe,
Filling the curved pipe with a solidifying material,
Inside the curved pipe and in the ground above and below the planned excavation site, installed so as to span the support material from the one shield tunnel to the other shield tunnel,
A method for supporting a natural ground, comprising supporting a natural ground around the planned excavation site.
JP2007097671A 2007-04-03 2007-04-03 Ground support structure and ground support method Expired - Fee Related JP5012149B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007097671A JP5012149B2 (en) 2007-04-03 2007-04-03 Ground support structure and ground support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007097671A JP5012149B2 (en) 2007-04-03 2007-04-03 Ground support structure and ground support method

Publications (2)

Publication Number Publication Date
JP2008255614A true JP2008255614A (en) 2008-10-23
JP5012149B2 JP5012149B2 (en) 2012-08-29

Family

ID=39979469

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007097671A Expired - Fee Related JP5012149B2 (en) 2007-04-03 2007-04-03 Ground support structure and ground support method

Country Status (1)

Country Link
JP (1) JP5012149B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015098685A (en) * 2013-11-18 2015-05-28 株式会社大林組 Natural ground reinforcement material and natural ground reinforcement structure
JP2018009287A (en) * 2016-07-11 2018-01-18 日立造船株式会社 Thrusting apparatus
JP7316184B2 (en) 2019-10-18 2023-07-27 鹿島建設株式会社 Auxiliary method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005030148A (en) * 2003-07-10 2005-02-03 Kajima Corp Shell structure of underground structure
JP2006077402A (en) * 2004-09-07 2006-03-23 Shimizu Corp Underground timbering structure and its construction method, and tunnel construction method
JP2008025303A (en) * 2006-07-25 2008-02-07 Shimizu Corp Construction method for support structure at branched confluence

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005030148A (en) * 2003-07-10 2005-02-03 Kajima Corp Shell structure of underground structure
JP2006077402A (en) * 2004-09-07 2006-03-23 Shimizu Corp Underground timbering structure and its construction method, and tunnel construction method
JP2008025303A (en) * 2006-07-25 2008-02-07 Shimizu Corp Construction method for support structure at branched confluence

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015098685A (en) * 2013-11-18 2015-05-28 株式会社大林組 Natural ground reinforcement material and natural ground reinforcement structure
JP2018009287A (en) * 2016-07-11 2018-01-18 日立造船株式会社 Thrusting apparatus
JP7316184B2 (en) 2019-10-18 2023-07-27 鹿島建設株式会社 Auxiliary method

Also Published As

Publication number Publication date
JP5012149B2 (en) 2012-08-29

Similar Documents

Publication Publication Date Title
JP4958035B2 (en) Shield roof construction method
JP4803429B2 (en) Construction method of underground cavity
KR101665515B1 (en) Direct-boring pipe roof tunnel construction method and structure non-cutting natural ground
JP4793655B2 (en) Tunnel construction method
JP2006322222A (en) Construction method of large-sectional tunnel
KR101750273B1 (en) Tunnel Reinforcement structure and Tunnel Reinforcement methods using the same
KR101244257B1 (en) Method for digging tunnel
KR101121538B1 (en) Diaphragm wall tunnel method - dtm, and tunnel structure using diaphragm wall
KR101685088B1 (en) Construction method for tunneling
JP2017008568A (en) Tunnel joint structure and tunnel construction method
JP4771170B2 (en) Construction method of underground cavity
JP2007303155A (en) Construction method of underground cavity and tunnel construction method
KR102215505B1 (en) Construction method of internal pre-support tunnel for complete blocking water of all directions of the tunnel
KR101677017B1 (en) construction methods of close-twin tunnel using tube hollow
JP5012149B2 (en) Ground support structure and ground support method
JP4296549B2 (en) Underground support structure, its construction method and tunnel construction method
KR100898969B1 (en) Tunnel Boring Method Using Sheet Pile and Tunnel Structure therof
JP4730595B2 (en) Construction method of underground cavity
JP4816327B2 (en) Widening part formation method of shield tunnel
KR101479267B1 (en) Method for constructing tunnel by using pipe
JP2007040018A (en) Tunnel structure for branch section or junction section of underground passage and its execution method
JP2006219914A (en) Method of forming communicating section of juxtaposed shield tunnels
JP5806576B2 (en) Pipe roof and pipe roof construction method
JP2008121365A (en) Method of constructing multi-connected arched tunnel, and connection structure between tunnel and connection body
KR101612522B1 (en) Construction method for tunneling

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100319

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110829

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110906

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111102

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120508

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120521

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150615

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees