JP2008214930A - Temporary bridge between railroad platforms - Google Patents

Temporary bridge between railroad platforms Download PDF

Info

Publication number
JP2008214930A
JP2008214930A JP2007052593A JP2007052593A JP2008214930A JP 2008214930 A JP2008214930 A JP 2008214930A JP 2007052593 A JP2007052593 A JP 2007052593A JP 2007052593 A JP2007052593 A JP 2007052593A JP 2008214930 A JP2008214930 A JP 2008214930A
Authority
JP
Japan
Prior art keywords
guide rail
temporary bridge
platforms
guide rails
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2007052593A
Other languages
Japanese (ja)
Other versions
JP3991067B1 (en
Inventor
Koichi Mihashi
光一 三橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MITSUHASHI SEISAKUSHO KK
Mitsuhashi Corp
Original Assignee
MITSUHASHI SEISAKUSHO KK
Mitsuhashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MITSUHASHI SEISAKUSHO KK, Mitsuhashi Corp filed Critical MITSUHASHI SEISAKUSHO KK
Priority to JP2007052593A priority Critical patent/JP3991067B1/en
Application granted granted Critical
Publication of JP3991067B1 publication Critical patent/JP3991067B1/en
Publication of JP2008214930A publication Critical patent/JP2008214930A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a temporary bridge between railroad platforms, which can be easily temporarily constructed and easily removed, and which enables the conveyance of a heavy load without damage to railroad facilities. <P>SOLUTION: Both ends 21 and 21 of two guide rails 2 longer than a platform end panel PP are supported by being placed on curing panels 3 which are installed on the platforms, respectively; an on-track section of the guide rail 2 is supported by a height adjusting support 4 which is erected from a subgrade G; and both the guide rails 2 and 2 are connected together by means of a string piece 5. Scaffold boards 6 for a conveyance worker are spread all over the top of the string piece 5. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

この発明は、エスカレータ等の設備の重量部品を一方の鉄道ホームから相対する他方の鉄道ホームに搬送するための鉄道ホーム間仮設橋に関する。   The present invention relates to a temporary bridge between railway platforms for transporting heavy parts of equipment such as an escalator from one railway platform to the other railway platform.

エスカレータ、エレベータ等の鉄道駅設備や自動販売機等の機器をホームに設置する場合、駅周辺の立地状況によっては、一方のホームへはこれらの重量部品や機器等の重量物を搬入できるが、外部の道路等から設置予定の対向ホームへダイレクトに搬入することができないことがある。   When installing equipment such as escalators, elevators, and other railway station equipment and vending machines on the platform, depending on the location of the area around the station, heavy equipment such as heavy components and equipment can be carried into one platform. It may not be possible to carry directly into the opposite home that is planned to be installed from outside roads.

一方のホームから設置予定の対向ホームへの重量物の搬送に、ホーム間の既設の階段付き連絡橋や地下道、エレベータを使用することは、かなりの困難を伴うことが多く、不可能な場合もある。   The use of existing stepped bridges, underpasses, and elevators between platforms to transport heavy objects from one platform to the opposite platform is often quite difficult and sometimes impossible. is there.

相対式ホームでは、線路を挟んで一方のホームから他方のホームを見通せるのであるから、鉄道運行を休止する夜間等に、両ホーム間に仮設橋を架けて、一方のホームから他方のホームへ重量物を搬入するのが搬入労力も少なく、容易である。   In a relative type platform, the other platform can be seen from one platform across the track. Therefore, a temporary bridge is built between the two platforms at night when railway operation is suspended, and the weight from one platform to the other platform is increased. It is easy to carry in things with little labor.

しかし、限られた時間内に、重量物搬送用の強固な仮設橋を組み付け、搬送し、組み付けた仮設橋を分解して撤去しなければならないのであるから、このような鉄道ホーム間仮設橋は未だ実用化されなかった。   However, in a limited time, it is necessary to assemble and transport a strong temporary bridge for transporting heavy objects, disassemble and remove the assembled temporary bridge. Not yet commercialized.

河川や谷間を跨ぐ仮設橋は周知である。例えば、特許文献1には、高低差のある両岸の低い方に背の高いプレキャストコンクリート基礎材を、他方の岸に捨てコンクリートを設置して水平を出し、仮設橋を架けることが開示されている。また、特許文献2には、主桁の下面フランジに橋床を敷設して橋床と地面との高低差を小さくする仮設の人道橋が開示されている。   Temporary bridges across rivers and valleys are well known. For example, Patent Document 1 discloses that a tall precast concrete foundation material is placed on the lower side of both banks with a difference in height, a concrete is disposed on the other bank, the level is taken, and a temporary bridge is built. Yes. Further, Patent Document 2 discloses a temporary humanitarian bridge in which a bridge floor is laid on the lower surface flange of the main girder to reduce the height difference between the bridge floor and the ground.

これらの仮設橋は、仮設の物であるから、設置や撤去が比較的容易になってはいるが、夜間の短時間に設置と撤去を終わらせることは、想定されていないし、不可能である。また、周囲の既存の岸、路面を掘削したり、損傷したりしないようにする特別の配慮はなされていない。   Since these temporary bridges are temporary, they are relatively easy to install and remove, but it is not envisaged or impossible to finish the installation and removal in a short time at night. . Also, no special consideration has been given to avoid excavating or damaging existing existing shores and road surfaces.

特開平7−292618号公報JP-A-7-292618

特開平10−72808号公報Japanese Patent Laid-Open No. 10-72808

この発明は、上記問題点を解決するためになされたものであり、その目的とするところは、短時間の仮設、撤去が容易で、鉄道施設を損傷することなく重量物を搬送できる鉄道ホーム間仮設橋を提供しようとするものである。   The present invention has been made to solve the above-described problems, and the object of the present invention is to provide a space between railway platforms that can be temporarily installed and removed in a short time and can transport heavy objects without damaging the railway facilities. It is intended to provide a temporary bridge.

上述の課題を解決するために、この発明の鉄道ホーム間仮設橋は、互いに並行に配置され、相対式鉄道ホームの両ホーム端パネルを超える長さを有する重量物搬送用の2本のガイドレールと、上記鉄道ホーム上面に載置され、上記ホーム端パネルを超えた上記ガイドレールの端部を上面で支持する養生パネルと、上記相対式鉄道ホーム間の路盤上に立設され、上記ガイドレールの線路上の部分を支える複数の高さ調節支柱と、上記2本のガイドレールを接続して2本のガイドレールの並行を維持する複数の横桁と、上記複数の横桁上に敷いた足場板とを具備することを特徴とする。   In order to solve the above-mentioned problem, the temporary bridge between railway platforms of the present invention is arranged in parallel with each other and has two guide rails for carrying heavy loads that have a length exceeding both the home end panels of the relative railway platform. And a guide panel placed on the upper surface of the railroad platform and supporting the end portion of the guide rail beyond the home end panel on the upper surface, and a guide rail between the relative rail platform and the guide rail. A plurality of height adjustment posts that support a portion of the track, a plurality of cross beams that connect the two guide rails to keep the two guide rails parallel, and lay on the plurality of cross beams And a scaffold plate.

上記発明において、上記複数の高さ調節支柱間をつなぐつなぎ材を有するようにすれば、橋の強度が上がり、搬送作業がより安全になる。また、上記ガイドレールの横断面をU字型にすれば、重量物に取り付けキャスタ、あるいは、重量物を載せた台車のキャスタをガイドレールに載せて搬送できるので、脇にずれて線路上に落下するおそれがなくなる。   In the said invention, if it has a connecting material which connects between said several height adjustment support | pillars, the intensity | strength of a bridge will rise and a conveyance operation | work will become safer. In addition, if the cross section of the guide rail is U-shaped, it can be mounted on a heavy object or a caster with a heavy object placed on the guide rail to be transported. The risk of doing so is eliminated.

この発明においては、重量物搬送用の2本のガイドレールを仮設橋の主桁として、このガイドレールを高さ調節支柱と養生パネルとで支持し、横桁で両ガイドレールをつないで、この横桁上に足場板を敷くようにしたから、ホームとガイドレール、足場板の段差が小さく、重量物搬送作業を容易に行なえるうえ、仮設、撤去が容易で短時間に行なえ、しかも、ホーム面や線路等の鉄道施設を損傷することがない。   In this invention, the two guide rails for transporting heavy objects are used as the main girder of the temporary bridge, the guide rail is supported by the height adjusting column and the curing panel, and both guide rails are connected by the horizontal girder. Since the scaffolding is laid on the cross beam, the steps between the platform, the guide rail and the scaffolding are small, making it possible to carry heavy objects easily, and to make temporary and removal work in a short time. There is no damage to railway facilities such as surfaces and tracks.

以下、この発明に係る実施形態を図面を参照して説明する。   Embodiments according to the present invention will be described below with reference to the drawings.

図1は、この発明の一実施の形態を示す縦断面図、図2は、図1の実施の形態を示す平面図、図3は、図1の実施の形態を示す横断面図である。   FIG. 1 is a longitudinal sectional view showing an embodiment of the present invention, FIG. 2 is a plan view showing the embodiment of FIG. 1, and FIG. 3 is a transverse sectional view showing the embodiment of FIG.

図1および図2において、1は鉄道ホーム間仮設橋、2はガイドレール、3は養生パネル、4は高さ調節支柱、5は横桁、6は足場板である。   1 and 2, 1 is a temporary bridge between railway platforms, 2 is a guide rail, 3 is a curing panel, 4 is a height adjusting column, 5 is a cross beam, and 6 is a scaffolding plate.

上記ガイドレール2は、相対式鉄道ホームの両ホームP1、P2に架け渡せる長さを有し、2本のガイドレール2、2が互いに並行に配置されている。各ガイドレール2は、図3に示すように、断面が上に凹のU字型の鋼材でできていて、このU字型の溝に、重量物に取り付けキャスタ、あるいは、重量物を載せた台車のキャスタを載せて搬送するようになっている。このガイドレール2は、詳細な図示は省略するが、ガイドレール2自体の搬入が容易なように、複数のレールをつなげてなっている。レールとレールの継ぎ目は、大きな段差やずれがないように接続してある。勿論、設置場所によっては、継ぎ目なしのひとつのレールで長いガイドレール2を構成してもよい。   The guide rail 2 has a length that can be bridged between the two platforms P1 and P2 of the relative railway platform, and the two guide rails 2 and 2 are arranged in parallel to each other. As shown in FIG. 3, each guide rail 2 is made of a U-shaped steel material having a concave upper section, and a caster or a heavy object is mounted on the heavy object in the U-shaped groove. It is designed to carry a dolly caster. Although the detailed illustration of the guide rail 2 is omitted, a plurality of rails are connected so that the guide rail 2 itself can be easily carried. Rails and rail joints are connected so that there are no major steps or deviations. Of course, depending on the installation location, the long guide rail 2 may be constituted by one rail without a joint.

上記養生パネル3は、上記両ホームP1、P2の各々の上面に載置して、ガイドレール2の端部21を上面で支持するもので、合成樹脂板、木製板、厚い合成樹脂シート等、重荷重が加わってもホーム上面を傷つけない材料が選択される。   The curing panel 3 is placed on the upper surface of each of the homes P1, P2, and supports the end portion 21 of the guide rail 2 on the upper surface. The synthetic resin plate, the wooden plate, the thick synthetic resin sheet, etc. A material that does not damage the top surface of the home even when a heavy load is applied is selected.

ガイドレール2の断面形は、キャスタの両側を囲うU字型(凹部が上向きのコ型)のほか、キャスタの外側または内側に対向してキャスタをガイドするL型としてもよい。   The cross-sectional shape of the guide rail 2 may be an L shape that guides the caster while facing the outer side or the inner side of the caster, in addition to a U shape (a U-shaped concave portion facing upward) surrounding both sides of the caster.

一般に、鉄道ホームにおいては、乗客の乗り降りの際の足元安全確保のために、停車車両の側面に接近させて、線路側にホーム端パネルPPが張り出している。このホーム端パネルPPは張り出し構造であるから、重量物の荷重を支えるには適していない。そこで、養生パネル3は、ホーム端パネルPPを超えた位置でガイドレール2の端部21を支持し、ホーム端パネルPPには搬送される重量物の荷重が加わらないようにしてある。   In general, in a railroad platform, a home end panel PP protrudes on the side of the track so as to ensure the safety of the feet when passengers get on and off, approaching the side surface of the stopped vehicle. Since the home end panel PP has an overhang structure, it is not suitable for supporting a heavy load. Therefore, the curing panel 3 supports the end portion 21 of the guide rail 2 at a position beyond the home end panel PP so that a heavy load to be conveyed is not applied to the home end panel PP.

上記高さ調節支柱4は、鉄道ホームP1、P2間の路盤G上に複数本、この実施の形態では、ほぼ等間隔に立設されて、ガイドレール2の線路上の部分を支える。この高さ調節支柱4は、ジャッキのように作業員が高さを自在に調節できるもので、凹凸のある路盤Gに合わせて適宜調節し、ガイドレール2を水平に支持するようにする。   A plurality of the height adjusting columns 4 are provided on the roadbed G between the railroad platforms P1 and P2, and in this embodiment, the height adjusting columns 4 are erected at substantially equal intervals to support a portion of the guide rail 2 on the track. The height adjustment column 4 can be adjusted freely by a worker like a jack, and is adjusted as appropriate according to the uneven roadbed G to support the guide rail 2 horizontally.

上記横桁5は、2本のガイドレール2、2を接続して、2本のガイドレール2、2の並行を維持するためのもので、この実施の形態では、上記高さ調節支柱4の立設位置に1本ずつ配置し、各横桁5の両端に断面コ字型のチャンネル材51を設けて、このチャンネル材51にガイドレール2を収容したうえで、ガイドレール2をチャンネル材51に固定している。横桁5両端のチャンネル材51、51の間隔は等しくして、2本のガイドレール2、2の並行を出してある。   The cross beam 5 is for connecting the two guide rails 2 and 2 to keep the two guide rails 2 and 2 parallel, and in this embodiment, the height adjustment support 4 A channel material 51 having a U-shaped cross section is provided at each end of each cross beam 5 and the guide rail 2 is accommodated in the channel material 51, and the guide rail 2 is then connected to the channel material 51. It is fixed to. The distance between the channel members 51 and 51 at both ends of the cross beam 5 is equal, and the two guide rails 2 and 2 are arranged in parallel.

高さ調節支柱4の上端部41は、ボルト締め等によりチャンネル材51の底面に固定してある。なお、チャンネル材51を用いずに横桁5を直にガイドレール2にネジ締め等によって固定することもできる。この場合は、高さ調節支柱4の上端部41は、ガイドレール2の底面にボルト締め等により固定する。   The upper end portion 41 of the height adjustment column 4 is fixed to the bottom surface of the channel material 51 by bolting or the like. The cross beam 5 can be directly fixed to the guide rail 2 by screwing or the like without using the channel material 51. In this case, the upper end portion 41 of the height adjusting column 4 is fixed to the bottom surface of the guide rail 2 by bolting or the like.

上記足場板6は、重量物搬送の際の作業員の足場になるものである。足場板6は、複数の横桁5、5上に敷き置かれる。その両端は、養生パネル3上にあることが作業上このましい。足場板6も、ガイドレール2同様、長いものであるから、足場板6自体の搬入の便宜上、適宜複数枚に分割したものを用いてもよい。必要に応じて、その継ぎ目を接続したり、横桁5へ固定したりして、作業の安定化、安全化を図ることが望ましい。   The said scaffold board 6 becomes a scaffold of the worker in the case of heavy article conveyance. The scaffold plate 6 is laid on the plurality of cross beams 5 and 5. It is desirable for work that both ends are on the curing panel 3. Since the scaffolding plate 6 is also long like the guide rail 2, for the convenience of carrying in the scaffolding plate 6 itself, it may be appropriately divided into a plurality of pieces. If necessary, it is desirable to connect the seam or fix it to the cross beam 5 to stabilize the operation and make it safe.

ガイドレール2を下から支持する高さ調節支柱4、4は、足場板6上での重量物搬送による横荷重も受ける。そこで、高さ調節支柱4、4を互いにつなぎ材によりつないで構造を強固にしている。この実施の形態では、図1および図3に示した頭つなぎ7、根つなぎ8、斜め材9がつなぎ材である。頭つなぎ7、根つなぎ8は、周知のクランプ(つなぎ金具)71、81により高さ調節支柱4、4と結合され、更に、斜め材9が、クランプ91により頭つなぎ7、根つなぎ8と結合されて、剛性の高い3角構造を形成している。   The height adjustment columns 4 and 4 that support the guide rail 2 from below also receive a lateral load due to heavy material conveyance on the scaffolding plate 6. Therefore, the height adjusting struts 4 and 4 are connected to each other by a connecting material to strengthen the structure. In this embodiment, the head joint 7, the root joint 8, and the diagonal member 9 shown in FIGS. 1 and 3 are the joint members. The head tether 7 and the root tether 8 are coupled to the height adjusting posts 4 and 4 by known clamps (joint fittings) 71 and 81, and further, the diagonal member 9 is coupled to the head tether 7 and the root tether 8 by the clamp 91. As a result, a highly rigid triangular structure is formed.

10は、路盤Gからホーム端パネルPPを支持する高さ調節支柱、11は、鉄道レールである。   Reference numeral 10 denotes a height adjustment column that supports the home end panel PP from the roadbed G, and 11 denotes a railroad rail.

以上のように構成されたこの発明の鉄道ホーム間仮設橋は、ガイドレール2、高さ調節支柱4、横桁5、足場板6等の部品を架橋現場に搬入して短時間で組み付けて強固な仮設橋1を完成させることができる。完成した仮設橋1は、ホームP1、P2と段差が少なく、安定していて、重量物をガイドレール2に沿ってほぼ水平移動のみでホームからホームへ搬送できる。仮設橋1使用後は、速やかに解体、撤去することができる。   The railway platform temporary bridge of the present invention configured as described above is strong by bringing parts such as the guide rail 2, the height adjusting column 4, the cross beam 5 and the scaffolding plate 6 into the bridge site and assembling in a short time. The temporary bridge 1 can be completed. The completed temporary bridge 1 is stable with few steps from the homes P1 and P2, and can carry heavy objects from the home to the home only by horizontal movement along the guide rail 2. After using the temporary bridge 1, it can be quickly dismantled and removed.

この発明の一実施の形態を示す縦断面図。The longitudinal cross-sectional view which shows one embodiment of this invention. 図1の実施の形態を示す平面図。The top view which shows embodiment of FIG. 図1の実施の形態を示す横断面図。FIG. 2 is a transverse sectional view showing the embodiment of FIG. 1.

符号の説明Explanation of symbols

1 鉄道ホーム間仮設橋
2 ガイドレール
21 ガイドレールの端部
3 養生パネル
4 高さ調節支柱
41 高さ調節支柱の上端部
5 横桁
51 チャンネル材
6 足場板
7 頭つなぎ(つなぎ材)
71 クランプ
8 根つなぎ(つなぎ材)
81 クランプ
9 斜め材(つなぎ材)
91 クランプ
G 路盤
PP ホーム端パネル
P1、P2 鉄道ホーム
DESCRIPTION OF SYMBOLS 1 Temporary bridge between railroad platforms 2 Guide rail 21 Guide rail end 3 Curing panel 4 Height adjustment post 41 Height adjustment post upper end 5 Horizontal girder 51 Channel material 6 Scaffolding plate 7 Head connection (connection material)
71 Clamp 8 Root splicer (tether)
81 Clamp 9 Diagonal material (tether)
91 Clamp G Roadbed PP Home end panel P1, P2 Railway home

Claims (3)

互いに並行に配置され、相対式鉄道ホームの両ホーム端パネルを超える長さを有する重量物搬送用の2本のガイドレールと、
上記鉄道ホーム上面に載置され、上記ホーム端パネルを超えた上記ガイドレールの端部を上面で支持する養生パネルと、
上記相対式鉄道ホーム間の路盤上に立設され、上記ガイドレールの線路上の部分を支える複数の高さ調節支柱と、
上記2本のガイドレールを接続して2本のガイドレールの並行を維持する複数の横桁と、
上記複数の横桁上に敷いた足場板と
を具備することを特徴とする鉄道ホーム間仮設橋。
Two guide rails for transporting heavy objects that are arranged in parallel with each other and have a length exceeding both home end panels of the relative railway platform;
A curing panel placed on the upper surface of the railroad platform and supporting the end portion of the guide rail beyond the home end panel on the upper surface;
A plurality of height adjustment posts that are erected on the roadbed between the relative railway platforms and support a portion of the guide rail on the track;
A plurality of cross beams that connect the two guide rails to maintain the parallelism of the two guide rails;
A temporary bridge between railway platforms, comprising a scaffolding board laid on the plurality of cross beams.
上記複数の高さ調節支柱間をつなぐつなぎ材を有する請求項1記載の鉄道ホーム間仮設橋。   The temporary bridge between railway platforms according to claim 1, further comprising a connecting material that connects the plurality of height adjustment columns. 上記ガイドレールの横断面がU字型である請求項1記載の鉄道ホーム間仮設橋。   The temporary bridge between railway platforms according to claim 1, wherein the guide rail has a U-shaped cross section.
JP2007052593A 2007-03-02 2007-03-02 Temporary bridge between railway platforms Active JP3991067B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007052593A JP3991067B1 (en) 2007-03-02 2007-03-02 Temporary bridge between railway platforms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007052593A JP3991067B1 (en) 2007-03-02 2007-03-02 Temporary bridge between railway platforms

Publications (2)

Publication Number Publication Date
JP3991067B1 JP3991067B1 (en) 2007-10-17
JP2008214930A true JP2008214930A (en) 2008-09-18

Family

ID=38683347

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007052593A Active JP3991067B1 (en) 2007-03-02 2007-03-02 Temporary bridge between railway platforms

Country Status (1)

Country Link
JP (1) JP3991067B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014034821A (en) * 2012-08-09 2014-02-24 Asahi Kasei Homes Co Form transfer device

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484155B (en) * 2016-01-06 2017-05-24 扬州市振东电力器材有限公司 Crossing floor system for on-line high-speed railway crossing equipment
CN112900234A (en) * 2021-03-26 2021-06-04 中国二十二冶集团有限公司 Rotatable trestle and construction method thereof
CN114435409A (en) * 2022-01-25 2022-05-06 北京易盛通达工程技术有限公司 Assembled high-speed railway platform cross-line platform
CN114550597B (en) * 2022-03-14 2023-07-18 武汉体育学院 Self-moving type sports culture display device
CN117988207B (en) * 2024-04-03 2024-06-04 山西省交通规划勘察设计院有限公司 Temporary expansion device for bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014034821A (en) * 2012-08-09 2014-02-24 Asahi Kasei Homes Co Form transfer device

Also Published As

Publication number Publication date
JP3991067B1 (en) 2007-10-17

Similar Documents

Publication Publication Date Title
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
JP3991067B1 (en) Temporary bridge between railway platforms
JP4574705B2 (en) Suspended scaffolding
KR101290296B1 (en) Stairway structure for approaching bridge inspection passage and constructing method thereof
JP2016008406A (en) Temporary bearing method for main girder in floor slab replacement work with composite girder, floor slab replacement method with composite girder, and temporary bearing structure for main girder in floor slab replacement work with composite girder
JP6715000B2 (en) Temporary scaffolding for transportation facilities
JP2015078561A (en) Erection method of steel structure
KR101825587B1 (en) Temporary prestress deck for steel bridge.
JP6374353B2 (en) How to build a bridge
KR20180028216A (en) Checking way of Bridge
JP2020090785A (en) Widening structural body, widening structure, floor slab widening construction method, and floor slab renewal method
JP2008050811A (en) Movable suspended scaffolding apparatus
JP6590512B2 (en) Staircase temporary scaffolding
KR100881598B1 (en) Method for construction of track for linear induction motor panel in linear induction motor
JP4977110B2 (en) Composite digit structure and composite digit construction method
JP7409952B2 (en) Viaduct construction method and viaduct construction equipment
JP4044893B2 (en) Suspended scaffolding
US8459570B2 (en) Supporting arrangement
JP2008057226A (en) Method of constructing building on bridge girder, and bridge having the building
JPWO2007066387A1 (en) Bridge erection method
JP2005307684A (en) Laying apparatus of precast concrete floor board
KR20060116405A (en) The launching and removing method of hanging scaffold for bridge slab using rail and roller type device
JP2022120437A (en) Slide method of structure using moving working platform
JP7017927B2 (en) Steel bridge widening erection equipment and steel bridge widening erection method
KR200397441Y1 (en) Transferring vehicle for inspecting and repairing bridge

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070703

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070723

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100727

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 3991067

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100727

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110727

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120727

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120727

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130727

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140727

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250