JP2008151952A - Optical fiber cord holder and method for manufacturing optical fiber cord with connector using the same - Google Patents

Optical fiber cord holder and method for manufacturing optical fiber cord with connector using the same Download PDF

Info

Publication number
JP2008151952A
JP2008151952A JP2006338810A JP2006338810A JP2008151952A JP 2008151952 A JP2008151952 A JP 2008151952A JP 2006338810 A JP2006338810 A JP 2006338810A JP 2006338810 A JP2006338810 A JP 2006338810A JP 2008151952 A JP2008151952 A JP 2008151952A
Authority
JP
Japan
Prior art keywords
optical fiber
holder
fiber cord
ferrule
cord
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006338810A
Other languages
Japanese (ja)
Other versions
JP4630266B2 (en
Inventor
Tomohiro Akiyama
知広 秋山
Akio Tanabe
明夫 田邉
Takaaki Uchida
隆章 内田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Furukawa Electric Co Ltd
Original Assignee
Furukawa Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Furukawa Electric Co Ltd filed Critical Furukawa Electric Co Ltd
Priority to JP2006338810A priority Critical patent/JP4630266B2/en
Publication of JP2008151952A publication Critical patent/JP2008151952A/en
Application granted granted Critical
Publication of JP4630266B2 publication Critical patent/JP4630266B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide an optical fiber cord holder that stabilizes the connected state of optical fibers and facilitates manufacture of an optical connector with excellent reliability for a long period of time, and to provide a method for manufacturing an optical connector with an optical fiber cord by using the above holder. <P>SOLUTION: The optical fiber cord holder holds an optical fiber cord comprising an optical fiber covered with a sheath and is positioned and placed on a holder base of a fusing and splicing machine, and the method for manufacturing an optical fiber cord with connector is carried out by using the holder. The optical fiber cord holder 10 has a holding groove 11b to hold an optical fiber cord and a positioning groove 11d to position and hold a reinforcing sleeve to reinforce the fused and spliced portion of the optical fiber together with the optical fiber, both grooves formed on a substrate 11. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、光ファイバコードホルダ及びそれを用いた光ファイバコード付き光コネクタの製造方法に関するものである。   The present invention relates to an optical fiber cord holder and a method for manufacturing an optical connector with an optical fiber cord using the same.

近年、データ通信サービスにおけるFTTH(Fiber To The Home)の普及によって光通信網が一般家庭等で用いられるようになったのに伴い、光通信サービスの加入者宅等の接続現場において短時間で簡便に組み立てることを可能とした光コネクタが提案されている(例えば、特許文献1参照)。この光コネクタは、端面研磨した第一の光ファイバを内装し、接続相手の第二の光ファイバを第一の光ファイバの屈折率整合材を塗布した端面と突き合わせ可能に案内する案内溝を有するホルダ部を設けたフェルールを使用する。そして、接続現場において、前記フェルールが内装した第一の光ファイバに接続相手の第二の光ファイバを付き合わせ接続し、プラグフレーム,ストップリング及びブーツ等の構成部品を組み付けて光コネクタに組み立てている。   In recent years, with the spread of FTTH (Fiber To The Home) in data communication services, optical communication networks have come to be used in ordinary homes, etc., so it is easy and convenient in connection sites such as optical communication service subscriber homes. There has been proposed an optical connector that can be assembled (see, for example, Patent Document 1). This optical connector includes a first optical fiber whose end face is polished, and a guide groove that guides the second optical fiber to be connected to the end face to which the refractive index matching material of the first optical fiber is applied. Use a ferrule with a holder. At the connection site, the second optical fiber to be connected is connected to the first optical fiber built in the ferrule, and components such as a plug frame, a stop ring and a boot are assembled and assembled into an optical connector. Yes.

特開2005−257788号公報JP 2005-257788 A

ところで、特許文献1に開示された光コネクタは、第二の光ファイバを第一の光ファイバの屈折率整合材を塗布した端面と突き合わせ接続し、スリーブによってカバー部材をホルダ部に押圧して第一の光ファイバと第二の光ファイバとの接続状態を保持している。このため、特許文献1の光コネクタは、光ファイバ相互の接続状態が不安定であり、経時的に接続損失が増大することから長期に亘って使用するうえで信頼性に問題があった。   Incidentally, in the optical connector disclosed in Patent Document 1, the second optical fiber is abutted and connected to the end face coated with the refractive index matching material of the first optical fiber, and the cover member is pressed against the holder portion by the sleeve. The connection state between the first optical fiber and the second optical fiber is maintained. For this reason, the optical connector of Patent Document 1 has a problem in reliability when used for a long time because the connection state between optical fibers is unstable and the connection loss increases with time.

本発明は、上記に鑑みてなされたものであって、光ファイバ相互の接続状態が安定し、長期に亘って信頼性に優れた光コネクタを製造することが可能な光ファイバコードホルダ及びそれを用いた光ファイバコード付き光コネクタの製造方法を提供することを目的とする。   The present invention has been made in view of the above, and an optical fiber cord holder capable of manufacturing an optical connector having a stable connection state between optical fibers and excellent in reliability over a long period of time. It is an object of the present invention to provide a method for manufacturing an optical connector with an optical fiber cord used.

上述した課題を解決し、目的を達成するために、請求項1に係る光ファイバコードホルダは、光ファイバをシースで被覆した光ファイバコードを保持し、融着接続機のホルダ台上に位置決めして設置される光ファイバコードホルダであって、基板上に、前記光ファイバコードを保持する保持溝と、前記光ファイバの融着接続部を補強する補強スリーブを当該光ファイバと共に位置決め保持する位置決め溝と、が形成されていることを特徴とする。   In order to solve the above-described problems and achieve the object, an optical fiber cord holder according to claim 1 holds an optical fiber cord in which an optical fiber is covered with a sheath and positions the optical fiber cord on a holder base of a fusion splicer. An optical fiber cord holder installed on the substrate, the holding groove for holding the optical fiber cord, and the positioning groove for positioning and holding the reinforcing sleeve for reinforcing the fusion splicing portion of the optical fiber together with the optical fiber And are formed.

また、請求項2に係る光ファイバコードホルダは、上記の発明において、前記基板は、磁石が設けられると共に、前記磁石の磁力によって吸着され、前記補強スリーブを当該基板との間に挟持する蓋が開閉自在に取り付けられていることを特徴とする。   According to a second aspect of the present invention, in the optical fiber cord holder according to the above invention, the substrate is provided with a magnet, and is attracted by the magnetic force of the magnet, and a lid that sandwiches the reinforcing sleeve with the substrate. It can be opened and closed freely.

また、請求項3に係る光ファイバコードホルダは、上記の発明において、前記補強スリーブは、熱溶融樹脂からなるインナチューブと、抗張力体と、前記インナチューブと前記抗張力体とを被包する熱収縮チューブと、を有し、加熱によって前記インナチューブを前記光ファイバに溶着させると共に、前記熱収縮チューブを収縮させて前記インナチューブを介して前記抗張力体を前記接続部に保持し、前記接続部を補強することを特徴とする。   According to a third aspect of the present invention, in the optical fiber cord holder according to the present invention, the reinforcing sleeve includes an inner tube made of a hot-melt resin, a strength member, and the heat shrinkage encapsulating the inner tube and the strength member. A tube, and the inner tube is welded to the optical fiber by heating, and the heat-shrinkable tube is contracted to hold the tensile body through the inner tube to the connection portion. It is characterized by reinforcement.

また、上述した課題を解決し、目的を達成するために、請求項4に係るコネクタ付光ファイバコードの製造方法は、光ファイバをシースで被覆した光ファイバコードの端部に光コネクタを取り付けたコネクタ付光ファイバコードの製造方法であって、先端を接着した光ファイバの後端を後方へ所定長さ延出させると共に、長尺の延長部材を有するフェルール把持具によって把持されたフェルールをフェルールホルダに保持するフェルール保持工程と、予め光コネクタの構成部品を組み付けると共に、先端からシースを除去して露出した光ファイバに補強スリーブを被着した光ファイバコードを光ファイバコードホルダに保持するコード保持工程と、前記フェルールホルダと前記光ファイバコードホルダとを所定位置に配置することによって、前記フェルールの後方へ延出した前記光ファイバと前記光ファイバコード先端に露出した光ファイバとを対向させて位置決めする位置決め工程と、前記フェルールの後方へ延出した前記光ファイバと前記光ファイバコード先端に露出した光ファイバとを融着接続する接続工程と、融着接続した前記光ファイバの接続部へ前記補強スリーブを移動し、前記補強スリーブを加熱して前記接続部を補強する補強工程と、前記光コネクタの構成部品を前記光ファイバコードに沿って前記フェルールの位置へ移動し、光コネクタに組み立てる組立工程と、を含むことを特徴とする。   In addition, in order to solve the above-described problems and achieve the object, a method for manufacturing an optical fiber cord with a connector according to claim 4 includes attaching an optical connector to an end portion of an optical fiber cord in which the optical fiber is covered with a sheath. A method of manufacturing an optical fiber cord with a connector, wherein a rear end of an optical fiber having a front end bonded is extended by a predetermined length, and a ferrule gripped by a ferrule gripper having a long extending member is attached to a ferrule holder A ferrule holding step for holding the optical fiber cord, and a cord holding step for holding the optical fiber cord in which the reinforcing sleeve is attached to the optical fiber exposed by removing the sheath from the tip and holding the optical fiber cord holder in advance. And by arranging the ferrule holder and the optical fiber cord holder in a predetermined position, A positioning step for positioning the optical fiber extending rearward of the ferrule and the optical fiber exposed at the optical fiber cord tip; the optical fiber extending rearward of the ferrule; and the optical fiber cord tip A connection step of fusion-connecting the exposed optical fiber, a reinforcement step of moving the reinforcement sleeve to the connection portion of the fusion-connected optical fiber, and heating the reinforcement sleeve to reinforce the connection portion; An assembly step of moving a component part of the optical connector along the optical fiber cord to the position of the ferrule and assembling the optical connector.

本発明の光ファイバコードホルダは、基板上に光ファイバコードを保持する保持溝と、光ファイバの融着接続部を補強する補強スリーブを当該光ファイバと共に位置決め保持する位置決め溝とが形成されているので、光ファイバコードを保持した状態で融着接続機に搭載して使用することができ、また本発明のコネクタ付光ファイバコードの製造方法は、この光ファイバコードホルダを使用することから、光ファイバコードホルダによって光ファイバコードを保持した状態で他の光ファイバと融着接続することができるので、接続後における光ファイバ相互の接続状態が安定し、長期に亘って信頼性に優れた光ファイバコード付き光コネクタを製造することができるという効果を奏する。   In the optical fiber cord holder of the present invention, a holding groove for holding the optical fiber cord and a positioning groove for positioning and holding the reinforcing sleeve for reinforcing the fusion splicing portion of the optical fiber together with the optical fiber are formed on the substrate. Therefore, the optical fiber cord can be mounted and used in a fusion splicer, and the method of manufacturing an optical fiber cord with a connector according to the present invention uses this optical fiber cord holder. The optical fiber cord can be fusion-spliced with another optical fiber while the optical fiber cord is held by the fiber cord holder, so that the optical fiber connection state after the connection is stable, and the optical fiber has excellent reliability over a long period of time. There exists an effect that the optical connector with a cord can be manufactured.

以下、図面を参照して光ファイバコードホルダ(以下、単に「コードホルダ」という)及びそれを用いたコネクタ付光ファイバコードの製造方法にかかる実施の形態を詳細に説明する。図1は、本発明のコードホルダの蓋を開いた斜視図である。図2は、蓋を閉じたコードホルダの平面図である。図3は、蓋を外したコードホルダの基板を示す平面図である。   DESCRIPTION OF EMBODIMENTS Hereinafter, embodiments of an optical fiber cord holder (hereinafter simply referred to as “cord holder”) and a method of manufacturing an optical fiber cord with a connector using the same will be described in detail with reference to the drawings. FIG. 1 is a perspective view of the cord holder of the present invention with the lid opened. FIG. 2 is a plan view of the cord holder with the lid closed. FIG. 3 is a plan view showing the substrate of the code holder with the lid removed.

コードホルダ10は、光ファイバコードを保持するホルダであって、図1〜図6に示すように、基板11と蓋13を有している。   The cord holder 10 is a holder for holding an optical fiber cord, and has a substrate 11 and a lid 13 as shown in FIGS.

基板11は、図1〜図6に示すように、幅方向中央に光ファイバコードを配置する配置溝11aが形成され、配置溝11aの一端には光ファイバコードを保持する保持溝11bが形成されている。また、基板11は、保持溝11bと対向する長手方向の端部に幅狭に突出させた突出部11cが形成され、保持溝11bよりも幅が狭く、突出部11cへ延びる位置決め溝11dが配置溝11aに連設されている。位置決め溝11dは、光ファイバコードの光ファイバに被着した補強スリーブを光ファイバと共に位置決め保持する。基板11は、配置溝11aの幅方向一側にヒンジピン11e(図3参照)が設けられ、配置溝11aを挟んでヒンジピン11eと対向する他側上面には磁石12が埋設されている。基板11は、配置溝11aの略中央に上下方向に貫通する位置決め孔11fが設けられている。位置決め孔11fは、コードホルダ10を設置する融着接続機のホルダ台の傾斜に合わせて基板11に対して傾斜させて形成されている(図6参照)。   As shown in FIGS. 1 to 6, the substrate 11 is formed with an arrangement groove 11a for arranging the optical fiber cord at the center in the width direction, and a holding groove 11b for holding the optical fiber cord is formed at one end of the arrangement groove 11a. ing. Further, the substrate 11 is formed with a protruding portion 11c that protrudes narrowly at the end in the longitudinal direction facing the holding groove 11b, and a positioning groove 11d that is narrower than the holding groove 11b and extends to the protruding portion 11c is disposed. It is connected to the groove 11a. The positioning groove 11d positions and holds the reinforcing sleeve attached to the optical fiber of the optical fiber cord together with the optical fiber. The substrate 11 is provided with a hinge pin 11e (see FIG. 3) on one side in the width direction of the arrangement groove 11a, and a magnet 12 is embedded on the upper surface of the other side facing the hinge pin 11e across the arrangement groove 11a. The substrate 11 is provided with a positioning hole 11f penetrating in the vertical direction substantially at the center of the arrangement groove 11a. The positioning hole 11f is formed to be inclined with respect to the substrate 11 in accordance with the inclination of the holder base of the fusion splicer on which the cord holder 10 is installed (see FIG. 6).

蓋13は、図1〜図6に示すように、基板11の位置決め溝11d側の略半分を覆う蓋であり、ヒンジピン11eと係合するヒンジ部13aによって基板11に開閉自在に取り付けられている。蓋13は、突出部11c上へ張り出す押圧片13bを有しており、押圧片13bの基部側の端部下面には、例えば、ゴム等からなる摩擦部材14が取り付けられている。蓋13は、磁石12の磁力によって基板11に吸着され、光ファイバコードの光ファイバに被着した補強スリーブを光ファイバと共に基板11との間に挟持する。   As shown in FIGS. 1 to 6, the lid 13 is a lid that covers substantially half of the substrate 11 on the positioning groove 11d side, and is attached to the substrate 11 by a hinge portion 13a that engages with a hinge pin 11e so as to be freely opened and closed. . The lid 13 has a pressing piece 13b that protrudes onto the protruding portion 11c, and a friction member 14 made of rubber or the like is attached to the lower surface of the end of the pressing piece 13b on the base side. The lid 13 is attracted to the substrate 11 by the magnetic force of the magnet 12 and sandwiches the reinforcing sleeve attached to the optical fiber of the optical fiber cord between the optical fiber and the substrate 11.

コードホルダ10は、以上のように構成され、コネクタ付光ファイバコードを製造する際、以下に説明するフェルールホルダを使用する。   The cord holder 10 is configured as described above, and uses a ferrule holder described below when manufacturing an optical fiber cord with a connector.

フェルールホルダ20は、フェルールを保持するホルダであって、図7〜図11に示すように、基板21と蓋23を有している。   The ferrule holder 20 is a holder for holding a ferrule, and has a substrate 21 and a lid 23 as shown in FIGS.

基板21は、図7〜図11に示すように、長手方向一方に幅狭に突出させた突出部21aが形成され、突出部21aの端部にはフェルールの鍔部を配置する凹部21bが形成されている。また、基板21は、凹部21bに隣接する位置から長手方向他方へ延びるV溝21cが幅方向中央に形成され、長手方向に見て凹部21bに対向する後半側のV溝21c上部にはV溝21cを封止する封止板21d,21eが設置されている。基板21は、V溝21cの幅方向一側にヒンジピン21f(図9参照)が設けられ、V溝21cを挟んでヒンジピン21fと対向する他側上面には磁石22が埋設されている。基板21は、上下方向に貫通してV溝21cに開口する位置決め孔21gが封止板21dと封止板21eとの間に設けられている。位置決め孔21gは、フェルールホルダ20を設置する融着接続機のホルダ台の傾斜に合わせて基板21に対して傾斜させて形成されている(図11参照)。   As shown in FIGS. 7-11, the board | substrate 21 is formed with the protrusion part 21a protruded narrowly in one longitudinal direction, and the recessed part 21b which arrange | positions the collar part of a ferrule is formed in the edge part of the protrusion part 21a. Has been. In addition, the substrate 21 has a V-groove 21c extending from the position adjacent to the recess 21b to the other in the longitudinal direction at the center in the width direction, and a V-groove on the upper half of the V-groove 21c on the rear side facing the recess 21b when viewed in the longitudinal direction. Sealing plates 21d and 21e for sealing 21c are installed. The substrate 21 is provided with a hinge pin 21f (see FIG. 9) on one side in the width direction of the V-groove 21c, and a magnet 22 is embedded on the upper surface of the other side facing the hinge pin 21f across the V-groove 21c. The substrate 21 is provided with a positioning hole 21g penetrating in the vertical direction and opening in the V groove 21c between the sealing plate 21d and the sealing plate 21e. The positioning hole 21g is formed to be inclined with respect to the substrate 21 in accordance with the inclination of the holder base of the fusion splicer on which the ferrule holder 20 is installed (see FIG. 11).

蓋23は、図7〜図11に示すように、基板21の凹部21b側の略半分を覆う蓋であり、ヒンジピン21fと係合するヒンジ部23aによって基板21に開閉自在に取り付けられている。蓋23は、突出部21a上へ張り出す突出部23bが形成され、突出部23bの下面には、例えば、ゴム等からなる摩擦部材24が取り付けられている。蓋23は、磁石22の磁力によって基板21に吸着され、フェルールを把持するフェルール把持具30を基板21との間に挟持する。   7 to 11, the lid 23 is a lid that covers substantially half of the substrate 21 on the concave portion 21b side, and is attached to the substrate 21 so as to be freely opened and closed by a hinge portion 23a that engages with a hinge pin 21f. The lid 23 is formed with a protruding portion 23b projecting over the protruding portion 21a, and a friction member 24 made of, for example, rubber is attached to the lower surface of the protruding portion 23b. The lid 23 is attracted to the substrate 21 by the magnetic force of the magnet 22 and sandwiches the ferrule gripping tool 30 that grips the ferrule between the substrate 21 and the lid 23.

以上のように構成されるコードホルダ10は、コネクタ付光ファイバコードを製造する際、図12に示すように、蓋13を開いた状態で、配置溝11aにシース4の部分を配置して光ファイバコード1を保持する。このとき、光ファイバコード1は、図13に示すように、予め光コネクタの構成部品であるゴムブーツ41、リング42、カシメリング43、ストップリング44及びスプリング45を組み付けておき、先端からシース4を所定長さ除去し、露出する抗張力繊維3を所定長さに切断すると共に、シース4を長手方向に所定長さ縦裂きしておく。ここで、光ファイバコード1は、図13に示すように、光ファイバ2の先端から被覆2bを除去して裸ファイバ2aを所定長さ露出させてある。   When manufacturing the optical fiber cord with a connector, the cord holder 10 configured as described above is arranged in such a manner that the portion of the sheath 4 is arranged in the arrangement groove 11a with the lid 13 open as shown in FIG. The fiber cord 1 is held. At this time, as shown in FIG. 13, the optical fiber cord 1 is assembled with the rubber boot 41, the ring 42, the caulking ring 43, the stop ring 44 and the spring 45, which are components of the optical connector, and the sheath 4 is attached from the tip. A predetermined length is removed, the exposed tensile strength fiber 3 is cut into a predetermined length, and the sheath 4 is longitudinally split in the longitudinal direction by a predetermined length. Here, in the optical fiber cord 1, as shown in FIG. 13, the coating 2b is removed from the tip of the optical fiber 2 to expose the bare fiber 2a for a predetermined length.

そして、コードホルダ10は、図14に示すように、シース4の部分を保持溝11bに圧入すると共に、補強スリーブ5を光ファイバ2と共に位置決め溝11dに位置決め保持させる。次に、コードホルダ10は、図15に示すように、蓋13を閉じる。これにより、コードホルダ10は、基板11と磁石12の磁力によって吸着される蓋13とによって光ファイバコード1を保持する。このとき、コードホルダ10は、図16に示すように、蓋13の摩擦部材14と位置決め溝11dとによって補強スリーブ5を光ファイバ2と共に把持している。   As shown in FIG. 14, the cord holder 10 press-fits the sheath 4 portion into the holding groove 11 b and positions the reinforcing sleeve 5 together with the optical fiber 2 in the positioning groove 11 d. Next, the cord holder 10 closes the lid 13 as shown in FIG. Accordingly, the cord holder 10 holds the optical fiber cord 1 by the substrate 11 and the lid 13 that is attracted by the magnetic force of the magnet 12. At this time, as shown in FIG. 16, the cord holder 10 holds the reinforcing sleeve 5 together with the optical fiber 2 by the friction member 14 of the lid 13 and the positioning groove 11 d.

このとき、光ファイバコード1は、図17に示すように、光ファイバ2の周囲に抗張力繊維3が配置され、抗張力繊維3の外周を合成樹脂からなるシース4によって被覆されている。このため、光ファイバコード1は、シース4の部分を保持溝11bに圧入すると、図18に示すように、シース4が保持溝11bの部分で抗張力繊維3と共に変形して保持溝11bに圧入される。このように、コードホルダ10は、光ファイバコード1を簡単に保持することができるので、光ファイバコード1を単独で扱う場合に比べて光ファイバコード1の取り扱いが容易になり、融着接続等の際の作業性が向上する。   At this time, as shown in FIG. 17, in the optical fiber cord 1, the tensile strength fiber 3 is disposed around the optical fiber 2, and the outer periphery of the tensile strength fiber 3 is covered with a sheath 4 made of synthetic resin. Therefore, in the optical fiber cord 1, when the sheath 4 is press-fitted into the holding groove 11b, the sheath 4 is deformed together with the tensile fiber 3 at the holding groove 11b and is press-fitted into the holding groove 11b as shown in FIG. The Thus, since the cord holder 10 can easily hold the optical fiber cord 1, the handling of the optical fiber cord 1 becomes easier than the case where the optical fiber cord 1 is handled alone, such as fusion splicing. Workability at the time of improvement is improved.

ここで、補強スリーブ5は、図19に示すように、ホットメルト等の熱溶融樹脂からなるインナチューブ6と、金属棒からなる抗張力体7と、インナチューブ6と抗張力体7とを被包する熱収縮チューブ8とを有しており、予め光ファイバコード1の光ファイバ2に被着させた状態でコードホルダ10に保持させる。そして、コードホルダ10は、光ファイバコード1を保持した状態で、補強スリーブ5から延出した光ファイバ2の先端から被覆2bを除去して裸ファイバ2aを所定長さ露出させ、アルコールを含ませた払拭紙で裸ファイバ2aを清掃しておく。   Here, as shown in FIG. 19, the reinforcing sleeve 5 encloses an inner tube 6 made of a hot-melt resin such as hot melt, a tensile body 7 made of a metal rod, an inner tube 6 and the tensile body 7. It has a heat-shrinkable tube 8 and is held by the cord holder 10 in a state where it is attached to the optical fiber 2 of the optical fiber cord 1 in advance. Then, the cord holder 10 holds the optical fiber cord 1, removes the coating 2b from the tip of the optical fiber 2 extending from the reinforcing sleeve 5, exposes the bare fiber 2a for a predetermined length, and contains alcohol. The bare fiber 2a is cleaned with wiping paper.

一方、フェルールホルダ20は、コネクタ付光ファイバコードを製造する際、図20に示すように、予め光ファイバ26を取り付けたフェルール25をフェルール把持具30で把持させる。このとき使用するフェルール把持具30は、本体31の一方に割スリーブ32が設けられると共に、他方に紐状の把持部材33が設けられている。ここで、フェルール25は、図20に示したように、後部へ延出した光ファイバ26の端部から被覆26bを除去して裸ファイバ26aを所定長さ露出させている。また、フェルール25は、筒状部25aの後部に鍔部25bが形成され、鍔部25bには位置決め用の切欠き25cが長手方向に形成されている。そして、フェルール把持具30は、図21に示すように、割スリーブ32でフェルール25の筒状部25aを把持させる。   On the other hand, when manufacturing the optical fiber cord with a connector, the ferrule holder 20 grips the ferrule 25 to which the optical fiber 26 is attached in advance with a ferrule gripping tool 30, as shown in FIG. The ferrule gripping tool 30 used at this time is provided with a split sleeve 32 on one side of the main body 31 and a string-like gripping member 33 on the other side. Here, as shown in FIG. 20, the ferrule 25 removes the coating 26b from the end portion of the optical fiber 26 extending to the rear portion to expose the bare fiber 26a for a predetermined length. Further, the ferrule 25 has a flange portion 25b formed at the rear portion of the cylindrical portion 25a, and a positioning notch 25c is formed in the longitudinal direction of the flange portion 25b. Then, as shown in FIG. 21, the ferrule gripping tool 30 grips the tubular portion 25 a of the ferrule 25 with the split sleeve 32.

このようにしてフェルール25を把持したフェルール把持具30は、図22に示すように、蓋23を開いた状態で、フェルールホルダ20の基板21に形成されたV溝21cに配置される。このとき、フェルール25は、図22及び図23に示すように、鍔部25bが凹部21bに配置されると共に、筒状部25aを把持したフェルール把持具30の割スリーブ32がV溝21cによって位置決めされ、把持部材33は封止板21d,21e上を通って後方へ延出している。   As shown in FIG. 22, the ferrule gripping tool 30 that grips the ferrule 25 in this manner is arranged in a V groove 21 c formed in the substrate 21 of the ferrule holder 20 with the lid 23 opened. At this time, as shown in FIGS. 22 and 23, in the ferrule 25, the flange portion 25b is disposed in the concave portion 21b, and the split sleeve 32 of the ferrule gripping tool 30 that grips the cylindrical portion 25a is positioned by the V groove 21c. The gripping member 33 extends rearward through the sealing plates 21d and 21e.

次に、フェルールホルダ20は、図24に示すように、蓋23を閉じる。これにより、フェルールホルダ20は、基板21と磁石22の磁力によって吸着される蓋23とによってフェルール把持具30に把持されたフェルール25を保持する。このとき、フェルールホルダ20は、図25に示すように、蓋23の摩擦部材24とV溝21cの斜面とによってフェルール25の筒状部25aを保持している。   Next, the ferrule holder 20 closes the lid 23 as shown in FIG. Thereby, the ferrule holder 20 holds the ferrule 25 gripped by the ferrule gripping tool 30 by the substrate 21 and the lid 23 attracted by the magnetic force of the magnet 22. At this time, as shown in FIG. 25, the ferrule holder 20 holds the cylindrical portion 25a of the ferrule 25 by the friction member 24 of the lid 23 and the inclined surface of the V groove 21c.

このようにして光ファイバコード1を保持したコードホルダ10とフェルール25を保持したフェルールホルダ20は、図26に示す光ファイバの融着接続機50に設置してそれぞれが保持している光ファイバコード1の光ファイバ2とフェルール25の光ファイバ26とが融着接続される。   Thus, the cord holder 10 holding the optical fiber cord 1 and the ferrule holder 20 holding the ferrule 25 are installed in the optical fiber fusion splicer 50 shown in FIG. The optical fiber 2 of 1 and the optical fiber 26 of the ferrule 25 are fusion-connected.

この融着接続に使用される融着接続機50は、中央に融着接続をする作業部51が配置され、作業部51の奥部側には加熱部56が配置されている。   In the fusion splicer 50 used for the fusion splicing, a working unit 51 for fusion splicing is disposed at the center, and a heating unit 56 is disposed on the back side of the working unit 51.

作業部51は、左右にホルダ台52が配置され、各ホルダ台52上に光ファイバFを把持するホルダ53(一方は光ファイバFを把持している)が設置されている。両ホルダ台52は、風防カバー58を閉じると互いに所定距離移動して接近し、ホルダ53が把持した光ファイバFが突き合わされ、風防カバー58を開くと同じ距離移動して把持した光ファイバFが離れるように構成されている。ここで、ホルダ台52には、光ファイバFの端面を対向配置させるホルダ53に代えて、コードホルダ10やフェルールホルダ20を設置することも可能である。また、両側のホルダ台52の間にはV溝を形成したガイド板を有する2つのV溝ブロック54が間隔を置いて設けられ、2つのV溝ブロック54の間には光ファイバFの長手方向に対して直交する方向に放電電極55が先端を対向させて配置されている。   In the working unit 51, holder tables 52 are arranged on the left and right sides, and holders 53 (one of which holds the optical fiber F) for holding the optical fiber F are installed on each holder table 52. When the windshield cover 58 is closed, the two holder bases 52 move toward each other by a predetermined distance, the optical fibers F gripped by the holder 53 are abutted, and when the windshield cover 58 is opened, the optical fibers F gripped by the same distance move. It is configured to leave. Here, the holder holder 52 may be provided with the cord holder 10 or the ferrule holder 20 in place of the holder 53 in which the end faces of the optical fibers F are arranged to face each other. Two V-groove blocks 54 having guide plates formed with V-grooves are provided at intervals between the holder bases 52 on both sides, and the longitudinal direction of the optical fiber F is between the two V-groove blocks 54. Discharge electrode 55 is disposed with its tip opposed in a direction orthogonal to the front end.

一方、加熱部56は、光ファイバFの長手方向に沿って直線状に形成された加熱室であり、両端には融着接続された光ファイバやフェルール把持具30の紐状の把持部材33を保持するホルダ57が設けられている。ここで、融着接続機50は、光ファイバの融着接続を行う場合には、風防カバー58を閉じて作業部51を覆う。   On the other hand, the heating unit 56 is a heating chamber formed in a straight line along the longitudinal direction of the optical fiber F, and the optical fiber and the string-shaped gripping member 33 of the ferrule gripping tool 30 are fused at both ends. A holder 57 for holding is provided. Here, the fusion splicer 50 closes the windshield cover 58 and covers the working unit 51 when performing fusion splicing of optical fibers.

このとき、ホルダ台52は、図27〜図29に示すように、ホルダ53,コードホルダ10或いはフェルールホルダ20の設置位置を位置決めする位置決め突起52a,52aと位置決めピン52bとを有している。ホルダ台52は、位置決め突起52a,52a間にホルダ53の突出部53aやコードホルダ10或いはフェルールホルダ20の突出部11c,21aを係合させると共に、位置決めピン52bに位置決め孔53b、11f,21gを係合させてホルダ53、コードホルダ10或いはフェルールホルダ20を設置する。ここで、一方のホルダ台52にコードホルダ10を設置し、他方のホルダ台52にフェルールホルダ20を設置すると、図30に示すように、各V溝ブロック54によって光ファイバ2,26が位置決めされて光ファイバ2,26の先端が対向配置される。   At this time, the holder base 52 has positioning protrusions 52a and 52a for positioning the installation position of the holder 53, the cord holder 10 or the ferrule holder 20 and positioning pins 52b as shown in FIGS. The holder base 52 engages the protrusions 53a of the holder 53 and the protrusions 11c, 21a of the cord holder 10 or the ferrule holder 20 between the positioning protrusions 52a, 52a, and positioning holes 53b, 11f, 21g are provided in the positioning pins 52b. The holder 53, the cord holder 10, or the ferrule holder 20 is installed by engaging. Here, when the cord holder 10 is installed on one holder base 52 and the ferrule holder 20 is installed on the other holder base 52, the optical fibers 2 and 26 are positioned by the respective V-groove blocks 54 as shown in FIG. Thus, the tips of the optical fibers 2 and 26 are arranged to face each other.

このとき、フェルール25は、図31に示すように、筒状部25aの中心に形成したファイバ孔に光ファイバ26の裸ファイバ26aが接着固定され、鍔部25bの中心から後方に形成された挿通孔25dを通って光ファイバ26が延出している。このため、フェルール25は、挿通孔25dが光ファイバ26の直径に比べて大径に成形されていることから、挿通孔25dから延出する光ファイバ26の延出端側が動き易く、筒状部25aを中心として光ファイバ26が軸ずれし易い。   At this time, as shown in FIG. 31, the ferrule 25 is inserted through the fiber hole formed at the center of the cylindrical portion 25a, with the bare fiber 26a of the optical fiber 26 adhered and fixed, and formed rearward from the center of the flange portion 25b. An optical fiber 26 extends through the hole 25d. For this reason, in the ferrule 25, since the insertion hole 25d is formed to have a larger diameter than the diameter of the optical fiber 26, the extending end side of the optical fiber 26 extending from the insertion hole 25d is easy to move, and the cylindrical portion The optical fiber 26 is easily misaligned around 25a.

このため、フェルールホルダ20は、図32に示すように、基板21の突出部21aの幅Wbをホルダ台52の位置決め突起52a,52a間の幅Wpよりも狭く形成し、位置決め孔21gを位置決めピン52bの直径Dに対して幅方向に長い長さLの長孔に形成する。フェルールホルダ20は、基板21の突出部21a及び位置決め孔21gをこのように形成すると、保持したフェルール25の光ファイバ26に水平方向の軸ずれが生じても、基板21を幅方向にずらしてホルダ台52に対して位置調整することにより、図33に示すように、光ファイバ26をV溝ブロック54のV溝に具合よく配置することができる。なお、融着接続機50は、風防カバー58を閉じると、風防カバー58内面の部材が光ファイバ26をV溝ブロック54上に押圧するので、光ファイバ26の上下方向の軸ずれは何ら問題にはならない。   For this reason, as shown in FIG. 32, the ferrule holder 20 is formed such that the width Wb of the protruding portion 21a of the substrate 21 is narrower than the width Wp between the positioning protrusions 52a and 52a of the holder base 52, and the positioning hole 21g is formed as a positioning pin. A long hole having a length L that is long in the width direction with respect to the diameter D of 52b is formed. When the protrusion 21a and the positioning hole 21g of the substrate 21 are formed in this way, the ferrule holder 20 is configured to shift the substrate 21 in the width direction even if the optical fiber 26 of the held ferrule 25 is displaced in the horizontal direction. By adjusting the position with respect to the base 52, the optical fiber 26 can be arranged in the V groove of the V groove block 54 in a good manner as shown in FIG. In the fusion splicer 50, when the windshield cover 58 is closed, the member on the inner surface of the windshield cover 58 presses the optical fiber 26 onto the V-groove block 54, so that the vertical misalignment of the optical fiber 26 is not a problem. Must not.

ここで、突出部21aの幅Wbと位置決め突起52a,52a間の幅Wpとの間に差があれば、フェルールホルダ20は、位置決めピン52bを中心として基板21の突出部21a側を幅方向にずらすことができる。このため、位置決め孔21gは、位置決めピン52bの直径Dに対して幅方向に長い長孔に形成しなくてもよい。このとき、突出部21aの幅Wbと位置決め突起52a,52a間の幅Wpとの間の差は、フェルール25が有する光ファイバ26から被覆26bを除去して露出する裸ファイバ26aの直径の4倍程度あればよい。   Here, if there is a difference between the width Wb of the protruding portion 21a and the width Wp between the positioning protrusions 52a and 52a, the ferrule holder 20 moves the protruding portion 21a side of the substrate 21 in the width direction around the positioning pin 52b. Can be shifted. For this reason, the positioning hole 21g may not be formed as a long hole that is long in the width direction with respect to the diameter D of the positioning pin 52b. At this time, the difference between the width Wb of the protrusion 21a and the width Wp between the positioning protrusions 52a and 52a is four times the diameter of the bare fiber 26a exposed by removing the coating 26b from the optical fiber 26 of the ferrule 25. It only has to be about.

このようにして一方のホルダ台52に設置して光ファイバ2,26の先端を対向配置した後、風防カバー58を閉じる。これにより、双方のホルダ台52が接近し、図34に示すように、光ファイバ2,26が先端の裸ファイバ2a,26a間に所定距離を置いた状態で位置決めされる。   In this way, the windshield cover 58 is closed after the optical fibers 2 and 26 are disposed so as to face each other on one holder base 52. As a result, both holder bases 52 approach each other, and the optical fibers 2 and 26 are positioned with a predetermined distance between the bare fibers 2a and 26a at the tip, as shown in FIG.

次に、対向配置された放電電極55に通電し、フェルール25の後方へ延出した光ファイバ26と光ファイバコード1先端に露出した光ファイバ2とを融着接続する。このとき、光ファイバ2,26は、図35に示すように、放電電極55に通電することによって発生する放電アークAによって裸ファイバ2a,26aの先端が融着接続される。ここで、図34及び図35には、補強スリーブ5を描いているが、補強スリーブ5は、実際には光ファイバ2と共にコードホルダ10に保持されている。   Next, the discharge electrode 55 disposed oppositely is energized, and the optical fiber 26 extending to the rear of the ferrule 25 and the optical fiber 2 exposed at the tip of the optical fiber cord 1 are fusion-connected. At this time, as shown in FIG. 35, the ends of the bare fibers 2a and 26a are fusion-bonded to the optical fibers 2 and 26 by a discharge arc A generated by energizing the discharge electrode 55. Here, the reinforcing sleeve 5 is illustrated in FIGS. 34 and 35, but the reinforcing sleeve 5 is actually held by the cord holder 10 together with the optical fiber 2.

このようにして裸ファイバ2a,26aを融着接続した後、図36に示すように、融着接続した裸ファイバ2a,26aの接続部へ補強スリーブ5を移動する。次いで、風防カバー58を開いた後、コードホルダ10及びフェルールホルダ20の蓋13,23を開き、図37に示すように、シース4と把持部材33とを指で挟んで光ファイバ2,26が融着接続された光ファイバコード1とフェルール25とをコードホルダ10及びフェルールホルダ20から取り出す。そして、光ファイバコード1とフェルール25を把持したフェルール把持具30とを加熱部56に移動し、ホルダ57によって保持する。このとき、各ホルダ57によってコードホルダ10のシース4とフェルール把持具30の把持部材33とを、それぞれ保持する。   After the bare fibers 2a and 26a are fusion spliced in this way, as shown in FIG. 36, the reinforcing sleeve 5 is moved to the connection portion of the fusion-connected bare fibers 2a and 26a. Next, after the windshield cover 58 is opened, the lids 13 and 23 of the cord holder 10 and the ferrule holder 20 are opened, and the optical fibers 2 and 26 are sandwiched between the sheath 4 and the gripping member 33 as shown in FIG. The fused optical fiber cord 1 and the ferrule 25 are taken out from the cord holder 10 and the ferrule holder 20. Then, the optical fiber cord 1 and the ferrule gripping tool 30 that grips the ferrule 25 are moved to the heating unit 56 and held by the holder 57. At this time, the sheath 4 of the cord holder 10 and the gripping member 33 of the ferrule gripping tool 30 are respectively held by the holders 57.

ここで、融着接続機50によって光ファイバ2,26を融着接続する際、フェルール25はフェルール把持具30で把持してハンドリングされる。このため、フェルール把持具30を使用すると、10mm程度の長さしかない小さなフェルール25を素手でハンドリングする場合に比べ、フェルール25のハンドリングが格段に容易になるうえ、フェルール25から延出している光ファイバ26を折損等の事故から保護することができる。   Here, when the optical fibers 2 and 26 are fusion spliced by the fusion splicer 50, the ferrule 25 is gripped by the ferrule gripping tool 30 and handled. For this reason, when the ferrule gripping tool 30 is used, handling of the ferrule 25 becomes much easier than in the case of handling a small ferrule 25 having a length of only about 10 mm with bare hands, and the light extending from the ferrule 25 is used. The fiber 26 can be protected from accidents such as breakage.

その後、加熱部56で補強スリーブ5を加熱処理する。これにより、図38に示すように、インナチューブ6が溶融して光ファイバ2,26の被覆2b,26b及び裸ファイバ2a,26aに溶着すると共に、収縮した熱収縮チューブ8によってインナチューブ6及び抗張力体7が被覆され、裸ファイバ2a,26aの接続部Psが抗張力体7によって補強される。   Thereafter, the reinforcing sleeve 5 is heated by the heating unit 56. As a result, as shown in FIG. 38, the inner tube 6 is melted and welded to the coatings 2b and 26b of the optical fibers 2 and 26 and the bare fibers 2a and 26a, and the inner tube 6 and the tensile strength are contracted by the contracted heat-shrinkable tube 8. The body 7 is covered, and the connecting portion Ps of the bare fibers 2a and 26a is reinforced by the tensile body 7.

次に、図39に示すように、ゴムブーツ41、リング42、カシメリング43、ストップリング44及びスプリング45をフェルール25側へ移動させると共に、フェルール25をプラグフレーム46に挿着すると共に、プラグフレーム46をプラグハウジング47に挿着して光コネクタに組み立てる。これにより、光ファイバコード1の端部に光コネクタ40を組み付けた図40に示すコネクタ付光ファイバコードが製造される。   Next, as shown in FIG. 39, the rubber boot 41, the ring 42, the caulking ring 43, the stop ring 44, and the spring 45 are moved to the ferrule 25 side, and the ferrule 25 is inserted into and attached to the plug frame 46. Is inserted into the plug housing 47 and assembled into an optical connector. Thereby, the optical fiber cord with connector shown in FIG. 40 in which the optical connector 40 is assembled to the end of the optical fiber cord 1 is manufactured.

このとき、フェルール25とスプリング45は、フェルール25の鍔部25b側の後端からストップリング44の中へ収容し、これらを一体としてプラグフレーム46内へ挿着する。次に、ストップリング44のローレット部44aの周囲に接着剤を塗布し、その上に抗張力繊維3を広げて被せ、先端側の大径部43aを縮径させてカシメリング43をストップリング44の後部に取り付けると共に、抗張力繊維3をカシメリング43とストップリング44とで固定する。   At this time, the ferrule 25 and the spring 45 are accommodated in the stop ring 44 from the rear end of the ferrule 25 on the flange portion 25b side, and are inserted into the plug frame 46 as a unit. Next, an adhesive is applied around the knurled portion 44 a of the stop ring 44, the tensile strength fiber 3 is spread and covered thereon, the large diameter portion 43 a on the distal end side is reduced, and the caulking ring 43 is attached to the stop ring 44. The tensile strength fiber 3 is fixed with a caulking ring 43 and a stop ring 44 while being attached to the rear portion.

次いで、カシメリング43の小径部43bの周囲に接着剤を塗布し、光ファイバコード1の予め所定長さ縦裂きしておいたシース4を引き戻すようにして小径部43bに被せ、リング42を縮径させて小径部43bとリング42とでシース4を把持する。そして、これらに後方からゴムブーツ41を被せ、プラグフレーム46をプラグハウジング47に挿着して光コネクタ40の組み立てが完了する。   Next, an adhesive is applied around the small-diameter portion 43b of the caulking ring 43, and the sheath 4 that has been longitudinally split for a predetermined length of the optical fiber cord 1 is pulled back to cover the small-diameter portion 43b. The sheath 4 is gripped by the small diameter portion 43b and the ring 42. Then, rubber boots 41 are covered from behind, and the plug frame 46 is inserted into the plug housing 47 to complete the assembly of the optical connector 40.

光コネクタ40の組み立てに際し、フェルール25の光ファイバ26と光ファイバコード1の光ファイバ2とは融着接続によって接続される。このため、図40に示すコネクタ付光ファイバコードは、光ファイバ2,26相互の接続状態が安定しており、光コネクタ40の信頼性を長期に亘って保証することができる。   When the optical connector 40 is assembled, the optical fiber 26 of the ferrule 25 and the optical fiber 2 of the optical fiber cord 1 are connected by fusion splicing. For this reason, the optical fiber cord with a connector shown in FIG. 40 has a stable connection state between the optical fibers 2 and 26, and can guarantee the reliability of the optical connector 40 over a long period of time.

なお、光ファイバコードホルダは、単心の光ファイバを有する光ファイバコードを保持するホルダについて説明したが、多心の光ファイバを有する光ファイバコードを保持するホルダとしても使用することができる。この場合、光ファイバコードホルダは、光ファイバコードを保持する保持溝と、光ファイバの融着接続部を補強する補強スリーブを光ファイバと共に位置決め保持する位置決め溝とを横方向に延びる水平方向に形成し、光ファイバコードを側方から保持溝や位置決め溝に配置する。このようにすると、光ファイバコードホルダは、複数の光ファイバの配置を乱すことなく、光ファイバコードを保持溝や位置決め溝に配置することができる。   In addition, although the optical fiber cord holder demonstrated the holder holding the optical fiber cord which has a single core optical fiber, it can be used also as a holder which hold | maintains the optical fiber cord which has a multi-core optical fiber. In this case, the optical fiber cord holder forms a holding groove for holding the optical fiber cord and a positioning groove for positioning and holding the reinforcing sleeve for reinforcing the fusion splicing portion of the optical fiber together with the optical fiber in the horizontal direction. Then, the optical fiber cord is arranged in the holding groove or the positioning groove from the side. In this case, the optical fiber cord holder can arrange the optical fiber cord in the holding groove or the positioning groove without disturbing the arrangement of the plurality of optical fibers.

本発明のコードホルダの蓋を開いた状態の斜視図である。It is a perspective view of the state where the lid of the cord holder of the present invention was opened. 図1に示すコードホルダの蓋を閉じた状態の平面図である。It is a top view in the state where the lid of the cord holder shown in FIG. 1 was closed. 図1に示すコードホルダから蓋を外した基板を示す平面図である。It is a top view which shows the board | substrate which removed the lid | cover from the cord holder shown in FIG. 図2に示すコードホルダの左側面図である。It is a left view of the cord holder shown in FIG. 図2に示すコードホルダの右側面図である。It is a right view of the cord holder shown in FIG. 図2に示すコードホルダのC1−C1線に沿った断面図である。It is sectional drawing along the C1-C1 line | wire of the cord holder shown in FIG. 本発明の光ファイバコード付き光コネクタの製造方法で使用するフェルールホルダの蓋を開いた状態の斜視図である。It is a perspective view of the state which opened the cover of the ferrule holder used with the manufacturing method of the optical connector with an optical fiber cord of the present invention. 図7に示すフェルールホルダの蓋を閉じた状態の平面図である。It is a top view of the state which closed the cover of the ferrule holder shown in FIG. 図7に示すフェルールホルダから蓋を外した基板を示す平面図である。It is a top view which shows the board | substrate which removed the cover from the ferrule holder shown in FIG. 図7に示すフェルールホルダの右側面図である。It is a right view of the ferrule holder shown in FIG. 図8に示すフェルールホルダのC2−C2線に沿った断面図である。It is sectional drawing along the C2-C2 line of the ferrule holder shown in FIG. 図1に示すコードホルダの基板上に光ファイバコードを配置した斜視図である。It is the perspective view which has arrange | positioned the optical fiber cord on the board | substrate of the cord holder shown in FIG. コードホルダに配置するのに先立って、光コネクタの構成部品を組み付けると共に、先端からシースを除去して露出した光ファイバに補強スリーブを被着した光ファイバコードを示す正面図である。FIG. 3 is a front view showing an optical fiber cord in which components of the optical connector are assembled and the reinforcing sleeve is attached to the exposed optical fiber after the sheath is removed from the distal end prior to the placement on the cord holder. 蓋を外したコードホルダの基板上に光ファイバコードを配置した平面図である。It is the top view which has arrange | positioned the optical fiber cord on the board | substrate of the code holder which removed the lid | cover. 図12に示すコードホルダの蓋を閉じた状態を示す平面図である。It is a top view which shows the state which closed the lid | cover of the cord holder shown in FIG. 図15のC3−C3線に沿った断面図である。FIG. 16 is a cross-sectional view taken along line C3-C3 in FIG. 光ファイバコードをコードホルダの基板に形成した保持溝に圧入して保持する様子を示す要部側面図である。It is a principal part side view which shows a mode that an optical fiber cord is press-fitted and hold | maintained in the holding groove formed in the board | substrate of a code holder. 光ファイバコードをコードホルダの基板に形成した保持溝に圧入して保持させた状態を示す要部側面図である。It is a principal part side view which shows the state which press-fitted and hold | maintained the optical fiber cord in the holding groove formed in the board | substrate of a cord holder. 光ファイバに被着した補強スリーブを光ファイバと共に位置決め溝に位置決め保持した状態を位置決め溝の突出部側下方から見た斜視図である。It is the perspective view which looked at the state which the reinforcement sleeve attached to the optical fiber was positioned and hold | maintained in the positioning groove with the optical fiber from the protrusion part side lower side of the positioning groove. 光ファイバコード付き光コネクタに組み上げるフェルールとフェルール把持具とを示す平面図である。It is a top view which shows the ferrule assembled to the optical connector with an optical fiber cord, and a ferrule holding tool. 図20において、フェルールをフェルール把持具で把持した状態を示す平面図である。In FIG. 20, it is a top view which shows the state which hold | gripped the ferrule with the ferrule holding tool. 図7に示すフェルールホルダの基板上にフェルール把持具で把持したフェルールを配置した斜視図である。It is the perspective view which has arrange | positioned the ferrule hold | gripped with the ferrule holding tool on the board | substrate of the ferrule holder shown in FIG. 蓋を外したフェルールホルダの基板上にフェルール把持具で把持したフェルールを配置した平面図である。It is the top view which has arrange | positioned the ferrule hold | gripped with the ferrule holding tool on the board | substrate of the ferrule holder which removed the cover. 図22に示すフェルールホルダの蓋を閉じた状態を示す平面図である。It is a top view which shows the state which closed the cover of the ferrule holder shown in FIG. 図24のC4−C4線に沿った断面図である。FIG. 25 is a sectional view taken along line C 4 -C 4 in FIG. 24. 本発明の光ファイバコード付き光コネクタの製造方法で使用する融着接続機の一例を示す要部平面図である。It is a principal part top view which shows an example of the fusion splicer used with the manufacturing method of the optical connector with an optical fiber cord of this invention. 図26に示す融着接続機のホルダ台の平面図である。It is a top view of the holder stand of the fusion splicer shown in FIG. 図26に示す融着接続機のホルダ台の正面図である。It is a front view of the holder stand of the fusion splicer shown in FIG. 図26に示す融着接続機のホルダ台の右側面図である。It is a right view of the holder stand of the fusion splicer shown in FIG. 図26に示す融着接続機におけるコードホルダが保持した光ファイバコードの光ファイバとフェルールホルダが保持したフェルールの光ファイバとの融着接続を説明する要部平面図である。It is a principal part top view explaining the fusion splicing with the optical fiber of the optical fiber cord hold | maintained at the cord holder in the fusion splicer shown in FIG. 26, and the optical fiber of the ferrule hold | maintained at the ferrule holder. 一端が接着固定された光ファイバの他端が後部から延出しているフェルールの断面図である。It is sectional drawing of the ferrule which the other end of the optical fiber to which one end was adhere | attached and fixed has extended from the rear part. 融着接続機に対する位置調整を説明するフェルールホルダの基板の模式図である。It is a schematic diagram of the board | substrate of a ferrule holder explaining the position adjustment with respect to a fusion splicer. フェルール把持具で把持したフェルールを保持したフェルールホルダと融着接続機のV溝ブロックを示す斜視図である。It is a perspective view which shows the ferrule holder holding the ferrule grasped with the ferrule grasping tool, and the V-groove block of the fusion splicer. 融着接続機において、対向配置される光ファイバが先端の裸ファイバ間に所定距離を置いて位置決めされた状態を示す図である。In a fusion splicer, it is a figure which shows the state by which the optical fiber arrange | positioned facing was positioned at predetermined distance between the bare fibers of the front-end | tip. 対向配置された光ファイバ先端の裸ファイバが放電アークによって融着接続される様子を示す図である。It is a figure which shows a mode that the bare fiber of the optical fiber tip arrange | positioned facing is fusion-connected by a discharge arc. 融着接続した裸ファイバの接続部へ補強スリーブを移動した状態を示す図である。It is a figure which shows the state which moved the reinforcement sleeve to the connection part of the bare fiber which carried out the melt | fusion connection. 光ファイバが融着接続されたフェルールを把持したフェルール把持具と光ファイバコードとを手で持ってハンドリングする様子を示す斜視図である。It is a perspective view which shows a mode that the ferrule holding tool and the optical fiber cord which hold | gripped the ferrule by which the optical fiber was fusion-spliced were held by hand. 光ファイバが融着接続された接続部へ補強スリーブを移動し、接続部を補強した状態を模式的に示す断面図である。It is sectional drawing which shows typically the state which moved the reinforcement sleeve to the connection part to which the optical fiber was fusion-spliced, and reinforced the connection part. 光ファイバが融着接続されたフェルール側へ光ファイバコードに予め組み付けておいた光コネクタの構成部品を移動して組み付け、光ファイバコード付き光コネクタとする分解組立図である。FIG. 3 is an exploded view of an optical connector with an optical fiber cord by moving and assembling components of the optical connector that have been assembled in advance to the optical fiber cord to the ferrule side to which the optical fiber has been fusion spliced. 本発明の光ファイバコード付き光コネクタの製造方法によって製造された光ファイバコード付き光コネクタの完成図である。It is a completion drawing of the optical connector with an optical fiber cord manufactured by the manufacturing method of the optical connector with an optical fiber cord of the present invention.

符号の説明Explanation of symbols

1 光ファイバコード
2 光ファイバ
2b 被覆
2a 裸ファイバ
3 抗張力繊維
4 シース
5 補強スリーブ
6 インナチューブ
7 抗張力体
8 熱収縮チューブ
10 コードホルダ
11 基板
11a 配置溝
11b 保持溝
11c 突出部
11d 位置決め溝
11e ヒンジピン
11f 位置決め孔
12 磁石
13 蓋
13a ヒンジ部
13b 押圧片
14 摩擦部材
20 フェルールホルダ
21 基板
21a 突出部
21b 凹部
21c V溝
21d,21e 封止板
21f ヒンジピン
22 磁石
21g 位置決め孔
23 蓋
23a ヒンジ部
23b 突出部
24 摩擦部材
25 フェルール
25a 筒状部
25b 鍔部
25c 切欠き
25d 挿通孔
26 光ファイバ
26a 裸ファイバ
26b 被覆
30 フェルール把持具
31 本体
32 割スリーブ
33 把持部材
40 光コネクタ
41 ゴムブーツ
42 リング
43 カシメリング
44 ストップリング
45 スプリング
50 融着接続機
51 作業部
52 ホルダ台
53 ホルダ
54 V溝ブロック
55 放電電極
56 加熱部
57 ホルダ
58 風防カバー
DESCRIPTION OF SYMBOLS 1 Optical fiber cord 2 Optical fiber 2b Cover 2a Bare fiber 3 Tensile fiber 4 Sheath 5 Reinforcement sleeve 6 Inner tube 7 Tensile body 8 Heat shrinkable tube 10 Cord holder 11 Substrate 11a Arrangement groove 11b Holding groove 11c Protruding part 11d Positioning groove 11e Hinge pin 11f Positioning hole 12 Magnet 13 Lid 13a Hinge part 13b Pressing piece 14 Friction member 20 Ferrule holder 21 Substrate 21a Protruding part 21b Recessed part 21c V groove 21d, 21e Sealing plate 21f Hinge pin 22 Magnet 21g Positioning hole 23 Lid 23a Protruding part 24 Friction member 25 Ferrule 25a Tubular portion 25b Gutter portion 25c Notch 25d Insertion hole 26 Optical fiber 26a Bare fiber 26b Cover 30 Ferrule gripping tool 31 Main body 32 Split sleeve 33 Grasping Material 40 optical connector 41 the rubber boot 42 ring 43 caulking ring 44 stop ring 45 spring 50 fusion splicer 51 working portion 52 holder table 53 holder 54 V grooves block 55 discharge electrode 56 heating unit 57 the holder 58 windshield cover

Claims (4)

光ファイバをシースで被覆した光ファイバコードを保持し、融着接続機のホルダ台上に位置決めして設置される光ファイバコードホルダであって、
基板上に、
前記光ファイバコードを保持する保持溝と、
前記光ファイバの融着接続部を補強する補強スリーブを当該光ファイバと共に位置決め保持する位置決め溝と、
が形成されていることを特徴とする光ファイバコードホルダ。
An optical fiber cord holder that holds an optical fiber cord coated with an optical fiber sheath and is positioned and installed on a holder base of a fusion splicer,
On the board
A holding groove for holding the optical fiber cord;
A positioning groove for positioning and holding the reinforcing sleeve for reinforcing the fusion spliced portion of the optical fiber together with the optical fiber;
An optical fiber cord holder characterized in that is formed.
前記基板は、磁石が設けられると共に、前記磁石の磁力によって吸着され、前記補強スリーブを当該基板との間に挟持する蓋が開閉自在に取り付けられていることを特徴とする請求項1に記載の光ファイバコードホルダ。   The said board | substrate is provided with a magnet, and is attracted | sucked by the magnetic force of the said magnet, The lid which clamps the said reinforcement sleeve between the said board | substrates is attached so that opening and closing is possible. Optical fiber cord holder. 前記補強スリーブは、
熱溶融樹脂からなるインナチューブと、
抗張力体と、
前記インナチューブと前記抗張力体とを被包する熱収縮チューブと、
を有し、
加熱によって前記インナチューブを前記光ファイバに溶着させると共に、前記熱収縮チューブを収縮させて前記インナチューブを介して前記抗張力体を前記接続部に保持し、前記接続部を補強することを特徴とする請求項1又は2に記載の光ファイバコードホルダ。
The reinforcing sleeve is
An inner tube made of hot-melt resin;
A tensile body,
A heat shrinkable tube encapsulating the inner tube and the tensile body;
Have
The inner tube is welded to the optical fiber by heating, and the heat-shrinkable tube is contracted to hold the strength member to the connecting portion via the inner tube, thereby reinforcing the connecting portion. The optical fiber cord holder according to claim 1 or 2.
光ファイバをシースで被覆した光ファイバコードの端部に光コネクタを取り付けたコネクタ付光ファイバコードの製造方法であって、
先端を接着した光ファイバの後端を後方へ所定長さ延出させると共に、長尺の延長部材を有するフェルール把持具によって把持されたフェルールをフェルールホルダに保持するフェルール保持工程と、
予め光コネクタの構成部品を組み付けると共に、先端からシースを除去して露出した光ファイバに補強スリーブを被着した光ファイバコードを光ファイバコードホルダに保持するコード保持工程と、
前記フェルールホルダと前記光ファイバコードホルダとを所定位置に配置することによって、前記フェルールの後方へ延出した前記光ファイバと前記光ファイバコード先端に露出した光ファイバとを対向させて位置決めする位置決め工程と、
前記フェルールの後方へ延出した前記光ファイバと前記光ファイバコード先端に露出した光ファイバとを融着接続する接続工程と、
融着接続した前記光ファイバの接続部へ前記補強スリーブを移動し、前記補強スリーブを加熱して前記接続部を補強する補強工程と、
前記光コネクタの構成部品を前記光ファイバコードに沿って前記フェルールの位置へ移動し、光コネクタに組み立てる組立工程と、
を含むことを特徴とするコネクタ付光ファイバコードの製造方法。
A method of manufacturing an optical fiber cord with a connector in which an optical connector is attached to an end of an optical fiber cord covered with a sheath,
A ferrule holding step of holding the ferrule gripped by the ferrule gripping tool having a long extending member on the ferrule holder while extending the rear end of the optical fiber having the tip bonded rearward by a predetermined length;
Assembling the optical connector components in advance, a cord holding step of holding an optical fiber cord in which a reinforcing sleeve is attached to an exposed optical fiber by removing the sheath from the tip, and holding the optical fiber cord holder;
A positioning step of positioning the ferrule holder and the optical fiber cord holder in a predetermined position so that the optical fiber extending rearward of the ferrule and the optical fiber exposed at the tip of the optical fiber cord face each other. When,
A connection step of fusion-bonding the optical fiber extending to the rear of the ferrule and the optical fiber exposed at the optical fiber cord tip;
A reinforcing step of moving the reinforcing sleeve to the spliced connection portion of the optical fiber and heating the reinforcing sleeve to reinforce the connecting portion;
An assembly step of moving the components of the optical connector to the position of the ferrule along the optical fiber cord and assembling the optical connector;
The manufacturing method of the optical fiber cord with a connector characterized by including these.
JP2006338810A 2006-12-15 2006-12-15 Optical fiber cord holder, method of manufacturing optical fiber cord with connector using the same, and fusion splicer Expired - Fee Related JP4630266B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006338810A JP4630266B2 (en) 2006-12-15 2006-12-15 Optical fiber cord holder, method of manufacturing optical fiber cord with connector using the same, and fusion splicer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006338810A JP4630266B2 (en) 2006-12-15 2006-12-15 Optical fiber cord holder, method of manufacturing optical fiber cord with connector using the same, and fusion splicer

Publications (2)

Publication Number Publication Date
JP2008151952A true JP2008151952A (en) 2008-07-03
JP4630266B2 JP4630266B2 (en) 2011-02-09

Family

ID=39654198

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006338810A Expired - Fee Related JP4630266B2 (en) 2006-12-15 2006-12-15 Optical fiber cord holder, method of manufacturing optical fiber cord with connector using the same, and fusion splicer

Country Status (1)

Country Link
JP (1) JP4630266B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010249967A (en) * 2009-04-14 2010-11-04 Sumitomo Electric Ind Ltd Holder, fusion splicer, and fusion splicing method
JP2010266567A (en) * 2009-05-13 2010-11-25 Sumitomo Electric Ind Ltd Holder, and fusion splicing machine and method
JP2011048404A (en) * 2010-12-09 2011-03-10 Sumitomo Electric Ind Ltd Fiber holder
JP2011107212A (en) * 2009-11-12 2011-06-02 Fujikura Ltd Optical fiber holder
WO2013015249A1 (en) * 2011-07-25 2013-01-31 Seiオプティフロンティア株式会社 Fusion splicer
WO2014012245A1 (en) * 2012-07-20 2014-01-23 大豪信息技术(威海)有限公司 Multifunctional optical fiber fixing clamp
KR101742341B1 (en) 2009-12-21 2017-05-31 스미토모 덴키 고교 가부시키가이샤 Optical fiber holder and method for holding optical fiber core

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6432208A (en) * 1987-07-28 1989-02-02 Sumitomo Electric Industries Reinforcing member for optical fiber fusion splicing part
JPH0555105U (en) * 1991-12-26 1993-07-23 日本電気株式会社 Optical fiber holder
JPH09297244A (en) * 1996-05-02 1997-11-18 Fujikura Ltd Ferrule protective cap
JPH10319272A (en) * 1997-05-22 1998-12-04 Fujikura Ltd Optical connector cover
JPH10319270A (en) * 1997-05-16 1998-12-04 Fujikura Ltd Heating device for heat-shrinkage sleeve for optical fiber connection reinforcement
JPH11231164A (en) * 1998-02-13 1999-08-27 Fujikura Ltd Optical fiber holder
JP2000249864A (en) * 1999-02-25 2000-09-14 Fujikura Ltd Optical fiber fusion splicing device
JP2002082257A (en) * 2000-09-06 2002-03-22 Sumitomo Electric Ind Ltd Optical connector and optical connector parts
JP2006030669A (en) * 2004-07-16 2006-02-02 Three M Innovative Properties Co Optical connector and optical fiber connection system
WO2008059842A1 (en) * 2006-11-13 2008-05-22 Sumitomo Electric Industries, Ltd. Optical connector

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6432208A (en) * 1987-07-28 1989-02-02 Sumitomo Electric Industries Reinforcing member for optical fiber fusion splicing part
JPH0555105U (en) * 1991-12-26 1993-07-23 日本電気株式会社 Optical fiber holder
JPH09297244A (en) * 1996-05-02 1997-11-18 Fujikura Ltd Ferrule protective cap
JPH10319270A (en) * 1997-05-16 1998-12-04 Fujikura Ltd Heating device for heat-shrinkage sleeve for optical fiber connection reinforcement
JPH10319272A (en) * 1997-05-22 1998-12-04 Fujikura Ltd Optical connector cover
JPH11231164A (en) * 1998-02-13 1999-08-27 Fujikura Ltd Optical fiber holder
JP2000249864A (en) * 1999-02-25 2000-09-14 Fujikura Ltd Optical fiber fusion splicing device
JP2002082257A (en) * 2000-09-06 2002-03-22 Sumitomo Electric Ind Ltd Optical connector and optical connector parts
JP2006030669A (en) * 2004-07-16 2006-02-02 Three M Innovative Properties Co Optical connector and optical fiber connection system
WO2008059842A1 (en) * 2006-11-13 2008-05-22 Sumitomo Electric Industries, Ltd. Optical connector

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010249967A (en) * 2009-04-14 2010-11-04 Sumitomo Electric Ind Ltd Holder, fusion splicer, and fusion splicing method
US8254743B2 (en) 2009-04-14 2012-08-28 Sumitomo Electric Industries, Ltd. Optical fiber cable holder, fusion splicer including the holder, and fusion splicing method using the holder
JP2010266567A (en) * 2009-05-13 2010-11-25 Sumitomo Electric Ind Ltd Holder, and fusion splicing machine and method
JP2011107212A (en) * 2009-11-12 2011-06-02 Fujikura Ltd Optical fiber holder
KR101742341B1 (en) 2009-12-21 2017-05-31 스미토모 덴키 고교 가부시키가이샤 Optical fiber holder and method for holding optical fiber core
JP2011048404A (en) * 2010-12-09 2011-03-10 Sumitomo Electric Ind Ltd Fiber holder
WO2013015249A1 (en) * 2011-07-25 2013-01-31 Seiオプティフロンティア株式会社 Fusion splicer
JP2013025239A (en) * 2011-07-25 2013-02-04 Sei Optifrontier Co Ltd Fusion splicer
US9146354B2 (en) 2011-07-25 2015-09-29 Sei Optifrontier Co., Ltd. Fusion splicer
WO2014012245A1 (en) * 2012-07-20 2014-01-23 大豪信息技术(威海)有限公司 Multifunctional optical fiber fixing clamp

Also Published As

Publication number Publication date
JP4630266B2 (en) 2011-02-09

Similar Documents

Publication Publication Date Title
JP4495173B2 (en) Ferrule holder and fusion splicer
KR101038195B1 (en) Assembliy method and optical connector for assembling in the field
US9091825B2 (en) Optical fiber connector, optical fiber connector assembling method, fusion-spliced portion reinforcing method, pin clamp, cap-attached optical fiber connector, optical fiber connector cap, optical fiber connector assembling tool, and optical fiber connector assembling set
US7467899B2 (en) Ferrule transfer method and ferrule holder
JP4630266B2 (en) Optical fiber cord holder, method of manufacturing optical fiber cord with connector using the same, and fusion splicer
US8118494B2 (en) Remote grip optical fiber connector
US20150003790A1 (en) Field mountable duplex optical fiber connector with mechanical splice elements
US8985876B2 (en) Ferrule holder
JP4495175B2 (en) Ferrule transport method and ferrule gripper
JP2012037624A (en) Optical connector and optical connector assembly tool
JP4878833B2 (en) Optical fiber holder and batch fusion splicing method
JP2006235199A (en) Optical fiber holder and fusion splicing machine
JP2005107309A (en) Optical connector and method for assembling optical connector
JP2010102358A (en) Fusion-splicing machine
JP4255803B2 (en) Optical connector
JP2011095493A (en) Optical connector
JP2007121601A (en) Tool for holding core wire of optical fiber and method of assembling optical connector on site
JP3755282B2 (en) Manufacturing method of optical connector
JP3785337B2 (en) Mechanical splice
JP2021148862A (en) Holder fixture, set of fixtures, and fusion splicing method
JPH01262505A (en) Splicing device for optical fibers and connecting method thereof
JP2006018080A (en) Optical fiber for optical connector, and optical connector

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090818

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091013

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091211

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100309

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100507

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100720

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100823

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101019

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101112

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131119

Year of fee payment: 3

R151 Written notification of patent or utility model registration

Ref document number: 4630266

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131119

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees