JP2008148940A - Structure of game island - Google Patents

Structure of game island Download PDF

Info

Publication number
JP2008148940A
JP2008148940A JP2006340310A JP2006340310A JP2008148940A JP 2008148940 A JP2008148940 A JP 2008148940A JP 2006340310 A JP2006340310 A JP 2006340310A JP 2006340310 A JP2006340310 A JP 2006340310A JP 2008148940 A JP2008148940 A JP 2008148940A
Authority
JP
Japan
Prior art keywords
frame
unit member
unit
island
lower unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006340310A
Other languages
Japanese (ja)
Inventor
Naoki Omi
尚城 大見
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SAMMY SYSTEMS KK
Sammy Systems KK
Original Assignee
SAMMY SYSTEMS KK
Sammy Systems KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SAMMY SYSTEMS KK, Sammy Systems KK filed Critical SAMMY SYSTEMS KK
Priority to JP2006340310A priority Critical patent/JP2008148940A/en
Publication of JP2008148940A publication Critical patent/JP2008148940A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Pinball Game Machines (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an island structure having favorable work efficiency by reducing a manhour when constituting a game island. <P>SOLUTION: The game island constituted by installing an upper-stage unit member and a lower-stage unit member between frame members 10 erected on a floor FL of game facilities at left/right prescribed intervals, is provided with: a lower support part 133 having a support side 133b for supporting the lower face of the lower-stage unit member, and a positioning side 133c engaged with a lower positioning groove formed in the lower face; and a groove-shaped upper support part 34 formed on the upper face of the lower-stage unit member and communicable with an upper positioning groove 134. When the lower part of the lower-stage unit member is engaged and supported to the lower support part and the upper part of the lower-stage unit member is disposed in a matching position communicating with the upper support part, the lower-stage unit member is positioned in top/bottom and front/rear direction, and the inclination in the front/rear direction is positioned. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、遊技施設の床面に左右所定間隔で立設された複数のフレーム部材と、フレーム部材の間に配設される下段ユニット部材及び上段ユニット部材を備え、これら上下のユニット部材の間に縦型遊技機が左右に並んで固定保持される遊技島の島構造に関する。   The present invention includes a plurality of frame members erected on the floor surface of a game facility at a predetermined interval on the left and right sides, and a lower unit member and an upper unit member disposed between the frame members. In particular, the present invention relates to an island structure of gaming islands in which vertical gaming machines are fixedly held side by side.

パチンコ機やスロットマシン等の縦型遊技機は、遊技者が最も着目する遊技盤の中央飾り部やリール中央の有効ラインが着座姿勢にある遊技者の目前に位置するように、遊技島と称される設備に左右に並んで固定配設されて遊技に供される。遊技島の島構造には種々の構成形態があり、例えば、遊技施設の床面に左右所定間隔(例えば遊技機2〜3台間隔)で複数のフレーム部材を立設して各フレーム部材の間に下段ユニット部材及び上段ユニット部材を配設するような構成形態の島構造がある(例えば特許文献1を参照)。   Vertical gaming machines such as pachinko machines and slot machines are called game islands so that the central decoration of the game board that the player pays most attention to and the effective line at the center of the reel are located in front of the player in the sitting position. It is fixedly arranged side by side on the equipment to be used for the game. The island structure of the game island has various configurations. For example, a plurality of frame members are erected on the floor of the game facility at predetermined intervals (for example, two to three game machines) between the frame members. There is an island structure having a configuration in which a lower unit member and an upper unit member are disposed (see, for example, Patent Document 1).

このような島構造において、左右に並んで配設される下段ユニット部材について、フレーム部材に下段ユニット部材を支持する支持部を形成し、この支持部に下段ユニット部材を載置したときに当該下段ユニット部材が遊技島における所定の高さ位置に配設されるように構成した遊技機の島構造が知られている。   In such an island structure, for the lower unit members arranged side by side, a support part that supports the lower unit member is formed on the frame member, and the lower unit member is placed when the lower unit member is placed on the support part. There is known an island structure of a gaming machine configured such that a unit member is disposed at a predetermined height position on a gaming island.

特開平11−47418号公報Japanese Patent Laid-Open No. 11-47418

ところが、上記のような従来の島構造では、左右のフレーム部材の支持部に仮支持された下段ユニット部材は、当該ユニット部材全般の高さ位置については規定されるものの、前後方向の位置や傾き、ねじれ等に関しては、作業者がメジャーや水準器あるいは水糸などを用いて各下段ユニット部材ごとに調整を行う必要があり、作業が繁雑であるという課題があった。   However, in the conventional island structure as described above, although the lower unit member temporarily supported by the support portions of the left and right frame members is defined in terms of the height position of the unit member in general, the position and inclination in the front-rear direction Regarding torsion, etc., it is necessary for the operator to make adjustments for each lower unit member using a measure, a level or water thread, and there is a problem that the work is complicated.

また、下段ユニット部材の下側に床面との間を塞ぐ巾木部材が設けられるが、この巾木部材を予め下段ユニット部材に取り付けておくとすれば、各フレーム部材のレベル調整後に巾木部材と床面との間に隙間が生じてしまう。そこで、従来では、巾木部材固定用の角材をフレーム部材との相対関係のもとで位置出しして床面に固定しており、巾木部材を適正位置に配設するための墨出し工程や、角材を床面にコンクリート釘で固定する等の付帯工数が発生して遊技島の構築に時間と手間がかかるという課題があった。   In addition, a baseboard member that closes the floor surface is provided below the lower unit member. If this baseboard member is attached to the lower unit member in advance, the baseboard member is adjusted after the level of each frame member is adjusted. A gap is generated between the member and the floor surface. Therefore, in the past, the square board for fixing the baseboard member is positioned relative to the frame member and fixed to the floor surface, and the ink marking process for arranging the baseboard member at an appropriate position In addition, there is a problem that it takes time and labor to construct an amusement island due to the incidental man-hours such as fixing the timber to the floor with concrete nails.

本発明は、上記のような課題に鑑みてなされたものであり、遊技島を構築する際の工数を低減して作業性が良好な島構造を提供することを目的とする。   This invention is made | formed in view of the above subjects, and it aims at providing the island structure with favorable workability | operativity by reducing the man-hour at the time of constructing a game island.

上記課題を解決して目的を達成するため、本発明は、遊技施設の床面に左右に所定のユニット間隔をおいて立設された複数のフレーム部材と、これら複数のフレーム部材の間に配設されて左右側部がフレーム部材の下部に取り付けられる下段ユニット部材及び当該下段ユニット部材の上方に所定の高さ間隔を隔てて配設されて左右側部がフレーム部材の上部に取り付けられる上段ユニット部材とを備え、上段ユニット部材と下段ユニット部材との間に縦型遊技機が左右に並んで固定保持される遊技島の島構造である。この島構造においては、それぞれフレーム部材の下部に左右に突出して設けられ、各々左右の下段ユニット部材の下面を支持する支持辺、および支持辺の端部が上向きに曲折されて下段ユニット部材の下面に左右に延びて形成された下位置決め溝と係合する位置決め辺を有する下方支持部(例えば、実施形態における下方支持部133)と、フレーム部材の上部に当該フレーム部材を左右に貫通して上下に延びる溝状に形成され、下段ユニット部材の上面に左右に延びて形成された上位置決め溝と連通し得る上方支持部とを備えて構成される。そして、下段ユニット部材の下部を左右に位置するフレーム部材の下方支持部に係合支持させ、下段ユニット部材の上部を上位置決め溝が上方支持部と連通する整合位置に配置したときに、この下段ユニット部材の上下及び前後方向の位置並びに前後方向の傾きが位置決めされるように構成される。   In order to solve the above problems and achieve the object, the present invention provides a plurality of frame members erected on the floor surface of the game facility with a predetermined unit interval on the left and right sides, and disposed between the plurality of frame members. A lower unit member that is installed and the left and right side portions are attached to the lower portion of the frame member, and an upper unit that is disposed above the lower unit member with a predetermined height interval and the left and right side portions are attached to the upper portion of the frame member This is an island structure of a game island in which a vertical gaming machine is fixedly held side by side between an upper unit member and a lower unit member. In this island structure, the lower side of the lower unit member is provided by projecting left and right at the lower part of the frame member and supporting the lower sides of the lower unit members on the left and right sides, and the ends of the support sides bent upward. A lower support portion (for example, the lower support portion 133 in the embodiment) having a positioning side that engages with a lower positioning groove formed to extend left and right, and an upper portion of the frame member. And an upper support portion that can communicate with the upper positioning groove formed on the upper surface of the lower unit member so as to extend from side to side. When the lower part of the lower unit member is engaged and supported by the lower support part of the frame member located on the left and right, and the upper part of the lower unit member is disposed at the alignment position where the upper positioning groove communicates with the upper support part, The position of the unit member in the vertical direction and the front-rear direction and the inclination in the front-rear direction are configured.

なお、フレーム部材を挟んで左右に隣接する下段ユニット部材は、それぞれ左右のフレーム部材の間に位置決めされて上位置決め溝と上方支持部とが連通した整合位置で形成された溝部に、左右の上位置決め溝を連絡する係止片を嵌入することにより、一体的に位置決めされるように構成することが好ましい。   Note that the lower unit members adjacent to the left and right across the frame member are positioned between the left and right frame members, and the upper and lower upper members are aligned with the groove formed at the alignment position where the upper positioning groove communicates with the upper support portion. It is preferable to configure so as to be integrally positioned by inserting a locking piece that communicates with the positioning groove.

また、フレーム部材の下方に位置して遊技施設の床面に固定されフレーム部材を支持するアンカーベースは、遊技施設の床面に沿って前後に延び床面に固定される底辺および底辺の左右方向の側縁が上向きに曲折されて上方に延びフレーム部材と連結される立設壁面と、底辺の前後方向の端部が上向きに曲折されて形成された掛止辺部とを有し、下段ユニット部材の下部に当該下段ユニット部材と床面との間を塞ぐ巾木部材の裏面側上部を当接支持する桟部材(例えば、実施形態における巾木桟31H)を有し、巾木部材における裏面側下部に掛止辺部を前後に挟持する挟持部が設けられ、巾木部材の裏面側上部を桟部材に当接支持させて挟持部を左右のアンカーベースの掛止辺部に係合させたときに巾木部材が前後に位置決めされて床面と隙間なく配設されるように構成することが好ましい。   The anchor base positioned below the frame member and fixed to the floor of the gaming facility and supporting the frame member extends in the front-rear direction along the floor of the gaming facility and is fixed to the floor. The lower unit has a standing wall surface that is bent upward and extends upward and connected to the frame member, and a hook side that is formed by bending the front and rear ends of the base upward. The lower part of the member has a crosspiece member (for example, the baseboard crosspiece 31H in the embodiment) that abuts and supports the upper part of the backside of the baseboard member that closes the space between the lower unit member and the floor, and the rear surface of the baseboard member The lower part is provided with a holding part for holding the hooking side part back and forth, and the upper part of the back side of the baseboard member is brought into contact with and supported by the crosspiece member so that the holding part is engaged with the hooking side parts of the left and right anchor bases. When the baseboard member is positioned back and forth, It is preferably configured to be disposed without therebetween.

本発明によれば、下段ユニット部材の下部をフレーム部材の下方支持部に係合支持させて上位置決め溝がフレーム部材の上方支持部と連通する整合位置に配置したときに、下段ユニット部材の上下及び前後方向の位置並びに前後方向の傾きが位置決めされる。すなわち、下段ユニット部材の荷重を下方支持部に支持させた状態で、下段ユニット部材の上部でスリット状の溝を整合させる簡単な作業で、下段ユニット部材の位置及び傾きが全て位置決めされる。このため遊技島を構築する作業者(島大工と称される)は、下段ユニット部材の取り付け時にメジャーや水準器等を用いて調整を行う必要がなく、容易且つ迅速に遊技島の構築作業を進めることができる。   According to the present invention, when the lower unit member is engaged with and supported by the lower support portion of the frame member and the upper positioning groove is disposed at the alignment position where the upper positioning groove communicates with the upper support portion of the frame member, And the position in the front-rear direction and the tilt in the front-rear direction are positioned. That is, with the load of the lower unit member supported by the lower support part, the position and inclination of the lower unit member are all positioned by a simple operation of aligning the slit-shaped grooves on the upper part of the lower unit member. For this reason, an operator who constructs an amusement island (referred to as an island carpenter) does not need to make adjustments using a major or level when attaching the lower unit member, and can easily and quickly construct an amusement island. Can proceed.

なお、フレーム部材を挟んで左右に隣接する下段ユニット部材が、上位置決め溝と上方支持部とが連通した整合位置で形成される溝部に係止片を嵌入することで一体的に位置決めされるような構成によれば、溝部に一片の係止片を嵌入するだけで左右に隣接する下段ユニット部材を同時に、且つ左右のユニット部材間でズレを生じることなく位置決めすることができ、遊技島の構築作業をさらに容易且つ迅速に進めることができる。   It should be noted that the lower unit members adjacent to the left and right with the frame member interposed therebetween are positioned integrally by inserting a locking piece into the groove formed at the alignment position where the upper positioning groove communicates with the upper support portion. According to this configuration, it is possible to position the lower unit members adjacent to the left and right at the same time and without causing a gap between the left and right unit members simply by inserting a single locking piece into the groove, thereby constructing an amusement island. The work can be performed more easily and quickly.

また、下段ユニット部材の下部に巾木部材の裏面上部を当接支持する桟部材、アンカーベースに掛止辺部を設けるとともに、巾木部材の裏面側下部に掛止辺部を挟持する挟持部を設け、巾木部材の裏面側上部を桟部材に当接して挟持部を掛止辺部に係合させたときに巾木部材が前後に位置決めされて床面と隙間なく配設されるような構成によれば、巾木部材を適正位置に配設するための墨出し作業や、巾木支持用の角材を床面に固定する等の付帯工数を削減することができ、工期を短縮して遊技島の構築作業を迅速化させることができる。   In addition, a crosspiece member that abuts and supports the upper back of the baseboard member at the lower part of the lower unit member, and a holding part that holds the hooking side part at the lower part of the backside of the baseboard member while providing a hooking side part on the anchor base When the upper part of the bottom side of the base plate member is brought into contact with the crosspiece member and the clamping part is engaged with the latching side part, the base board member is positioned forward and backward so that it is arranged without a gap from the floor surface. With such a configuration, it is possible to reduce the number of incidental man-hours such as inking to place the baseboard members at appropriate positions and fixing the baseboard for supporting the baseboard to the floor surface, thereby shortening the construction period. This makes it possible to speed up the construction of amusement islands.

従って、本発明によれば、遊技島を構築する際の工数を低減させて作業性が良好な島構造を提供することができる。   Therefore, according to this invention, the man-hour at the time of constructing a game island can be reduced, and an island structure with favorable workability | operativity can be provided.

以下、図面を参照して本発明の好ましい実施形態について説明する。本発明に係る島構造を適用した遊技島PIの外観斜視図を図2に示しており、まずこの図を参照して遊技島PIの全体構成について概要説明する。なお、以降の説明において、遊技島PIに対面した姿勢をもって前後、左右を規定し、図2中に付記するF,R,Uの矢印方向をそれぞれ前方,右方,上方と称して説明する。   Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings. FIG. 2 shows an external perspective view of the game island PI to which the island structure according to the present invention is applied. First, the overall configuration of the game island PI will be outlined with reference to this figure. In the following description, the front, back, left and right are defined with the posture facing the game island PI, and the F, R, and U arrow directions added in FIG. 2 will be referred to as the front, right, and top, respectively.

遊技島PIは、遊技施設の床に立設されて左右に延びる壁面状をなし、通常、複数列の遊技島が島間の配設ピッチ3.5m程度の間隔をおいて並列に並んで設置される。各遊技島PIには、図2に例示するパチンコ機の他、例えばアレンジボール機や雀球機、スロットマシンなどの縦型遊技機PMが、各遊技島ごとに左右に複数並んで立設姿勢で固定保持される。遊技島には、上記のような縦型遊技機(以下、パチンコ機を代表例として記載する)PMが背中合わせに島の両面に固定される「両島」と、背後の壁面に沿って設けられて島の片面のみにパチンコ機が固定される「カベ島」とがあるが、基本構成は同様であり、以下両島の構成について説明する。   The amusement island PI has a wall-like shape standing on the floor of the amusement facility and extending to the left and right. Usually, a plurality of rows of amusement islands are installed side by side at intervals of about 3.5 m between the islands. . In addition to the pachinko machine illustrated in FIG. 2, each gaming island PI has a plurality of vertical gaming machines PM such as an arrangement ball machine, a sparrow ball machine, a slot machine, etc. It is fixed and held by. On the amusement islands, the vertical gaming machines (hereinafter referred to as pachinko machines as representative examples) PM as described above are provided along the back wall and the “Ryoshima” where both sides of the island are fixed back to back. There is “Kabbe Island” where pachinko machines are fixed only on one side of the island, but the basic configuration is the same, and the configuration of both islands will be described below.

遊技島PIは、図3に島全体の正面図を示し、図3中のIV矢視方向の側断面図を図4に示すように、通常8〜10台程度のパチンコ機PMをもって一単位とされ、左右中間部に「研磨機柱」と称される柱CKが設けられる(図3では研磨機柱CKの左側に9台、右側に10台の設置構成とした例を示す)。研磨機柱CKについては詳細説明を省略するが、柱下端部から受け入れた汚れた遊技済み球を揚送過程で表面研磨し遊技球の汚れを落として柱上端に設けられた上部タンクUTに揚送する揚送研磨機と、揚送研磨機により清浄化された遊技球を下段のメインタンクMTに流下させる下降誘導路とが設けられている。図3における紙面直交の前後方向に並列に並んだ遊技島間では、上部タンクUT間を相互に結ぶ供給樋が設けられ、島単位での貯留遊技球数が所定量未満になったときに、遊技球が他列の遊技島を介して上部タンクに補給されるようになっている。   3 is a front view of the whole island in FIG. 3, and a side sectional view in the direction of arrow IV in FIG. 3 is shown in FIG. In addition, columns CK called “polishing machine columns” are provided in the left and right intermediate portions (FIG. 3 shows an example in which 9 units are installed on the left side and 10 units on the right side of the polishing machine column CK). Detailed explanation of the grinder pillar CK is omitted, but the dirty game balls received from the lower end of the pillar are surface-polished during the lifting process to remove the dirt of the game balls and lift it to the upper tank UT provided at the upper end of the pillar. There are provided a lifting grinder for feeding and a lowering guide path for allowing the game balls cleaned by the lifting grinder to flow down to the lower main tank MT. In the game islands arranged in parallel in the front-rear direction orthogonal to the plane of the drawing in FIG. 3, there are provided supply rods connecting the upper tanks UT to each other, and when the number of stored game balls per island is less than a predetermined amount, The ball is supplied to the upper tank through the other islands.

遊技島PIは、大別的には、パチンコ機PMが配設される中段と、パチンコ機PMの上方に位置する上段と、パチンコ機PMの下方に位置する下段の3段構成になっている。上段には、前後中央に位置して上部タンクUTに貯留された遊技球をパチンコ機PMに供給する補給樋1が、研磨機柱上端の上部タンクUTから遊技島の側端に向けて所定勾配の傾斜姿勢で設けられるとともに、補給樋の前方には補給樋を保守管理するために天板(幕板または欄間とも称される)2が上下に開閉可能に付けられ、この天板の下側に位置して呼び出しランプや各パチンコ機ごとの特別遊技(いわゆる大当たり)実行回数データ表示器などを備えたランプ板3が設けられる。   The amusement island PI is broadly divided into three stages: a middle stage where the pachinko machine PM is disposed, an upper stage located above the pachinko machine PM, and a lower stage located below the pachinko machine PM. . In the upper stage, a replenishment rod 1 for supplying game balls stored in the upper tank UT to the pachinko machine PM at the front and rear center is a predetermined gradient from the upper tank UT at the upper end of the polishing machine column toward the side edge of the game island. A top plate (also referred to as a curtain plate or a column) 2 is attached to the front of the replenisher so as to be openable and closable in order to maintain and manage the replenisher. A lamp plate 3 provided with a call lamp, a special game (so-called jackpot) execution frequency data display for each pachinko machine, and the like is provided.

遊技島PIの下段には、パチンコ機PMの裏面側下方に、各パチンコ機PMから排出されたセーフ球やアウト球等の遊技済み球を受け止めて揚送研磨機に流下させる回収樋(一般的にどぶ板と称される)5が、遊技島の側端から研磨機柱CK下端の揚送研磨機の導入口に向けて所定勾配の傾斜姿勢で設けられるとともに、揚送研磨機により清浄化され下降誘導路を介して下段に導かれた遊技球を貯留するメインタンクMTが、研磨機柱と隣接して設けられている。   In the lower part of the amusement island PI, a collection basket (generally used) that accepts already played balls such as safe balls and out balls discharged from each pachinko machine PM and flows down to the lifting grinder on the lower back side of the pachinko machine PM. 5 is called a throat plate and is provided in a slanted posture with a predetermined gradient from the side edge of the game island to the inlet of the lift grinder at the lower end of the grinder pillar CK, and is cleaned by the lift grinder A main tank MT for storing a game ball guided to the lower stage via the descending guide path is provided adjacent to the polishing machine pillar.

なおメインタンクMTの配設領域では、この領域のパチンコ機から排出された遊技済み球を回収樋5に合流させるアウト球レール5rが、回収樋5と左右逆勾配の傾斜姿勢でメインタンクMTの上部に形成されるとともに、回収樋5と揚送研磨機の導入口との間を繋ぐ回収ダクト5dがメインタンクMTの内部を貫通して形成されている。遊技島PIの前面側には、パチンコ機PMの下側に位置して球箱等を載置するための膳板6が前方に突出して設けられ、その下側に回収樋5及びメインタンクMTの前方を覆う腰板7が着脱可能に設けられ、この腰板7と床面との間を塞いで巾木部材8が取り付けられている。   In the area where the main tank MT is disposed, the out ball rail 5r that joins the game balls discharged from the pachinko machines in this area to the collection basket 5 is inclined to the collection tank 5 in an inclined posture opposite to the left and right of the main tank MT. A recovery duct 5d that is formed at the upper portion and connects between the recovery basket 5 and the inlet of the lifting grinder is formed so as to penetrate through the inside of the main tank MT. On the front side of the amusement island PI, a saddle plate 6 for placing a ball box or the like is provided on the lower side of the pachinko machine PM so as to protrude forward, and on the lower side there is a recovery basket 5 and a main tank MT. A waist plate 7 covering the front of the floor is detachably provided, and a baseboard member 8 is attached so as to close the space between the waist plate 7 and the floor surface.

このような全体構成の遊技島PIにあって、各遊技島は、図5に島構造の概要構成を示すように、遊技施設の床面FLに固定されたアンカーベース9を介して左右に所定のユニット間隔Ly(Ly1〜Ly3)を隔てて立設された複数のフレーム部材10,10…と、これら複数のフレーム部材の間に配設されて左右側部がフレーム部材の下部に取り付けられる下段ユニット部材30,30…及び当該下段ユニット部材の上方に所定の高さ間隔を隔てて配設されて左右側部がフレーム部材の上部に取り付けられる上段ユニット部材20,20…などからなり、遊技島の主要部が生産工場においてユニット単位で製作され、遊技施設で各ユニットを連結固定して組み上げることにより遊技島PIが構築されるようになっている。 In the gaming island PI having such an overall configuration, each gaming island is predetermined to the left and right via an anchor base 9 fixed to the floor FL of the gaming facility as shown in FIG. The plurality of frame members 10, 10... Standing up and down with a unit interval Ly (Ly 1 to Ly 3 ), and the left and right side portions are attached to the lower portion of the frame member. .. And the upper unit members 20, 20... That are disposed above the lower unit members at a predetermined height interval and the left and right sides are attached to the upper part of the frame member. The main part of the amusement island is manufactured in units of units at the production factory, and the amusement island PI is constructed by connecting and fixing the units at the amusement facility.

図5中のVI矢視方向に見たフレーム部材10の側面図を図6(a)に示し、図6(a)の右側面図(図3におけるフレーム部材10の背面図)を図6(b)に示すように、フレーム部材10は、大別的には、上下に延びる前後一対の上柱部11及び前後の上柱部11,11を連結する上横桟部12を有し、前後の上柱部11にそれぞれ上段ユニット部材20の取着部120が設けられた上フレーム部10Uと、上下に延びる前後一対の下柱部13及び前後の下柱部13,13を連結する下横桟部14,15を有して上フレーム部10Uの下側に結合され前後の下柱部にそれぞれ下段ユニット部材30の取着部130が設けられた下フレーム部10Dとからなり、下フレーム部10Dは前後の下柱部13の内面間隔が前後の上柱部11の内面間隔よりも大きな方形枠状に構成される。   FIG. 6A shows a side view of the frame member 10 viewed in the direction of the arrow VI in FIG. 5, and a right side view of FIG. 6A (a rear view of the frame member 10 in FIG. 3) is shown in FIG. As shown in b), the frame member 10 generally includes a pair of front and rear upper pillars 11 extending vertically and an upper horizontal crosspiece 12 connecting the front and rear upper pillars 11 and 11. The lower frame connecting the upper frame portion 10U provided with the mounting portion 120 of the upper unit member 20 to the upper column portion 11, the pair of front and rear lower column portions 13 and the front and rear lower column portions 13 and 13, respectively. The lower frame portion is composed of a lower frame portion 10D having crosspieces 14 and 15 and coupled to the lower side of the upper frame portion 10U and provided with attachment portions 130 of the lower unit member 30 on the front and rear lower column portions. In 10D, the inner surface spacing of the front and rear lower column portions 13 is larger than the inner surface spacing of the front and rear upper column portions 11. Kina configured into a square frame shape.

前後の上柱部11及び前後の下柱部13は、図6(a)(b)からも明らかなように、共に平板を中心線CLに対して勝手違いの前後対称な形状寸法に切断し、各柱部材の内側の側縁を平断面視L字状に直角に曲げ成型して形成されており、これらの4枚の柱部材を、側面視Z字状の連結板で前後から挟み込んで連結固定して前後一対のクランク状の柱を形成し、これを断面視コの字状に折り曲げ成形した上横桟部12、下横桟部14,15の3枚の横桟部材で一体に連結してフレーム部材10を形成している。フレーム部材を形成する各部材は、板厚1.6〜3.2mm程度の鋼板(例えば、板厚2.3mmのメッキ処理鋼板)を切断、孔開け、バーリング及び曲げ加工等して各部材形状に形成し、ネジや溶接等の連結手段により一体に形成される。このため、機械構造用角形鋼管等を用いた場合よりも軽量且つ安価にフレーム部材10を構成できるとともに、左右に隣接するユニット間の間隔を大幅に低減することができる。   As is clear from FIGS. 6 (a) and 6 (b), the front and rear upper column portions 11 and the front and rear lower column portions 13 are both cut into flat and symmetrical shapes that are different from the center line CL. The inner side edge of each pillar member is formed by bending at right angles in an L shape in a plan view, and these four pillar members are sandwiched from the front and rear by a Z-shaped connecting plate in a side view. Connected and fixed to form a pair of front and rear crank-shaped pillars, which are bent into a U-shape in cross-section and formed integrally with three horizontal beam members of the lower horizontal beam portion 12 and the lower horizontal beam portions 14 and 15. The frame member 10 is formed by being connected. Each member forming the frame member is formed into each member shape by cutting, drilling, burring, bending, etc., a steel plate having a thickness of about 1.6 to 3.2 mm (for example, a plated steel plate having a thickness of 2.3 mm). They are integrally formed by connecting means such as screws and welding. For this reason, the frame member 10 can be constructed at a lower weight and at a lower cost than when a square steel pipe for machine structure is used, and the interval between the left and right adjacent units can be greatly reduced.

遊技施設の床面FLには、フレーム部材10の立設固定に先立って、正面視L字状に曲折されたアンカーベース9がユニット間隔Lyを隔ててアンカーボルト19で固定されており、底辺から上方に立設された立設壁面にフレーム部材10を固定するボルト18を挿通させるボルト挿通孔が形成されている。一方、下フレーム部10Dには、下横桟15の下面に溶着されたナットにレベル調整用のアジャスタボルト16,16が下方に張り出し自在に螺合されるとともに、前後の下柱部13の下端部に下端側が開く長孔状の固定溝17が形成されて固定用ボルト18と係脱可能になっている。   Prior to standing and fixing the frame member 10, the anchor base 9 bent in an L shape in front view is fixed to the floor FL of the game facility with an anchor bolt 19 with a unit interval Ly therebetween. Bolt insertion holes for inserting bolts 18 for fixing the frame member 10 are formed in the standing wall surface standing upward. On the other hand, adjuster bolts 16 and 16 for level adjustment are screwed onto the nuts welded to the lower surface of the lower horizontal rail 15 so as to project downward downward, and the lower ends of the front and rear lower column parts 13 are fitted to the lower frame part 10D. A long hole-like fixing groove 17 that opens at the lower end side is formed in the part, and can be engaged with and disengaged from the fixing bolt 18.

そこで、前後の固定溝をアンカーベース側の固定ボルト18及びナット間に係合させて緩く仮止めした立設状態とし、遊技島PIを構成する複数のフレーム部材10,10…について下フレーム部10Dの上面位置が水平になるようにアジャスタボルト16を張り出してフレーム部材間でレベル調整するとともに、各フレーム部材10ごとに前後の下フレーム部10Dの上面高さが同一となるように前後のアジャスタボルト16,16の張り出し量を調整して各フレーム部材の前後方向の傾き調整を行い、これらのレベル出しが終了した段階で固定ボルト18,18を締め込んでアンカーベース9とフレーム部材10とを締結する。これにより左右に離隔して並ぶ複数のフレーム部材10,10…が床面FLの傾斜や凹凸に拘わらず水平となる高さ位置に配設されるとともに、各フレーム部材が前後に傾きなく中心線CLが鉛直な姿勢で床面FLに立設固定される。   Thus, the front and rear fixing grooves are engaged between the anchor base side fixing bolts 18 and nuts to be loosely temporarily fixed, and the lower frame portion 10D of the plurality of frame members 10, 10. The adjuster bolts 16 are extended so that the upper surface position of each frame is leveled to adjust the level between the frame members, and the front and rear adjuster bolts so that the upper surface height of the front and rear lower frame portions 10D is the same for each frame member 10. 16 and 16 are adjusted to adjust the inclination of each frame member in the front-rear direction. When the leveling is finished, the fixing bolts 18 and 18 are tightened to fasten the anchor base 9 and the frame member 10 together. To do. As a result, the plurality of frame members 10, 10... Arranged side by side on the left and right are arranged at a height level that is horizontal regardless of the inclination or unevenness of the floor surface FL, and each frame member is centerline without tilting back and forth. CL is erected and fixed to the floor surface FL in a vertical posture.

このようにして床面FLに立設固定された複数のフレーム部材10間に、メインタンクMTがフレーム部材10を跨いで設置され、メインタンクMT内に形成された回収ダクト5dと位置整合して回収樋5が取り付けられる。図4における下フレーム部近傍の部分拡大図を図7に示す。既述したように、下フレーム部10Dは、前後の下柱部13,13の内面間隔が前後の上柱部11,11の内面間隔よりも大きな方形枠状に形成されており、図3に示されるように、メインタンクMTが方形枠状の下フレーム部10Dを左右に跨いで配設可能になっている。このため、上柱部がそのままアンカーベースまで下方に延びて形成された従来のフレーム構造のように、メインタンクの長さ寸法がフレーム部材の配設ピッチ(すなわちユニット間隔Ly)によって制限されるようなことがなく、遊技島PIに必要な数量の遊技球を、余裕を持って貯留可能な長尺、大容量のメインタンクを配置することができる。   In this way, the main tank MT is installed across the frame member 10 between the plurality of frame members 10 that are erected and fixed on the floor surface FL, and is aligned with the recovery duct 5d formed in the main tank MT. A collection basket 5 is attached. FIG. 7 shows a partially enlarged view of the vicinity of the lower frame portion in FIG. As described above, the lower frame portion 10D is formed in a rectangular frame shape in which the inner surface interval between the front and lower lower column portions 13 and 13 is larger than the inner surface interval between the upper and lower upper column portions 11 and 11. As shown, the main tank MT can be disposed across the lower frame portion 10D in the shape of a rectangular frame. For this reason, the length dimension of the main tank is limited by the arrangement pitch of the frame members (that is, the unit interval Ly) as in the conventional frame structure in which the upper column portion extends to the anchor base as it is. It is possible to arrange a long, large-capacity main tank capable of storing a sufficient amount of game balls necessary for the game island PI with a margin.

また、下フレーム部10Dの枠内に回収樋5を支持する回収樋支持構造150が設けられている。回収樋支持構造150は、前後の下柱部13の内面に穿設された複数のブラケット取付孔151と、側面視クランク状に曲げ成形されてブラケット取付孔に固定される回収樋支持ブラケット155とから構成される。図6中のVIII矢視方向に見た下柱部13の正面図を図8(a)に示し、その右側面図を図8(b)に示す。   In addition, a collection basket support structure 150 that supports the collection basket 5 is provided in the frame of the lower frame portion 10D. The recovery rod support structure 150 includes a plurality of bracket mounting holes 151 formed in the inner surfaces of the front and rear lower column portions 13, and a recovery rod support bracket 155 that is bent into a crank shape in a side view and fixed to the bracket attachment holes. Consists of FIG. 8A shows a front view of the lower column portion 13 viewed in the direction of arrow VIII in FIG. 6, and FIG. 8B shows a right side view thereof.

支持ブラケット取付孔151は、回収樋支持ブラケット155の基板部に形成されたネジ挿通孔と同一ピッチPsの2個一組の取付孔が複数組(図8に例示する構成においては151a〜151dの4組)設けられて構成される。各組間の配設ピッチPyはフレーム部材10が配設されるユニット間隔Lyと回収樋5の勾配(3〜5度程度)に基づいて設定されており、例えばユニット間隔Ly=1800mm、回収樋5の基準勾配を4.5%としたときにPy=80mm程度となり、メインタンクMTにおける回収ダクト5dの入口高さを位置基準として設定される。   The support bracket mounting hole 151 includes a plurality of pairs of mounting holes having the same pitch Ps as the screw insertion holes formed in the substrate portion of the recovery rod support bracket 155 (in the configuration illustrated in FIG. 8, 151 a to 151 d). 4 sets) are provided and configured. The arrangement pitch Py between the groups is set based on the unit interval Ly in which the frame member 10 is arranged and the gradient of the collection basket 5 (about 3 to 5 degrees). For example, the unit interval Ly = 1800 mm, the collection basket When the reference gradient of 5 is 4.5%, Py is about 80 mm, and the inlet height of the recovery duct 5d in the main tank MT is set as the position reference.

ここで、ネジ挿通孔の形成ピッチPsを上記Pyの半分(2Ps=Py)に設定すれば、支持ブラケット取付孔151は全て0.5Pyの同一ピッチとなり、細かな勾配設定を行うことができる。一方、上記のような等ピッチ構成とすれば、どの取付孔に支持ブラケットを固定すれば基準勾配に設定できるかを一義的に理解することが困難である。そこで、回収樋支持構造150では、ネジ挿通孔の形成ピッチPsを、各組の配設ピッチPyの半分からずらせて2Ps≠Py(2Ps<Pyまたは2Ps>Py)となるように、すなわち、回収樋支持ブラケット155が取り付けられる2個一組の取付孔と、上記所定勾配に基づいて段階的に設定された回収樋支持ブラケット155の取り付け高さとが一目で理解できるように構成している。   Here, if the formation pitch Ps of the screw insertion holes is set to half of the above Py (2Ps = Py), all of the support bracket mounting holes 151 have the same pitch of 0.5 Py, and a fine gradient can be set. On the other hand, with the above-described equal pitch configuration, it is difficult to uniquely understand which mounting hole the support bracket is fixed to set the reference gradient. Therefore, in the recovery rod support structure 150, the formation pitch Ps of the screw insertion holes is shifted from half of the arrangement pitch Py of each set so that 2Ps ≠ Py (2Ps <Py or 2Ps> Py), that is, the recovery A set of two mounting holes to which the heel support bracket 155 is attached and a mounting height of the recovery heel support bracket 155 set in a stepwise manner based on the predetermined gradient can be understood at a glance.

このため、回収樋5を組付けようとする作業者は、メインタンクMTに隣接するフレーム部材10側から順に1段ずつ高い組の支持ブラケット取付孔151(151d、151c、151b)に回収樋支持ブラケット155をネジ固定すれば、回収樋5が必然的に基準勾配で下フレーム部10D内に支持される。   For this reason, an operator who intends to assemble the recovery rod 5 supports the recovery rod in the support bracket mounting holes 151 (151d, 151c, 151b) that are one step higher from the side of the frame member 10 adjacent to the main tank MT. If the bracket 155 is fixed with screws, the recovery rod 5 is inevitably supported in the lower frame portion 10D with a reference gradient.

回収樋支持ブラケット155は、前後の下柱部の内面に沿って配設される基板部155aと、この回収樋5の下面側に前後の縁部に沿って固定された樋縦桟5sの下面を支持する下面支持部155bと、樋縦桟5sの下面を支持する側面支持部155cとからなり、例えば板厚1.6〜2.3mm程度の鋼板を切断及び曲げ成形して形成される。基板部155aには上下にピッチPsでネジ157を挿通させるネジ挿通孔が形成されている。   The recovery rod support bracket 155 includes a base plate portion 155a disposed along the inner surfaces of the front and rear lower column portions, and a lower surface of the vertical rail 5s fixed to the lower surface side of the recovery rod 5 along the front and rear edges. Is formed by cutting and bending a steel plate having a thickness of about 1.6 to 2.3 mm, for example. The board portion 155a is formed with screw insertion holes through which screws 157 are inserted at a pitch Ps.

側面支持部155cは、前後の樋縦桟5sの内側面を弾性的に支持するように、基板部155aとの面間寸法(図8(b)における左右方向寸法)が側面支持部155cの下部で樋縦桟5sの桟幅と略同一寸法に、上部で樋縦桟5sの桟幅よりも幾分小さめの寸法に形成されており、上記のように段階的な高さ位置に各回収樋支持ブラケットを固定し、前後の回収樋支持ブラケット155に回収樋5を上方からあてがって下方に押圧したときに、前後の樋縦桟5sが側面支持部の上端部を開くように進入して樋縦桟5sの下面が下面支持部155bに支持され、前後の樋縦桟5sの内側の側面が各支持ブラケットの側面支持部を弾性的に挟み込んだ状態で基準勾配の傾斜姿勢に係止保持される。   The side surface support portion 155c has an inter-surface dimension (the horizontal dimension in FIG. 8B) below the side surface support portion 155c so as to elastically support the inner side surfaces of the front and rear eaves vertical bars 5s. In the upper part, it is formed to have approximately the same width as the vertical bar 5s and slightly smaller than the vertical bar 5s in the upper part. When the support bracket is fixed and the recovery rod 5 is applied to the front and rear recovery rod support brackets 155 from above and pressed downward, the front and rear vertical rods 5s enter so as to open the upper end of the side support portion. The lower surface of the vertical beam 5s is supported by the lower surface support portion 155b, and the inner side surfaces of the front and rear vertical beam 5s are locked and held in an inclined posture with a reference gradient in a state where the side surface support portions of the respective support brackets are elastically sandwiched. The

従って、回収樋支持構造150によれば、従来では下フレーム部下段ユニット部材30の装着後に、下段ユニットの左右の枠杆に基準勾配の墨出しを行い、この勾配線に合わせて回収樋を釘打ち固定していた作業工数を大幅に低減し、作業性が良好で迅速に組付け可能な回収樋支持構造を得ることができる。また回収樋5の前後で樋縦桟5sを挟み込んで支持する構成により、回収樋5が脱落したり振動して騒音を発したりしないようになっている。なお、詳細図示を省略するが、回収樋5の上面には厚さ1〜2mm程度のゴムシートが貼付されており、パチンコ機から排出され回収樋5に落下する遊技球をゴムシートで受け止めて騒音の発生を抑制するとともに、木材を主体とした回収樋の上面を保護し遊技球の衝突による木片の発生を防止している。   Therefore, according to the collection rod support structure 150, conventionally, after mounting the lower frame unit lower unit member 30, the reference gradient is marked on the left and right frame rods of the lower unit, and the collection rod is nailed in accordance with this gradient line. The work man-hour that has been fixed in place can be greatly reduced, and a recovery rod support structure that has good workability and can be assembled quickly can be obtained. Further, the configuration in which the vertical gutter 5s is sandwiched and supported before and after the recovery rod 5 prevents the recovery rod 5 from falling off or vibrating to generate noise. Although not shown in detail, a rubber sheet having a thickness of about 1 to 2 mm is affixed to the upper surface of the collection basket 5, and the game balls that are discharged from the pachinko machine and fall into the collection basket 5 are received by the rubber sheet. In addition to suppressing the generation of noise, the top surface of the collection basket mainly made of wood is protected to prevent the generation of wooden pieces due to the collision of game balls.

さて、このようにしてメインタンクMT及び回収樋5が取り付けられたフレーム部材10,10の間に位置して下フレーム部10Dの下段ユニット取り付け部130に下段ユニット部材30が取り付けられる。   Now, the lower unit member 30 is attached to the lower unit attaching part 130 of the lower frame part 10D located between the frame members 10 and 10 to which the main tank MT and the recovery rod 5 are attached in this way.

下段ユニット部材30は、厚さ24mm程度、幅120mm程度の木工板材をユニット間隔Lyに応じた所定の長さ寸法に切断した上枠杆31Uと、同様の板厚で幅70mm程度の木工角材を上記所定寸法に切断した下枠杆31D、右枠杆31R及び左枠杆31Lを直角に枠組みした外郭方形で横長の下段ユニット枠31を基体として構成され、左右方向の外幅寸法が、ユニット間隔Lyで床面に固定された左右のフレーム部材の内幅間隔と同一寸法に設定されている。下段ユニット枠31における上枠杆31Uの後部上面には、左右の枠杆31L,31Rよりも後方に突出してパチンコ機PMの下面を支持する支持枠杆31Sが固定され、上枠杆31Uの前端部から上面及び支持枠杆31Sの前端面までをアルミ合金製の引き抜き型材の化粧面材32でカバーして膳板6が形成される。上枠杆31Uの下面と下枠杆31Dの前端面には、断面視コの字状の腰板支持レール38が上下に対向して固定されており、ここに腰板7が着脱自在に装着される。また、下枠杆31Dの下面には、巾木部材8の背面を支持する巾木桟31Hが設けられている。   The lower unit member 30 includes an upper frame rod 31U obtained by cutting a woodwork board material having a thickness of about 24 mm and a width of about 120 mm into a predetermined length according to the unit interval Ly, and a woodworking square material having a similar board thickness and a width of about 70 mm. The lower frame frame 31D, the right frame frame 31R and the left frame frame 31L cut into the predetermined dimensions are configured as a rectangular shape with a horizontally long lower unit frame 31 as a base. It is set to the same dimension as the inner width interval of the left and right frame members fixed to the floor with Ly. A support frame rod 31S that protrudes rearward from the left and right frame rods 31L and 31R and supports the lower surface of the pachinko machine PM is fixed to the rear upper surface of the upper frame rod 31U in the lower unit frame 31, and the front end of the upper frame rod 31U The cover plate 6 is formed by covering the upper surface and the front end surface of the support frame rod 31S with the decorative face material 32 made of an aluminum alloy drawing mold material. A waist plate support rail 38 having a U-shaped cross-sectional view is fixed to the lower surface of the upper frame rod 31U and the front end surface of the lower frame rod 31D so as to face each other, and the waist plate 7 is detachably attached thereto. . Further, on the lower surface of the lower frame rod 31D, a baseboard bar 31H that supports the back surface of the baseboard member 8 is provided.

一方、下フレーム部10Dに設けられた下段ユニット取り付け部130は、下柱部13の下端近傍に左右に突出して設けられた舌片状の下方支持部133と、下柱部13の上端部に下向きのスリット溝状に形成された上方支持部134と、下柱部13における上下2箇所の所定位置に下柱部13を左右に貫通して形成されたボルト挿通孔136などから構成される。   On the other hand, the lower unit mounting portion 130 provided in the lower frame portion 10D is provided with a tongue-like lower support portion 133 provided to protrude left and right in the vicinity of the lower end of the lower column portion 13 and an upper end portion of the lower column portion 13. The upper support portion 134 is formed in a downward slit groove shape, and the bolt insertion hole 136 is formed by penetrating the lower column portion 13 left and right at two predetermined positions on the lower column portion 13.

下方支持部133は、下柱部13の下端部に長孔状に形成された固定溝17を前後に挟んでネジ固定された固定溝補強部材の上端部に形成されており、下柱部13の板面に沿って延びる基板部から下枠杆31Dの下面を当接支持する支持辺133bが左右に突出して形成されるとともに、その前後方向外側の縁部が更に上向きに曲折されて、下段ユニット部材30を下部において前後方向に位置決めする位置決め辺133cが形成されている。上方支持部134は、下柱部13の上端部に溝幅2mm程度、長さ16mm程度で下向きに延びるスリット溝状に形成されている。下柱部の上下2箇所に形成されたボルト挿通孔136は、左右に隣接する下段ユニット部材30,30を連結させてフレーム部材10に固定するための連結ボルト137の挿通孔である。   The lower support portion 133 is formed at the upper end portion of the fixed groove reinforcing member that is fixed to the lower end portion of the lower column portion 13 by screwing the fixed groove 17 formed in the shape of a long hole in the front-rear direction. A support side 133b that abuts and supports the lower surface of the lower frame collar 31D from the base plate portion extending along the plate surface is formed to protrude left and right, and its outer edge in the front-rear direction is further bent upward, A positioning side 133c for positioning the unit member 30 in the front-rear direction at the lower portion is formed. The upper support part 134 is formed in the upper end part of the lower pillar part 13 in the shape of a slit groove extending downward with a groove width of about 2 mm and a length of about 16 mm. Bolt insertion holes 136 formed at two upper and lower portions of the lower pillar portion are insertion holes for connecting bolts 137 for connecting the lower unit members 30, 30 adjacent to the left and right to be fixed to the frame member 10.

このような下段ユニット取り付け部130に対し、下段ユニット枠31における下枠杆31Dには、下方支持部133に設けられた位置決め辺133cの配設位置及び板厚に合わせたスリット溝状の下位置決め溝33が形成されている。また下段ユニット枠31における支持枠杆31Sの左右の端部には、下柱部13の上端に形成された上方支持部134と位置整合して同様の溝幅で上下に貫通するスリット溝状の上位置決め溝34が側端面から30mm程度の長さで形成されている。そして、下段ユニット枠31の左右の枠杆31L,31Rには、一方の枠杆(例えば、各図に例示する実施例において正面右側の右枠杆31R)にボルト挿通孔136と位置整合して鬼目ナット36が圧入固定され、他方の枠杆(同上左枠杆31L)の対応位置に連結ボルト137を挿通させる円孔(不図示)が穿設されている。   In contrast to such a lower unit mounting portion 130, the lower frame collar 31D of the lower unit frame 31 has a slit groove-like lower positioning according to the arrangement position and the plate thickness of the positioning side 133c provided in the lower support portion 133. A groove 33 is formed. In addition, the left and right ends of the support frame rod 31S in the lower unit frame 31 are slit-grooves that are aligned with the upper support part 134 formed at the upper end of the lower column part 13 and penetrate vertically with the same groove width. The upper positioning groove 34 is formed with a length of about 30 mm from the side end face. The left and right frame rods 31L and 31R of the lower unit frame 31 are aligned with the bolt insertion holes 136 on one frame rod (for example, the right frame rod 31R on the front right side in the embodiments illustrated in the drawings). The demon nut 36 is press-fitted and fixed, and a circular hole (not shown) through which the connecting bolt 137 is inserted is formed at a corresponding position of the other frame rod (the left frame rod 31L).

そこで、下段ユニット取り付け部130に下段ユニット部材30を取り付ける際には、フレーム部材10の前方から下枠杆31Dを斜め下方とした傾斜姿勢で下段ユニット枠31を下方支持部133に接近させ、下位置決め溝33を位置決め辺133cに位置合わせして嵌合させ、ユニット枠31の上部を後方に揺動させて下枠杆31Dの下面を支持辺133bに支持させる。これにより下段ユニット枠31の下部が上下及び前後に位置決めされて左右のフレーム部材の間に支持される。   Therefore, when attaching the lower unit member 30 to the lower unit attachment part 130, the lower unit frame 31 is brought close to the lower support part 133 in an inclined posture with the lower frame collar 31D obliquely downward from the front of the frame member 10, The positioning groove 33 is aligned and fitted to the positioning side 133c, and the upper part of the unit frame 31 is swung rearward so that the lower surface of the lower frame collar 31D is supported by the support side 133b. As a result, the lower part of the lower unit frame 31 is positioned vertically and longitudinally and supported between the left and right frame members.

次いで、下段ユニット枠31の上部を僅かに前後揺動させて上位置決め溝34が上方支持部134と同一線上で整合するように位置合わせする。そして、一本の直線状に位置合わせされた左右の下段ユニット枠の上位置決め溝34と上方支持部134のスリット溝に、舌片状の係止片(例えば板厚2mm幅18mm長さ50mm程度の矩形金属片)135を嵌入する。これにより、左右に隣接する下段ユニット枠31の上部が一体的に前後に位置決めされ、下段ユニット枠31は、上下及び前後方向の位置並びに前後方向の傾きが位置決めされた状態で左右のフレーム部材間に支持される。   Next, the upper part of the lower unit frame 31 is slightly swung back and forth so that the upper positioning groove 34 is aligned with the upper support part 134 on the same line. Then, in the upper positioning groove 34 of the left and right lower unit frames aligned in a straight line and the slit groove of the upper support part 134, a tongue-like locking piece (for example, plate thickness 2 mm width 18 mm length 50 mm length) (Rectangular metal piece) 135 is inserted. Thereby, the upper part of the lower unit frame 31 adjacent to the left and right is integrally positioned in the front-rear direction. Supported by

このとき下柱部13に形成された上下2箇所のボルト挿通孔136と左右の枠杆にそれぞれ設けられた2箇所の鬼目ナット36及び円孔とが同一軸上に位置整合して配設される。そこで、左枠杆31Lに形成された円孔側から連結ボルト137を挿入してボルト挿通孔136を通し、右枠杆31Rに固定された鬼目ナット36に螺合させて締め込む。これにより、左右に隣接する下段ユニット枠31の左右枠杆31L,31Rが下フレーム部10Dを左右から挟み込むようにして同一高さの水平姿勢に位置決めされて連結固定される。   At this time, the upper and lower bolt insertion holes 136 formed in the lower pillar portion 13 and the two demon nuts 36 and the circular holes respectively provided in the left and right frame rods are aligned and arranged on the same axis. Is done. Therefore, the connecting bolt 137 is inserted from the circular hole formed in the left frame rod 31L, passed through the bolt insertion hole 136, and screwed into the demon nut 36 fixed to the right frame rod 31R and tightened. Accordingly, the left and right frame rods 31L and 31R of the lower unit frame 31 adjacent to the left and right are positioned and connected and fixed in a horizontal posture of the same height so as to sandwich the lower frame portion 10D from the left and right.

このため、遊技島を構築する作業者は、下段ユニット部材30の取り付け時にメジャーや水準器等を用いて調整を行う必要がなく、左右に隣接する下段ユニット部材を同時に且つ左右のユニット部材間でズレを生じることなく確実に位置決めして連結固定することができる。従って、遊技島の構築作業を容易且つ迅速に進めることができる。なお前述した化粧面材32は、引き抜き材一本当たりの定尺長さが4m程度あるため、左右の下段ユニット部材30が連結固定された後に複数ユニットに跨って取り付けられ、ユニット間に隙間が生じないようになっている。   For this reason, the operator who constructs a game island does not need to adjust using a measure, a level, etc. at the time of attachment of the lower unit member 30, and the lower unit member adjacent to right and left is simultaneously and between the left and right unit members. It is possible to reliably position and connect and fix without causing a deviation. Therefore, the construction work of amusement islands can be easily and quickly advanced. Note that the decorative face material 32 described above has a standard length of about 4 m per drawing material, so that the left and right lower unit members 30 are connected and fixed across a plurality of units, and there are gaps between the units. It does not occur.

こうして左右連結された下段ユニット部材30の下部と床面FLとの間を塞いで巾木部材8が取り付けられる。図9に巾木取り付け部の側断面図を示すように、床面に固定されたアンカーベース9の前後の端部は、下段ユニット部材30における巾木桟31Hの配設位置に合わせた所定間隔で上向きに曲折されて掛止辺部9Hが形成されている。一方、巾木部材8の裏面側は左右の側端部がアンカーベース9の板厚に合わせた加工代で段落とし加工されるとともに、この段落とし加工部を覆って矩形薄板状の挟持片がビス固定されて、掛止辺部9Hを前後に挟持する挟持部8Hが設けられている。そして、図9に矢印で示すように、巾木部材8を前方から挿入して裏面を巾木桟31Hに当接させて下動し、挟持部8Hを掛止辺部9Hを挟み込むように係合させると、巾木部材8が前後に位置決めされた状態で床面FLと隙間なく配設されるようになっている。従って、作業者はこうして位置決めされた巾木部材8の上部を巾木桟31Hに釘打ち固定すればよく、従来のようにアンカーベース9と別途に巾木固定用の桟部材を予め床面に固定するような工数を要することなく、簡単に巾木部材を取り付けることができる。   Thus, the baseboard member 8 is attached by closing the space between the lower part of the lower unit member 30 connected to the left and right and the floor surface FL. As shown in the side cross-sectional view of the baseboard attachment portion in FIG. 9, the front and rear ends of the anchor base 9 fixed to the floor surface are set at a predetermined interval according to the arrangement position of the baseboard rail 31H in the lower unit member 30. The hook side 9H is formed by bending upward. On the other hand, the back side of the baseboard member 8 is processed into a paragraph with processing margins corresponding to the plate thickness of the anchor base 9 on the left and right sides. The clamping part 8H which clamps the latching edge part 9H back and forth is provided. Then, as shown by the arrows in FIG. 9, the baseboard member 8 is inserted from the front and the back surface is brought into contact with the baseboard bar 31H to move downward so that the holding portion 8H is sandwiched by the hook side portion 9H. When combined, the baseboard member 8 is arranged without gaps from the floor surface FL in a state where the baseboard member 8 is positioned forward and backward. Accordingly, the operator only needs to nail and fix the upper portion of the baseboard member 8 thus positioned to the baseboard crosspiece 31H, and the baseboard member for fixing the baseboard separately from the anchor base 9 as in the prior art. The baseboard member can be easily attached without requiring man-hours for fixing.

下段ユニット部材30の上方に、パチンコ機PMの外枠サイズに応じた所定の高さ間隔を隔てて、上段ユニット部材20が取り付けられる。上フレーム部10Uにおける上段ユニット取り付け部120の側面図(図6(a)の部分拡大図)を図10に、上段ユニット取り付け部120に上段ユニット部材20が取り付けられた状態の側断面図(図4の部分拡大図)を図11に、左右の上段ユニット部材20,20と上段ユニット取り付け部120との関係を説明するための斜視図を図1及び図12に示す。   The upper unit member 20 is attached above the lower unit member 30 with a predetermined height interval according to the outer frame size of the pachinko machine PM. FIG. 10 is a side view of the upper unit attaching part 120 in the upper frame part 10U (partial enlarged view of FIG. 6A), and FIG. 10 is a side sectional view of the upper unit attaching part 120 with the upper unit member 20 attached thereto. FIG. 11 is a perspective view for explaining the relationship between the left and right upper unit members 20 and 20 and the upper unit mounting portion 120. FIG.

上段ユニット部材20は、厚さ24mm程度、幅70mm程度の木工角材をユニット間隔Lyに応じた所定の長さ寸法に切断した上枠杆21U、下枠杆21Dと、右枠杆21R及び左枠杆21Lを直角に枠組みし、この枠内の上下中間部に左右の枠杆21R,21Lを結ぶ中央連杆21Cを設けた外郭方形で横長の上段ユニット枠21を基体として構成される。上段ユニット枠21は、左右方向の外幅寸法が、ユニット間隔Lyで床面に固定された左右のフレーム部材の内幅間隔と同一寸法に設定されている。上段ユニット枠21の前面上部には、上端が上枠杆21Uの上部にヒンジ連結され下端側が前方上方に揺動開閉可能に天板2が取り付けられ、その下側に位置してランプ板3が中央連杆21Cと下枠杆21Dとの間に取り付けられている。   The upper unit member 20 includes an upper frame rod 21U, a lower frame rod 21D, a right frame rod 21R, and a left frame obtained by cutting a woodworking square member having a thickness of about 24 mm and a width of about 70 mm into a predetermined length according to the unit interval Ly. A horizontally long upper unit frame 21 is configured as a base with an outer rectangular shape in which a flange 21L is framed at a right angle and a central linkage 21C is provided in the middle of the frame to connect the left and right frame flanges 21R and 21L. The upper unit frame 21 has an outer width dimension in the left-right direction that is the same as an inner width interval of the left and right frame members fixed to the floor surface with a unit interval Ly. A top plate 2 is attached to the upper front of the upper unit frame 21 so that the upper end is hinged to the upper portion of the upper frame collar 21U, and the lower end side is swingable upward and downward, and the lamp plate 3 is positioned below the top plate 2. It is attached between the central linkage 21C and the lower frame rod 21D.

上段ユニット枠21の左右の枠杆21L,21Rには、上述した下段ユニット枠31と同様に、一方の枠杆(各図に例示する実施例において正面右側の右枠杆21R)に上下所定間隔を隔てて2個一組の鬼目ナット26(26A,26B)が二組(計4箇所)圧入固定され、他方の枠杆(同上左枠杆21L)の対応位置に、連結ボルト127を挿通させる円孔27(27A,27B)が対応位置に4箇所穿設されている。また、上方の鬼目ナット(または円孔)に近接して側方に突出する円柱状の軸部22が設けられ、他方の枠杆には軸部22の対応位置を基準として軸部22と係合する軸係合部23が形成されている。   Similarly to the lower unit frame 31 described above, the left and right frame rods 21L and 21R of the upper unit frame 21 are vertically spaced by one frame rod (the right frame rod 21R on the front right side in the embodiments illustrated in the drawings). Two pairs of demon nuts 26 (26A, 26B) are press-fitted and fixed with a gap between them, and the connecting bolt 127 is inserted into the corresponding position of the other frame rod (left frame rod 21L). Four circular holes 27 (27A, 27B) are formed at corresponding positions. In addition, a cylindrical shaft portion 22 that protrudes laterally in the vicinity of the upper demon nut (or circular hole) is provided, and the other frame rod is connected to the shaft portion 22 on the basis of the corresponding position of the shaft portion 22. A shaft engaging portion 23 to be engaged is formed.

軸部22は、上段ユニット20における右枠杆側の上下及び前後の位置基準となり、例えば右枠杆21Rの基準位置に穿設された円孔にロールピンやスプリングピンなどを圧入固定して構成される。また軸係合部23は、軸部22と同一軸上に設けられて左枠杆21L側の上下及び前後の位置基準とあり、例えば軸部22を嵌合受容する円孔とすることができるが、本実施形態では、軸部22を基準として左枠杆21Lの後面側に開く溝状に形成した構成例を示す。   The shaft portion 22 serves as a reference position for the upper and lower and front and rear positions of the upper frame unit 20 on the right frame rod side. For example, a roll pin or a spring pin is press-fitted and fixed in a circular hole formed at the reference position of the right frame rod 21R. The Further, the shaft engaging portion 23 is provided on the same axis as the shaft portion 22, and has a vertical and front / rear position reference on the left frame flange 21 </ b> L side. For example, the shaft engaging portion 23 can be a circular hole that fits and receives the shaft portion 22. However, in the present embodiment, a configuration example in which the shaft portion 22 is formed in a groove shape that opens to the rear surface side of the left frame rod 21L is shown.

この軸係合部23の溝形状は、溝上面23aが水平で溝下面23bが後方に下傾するV字状をなし、両溝面が交わる前端部23cは軸部22の軸半径に合わせた円弧状に形成されて、この円弧の中心軸が右枠杆側の軸部22と同一軸上に設けられて左枠杆側の上下及び前後の位置基準となっている。すなわち、軸係合部23の前端部23cを軸部22に係合させたときに、左右の上段ユニット部材20,20が上下及び前後に位置整合するようになっている。なお、軸係合部23の溝形状は、前端部23cにおいて軸部22との係合位置を規定可能であれば良く、例えば、前後に水平または後方に下傾して後端側が枠杆の後面に開く長孔状に形成しても良い。   The groove shape of the shaft engaging portion 23 is a V-shape in which the groove upper surface 23a is horizontal and the groove lower surface 23b is inclined backward, and the front end portion 23c where both groove surfaces meet is matched with the shaft radius of the shaft portion 22. It is formed in a circular arc shape, and the central axis of this circular arc is provided on the same axis as the shaft portion 22 on the right frame collar side, and serves as a reference position for the upper and lower and front and rear positions on the left frame collar side. That is, when the front end portion 23c of the shaft engaging portion 23 is engaged with the shaft portion 22, the left and right upper unit members 20, 20 are aligned vertically and front and rear. The groove shape of the shaft engaging portion 23 may be any shape as long as the engagement position with the shaft portion 22 can be defined at the front end portion 23c. You may form in the shape of a long hole which opens in a rear surface.

一方、上段ユニット取り付け部120は、上柱部11の上部前端に設けられ軸部22を左右に挿通させて支持する軸支持部122と、上柱部11の下部に固着されて左右枠杆21L,21Rの後面を支持する下方支持部123と、上柱部11の上下に所定間隔を隔てて上柱部12を左右に貫通して設けられた2個一組(計4箇所)のボルト挿通孔126(126A,126B)などから構成される。   On the other hand, the upper stage unit attaching portion 120 is provided at the upper front end of the upper column portion 11 and supports the shaft portion 22 through the left and right sides, and is fixed to the lower portion of the upper column portion 11 and is fixed to the left and right frame rod 21L. , 21R for supporting the rear surface of the lower pillar 123, and a set of two bolts (a total of four places) inserted through the upper pillar 12 to the left and right at a predetermined interval above and below the upper pillar 11 The hole 126 (126A, 126B) is configured.

軸支持部122は、上段ユニット取り付け部120に取り付けられる上段ユニット部材20の上下及び前後の位置を規定する位置基準であり、例えば軸部22を嵌合受容する円孔とすることができるが、本実施形態では、軸部22を基準として上柱部11の前端側に開く溝状に形成した構成例を示す。この軸支持部122の溝形状は、溝幅が軸部22の軸直径より僅かに大きく前端側が上柱部の前端側に開いて後端側が斜め下方に延びる長孔状をなし、この長孔の後端部122cに軸部22が支持されたときに、軸部22がフレーム部材10の前後及び上下の基準位置に配設されるようになっている。なお、軸支持部122は後端部122cにおいて軸部22の支持位置を規定可能であれば良く、例えば、長孔状の溝を前後水平に形成し、あるいは水平溝の後端側に一部鉛直溝を形成し、または溝下面が水平で前端側に向けて開くV字状に形成しても良い。   The shaft support part 122 is a position reference that defines the upper and lower and front and rear positions of the upper unit member 20 that is attached to the upper unit attachment part 120. For example, the shaft support part 122 can be a circular hole that fits and receives the shaft part 22. In the present embodiment, a configuration example in which the shaft portion 22 is formed in a groove shape opened to the front end side of the upper column portion 11 with reference to the shaft portion 22 is shown. The groove shape of the shaft support portion 122 is a long hole shape in which the groove width is slightly larger than the shaft diameter of the shaft portion 22, the front end side opens to the front end side of the upper column portion, and the rear end side extends obliquely downward. When the shaft portion 22 is supported by the rear end portion 122c, the shaft portion 22 is disposed at the front and rear and upper and lower reference positions of the frame member 10. Note that the shaft support portion 122 only needs to be able to define the support position of the shaft portion 22 at the rear end portion 122c. A vertical groove may be formed, or the groove lower surface may be formed in a V shape that is horizontal and opens toward the front end side.

また、下方支持部123は、軸支持部122に軸部22を介して支持された左右の上段ユニット部材20の前後方向の傾きを規定する角度基準であり、軸部22を軸支持部の後端部122cに支持させて上段ユニット部材20の下部を後方に揺動させたときに左右枠杆21L,21Rの後端面と当接して後方への移動を規制し、左右枠杆が鉛直となるように(上段ユニット部材20が前後に傾いた状態にならないように)設けられる。本実施形態では、円柱状の軸ピンを上フレーム部10Uを貫通させて左右に突出して配設し溶接またはカシメ等の手段により固着した構成例を示す。なお、このような円柱状部材を左右貫通させて固着する構成の他、例えば立設面で左右枠杆の後面を支持するL字アングル状ないしブロック状の部材を溶接またはネジ固定等するように下方支持部を構成しても良い。   The lower support portion 123 is an angle reference that defines the front-rear direction inclination of the left and right upper unit members 20 supported by the shaft support portion 122 via the shaft portion 22, and the shaft portion 22 is disposed behind the shaft support portion. When the lower part of the upper unit member 20 is swung backward by being supported by the end portion 122c, the rear frame is in contact with the rear end surfaces of the left and right frame rods 21L and 21R, and the rearward movement is restricted, and the left and right frame rods become vertical. (So that the upper unit member 20 is not tilted back and forth). In the present embodiment, a configuration example is shown in which a cylindrical shaft pin is disposed so as to protrude left and right through the upper frame portion 10U and fixed by means such as welding or caulking. In addition to the structure in which such a cylindrical member is fixed by penetrating left and right, for example, an L-shaped or block-shaped member that supports the rear surface of the left and right frame rods by a standing surface is welded or screwed. You may comprise a downward support part.

ここで、軸支持部122は上段ユニット部材20の支持高さを規定する基準となる部位であるが、フレーム部材10には軸支持部が複数設けられており、各図に示す実施形態では上下に2箇所形成した構成例を示す。この2箇所の軸支持部122は、上段ユニット部材20と下段ユニット部材30とを関東枠の枠サイズに合わせた第1の所定間隔を隔てて連結させる第1軸支持部122Aと、関西枠の枠サイズに合わせた第2の所定間隔を隔てて連結させる第2軸支持部122Bとからなり、軸部22を第1軸支持部122Aに支持させたときに上段ユニット部材20が関東枠に合わせた高さ位置に配設され、軸部22を第2軸支持部122Bに支持させたときに上段ユニット部材20が関西枠に合わせた高さ位置に配設されるように構成している。すなわち、遊技島PIを構築する際に、第1軸支持部122A及び第2軸支持部122Bのいずれか一方を選択して軸部22を支持させることにより、上段ユニット20がパチンコ機PMの枠サイズに応じた高さ位置に配設されるように設定されている。   Here, the shaft support portion 122 is a reference portion that defines the support height of the upper unit member 20, but the frame member 10 is provided with a plurality of shaft support portions. Shows an example of a configuration in which two locations are formed. The two shaft support portions 122 include a first shaft support portion 122A that connects the upper unit member 20 and the lower unit member 30 with a first predetermined interval that matches the frame size of the Kanto frame, and a Kansai frame The second shaft support part 122B is connected at a second predetermined interval according to the frame size. When the shaft part 22 is supported by the first shaft support part 122A, the upper unit member 20 is aligned with the Kanto frame. The upper unit member 20 is arranged at a height position matching the Kansai frame when the shaft portion 22 is supported by the second shaft support portion 122B. In other words, when constructing the game island PI, the upper unit 20 is supported by the frame of the pachinko machine PM by selecting either the first shaft support portion 122A or the second shaft support portion 122B and supporting the shaft portion 22. It is set to be disposed at a height position corresponding to the size.

また、フレーム部材10側の4箇所のボルト挿通孔126(126A,126B)と上段ユニット部材20側の4箇所の鬼目ナット26(26A,26B)及び円孔27(27A,27B)との関係は、上段ユニット部材20の軸部22が第1軸支持部122Aに支持されたときに、上段ユニット部材20側の各2箇所の鬼目ナット26A及び円孔27Aがそれぞれフレーム部材10側の2箇所のボルト挿通孔126Aと同一軸上に配設され、上段ユニット部材20の軸部22が第2軸支持部122Bに支持されたときに、上段ユニット部材20側の各2箇所の鬼目ナット26B及び円孔27Bがそれぞれフレーム部材10側の2箇所のボルト挿通孔126Bと同一軸上に配設されるように位置関係が規定されている。   Further, the relationship between the four bolt insertion holes 126 (126A, 126B) on the frame member 10 side and the four demon nuts 26 (26A, 26B) and the circular holes 27 (27A, 27B) on the upper unit member 20 side. When the shaft portion 22 of the upper unit member 20 is supported by the first shaft support portion 122A, the two demon nuts 26A and the circular holes 27A on the upper unit member 20 side are respectively 2 on the frame member 10 side. When the shaft portion 22 of the upper unit member 20 is supported by the second shaft support portion 122B, the two demon nuts on the upper unit member 20 side are disposed on the same axis as the bolt insertion holes 126A. The positional relationship is defined such that 26B and the circular hole 27B are disposed on the same axis as the two bolt insertion holes 126B on the frame member 10 side.

このため、遊技島PIを構築する作業者は、図1(a)に示すように、左右のフレーム部材の間に、上フレーム部10Uの前方から上段ユニット部材20を接近させ、右枠杆21Rから右方に突出する軸部22をフレーム部材10の第1軸支持部122Aまたは第2軸支持部122B、例えば、構築しようとする遊技島PIが関東枠仕様である場合には、図示するように第1軸支持部122Aの前端開口に導入する。軸部22が第1軸支持部122Aの前端開口に導入されると、あとは後方に下傾する溝形状に沿って軸部22が斜め後方に移動し、第1軸支持部122Aの後端部122cにおいて軸部22の下面及び後面が支持されて、上段ユニット部材20の右上部がフレーム部材10に対して前後及び上下に位置決めされる。   For this reason, as shown in FIG. 1A, the operator who constructs the game island PI brings the upper unit member 20 closer to the right frame ridge 21R from the front of the upper frame portion 10U between the left and right frame members. If the shaft portion 22 protruding rightward from the first shaft support portion 122A or the second shaft support portion 122B of the frame member 10, for example, the game island PI to be constructed has Kanto frame specifications, as shown in the figure. And introduced into the front end opening of the first shaft support portion 122A. When the shaft portion 22 is introduced into the front end opening of the first shaft support portion 122A, the shaft portion 22 moves obliquely rearward along the groove shape inclined downward to the rear, and the rear end of the first shaft support portion 122A. The lower surface and the rear surface of the shaft portion 22 are supported at the portion 122c, and the upper right portion of the upper unit member 20 is positioned front and rear and up and down with respect to the frame member 10.

また、上段ユニット部材20の左枠杆部21L側を、図1(b)に示すように左側のフレーム部材の前方から挿入し、後方にV字状に開く軸係合部23を、上記同様にして既に第1軸支持部122Aに支持された左側の上段ユニット部材の軸部22に係合させて後方に押圧移動させる。すると溝上面において軸部22に支持された上段ユニット部材20の左上部が後方に水平移動し、前端部23cの上面及び前端面が軸部22に当接支持されて、上段ユニット部材20の左上部がフレーム部材10に対して前後及び上下に位置決めされる。   Further, as shown in FIG. 1 (b), the left frame flange portion 21L side of the upper unit member 20 is inserted from the front of the left frame member, and the shaft engaging portion 23 that opens in a V shape rearward is the same as described above. Then, it is engaged with the shaft portion 22 of the upper unit member on the left side already supported by the first shaft support portion 122A and is pushed and moved rearward. Then, the upper left portion of the upper unit member 20 supported by the shaft portion 22 on the upper surface of the groove horizontally moves rearward, and the upper surface and the front end surface of the front end portion 23c are abutted and supported by the shaft portion 22, so that the upper left portion of the upper unit member 20 is The portion is positioned front and rear and up and down with respect to the frame member 10.

そして、このように左右上部が前後及び上下に位置決めされて左右の軸部22に支持された上段ユニット部材20の上部を押さえ、下部を自重により後方に揺動させて左右の枠杆部21R,21Rの後端面を下方支持部123に当接させる。すると上段ユニット部材20は左右の枠杆が鉛直となる姿勢で揺動角度位置が規定され、これにより上段ユニット20が、上下、前後に位置決めされるとともに、直交する3軸まわりの角度位置も位置決めされる。   Then, the left and right upper parts are positioned in the front and rear and up and down directions, the upper part of the upper unit member 20 supported by the left and right shaft parts 22 is pressed, and the lower part is swung rearward by its own weight. The rear end surface of 21R is brought into contact with the lower support portion 123. Then, the upper unit member 20 is defined with a swing angle position in a posture in which the left and right frame rods are vertical, whereby the upper unit 20 is positioned vertically and forward and backward, and the angular positions around three orthogonal axes are also positioned. Is done.

このとき、上段ユニット部材20側の4箇所の鬼目ナット26及び円孔27と、フレーム部材10側の4箇所のボルト挿通孔126とは、上段ユニット部材20側の各2箇所の鬼目ナット26A及び円孔27Aが、それぞれフレーム部材10側の2箇所のボルト挿通孔126Aと位置整合して同一軸上に配設される。従って作業者は、遊技島PIが関東枠仕様の場合には、上下に隣接する円孔27A,27Bのうち上方の円孔27Aに連結ボルト127を挿入すれば、連結ボルト127の先端部が確実にボルト挿通孔126Aを通って鬼目ナット26Aに到達し、鬼目ナット26Aに容易に螺合させることができる。   At this time, the four demon nuts 26 and the circular holes 27 on the upper unit member 20 side and the four bolt insertion holes 126 on the frame member 10 side are each two demon nuts on the upper unit member 20 side. 26A and the circular hole 27A are disposed on the same axis in alignment with the two bolt insertion holes 126A on the frame member 10 side. Therefore, when the game island PI has the Kanto frame specification, if the connecting bolt 127 is inserted into the upper circular hole 27A of the circular holes 27A and 27B adjacent to each other in the vertical direction, the tip of the connecting bolt 127 is surely secured. Can reach the demon nut 26A through the bolt insertion hole 126A and can be easily screwed into the demon nut 26A.

そして連結ボルト127を螺合させて締め込むと、左右に隣接する上段ユニット枠21の左右枠杆21L,21Rが上フレーム部10Uを左右から挟み込むように固定され、左右の上段ユニット部材20がともに関東枠サイズに対応した適切な高さ位置で、前後、左右、上下に位置決めされ、及びいずれの方向の軸廻りにも傾きのない水平姿勢に位置決めされて連結固定される。   When the connecting bolt 127 is screwed and tightened, the left and right frame collars 21L and 21R of the upper unit frame 21 adjacent to the left and right are fixed so as to sandwich the upper frame portion 10U from the left and right, and the left and right upper unit members 20 are both It is positioned at the appropriate height position corresponding to the Kanto frame size, and is positioned front and rear, left and right, and up and down, and is positioned and connected and fixed in a horizontal posture with no inclination around any axis.

従って、遊技島を構築する作業者は、遊技島PIの前方から上段ユニット部材20を左右のフレーム部材10,10の間に進入させて、当該上段ユニット部材20の左側において軸係合部23を隣接する上段ユニットの軸部22に係合させ、当該上段ユニット20の右側において軸部22を軸支持部122に係合させて軽く後方に押圧するだけで上段ユニット部材20を適正な枠サイズ対応位置に位置決めすることができ、この状態で位置整合する円孔27に連結ボルト127を挿入して鬼目ナット26に螺合締結することで、容易且つ確実に左右の上段ユニットを連結固定することができる。すなわち、上段ユニット部材20が順次落下しない状態で適正位置に仮設置されるため、遊技島を容易に構築することができる。   Therefore, an operator who constructs a game island enters the upper unit member 20 between the left and right frame members 10 from the front of the game island PI, and sets the shaft engaging portion 23 on the left side of the upper unit member 20. Engage with the shaft portion 22 of the adjacent upper stage unit, and engage the shaft portion 22 with the shaft support portion 122 on the right side of the upper stage unit 20 and press it lightly rearward to accommodate the upper unit member 20 to an appropriate frame size. In this state, the connecting bolt 127 is inserted into the circular hole 27 that is aligned and screwed to the demon nut 26 to fasten the left and right upper units easily and reliably. Can do. That is, since the upper unit member 20 is temporarily installed at an appropriate position without sequentially dropping, the game island can be easily constructed.

なお、遊技島PIにおいて左端側に位置する上段ユニット部材に対しては、右枠杆21Rに相当する構成の側板部材を上フレーム部10Uの左面側に固定することで同様に組み付けることができる。また、上段ユニット部材における左右の枠杆の配置構成を逆にしても良く、これらを組み合わせて構成しても良い。例えば、軸部22の突出方向を研磨機柱CK側から遊技島の側端側に突出するように、上段ユニット部材20を二種類設定し、これらを研磨機柱の左右と両島の前後面とで組み合わせて、中央の研磨機柱CK側から遊技島の側端側に向けて組み付けるように構成することができる。   In addition, it can assemble | attach similarly to the upper stage member located in the left end side in game island PI by fixing the side plate member of the structure corresponded to the right frame collar 21R to the left surface side of the upper frame part 10U. Moreover, the arrangement configuration of the left and right frame rods in the upper unit member may be reversed, or may be configured in combination. For example, two types of upper unit members 20 are set so that the protruding direction of the shaft portion 22 protrudes from the polishing machine column CK side to the side end side of the game island, and these are set to the left and right sides of the polishing machine column and the front and rear surfaces of both islands. Can be assembled from the central polishing machine pillar CK side toward the side end side of the game island.

なお、以上説明した実施形態では、外枠サイズが異なるパチンコ機を設置する遊技島に本発明を適用した構成例を示したが、本発明は係る実施形態に限定されるものではなく、他の種別の縦型遊技機、例えばアレンジボール機や雀球遊技機、スロットマシン等を設置する遊技島、あるいはこれらを複合的に設置する遊技島についても同様に適用し同様の効果を得ることができる。   In the embodiment described above, the configuration example in which the present invention is applied to the amusement island in which pachinko machines having different outer frame sizes are installed is shown, but the present invention is not limited to the embodiment, and other The same effect can be obtained by applying the same to a type of vertical gaming machine, for example, a game island in which an arrangement ball machine, a sparrow ball game machine, a slot machine or the like is installed, or a game island in which these are installed in combination. .

左右の上段ユニット部材とフレーム部材における上段ユニット取り付け部との関係を説明するための説明図(斜視図)である。It is explanatory drawing (perspective view) for demonstrating the relationship between the upper stage unit member on either side, and the upper stage unit attaching part in a frame member. 本発明に係る島構造を適用した遊技島の外観斜視図である。1 is an external perspective view of an amusement island to which an island structure according to the present invention is applied. 上記遊技島全体の正面図である。It is a front view of the whole amusement island. 図3中のIV矢視方向の側断面図である。FIG. 4 is a side sectional view in the direction of arrow IV in FIG. 3. 島構造の概要構成を示す説明図(正面図)である。It is explanatory drawing (front view) which shows schematic structure of an island structure. (a)は図5中のVI矢視方向に見たフレーム部材の側面図、(b)は(a)の右側面図(図3におけるフレーム部材の背面図)である。(a) is a side view of the frame member viewed in the direction of arrow VI in FIG. 5, and (b) is a right side view of (a) (back view of the frame member in FIG. 3). 図4における下部領域の部分拡大図である。It is the elements on larger scale of the lower area | region in FIG. (a)は図6中のVIII矢視方向に見た下柱部の正面図、(b)は(a)の右側面図(図7の部分拡大図)である。(a) is the front view of the lower pillar part seen in the VIII arrow direction in FIG. 6, (b) is the right view (partial enlarged view of FIG. 7) of (a). 巾木取り付け部分の側断面図である。It is a sectional side view of a baseboard attachment part. フレーム部材における上段ユニット取り付け部の側面図(図6(a)の部分拡大図)である。It is a side view (partial enlarged view of Drawing 6 (a)) of the upper unit attachment part in a frame member. 上段ユニット取り付け部に上段ユニット部材が取り付けられた状態の側断面図(図4の部分拡大図)である。It is a sectional side view (partial enlarged view of Drawing 4) in the state where the upper unit member was attached to the upper unit attachment part. フレーム部材を挟む左右の上段ユニット部材の側枠杆と上段ユニット取り付け部との位置関係を示す斜視図である。It is a perspective view which shows the positional relationship of the side frame collar of the upper stage unit member on either side which pinches | interposes a frame member, and an upper stage unit attaching part.

符号の説明Explanation of symbols

PI 遊技島
PM パチンコ機(縦型遊技機)
Ly(Ly1〜Ly3) ユニット間隔
FL 床面
8 巾木部材(8H 挟持部)
9 アンカーベース(9a 底辺、9b 立設壁面、9H 掛止辺部)
10 フレーム部材
20 上段ユニット部材
22 軸部
23 軸係合部(23c 前端部)
30 下段ユニット部材
31H 巾木桟(桟部材)
33 下位置決め溝
34 上位置決め溝
122 軸支持部(122A 第1軸支持部、122B 第2軸支持部、122c 後端部)
123 下方支持部
133 下方支持部(133b 支持辺、133c 位置決め辺)
134 上方支持部
135 係止片
PI Amusement Island PM Pachinko machine (vertical game machine)
Ly (Ly 1 to Ly 3 ) Unit interval FL Floor 8 Skirting member (8H clamping part)
9 Anchor base (9a bottom, 9b standing wall, 9H hanging edge)
10 Frame member 20 Upper unit member 22 Shaft portion 23 Shaft engaging portion (23c front end portion)
30 Lower unit member 31H Skirt bar (crosspiece member)
33 Lower positioning groove 34 Upper positioning groove 122 Shaft support portion (122A first shaft support portion, 122B second shaft support portion, 122c rear end portion)
123 Lower support part 133 Lower support part (133b support side, 133c positioning side)
134 Upper support part 135 Locking piece

Claims (3)

遊技施設の床面に左右に所定のユニット間隔をおいて立設された複数のフレーム部材と、前記複数のフレーム部材の間に配設されて左右側部が前記フレーム部材の下部に取り付けられる下段ユニット部材及び当該下段ユニット部材の上方に所定の高さ間隔を隔てて配設されて左右側部が前記フレーム部材の上部に取り付けられる上段ユニット部材とを備え、前記上段ユニット部材と前記下段ユニット部材との間に縦型遊技機が左右に並んで固定保持される遊技島の島構造であって、
前記フレーム部材の下部に左右に突出して設けられ、各々左右の前記下段ユニット部材の下面を支持する支持辺、および前記支持辺の端部が上向きに曲折されて前記下段ユニット部材の下面に左右に延びて形成された下位置決め溝と係合する位置決め辺を有する下方支持部と、
前記フレーム部材の上部に当該フレーム部材を左右に貫通して上下に延びる溝状に形成され、前記下段ユニット部材の上面に左右に延びて形成された上位置決め溝と連通し得る上方支持部とを備え、
前記下段ユニット部材の下部を左右に位置する前記フレーム部材の前記下方支持部に係合支持させ、前記下段ユニット部材の上部を前記上位置決め溝が前記上方支持部と連通する整合位置に配置したときに、当該下段ユニット部材の上下及び前後方向の位置並びに前後方向の傾きが位置決めされるように構成したことを特徴とする遊技島の島構造。
A plurality of frame members erected on the floor surface of the game facility at a predetermined unit interval on the left and right sides, and a lower stage disposed between the plurality of frame members and having left and right side portions attached to a lower portion of the frame member A unit member and an upper unit member disposed at a predetermined height above the lower unit member and having left and right sides attached to the upper portion of the frame member, the upper unit member and the lower unit member Is an island structure of gaming islands in which vertical gaming machines are fixed and held side by side,
The lower side of the frame member is provided so as to protrude left and right, and the support sides for supporting the lower surfaces of the left and right lower unit members and the end portions of the support sides are bent upward so that the lower surfaces of the lower unit members are A lower support portion having a positioning side that engages with a lower positioning groove formed to extend;
An upper support portion that is formed in a groove shape that penetrates the frame member in the left and right direction and extends vertically on the upper portion of the frame member, and that can communicate with an upper positioning groove formed in the upper surface of the lower unit member. Prepared,
When the lower part of the lower unit member is engaged and supported by the lower support part of the frame member positioned on the left and right, and the upper part of the lower unit member is disposed at an alignment position where the upper positioning groove communicates with the upper support part In addition, the island structure of the amusement island is characterized in that the lower unit member is configured to be positioned in the vertical and longitudinal directions and in the longitudinal direction.
前記フレーム部材を挟んで左右に隣接する前記下段ユニット部材は、
それぞれ前記左右のフレーム部材の間に位置決めされて前記上位置決め溝と前記上方支持部とが連通した前記整合位置で形成された溝部に、左右の前記上位置決め溝を連絡する係止片を嵌入することにより、一体的に位置決めされるように構成したことを特徴とする請求項1に記載の遊技島の島構造。
The lower unit member adjacent to the left and right across the frame member is
A locking piece that connects the left and right upper positioning grooves is inserted into a groove portion that is positioned between the left and right frame members and formed at the alignment position where the upper positioning groove communicates with the upper support portion. The island structure of the amusement island according to claim 1, wherein the island structure is configured to be integrally positioned.
前記フレーム部材の下方に位置して前記遊技施設の床面に固定され前記フレーム部材を支持するアンカーベースは、前記遊技施設の床面に沿って前後に延び前記床面に固定される底辺および前記底辺の左右方向の側縁が上向きに曲折されて上方に延び前記フレーム部材と連結される立設壁面と、前記底辺の前後方向の端部が上向きに曲折されて形成された掛止辺部とを有し、
前記下段ユニット部材の下部に当該下段ユニット部材と前記床面との間を塞ぐ巾木部材の裏面側上部を当接支持する桟部材を有し、
前記巾木部材における裏面側下部に前記掛止辺部を前後に挟持する挟持部が設けられ、
前記巾木部材の裏面側上部を前記桟部材に当接支持させて前記挟持部を左右の前記アンカーベースの前記掛止辺部に係合させたときに前記巾木部材が前後に位置決めされて前記床面と隙間なく配設されるように構成したことを特徴とする請求項1または請求項2に記載の遊技島の島構造。
An anchor base positioned below the frame member and fixed to the floor surface of the gaming facility and supporting the frame member extends back and forth along the floor surface of the gaming facility, and the bottom side fixed to the floor surface and the anchor base A side wall in the lateral direction of the bottom side that is bent upward and extends upward, and is connected to the frame member, and a latching side portion that is formed by bending the front and rear ends of the bottom side upward. Have
A crosspiece member that abuts and supports the upper part of the back side of the baseboard member that closes the space between the lower unit member and the floor surface at the lower part of the lower unit member,
A holding part that holds the hook side part back and forth is provided in the lower part on the back side of the baseboard member,
When the upper part of the backside of the baseboard member is brought into contact with and supported by the crosspiece member and the holding part is engaged with the hooking side parts of the left and right anchor bases, the baseboard member is positioned forward and backward. 3. The island structure of amusement islands according to claim 1 or 2, wherein the island structure is arranged so as not to be spaced from the floor surface.
JP2006340310A 2006-12-18 2006-12-18 Structure of game island Pending JP2008148940A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006340310A JP2008148940A (en) 2006-12-18 2006-12-18 Structure of game island

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006340310A JP2008148940A (en) 2006-12-18 2006-12-18 Structure of game island

Publications (1)

Publication Number Publication Date
JP2008148940A true JP2008148940A (en) 2008-07-03

Family

ID=39651795

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006340310A Pending JP2008148940A (en) 2006-12-18 2006-12-18 Structure of game island

Country Status (1)

Country Link
JP (1) JP2008148940A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012005680A (en) * 2010-06-25 2012-01-12 Takeya Co Ltd Game bank platform
JP2013158514A (en) * 2012-02-07 2013-08-19 Sanei:Kk Bank of game machine
JP2015208491A (en) * 2014-04-25 2015-11-24 京楽産業.株式会社 Game machine island
JP2019177073A (en) * 2018-03-30 2019-10-17 京楽産業.株式会社 Manufacturing method of game machine island and game machine island

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012005680A (en) * 2010-06-25 2012-01-12 Takeya Co Ltd Game bank platform
JP2013158514A (en) * 2012-02-07 2013-08-19 Sanei:Kk Bank of game machine
JP2015208491A (en) * 2014-04-25 2015-11-24 京楽産業.株式会社 Game machine island
JP2019177073A (en) * 2018-03-30 2019-10-17 京楽産業.株式会社 Manufacturing method of game machine island and game machine island

Similar Documents

Publication Publication Date Title
JP2008148940A (en) Structure of game island
JP2008148939A (en) Structure of game island
JP4741993B2 (en) Railroad crossing structure
US20070163205A1 (en) Method for constructing decks
JP4939868B2 (en) Amusement machine island unit
JP4843443B2 (en) Support frame
JP2008055080A (en) Pachinko machine bank unit
JP4022592B2 (en) Conveying rod mounting structure on amusement machine island
JP4843462B2 (en) Game machine support frame
JP2010104670A (en) Bank unit for game machine
JP2022098946A (en) Structure of game machine island
JP2006014791A (en) Shelf plate attaching structure in self-assembly shelf
JP2532015B2 (en) Island for installing game machines in a game shop
JPH049173A (en) Structure of island to install game machine in game shop
JP5510689B2 (en) Amusement machine island unit
JP7355350B2 (en) Manufacturing method of game machine island
JP2005245652A (en) Attitude controller for pachinko game machine
KR102575565B1 (en) Post for rail and fence
JPH0741783Y2 (en) Push-in middle shelf assembly set
JP2007068966A (en) Pillar unit for game machine island
US20090078839A1 (en) Gate building kit
JP4672453B2 (en) Outer frame of gaming machine
JP2015208491A (en) Game machine island
JPH07233578A (en) Wall panel and installation method thereof
JPS6231557Y2 (en)

Legal Events

Date Code Title Description
RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20090715

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20090721