JP2008007326A - Part supply control device - Google Patents

Part supply control device Download PDF

Info

Publication number
JP2008007326A
JP2008007326A JP2006202545A JP2006202545A JP2008007326A JP 2008007326 A JP2008007326 A JP 2008007326A JP 2006202545 A JP2006202545 A JP 2006202545A JP 2006202545 A JP2006202545 A JP 2006202545A JP 2008007326 A JP2008007326 A JP 2008007326A
Authority
JP
Japan
Prior art keywords
nut
nozzle
air
stopper member
screw hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006202545A
Other languages
Japanese (ja)
Other versions
JP4529166B2 (en
Inventor
Yoshitaka Aoyama
好高 青山
Shoji Aoyama
省司 青山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2006202545A priority Critical patent/JP4529166B2/en
Publication of JP2008007326A publication Critical patent/JP2008007326A/en
Application granted granted Critical
Publication of JP4529166B2 publication Critical patent/JP4529166B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Feeding Of Articles To Conveyors (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a part supply control device which highly efficiently supplies a part, by immediately sending out the part, when a stopper member retreats. <P>SOLUTION: The stopper member 16 is arranged for stopping the part 1 in a transfer passage 9. A nozzle port 20 is arranged for injecting sending-out air from the oblique rear in the sending-out direction of the part 1 to the part 1 received by this stopper member 16. An interval between the stopper member 16 and the nozzle port 20 is set to an adaptive interval L set by being adapted to a shape and a dimension of the part. The direction of an air jet from the nozzle port 20 is also set to an adaptive inclination θ set by being adapted to the shape and the dimension of the part. Thus, the part 1 is surely started by air injection from the nozzle port 20. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

この発明は、部品の移送通路が設けられた通路部材に、移送通路内の部品を停止する進退動作式のストッパ部材を設け、このストッパ部材を後退させて部品を送出する部品供給制御装置に関している。  The present invention relates to a component supply control device in which a path member provided with a part transfer passage is provided with an advancing / retracting stopper member for stopping a part in the transfer path, and the stopper member is moved backward to send the part. .

部品の移送通路が設けられた通路部材に、移送通路内の部品を停止する進退動作式のストッパ部材を設け、このストッパ部材を後退させて部品を送出する部品供給制御装置が、特公平7−96402号公報に開示されている。そして、この部品供給制御装置では、ストッパ部材が後退して移動し始めた部品に対して、目的箇所へ送給するための搬送用空気がノズルから噴射されるようになっている。
特公平7−96402号公報
A component supply control device is provided in which a stopper member of an advancing / retreating operation type that stops a component in a transfer passage is provided in a passage member provided with a component transfer passage, and the stopper member is moved backward to send out the component. No. 96402. And in this component supply control apparatus, the air for conveyance for feeding to the target location is injected from the nozzle with respect to the component which the stopper member started to move backward.
Japanese Patent Publication No. 7-96402

上述のような部品供給制御装置においては、ストッパ部材が後退しても部品が移動を開始しないことや、この移動速度が均一に維持されないこと等の問題がある。このような問題は、部品に防錆油などの粘着性のある液体が付着していたり、部品と移送通路内面との間に鉄くずのような異物が噛み込んでいたりするために生じている。  In the component supply control device as described above, there are problems such as that the component does not start moving even when the stopper member is retracted, and that the moving speed is not maintained uniformly. Such problems are caused by sticky liquids such as rust preventive oil adhering to the parts, or foreign matters such as iron scraps being caught between the parts and the inner surface of the transfer passage. .

本発明は、上記の問題点を解決するために提供されたもので、ストッパ部材が後退すると部品が直ちに送出され、効率の高い部品供給をおこなうことができる部品供給制御装置を提供することを目的とする。  The present invention has been provided to solve the above-described problems, and an object of the present invention is to provide a component supply control device capable of supplying components with high efficiency by immediately sending out components when the stopper member is retracted. And

問題を解決するための手段Means to solve the problem

請求項1記載の発明は、部品の移送通路が設けられた管状の通路部材に、移送通路内の部品を停止する進退動作式のストッパ部材を設け、このストッパ部材に受け止められている部品に対して部品の送出方向の斜め後方から送出用の空気を噴射する噴口が通路部材の一部に設けられ、移送通路内に進入しているストッパ部材と前記噴口との間隔は、部品の形状や寸法に適合させて設定した適合間隔とされ、さらに前記噴口からの空気噴流の方向は、部品の形状や寸法に適合させて設定した適合傾斜角度とされていることを特徴とする部品供給制御装置である。  According to the first aspect of the present invention, the tubular passage member provided with the part transfer passage is provided with an advancing / retracting stopper member for stopping the part in the transfer passage, and the part received by the stopper member is provided. A part of the passage member is provided with an injection hole for injecting air for delivery from an obliquely rear in the part delivery direction, and the interval between the stopper member entering the transfer passage and the injection hole is determined by the shape and dimensions of the part. And the direction of the air jet from the nozzle is an adapted inclination angle set to suit the shape and dimensions of the component. is there.

発明の効果The invention's effect

このような構成によって、ストッパ部材と前記噴口との間隔は、部品の形状や寸法に適合させて設定した適合間隔とされ、さらに噴口からの空気噴流の傾斜角度が適合傾斜角度とされているので、噴射空気は部品を送出するのに適した箇所に吹き付けられ、ストッパ部材の後退によって直ちに移動を開始する。すなわち、部品に対して積極的な送出力が噴射空気によって付与される。また、ストッパ部材の後退と同時に空気噴射を開始してもよい。  With such a configuration, the interval between the stopper member and the nozzle is set to an appropriate interval set according to the shape and dimensions of the parts, and the inclination angle of the air jet from the nozzle is the appropriate inclination angle. The blast air is blown to a part suitable for delivering the component, and the movement starts immediately by the backward movement of the stopper member. That is, a positive feed force is given to the parts by the jet air. Further, air injection may be started simultaneously with the backward movement of the stopper member.

このようにして、ストッパ部材の後退と同時に部品の移動が開始されるので、部品送出に要する時間が短縮されしかも均一化される。前述のように、部品に防錆油が塗布されていたり鉄くずのような異物が噛み込んでいたりしても、空気噴射で強力に送出することができるので、部品送出が遅れたりすることがない。したがって、上述のように予備的に空気噴射をしてストッパ部材の後退と同時に部品移動を開始し、その後、主噴口からの搬送空気で遠方にある目的箇所まで部品を供給する場合であっても、最短時間で確実に動作させることができ、信頼性の高い部品供給がえられる。  In this way, since the movement of the component is started simultaneously with the backward movement of the stopper member, the time required for the component delivery is shortened and made uniform. As mentioned above, even if rust preventive oil is applied to parts or foreign matter such as iron scrap is caught, it can be sent out strongly by air injection, so the part delivery may be delayed. Absent. Therefore, even when the air is preliminarily injected as described above and the movement of the parts is started simultaneously with the backward movement of the stopper member, the parts are then supplied to the far-off target location by the carrier air from the main nozzle. Therefore, it can be reliably operated in the shortest time, and a highly reliable component supply can be obtained.

請求項2記載の発明は、前記噴口は、部品の凹型形状部または凸型形状部に対して空気噴射を行うようにその配置位置が設定されている請求項1記載の部品供給制御装置である。  The invention according to claim 2 is the component supply control device according to claim 1, wherein the position of the nozzle hole is set so as to inject air to the concave shape portion or the convex shape portion of the component. .

部品の凹型形状部または凸型形状部に対して空気噴射を行うので、空気の動圧が確実に部品に作用し、強い送出力がえられる。  Since air injection is performed on the concave shape portion or the convex shape portion of the part, the dynamic pressure of air surely acts on the part, and a strong power output can be obtained.

請求項3記載の発明は、前記部品は、ねじ孔が開口している端面とねじ孔の軸線と平行な状態の平たい横側面を有するナットであり、空気噴射はねじ孔に対して行われるように構成した請求項1または請求項2記載の部品供給制御装置である。  According to a third aspect of the present invention, the component is a nut having a flat side surface parallel to an end surface where the screw hole is open and an axis of the screw hole, and air injection is performed on the screw hole. The component supply control device according to claim 1 or claim 2 configured as described above.

このような形状のナットであると、最先のナットに後続するナットが平たい横側面を有しているために、前後のナットの横側面間に防錆油などが介在してナット同士が粘着する現象が生じるのであるが、空気噴射が凹型形状部であるねじ孔に対して行われるので、強い送出力がえられて確実な部品移動開始が可能となる。  In the case of such a nut, since the nut following the earliest nut has a flat lateral surface, rust preventive oil is interposed between the lateral surfaces of the front and rear nuts so that the nuts adhere to each other. However, since the air injection is performed on the screw hole that is the concave shape portion, a strong feed force can be obtained and the component movement can be reliably started.

請求項4記載の発明は、空気噴射が前記ねじ孔の送出側の内側部に対して行われるように前記噴口が配置してある請求項3記載の部品供給制御装置である。  According to a fourth aspect of the present invention, there is provided the component supply control device according to the third aspect, wherein the nozzle is arranged so that air injection is performed on the inner side of the screw hole on the delivery side.

部品の送出方向の斜め後方から噴射される空気噴流が、ねじ孔の送出側の内側部に作用するので、空気噴流による動圧がナット送出方向に確実に作用する。  Since the air jet injected from diagonally rearward in the part delivery direction acts on the inner side of the screw hole on the delivery side, the dynamic pressure due to the air jet acts reliably in the nut delivery direction.

請求項5記載の発明は、空気噴射は噴口に近い側のねじ孔開口部近傍部分に対して行われるように前記噴口が配置してある請求項4記載の部品供給制御装置である。  A fifth aspect of the present invention is the component supply control device according to the fourth aspect, wherein the nozzle is arranged so that air injection is performed on a portion near the screw hole opening on the side close to the nozzle.

部品の送出方向の斜め後方から噴射される空気噴流が、ねじ孔の送出側の内側部であるとともに噴口に近い側のねじ孔開口部近傍に対して噴射されるので、ナットを傾けようとする力成分が発生し、それによってナットの横側面同士の前記粘着を引き剥がすことが積極的に行われる。したがって、剥離しにくい粘着であっても確実に移動開始が可能となる。また、ナット端面と移送通路の底面との間に油膜が存在している場合でも、上述の場合と同様に確実な移動開始が確保できる。  The air jet jetted from obliquely rearward in the delivery direction of the parts is jetted to the inside of the screw hole on the delivery side and to the vicinity of the screw hole opening on the side close to the nozzle, so that the nut is inclined. A force component is generated, thereby actively removing the adhesion between the side surfaces of the nut. Therefore, even if the adhesive is difficult to peel, the movement can be surely started. Further, even when an oil film is present between the nut end surface and the bottom surface of the transfer passage, a reliable start of movement can be ensured as in the case described above.

請求項6記載の発明は、前記通路部材の一部を着脱可能にして交換用部材を構成し、この交換用部材に前記進退動作式のストッパ部材と前記噴口が設置され、複数準備された交換用部材に各部品の形状や寸法に応じた前記適合間隔と前記適合傾斜角度が形成されている請求項1〜請求項5のいずれかに記載の部品供給制御装置である。  According to a sixth aspect of the present invention, a part of the passage member is detachably configured to constitute a replacement member, and the replacement member is provided with a plurality of prepared replacements in which the advancing / retracting stopper member and the nozzle are installed. The component supply control device according to any one of claims 1 to 5, wherein the conforming interval and the conforming inclination angle corresponding to the shape and dimensions of each component are formed on the member for use.

このように各部品の形状や寸法に応じた適合間隔と適合傾斜角度を、あらかじめ各交換用部材に付与しておくことにより、供給する部品が変更される都度、その部品に適応した交換用部材を選択して、通路部材に取り付ける。したがって、簡単な交換作業で部品の変更に対応することが可能となる。さらに、装置の変更の必要な局部だけを交換して、装置本体部は変更することなく継続して使用することができ、経済的である。  In this way, each time a component to be supplied is changed by providing a suitable interval and a suitable inclination angle according to the shape and size of each component to each replacement member in advance, the replacement member adapted to that component Is selected and attached to the passage member. Therefore, it is possible to cope with the change of parts by a simple replacement operation. Furthermore, only the local part that needs to be changed is exchanged, and the apparatus main body can be used continuously without being changed, which is economical.

つぎに、本発明の部品供給制御装置を実施するための最良の形態を説明する。  Next, the best mode for carrying out the component supply control device of the present invention will be described.

本発明の部品供給制御装置によって送出される部品としては、鋼板をハット型に屈曲させた形状の鋼板部品や、孔のあいたディスタンスピースなど種々なものが対象になる。この実施例では、図1(B)に示した四角い形状の鉄製のプロジェクションナット1である。これは、ねじ孔2が開口している表裏の端面3,4と、ねじ孔2の軸線と平行になっている4つの横側面5と、端面4の4隅に形成された溶着用突起6によって形成されている。なお、図示の実施例では、溶着用突起6の図示は省略してある。また、以下の説明において、プロジェクションナットを単にナットと表現する場合もある。  Various parts such as a steel plate part having a shape obtained by bending a steel plate into a hat shape, a distance piece having a hole, and the like are targeted as parts sent out by the component supply control device of the present invention. In this embodiment, it is the iron-made projection nut 1 having a square shape shown in FIG. This is because the front and back end faces 3 and 4 where the screw holes 2 are open, four lateral side faces 5 parallel to the axis of the screw holes 2, and welding protrusions 6 formed at the four corners of the end face 4. Is formed by. In the illustrated embodiment, the illustration of the welding projection 6 is omitted. In the following description, the projection nut may be simply expressed as a nut.

部品供給制御装置全体は、符号7で示されている。  The entire component supply control device is denoted by reference numeral 7.

ステンレス鋼で作られた管状の通路部材8に断面矩形の移送通路9が設けられ、この通路部材8は送出側が低くなるように傾斜した状態で支柱10に支持されている。支柱10の下部は機枠などの静止部材11に固定されている。移送通路9は、パーツフィーダ12からのボルト1を受け入れるようにパーツフィーダ12に連通してある。通路部材8は図2に示すように、上方に開放している断面コ字型の本体部13とこれを閉塞して矩形の閉断面を形成する蓋部材14によって構成されている。蓋部材14は厚板で構成され、溶接またはボルト付けで本体部13に固定されている。  A tubular passage member 8 made of stainless steel is provided with a transfer passage 9 having a rectangular cross section, and this passage member 8 is supported by the support column 10 in an inclined state so that the delivery side is lowered. The lower part of the column 10 is fixed to a stationary member 11 such as a machine frame. The transfer passage 9 communicates with the parts feeder 12 so as to receive the bolt 1 from the parts feeder 12. As shown in FIG. 2, the passage member 8 includes a U-shaped main body 13 that opens upward and a lid member 14 that closes the main body 13 to form a rectangular closed cross section. The lid member 14 is formed of a thick plate and is fixed to the main body 13 by welding or bolting.

進退動作式のストッパ部材16が通路部材8に取付けられている。このストッパ部材16は、移送通路9内に進入してナット1を停止させるもので、蓋部材14に固定したエアシリンダ17によって進退するようになっている。ストッパ部材16は、エアシリンダ17の断面円形のピストンロッドで構成されているが、適当な板状部材であってもよい。ナット1の横側面5がストッパ部材16に当たっている。  An advancing / retracting stopper member 16 is attached to the passage member 8. The stopper member 16 enters the transfer passage 9 to stop the nut 1 and is advanced and retracted by an air cylinder 17 fixed to the lid member 14. The stopper member 16 is constituted by a piston rod having a circular cross section of the air cylinder 17, but may be a suitable plate member. The lateral side surface 5 of the nut 1 is in contact with the stopper member 16.

ストッパ部材16によって受け止められているナット1だけを送出するために、2番目のナット1を停止させるストッパ部材18が設けてある。このストッパ部材18は、本体部13の底部を貫通して移送通路9内に進入するもので、ねじ孔2内に挿入されることによってストッパ機能を果たしている。そして、前記ストッパ部材16と同様に、本体部13の底部に固定したエアシリンダ19によって進退するようになっている。  In order to send only the nut 1 received by the stopper member 16, a stopper member 18 for stopping the second nut 1 is provided. The stopper member 18 penetrates the bottom of the main body 13 and enters the transfer passage 9, and has a stopper function when inserted into the screw hole 2. Then, like the stopper member 16, the air cylinder 19 fixed to the bottom of the main body 13 is advanced and retracted.

ストッパ部材16によって受け止められているナット1が最先のものであり、それに連なってストッパ部材18によって受け止められているナット1が2番目のものである。そして、この2番目のナット1に後続のナットが密着した状態で連なっている。  The nut 1 received by the stopper member 16 is the first one, and the nut 1 continuously received by the stopper member 18 is the second one. Then, the second nut 1 is connected in a state where the subsequent nut is in close contact therewith.

最先のナット1が確実に移動を開始するようにするために、蓋部材14に空気噴射用の噴口20が設けてある。この噴口20は最先のナット1を始動するものであり、この始動に引き続いてナット1を目的箇所へ移送するために、後述の「主噴口」が配置されている。したがって、以下の説明では噴口20を「予備噴口20」と記載する。この予備噴口20は、図1(A),図3(A)および(B)に示すように、ナットの送出方向の斜め後方からナット1に空気噴射をするため、その開口位置と開口方向が設定されている。  In order to ensure that the first nut 1 starts to move reliably, an air injection nozzle 20 is provided in the lid member 14. The nozzle 20 starts the earliest nut 1, and a “main nozzle” to be described later is arranged to transfer the nut 1 to a target location following this startup. Therefore, in the following description, the nozzle 20 is referred to as “preliminary nozzle 20”. As shown in FIGS. 1 (A), 3 (A), and 3 (B), the preliminary injection port 20 injects air into the nut 1 from an obliquely rearward direction of the nut delivery direction, so that its opening position and opening direction are Is set.

前記予備噴口20からの空気噴流が最も効果的にナット1に吹き付けられて、ナット1を移動させる送出推力が最大限に確保されることが重要である。そのために空気噴流がねじ孔2の送出側の内側部21に対して吹き付けられるように予備噴口20の開口位置と開口方向が選定してある。これに加えて、空気噴流が吹き付けられる最適の箇所は、予備噴口20に近い側のねじ孔開口部近傍部分22である。前記予備噴口20に近い側のねじ孔開口部近傍部分22とは、図3においてねじ孔2の上方側の送出側内面部分(21)を意味している。  It is important that the air jet from the preliminary nozzle 20 is blown to the nut 1 most effectively, and the sending thrust for moving the nut 1 is ensured to the maximum extent. For this purpose, the opening position and the opening direction of the preliminary nozzle 20 are selected so that the air jet is blown against the inner part 21 on the delivery side of the screw hole 2. In addition to this, the optimum place where the air jet is blown is the vicinity 22 of the screw hole opening on the side close to the preliminary nozzle 20. The screw hole opening vicinity portion 22 on the side close to the preliminary injection port 20 means the sending side inner surface portion (21) above the screw hole 2 in FIG.

このように空気噴流が所定の箇所に吹き付けられるようにするためには、予備噴口20の開口位置の選定と、予備噴口20からの空気噴流の方向の選定とを複合させる必要がある。したがって、予備噴口20に連なる真っ直ぐな空気通路23の傾斜角度θも最適値に設定されている。なお、図1(A)や図3(C)から理解されるように、空気通路23は移送通路9の幅方向の中央部に設けられている。  Thus, in order to blow the air jet to a predetermined location, it is necessary to combine the selection of the opening position of the preliminary nozzle 20 and the selection of the direction of the air jet from the preliminary nozzle 20. Therefore, the inclination angle θ of the straight air passage 23 connected to the preliminary nozzle 20 is also set to an optimum value. As can be understood from FIGS. 1A and 3C, the air passage 23 is provided in the center of the transfer passage 9 in the width direction.

予備噴口20の開口箇所や前記傾斜角度θは、上述の最適箇所に空気噴流を吹き付けるように設定されるのである。この場合、ナット1の形状や寸法に適合させて開口位置と傾斜角度θが選定される。すなわち、ストッパ部材16によって停止されているナット1の大きさに適合させて、予備噴口20とストッパ部材16との間隔Lが選定される。それと同時に、空気通路23の傾斜角度θも選定される。したがって、前記間隔Lは、「適合間隔」であり、また、傾斜角度θは、「適合傾斜角度」である。  The opening location of the preliminary nozzle 20 and the inclination angle θ are set so as to blow an air jet at the optimum location described above. In this case, the opening position and the inclination angle θ are selected according to the shape and dimensions of the nut 1. That is, the distance L between the preliminary nozzle 20 and the stopper member 16 is selected in accordance with the size of the nut 1 stopped by the stopper member 16. At the same time, the inclination angle θ of the air passage 23 is also selected. Therefore, the interval L is an “adaptive interval”, and the inclination angle θ is an “adaptive inclination angle”.

適合間隔Lを長くするとともに適合傾斜角度θを小さくすることも可能であるが、このようにすると予備噴口20から空気が吹き付けられる箇所すなわち内側部21(ねじ孔開口部近傍部分22)までの距離が長くなる。そのために空気噴流か拡散してその動圧が低下し、結局、送出推力が低下してしまう。また、適合間隔を短くするとともに適合傾斜角度θを大きくすると、空気噴流の拡散は少なくなるが、送出推力が大きく求められなくなる。  While it is possible to lengthen the fitting interval L and reduce the fitting inclination angle θ, the distance from the preliminary nozzle 20 to the location where the air is blown, that is, the inner portion 21 (the portion near the screw hole opening portion 22) is configured in this way. Becomes longer. As a result, the air jet diffuses and its dynamic pressure decreases, and eventually the delivery thrust decreases. Further, if the adaptation interval is shortened and the adaptation inclination angle θ is increased, the diffusion of the air jet is reduced, but the delivery thrust is not required to be large.

図3(A)に示すように、空気噴流によって作用する動圧は成分Fであり、それを分解して求められる送出方向の送出推力はF1である。そして、ナット1を移送通路9の底面に押し付ける成分がF2である。したがって、予備噴口20の開口位置(適合間隔L)の設定や、空気通路23の傾斜角度(適合傾斜角度θ)の設定は、この送出推力F1をできるだけ大きく求めることが狙いとされている。  As shown in FIG. 3A, the dynamic pressure acting by the air jet is the component F, and the sending thrust in the sending direction obtained by decomposing it is F1. The component that presses the nut 1 against the bottom surface of the transfer passage 9 is F2. Therefore, the setting of the opening position (adaptation interval L) of the preliminary injection nozzle 20 and the setting of the inclination angle (adaptation inclination angle θ) of the air passage 23 are aimed at obtaining the sending thrust F1 as large as possible.

そして、ねじ孔2は部品の凹型形状部であり、このような箇所に空気噴流を吹き付けて部品の送出推力が適確に求められている。また、図3(D)に示すように、直方体型の部品34に突起35が設けられている場合、空気噴流は突起35に吹き付けられる。このような部品は凹型形状部を有するものであり、突起35が送出推力を確保するのに役立っている。  The screw hole 2 is a concave-shaped part of the component, and an air jet is blown onto such a portion, and the delivery thrust of the component is accurately determined. In addition, as shown in FIG. 3D, when the projection 35 is provided on the rectangular parallelepiped component 34, the air jet is blown onto the projection 35. Such a part has a concave-shaped part, and the projection 35 is useful for securing the sending thrust.

図1(A)に示すように、通路部材8の一部が着脱可能な交換用部材36とされている。ここでは蓋部材14の一部が図2から明らかなように、ボルト37を緩めて取り外すことができるようになっている。この交換用部材36は複数個準備され、それぞれにストッパ部材16用のエアシリンダ17や予備噴口20が設けられている。そして、各交換用部材36における適合間隔Lや適合傾斜角度θが、ナット1の大きさや形状に適合させて設定されている。  As shown in FIG. 1A, a part of the passage member 8 is a detachable replacement member 36. Here, a part of the lid member 14 can be removed by loosening the bolt 37, as is apparent from FIG. A plurality of replacement members 36 are prepared, and each is provided with an air cylinder 17 for the stopper member 16 and a preliminary nozzle 20. The matching interval L and the matching inclination angle θ in each replacement member 36 are set so as to match the size and shape of the nut 1.

したがって、例えば、ナット1が溶着用突起6付きのM8ナットから、溶着用突起なしのM6ナットに変更される場合には、M6ナットに適応した適合間隔Lや適合傾斜角度θを有する交換用部材36に取り換えるのである。  Therefore, for example, when the nut 1 is changed from the M8 nut with the welding projection 6 to the M6 nut without the welding projection, the replacement member having the fitting interval L and the fitting inclination angle θ adapted to the M6 nut. It is replaced with 36.

図4は、送出される部品が2点鎖線で示すように、鋼板部品38であり、これは短冊形の細長い鋼板をハット型に屈曲させたものである。したがって、適合間隔Lや適合傾斜角度θはこの鋼板部品38に適応させた値とされている。それ以外の構成は先の例と同じなので、同様な機能の部材には同一の符号が記載してある。  FIG. 4 shows a steel plate part 38 as shown by a two-dot chain line, which is a strip-shaped long steel plate bent into a hat shape. Therefore, the conforming interval L and the conforming inclination angle θ are values adapted to the steel plate part 38. Since the other configuration is the same as the previous example, the same reference numerals are given to members having similar functions.

部品供給制御装置7から送出されたナット1は、目的箇所に移送される。目的箇所としては種々なものがあるが、ここでは供給ロッド式の部品供給装置24である。この部品供給装置24は、電気抵抗溶接機と対をなしているもので、固定電極25上に載置された鋼板部品26にナット1を供給する。ナット1は、部品供給装置24の保持部27に供給され、そこに待機しているナット1に進退式の供給ロッド28を進出させて、鋼板部品26に移載される。なお、供給ロッド28はエアシリンダ29によって進退動作がなされる。また、符号30は可動電極である。  The nut 1 delivered from the component supply control device 7 is transferred to the target location. Although there are various target locations, the supply rod type component supply device 24 is used here. The component supply device 24 is paired with an electric resistance welder and supplies the nut 1 to the steel plate component 26 placed on the fixed electrode 25. The nut 1 is supplied to the holding unit 27 of the component supply device 24, and the advancing / retracting supply rod 28 is advanced to the nut 1 waiting there, and transferred to the steel plate component 26. The supply rod 28 is moved back and forth by the air cylinder 29. Reference numeral 30 denotes a movable electrode.

部品供給制御装置7から部品供給装置24までは、10m〜15mにおよぶ供給ホース31によって接続されている。この供給ホース31は、ウレタン樹脂や塩化ビニールなどの柔軟性のある合成樹脂で作られている。ナット1がこの供給ホース31内を勢いよく通過するために、ストッパ部材16の送出側すなわち前方に、空気噴射用の主噴口33が設けてある。この主噴口33は送出方向の斜め後方から空気噴射をするように、噴口の開口方向が設定されている。  The component supply control device 7 to the component supply device 24 are connected by a supply hose 31 ranging from 10 m to 15 m. The supply hose 31 is made of a flexible synthetic resin such as urethane resin or vinyl chloride. In order for the nut 1 to pass through the supply hose 31 vigorously, a main injection port 33 for air injection is provided on the delivery side of the stopper member 16, that is, in front thereof. The opening direction of the nozzle hole is set so that this main nozzle 33 injects air from diagonally behind in the delivery direction.

押圧噴口39がストッパ部材18の後方に設けられ、ここからの空気噴流によってストッパ部材16にナット1が円滑に到達するようになっている。なお、各噴口20,33,39にはそれぞれ空気供給管41,42,43が接続されている。  A pressing nozzle 39 is provided behind the stopper member 18, and the nut 1 smoothly reaches the stopper member 16 by an air jet from here. Note that air supply pipes 41, 42, and 43 are connected to the nozzle holes 20, 33, and 39, respectively.

図1(A)は、移送通路9内のナット列全体が停止した状態を示しており、このときにはストッパ部材16およびストッパ部材18いずれもが移送通路9内に進入して各ナット1を受け止めている。この状態でストッパ部材16が後退して最先のナット1が開放されるのと同時に、予備噴口20から空気が最先のナット1に吹き付けられ、このナット1は直ちに移動を開始する。このようにして移動を開始したナット1が主噴口33を通過した時点で、主噴口33から搬送用の空気が噴射されてナット1は供給ホース31を通って部品供給装置24に供給される。その後、ナット1は固定電極25上の鋼板部品26に載置され、可動電極30による加圧と溶接電流の通電によって溶接が完了する。  FIG. 1A shows a state in which the entire nut row in the transfer passage 9 is stopped. At this time, both the stopper member 16 and the stopper member 18 enter the transfer passage 9 to receive the nuts 1. Yes. In this state, the stopper member 16 retreats and the earliest nut 1 is released. At the same time, air is blown from the auxiliary nozzle 20 to the earliest nut 1, and the nut 1 immediately starts moving. When the nut 1 that has started moving in this manner passes through the main injection port 33, air for conveyance is injected from the main injection port 33, and the nut 1 is supplied to the component supply device 24 through the supply hose 31. Thereafter, the nut 1 is placed on the steel plate part 26 on the fixed electrode 25, and welding is completed by pressurization by the movable electrode 30 and energization of a welding current.

ストッパ部材16が後退して最先のナット1が送出されると、その直後にはストッパ部材16は再び進出する。その後、ストッパ部材18がねじ孔2から後退すると、2番目のナット1が進出してストッパ部材16に受け止められる。2番目のナット1が移動するときに、押圧噴口39から空気が噴射されてナット1が円滑にストッパ部材16に当たるようになっている。押圧噴口39からの空気噴射でナット列全体が後押しされる。  When the stopper member 16 moves backward and the first nut 1 is delivered, the stopper member 16 advances again immediately after that. Thereafter, when the stopper member 18 is retracted from the screw hole 2, the second nut 1 is advanced and received by the stopper member 16. When the second nut 1 moves, air is ejected from the pressure injection port 39 so that the nut 1 smoothly hits the stopper member 16. The entire nut row is boosted by the air injection from the pressing nozzle 39.

予備噴口20から空気が噴射される時期は、ストッパ部材16が進出している状態のときでもよく、また、ストッパ部材16が後退するのと同時であってもよい。  The time at which air is injected from the preliminary nozzle 20 may be when the stopper member 16 is in the advanced state, or at the same time as the stopper member 16 is retracted.

図3(A)に示すように、黒く塗りつぶして図示した防錆油の油膜40がナット1の横側面5の間に存在していても、送出推力F1によって隣り合う横側面5が剥離する。したがって、予備噴口20からの空気噴射と同時に最先のナット1は送出方向に始動する。溶着用突起6のない場合には、油膜がナットの端面4と移送通路9の底面との間に存在することもあるが、やはり前述の送出推力F1によってナット始動がなされる。  As shown in FIG. 3 (A), even if the oil film 40 of the rust-preventing oil illustrated in black is present between the lateral surfaces 5 of the nut 1, the adjacent lateral surfaces 5 are separated by the sending thrust F1. Therefore, the earliest nut 1 starts in the delivery direction simultaneously with the air injection from the preliminary nozzle 20. When there is no welding projection 6, an oil film may exist between the end face 4 of the nut and the bottom face of the transfer passage 9, but the nut is also started by the aforementioned sending thrust F1.

図3(B)に示すように、空気噴流が前記ねじ孔開口部近傍部分22に吹き付けられると、ナット1を図示のように傾けようとする力成分が発生する。そのため、油膜40の存在する箇所において剥離方向の隙間が形成されて、上述のような剥離現象と迅速なナット始動が実現する。  As shown in FIG. 3B, when an air jet is blown onto the screw hole opening vicinity 22, a force component is generated to tilt the nut 1 as shown. Therefore, a gap in the peeling direction is formed at the location where the oil film 40 exists, and the above-described peeling phenomenon and quick nut start-up are realized.

上述の実施例においては各種のエアシリンダが採用されているが、これに換えて進退出力をする電動モータを採用してもよい。さらに、上述のような動作を行わせるためには、図示していないが、通常のシーケンサーのような制御装置や、センサーや、前記制御装置によって動作する空気切換弁などを用いて容易に行うことができる。  Although various air cylinders are employed in the above-described embodiments, an electric motor that performs forward / backward output may be employed instead. Further, in order to perform the operation as described above, although not shown, it is easily performed using a control device such as a normal sequencer, a sensor, an air switching valve operated by the control device, or the like. Can do.

以上に説明した実施例の作用効果を列記すると、つぎのとおりである。  The functions and effects of the embodiment described above are listed as follows.

上述のような構成によって、ストッパ部材16と前記予備噴口20との間隔は、プロジェクションナット1の形状や寸法に適合させて設定した適合間隔Lとされ、さらに予備噴口20からの空気噴流の傾斜角度が適合傾斜角度θとされているので、噴射空気はナット1を送出するのに適した箇所に吹き付けられ、ストッパ部材16の後退によって直ちに移動を開始する。すなわち、ナット1に対して積極的な送出力が噴射空気によって付与される。  With the above-described configuration, the interval between the stopper member 16 and the preliminary injection port 20 is set to an adjustment interval L that is set in accordance with the shape and dimensions of the projection nut 1, and the inclination angle of the air jet from the preliminary injection port 20 Is set to a suitable inclination angle θ, the blast air is blown to a location suitable for feeding the nut 1 and immediately starts moving by the backward movement of the stopper member 16. That is, a positive feed force is applied to the nut 1 by the jet air.

このようにして、ストッパ部材16の後退と同時にナット1の移動が開始されるので、ナット送出に要する時間が短縮されしかも均一化される。前述のように、ナット1に防錆油が塗布されていたり鉄くずのような異物が噛み込んでいたりしても、空気噴射で強力に送出することができるので、ナット送出が遅れたりすることがない。したがって、上述のように予備的に空気噴射をしてストッパ部材16の後退と同時にナット移動を開始し、その後、主噴口33からの搬送空気で遠方にある目的箇所である部品供給装置24まで部品を供給する場合であっても、最短時間で確実に動作させることができ、信頼性の高い部品供給がえられる。  Thus, since the movement of the nut 1 is started simultaneously with the backward movement of the stopper member 16, the time required for nut feeding is shortened and made uniform. As described above, even if the rust preventive oil is applied to the nut 1 or a foreign object such as iron scrap is caught, the nut can be sent out powerfully by air injection, which delays the nut delivery. There is no. Accordingly, the air is preliminarily injected as described above, and the nut movement is started simultaneously with the backward movement of the stopper member 16, and then the parts are supplied to the parts supply device 24 which is a destination place far away by the carrier air from the main nozzle 33. Can be reliably operated in the shortest time, and highly reliable component supply can be obtained.

前記予備噴口20は、ナット1の凹型形状部であるねじ孔2または凸型形状部である突起35に対して空気噴射を行うようにその配置位置が設定されている。  The preliminary injection port 20 is arranged at a position so as to inject air into the screw hole 2 that is the concave shape portion of the nut 1 or the projection 35 that is the convex shape portion.

部品の凹型形状部または凸型形状部に対して空気噴射を行うので、空気の動圧が確実に部品に作用し、強い送出力がえられる。  Since air injection is performed on the concave shape portion or the convex shape portion of the part, the dynamic pressure of air surely acts on the part, and a strong power output can be obtained.

前記部品は、ねじ孔2が開口している端面3,4とねじ孔2の軸線と平行な状態の平たい横側面5を有するナット1であり、空気噴射はねじ孔2に対して行われるように構成した。  The part is a nut 1 having end faces 3 and 4 where the screw hole 2 is open and a flat lateral surface 5 in a state parallel to the axis of the screw hole 2 so that air injection is performed on the screw hole 2. Configured.

このような形状のナット1であると、最先のナット1に後続するナット1が平たい横側面を有しているために、前後のナットの横側面間に防錆油などが介在してナット同士が粘着する現象が生じるのであるが、空気噴射が凹型形状部であるねじ孔2に対して行われるので、強い送出力がえられて確実な部品移動開始が可能となる。  In the case of the nut 1 having such a shape, since the nut 1 subsequent to the first nut 1 has a flat lateral surface, rust preventive oil or the like is interposed between the lateral surfaces of the front and rear nuts. Although the phenomenon of sticking to each other occurs, the air injection is performed on the screw hole 2 which is a concave shape portion, so that a strong power output is obtained and the component movement can be reliably started.

空気噴射が前記ねじ孔2の送出側の内側部21に対して行われるように前記予備噴口20が配置してある。  The preliminary injection port 20 is arranged so that air injection is performed on the inner side portion 21 on the delivery side of the screw hole 2.

ナット1の送出方向の斜め後方から噴射される空気噴流が、ねじ孔2の送出側の内側部21に作用するので、空気噴流による動圧がナット送出方向に確実に作用する。  Since the air jet injected from the diagonally rear in the delivery direction of the nut 1 acts on the inner side portion 21 on the delivery side of the screw hole 2, the dynamic pressure due to the air jet acts reliably in the nut delivery direction.

空気噴射は予備噴口20に近い側のねじ孔開口部近傍部分22に対して行われるように予備噴口20が配置してある。  The preliminary injection port 20 is arranged so that the air injection is performed on the portion 22 near the screw hole opening near the preliminary injection port 20.

ナット1の送出方向の斜め後方から噴射される空気噴流が、ねじ孔2の送出側の内側部21であるとともに予備噴口20に近い側のねじ孔開口部近傍部分22に対して噴射されるので、ナット1を傾けようとする力成分が発生し、それによってナット1の横側面同士の前記粘着を引き剥がすことが積極的に行われる。したがって、剥離しにくい粘着であっても確実に移動開始が可能となる。図3(A),(B)および(C)に示すように、矢線15で示す空気噴流がねじ孔開口部近傍部分22に吹き付けられていることによって、上述の効果がえられる。  Since the air jet injected from diagonally rearward in the sending direction of the nut 1 is jetted to the inner portion 21 on the sending side of the screw hole 2 and to the screw hole opening vicinity portion 22 on the side close to the preliminary nozzle 20. A force component that tries to incline the nut 1 is generated, and thereby, the adhesion between the side surfaces of the nut 1 is actively peeled off. Therefore, even if the adhesive is difficult to peel, the movement can be surely started. As shown in FIGS. 3A, 3 </ b> B, and 3 </ b> C, the air jet indicated by the arrow 15 is blown to the screw hole opening vicinity portion 22, thereby obtaining the above-described effect.

前記通路部材8の一部を着脱可能にして交換用部材36を構成し、この交換用部材36に前記進退動作式のストッパ部材16と前記予備噴口20が設置され、複数準備された交換用部材36に各ナット1の形状や寸法に応じた前記適合間隔Lと前記適合傾斜角度θが形成されている。  A part of the passage member 8 is detachable to form a replacement member 36, and the replacement member 36 is provided with the advance / retractable stopper member 16 and the preliminary injection port 20, and a plurality of prepared replacement members. 36, the adaptation interval L and the adaptation inclination angle θ corresponding to the shape and dimensions of each nut 1 are formed.

このように各ナット1の形状や寸法に応じた適合間隔Lと適合傾斜角度θを、あらかじめ各交換用部材36に付与しておくことにより、供給するナット1が変更される都度、そのナット1に適応した交換用部材36を選択して、通路部材8に取り付ける。したがって、簡単な交換作業でナット1の変更に対応することが可能となる。さらに、装置の変更の必要な局部だけを交換して、装置本体部は変更することなく継続して使用することができ、経済的である。  As described above, each time the nut 1 to be supplied is changed by previously providing each replacement member 36 with the appropriate interval L and the appropriate inclination angle θ according to the shape and size of each nut 1, the nut 1 is changed. The replacement member 36 adapted to the above is selected and attached to the passage member 8. Therefore, it becomes possible to cope with the change of the nut 1 by a simple replacement operation. Furthermore, only the local part that needs to be changed is exchanged, and the apparatus main body can be used continuously without being changed, which is economical.

上述のように、本発明によれば、ストッパ部材が後退すると部品が直ちに送出され、効率の高い部品供給をおこなうことができるので、自動車の車体溶接工程や、家庭電化製品の板金溶接工程などの広い産業分野で利用できる。  As described above, according to the present invention, when the stopper member is retracted, the parts are immediately sent out, so that the parts can be supplied with high efficiency. Thus, the car body welding process for automobiles, the sheet metal welding process for home appliances, etc. It can be used in a wide range of industrial fields.

部品供給制御装置全体を示す側面図とナットの斜視図である。It is the side view which shows the whole components supply control apparatus, and the perspective view of a nut. 図1(A)の(2)−(2)断面図である。It is (2)-(2) sectional drawing of FIG. 1 (A). 装置の要部を示す断面図と平面図および部品の斜視図である。It is sectional drawing and a top view which show the principal part of an apparatus, and a perspective view of components. 他の部品を送出する装置の側面図である。It is a side view of the device which sends out other parts.

符号の説明Explanation of symbols

1 プロジェクションボルト
2 ねじ孔
3 端面
4 端面
5 横側面
7 部品供給制御装置
8 通路部材
9 移送通路
16 ストッパ部材
20 予備噴口
21 内側部
22 ねじ孔開口部近傍部分
23 空気通路
24 部品供給装置
33 主噴口
34 部品
35 突起
36 交換用部材
40 油膜
DESCRIPTION OF SYMBOLS 1 Projection bolt 2 Screw hole 3 End surface 4 End surface 5 Lateral side surface 7 Component supply control device 8 Passage member 9 Transfer passage 16 Stopper member 20 Preliminary injection port 21 Inner portion 22 Screw hole opening vicinity 23 Air passage 24 Component supply device 33 Main injection port 34 Parts 35 Projections 36 Replacement members 40 Oil film

Claims (6)

部品の移送通路が設けられた管状の通路部材に、移送通路内の部品を停止する進退動作式のストッパ部材を設け、このストッパ部材に受け止められている部品に対して部品の送出方向の斜め後方から送出用の空気を噴射する噴口が通路部材の一部に設けられ、移送通路内に進入しているストッパ部材と前記噴口との間隔は、部品の形状や寸法に適合させて設定した適合間隔とされ、さらに前記噴口からの空気噴流の方向は、部品の形状や寸法に適合させて設定した適合傾斜角度とされていることを特徴とする部品供給制御装置。  The tubular passage member provided with the parts transfer passage is provided with an advancing / retracting stopper member for stopping the parts in the transfer passage, and obliquely rearward in the part feeding direction with respect to the parts received by the stopper member. A nozzle hole for injecting air for delivery from the nozzle is provided in a part of the passage member, and the interval between the stopper member entering the transfer passage and the nozzle hole is an adapted interval set according to the shape and dimensions of the parts In addition, the direction of the air jet from the nozzle is an adapted inclination angle set in conformity with the shape and dimensions of the component. 前記噴口は、部品の凹型形状部または凸型形状部に対して空気噴射を行うようにその配置位置が設定されている請求項1記載の部品供給制御装置。  2. The component supply control device according to claim 1, wherein an arrangement position of the nozzle is set so that air is ejected to a concave shape portion or a convex shape portion of the component. 前記部品は、ねじ孔が開口している端面とねじ孔の軸線と平行な状態の平たい横側面を有するナットであり、空気噴射はねじ孔に対して行われるように構成した請求項1または請求項2記載の部品供給制御装置。  The said component is a nut which has a flat side surface in a state parallel to the end surface where the screw hole is opened and the axis of the screw hole, and the air injection is configured to be performed on the screw hole. Item 2. The component supply control device according to Item 2. 空気噴射が前記ねじ孔の送出側の内側部に対して行われるように前記噴口が配置してある請求項3記載の部品供給制御装置。  The component supply control device according to claim 3, wherein the injection port is arranged such that air injection is performed on the inner side of the screw hole on the delivery side. 空気噴射は噴口に近い側のねじ孔開口部近傍部分に対して行われるように前記噴口が配置してある請求項4記載の部品供給制御装置。  The component supply control device according to claim 4, wherein the nozzle is arranged so that air injection is performed on a portion near the screw hole opening on the side close to the nozzle. 前記通路部材の一部を着脱可能にして交換用部材を構成し、この交換用部材に前記進退動作式のストッパ部材と前記噴口が設置され、複数準備された交換用部材に各部品の形状や寸法に応じた前記適合間隔と前記適合傾斜角度が形成されている請求項1〜請求項5のいずれかに記載の部品供給制御装置。  A part of the passage member is detachably configured to constitute a replacement member. The replacement member is provided with the advancing / retracting stopper member and the injection port. The component supply control device according to claim 1, wherein the fitting interval and the fitting inclination angle corresponding to dimensions are formed.
JP2006202545A 2006-06-26 2006-06-26 Parts supply control device Active JP4529166B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006202545A JP4529166B2 (en) 2006-06-26 2006-06-26 Parts supply control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006202545A JP4529166B2 (en) 2006-06-26 2006-06-26 Parts supply control device

Publications (2)

Publication Number Publication Date
JP2008007326A true JP2008007326A (en) 2008-01-17
JP4529166B2 JP4529166B2 (en) 2010-08-25

Family

ID=39065855

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006202545A Active JP4529166B2 (en) 2006-06-26 2006-06-26 Parts supply control device

Country Status (1)

Country Link
JP (1) JP4529166B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010095380A (en) * 2008-10-15 2010-04-30 Yoshitaka Aoyama Component carrying control device
KR20160094701A (en) * 2015-02-02 2016-08-10 에스티에스 주식회사 A Lens Feeder for Suppling a Plural Lens

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62133527U (en) * 1986-02-15 1987-08-22
JPS63130430U (en) * 1987-02-14 1988-08-25
JPH05193736A (en) * 1992-01-21 1993-08-03 Yoshitaka Aoyama Parts supply control device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62133527U (en) * 1986-02-15 1987-08-22
JPS63130430U (en) * 1987-02-14 1988-08-25
JPH05193736A (en) * 1992-01-21 1993-08-03 Yoshitaka Aoyama Parts supply control device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010095380A (en) * 2008-10-15 2010-04-30 Yoshitaka Aoyama Component carrying control device
KR20160094701A (en) * 2015-02-02 2016-08-10 에스티에스 주식회사 A Lens Feeder for Suppling a Plural Lens
KR101700857B1 (en) * 2015-02-02 2017-01-31 에스티에스 주식회사 A Lens Feeder for Suppling a Plural Lens

Also Published As

Publication number Publication date
JP4529166B2 (en) 2010-08-25

Similar Documents

Publication Publication Date Title
JP4529166B2 (en) Parts supply control device
JP5934514B2 (en) Article supply apparatus having vacuum suction head
KR101944889B1 (en) Apparatus for manufacturing welding stud bolt
JP6736010B2 (en) Parts storage type parts feeder
JP2009056579A (en) Feeding auxiliary device for shaft-like component
JP4614174B2 (en) Parts delivery device
JP2007320769A (en) Parts feeder
EP1595707A3 (en) Image forming apparatus
JP2008213032A (en) Device for controlling passage of projection bolt
JP2001314975A (en) Apparatus for welding projection bolt
JP7185898B2 (en) bolt feeder
KR200381222Y1 (en) Do nut supply chapter of spot welding appointment site feeder
JP2008179471A (en) Component carrying passage device
JP3689847B2 (en) Method and apparatus for supplying flanged shaft-like parts
JP2000317644A (en) Method for feeding parts to composite welding machine
JP2008200842A (en) Device and method for bolt fastening
JP2008246575A (en) Method and apparatus for welding projection bolt
JP3646203B2 (en) Projection bolt welding equipment
JP3716116B2 (en) Stud welding equipment
CN113798643B (en) Stud welding gun and cleaning method thereof
JP5686257B2 (en) Holding head structure of component feeder
JPH09220676A (en) Parts supplying rod equipment and supplying method thereby
JP5954563B2 (en) Shaft-shaped parts supply device
JP4529165B2 (en) Parts delivery control device
JP2010001154A (en) Component distributing/feeding device, and distributing/feeding method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100121

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100202

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100323

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100511

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100528

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20190618

Year of fee payment: 9

R250 Receipt of annual fees