JP2007241869A - Work information providing system, server and work information providing method - Google Patents

Work information providing system, server and work information providing method Download PDF

Info

Publication number
JP2007241869A
JP2007241869A JP2006066200A JP2006066200A JP2007241869A JP 2007241869 A JP2007241869 A JP 2007241869A JP 2006066200 A JP2006066200 A JP 2006066200A JP 2006066200 A JP2006066200 A JP 2006066200A JP 2007241869 A JP2007241869 A JP 2007241869A
Authority
JP
Japan
Prior art keywords
work
information
applicant
display
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2006066200A
Other languages
Japanese (ja)
Inventor
Teruo Iwanari
輝雄 岩成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006066200A priority Critical patent/JP2007241869A/en
Publication of JP2007241869A publication Critical patent/JP2007241869A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To reasonably urge a proposer to adjust working time by notifying the proposer of work information in which desired working time and working time are overlapped in an applying stage. <P>SOLUTION: Display information about work place information of a desired work place is transmitted to a requesting place terminal 20 through a network 60 on the basis of the desired work place sent from the requesting place terminal 20, and the CPU 21 of the requesting place terminal 20 displays the display information on a display 28. A CPU 11 retrieves whether other work information in which working time overlaps exists in an HDD 15 on the basis of the desired working time input on the basis of the display information and included in input information sent from the requesting place terminal 20, and transmits the display information about the overlapping work information to the requesting place terminal 20 through the network 60 when the work information in which working time overlaps, and the CPU 21 displays the display information on the display 28. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

この発明は、申込者が希望する作業期間と重複する作業に係る作業情報を申込者に知らせる作業情報提供システム、サーバおよび作業情報提供方法に関する。   The present invention relates to a work information providing system, a server, and a work information providing method for notifying an applicant of work information related to work overlapping with a work period desired by an applicant.

詳しくは、この発明は、作業情報を管理するサーバが、ネットワークを介して申込者側端末から送られてくる入力情報に基づいて、この入力情報に含まれる希望作業期間と作業日程が重複する作業情報に係る表示情報を申込者側端末に送信することによって、申込者に作業期間が重複した作業情報を申し込み段階で知らせて無理なく作業期間の調整を促すようにした作業情報提供システム等に係わるものである。   Specifically, according to the present invention, the server that manages the work information is a work in which the desired work period and the work schedule included in the input information overlap based on the input information sent from the applicant side terminal via the network. By sending display information related to the information to the applicant's terminal, the work information provision system that informs the applicant of work information with overlapping work periods at the application stage and facilitates adjustment of the work period without difficulty. Is.

従来、電力会社において停電を伴う作業を行う場合、停電調整箇所は給電規程に基づき、供給信頼度(電力を安定して供給する基準)の確保、効率的な発電、停電期間短縮を目的として作業調整をするため、作業年度の1年前に申し込みを受け付け、申込者は申し込みを行う際に、上記のことを考慮しなければならなかった。   Conventionally, when working with a power outage at an electric power company, the power outage adjustment points are based on the power supply regulations to ensure supply reliability (standard for stable power supply), efficient power generation, and shortening the power outage period. In order to make adjustments, the application was accepted one year before the working year, and the applicant had to consider the above when applying.

このため、申込者は、資機材調達を行いつつ、作業場所が水力発電所である場合等には、必要に応じて需給電力および河川流入量の聞き取り等を行って、なるべく他の作業と同じ期間で作業を行うことが望まれた。   For this reason, the applicant, when procuring materials and equipment, when the work place is a hydroelectric power station, etc., listens to the supply and demand power and river inflow as necessary, etc. It was desired to work in a period.

そこで、従来、電力会社における停電を伴う作業の作業期間の調整を自動的に行う作業停電計画システムが考案されている(特許文献1参照)。この作業停電計画システムは、複数の申込者(作業要求者)側端末で入力された入力情報(作業件名)をサーバが集約して、作業件名の日時を自動的に調整するものである。これにより、複数の作業が同じ期間に重複して行われるようになり、電力会社の停電期間を短縮することが容易となった。   In view of this, a work blackout planning system has been devised that automatically adjusts the work period of work involving a power failure in an electric power company (see Patent Document 1). In this work outage planning system, a server aggregates input information (work titles) input at a plurality of applicant (work requester) side terminals, and automatically adjusts the date and time of the work title. As a result, a plurality of operations are performed in duplicate during the same period, making it easy to shorten the power outage period of the power company.

特開2003−111276号公報Japanese Patent Laid-Open No. 2003-111276

しかし、特許文献1に記載の作業停電計画システムは、作業期間を自動的に調整して停電期間の短縮化には貢献したものの、これによって、各作業場所で同じ期間に複数の大規模な作業が重なることがあり、作業員の確保ができないという問題が生じた。   However, although the work outage planning system described in Patent Document 1 has automatically adjusted the work period and contributed to shortening the power outage period, a plurality of large-scale work in the same period at each work place. There was a problem that workers could not be secured.

また、この作業停電計画システムでは、申込者が申し込みを行う際に、他の申込者の申し込み状況を把握することができなかったため、直前になって作業員の確保が困難であることがわかった場合には、申込者は作業期間を調節しなおさなければならず、これに伴い、需給電力および河川流入量の聞き取り等を再度行わなければならなかった。   Also, in this work outage planning system, it was found that it was difficult to secure workers just before because the applicant could not grasp the application status of other applicants when applying. In some cases, the applicant had to re-adjust the work period, and as a result, the supply and demand power and the amount of river inflow had to be heard again.

この発明の目的は、申込者に作業期間が重複した作業情報を申し込み段階で知らせて、無理なく作業期間の調整を促すことにある。   An object of the present invention is to inform the applicant of work information with overlapping work periods at the application stage, and to facilitate adjustment of the work period without difficulty.

この発明の概念は、
作業の申し込みを行うための申込者側端末と、上記申込者側端末にネットワークを介して接続され、少なくとも作業場所、作業期間、作業内容および作業担当者に関する情報を含む作業情報を管理するサーバとで構成され、
上記サーバは、
上記作業情報を記憶する記憶部と、
上記申込者側端末から送られてくる入力画面読み出し要求に応じて、入力画面を表示するための第1の表示情報を送信する第1の送信制御部と、
上記申込者側端末から送られてくる、希望作業期間を少なくとも含む入力情報を受信する受信制御部と、
上記受信制御部で受信した上記入力情報に基づいて、上記入力情報に含まれる上記希望作業期間と作業期間が重複する作業情報を上記記憶部から読み出し、上記重複する作業情報に係る第2の表示情報を、上記ネットワークを介して上記申込者側端末に送信する第2の送信制御部とを有する
ことを特徴とする作業情報提供システムにある。
The concept of this invention is
An applicant-side terminal for applying for work; a server connected to the applicant-side terminal via a network for managing work information including at least work location, work period, work content, and information on a person in charge of work; Consists of
The server
A storage unit for storing the work information;
A first transmission control unit that transmits first display information for displaying an input screen in response to an input screen read request sent from the applicant-side terminal;
A reception control unit that receives input information including at least a desired work period sent from the applicant-side terminal;
Based on the input information received by the reception control unit, the work information in which the desired work period and the work period included in the input information overlap is read from the storage unit, and the second display relating to the overlapped work information And a second transmission control unit configured to transmit information to the applicant-side terminal via the network.

この発明において、サーバは、ネットワークを介して、申込者側端末に接続されている。申込者とは、作業の申し込みを行う者のことであり、申込者側端末は、例えば、電力会社内の工事、点検を行う箇所に設置されている。   In the present invention, the server is connected to the applicant side terminal via the network. The applicant is a person who applies for work, and the applicant-side terminal is installed, for example, at a place where construction and inspection are performed in an electric power company.

また、このサーバは、作業情報を管理している。作業情報は、少なくとも、作業場所(例えば、発電所、変電所、送電線等)、作業期間、作業内容、および作業担当者に関する情報を含んでいる。作業担当者に関する情報とは、例えば、作業担当者の名前や連絡先等である。これらの情報は、記憶部に記憶されている。   In addition, this server manages work information. The work information includes at least information on a work place (for example, a power plant, a substation, a power transmission line, etc.), a work period, work contents, and a worker. The information regarding the person in charge of work is, for example, the name or contact information of the person in charge of work. These pieces of information are stored in the storage unit.

また、上述した作業情報に加えて、作業場所に係る作業場所情報を記憶するようにしてもよい。作業場所情報とは、例えば、作業場所が水力発電所である場合には、過去何年間の河川流入量およびこの水力発電所の発電電力量、そして、これらの情報に基づいて計算された来年度の予想河川流入量および予想発電電力量である。   In addition to the work information described above, work place information related to the work place may be stored. For example, if the work place is a hydroelectric power plant, the amount of river inflow in the past years and the amount of power generated by this hydroelectric power plant, and the next year calculated based on these information Expected river inflow and expected power generation.

このように来年度の予想河川流入量および予想発電電力量を記憶するのは、停電を伴う作業の申し込みは、作業開始年度の前年に計画されて申し込みが行われることになっているためである。   The reason why the predicted river inflow amount and the predicted power generation amount for the next fiscal year are stored in this way is that the application for work involving a power outage is planned and made in the previous year of the work start year.

サーバは、ネットワークを介して申込者側端末から送られてくる入力画面の読み出し要求に応じて、入力画面を表示するための第1の表示情報を申込者側端末に送信する。申込者側端末のディスプレイには、例えば、申込者が作業を希望する希望作業期間および希望作業場所を入力するための、入力画面が表示される。   The server transmits first display information for displaying the input screen to the applicant side terminal in response to the input screen read request sent from the applicant side terminal via the network. For example, an input screen for inputting a desired work period and a desired work place that the applicant desires to perform is displayed on the display of the applicant side terminal.

また、このとき、希望作業場所を特定する情報が入力画面の読み出し要求に含まれている場合には、上述した作業場所情報のうち、希望作業場所の作業情報を記憶部から読み出して表示するようにしてもよい。作業場所情報が入力画面と併せて表示されることで、例えば、作業場所が水力発電所である場合には、申込者は電力供給信頼度に影響がない時期や、溢水電力を伴わない、あるいは少ない時期を容易に把握することができるとともに、需給電力や河川流入量等の聞き取りを行う手間を省くことができる。   At this time, when the information for specifying the desired work place is included in the input screen read request, the work information of the desired work place is read out from the storage unit and displayed among the work place information described above. It may be. By displaying the work place information together with the input screen, for example, when the work place is a hydroelectric power station, the applicant does not affect the power supply reliability, does not accompany overflow power, or In addition to being able to easily grasp the time when there is little time, it is possible to save time and effort to listen to power supply and demand and river inflow.

申込者は、表示された入力画面を見て、作業を行ってもその作業場所の需給電力に影響がないと思われる期間を選択して、入力画面に、少なくとも、希望作業期間、希望作業場所を入力して、この入力情報を、ネットワークを介してサーバに送信する。   The applicant looks at the displayed input screen, selects a period that does not affect the power supply and demand of the work place even if the work is performed, and displays at least the desired work period and the desired work place on the input screen. This input information is transmitted to the server via the network.

サーバは、この入力情報を受信して、この入力情報に含まれる希望作業期間と重複する作業期間で申し込まれた作業情報が記憶部に記憶されているかを検索し、重複する作業情報がある場合、サーバは、その重複する作業情報に係る第2の表示情報を、ネットワークを介して申込者側端末に送信する。   When the server receives this input information, searches the storage unit for work information applied in a work period overlapping with the desired work period included in the input information, and there is duplicate work information The server transmits the second display information related to the overlapping work information to the applicant side terminal via the network.

第2の表示情報は、重複する作業の作業期間、作業場所、作業内容、および作業担当者に関する情報(担当者名、担当者の連絡先等)を少なくとも含んでおり、この第2の表示情報を申込者側端末に送信することで、申込者は、希望作業期間と作業期間が重複する他の作業情報を、申し込む前の段階で容易に把握することができる。   The second display information includes at least information about the work period, work place, work content, and work person in charge of duplicate work (name of person in charge, contact information of the person in charge, etc.). Is transmitted to the applicant side terminal, so that the applicant can easily grasp other work information whose work period overlaps with the desired work period at the stage before applying.

申込者は、表示される表示内容を見て、作業内容から作業員の確保が困難であると判断する場合は、作業期間を調整しなおして、調整後の希望作業期間を入力画面に再度入力するようにしてもよいし、また、作業内容から作業員の確保に問題がないと判断する場合は、このまま申し込みを行うようにしてもよい。   If the applicant looks at the displayed content and determines that it is difficult to secure workers from the work content, the applicant adjusts the work period again and re-enters the desired work period after adjustment on the input screen. In addition, when it is determined from the work content that there is no problem in securing workers, the application may be made as it is.

このように、サーバが申し込み段階で希望作業期間と作業期間が重複する作業を知らせることができるので、申込者に無理なく作業期間の調整を促すことができる。   As described above, since the server can notify the work in which the desired work period and the work period overlap at the application stage, the applicant can be urged to adjust the work period without difficulty.

この発明によれば、作業情報を管理するサーバが、ネットワークを介して申込者側端末から送られてくる入力情報に基づいて、この入力情報に含まれる希望作業期間と作業日程が重複する作業情報に係る表示情報を申込者側端末に送信するものであり、申込者に作業期間が重複した作業情報を申し込み段階で知らせて無理なく作業期間の調整を促すことができる。   According to this invention, based on the input information sent from the applicant side terminal via the network, the server that manages the work information, the work information in which the desired work period and the work schedule included in this input information overlap. The display information according to the above is transmitted to the terminal on the applicant side, and the applicant can be notified of the work information with the overlapped work period at the application stage, and can be urged to adjust the work period without difficulty.

以下、この発明の実施の形態について説明を行う。   Embodiments of the present invention will be described below.

図1は、この発明の実施の形態である、作業情報提供システム100の構成を示す図である。以下、図1を用いて作業情報提供システム100の構成について説明する。   FIG. 1 is a diagram showing a configuration of a work information providing system 100 according to an embodiment of the present invention. Hereinafter, the configuration of the work information providing system 100 will be described with reference to FIG.

図1に示すように、作業情報提供システム100は、サーバ10と、このサーバ10とそれぞれネットワーク60を介して接続された、申込者側端末としての要求箇所端末20と、調整箇所端末30と、決定箇所端末40と、情報提供端末50とからなる。また、このネットワーク60は、例えば、社内LAN(Local Area Network)またはインターネットで構成されている。   As shown in FIG. 1, the work information providing system 100 includes a server 10, a request location terminal 20 as an applicant-side terminal connected to the server 10 via a network 60, an adjustment location terminal 30, The decision point terminal 40 and the information providing terminal 50 are included. The network 60 is configured by, for example, an in-house LAN (Local Area Network) or the Internet.

要求箇所端末20は、例えば、作業を行う工事担当箇所等にあり、電力会社に停電を伴った作業の申し込みを行うために使用される端末である。なお、図1においては、要求箇所端末20は一つのみ示されているが、実際には複数個がネットワーク60に接続されている。   The request location terminal 20 is, for example, a location that is in a construction charge location where work is performed, and is a terminal used to apply to a power company for work involving a power failure. In FIG. 1, only one request location terminal 20 is shown, but a plurality of request location terminals 20 are actually connected to the network 60.

調整箇所端末30は、例えば制御所に設置され、申し込まれた作業によって生じる停電が、電力供給信頼度を下げない程度であるかを計算するため等に用いられる。また、決定箇所端末40は、例えば、制御所、基幹給電制御所、中央給電指令所に設置され、調整箇所端末30から送られてくる計算値に基づいて、作業の申し込み内容を受け付けるか否かを決定するために用いられる。また、情報提供端末50は、例えば、制御所、基幹給電制御所、中央給電指令所、あるいは土木課に設置され、電力需給・河川状況の把握や、故障が発生した箇所などを報告する際に用いられる。   The adjustment location terminal 30 is installed in, for example, a control center, and is used to calculate whether or not a power failure caused by the applied work does not lower the power supply reliability. In addition, the determination location terminal 40 is installed at, for example, a control station, a main power supply control location, and a central power supply command location, and whether or not to accept work application content based on a calculated value sent from the adjustment location terminal 30. Used to determine In addition, the information providing terminal 50 is installed at, for example, a control station, a main power supply control station, a central power supply command station, or the civil engineering section to grasp the power supply / demand / river status, or to report a location where a failure has occurred. Used.

図2は、サーバ10および要求箇所端末20の詳細な構成を示す図である。以下、図2を用いてサーバ10および要求箇所端末20の説明を行う。   FIG. 2 is a diagram showing a detailed configuration of the server 10 and the request location terminal 20. Hereinafter, the server 10 and the request location terminal 20 will be described with reference to FIG.

サーバ10は、図2に示すように、CPU(Central Processing Unit)11と、RAM(Random Access Memory)12と、ROM(Read Only Memory)13と、ネットワークI/F(Interface)14aと、入出力I/F(Interface)14bと、記憶部としてのHDD(Hard Disk Drive)15とを有しており、これらはバス19に接続されている。また、入出力I/F14bには、ユーザーインターフェイスとしてのキーボード16と、マウス17と、ディスプレイ18とが接続されている。   As shown in FIG. 2, the server 10 includes a CPU (Central Processing Unit) 11, a RAM (Random Access Memory) 12, a ROM (Read Only Memory) 13, a network I / F (Interface) 14a, and an input / output. An I / F (Interface) 14 b and an HDD (Hard Disk Drive) 15 as a storage unit are included, and these are connected to a bus 19. The input / output I / F 14b is connected to a keyboard 16 as a user interface, a mouse 17, and a display 18.

CPU11は、サーバ10の全体の動作を制御するものである。RAM12は、CPU11のワーキングエリアとして機能する。ROM13は、CPU11の動作を制御するための、制御プログラムやデータ等を格納している。CPU11は、ROM13に格納されている制御プログラムを必要に応じて読み出し、RAM12に転送して展開する。そして、CPU11は、RAM12に展開された制御プログラムを読み出して実行することで、サーバ10の各部を制御する。   The CPU 11 controls the overall operation of the server 10. The RAM 12 functions as a working area for the CPU 11. The ROM 13 stores a control program and data for controlling the operation of the CPU 11. The CPU 11 reads out the control program stored in the ROM 13 as necessary, transfers it to the RAM 12 and develops it. And CPU11 controls each part of the server 10 by reading and executing the control program expand | deployed by RAM12.

ネットワークI/F14aは、ネットワーク60を介してデータの送受信を行うためのインターフェイスである。また、入出力I/F14bは、データのやり取りの制御方法などを規定する。キーボード16やマウス17によって操作された入力情報は、入出力I/F14bを介してCPU11によって処理される。また、CPU11によって制御される表示情報も、入出力I/F14bを介してディスプレイ18に表示される。ディスプレイ18は、LCD(Liquid Crystal Display)等の表示器によって構成されている。   The network I / F 14 a is an interface for transmitting and receiving data via the network 60. The input / output I / F 14b defines a data exchange control method and the like. Input information operated by the keyboard 16 and the mouse 17 is processed by the CPU 11 via the input / output I / F 14b. Display information controlled by the CPU 11 is also displayed on the display 18 via the input / output I / F 14b. The display 18 includes a display device such as an LCD (Liquid Crystal Display).

HDD15は、申し込まれた作業に係る複数の作業情報を記憶している。作業情報とは、停電を伴う作業に関する情報のことであり、HDD15は、各作業の作業場所、作業期間、作業に伴って発電に支障をきたす発電支障期間、作業担当者の名前、所属箇所および連絡先を記憶している。   The HDD 15 stores a plurality of pieces of work information related to the applied work. The work information is information related to work involving a power failure, and the HDD 15 has a work place, a work period, a power generation trouble period that hinders power generation accompanying the work, the name of the person in charge, the belonging part, Remember your contact information.

また、HDD15は、作業場所に係る作業場所情報を記憶している。作業場所情報とは、例えば、作業場所が水力発電所である場合は、過去3年分の河川流入量の実績値、過去3年分の総発電電力量、配電総合、そしてこれらに基づいて算出された、来年度の河川流入量、総発電電力量、配電総合の各予想値を含む。HDD15は記憶部を構成している。   Further, the HDD 15 stores work place information related to the work place. For example, when the work place is a hydroelectric power station, the work place information is calculated based on the actual value of the river inflow for the past three years, the total amount of generated power for the past three years, the total power distribution, and these. Including the estimated amount of river inflow, total power generation, and total power distribution for the next fiscal year. The HDD 15 constitutes a storage unit.

要求箇所端末20は、同じく図2に示すように、CPU21と、RAM22と、ROM23と、ネットワークI/F24aと、入出力I/F24bと、HDD25とを有しており、これらはバス29に接続されている。また、入出力I/F24bには、キーボード26と、マウス27と、ディスプレイ28とが接続されている。各部の構成および動作については、上述したサーバ10の対応する部分と同じであるので、その詳細については説明を省略する。   As shown in FIG. 2, the request location terminal 20 includes a CPU 21, a RAM 22, a ROM 23, a network I / F 24 a, an input / output I / F 24 b, and an HDD 25, which are connected to a bus 29. Has been. A keyboard 26, a mouse 27, and a display 28 are connected to the input / output I / F 24b. About the structure and operation | movement of each part, since it is the same as the corresponding part of the server 10 mentioned above, description is abbreviate | omitted for the detail.

また、調整箇所端末30、決定箇所端末40、および情報提供端末50の詳細な構成および動作については、サーバ10および要求箇所端末20と同じであるので、説明を省略する。   Further, since the detailed configurations and operations of the adjustment location terminal 30, the determination location terminal 40, and the information provision terminal 50 are the same as those of the server 10 and the request location terminal 20, the description thereof is omitted.

図3は、要求箇所端末20から申し込みを受けた際の、サーバ10のCPU11の動作を示すフローチャートである。次に、図3を用いて、申込者によって作業の申し込みがされる際のCPU11の動作について説明する。   FIG. 3 is a flowchart showing the operation of the CPU 11 of the server 10 when receiving an application from the request location terminal 20. Next, the operation of the CPU 11 when an application for work is applied by the applicant will be described with reference to FIG.

まず、CPU11は、ステップST1で要求箇所端末20から、ネットワーク60を介して作業場所を入力する入力画面の読み出し要求を受信して、動作をスタートする。CPU11は、ステップST2で、ステップST1で送られてきた読み出し要求に応じて、作業場所を入力する入力画面を表示するための表示情報を、ネットワーク60を介して要求箇所端末20に送信する。   First, in step ST1, the CPU 11 receives an input screen read request for inputting a work location from the request location terminal 20 via the network 60, and starts operation. In step ST <b> 2, the CPU 11 transmits display information for displaying an input screen for inputting a work place to the request location terminal 20 via the network 60 in response to the read request sent in step ST <b> 1.

要求箇所端末のCPU21は、この表示情報をネットワークI/F24aで受信し、バス29、入出力I/F24bを介してディスプレイ28に供給する。ディスプレイ28には、図4に示す表示情報が表示される。   The CPU 21 of the request location terminal receives this display information by the network I / F 24a and supplies it to the display 28 via the bus 29 and the input / output I / F 24b. Display information shown in FIG. 4 is displayed on the display 28.

図4は、作業を希望する作業場所(希望作業場所)を入力するための入力画面である。入力画面には、作業場所としての発電所、変電所、送電線、ダムが縦に並んで表示され、申込者が各項目の右側に表示されたボックスから、作業場所を、マウス27を用いて選択するように構成されている。   FIG. 4 is an input screen for inputting a work place where the work is desired (desired work place). On the input screen, power plants, substations, power transmission lines, and dams as work places are displayed vertically, and the applicant uses the mouse 27 to select the work place from the box displayed on the right side of each item. Configured to select.

例えば、申込者は、A発電所を希望する場合、発電所の右側にあるボックスの矢印を選択すると表示される複数の発電所の中から、A発電所をマウス27で選択する。また、キーボード26で発電所名を手入力することも可能である。選択または手入力されたA発電所は、図4に示すように、大きく表示される。この後、申込者は、下部に表示された「確認」と書かれたボタンをマウス27で選択する。   For example, when the applicant desires the A power plant, the applicant selects the A power plant with the mouse 27 from the plurality of power plants displayed when the arrow in the box on the right side of the power plant is selected. It is also possible to manually input the power plant name using the keyboard 26. The selected or manually entered power plant A is displayed large as shown in FIG. Thereafter, the applicant selects the button labeled “Confirm” displayed at the bottom with the mouse 27.

確認ボタンが選択されると、CPU11は、ステップST3で、希望作業場所に関する入力情報を受信したと判断し、ステップST4に進む。なお、この入力情報を受信するまで、CPU11はステップST3の動作を繰り返し、ステップST15で所定時間(例えば10分)が経過したと判断すると、ステップST18で動作を終了する。   When the confirmation button is selected, the CPU 11 determines in step ST3 that input information related to the desired work place has been received, and proceeds to step ST4. Until receiving this input information, the CPU 11 repeats the operation of step ST3. When it is determined in step ST15 that a predetermined time (for example, 10 minutes) has elapsed, the operation ends in step ST18.

ステップST4では、CPU11は、A発電所に係る作業場所情報をHDD15から読み出し、ステップST5で、このA発電所に係る作業場所情報を表示するための表示情報を、ネットワークI/F14a、ネットワーク60を介して、要求箇所端末20に送信する。   In step ST4, the CPU 11 reads the work location information relating to the A power plant from the HDD 15, and in step ST5, the display information for displaying the work location information relating to the A power plant is displayed on the network I / F 14a and the network 60. To the request location terminal 20.

要求箇所端末20のCPU21は、送られてきた表示情報をネットワークI/F24aで受信し、バス29、入出力I/F24bを介してディスプレイ28に供給する。図5は、このときディスプレイ28に表示される表示例を示した図である。図5に示すように、ディスプレイ28の画面には、A発電所の、2006年度(来年度)の9月の各予想値が日にちごとに表示されている。ここでは9月の予想値が表示されているが、9月に限らず、申込者がアクセスした日付に合わせた月を初めに表示するようにしている。   The CPU 21 of the request location terminal 20 receives the transmitted display information by the network I / F 24a and supplies it to the display 28 via the bus 29 and the input / output I / F 24b. FIG. 5 is a diagram showing a display example displayed on the display 28 at this time. As shown in FIG. 5, on the screen of the display 28, predicted values for September of September 2006 (next year) of the power plant A are displayed for each day. Here, the predicted value for September is displayed. However, not only September, but the month corresponding to the date accessed by the applicant is displayed first.

また、図5に示すように、上述した「来年予想値」とともに、「過去1年実績値」、「過去2年実績値」、「過去3年実績値」が書かれた3つのボタンが並べて表示されている。例えば、「過去1年実績値」をマウス27で選択すると、前年の9月の実績値が表示される。なお、表示する月を変更する際は、画面の中央に示す、月を選択するための矢印を選択して、表示を希望する月を選択する。   Further, as shown in FIG. 5, in addition to the above-mentioned “next year forecast value”, three buttons in which “the past one year actual value”, “the past two year actual value” and “the past three year actual value” are written are arranged. It is displayed. For example, when “past one year actual value” is selected with the mouse 27, the previous September actual value is displayed. When changing the month to be displayed, the arrow for selecting the month shown in the center of the screen is selected, and the month desired to be displayed is selected.

申込者は図5に示す作業場所情報を見て、作業を行うにあたって、最適な期間を判断し、「入力画面に進む」と書かれたボタンをマウス27を用いて選択する。このボタンが選択されると、サーバ10のCPU11は、ステップST6で、入力画面の読み出し要求を受信したと判断し、ステップST7で入力画面の表示情報(第1の表示情報)をネットワーク60を介して要求箇所端末20に送信する。このとき、CPU11は第1の送信制御部を構成している。   The applicant looks at the work location information shown in FIG. 5, determines the optimum period for performing the work, and selects the button “go to input screen” using the mouse 27. When this button is selected, the CPU 11 of the server 10 determines that the input screen read request has been received in step ST6, and displays the input screen display information (first display information) via the network 60 in step ST7. To the request location terminal 20. At this time, the CPU 11 constitutes a first transmission control unit.

また、逆に、ステップST6で読み出し要求を受信していないと判断し、所定時間が経過していれば(ステップST16)、ステップST18で動作を終了する。所定時間が経過していない場合は、ステップST6およびステップST16の動作を繰り返す。   Conversely, if it is determined in step ST6 that a read request has not been received and a predetermined time has elapsed (step ST16), the operation ends in step ST18. If the predetermined time has not elapsed, the operations of step ST6 and step ST16 are repeated.

要求箇所端末20のCPU21は、この表示情報をネットワークI/F24aで受信し、ディスプレイ28に供給する。図6は、このときディスプレイ28に表示される入力画面を示した図である。図6に示すように、希望作業場所であるA発電所が左上に表示されており、その右には、件名、つまり作業内容を入力するための項目がある。その下には、作業期間および発電に支障がでる期間を入力するための項目がある。   The CPU 21 of the request location terminal 20 receives this display information by the network I / F 24 a and supplies it to the display 28. FIG. 6 is a diagram showing an input screen displayed on the display 28 at this time. As shown in FIG. 6, the power plant A, which is the desired work location, is displayed on the upper left, and on the right is an item for inputting the subject, that is, the work content. Below that, there are items for entering the work period and the period during which power generation is hindered.

発電に支障がでる期間を入力するのは、例えば、A発電所とC発電所とで同じ期間に停電を伴う作業が行われる場合、電力供給信頼度に支障が生じるおそれがあるためである。この項目は調整機関および決定箇所によってチェックされる。逆に、この項目に期間が記入されなければ、発電に支障のない作業であることがわかる。   The reason for inputting the period during which power generation is hindered is that, for example, when work involving a power failure is performed at the A power station and the C power station during the same period, there is a possibility that power supply reliability may be hindered. This item is checked by the coordinating body and the decision point. On the contrary, if the period is not entered in this item, it is understood that the work does not hinder power generation.

申込者は、キーボード26を用いて、件名、作業日時、およびA発電所の発電に支障がでる期間の入力を行う。また、その下には、作業が毎日連続して行われるのか、あるいは断続的に行われるものなのかを選択する項目があり、いずれかをマウス27で選択する。下部には、担当者の名前、所属箇所、連絡先を入力する項目があり、申込者は、キーボード26を用いて入力する。   The applicant uses the keyboard 26 to input the subject, the work date and time, and the period during which the power generation at the A power plant is hindered. Below that, there is an item for selecting whether the work is performed continuously every day or intermittently, and one of them is selected with the mouse 27. At the bottom, there are items for inputting the name, affiliation location, and contact information of the person in charge, and the applicant inputs using the keyboard 26.

全ての項目の入力が終わると、申込者によって、右下にある「申し込む」と書かれたボタンがマウス27で選択される。CPU21は、ネットワークI/F24a、ネットワーク60を介して、この入力された入力画面(入力情報)をサーバ10に送信する。   When all the items have been entered, the applicant selects the button “Apply” on the lower right with the mouse 27. The CPU 21 transmits this input screen (input information) to the server 10 via the network I / F 24a and the network 60.

サーバ10のCPU11は、ネットワークI/F14aで送られてくる入力情報を受信すると、ステップST8で入力情報を受信したと判断する。このときCPU11は受信制御部を構成している。この後、CPU11はステップST9でHDD15が記憶する作業情報の中に、入力情報に含まれる作業期間と重複する作業があるかを検索する。   When the CPU 11 of the server 10 receives the input information sent through the network I / F 14a, it determines that the input information has been received in step ST8. At this time, the CPU 11 constitutes a reception control unit. Thereafter, in step ST9, the CPU 11 searches the work information stored in the HDD 15 for a work that overlaps the work period included in the input information.

逆に、申込者が入力情報を送信しなかった場合等、CPU11がステップST8で入力情報を受信していないと判断し、ステップST17で所定時間が経過したと判断した場合は、ステップST18で一連の動作を終了する。   On the contrary, when the applicant does not transmit the input information, for example, the CPU 11 determines that the input information is not received in step ST8, and when it is determined that the predetermined time has passed in step ST17, the series of steps is performed in step ST18. End the operation.

CPU11は、ステップST9で検索した結果、ステップST10で作業期間が重複する作業情報があると判断した場合は、ステップST11で、その重複する作業情報に係る表示情報(第2の表示情報)を、ネットワーク60を介して要求箇所端末20に送信する。このときCPU11は第2の送信制御部を構成している。   As a result of the search in step ST9, if the CPU 11 determines that there is work information having a duplicate work period in step ST10, the CPU 11 displays the display information (second display information) related to the duplicate work information in step ST11. The data is transmitted to the request location terminal 20 via the network 60. At this time, the CPU 11 constitutes a second transmission control unit.

要求箇所端末20のCPU21は、送られてきたこの表示情報をディスプレイ28に供給し、ディスプレイ28には図7に示す画面が表示される。   The CPU 21 of the request location terminal 20 supplies the display information sent to the display 28, and a screen shown in FIG.

図7に示すように、重複する作業があることが表示され、重複する作業の作業期間、発電支障がある期間、担当者の所属箇所、名前および連絡先が表示される。   As shown in FIG. 7, it is displayed that there is an overlapping work, the work period of the overlapping work, the period when there is a power generation trouble, the affiliation location, the name, and the contact information of the person in charge are displayed.

申込者は、この画面を見て、自分自身が申し込む作業と、この重複する作業とが同じ期間で行われたとしても、作業員の確保に問題はないかを判断する。また、件名および発電支障の欄を見て、A発電所およびB発電所が同時期に停電となることで、電力供給信頼度に影響がないかを総合的に判断する。申し込み者が、問題がないと判断すれば、マウス27を用いて画面の右下に表示される「申し込む」のボタンを選択する。   The applicant looks at this screen and determines whether there is no problem in securing the worker even if the work he / she applies for and the duplicate work are performed in the same period. Further, looking at the column of the subject and power generation trouble, it is comprehensively determined whether the power supply reliability is not affected by the power outage at the same time in the A power station and the B power station. If the applicant determines that there is no problem, the user selects the “Apply” button displayed at the lower right of the screen using the mouse 27.

このように「申し込む」のボタンが選択されると、CPU11は、ステップST12で申込者が申し込みを希望していると判断し、ステップST13に進む。また、ステップST10で、CPU11が、作業期間が重複する作業情報がないと判断した場合も、同じくステップST13に進む。   When the “apply” button is selected in this way, the CPU 11 determines in step ST12 that the applicant wishes to apply, and proceeds to step ST13. If the CPU 11 determines in step ST10 that there is no work information having a duplicate work period, the process proceeds to step ST13.

また、申込者が、図7に示す画面を見て、重複する作業が表示され、期間が重なることで発電に支障がでると判断するか、あるいは作業員の確保が難しいと判断する場合は、図7に示す「作業期間を調整する」と書かれたボタンが選択される。サーバ10のCPU11は、ステップST12で、申込者がこの作業期間での申込を希望していないと判断し、ステップST7に戻り、図6に示す入力画面の表示情報を再度要求箇所端末20に送信し、ステップST7からの動作が繰り返される。   In addition, if the applicant sees the screen shown in FIG. 7 and displays that the overlapping work is displayed and the period is overlapped, it is determined that the power generation is hindered, or if it is difficult to secure workers, The button labeled “Adjust work period” shown in FIG. 7 is selected. In step ST12, the CPU 11 of the server 10 determines that the applicant does not wish to apply for this work period, returns to step ST7, and transmits the display information on the input screen shown in FIG. Then, the operation from step ST7 is repeated.

CPU11はステップST13で、申し込みが完了したことを示す表示情報を、ネットワーク60を介して要求箇所端末20に送信する。要求箇所端末20のCPU21は、送られてくる表示情報をディスプレイ28に表示させる。図8は、このときディスプレイ28に表示される表示例である。   CPU11 transmits the display information which shows that the application was completed to the request | requirement location terminal 20 via the network 60 by step ST13. The CPU 21 of the request location terminal 20 displays the display information sent on the display 28. FIG. 8 is a display example displayed on the display 28 at this time.

また、図9に示すように、ステップST10で重複する作業がないと判断された場合は、ステップST13で重複する作業情報がないことが併記される。CPU11は、この後、ステップST14でHDD15に申し込み内容を記憶する。   Also, as shown in FIG. 9, when it is determined in step ST10 that there is no duplicate work, it is additionally written in step ST13 that there is no duplicate work information. Thereafter, the CPU 11 stores the application content in the HDD 15 in step ST14.

図8または図9に表示される画面おいて、左下に表示される「続けて申し込む」のボタンが申込者によってマウス27で選択されると、CPU11は、ステップST18で続けて申し込みを希望していると判断し、ステップST2からの動作を繰り返す。   In the screen displayed in FIG. 8 or FIG. 9, when the “continue application” button displayed in the lower left is selected by the applicant with the mouse 27, the CPU 11 wishes to apply continuously in step ST18. The operation from step ST2 is repeated.

また、ステップ18で続けて申し込みを希望していないと判断する場合であって、申込者によって図8および図9の右下に表示される「件名一覧表表示」のボタンが選択された場合は、CPU11はステップST19で申込者が件名の一覧表の表示を希望していると判断し、ステップST21で件名一覧表を作成した後、ステップST22で一覧表の表示情報を、ネットワーク60を介して要求箇所端末20に送信する。   If it is determined in step 18 that the application is not desired, and the “subject list display” button displayed at the lower right of FIGS. 8 and 9 is selected by the applicant, The CPU 11 determines in step ST19 that the applicant desires to display the subject list, creates the subject list in step ST21, and then displays the list display information via the network 60 in step ST22. It transmits to the request location terminal 20.

要求箇所端末20のCPU21は、送られてくる表示情報をディスプレイ28に表示させる。図10は、このときディスプレイ28に表示される表示例である。この後、CPU11はステップST23で一連の動作を終了する。   The CPU 21 of the request location terminal 20 displays the display information sent on the display 28. FIG. 10 is a display example displayed on the display 28 at this time. Then, CPU11 complete | finishes a series of operation | movement by step ST23.

また、ステップST19で件名の一覧表の表示を希望していないと判断し、ステップST20で所定時間が経過した場合も、ステップST23でCPU11は動作を終了する。   Also, if it is determined in step ST19 that the display of the subject list is not desired, and if a predetermined time has elapsed in step ST20, the CPU 11 ends the operation in step ST23.

以上、図3のフローチャートを用いて説明したような方法によって申し込みが完了すると、図10に示す年度停電作業計画一覧表(停電作業に限らず)が、要求箇所の所属長に確認されて、承認され、図1に示す調整箇所端末30に申し込み内容がEメール等を用いて送信される。   As described above, when the application is completed by the method described with reference to the flowchart of FIG. 3, the annual power failure work plan table (not limited to the power failure work) shown in FIG. Then, the application content is transmitted to the adjustment location terminal 30 shown in FIG. 1 using e-mail or the like.

調整箇所にいる人間は、送られてくる申し込み内容を見て、作業を行うことで作業員の人数は確保できるか、A発電所をその期間停電させることに問題はないか等をチェックして、問題がなければ、この申し込み内容がネットワーク60を介して、決定箇所端末40に、送信される。決定箇所にいる人間は、決定箇所端末40に送られた申し込み内容を見て、最終的な決定を下し、申込者に連絡する。   The person at the adjustment point looks at the contents of the application that is sent and checks whether the number of workers can be secured by performing the work and whether there is no problem in powering out the A power plant for that period. If there is no problem, the contents of the application are transmitted to the decision point terminal 40 via the network 60. The person at the decision point looks at the contents of the application sent to the decision point terminal 40, makes a final decision, and contacts the applicant.

このように、申込者が希望作業場所を入力すると、図5に示す作業場所情報が表示されるので、電話等による聞き取りを行うことなく、申込者は最適な作業期間を容易に把握することができる上、図6に示す入力画面に希望作業場所および希望作業期間を入力することで、図7に示すように、作業期間が重複した作業情報が表示され、申し込み段階に作業期間が重複した作業情報を知ることができるので、作業期間を無理なく調整しなおすことができる。   In this way, when the applicant inputs the desired work place, the work place information shown in FIG. 5 is displayed, so that the applicant can easily grasp the optimum work period without listening to the telephone or the like. In addition, by entering the desired work place and desired work period on the input screen shown in FIG. 6, work information with duplicate work periods is displayed as shown in FIG. 7, and work with duplicate work periods at the application stage is displayed. Since the information can be known, the work period can be adjusted without difficulty.

なお、上述の実施の形態においては、重複する作業情報に係る表示情報には、作業期間、発電支障がある期間、担当者の所属箇所、名前および連絡先が含まれていたが、その作業に必要な作業員数を併せて表示するようにしてもよい。この場合、申込者が申し込む際にも、入力画面に必要な作業員数を入力するための項目が、図6に示す入力画面に設けられる。   In the above-described embodiment, the display information related to the overlapping work information includes the work period, the period during which power generation is hindered, the location of the person in charge, the name, and the contact information. The required number of workers may be displayed together. In this case, when the applicant applies, an item for inputting the necessary number of workers on the input screen is provided on the input screen shown in FIG.

このように必要な作業員数を併せて表示することで、作業を重複する作業の作業期間と同じ期間に申し込んだ場合に、作業員の確保ができるのかを大体把握することができる。   By displaying the necessary number of workers together in this way, it is possible to roughly grasp whether or not workers can be secured when applying for the same work period as the work period of the overlapping work.

この発明は、作業情報を管理するサーバが、ネットワークを介して申込者側端末から送られてくる入力情報に基づいて、この入力情報に含まれる希望作業期間と作業日程が重複する作業情報に係る表示情報を申込者側端末に送信するものであって、発電所等の停電を伴う作業を申し込む際に適用することができる。   The present invention relates to work information in which a server for managing work information overlaps a desired work period and work schedule included in the input information based on input information sent from the applicant side terminal via the network. The display information is transmitted to the terminal on the applicant side, and can be applied when applying for work involving a power failure at a power plant or the like.

作業情報提供システム100の構成を示す図である。1 is a diagram illustrating a configuration of a work information providing system 100. FIG. サーバ10および要求箇所端末20の詳細な構成を示した図である。It is the figure which showed the detailed structure of the server 10 and the request | requirement location terminal 20. FIG. 要求箇所端末20が作業申込を行う際の、サーバ10のCPU11の動作を示すフローチャートである。It is a flowchart which shows operation | movement of CPU11 of the server 10 when the request | requirement location terminal 20 performs work application. 作業場所を入力するための入力画面の表示例である。It is an example of a display of the input screen for inputting a work place. A発電所の作業場所情報を表示した表示例である。It is the example of a display which displayed the work place information of A power plant. 入力画面を表示した表示例である。It is the example of a display which displayed the input screen. 作業期間が重複する作業情報を表示した表示例である。It is the example of a display which displayed the work information with which work periods overlap. 申し込みが完了したことを表示した表示例である。It is the example of a display which displayed that application was completed. 作業期間が重複する作業がなく、申し込みが完了したことを表示した表示例である。It is the example of a display which displayed that there was no work in which work periods overlap and the application was completed. 年度作業計画一覧表を表示した表示例である。It is the example of a display which displayed the annual work plan list.

符号の説明Explanation of symbols

10・・・サーバ、11,21・・・CPU、12,22・・・RAM、13,23・・・ROM、14a,24a・・・ネットワークI/F、14b,24b・・・入出力I/F、15,25・・・HDD、16,26・・・キーボード、17,27・・・マウス、18,28・・・ディスプレイ、19,29・・・バス、20・・・要求箇所端末、30・・・調整箇所端末、40・・・決定箇所端末、50・・・情報提供端末、100・・・作業情報提供システム DESCRIPTION OF SYMBOLS 10 ... Server, 11, 21 ... CPU, 12, 22 ... RAM, 13, 23 ... ROM, 14a, 24a ... Network I / F, 14b, 24b ... Input / output I / F, 15, 25 ... HDD, 16, 26 ... keyboard, 17, 27 ... mouse, 18, 28 ... display, 19, 29 ... bus, 20 ... request location terminal , 30 ... adjustment location terminal, 40 ... decision location terminal, 50 ... information provision terminal, 100 ... work information provision system

Claims (5)

作業の申し込みを行うための申込者側端末と、上記申込者側端末にネットワークを介して接続され、少なくとも作業場所、作業期間、作業内容および作業担当者に関する情報を含む作業情報を管理するサーバとで構成され、
上記サーバは、
上記作業情報を記憶する記憶部と、
上記申込者側端末から送られてくる入力画面読み出し要求に応じて、入力画面を表示するための第1の表示情報を送信する第1の送信制御部と、
上記申込者側端末から送られてくる、希望作業期間を少なくとも含む入力情報を受信する受信制御部と、
上記受信制御部で受信した上記入力情報に基づいて、上記入力情報に含まれる上記希望作業期間と作業期間が重複する作業情報を上記記憶部から読み出し、上記重複する作業情報に係る第2の表示情報を、上記ネットワークを介して上記申込者側端末に送信する第2の送信制御部とを有する
ことを特徴とする作業情報提供システム。
An applicant-side terminal for applying for work; a server connected to the applicant-side terminal via a network for managing work information including at least work location, work period, work content, and information on a person in charge of work; Consists of
The server
A storage unit for storing the work information;
A first transmission control unit that transmits first display information for displaying an input screen in response to an input screen read request sent from the applicant-side terminal;
A reception control unit that receives input information including at least a desired work period sent from the applicant-side terminal;
Based on the input information received by the reception control unit, the work information in which the desired work period and the work period included in the input information overlap is read from the storage unit, and the second display relating to the overlapped work information A work information providing system, comprising: a second transmission control unit configured to transmit information to the applicant-side terminal via the network.
作業の申し込みを行うための申込者側端末にネットワークを介して接続され、少なくとも作業場所、作業期間、作業内容および作業担当者に関する情報を含む作業情報を管理するサーバであって、
上記サーバは、
上記作業情報を記憶する記憶部と、
上記申込者側端末から送られてくる入力画面読み出し要求に応じて、入力画面を表示するための第1の表示情報を送信する第1の送信制御部と、
上記申込者側端末から送られてくる、希望作業期間を少なくとも含む入力情報を受信する受信制御部と、
上記受信制御部で受信した上記入力情報に基づいて、上記入力情報に含まれる上記希望作業期間と作業期間が重複する作業情報を上記記憶部から読み出し、上記重複する作業情報に係る第2の表示情報を、上記ネットワークを介して上記申込者側端末に送信する第2の送信制御部とを有する
ことを特徴とするサーバ。
A server that is connected to an applicant side terminal for applying for work via a network and manages work information including at least work place, work period, work contents, and information on a person in charge of work,
The server
A storage unit for storing the work information;
A first transmission control unit that transmits first display information for displaying an input screen in response to an input screen read request sent from the applicant-side terminal;
A reception control unit that receives input information including at least a desired work period sent from the applicant-side terminal;
Based on the input information received by the reception control unit, the work information in which the desired work period and the work period included in the input information overlap is read from the storage unit, and the second display relating to the overlapped work information A second transmission control unit configured to transmit information to the applicant-side terminal via the network.
上記記憶部は、複数の作業場所に係る作業場所情報をさらに記憶しており、
上記入力画面読み出し要求には、少なくとも希望作業場所を特定する情報が含まれており、
上記第1の表示情報は、上記入力画面に、上記希望作業場所に係る作業場所情報を併せて表示するように生成されている
ことを特徴とする請求項2に記載のサーバ。
The storage unit further stores work place information relating to a plurality of work places,
The input screen read request includes at least information for specifying a desired work place,
The server according to claim 2, wherein the first display information is generated so as to display work location information related to the desired work location on the input screen.
上記作業場所は水力発電所であって、上記記憶部には、上記作業場所に係る作業場所情報として水力発電所の発電電力および水系統情報が記憶されている
ことを特徴とする請求項3に記載のサーバ。
The work place is a hydroelectric power station, and the storage unit stores generated power and water system information of the hydropower station as work place information related to the work place. The listed server.
申込者側端末にネットワークを介して接続され、少なくとも作業場所、作業期間、作業内容および作業担当者に関する情報を含む作業情報を管理するサーバを用いた作業情報提供方法であって、
上記申込者側端末から送られてくる入力画面読み出し要求に応じて、入力画面を表示するための第1の表示情報を送信する第1の送信制御ステップと、
上記申込者側端末から送られてくる、希望作業期間を少なくとも含む入力情報を受信する受信制御ステップと、
受信した上記入力情報に基づいて、上記入力情報に含まれる上記希望作業期間と作業期間が重複する作業情報を記憶部から読み出す読み出しステップと、
上記重複する作業情報に係る第2の表示情報を、上記ネットワークを介して上記申込者側端末に送信する第2の送信制御ステップとを有する
ことを特徴とする作業情報提供方法。
A work information providing method using a server that is connected to a terminal on the applicant side via a network and manages work information including at least work place, work period, work contents, and information on a person in charge of work,
A first transmission control step of transmitting first display information for displaying an input screen in response to an input screen read request sent from the applicant side terminal;
A reception control step for receiving input information including at least a desired work period sent from the applicant side terminal;
Based on the received input information, a reading step of reading out work information that overlaps the desired work period and the work period included in the input information from a storage unit;
And a second transmission control step of transmitting the second display information related to the duplicated work information to the applicant side terminal via the network.
JP2006066200A 2006-03-10 2006-03-10 Work information providing system, server and work information providing method Pending JP2007241869A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006066200A JP2007241869A (en) 2006-03-10 2006-03-10 Work information providing system, server and work information providing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006066200A JP2007241869A (en) 2006-03-10 2006-03-10 Work information providing system, server and work information providing method

Publications (1)

Publication Number Publication Date
JP2007241869A true JP2007241869A (en) 2007-09-20

Family

ID=38587317

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006066200A Pending JP2007241869A (en) 2006-03-10 2006-03-10 Work information providing system, server and work information providing method

Country Status (1)

Country Link
JP (1) JP2007241869A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101552961B1 (en) 2010-09-29 2015-09-14 주식회사 케이티 Method and apparatus for providing information for overlapping construction
JP2021039550A (en) * 2019-09-03 2021-03-11 東京電力ホールディングス株式会社 Hydraulic power plant construction plan optimization support server, hydraulic power plant construction plan optimization support system, and hydraulic power plant construction plan optimization support method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08322149A (en) * 1995-05-29 1996-12-03 Mitsubishi Electric Corp Method for work sorting, method for preparing restrictive condition and power interruption regulator
JPH114541A (en) * 1997-06-11 1999-01-06 Mitsubishi Electric Corp Power interruption work regulating system
JP2002064934A (en) * 2000-06-06 2002-02-28 Mitsubishi Corp System and method for controlling power supply
JP2002117097A (en) * 2000-10-10 2002-04-19 Toyota Motor Corp Method and system for managing construction information
JP2002345154A (en) * 2001-05-18 2002-11-29 Hitachi Ltd Power demand and supply method, and display device
JP2005031824A (en) * 2003-07-09 2005-02-03 Hitachi Ltd Road occupying construction information management system
JP2005190309A (en) * 2003-12-26 2005-07-14 Toyota Motor Corp Construction planning support system
JP2005227913A (en) * 2004-02-10 2005-08-25 Chugoku Electric Power Co Inc:The Underground buried object management system and service providing method using the same system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08322149A (en) * 1995-05-29 1996-12-03 Mitsubishi Electric Corp Method for work sorting, method for preparing restrictive condition and power interruption regulator
JPH114541A (en) * 1997-06-11 1999-01-06 Mitsubishi Electric Corp Power interruption work regulating system
JP2002064934A (en) * 2000-06-06 2002-02-28 Mitsubishi Corp System and method for controlling power supply
JP2002117097A (en) * 2000-10-10 2002-04-19 Toyota Motor Corp Method and system for managing construction information
JP2002345154A (en) * 2001-05-18 2002-11-29 Hitachi Ltd Power demand and supply method, and display device
JP2005031824A (en) * 2003-07-09 2005-02-03 Hitachi Ltd Road occupying construction information management system
JP2005190309A (en) * 2003-12-26 2005-07-14 Toyota Motor Corp Construction planning support system
JP2005227913A (en) * 2004-02-10 2005-08-25 Chugoku Electric Power Co Inc:The Underground buried object management system and service providing method using the same system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101552961B1 (en) 2010-09-29 2015-09-14 주식회사 케이티 Method and apparatus for providing information for overlapping construction
JP2021039550A (en) * 2019-09-03 2021-03-11 東京電力ホールディングス株式会社 Hydraulic power plant construction plan optimization support server, hydraulic power plant construction plan optimization support system, and hydraulic power plant construction plan optimization support method
JP7412673B2 (en) 2019-09-03 2024-01-15 東京電力ホールディングス株式会社 Hydropower plant construction plan optimization support server, hydropower plant construction plan optimization support system, and hydropower plant construction plan optimization support method

Similar Documents

Publication Publication Date Title
EP1168563B1 (en) Power amount control method and apparatus
US7467161B2 (en) Computer system for maintenance resource optimization
JP6275020B2 (en) Energy management system
JP2006280154A (en) Dispersion power control system
JP2007241869A (en) Work information providing system, server and work information providing method
JP2014519105A (en) Securities information providing method and apparatus
JP5508250B2 (en) Energy saving support device
JP4075872B2 (en) Supply plan operation plan creation method and operation plan creation device
JP2010161913A (en) System and method for design evaluation support of receiving-transformation equipment system
JP2004054716A (en) Work management method and display method for work
Hazarika et al. Power system restoration: planning and simulation
JP4245797B2 (en) Internet-based construction management system
JP2009003666A (en) Schedule control device, schedule control method and program
JP5008437B2 (en) System work support system
JP2007244139A (en) Setting method for planning power stoppage work of power system and device thereof
JP2007141016A (en) Damage compensating device, damage compensating method, computer program and compensation system for abnormality of power transmission
JP2011041416A (en) Facility data managing method of power system
JP2011061914A (en) Power failure plan evaluating system, and method and program for evaluating power failure plan
JPH08129414A (en) Management device for plant maintenance work
JP2003111276A (en) Adjustment system for service interruption during working
JP7440694B1 (en) Information processing systems and programs
JP2008299638A (en) Ordering support system for fuel cell system
JP2011010470A (en) Usage energy management device
KR20130023670A (en) Offshore main equipment point control system
JP2005063104A (en) Order procuration device, order procuration method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090109

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100727

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101214

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110210

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20111011