JP2007219148A - Optical equipment equipped with stroboscope - Google Patents

Optical equipment equipped with stroboscope Download PDF

Info

Publication number
JP2007219148A
JP2007219148A JP2006039588A JP2006039588A JP2007219148A JP 2007219148 A JP2007219148 A JP 2007219148A JP 2006039588 A JP2006039588 A JP 2006039588A JP 2006039588 A JP2006039588 A JP 2006039588A JP 2007219148 A JP2007219148 A JP 2007219148A
Authority
JP
Japan
Prior art keywords
charging
voltage
strobe
time
predetermined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2006039588A
Other languages
Japanese (ja)
Inventor
Toshiharu Ueda
敏治 上田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Canon Inc
Original Assignee
Canon Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Canon Inc filed Critical Canon Inc
Priority to JP2006039588A priority Critical patent/JP2007219148A/en
Publication of JP2007219148A publication Critical patent/JP2007219148A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Indication In Cameras, And Counting Of Exposures (AREA)
  • Exposure Control For Cameras (AREA)
  • Stroboscope Apparatuses (AREA)
  • Camera Bodies And Camera Details Or Accessories (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To avoid trouble (impossibleness of charging and insufficient capacity) caused by mounting failure assumed by a detection circuit for detecting the charging of a stroboscope and multiple connection of main capacitors, which cannot be detected in the past. <P>SOLUTION: In optical equipment, charging time: T until attaining predetermined voltage: V1 during charging operation is decided by a means for detecting charging voltage of the stroboscope. When T is shorter than the predetermined time: Tx, control different from ordinary one, for example, warning, inhibition or the change of a control table is performed. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、ストロボを備えた銀塩カメラ・デジタルカメラ等の光学機器に関するものである。   The present invention relates to an optical apparatus such as a silver salt camera or a digital camera provided with a strobe.

近年、銀塩カメラ(フィルムカメラ)やデジタルカメラには、暗所での撮影を行なう際に使用するストロボ装置が内蔵されているのが一般的になっている。   In recent years, it has become common for a silver salt camera (film camera) and a digital camera to have a built-in strobe device used for shooting in a dark place.

該ストロボ装置は発光体となるキセノン管(以後、Xeと称する)と発光エネルギーを蓄積するためのメインコンデンサ(以後、MCと称する)が並列に接続され、撮影動作(露光動作)時に、発光制御する(トリガをかける)ことにより、該MCからXeへのエネルギー放出を行い、Xeが発光するものである。   In the strobe device, a xenon tube (hereinafter referred to as Xe) serving as a light emitter and a main capacitor (hereinafter referred to as MC) for storing light emission energy are connected in parallel, and light emission control is performed during a photographing operation (exposure operation). By performing (triggering), energy is released from the MC to Xe, and Xe emits light.

該MCは、求められる容量・電圧が大きい為、形状的が大きくなってしまう問題があるが、近年の光学機器の小型化に伴い、容量・形状の小さめのMCを複数使用し並列接続することで、必要な容量を確保するとともに構造的な制約内での配置自由度を広げる構成を取っているものも多く存在する。   Since the required capacity and voltage of the MC are large, there is a problem that the shape becomes large. However, with recent miniaturization of optical equipment, a plurality of MCs with smaller capacity and shape should be used and connected in parallel. In many cases, the required capacity is secured and the degree of freedom of arrangement within the structural constraints is increased.

当然、該ストロボ装置には、該MCへの電荷蓄積のための充電手段を有しており、ストロボ発光による電荷放出後や、撮影直前の被写体輝度が暗い場合等にMCへの必要電荷(電圧)の充電動作を行う。   Naturally, the strobe device has a charging means for accumulating charges in the MC, and the necessary charge (voltage) to the MC after discharge of the light by strobe light emission or when the subject brightness just before photographing is low. ) Charge operation.

また、充電電圧を検出する充電電圧検出手段を備えているものが一般的であり、該検出手段は、MC充電時に所定の充電電圧に達したのを検出し、充電手段を停止させるのを主目的とするが、該検出手段はトラブル回避機能として、MCの充電電圧が所定時間内に所定電圧まで充電できていないと判断した場合、充電機能に異常があるとして、警告や撮影禁止等の処理を行なうのも一般的となってきている。   In general, a charging voltage detecting means for detecting a charging voltage is provided. The detecting means detects that a predetermined charging voltage has been reached during MC charging, and mainly stops the charging means. Although the purpose is that the detection means is a trouble avoidance function, if it is determined that the charging voltage of the MC has not been charged to the predetermined voltage within a predetermined time, the charging function is abnormal and processing such as warning or photographing prohibition is performed. It has become common to do.

該トラブル回避機能については、特公平4−59622では“第1所定電圧−第2所定電圧間の充電時間を測定することで、第2所定時間−第3所定時間までの充電予測時間を算出し、該充電予測時間が所定時間以上かかる場合は警告する”というものが提案されている。また、特許第2683800号では“レリーズ釦操作毎に、充電検出を行ない、所定時間内に充電完了を検出できない場合には露光不能にする”ことが提案され、特開平11−237668では“所定間隔で電圧検出を行い、検出電圧と基準値の比較結果で(基準値を満たしていないとき)充電動作を禁止する”等の提案がなされている。   Regarding the trouble avoidance function, Japanese Examined Patent Publication No. 4-59622 calculates the estimated charging time from the second predetermined time to the third predetermined time by measuring the charging time between the first predetermined voltage and the second predetermined voltage. In such a case, a warning is given when the estimated charging time is longer than a predetermined time. Japanese Patent No. 2683800 proposes that “charge detection is performed every time the release button is operated and exposure is not possible when the completion of charging cannot be detected within a predetermined time”, and JP-A-11-237668 discloses “predetermined intervals”. In other words, a proposal has been made, such as “detecting the voltage in the first step, and prohibiting the charging operation (when the reference value is not satisfied) based on the comparison result between the detected voltage and the reference value”.

つまり、いづれも、充電に時間がかかりすぎる(所定時間内に所定電圧の充電が行えない)と判断された場合のトラブル回避策である。
特公平4−59622号公報 特登録2683800号公報 特開平11−237668号公報
That is, any of these is a trouble avoidance measure when it is determined that charging takes too much time (charging with a predetermined voltage cannot be performed within a predetermined time).
Japanese Examined Patent Publication No. 4-59622 Japanese Patent Registration No. 2683800 Japanese Patent Laid-Open No. 11-237668

しかしながら、充電電圧検出手段にはさまざまな構成があり、そのトラブル状況によっては、回路内の断線により、充電がなされていないのに、既に充電完了という判断をしてしまうものもある。   However, there are various configurations of the charging voltage detection means, and depending on the trouble situation, there is a case where the charging is not completed due to the disconnection in the circuit, but it is already determined that the charging is completed.

例えば、充電電圧検出回路が図2に示すような回路構成だった場合を考える。   For example, consider a case where the charging voltage detection circuit has a circuit configuration as shown in FIG.

該充電電圧検出回路は、電源(例えば3V電池)の電圧を、周知の昇圧回路(例えば、昇圧トランスの1次側に電池電圧をパルス印加し、2次側に巻線比分の電圧を発生させる方式で、具体的にはフライバック方式やフォアード方式等があるが、周知である為ここでの詳細説明は割愛する)を用いた充電手段の出力を、逆流防止ダイオード:D1およびD2を介して発光エネルギー蓄積用コンデンサ:MC(本図においてはMC1とMC2の並列接続された2つの発光エネルギー蓄積用コンデンサを総称してMCとする)に充電される電圧:HVを低電圧回路(例えば3V系回路)で検出するために、D1―D2間に検出抵抗(HVの分圧抵抗):R1およびR2と平滑コンデンサ:C1を配置した構成になっている。   The charging voltage detection circuit applies a voltage of a power source (for example, a 3V battery) to a known booster circuit (for example, a battery voltage on the primary side of a step-up transformer, and generates a voltage corresponding to the winding ratio on the secondary side. The output of the charging means using a flyback method, a forward method, etc., which are well-known and will not be described in detail here, is known via backflow prevention diodes D1 and D2. Luminescent energy storage capacitor: MC (in this figure, two luminescent energy storage capacitors connected in parallel with MC1 and MC2 are collectively referred to as MC): HV is a low voltage circuit (for example, 3V system) In order to detect by a circuit), detection resistors (HV voltage dividing resistors): R1 and R2 and a smoothing capacitor: C1 are arranged between D1 and D2.

すなわち、該充電電圧検出では、MCの充電電圧:HV を、抵抗:R1およびR2により分圧した電圧:HV’により検出する。   That is, in the charge voltage detection, the MC charge voltage: HV is detected by the voltage: HV 'divided by the resistors: R1 and R2.

HV’≒ HV×R2/(R1+R2)であり、仮に HV=320V、R1=4MΩ、R2=20kΩの場合、HV’≒320×(20×10)/{(4×10)+(20×10)}≒1.592Vで検出できる。 HV′≈HV × R2 / (R1 + R2). If HV = 320V, R1 = 4 MΩ, and R2 = 20 kΩ, HV′≈320 × (20 × 10 3 ) / {(4 × 10 6 ) + (20 × 10 3 )} ≈1.592V, and can be detected.

該HV’はA/Dコンバータを備えた制御回路により検出され、該検出結果で所定値の充電がなされたか否かの判定を行い、制御状態を変化させる。   The HV 'is detected by a control circuit including an A / D converter, and it is determined whether or not a predetermined value is charged based on the detection result, and the control state is changed.

例えば、充電電圧が充電完了相当(例えば、HV=320V充電完了の設定だった場合、HV’=1.592V)になったら充電動作を停止したり、充電動作開始後に所定時間内に所定電圧まで充電できなかった(例えば、充電開始後、3sec以内にHVが150Vに達しない)場合、充電回路もしくは充電電圧検出手段に問題があると判断して充電動作停止とともに警告・撮影動作禁止等の制御を行なったりする。   For example, the charging operation is stopped when the charging voltage is equivalent to the completion of charging (for example, HV ′ = 1.592 V when HV = 320 V charging completion is set), or until the predetermined voltage is reached within a predetermined time after the charging operation is started. If charging is not possible (for example, if HV does not reach 150V within 3 seconds after the start of charging), it is determined that there is a problem with the charging circuit or charging voltage detection means, and charging is stopped and warning / shooting operation is prohibited. Or do.

しかし、上記該充電電圧検出手段において、R1とR2の結線が何らかの要件で断線し、R1から直接制御回路へHV’が印加された場合、分圧されていないため HV≒HV’となり、充電電圧が直接制御回路(A/Dコンバータ)へ入力されるので、充電を開始した直後のわずかな充電電圧でも充電完了相当の判断を行なってしまい、何の問題もなく正常動作として充電動作を停止してしまう。
該問題に対して、上記の提案件の内容では、問題を回避することはできない。
However, in the above charging voltage detecting means, when the connection between R1 and R2 is disconnected due to some requirement and HV ′ is applied directly from R1 to the control circuit, the voltage is not divided, so HV≈HV ′. Is directly input to the control circuit (A / D converter), so even a slight charge voltage immediately after starting charging makes a judgment corresponding to the completion of charging, and stops the charging operation as normal operation without any problem. End up.
With respect to the problem, the problem cannot be avoided with the content of the above proposal.

また、容量・形状の小さめのMCを複数使用し並列接続する場合においても、一部のコンデンサが結線不良を起こした場合、正常接続されているコンデンサ(例えばMC1)が正常ならば、MC1に対しては正常に充電が行なわれる為、充電電圧検出は正常な結果となるが、結線不良を起こしたコンデンサ(例えばMC2)分の容量のエネルギーが不足することになり、該状況でストロボの発光を行なった場合、所望の光量を得ることが出来ず、撮影されたシーンは露出不足の写真となってしまう。   In addition, when using a plurality of MCs with smaller capacities and shapes and connecting them in parallel, if some of the capacitors cause poor connection, and if the normally connected capacitors (for example, MC1) are normal, then MC1 In this situation, the charging voltage is detected normally, but the capacity of the capacitor (for example, MC2) that causes the connection failure is insufficient, and the strobe emits light in this situation. If this is done, the desired amount of light cannot be obtained, and the photographed scene becomes an underexposed photograph.

具体例を示すと、例えば、MC1=MC2として各々320V/100μFのコンデンサを並列接続使用する場合、320V/200μF相当の容量を使用していることに相当するが、結線異常によりMC1だけを使用するようになった場合、320V/100μFとなってしまう。   To give a concrete example, for example, when MC1 = MC2 and 320 V / 100 μF capacitors are used in parallel, it corresponds to using a capacity equivalent to 320 V / 200 μF, but only MC1 is used due to abnormal wiring. In such a case, it becomes 320 V / 100 μF.

この場合、容量が少ない分、充電時間は早くなり、且つ、充電電圧自体は320Vまで充電できる為、従来の充電検出手段では異常を検出できない。   In this case, since the capacity is small, the charging time is shortened, and the charging voltage itself can be charged up to 320 V. Therefore, the conventional charging detection means cannot detect abnormality.

しかし、200μF相当時の光量をQa・100μF時の光量をQbとして比光量を考えると、
Qb/Qa = (0.5・Cb・Vb)/(0.5・Ca・Va
=(0.5×100×10−6×320)/
(0.5×200×10−6×320
=(5.12/10.24)
=0.5
となる。
However, when considering the specific light quantity with Qa as the light quantity corresponding to 200 μF and Qb as the light quantity at 100 μF,
Qb / Qa = (0.5 · Cb · Vb 2 ) / (0.5 · Ca · Va 2 )
= (0.5 × 100 × 10 −6 × 320 2 ) /
(0.5 × 200 × 10 −6 × 320 2 )
= (5.12 / 10.24)
= 0.5
It becomes.

当然ながら、この状態でストロボ撮影した場合は、光量不足となってしまう。   Of course, if the flash is taken in this state, the amount of light will be insufficient.

該問題に対しても、所定時間内での所定電圧の検出が出来る(充電できたと判断される)ため、上記の提案件の内容では、問題を回避することはできない。   Even for this problem, since a predetermined voltage can be detected within a predetermined time (it is determined that charging is possible), the problem cannot be avoided with the contents of the above proposal.

(発明の目的)
本発明の目的は、ストロボを備えた光学機器における、従来の方式で検出しえないトラブルを検出し、警告・禁止等の回避措置を取る、もしくは、トラブル状況に応じた撮影手法をとることにより、使用者の予想し得ない失敗をなくすことである。
(Object of invention)
The object of the present invention is to detect troubles that cannot be detected by conventional methods in optical devices equipped with strobes, and to take preventive measures such as warnings and prohibitions, or by taking a photographing method according to the trouble situation. It is to eliminate the user's unexpected failure.

上記問題を鑑みて、本発明は、ストロボ装置を有する光学機器において、ストロボ発光体に並列に配設された発光エネルギー蓄積用メインコンデンサと、該メインコンデンサに電荷を充電する為の充電手段と、該充電手段により充電されていく電圧を検出する充電電圧検出手段と、該充電手段や該充電電圧検出手段の動作および該光学機器の露出制御等を行なう制御手段を備え、該制御手段により充電動作が開始された後、充電電圧検出手段は所定電圧までの充電時間を判定し、該判定結果が所定時間より短いと判定された場合、通常と異なる制御を行なうこと、
もしくは、ストロボ装置を有する光学機器において、ストロボ発光体に並列に配設された発光エネルギー蓄積用メインコンデンサを少なくとも2つ並列配設として備え、該メインコンデンサに電荷を充電する為の充電手段と、該充電手段により充電されていく電圧を観測する充電電圧検出手段と、該充電手段や該充電電圧検出手段の動作および該光学機器の露出制御等を行なう制御手段を備え、該制御手段により充電動作が開始された後、充電電圧検出手段は所定電圧までの充電時間を判定し、該判定結果が所定時間より短いと判定された場合、通常と異なる制御を行なうこと、
さらに、上記の通常と異なる制御とは、警告制御であることや露光動作禁止とすることとすることで、ストロボ撮影におけるトラブルを事前に警告・回避することが可能となる。
In view of the above problems, the present invention provides an optical apparatus having a strobe device, a main capacitor for storing light emission energy disposed in parallel with a strobe light emitter, and a charging means for charging the main capacitor with charges. A charging voltage detecting means for detecting a voltage charged by the charging means; and a control means for controlling the operation of the charging means and the charging voltage detecting means and the exposure control of the optical device. Is started, the charging voltage detection means determines the charging time up to a predetermined voltage, and when it is determined that the determination result is shorter than the predetermined time, performing a control different from normal,
Alternatively, in an optical device having a strobe device, at least two main capacitors for storing light emission energy arranged in parallel with a strobe light emitter are provided in parallel, and charging means for charging the main capacitor with charges, A charging voltage detecting means for observing the voltage charged by the charging means; and a control means for controlling the operation of the charging means and the charging voltage detecting means and the exposure control of the optical device. Is started, the charging voltage detection means determines the charging time up to a predetermined voltage, and when it is determined that the determination result is shorter than the predetermined time, performing a control different from normal,
Furthermore, the above-mentioned control different from normal is warning control or prohibiting the exposure operation, so that troubles in flash photography can be warned and avoided in advance.

加えて、充電電圧検出手段は所定電圧までの充電時間判定は、充電状況によって判定するか否かを変更すること、
具体的には、充電電圧検出手段は所定電圧までの充電時間判定は、ストロボ発光直後の充電動作に行なうことや、ストロボ充電開始前の充電電圧検出結果によって行なうか否かの判断をすること、
また、充電時間判定の基準になる所定時間は、電源電圧・環境温度応じて変化させることにより、トラブル検知の確度を上げるを可能とする。
In addition, the charging voltage detection means changes whether or not the charging time determination up to a predetermined voltage is determined according to the charging status,
Specifically, the charging voltage detection means determines whether the charging time up to a predetermined voltage is performed in a charging operation immediately after strobe light emission, or whether the charging voltage is detected based on a charging voltage detection result before the start of strobe charging.
Further, the accuracy of trouble detection can be increased by changing the predetermined time serving as a reference for determining the charging time according to the power supply voltage and the environmental temperature.

また、ストロボ装置を有する光学機器において、ストロボ発光体に並列に配設された発光エネルギー蓄積用メインコンデンサを少なくとも2つ並列配設として備え、該メインコンデンサに電荷を充電する為の充電手段と、該充電手段により充電されていく電圧を観測する充電電圧検出手段と、該充電手段や該充電電圧検出手段の動作および該光学機器の露出制御等を行なう制御手段を備え、該制御手段により充電動作が開始された後、充電電圧検出手段は所定電圧までの充電時間を判定し、該判定結果の充電時間からメインコンデンサの接続状況を推測し、接続状況に応じたストロボ撮影制御を行なうこと、
具体的には、推測されたメインコンデンサの接続状況に応じて、露光時間およびストロボ発光タイミングを補正することによって、トラブル発生時の撮影禁止状況を最小限に留め、使用者への影響を少なくするものである。
Further, in an optical apparatus having a strobe device, at least two main capacitors for storing light emission energy arranged in parallel to the strobe light emitter are provided in parallel, and charging means for charging the main capacitor with charges, A charging voltage detecting means for observing a voltage charged by the charging means; and a control means for controlling the operation of the charging means and the charging voltage detecting means and the exposure control of the optical device. Is started, the charging voltage detection means determines the charging time to a predetermined voltage, estimates the connection state of the main capacitor from the charging time of the determination result, and performs strobe shooting control according to the connection state,
Specifically, by correcting the exposure time and strobe lighting timing according to the estimated connection status of the main capacitor, the shooting prohibition status at the time of trouble is minimized and the influence on the user is reduced. Is.

以上説明したとおり、本発明は、ストロボ装置を有する光学機器において、ストロボ発光体に並列に配設された発光エネルギー蓄積用メインコンデンサと、該メインコンデンサに電荷を充電する為の充電手段と、該充電手段により充電されていく電圧を検出する充電電圧検出手段と、該充電手段や該充電電圧検出手段の動作および該光学機器の露出制御等を行なう制御手段を備え、該制御手段により充電動作が開始された後、充電電圧検出手段は所定電圧までの充電時間を判定し、該判定結果が所定時間より短いと判定された場合、通常と異なる制御を行なうこと、もしくは、ストロボ装置を有する光学機器において、ストロボ発光体に並列に配設された発光エネルギー蓄積用メインコンデンサを少なくとも2つ並列配設として備え、該メインコンデンサに電荷を充電する為の充電手段と、該充電手段により充電されていく電圧を観測する充電電圧検出手段と、該充電手段や該充電電圧検出手段の動作および該光学機器の露出制御等を行なう制御手段を備え、該制御手段により充電動作が開始された後、充電電圧検出手段は所定電圧までの充電時間を判定し、該判定結果が所定時間より短いと判定された場合、通常と異なる制御を行なうこと、さらに、上記の通常と異なる制御とは、警告制御であることや露光動作禁止とすることとすることで、ストロボ撮影におけるトラブルを事前に警告・回避することが可能となった。   As described above, the present invention provides an optical device having a strobe device, a main capacitor for storing light emission energy disposed in parallel with a strobe light emitter, charging means for charging the main capacitor with electric charge, A charging voltage detecting means for detecting a voltage charged by the charging means; and a control means for controlling the operation of the charging means and the charging voltage detecting means and the exposure control of the optical device. After being started, the charging voltage detection means determines the charging time up to a predetermined voltage, and when it is determined that the determination result is shorter than the predetermined time, it performs an unusual control or an optical apparatus having a strobe device In which at least two main capacitors for storing light emission energy arranged in parallel to the strobe light emitter are provided in parallel. Charging means for charging the capacitor with charge, charging voltage detecting means for observing the voltage charged by the charging means, operation of the charging means and the charging voltage detecting means, exposure control of the optical device, etc. A control means for performing, after the charging operation is started by the control means, the charging voltage detection means determines the charging time to a predetermined voltage, and when it is determined that the determination result is shorter than the predetermined time, it is different from normal It is possible to warn and avoid troubles in flash photography in advance by performing control, and by controlling the above-mentioned unusual control to be warning control or prohibiting the exposure operation. .

加えて、充電電圧検出手段は所定電圧までの充電時間判定は、充電状況によって判定するか否かを変更すること、具体的には、充電電圧検出手段は所定電圧までの充電時間判定は、ストロボ発光直後の充電動作に行なうことや、ストロボ充電開始前の充電電圧検出結果によって行なうか否かの判断をすること、また、充電時間判定の基準になる所定時間は、電源電圧・環境温度応じて変化させることにより、トラブル検知の確度を上げるを可能となった。   In addition, the charging voltage detection means changes whether or not the determination of the charging time up to a predetermined voltage depends on the charging status. Specifically, the charging voltage detection means determines whether or not the charging time up to the predetermined voltage is a strobe. Perform charging operation immediately after light emission, determine whether to perform charging based on the result of charging voltage detection before the start of strobe charging, and the predetermined time used as the criterion for charging time depends on the power supply voltage and environmental temperature. By changing it, it became possible to improve the accuracy of trouble detection.

また、ストロボ装置を有する光学機器において、ストロボ発光体に並列に配設された発光エネルギー蓄積用メインコンデンサを少なくとも2つ並列配設として備え、該メインコンデンサに電荷を充電する為の充電手段と、該充電手段により充電されていく電圧を観測する充電電圧検出手段と、該充電手段や該充電電圧検出手段の動作および該光学機器の露出制御等を行なう制御手段を備え、該制御手段により充電動作が開始された後、充電電圧検出手段は所定電圧までの充電時間を判定し、該判定結果の充電時間からメインコンデンサの接続状況を推測し、接続状況に応じたストロボ撮影制御を行なうこと、具体的には、推測されたメインコンデンサの接続状況に応じて、露光時間およびストロボ発光タイミングを補正することによって、トラブル発生時の撮影禁止状況を最小限に留め、使用者への影響を少なくなった。   Further, in an optical apparatus having a strobe device, at least two main capacitors for storing light emission energy arranged in parallel to the strobe light emitter are provided in parallel, and charging means for charging the main capacitor with charges, A charging voltage detecting means for observing a voltage charged by the charging means; and a control means for controlling the operation of the charging means and the charging voltage detecting means and the exposure control of the optical device. After the start of the charging, the charging voltage detection means determines the charging time up to a predetermined voltage, estimates the connection status of the main capacitor from the charging time of the determination result, and performs strobe shooting control according to the connection status, Specifically, the exposure time and strobe flash timing are corrected according to the estimated connection status of the main capacitor. Minimizing the shooting prohibited status of the bull during the occurrence, it was less the impact on the user.

(第1の実施例)
本発明の第1の実施例を図1乃至図5を用いて説明する。
(First embodiment)
A first embodiment of the present invention will be described with reference to FIGS.

図1は本発明の第1の実施例におけるカメラの主要部分の回路ブロック図である。   FIG. 1 is a circuit block diagram of the main part of the camera in the first embodiment of the present invention.

該図1において、1はカメラの電源電池、2はカメラの各種動作を制御するマイクロコンピュータ等の制御回路であり、内部にストロボ発光エネルギー蓄積用コンデンサ(メインコンデンサ):MC1乃至MC2の充電電圧を検出する為の、(充電電圧検出手段の一部である)A/Dコンバーター、ストロボ充電時間等を計時をするためのタイマー手段、各種データを記憶するためのメモリーを備える。本実施例では、該制御手段2は後述するストロボ充電手段や充電電圧検出手段等の制御も行なうものである。   In FIG. 1, 1 is a power supply battery for a camera, 2 is a control circuit such as a microcomputer for controlling various operations of the camera, and a strobe light emission energy storage capacitor (main capacitor): MC1 to MC2 charging voltages are stored therein. An A / D converter (which is a part of the charging voltage detecting means) for detecting, timer means for measuring the strobe charging time, etc., and a memory for storing various data are provided. In the present embodiment, the control unit 2 also controls a strobe charging unit and a charging voltage detection unit which will be described later.

3は写真撮影動作を開始させるためのレリーズスイッチであり、該レリーズスイッチ3がONされた場合に、制御手段2により撮影シーケンス・充電シーケンス等の制御が行なわれる。   Reference numeral 3 denotes a release switch for starting a photographing operation. When the release switch 3 is turned on, the control unit 2 controls the photographing sequence, the charging sequence, and the like.

4はストロボ装置であり、該ストロボ装置4は、周知の昇圧回路を含む充電手段4−1と、該充電手段4−1が昇圧した電圧を発光エネルギーとして蓄積するメインコンデンサ:MC1およびMC2(本実施例では、並列接続された該MC1および該MC2を総称してMCと称する)と、該メインコンデンサMCに蓄積された電圧を検出するための充電電圧検出回路4−2と、該メインコンデンサの蓄積エネルギーにより発光する発光体であるキセノン管Xeと、該キセノン管Xeへ該メインコンデンサの蓄積エネルギーを放出させ発光させるための発光制御手段4−3を備えている。   Reference numeral 4 denotes a strobe device. The strobe device 4 includes a charging unit 4-1 including a well-known boosting circuit, and main capacitors MC 1 and MC 2 (the main capacitors for storing the voltage boosted by the charging unit 4-1 as light emission energy. In the embodiment, MC1 and MC2 connected in parallel are collectively referred to as MC), a charging voltage detection circuit 4-2 for detecting the voltage accumulated in the main capacitor MC, and the main capacitor A xenon tube Xe, which is a light emitter that emits light by stored energy, and a light emission control means 4-3 for emitting light by releasing the stored energy of the main capacitor to the xenon tube Xe.

なお、該充電電圧検出回路4−2の詳細構成を図2に示す。   A detailed configuration of the charging voltage detection circuit 4-2 is shown in FIG.

(該図2に関しては、既に説明済みであるため、ここでの説明は割愛する。)
本実施例では、該充電電圧検出回路4−2と該制御手段2(内蔵のA/Dコンバーターや充電制御)を含んだシステムを「充電電圧検出手段」と称する。
(Since this FIG. 2 has already been explained, explanation here is omitted.)
In the present embodiment, a system including the charging voltage detection circuit 4-2 and the control means 2 (built-in A / D converter and charge control) is referred to as “charging voltage detection means”.

5は被写体の明るさを測定する周知の測光手段(以後、AE手段と称する)、6は被写体までの距離を測定する周知の測距手段(以後、AF手段と称する)、7は不図示のフィルムへの露光制御を行なう周知のシャッター手段(以後、SH手段と称する)、8はフィルムを所定位置に動かす周知のフィルム給送手段である。   5 is a known photometric means for measuring the brightness of the subject (hereinafter referred to as AE means), 6 is a known distance measuring means for measuring the distance to the subject (hereinafter referred to as AF means), and 7 is not shown. A known shutter means (hereinafter referred to as SH means) for controlling exposure of the film, and 8 is a known film feeding means for moving the film to a predetermined position.

9はカメラのモード状態や撮影可能枚数・トラブル状況の警告等に使用されるLCD・LED等の周知の表示手段である。   Reference numeral 9 denotes a well-known display means such as an LCD / LED used for a camera mode state, the number of shootable images, a trouble status warning, and the like.

図3乃至図5は本発明の第1の実施例におけるカメラのシーケンスフローチャートであり、図3はレリーズスイッチ3がONされた場合の制御回路2のシーケンスを示す。   FIGS. 3 to 5 are sequence flowcharts of the camera according to the first embodiment of the present invention. FIG. 3 shows a sequence of the control circuit 2 when the release switch 3 is turned on.

S101は、制御回路2内のメモリーの所定のエリアに動作不良発生を意味する「NGフラグ」が設定されているか否かを判定し、設定されていれば(“1”ならば)該シーケンスを終了し待機状態へ、設定されていなければ(“1”でなければ)S102へ移行する。   In S101, it is determined whether or not the “NG flag” indicating the occurrence of malfunction is set in a predetermined area of the memory in the control circuit 2, and if it is set (if “1”), the sequence is executed. If not set (if not "1"), the process proceeds to S102.

すなわち、「NGフラグ」が設定されている場合、露光を行なわず(露光を禁止して)待機状態へ移行する。   That is, when the “NG flag” is set, the exposure is not performed (exposure is prohibited) and the process shifts to a standby state.

なお、動作不良が発生した場合、「NGフラグ」設定時点で表示手段9等にその旨を警告する表示を行なうものであるため、「NGフラグ」が確認された際には、使用者は表示手段による警告を確認できているものとする。   When a malfunction occurs, when the “NG flag” is set, the display means 9 displays a warning to that effect. Therefore, when the “NG flag” is confirmed, the user displays It is assumed that the warning by means has been confirmed.

S102は、該AE手段5により、周知の測光方法で被写体の明るさ:AEを測定する。   In S102, the AE means 5 measures the brightness: AE of the subject by a known photometric method.

S103は、予め設定されている基準の明るさ:BとS102で測定した被写体の明るさ:AEを比較し、AE<BであればS104へ、AE<BでなければS107へ移行する。   In S103, the reference brightness set in advance: B is compared with the brightness of the subject measured in S102: AE. If AE <B, the process proceeds to S104, and if AE <B, the process proceeds to S107.

S104は、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   In S104, the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 are used to measure the voltage HV charged in the light emitting energy storage capacitor MC (MC1 and MC2).

該充電電圧検出は、既に説明している通り、HVを直接測定するわけではなく、分割抵抗を介した電圧HV’を測定し、該電圧:HV’からHVを求める。   As described above, the charging voltage detection does not directly measure the HV, but measures the voltage HV ′ via the dividing resistor and obtains the HV from the voltage: HV ′.

S105は、上記S104で求めたHVと充電完了判定電圧:Vfullを比較し、HV≧Vfullの場合はS107へ、HV≧Vfullでない場合はS106へ移行する。   In S105, the HV obtained in S104 is compared with the charging completion determination voltage: Vfull. If HV ≧ Vfull, the process proceeds to S107, and if not HV ≧ Vfull, the process proceeds to S106.

S106は、ストロボ充電動作1のシーケンスに入る。詳細は図4で後述するが、該ステップS106の充電動作は、残電圧が状況によって異なるので、従来どおりの充電動作であり、NGチェック動作は充電完了までの時間が基準値:Tfull未満か否かの確認のみを行なうものである。   S106 enters the sequence of the strobe charging operation 1. Although the details will be described later with reference to FIG. 4, the charging operation in step S106 is a conventional charging operation because the remaining voltage varies depending on the situation, and the NG check operation has a time until the completion of charging is less than the reference value: Tfull. This is only a confirmation.

S107は、該AF手段6により、周知の測距方法で被写体の距離を測定する。   In S107, the distance of the subject is measured by the AF means 6 by a known distance measuring method.

S108は、S102で測定した測光結果およびS107で測定した測距結果を基に、適正のピント・シャッター速度・ストロボ発光有無・ストロボ制御タイミング等の露光条件を求める演算を行なう。   In S108, calculation is performed to obtain exposure conditions such as an appropriate focus, shutter speed, strobe light emission, and strobe control timing based on the photometry result measured in S102 and the distance measurement result measured in S107.

なお、該S108では、適正露光を得るためにストロボ発光させる必要がある場合は、該制御回路2内のメモリーの所定エリアにストロボ発光指示用のストロボ発光フラグを設定する。   In S108, when it is necessary to emit strobe light to obtain proper exposure, a strobe light emission flag for strobe light emission instruction is set in a predetermined area of the memory in the control circuit 2.

S109は、上記S108で求めた露光条件に基づき該SH手段7の制御を行なう周知の露光動作を行なう。   In S109, a well-known exposure operation for controlling the SH means 7 is performed based on the exposure condition obtained in S108.

該S109では、上記S108で該ストロボ発光フラグが設定されている場合、ストロボ発光による露光動作を行なう。   In S109, when the strobe emission flag is set in S108, an exposure operation by strobe emission is performed.

S110は、該給送手段8により、不図示のフィルムを移動させる(次の露光コマを不図示のアパーチャー位置に設定する)給送動作を行なう。   In S110, the feeding unit 8 performs a feeding operation of moving a film (not shown) (setting the next exposure frame to an aperture position (not shown)).

S111はストロボ発光の履歴を確認する為、該制御回路2内のメモリーのストロボ発光フラグの状態を確認し、該ストロボ発光フラグがストロボ発光に設定されている場合(S109でストロボ発光した場合)はS112へ、該ストロボ発光フラグがストロボ発光に設定されていない場合は待機状態へ移行する。なお、該S111を終了する際は、判定動作後、ストロボ発光フラグのデータをリセットするものである。   In S111, in order to check the flash emission history, the status of the flash emission flag in the memory in the control circuit 2 is checked, and when the flash emission flag is set to flash emission (when the flash is emitted in S109). If the strobe emission flag is not set to strobe emission, the process proceeds to a standby state. When ending S111, the flash emission flag data is reset after the determination operation.

S112は、ストロボ発光直後の充電動作であるところの、ストロボ充電動作2のシーケンスに入る。詳細は図5で後述するが、該ステップS112の充電動作は、発光後であり残電圧はほとんど同じ状況になるので、NGチェック動作は充電完了までの時間が基準値:Tfull未満か否かの確認、および、所定電圧:V1までの充電時間が基準時間:Tx以上か否かの確認を行なうものである。   S112 enters the sequence of the strobe charging operation 2 which is the charging operation immediately after the strobe light emission. Although details will be described later with reference to FIG. 5, the charging operation in step S112 is after light emission and the remaining voltage is almost the same. Therefore, the NG check operation determines whether the time until the completion of charging is less than the reference value: Tfull. Confirmation and confirmation of whether or not the charging time to the predetermined voltage: V1 is equal to or longer than the reference time: Tx.

該S112を終了したら該制御回路2は操作待機状態となる。   When S112 ends, the control circuit 2 enters an operation standby state.

以上が、レリーズスイッチ3がONされた場合の制御回路2のシーケンスである。   The above is the sequence of the control circuit 2 when the release switch 3 is turned on.

図4は上記図3におけるS106の充電動作1の詳細シーケンスを示す。   FIG. 4 shows a detailed sequence of the charging operation 1 in S106 in FIG.

S201は、該制御回路2内のタイマー:Tをリセットする。   In step S201, the timer T in the control circuit 2 is reset.

S202は、図3のS104と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S202 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 as in S104 of FIG. 3 to charge the light emitting energy storage capacitors MC (MC1 and MC2). Voltage: HV is measured.

S203は、ストロボ装置4の充電手段4−1を駆動し、メインコンデンサMCへの充電を開始する。   In step S203, the charging unit 4-1 of the strobe device 4 is driven to start charging the main capacitor MC.

S204は、表示手段9により、ストロボの充電動作中を示す警告表示(例えばイナズママークの点滅等)を行なう。   In step S204, the display unit 9 displays a warning indicating that the flash is being charged (for example, flashing of a progress mark).

S205は、該制御回路2内のタイマー:Tのカウントをスタートする。   In step S205, the timer T in the control circuit 2 is started.

S206は、S202と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S206 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S202, and the voltage for charging the light emitting energy storage capacitor: MC (MC1 and MC2): HV Measure.

S207は、前記S206で測定した充電電圧:HVと比較電圧:Vfull(本実施例では充電完了電圧。〔例えば、320V〕)と比較し、HV≧Vfullの場合はS212へ、HV≧Vfullでない場合はS208へ移行する。   S207 is compared with the charging voltage: HV measured in S206 and the comparison voltage: Vfull (in this embodiment, the charging completion voltage [eg, 320V]). If HV ≧ Vfull, the process proceeds to S212. Proceeds to S208.

S208は、前記S205でカウントを開始したタイマー:Tを所定時間:Tfull(本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS209へ、T≧Tfullでない場合はS206へ移行する。   S208 is a timer that starts counting in S205: T is set to a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be fully charged from 0V to the charging time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S209, and if T ≧ Tfull, the process proceeds to S206.

S209は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S209, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is finished.

S210は、所定時間:Tfullを経過しても充電完了出来ないため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ1)を設定する。   In S210, since charging cannot be completed even after a predetermined time: Tfull has elapsed, it is determined that there is some abnormality, and an “NG flag” (charging NG flag 1) in a predetermined area of the memory in the control circuit 2 is set. To do.

S211は、表示手段9により、充電の問題を意味する警告表示(例えば、“H”(Helpマーク1)点滅)を行ない、次動作待機状態となる。   In S211, the display means 9 displays a warning indicating a charging problem (for example, “H” (Help mark 1) blinks) and enters the next operation standby state.

S212は、S209と同様に、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S212, similarly to S209, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S213は、表示手段9により、ストロボの充電完了を示す表示(例えばイナズママークの点灯等)を行ない、次動作待機状態となる。   In S213, the display unit 9 displays a display indicating that the flash unit has been charged (for example, lighting of a progress mark), and enters a next operation standby state.

以上が、上記図3におけるS106の充電動作1の詳細シーケンスである。   The above is the detailed sequence of the charging operation 1 in S106 in FIG.

図5は上記図3におけるS112の充電動作2の詳細シーケンスを示す。   FIG. 5 shows a detailed sequence of the charging operation 2 in S112 in FIG.

S301は、該制御回路2内のタイマー:Tをリセットする。   In step S301, the timer T in the control circuit 2 is reset.

S302は、図3のS104と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   Similar to S104 of FIG. 3, S302 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 to charge the light emitting energy storage capacitors: MC (MC1 and MC2). Voltage: HV is measured.

S303は、ストロボ装置4の充電手段4−1を駆動し、メインコンデンサMCへの充電を開始する。   In step S303, the charging unit 4-1 of the strobe device 4 is driven to start charging the main capacitor MC.

S304は、表示手段9により、ストロボの充電動作中を示す警告表示(例えばイナズママークの点滅等)を行なう。   In S304, the display means 9 displays a warning indicating that the strobe is being charged (for example, flashing of a progress mark).

S305は、該制御回路2内のタイマー:Tのカウントをスタートする。   In step S305, the timer T in the control circuit 2 starts counting.

S306は、S302と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S306 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S302, and the voltage charged to the light emitting energy storage capacitor MC (MC1 and MC2): HV Measure.

S307は、前記S306で測定した充電電圧:HVと比較電圧:V1 (本実施例では充電完了電圧の80%〔例えば、256V〕)と比較し、HV≧V1の場合はS312へ、HV≧V1でない場合はS308へ移行する。   S307 compares the charging voltage: HV measured in S306 with the comparison voltage: V1 (in this embodiment, 80% of the charging completion voltage [eg, 256V]). If HV ≧ V1, the process goes to S312 and HV ≧ V1. If not, the process proceeds to S308.

S308は、前記S305でカウントを開始したタイマー:Tを所定時間:Tfull(本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS309へ、T≧Tfullでない場合はS306へ移行する。   S308 is a timer that starts counting in S305: T is a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be fully charged from 0V to the normal time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S309, and if T ≧ Tfull, the process proceeds to S306.

S309は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In step S309, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S310は、所定時間:Tfullを経過しても充電完了出来ないため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ1)を設定する。   In S310, since the charging cannot be completed even after the predetermined time: Tfull has elapsed, it is determined that there is some abnormality, and the “NG flag” (charging NG flag 1) in the predetermined area of the memory in the control circuit 2 is set. To do.

S311は、表示手段9により、充電の問題を意味する警告表示(例えば、“H1”(Helpマーク1)点滅)を行ない、次動作待機状態となる。   In S311, the display means 9 displays a warning indicating a charging problem (for example, “H1” (Help mark 1) blinks), and enters the next operation standby state.

S312は、前記S305でカウントを開始したタイマー:Tを所定時間:Tx (本実施例では正常時のメインコンデンサMCが0V〜Vxできるまでの時間の1/2の約1.2倍〔例えば、2sec〕)と比較し、T<Txの場合はS313へ、T<Txでない場合はS316へ移行する。   S312 is a timer that starts counting in S305: T is a predetermined time: Tx (in this embodiment, approximately 1.2 times 1/2 of the time until the main capacitor MC in a normal state can be 0V to Vx [for example, 2sec]), if T <Tx, the process proceeds to S313, and if T <Tx, the process proceeds to S316.

S313は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In step S313, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S314は、所定時間:Txが経過する前に所定電圧:Vxまでの充電がなされたとして、正常時よりも充電時間が早いため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ2)を設定する。   S314 determines that there is some abnormality because the charging time is earlier than the normal time when charging to the predetermined voltage: Vx is made before the predetermined time: Tx elapses, and the memory in the control circuit 2 The “NG flag” (charging NG flag 2) in the predetermined area is set.

S315は、表示手段9により、充電の問題を意味する警告表示(例えば、“H2”(Helpマーク2)点滅)を行ない、次動作待機状態となる。   In S315, the display means 9 displays a warning indicating a charging problem (for example, “H2” (Help mark 2) blinks) and enters the next operation standby state.

S316は、S306と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S316 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S306, and the voltage for charging the light-emitting energy storage capacitors MC (MC1 and MC2): HV Measure.

S317は、前記S316で測定した充電電圧:HVと比較電圧:Vfull(本実施例では充電完了電圧〔例えば、320V〕)と比較し、HV≧Vfullの場合はS319へ、HV≧Vfullでない場合はS318へ移行する。   S317 compares the charging voltage: HV measured in S316 and the comparison voltage: Vfull (in this embodiment, charging completion voltage [eg, 320V]). If HV ≧ Vfull, the process proceeds to S319, and if HV ≧ Vfull is not satisfied The process proceeds to S318.

S318は、前記S305でカウントを開始したタイマー:Tを所定時間:Tfull (本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS309へ、T≧Tfullでない場合はS316へ移行する。   S318 is a timer that starts counting in S305: T is a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be charged from 0V to the normal time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S309, and if T ≧ Tfull, the process proceeds to S316.

S319は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S319, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S320は、表示手段9により、ストロボの充電完了を示す表示(例えばイナズママークの点灯等)を行ない、次動作待機状態となる。   In S320, the display unit 9 displays a display indicating the completion of charging of the strobe (for example, lighting of a progress mark), and enters a next operation standby state.

以上が、上記図3におけるS112の充電動作2の詳細シーケンスである。   The above is the detailed sequence of the charging operation 2 in S112 in FIG.

すなわち、本発明の第1の実施例においては、所定電圧:Vxまでの充電時間が所定時間:Txより短い場合、通常とは異なる制御であるところの警告表示および撮影(露光動作)禁止動作を行なうこととなる。   That is, in the first embodiment of the present invention, when the charging time to the predetermined voltage: Vx is shorter than the predetermined time: Tx, the warning display and the photographing (exposure operation) prohibiting operation, which are different from the normal control, are performed. Will be done.

また、所定電圧:Vxまでの充電時間が所定時間:Txより短いか否かの判定は、露光動作時にストロボ発光がなされた場合、つまり、ストロボ発光によりメインコンデンサMCの充電電圧がほとんどないという充電状況の場合の、ストロボ発光直後の充電動作(充電動作2)で行なっている。   Further, whether or not the charging time to the predetermined voltage: Vx is shorter than the predetermined time: Tx is determined when the strobe light is emitted during the exposure operation, that is, the charging that the main capacitor MC has almost no charging voltage due to the strobe light emission. In the case of the situation, the charging operation is performed immediately after the flash emission (charging operation 2).

なお、図14には、本発明の充電電圧検出手段におけるメインコンデンサMCの充電カーブを示している。   FIG. 14 shows a charging curve of the main capacitor MC in the charging voltage detecting means of the present invention.

メインコンデンサMC(MC1とMC2の並列接続)の接続が正常な場合は、所定電圧:V1までの充電時間が所定時間:Txより長く、所定電圧:Vfullまでの充電時間が所定時間:Tfullより短くなっている。   When the connection of the main capacitor MC (parallel connection of MC1 and MC2) is normal, the charging time to the predetermined voltage: V1 is longer than the predetermined time: Tx, and the charging time to the predetermined voltage: Vfull is shorter than the predetermined time: Tfull. It has become.

しかし、メインコンデンサMCの接続が異常な場合(例えば、MC1の接続リード線がはずれた場合)、所定電圧:V1までの充電時間が所定時間:Txより短くなっている。   However, when the connection of the main capacitor MC is abnormal (for example, when the connection lead wire of MC1 is disconnected), the charging time to the predetermined voltage: V1 is shorter than the predetermined time: Tx.

該状況は、本発明の充電シーケンス2である充電動作2(図5)で異常判定することができる。   This situation can be determined as abnormal in the charging operation 2 (FIG. 5) which is the charging sequence 2 of the present invention.

(第2の実施例)
本発明の第2の実施例を図6乃至図7を用いて説明する。
(Second embodiment)
A second embodiment of the present invention will be described with reference to FIGS.

なお、カメラの構成等は本発明第1の実施例と同様であり、既に説明済みであるため、ここでの説明は割愛する。   The configuration of the camera is the same as that of the first embodiment of the present invention, and since it has already been described, description thereof is omitted here.

図6はレリーズスイッチ3がONされた場合の制御回路2のシーケンスを示す。   FIG. 6 shows a sequence of the control circuit 2 when the release switch 3 is turned on.

S401は、制御回路2内のメモリーの所定のエリアに動作不良発生を意味する「NGフラグ」が設定されているか否かを判定し、設定されていれば(“1”ならば)該シーケンスを終了し待機状態へ、設定されていなければ(“1”でなければ)S402へ移行する。   In step S401, it is determined whether or not an “NG flag” indicating the occurrence of an operation failure is set in a predetermined area of the memory in the control circuit 2. If it is set (if “1”), the sequence is performed. If it is not set (“1”), the process proceeds to S402.

すなわち、「NGフラグ」が設定されている場合、露光を行なわず(露光を禁止して)待機状態へ移行する。   That is, when the “NG flag” is set, the exposure is not performed (exposure is prohibited) and the process shifts to a standby state.

なお、動作不良が発生した場合、「NGフラグ」設定時点で表示手段9等にその旨を警告する表示を行なうものであるため、「NGフラグ」が確認された際には、使用者は表示手段による警告を確認できているものとする。   When a malfunction occurs, when the “NG flag” is set, the display means 9 displays a warning to that effect. Therefore, when the “NG flag” is confirmed, the user displays It is assumed that the warning by means has been confirmed.

S402は、該AE手段5により、周知の測光方法で被写体の明るさ:AEを測定する。   In S402, the AE means 5 measures the brightness: AE of the subject by a known photometric method.

S403は、予め設定されている基準の明るさ:BとS402で測定した被写体の明るさ:AEを比較し、AE<BであればS404へ、AE<BでなければS406へ移行する。   In S403, the reference brightness set in advance: B is compared with the brightness of the subject measured in S402: AE. If AE <B, the process proceeds to S404, and if AE <B, the process proceeds to S406.

S404は、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   In S404, the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 are used to measure the voltage HV charged in the light emitting energy storage capacitor MC (MC1 and MC2).

該充電電圧検出は、既に説明している通り、HVを直接測定するわけではなく、分割抵抗を介した電圧HV’を測定し、該電圧:HV’からHVを求める。   As described above, the charging voltage detection does not directly measure the HV, but measures the voltage HV ′ via the dividing resistor and obtains the HV from the voltage: HV ′.

S405は、上記S404で求めたHVと充電完了判定電圧:Vfullを比較し、HV≧Vfullの場合はS406へ、HV≧Vfullでない場合はS411へ移行する。   In S405, the HV obtained in S404 is compared with the charging completion determination voltage: Vfull. If HV ≧ Vfull, the process proceeds to S406, and if HV ≧ Vfull, the process proceeds to S411.

S406は、該AF手段6により、周知の測距方法で被写体の距離を測定する。   In S406, the AF unit 6 measures the distance of the subject by a known distance measuring method.

S407は、S402で測定した測光結果およびS107で測定した測距結果を基に、適正のピント・シャッター速度等の露光条件を求める演算を行なう。   In S407, a calculation for obtaining an exposure condition such as an appropriate focus / shutter speed is performed based on the photometry result measured in S402 and the distance measurement result measured in S107.

なお、該S407では、適正露光を得るためにストロボ発光させる必要がある場合は、該制御回路2内のメモリーの所定エリアにストロボ発光指示用のストロボ発光フラグを設定する。   In step S407, if it is necessary to emit strobe light to obtain proper exposure, a strobe light emission flag for strobe light emission instruction is set in a predetermined area of the memory in the control circuit 2.

S408は、上記S407で求めた露光条件に基づき該SH手段7の制御を行なう周知の露光動作を行なう。   In S408, a well-known exposure operation for controlling the SH means 7 is performed based on the exposure condition obtained in S407.

該S408では、上記S407で該ストロボ発光フラグが設定されている場合、ストロボ発光による露光動作を行なう。   In S408, when the strobe emission flag is set in S407, an exposure operation by strobe emission is performed.

S409は、該給送手段8により、不図示のフィルムを移動させる(次の露光コマを不図示のアパーチャー位置に設定する)給送動作を行なう。   In step S409, the feeding unit 8 performs a feeding operation of moving a film (not shown) (setting the next exposure frame to an aperture position (not shown)).

S410はストロボ発光の履歴を確認する為、該制御回路2内のメモリーのストロボ発光フラグの状態を確認し、該ストロボ発光フラグがストロボ発光に設定されている場合(S408でストロボ発光した場合)はS411へ、該ストロボ発光フラグがストロボ発光に設定されていない場合は待機状態へ移行する。なお、該S410を終了する際は、判定動作後、ストロボ発光フラグのデータをリセットするものである。   In step S410, in order to check the flash emission history, the state of the flash emission flag in the memory in the control circuit 2 is checked, and when the flash emission flag is set to flash emission (when the flash emission is made in S408). If the strobe emission flag is not set to strobe emission, the process proceeds to S411. When ending S410, the data of the flash emission flag is reset after the determination operation.

S411は、ストロボ充電動作3のシーケンスに入る。詳細は図7で後述するが、該ステップS411の充電動作は、発光後であり残電圧はほとんど同じ状況になるので、NGチェック動作は充電完了までの時間が基準値:Tfull未満か否かの確認、および、所定電圧:V1までの充電時間が基準時間:Tx以上か否かの確認を行なうものである。   S411 enters the sequence of the strobe charging operation 3. Although the details will be described later with reference to FIG. 7, the charging operation in step S411 is after light emission and the remaining voltage is almost the same. Therefore, the NG check operation determines whether the time until completion of charging is less than the reference value: Tfull. Confirmation and confirmation of whether or not the charging time to the predetermined voltage: V1 is equal to or longer than the reference time: Tx.

該S411を終了したら該制御回路2は操作待機状態となる。   When S411 ends, the control circuit 2 enters an operation standby state.

以上が、本発明の第2の実施例におけるレリーズスイッチ3がONされた場合の制御回路2のシーケンスである。   The above is the sequence of the control circuit 2 when the release switch 3 is turned on in the second embodiment of the present invention.

図7は上記図6におけるS411の充電動作3の詳細シーケンスを示す。   FIG. 7 shows a detailed sequence of the charging operation 3 in S411 in FIG.

S501は、該制御回路2内のタイマー:Tをリセットする。   In step S501, the timer T in the control circuit 2 is reset.

S502は、図3のS104と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   Similar to S104 of FIG. 3, S502 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 to charge the light emitting energy storage capacitors: MC (MC1 and MC2). Voltage: HV is measured.

S503は、ストロボ装置4の充電手段4−1を駆動し、メインコンデンサMCへの充電を開始する。   In step S503, the charging unit 4-1 of the strobe device 4 is driven to start charging the main capacitor MC.

S504は、表示手段9により、ストロボの充電動作中を示す警告表示(例えばイナズママークの点滅等)を行なう。   In S504, the display means 9 displays a warning indicating that the strobe is being charged (for example, flashing of a progress mark).

S505は、該制御回路2内のタイマー:Tのカウントをスタートする。   In step S505, the timer T in the control circuit 2 starts counting.

S506は、前記S502で測定した充電電圧:HVと比較電圧:V0 (本実施例では充電完了電圧の1/2〔例えば、210V〕)と比較し、HV>V0の場合はS517へ、HV>V0でない場合はS507へ移行する。   In step S506, the charging voltage measured in S502 is compared with HV and the comparison voltage is V0 (in this embodiment, ½ of the charging completion voltage (eg, 210V)). If HV> V0, the process proceeds to S517. If it is not V0, the process proceeds to S507.

S507は、S502と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S507 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S502, and the voltage charged to the light emitting energy storage capacitor MC (MC1 and MC2): HV Measure.

S508は、前記S507で測定した充電電圧:HVと比較電圧:V1 (本実施例では充電完了電圧の80%〔例えば、256V〕)と比較し、HV≧V1の場合はS513へ、HV≧V1でない場合はS509へ移行する。   S508 is compared with the charging voltage: HV measured in S507 and the comparison voltage: V1 (in this embodiment, 80% of the charging completion voltage [eg, 256V]). If HV ≧ V1, the process proceeds to S513, and HV ≧ V1. If not, the process proceeds to S509.

S509は、前記S505でカウントを開始したタイマー:Tを所定時間:Tfull(本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS510へ、T≧Tfullでない場合はS507へ移行する。   S509 is a timer that started counting in S505: T is set to a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be charged from 0V to the normal time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S510, and if T ≧ Tfull, the process proceeds to S507.

S510は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S510, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is finished.

S511は、所定時間:Tfullを経過しても充電完了出来ないため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ1)を設定する。   In S511, since charging cannot be completed even after a predetermined time: Tfull has elapsed, it is determined that there is some abnormality, and an “NG flag” (charging NG flag 1) in a predetermined area of the memory in the control circuit 2 is set. To do.

S512は、表示手段9により、充電の問題を意味する警告表示(例えば、“H1”(Helpマーク1)点滅)を行ない、次動作待機状態となる。   In S512, the display means 9 displays a warning indicating a charging problem (for example, “H1” (Help mark 1) blinks), and enters the next operation standby state.

S513は、前記S505でカウントを開始したタイマー:Tを所定時間:Tx (本実施例では正常時のメインコンデンサMCが0V〜Vxできるまでの時間の1/2の約1.2倍〔例えば、2sec〕)と比較し、T<Txの場合はS514へ、T<Txでない場合はS517へ移行する。   S513 is a timer that starts counting in S505: T is a predetermined time: Tx (in this embodiment, about 1.2 times 1/2 of the time until the main capacitor MC in a normal state can be 0 V to Vx [for example, 2sec]), the process proceeds to S514 if T <Tx, and to S517 if T <Tx.

S514は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S514, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S515は、所定時間:Txが経過する前に所定電圧:Vxまでの充電がなされたとして、正常時よりも充電時間が早いため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ2)を設定する。   S515 determines that there is some abnormality because the charging time is earlier than the normal time, assuming that the charging to the predetermined voltage: Vx is performed before the predetermined time: Tx elapses, and the memory in the control circuit 2 The “NG flag” (charging NG flag 2) in the predetermined area is set.

S516は、表示手段9により、充電の問題を意味する警告表示(例えば、“H2”(Helpマーク2)点滅)を行ない、次動作待機状態となる。   In S516, the display means 9 displays a warning indicating a charging problem (for example, “H2” (Help mark 2) blinks), and enters the next operation standby state.

S517は、S507と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S517 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S507, and the voltage stored in the luminescence energy storage capacitor MC (MC1 and MC2) is HV. Measure.

S518は、前記S517で測定した充電電圧:HVと比較電圧:Vfull(本実施例では充電完了電圧〔例えば、320V〕)と比較し、HV≧Vfullの場合はS520へ、HV≧Vfullでない場合はS519へ移行する。   S518 is compared with the charging voltage: HV measured in S517 and the comparison voltage: Vfull (in this embodiment, charging completion voltage [eg, 320V]). If HV ≧ Vfull, the process proceeds to S520, and if HV ≧ Vfull is not satisfied. The process proceeds to S519.

S519は、前記S505でカウントを開始したタイマー:Tを所定時間:Tfull (本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS510へ、T≧Tfullでない場合はS517へ移行する。   S519 is a timer that starts counting in S505: T is set to a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be fully charged from 0 V to the charging time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S510, and if T ≧ Tfull, the process proceeds to S517.

S520は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S520, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is finished.

S521は、表示手段9により、ストロボの充電完了を示す表示(例えばイナズママークの点灯等)を行ない、次動作待機状態となる。   In S521, the display unit 9 displays a display indicating the completion of charging of the strobe (for example, lighting of a progress mark) and enters a next operation standby state.

以上が、上記図6におけるS411の充電動作2の詳細シーケンスである。   The above is the detailed sequence of the charging operation 2 in S411 in FIG.

上記本発明の第2の実施例では、充電電圧:HVの充電状況が、比較電圧V0より高いか否かによって、所定電圧:Vxまでの充電時間が所定時間:Txより短いか否かの判定を行なうか否かの判定を行なっている。   In the second embodiment of the present invention, it is determined whether the charging time to the predetermined voltage: Vx is shorter than the predetermined time: Tx depending on whether the charging state of the charging voltage: HV is higher than the comparison voltage V0. It is determined whether or not to perform.

なお、上記本発明の第2の実施例においては比較電圧:V0を基準に、所定時間:Txより短いか否かの判定を行なうという2値的な切換になっているが、本発明はそれに限ったものではなく、例えば、メインコンデンサMCの電圧:HVの測定結果から、所定時間:Txや所定電圧:V1を可変設定することで、より細かな接続トラブル検知を行うことが可能となる。   In the second embodiment of the present invention, the binary switching is performed in which it is determined whether or not the predetermined time is shorter than Tx with reference to the comparison voltage V0. For example, from the measurement result of the voltage: HV of the main capacitor MC, by setting the predetermined time: Tx and the predetermined voltage: V1 variably, it is possible to detect more detailed connection troubles.

具体的には、HVが50Vの場合はV1:256V,Tx:1.2secだが、HVが100Vの場合はV1:280V,Tx:1.8sec、HVが200Vの場合はV1:300V,Tx:2.5sec等を、充電回路の効率とコンデンサ特性から算出して変化させたり、データテーブルを基に変化させたりしても何ら本発明の主旨に反するものではない。   Specifically, when HV is 50V, V1: 256V, Tx: 1.2 sec, but when HV is 100V, V1: 280V, Tx: 1.8 sec, and when HV is 200V, V1: 300V, Tx: It is not contrary to the gist of the present invention to change 2.5 sec etc. by calculating from the efficiency of the charging circuit and the capacitor characteristics, or changing it based on the data table.

(第3の実施例)
本発明の第3の実施例を図8を用いて説明する。
(Third embodiment)
A third embodiment of the present invention will be described with reference to FIG.

なお、カメラの構成等は本発明第1の実施例と同様であり、既に説明済みであるため、ここでの説明は割愛する。   The configuration of the camera is the same as that of the first embodiment of the present invention, and since it has already been described, description thereof is omitted here.

また、レリーズスイッチ3がONされた場合の制御回路2のシーケンスは、本発明の第2の実施例の図6と同様であるため、ここでの説明は割愛する。   Further, since the sequence of the control circuit 2 when the release switch 3 is turned on is the same as that of FIG. 6 of the second embodiment of the present invention, description thereof is omitted here.

図8は本発明の第3の実施例においての上記図6におけるS411の充電動作3の詳細シーケンスを示す。   FIG. 8 shows a detailed sequence of the charging operation 3 of S411 in FIG. 6 in the third embodiment of the present invention.

S601は、不図示の温度センサーにより、温度:Tempを測定する。   In S601, temperature: Temp is measured by a temperature sensor (not shown).

S602は、S601で測定した温度:Tempと比較データ:Yを比較し、Temp<YでなければS603へ、Temp<YならばS604へ移行する。   In S602, the temperature measured in S601: Temp and the comparison data: Y are compared. If Temp <Y, the process proceeds to S603, and if Temp <Y, the process proceeds to S604.

S603は、温度が所定温度:Yより高めにあるとして、充電時間測定基準である所定時間:Tx をTx1に設定する。   In S603, assuming that the temperature is higher than the predetermined temperature: Y, the predetermined time: Tx, which is a charging time measurement standard, is set to Tx1.

S604は、温度が所定温度:Yより低めにあるとして、充電時間測定基準である所定時間:Tx をTx2に設定する。   In S604, assuming that the temperature is lower than the predetermined temperature: Y, the predetermined time: Tx which is a charging time measurement standard is set to Tx2.

すなわち、該S602乃至S604によって、環境温度に応じて所定時間:Txを変化させる。   That is, the predetermined time: Tx is changed according to the environmental temperature through S602 to S604.

S605は、該制御回路2内のタイマー:Tをリセットする。   In step S605, the timer T in the control circuit 2 is reset.

S606は、図3のS104と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   In S606, similarly to S104 of FIG. 3, the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 are used to charge the luminescence energy storage capacitors MC (MC1 and MC2). Voltage: HV is measured.

S607は、ストロボ装置4の充電手段4−1を駆動し、メインコンデンサMCへの充電を開始する。   In S607, the charging unit 4-1 of the strobe device 4 is driven to start charging the main capacitor MC.

S608は、表示手段9により、ストロボの充電動作中を示す警告表示(例えばイナズママークの点滅等)を行なう。   In step S608, the display unit 9 displays a warning indicating that the strobe is being charged (for example, blinking of a progress mark).

S609は、該制御回路2内のタイマー:Tのカウントをスタートする。   In step S609, the timer T in the control circuit 2 starts counting.

S610は、前記S606で測定した充電電圧:HVと比較電圧:V0 (本実施例では充電完了電圧の1/2〔例えば、210V〕)と比較し、HV>V0の場合はS621へ、HV>V0でない場合はS611へ移行する。   S610 compares the charging voltage: HV measured in S606 with the comparison voltage: V0 (in this embodiment, 1/2 of the charging completion voltage [eg, 210V]). If HV> V0, go to S621, HV> If it is not V0, the process proceeds to S611.

S611は、S606と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S611 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S606, and the voltage charged to the light emitting energy storage capacitors MC (MC1 and MC2): HV Measure.

S612は、前記S611で測定した充電電圧:HVと比較電圧:V1 (本実施例では充電完了電圧の80%〔例えば、256V〕)と比較し、HV≧V1の場合はS617へ、HV≧V1でない場合はS613へ移行する。   S612 is compared with the charging voltage HV measured in S611 and the comparison voltage V1 (in this embodiment, 80% of the charging completion voltage [for example, 256V]). When HV ≧ V1, the process proceeds to S617, and HV ≧ V1. If not, the process proceeds to S613.

S613は、前記S609でカウントを開始したタイマー:Tを所定時間:Tfull(本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS614へ、T≧Tfullでない場合はS611へ移行する。   In step S613, the timer: T started counting in step S609 is set to a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be charged from 0V to the normal time [for example, 8.4 sec. ], The process proceeds to S614 if T ≧ Tfull, and to S611 if T ≧ Tfull.

S614は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S614, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S615は、所定時間:Tfullを経過しても充電完了出来ないため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ1)を設定する。   In S615, since charging cannot be completed even after a predetermined time: Tfull has passed, it is determined that there is some abnormality, and an “NG flag” (charging NG flag 1) in a predetermined area of the memory in the control circuit 2 is set. To do.

S616は、表示手段9により、充電の問題を意味する警告表示(例えば、“H1”(Helpマーク1)点滅)を行ない、次動作待機状態となる。   In S616, the display means 9 displays a warning indicating a charging problem (for example, “H1” (Help mark 1) blinks), and enters the next operation standby state.

S617は、前記S609でカウントを開始したタイマー:Tを前記S603乃至S604で設定した所定時間:Txと比較し、T<Txの場合はS618へ、T<Txでない場合はS621へ移行する。   In step S617, the timer T that has started counting in step S609 is compared with the predetermined time Tx set in steps S603 to S604. If T <Tx, the process proceeds to step S618. If T <Tx, the process proceeds to step S621.

S618は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S618, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S619は、所定時間:Txが経過する前に所定電圧:Vxまでの充電がなされたとして、正常時よりも充電時間が早いため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ2)を設定する。   S619 determines that there is some abnormality because the charging time is earlier than the normal time, assuming that the charging to the predetermined voltage: Vx is performed before the predetermined time: Tx elapses, and the memory in the control circuit 2 The “NG flag” (charging NG flag 2) in the predetermined area is set.

S620は、表示手段9により、充電の問題を意味する警告表示(例えば、“H2”(Helpマーク2)点滅)を行ない、次動作待機状態となる。   In S620, the display means 9 displays a warning indicating a charging problem (for example, “H2” (Help mark 2) blinks), and enters the next operation standby state.

S621は、S611と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S621 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S611, and the voltage stored in the luminescence energy storage capacitor MC (MC1 and MC2) is HV. Measure.

S622は、前記S621で測定した充電電圧:HVと比較電圧:Vfull(本実施例では充電完了電圧〔例えば、320V〕)と比較し、HV≧Vfullの場合はS624へ、HV≧Vfullでない場合はS623へ移行する。   S622 is compared with the charging voltage: HV measured in S621 and the comparison voltage: Vfull (in this embodiment, charging completion voltage [eg, 320V]). If HV ≧ Vfull, the process proceeds to S624, and if HV ≧ Vfull is not satisfied. The process proceeds to S623.

S623は、前記S609でカウントを開始したタイマー:Tを所定時間:Tfull (本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS614へ、T≧Tfullでない場合はS621へ移行する。   S623 is a timer that starts counting in S609: T is a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be fully charged from 0V to [for example, 8.4 sec.] ], If T ≧ Tfull, the process proceeds to S614, and if T ≧ Tfull, the process proceeds to S621.

S624は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S624, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S625は、表示手段9により、ストロボの充電完了を示す表示(例えばイナズママークの点灯等)を行ない、次動作待機状態となる。   In S625, the display unit 9 displays a display indicating that the strobe is fully charged (for example, lighting of a progress mark) and enters a next operation standby state.

以上が、本発明の第3の実施例においての上記図6におけるS411の充電動作2の詳細シーケンス(図8)である。   The above is the detailed sequence (FIG. 8) of the charging operation 2 of S411 in FIG. 6 in the third embodiment of the present invention.

なお、本実施例では、温度に関する所定時間:Txの変化を、切換点を所定温度:Yの1ポイントのみとして説明したが、本発明はそれに限られたものではなく、例えば、複数ポイントでの切換や、演算による係数で温度に対するTxの変化を行なわせても何ら本発明の主旨に反するものではない。   In the present embodiment, the change of the predetermined time Tx related to the temperature has been described with the switching point as only one point of the predetermined temperature Y, but the present invention is not limited to this, for example, at a plurality of points. It is not contrary to the gist of the present invention to change the Tx with respect to the temperature by switching or a coefficient by calculation.

(第4の実施例)
本発明の第4の実施例を図9を用いて説明する。
(Fourth embodiment)
A fourth embodiment of the present invention will be described with reference to FIG.

なお、カメラの構成等は本発明第1の実施例と同様であり、既に説明済みであるため、ここでの説明は割愛する。   The configuration of the camera is the same as that of the first embodiment of the present invention, and since it has already been described, description thereof is omitted here.

また、レリーズスイッチ3がONされた場合の制御回路2のシーケンスは、本発明の第2の実施例の図6と同様であるため、ここでの説明は割愛する。   Further, since the sequence of the control circuit 2 when the release switch 3 is turned on is the same as that of FIG. 6 of the second embodiment of the present invention, description thereof is omitted here.

図9は本発明の第3の実施例においての上記図6におけるS411の充電動作3の詳細シーケンスを示す。   FIG. 9 shows a detailed sequence of the charging operation 3 of S411 in FIG. 6 in the third embodiment of the present invention.

S701は、制御回路2内のA/Dコンバータにより電源電池1の電圧:VBATを測定する。   In step S <b> 701, the voltage: VBAT of the power supply battery 1 is measured by the A / D converter in the control circuit 2.

該VBAT測定時には、電源電池1の内部抵抗分の影響を鑑み、SH手段等の負荷に通電(閉じ方向通電)を行なった状態でVBATを測定する。   At the time of the VBAT measurement, in consideration of the influence of the internal resistance of the power supply battery 1, the VBAT is measured in a state where the load such as the SH means is energized (closed direction energization).

S702は、S701で測定した電源電圧:VBATと比較データ:Zを比較し、VBAT<ZでなければS703へ、VBAT<ZならばS704へ移行する。   In S702, the power supply voltage: VBAT measured in S701 is compared with the comparison data: Z. If VBAT <Z, the process proceeds to S703, and if VBAT <Z, the process proceeds to S704.

S703は、電源電圧:VBATが所定電圧:Zより高めにあるとして、充電時間測定基準である所定時間:Tx をTx1に設定する。   In step S703, assuming that the power supply voltage: VBAT is higher than the predetermined voltage: Z, the predetermined time: Tx which is a charging time measurement standard is set to Tx1.

S704は、電源電圧:VBATが所定電圧:Zより低めにあるとして、充電時間測定基準である所定時間:Tx をTx2に設定する。   In S704, assuming that the power supply voltage: VBAT is lower than the predetermined voltage: Z, the predetermined time: Tx which is a charging time measurement reference is set to Tx2.

すなわち、該S702乃至S704によって、環境温度に応じて所定時間:Txを変化させる。   That is, by S702 to S704, the predetermined time: Tx is changed according to the environmental temperature.

S705は、該制御回路2内のタイマー:Tをリセットする。   In step S705, the timer T in the control circuit 2 is reset.

S706は、図3のS104と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   In S706, similarly to S104 of FIG. 3, the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 are used to charge the luminescence energy storage capacitors: MC (MC1 and MC2). Voltage: HV is measured.

S707は、ストロボ装置4の充電手段4−1を駆動し、メインコンデンサMCへの充電を開始する。   In step S707, the charging unit 4-1 of the strobe device 4 is driven to start charging the main capacitor MC.

S708は、表示手段9により、ストロボの充電動作中を示す警告表示(例えばイナズママークの点滅等)を行なう。   In S708, the display means 9 displays a warning indicating that the strobe is being charged (for example, flashing of a progress mark).

S709は、該制御回路2内のタイマー:Tのカウントをスタートする。   In step S709, the timer T in the control circuit 2 starts counting.

S710は、前記S706で測定した充電電圧:HVと比較電圧:V0 (本実施例では充電完了電圧の1/2〔例えば、210V〕)と比較し、HV>V0の場合はS621へ、HV>V0でない場合はS611へ移行する。   S710 compares the charging voltage: HV measured in S706 with a comparison voltage: V0 (in this embodiment, 1/2 of the charging completion voltage [eg, 210V]). If HV> V0, go to S621, HV> If it is not V0, the process proceeds to S611.

S711は、S706と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S711 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S706, and the voltage stored in the light-emitting energy storage capacitor MC (MC1 and MC2) is HV. Measure.

S712は、前記S711で測定した充電電圧:HVと比較電圧:V1 (本実施例では充電完了電圧の80%〔例えば、256V〕)と比較し、HV≧V1の場合はS717へ、HV≧V1でない場合はS713へ移行する。   S712 is compared with the charging voltage HV measured in S711 and the comparison voltage V1 (in this embodiment, 80% of the charging completion voltage [e.g., 256V]). If HV ≧ V1, the process proceeds to S717, and HV ≧ V1. If not, the process proceeds to S713.

S713は、前記S709でカウントを開始したタイマー:Tを所定時間:Tfull(本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS714へ、T≧Tfullでない場合はS711へ移行する。   In step S713, the timer T started counting in step S709 is set to a predetermined time Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be charged from 0V to the normal time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S714, and if T ≧ Tfull, the process proceeds to S711.

S714は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S714, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is finished.

S715は、所定時間:Tfullを経過しても充電完了出来ないため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ1)を設定する。   In S715, since charging cannot be completed even after a predetermined time: Tfull has elapsed, it is determined that there is some abnormality, and an “NG flag” (charging NG flag 1) in a predetermined area of the memory in the control circuit 2 is set. To do.

S716は、表示手段9により、充電の問題を意味する警告表示(例えば、“H1”(Helpマーク1)点滅)を行ない、次動作待機状態となる。   In S716, the display means 9 displays a warning indicating a charging problem (for example, “H1” (Help mark 1) blinks), and enters the next operation standby state.

S717は、前記S709でカウントを開始したタイマー:Tを前記S703乃至S704で設定した所定時間:Txと比較し、T<Txの場合はS718へ、T<Txでない場合はS721へ移行する。   In step S717, the timer T that has started counting in step S709 is compared with the predetermined time Tx set in steps S703 to S704. If T <Tx, the process proceeds to step S718. If T <Tx, the process proceeds to step S721.

S718は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S718, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is finished.

S719は、所定時間:Txが経過する前に所定電圧:Vxまでの充電がなされたとして、正常時よりも充電時間が早いため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ2)を設定する。   S719 determines that there is some abnormality because the charging time is earlier than the normal time, assuming that charging to the predetermined voltage: Vx is performed before the predetermined time: Tx elapses, and the memory in the control circuit 2 The “NG flag” (charging NG flag 2) in the predetermined area is set.

S720は、表示手段9により、充電の問題を意味する警告表示(例えば、“H2”(Helpマーク2)点滅)を行ない、次動作待機状態となる。   In S720, the display means 9 displays a warning indicating a charging problem (for example, “H2” (Help mark 2) blinks) and enters the next operation standby state.

S721は、S711と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S721 uses the charge voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S711, and the voltage stored in the light-emitting energy storage capacitor MC (MC1 and MC2): HV Measure.

S722は、前記S721で測定した充電電圧:HVと比較電圧:Vfull(本実施例では充電完了電圧〔例えば、320V〕)と比較し、HV≧Vfullの場合はS724へ、HV≧Vfullでない場合はS723へ移行する。   S722 is compared with the charging voltage: HV measured in S721 and the comparison voltage: Vfull (in this embodiment, charging completion voltage [eg, 320V]). If HV ≧ Vfull, the process proceeds to S724, and if HV ≧ Vfull is not satisfied. The process proceeds to S723.

S723は、前記S709でカウントを開始したタイマー:Tを所定時間:Tfull (本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS714へ、T≧Tfullでない場合はS721へ移行する。   S723 is a timer that starts counting in S709: T is set to a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be fully charged from 0V to [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S714. If T ≧ Tfull, the process proceeds to S721.

S724は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S724, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is finished.

S725は、表示手段9により、ストロボの充電完了を示す表示(例えばイナズママークの点灯等)を行ない、次動作待機状態となる。   In S725, the display unit 9 displays a display indicating the completion of charging of the strobe (for example, lighting of a progress mark) and enters a next operation standby state.

以上が、本発明の第4の実施例においての上記図6におけるS411の充電動作2の詳細シーケンス(図9)である。   The above is the detailed sequence (FIG. 9) of the charging operation 2 of S411 in FIG. 6 in the fourth embodiment of the present invention.

なお、本実施例では、電源電圧に関する所定時間:Txの変化を、切換点を所定電圧:Zの1ポイントのみとして説明したが、本発明はそれに限られたものではなく、例えば、複数ポイントでの切換や、演算による係数で電源電圧に対するTxの変化を行なわせても何ら本発明の主旨に反するものではない。   In the present embodiment, the change in the predetermined time: Tx related to the power supply voltage has been described with only one point of the predetermined voltage: Z as the switching point. However, the present invention is not limited to this, for example, at a plurality of points. It is not contrary to the gist of the present invention to change the Tx with respect to the power supply voltage by switching or by a coefficient by calculation.

(第5の実施例)
本発明の第5の実施例を図10を用いて説明する。
(Fifth embodiment)
A fifth embodiment of the present invention will be described with reference to FIG.

なお、カメラの構成等は本発明第1の実施例と同様であり、既に説明済みであるため、ここでの説明は割愛する。   The configuration of the camera is the same as that of the first embodiment of the present invention, and since it has already been described, description thereof is omitted here.

また、レリーズスイッチ3がONされた場合の制御回路2のシーケンスは、本発明の第2の実施例の図6と同様であるため、ここでの説明は割愛する。   Further, since the sequence of the control circuit 2 when the release switch 3 is turned on is the same as that of FIG. 6 of the second embodiment of the present invention, description thereof is omitted here.

図10は本発明の第5の実施例においての上記図6におけるS411の充電動作3の詳細シーケンスを示す。   FIG. 10 shows a detailed sequence of the charging operation 3 of S411 in FIG. 6 in the fifth embodiment of the present invention.

S801は、該制御回路2内のタイマー:Tをリセットする。   In step S801, the timer T in the control circuit 2 is reset.

S802は、図3のS104と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S802 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 as in S104 of FIG. 3 to charge the light emitting energy storage capacitors MC (MC1 and MC2). Voltage: HV is measured.

S803は、前記S802で測定したメインコンデンサの充電電圧検出結果、すなわち、ストロボ充電開始前の充電電圧検出結果を基に、所定時間:Txを決定するための演算を行なう。   In step S803, calculation for determining a predetermined time: Tx is performed based on the charging voltage detection result of the main capacitor measured in step S802, that is, the charging voltage detection result before the start of strobe charging.

例えば、0VからVfullの充電を行なう場合の所定時間:Txを基準とし、Vfull−HVで充電残量を求め、その残量に見合った係数をTxにかけた値を判断基準:Txとする。   For example, a predetermined time when charging from 0 V to Vfull: Tx is used as a reference, the remaining charge is obtained from Vfull-HV, and a value obtained by multiplying a coefficient corresponding to the remaining charge by Tx is used as a determination reference: Tx.

すなわち、判断基準をストロボ充電開始前の充電電圧検出結果に見合った判断基準時間:Txに変更する。   That is, the determination reference is changed to a determination reference time: Tx corresponding to the charge voltage detection result before the start of strobe charging.

S804は、ストロボ装置4の充電手段4−1を駆動し、メインコンデンサMCへの充電を開始する。   In step S804, the charging unit 4-1 of the strobe device 4 is driven to start charging the main capacitor MC.

S805は、表示手段9により、ストロボの充電動作中を示す警告表示(例えばイナズママークの点滅等)を行なう。   In step S805, the display unit 9 displays a warning indicating that the flash is being charged (for example, flashing of a progress mark).

S806は、該制御回路2内のタイマー:Tのカウントをスタートする。   In step S806, the timer T in the control circuit 2 starts counting.

S807は、前記S802で測定した充電電圧:HVと比較電圧:V0 (本実施例では充電完了電圧の1/2〔例えば、210V〕)と比較し、HV>V0の場合はS818へ、HV>V0でない場合はS808へ移行する。   In step S807, the charging voltage: HV measured in step S802 is compared with the comparison voltage: V0 (in this embodiment, ½ of the charging completion voltage [eg, 210V]). If HV> V0, the process proceeds to step S818. If it is not V0, the process proceeds to S808.

S808は、S802と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S808 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S802, and the voltage for charging the light emitting energy storage capacitors MC (MC1 and MC2): HV Measure.

S809は、前記S808で測定した充電電圧:HVと比較電圧:V1 (本実施例では充電完了電圧の80%〔例えば、256V〕)と比較し、HV≧V1の場合はS814へ、HV≧V1でない場合はS810へ移行する。   S809 compares the charging voltage: HV measured in S808 with the comparison voltage: V1 (in this embodiment, 80% of the charging completion voltage [eg, 256V]). If HV ≧ V1, the process proceeds to S814, and HV ≧ V1. If not, the process proceeds to S810.

S810は、前記S806でカウントを開始したタイマー:Tを所定時間:Tfull(本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS811へ、T≧Tfullでない場合はS808へ移行する。   In step S810, the timer T started counting in step S806 is set to a predetermined time Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be charged from 0V to the normal time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S811, and if T ≧ Tfull, the process proceeds to S808.

S811は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In step S811, driving of the charging unit 4-1 of the strobe device 4 is stopped, and charging of the main capacitor MC is terminated.

S812は、所定時間:Tfullを経過しても充電完了出来ないため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ1)を設定する。   In S812, since charging cannot be completed even after a predetermined time: Tfull, it is determined that there is some abnormality, and an “NG flag” (charging NG flag 1) in a predetermined area of the memory in the control circuit 2 is set. To do.

S813は、表示手段9により、充電の問題を意味する警告表示(例えば、“H1”(Helpマーク1)点滅)を行ない、次動作待機状態となる。   In step S813, the display unit 9 displays a warning indicating a charging problem (for example, “H1” (Help mark 1) blinks), and enters a next operation standby state.

S814は、前記S806でカウントを開始したタイマー:Tを前記S803で設定した所定時間:Txと比較し、T<Txの場合はS815へ、T<Txでない場合はS818へ移行する。   In step S814, the timer T started counting in step S806 is compared with the predetermined time Tx set in step S803. If T <Tx, the process proceeds to step S815. If T <Tx, the process proceeds to step S818.

S815は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S815, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S816は、所定時間:Txが経過する前に所定電圧:Vxまでの充電がなされたとして、正常時よりも充電時間が早いため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ2)を設定する。   In S816, it is determined that there is some abnormality because the charging time is earlier than the normal time when charging to the predetermined voltage: Vx is performed before the predetermined time: Tx elapses, and the memory in the control circuit 2 The “NG flag” (charging NG flag 2) in the predetermined area is set.

S817は、表示手段9により、充電の問題を意味する警告表示(例えば、“H2”(Helpマーク2)点滅)を行ない、次動作待機状態となる。   In S817, the display means 9 displays a warning indicating a charging problem (for example, “H2” (Help mark 2) blinks), and enters the next operation standby state.

S818は、S802と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S818 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S802, and the voltage charged to the light emitting energy storage capacitor MC (MC1 and MC2): HV Measure.

S819は、前記S818で測定した充電電圧:HVと比較電圧:Vfull(本実施例では充電完了電圧〔例えば、320V〕)と比較し、HV≧Vfullの場合はS821へ、HV≧Vfullでない場合はS820へ移行する。   S819 is compared with the charging voltage: HV measured in S818 and the comparison voltage: Vfull (in this embodiment, the charging completion voltage [eg, 320V]). If HV ≧ Vfull, the process proceeds to S821, and if HV ≧ Vfull, The process proceeds to S820.

S820は、前記S806でカウントを開始したタイマー:Tを所定時間:Tfull (本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS811へ、T≧Tfullでない場合はS818へ移行する。   In step S820, the timer: T started counting in step S806 is set to a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be charged from 0V to the normal time [for example, 8.4 sec. ], The process proceeds to S811 if T ≧ Tfull, and to S818 if T ≧ Tfull.

S821は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In S821, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S822は、表示手段9により、ストロボの充電完了を示す表示(例えばイナズママークの点灯等)を行ない、次動作待機状態となる。   In step S822, the display unit 9 displays the strobe charging completion (for example, lighting of a progress mark), and enters the next operation standby state.

以上が、本発明の第5の実施例においての上記図6におけるS411の充電動作2の詳細シーケンス(図10)である。   The above is the detailed sequence (FIG. 10) of the charging operation 2 of S411 in FIG. 6 in the fifth embodiment of the present invention.

なお、本実施例では、判定基準時間設定のファクターを充電電圧検出結果のみとして記載しているが、本発明の主旨としては、前記本発明の第3の実施例乃至第4の実施例のように、判定基準演算の係数に環境温度・電源電池電圧等のファクターを加えておいても何ら本発明の主旨に反するものではない。   In this embodiment, the factor for setting the determination reference time is described as only the charge voltage detection result. However, the gist of the present invention is as in the third to fourth embodiments of the present invention. In addition, adding factors such as environmental temperature and power supply battery voltage to the coefficient of determination criterion calculation does not contradict the gist of the present invention.

また、ここまでの説明は、全てカメラ内部のシーケンスとして使用していたが、本シーケンスは、例えばカメラ等の製品製造工程で使用される調整工具に適用することもできる。   Further, all the description so far has been used as a sequence inside the camera, but this sequence can also be applied to an adjustment tool used in a product manufacturing process such as a camera.

具体的には、充電完了電圧の検出精度を細かく調整する工程において、充電完了時間が早い場合、製造上の不良があるとして、再チェックをかける等の方法をとることも出来る。   Specifically, in the step of finely adjusting the detection accuracy of the charging completion voltage, if the charging completion time is early, it is possible to take a method such as re-checking that there is a manufacturing defect.

(第6の実施例)
本発明の第6の実施例を図11乃至図13を用いて説明する。
(Sixth embodiment)
A sixth embodiment of the present invention will be described with reference to FIGS.

本発明の第6の実施例は、上記第1の実施例乃至第5の実施例とは異なり、充電時間に応じてメインコンデンサMCの接続状況を推測し、異常状況があると判断された場合にも、状況に応じたストロボ撮影制御を行なうものである。   Unlike the first to fifth embodiments, the sixth embodiment of the present invention estimates the connection state of the main capacitor MC according to the charging time, and determines that there is an abnormal state In addition, the flash photography control according to the situation is performed.

図11乃至図13は本発明の第6の実施例におけるカメラのシーケンスフローチャートであり、図11はレリーズスイッチ3がONされた場合の制御回路2のシーケンスを示す。   11 to 13 are sequence flowcharts of the camera according to the sixth embodiment of the present invention. FIG. 11 shows a sequence of the control circuit 2 when the release switch 3 is turned on.

S901は、制御回路2内のメモリーの所定のエリアに動作不良発生を意味する「NGフラグ」が設定されているか否かを判定し、設定されていれば(“1”ならば)該シーケンスを終了し待機状態へ、設定されていなければ(“1”でなければ)S902へ移行する。   In step S901, it is determined whether or not an “NG flag” indicating occurrence of an operation failure is set in a predetermined area of the memory in the control circuit 2. If it is set (if “1”), the sequence is performed. If not set (if not "1"), the process proceeds to S902.

すなわち、「NGフラグ」が設定されている場合、露光を行なわず(露光を禁止して)待機状態へ移行する。   That is, when the “NG flag” is set, the exposure is not performed (exposure is prohibited) and the process shifts to a standby state.

なお、動作不良が発生した場合、「NGフラグ」設定時点で表示手段9等にその旨を警告する表示を行なうものであるため、「NGフラグ」が確認された際には、使用者は表示手段による警告を確認できているものとする。   When a malfunction occurs, when the “NG flag” is set, the display means 9 displays a warning to that effect. Therefore, when the “NG flag” is confirmed, the user displays It is assumed that the warning by means has been confirmed.

S902は、該AE手段5により、周知の測光方法で被写体の明るさ:AEを測定する。   In step S <b> 902, the AE unit 5 measures the brightness of the subject: AE by a known photometric method.

S903は、予め設定されている基準の明るさ:BとS902で測定した被写体の明るさ:AEを比較し、 AE<B であればS904へ、AE<BでなければS907へ移行する。   In S903, the reference brightness set in advance: B is compared with the brightness of the subject measured in S902: AE. If AE <B, the process proceeds to S904, and if AE <B, the process proceeds to S907.

S904は、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   In S904, the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 are used to measure the voltage HV charged in the light emitting energy storage capacitor MC (MC1 and MC2).

該充電電圧検出は、既に説明している通り、HVを直接測定するわけではなく、分割抵抗を介した電圧HV’を測定し、該電圧:HV’からHVを求める。   As described above, the charging voltage detection does not directly measure the HV, but measures the voltage HV ′ via the dividing resistor and obtains the HV from the voltage: HV ′.

S905は、上記S904で求めたHVと充電完了判定電圧:Vfullを比較し、HV≧Vfullの場合はS907へ、HV≧Vfullでない場合はS906へ移行する。   In S905, the HV obtained in S904 is compared with the charging completion determination voltage: Vfull. If HV ≧ Vfull, the process proceeds to S907, and if HV ≧ Vfull, the process proceeds to S906.

S906は、ストロボ充電動作1のシーケンスに入る。詳細は図12で後述するが、該ステップS906の充電動作は、一般的な充電動作に加え、所定電圧:V1までの充電時間:Tを測定・判定して、制御回路2内のメモリーの所定エリアにある「MCフラグ」を設定するものである。   In step S906, the sequence of the strobe charging operation 1 is entered. Although the details will be described later with reference to FIG. 12, the charging operation in step S906 is performed in addition to a general charging operation, by measuring and determining a charging time: T up to a predetermined voltage: V1, to determine a predetermined value in a memory in the control circuit 2. The “MC flag” in the area is set.

S907は、該AF手段6により、周知の測距方法で被写体の距離を測定する。   In step S907, the AF unit 6 measures the distance of the subject by a known distance measuring method.

S908は、S906の該ストロボ充電動作1シーケンスで設定された「MCフラグ」の判定を行い、MCフラグ=0ならばS909へ、MCフラグ=0でなければS910へ移行する。   In S908, the “MC flag” set in the strobe charging operation 1 sequence in S906 is determined. If the MC flag = 0, the process proceeds to S909, and if the MC flag = 0, the process proceeds to S910.

S909は、ストロボ制御用テーブルとして、メインコンデンサMCの接続正常時の制御テーブルである“ストロボ制御テーブル1”を設定する。   In step S909, “strobe control table 1”, which is a control table when the main capacitor MC is normally connected, is set as the strobe control table.

S910は、ストロボ制御用テーブルとして、メインコンデンサMCの接続異常時の制御テーブルである“ストロボ制御テーブル2”を設定する。   In step S910, “strobe control table 2”, which is a control table when the connection of the main capacitor MC is abnormal, is set as the strobe control table.

前記ストロボ制御テーブルは、メインコンデンサ:MCが正常の容量(MC1+MC2)であった場合の光量を基準にしたストロボ制御テーブル1と、メインコンデンサ:MCが異常の容量(MC1もしくはMC2)であった場合の光量を基準にしたストロボ制御テーブル2となるものであり、本実施例では正常時と異常時でメインコンデンサMCの容量が1/2となるため、その分の発光タイミング補正がかかる。   The strobe control table includes a strobe control table 1 based on the amount of light when the main capacitor: MC has a normal capacity (MC1 + MC2) and a main capacitor: MC having an abnormal capacity (MC1 or MC2). In this embodiment, the capacity of the main capacitor MC is halved during normal operation and abnormal operation, so that the light emission timing is corrected accordingly.

また、被写体距離を測定しストロボ到達距離範囲外の被写体であった場合に警告を行う機能を備えたカメラの場合、制御テーブルのみではなく、到達距離の補正も併せて行う。   In addition, in the case of a camera having a function for measuring the subject distance and giving a warning when the subject is out of the strobe reachable distance range, not only the control table but also the reachable distance correction is performed.

S911は、S902で測定した測光結果およびS907で測定した測距結果を基に、適正のピント・シャッター速度・ストロボ発光有無・ストロボ制御タイミング等の露光条件を求める演算を行なう。   In S911, based on the photometry result measured in S902 and the distance measurement result measured in S907, an operation for obtaining an exposure condition such as an appropriate focus, shutter speed, strobe light emission, strobe control timing, and the like is performed.

なお、該S911では、適正露光を得るためにストロボ発光させる必要がある場合は、該制御回路2内のメモリーの所定エリアにストロボ発光指示用のストロボ発光フラグを設定する。   In step S911, if it is necessary to emit strobe light to obtain proper exposure, a strobe light emission flag for strobe light emission is set in a predetermined area of the memory in the control circuit 2.

また、ストロボ発光制御に関しては、該S909もしくは該S910で設定したストロボ制御テーブルを使用して発光タイミング等の制御を決定する。   Further, regarding the strobe light emission control, the control of the light emission timing and the like is determined using the strobe control table set in S909 or S910.

S912は、上記S911で求めた露光条件に基づき該SH手段7の制御を行なう周知の露光動作を行なう。   In S912, a well-known exposure operation for controlling the SH means 7 is performed based on the exposure condition obtained in S911.

該S912では、上記S911で該ストロボ発光フラグが設定されている場合、ストロボ発光による露光動作を行なう。   In S912, when the strobe emission flag is set in S911, an exposure operation by strobe emission is performed.

S913は、該給送手段8により、不図示のフィルムを移動させる(次の露光コマを不図示のアパーチャー位置に設定する)給送動作を行なう。   In step S913, the feeding unit 8 performs a feeding operation of moving a film (not shown) (setting the next exposure frame to an aperture position (not shown)).

S914はストロボ発光の履歴を確認する為、該制御回路2内のメモリーのストロボ発光フラグの状態を確認し、該ストロボ発光フラグがストロボ発光に設定されている場合(S912でストロボ発光した場合)はS915へ、該ストロボ発光フラグがストロボ発光に設定されていない場合は待機状態へ移行する。なお、該S914を終了する際は、判定動作後、ストロボ発光フラグのデータをリセットするものである。   In step S914, in order to check the history of flash emission, the status of the flash emission flag in the memory in the control circuit 2 is checked. If the flash emission flag is set to flash emission (if the flash is emitted in S912), If the strobe emission flag is not set to strobe emission, the process shifts to S915. When ending S914, the flash emission flag data is reset after the determination operation.

S915は、ストロボ発光直後の充電動作であるところの、ストロボ充電動作2のシーケンスに入る。詳細は図13で後述するが、該ステップS915の充電動作は、発光後であり残電圧はほとんど同じ状況になるので、NGチェック動作は充電完了までの時間が基準値:Tfull未満か否かの確認、および、所定電圧:V1までの充電時間が基準時間:Tx以上か否かの確認を行なうものである。   S915 enters the sequence of the flash charging operation 2 which is the charging operation immediately after the flash emission. Although the details will be described later with reference to FIG. 13, the charging operation in step S915 is after light emission and the remaining voltage is almost the same. Therefore, the NG check operation determines whether the time until the completion of charging is less than the reference value: Tfull. Confirmation and confirmation of whether or not the charging time to the predetermined voltage: V1 is equal to or longer than the reference time: Tx.

該S915を終了したら該制御回路2は操作待機状態となる。   When S915 ends, the control circuit 2 enters an operation standby state.

以上が、本発明の第6の実施例のレリーズスイッチ3がONされた場合の制御回路2のシーケンスである。   The above is the sequence of the control circuit 2 when the release switch 3 of the sixth embodiment of the present invention is turned on.

図12は上記図11におけるS906の充電動作1の詳細シーケンスを示す。   FIG. 12 shows a detailed sequence of the charging operation 1 in S906 in FIG.

S1001は、該制御回路2内のタイマー:Tをリセットする。   In step S1001, the timer T in the control circuit 2 is reset.

S1002は、図11のS904と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S1002 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 as in S904 of FIG. 11 to charge the light emitting energy storage capacitors MC (MC1 and MC2). Voltage: HV is measured.

S1003は、ストロボ装置4の充電手段4−1を駆動し、メインコンデンサMCへの充電を開始する。   In step S1003, the charging unit 4-1 of the strobe device 4 is driven to start charging the main capacitor MC.

S1004は、表示手段9により、ストロボの充電動作中を示す警告表示(例えばイナズママークの点滅等)を行なう。   In step S1004, the display unit 9 displays a warning indicating that the flash is being charged (for example, flashing of a progress mark).

S1005は、該制御回路2内のタイマー:Tのカウントをスタートする。   In step S1005, the timer T in the control circuit 2 starts counting.

S1006は、S1002と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   Similarly to S1002, S1006 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2, and the voltage for charging the light emitting energy storage capacitors: MC (MC1 and MC2): HV Measure.

S1007は、前記S1006で測定した充電電圧:HVと比較電圧:V1 (本実施例では充電完了電圧の80%〔例えば、256V〕)と比較し、HV≧V1の場合はS1012へ、HV≧V1でない場合はS1008へ移行する。   S1007 is compared with the charging voltage HV measured in S1006 and the comparison voltage V1 (in this embodiment, 80% of the charging completion voltage [eg, 256V]). If HV ≧ V1, the process proceeds to S1012, and HV ≧ V1. If not, the process proceeds to S1008.

S1008は、前記S1005でカウントを開始したタイマー:Tを所定時間:Tfull(本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS1009へ、T≧Tfullでない場合はS1006へ移行する。   In step S1008, the timer T started counting in step S1005: T is set to a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be charged from 0V to the normal time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S1009. If T ≧ Tfull, the process proceeds to S1006.

S1009は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In step S1009, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S1010は、所定時間:Tfullを経過しても充電完了出来ないため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ1)を設定する。   In S1010, since charging cannot be completed even after a predetermined time: Tfull has elapsed, it is determined that there is some abnormality, and an “NG flag” (charging NG flag 1) in a predetermined area of the memory in the control circuit 2 is set. To do.

S1011は、表示手段9により、充電の問題を意味する警告表示(例えば、“H1”(Helpマーク1)点滅)を行ない、次動作待機状態となる。   In S1011, the display means 9 displays a warning indicating a charging problem (for example, “H1” (Help mark 1) blinks), and enters a next operation standby state.

S1012は、前記S1005でカウントを開始したタイマー:Tを所定時間:Tx (本実施例では正常時のメインコンデンサMCが0V〜Vxできるまでの時間の1/2の約1.2倍〔例えば、2sec〕)と比較し、T<Txでない場合はS1013へ、T<Txの場合はS1016へ移行する。   S1012 is a timer that starts counting in S1005: T is a predetermined time: Tx (in this embodiment, about 1.2 times 1/2 of the time until the main capacitor MC at normal time can be 0 V to Vx [for example, 2sec]), the process proceeds to S1013 if T <Tx, and to S1016 if T <Tx.

S1013は、制御回路2内のメモリーの所定エリアにある「MCフラグ」を“0”に設定する。   In S1013, the “MC flag” in the predetermined area of the memory in the control circuit 2 is set to “0”.

S1014は、制御回路2内のメモリーの所定エリアにある「MCフラグ」を“1”に設定する。   In S1014, the “MC flag” in the predetermined area of the memory in the control circuit 2 is set to “1”.

S1015は、S1006と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S1015 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S1006, and the voltage for charging the light-emitting energy storage capacitors: MC (MC1 and MC2): HV Measure.

S1016は、前記S1015で測定した充電電圧:HVと比較電圧:Vfull(本実施例では充電完了電圧〔例えば、320V〕)と比較し、HV≧Vfullの場合はS1018へ、HV≧Vfullでない場合はS1017へ移行する。   S1016 compares the charging voltage: HV measured in S1015 with a comparison voltage: Vfull (in this embodiment, charging completion voltage [eg, 320V]). If HV ≧ Vfull, the process proceeds to S1018. If HV ≧ Vfull is not satisfied, The process proceeds to S1017.

S1017は、前記S1005でカウントを開始したタイマー:Tを所定時間:Tfull (本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS1009へ、T≧Tfullでない場合はS1015へ移行する。   S1017 is a timer that starts counting in S1005: T is set to a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be fully charged from 0 V to the charging time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S1009. If T ≧ Tfull, the process proceeds to S1015.

S1018は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In step S1018, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S1019は、表示手段9により、ストロボの充電完了を示す表示(例えばイナズママークの点灯等)を行ない、次動作待機状態となる。   In step S1019, the display unit 9 displays a strobe charging completion (for example, lighting of a progress mark), and enters a next operation standby state.

以上が、上記図11におけるS906の充電動作1の詳細シーケンスである。   The above is the detailed sequence of the charging operation 1 in S906 in FIG.

図13は上記図11におけるS915の充電動作2の詳細シーケンスを示す。   FIG. 13 shows a detailed sequence of the charging operation 2 in S915 in FIG.

図12は上記図11におけるS906の充電動作1の詳細シーケンスを示す。   FIG. 12 shows a detailed sequence of the charging operation 1 in S906 in FIG.

S1101は、該制御回路2内のタイマー:Tをリセットする。   In step S1101, the timer T in the control circuit 2 is reset.

S1102は、図11のS904と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S1102 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 as in S904 of FIG. 11 to charge the light emitting energy storage capacitors MC (MC1 and MC2). Voltage: HV is measured.

S1103は、ストロボ装置4の充電手段4−1を駆動し、メインコンデンサMCへの充電を開始する。   In step S1103, the charging unit 4-1 of the strobe device 4 is driven to start charging the main capacitor MC.

S1104は、表示手段9により、ストロボの充電動作中を示す警告表示(例えばイナズママークの点滅等)を行なう。   In step S1104, the display unit 9 displays a warning indicating that the flash is being charged (for example, flashing of a progress mark).

S1105は、該制御回路2内のタイマー:Tのカウントをスタートする。   In step S1105, the timer T in the control circuit 2 starts counting.

S1106は、S1102と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   Similarly to S1102, S1106 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 to charge the light-emitting energy storage capacitors MC (MC1 and MC2): HV Measure.

S1107は、前記S1106で測定した充電電圧:HVと比較電圧:V1 (本実施例では充電完了電圧の80%〔例えば、256V〕)と比較し、HV≧V1の場合はS1112へ、HV≧V1でない場合はS1108へ移行する。   S1107 compares the charging voltage: HV measured in S1106 with the comparison voltage: V1 (in this embodiment, 80% of the charging completion voltage [eg, 256V]). If HV ≧ V1, the process proceeds to S1112, and HV ≧ V1. If not, the process proceeds to S1108.

S1108は、前記S1105でカウントを開始したタイマー:Tを所定時間:Tfull(本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS1109へ、T≧Tfullでない場合はS1106へ移行する。   S1108 is a timer that starts counting in S1105: T is set to a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be fully charged from 0 V to the charging time [for example, 8.4 sec. ], If T ≧ Tfull, the process proceeds to S1109. If T ≧ Tfull, the process proceeds to S1106.

S1109は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In step S1109, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is finished.

S1110は、所定時間:Tfullを経過しても充電完了出来ないため、何らかの異常があると判断して、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ1)を設定する。   In S1110, since charging cannot be completed even after the elapse of the predetermined time: Tfull, it is determined that there is some abnormality, and the “NG flag” (charging NG flag 1) in the predetermined area of the memory in the control circuit 2 is set. To do.

S1111は、表示手段9により、充電の問題を意味する警告表示(例えば、“H1”(Helpマーク1)点滅)を行ない、次動作待機状態となる。   In S1111, the display means 9 displays a warning indicating a charging problem (for example, “H1” (Help mark 1) blinks), and enters the next operation standby state.

S1112は、前記S1105でカウントを開始したタイマー:Tを所定時間:Tx (本実施例では正常時のメインコンデンサMCが0V〜Vxできるまでの時間の1/2の約1.2倍〔例えば、2sec〕)と比較し、T<Txでない場合はS1117へ、T<Txの場合はS1113へ移行する。   S1112 is a timer that starts counting in S1105: T is a predetermined time: Tx (in this embodiment, about 1.2 times 1/2 of the time until the main capacitor MC at normal time can be 0 V to Vx [for example, 2sec]), if T <Tx, the process proceeds to S1117, and if T <Tx, the process proceeds to S1113.

S1113は、前記S1105でカウントを開始したタイマー:Tを所定時間:Tf (本実施例では正常時のメインコンデンサMCが0V〜Vxできるまでの時間の1/10)と比較し、T<Tfでない場合はS1118へ、T<Txの場合はS1114へ移行する。   In step S1113, the timer T started counting in the step S1105 is compared with a predetermined time Tf (in this embodiment, 1/10 of the time until the main capacitor MC is normally set to 0V to Vx), and T <Tf is not satisfied. If YES, the process advances to step S1118. If T <Tx, the process advances to step S1114.

S1114は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In step S1114, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is finished.

S1115は、所定時間:Tfが経過する前に所定電圧:Vxまでの充電がなされたとして、ストロボ発光直後からの充電にもかかわらず極めて短い時間で充電完了信号が発生しているため、充電電圧検出手段4−2に何らかの不具合があると判断し、制御回路2内のメモリーの所定エリアにある「NGフラグ」(充電NGフラグ2)を設定する。   In S1115, a charge completion signal is generated in a very short time regardless of charging immediately after strobe light emission, assuming that charging to a predetermined voltage: Vx is performed before the predetermined time: Tf elapses. It is determined that the detection means 4-2 has some problem, and an “NG flag” (charging NG flag 2) in a predetermined area of the memory in the control circuit 2 is set.

S1116は、表示手段9により、充電の問題を意味する警告表示(例えば、“H2”(Helpマーク2)点滅)を行ない、次動作待機状態となる。   In S1116, the display means 9 displays a warning indicating a charging problem (for example, “H2” (Help mark 2) blinks) and enters a next operation standby state.

S1117は、制御回路2内のメモリーの所定エリアにある「MCフラグ」を“0”に設定する。   In step S <b> 1117, the “MC flag” in the predetermined area of the memory in the control circuit 2 is set to “0”.

S1118は、制御回路2内のメモリーの所定エリアにある「MCフラグ」を“1”に設定する。   In step S1118, the “MC flag” in the predetermined area of the memory in the control circuit 2 is set to “1”.

S1119は、S1106と同様に、該充電電圧検出回路4−2および該制御手段2のA/Dコンバーターを使用し、発光エネルギー蓄積用コンデンサ:MC(MC1およびMC2)に充電されている電圧:HVを測定する。   S1119 uses the charging voltage detection circuit 4-2 and the A / D converter of the control means 2 in the same manner as S1106, and the light-emitting energy storage capacitor MC (MC1 and MC2) is charged: HV Measure.

S1120は、前記S1119で測定した充電電圧:HVと比較電圧:Vfull(本実施例では充電完了電圧〔例えば、320V〕)と比較し、HV≧Vfullの場合はS1122へ、HV≧Vfullでない場合はS1121へ移行する。   S1120 compares the charging voltage: HV measured in S1119 and the comparison voltage: Vfull (in this embodiment, charging completion voltage [eg, 320V]). If HV ≧ Vfull, the process proceeds to S1122. The process proceeds to S1121.

S1121は、前記S1105でカウントを開始したタイマー:Tを所定時間:Tfull (本実施例では正常時のメインコンデンサMCが0V〜充電完了できるまでの時間の約1.4倍〔例えば、8.4sec〕)と比較し、T≧Tfullの場合はS1109へ、T≧Tfullでない場合はS1119へ移行する。   S1121 is a timer that starts counting in S1105: T is a predetermined time: Tfull (in this embodiment, about 1.4 times as long as the normal main capacitor MC can be charged from 0V to the normal time [for example, 8.4 sec. ], The process proceeds to S1109 if T ≧ Tfull, and to S1119 if T ≧ Tfull.

S1122は、ストロボ装置4の充電手段4−1の駆動を停止し、メインコンデンサMCへの充電を終了する。   In step S1122, the driving of the charging unit 4-1 of the strobe device 4 is stopped, and the charging of the main capacitor MC is ended.

S1123は、表示手段9により、ストロボの充電完了を示す表示(例えばイナズママークの点灯等)を行ない、次動作待機状態となる。   In step S1123, the display unit 9 displays a strobe charging completion (for example, lighting of a progress mark), and enters a next operation standby state.

以上が、上記図11におけるS915の充電動作2の詳細シーケンスである。   The above is the detailed sequence of the charging operation 2 in S915 in FIG.

なお、上記本発明の第6の実施例では、充電時間によってストロボの制御を切り換える手段として、テーブルを切り換える方法を説明したが、本発明はそれに限ったものではなく、例えば、正常時を通常と考え、異常発生時に演算(例えば正常時の情報に係数をかけて補正を行なう)等の手法で制御を切り換えても何ら本発明の主旨に反するものではない。   In the sixth embodiment of the present invention, the table switching method has been described as means for switching the control of the strobe according to the charging time. However, the present invention is not limited to this, and for example, the normal time is set as normal. If the control is switched by a method such as calculation (for example, correction is performed by applying a coefficient to normal information) when an abnormality occurs, it does not violate the gist of the present invention.

また、今まで説明した本発明第1乃至第6の実施例は、銀塩フィルム使用のカメラで説明したが、本発明はそれに限定されたものではなく、例えば、デジタルカメラ等の光学機器にも有効であることを明示しておく。   The first to sixth embodiments of the present invention described so far have been described using a camera using a silver salt film. However, the present invention is not limited to this, and for example, an optical apparatus such as a digital camera. Make sure it is valid.

本発明第1の実施例におけるカメラの主要部分の回路ブロック図1 is a circuit block diagram of main parts of a camera according to a first embodiment of the present invention. 本発明第1の実施例におけるストロボの充電電圧検出回路図FIG. 1 is a circuit diagram of a strobe charging voltage detection circuit in the first embodiment of the present invention. 本発明第1の実施例におけるレリーズスイッチON時の制御回路2シーケンスControl circuit 2 sequence when release switch is ON in the first embodiment of the present invention 本発明第1の実施例における充電動作1の詳細シーケンスDetailed sequence of charging operation 1 in the first embodiment of the present invention 本発明第1の実施例における充電動作2の詳細シーケンスDetailed sequence of charging operation 2 in the first embodiment of the present invention 本発明第2の実施例におけるレリーズスイッチON時の制御回路2シーケンスControl circuit 2 sequence when the release switch is ON in the second embodiment of the present invention 本発明第2の実施例における充電動作3の詳細シーケンスDetailed sequence of charging operation 3 in the second embodiment of the present invention 本発明第3の実施例における充電動作3の詳細シーケンスDetailed sequence of charging operation 3 in the third embodiment of the present invention 本発明第4の実施例における充電動作3の詳細シーケンスDetailed sequence of charging operation 3 in the fourth embodiment of the present invention 本発明第5の実施例における充電動作3の詳細シーケンスDetailed sequence of charging operation 3 in the fifth embodiment of the present invention 本発明第6の実施例におけるレリーズスイッチON時の制御回路2シーケンスControl circuit 2 sequence when release switch is ON in the sixth embodiment of the present invention 本発明第6の実施例における充電動作1の詳細シーケンスDetailed sequence of charging operation 1 in the sixth embodiment of the present invention 本発明第3の実施例における充電動作2の詳細シーケンスDetailed sequence of charging operation 2 in the third embodiment of the present invention 本発明の充電電圧検出手段におけるメインコンデンサMCの充電カーブCharging curve of main capacitor MC in the charging voltage detecting means of the present invention

符号の説明Explanation of symbols

1 電源電池
2 制御回路
3 レリーズスイッチ
4 ストロボ装置
4−1 充電手段
4−2 充電電圧検出回路
4−3 発光制御手段
MC1/MC2 メインコンデンサ
Xe キセノン管(発光体)
5 測光手段
6 測距手段
7 シャッター手段
8 フィルム給送手段
9 表示手段
R1/R2 分圧抵抗
D1/D2 逆流防止ダイオード
C1 平滑コンデンサ
DESCRIPTION OF SYMBOLS 1 Power supply battery 2 Control circuit 3 Release switch 4 Strobe device 4-1 Charging means 4-2 Charging voltage detection circuit 4-3 Light emission control means MC1 / MC2 Main capacitor Xe Xenon tube (light emitting body)
5 Photometric means 6 Distance measuring means 7 Shutter means 8 Film feeding means 9 Display means R1 / R2 Voltage dividing resistor D1 / D2 Backflow prevention diode C1 Smoothing capacitor

Claims (11)

ストロボ装置を有する光学機器において、ストロボ発光体に並列に配設された発光エネルギー蓄積用メインコンデンサと、該メインコンデンサに電荷を充電する為の充電手段と、該充電手段により充電されていく電圧を検出する充電電圧検出手段と、該充電手段や該充電電圧検出手段の動作および該光学機器の制御を行なう制御手段を備え、該制御手段により充電動作が開始された後、充電電圧検出手段は所定電圧までの充電時間を判定し、該判定結果が所定時間より短いと判定された場合、通常と異なる制御を行なうことを特徴としたストロボ装置を有する光学機器。   In an optical device having a strobe device, a main capacitor for storing light emission energy arranged in parallel with a strobe light emitter, a charging means for charging the main capacitor with a charge, and a voltage charged by the charging means A charging voltage detection means for detecting, and a control means for controlling the operation of the charging means and the charging voltage detection means and the optical device. After the charging operation is started by the control means, the charging voltage detection means is predetermined An optical apparatus having a strobe device that determines a charging time to a voltage and performs control different from normal when it is determined that the determination result is shorter than a predetermined time. ストロボ装置を有する光学機器において、ストロボ発光体に並列に配設された発光エネルギー蓄積用メインコンデンサを少なくとも2つ並列配設として備え、該メインコンデンサに電荷を充電する為の充電手段と、該充電手段により充電されていく電圧を観測する充電電圧検出手段と、該充電手段や該充電電圧検出手段の動作および該光学機器の制御を行なう制御手段を備え、該制御手段により充電動作が開始された後、充電電圧検出手段は所定電圧までの充電時間を判定し、該判定結果が所定時間より短いと判定された場合、通常と異なる制御を行なうことを特徴としたストロボ装置を有する光学機器。   In an optical apparatus having a strobe device, at least two main capacitors for storing light emission energy arranged in parallel with a strobe light emitter are arranged in parallel, charging means for charging the main capacitor with electric charge, and the charging Charging voltage detecting means for observing the voltage charged by the means, and control means for controlling the operation of the charging means and the charging voltage detecting means and the optical device, and the charging operation is started by the control means. Thereafter, the charging voltage detection means determines the charging time to a predetermined voltage, and when it is determined that the determination result is shorter than the predetermined time, the optical apparatus having the strobe device performs control different from normal. 上記請求項1乃至請求項2において、通常と異なる制御とは、警告制御であることを特徴とするストロボ装置を有する光学機器。   3. The optical apparatus having a strobe device according to claim 1 or 2, wherein the control different from normal is warning control. 上記請求項1乃至請求項3において、通常と異なる制御とは、露光動作禁止とすることを含むことを特徴とするストロボ装置を有する光学機器。   4. The optical apparatus having a strobe device according to claim 1, wherein the control different from normal includes prohibiting an exposure operation. 上記請求項1乃至請求項4において、充電電圧検出手段は所定電圧までの充電時間が所定時間より短いか否かの判定は、充電状況によって判定するか否かを変更することを特徴とするストロボ装置を有する光学機器。   5. The electronic flash according to claim 1, wherein the determination of whether or not the charging voltage detecting means determines that the charging time to the predetermined voltage is shorter than the predetermined time is based on whether or not the determination is based on a charging state. Optical instrument having a device. 上記請求項5において、充電電圧検出手段は所定電圧までの充電時間判定は、少なくともストロボ発光直後の充電動作時に行なうことを特徴とするストロボ装置を有する光学機器。   6. The optical apparatus having a strobe device according to claim 5, wherein the charging voltage detecting means determines the charging time up to a predetermined voltage at least during a charging operation immediately after strobe light emission. 上記請求項5において、充電電圧検出手段は所定電圧までの充電時間判定は、ストロボ充電開始前の充電電圧検出結果によって判断を変更することを特徴とするストロボ装置を有する光学機器。   6. The optical apparatus having a strobe device according to claim 5, wherein the charge voltage detecting means changes the determination according to the charge voltage detection result before the start of the strobe charging for the determination of the charging time up to a predetermined voltage. 上記請求項1乃至請求項7において、充電時間判定の基準になる所定時間は、電源電圧に応じて変化させることを特徴とするストロボ装置を有する光学機器。   8. The optical apparatus having a strobe device according to any one of claims 1 to 7, wherein the predetermined time as a reference for determining the charging time is changed according to a power supply voltage. 上記請求項1乃至請求項7において、充電時間判定の基準になる所定時間は、環境温度に応じて変化させることを特徴とするストロボ装置を有する光学機器。   8. The optical apparatus having a strobe device according to any one of claims 1 to 7, wherein the predetermined time as a reference for determining the charging time is changed according to the environmental temperature. ストロボ装置を有する光学機器において、ストロボ発光体に並列に配設された発光エネルギー蓄積用メインコンデンサを少なくとも2つ並列配設として備え、該メインコンデンサに電荷を充電する為の充電手段と、該充電手段により充電されていく電圧を観測する充電電圧検出手段と、該充電手段や該充電電圧検出手段の動作および該光学機器の制御を行なう制御手段を備え、該制御手段により充電動作が開始された後、充電電圧検出手段は所定電圧までの充電時間を判定し、該判定結果の充電時間からメインコンデンサの接続状況を推測し、接続状況に応じたストロボ撮影制御を行なうことを特徴としたストロボ装置を有する光学機器。   In an optical apparatus having a strobe device, at least two main capacitors for storing light emission energy arranged in parallel with a strobe light emitter are arranged in parallel, and charging means for charging the main capacitor with electric charge, Charging voltage detecting means for observing the voltage charged by the means, and control means for controlling the operation of the charging means and the charging voltage detecting means and the optical device, and the charging operation is started by the control means. Thereafter, the charging voltage detecting means determines a charging time up to a predetermined voltage, estimates a connection state of the main capacitor from the charging time of the determination result, and performs strobe shooting control according to the connection state An optical instrument. 上記請求項10において、推測されたメインコンデンサの接続状況に応じて、露光時間およびストロボ発光タイミングを補正することを特徴とするストロボ装置を有する光学機器。   11. The optical apparatus having a strobe device according to claim 10, wherein the exposure time and the strobe light emission timing are corrected in accordance with the estimated connection state of the main capacitor.
JP2006039588A 2006-02-16 2006-02-16 Optical equipment equipped with stroboscope Withdrawn JP2007219148A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006039588A JP2007219148A (en) 2006-02-16 2006-02-16 Optical equipment equipped with stroboscope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006039588A JP2007219148A (en) 2006-02-16 2006-02-16 Optical equipment equipped with stroboscope

Publications (1)

Publication Number Publication Date
JP2007219148A true JP2007219148A (en) 2007-08-30

Family

ID=38496530

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006039588A Withdrawn JP2007219148A (en) 2006-02-16 2006-02-16 Optical equipment equipped with stroboscope

Country Status (1)

Country Link
JP (1) JP2007219148A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013257414A (en) * 2012-06-12 2013-12-26 Canon Inc Luminescent device, and method and program for controlling the same
WO2019038873A1 (en) * 2017-08-24 2019-02-28 株式会社Fuji Capacitor charging performance monitoring system of production machine

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013257414A (en) * 2012-06-12 2013-12-26 Canon Inc Luminescent device, and method and program for controlling the same
WO2019038873A1 (en) * 2017-08-24 2019-02-28 株式会社Fuji Capacitor charging performance monitoring system of production machine
CN111033281A (en) * 2017-08-24 2020-04-17 株式会社富士 Capacitor charging performance monitoring system for production machine
JPWO2019038873A1 (en) * 2017-08-24 2020-07-02 株式会社Fuji Capacitor charging performance monitoring system for production machinery
EP3674718A4 (en) * 2017-08-24 2020-08-19 Fuji Corporation Capacitor charging performance monitoring system of production machine
US11215680B2 (en) 2017-08-24 2022-01-04 Fuji Corporation Capacitor charging performance monitoring system of production machine

Similar Documents

Publication Publication Date Title
JP2019124782A (en) Illumination device, method for controlling the same, and program
JP2007219148A (en) Optical equipment equipped with stroboscope
JP6611483B2 (en) Imaging system, illumination device, and focus detection method
US8391703B2 (en) Lens unit, camera body, camera device, and imaging method
CN111629493B (en) Lighting device having function of cooling light-emitting part and control method thereof
JP5570258B2 (en) Interchangeable lens and camera lens system
JP2010038775A (en) Electronic device
CN109327661B (en) Image pickup apparatus, light emitting apparatus, control method thereof, and storage medium
JP2017103966A (en) Electronic apparatus
JP2015138062A (en) LED strobe device
JP2010101962A (en) External flash device
JP2016017973A (en) Imaging device
JP2012048001A (en) Light emitting device
JP5715211B2 (en) Camera system
JP5541712B2 (en) Imaging apparatus and control method thereof, and camera system and control method thereof
JP5392206B2 (en) Camera and camera system
JP2005339987A (en) Light emitting device for photography and camera having the same
JP2008270987A (en) Image pickup device and its control method
JP2002072311A (en) Camera
JP2003270702A (en) Camera
JP2022018809A (en) Image capturing device, control method, and program
JP2024013937A (en) Light emission control device, imaging system, control method for light emitting device, and program
JP2007264650A (en) Camera
JP4088402B2 (en) camera
JP5447582B2 (en) Accessories, camera, accessory control program, and camera control program

Legal Events

Date Code Title Description
A300 Application deemed to be withdrawn because no request for examination was validly filed

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20090512