JP2007164281A - Electric pole site charge management system - Google Patents

Electric pole site charge management system Download PDF

Info

Publication number
JP2007164281A
JP2007164281A JP2005356686A JP2005356686A JP2007164281A JP 2007164281 A JP2007164281 A JP 2007164281A JP 2005356686 A JP2005356686 A JP 2005356686A JP 2005356686 A JP2005356686 A JP 2005356686A JP 2007164281 A JP2007164281 A JP 2007164281A
Authority
JP
Japan
Prior art keywords
utility pole
charge
fee
site
landowner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005356686A
Other languages
Japanese (ja)
Inventor
Masayuki Shiode
雅行 塩出
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2005356686A priority Critical patent/JP2007164281A/en
Publication of JP2007164281A publication Critical patent/JP2007164281A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To enable an organization which supplies electric power and has a facility for suupplying the electric power to efficiently manage the charging or transfer of electricity use charge and electric pole site charge un bloc. <P>SOLUTION: This electric pole site charge management system is provided with: a database 23 including at least electric pole information showing the location of a electric pole and electric pole site charge for every electric pole, landowner information relating to a landowner who installs the electric pole in his or her personally owned site and contracting party information relating to a contracting party who receives a power; a charge calculating means 21 for specifying the landowner from the database 23, and calculating a balance charge from the electricity charge and the electric pole chargefor, when the electric power is used by the landowner, and the electricity use charge for the power that the landowner has used is generated; and a charge management means 22 for managing the balance charge as either a transfer sum or a payment sum. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、電力を供給する組織が管理する使用料金に基づいて、個人の所有する敷地内に電柱を設置した際に振り込まれる電柱敷地料金を管理する電柱敷地料金管理システムに関する。   The present invention relates to a utility pole site fee management system that manages a utility pole site fee transferred when a utility pole is installed in a site owned by an individual, based on a usage fee managed by an organization that supplies power.

従来から、電力会社が所有する電力柱と、電話会社が所有する電信柱の何れかを設置する場合に、電柱等の設置場所を提供している地権者に対する電柱敷地料金の支払いが行われている。例えば、電力会社の場合では、年一回の所定日に地権者の指定口座へ振込をすることで支払を行っている。また、新規に設置した電柱などの電柱設置料金については、工事完了後に地権者の指定口座へ振込をすることで支払を行っている。   Conventionally, when installing either a power pole owned by an electric power company or a telephone pole owned by a telephone company, a utility pole site fee has been paid to the landowner who provides the installation location of the power pole etc. Yes. For example, in the case of an electric power company, payment is made by making a transfer to a designated account of the landowner on a predetermined date once a year. In addition, for the installation of utility poles such as newly installed utility poles, payment is made by transferring funds to the designated account of the landowner after the completion of construction.

しかしながら、電力会社では、電柱敷地料金の振込の為の、支払に関する事務作業に労力を要していた。例えば、口座の事前照合、振込不能への対応作業等にかなりの時間と手間を要していた。また、電気料金の引き落し口座とは別に、電柱敷地料金の振込に必要な口座を別途管理する業務が必要となり、個人情報管理の観点からも各人に対するリスクが大きくなるという問題があった。さらに、電力会社では、電柱敷地契約に関する情報(例えば、土地の売買、地権者の転宅、土地の相続)が確実に管理できる状況ではなく、これら情報の把握が困難であるという問題もあった。   However, the electric power company required labor for the office work concerning the payment for the transfer of the utility pole site charges. For example, considerable time and labor were required for account verification and account transfer work. In addition to the account for debiting the electricity bill, there is a need to separately manage the account required for the transfer of the utility pole site fee, and there is a problem that the risk for each person increases from the viewpoint of personal information management. In addition, the power company has a problem that it is difficult to grasp information related to the utility pole site contract (for example, buying and selling land, changing land owners, inheritance of land), and it is difficult to grasp such information.

このような状況下において、例えば、電力会社の業務形態において発生する料金(例えば、電気使用料金、電柱敷地料金)に関係するあらゆる情報を一括して管理できる体制が望まれていた。   Under such circumstances, for example, there has been a demand for a system that can collectively manage all information related to charges (for example, electricity usage charges and utility pole site charges) generated in the business form of an electric power company.

また、電気料金に関連する技術として、例えば、電機機器を購入した顧客が、予め定められた期間は電気料金の所定の割引を受けることができる割引電気料金付き電機機器の電気料金徴収システムが提案されている(特許文献1参照)。しかしながら、このような技術は、電力に関する全ての料金情報を管理するためのシステムではないため、そのまま適用することはできない。   In addition, as a technology related to electricity charges, for example, a system for collecting electricity charges for electrical equipment with a discounted electricity charge that allows customers who purchase electrical equipment to receive a predetermined discount on electricity charges for a predetermined period of time is proposed. (See Patent Document 1). However, such a technique cannot be applied as it is because it is not a system for managing all charge information relating to power.

特開2002−230101号公報JP 2002-230101 A

本発明はこのような事情に鑑み、電力を供給し且つ当該電力を供給するための設備を有する組織が電気使用料金及び電柱敷地料金の請求又は振込を一括で効率的に管理することができる電柱敷地料金管理システムを提供することを課題とする。   In view of such circumstances, the present invention is a utility pole that can efficiently manage billing or transfer of electricity usage fees and utility pole site charges collectively by an organization that supplies power and has facilities for supplying such electricity. An object is to provide a site charge management system.

上記課題を解決する本発明の第1の態様は、電力を供給する組織が管理する電気使用料金に基づいて電柱を設置した際に振り込まれる電柱敷地料金を管理する電柱敷地料金管理システムであって、少なくとも、前記電柱の所在地及び当該電柱ごとの前記電柱敷地料金を示す電柱情報、当該電柱を個人の所有する敷地に設置している地権者に関する地権者情報、及び電力の供給を受けている契約者に関する契約者情報を含むデータベースと、前記データベースから地権者を特定して、当該地権者が電力を使用しており且つ使用した電気使用料金が発生している場合に、当該電気使用料金及び前記電柱敷地料金から差額料金を算出する料金算出手段と、前記差額料金を振込金額又は支払金額の何れかとして管理する料金管理手段とを具備することを特徴とする電柱敷地料金管理システムにある。   A first aspect of the present invention that solves the above problem is a utility pole site charge management system that manages a utility pole site charge transferred when a utility pole is installed based on an electricity usage charge managed by an organization that supplies power. , At least, the utility pole information indicating the location of the utility pole and the utility pole fee for each utility pole, the owner information regarding the owner of the utility pole installed on the site owned by the individual, and the contract receiving power supply A database including contractor information on the owner, and when the landowner is identified from the database, the landowner is using power and the electricity usage fee used is incurred, the electricity usage fee and the Charge calculation means for calculating the difference charge from the utility pole site charge and charge management means for managing the difference charge as either a transfer amount or a payment amount There is a telephone pole site fee management system which is characterized.

かかる第1の態様では、地権者が特定されて、その地権者が電力を使用しており且つ使用した電気使用料金が発生している場合に、電気使用料金及び電柱敷地料金から差額料金が算出されて、差額料金が振込金額又は支払金額の何れかとして管理される。これにより、電気使用料金及び電柱敷地料金の請求又は振込を一括で効率的に管理することができる。   In the first aspect, when the landowner is specified, the landowner is using electric power and the electricity usage fee used is calculated, the difference fee is calculated from the electricity usage fee and the utility pole site fee. Thus, the difference fee is managed as either the transfer amount or the payment amount. Thereby, billing or transfer of electricity usage fees and utility pole site fees can be managed efficiently in a lump.

本発明の第2の態様は、第1の態様に記載の電柱敷地料金管理システムにおいて、前記料金算出手段は、前記差額金額を、電柱敷地料金の支払月の電気使用料金に基づいて算出する又は所定の期間内の電気使用料金から算出することを特徴とする電柱敷地料金管理システムにある。   According to a second aspect of the present invention, in the utility pole site charge management system according to the first aspect, the charge calculation means calculates the difference amount based on an electricity usage charge in a month of payment of the utility pole site charge. The utility pole site charge management system is characterized in that it is calculated from the electricity usage charge within a predetermined period.

かかる第2の態様では、差額金額が、電柱敷地料金の支払月の電気使用料金に基づいて算出される又は所定の期間内の電気使用料金から算出される。これにより、効率的な手法を適宜選択しながら電気使用料金及び電柱敷地料金の請求又は振込を一括で管理することができる。   In the second aspect, the difference amount is calculated based on the electricity usage fee in the payment month of the utility pole site fee or is calculated from the electricity usage fee within a predetermined period. This makes it possible to collectively manage billing or transfer of electricity usage charges and utility pole site charges while appropriately selecting an efficient method.

本発明の第3の態様は、第1又は2の態様に記載の電柱敷地料金管理システムにおいて、前記料金算出手段は、前記電柱敷地料金が前記電気使用料金以下である場合に、前記差額金額を支払金額として算出し、前記電柱敷地料金が前記電気使用料金を超えている場合に、前記差額金額を振込金額として算出することを特徴とする電柱敷地料金管理システムにある。   According to a third aspect of the present invention, in the utility pole site charge management system according to the first or second aspect, the charge calculating means calculates the difference amount when the utility pole site charge is equal to or less than the electricity usage charge. The utility pole site fee management system calculates the amount of payment as a transfer amount when the utility pole site fee is calculated as a payment amount and the electricity usage fee exceeds the electricity usage fee.

かかる第3の態様では、電柱敷地料金が電気使用料金以下である場合に、差額金額が支払金額として算出され、電柱敷地料金が電気使用料金を超えている場合に、差額金額が振込金額として算出される。これにより、確実に各種料金に関する情報を管理することができる。   In the third aspect, when the utility pole site charge is equal to or less than the electricity usage fee, the difference amount is calculated as the payment amount, and when the utility pole site fee exceeds the electricity usage fee, the difference amount is calculated as the transfer amount. Is done. Thereby, the information regarding various charges can be managed reliably.

本発明の第4の態様は、第1〜3の何れかの態様に記載の電柱敷地料金管理システムにおいて、前記料金管理手段は、前記差額金額が振込金額の場合に、前記地権者に対する当該差額金額を振り込む旨の指示を送出する一方、前記差額金額が支払金額の場合に、前記地権者に対する当該差額金額の支払う旨の指示を送出することを特徴とする電柱敷地料金管理システムにある。   According to a fourth aspect of the present invention, in the utility pole site charge management system according to any one of the first to third aspects, the charge management means, when the difference amount is a transfer amount, the difference with respect to the landowner. The utility pole site charge management system is characterized in that an instruction to pay the amount of difference is sent to the landowner when the difference amount is a payment amount while the instruction to transfer the amount is sent.

かかる第4の態様では、差額金額が振込金額の場合に、地権者に対するその差額金額を振り込む旨の指示が送出される一方、差額金額が支払金額の場合に、地権者に対するその差額金額の支払う旨の指示が送出される。これにより、より効率的に電気使用料金及び電柱敷地料金の請求又は振込を一括で管理することができる。   In the fourth aspect, when the difference amount is the transfer amount, an instruction to transfer the difference amount to the landowner is sent, while when the difference amount is the payment amount, the difference amount is paid to the landowner. An instruction to that effect is sent. Thereby, billing or transfer of electricity usage charges and utility pole site charges can be managed more efficiently in a lump.

本発明の第5の態様は、第1〜4の何れかの態様に記載の電柱敷地料金管理システムにおいて、前記データベースには、前記地権者に付随する情報を将来的に把握する際の電力契約に関する電力契約情報をさらに含むことを特徴とする電柱敷地料金管理システムにある。   According to a fifth aspect of the present invention, in the utility pole site charge management system according to any one of the first to fourth aspects, the database includes a power contract when the information accompanying the landowner is to be grasped in the future. It is in a utility pole site charge management system characterized in that it further includes power contract information regarding.

かかる第5の態様では、地権者に付随する情報を将来的に把握する際の電力契約に関する電力契約情報が管理される。これにより、例えば、電力契約情報に基づいて地権者にかかる土地の売買、転宅、及び相続など将来的に発生すると想定される各種情報を確実に把握することができる。   In the fifth aspect, the power contract information related to the power contract when the information accompanying the landowner is grasped in the future is managed. Thereby, for example, it is possible to reliably grasp various information that is expected to occur in the future, such as buying and selling land, changing homes, and inheritance of land owners based on the power contract information.

本発明によれば、地権者である電力契約者の電気使用料金及び電柱敷地料金を一元化して管理することで、各地権者の電気使用料金を電柱敷地料金と相殺することができるため、電力を供給し且つその電力を供給するための設備を有する組織が電気使用料金及び電柱敷地料金の請求又は振込を一括で効率的に管理することができる電柱敷地料金管理システムを提供することが可能となる。   According to the present invention, by centralizing and managing the electricity usage charges and utility pole site charges of the power contractor who is the land owner, the electricity usage charges of the local owners can be offset with the utility pole site charges. It is possible to provide a utility pole site charge management system that allows organizations that have facilities to supply electricity and supply power to efficiently manage billing or transfer of electricity usage fees and utility pole site fees in a batch. Become.

以下、図面を用いて本発明を実施するための最良の形態について説明する。なお、本実施形態の説明は例示であり、本発明の構成は以下の説明に限定されない。   The best mode for carrying out the present invention will be described below with reference to the drawings. The description of the present embodiment is an exemplification, and the configuration of the present invention is not limited to the following description.

本実施形態では、電力を供給し且つその電力を供給するための設備を有する組織として、電力会社が電気使用料金及び電柱敷地料金の請求又は振込を一括で効率的に管理することができる電柱敷地料金管理システムを実現するものである。これにより、例えば、電力会社で電柱敷地料金用の口座情報などを別途管理することも不要となり業務リスクや業務負担を軽減させることが可能となる。   In this embodiment, as an organization that supplies power and has facilities for supplying the power, a power utility site where an electric power company can efficiently manage billing or transfer of electricity usage charges and utility pole site charges collectively. A charge management system is realized. As a result, for example, it is not necessary to separately manage account information for utility pole site charges at an electric power company, and it becomes possible to reduce business risk and business burden.

図1は、本発明の実施形態に係る電柱敷地料金管理システムのシステム構成を示す図である。なお、本実施形態では、電力を供給する組織として、電力会社が管理する電力使用料金に基づいて電柱を設置した際に振り込まれる電柱敷地料金を管理する場合を例示している。   FIG. 1 is a diagram showing a system configuration of a utility pole site charge management system according to an embodiment of the present invention. In addition, in this embodiment, the case where the electric pole site charge transferred when installing an electric pole based on the electric power usage fee which an electric power company manages as an organization which supplies electric power is illustrated.

図示するように、本実施形態の電柱敷地料金管理システム1は、電力会社2に設置されており、電力使用料金に基づいて電柱を設置した際に振り込まれる電柱敷地料金を管理する管理サーバ20と管理サーバ20からの各種指示を受信して請求又は支払業務を実行する他システム3及び金融機関4がそれぞれネットワークを介して接続されている。勿論、他システム3は、ネットワークを介さずに連携できるシステムであってもよく、電力会社2内に設置されていてもよい。   As shown in the figure, a utility pole site charge management system 1 according to the present embodiment is installed in an electric power company 2, and a management server 20 that manages a utility pole site charge transferred when a utility pole is installed based on a power usage fee. Other systems 3 and financial institutions 4 that receive various instructions from the management server 20 and execute billing or payment operations are connected via a network. Of course, the other system 3 may be a system that can cooperate without going through a network, and may be installed in the electric power company 2.

管理サーバ20は、料金算出手段21、料金管理手段22、及びデータベース(「DB」と図示する)23を含み構成されている。また、データベース23は、電力会社2内で使用料金管理データベース(「DB」と図示する)24と連携するように構成されている。なお、料金算出手段21とデータベース23は、後述する支払者番号をキーとして関連づけられ、例えば、支払者番号は地権者である顧客が電柱敷地契約時に承諾書に記入することで決定されるようにすればよい。   The management server 20 includes a charge calculation unit 21, a charge management unit 22, and a database (shown as “DB”) 23. The database 23 is configured to cooperate with a usage fee management database (shown as “DB”) 24 within the electric power company 2. The fee calculation means 21 and the database 23 are associated with a payer number, which will be described later, as a key. For example, the payer number is determined by the customer who is the landowner entering the consent form at the time of the telephone pole site contract. do it.

料金算出手段21は、後述するデータベース23から地権者を特定して、その地権者が電力を使用しており且つ使用した電気使用料金が発生している場合に、電気使用料金及び電柱敷地料金から差額料金を算出する。具体的に、料金算出手段21は、差額金額を、電柱敷地料金の支払月の電気使用料金に基づいて算出する又は所定の期間内の電気使用料金から算出する。そして、料金算出手段21は、電柱敷地料金が電気使用料金以下である場合に、差額金額を支払金額として算出し、電柱敷地料金が電気使用料金を超えている場合に、差額金額を振込金額として算出するようにする。   The charge calculation means 21 identifies the landowner from the database 23 to be described later, and when the landowner uses electric power and the electricity usage fee used has been generated, from the electricity usage fee and the utility pole site fee. Calculate the difference fee. Specifically, the fee calculation means 21 calculates the difference amount based on the electricity usage fee in the month of payment of the utility pole site fee or from the electricity usage fee within a predetermined period. Then, the charge calculating means 21 calculates the difference amount as a payment amount when the utility pole site fee is equal to or less than the electricity usage fee, and if the utility pole site fee exceeds the electricity usage fee, the difference amount is used as the transfer amount. Try to calculate.

料金管理手段22は、差額料金を振込金額又は支払金額の何れかとして管理する。具体的に、料金管理手段22は、差額金額が振込金額の場合に、地権者に対する差額金額を振り込む旨の指示を送出する一方、差額金額が支払金額の場合に、地権者に対する差額金額の支払う旨の指示を送出する。   The fee management means 22 manages the difference fee as either a transfer amount or a payment amount. Specifically, the charge management means 22 sends an instruction to transfer the difference amount to the land owner when the difference amount is the transfer amount, while paying the difference amount to the land owner when the difference amount is the payment amount. Send an instruction to that effect.

データベース23は、少なくとも、電柱の所在地及びその電柱ごとの電柱敷地料金を示す電柱情報231、電柱を個人の所有する敷地に設置している地権者に関する地権者情報232、及び電力の供給を受けている契約者に関する契約者情報233を含んでいる。そして、データベース23は、地権者に付随する情報を将来的に把握する際の電力契約に関する電力契約情報234をさらに含むようにしてもよい。   The database 23 receives at least the utility pole information 231 indicating the location of the utility pole and the utility pole fee for each utility pole, the owner information 232 regarding the owner of the utility who has installed the utility pole on the site owned by the individual, and the supply of power. The contractor information 233 related to the contractor is included. The database 23 may further include power contract information 234 related to a power contract when the information accompanying the landowner is grasped in the future.

具体的には、図2及び図3に示すような情報が格納されて管理される。図2(a)には、電柱情報231が例示されており、例えば、電柱を識別する電柱番号、電柱の位置(緯度、経度)、電柱を設置した設置年月日、及び電柱敷地料金が各電柱ごとに示されている。図2(b)には、地権者情報232が例示されており、例えば、地権者を識別する地権ID、地権者の敷地内に設置されている電柱を示す電柱番号、地権者の電話番号、地権者の住所、地権者の電力契約の有無、及び地権者の支払者番号が各地権者ごとに示されている。図3(a)には、契約者情報233が例示されており、例えば、地権者の支払者番号、その地権者が電力契約者として電力の供給を受けている際の電力契約番号、電話番号、住所、契約開始年月日、契約種別、及び電気使用料金が各電力契約者ごとに示されている。図3(b)には、電力契約情報234が例示されており、例えば、電力契約番号及び電力契約者(支払者)が転宅した場合の転宅先と転宅年月日が示されている。これにより、支払者番号及び電力契約者番号をキーとして地権者情報232、契約者情報233、及び電力契約情報234を関連付けることで、電力会社2では、地権者が転宅したという情報を知ることができ、必要に応じて、土地の売買などを想定してその地権者に問合せをすることが可能となる。これにより、例えば、土地が売買された場合には、地権者が所有する電柱が設置された土地を売買した際の土地売買先と土地売買年月日を取得して管理するようにしてもよいし、土地が相続された場合には、地権者が所有する電柱が設置された土地が相続された際の相続先と相続年月日を取得して管理するようにしてもよい。   Specifically, information as shown in FIGS. 2 and 3 is stored and managed. FIG. 2A illustrates telephone pole information 231. For example, the telephone pole number for identifying the telephone pole, the position of the telephone pole (latitude, longitude), the date of installation of the telephone pole, and the telephone pole site charge Shown for each utility pole. FIG. 2B illustrates the landowner information 232. For example, a landowner ID for identifying the landowner, a telephone pole number indicating a telephone pole installed in the landowner's site, a telephone number of the landowner, The landowner's address, the presence / absence of the landowner's power contract, and the landowner's payer number are shown for each landowner. FIG. 3A illustrates the contractor information 233. For example, the payer number of the landowner, the power contract number when the landowner is receiving power supply as a power contractor, and the telephone number The address, contract start date, contract type, and electricity usage fee are shown for each power contractor. FIG. 3B illustrates the power contract information 234. For example, a power contract number and a power transfer destination and a date when the power contractor (payer) moves home are shown. As a result, by associating the landowner information 232, the contractor information 233, and the power contract information 234 with the payer number and the power contractor number as keys, the power company 2 can know information that the landowner has moved home. If necessary, it is possible to make inquiries to the landowner assuming the purchase and sale of land. Thereby, for example, when the land is bought and sold, the land purchaser and the land sale date when buying and selling the land where the power pole owned by the landowner is installed may be acquired and managed. However, when the land is inherited, the inheritance destination and the inheritance date when the land on which the utility pole owned by the landowner is installed may be acquired and managed.

上述のようなデータベース23を構成することにより、電力会社2では、電力会社の業務形態において発生する料金(本実施形態では、電気使用料金、電柱敷地料金)に関係するあらゆる情報を一括して管理することができるため、例えば、口座の事前照合、振込不能への対応作業等の負担を軽減することが可能となる。また、電柱敷地料金は年一回発生するのに対し、電気使用料金は月一回発生するため、電柱敷地料金と電気使用料金との発生頻度の相違による早期の対応を採ることも可能となる。   By configuring the database 23 as described above, the power company 2 collectively manages all information related to charges (in this embodiment, electricity usage charges, utility pole charges) generated in the business form of the power company. Therefore, for example, it is possible to reduce the burden of prior verification of an account, work for dealing with inability to transfer, and the like. In addition, while the utility pole site fee is generated once a year, the electricity usage fee is generated once a month, so it is possible to take an early response due to the frequency difference between the utility pole site fee and the electricity usage fee. .

使用料金管理データベース24は、契約者が使用した電力使用料金に基づく電気使用料金を月単位で管理しており、データベース23と連携することで、契約者情報233の電気使用料金を、例えば、月単位又は所定の期間で更新する。   The usage fee management database 24 manages the electricity usage fee based on the electricity usage fee used by the contractor on a monthly basis, and by coordinating with the database 23, the electricity usage fee of the contractor information 233 is changed to, for example, the month. Update in units or a predetermined period.

次に、電柱敷地料金管理システム1の動作手順について説明する。図4は、本発明の実施形態に係る電柱敷地料金管理システムのフローチャートを示す図である。なお、ここでの処理は、データベース23で管理されている各種情報に基づいて実行される。   Next, the operation procedure of the utility pole site charge management system 1 will be described. FIG. 4 is a diagram showing a flowchart of the utility pole site charge management system according to the embodiment of the present invention. The processing here is executed based on various information managed in the database 23.

図示するように、まず、料金算出手段21により地権者が特定されると(S1)、その地権者の電気使用料金の支払があるか否かが判断される(S2)。ここで、地権者の電気使用料金の支払がある場合(S2;Yes)には、その電気使用料金が電柱敷地料金を超えているか否かが判断される(S3)。   As shown in the figure, first, when the landowner is specified by the charge calculation means 21 (S1), it is determined whether or not the landowner has paid the electricity usage fee (S2). Here, if the landowner pays the electricity usage fee (S2; Yes), it is determined whether the electricity usage fee exceeds the utility pole site fee (S3).

ここで、電気使用料金が電柱敷地料金を超えている場合(S3;Yes)には、電気使用料金から電柱敷地料金を差し引くことで算出される差額金額を地権者からの支払金額として算出する(S4)。そして、料金管理手段22から差額金額の支払処理に関する指示が他システム3に対して送出されて(S5)、地権者でもある電力契約者に対して電気使用料金についての請求書が発行される(S6)。すなわち、電気使用料金と電柱敷地料金とを相殺した差額金額が請求書で請求される金額となる。   Here, when the electricity usage fee exceeds the utility pole site fee (S3; Yes), the difference amount calculated by subtracting the utility pole site fee from the electricity usage fee is calculated as the payment amount from the landowner ( S4). Then, the fee management means 22 sends an instruction regarding the payment processing of the difference amount to the other system 3 (S5), and a bill for the electricity usage fee is issued to the power contractor who is also the landowner ( S6). That is, the difference amount obtained by offsetting the electricity usage fee and the utility pole site fee is the amount charged on the invoice.

一方、電気使用料金が電柱敷地料金以下である場合(S3;No)には、電柱敷地料金から電気使用料金を差し引くことで算出される差額金額を地権者に対する振込金額として算出する(S7)。そして、料金管理手段22から差額金額の振込処理に関する指示が金融機関4に対して送出されて(S8)、電力契約者でもある地権者に対して電柱敷地料金についての振込が行われる(S9)。すなわち、電気使用料金と電柱敷地料金とを相殺した差額金額が電柱敷地料金に対して振り込まれる金額となる。   On the other hand, when the electricity usage fee is equal to or less than the utility pole site fee (S3; No), the difference amount calculated by subtracting the electricity usage fee from the utility pole site fee is calculated as the transfer amount to the landowner (S7). Then, an instruction regarding the transfer process of the difference amount is sent from the fee management means 22 to the financial institution 4 (S8), and the transfer of the utility pole site fee is performed to the landowner who is also a power contractor (S9). . That is, the difference amount obtained by offsetting the electricity usage fee and the utility pole site fee is the amount transferred to the utility pole site fee.

また、地権者の電気使用料金の支払がない場合(S2;No)には、ステップS8へ移行して振込処理が実行されることになる。   If the landowner does not pay the electricity usage fee (S2; No), the process proceeds to step S8 and the transfer process is executed.

上述したように、本実施形態の電柱敷地料金管理システム1では、地権者である電力契約者の電気使用料金及び電柱敷地料金をデータベース23で一元化して管理することで、各地権者の電気使用料金を電柱敷地料金と相殺することができる。このときの差分を請求金額又は振込金額として効率的に管理することができる。これにより、例えば、電柱敷地料金の口座を別途管理する必要性もなくなり、個人情報管理のリスクを軽減することができる。また、電柱敷地契約に関する情報も併せて管理することができるため、地権者に関する情報の把握が容易になり効率良く業務を遂行することも可能となる。   As described above, in the utility pole site charge management system 1 of the present embodiment, the electricity usage charges and utility pole site charges of the power contractor who is the landowner are centralized and managed in the database 23, so that Fees can be offset with utility pole site fees. The difference at this time can be efficiently managed as the billing amount or the transfer amount. Thereby, for example, there is no need to separately manage an account for a utility pole site charge, and the risk of personal information management can be reduced. In addition, since information related to telephone pole site contracts can be managed together, it becomes easy to grasp information related to landowners and it is possible to carry out operations efficiently.

本発明の実施形態に係る電柱敷地料金管理システムのシステム構成を示す図である。It is a figure which shows the system configuration | structure of the utility pole site charge management system which concerns on embodiment of this invention. 本発明の実施形態に係る電柱情報及び地権者情報の一例を示す図である。It is a figure which shows an example of the utility pole information and landowner information which concern on embodiment of this invention. 本発明の実施形態に係る契約者情報及び敷地契約情報の一例を示す図である。It is a figure which shows an example of the contractor information and site contract information which concern on embodiment of this invention. 本発明の実施形態に係る電柱敷地料金管理システムのフローチャートを示す図である。It is a figure which shows the flowchart of the utility pole site charge management system which concerns on embodiment of this invention.

符号の説明Explanation of symbols

2 電力会社
3 他システム
4 金融機関
20 管理サーバ
21 料金算出手段
22 料金管理手段
23 データベース
24 使用料金管理データベース
231 電柱情報
232 地権者情報
233 契約者情報
234 電力契約情報
2 Electric power company 3 Other system 4 Financial institution 20 Management server 21 Charge calculation means 22 Charge management means 23 Database 24 Usage charge management database 231 Telephone pole information 232 Land owner information 233 Contractor information 234 Electricity contract information

Claims (5)

電力を供給する組織が管理する電気使用料金に基づいて電柱を設置した際に振り込まれる電柱敷地料金を管理する電柱敷地料金管理システムであって、
少なくとも、前記電柱の所在地及び当該電柱ごとの前記電柱敷地料金を示す電柱情報、当該電柱を個人の所有する敷地に設置している地権者に関する地権者情報、及び電力の供給を受けている契約者に関する契約者情報を含むデータベースと、
前記データベースから地権者を特定して、当該地権者が電力を使用しており且つ使用した電気使用料金が発生している場合に、当該電気使用料金及び前記電柱敷地料金から差額料金を算出する料金算出手段と、
前記差額料金を振込金額又は支払金額の何れかとして管理する料金管理手段とを具備することを特徴とする電柱敷地料金管理システム。
A utility pole site charge management system that manages a utility pole site charge that is transferred when a utility pole is installed based on an electricity usage fee managed by an organization that supplies power,
At least the utility pole information indicating the location of the utility pole and the utility pole site charge for each utility pole, the owner information regarding the owner of the utility pole installed on the site owned by the individual, and the contractor receiving power supply A database containing contractor information about
Fee for calculating the difference fee from the electricity usage fee and the utility pole site fee when the landowner is identified from the database and the landowner is using electricity and the electricity usage fee used is incurred A calculation means;
A utility pole site charge management system comprising charge management means for managing the difference charge as either a transfer amount or a payment amount.
請求項1に記載の電柱敷地料金管理システムにおいて、前記料金算出手段は、前記差額金額を、電柱敷地料金の支払月の電気使用料金に基づいて算出する又は所定の期間内の電気使用料金から算出することを特徴とする電柱敷地料金管理システム。 2. The utility pole site charge management system according to claim 1, wherein the fee calculating means calculates the difference amount based on an electricity usage fee in a payment month of the utility pole site fee or from an electricity usage fee within a predetermined period. Electric pole site charge management system characterized by 請求項1又は2に記載の電柱敷地料金管理システムにおいて、前記料金算出手段は、前記電柱敷地料金が前記電気使用料金以下である場合に、前記差額金額を支払金額として算出し、前記電柱敷地料金が前記電気使用料金を超えている場合に、前記差額金額を振込金額として算出することを特徴とする電柱敷地料金管理システム。 3. The utility pole site charge management system according to claim 1, wherein, when the utility pole site charge is equal to or less than the electricity usage charge, the charge calculating unit calculates the difference amount as a payment amount, and the utility pole site charge When the power usage fee exceeds the electricity usage fee, the difference amount is calculated as a transfer amount. 請求項1〜3の何れかに記載の電柱敷地料金管理システムにおいて、前記料金管理手段は、前記差額金額が振込金額の場合に、前記地権者に対する当該差額金額を振り込む旨の指示を送出する一方、前記差額金額が支払金額の場合に、前記地権者に対する当該差額金額の支払う旨の指示を送出することを特徴とする電柱敷地料金管理システム。 The telephone pole site charge management system according to any one of claims 1 to 3, wherein, when the difference amount is a transfer amount, the charge management means sends an instruction to the land owner to transfer the difference amount. When the difference amount is a payment amount, an instruction for paying the difference amount to the landowner is sent out. 請求項1〜4の何れかに記載の電柱敷地料金管理システムにおいて、前記データベースには、前記地権者に付随する情報を将来的に把握する際の電力契約に関する電力契約情報をさらに含むことを特徴とする電柱敷地料金管理システム。
5. The utility pole site charge management system according to claim 1, wherein the database further includes power contract information related to a power contract when grasping information accompanying the landowner in the future. Electric pole site charge management system.
JP2005356686A 2005-12-09 2005-12-09 Electric pole site charge management system Pending JP2007164281A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005356686A JP2007164281A (en) 2005-12-09 2005-12-09 Electric pole site charge management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005356686A JP2007164281A (en) 2005-12-09 2005-12-09 Electric pole site charge management system

Publications (1)

Publication Number Publication Date
JP2007164281A true JP2007164281A (en) 2007-06-28

Family

ID=38247129

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005356686A Pending JP2007164281A (en) 2005-12-09 2005-12-09 Electric pole site charge management system

Country Status (1)

Country Link
JP (1) JP2007164281A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014106658A (en) * 2012-11-27 2014-06-09 Sharp Corp Electric power buying and selling system
JP2014106659A (en) * 2012-11-27 2014-06-09 Sharp Corp Electric power buying and selling system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014106658A (en) * 2012-11-27 2014-06-09 Sharp Corp Electric power buying and selling system
JP2014106659A (en) * 2012-11-27 2014-06-09 Sharp Corp Electric power buying and selling system

Similar Documents

Publication Publication Date Title
US11756137B2 (en) Systems and methods for advanced energy settlements, network-based messaging, and software applications for electric power grids, microgrids, grid elements, and/or electric power networks
US11436582B2 (en) Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same
JP6414766B2 (en) Power management method, power management system, and power supply apparatus
JP2007094732A (en) Power transaction control system, power transaction control method and power transaction control program
JP6767561B1 (en) Power trading support systems, power trading support devices, and programs
JP2013156695A (en) Charging stand unit price formulation system and charging stand unit price formulation method
JP2007164281A (en) Electric pole site charge management system
KR102062644B1 (en) System and method for management of collective building
JP2009020674A (en) Electric power sales contract management system
JP2004062805A (en) Electric power metering service system, metering service center and metering method
JP2003348753A (en) Intermediation method and program for power supply, recording medium recorded with program, intermediation terminal for power supply, and power supply system
JP2003122819A (en) Management method and system for solar power facility
JP6580659B2 (en) Lease information management device
JP6514662B2 (en) Utility charge billing program
JP2017068390A (en) Lease-time risk compensation system and lease-time risk compensation method
JP2007034639A (en) Power failure insurance system, power failure insurance providing method and power failure insurance program
JP2005032199A (en) Business system related to electricity joint purchase using internet
KR102307561B1 (en) Managements method of realty estate using manager computer system
JP7212197B1 (en) Information processing device, information processing method and information processing program
JP2011192264A (en) Point management system
JP7386639B2 (en) Electric power transmission system and method
JP2021064058A (en) Tax payment supporting system, tax payment supporting method, and program
JP6668444B2 (en) Rent settlement system and rent settlement method
KR20200050771A (en) Method for providing settlement service for payment charge difference and payment gateway server thereof
JP2002083228A (en) Payment demand business support system, payment demand business support method, and storage medium with payment demand business support program stored therein