JP2007145473A - Emergency operation information gathering device of elevator - Google Patents

Emergency operation information gathering device of elevator Download PDF

Info

Publication number
JP2007145473A
JP2007145473A JP2005340475A JP2005340475A JP2007145473A JP 2007145473 A JP2007145473 A JP 2007145473A JP 2005340475 A JP2005340475 A JP 2005340475A JP 2005340475 A JP2005340475 A JP 2005340475A JP 2007145473 A JP2007145473 A JP 2007145473A
Authority
JP
Japan
Prior art keywords
elevator
control operation
emergency
earthquake
patrol route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005340475A
Other languages
Japanese (ja)
Inventor
Toru Kato
亨 加藤
Akiyasu Ogawa
顕康 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2005340475A priority Critical patent/JP2007145473A/en
Publication of JP2007145473A publication Critical patent/JP2007145473A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an emergency operation information gathering device of an elevator capable of eliminating useless work of a professional engineer when restoring earthquake emergency operation. <P>SOLUTION: A monitoring center 2 has an emergency time patrol route processing part making restoration order of emergency operation in response to a work schedule of the professional engineer 5 performing maintenance work of the elevator, an emergency time patrol route changing processing part changing the restoration order of the emergency operation by a command from the professional engineer 5, and an emergency operation state confirming means confirming an emergency operation actuating state of the elevator in response to patrol order of the emergency time patrol route processing part and the emergency time patrol route changing processing part. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明はエレベータの管制運転情報収集装置に係り、特に地震発生に伴うエレベータ管制運転の復旧作業に好適なエレベータの管制運転情報収集装置に関する。   The present invention relates to an elevator control operation information collecting device, and more particularly to an elevator control operation information collecting device suitable for restoration work of an elevator control operation accompanying an earthquake.

エレベータでは、地震発生時の不測の事故発生を防止するために、エレベータの付加設備として地震感知器を設置し、この地震感知器が所定の震度を越える振動を感知すると、エレベータの制御装置は地震管制運転状態になり、乗りかごは最寄り階まで運転され当該階に開扉状態で停止する。そして、停止した乗りかごは、エレベータ保守会社の専門技術者が当該現場で復旧作業を完了し、安全が確認されるまで停止状態で待機する。   In an elevator, an earthquake detector is installed as an additional facility for the elevator to prevent an unexpected accident at the occurrence of an earthquake. The car enters the controlled operation state, and the car is driven to the nearest floor and stopped on the floor with the door open. Then, the stopped car waits in a stopped state until an expert of the elevator maintenance company completes the recovery work at the site and safety is confirmed.

このため、エレベータ保守会社の専門技術者は、地震感知器が設置されているエレベータの運転状態を順次確認し、地震管制運転状態で最寄り階に停止している場合は、専門技術者は、現場で必要な復旧処置を行い、当惑エレベータを点検運転、及び安全を確認してから、管制運転から通常運転に切り替えて復旧作業を完了する。   For this reason, an expert engineer at the elevator maintenance company checks the operation status of the elevators where the seismic detectors are installed one after the other. After completing the necessary recovery measures, check the perplexed elevator for inspection and safety, and then switch from control operation to normal operation to complete the recovery operation.

ところで、エレベータを管制運転で停止させる必要がある地震は一般的に規模が大きく、かつ広域に渡るため、地震発生と同時に当該地域内の多くのビルの地震感知器が動作する。この場合、専門技術者が巡回を行う経路を把握するために、何度も専門技術者の所属する出動拠点との間で電話連格を行う必要があり、地震発生時の対応に時間を要するという問題があった。   By the way, earthquakes that require elevators to be stopped by control operation are generally large and spread over a wide area, so that earthquake detectors in many buildings in the area operate simultaneously with the occurrence of an earthquake. In this case, in order to understand the route that the specialist engineer makes the patrol, it is necessary to make a continuous telephone call with the dispatching base to which the expert engineer belongs, and it takes time to respond when an earthquake occurs. There was a problem.

この問題を解決するために、専門技術者の保有する保全ツールに予め巡回を行うエレベータリストを記録し、出動拠点との連絡を不要とする方法が提案されている。(特許文献1参照)
特開平8−282939号公報
In order to solve this problem, a method has been proposed in which an elevator list that is visited in advance is recorded in a maintenance tool owned by a professional engineer, so that it is not necessary to contact a dispatching base. (See Patent Document 1)
JP-A-8-282939

上述した従来の方法では、専門技術者は復旧作業を行う経路上でエレベータが管制運転が動作したか否か、管制運転を誰かが既に復旧したものかの状態が判断つかないため、専門技術者が管制運転が動作しなかったエレベータや、既に復旧作業を終了したエレベータに出向く等の無駄を行うため、復旧までに時間が掛かる問題があった。   In the above-described conventional method, the expert engineer cannot determine whether the elevator has been in control operation on the route to perform the recovery operation or whether someone has already recovered the control operation. However, there is a problem that it takes time until the recovery because it is wasted such as going to an elevator where the control operation has not been operated or an elevator that has already completed the recovery work.

本発明の目的は、地震管制運転復旧時の専門技術者の無駄な作業を排除することのできるエレベータの管制運転情報収集装置を提供することにある。   An object of the present invention is to provide an elevator control operation information collection device that can eliminate useless work of a professional engineer at the time of restoration of seismic control operation.

上記目的を達成するために本発明は、建物に設置され、地震を感知すると動作する地震感知器と、地震感知器動作時にエレベータを最寄階に停止させる地震管制運転を行う地震管制運転装置と、エレベータを制御する制御盤と接続されエレベータの異常検出や機械点検を行う監視端末と、複数の監視端末と通信回線を介して接続され、エレベータの異常監視や機械点検の診断管理を行う監視センタとを備えたエレベータの管制運転情報収集装置において、前記監視センタには、前記エレベータの保全作業を行う専門技術者の作業予定に合わせて、前記管制運転の復旧順序を作成する緊急時巡回経路処理部と、前記専門技術者からの指令により前記管制運転の復旧順序を変更する緊急時巡回経路変更処理部と、前記緊急時巡回経路処理部及び前記緊急時巡回経路変更処理部の巡回順序に従い、当該エレベータの管制運転作動状況を確認する管制運転状態確認手段とを備えたものである。   In order to achieve the above object, the present invention provides an earthquake detector that is installed in a building and that operates when an earthquake is detected, and an earthquake control operation device that performs an earthquake control operation that stops an elevator at the nearest floor when the earthquake sensor is activated. A monitoring terminal connected to a control panel for controlling the elevator to detect the abnormality of the elevator and machine inspection, and a monitoring center connected to a plurality of monitoring terminals via a communication line to monitor the abnormality of the elevator and diagnose and manage the machine inspection In the elevator control operation information collecting apparatus, the emergency monitoring route processing for creating the recovery order of the control operation in accordance with the work schedule of a specialist engineer who performs maintenance work of the elevator in the monitoring center An emergency patrol route change processing unit that changes the restoration order of the control operation according to a command from the expert, the emergency patrol route processing unit, and the front According sequence order of emergency patrol route change processing unit, in which a control operation state confirming means for confirming the control operation operating condition of the elevator.

このようにしたので、緊急時巡回経路処理部で作成した専門技術者毎の巡回経路や、緊急時巡回経路変更処理部で変更した巡回順路に従って、エレベータの管制運転動作を確認することで、専門技術者の作業対象エレベータに合わせて管制運転動作の有無を連絡することができる。   Since this is done, it is possible to check the operation control of the elevator according to the patrol route for each specialist engineer created by the emergency patrol route processing unit and the patrol route changed by the emergency patrol route change processing unit. The presence or absence of a control operation can be communicated according to the engineer's work target elevator.

本発明によれば、専門技術者の予定作業に先んじて管制運転作動の有無の情報提供を行うことができるので、専門技術者の無駄な作業を排除するとともに、エレベータの不稼働時間を短くすることができる。   According to the present invention, it is possible to provide information on the presence or absence of the control operation prior to the scheduled work of the expert engineer, so that unnecessary work of the expert engineer is eliminated and the elevator downtime is shortened. be able to.

以下、図面を参照して本発明の実施形態を説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1は本発明に係る監視システムの構成図で、図2は本発明に係る管制運転情報収集手順を表すフローチャートである。   FIG. 1 is a configuration diagram of a monitoring system according to the present invention, and FIG. 2 is a flowchart showing a control operation information collecting procedure according to the present invention.

図1において、1は地震の被災地ビル群で、このビル群1には多数の設備機器(図示せず)が設置されている。11、12、13は設備監視を行うビル群1のそれぞれに設置され、後述する監視センタと通信回線を介して選択的に接続される監視端末であり、2はビル群1の昇降機、設備機器等の動作状況を確認し、対応者へ出動指示を行う監視センタで、21は監視端末11、12、13と通信回線を介して接続され、情報の送受信を行う監視端末通信装置で、22は監視端末11、12、13の監視設備情報等の構成情報、及び専門技術者の勤務体系登録を行う情報入出力装置で、23は情報入出力装置監22にて情報登録された際に専門技術者の巡回経路を再設定する巡回経路処理部で、24は監視端末11、12、13の構成情報、及び取付け地域と専門技術者の所属、勤務体系、及び技能を記録する情報記録部で、25は記録装置、3は通信回線、4はインターネット、5はエレベータが管制運転を行った際に復旧作業を行う専門技術者で、6は専門技術者が保守作業時に使用する保守ツールである。   In FIG. 1, reference numeral 1 denotes a group of buildings affected by an earthquake, and a number of facility devices (not shown) are installed in the building group 1. Reference numerals 11, 12, and 13 denote monitoring terminals that are installed in each of the building group 1 that performs facility monitoring and are selectively connected to a monitoring center, which will be described later, via a communication line. The monitoring center 21 confirms the operation status of the person and sends out instructions to the responders. 21 is a monitoring terminal communication device that is connected to the monitoring terminals 11, 12, and 13 through a communication line and transmits / receives information. Configuration information such as monitoring equipment information of the monitoring terminals 11, 12, and 13 and an information input / output device for registering a work system of a professional engineer, 23 is a specialized technology when information is registered in the information input / output device supervisor 22 24 is an information recording unit that records the configuration information of the monitoring terminals 11, 12, and 13 and the affiliation, work system, and skill of the installation area and the specialist engineer. 25 is a recording device, 3 is communication Line, 4 is the Internet, 5 is a professional engineer to perform the restoration work when the elevator went a control operation, 6 is a maintenance tool for professional technicians to use during maintenance work.

次に、本発明の動作の説明を行う。   Next, the operation of the present invention will be described.

まず、専門技術者5が通常勤務を行う際、勤務時間帯や休暇情報を情報入力装置22に対して予め登録を行う(手順Sl)。   First, when the professional engineer 5 performs normal work, the working time zone and vacation information are registered in advance in the information input device 22 (step S1).

監視センタ2では、専門技術者5が登録した勤務体系に基づき、記録装置25に予め登録されているビル群1の位置情報、及び点検周期や専門技術者5の所属、及び技能を基に、巡回経路処理部23にて専門技術者5毎の保守巡回経路と地震発生時に備えた緊急時巡回経路を作成し、情報記録部24を介して記録装置25に巡回経路情報を記録する(手順S2)。   In the monitoring center 2, based on the work system registered by the professional engineer 5, based on the location information of the building group 1 registered in the recording device 25 in advance, the inspection period, the affiliation of the professional engineer 5, and the skill, The tour route processing unit 23 creates a maintenance tour route for each expert 5 and an emergency tour route prepared in the event of an earthquake, and records the tour route information in the recording device 25 via the information recording unit 24 (step S2). ).

地震が発生していない場合は(手順S3)、専門技術者5は予め作成された保守巡回経路に従い、通常の保守点検作業を実施する(手順S9)。   If an earthquake has not occurred (procedure S3), the expert engineer 5 performs a normal maintenance inspection work (procedure S9) according to a maintenance patrol route prepared in advance.

地震が発生した場合は、緊急時巡回経路に従い管制運転を行っているエレベータの復旧作業が可能かを判断(手順S4)、対応可能な場合は、管制センター2より記録装置25の巡回経路に従い、監視端末通信装置21より、順次監視端末11、12、13の運転状態確認を実施する(手順S5)。   When an earthquake occurs, it is determined whether restoration work for the elevator that is in control operation according to the emergency patrol route is possible (procedure S4), and if it is possible, the control center 2 follows the patrol route of the recording device 25, The operation status of the monitoring terminals 11, 12, 13 is sequentially confirmed from the monitoring terminal communication device 21 (step S5).

一方、専門技術者5が交通事情、地震発生時の所在地などの要因により緊急時巡回経路に従った対応が行えないと判断した場合、専門技術者5が保有する保守ツール6より巡回開始地点の登録を行う(手順S7)。   On the other hand, if the expert engineer 5 determines that it is not possible to respond to the emergency patrol route due to factors such as traffic conditions and the location of the earthquake, the maintenance tool 6 owned by the expert engineer 5 Registration is performed (step S7).

この登録された情報は、インターネット7を介して監視センタ2に備えられる保守ツール通信装置26に送信され、巡回経路処理部23にて情報を解析、再度登録されているビル群1の位置情報、及び点検周期や専門技術者5の所属、及び技能を基に、緊急時巡回経路を再度作成し、情報記録部24を介して記録装置25に巡回経路情報を記録し(手順S8)、管制センタ2より記録装置25の巡回経路に従い、監視端末通信装置21より、順次監視端末11、12、13の運転状態であるエレベータの管制運転作動の有無の確認を実施する(手順S5)。   The registered information is transmitted to the maintenance tool communication device 26 provided in the monitoring center 2 via the Internet 7, and the information is analyzed and re-registered by the traveling route processing unit 23. Then, based on the inspection period, the affiliation of the expert engineer 5 and the skill, the emergency tour route is created again, and the tour route information is recorded in the recording device 25 via the information recording unit 24 (step S8). 2, the monitoring terminal communication device 21 sequentially checks the presence or absence of the control operation of the elevator, which is the operation state of the monitoring terminals 11, 12, 13, according to the patrol route of the recording device 25 (procedure S 5).

以上の処理により、収集した監視端末11、12、13の運転状態は、監視センタ2の記録装置25に記録され、専門技術者5が保有する保守ツール6へ順次巡回経路上におけるエレベータの管制運転の作動状態を提供することで(手順S6)、専門技術者5の管制運転復旧作業を支援する。   Through the above processing, the collected operation states of the monitoring terminals 11, 12, and 13 are recorded in the recording device 25 of the monitoring center 2, and sequentially controlled to the maintenance tool 6 owned by the professional engineer 5 on the patrol route. Is provided (procedure S6), thereby assisting the professional engineer 5 in the control operation recovery work.

本発明に係る監視システムの構成図である。It is a block diagram of the monitoring system which concerns on this invention. 本発明に係る管制運転情報収集手順を表すフローチャートである。It is a flowchart showing the control operation information collection procedure which concerns on this invention.

符号の説明Explanation of symbols

1 被災地域のビル群
11、12、13 監視端末
2 監視センタ
21 監視端末通信装置
22 情報入出力装置
23 巡回経路処理部
24 情報記録部
25 記録装置
26 保守ツール通信装置
3 通信回線
4 インターネット
5 専門技術者
6 保守ツール
DESCRIPTION OF SYMBOLS 1 Building group of a stricken area 11, 12, 13 Monitoring terminal 2 Monitoring center 21 Monitoring terminal communication apparatus 22 Information input / output apparatus 23 Cyclic route processing part 24 Information recording part 25 Recording apparatus 26 Maintenance tool communication apparatus 3 Communication line 4 Internet 5 Specialization Engineer 6 Maintenance tool

Claims (1)

建物に設置され、地震を感知すると動作する地震感知器と、地震感知器動作時にエレベータを最寄階に停止させる地震管制運転を行う地震管制運転装置と、エレベータを制御する制御盤と接続されエレベータの異常検出や機械点検を行う監視端末と、複数の監視端末と通信回線を介して接続され、エレベータの異常監視や機械点検の診断管理を行う監視センタとを備えたエレベータの管制運転情報収集装置において、前記監視センタには、前記エレベータの保全作業を行う専門技術者の作業予定に合わせて、前記管制運転の復旧順序を作成する緊急時巡回経路処理部と、前記専門技術者からの指令により前記管制運転の復旧順序を変更する緊急時巡回経路変更処理部と、前記緊急時巡回経路処理部及び前記緊急時巡回経路変更処理部の巡回順序に従い、当惑エレベータの管制運転作動状況を確認する管制運転状態確認手段とを備えたことを特徴とするエレベータの管制運転情報収集装置。   An elevator connected to a control panel that controls an elevator, an earthquake detector that is installed in a building and operates when an earthquake is detected, an earthquake control operation device that performs an earthquake control operation that stops the elevator at the nearest floor when the earthquake detector operates Elevator control operation information collection device comprising a monitoring terminal for detecting abnormalities in the machine and inspecting the machine, and a monitoring center connected to a plurality of monitoring terminals via a communication line for monitoring the abnormality of the elevator and diagnosing and managing the machine inspection In the monitoring center, an emergency patrol route processing unit that creates a recovery sequence of the control operation in accordance with a work schedule of a specialist engineer who performs maintenance work on the elevator, and a command from the expert engineer The emergency patrol route change processing unit for changing the restoration order of the control operation, and the patrol order of the emergency patrol route processing unit and the emergency patrol route change processing unit According, control operation information collecting device for an elevator, characterized in that a control operation state confirming means for confirming the control operation operating condition embarrassment elevator.
JP2005340475A 2005-11-25 2005-11-25 Emergency operation information gathering device of elevator Pending JP2007145473A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005340475A JP2007145473A (en) 2005-11-25 2005-11-25 Emergency operation information gathering device of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005340475A JP2007145473A (en) 2005-11-25 2005-11-25 Emergency operation information gathering device of elevator

Publications (1)

Publication Number Publication Date
JP2007145473A true JP2007145473A (en) 2007-06-14

Family

ID=38207351

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005340475A Pending JP2007145473A (en) 2005-11-25 2005-11-25 Emergency operation information gathering device of elevator

Country Status (1)

Country Link
JP (1) JP2007145473A (en)

Similar Documents

Publication Publication Date Title
JP4005328B2 (en) Building equipment and elevator management equipment
JPH02138081A (en) Elevator system
KR20190049602A (en) IoT based elevator pervasive autonomous system and method
JP2018188273A (en) Elevator inspection device
JP4932855B2 (en) Elevator control system
JP2008195481A (en) Passenger conveyor monitoring system
JP2007238202A (en) Maintenance/inspection management system
JP5114038B2 (en) Elevator function variable remote monitoring system
JP2922045B2 (en) Remote failure diagnosis device for elevators
JP6522254B2 (en) Elevator failure remote recovery system
JP2008007308A (en) Operation report system used when earthquake occurs
CN115367579B (en) Elevator system and maintenance method for elevator system
JP2007145473A (en) Emergency operation information gathering device of elevator
JP7412316B2 (en) Elevator call registration method and elevator system
JP4708211B2 (en) Elevator apparatus and elevator control method
KR20200074203A (en) Elevator system
JP4935593B2 (en) Elevator earthquake reference floor return operation device
JP2008044715A (en) Earthquake hazard prediction system for elevator
JP6419360B1 (en) Elevator system
JP4973067B2 (en) Elevator restoration device after earthquake and restoration method
JP6537745B2 (en) Elevator remote monitoring system
JPH05193856A (en) Remote trouble diagnostic device for elevator
JP6522256B2 (en) Elevator failure remote recovery system
WO2018122996A1 (en) Elevator failure remote recovery system
JP5960646B2 (en) Remote monitoring support device, remote monitoring system, remote monitoring support program, and remote monitoring program