JP2006331262A - Material requirement planning apparatus - Google Patents

Material requirement planning apparatus Download PDF

Info

Publication number
JP2006331262A
JP2006331262A JP2005156948A JP2005156948A JP2006331262A JP 2006331262 A JP2006331262 A JP 2006331262A JP 2005156948 A JP2005156948 A JP 2005156948A JP 2005156948 A JP2005156948 A JP 2005156948A JP 2006331262 A JP2006331262 A JP 2006331262A
Authority
JP
Japan
Prior art keywords
product
plan
item
material requirement
planning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005156948A
Other languages
Japanese (ja)
Inventor
Shinsuke Miyake
伸輔 三宅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2005156948A priority Critical patent/JP2006331262A/en
Publication of JP2006331262A publication Critical patent/JP2006331262A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a MPR (Material Requirements Planning) apparatus capable of reducing operator's load by quickly and accurately determining a timing of ordering intermediate assemblies set as independent required articles even when the date of delivery of a final product is changed or the design of parts is changed. <P>SOLUTION: When there are a plurality of independent required articles including a product and its constitutional parts, these articles are previously registered in a database in association with each other by a common key, and when material requirement planning of a product planned by a requirement planning processing means 6 is changed by changing the date of delivery of the product or specifying a design changing period, the common key of the articles related to each other is referred to synchronously with the change, the material requirement planning of other independent required articles is linked and the material requirement planning of the other linked articles is changed. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、資材所要量計画(MRP:Material Requirements Planning)を立案する資材所要量計画立案装置に関する。   The present invention relates to a material requirement planning device for planning material requirements planning (MRP: Material Requirements Planning).

一般に、資材所要量計画を立案する際、製品とその構成部品との間に親子関係(BOM:階層構成関係)がある場合、例えば、図2に示すように、製品Xが中間組立品TA,TBや個別の部品a〜eを組み合わせて構成されているような場合、製品の必要数量、製品や各構成品目のリードタイム、在庫量、ならびに上記のような親子関係を記述した構成情報などを用いて、最終的に製品が得られるまでの各構成品目がいつの日に、いくつ必要になるか、つまり各品目ごとの必要日と必要量とを計算して資材所要量計画を立案し、その計画に基づいて各構成品目について発注手配や作業指示の情報を生成するようになっている。なお、この場合の資材所要量計画は、通常、上位の品目から次第に下位の品目にわたって展開され、全ての品目についての計画が立案された時点でMRPの処理が終了する。   In general, when planning a material requirement plan, if there is a parent-child relationship (BOM: hierarchical structure relationship) between a product and its component parts, for example, as shown in FIG. When it is configured with a combination of TB and individual parts a to e, the required quantity of product, lead time of the product and each component, inventory quantity, configuration information describing the parent-child relationship as described above, etc. To calculate how many of each component item will be required until the final product is obtained, that is, calculate the required date and required amount for each item, and plan the material requirement. Information on ordering arrangements and work instructions is generated for each component based on the plan. Note that the material requirement plan in this case is normally developed from the upper items to the lower items, and the MRP process ends when plans for all the items are made.

なお、以下において、ある品目について必要日と必要量とをオペレータ自らが設定入力するものを独立需要品目、この独立需要品目について立案された資材所要量計画に従って必要日と必要量とが自ずと決まってくる品目を従属需要品目と称する。   In the following, the required date and required amount for an item are set and input by the operator himself as an independent demand item, and the required date and required amount are determined according to the material requirement plan designed for this independent demand item. Coming items are called dependent demand items.

ところで、このようなある製品Xについての資材所要量計画が立案された場合でも、品質改善や設計変更などのために製品を構成する各品目を切り替える必要が生じることがある。例えば、図2における部品eをe’に変更する必要が生じることがある。   By the way, even when such a material requirement plan for a certain product X is drawn up, it may be necessary to switch each item constituting the product for quality improvement or design change. For example, it may be necessary to change the part e in FIG. 2 to e ′.

このような構成品目の一部を切り替える場合に対処するため、従来技術では、切り替え前の旧品目が在庫として残ったり、旧品目の物品を新たに生産したりする必要がないように、切り替え前の旧品目の在庫が有る場合には、先に立案されている資材所要量計画に基づいて切り替え前の品目を全て引き当てて在庫を処分できるようにした後、切り替え後の品目について新たな資材所要量計画を作成するようにしている(例えば、特許文献1参照)。   In order to deal with the case of switching some of these component items, the conventional technology does not require the old items before switching to remain in stock or produce new items of the old items before switching. If there is a stock of the old item, after assigning all the items before switching based on the material requirement plan that has been planned earlier, it is possible to dispose of the stock, and then the new material requirements for the item after switching A quantity plan is created (see, for example, Patent Document 1).

また、一つの製品Xについて立案された資材所要量計画に基づいて品目ごとに発注手配を行う場合、生産効率化などの改善によって生産量やスループット、安全在庫量などが変化し、この変化に伴って各品目の手配の仕方が変更されることがある。   In addition, when placing an order for each item based on the material requirement plan formulated for one product X, the production volume, throughput, safety stock quantity, etc. change due to improvements in production efficiency, etc. The arrangement of each item may change.

これに対処するため、従来技術では、手配方式が変更される品目の情報(品目固有情報)を世代毎に管理し、品目手配方式が変更されたときには、この品目固有情報に基づいて、品目手配方式の変更を反映した資材所要量計画を新たに立案できるようにした技術も提案されている(例えば、特許文献2参照)。   In order to cope with this, in the prior art, information (item specific information) of the item whose arrangement method is changed is managed for each generation, and when the item arrangement method is changed, the item arrangement is performed based on this item specific information. There has also been proposed a technique that enables a new material requirement plan reflecting a change in method (see, for example, Patent Document 2).

特開平7−254023号公報JP-A-7-254023 特開平11−25181号公報JP 11-25181 A

ところで、図2に示すように、ある製品Xを製造する際、中間工程にある中間組立品TA,TB等の製造を外注業者に委託することがある。そのようなときには、トラブル等の不測の事態が発生した場合に対処できるように、時間的に余裕を見込んでその購入日程を実際に製品Xを組み立てるために予定されている日よりも何日か前倒し、その前倒しした日程に基づいて資材手配を行うことも多い。   By the way, as shown in FIG. 2, when manufacturing a certain product X, manufacture of intermediate assemblies TA, TB, etc. in an intermediate process may be outsourced to a subcontractor. In such a case, in order to deal with an unexpected situation such as a trouble, the number of days from the scheduled date for actually assembling the product X with the allowance in terms of time can be taken into account. In many cases, materials are arranged ahead of schedule, based on the advance schedule.

いま、図5に示すように、製品Xとその構成部品TA,TB,eにのみ着目したとき、製品Xについて予め立案された資材所要量計画(1)では中間組立品の必要日が3月25日に予定されているときでも、中間組立品TAを独立需要品目として設定した上で、この中間組立品TAについて前倒しした日、例えば3月21日を起点日として資材所要量計画(2)を独自に立てることがある。なお、各品目についての購入取得が必要となる期間は現実には数日にわたることが多いが、ここでは、説明を容易にするために、各品目についての必要期間は便宜上1日と見なしている。   Now, as shown in FIG. 5, when focusing only on the product X and its components TA, TB, and e, in the material requirement plan (1) previously planned for the product X, the required date for the intermediate assembly is March. Even when scheduled on the 25th, the material requirement plan (2) with the intermediate assembly TA set as an independent demand item and the intermediate assembly TA moved forward, for example, March 21 May stand independently. In addition, the period in which purchase and acquisition for each item is necessary is often several days in practice, but here, for the sake of explanation, the necessary period for each item is regarded as one day for convenience. .

従来の資材所要量計画立案装置(以下、MRP立案装置と略称する)は、このように一旦、ある品目を独立需要品目、例えばTAとして設定すると、この独立需要品目TAについての資材所要量計画(2)は、他の独立需要品目、例えば製品Xの資材所要量計画(1)とは別個の計画となる。このため、両者X,TAの計画(1),(2)の日程間には関連性がなくなってしまう。   In the conventional material requirement planning device (hereinafter abbreviated as MRP planning device), once a certain item is set as an independent demand item, for example, TA, the material requirement planning (independent demand item TA) ( 2) is a separate plan from the material requirement plan (1) of other independent demand items, for example, product X. For this reason, the relationship between the schedules of both plans X and TA (1) and (2) is lost.

したがって、一方の独立需要品目である製品Xの計画(1)に変更があった場合でも、他方の独立需要品目である中間組立品TAについての資材所要量計画(2)はそれに同期して変更されることはない。その結果、製品Xを独立需要品目、中間組立品TAを従属需要品目として製品Aの資材所要量計画(1)を立てた場合と、中間組立品TAを独立需要品目としてこの品目について資材所要量計画(2)を立てた場合とでは、日程がうまく折り合わなくなることが起こる。   Therefore, even if there is a change in the plan (1) of the product X that is one independent demand item, the material requirement plan (2) for the intermediate assembly TA that is the other independent demand item is changed synchronously. It will never be done. As a result, when the material requirement plan (1) for product A is set with the product X as an independent demand item and the intermediate assembly TA as a dependent demand item, the material requirement for this item with the intermediate assembly TA as an independent demand item When the plan (2) is made, it may happen that the schedule is not well-balanced.

例えば、製品Xの納期がユーザの要求により当初予定していた日程よりも早められたような場合(この例では当初3月30日納期を予定していたのに3月27日に変更)、製品Xと中間組立品TAとが共に独立需要品目であるときには、中間組立品TAの資材所要量計画(2)は、製品Xのものとは別個の計画となるため、製品Xの資材所要量計画が(1)から(3)に変更されても、これが中間組立品TXの資材所要量計画(2)には反映されず、中間組立品TA,TBや購入部品b〜eを購入発注するための適切な時期を決定することができない。つまり、製品Xの納期変更後の資材所要量計画(3)では、中間組立品TAの必要日が3月22日となり、中間組立品TAの前倒しに必要な期間が考慮されていない。   For example, when the delivery date of the product X is earlier than the schedule originally scheduled at the request of the user (in this example, the delivery date was originally scheduled for March 30 but changed to March 27), When the product X and the intermediate assembly TA are both independent demand items, the material requirement plan (2) of the intermediate assembly TA is a plan different from that of the product X. Therefore, the material requirement of the product X Even if the plan is changed from (1) to (3), this is not reflected in the material requirement plan (2) of the intermediate assembly TX, and purchase orders for the intermediate assemblies TA, TB and purchased parts b to e are made. It is not possible to determine an appropriate time for. That is, in the material requirement plan (3) after the delivery date change of the product X, the necessary date of the intermediate assembly TA is March 22, and the period necessary for the advancement of the intermediate assembly TA is not taken into consideration.

また、例えば品質改善等のために、製品Xの構成部品、例えば部品eを一部最新のものに設計変更してe’とし、製品Xを新製品として販売を開始する場合、これに応じて購入部品をeからe’に変更する時期を、製品Xの販売開始日から溯って決定する必要が生じる。この場合でも、製品Xと中間組立品TAとが共に独立需要品目であるときには、中間組立品TAの資材所要量計画(2)は、部品切り替えによる新製品Xの資材所要量計画(3)とは別個の計画となるため、製品Xの資材所要量計画(3)に基づいて日程を溯って購入部品をeからe’に変更する時期を適切に決定することができない。   In addition, for example, in order to improve quality, etc., when a component X of a product X, for example, a part e is redesigned to be partly up-to-date to e ′ and the product X is started to be sold as a new product, It is necessary to determine when to change the purchased part from e to e ′ from the sales start date of the product X. Even in this case, when the product X and the intermediate assembly TA are both independent demand items, the material requirement plan (2) of the intermediate assembly TA is the same as the material requirement plan (3) of the new product X by parts switching. Is a separate plan, it is not possible to appropriately determine when to change the purchased part from e to e ′ over the schedule based on the material requirement plan (3) of product X.

すなわち、部品eをe’に切り替えた場合の製品Xの販売開始日を3月27日に決定し、これに合わせて製品Xの資材所要量計画(3)を立案した場合、部品をeからe’に切り替える日は3月14日となるが、この計画(3)は、中間組立品TAの資材所要量計画(2)とは別個の計画となっているため、中間組立品TAの前倒しに必要な期間が考慮されていない。このため、部品をeからe’に切り替える時期(3月14日)が、本来は余裕をみて更に早期に設定されるべき切り替え日よりも遅く設定されてしまう。   That is, when the sales start date of the product X when the part e is switched to e ′ is determined on March 27, and the material requirement plan (3) of the product X is formulated accordingly, the part is changed from e The date of switching to e ′ will be March 14, but this plan (3) is a plan separate from the material requirement plan (2) of the intermediate assembly TA, so the intermediate assembly TA is brought forward. The necessary period is not considered. For this reason, the time (March 14) at which the part is switched from e to e 'is set later than the switching date that should be set at an earlier stage with a margin.

前述の特許文献1,2に記載されている従来技術は、いずれも、最上位の独立需要品目である製品Xの資材所要量計画に基づいて、製品Xの納期変更や部品の設計変更時期を決定しているので、中間組立品TAが独立需要品目である場合には、購入部品をeからe’に変更する適切な時期を決定することが実際には難しい。   The conventional techniques described in Patent Documents 1 and 2 described above are based on the material requirement plan for product X, which is the highest independent demand item. In the case where the intermediate assembly TA is an independent demand item, it is actually difficult to determine an appropriate time to change the purchased part from e to e ′.

したがって、従来は、このような製品Xの納期変更や部品の設計変更がある場合に中間組立品TAの発注手配の時期を決定するためには、納期変更や設計変更に併せて再度立案された製品Xについての資材所要量計画(3)と、独立需要品目として中間組立品TAについて既に立案されている資材所要量計画(2)とをオペレータが比較検討し、中間組立品TAの前倒しに必要な期間を考慮した上で、再度、中間組立品TAについて資材所要量計画(4)を立案し直して各部品TB,d,eなどの発注手配時期を決定している。この例では、製品Xの資材所要量計画(2)では中間組立品TAの必要日は3月22日であるが、中間組立品TAの前倒しに必要な期間を考慮して起点日を3月18日とした資材所要量計画(4)を再度立案する。   Therefore, conventionally, in order to determine the timing for ordering the intermediate assembly TA when there is such a change in the delivery date of the product X or a change in the design of the parts, it has been proposed again in accordance with the change in the delivery date or the design change. Necessary to advance the intermediate assembly TA by comparing the material requirement plan (3) for the product X with the material requirement plan (2) already planned for the intermediate assembly TA as an independent demand item. In consideration of a long period, the material requirement plan (4) is re-developed for the intermediate assembly TA, and the order arrangement timing for each part TB, d, e, etc. is determined. In this example, in the material requirement plan (2) of the product X, the required date for the intermediate assembly TA is March 22, but the starting date is set to March in consideration of the period required for the intermediate assembly TA to be advanced. The material requirement plan (4) on the 18th is formulated again.

このように、従来は、製品Xの納期変更や部品の設計変更がある場合、独立需要品目として設定している中間組立品の発注手配の時期を適切に決定するためには、オペレータが各計画(1)〜(4)について日程をその都度調整する必要が生じ、立案に余分な手間と労力がかかるだけでなく、リアルタイム性に欠け、また、立案時にミスも発生し易いという問題があった。   Thus, conventionally, when there is a change in the delivery date of the product X or a change in the design of the parts, the operator has to plan each order in order to appropriately determine the order for ordering the intermediate assembly set as an independent demand item. There was a problem that it was necessary to adjust the schedule for each of (1) to (4), which not only required extra effort and labor for planning, but also lacked real-time performance, and also made mistakes during planning. .

本発明は、上記の課題を解決するためになされたもので、最終製品の納期変更や部品の設計変更があった場合でも、独立需要品目として設定されている中間組立品の発注手配等の時期を短時間の内に的確に決定することができるようにして、オペレータの負荷を軽減するとともに、計画立案時のミスの発生も無くすことが可能なMRP立案装置を提供することを目的とする。   The present invention has been made to solve the above-described problems. Even when there is a change in the delivery date of the final product or a change in the design of the parts, the timing of ordering arrangement of intermediate assemblies set as independent demand items, etc. It is an object of the present invention to provide an MRP planning apparatus that can accurately determine the time limit within a short time to reduce the load on the operator and eliminate the occurrence of mistakes during planning.

上記の目的を達成するために、本発明は、製品の納期や必要量、製品およびこの製品を構成する複数の部品や中間組立品の各品目のリードタイムや在庫量などの情報、ならびに各品目の親子関係を記述した構成情報が登録されたデータベースと、このデータベースを用いて独立需要品目についての資材所要量計画を立案する所要量計画処理手段とを備えた資材所要量計画立案装置において、次の構成を採用している。   In order to achieve the above object, the present invention provides information such as the delivery time and required amount of a product, the lead time and inventory amount of each item of the product and a plurality of parts and intermediate assemblies constituting this product, and each item. In a material requirements planning device comprising: a database in which configuration information describing the parent-child relationship of the product is registered; and a requirements planning processing means for planning a material requirements plan for independent demand items using this database. The configuration is adopted.

すなわち、本発明では、製品とその構成部品を含む複数の独立需要品目がある場合にこれらの品目を共通のキーによって互いに関連付ける関連付け手段を備え、かつ、上記所要量計画処理手段は、製品の納期変更や部品の設計変更時期の指定により、製品の資材所要量計画が変更された場合には、これに同期して上記関連付け手段で互いに関連付けられた品目同士の共通のキーを参照して他の独立需要品目の資材所要量計画をリンクして他の品目についての資材所要量計画を変更するものである、ことを特徴としている。   That is, according to the present invention, when there are a plurality of independent demand items including a product and its component parts, an association means for associating these items with each other by a common key is provided, and the requirement plan processing means includes a delivery date of the product. If the material requirements plan of the product is changed due to the change or the design change timing of the parts, refer to the common key of the items associated with each other by the association means in synchronization with this, It is characterized in that the material requirement plan of other items is changed by linking the material requirement plan of the independent demand item.

本発明によれば、製品とこれを構成する部品とがそれぞれ独立需要品目として設定されている場合でも、これらの品目について相互の日程について関連付けが必要な場合には、関連付けしたい品目を設定すると、これに応じて計画関連付け手段により関連付けしたい品目に共通のキーが設定される。そして、独立需要品目である製品の納期変更や部品の設計変更のために、製品について予め立案されていた資材所要量計画を変更した場合、所要量計画処理手段は、これに同期して関連付け手段により関連付けされた各品目共通のキーを参照して他の独立需要品目について立案されている資材所要量計画をリンクし、他の品目についての資材所要量計画を変更する。このため、独立需要品目として設定されている他の中間組立品などの発注手配等の時期を短時間の内に的確に決定することができる。これにより、従来に比べてオペレータの負荷を軽減できるとともに、計画立案時のミスの発生も無くすことが可能となる。   According to the present invention, even when the product and the parts constituting it are set as independent demand items, if it is necessary to associate these items with each other's schedule, In response to this, a common key is set for items to be associated by the plan association means. If the material requirement plan previously planned for the product is changed due to a change in the delivery date of the product, which is an independent demand item, or a change in the design of the part, the requirement plan processing means synchronizes with this. Referring to the key common to each item related by linking the material requirement plan planned for other independent demand items, the material requirement plan for other items is changed. For this reason, it is possible to accurately determine the timing of ordering arrangement for other intermediate assemblies set as independent demand items within a short time. As a result, it is possible to reduce the load on the operator as compared with the conventional case, and it is possible to eliminate the occurrence of mistakes at the time of planning.

実施の形態1.
図1は本発明の実施の形態1におけるMRP立案装置のハードウェア構成を示すブロック図である。
Embodiment 1 FIG.
FIG. 1 is a block diagram showing a hardware configuration of an MRP planning apparatus according to Embodiment 1 of the present invention.

この実施の形態1のMRP立案装置1は、品目データベース2、品目構成データベース3、所要量計画データベース4、資材所要量計画関連付けデータベース5、所要量計画処理部6、入出力装置7、発注計画ファイル8、および作業計画ファイル9を備えている。   The MRP planning apparatus 1 according to the first embodiment includes an item database 2, an item configuration database 3, a requirement plan database 4, a material requirement plan association database 5, a requirement plan processing unit 6, an input / output device 7, an order plan file. 8 and a work plan file 9.

上記の品目データベース2には、各製品およびこれらの製品を構成する複数の部品や中間組立品の各品目が登録されている。また、品目構成データベース3には、製品とその構成部品との間の親子関係(BOM:階層構成関係)の情報が品目構成情報として登録されている。所要量計画データベース4には、製品の納期や必要数量、製品や各構成部品について品目ごとのリードタイムや在庫量などの情報が登録されている。また、資材所要量計画関連付けデータベース5には、各独立需要品目についての各資材所要量計画を互いにリンクさせるために、製品とこれを構成する部品の各品目、ならびに各品目同士を関連付けるためのキーの情報が登録されている。   In the item database 2, each product and each item of a plurality of parts and intermediate assemblies constituting these products are registered. In the item configuration database 3, information on a parent-child relationship (BOM: hierarchical configuration relationship) between a product and its component parts is registered as item configuration information. In the requirement planning database 4, information such as the delivery time and required quantity of the product, the lead time and the inventory quantity for each item of the product and each component are registered. In addition, in the material requirement plan association database 5, in order to link the material requirement plans for each independent demand item to each other, a key for associating each item of the product with the components constituting the product and each item. Is registered.

所要量計画処理部6は、予めインストールされている制御プログラムに従い、上記の各データベース2〜5に登録されている情報に基づいて独立需要品目についての資材所要量計画を立案するもので、例えばパーソナルコンピュータ等によって構成される。そして、この所要量計画処理部6は、製品の納期変更や部品の設計変更時期指定により、製品の資材所要量計画が変更された場合には、これに同期して資材所要量計画関連付けデータベース5の情報を参照して互いに関連付けられた各品目の資材所要量計画をリンクして製品を構成する他の品目についての資材所要量計画を変更するようになっている。   The requirement plan processing unit 6 makes a material requirement plan for an independent demand item based on the information registered in each of the databases 2 to 5 according to a control program installed in advance. Consists of a computer or the like. Then, when the material requirement plan of the product is changed due to the change of the delivery date of the product or the design change timing specification of the part, the requirement plan processing unit 6 synchronizes with this and the material requirement plan association database 5 The material requirement plan for other items constituting the product is changed by linking the material requirement plan of each item associated with each other with reference to the information of the item.

入出力装置7は、各データベース2〜5に登録すべき各種の情報や所要量計画処理部6に対する指令を入力したり、所要量計画処理部6で処理された結果を出力したりするもので、例えば、図示しないキーボード、マウス、プリンタ、ディスプレイなどを備えて構成されている。
そして、上記の入出力装置7、所要量計画処理部6、および資材所要量計画関連付けデータベース5により特許請求の範囲における関連付け手段が構成されている。
The input / output device 7 inputs various information to be registered in each of the databases 2 to 5 and a command for the requirement plan processing unit 6 and outputs a result processed by the requirement plan processing unit 6. For example, a keyboard, a mouse, a printer, a display, and the like (not shown) are provided.
The input / output device 7, the requirement plan processing unit 6, and the material requirement plan association database 5 constitute association means in the scope of claims.

発注計画ファイル8は、所要量計画処理部6で立案された資材所要量計画に基づいて生成される各品目についての発注計画の情報を登録するものである。また、作業計画ファイル9は、所要量計画処理部6で立案された資材所要量計画に基づいて生成される各品目の作業計画の情報を登録するものである。そして、発注計画ファイル8に登録されている各品目についての発注計画は注文書として、また、作業計画ファイル9に登録されている各品目についての作業計画は作業指示書として、それぞれ必要に応じて入出力装置7に出力される。   The order plan file 8 is for registering order plan information for each item generated based on the material requirement plan prepared by the requirement plan processing unit 6. The work plan file 9 is for registering work plan information for each item generated based on the material requirement plan prepared by the requirement plan processing unit 6. The order plan for each item registered in the order plan file 8 is an order form, and the work plan for each item registered in the work plan file 9 is a work instruction sheet, as necessary. It is output to the input / output device 7.

次に、上記構成を備えたMRP立案装置1における資材所要量計画の立案動作について、図3に示す説明図および図4に示すフローチャートを参照して説明する。なお、ここでは、一例として製品Xが中間組立品TA,TBや個別の部品a〜eを組み合わせて構成されていて、図2に示すような親子関係(BOM:階層構成関係)があるものとし、製品Xとその構成部品TA,TB,eにのみ着目して説明を行う。この場合、各品目についての購入取得が必要となる期間は現実には数日にわたることが多いが、ここでは、便宜上、各品目についての必要期間は1日と見なしている。   Next, the planning operation of the material requirement plan in the MRP planning apparatus 1 having the above configuration will be described with reference to the explanatory diagram shown in FIG. 3 and the flowchart shown in FIG. Here, as an example, it is assumed that the product X is configured by combining intermediate assemblies TA and TB and individual parts a to e, and has a parent-child relationship (BOM: hierarchical configuration relationship) as shown in FIG. Only the product X and its components TA, TB, and e will be described. In this case, the period in which purchase and acquisition for each item is necessary is often several days in reality, but here, for convenience, the necessary period for each item is regarded as one day.

[A]各独立需要品目の資材所要量計画の立案
独立需要品目である製品Xについて資材所要量計画を立案するには、入出力装置7から製品Xについての計画立案の指令を入力すると、これに応じて、所要量計画処理部6は、予めインストールされている制御プログラムに従い、上記の各データベース2〜4に登録されている情報に基づいて製品Xについての資材所要量計画を立案する。この場合、製品Xについて立案された資材所要量計画は、例えば図3の計画(1)のようなものであったとする。この計画(1)では、中間組立品の必要日が3月25日に予定されている。
[A] Planning of Material Requirement Plan for Each Independent Demand Item In order to plan a material requirement plan for product X, which is an independent demand item, when a planning command for product X is input from the input / output device 7, this Accordingly, the requirement plan processing unit 6 makes a material requirement plan for the product X based on the information registered in each of the databases 2 to 4 in accordance with the control program installed in advance. In this case, it is assumed that the material requirement plan prepared for the product X is, for example, the plan (1) in FIG. In this plan (1), the required date for the intermediate assembly is scheduled for March 25.

一方、中間組立品、例えばTAについて、製品Xについて立案された上述の資材所要量計画(1)によって予定されている日よりも前倒しで資材手配を行う必要がある場合、この前倒しした日(ここでは3月21日)を起点日として中間組立品TA独自の資材所要量計画を立案する。   On the other hand, if it is necessary to arrange materials for an intermediate assembly, for example TA, ahead of the date planned by the above-mentioned material requirement plan (1) planned for product X, this advanced date (here Then, the original material requirement plan for the intermediate assembly TA will be drafted starting on March 21).

そのためには、入出力装置7から所要量計画処理部6に対して中間組立品TAが独立需要品目である旨を設定した後、その中間組立品TAの計画立案の指令を入力する。これに応じて、所要量計画処理部6は、各データベース2〜4に登録されている情報に基づいてこの中間組立品TAについての資材所要量計画を立案する。この場合、中間組立品TAについて立案された資材所要量計画は、例えば図3の計画(2)のようなものであったとする。この計画(2)では、中間組立品の必要日が3月21日に予定されている。   For this purpose, after setting that the intermediate assembly TA is an independent demand item from the input / output device 7 to the requirement planning processing unit 6, a command for planning the intermediate assembly TA is input. In response to this, the requirement plan processing unit 6 makes a material requirement plan for the intermediate assembly TA based on the information registered in the databases 2 to 4. In this case, it is assumed that the material requirement plan designed for the intermediate assembly TA is, for example, the plan (2) in FIG. In this plan (2), the required date for the intermediate assembly is scheduled for March 21.

[B]各独立需要品目について立案された計画の関連付け
製品Xと中間組立品TAとをそれぞれ独立需要品目として資材所要量計画(1),(2)を立案したときには両者の計画(1),(2)の日程間には本来、関連性がなくなってしまう。
[B] Association of plans planned for each independent demand item When the material requirement plans (1) and (2) are formulated with the product X and the intermediate assembly TA as independent demand items, both plans (1), The relevance of the schedule (2) is essentially lost.

しかし、製品Xとこれを構成する部品TAとがそれぞれ独立需要品目として設定されている場合でも、両者A,TAについて相互の関連付けが必要な場合には、入出力装置7により、関連付けしたい品目を指定する。これに応じて所要量計画処理部6は、関連付けしたい品目に共通のキーを設定し、相互の関連付けが必要な品目およびこれら各品目を関連付けるための共通のキーの情報を所要量計画関連付けデータベース5に登録する。この例では、製品Xと中間組立品TAの各品目、および両者を互いに関連付ける共通のキー“α”がコード化されて所要量計画関連付けデータベース5に登録されている。   However, even if the product X and the component TA constituting the product X are set as independent demand items, if the mutual association is required for both A and TA, the input / output device 7 selects the item to be associated. specify. In response to this, the requirement plan processing unit 6 sets a common key for the items to be associated, information on the items that need to be associated with each other and information on the common key for associating these items with the requirement plan association database 5. Register with. In this example, each item of the product X and the intermediate assembly TA, and a common key “α” for associating them with each other are encoded and registered in the requirement plan association database 5.

[C]製品Xの納期変更に伴う資材所要量計画の変更
製品Xの納期がユーザの要求により当初予定していた日程よりも早められたような場合、例えば当初3月30日納期を予定していたのに3月27日に変更された場合、製品Xについて再度、3月27日を起点日とした資材所要量計画を立案する必要性が生じる。そこで、入出力装置7により製品Xの必要日を3月27日に指定するとともに、この日を起点日とした製品Xについての新たに資材所要量計画を立案するように指示する。
[C] Change in material requirement plan due to change in delivery date of product X When the delivery date of product X is earlier than the originally scheduled date according to the user's request, for example, the delivery date is initially scheduled for March 30 However, if it is changed on March 27, it will be necessary to formulate a material requirement plan for product X starting from March 27 again. Therefore, the input / output device 7 designates the required date of the product X on March 27, and instructs that a new material requirement plan for the product X with this date as the starting date be drawn up.

所要量計画処理部6は、製品Xについて新たに資材所要量計画を立案するにあたり、これに同期して所要量計画関連付けデータベース5を検索し、予め登録されている関連付けが必要な品目X,TAに関する共通のキー“α”があるかどうかを調べる。そして、両品目X,TAに共通のキー“α”があると、他の独立需要品目TAについて既に立案されている資材所要量計画(2)をリンクする。   The requirement plan processing unit 6 searches the requirement plan association database 5 in synchronism with the planning of a new material requirement plan for the product X, and the items X and TA that need to be associated in advance are registered. Check whether there is a common key “α” for. If there is a common key “α” for both items X and TA, the material requirement plan (2) already planned for the other independent demand items TA is linked.

引き続いて、所要量計画処理部6は、中間組立品TAについて既に立案されている計画(2)の起点日(この例では3月21日)を基準とし、この基準日から中間組立品TAの必要量、リードタイム、在庫量などに応じて前倒しに必要な期間を計算する。すなわち、この例では、中間組立品TAの前倒しに必要な期間を4日として計算する。そして、所要量計画処理部6は、3月21日よりも4日前倒しした3月17日を起点日とした中間組立品TAについての資材所要量計画(3)を立案する。したがって、製品Xの資材所要量計画の変更に伴い、中間組立品TAの計画(3)は、その必要日が3月17日、その配下の部品d,eの必要日がそれぞれ3月13日と3月9日に変更される。これにより、各品目TA,d,eの必要日を自動的に、かつ適切に決定することができる。   Subsequently, the requirement planning processing unit 6 uses the starting date of the plan (2) already planned for the intermediate assembly TA (March 21 in this example) as a reference, and from this reference date, Calculate the time period required to advance according to the required amount, lead time, inventory amount, etc. In other words, in this example, the period required for the advancement of the intermediate assembly TA is calculated as 4 days. Then, the requirement plan processing unit 6 drafts a material requirement plan (3) for the intermediate assembly TA starting from March 17 which is four days ahead of March 21. Therefore, in accordance with the change in the material requirement plan for the product X, the plan (3) of the intermediate assembly TA has a necessary date of March 17 and a necessary date of the subordinate parts d and e is March 13 respectively. Will be changed on March 9th. Thereby, the required date of each item TA, d, e can be determined automatically and appropriately.

このように、製品Xの資材所要量計画を変更すると、これに同期して中間組立品TXの資材所要量計画も(2)から(3)に自動的に変更され、しかも、その際、中間組立品TXの購入等に必要となる前倒し期間が新たに立案される計画(3)に反映されるので、中間組立品TAやその配下にある部品d,eを購入したり発注するための時期を常に適切に決定することができる。   As described above, when the material requirement plan of the product X is changed, the material requirement plan of the intermediate assembly TX is automatically changed from (2) to (3) in synchronization with this, and at that time, the intermediate requirement TX Since the advance period required for purchasing the assembly TX is reflected in the newly planned plan (3), the timing for purchasing or placing the order for the intermediate assembly TA and its subordinate parts d and e Can always be determined appropriately.

[D]部品の設計変更時期の決定
品質改善等のために、製品Xの構成部品、例えば部品eを一部最新のものに設計変更してe’とし、製品Xを新製品として販売を開始する場合、これに応じて購入部品をeからe’に変更する時期を製品Xの販売開始時期から溯って決定する必要が生じる。例えば、部品eの切り替に伴う新製品Xの販売開始日を3月27日とした場合、これに応じて購入部品をeからe’に変更する時期を溯って決定する必要がある。
[D] Determining when to change the design of parts To improve the quality, etc., change the component parts of product X, for example, part e to the latest, change it to e ', and start selling product X as a new product In this case, it is necessary to determine the timing for changing the purchased part from e to e ′ according to this from the sales start timing of the product X. For example, when the sales start date of the new product X associated with the switching of the part e is March 27, it is necessary to determine when to change the purchased part from e to e ′.

そのためには、図4のフローチャートに示すように、部品切り替えによる新製品Xの販売開始時期を決めるために、入出力装置7により製品Xの販売開始時期を起点日として指定するとともに(S1)、製品Xについて新たに資材所要量計画を立案するように指示する。   For this purpose, as shown in the flowchart of FIG. 4, in order to determine the sales start time of the new product X by switching the parts, the sales start time of the product X is designated as the starting date by the input / output device 7 (S1), Instruct to make a new material requirement plan for product X.

所要量計画処理部6は、製品Xについて新たに資材所要量計画を立案する際、これに同期して所要量計画関連付けデータベース5を検索し、予め登録されている関連付けが必要な品目X,TAに関する共通のキー“α”があるかどうかを調べる(S2)。このとき、両品目X,TAに共通のキー“α”があると、他の独立需要品目について立案されている品目TAについての資材所要量計画(2)をリンクする。   When preparing a new material requirement plan for the product X, the requirement plan processing unit 6 searches the requirement plan association database 5 in synchronism with this, and the items X and TA that require pre-registered association are searched. It is checked whether there is a common key “α” relating to (S2). At this time, if there is a common key “α” for both items X and TA, the material requirement plan (2) for the item TA planned for other independent demand items is linked.

引き続いて、所要量計画処理部6は、上記[C]の製品Xの納期変更の場合と同様に、中間組立品TAについて既に立案されている計画(2)の起点日(この例では3月21日)を基準とし、この基準日から中間組立品TAの必要量、リードタイム、在庫量などに応じて前倒しに必要性な期間(この例では4日)を計算する(S3)。   Subsequently, as in the case of changing the delivery date of the product X in [C] above, the requirement plan processing unit 6 starts the start date of the plan (2) already planned for the intermediate assembly TA (March in this example). 21 days) as a reference, a period (4 days in this example) necessary for advancement is calculated from the reference date according to the required amount, lead time, inventory amount, etc. of the intermediate assembly TA (S3).

そして、所要量計画処理部6は、3月21日を基準日として4日前倒した3月17日を起点日とした中間組立品TAについての資材所要量計画(3)を立案する(S4)。このため、中間組立品TAの配下の部品dの切替日は3月13日、部品のeからe’への切替日は3月9日に決定される。これにより、各品目TA,d,eの各切替日を自動的に、かつ適切に決定することができる。   Then, the requirement plan processing unit 6 formulates a material requirement plan (3) for the intermediate assembly TA starting from March 17 which is four days ahead of March 21 as the reference date (S4). . Therefore, the switching date of the part d under the intermediate assembly TA is determined on March 13, and the switching date of the part from e to e 'is determined on March 9. Thereby, each switching date of each item TA, d, e can be determined automatically and appropriately.

所要量計画処理部6は、こうして各品目TA,d,eの各切替日が決定されると、発注計画ファイル8に各品目TA,d,eについての発注計画情報を登録するので、この発注計画ファイル8の情報をプリントアウトするなどして例えば品目eをe’に切り替えた注文書を作成することができる。   The requirement plan processing unit 6 registers the ordering plan information for each item TA, d, e in the ordering plan file 8 when each switching date of each item TA, d, e is determined in this way. For example, an order form in which the item e is switched to e ′ can be created by printing out the information in the plan file 8 or the like.

一方、S2において、所要量計画処理部6は、所要量計画関連付けデータベース5に予め登録されている各品目の関連する共通のキーを検索しても共通のキーが見当たらない場合には、入出力装置7に対して品目の関連付けが無い旨の警告信号を出力するとともに(S6)、元の中間組立品TAに関する資材所要量計画(2)に基づいて、品目eをe’に切り替える切替日(この例では3月13日)を指定する(S7)。   On the other hand, in S2, if the common key is not found even after searching for the common key related to each item registered in the requirement plan association database 5 in advance, the requirement plan processing unit 6 inputs / outputs. A warning signal to the effect that there is no item association is output to the device 7 (S6), and the switching date for switching the item e to e ′ based on the material requirement plan (2) for the original intermediate assembly TA ( In this example, March 13) is designated (S7).

このように、この実施の形態1のMRP立案装置1においては、製品Xおよび中間組立品TAがそれぞれ独立需要品目として設定されている場合でも、製品Xの納期変更や部品の設計変更のために、予め立案されていた計画(1)が変更される際、これに同期して他の独立需要品目である中間組立品TAについての資材所要量計画(2)が、この元の計画(2)の日程を反映した状態で新たな計画(3)に変更されるので、従来のように、各独立需要品目についての計画の日程をオペレータが介在して逐一調整する必要がなくなる。このため、従来に比べて立案に要する余分な手間と労力を省くことができ、オペレータの負荷を軽減できるとともに、リアルタイム性に優れ、しかも計画立案時のミスの発生も無くすことが可能となる。   As described above, in the MRP planning apparatus 1 according to the first embodiment, even when the product X and the intermediate assembly TA are set as independent demand items, the delivery date of the product X and the design change of parts are changed. When the previously planned plan (1) is changed, the material requirement plan (2) for the intermediate assembly TA, which is another independent demand item, is synchronized with the original plan (2). Since the schedule is changed to the new plan (3) reflecting the schedule, it is not necessary to adjust the schedule for each independent demand item through the operator. For this reason, it is possible to save extra labor and labor required for planning as compared with the prior art, to reduce the load on the operator, to improve the real-time performance, and to eliminate the occurrence of mistakes during planning.

なお、上記の実施の形態1では、理解を容易にするために、中間組立品TAを独立需要品目とし、製品Xとその構成部品TA,TB,eにのみ着目して説明を行ったが、他の中間組立品TB等を独立需要品目とした場合の動作についても同様である。また、この実施の形態1では、製品Xと構成部品TA,TB,a〜eとに図2に示したような親子関係がある場合を例にとって説明したが、このような関係に限定されるものでないことは勿論である。また、当然ながら各計画の具体的な日程もあくまで一つの例示であることは勿論である。   In the first embodiment, for ease of understanding, the intermediate assembly TA has been described as an independent demand item, focusing on the product X and its components TA, TB, e. The same applies to the operation when other intermediate assembly TB or the like is an independent demand item. In the first embodiment, the case where the product X and the component parts TA, TB, a to e have a parent-child relationship as shown in FIG. 2 is described as an example. However, the embodiment is limited to such a relationship. Of course, it is not a thing. Of course, the specific schedule of each plan is only an example.

本発明の実施の形態1における資材所要量計画立案装置のハードウェア構成を示すブロック図である。It is a block diagram which shows the hardware constitutions of the material requirement plan planning apparatus in Embodiment 1 of this invention. 製品およびこれを構成する中間組立品や部品との親子関係の一例を示すツリー図である。It is a tree figure which shows an example of the parent-child relationship with a product and the intermediate assembly and components which comprise this. 本発明の実施の形態1の資材所要量計画立案装置における資材所要量計画の立案動作の説明図である。It is explanatory drawing of the planning operation | movement of the material requirement plan in the material requirement plan planning apparatus of Embodiment 1 of this invention. 本発明の実施の形態1の資材所要量計画立案装置において、部品の設計変更がある場合の資材所要量計画の立案動作の説明に供するフローチャートである。5 is a flowchart for explaining a planning operation of a material requirement plan when there is a design change of a part in the material requirement planning system according to the first embodiment of the present invention. 従来の資材所要量計画立案装置における資材所要量計画の立案動作の説明図である。It is explanatory drawing of planning operation | movement of the material requirement plan in the conventional material requirement plan planning apparatus.

符号の説明Explanation of symbols

1 資材所要量計画(MRP)立案装置、2 品目データベース、
3 品目構成データベース、4 所要量計画データベース、
5 所要量計画関連付けデータベース、6 所要量計画処理部(所要量計画処理手段)、7 入出力装置。
1 Material requirements planning (MRP) planning device, 2 item database,
3 Item configuration database, 4 Requirements planning database,
5 requirement planning association database, 6 requirement planning processing unit (requirement planning processing means), 7 input / output device.

Claims (2)

製品の納期や必要量、製品およびこの製品を構成する複数の部品や中間組立品の各品目のリードタイムや在庫量などの情報、ならびに各品目の親子関係を記述した構成情報が登録されたデータベースと、このデータベースを用いて独立需要品目についての資材所要量計画を立案する所要量計画処理手段とを備えた資材所要量計画立案装置において、
製品とその構成部品を含む複数の独立需要品目がある場合にこれらの品目を共通のキーによって互いに関連付ける関連付け手段を備え、かつ、上記所要量計画処理手段は、製品の納期変更や部品の設計変更時期の指定により、製品の資材所要量計画が変更された場合には、これに同期して上記関連付け手段で互いに関連付けられた品目同士の共通のキーを参照して他の独立需要品目の資材所要量計画をリンクし、このリンクした他の品目についての資材所要量計画を変更するものである、ことを特徴とする。
A database that stores information such as the lead time and required quantity of products, the lead time and inventory quantity of each item of the product and multiple parts and intermediate assemblies that make up this product, and configuration information that describes the parent-child relationship of each item And a material requirements planning device comprising a requirements planning processing means for planning material requirements planning for independent demand items using this database,
When there are a plurality of independent demand items including products and their component parts, an association means for associating these items with each other by a common key is provided, and the requirement planning processing means changes the delivery date of the product or changes the design of the parts. If the material requirement plan of the product is changed due to the specification of the time, the material requirement of other independent demand items is referred to by referring to the common key of the items associated with each other by the association means in synchronization with this. The quantity plan is linked, and the material requirement plan for the other linked items is changed.
上記所要量計画処理手段は、上記製品の資材所要量計画の変更に同期して上記リンクした他の品目の資材所要量計画を変更する場合、当該他の品目について既に立案されている資材所要量計画の起点日を基準とし、この基準となる起点日から当該品目の必要量、リードタイム、在庫量などに応じた前倒しに必要性な期間を計算して日程を変更するものであることを特徴とする請求項1記載の資材所要量計画立案装置。 When the requirement planning processing means changes the material requirement plan of the linked other item in synchronization with the change of the material requirement plan of the product, the material requirement already planned for the other item Based on the starting date of the plan, the schedule is changed by calculating the period necessary for the advance according to the required amount, lead time, inventory amount, etc. of the item from the starting date as the reference The material requirement planning apparatus according to claim 1.
JP2005156948A 2005-05-30 2005-05-30 Material requirement planning apparatus Pending JP2006331262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005156948A JP2006331262A (en) 2005-05-30 2005-05-30 Material requirement planning apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005156948A JP2006331262A (en) 2005-05-30 2005-05-30 Material requirement planning apparatus

Publications (1)

Publication Number Publication Date
JP2006331262A true JP2006331262A (en) 2006-12-07

Family

ID=37552865

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005156948A Pending JP2006331262A (en) 2005-05-30 2005-05-30 Material requirement planning apparatus

Country Status (1)

Country Link
JP (1) JP2006331262A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008146861A1 (en) * 2007-05-29 2008-12-04 Honda Motor Co., Ltd. Computer system for managing part order placement
JP2017191348A (en) * 2016-04-11 2017-10-19 株式会社日立製作所 Work instruction system using parent-child instructions

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03156504A (en) * 1989-11-14 1991-07-04 Nec Corp Production control system
JPH11312197A (en) * 1998-04-30 1999-11-09 Hitachi Ltd Schedule plan and preparation managing system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03156504A (en) * 1989-11-14 1991-07-04 Nec Corp Production control system
JPH11312197A (en) * 1998-04-30 1999-11-09 Hitachi Ltd Schedule plan and preparation managing system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008146861A1 (en) * 2007-05-29 2008-12-04 Honda Motor Co., Ltd. Computer system for managing part order placement
US8521622B2 (en) 2007-05-29 2013-08-27 Honda Motor Co., Ltd. Computer system for managing part order placement
JP2017191348A (en) * 2016-04-11 2017-10-19 株式会社日立製作所 Work instruction system using parent-child instructions

Similar Documents

Publication Publication Date Title
JP3338373B2 (en) Sheet metal processing integrated support system
JP2005520225A (en) Experiment management system, method and medium
JP2018036899A (en) Manufacturing bom edition support system, manufacturing bom edition support method, and program
CN112818189B (en) Visual processing procedure list scheduling method, system and platform
US20090198362A1 (en) Apparatus and method for handling orders
JP5508872B2 (en) Manufacturing procedure information creation system and manufacturing procedure information creation program
JP2006331262A (en) Material requirement planning apparatus
JPH10244448A (en) Production process history management system
JPH1080842A (en) Production plan preparing device
JP2005063084A (en) Method and system for managing process plan, progress performance and productivity using multiviewer gantt chart
JP2001142929A (en) Family tree editing and designing system
JP2001166928A (en) Device for automatically generating job net
JP4831827B2 (en) Project scheduling system
JP5007609B2 (en) Production order creation program and production order creation device
JP2007148598A (en) Information processor
JP2004062526A (en) Production management system
JP2723721B2 (en) Synchronization device for production data
JP4308554B2 (en) PRODUCTION MANAGEMENT SUPPORT DEVICE, PRODUCTION MANAGEMENT SUPPORT COMPUTER PROGRAM, AND RECORDING MEDIUM CONTAINING THE COMPUTER PROGRAM
JPH01264751A (en) Preparation for production process planning table
JP5687918B2 (en) Business application component device
JP2024038813A (en) Production planning system and production planning method
JP2007334393A (en) Method and system for managing parts list data
US20220350313A1 (en) Information management system, information management method, and non-transitory storage medium having information management program stored thereon
JPH10540A (en) Integrated manufacturing design processing system
JP2022118879A (en) Production planning support device and method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080403

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101214

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101221

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20110426