JP2006331231A - Credit management system and credit management method - Google Patents

Credit management system and credit management method Download PDF

Info

Publication number
JP2006331231A
JP2006331231A JP2005156386A JP2005156386A JP2006331231A JP 2006331231 A JP2006331231 A JP 2006331231A JP 2005156386 A JP2005156386 A JP 2005156386A JP 2005156386 A JP2005156386 A JP 2005156386A JP 2006331231 A JP2006331231 A JP 2006331231A
Authority
JP
Japan
Prior art keywords
information
value
product
building material
credit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005156386A
Other languages
Japanese (ja)
Inventor
Hiroyuki Nakamura
裕幸 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dcmc Kk
Original Assignee
Dcmc Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dcmc Kk filed Critical Dcmc Kk
Priority to JP2005156386A priority Critical patent/JP2006331231A/en
Publication of JP2006331231A publication Critical patent/JP2006331231A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a credit management apparatus, a credit management method and a program that, in the building of a house or some other building, enable the supply of a low cost and high quality house to the purchaser of the house or some other building by appropriately crediting a building contractor which constructs the house or some other building and expanding a building contractor's purchase range and credit. <P>SOLUTION: When order information on product purchase is received from a client, a predetermined value relating to the received order information is calculated from a calculated payment probability, a collection period and an average collection cost, the selling price of a product relevant to the received order information, and a cost-of-sales ratio, then it is determined whether or not the calculated predetermined value is within an available credit line, and if the calculated predetermined value is within the available credit line, it is determined that the order amount of the product relevant to the received order information is within the client's credit line. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、与信管理装置、与信管理方法及びプログラムに関する。   The present invention relates to a credit management device, a credit management method, and a program.

住宅等の建物を建築する場合、建物を完成させる過程において非常に多くの建築工程が存在する。具体的には、住宅等の建築工程については、仮設工事、土工事・地業工事、型枠工事、鉄筋コンクリート工事、木工事、サッシ・ガラス工事、内装工事等の各工程に分かれている。また、通常は、前記各工程をそれぞれ異なる専門工事業者が施工する場合が多く、これらの各工程は、互いに異なる時期に行われることが多い。   When building a building such as a house, there are a great number of building processes in the process of completing the building. Specifically, the construction process of a house, etc. is divided into each process such as temporary work, earth work / geo work, formwork, reinforced concrete work, wood work, sash / glass work, and interior work. Also, usually, each of the above steps is often performed by different specialized contractors, and these steps are often performed at different times.

このため、住宅等の建物を建築する場合、工務店と専門工事業者との間で工事の工程計画を予め取り決め、この工程計画に沿って、建築工事に必要な建材(建設資材)をその都度搬入し各工程の工事が進められる。なお、通常の住宅一棟を建築する場合には、屋根、柱、壁、玄関、窓、サッシ、ドア、襖、バス、キッチン、トイレ、照明等の多品種の建材が使用され、その数は一般的に数万点であると言われている。このように、住宅等の建物を建築する場合には、大量の建材が必要となるので、これらの建材を工務店が各建材メーカに発注し購入する。   For this reason, when building a building such as a house, a construction process plan is agreed in advance between the construction contractor and a specialized contractor, and building materials (construction materials) necessary for the construction work are in each case in accordance with this process plan. Carry in and work on each process will proceed. When building a normal house, many types of building materials such as roofs, pillars, walls, entrances, windows, sashes, doors, fences, baths, kitchens, toilets, lighting, etc. are used. It is generally said that there are tens of thousands of points. In this way, when building a building such as a house, a large amount of building materials is required, and the construction company orders and purchases these building materials from each building material manufacturer.

このように、各種建材を工務店が各建材メーカから購入する場合には、各建材メーカが工務店毎に設定する与信枠の範囲内において必要となる建材を購入する場合と、現金で購入する場合とがある。なお、上記与信枠は、工務店の規模や、過去の取引状況等に基づいて決定される。   In this way, when a construction company purchases various building materials from each building material manufacturer, the building material manufacturer purchases the building materials required within the credit limit set for each construction company, and purchases in cash. There are cases. The credit limit is determined based on the size of the construction company, past transaction status, and the like.

ところで、我が国に存在する工務店は、比較的規模が小さい零細企業が多く、運転資金が少なく物的担保が乏しい場合が多い。具体的には、住宅等の建物を建築する場合、着工から完成までの期間が長く、この建築を施工する工務店に対する支払は、完成後に行われることが多い。つまり、比較的規模が小さい工務店が住宅等の建物を建築する場合、受注件数が多くても、着工から支払いまでの期間が長いので、その運転資金が不足することが多いという問題がある。   By the way, there are many small and medium-sized enterprises in Japan, and there are many cases where there is little working capital and physical collateral is scarce. Specifically, when a building such as a house is constructed, the period from the start of construction to completion is long, and payment to a construction shop that constructs the building is often made after completion. That is, when a relatively small construction shop builds a building such as a house, there is a problem that even if the number of orders is large, the period from the start of construction to payment is long, so the working capital is often insufficient.

このため、比較的規模が小さい工務店が各建材メーカから各種建材を購入する場合には、現金での購入は困難であり、各建材メーカが工務店毎に設定する与信枠の範囲内において必要となる建材を購入する場合が多い。しかし、上記与信枠は、工務店の規模や、過去の取引状況等に基づいて決定されるので、比較的規模が小さい工務店の与信枠は、低く設定されることが多く、支払等の条件で購入範囲が限定される。   For this reason, when a construction company that is relatively small in scale purchases various building materials from each building material manufacturer, it is difficult to purchase in cash, and it is necessary within the credit limit set by each building material manufacturer for each construction store. There are many cases where building materials are purchased. However, since the above credit lines are determined based on the size of the construction companies and the past transaction status, the credit lines of construction companies with relatively small scales are often set low, and payment conditions, etc. The purchase range is limited.

このように、工務店の購入範囲が限定されている場合、当該工務店が最適な建材を購入することができず、低価格・高品質な資材を購入することができない場合がある。住宅等の建物を建築する場合、当該住宅等の建物の購入者に低価格・高品質な住宅を供給することが重要である。このように、住宅の購入者に低価格・高品質な住宅を供給するためには、建築を施工する工務店の購買範囲を拡大させ、最適な建材を購入することができるようにすることが重要である。   As described above, when the purchase range of a construction company is limited, the construction company may not be able to purchase an optimal building material, and may not be able to purchase a low-priced and high-quality material. When building a building such as a house, it is important to supply a low-priced and high-quality house to a purchaser of the building such as the house. In this way, in order to supply low-priced and high-quality housing to home buyers, it is necessary to expand the purchasing range of construction companies that construct buildings and to purchase optimal building materials. is important.

このため、現在では、適切な与信枠を設定するための与信サービスとして、売掛債権担保融資や売掛債権証券化等が多数提案されている。   For this reason, currently, many credit collateralized loans and securitization of accounts receivable have been proposed as credit services for setting an appropriate credit line.

与信サービスとして提案されている売掛債権担保融資や売掛債権証券化等に関連する発明として、特許文献1には、販売企業が製品を出荷する際に生成する出荷情報を入力し、出荷情報と取引情報とに基づいて返品されると予想される製品の比率である予想返品率を算出し、予想返品率と出荷情報とに基づいて販売企業の予想債権額を算出する売掛債権算出方法が開示されている。   As an invention related to a receivable-collateralized loan or a receivable securitization proposed as a credit service, Patent Document 1 inputs shipping information generated when a sales company ships a product, and ships information Account receivable calculation method that calculates the expected return rate, which is the ratio of products expected to be returned based on the transaction information and the expected return amount of the selling company based on the expected return rate and the shipping information Is disclosed.

また、特許文献2には、インターネット経由で融資申込者の売掛債権先を特定する情報を登録し、登録した売掛債権先との取引に関する情報に基づいて融資申込者の融資限度額を決定し、インターネット経由で融資申込者の保持する売掛債権の明細情報を登録し、登録した売掛債権の実効的な債権総額と前記融資限度額とに基づいて融資可能額を決定し、融資可能額の範囲内で希望に応じた融資申込者の融資額を決定する売掛債権担保融資方法およびシステムが開示されている。   Also, in Patent Document 2, information for identifying the credit receivables of the loan applicant is registered via the Internet, and the loan applicant's loan limit is determined based on the information relating to the transaction with the registered receivables of the loan. The details of the receivables held by the loan applicant are registered via the Internet, and the available loan amount is determined based on the effective total amount of the registered receivables and the above loan limit amount. A receivable-backed collateral financing method and system for determining a loan applicant's loan amount as desired within the amount is disclosed.

これらの与信サービスを利用することによって、現金決済に近い形を取ることが可能となり、比較的規模が小さい工務店の与信能力を向上させることができるので、当該工務店は購買範囲を拡大させることができ、最適な建材を購入することができる。これにより、当該工務店が低価格・高品質な資材の購入が可能となる。
特開2003−99694号公報 特開2001−319060号公報
By using these credit services, it becomes possible to take a form close to cash settlement, and the credit capacity of a relatively small contractor can be improved. You can purchase the most suitable building materials. As a result, the construction shop can purchase low-priced and high-quality materials.
JP 2003-99694 A JP 2001-319060 A

現在、上記で示したように、各種の与信サービスが提案されているが、建築に必要となる建材は多品種かつ大量であるので、上記各与信サービスにおいて、各資材に基づいた与信枠の設定を適切に行うことが困難である場合が多い。また、上記各与信サービスを利用して与信枠を設定した場合には、各建材について売り上げ債権の消し込みを行う必要がある。しかし、建築に必要となる建材が多品種かつ大量であるので、売り上げ債権の消し込み業務が煩雑であるという問題がある。このように、上記各与信サービスを利用する場合には、各資材に基づいた与信枠の設定を適切に行うことが困難であると共に、売り上げ債権の消し込み業務が煩雑であるという問題があるので、上記各与信サービスは十分に活用されていないのが現状であり、特に、比較的規模が小さい工務店等では十分に活用されていない。   Currently, as shown above, various credit services have been proposed. However, since there are many kinds of building materials required for construction, the credit limits based on each material are set for each credit service. In many cases, it is difficult to properly perform the above. In addition, when a credit limit is set by using each credit service, it is necessary to clear sales receivables for each building material. However, since there are many kinds of building materials necessary for construction, there is a problem that the operation of clearing sales receivables is complicated. As described above, when using each credit service, it is difficult to appropriately set a credit frame based on each material, and there is a problem that the sales receivable elimination process is complicated. Currently, the credit services are not fully utilized, and are not sufficiently utilized particularly in construction shops that are relatively small in scale.

なお、特許文献1に記載の売掛債権算出方法は、上記問題と共に、予想返品率と出荷情報とに基づいて販売企業の予想債権額を算出するものであり、予想債権額を算出することはできるが、正確な債権の把握をすることができず、与信枠の設定を適切に行うことができないという問題がある。   In addition, the method for calculating the accounts receivable described in Patent Document 1 calculates the expected amount of receivables of the selling company based on the expected return rate and the shipping information together with the above problem. However, there is a problem that it is not possible to accurately grasp the receivables and the credit line cannot be set appropriately.

また、特許文献2に記載の売掛債権担保融資方法およびシステムは、上記問題と共に、インターネット経由で融資申込者から入力された情報に基づいて、融資申込者の融資限度額と融資可能額とを決定し、融資可能額の範囲内で融資申込者の融資額を決定するものであり、融資申込者が情報の入力を誤った場合等には、正確な融資額を決定することができないという問題がある。   In addition, the method and system for receivable-collateralized collateral described in Patent Document 2 determines the loan applicant's loan limit and possible loan amount based on the information input from the loan applicant via the Internet along with the above problem. The problem is that the loan amount of the loan applicant is determined within the range of the loanable amount, and the correct loan amount cannot be determined if the loan applicant incorrectly enters information. There is.

以上で示したように、住宅等の建物を建築する場合、住宅等の建物を施工する工務店に対して、適正な与信枠または融資枠を設定し、当該住宅等の建物の購入者に低価格・高品質な住宅を供給することが重要である。   As shown above, when building a building such as a house, an appropriate credit line or a loan line is set for the construction company that constructs the house and the like, and it is low for purchasers of the building such as the house. It is important to supply high-quality housing at a high price.

本発明は、住宅等の建物を建築する場合、住宅等の建物を施工する工務店に対して、適正な与信枠または融資枠を設定することができ、当該工務店の購買範囲と与信を拡大させ、当該住宅等の建物の購入者に低価格・高品質な住宅を供給することができる与信管理装置、与信管理方法及びプログラムを提供することを目的とする。   In the case of building a building such as a house, the present invention can set an appropriate credit line or a loan line for a construction shop that constructs a building such as a house, and expands the purchase scope and credit of the construction shop. It is an object of the present invention to provide a credit management device, a credit management method, and a program capable of supplying a low-priced and high-quality home to a purchaser of a building such as the home.

本発明は、商品を販売する取引先の与信を管理する与信管理装置であって、商品の代金回収・未回収を含む前記取引先の過去の取引実績と、前記取引先の過去の取引実績に基づいて決定される前記取引先の取引実績評価を示す取引実績評価情報とを記憶する取引実績記憶手段と、売上原価率と販売価格とを含む商品情報を記憶する商品情報記憶手段と、前記取引実績記憶手段に記憶されている過去の取引実績に基づいて、前記取引先の最大与信枠を設定する手段と、前記設定した最大与信枠と、前記取引実績記憶手段に記憶されている取引実績評価情報と、前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格と、前記商品情報記憶手段に記憶されている売上原価率とに基づいて、前記取引先の利用可能与信枠を算出する手段と、商品購入に係る情報である発注情報を前記取引先から受信する手段と、前記取引実績記憶手段に記憶されている取引実績評価情報と、前記受信した発注情報に係る商品の販売価格と、前記商品情報記憶手段に記憶されている売上原価率とに基づいて、前記受信した発注情報に係る所定値を算出する手段と、前記算出した所定値が前記利用可能与信枠の範囲内にあるか否かを判断し、前記算出した所定値が前記利用可能与信枠の範囲内にあれば、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定する手段とを有することを特徴とする与信管理装置、これに使用される与信管理方法及びプログラムである。   The present invention is a credit management device that manages the credit of a business partner who sells a product, and includes the past business performance of the business partner including collection and non-collection of the price of the product, and the past business performance of the business partner. Transaction performance storage means for storing transaction performance evaluation information indicating the transaction performance evaluation of the supplier determined based on the product, product information storage means for storing product information including a sales cost rate and a sales price, and the transaction Based on the past transaction results stored in the result storage means, means for setting the maximum credit limit of the customer, the set maximum credit limit, and the transaction result evaluation stored in the transaction result storage means The transaction based on the information, the sales price of the uncollected product included in the past transaction record stored in the transaction record storage unit, and the sales cost rate stored in the product information storage unit Previous use A means for calculating a credit line, a means for receiving order information, which is information related to product purchase, from the business partner, transaction performance evaluation information stored in the transaction performance storage means, and the received order information. Means for calculating a predetermined value related to the received order information based on the sales price of the product and the sales cost rate stored in the product information storage means; and the calculated predetermined value is the available credit. If it is determined whether the calculated predetermined value is within the range of the available credit limit, the order amount of the product related to the received order information is the credit limit of the supplier. And a credit management method, and a credit management method and program used for the credit management device.

本発明は、商品を販売する取引先の与信を管理する与信管理装置であって、商品の代金回収・未回収を含む前記取引先の過去の取引実績と、前記取引先の過去の取引実績に基づいて決定される前記取引先の支払確率とを記憶する取引実績記憶手段と、売上原価率と販売価格とを含む商品情報を記憶する商品情報記憶手段と、前記取引実績記憶手段に記憶されている過去の取引実績に基づいて、所定期間内における取引額の平均値に所定の値を乗じた値である前記取引先の最大与信枠を設定する手段と、前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格の総和である第1の値を算出する手段と、前記第1の値に、前記取引実績記憶手段に記憶されている支払確率を乗じた値である第2の値を算出する手段と、前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格に当該商品の売上原価率を乗じた値である第3の値を前記代金未回収の商品毎に算出し、当該商品毎に算出した第3の値の総和である第4の値を算出する手段と、前記第1の値と前記第4の値との和から前記第2の値を減じた値を、前記最大与信枠から減じた値である利用可能与信枠を算出する手段と、商品購入に係る情報である発注情報を前記取引先から受信する手段と、前記受信した発注情報に係る商品の販売価格に、前記取引実績記憶手段に記憶されている支払確率を乗じた値である第5の値を算出すると共に、前記受信した発注情報に係る商品の販売価格に、当該商品の売上原価率を乗じた値である第6の値を算出し、前記第5の値から前記第6の値を減じた値である第7の値を算出し、前記受信した発注情報に係る商品の販売価格から前記第7の値を減じた値である第8の値を算出する手段と、前記第8の値が前記利用可能与信枠の範囲内にあるか否かを判断し、前記第8の値が前記利用可能与信枠の範囲内にあれば、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定する手段とを有することを特徴とする与信管理装置、これに使用される与信管理方法及びプログラムである。
なお、前記取引実績記憶手段には、商品の流通に関する情報である商品流通情報と、識別情報とが関連付けて記憶され、与信管理装置は、前記識別情報が記録された可搬記録手段が装着された商品に係る各流通段階において、前記可搬記録手段から読み出された識別情報を受信する手段と、前記識別情報を受信すると、前記取引実績記憶手段に記憶されている当該識別情報に係る商品流通情報に受信日時を順次登録する手段と、前記取引先に販売した商品についての代金回収情報を受信する手段と、前記代金回収情報を受信すると、前記取引実績記憶手段に記憶されている当該代金回収情報に係る商品の商品流通情報に代金回収情報を登録する手段とを有する。
The present invention is a credit management device that manages the credit of a business partner who sells a product, and includes the past business performance of the business partner including collection and non-collection of the price of the product, and the past business performance of the business partner. Transaction result storage means for storing the payment probability of the business partner determined based on the product, product information storage means for storing product information including a sales cost rate and a sales price, and stored in the transaction result storage means A means for setting a maximum credit limit of the customer, which is a value obtained by multiplying a predetermined value by an average value of the transaction amount within a predetermined period, based on the past transaction results, and stored in the transaction result storage means Means for calculating a first value that is the sum of sales prices of uncollected products included in the past transaction results, and the payment probability stored in the transaction result storage means as the first value. Calculate the second value that is the product And a third value which is a value obtained by multiplying the sales price of the uncollected product included in the past transaction record stored in the transaction record storage unit by the sales cost ratio of the product. Means for calculating the fourth value, which is the sum of the third values calculated for each product, and the sum of the first value and the fourth value. Means for calculating an available credit line that is a value obtained by subtracting a value from the maximum credit line, means for receiving order information that is information related to product purchase from the customer, and the received order A fifth value that is a value obtained by multiplying the sales price of the product related to the information by the payment probability stored in the transaction record storage means is calculated, and the sales price of the product related to the received order information is A sixth value, which is a value obtained by multiplying the sales cost ratio of the product, A seventh value which is a value obtained by subtracting the sixth value from the value of the first value, and an eighth value which is a value obtained by subtracting the seventh value from the sales price of the commodity related to the received ordering information. Means for calculating and determining whether the eighth value is within the range of the available credit line; and if the eighth value is within the range of the available credit line, the received ordering A credit management apparatus, and a credit management method and program used for the credit management apparatus, characterized by comprising: a means for determining that an order amount of a product related to information is within a credit frame of the business partner.
The transaction record storage means stores the merchandise distribution information, which is information relating to the merchandise distribution, and the identification information in association with each other, and the credit management device is equipped with a portable recording means in which the identification information is recorded. Means for receiving the identification information read from the portable recording means in each distribution stage related to the goods, and the goods related to the identification information stored in the transaction record storage means when receiving the identification information Means for sequentially registering the reception date and time in the distribution information; means for receiving the price collection information for the product sold to the supplier; and when receiving the price collection information, the price stored in the transaction record storage means Means for registering the price collection information in the merchandise distribution information of the merchandise related to the collection information.

本発明によれば、住宅等の建物を建築する場合、住宅等の建物を施工する工務店に対して、適正な与信枠または融資枠を設定することができると共に、当該工務店の購買範囲と与信を拡大させることによって、当該住宅等の建物の購入者に低価格・高品質な住宅を供給することができるという効果を奏する。   According to the present invention, when a building such as a house is constructed, an appropriate credit line or a financing line can be set for a construction shop that constructs the building such as a house, and the purchase range of the construction shop By expanding the credit, it is possible to supply a low-priced and high-quality housing to a purchaser of the building such as the housing.

また、本発明によれば、商品を製造または販売する事業者に対して、適正な与信枠または融資枠を設定することができると共に、当該事業者の購買範囲と与信を拡大させることによって、当該商品の購入者に低価格・高品質な商品を供給することができるという効果を奏する。   In addition, according to the present invention, it is possible to set an appropriate credit line or a credit line for an operator that manufactures or sells a product, and by expanding the purchase range and credit of the operator, There is an effect that it is possible to supply a low-priced and high-quality product to the product purchaser.

以下、本発明の実施の形態である与信管理装置、与信管理方法及びプログラムについて、図面を参照して詳細に説明する。   Hereinafter, a credit management device, a credit management method, and a program according to embodiments of the present invention will be described in detail with reference to the drawings.

[第1の実施の形態]
図1は、本発明の第1の実施の形態である与信管理システム1の構成を示すブロック図である。
[First Embodiment]
FIG. 1 is a block diagram showing a configuration of a credit management system 1 according to the first embodiment of the present invention.

図1では、与信管理システム1において、建築現場103で使用される建材について、製造工場101から物流センタ102を経由して建築現場103まで輸送される流れを概略的に示す。また、管理センタ100と、工務店201と、建材製造会社210と、金融機関220との間で行われる金銭的な情報の流れを概略的に示す。なお、本願明細書において、建材は、建設資材・建築資材等の建設・建築において使用される各種資材を意味するものとする。   FIG. 1 schematically shows a flow in which the building materials used in the building site 103 are transported from the manufacturing factory 101 to the building site 103 via the distribution center 102 in the credit management system 1. In addition, the flow of monetary information performed between the management center 100, the construction company 201, the building material manufacturing company 210, and the financial institution 220 is schematically shown. In the present specification, building materials mean various materials used in construction and construction such as construction materials and building materials.

また、本実施の形態で示す物流センタ102は、住宅建築に係る建材を製造・販売する建材製造会社の工場の倉庫、建材の物流を委託されている物流会社の倉庫等の、住宅建築に係る建材を管理する場所全般を含むものとする。また、各実施の形態で示す建築現場は、土木建築工事(解体工事含む)全般の現場を含むものとする。さらに、専門工事業者は、施工業者全般を意味するものとする。また、本実施の形態で示す製造工場101は建材製造会社210内に設けられているが、製造工場101と建材製造会社210とが物理的に離れている場合についても同様である。   In addition, the distribution center 102 shown in this embodiment is related to residential construction, such as a warehouse of a factory of a building material manufacturing company that manufactures and sells building materials related to residential construction, and a warehouse of a logistics company that is entrusted with logistics of building materials. Includes all locations where building materials are managed. Moreover, the construction site shown in each embodiment shall include the general site of civil engineering construction work (including dismantling work). Furthermore, a professional contractor shall mean the general contractor. Further, although the manufacturing factory 101 shown in this embodiment is provided in the building material manufacturing company 210, the same applies to the case where the manufacturing factory 101 and the building material manufacturing company 210 are physically separated.

図2は、与信管理システム1において使用されるハードウェア構成を概略的に示す概略構成図である。   FIG. 2 is a schematic configuration diagram schematically showing a hardware configuration used in the credit management system 1.

与信管理システム1は、与信管理装置10と、CAD積算装置20と、製造工場PDA30と、物流センタPDA40と、建築現場PDA50と、電子タグ60と、建材(ドア)70と、インターネット90と、工務店PC201aと、金融機関PC220aとを有する。   The credit management system 1 includes a credit management device 10, a CAD integration device 20, a manufacturing factory PDA 30, a distribution center PDA 40, a construction site PDA 50, an electronic tag 60, a building material (door) 70, the Internet 90, and construction work. It has a store PC 201a and a financial institution PC 220a.

与信管理装置10は、商品を販売する取引先の与信を管理する与信管理装置であって、住宅建築における工事の工程計画及び建材等に関する各種情報が格納されたデータベースを有し、与信管理システム1全体と、建築建材等に関する各種情報とを管理するサーバ等の情報処理装置である。また、与信管理装置10は、CAD積算装置20に接続され、CAD積算装置20との間で住宅建築における各種情報の通信を実行すると共に、ルータを介してインターネット90と接続され、インターネット90を介して、各PDA30〜50との間で建材に関する各種情報の通信を実行する。   The credit management device 10 is a credit management device that manages the credits of business partners who sell products. The credit management device 10 has a database in which various types of information related to construction process plans and building materials in a residential building are stored. An information processing apparatus such as a server that manages the whole and various types of information related to building materials. In addition, the credit management device 10 is connected to the CAD integration device 20, communicates various information in the home building with the CAD integration device 20, is connected to the Internet 90 via a router, and is connected via the Internet 90. Then, communication of various information related to building materials is executed between the PDAs 30 to 50.

CAD積算装置20は、住宅建築における建築の設計に関する設計情報(建築物の設計図等)を作成し、作成した設計情報をCADファイルとして登録し、登録したCADファイルを与信管理装置10に出力するものである。   The CAD integrating device 20 creates design information (such as a design drawing of a building) related to the design of a building in a residential building, registers the created design information as a CAD file, and outputs the registered CAD file to the credit management device 10. Is.

工務店PC201aは、工務店201で使用されるパソコン等の情報処理装置であって、インターネット90を介して与信管理装置10との間で各種の情報通信を実行する。また、金融機関PC220aは、金融機関220で使用されるパソコン等の情報処理装置であって、インターネット90を介して与信管理装置10との間で各種の情報通信を実行する。   The construction shop PC 201 a is an information processing apparatus such as a personal computer used in the construction shop 201, and executes various types of information communication with the credit management apparatus 10 via the Internet 90. The financial institution PC 220 a is an information processing apparatus such as a personal computer used in the financial institution 220, and executes various types of information communication with the credit management apparatus 10 via the Internet 90.

図3は、与信管理装置10の内部構成を示すブロック図である。
なお、CAD積算装置20と工務店PC201aと金融機関PC220aとのそれぞれの内部構成は、与信管理装置10の内部構成とほぼ同様である。
FIG. 3 is a block diagram showing an internal configuration of the credit management device 10.
Note that the internal configuration of each of the CAD integrating device 20, the construction office PC 201a, and the financial institution PC 220a is substantially the same as the internal configuration of the credit management device 10.

与信管理装置10は、CPU11と、ROM12と、RAM13と、入力部14と、記憶部15と、表示部16と、通信部17とを有する。   The credit management device 10 includes a CPU 11, a ROM 12, a RAM 13, an input unit 14, a storage unit 15, a display unit 16, and a communication unit 17.

CPU11は、ROM12に格納された各種制御プログラムに基づいて各種制御を実行するものである。また、CPU11は、入力部14から操作情報を入力すると、この操作情報に基づいて制御情報を生成し、生成した制御情報を各部に出力するものである。   The CPU 11 executes various controls based on various control programs stored in the ROM 12. Further, when the operation information is input from the input unit 14, the CPU 11 generates control information based on the operation information, and outputs the generated control information to each unit.

ROM12は、CPU11に実行させる各種制御プログラムが格納されているメモリである。RAM13は、CPU11のワーク領域等に使用されるメモリである。入力部14は、各種入力キーを備え、操作されたキーに応じた操作情報をCPU11に出力するものである。   The ROM 12 is a memory that stores various control programs to be executed by the CPU 11. The RAM 13 is a memory used as a work area for the CPU 11. The input unit 14 includes various input keys, and outputs operation information corresponding to the operated keys to the CPU 11.

記憶部15は、各種アプリケーションプログラムや建材に関する各種情報等が格納されるハードディスクであり、各種データベースが格納されている。表示部16は、CPU11の制御に基づいて各種情報を表示する表示部である。   The storage unit 15 is a hard disk that stores various application programs, various information about building materials, and the like, and stores various databases. The display unit 16 is a display unit that displays various information based on the control of the CPU 11.

通信部17は、CAD積算装置20と接続し、CAD積算装置20との間で各種情報の送受信を実行すると共に、インターネット90と接続し、インターネット90を介して各PDAや各PCとの間で各種情報の送受信を実行する通信部である。   The communication unit 17 is connected to the CAD integrating device 20 and executes transmission / reception of various information to / from the CAD integrating device 20, and is connected to the Internet 90 and between each PDA and each PC via the Internet 90. It is a communication part which performs transmission / reception of various information.

製造工場PDA30は、PDA本体30aと、電子タグリードライタ(CFカード型RFIDリードライタ)30bと、データ通信カード30cとで構成される携帯型個人情報端末である。なお、以下で示す実施の形態で使用される各PDAの構成は、製造工場PDA30の構成と同様である。   The manufacturing factory PDA 30 is a portable personal information terminal including a PDA main body 30a, an electronic tag reader / writer (CF card type RFID reader / writer) 30b, and a data communication card 30c. The configuration of each PDA used in the embodiment described below is the same as the configuration of the manufacturing plant PDA 30.

図4は、PDA本体30aの内部構成を示すブロック図である。
PDA本体30aは、CPU31と、ROM32と、RAM33と、入力部34と、表示部35と、電子タグリードライタI/F部36と、データ通信カードI/F部37とを有する。
FIG. 4 is a block diagram showing an internal configuration of the PDA main body 30a.
The PDA main body 30 a includes a CPU 31, a ROM 32, a RAM 33, an input unit 34, a display unit 35, an electronic tag reader / I / F unit 36, and a data communication card I / F unit 37.

CPU31は、ROM32に格納された各種制御プログラムに基づいて各種制御を実行するものである。また、CPU31は、入力部34から操作情報を入力すると、入力された操作情報に基づいて制御情報を生成し、生成した制御情報を各部に出力するものである。なお、CPU31は、時刻を計測するカウンタ(図示せず)を内蔵する。   The CPU 31 executes various controls based on various control programs stored in the ROM 32. In addition, when the operation information is input from the input unit 34, the CPU 31 generates control information based on the input operation information, and outputs the generated control information to each unit. The CPU 31 includes a counter (not shown) that measures time.

ROM32は、CPU31に実行させる各種制御プログラムが格納されているメモリである。RAM33は、各種アプリケーションプログラムや建材に関する各種情報等が格納されるメモリであって、CPU31のワーク領域等に使用されるものである。   The ROM 32 is a memory in which various control programs to be executed by the CPU 31 are stored. The RAM 33 is a memory in which various application programs, various information related to building materials, and the like are stored, and is used for a work area of the CPU 31 and the like.

入力部34は、各種情報を入力するタッチパネルであって、ユーザの入力操作に応じた操作情報をCPU31に出力するものである。なお、入力部34を、タッチパネル以外の各種入力キー(テンキー、上下左右キー、各種機能キー等)で構成するようにしてもよい。   The input unit 34 is a touch panel for inputting various types of information, and outputs operation information corresponding to a user's input operation to the CPU 31. The input unit 34 may be configured by various input keys (such as numeric keys, up / down / left / right keys, and various function keys) other than the touch panel.

表示部35は、CPU31の制御に基づいて、与信管理装置10から受信した建材に関する各種情報やCPU31が生成した画像情報等の各種画像情報を表示するタッチパネルである。つまり、入力部34と表示部35とでタッチパネルを構成する。なお、表示部35を、タッチパネル以外の液晶ディスプレイ等の各種ディスプレイで構成するようにしてもよい。   The display unit 35 is a touch panel that displays various pieces of image information such as various pieces of information related to building materials received from the credit management device 10 and image information generated by the CPU 31 based on the control of the CPU 31. That is, the input unit 34 and the display unit 35 constitute a touch panel. In addition, you may make it comprise the display part 35 with various displays, such as liquid crystal displays other than a touch panel.

電子タグリードライタI/F部36は、電子タグリードライタ30bと接続し、電子タグリードライタ30bのI/F部303との間で実行される各種情報の送受信を制御するインタフェースである。データ通信カードI/F部37は、データ通信カード30cと接続し、与信管理装置10との間で実行される各種情報の送受信を制御するインタフェースである。   The electronic tag reader / writer I / F unit 36 is an interface that is connected to the electronic tag reader / writer 30b and controls transmission / reception of various information executed with the I / F unit 303 of the electronic tag reader / writer 30b. The data communication card I / F unit 37 is an interface that is connected to the data communication card 30 c and controls transmission / reception of various information executed with the credit management device 10.

データ通信カード30cは、インターネット90を介して与信管理装置10と接続し、与信管理装置10との間で各種情報の送受信を実行するデータ通信カードである。   The data communication card 30 c is a data communication card that is connected to the credit management device 10 via the Internet 90 and executes transmission / reception of various information to and from the credit management device 10.

また、PDA本体30aは、人工衛星から電波を受信して位置を検出するGPS装置(図示せず)を有し、このGPS装置によって現在の位置を測定し、測定した現在位置を、位置情報としてRAM33に格納する。なお、GPS装置をPDA本体30aに設ける代わりに、PDA30を所持する作業員P1が入力部34から位置情報を随時入力し、入力された位置情報をRAM33に格納するようにしてもよい。   Further, the PDA main body 30a has a GPS device (not shown) that receives radio waves from an artificial satellite and detects a position, measures the current position by the GPS device, and uses the measured current position as position information. Store in the RAM 33. Instead of providing the GPS device in the PDA main body 30a, the worker P1 who owns the PDA 30 may input position information from the input unit 34 at any time and store the input position information in the RAM 33.

また、ネットワーク上において各PDAを特定するユーザIDがPDAのそれぞれに付与され、たとえば、IPアドレスと関連付けられてRAMに格納されている。具体的には、PDA30については建材製造工場コードとユーザIDとを対応付け、PDA40についてはドライバコードとユーザIDとを対応付け、PDA50については現場コードとユーザIDとを対応付けるようにする。   Further, a user ID for identifying each PDA on the network is assigned to each PDA, and is stored in the RAM in association with an IP address, for example. Specifically, the building material manufacturing factory code and the user ID are associated with each other for the PDA 30, the driver code and the user ID are associated with each other for the PDA 40, and the site code and the user ID are associated with each other for the PDA 50.

電子タグ60は、ICチップとアンテナとを内蔵したICタグ、無線タグ、無線ICタグ、RFID(Radio Frequency Identification)タグ等の電子タグであって、非接触通信が可能な可搬記憶手段の一例である。電子タグ60には各種情報(タグ情報)が格納され、電子タグ60に格納されているタグ情報を電波を利用してPDA30が読み書きすることができる。つまり、PDA30が電子タグ60に接触しなくてもタグ情報を読み書きすることができ、さらに複数の電子タグから同時にタグ情報を読み取ることができる。なお、各種情報を格納し、この格納されている各種情報を所定の情報読書装置で読み書きすることができる他の可搬記憶手段を電子タグの代わりに使用するようにしてもよい。また、非接触通信が可能な可搬記憶手段の代わりに、ユニークな情報を保持することができ、そのユニークな情報を情報読取装置で読み取ることができるバーコードや2次元コード等を具備する情報記録媒体(可搬記録手段)を使用するようにしてもよい。この情報記録媒体として、バーコードや2次元コード等が印刷されたシール等が考えられる。   The electronic tag 60 is an electronic tag such as an IC tag, a wireless tag, a wireless IC tag, or an RFID (Radio Frequency Identification) tag that incorporates an IC chip and an antenna, and is an example of portable storage means that can perform non-contact communication. It is. Various information (tag information) is stored in the electronic tag 60, and the PDA 30 can read and write the tag information stored in the electronic tag 60 using radio waves. That is, the tag information can be read and written without the PDA 30 contacting the electronic tag 60, and the tag information can be read simultaneously from a plurality of electronic tags. Note that other portable storage means that stores various types of information and can read and write the various types of stored information with a predetermined information reading device may be used instead of the electronic tag. Further, in place of the portable storage means capable of non-contact communication, information having a barcode, a two-dimensional code or the like that can hold unique information and can read the unique information with an information reader. A recording medium (portable recording means) may be used. As this information recording medium, a sticker on which a barcode, a two-dimensional code, or the like is printed can be considered.

図5は、電子タグリードライタ30bと電子タグ60との内部構成を示すブロック図である。
電子タグリードライタ30bは、主制御部301と、RAM302と、I/F部303と、信号変換部304と、変調部305と、復調部306と、送信アンテナ307と、受信アンテナ308とを有する。
FIG. 5 is a block diagram showing an internal configuration of the electronic tag reader / writer 30b and the electronic tag 60. As shown in FIG.
The electronic tag reader / writer 30b includes a main control unit 301, a RAM 302, an I / F unit 303, a signal conversion unit 304, a modulation unit 305, a demodulation unit 306, a transmission antenna 307, and a reception antenna 308. .

主制御部301は、電子タグリードライタ30b全体を制御する主制御部である。RAM302は、電子タグ60から受信した各種タグ情報を蓄積する記憶部であって、読み出し/書き込み可能なRAMである。I/F部303は、PDA本体30aとの間で実行される各種情報の送受信を制御するインタフェースである。   The main control unit 301 is a main control unit that controls the entire electronic tag reader / driver 30b. The RAM 302 is a storage unit that accumulates various tag information received from the electronic tag 60, and is a readable / writable RAM. The I / F unit 303 is an interface that controls transmission and reception of various types of information executed with the PDA main body 30a.

信号変換部304は、電子タグ60への送信情報をパラレル信号からシリアル信号に変換し、電子タグ60からの受信信号をシリアル信号からパラレル信号に変換する信号変換部である。変調部305は、電子タグ60への送信信号を伝送用の信号に変調する変調部である。復調部306は、電子タグ60からの受信信号を復調する復調部である。   The signal conversion unit 304 is a signal conversion unit that converts transmission information to the electronic tag 60 from a parallel signal to a serial signal, and converts a reception signal from the electronic tag 60 from a serial signal to a parallel signal. The modulation unit 305 is a modulation unit that modulates a transmission signal to the electronic tag 60 into a transmission signal. The demodulator 306 is a demodulator that demodulates the received signal from the electronic tag 60.

電子タグ60は、主制御部61と、EEPROM62と、信号変換部63と、変調部64と、復調部65と、送信アンテナ66と、受信アンテナ67とを有する。   The electronic tag 60 includes a main control unit 61, an EEPROM 62, a signal conversion unit 63, a modulation unit 64, a demodulation unit 65, a transmission antenna 66, and a reception antenna 67.

主制御部61は、電子タグ60全体を制御する主制御部である。
EEPROM62は、各種タグ情報を蓄積するEEPROM等の電源バックアップ不要な記憶部である。信号変換部63は、電子タグリードライタ30bへの送信情報をパラレル信号からシリアル信号に変換し、電子タグリードライタ30bからの受信信号をシリアル信号からパラレル信号に変換する信号変換部である。
The main control unit 61 is a main control unit that controls the entire electronic tag 60.
The EEPROM 62 is a storage unit that does not require power backup, such as an EEPROM that stores various tag information. The signal converter 63 is a signal converter that converts transmission information to the electronic tag reader / driver 30b from a parallel signal to a serial signal, and converts a reception signal from the electronic tag reader / driver 30b from a serial signal to a parallel signal.

変調部64は、電子タグリードライタ30bへの送信信号を伝送用の信号に変調する変調部である。復調部65は、電子タグリードライタ30bからの受信信号を復調する復調部である。   The modulation unit 64 is a modulation unit that modulates a transmission signal to the electronic tag reader / driver 30b into a transmission signal. The demodulator 65 is a demodulator that demodulates the received signal from the electronic tag reader / writer 30b.

建材70は、屋根、柱、壁、玄関、窓、サッシ、ドア、襖、バス、キッチン、トイレ、照明等の建築現場103で使用される各種建材であり、本実施の形態では、ドアを例にして説明する。建築現場103で使用される各種建材には、製造工場101で製造される際に電子タグ60が装着される。具体的には、建材70の目立たない部分であって電子タグ60の情報を読書装置で読書きすることができる部分に電子タグ60を装着する。   The building material 70 is various building materials used in the construction site 103 such as a roof, a pillar, a wall, an entrance, a window, a sash, a door, a fence, a bath, a kitchen, a toilet, and a lighting. In the present embodiment, the door is an example. I will explain. Various building materials used in the construction site 103 are attached with an electronic tag 60 when manufactured at the manufacturing factory 101. Specifically, the electronic tag 60 is attached to an inconspicuous portion of the building material 70 where information on the electronic tag 60 can be read and written by a reading device.

図6は、与信管理システム1における建材に装着される電子タグの管理方法の概略を示す図である。   FIG. 6 is a diagram showing an outline of a method for managing an electronic tag attached to a building material in the credit management system 1.

与信管理システム1において、建築現場103で使用される建材に装着される電子タグは、種類に応じた管理方法で管理する。具体的には、個々に管理できる建材であるか否かに応じて、電子タグの管理方法を決定する。   In the credit management system 1, the electronic tag attached to the building material used in the construction site 103 is managed by a management method according to the type. Specifically, the management method of the electronic tag is determined depending on whether the building material can be managed individually.

本実施の形態において、玄関やサッシ等は、個々に管理することができる建材(個々に管理する建材)であり、屋根や躯体(くたい)等の構造材等は、個々に管理することができない建材(ロット単位で管理する建材)とする。建築現場103において、個々に管理する建材は、電子タグを埋め込んだ(装着した)状態で設置する。一方、ロット単位で管理する建材については、建築現場103に搬送され、建材に装着されている電子タグから建材情報を読書装置で読み込んだ後に、電子タグを建材から引き離し、建築現場103に建築される住宅103a内の一覧プレート103bに引き離した電子タグを貼り付け、住宅103a内の一覧プレート103bで電子タグを管理する。   In this embodiment, entrances and sashes are building materials that can be managed individually (building materials that are managed individually), and structural materials such as roofs and frames can be individually managed. Building materials that cannot be used (building materials managed in lot units). In the construction site 103, building materials to be managed individually are installed in a state where electronic tags are embedded (attached). On the other hand, building materials managed in lot units are transported to the building site 103, and after reading the building material information from the electronic tags attached to the building materials with a reading device, the electronic tags are separated from the building materials and built on the building site 103. The separated electronic tag is attached to the list plate 103b in the house 103a, and the electronic tag is managed by the list plate 103b in the house 103a.

また、住宅103aの完成後においては、個々に管理する建材は、メンテナンスや点検等の際に建材に埋め込まれている電子タグを読書装置で読み取ることによって当該建材を管理する。一方、ロット単位で管理する建材は、住宅103a内の一覧プレート103bに装着されている電子タグを読書装置で読み取ることによって当該建材を管理する。このため、住宅103a内における一覧プレート103bの設置場所は、住宅103aの完成後に行うメンテナンスや点検等の際に接し易い場所が好ましい。   In addition, after the housing 103a is completed, the building materials managed individually manage the building materials by reading an electronic tag embedded in the building materials with a reading device during maintenance or inspection. On the other hand, the building material managed in units of lots is managed by reading the electronic tag attached to the list plate 103b in the house 103a with a reading device. For this reason, the installation place of the list plate 103b in the house 103a is preferably a place where it is easy to come into contact during maintenance or inspection after the completion of the house 103a.

図7は、与信管理装置10が管理する建材データベース15aに格納されている住宅基本情報が表示部16に表示されている場合を示す図である。   FIG. 7 is a diagram illustrating a case where the basic house information stored in the building material database 15a managed by the credit management device 10 is displayed on the display unit 16.

住宅基本情報は、図7に示すように、「建材ID」と、「ロット番号」と、「建材種類」と、「建材メーカ」と、「工務店」と、「物流会社」と、「メンテナンス会社」と、「設置フロア」と、「設置エリア」と、「設置日」と、「点検履歴」と、「メンテナンス履歴」と、「問合せ履歴」とを含む情報であり、これらの情報が、各建材に付与される識別情報である「建材ID」に関連付けて格納されている。なお、建材IDは、製造工場101で製造される際に各建材に付与される識別情報であり、ロット番号は、建材の種類や製造場所等に応じて付与されるロット番号である。つまり、建材の種類や製造場所等が同一でロット番号が同一である建材であっても、付与される建材IDはそれぞれ異なる。   As shown in FIG. 7, the basic housing information includes “building material ID”, “lot number”, “building material type”, “building material manufacturer”, “construction shop”, “logistics company”, “maintenance” It is information including “Company”, “Installation floor”, “Installation area”, “Installation date”, “Inspection history”, “Maintenance history”, and “Inquiry history”. It is stored in association with “building material ID” which is identification information given to each building material. The building material ID is identification information given to each building material when manufactured at the manufacturing factory 101, and the lot number is a lot number given according to the type of building material, the manufacturing location, and the like. That is, even if the building materials have the same type and manufacturing location and the same lot number, the building material IDs assigned are different.

なお、本実施の形態において、現場コードは、建築現場を特定するために建築現場毎に付与される識別情報であり、物流センタコードは、物流センタを特定するために物流センタ毎に付与される識別情報であり、金融コードは、建築現場における複数の建築工程について各建築工程を特定するために建築工程毎に付与される識別情報であり、輸送業者コードは、建材輸送業者を特定するために輸送業者毎に付与される識別情報であり、ドライバコードは、建材輸送業者のドライバを特定するためにドライバ毎に付与される識別情報であり、建材製造工場コードは、建材製造工場を特定するために建材製造工場毎に付与される識別情報であり、建材コードは、建築現場の各建築工程に係る工事において使用される各建材を特定するために建材毎に付与される識別情報であり、業者コードは、建築現場における複数の建築工程について実際に建築工事を行う専門工事業者毎に付与される識別情報である。   In the present embodiment, the site code is identification information assigned to each construction site in order to specify the construction site, and the distribution center code is assigned to each distribution center in order to specify the distribution center. It is identification information, and the financial code is identification information given to each building process in order to specify each building process for a plurality of building processes at the building site, and the transporter code is used to specify the building material transporter. It is identification information given to each carrier, the driver code is identification information given to each driver to specify the driver of the building material carrier, and the building material manufacturing factory code is to specify the building material manufacturing factory Is the identification information given to each building material manufacturing factory, and the building material code is used for each building material to identify each building material used in construction related to each construction process at the building site. Is identification information added, skill code is identification information assigned to each specialist contractors for actual construction work for a plurality of construction steps in the construction site.

次に、与信管理システム1における動作について説明する。
最初に、CAD積算装置20の動作について説明する。
Next, the operation in the credit management system 1 will be described.
First, the operation of the CAD integrating device 20 will be described.

建築現場103に係る建築物の設計に関する各種情報がCAD積算装置20に入力されると、入力された情報に基づいてCAD積算装置20が当該建築物の設計に関する設計情報(建築物の設計図等)を作成し、作成した設計情報をCADファイルとして建築現場103に係る現場コードに対応付けて登録する。続いて、登録したCADファイルに基づいて、このCADファイルに係る建築に使用される各建材についての積算データ(必要となる建材の種類、数量を含む情報)をCAD積算装置20が作成する。CAD積算装置20が積算データを作成すると、作成した積算データを与信管理装置10に出力する。   When various pieces of information related to the design of the building relating to the building site 103 are input to the CAD integrating device 20, the CAD integrating device 20 uses the input information to design information relating to the design of the building (design drawings of the building, etc. ) And the created design information is registered as a CAD file in association with the site code related to the construction site 103. Subsequently, based on the registered CAD file, the CAD integrating device 20 creates integrated data (information including the type and quantity of necessary building materials) for each building material used in the construction related to the CAD file. When the CAD integration device 20 creates integration data, the created integration data is output to the credit management device 10.

図8は、与信管理システム1において、製造工場101で製造された建材70を物流センタ102に輸送する流れを示す動作フロー図である。   FIG. 8 is an operation flowchart showing a flow of transporting the building material 70 manufactured at the manufacturing factory 101 to the distribution center 102 in the credit management system 1.

図8に示す動作フロー図のうちで、上段は、与信管理システム1における情報の流れを示すシステムフロー図であり、下段は、製造工場101で製造された建材70についての実際の流れを示す運用フロー図である。   In the operation flow chart shown in FIG. 8, the upper part is a system flow chart showing a flow of information in the credit management system 1, and the lower part is an operation showing an actual flow of the building material 70 manufactured at the manufacturing factory 101. FIG.

この動作のうちの各装置に係る制御動作は、各装置においてROMに格納されている制御プログラムに基づいてCPUが実行する動作である。   Of these operations, the control operation related to each device is an operation executed by the CPU based on a control program stored in the ROM in each device.

製造工場101で使用される製造工場PDA30は、予め、与信管理装置10から所定数の建材IDを受信し、受信した建材IDをRAM33に格納している。なお、建材IDをRAM33に格納しておく代わりに、ユニークな建材IDが付与された電子タグ60を使用するようにしてもよい。   The manufacturing factory PDA 30 used in the manufacturing factory 101 receives a predetermined number of building material IDs from the credit management device 10 in advance, and stores the received building material IDs in the RAM 33. Instead of storing the building material ID in the RAM 33, the electronic tag 60 to which a unique building material ID is assigned may be used.

[建材情報登録]
建材製造会社210の製造工場101において建材70が製造される。この製造工程において、図6に示すように、建材70の所定部分に電子タグ60が装着される(または、電子タグ60を埋め込む)。建材70の製造後の検査において、作業員P1が、建材70の良否等を検査する。この検査が終了した後に、検査した建材70についての種類と、原材料に関する情報(木材の原産地:カナダ、ドアノブ:○○社製、等)と、建材70の外観に関する情報(形状の特徴や、外観の色等のように、取扱者が視覚的に容易に建材70を認識できる情報。例えば、写真等の画像情報でもよい)と、検査者と、検査日時と、位置情報と、輸送ルートとを含む建材製造情報を、製造工場PDA30の入力部34から作業員P1が入力する(S1)。なお、建材70に関する各種情報について、建材製造情報に係る複数のパターンを製造工場PDA30に予め登録しておき、建材製造情報を製造工場PDA30に入力する際には、登録されている複数のパターンのうちから適切なパターンを選択するようにしてもよい。また、確認日時と位置情報とについては、作業員P1が入力部34から入力する代わりに、CPU31が計測する時刻とGPS装置によって取得した位置情報とを使用するようにしてもよい。
[Construction material information registration]
The building material 70 is manufactured at the manufacturing factory 101 of the building material manufacturing company 210. In this manufacturing process, as shown in FIG. 6, the electronic tag 60 is attached to a predetermined portion of the building material 70 (or the electronic tag 60 is embedded). In the inspection after manufacturing the building material 70, the worker P1 inspects the quality of the building material 70 and the like. After this inspection is completed, information on the type of building material 70 inspected and information on the raw materials (wood origin: Canada, doorknob: manufactured by XX Corporation, etc.) and information on the appearance of the building material 70 (shape characteristics and appearance) Information such that the operator can easily visually recognize the building material 70, for example, image information such as photographs), the inspector, the date and time of inspection, position information, and the transportation route. The worker P1 inputs building material manufacturing information including the input from the input unit 34 of the manufacturing factory PDA 30 (S1). In addition, about the various information regarding the building material 70, when registering a plurality of patterns related to the building material manufacturing information in the manufacturing factory PDA 30 in advance and inputting the building material manufacturing information into the manufacturing factory PDA 30, the registered plurality of patterns An appropriate pattern may be selected from the house. As for the confirmation date and position information, the time measured by the CPU 31 and the position information acquired by the GPS device may be used instead of the operator P1 inputting from the input unit 34.

製造工場PDA30において建材製造情報が入力部34から入力されると、RAM33に格納されている建材IDのうちから1の建材IDを抽出し、抽出した建材IDと入力された建材製造情報とを対応付けてRAM33に格納する。続いて、建材製造情報の入力が終了すると、製造工場PDA30と電子タグ60との間で情報の送受信が可能な範囲内に入るように、作業員P1が製造工場PDA30を建材70に装着されている電子タグ60に近づけ、入力した建材製造情報とこれに対応する建材IDとを含む建材情報を電子タグ60へ書き込む操作を作業員P1が入力部34で実行する(S2)。   When building material manufacturing information is input from the input unit 34 in the manufacturing factory PDA 30, one building material ID is extracted from the building material IDs stored in the RAM 33, and the extracted building material ID corresponds to the input building material manufacturing information. In addition, it is stored in the RAM 33. Subsequently, when the input of the building material manufacturing information is completed, the worker P1 attaches the manufacturing factory PDA30 to the building material 70 so that information can be transmitted and received between the manufacturing factory PDA30 and the electronic tag 60. The operator P1 performs an operation of writing the building material information including the input building material manufacturing information and the corresponding building material ID on the electronic tag 60 with the input unit 34 (S2).

入力部34で書き込み操作が実行されると、RAM33に格納されている建材情報を、電子タグリードライタI/F部36を介して、電子タグリードライタ30bが電子タグ60に送信し、建材情報をEEPROM62に格納する(S3)。また、電子タグ60への書き込み動作と同時に、データ通信カードI/F部37を介して、データ通信カード30cが建材情報を与信管理装置10に送信する(S2)。建材情報を与信管理装置10が受信すると、受信した建材情報に含まれる建材IDと、当該建材情報とを対応させ、記憶部15の建材データベース15aに格納する(S4)。これらの動作を実行することによって、建材IDに基づく同一の建材情報を与信管理装置10と電子タグ60とに登録することができる。なお、ユニークな建材IDが付与された電子タグ60を使用する場合には、製造工場PDA30から電子タグ60への書き込み動作の際に(S2)、建材製造情報を電子タグ60に書き込むと共に、電子タグ60に付与された建材IDを製造工場PDA30が受け取り(S3)、受け取った建材IDと建材製造情報とを対応付けてRAM33に格納し、製造工場PDA30が与信管理装置10に建材情報を送信する(S2)。また、電子タグ60の代わりに、バーコード等を具備する情報記録媒体を使用する場合には、建材70に貼付された当該情報記録媒体に付与された建材IDとしてのバーコード情報等を製造工場PDA30が読み取り(S3)、読み取った建材IDと建材製造情報とを対応付けてRAM33に格納し、製造工場PDA30が与信管理装置10に建材情報を送信する(S2)。   When the writing operation is executed by the input unit 34, the building material information stored in the RAM 33 is transmitted to the electronic tag 60 by the electronic tag driter 30b via the electronic tag reader / writer I / F unit 36. Is stored in the EEPROM 62 (S3). Simultaneously with the writing operation to the electronic tag 60, the data communication card 30c transmits the building material information to the credit management device 10 via the data communication card I / F unit 37 (S2). When the credit management device 10 receives the building material information, the building material ID included in the received building material information is associated with the building material information and stored in the building material database 15a of the storage unit 15 (S4). By executing these operations, the same building material information based on the building material ID can be registered in the credit management device 10 and the electronic tag 60. In addition, when using the electronic tag 60 to which the unique building material ID is assigned, during the writing operation from the manufacturing factory PDA 30 to the electronic tag 60 (S2), the building material manufacturing information is written to the electronic tag 60 and the electronic tag 60 The manufacturing plant PDA 30 receives the building material ID assigned to the tag 60 (S3), associates the received building material ID with the building material manufacturing information and stores them in the RAM 33, and the manufacturing plant PDA 30 transmits the building material information to the credit management device 10. (S2). Further, when an information recording medium having a barcode or the like is used instead of the electronic tag 60, barcode information or the like as a building material ID attached to the information recording medium attached to the building material 70 is manufactured. The PDA 30 reads (S3), the read building material ID and the building material manufacturing information are stored in the RAM 33 in association with each other, and the manufacturing factory PDA 30 transmits the building material information to the credit management device 10 (S2).

[建材出荷情報]
製造工場101から物流センタ102に建材70を輸送する場合には、製造工場101の出荷時において、製造工場PDA30と電子タグ60との間で情報の送受信が可能な範囲内に入るように、作業員P1が製造工場PDA30を建材70に装着されている電子タグ60に近づけ、電子タグ60へ書き込まれている建材情報を読み込む(S5)。製造工場PDA30が建材情報を読み込むと、読み込んだ建材情報を表示部35に表示し、建材70と表示部35に表示された建材情報とを作業員P1が確認することができるようにする(S6)。
[Building material shipment information]
When the building material 70 is transported from the manufacturing factory 101 to the distribution center 102, work is performed so that information can be transmitted and received between the manufacturing factory PDA 30 and the electronic tag 60 when the manufacturing factory 101 is shipped. The worker P1 brings the manufacturing plant PDA 30 close to the electronic tag 60 attached to the building material 70, and reads the building material information written in the electronic tag 60 (S5). When the manufacturing factory PDA 30 reads the building material information, the read building material information is displayed on the display unit 35 so that the worker P1 can check the building material 70 and the building material information displayed on the display unit 35 (S6). ).

建材70と表示部35に表示された建材情報とを作業員P1が確認した後に、出荷日時と出荷担当者とを入力部34から入力する(S7)。入力部34に出荷日時と出荷担当者とが入力されると、入力された出荷日時・出荷担当者を読み込んだ建材情報に係る建材IDに関連付けてRAM33に格納する。続いて、入力された出荷日時・出荷担当者と、建材IDとを含む建材出荷実績情報を、データ通信カードI/F部37を介して、データ通信カード30cが与信管理装置10に送信する。続いて、受信した建材出荷実績情報を建材IDに関連付けて記憶部15の建材データベース15aに与信管理装置10が格納する(S8)。   After the worker P1 confirms the building material 70 and the building material information displayed on the display unit 35, the shipping date and time and the person in charge of shipping are input from the input unit 34 (S7). When the shipping date / time and the person in charge of shipping are input to the input unit 34, the input shipping date / time / shipping person in charge is stored in the RAM 33 in association with the building material ID related to the read building material information. Subsequently, the data communication card 30 c transmits the building material shipment result information including the input shipping date / time, the person in charge of shipping, and the building material ID to the credit management device 10 via the data communication card I / F unit 37. Subsequently, the credit management device 10 stores the received building material shipment record information in the building material database 15a of the storage unit 15 in association with the building material ID (S8).

[建材荷積情報登録]
製造工場101から物流センタ102に建材70を輸送する輸送業者が建材70を輸送車C1に荷積する場合、製造工場101の荷積時において、輸送業者PDA30Dと電子タグ60との間で情報の送受信が可能な範囲内に入るように、ドライバD1が輸送業者PDA30Dを建材70に装着されている電子タグ60に近づけ、電子タグ60へ書き込まれている建材情報を読み込む(S9)。輸送業者PDA30Dが建材情報を読み込むと、読み込んだ建材情報を表示部に表示し、建材70と表示部に表示された建材情報とをドライバD1が確認することができるようにする(S10)。
[Building material loading information registration]
When a transporter that transports the building material 70 from the manufacturing factory 101 to the distribution center 102 loads the building material 70 onto the transport vehicle C1, when the manufacturing factory 101 loads, information is transferred between the transporter PDA 30D and the electronic tag 60. The driver D1 brings the carrier PDA 30D closer to the electronic tag 60 attached to the building material 70 and reads the building material information written in the electronic tag 60 so that the transmission / reception is within a possible range (S9). When the transporter PDA 30D reads the building material information, the read building material information is displayed on the display unit, and the driver D1 can confirm the building material 70 and the building material information displayed on the display unit (S10).

建材70と表示部に表示された建材情報とをドライバD1が確認した後に、荷積日時と輸送業者名(ドライバ名)とを入力部から入力する(S11)。入力部に荷積日時と輸送業者名とが入力されると、入力された荷積日時・輸送業者名を読み込んだ建材情報に係る建材IDに関連付けてRAMに格納する。続いて、入力された荷積日時・輸送業者名と、建材IDとを含む建材荷積実績情報を、輸送業者PDA30Dが与信管理装置10に送信すると、建材荷積実績情報を建材IDに関連付けて与信管理装置10が記憶部15の建材データベース15aに格納する(S12)。   After the driver D1 confirms the building material 70 and the building material information displayed on the display unit, the loading date and time and the carrier name (driver name) are input from the input unit (S11). When the loading date and time and the name of the carrier are input to the input unit, the input loading date and time and the name of the carrier are stored in the RAM in association with the building material ID related to the read building material information. Subsequently, when the transporter PDA 30D transmits the building material loading record information including the input loading date / time / transporter name and the building material ID to the credit management device 10, the building material loading record information is associated with the building material ID. The credit management device 10 stores the building material database 15a in the storage unit 15 (S12).

[建材荷下情報登録]
製造工場101から物流センタ102に建材70を輸送する輸送業者が建材70を物流センタ102に荷下する場合、物流センタ102の荷下時において、輸送業者PDA30Dと電子タグ60との間で情報の送受信が可能な範囲内に入るように、ドライバD1が輸送業者PDA30Dを建材70に装着されている電子タグ60に近づけ、電子タグ60へ書き込まれている建材情報を読み込む(S13)。輸送業者PDA30Dが建材情報を読み込むと、読み込んだ建材情報を表示部に表示し、建材70と表示部に表示された建材情報とをドライバD1が確認することができるようにする(S14)。
[Register building material unloading information]
When a transporter that transports the building material 70 from the manufacturing factory 101 to the distribution center 102 unloads the building material 70 to the distribution center 102, information is transferred between the transporter PDA 30D and the electronic tag 60 when the distribution center 102 unloads. The driver D1 brings the carrier PDA 30D close to the electronic tag 60 attached to the building material 70 and reads the building material information written in the electronic tag 60 so that the transmission / reception is within a possible range (S13). When the transporter PDA 30D reads the building material information, the read building material information is displayed on the display unit, and the driver D1 can confirm the building material 70 and the building material information displayed on the display unit (S14).

建材70と表示部に表示された建材情報とをドライバD1が確認した後に、荷下日時と輸送業者名とを入力部から入力する(S15)。入力部に荷下日時と輸送業者名とが入力されると、入力された荷下日時・輸送業者名を建材IDに関連付けてRAMに格納する。続いて、入力された荷下日時・輸送業者名と建材IDとを含む建材荷下実績情報を、輸送業者PDA30Dが与信管理装置10に送信すると、建材荷下実績情報を建材IDに関連付けて与信管理装置10が記憶部15の建材データベース15aに格納する(S16)。   After the driver D1 confirms the building material 70 and the building material information displayed on the display unit, the unloading date and time and the name of the carrier are input from the input unit (S15). When the unloading date / time and the name of the carrier are input to the input unit, the input unloading date / time / transporter name is associated with the building material ID and stored in the RAM. Subsequently, when the transporter PDA 30D transmits the construction material unloading record information including the input unloading date / time / transporter name and building material ID to the credit management device 10, the building material unloading record information is associated with the building material ID and credited. The management apparatus 10 stores it in the building material database 15a of the storage unit 15 (S16).

[建材入荷情報登録]
物流センタ102において製造工場101からの建材70を入荷する場合、物流センタ102の入荷時において、物流センタPDA40と電子タグ60との間で情報の送受信が可能な範囲内に入るように、作業員P2が物流センタPDA40を建材70に装着されている電子タグ60に近づけ、電子タグ60へ書き込まれている建材情報を読み込む(S17)。物流センタPDA40が建材情報を読み込むと、読み込んだ建材情報を表示部に表示し、建材70と表示部に表示された建材情報とを作業員P2が確認することができるようにする(S18)。
[Building material arrival information registration]
When the building material 70 from the manufacturing factory 101 is received at the distribution center 102, the worker is in a range where information can be transmitted and received between the distribution center PDA 40 and the electronic tag 60 when the distribution center 102 is received. P2 brings the distribution center PDA 40 closer to the electronic tag 60 mounted on the building material 70 and reads the building material information written in the electronic tag 60 (S17). When the distribution center PDA 40 reads the building material information, the read building material information is displayed on the display unit, and the worker P2 can confirm the building material 70 and the building material information displayed on the display unit (S18).

建材70と表示部に表示された建材情報とを作業員P2が確認した後に、入荷日時と入荷担当者とを入力部から入力する(S19)。入力部に入荷日時と入荷担当者とが入力されると、入力された入荷日時・入荷担当者を読み込んだ建材情報に含まれる建材IDに関連付けてRAMに格納する。続いて、入力された入荷日時・入荷担当者と、建材IDとを含む建材入荷実績情報を、物流センタPDA40が与信管理装置10に送信すると、建材入荷実績情報を建材IDに関連付けて与信管理装置10が記憶部15の建材建材データベース15aに格納する(S20)。   After the worker P2 confirms the building material 70 and the building material information displayed on the display unit, the arrival date and time and the person in charge of the arrival are input from the input unit (S19). When the arrival date and time and the arrival person in charge are input to the input unit, the input arrival date and time and the arrival person are stored in the RAM in association with the building material ID included in the read building material information. Subsequently, when the distribution center PDA 40 transmits building material arrival record information including the input arrival date / time, arrival person in charge, and building material ID to the credit management device 10, the credit management device associates the building material arrival record information with the building material ID. 10 stores in the building material database 15a of the storage unit 15 (S20).

なお、上記動作において、各PDAの入力部から日時情報を入力しRAMに格納する代わりに、電子タグ60へ書き込まれている建材情報を読み込む際に(S5、S9、S13、S17)、この時の時刻をRAMに格納し、この時刻を日時情報とするようにしてもよい。また、この時の実際の位置を確認することができるように、GPS装置で測定した現在位置を位置情報として、読み込んだ建材情報に含まれる建材IDと関連付けてRAMに格納し、この位置情報を含む各種実績情報を与信管理装置10に送信するようにしてもよい。   In the above operation, instead of inputting the date / time information from the input unit of each PDA and storing it in the RAM, when reading the building material information written in the electronic tag 60 (S5, S9, S13, S17), May be stored in the RAM, and this time may be used as date / time information. Further, in order to be able to confirm the actual position at this time, the current position measured by the GPS device is stored as position information in the RAM in association with the building material ID included in the read building material information, and this position information is stored. Various performance information including it may be transmitted to the credit management device 10.

電子タグ60の代わりに、バーコード等を具備する情報記録媒体を使用する場合、当該情報記録媒体に付与されたバーコード情報等(建材ID)を各PDAが読み取り(S5、S9、S13、S17)、読み取った建材IDを与信管理装置10に送信する。続いて、当該建材IDに係る建材情報を与信管理装置10から各PDAが取得し、取得した建材情報を使用して建材チェックをするようにする(S6、S10、S14、S18)。   When an information recording medium having a barcode or the like is used instead of the electronic tag 60, each PDA reads the barcode information or the like (building material ID) given to the information recording medium (S5, S9, S13, S17). ), The read building material ID is transmitted to the credit management device 10. Subsequently, each PDA acquires the building material information related to the building material ID from the credit management device 10 and performs the building material check using the acquired building material information (S6, S10, S14, S18).

図9は、与信管理システム1において、複数の工務店201〜203が建築現場に必要な建材を製造会社210〜213に発注する場合における概略構成を示すブロック図である。   FIG. 9 is a block diagram illustrating a schematic configuration in the case where a plurality of construction companies 201 to 203 orders building materials necessary for a construction site from the manufacturing companies 210 to 213 in the credit management system 1.

図10は、与信管理システム1において、建築現場103に必要な建材を工務店201が発注してから、発注した各建材についての売上計上がされるまでの流れを示す動作フロー図である。   FIG. 10 is an operation flow diagram showing a flow from the construction shop 201 placing an order for building materials required for the construction site 103 to the sales being recorded for each ordered building material in the credit management system 1.

この動作のうちの各装置に係る制御動作は、各装置においてROMに格納されている制御プログラムに基づいてCPUが実行する動作である。   Of these operations, the control operation related to each device is an operation executed by the CPU based on a control program stored in the ROM in each device.

工務店201の過去3月間の発注実績の月平均を2000万円とし、工務店201が現在施工している住宅をA邸、B邸、C邸、D邸(建築現場103)の4つとし、A邸については、工務店201が発注した建材が建築現場に納品され、各建材についての各メーカに対する支払が完了しているとする。B邸については、工務店201が発注した建材が建築現場に納品され、各建材についての各メーカに対する支払がまだ完了していないとする。C邸については、建材を発注しこれから配送されるものとする。D邸は、建築現場103において施工される住宅であり、以下の動作で示す発注を行う。なお、A邸の建材に係る発注額の合計は500万円とし、B邸の建材に係る発注額の合計は600万円とし、C邸の建材に係る発注額の合計は400万円とし、D邸(建築現場103)の建材に係る発注額の合計は500万円とする。   The monthly average of orders for the construction company 201 for the past three months is 20 million yen, and the houses currently constructed by the construction company 201 are the four residences A, B, C, and D (building site 103). As for House A, it is assumed that the building materials ordered by the construction company 201 are delivered to the construction site, and the payment for each manufacturer for each building material is completed. As for House B, it is assumed that the building materials ordered by the construction company 201 are delivered to the construction site, and the payment for each manufacturer for each building material has not yet been completed. For House C, building materials will be ordered and will be delivered. House D is a house constructed at the construction site 103 and places an order as shown in the following operation. In addition, the total order amount for the building materials for the residence A is 5 million yen, the total order amount for the building materials for the residence B is 6 million yen, the total order amount for the building materials for the residence C is 4 million yen, The total order amount for building materials for D House (building site 103) is 5 million yen.

製造会社210は、ドア、サッシ等を製造・販売する会社であり、製造会社212は、キッチン、バス等を製造・販売する会社であり、製造会社213は、柱、壁等を製造・販売する会社であるとする。   The manufacturing company 210 is a company that manufactures and sells doors, sashes, etc., the manufacturing company 212 is a company that manufactures and sells kitchens, baths, and the like, and the manufacturing company 213 manufactures and sells pillars, walls, and the like. Suppose you are a company.

一般的に、売掛をしようとする相手(取引先)に対する与信を評価する場合、次の(a)〜(c)の場合が考えられる。
(a)過去の取引実績を調べずに与信を付与する
(b)過去の取引実績を調べ、その結果に基づいて与信を付与する
(c)与信を付与しない
Generally, the following cases (a) to (c) can be considered when evaluating credit to a counterparty (customer) who is going to make an account.
(A) Grant credit without checking past transaction results (b) Check past transaction results and grant credit based on the results (c) Do not grant credit

なお、上記(a)〜(c)のうちで、(b)が最も一般的であり、(b)で与信を評価する場合には、2以上の調査結果に基づいて評価する場合が考えられる。
具体的に、評価者自身による過去の取引実績に基づく調査結果と、評価者以外の信用調査会社等による調査結果(信用調書)とに基づいて、取引先に対する評価を決定する場合について説明する。
Of the above (a) to (c), (b) is the most common. When (b) evaluates credit, it may be evaluated based on two or more survey results. .
Specifically, a case will be described in which an evaluation for a business partner is determined based on a survey result based on past transaction results by the evaluator and a survey result (credit record) by a credit research company other than the evaluator.

評価者自身が過去の取引実績に基づいて取引先に対する評価を決定する場合、例えば、過去の取引実績が非常に優れている取引先には「優」と評価し、過去の取引実績が通常である取引先には「良」と評価し、過去の取引実績が悪い取引先には「可」と評価する。
一方、評価者以外の信用調査会社等による信用調査に基づいて、取引先に対する評価を決定する場合、例えば、取引先の調査結果が非常に優れている場合には「A」と評価し、取引先の調査結果が通常である場合には「B」と評価し、取引先の調査結果が悪い場合には「C」と評価する。
When the evaluator himself / herself decides an evaluation for a business partner based on the past transaction performance, for example, the business performance of the past business performance is evaluated as “excellent” for a business partner with a very good past business performance. A certain business partner is evaluated as “good”, and a business partner with a poor past transaction performance is evaluated as “good”.
On the other hand, when deciding the evaluation of a business partner based on a credit survey by a credit research company other than the evaluator, for example, if the survey result of the business partner is very good, it is evaluated as “A”. If the previous survey result is normal, it is evaluated as “B”, and if the survey result of the business partner is bad, it is evaluated as “C”.

続いて、過去の取引実績(優・良・可)と信用調査会社等による信用調査(A・B・C)との組み合わせに応じて、取引先に対する評価である信用レート(CR)を決定する。   Next, the credit rate (CR), which is the evaluation for the business partner, is determined according to the combination of past transaction results (excellent / good / good) and credit research (A / B / C) by credit research firms. .

図11は、過去の取引実績(i)と、信用調査会社等による信用調査(j)とに基づいて、平均回収期間tijと、支払確率pijと、回収平均コストcijとを求める表の一例である。これらの表は、記憶部15に記憶されている。 FIG. 11 is a table for obtaining an average collection period t ij , a payment probability p ij, and an average collection cost c ij based on past transaction results (i) and credit investigation (j) by a credit investigation company or the like. It is an example. These tables are stored in the storage unit 15.

例えば、取引先についての、回収期間、支払確率、回収平均コスト等を、過去の取引実績と、信用調査会社等による信用調査とに基づいて、図11に示すように、求めることができる。   For example, as shown in FIG. 11, the collection period, payment probability, average collection cost, and the like for a business partner can be obtained based on past transaction results and credit research by a credit research company or the like.

なお、図11に示す平均回収期間tijと、支払確率pijと、回収平均コストcijとに関する各要素をどのように設定するかは、与信を評価する評価者側のノウハウである。これらの各要素は、評価者側の過去の実績や社内の専門家の経験的判断等に基づいて随時設定され、記憶部15に記憶されている表を更新する。なお、データが整えば、回収期間、支払確率、回収平均コストを確率分布としてとらえることが可能である。 Note that how to set each element related to the average collection period t ij , the payment probability p ij, and the collection average cost c ij shown in FIG. 11 is know-how on the evaluator side for evaluating credit. Each of these elements is set as needed based on the past results of the evaluator side, empirical judgments of in-house experts, and the like, and the table stored in the storage unit 15 is updated. If the data is prepared, the collection period, payment probability, and collection average cost can be taken as a probability distribution.

ところで、一般に工務店が保有する総価値(例えば、手持工事や固定資産、工事能力や人的資産等の全体的な評価額)と工務店に対する与信との関係は様々な方法で決められるが、一例として、正味現在価値(NPV)を用いた(式1)を示す。   By the way, in general, the relationship between the total value held by construction companies (for example, the overall value of on-hand construction and fixed assets, construction capacity, human assets, etc.) and credits to construction companies can be determined in various ways. As an example, (Formula 1) using the net present value (NPV) is shown.

NPV=(p・X−C)/(1+r)t/365−(v・X+I)……(式1) NPV = (p · X−C) / (1 + r) t / 365 − (v · X + I) (Formula 1)

(式1)を用いて求めるNPVは、ある建設工事の現在価値であり、資材を買う場合の与信額Xや下記(1)〜(7)に示す各要素を加味して決められる。 The NPV obtained using (Equation 1) is the present value of a certain construction work, and is determined in consideration of the credit amount X when purchasing materials and the elements shown in the following (1) to (7).

NPVを推定する各要素(変数)は、下記(1)〜(7)である。
(1)発注額(資材購入額)=X
(2)支払確率=pij
(3)回収平均コスト=Cij
(4)割引率(物価上昇率の影響を考慮した値)=r
(5)売上原価率=v
(6)調査費用(過去の実績調査費用及び信用調査費用)=I
(7)回収期間=tij
なお、「(5)売上原価率=v」は、建設工事に使用される資材の種類によって異なるものであるが、以下では、説明を簡単にするために、資材の種類に係わりなく同一であるとして説明する。
Each element (variable) for estimating NPV is the following (1) to (7).
(1) Order amount (material purchase amount) = X
(2) Payment probability = p ij
(3) Average recovery cost = C ij
(4) Discount rate (value taking into account the impact of price increase rate) = r
(5) Cost of sales ratio = v
(6) Survey costs (past performance survey costs and credit survey costs) = I
(7) Collection period = t ij
“(5) Cost of sales ratio = v” differs depending on the type of material used for the construction work, but is the same regardless of the type of material in the following for the sake of simplicity. Will be described.

NPVの例として、過去の取引実績が「優」で信用調書のグレードが「A」と評価された工務店201と、過去の取引実績が「可」で信用調書のグレードが「C」と評価された工務店202とについて説明する。例えば、与信枠を利用して、所定の工事で使用する資材を500万円購入する場合について説明する。この場合、500万円の与信が必要となる。また、「(4)割引率」を2%とし、「(5)売上原価率」を70%とし、「(6)調査費用(過去の実績調査費用及び信用調査費用)」を1万円とし、図11に示す表を用いて、工務店201と、工務店202とについての、(1)〜(7)の各要素(変数)を求めると、以下で示す値となる。
(1)発注額(資材購入額)=500万円
(2)支払確率=工務店201:1、工務店202:0.34
(3)回収平均コスト=工務店201:5000円、工務店202:15万円
(4)割引率=2%
(5)売上原価率=70%
(6)調査費用(過去の実績調査費用及び信用調査費用)=1万円
(7)回収期間=工務店201:25日、工務店202:120日
As an example of NPV, the construction company 201 where the past transaction record was evaluated as “Excellent” and the credit record grade was evaluated as “A”, and the past transaction record was evaluated as “Yes” and the credit record grade was evaluated as “C”. The constructed construction store 202 will be described. For example, a case will be described in which 5 million yen is purchased for materials used in a predetermined construction using a credit frame. In this case, a credit of 5 million yen is required. In addition, “(4) Discount rate” is 2%, “(5) Cost of sales ratio” is 70%, and “(6) Survey costs (past performance survey costs and credit survey costs)” is 10,000 yen. When the elements (variables) (1) to (7) for the construction shop 201 and the construction shop 202 are obtained using the table shown in FIG. 11, the following values are obtained.
(1) Order amount (material purchase amount) = 5 million yen (2) Payment probability = Contractor 201: 1, Contractor 202: 0.34
(3) Average recovery cost = Contractor 201: 5000 yen, Contractor 202: 150,000 yen (4) Discount rate = 2%
(5) Cost of sales ratio = 70%
(6) Survey costs (past performance survey costs and credit survey costs) = 10,000 yen (7) Collection period = Contractor 201: 25 days, Contractor 202: 120 days

工務店201の当該工事のNPV=(1・500万円−5000円)/(1+0.02)25/365−(0.7・500万円+1万円)=約148万円 NPV of the construction of the construction company 201 = (15 million yen-5000 yen) / (1 + 0.02) 25/ 365- (0.75 million yen + 10,000 yen) = about 14.8 million yen

工務店202の当該工事のNPV=(0.34・500万円−15万円)/(1+0.02)120/365−(0.7・500万円+1万円)=約−196万円 NPV of the construction work of the construction company 202 = ( 0.345 million yen-150,000 yen) / (1 + 0.02) 120 / 365- (0.75 million yen + 10,000 yen) = about -1.96 million yen

以上で示すように、評価の高い工務店に係るNPVは、高い値となる。一方、評価の低い工務店に係るNPVは、マイナスの値となる場合がある。   As described above, the NPV related to a highly evaluated construction company has a high value. On the other hand, NPV related to a low-rated construction company may be a negative value.

工務店は、複数の工事を施工している場合が多いので、施工している工事のNPVを合計したNPV合計額と、工務店の総価値とを比較し、NPV合計額が工務店の総価値よりも大きければ、NPV合計額を与信額として使用することが考えられる。   The construction companies often have multiple constructions, so the total NPV of the construction works is compared with the total value of the construction shop. If it is larger than the value, the total amount of NPV may be used as the credit amount.

本実施の形態で示す「最大与信枠」と「利用可能与信枠」とは、以下で示す式を使用し、計算される。なお、これらは一例であり、工務店毎に設定される所定の信用係数を使用する等のように、他の計算式を使用するようにしてもよい。例えば、(式1)の代わりに、NPV=(p・X)−(v・X)を使用し、代金未回収の商品の販売価格の総和である第1の値(ΣX)を算出し、第1の値に支払確率を乗じた値である第2の値(Σp・X)を算出し、代金未回収の商品の販売価格に当該商品の売上原価率を乗じた値である第3の値(v・X)を代金未回収の商品毎に算出し、当該商品毎に算出した第3の値の総和である第4の値(Σv・X)を算出し、第1の値と第4の値との和から第2の値を減じた値(Σ(X−NPV))を、最大与信枠から減じた値である利用可能与信枠(最大与信枠−Σ(X−NPV))を算出するようにしてもよい。   The “maximum credit limit” and “available credit limit” shown in the present embodiment are calculated using the following expressions. These are merely examples, and other calculation formulas may be used, such as using a predetermined credit coefficient set for each construction contractor. For example, instead of (Equation 1), NPV = (p · X) − (v · X) is used to calculate a first value (ΣX) that is the sum of the selling prices of uncollected products, A second value (Σp · X), which is a value obtained by multiplying the first value by the payment probability, is calculated by multiplying the sales price of the product not yet collected by the sales cost rate of the product. A value (v · X) is calculated for each product that has not been collected, and a fourth value (Σv · X) that is the sum of the third values calculated for each product is calculated. Available credit limit (maximum credit limit-Σ (X-NPV)), which is a value obtained by subtracting the second value from the sum of the four values (Σ (X-NPV)) from the maximum credit limit May be calculated.

NPV=(p・X−C)/(1+r)t/365−(v・X+I)……(式1)
最大与信枠=(過去の3月間の取引額の月平均×0.6)……(式2)
利用可能与信枠=最大与信枠−Σ(X−NPV)……(式3)
なお、『Σ(X−NPV)』は、与信評価対象の工務店が施工する各工事についての「X−NPV」を合計した値を示すものである。なお、『Σ(X−NPV)』には、各建材についての各メーカに対する支払が完了している建築現場を含めない。つまり、本実施の形態においては、A邸を含めずに計算する。
NPV = (p · X−C) / (1 + r) t / 365 − (v · X + I) (Formula 1)
Maximum credit limit = (Monthly average transaction amount in the past March x 0.6) ... (Formula 2)
Available credit limit = Maximum credit limit-Σ (X-NPV) (Equation 3)
Note that “Σ (X-NPV)” indicates a value obtained by summing up “X-NPV” for each construction performed by the construction company subject to credit evaluation. Note that “Σ (X-NPV)” does not include construction sites where payment to each manufacturer for each building material has been completed. That is, in this embodiment, the calculation is performed without including the A residence.

D邸に係る建材の発注前において、工務店201の最大与信枠について算出すると、
最大与信枠=(2000万円×0.6)=1200万円であり、
利用可能与信枠=1200万円−{(600万円−約178万円(B邸))+(400万円−約118万円(C邸))}=1200万円−(約422万円+約282万円)=約496万円
したがって、D邸に係る建材の発注前において、工務店201は、「X−NPV」の値が約496万円に相当する建材を発注することが可能である。
Before ordering building materials related to House D, when calculating the maximum credit limit of the construction company 201,
Maximum credit limit = (20 million yen x 0.6) = 12 million yen,
Available credit limit = 12 million yen-{(6 million yen-about 1.78 million yen (B House)) + (4 million yen-about 1.18 million yen (C House))} = 12 million yen-(about 42.2 million yen Therefore, before ordering building materials related to House D, the construction shop 201 can place orders for building materials whose value of “X-NPV” is about 49.60 million yen. It is.

[建材発注]
CAD積算装置20が作成した積算データを与信管理装置10が受信すると、受信した積算データを建築現場103に係る現場コードに対応付けて記憶部15の住宅管理データベース15b(図示せず)に格納すると共に、当該積算データを工務店PC201aに送信する。続いて、工務店201において、与信管理装置10から受信した積算データを工務店PC201aの表示部に表示させ、表示部に表示された積算データの内容をオペレータが確認し、修正が必要な部分を修正する。続いて、修正した積算データに基づいて、建築現場103において必要となる建材を発注するための情報である建材発注情報(発注情報)を作成し、作成した建材発注情報を与信管理装置10に送信する(S50)。
[Building material ordering]
When the credit management device 10 receives the integration data created by the CAD integration device 20, the received integration data is stored in a housing management database 15 b (not shown) of the storage unit 15 in association with the site code related to the building site 103. At the same time, the integrated data is transmitted to the construction company PC 201a. Subsequently, in the construction company 201, the integrated data received from the credit management device 10 is displayed on the display unit of the engineering company PC 201a, the operator confirms the content of the integrated data displayed on the display unit, and the part that needs to be corrected is displayed. Correct it. Subsequently, based on the corrected integrated data, building material ordering information (ordering information) that is information for placing an order for building materials required at the construction site 103 is created, and the created building material ordering information is transmitted to the credit management device 10. (S50).

なお、修正した積算データを工務店PC201aから与信管理装置10に送信し、工務店PC201aから確認済の積算データを与信管理装置10が受信すると、受信した積算データを建築現場103に係る現場コードに対応付けて記憶部15の住宅管理データベース15bに格納すると共に、当該積算データに基づいて、建築現場103において必要となる建材発注情報を与信管理装置10が作成するようにしてもよい。   The corrected integrated data is transmitted from the construction shop PC 201 a to the credit management apparatus 10, and when the credit management apparatus 10 receives the confirmed integrated data from the construction shop PC 201 a, the received integrated data is converted into a site code related to the construction site 103. The credit management device 10 may create the building material ordering information required at the construction site 103 based on the integrated data, while storing them in the housing management database 15b of the storage unit 15 in association with each other.

建材発注情報は、配送場所(現場コード)と、建材の種類(建材コード)と、建材の数量と、配送日時とを含む情報である。   The building material ordering information is information including a delivery location (site code), a type of building material (building material code), a quantity of building material, and a delivery date and time.

図12は、工務店別発注情報データベース15cと、メーカ別発注情報データベース15dとを示す図であり、図13は、与信データベース15eを示す図である。   FIG. 12 is a diagram showing an order information database 15c by construction company and an order information database 15d by manufacturer, and FIG. 13 is a diagram showing a credit database 15e.

与信管理装置10が建材発注情報を受信すると(S51)、受信した建材発注情報を、図12(1)に示す工務店別発注情報データベース15cと、図12(2)に示すメーカ別発注情報データベース15dとに格納する(S52)。続いて、発注情報に係る合計額に基づいて、「X−NPV」を算出する。この場合に、建材発注情報を送信した工務店に係る過去の取引実績(i)と、信用調査会社等による信用調査(j)とに基づいて、平均回収期間tijと、支払確率pijと、回収平均コストcijとを、図11に示す表から求める。工務店201は、過去の取引実績が「優」で信用調書のグレードが「A」と評価されているので、平均回収期間tijは「25」で、支払確率pijは「1」で、回収平均コストcijは「5000」である。なお、「(5)売上原価率」は、建材の種類によって異なるが、説明を簡単にするために、「70%」で統一して説明する。 When the credit management device 10 receives the building material ordering information (S51), the received building material ordering information is converted into the construction shop ordering information database 15c shown in FIG. 12 (1) and the manufacturer ordering information database shown in FIG. 12 (2). 15d (S52). Subsequently, “X-NPV” is calculated based on the total amount related to the order information. In this case, based on the past transaction record (i) related to the construction company that sent the building material ordering information and the credit check (j) by a credit check company or the like, the average collection period t ij , the payment probability p ij , The recovery average cost c ij is obtained from the table shown in FIG. The construction company 201 has evaluated that the past transaction performance is “excellent” and the credit record grade is “A”, so the average collection period t ij is “25”, the payment probability p ij is “1”, The average recovery cost c ij is “5000”. Note that “(5) Cost of sales ratio” varies depending on the type of building material, but in order to simplify the explanation, “70%” is used as a unified explanation.

なお、一の建築現場における建材発注情報に係る建材毎に(式4)の値を算出し、算出した(式4)の値の合計値に基づいて、建材発注情報に係る「X−NPV」の値を求めるようにしてもよい。
NPV’=(p・X’−C’)/(1+r)t/365−(v’・X’+I’)……(式4)
NPV=ΣNPV’
ただし、ΣNPV’は、一の建築現場における各建材のNPV’の総和を示し、(式4)の「X’」は各建材の発注額(資材購入額)、「v’」は各建材の売上原価率、「C’」は各建材に応じた回収平均コスト、「I’」は各建材に応じた調査費用とする。
In addition, the value of (Formula 4) is calculated for each building material related to the building material ordering information in one building site, and “X-NPV” related to the building material ordering information is based on the total value of the calculated (Formula 4) value. May be obtained.
NPV ′ = (p · X′−C ′) / (1 + r) t / 365 − (v ′ · X ′ + I ′) (Formula 4)
NPV = ΣNPV '
However, ΣNPV ′ indicates the sum of NPV ′ of each building material at one construction site, “X ′” in (Formula 4) is the order value (material purchase amount) of each building material, and “v ′” is the amount of each building material. The cost of sales ratio, “C ′” is the average recovery cost for each building material, and “I ′” is the survey cost for each building material.

「X−NPV」を算出する際に使用される、各工務店に係る過去の取引実績(i)と、信用調査会社等による信用調査(j)とは、予め記憶部15に記憶させておくようにしてもよく、建材発注情報を受信した際に最新の情報を入力部14から随時入力するようにしてもよい。また、各工務店に係る過去の取引実績(i)は、図12(2)に示すメーカ別発注情報DB15dに格納されている情報に基づいて作成し使用するようにしてもよい。例えば、「評価」の欄に「×」「△」のない工務店には「優」とし、「△」が所定の数(例えば、2)以内で「×」のない工務店には「良」とし、「×」が存在する工務店には「可」とする評価を作成する。また、記憶部15は、建材の代金回収・未回収を含む各工務店の過去の取引実績と共に、売上原価率と販売価格とを含む建材情報(商品情報)とを記憶する。なお、記憶部15には、予め、各工務店の過去の取引実績に基づいて決定される各工務店の支払確率を記憶し、各工務店の過去の取引実績に基づいて決定される各工務店の取引実績評価を示す取引実績評価情報(平均回収期間、支払確率、回収平均コスト等)を記憶しておくようにしてもよい。   The past transaction record (i) related to each construction company and the credit check (j) by a credit check company and the like used when calculating “X-NPV” are stored in the storage unit 15 in advance. Alternatively, the latest information may be input from the input unit 14 at any time when building material ordering information is received. The past transaction record (i) relating to each construction company may be created and used based on information stored in the manufacturer-specific ordering information DB 15d shown in FIG. For example, “excellent” is assigned to a construction shop without “×” or “△” in the “evaluation” column, and “good” is designated for a construction shop without “×” within a predetermined number (for example, 2). And an evaluation “Yes” is created for a construction shop where “×” exists. In addition, the storage unit 15 stores building material information (commodity information) including a cost of sales ratio and a selling price, together with past transaction results of construction companies including collection / non-collection of the price of building materials. The storage unit 15 stores in advance the payment probabilities of the respective contractors determined based on the past transaction results of the respective contractors, and the respective contractors determined based on the past transaction results of the respective contractors. You may make it memorize | store transaction performance evaluation information (average collection period, payment probability, collection average cost etc.) which shows the transaction performance evaluation of a shop.

D邸(建築現場103)の建材に係る発注額の合計は500万円であるので、「X−NPV」=500万円−約148万円=約352万円である。続いて、算出した「X−NPV」の値が与信データベース15eに格納されている工務店201の利用可能与信枠の範囲内にあるか否かを判断し(S53)、算出した「X−NPV」の値が利用可能与信枠の範囲を超えている場合には、発注情報を送信した工務店PC201aに発注不可通知を送信する(S100)。   Since the total order amount related to the building materials of D House (building site 103) is 5 million yen, “X-NPV” = 5 million yen−about 1.48 million yen = about 35.2 million yen. Next, it is determined whether or not the calculated value of “X-NPV” is within the range of the available credit limit of the construction shop 201 stored in the credit database 15e (S53), and the calculated “X-NPV” When the value of “” exceeds the range of the available credit limit, an order impossible notification is transmitted to the construction shop PC 201a that transmitted the order information (S100).

一方、算出した「X−NPV」の値が利用可能与信枠の範囲内にあれば、D邸の建材に係る発注額が工務店201の与信枠の範囲内にあると判定する(S53)。続いて、図13(1)に示す与信データベース15eの利用可能与信枠の値について、算出した「X−NPV」の値を引いた値に変更する(S54)。つまり、工務店201の利用可能与信枠の値を、「144=496(万円)−352(万円)」に変更する(S54)。なお、発注額が工務店201の与信枠の範囲内にあると判定した場合に、その旨を表示・音声出力し、または、発注情報を送信した工務店PC201aに送信等して、与信枠の範囲内にあると判定した旨を出力(通知)するようにしてもよい(S53)。また、受信した発注情報に係る建材の販売価格(X)に、支払確率を乗じた値である第5の値(p・X)を算出すると共に、受信した発注情報に係る建材の販売価格に、当該建材の売上原価率を乗じた値である第6の値(v・X)を算出し、第5の値から第6の値を減じた値である第7の値((p・X)−(v・X))を算出し、受信した発注情報に係る建材の販売価格から第7の値を減じた値を「X−NPV」の値とするようにしてもよい。   On the other hand, if the calculated value of “X-NPV” is within the range of the available credit limit, it is determined that the order amount relating to the building material of D House is within the credit limit of the construction company 201 (S53). Subsequently, the value of the available credit frame in the credit database 15e shown in FIG. 13 (1) is changed to a value obtained by subtracting the calculated value of “X-NPV” (S54). That is, the value of the available credit limit of the construction company 201 is changed to “144 = 496 (10,000 yen) −352 (10,000 yen)” (S54). If it is determined that the order amount is within the credit limit of the contractor 201, a message to that effect is displayed / sound output, or transmitted to the contractor PC 201a that transmitted the order information, etc. You may make it output (notify) that it determined with it being in the range (S53). Further, a fifth value (p · X), which is a value obtained by multiplying the sales price (X) of the building material related to the received ordering information by the payment probability, is calculated, and the sales price of the building material related to the received ordering information is calculated. The sixth value (v · X), which is a value obtained by multiplying the sales cost ratio of the building material, is calculated, and the seventh value ((p · X) is obtained by subtracting the sixth value from the fifth value. ) − (V · X)) may be calculated, and a value obtained by subtracting the seventh value from the sales price of the building material related to the received ordering information may be set as the value of “X-NPV”.

続いて、工務店PC201aから受信した発注情報を、発注情報に係る建材毎に当該建材に係る製造会社PCに送信する(S55)。例えば、建材がドアである場合には、製造会社PC210aに送信する。なお、工務店201の利用可能与信枠が約496万円であり、D邸(建築現場103)の建材に係る発注額に対する「X−NPV」の値は約352万円であるので、建築現場103の発注額は利用可能与信枠の範囲内であると判断する。   Subsequently, the ordering information received from the construction shop PC 201a is transmitted to the manufacturing company PC related to the building material for each building material related to the ordering information (S55). For example, when the building material is a door, it is transmitted to the manufacturing company PC 210a. In addition, since the usable credit limit of the construction shop 201 is about 49.60 million yen and the value of “X-NPV” with respect to the order amount related to the building material of the D house (building site 103) is about 35.2 million yen, It is determined that the order amount 103 is within the range of available credit lines.

与信管理装置10から発注情報を製造会社PC210aが受信すると、発注情報に含まれる建材コードに基づいて、当該建材コードに係る建材の建材出荷指示情報を製造会社PC210aが物流センタPDA40に送信する。なお、与信管理装置10が、物流センタPDA40に建材出荷指示情報を直接送信するようにしてもよい。   When the manufacturing company PC 210a receives the order information from the credit management device 10, the manufacturing company PC 210a transmits the building material shipment instruction information of the building material related to the building material code to the distribution center PDA 40 based on the building material code included in the order information. Note that the credit management device 10 may directly transmit the building material shipment instruction information to the distribution center PDA 40.

続いて、製造会社PC210aに送信した発注情報を、メーカ毎・製品毎に輸送情報データベース15gと、輸送コスト情報データベース15hに格納する(S56)。続いて、発注情報に含まれる現場コードと、建材コードと、建材の数量と、配送日時とに基づいて、輸送業者(輸送業者コード)と、出荷場所(物流センタコード)と、出荷日時とを決定する。続いて、発注情報に輸送情報(邸別製品内容、数量、納品日時指示、納品荷姿、重量、特記等)を付加し(S57)、発注情報に輸送情報を付加した情報である輸送・配送情報を、決定した輸送業者(輸送業者コード)と、発注情報に含まれる現場コードとに基づいて、輸送業者PDA40Dと、建築現場PDA50とに送信する(S58、S75、S86)と共に、物流センタPDA40に送信する(S60)。   Subsequently, the ordering information transmitted to the manufacturing company PC 210a is stored in the transport information database 15g and the transport cost information database 15h for each manufacturer / product (S56). Next, based on the site code, building material code, building material quantity, delivery date and time included in the ordering information, the carrier (transporter code), shipping location (distribution center code), and shipping date and time are determined. decide. Subsequently, transportation information (product contents by house, quantity, delivery date / time instruction, delivery package, weight, special notes, etc.) is added to the ordering information (S57), and transportation / delivery is information obtained by adding transportation information to the ordering information. Information is transmitted to the carrier PDA 40D and the construction site PDA 50 based on the determined carrier (carrier code) and the site code included in the ordering information (S58, S75, S86), and the distribution center PDA40. (S60).

[建材出荷]
発注情報と輸送・配送情報とを物流センタPDA40が受信すると(S60)、受信した各情報をRAMに格納し、輸送・配送情報に含まれる建材出荷指示情報を表示部に表示する(S61)。この場合には、例えば、出荷日時と、建材と、建材の数量と、建材の荷姿と、荷積みする輸送業者名とを表示する。
[Building materials shipment]
When the distribution center PDA 40 receives the ordering information and the transportation / delivery information (S60), the received information is stored in the RAM, and the building material shipment instruction information included in the transportation / delivery information is displayed on the display unit (S61). In this case, for example, the shipping date and time, the building material, the quantity of the building material, the packing form of the building material, and the name of the carrier to be loaded are displayed.

続いて、出荷の準備をしている建材が出荷を指示された建材であるか否かを確認するために、物流センタPDA40と電子タグ60との間で情報の送受信が可能な範囲内になるように、物流センタPDA40を建材70に装着(貼付)されている電子タグ60に作業員P2が近づけ、出荷を指示された建材であるか否かを確認するための操作を作業員P2が入力部で実行する。この確認操作が実行されると、電子タグリードライタI/F部を介して、EEPROM62に格納されている建材情報を読み出す旨の情報を電子タグリードライタが電子タグ60に送信し、この情報を電子タグ60が受信すると、EEPROM62に格納されている建材情報を、物流センタPDA40に送信する(S62)。   Subsequently, in order to confirm whether or not the building material prepared for shipment is the building material instructed to be shipped, the information can be transmitted and received between the distribution center PDA 40 and the electronic tag 60. Thus, the worker P2 approaches the electronic tag 60 attached (attached) to the building material 70 with the distribution center PDA 40, and the worker P2 inputs an operation for confirming whether the building material is instructed to be shipped. Run in the department. When this confirmation operation is executed, the electronic tag reader / writer sends information to the effect that the building material information stored in the EEPROM 62 is read out to the electronic tag 60 via the electronic tag reader / writer I / F unit. When the electronic tag 60 receives the information, the building material information stored in the EEPROM 62 is transmitted to the distribution center PDA 40 (S62).

続いて、電子タグ60から建材情報を物流センタPDA40が受信すると、受信した建材情報に含まれる建材コードと、建材出荷指示情報に含まれる建材コードとを比較する。比較した結果、比較した双方の建材コードが同一であれば、受信した建材情報に係る建材と、建材出荷指示情報に係る建材とが同一であると判断できるので、この電子タグ60が装着されている建材70を出荷する指示と、出荷日時と出荷担当者を入力する旨とを表示部に表示する。   Subsequently, when the distribution center PDA 40 receives the building material information from the electronic tag 60, the building material code included in the received building material information is compared with the building material code included in the building material shipping instruction information. As a result of the comparison, if both of the compared building material codes are the same, it can be determined that the building material related to the received building material information and the building material related to the building material shipping instruction information are the same. The display unit displays an instruction to ship the existing building material 70, a date and time of shipment, and an input of a person in charge of shipment.

この表示を見た作業員P2が、指示された建材70の出荷準備を進め、物流センタPDA40の入力部から出荷日時と出荷担当者とを入力する(S63)。入力部に出荷日時と出荷担当者とが入力されると、入力された出荷日時・出荷担当者を、読み込んだ建材情報に含まれる建材IDに関連付けてRAMに格納する。   The worker P2 who sees this display proceeds with preparations for shipping the designated building material 70, and inputs a shipping date and a person in charge of shipping from the input unit of the distribution center PDA 40 (S63). When the shipping date / time and the person in charge of shipping are input to the input unit, the input shipping date / time / shipping person in charge is stored in the RAM in association with the building material ID included in the read building material information.

続いて、入力部に出荷日時・出荷担当者が入力されると(S63)、入力された出荷日時・出荷担当者と読み込んだ建材情報に含まれる建材IDとを含む建材出荷実績情報を、データ通信カードI/F部を介して、データ通信カードが与信管理装置10に送信する(S64)。建材出荷実績情報を受信すると、建材出荷実績情報に含まれる現場コードと建材コードとに基づいて、建材IDに関連付けて当該建材出荷実績情報を与信管理装置10の各データベース(建材データベース15a、工務店別発注情報データベース15c、メーカ別発注情報データベース15d、輸送情報データベース15g、輸送コスト情報データベース15h)に格納する。   Subsequently, when the shipping date / time and the person in charge of shipping are input to the input unit (S63), the building material shipment result information including the input shipping date / time and the person in charge of shipping and the building material ID included in the read building material information is stored as data. The data communication card transmits to the credit management device 10 via the communication card I / F unit (S64). When the building material shipment result information is received, the building material shipment result information is associated with the building material ID on the basis of the site code and the building material code included in the building material shipment result information, and each database of the credit management device 10 (the building material database 15a, the construction shop) The order information database 15c, the order information database 15d by manufacturer, the transport information database 15g, and the transport cost information database 15h) are stored.

また、物流センタPDA40から建材出荷実績情報を与信管理装置10が受信すると(S59)、受信した建材出荷実績情報に対応する建材発注情報に含まれる現場コード及び輸送業者コードに基づいて、受信した建材出荷実績情報に係る建材IDを含む建材集荷指示情報または建材荷受指示情報を、輸送業者PDA40D及び建築現場PDA50に送信するようにしてもよい。このように、受信した建材出荷実績情報に係る建材IDを含む各指示情報を各PDAに送信することによって、物流センタ102から出荷した建材と、各PDAで確認する建材とが同一であるか否かを正確に判断できる。   Further, when the credit management device 10 receives the building material shipment result information from the distribution center PDA 40 (S59), the received building material is received based on the site code and the carrier code included in the building material ordering information corresponding to the received building material shipment result information. You may make it transmit the building material collection instruction | indication information containing the building material ID which concerns on shipment results information, or building material receipt instruction information to the carrier PDA40D and the construction site PDA50. In this way, by transmitting each instruction information including the building material ID related to the received building material shipment result information to each PDA, the building material shipped from the distribution center 102 and the building material to be confirmed by each PDA are the same. Can be accurately determined.

[内部処理]
物流センタPDA40から建材出荷実績情報を与信管理装置10が受信すると(S59)、建材出荷実績情報に基づく出荷情報(出荷日時等)を各データベースに格納する。具体的には、図12(1)(2)に示す各データベースの「出荷」の欄に日付を記録する。また、各データベースへの格納と共に、メーカ別発注情報データベース15dに基づいて、建材IDを含むメーカ別売掛計上情報を作成し(S65)、作成したメーカ別売掛計上情報を金融機関に通知する(S66)。本実施の形態において、メーカ別売掛計上情報は、発注に係る建材を出荷した際に作成される売掛情報である。
[Internal processing]
When the credit management device 10 receives the building material shipment result information from the distribution center PDA 40 (S59), the shipping information (shipping date and time) based on the building material shipment result information is stored in each database. Specifically, the date is recorded in the “shipment” column of each database shown in FIGS. Further, along with storing in each database, based on the manufacturer-specific ordering information database 15d, the manufacturer-specific account receivable information including the building material ID is created (S65), and the created manufacturer-specific account receivable information is notified to the financial institution (S66). ). In the present embodiment, the maker-specific account receivable information is account receivable information created when the building material related to the order is shipped.

[建材輸送]
輸送・配送情報を輸送業者PDA40Dが受信すると(S75)、受信した輸送・配送情報をRAMに格納し、輸送・配送情報に含まれる建材集荷指示情報を表示部に表示する(S76)。この場合には、例えば、集荷日時と、建材と、建材の数量と、建材の荷姿と、集荷場所とを表示する。
[Construction material transportation]
When the carrier PDA 40D receives the transportation / delivery information (S75), the received transportation / delivery information is stored in the RAM, and the building material collection instruction information included in the transportation / delivery information is displayed on the display unit (S76). In this case, for example, the collection date and time, the building material, the quantity of the building material, the packaging form of the building material, and the collection location are displayed.

続いて、荷積する建材が集荷を指示された建材であるか否かを確認するために、輸送業者PDA40Dと電子タグ60との間で情報の送受信が可能な範囲内になるように、輸送業者PDA40Dを建材70に装着されている電子タグ60にドライバD3が近づけ、集荷を指示された建材であるか否かを確認するための操作をドライバD3が入力部で実行する。この確認操作が実行されると、電子タグ60に格納されている建材情報を輸送業者PDA40Dが読み出すことができる(S77)。   Subsequently, in order to confirm whether or not the building material to be loaded is the building material instructed to be collected, transportation is performed so that information can be transmitted and received between the carrier PDA 40D and the electronic tag 60. The driver D3 brings the trader PDA 40D closer to the electronic tag 60 attached to the building material 70, and the driver D3 executes an operation for confirming whether or not the building material is instructed to collect the cargo at the input unit. When this confirmation operation is executed, the carrier PDA 40D can read the building material information stored in the electronic tag 60 (S77).

続いて、電子タグ60から建材情報を輸送業者PDA40Dが読み出すと、この建材情報に含まれる建材ID(建材コード)と、建材集荷指示情報に含まれる建材ID(建材コード)とを比較する。比較した結果、比較した双方の建材ID(建材コード)が同一であれば、受信した建材情報に係る建材と、建材集荷指示情報に係る建材とが同一であると判断できるので、この電子タグ60が装着されている建材70を荷積みする指示と、荷積日時と担当ドライバとを入力する旨とを表示部に表示する。   Subsequently, when the carrier PDA 40D reads the building material information from the electronic tag 60, the building material ID (building material code) included in the building material information is compared with the building material ID (building material code) included in the building material collection instruction information. As a result of the comparison, if both of the compared building material IDs (building material codes) are the same, it can be determined that the building material related to the received building material information is the same as the building material related to the building material collection instruction information. The display unit displays an instruction to load the building material 70 to which is attached, and the input of the loading date and time and the driver in charge.

この表示を見たドライバD3が、指示された建材70を輸送車C2に荷積みし、輸送業者PDA40Dの入力部から荷積日時と担当ドライバとを入力する(S78)。入力部に荷積日時と担当ドライバとが入力されると、入力された荷積日時と担当ドライバとを読み込んだ建材情報に含まれる建材IDに関連付けてRAMに格納する。続いて、入力された荷積日時・担当ドライバと、建材IDとを含む建材荷積実績情報を、輸送業者PDA40Dが与信管理装置10に送信し(S79)、建材荷積実績情報を建材IDに関連付けて与信管理装置10の各データベースに格納する。   The driver D3 who sees this display loads the designated building material 70 on the transport vehicle C2, and inputs the loading date and time and the responsible driver from the input section of the transporter PDA 40D (S78). When the loading date / time and the responsible driver are input to the input unit, the input loading date / time and the responsible driver are stored in the RAM in association with the building material ID included in the read building material information. Subsequently, the transporter PDA 40D transmits the building material loading result information including the input loading date / time / driver in charge and the building material ID to the credit management device 10 (S79), and the building material loading result information is used as the building material ID. The data are stored in each database of the credit management device 10 in association with each other.

[建材荷下]
建材荷積実績情報を与信管理装置10に送信した後に、RAMに格納されている輸送・配送情報に含まれる建材荷下指示情報を輸送業者PDA40Dが表示部に表示する(S80)。この場合には、例えば、納品日時と、建材と、建材の数量と、建材の荷姿と、納品場所とを表示する。
[Unloading building materials]
After transmitting the building material loading record information to the credit management device 10, the transporter PDA 40D displays the building material unloading instruction information included in the transportation / delivery information stored in the RAM on the display unit (S80). In this case, for example, the delivery date and time, the building material, the quantity of the building material, the packing form of the building material, and the delivery location are displayed.

表示部に表示されている納品場所で建材を荷下ろしする場合に、荷下する建材が配送を指示された建材であるか否かを確認するために、輸送業者PDA40Dと電子タグ60との間で情報の送受信が可能な範囲内になるように、輸送業者PDA40Dを建材70に装着されている電子タグ60にドライバD3が近づけ、配送を指示された建材であるか否かを確認するための操作をドライバD3が入力部で実行する。この確認操作が実行されると、電子タグ60に格納されている建材情報を輸送業者PDA40Dが読み出すことができる(S81)。   When unloading the building material at the delivery location displayed on the display unit, between the carrier PDA 40D and the electronic tag 60 in order to confirm whether the building material to be unloaded is the building material instructed to be delivered. The driver D3 brings the carrier PDA 40D closer to the electronic tag 60 attached to the building material 70 so that the information can be transmitted and received in order to confirm whether the building material is instructed to be delivered. The driver D3 executes the operation at the input unit. When this confirmation operation is executed, the carrier PDA 40D can read the building material information stored in the electronic tag 60 (S81).

続いて、電子タグ60から建材情報を輸送業者PDA40Dが読み出すと、この建材情報に含まれる建材ID(建材コード)と、建材荷下指示情報に含まれる建材ID(建材コード)とを比較する。比較した結果、比較した双方の建材ID(建材コード)が同一であれば、受信した建材情報に係る建材と、建材荷下指示情報に係る建材とが同一であると判断できるので、この電子タグ60が装着されている建材70を荷下する指示と、荷下日時と荷下位置を入力する旨とを表示部に表示する。   Subsequently, when the carrier PDA 40D reads the building material information from the electronic tag 60, the building material ID (building material code) included in the building material information is compared with the building material ID (building material code) included in the building material unloading instruction information. As a result of the comparison, if both of the compared building material IDs (building material codes) are the same, it can be determined that the building material related to the received building material information and the building material related to the building material unloading instruction information are the same. The display unit displays an instruction to unload the building material 70 to which 60 is mounted, and an input date and time of unloading and an unloading position.

この表示を見たドライバD3が、指示された建材70を輸送車C2から荷下し、輸送業者PDA40Dの入力部から荷下日時と担当ドライバとを入力する(S82)。入力部に荷下日時と担当ドライバとが入力されると、入力された荷下日時・担当ドライバと、読み込んだ建材情報に含まれる建材IDとを関連付けてRAMに格納する。続いて、入力された荷下日時・担当ドライバと、建材IDとを含む建材荷下実績情報を、輸送業者PDA40Dが与信管理装置10に送信し(S83)、建材出荷実績情報を建材IDに関連付けて与信管理装置10の各データベースに格納する。   The driver D3 who sees this display unloads the designated building material 70 from the transport vehicle C2, and inputs the unloading date and time and the driver in charge from the input section of the transporter PDA 40D (S82). When the unloading date and time and the driver in charge are input to the input unit, the input unloading date and time and the driver in charge are associated with the building material ID included in the read building material information and stored in the RAM. Subsequently, the transporter PDA 40D transmits the construction material unloading record information including the input unloading date / time and the driver in charge and the building material ID to the credit management device 10 (S83), and associates the building material shipment record information with the building material ID. And stored in each database of the credit management device 10.

なお、各物流センタから出荷された建材を建築現場に直接配送する代わりに、各物流センタから出荷された建材を所定の地域毎(例えば、区、市町村の単位)に設けられた地域物流センタに一旦配送し、この地域物流センタに配送された各建材を建築現場毎にまとめ、まとめた建材を各建築現場に配送するようにしてもよい。この場合、ステップS75〜S83と同様の動作を実行する。   Instead of directly delivering building materials shipped from each distribution center to the construction site, the building materials shipped from each distribution center are sent to regional distribution centers provided for each predetermined area (for example, units of wards and municipalities). The building materials that have been once delivered and delivered to the regional distribution center may be collected for each construction site, and the collected building materials may be delivered to each building site. In this case, the same operations as in steps S75 to S83 are executed.

[建材荷受]
輸送・配送情報を建築現場PDA50が受信すると(S86)、受信した輸送・配送情報をRAMに格納し、輸送・配送情報に含まれる建材荷受指示情報を表示部に表示する(S87)。この場合には、例えば、納品日時と、建材と、建材の数量と、建材の荷姿と、配送する輸送業者名とを表示する。
[Construction material receipt]
When the construction site PDA 50 receives the transportation / delivery information (S86), the received transportation / delivery information is stored in the RAM, and the building material receiving instruction information included in the transportation / delivery information is displayed on the display unit (S87). In this case, for example, the delivery date and time, the building material, the quantity of the building material, the packing form of the building material, and the name of the carrier to deliver are displayed.

表示部に表示されている輸送業者が建材を荷下ろしする場合に、荷受する建材が荷受を指示された建材であるか否かを確認するために、建築現場PDA50と電子タグ60との間で情報の送受信が可能な範囲内になるように、建築現場PDA50を建材70に装着(貼付)されている電子タグ60に作業員P3が近づけ、荷受を指示された建材であるか否かを確認するための操作を作業員P3が入力部で実行する。この確認操作が実行されると、電子タグリードライタI/F部を介して、EEPROM62に格納されている建材情報を読み出す旨の情報を電子タグリードライタが電子タグ60に送信し、この情報を電子タグ60が受信すると、EEPROM62に格納されている建材情報を、建築現場PDA50に送信する(S88)。   When the transporter displayed on the display unit unloads the building material, in order to confirm whether or not the building material to be received is the building material instructed to receive the cargo, between the construction site PDA 50 and the electronic tag 60. The worker P3 is brought close to the electronic tag 60 attached (attached) to the building material 70 so that the information can be transmitted and received, and it is confirmed whether the building material is instructed to receive the cargo. The operator P3 executes an operation for performing the operation at the input unit. When this confirmation operation is executed, the electronic tag reader / writer sends information to the effect that the building material information stored in the EEPROM 62 is read out to the electronic tag 60 via the electronic tag reader / writer I / F unit. When the electronic tag 60 receives the information, the building material information stored in the EEPROM 62 is transmitted to the construction site PDA 50 (S88).

続いて、電子タグ60から建材情報を建築現場PDA50が受信すると、受信した建材情報に含まれる建材ID(建材コード)と、建材荷受指示情報に含まれる建材ID(建材コード)とを比較する。比較した結果、比較した双方の建材ID(建材コード)が同一であれば、受信した建材情報に係る建材と、建材荷受指示情報に係る建材とが同一であると判断できるので、この電子タグ60が装着されている建材70を荷受する指示と、荷受日時と荷受担当者を入力する旨とを表示部に表示する。   Subsequently, when the building site PDA 50 receives the building material information from the electronic tag 60, the building material ID (building material code) included in the received building material information is compared with the building material ID (building material code) included in the building material receiving instruction information. As a result of the comparison, if both of the compared building material IDs (building material codes) are the same, it can be determined that the building material related to the received building material information is the same as the building material related to the building material receiving instruction information. The display unit displays an instruction to receive the building material 70 to which the is attached, a date and time of receiving the cargo and a person in charge of receiving the cargo.

この表示を見た作業員P3が、指示された建材70を荷受し、荷受日時と荷受担当者とを入力する(S89)。入力部に荷受日時と荷受担当者とが入力されると、入力された荷受日時と荷受担当者とを読み込んだ建材情報に含まれる建材IDに関連付けてRAMに格納する。続いて、入力された荷受日時・荷受担当者と、読み込んだ建材情報に含まれる建材IDとを含む建材荷受実績情報を、データ通信カードI/F部を介して、データ通信カードが与信管理装置10に送信する(S90)。   The worker P3 who sees this display receives the instructed building material 70, and inputs the receiving date and time and the person in charge of receiving the cargo (S89). When the receiving date and time and the person in charge of receiving the goods are input to the input unit, the input date and time of receiving the goods and the person in charge of receiving the goods are stored in the RAM in association with the building material ID included in the read building material information. Subsequently, the data communication card uses the data communication card I / F unit to send the building material receipt result information including the input receipt date / time, the person in charge of the receipt, and the building material ID included in the read building material information, to the credit management device. 10 (S90).

建築現場PDA50から、建材荷受実績情報(受領情報)を与信管理装置10が受信すると(S70)、受信した建材荷受実績情報に含まれる建材IDに関連付けて当該建材荷受実績情報を与信管理装置10の各データベースに格納する。具体的には、図12(1)(2)に示す各データベースの「受領」の欄に日付を記録する。   When the credit management device 10 receives the building material receipt result information (reception information) from the building site PDA 50 (S70), the building material receipt result information is associated with the building material ID included in the received building material receipt result information. Store in each database. Specifically, the date is recorded in the “reception” column of each database shown in FIGS.

続いて、与信管理装置10は、メーカ別発注情報データベース15dに格納されている各建材について「受領」の欄に日付が記録されると、「受領」の欄に日付が記録された各建材に係る請求書を工務店毎にメーカ別に作成し(S71)、作成した請求書を各工務店PCに送信する(S91)と共に、各工務店PCに送信した請求書と同じものを控えとして製造会社PCに送信する。なお、請求書の作成は、現場毎に全ての受領が終了してから行うようにしてもよく、受領情報を受信した際にその都度行うようにしてもよい。また、請求書には、建材IDを含めておくようにする。続いて、建材IDを含むメーカ別売上計上情報を作成し(S72)、建材IDを含むメーカ別売掛消し込み情報を作成し(S73)、作成したメーカ別売掛消し込み情報を金融機関に通知する(S74)。建材IDを含むメーカ別売掛消し込み情報を金融機関に通知することによって、建材IDに基づいて、売掛情報に対応する売上計上をすることができるので、正確に売上計上を行うことができる。   Subsequently, when the date is recorded in the “Received” column for each building material stored in the manufacturer-specific ordering information database 15d, the credit management apparatus 10 records each building material in which the date is recorded in the “Received” column. Such invoices are created for each manufacturer for each manufacturer (S71), and the created invoice is sent to each construction company PC (S91). Send to PC. Note that the invoice may be created after all receipts have been completed at each site, or may be performed each time receipt information is received. In addition, the bill includes the building material ID. Subsequently, the sales record information classified by manufacturer including the building material ID is created (S72), the sales reversal information classified by manufacturer including the building material ID is created (S73), and the created sales reversal information classified by manufacturer is notified to the financial institution. (S74). By notifying the financial institution of the receivable cancellation information by manufacturer including the building material ID, it is possible to record the sales corresponding to the sales receivable information based on the building material ID, and therefore it is possible to accurately calculate the sales.

図14は、製造会社の工務店に対する売掛・売上の変位を示す図である。
図14(1)は、複数の建材についての、売掛計上時と売上計上時との時間変位を示す図であり、図14(2)は、図14(1)に示す時間変位図に対応する売掛金の合計額の時間変位を示すグラフである。本実施の形態の場合には、電子タグ60から読み出した情報に基づいて、売掛計上時と売上計上時との処理を行うので、物流と金銭処理とのタイムラグがほとんどない。つまり、迅速で正確な売上・売掛処理を実行することができる。
FIG. 14 is a diagram showing changes in accounts receivable / sales for a manufacturing company's construction shop.
FIG. 14 (1) is a diagram showing the time displacement between the time of sales receivable and the time of sales recording for a plurality of building materials, and FIG. 14 (2) corresponds to the time displacement diagram shown in FIG. 14 (1). It is a graph which shows the time displacement of the total amount of the accounts receivable to do. In the case of the present embodiment, processing at the time of sales receivable and sales recording is performed based on information read from the electronic tag 60, so there is almost no time lag between logistics and money processing. That is, it is possible to execute quick and accurate sales / receivable processing.

与信管理装置10から請求書を工務店PCが受信すると(S91)、受信した請求書に基づいて、売上計上処理を実行し(S92)、建材IDを含む支払情報を作成し、作成した支払情報(振込明細書等)を出力する(S93)。   When the contractor PC receives the bill from the credit management device 10 (S91), the sales recording process is executed based on the received bill (S92), and payment information including the building material ID is created, and the created payment information is created. (Transfer details etc.) is output (S93).

工務店201は、工務店PCから出力された振込明細書に基づいて、各メーカに対する振込を建材IDに対応させ所定期間内に行う。この振込動作を工務店PCと、金融機関との間で自動的に行うようにしてもよい。振込が完了した場合には、振込が完了したメーカに対する振込完了情報を工務店PCが作成し、作成した振込完了情報を与信管理装置10に送信する。また、振込完了を製造会社で確認した場合には、振込確認情報を与信管理装置10に送信する。なお、振込完了情報と、振込確認情報とには、対応する建材IDを含めておく。   Based on the transfer statement output from the contractor PC, the construction company 201 performs the transfer to each manufacturer within a predetermined period in association with the building material ID. This transfer operation may be automatically performed between the construction shop PC and the financial institution. When the transfer is completed, the construction company PC creates transfer completion information for the manufacturer that has completed the transfer, and transmits the created transfer completion information to the credit management device 10. Further, when the transfer company confirms the completion of the transfer, the transfer confirmation information is transmitted to the credit management device 10. Note that the corresponding building material ID is included in the transfer completion information and the transfer confirmation information.

工務店からの振込完了情報と、製造会社からの振込確認情報との双方(代金回収情報)を与信管理装置10が受信したことを条件に、各データベースに格納されている建材のうちで、受信した振込完了情報と振込確認情報とに係る建材について支払が完了した旨を各データベースに登録する。具体的には、受信した振込完了情報と振込確認情報とに含まれる建材IDに基づいて、「支払日」の欄に日付を記録する。つまり、代金回収情報を登録する。   Received from the building materials stored in each database on the condition that the credit management device 10 received both the transfer completion information from the construction company and the transfer confirmation information from the manufacturing company (price collection information) The fact that payment has been completed for the building materials related to the transfer completion information and the transfer confirmation information is registered in each database. Specifically, the date is recorded in the column “Payment date” based on the building material ID included in the received transfer completion information and transfer confirmation information. That is, the price collection information is registered.

このように、「支払日」の欄に日付を記録された場合には、「支払日」の欄に日付を記録された建材についての与信枠を除外するために、当該建材に係るNPV’を算出し、(式5)を使用して利用可能与信枠を算出する。
利用可能与信枠={最大与信枠−Σ(X−NPV)}+(X’−NPV’)……(式5)
続いて、算出した利用可能与信枠を与信データベース15eに格納する。このようにすることによって、最新の利用可能与信枠に基づいて、工務店が発注をすることができるので、適正な与信枠を維持することができる。
Thus, when the date is recorded in the “Payment date” column, the NPV ′ related to the building material is excluded in order to exclude the credit limit for the building material whose date is recorded in the “Payment date” column. And use (Formula 5) to calculate the available credit line.
Available credit limit = {maximum credit limit−Σ (X−NPV)} + (X′−NPV ′) (Formula 5)
Subsequently, the calculated available credit limit is stored in the credit database 15e. By doing in this way, since a contractor can place an order based on the latest available credit line, an appropriate credit line can be maintained.

これらによって、住宅を建築する場合に、実際の出荷日時や出荷場所等を正確に特定することができるので、与信管理装置10に正確な建材に係る情報を登録することができる。さらに、当該住宅に使用される建材情報を正確に登録することができるので、住宅を施工する工務店に対して、適正な与信枠または融資枠を設定することができる。また、適正な与信を評価することができる。したがって、当該工務店の購買範囲と与信を拡大させ、当該住宅の購入者に低価格・高品質な住宅を供給することができる。また、作業員等の建材取扱者が建材を誤って荷積・荷下等をすることを防止することができる。   As a result, when building a house, it is possible to accurately specify the actual shipping date and time, the shipping location, and the like, so that it is possible to register information relating to accurate building materials in the credit management device 10. Furthermore, since the building material information used for the house can be accurately registered, an appropriate credit line or loan line can be set for the construction shop that constructs the house. In addition, appropriate credit can be evaluated. Therefore, the purchase range and credit of the construction company can be expanded, and low-priced and high-quality houses can be supplied to purchasers of the houses. Moreover, it is possible to prevent a building material handler such as an operator from loading and unloading the building material by mistake.

また、各PDAの表示部において、各作業員が各種指示情報(出荷日時、建材等)を視覚的に容易に確認することができるので、各作業員が作業計画を立てやすい。なお、RAMに複数の指示情報が格納されている場合には、当該指示情報の日時の順番、または作業員の指示に応じた順番で表示部に表示させるようにしてもよい。   In addition, since each worker can visually confirm various instruction information (shipping date and time, building materials, etc.) easily on the display unit of each PDA, each worker can easily make a work plan. When a plurality of instruction information is stored in the RAM, the instruction information may be displayed on the display unit in the order of the date / time of the instruction information or the order according to the instruction of the worker.

また、各作業員が各PDAに入力した日時情報をRAMに格納する代わりに、比較した双方の建材ID(または建材コード)が同一であった場合に、この時の時刻をRAMに格納し、この時刻を日時情報とするようにしてもよい。また、この時の実際の位置を確認することができるように、GPS装置で測定した現在位置を位置情報として、読み込んだ建材情報に含まれる建材IDと関連付けてRAMに格納し、与信管理装置10に送信するようにしてもよい。   In addition, instead of storing the date and time information input to each PDA by each worker, if both compared building material IDs (or building material codes) are the same, the time at this time is stored in the RAM, This time may be used as date information. Further, the current position measured by the GPS device is stored as position information in the RAM in association with the building material ID included in the read building material information so that the actual position at this time can be confirmed, and the credit management device 10 You may make it transmit to.

また、各PDAの表示部で上記各情報を表示して通知する代わりに、音声等を出力する出力手段を設け、この出力手段によって上記各情報を通知するようにしてもよい。   Further, instead of displaying and notifying each of the above information on the display unit of each PDA, an output means for outputting sound or the like may be provided, and the above information may be notified by this output means.

なお、本実施の形態では、複数の工務店からの発注を受け、複数のメーカに発注する与信管理システムについて説明したが、この与信管理システムを1の製造会社または販売会社と複数の工務店とのやり取りに適用することができる。また、本実施の形態では、工務店と、製造会社とのやり取りについて説明したが、この与信管理システムを工務店以外の他の商品購入者と、1または2以上の製造会社または販売会社とのやり取りに適用することができる。   In the present embodiment, the credit management system that receives orders from a plurality of construction companies and places an order with a plurality of manufacturers has been described. However, this credit management system is divided into one manufacturing company or sales company and a plurality of construction companies. Can be applied to Further, in the present embodiment, the exchange between the construction company and the manufacturing company has been described. However, this credit management system is used between the product purchaser other than the construction company and one or more manufacturing companies or sales companies. It can be applied to exchanges.

第1の実施の形態によれば、電子タグを使用して建材単位で正確な物流情報を建材IDに基づいて把握することができるので、住宅等の建物を建築する場合、住宅等の建物を施工する工務店に対して、適正な与信枠または融資枠を設定することができる。また、NPVに基づいて発注額を変換し、この変換した値に基づいて、発注額が与信枠の範囲内か否かを判断するので、工務店の購買範囲と与信を拡大させることができる。これらによって、当該住宅等の建物の購入者に低価格・高品質な住宅を供給することができる。   According to the first embodiment, since it is possible to grasp accurate logistics information in building material units based on the building material ID using the electronic tag, when building a building such as a house, the building such as the house is Appropriate credit lines or credit lines can be set for construction companies. In addition, the order amount is converted based on the NPV, and based on the converted value, it is determined whether or not the order amount is within the range of the credit frame. Therefore, the purchase range and credit of the construction shop can be expanded. As a result, a low-priced and high-quality house can be supplied to a purchaser of the building such as the house.

なお、上記各実施の形態においては通信端末としてPDAを使用したが、所定のネットワークとの通信機能と、電子タグの読み書き機能とを有するPDA以外の通信端末を使用するようにしてもよい。   In each of the above embodiments, a PDA is used as a communication terminal. However, a communication terminal other than a PDA having a communication function with a predetermined network and a read / write function of an electronic tag may be used.

また、上記各実施の形態で示した与信管理装置10が有する機能を複数の情報処理装置で構成するシステムに備え、このシステム全体が与信管理装置10の動作を実行するようにしてもよい。   Moreover, the system which comprises the function which the credit management apparatus 10 shown in each said embodiment has with a some information processing apparatus may be provided, and this whole system may be made to perform operation | movement of the credit management apparatus 10. FIG.

なお、上記各実施の形態をプログラムの発明として把握することができる。
つまり、上記制御動作に係るプログラムをパソコン等の情報処理装置の記憶媒体に記憶させ、この記憶媒体から上記プログラムを読み出し、読み出したプログラムを当該情報処理装置に実行させることで、本発明を実現することができる。
Each of the above embodiments can be understood as a program invention.
That is, the present invention is realized by storing a program related to the control operation in a storage medium of an information processing apparatus such as a personal computer, reading the program from the storage medium, and causing the information processing apparatus to execute the read program. be able to.

本発明の活用例として、パソコン等の情報処理装置を用い、本発明に係る制御動作を当該情報処理装置に実行させることが考えられる。   As an application example of the present invention, an information processing apparatus such as a personal computer may be used to cause the information processing apparatus to execute a control operation according to the present invention.

本発明の第1の実施の形態である与信管理システム1の構成を示すブロック図である。It is a block diagram which shows the structure of the credit management system 1 which is the 1st Embodiment of this invention. 与信管理システム1において使用されるハードウェア構成を概略的に示す概略構成図である。It is a schematic block diagram which shows schematically the hardware constitutions used in the credit management system 1. 与信管理装置10の内部構成を示すブロック図である。2 is a block diagram showing an internal configuration of a credit management device 10. FIG. PDA本体30aの内部構成を示すブロック図である。It is a block diagram which shows the internal structure of the PDA main body 30a. 電子タグリードライタ30bと電子タグ60との内部構成を示すブロック図である。3 is a block diagram showing an internal configuration of an electronic tag reader / writer 30b and an electronic tag 60. FIG. 与信管理システム1における建材に装着される電子タグの管理方法の概略を示す図である。It is a figure which shows the outline of the management method of the electronic tag with which the building material in the credit management system 1 is mounted | worn. 与信管理装置10が管理する建材データベース15aに格納されている住宅基本情報が表示部16に表示されている場合を示す図である。It is a figure which shows the case where the housing basic information stored in the building material database 15a which the credit management apparatus 10 manages is displayed on the display part 16. FIG. 与信管理システム1において、製造工場101で製造された建材70を物流センタ102に輸送する流れを示す動作フロー図である。FIG. 6 is an operation flowchart showing a flow of transporting building materials 70 manufactured at a manufacturing factory 101 to a distribution center 102 in the credit management system 1. 与信管理システム1において、複数の工務店201〜203が建築現場に必要な建材を製造会社210〜213に発注する場合における概略構成を示すブロック図である。In the credit management system 1, it is a block diagram which shows schematic structure in case the some construction contractors 201-203 order the building materials required for a construction site from the manufacturing companies 210-213. 与信管理システム1において、建築現場103に必要な建材を工務店201が発注してから、発注した各建材についての売上計上がされるまでの流れを示す動作フロー図である。In the credit management system 1, it is an operation | movement flowchart which shows the flow after the construction shop 201 orders the building materials required for the construction site 103 until the sales recording about each ordered building material is carried out. 過去の取引実績(i)と、信用調査会社等による信用調査(j)とに基づいて、平均回収期間tijと、支払確率pijと、回収平均コストcijとを求める表の一例である。It is an example of the table | surface which calculates | requires average collection period tij , payment probability pij , and collection | recovery average cost cij based on the past transaction performance (i) and credit investigation (j) by a credit research company etc. . 工務店別発注情報データベース15cと、メーカ別発注情報データベース15dとを示す図である。It is a figure which shows the order information database 15c classified by construction shop, and the order information database 15d classified by manufacturer. 与信データベース15eを示す図である。It is a figure which shows the credit database 15e. 製造会社の工務店に対する売掛・売上の変位を示す図である。It is a figure which shows the shift of the accounts receivable and sales with respect to the construction company of a manufacturing company.

符号の説明Explanation of symbols

1…与信管理システム、
10…与信管理装置、
20…CAD積算装置、
30…製造工場PDA、
40…輸送業者PDA、
50…建築現場PDA、
60…電子タグ、
70…建材、
90…インターネット。
1 ... Credit management system,
10: Credit management device,
20 ... CAD integrating device,
30 ... Manufacturing factory PDA,
40 ... carrier PDA,
50 ... Building site PDA,
60 ... Electronic tag,
70 ... building materials,
90 ... Internet.

本発明は、商品を発注する取引先で使用される第1の情報処理装置と、前記取引先の商品荷受場所で使用される第1の通信端末と、商品を販売する販売元で使用される第2の情報処理装置とに所定のネットワークを介して接続し、前記取引先の与信を管理する与信管理装置であって、商品の流通に関する情報である商品流通情報と、当該商品に装着された可搬記録手段に記録された識別情報とを関連付けて記憶すると共に、商品の代金回収・未回収を含む前記取引先の過去の取引実績と、前記取引先の過去の取引実績に基づいて決定される前記取引先の取引実績評価を示す取引実績評価情報とを記憶する取引実績記憶手段と、売上原価率と販売価格とを含む商品情報を記憶する商品情報記憶手段と、前記取引実績記憶手段に記憶されている過去の取引実績に基づいて、前記取引先の最大与信枠を設定する手段と、前記設定した最大与信枠と、前記取引実績記憶手段に記憶されている取引実績評価情報と、前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の各商品の販売価格と、前記商品情報記憶手段に記憶されている当該代金未回収の各商品に係る売上原価率とに基づいて、前記取引先の利用可能与信枠を算出する手段と、前記算出した利用可能与信枠と前記取引先とを関連付けて格納する与信記憶手段と、商品購入に係る情報である発注情報を前記第1の情報処理装置から受信する手段と、前記発注情報を受信すると、当該発注情報を前記取引実績記憶手段に格納すると共に、前記取引実績記憶手段に記憶されている取引実績評価情報と、当該発注情報に係る商品の販売価格と、前記商品情報記憶手段に記憶されている当該商品に係る売上原価率とに基づいて、当該発注情報に係る所定値である第1の値を算出する手段と、前記算出した第1の値前記与信記憶手段に格納されている利用可能与信枠の範囲内にあるか否かを判断し、当該第1の値当該利用可能与信枠の範囲内にあれば、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定し、その旨を出力する手段と、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定した場合に、前記与信記憶手段に格納されている利用可能与信枠について、当該利用可能与信枠から前記第1の値を減じた値に変更する手段と、前記発注情報に係る商品であって識別情報が記録された可搬記録手段が装着された商品に係る流通段階において、前記第1の通信端末が当該可搬記録手段から読み取った識別情報及び荷受日時を含む商品受領情報を前記第1の通信端末から受信する手段と、前記商品受領情報を受信すると、当該商品受領情報に含まれる識別情報に関連付けて当該商品受領情報を前記取引実績記憶手段に格納すると共に、当該商品受領情報に係る商品の請求書であって当該識別情報を含む請求書を前記第1の情報処理装置に送信し、当該識別情報を含む当該請求書の控えを前記第2の情報処理装置に送信する手段と、前記請求書に係る商品の振込が完了した旨を示す情報であって当該商品に係る識別情報を含む振込完了情報を前記第1の情報処理装置から受信する手段と、前記請求書に係る商品の振込完了を前記販売元が確認した旨を示す情報であって当該商品に係る識別情報を含む振込確認情報を前記第2の情報処理装置から受信する手段と、同一の識別情報を含む前記振込完了情報と前記振込確認情報とを受信したことを条件に、当該振込完了情報及び振込確認情報に含まれる識別情報に関連付けて当該振込完了情報及び振込確認情報に係る商品の支払が完了した旨を前記取引実績記憶手段に登録すると共に、前記取引実績記憶手段に記憶されている取引実績評価情報と、当該商品の販売価格と、前記商品情報記憶手段に記憶されている当該商品に係る売上原価率とに基づいて、当該振込完了情報及び振込確認情報に係る所定値である第2の値を算出し、前記与信記憶手段に格納されている利用可能与信枠について、当該利用可能与信枠に当該第2の値を加算した値に変更する手段とを有することを特徴とする与信管理装置、これに使用される与信管理方法及びプログラムである。 The present invention is used in a first information processing apparatus used in a business partner who orders a product, a first communication terminal used in a product receiving place of the business partner, and a vendor selling the product. A credit management device that connects to a second information processing device via a predetermined network and manages the credit of the business partner, product distribution information that is information relating to the distribution of the product, and attached to the product The identification information recorded in the portable recording means is stored in association with each other, and is determined based on the past transaction record of the supplier including the collection / non-collection of the price of the product and the past transaction record of the supplier. Transaction performance storage means for storing transaction performance evaluation information indicating the transaction performance evaluation of the supplier, product information storage means for storing product information including a sales cost rate and a sales price, and the transaction performance storage means Remembered over The means for setting the maximum credit limit of the business partner based on the transaction result of the transaction, the set maximum credit limit, the transaction result evaluation information stored in the transaction result storage means, and the transaction result storage means Based on the sales price of each uncollected product included in the stored past transaction results, and the cost of sales related to each uncollected product stored in the product information storage means, Means for calculating an available credit line of a supplier, credit storage means for storing the calculated available credit line and the supplier in association with each other, and order information which is information relating to product purchases as the first information means for receiving from the processing unit, when receiving the order information, stores the order information in the transaction record storing unit, the transaction performance evaluation information stored in the transaction record storing unit, the order information And selling price of a product according to, on the basis of the cost of sales rate according to the product stored in the product information storage means, and means for calculating a first value is a predetermined value according to the order information, the first value calculated is determined whether there are any within the scope of the credit storage unit in the available stored credit, if the first value is within the range of the available credit line, It is determined that the order amount of the product related to the received order information is within the credit range of the business partner, and means for outputting the fact, and the order amount of the product related to the received order information is the business partner Means for changing the available credit limit stored in the credit storage means to a value obtained by subtracting the first value from the available credit limit when it is determined that the credit limit is within the range of the credit limit. Product related to the ordering information and identification information recorded In the distribution stage related to the commodity with the portable recording means attached thereto, the first communication terminal receives the commodity reception information including the identification information read from the portable recording means and the receipt date and time from the first communication terminal. When the product receipt information is received, the product receipt information is stored in the transaction record storage means in association with the identification information included in the product receipt information, and the product receipt information is related to the product receipt information. Means for transmitting a bill including the identification information to the first information processing device, and transmitting a copy of the bill including the identification information to the second information processing device, and a product related to the bill Means for receiving transfer completion information from the first information processing apparatus, which is information indicating that the transfer has been completed and includes identification information related to the product, and the transfer completion of the product related to the invoice Means for receiving transfer confirmation information from the second information processing apparatus, which is information indicating that the origin has been confirmed and includes identification information relating to the product, and the transfer completion information and the transfer confirmation including the same identification information The transaction result storage means that the payment of the goods related to the transfer completion information and the transfer confirmation information is completed in association with the identification information included in the transfer completion information and the transfer confirmation information on the condition that the information is received. While registering, based on the transaction performance evaluation information stored in the transaction performance storage means, the sales price of the product, and the cost of sales related to the product stored in the product information storage means, A second value, which is a predetermined value related to the transfer completion information and the transfer confirmation information, is calculated, and the available credit frame stored in the credit storage means is set to the available credit frame. Credit management apparatus characterized by comprising a means for changing the value obtained by adding the a credit management method and a program used for this.

また、前記与信管理装置は、前記販売元の商品出荷場所で使用される第2の通信端末と前記ネットワークを介して接続し、前記発注情報に係る商品であって識別情報が記録された可搬記録手段が装着された商品に係る流通段階において、前記第2の通信端末が当該可搬記録手段から読み取った識別情報及び出荷日時を含む商品出荷実績情報を前記第2の通信端末から受信する手段と、前記商品出荷実績情報を受信すると、当該商品出荷実績情報に含まれる識別情報に関連付けて当該商品出荷実績情報を前記取引実績記憶手段に格納する共に、前記発注情報に係る商品を出荷する際に作成される売掛情報であって当該識別情報を含む売掛計上情報を、金融機関において売上計上処理を実行する情報処理装置である第3の情報処理装置に送信する手段と、前記商品受領情報を受信すると、当該商品受領情報に係る商品の売掛計上情報の消し込みをするための情報であって当該商品受領情報に含まれる識別情報を含む売掛消し込み情報を、前記第3の情報処理装置に送信する手段とを有することを特徴とする。The credit management device is connected to a second communication terminal used at the merchandise shipping location of the seller via the network, and is a portable product in which identification information is recorded, which is a merchandise related to the order information. Means for receiving, from the second communication terminal, merchandise shipment record information including the identification information and the shipping date and time read by the second communication terminal from the portable recording means in the distribution stage related to the commodity to which the recording means is attached. When receiving the product shipment record information, the product shipment record information is stored in the transaction record storage means in association with the identification information included in the product shipment record information, and the product related to the ordering information is shipped. Account receivable information that is created at the same time and includes the identification information is transmitted to a third information processing apparatus, which is an information processing apparatus that executes sales record processing in a financial institution. When receiving the product receipt information, the information for canceling the sales receivable information of the product related to the product receipt information and including the identification information included in the product receipt information. Is transmitted to the third information processing apparatus.

本発明は、与信管理システム及び与信管理方法に関する。 The present invention relates to a credit management system and a credit management method .

本発明は、住宅等の建物を建築する場合、住宅等の建物を施工する工務店に対して、適正な与信枠または融資枠を設定することができ、当該工務店の購買範囲と与信を拡大させ、当該住宅等の建物の購入者に低価格・高品質な住宅を供給することができる与信管理システム及び与信管理方法を提供することを目的とする。 In the case of building a building such as a house, the present invention can set an appropriate credit line or a loan line for a construction shop that constructs a building such as a house, and expands the purchase scope and credit of the construction shop. It is an object of the present invention to provide a credit management system and a credit management method capable of supplying a low-priced and high-quality housing to a purchaser of a building such as the housing.

本発明は、商品を発注する取引先で使用される第1の情報処理装置と、前記取引先の商品荷受場所で使用される第1の通信端末と、商品を販売する販売元で使用される第2の情報処理装置と、前記取引先の与信を管理する与信管理装置とが所定のネットワークを介して接続される与信管理システムであって、前記第1の情報処理装置は、商品購入に係る情報である発注情報を前記与信管理装置に送信する手段を有し、前記与信管理装置は、商品の流通に関する情報である商品流通情報と、当該商品に装着された可搬記録手段に記録された識別情報とを関連付けて記憶すると共に、商品の代金回収・未回収を含む前記取引先の過去の取引実績と、前記取引先の過去の取引実績に基づいて決定される前記取引先の取引実績評価を示す取引実績評価情報とを記憶する取引実績記憶手段と、売上原価率と販売価格とを含む商品情報を記憶する商品情報記憶手段と、前記取引実績記憶手段に記憶されている過去の取引実績に基づいて、前記取引先の最大与信枠を設定する手段と、前記設定した最大与信枠と、前記取引実績記憶手段に記憶されている取引実績評価情報と、前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の各商品の販売価格と、前記商品情報記憶手段に記憶されている当該代金未回収の各商品に係る売上原価率とに基づいて、前記取引先の利用可能与信枠を算出する手段と、前記算出した利用可能与信枠と前記取引先とを関連付けて格納する与信記憶手段と、前記発注情報を前記第1の情報処理装置から受信すると、当該発注情報を前記取引実績記憶手段に格納すると共に、前記取引実績記憶手段に記憶されている取引実績評価情報と、当該発注情報に係る商品の販売価格と、前記商品情報記憶手段に記憶されている当該商品に係る売上原価率とに基づいて、当該発注情報に係る所定値である第1の値を算出する手段と、前記算出した第1の値が前記与信記憶手段に格納されている利用可能与信枠の範囲内にあるか否かを判断し、当該第1の値が当該利用可能与信枠の範囲内にあれば、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定し、その旨を出力する手段と、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定した場合に、前記与信記憶手段に格納されている利用可能与信枠について、当該利用可能与信枠から前記第1の値を減じた値に変更する手段とを有し、前記第1の通信端末は、前記発注情報に係る商品であって識別情報が記録された可搬記録手段が装着された商品に係る流通段階において、識別情報を当該可搬記録手段から読み取る手段と、当該可搬記録手段から読み取った識別情報及び荷受日時を含む商品受領情報を前記与信管理装置に送信する手段とを有し、前記与信管理装置は、前記商品受領情報を前記第1の通信端末から受信する手段と、前記商品受領情報を受信すると、当該商品受領情報に含まれる識別情報に関連付けて当該商品受領情報を前記取引実績記憶手段に格納すると共に、当該商品受領情報に係る商品の請求書であって当該識別情報を含む請求書を前記第1の情報処理装置に送信し、当該識別情報を含む当該請求書の控えを前記第2の情報処理装置に送信する手段とを有し、前記第1の情報処理装置は、前記請求書を前記与信管理装置から受信する手段と、前記請求書に係る商品の振込が完了した旨を示す情報であって当該商品に係る識別情報を含む振込完了情報を前記与信管理装置に送信する手段とを有し、前記第2の情報処理装置は、前記請求書の控えを前記与信管理装置から受信する手段と、前記請求書に係る商品の振込完了を前記販売元が確認した旨を示す情報であって当該商品に係る識別情報を含む振込確認情報を前記与信管理装置に送信する手段とを有し、前記与信管理装置は、前記振込完了情報を前記第1の情報処理装置から受信し、前記振込確認情報を前記第2の情報処理装置から受信する手段と、同一の識別情報を含む前記振込完了情報と前記振込確認情報とを受信したことを条件に、当該振込完了情報及び振込確認情報に含まれる識別情報に関連付けて当該振込完了情報及び振込確認情報に係る商品の支払が完了した旨を前記取引実績記憶手段に登録すると共に、前記取引実績記憶手段に記憶されている取引実績評価情報と、当該商品の販売価格と、前記商品情報記憶手段に記憶されている当該商品に係る売上原価率とに基づいて、当該振込完了情報及び振込確認情報に係る所定値である第2の値を算出し、前記与信記憶手段に格納されている利用可能与信枠について、当該利用可能与信枠に当該第2の値を加算した値に変更する手段とを有することを特徴とする与信管理システム及びこれに用いられる与信管理方法である。 The present invention is used in a first information processing apparatus used in a business partner who orders a product, a first communication terminal used in a product receiving place of the business partner, and a vendor selling the product. A credit management system in which a second information processing apparatus and a credit management apparatus that manages credit of the business partner are connected via a predetermined network , wherein the first information processing apparatus relates to product purchase Means for transmitting the ordering information, which is information, to the credit management device, the credit management device recorded in the merchandise distribution information, which is information relating to the merchandise distribution, and the portable recording means attached to the merchandise. In addition to storing the identification information in association with each other, the transaction result evaluation of the supplier determined based on the past transaction record of the supplier including the collection / non-collection of the price of the product and the past transaction record of the supplier Transaction performance evaluation showing Based on past transaction results stored in the transaction result storage means, transaction information storage means for storing product information, product information storage means for storing product information including a sales cost rate and a sales price, Means for setting a maximum credit limit of a supplier, the set maximum credit limit, transaction result evaluation information stored in the transaction result storage means, and past transaction results stored in the transaction result storage means Based on the selling price of each uncollected product included in the product and the cost of sales ratio for each uncollected product stored in the product information storage means, means for calculating a credit storage means for storing in association with the partner and the calculated available credit line, when receiving the order information from the first information processing apparatus, the order information the transaction record SL The transaction result evaluation information stored in the transaction result storage means, the sales price of the product related to the ordering information, and the cost of sales ratio related to the product stored in the product information storage means And a means for calculating a first value, which is a predetermined value related to the order information, and the calculated first value is within a range of available credit frames stored in the credit storage means. If the first value is within the range of the available credit limit, it is determined that the order amount of the product related to the received order information is within the credit limit of the business partner. And a means for outputting that information, and the use stored in the credit storage means when it is determined that the order amount of the product related to the received order information is within the credit line of the supplier. About credit line, from the available credit line Means for changing the first value to a value obtained by subtracting the first value, and the first communication terminal is a product related to the ordering information and equipped with a portable recording means in which identification information is recorded. A means for reading identification information from the portable recording means, and means for transmitting product receipt information including the identification information read from the portable recording means and the date and time of receipt of goods to the credit management device. The credit management device receives the product receipt information from the first communication terminal, and receives the product receipt information, and associates the product receipt information with the identification information included in the product receipt information. A bill of merchandise related to the merchandise receipt information that is stored in the transaction record storage means and includes the identification information is transmitted to the first information processing apparatus, and the bill of the bill including the identification information Deduction The and means for transmitting to said second information processing apparatus, the first information processing apparatus includes means for receiving the bill from the credit management system, the transfer is complete product according to the bill And means for transmitting transfer completion information including identification information relating to the product to the credit management device, and the second information processing device stores a copy of the invoice in the credit Means for receiving from the management device, and information indicating that the seller has confirmed the completion of the transfer of the product related to the invoice, and transmits the transfer confirmation information including the identification information related to the product to the credit management device And the credit management device receives the transfer completion information from the first information processing device, and the same identification information as the means for receiving the transfer confirmation information from the second information processing device. Including the transfer completion information including On the condition that the transfer confirmation information has been received, the transaction results indicate that payment of the goods related to the transfer completion information and the transfer confirmation information has been completed in association with the transfer completion information and the identification information included in the transfer confirmation information. Based on the transaction performance evaluation information stored in the transaction performance storage device, the sales price of the product, and the sales cost rate related to the product stored in the product information storage device, while registering in the storage device A second value, which is a predetermined value related to the transfer completion information and the transfer confirmation information, for the available credit frame stored in the credit storage means, the second value in the available credit frame A credit management system, and a credit management method used for the credit management system .

また、前記販売元の商品出荷場所で使用される第2の通信端末と、金融機関において売上計上処理を実行する第3の情報処理装置とが前記ネットワークを介して前記与信管理システムに接続され、前記第2の通信端末は、前記発注情報に係る商品であって識別情報が記録された可搬記録手段が装着された商品に係る流通段階において、識別情報を当該可搬記録手段から読み取る手段と、当該可搬記録手段から読み取った識別情報及び出荷日時を含む商品出荷実績情報を前記与信管理装置に送信する手段とを有し、前記与信管理装置は、前記商品出荷実績情報を前記第2の通信端末から受信する手段と、前記商品出荷実績情報を受信すると、当該商品出荷実績情報に含まれる識別情報に関連付けて当該商品出荷実績情報を前記取引実績記憶手段に格納する共に、前記発注情報に係る商品を出荷する際に作成される売掛情報であって当該識別情報を含む売掛計上情報を、前記第3の情報処理装置に送信する手段と、前記商品受領情報を受信すると、当該商品受領情報に係る商品の売掛計上情報の消し込みをするための情報であって当該商品受領情報に含まれる識別情報を含む売掛消し込み情報を、前記第3の情報処理装置に送信する手段とを有することを特徴とする。 Further, a second communication terminal used in product shipping location of the distributor, and the third information processing apparatus for executing sales recording process in the financial institution is connected to the credit management system via the network, The second communication terminal has a means for reading the identification information from the portable recording means in a distribution stage relating to the goods related to the ordering information and the portable recording means on which the identification information is recorded. And means for transmitting product shipment record information including the identification information read from the portable recording means and the shipping date and time to the credit management device, wherein the credit management device sends the product shipment record information to the second When receiving the product shipment record information from the communication terminal, the product shipment record information is associated with the identification information included in the product shipment record information. Both stores, the accounts receivable recorded information including the identification information to a trade information created when ship goods according to the order information, and means for transmitting to said third information processing apparatus, the product Upon receipt of the receipt information, the third item is the information for canceling the account receivable information related to the merchandise receipt information, and including the identification information included in the merchandise receipt information. Means for transmitting to the information processing apparatus.

Claims (5)

商品を販売する取引先の与信を管理する与信管理装置であって、
商品の代金回収・未回収を含む前記取引先の過去の取引実績と、前記取引先の過去の取引実績に基づいて決定される前記取引先の取引実績評価を示す取引実績評価情報とを記憶する取引実績記憶手段と、
売上原価率と販売価格とを含む商品情報を記憶する商品情報記憶手段と、
前記取引実績記憶手段に記憶されている過去の取引実績に基づいて、前記取引先の最大与信枠を設定する手段と、
前記設定した最大与信枠と、前記取引実績記憶手段に記憶されている取引実績評価情報と、前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格と、前記商品情報記憶手段に記憶されている売上原価率とに基づいて、前記取引先の利用可能与信枠を算出する手段と、
商品購入に係る情報である発注情報を前記取引先から受信する手段と、
前記取引実績記憶手段に記憶されている取引実績評価情報と、前記受信した発注情報に係る商品の販売価格と、前記商品情報記憶手段に記憶されている売上原価率とに基づいて、前記受信した発注情報に係る所定値を算出する手段と、
前記算出した所定値が前記利用可能与信枠の範囲内にあるか否かを判断し、前記算出した所定値が前記利用可能与信枠の範囲内にあれば、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定する手段と、
を有することを特徴とする与信管理装置。
A credit management device for managing credit of a business partner who sells a product,
Stores the past transaction results of the business partner including collection / non-collection of the price of the product, and transaction performance evaluation information indicating the transaction performance evaluation of the business partner determined based on the past business performance of the business partner. Transaction record storage means;
Product information storage means for storing product information including a cost of sales ratio and a sales price;
Means for setting a maximum credit line of the customer based on past transaction results stored in the transaction result storage means;
The set maximum credit limit, the transaction performance evaluation information stored in the transaction performance storage means, and the sales price of the uncollected product included in the past transaction performance stored in the transaction performance storage means; , Means for calculating an available credit line of the business partner based on the sales cost rate stored in the product information storage means;
Means for receiving ordering information, which is information related to product purchase, from the supplier;
Based on the transaction performance evaluation information stored in the transaction performance storage means, the sales price of the product related to the received ordering information, and the cost of sales ratio stored in the product information storage means, the received Means for calculating a predetermined value related to the order information;
It is determined whether or not the calculated predetermined value is within the range of the available credit line, and if the calculated predetermined value is within the range of the available credit line, the product related to the received order information Means for determining that the order amount is within the credit line of the customer;
A credit management device comprising:
商品を販売する取引先の与信を管理する与信管理装置であって、
商品の代金回収・未回収を含む前記取引先の過去の取引実績と、前記取引先の過去の取引実績に基づいて決定される前記取引先の支払確率とを記憶する取引実績記憶手段と、
売上原価率と販売価格とを含む商品情報を記憶する商品情報記憶手段と、
前記取引実績記憶手段に記憶されている過去の取引実績に基づいて、所定期間内における取引額の平均値に所定の値を乗じた値である前記取引先の最大与信枠を設定する手段と、
前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格の総和である第1の値を算出する手段と、
前記第1の値に、前記取引実績記憶手段に記憶されている支払確率を乗じた値である第2の値を算出する手段と、
前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格に当該商品の売上原価率を乗じた値である第3の値を前記代金未回収の商品毎に算出し、当該商品毎に算出した第3の値の総和である第4の値を算出する手段と、
前記第1の値と前記第4の値との和から前記第2の値を減じた値を、前記最大与信枠から減じた値である利用可能与信枠を算出する手段と、
商品購入に係る情報である発注情報を前記取引先から受信する手段と、
前記受信した発注情報に係る商品の販売価格に、前記取引実績記憶手段に記憶されている支払確率を乗じた値である第5の値を算出すると共に、前記受信した発注情報に係る商品の販売価格に、当該商品の売上原価率を乗じた値である第6の値を算出し、前記第5の値から前記第6の値を減じた値である第7の値を算出し、前記受信した発注情報に係る商品の販売価格から前記第7の値を減じた値である第8の値を算出する手段と、
前記第8の値が前記利用可能与信枠の範囲内にあるか否かを判断し、前記第8の値が前記利用可能与信枠の範囲内にあれば、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定する手段と、
を有することを特徴とする与信管理装置。
A credit management device for managing credit of a business partner who sells a product,
Transaction result storage means for storing past transaction results of the customer including price collection / non-recovery of the product, and the payment probability of the customer determined based on the past transaction results of the customer;
Product information storage means for storing product information including a cost of sales ratio and a sales price;
A means for setting a maximum credit line of the customer, which is a value obtained by multiplying an average value of transaction amounts within a predetermined period by a predetermined value, based on past transaction results stored in the transaction result storage means;
Means for calculating a first value that is a sum of selling prices of uncollected products included in past transaction results stored in the transaction result storage means;
Means for calculating a second value which is a value obtained by multiplying the first value by the payment probability stored in the transaction record storage means;
A third value, which is a value obtained by multiplying the sales price of the uncollected product included in the past transaction record stored in the transaction record storage means by the sales cost ratio of the product, is set for each uncollected product. Means for calculating a fourth value that is the sum of the third values calculated for each product;
Means for calculating an available credit line that is a value obtained by subtracting the second value from the sum of the first value and the fourth value from the maximum credit line;
Means for receiving ordering information, which is information related to product purchase, from the supplier;
Calculate a fifth value, which is a value obtained by multiplying the sales price of the product related to the received order information by the payment probability stored in the transaction record storage means, and sell the product related to the received order information. A sixth value that is a value obtained by multiplying the price by the sales cost rate of the product, a seventh value that is a value obtained by subtracting the sixth value from the fifth value, and the reception Means for calculating an eighth value, which is a value obtained by subtracting the seventh value from the sales price of the product related to the ordered information;
It is determined whether or not the eighth value is within the range of the available credit line, and if the eighth value is within the range of the available credit line, the product of the received order information is received. Means for determining that the order amount is within the credit line of the customer;
A credit management device comprising:
前記取引実績記憶手段には、商品の流通に関する情報である商品流通情報と、識別情報とが関連付けて記憶され、
前記識別情報が記録された可搬記録手段が装着された商品に係る各流通段階において、前記可搬記録手段から読み出された識別情報を受信する手段と、
前記識別情報を受信すると、前記取引実績記憶手段に記憶されている当該識別情報に係る商品流通情報に受信日時を順次登録する手段と、
前記取引先に販売した商品についての代金回収情報を受信する手段と、
前記代金回収情報を受信すると、前記取引実績記憶手段に記憶されている当該代金回収情報に係る商品の商品流通情報に代金回収情報を登録する手段と、
を有することを特徴とする請求項1または請求項2に記載の与信管理装置。
In the transaction record storage means, merchandise distribution information, which is information related to merchandise distribution, and identification information are stored in association with each other,
Means for receiving the identification information read from the portable recording means in each distribution stage relating to the commodity to which the portable recording means having the identification information recorded is attached;
When receiving the identification information, means for sequentially registering the reception date and time in the merchandise distribution information related to the identification information stored in the transaction record storage means;
Means for receiving price collection information about the product sold to the supplier;
Means for receiving the price collection information, registering the price collection information in the merchandise distribution information of the product related to the price collection information stored in the transaction record storage means;
The credit management device according to claim 1 or 2, characterized by comprising:
商品を販売する取引先の与信を管理する与信管理方法であって、
商品の代金回収・未回収を含む前記取引先の過去の取引実績と、前記取引先の過去の取引実績に基づいて決定される前記取引先の支払確率とを取引実績記憶手段に記憶するステップと、
売上原価率と販売価格とを含む商品情報を商品情報記憶手段に記憶するステップと、
前記取引実績記憶手段に記憶されている過去の取引実績に基づいて、所定期間内における取引額の平均値に所定の値を乗じた値である前記取引先の最大与信枠を設定するステップと、
前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格の総和である第1の値を算出するステップと、
前記第1の値に、前記取引実績記憶手段に記憶されている支払確率を乗じた値である第2の値を算出するステップと、
前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格に当該商品の売上原価率を乗じた値である第3の値を前記代金未回収の商品毎に算出し、当該商品毎に算出した第3の値の総和である第4の値を算出するステップと、
前記第1の値と前記第4の値との和から前記第2の値を減じた値を、前記最大与信枠から減じた値である利用可能与信枠を算出するステップと、
商品購入に係る情報である発注情報を前記取引先から受信するステップと、
前記受信した発注情報に係る商品の販売価格に、前記取引実績記憶手段に記憶されている支払確率を乗じた値である第5の値を算出すると共に、前記受信した発注情報に係る商品の販売価格に、当該商品の売上原価率を乗じた値である第6の値を算出し、前記第5の値から前記第6の値を減じた値である第7の値を算出し、前記受信した発注情報に係る商品の販売価格から前記第7の値を減じた値である第8の値を算出するステップと、
前記第8の値が前記利用可能与信枠の範囲内にあるか否かを判断し、前記第8の値が前記利用可能与信枠の範囲内にあれば、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定するステップと、
を有することを特徴とする与信管理方法。
A credit management method for managing credits of business partners who sell products,
Storing in the transaction record storage means a past transaction record of the supplier including the price collection / non-collection of the product and a payment probability of the partner determined based on the past transaction record of the supplier; ,
Storing product information including the cost of sales ratio and the sales price in the product information storage means;
Setting the maximum credit limit of the customer, which is a value obtained by multiplying the average value of the transaction amount within a predetermined period by a predetermined value, based on past transaction results stored in the transaction result storage means;
Calculating a first value that is a sum of sales prices of uncollected products included in past transaction results stored in the transaction result storage means;
Calculating a second value which is a value obtained by multiplying the first value by the payment probability stored in the transaction record storage means;
A third value, which is a value obtained by multiplying the sales price of the uncollected product included in the past transaction record stored in the transaction record storage means by the sales cost ratio of the product, is set for each uncollected product. Calculating a fourth value that is a sum of the third values calculated for each product,
Calculating an available credit line that is a value obtained by subtracting the second value from the sum of the first value and the fourth value from the maximum credit line;
Receiving ordering information, which is information related to product purchase, from the supplier;
Calculate a fifth value, which is a value obtained by multiplying the sales price of the product related to the received order information by the payment probability stored in the transaction record storage means, and sell the product related to the received order information. A sixth value that is a value obtained by multiplying the price by the sales cost rate of the product, a seventh value that is a value obtained by subtracting the sixth value from the fifth value, and the reception Calculating an eighth value that is a value obtained by subtracting the seventh value from the sales price of the product related to the ordered information;
It is determined whether or not the eighth value is within the range of the available credit line, and if the eighth value is within the range of the available credit line, the product of the received order information is received. Determining that the order amount is within the credit line of the customer;
A credit management method comprising:
商品を販売する取引先の与信を管理する与信管理装置のコンピュータに実行させるプログラムであって、
商品の代金回収・未回収を含む前記取引先の過去の取引実績と、前記取引先の過去の取引実績に基づいて決定される前記取引先の支払確率とを取引実績記憶手段に記憶する手順と、
売上原価率と販売価格とを含む商品情報を商品情報記憶手段に記憶する手順と、
前記取引実績記憶手段に記憶されている過去の取引実績に基づいて、所定期間内における取引額の平均値に所定の値を乗じた値である前記取引先の最大与信枠を設定する手順と、
前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格の総和である第1の値を算出する手順と、
前記第1の値に、前記取引実績記憶手段に記憶されている支払確率を乗じた値である第2の値を算出する手順と、
前記取引実績記憶手段に記憶されている過去の取引実績に含まれる代金未回収の商品の販売価格に当該商品の売上原価率を乗じた値である第3の値を前記代金未回収の商品毎に算出し、当該商品毎に算出した第3の値の総和である第4の値を算出する手順と、
前記第1の値と前記第4の値との和から前記第2の値を減じた値を、前記最大与信枠から減じた値である利用可能与信枠を算出する手順と、
商品購入に係る情報である発注情報を前記取引先から受信する手順と、
前記受信した発注情報に係る商品の販売価格に、前記取引実績記憶手段に記憶されている支払確率を乗じた値である第5の値を算出すると共に、前記受信した発注情報に係る商品の販売価格に、当該商品の売上原価率を乗じた値である第6の値を算出し、前記第5の値から前記第6の値を減じた値である第7の値を算出し、前記受信した発注情報に係る商品の販売価格から前記第7の値を減じた値である第8の値を算出する手順と、
前記第8の値が前記利用可能与信枠の範囲内にあるか否かを判断し、前記第8の値が前記利用可能与信枠の範囲内にあれば、前記受信した発注情報に係る商品の発注額が前記取引先の与信枠の範囲内にあると判定する手順と、
をコンピュータに実行させるプログラム。
A program to be executed by a computer of a credit management device that manages credits of business partners who sell products,
A procedure for storing in the transaction record storage means a past transaction record of the supplier including the price collection / non-collection of the product, and a payment probability of the supplier determined based on the past transaction record of the supplier ,
A procedure for storing product information including the cost of sales ratio and the sales price in the product information storage means;
Based on the past transaction record stored in the transaction record storage means, a procedure for setting the maximum credit limit of the customer, which is a value obtained by multiplying the average value of the transaction amount within a predetermined period by a predetermined value;
A procedure for calculating a first value that is a sum of sales prices of uncollected products included in the past transaction record stored in the transaction record storage unit;
Calculating a second value that is a value obtained by multiplying the first value by the payment probability stored in the transaction record storage means;
A third value, which is a value obtained by multiplying the sales price of the uncollected product included in the past transaction record stored in the transaction record storage means by the sales cost ratio of the product, is set for each uncollected product. And calculating a fourth value that is the sum of the third values calculated for each product,
Calculating an available credit line that is a value obtained by subtracting the second value from the sum of the first value and the fourth value from the maximum credit line;
A procedure for receiving order information, which is information relating to product purchase, from the supplier;
Calculate a fifth value, which is a value obtained by multiplying the sales price of the product related to the received order information by the payment probability stored in the transaction record storage means, and sell the product related to the received order information. A sixth value that is a value obtained by multiplying the price by the sales cost rate of the product, a seventh value that is a value obtained by subtracting the sixth value from the fifth value, and the reception A procedure for calculating an eighth value, which is a value obtained by subtracting the seventh value from the sales price of the product related to the ordered information;
It is determined whether or not the eighth value is within the range of the available credit line, and if the eighth value is within the range of the available credit line, the product of the received order information is received. A procedure for determining that the order amount is within the credit line of the customer;
A program that causes a computer to execute.
JP2005156386A 2005-05-27 2005-05-27 Credit management system and credit management method Pending JP2006331231A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005156386A JP2006331231A (en) 2005-05-27 2005-05-27 Credit management system and credit management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005156386A JP2006331231A (en) 2005-05-27 2005-05-27 Credit management system and credit management method

Publications (1)

Publication Number Publication Date
JP2006331231A true JP2006331231A (en) 2006-12-07

Family

ID=37552835

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005156386A Pending JP2006331231A (en) 2005-05-27 2005-05-27 Credit management system and credit management method

Country Status (1)

Country Link
JP (1) JP2006331231A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017182787A (en) * 2016-03-29 2017-10-05 株式会社オービック Credit frame management device, credit frame management method, and credit frame management program
CN111553751A (en) * 2020-06-04 2020-08-18 上海燕汐软件信息科技有限公司 Sales information data processing method, device and equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017182787A (en) * 2016-03-29 2017-10-05 株式会社オービック Credit frame management device, credit frame management method, and credit frame management program
CN111553751A (en) * 2020-06-04 2020-08-18 上海燕汐软件信息科技有限公司 Sales information data processing method, device and equipment
CN111553751B (en) * 2020-06-04 2023-08-15 上海燕汐软件信息科技有限公司 Sales information data processing method, device and equipment

Similar Documents

Publication Publication Date Title
US10013666B2 (en) Product lifecycle sustainability score tracking and indicia
US7069230B2 (en) Enhanced method and system for providing supply chain execution processes in an outsourced manufacturing environment
US20200034766A1 (en) System and method to increase productivity
US20030182206A1 (en) Accounts payable electronic processing
JP2006521633A (en) Order data modeling
US7711615B2 (en) Methods, apparatus, systems, computer program products and mediums for use in association with accounting and/or financial analysis
Saeed Osman Modeling and simulation for inventory management of repairable items in maintenance systems
Alarcón et al. Evaluation and improvement of the procurement process in construction projects
Golkhoo et al. Optimized material management in construction using multi-layer perceptron
Ibrahim et al. Materials management on construction sites using RFID technique
JP2006331231A (en) Credit management system and credit management method
Awara et al. Information technology tools and supply chain performance of online retailers in calabar metropolis, cross river state, Nigeria
JP2005044251A (en) Method for providing operating fund to supply chain and system thereof
JP2008123469A (en) Management system of object management information, person management information and real estate information
JP2017016504A (en) System and method for managing information on entering and leaving facility
TW511019B (en) System and method of managing jobs, managing financing, and/or providing materials
JP2008065750A (en) Loan amount calculation method and loan amount calculation system
JP7363097B2 (en) Sales system, gate device, server, cash register terminal, and sales method
Morris " If Tesco can do it why can't we?": The Challenges and Benefits of Implementing RFID and Mobile Computing in Upstream Environments
JP5427700B2 (en) Evaluation support system, evaluation support method, and evaluation support program for property value during transportation
Nwankwo Improving approaches to material inventory management in construction industry in the UK
Chima Improving Approaches to Material Inventory Management in Construction Industry in the UK
Heiskanen Utilizing RFID to improve spare parts inventory management
Jones et al. ERP Systems
Muya A systematic approach for improving construction materials logistics

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070104