JP2006328843A - Building member effectively using proof stress of reinforcing steel member product - Google Patents

Building member effectively using proof stress of reinforcing steel member product Download PDF

Info

Publication number
JP2006328843A
JP2006328843A JP2005155220A JP2005155220A JP2006328843A JP 2006328843 A JP2006328843 A JP 2006328843A JP 2005155220 A JP2005155220 A JP 2005155220A JP 2005155220 A JP2005155220 A JP 2005155220A JP 2006328843 A JP2006328843 A JP 2006328843A
Authority
JP
Japan
Prior art keywords
steel
reinforcing
neutral axis
reinforced
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005155220A
Other languages
Japanese (ja)
Other versions
JP4722560B2 (en
Inventor
Junji Hamada
純次 濱田
Tomio Tsuchiya
富男 土屋
Naoki Aso
直木 麻生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2005155220A priority Critical patent/JP4722560B2/en
Publication of JP2006328843A publication Critical patent/JP2006328843A/en
Application granted granted Critical
Publication of JP4722560B2 publication Critical patent/JP4722560B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a building member effectively using the proof stress of reinforcing steel products by approximately simultaneously plasticizing the reinforcing steel products such as reinforcing bars constituting the building member when bending moment due to earthquakes etc. acts on the building member such as a pile, a column, and a beam of a building. <P>SOLUTION: By arranging reinforcing bars of larger strength according to the distances from a neutral axis of a concrete pile, which is reinforced by reinforcing bars, reinforcing steel products, in such a way that stress ratios of reinforcing bars may be equal at the position of the lower surface of a foundation, which is a junction position with the foundation, the reinforcing bars are plasticized approximately at the same period by bending moment acting at the time of earthquakes. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

この発明は、地震などによる曲げモーメントが建物の杭、柱、梁などの建築部材に作用した際に、同建築部材を構成する鉄筋などの補強鋼材を略同時期に塑性化させ、補強鋼材の耐力を有効利用する建築部材の技術分野に属する。   When a bending moment due to an earthquake or the like is applied to a building member such as a pile, column, or beam of a building, this invention plasticizes the reinforcing steel material such as a reinforcing bar constituting the building member at substantially the same time. It belongs to the technical field of building components that make effective use of proof stress.

従来、建物の杭、柱、梁などの建築部材を構成する鉄筋などの補強鋼材の耐力を有効利用するべく、補強鋼材に着眼して工夫を施す技術は見聞することができず、等しい強度の補強鋼材を、等しい形態で設置しているだけであった。   Conventionally, in order to make effective use of the proof strength of reinforcing steel materials such as reinforcing bars that make up building members such as piles, columns, and beams of buildings, it has not been possible to observe the technology to focus on the reinforcing steel materials, and the equal strength Reinforced steel was only installed in equal form.

一例を挙げると、図18に示すように、杭1の中立軸Tからの距離に関係なく、等しい強度の鉄筋2を等しい形態で設置している。   For example, as shown in FIG. 18, the reinforcing bars 2 having the same strength are installed in the same form regardless of the distance from the neutral axis T of the pile 1.

そのため、地震などで曲げモーメントMが杭1に作用すると、杭1の中立軸Tから遠い鉄筋2aに、中立軸Tに近い鉄筋2bに比べてより大きな歪みが生じる。云い替えると、杭1の中立軸Tから遠い鉄筋2aが塑性化しても、中立軸Tに近い鉄筋2bは未だ塑性化していない。つまり、中立軸Tに近い鉄筋2bは十分なエネルギー吸収機能を発揮しておらず、同鉄筋2bの耐力を十分に有効利用していない。   Therefore, when the bending moment M acts on the pile 1 due to an earthquake or the like, a greater distortion is generated in the reinforcing bar 2a far from the neutral axis T of the pile 1 than in the reinforcing bar 2b near the neutral axis T. In other words, even if the reinforcing bar 2a far from the neutral axis T of the pile 1 is plasticized, the reinforcing bar 2b near the neutral axis T is not yet plasticized. That is, the reinforcing bar 2b close to the neutral axis T does not exhibit a sufficient energy absorbing function and does not sufficiently use the proof strength of the reinforcing bar 2b.

ちなみに、地震などによる曲げモーメントが梁に作用した際に、同梁の鉄筋を略同時に降伏させて幅広いイールドヒンジ領域を形成し、梁の圧壊を防ぐ技術が、以下の特許文献1に開示されている。しかし、補強鋼材の耐力を有効利用するための技術でない。
特開平4−118445号公報
Incidentally, when a bending moment due to an earthquake or the like acts on a beam, a technique for preventing a collapse of the beam by forming a wide yield hinge region by yielding the reinforcing bars of the beam almost simultaneously is disclosed in Patent Document 1 below. Yes. However, this is not a technique for effectively utilizing the proof stress of a reinforced steel material.
JP-A-4-118445

本発明の目的は、杭、柱、梁などの建築部材を、建築部材相互の接合位置で鉄筋などの補強鋼材の応力比が略等しくなるように、建築部材の中立軸から離れるにしたがい、強度が大きい補強鋼材を配置し、又は建築部材相互の接合位置近傍において、補強鋼材の周辺に所定の高さ(長さ)の空隙部を形成し、同空隙部の高さ(長さ)を、建築部材相互の接合位置で、補強鋼材の歪みが略等しくなるように、建築部材の中立軸から離れるにしたがい、高く(長く)設定し、地震時などに作用する曲げモーメントによって補強鋼材を略同時期に塑性化させる構成とし、建築部材の中立軸から遠い補強鋼材だけでなく、中立軸に近い補強鋼材にもエネルギー吸収機能を発揮させることができ、補強鋼材の耐力を有効利用することができる、補強鋼材の耐力を有効利用した建築部材を提供することである。   The purpose of the present invention is to increase the strength of building members such as piles, columns, and beams as they move away from the neutral axis of the building member so that the stress ratio of reinforcing steel such as reinforcing bars is substantially equal at the joint position between the building members. In the vicinity of the joint position between the building members, a gap with a predetermined height (length) is formed around the reinforcement steel, and the height (length) of the gap is As the distance from the neutral axis of the building member increases so that the distortion of the reinforcing steel material is approximately equal at the joint position between the building members, the height is set higher (longer) and the reinforcing steel material is substantially the same by the bending moment acting during an earthquake. It is structured to be plasticized at the time, and energy absorption function can be exerted not only on the reinforcing steel material far from the neutral axis of building members but also on the reinforcing steel material near the neutral axis, and the proof stress of the reinforcing steel material can be used effectively , Reinforced steel It is to provide an effective use of the building member strength.

上記従来技術の課題を解決するための手段として、請求項1に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鉄筋で補強されたコンクリート杭は、基礎との接合位置である同基礎の下面位置で鉄筋の応力比が略等しくなるように、杭の中立軸から離れるにしたがい、強度が大きい鉄筋を配置し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする。
As a means for solving the problems of the prior art, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 1 is:
Concrete piles reinforced with reinforcing steel bars are stronger as they are moved away from the neutral axis of the pile so that the stress ratio of the reinforcing bars is approximately equal at the bottom surface of the foundation, which is the position where the foundation is joined. It is characterized in that the reinforcing bar is plasticized at substantially the same time by a bending moment acting during an earthquake or the like.

請求項2に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鋼管が多重に配置された杭は、基礎との接合位置である同基礎の下面位置で鋼管の応力比が略等しくなるように、杭の中立軸から離れるにしたがい、強度が大きい鋼管を配置し、地震時などに作用する曲げモーメントによって鋼管を略同時期に塑性化させる構成としたことを特徴とする。
A building member that effectively utilizes the proof stress of the reinforcing steel material according to the invention described in claim 2,
A pile with multiple steel pipes, which are reinforced steel, has high strength as it moves away from the neutral axis of the pile so that the stress ratio of the steel pipe is approximately equal at the bottom surface position of the foundation, which is the joint position with the foundation. It is characterized in that a steel pipe is arranged and the steel pipe is plasticized substantially at the same time by a bending moment acting during an earthquake or the like.

請求項3に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鉄筋で補強されたコンクリート柱は、梁との接合位置である下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置で、鉄筋の応力比が略等しくなるように、柱の中立軸から離れるにしたがい、強度が大きい鉄筋を配置し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする。
A building member that effectively utilizes the proof stress of the reinforcing steel material according to the invention described in claim 3 is:
For concrete columns reinforced with reinforcing steel bars, the stress ratio of the reinforcing bars should be approximately equal at at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam, which is the joint position with the beam. As the distance from the neutral axis of the column increases, reinforcing bars with high strength are arranged, and the reinforcing bars are plasticized at substantially the same time by a bending moment acting during an earthquake or the like.

請求項4に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鋼管が多重に配置されたコンクリート充填鋼管柱は、梁との接合位置である下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置で、鋼管の応力比が略等しくなるように、柱の中立軸から離れるにしたがい、強度が大きい鋼管を配置し、地震時などに作用する曲げモーメントによって鋼管を略同時期に塑性化させる構成としたことを特徴とする。
A building member that effectively utilizes the proof stress of the reinforcing steel material according to the invention described in claim 4 is:
A concrete-filled steel pipe column in which steel pipes, which are reinforcing steel materials, are arranged in multiple layers, has a steel pipe stress ratio of approximately at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam, which is the joint position with the beam. The steel pipes having a high strength are arranged so as to be equal to each other so as to be equal to each other, and the steel pipes are plasticized substantially at the same time by a bending moment acting during an earthquake or the like.

請求項5に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鉄筋で補強されたコンクリート梁は、柱との接合位置である同柱の外周面位置で鉄筋の応力比が略等しくなるように、梁の中立軸から離れるにしたがい、強度が大きい鉄筋を配置し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする。
A building member that effectively utilizes the proof stress of the reinforcing steel material according to the invention described in claim 5 is:
Concrete beams reinforced with reinforcing steel bars are stronger as they are separated from the beam's neutral axis so that the stress ratio of the reinforcing bars is approximately equal at the outer peripheral surface of the column, which is the joint position with the column. It is characterized by arranging reinforcing bars and plasticizing the reinforcing bars almost simultaneously with a bending moment acting during an earthquake.

請求項6に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鉄筋で補強されたコンクリート杭は、基礎との接合位置である同基礎の下面位置近傍おいて、鉄筋の周辺に所定の高さの空隙部を形成しており、同空隙部の高さを、基礎の下面位置で鉄筋の歪みが略等しくなるように、杭の中立軸から離れるにしたがい、高く設定し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする。
A building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 6,
A concrete pile reinforced with reinforcing steel reinforcing bars has a gap with a predetermined height around the reinforcing bars near the bottom surface of the foundation, which is the position where the foundation is joined. The height is set higher as it moves away from the neutral axis of the pile so that the strain of the reinforcing bar is almost equal at the bottom surface position of the foundation, and the reinforcing bar is plasticized at almost the same time by the bending moment acting during an earthquake etc. It is characterized by having a configuration.

請求項7に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鋼管が多重に配置された杭は、基礎との接合位置である同基礎の下面位置近傍において、鋼管の周辺に所定の高さの空隙部を形成しており、同空隙部の高さを、基礎の下面位置で鋼管の歪みが略等しくなるように、杭の中立軸から離れるにしたがい、高く設定し、地震時などに作用する曲げモーメントによって鋼管を略同時期に塑性化させる構成としたことを特徴とする。
A building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 7 is:
A pile with multiple steel pipes, which are reinforcing steel materials, has a gap with a predetermined height around the steel pipe in the vicinity of the bottom surface of the foundation, which is the position where the foundation is joined. The height is set higher as the distance from the neutral axis of the pile is increased so that the strain of the steel pipe is approximately equal at the bottom surface position of the foundation, and the steel pipe is plasticized at approximately the same time by a bending moment that acts during an earthquake, etc. It is characterized by having a configuration.

請求項8に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鉄筋で補強されたコンクリート柱は、梁との接合位置である下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置近傍において、鉄筋の周辺に所定の高さの空隙部を形成しており、同空隙部の高さを、前記下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置で、鉄筋の歪みが略等しくなるように、柱の中立軸から離れるにしたがい、高く設定し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする。
A building member that effectively utilizes the proof stress of the reinforcing steel material according to the invention described in claim 8 is:
A concrete column reinforced with reinforcing steel bars, which are reinforced steel, has a predetermined height around the reinforcing bars in the vicinity of at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam, which is the joint position with the beam. A gap is formed, and the height of the gap is set at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam so that the distortion of the reinforcing bar is substantially equal. It is characterized in that it is set higher as it moves away from the vertical axis, and the rebar is plasticized at substantially the same time by a bending moment acting during an earthquake or the like.

請求項9に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鋼管が多重に配置されたコンクリート充填鋼管柱は、梁との接合位置である下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置近傍において、鋼管の周辺に所定の高さの空隙部を形成しており、同空隙部の高さを、前記下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置で、鋼管の歪みが略等しくなるように、柱の中立軸から離れるにしたがい、高く設定し、地震時などに作用する曲げモーメントによって鋼管を略同時期に塑性化させる構成としたことを特徴とする。
A building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 9 is:
A concrete-filled steel pipe column in which steel pipes, which are reinforced steel materials, are arranged in multiple locations is arranged around the steel pipe at the vicinity of at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam that is the joint position with the beam. The height of the gap is set so that the strain of the steel pipe is substantially equal at at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam. The structure is such that the steel pipe is plasticized at substantially the same time by a bending moment that acts in the event of an earthquake, etc., as it is set higher as it moves away from the neutral axis of the column.

請求項10に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、
補強鋼材である鉄筋で補強されたコンクリート梁は、柱との接合位置である同柱の外周面位置近傍において、鉄筋の周辺に所定の長さの空隙部を形成しており、同空隙部の長さを、柱の外周面位置で、鉄筋の歪みが略等しくなるように、梁の中立軸から離れるにしたがい、長く設定し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする。
A building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 10,
A concrete beam reinforced with reinforcing steel bars is a space with a predetermined length around the reinforcing bars in the vicinity of the outer peripheral surface of the column, which is the position where the column is joined. The length is set longer as the distance from the neutral axis of the beam increases so that the distortion of the rebar is approximately equal at the outer peripheral surface of the column, and the rebar is plasticized at approximately the same time by a bending moment acting during an earthquake, etc. It is characterized by having a configuration to make it.

請求項11記載の発明は、請求項6〜10のいずれか一に記載した補強鋼材の耐力を有効利用した建築部材において、
空隙部に粘弾性体を充填していることを特徴とする。
Invention of Claim 11 is the building member which utilized effectively the proof stress of the reinforced steel materials as described in any one of Claims 6-10,
The void portion is filled with a viscoelastic body.

本発明に係る補強鋼材の耐力を有効利用した建築部材は、杭、柱、梁などの建築部材を、建築部材相互の接合位置で補強鋼材の応力比が略等しくなるように、建築部材の中立軸から離れるにしたがい、強度が大きい補強鋼材を配置し、又は建築部材相互の接合位置近傍において、補強鋼材の周辺に所定の高さ(長さ)の空隙部を形成し、同空隙部の高さ(長さ)を、建築部材相互の接合位置で補強鋼材の歪みが略等しくなるように、建築部材の中立軸から離れるにしたがい、高く(長く)設定し、地震時などに作用する曲げモーメントによって補強鋼材を略同時期に塑性化させる構成とし、建築部材の中立軸から遠い補強鋼材だけでなく、中立軸に近い補強鋼材にもエネルギー吸収機能を発揮させることができ、補強鋼材の耐力を有効利用することができる。   The building member that effectively uses the proof stress of the reinforcing steel material according to the present invention is a building member such as a pile, a column, or a beam, in which the stress ratio of the reinforcing steel material is substantially equal at the joint position between the building members. As the distance from the vertical axis increases, a reinforcing steel material having a high strength is disposed, or a gap portion of a predetermined height (length) is formed around the reinforcing steel material in the vicinity of the joint position between the building members. Bending moment that acts in the event of an earthquake, etc., is set higher (longer) as the distance (length) increases from the neutral axis of the building member so that the distortion of the reinforcing steel material becomes approximately equal at the joint position between the building members. The reinforcement steel material is plasticized at almost the same time, and the energy absorption function can be exhibited not only in the reinforcement steel material far from the neutral axis of the building member but also in the reinforcement steel material near the neutral axis. Effective use It is possible.

特に、請求項1〜5に記載した発明に係る補強鋼材の耐力を有効利用した建築部材は、建築部材の中立軸に近い補強鋼材の強度が、中立軸から遠い補強鋼材の強度に比べて、小さくて良いので、前記建築部材の中立軸に近い補強鋼材に安価な補強鋼材を採用することができ、コストの削減に寄与できる。   In particular, the building member that effectively uses the proof stress of the reinforcing steel material according to the inventions described in claims 1 to 5 is such that the strength of the reinforcing steel material near the neutral axis of the building member is greater than the strength of the reinforcing steel material far from the neutral axis. Since it may be small, an inexpensive reinforcing steel material can be adopted as the reinforcing steel material close to the neutral axis of the building member, which can contribute to cost reduction.

補強鋼材である鉄筋で補強されたコンクリート杭は、基礎との接合位置である同基礎の下面位置で鉄筋の応力比が略等しくなるように、杭の中立軸から離れるにしたがい、強度が大きい鉄筋を配置し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成とする。   Concrete piles reinforced with reinforcing steel bars are stronger as they are moved away from the neutral axis of the pile so that the stress ratio of the reinforcing bars is approximately equal at the bottom surface of the foundation, which is the position where the foundation is joined. Is arranged, and the reinforcing bars are plasticized at almost the same time by a bending moment acting during an earthquake.

請求項1に記載した発明に係る補強部材の耐力を有効利用した建築部材(以下、単に建築部材と省略する場合がある。)の実施例を、図1及び図2に基づいて説明する。   An embodiment of a building member (hereinafter sometimes simply referred to as a building member) that effectively utilizes the proof stress of the reinforcing member according to the invention described in claim 1 will be described with reference to FIGS. 1 and 2.

本実施例の建築部材である鉄筋コンクリート杭1(以下、単に杭1と省略する。)は、通例の鉄筋コンクリート杭と略同様に、杭1の外形に倣って配置した中立軸Tから遠い鉄筋(補強鋼材)2aと、中立軸Tに近い鉄筋2bとで補強された構成としているが、鉄筋コンクリート造の基礎梁3(但し、基礎スラブ、フーチング等の通例の基礎でも良い。)との接合位置である同基礎梁3の下面3a位置で、全て(但し、この限りでない。)の鉄筋2a、2bの応力比(発生応力/降伏応力)が略等しくなるように、杭1の中立軸Tから離れるにしたがい、強度が大きい鉄筋を配置した構成としている。すなわち、杭1の中立軸Tに近い鉄筋2bに比べて、中立軸Tから遠い鉄筋2aに強度が大きい鉄筋を採用し、各々の鉄筋2a、2bの上端部を基礎梁3に定着させている。 Concrete piles 1 is a building element of the present embodiment (hereinafter, simply abbreviated as pile 1.) Is, substantially similar to usual reinforced concrete piles, far rebar from the neutral axis T 1 arranged following the contour of the pile 1 ( joining position of the reinforcing steel) 2a, and although the reinforced structure between the reinforcing bar 2b close to the neutral axis T 1, foundation beams 3 of reinforced concrete (provided that the base slab may be a customary basis, such as footing.) The neutral axis T 1 of the pile 1 so that the stress ratio (generated stress / yield stress) of all (but not limited to) the reinforcing bars 2a, 2b is substantially equal at the position of the lower surface 3a of the foundation beam 3. As it leaves, it has a configuration in which reinforcing bars with high strength are arranged. That is, as compared with the reinforcing bar 2b close to the neutral axis T 1 of the pile 1, the intensity is large rebar adopted far rebar 2a from the neutral axis T 1, allowed to settle each rebar 2a, the upper end portion of 2b to footing beams 3 ing.

その結果、杭1は地震などによる曲げモーメントが作用すると、杭1の中立軸Tから遠い鉄筋2aだけでなく、中立軸Tに近い鉄筋2bも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鉄筋2a、2bの耐力を有効活用することができる。 As a result, the pile 1 when bending moment acts due to an earthquake, as well as far rebar 2a from the neutral axis T 1 of the pile 1, by plastically of energy absorption function in substantially the same time also close rebar 2b to the neutral axis T 1 The proof stress of all the reinforcing bars 2a and 2b can be effectively utilized.

また、杭1の中立軸Tから遠い鉄筋2aに比べて、中立軸Tに近い鉄筋2bは強度が小さくて良いので、降伏強度の小さい安価な鉄筋を採用することができ、コストの削減に寄与できる。 Further, as compared with the far rebar 2a from the neutral axis T 1 of the pile 1, the reinforcing bar 2b close to the neutral axis T 1 may be small in strength, it is possible to employ a small inexpensive reinforcing bar of yield strength, cost reduction Can contribute.

本実施例の杭1は鉄筋コンクリート造であるが、鉄骨鉄筋コンクリート造でも同様に実施できる。   Although the pile 1 of this embodiment is reinforced concrete, it can be similarly applied to steel reinforced concrete.

本実施例の基礎梁3も鉄筋コンクリート造であるが、やはり鉄骨鉄筋コンクリート造でも同様に実施できる(以下の実施例2、6、7も同様)。   Although the foundation beam 3 of this embodiment is also reinforced concrete, it can also be implemented in the same manner with steel-framed reinforced concrete (the same applies to the following Examples 2, 6, and 7).

次に、請求項2に記載した発明に係る補強鋼材の耐力を有効利用した建築部材を、図3及び図4に基づいて説明する。   Next, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 2 will be described with reference to FIGS.

本実施例の建築部材である鋼管杭4(以下、単に杭4と省略する。)は、通例の三重鋼管杭と略同様に、地盤に打設した中立軸Tから遠い鋼管(補強鋼材)5aと、中立軸Tに近い鋼管5bと、その間に配置された鋼管5cとで構成しているが、基礎梁3との接合位置である同基礎梁3の下面3a位置で、全ての鋼管5a〜5cの応力比が略等しくなるように、杭4の中立軸Tから離れるにしたがい、強度が大きい鋼管を配置した構成としている。すなわち、杭4の中立軸Tから遠い鋼管5a、5c、5bの順番で強度が大きい鋼管を採用し、各々の鋼管5a〜5cの上端を基礎梁3に定着させている。 Steel pipe pile 4 a building element of the present embodiment (hereinafter, simply abbreviated as piles 4.) Is a triple steel pipe pile and substantially similarly to customary distant steel from the neutral axis T 2 that Da設to ground (reinforcement steel) and 5a, a steel pipe 5b close to the neutral axis T 2, but is constituted by a steel pipe 5c disposed therebetween, the lower surface 3a position of the footing beams 3, which is a bonding position of the foundation beam 3, all of the steel tube as stress ratio of 5a~5c are substantially equal, with the distance from the neutral axis T 2 of the pile 4 has a configuration of arranging the intensity is large steel pipe. That is, steel pipes having high strength are employed in the order of steel pipes 5 a, 5 c, 5 b far from the neutral axis T 2 of the pile 4, and the upper ends of the steel pipes 5 a to 5 c are fixed to the foundation beam 3.

その結果、杭4は地震などによる曲げモーメントが作用すると、杭4の中立軸Tから遠い鋼管5aだけでなく、中立軸Tに近い鋼管5b、更にはその間に配置した鋼管5cも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鋼管5a〜5cの耐力を有効利用することができる。 As a result, the pile 4 is bending moment acts due to an earthquake, as well as far steel 5a from the neutral axis T 2 of the pile 4, near the steel pipe 5b to the neutral axis T 2, the steel pipe 5c also substantially the same for further disposed therebetween It becomes the structure which can be plasticized at time and can exhibit an energy absorption function, and can use effectively the proof stress of all the steel pipes 5a-5c.

また、杭4の中立軸Tから遠い鋼管5aに比べて、中立軸Tに近い鋼管5b、その間に配置した鋼管5cは強度が小さくて良いので、降伏強度の小さい安価な鋼管を採用することができ、コストの削減に寄与できる。 Further, as compared with the far steel pipe 5a from the neutral axis T 2 of the pile 4, the neutral axis T 2 near the steel pipe 5b, so may the steel pipe 5c strength is small arranged therebetween, to adopt a less expensive steel pipe yield strength Can contribute to cost reduction.

本実施例の杭4は三重鋼管杭であるが、鋼管の数は特に限定されない。また、鋼管5aと5c、5cと5bの間にコンクリートが充填されたコンクリート充填鋼管杭でも同様に実施できる。   Although the pile 4 of a present Example is a triple steel pipe pile, the number of steel pipes is not specifically limited. Moreover, it can implement similarly also with the concrete filling steel pipe pile by which concrete was filled between the steel pipes 5a and 5c, 5c and 5b.

次に、請求項3に記載した発明に係る補強鋼材の耐力を有効利用した建築部材を、図5及び図6に基づいて説明する。   Next, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 3 will be described with reference to FIGS.

本実施例の建築部材である鉄筋コンクリート柱6(以下、単に柱6と省略する。)は、通例の鉄筋コンクリート柱と略同様に、柱6の外形に倣って配置した中立軸Tから遠い鉄筋7aと、中立軸Tに近い鉄筋7bとで補強された構成としているが、鉄筋コンクリート造の上階梁8との接合位置である同上階梁8の下面8a位置で、全て(但し、この限りでない。)の鉄筋7a、7bの応力比が略等しくなるように、柱6の中立軸Tから離れるにしたがい、強度が大きい鉄筋を配置した構成としている。すなわち、柱6の中立軸Tに近い鉄筋7bに比べて、中立軸Tから遠い鉄筋7aに強度が大きい鉄筋を採用し、各々の鉄筋7a、7bの上端部を上階梁8に定着させ、下端部を下階梁9に定着させている。 Concrete Columns 6 is a building element of the present embodiment (hereinafter, simply abbreviated as pillars 6.) Is substantially the same as the customary reinforced concrete column, farther rebar 7a from the neutral axis T 3 arranged to follow the contour of the posts 6 If, although the reinforced structure between the reinforcing bar 7b close to the neutral axis T 3, the lower surface 8a positions of the same Kaihari 8 is a joining position between the Kaihari 8 on the reinforced concrete, all (but shall not apply .) rebar 7a, as the stress ratio 7b are substantially equal, with the distance from the neutral axis T 3 pillars 6 has a configuration of arranging the intensity is large rebar. That is, compared to the reinforcing bar 7 b near the neutral axis T 3 of the column 6, a reinforcing bar having a higher strength is adopted for the reinforcing bar 7 a far from the neutral axis T 3, and the upper ends of the reinforcing bars 7 a and 7 b are fixed to the upper floor beam 8. The lower end is fixed to the lower floor beam 9.

その結果、柱6は地震などによる曲げモーメントが作用すると、柱6の中立軸Tから遠い鉄筋7aだけでなく、中立軸Tに近い鉄筋7bも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鉄筋7a、7bの耐力を十分に有効活用することができる。 As a result, when a bending moment due to an earthquake or the like acts on the column 6, not only the reinforcing bar 7 a far from the neutral axis T 3 of the column 6 but also the reinforcing bar 7 b near the neutral axis T 3 is plasticized at substantially the same time, thereby absorbing energy. The proof stress of all the reinforcing bars 7a and 7b can be fully utilized effectively.

また、柱6の中立軸Tから遠い鉄筋7aに比べて、中立軸Tに近い鉄筋7bは強度が小さくて良いので、降伏強度の小さい安価な鉄筋を採用することができ、コストの削減に寄与できる。 Further, as compared from the neutral axis T 3 pillars 6 farther rebar 7a, reinforcing bars 7b close to the neutral axis T 3 is the strength may be small, it is possible to employ a small inexpensive reinforcing bar of yield strength, cost reduction Can contribute.

本実施例の柱6は鉄筋コンクリート造であるが、鉄骨鉄筋コンクリート造でも同様に実施できる。   Although the column 6 of this embodiment is reinforced concrete, it can be similarly applied to steel reinforced concrete.

本実施例の上階梁8及び下階梁9も鉄筋コンクリート造であるが、鉄骨鉄筋コンクリート造でも同様に実施できる(以下、実施例4、8、9も同様)。   The upper floor beam 8 and the lower floor beam 9 of this embodiment are also reinforced concrete, but the same can be applied to a steel reinforced concrete structure (hereinafter, Examples 4, 8, and 9 are also the same).

次に、請求項4に記載した発明に係る補強鋼材の耐力を有効利用した建築部材を、図7及び図8に基づいて説明する。   Next, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 4 will be described with reference to FIGS.

本実施例の建築部材であるコンクリート充填鋼管柱10(以下、単に柱10と省略する。)は、通例のコンクリート充填鋼管柱と同様に、柱10の中立軸Tから遠い鋼管11aと、中立軸Tに近い鋼管11bと、その間に配置された鋼管11cとで補強された構成としているが、上階梁8との接合位置である同上階梁8の下面8a位置で、全ての鋼管11a〜11cの応力比が略等しくなるように、柱10の中立軸Tから離れるにしたがい、強度が大きい鋼管を配置した構成としている。すなわち、柱10の中立軸Tから遠い鋼管11a、11c、11bの順番で強度が大きい鋼管を採用し、各々の鋼管11a〜11cの上端部を上階梁8に定着させ、下端部を下階梁9に定着させている。 Concrete filled steel tube column 10 is a building component according to the present embodiment (hereinafter, simply abbreviated as pillars 10.), As well as the customary concrete-filled steel tube column, and far steel 11a from the neutral axis T 4 pillars 10, medium a steel tube 11b closer to the vertical spindle T 4, but has a configuration which is reinforced with a steel pipe 11c disposed therebetween, the lower surface 8a positions of the same Kaihari 8 is a joining position with Uekaihari 8, all the steel pipe 11a as stress ratio of ~11c are substantially equal, with the distance from the neutral axis T 4 pillar 10 has a configuration of arranging the intensity is large steel pipe. Under i.e., farther steel 11a from the neutral axis T 4 pillars 10, 11c, employing the intensity is large steel pipe 11b order, to fix the upper end of each of the steel pipe 11a~11c above Kaihari 8, the lower end It is fixed to the floor beam 9.

その結果、柱10は地震などによる曲げモーメントが作用すると、柱10の中立軸Tから遠い鋼管11aだけでなく、中立軸Tに近い鋼管11b、更にはその間に配置した鋼管11cも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鋼管11a〜11cの耐力を十分に有効利用することができる。 As a result, posts 10, upon bending moment acts due to an earthquake, as well as far steel 11a from the neutral axis T 4 pillars 10, near the steel pipe 11b to the neutral axis T 4, steel tube 11c is also substantially the same for further disposed therebetween It becomes the structure which can be plasticized at the time and can exhibit the energy absorption function, and the proof stress of all the steel pipes 11a-11c can fully be utilized effectively.

また、柱10の中立軸Tから遠い鋼管11aに比べて、中立軸Tに近い鋼管11b、その間に配置した鋼管11cは強度が小さくて良いので、降伏強度の小さい安価な鋼管を採用することができ、コストの削減に寄与できる。 Further, as compared from the neutral axis T 4 pillars 10 distant steel pipe 11a, near the steel pipe 11b to the neutral axis T 4, so may the steel pipe 11c intensity small arranged therebetween, to adopt a less expensive steel pipe yield strength Can contribute to cost reduction.

次に、請求項5に記載した発明に係る補強鋼材の耐力を有効利用した建築部材を、図9及び図10に基づいて説明する。   Next, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 5 will be described with reference to FIGS.

本実施例の建築部材である鉄筋コンクリート梁12(以下、単に梁12と省略する。)は、通例の鉄筋コンクリート梁と略同様に、梁12の外形に倣って配置した中立軸Tから遠い鉄筋13aと、中立軸Tに近い鉄筋13bとで補強された構成としているが、鉄筋コンクリート造の柱14との接合位置である同柱14の外周面14a位置で、全て(但し、この限りでない。)の鉄筋13a、13bの応力比が略等しくなるように、梁12の中立軸Tから離れるにしたがい、強度が大きい鉄筋を配置した構成としている。すなわち、梁12の中立軸Tに近い鉄筋13bに比べて、中立軸Tから遠い鉄筋13aに強度が大きい鉄筋を採用し、各々の鉄筋13a、13bを左右の柱14、14に通し定着させている。 Reinforced beam 12 is a building component according to the present embodiment (hereinafter, simply abbreviated as beam 12.) Is usually reinforced concrete beams and substantially similarly to distant reinforcing bars 13a from the neutral axis T 5 arranged following the contour of the beam 12 If, although the reinforced structure between the reinforcing bar 13b close to the neutral axis T 5, the outer peripheral surface 14a position of the pillar 14, which is a bonding position between the reinforced concrete pillars 14, all (but shall not apply.) rebar 13a, as stress ratio of 13b is substantially equal, with the distance from the neutral axis T 5 of the beam 12 has a configuration of arranging the intensity is large rebar. That is, as compared with the reinforcing bar 13b close to the neutral axis T 5 of the beam 12, the intensity is large rebar adopted far rebar 13a from the neutral axis T 5, the fixing through each rebar 13a, and 13b to the left and right pillars 14, 14 I am letting.

その結果、梁12は地震などによる曲げモーメントが作用すると、梁12の中立軸Tから遠い鉄筋13aだけでなく、中立軸Tに近い鉄筋13bも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鉄筋13a、13bの耐力を十分に有効活用することができる。 As a result, the beam 12 when bending moment acts due to an earthquake, as well as far rebar 13a from the neutral axis T 5 of the beam 12, by plastically of energy absorption function in substantially the same time also close rebar 13b to the neutral axis T 5 The proof stress of all the reinforcing bars 13a and 13b can be fully utilized effectively.

また、梁12の中立軸Tから遠い鉄筋13aに比べて、中立軸Tに近い鉄筋13bは強度が小さくて良いので、降伏強度の小さい安価な鉄筋を採用することができ、コストの削減に寄与できる。 Further, as compared from the neutral axis T 5 of the beam 12 farther Rebar 13a, rebar 13b close to the neutral axis T 5 is the strength may be small, it is possible to employ a small inexpensive reinforcing bar of yield strength, cost reduction Can contribute.

本実施例の梁12は鉄筋コンクリート造であるが、鉄骨鉄筋コンクリート造でも同様に実施できる。   Although the beam 12 of this embodiment is reinforced concrete, it can be similarly applied to steel reinforced concrete.

本実施例の柱14も鉄筋コンクリート造であるが、やはり鉄骨鉄筋コンクリート造でも同様に実施できる(以下、実施例10でも同様)。   Although the column 14 of this embodiment is also reinforced concrete, it can be similarly applied to steel reinforced concrete (hereinafter, the same applies to the embodiment 10).

次に、請求項6に記載した発明に係る補強鋼材の耐力を有効利用した建築部材を、図11〜図13に基づいて説明する。   Next, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 6 will be described with reference to FIGS.

本実施例の建築部材である鉄筋コンクリート杭15(以下、単に杭15と省略する。)は、通例の鉄筋コンクリート杭と略同様に、杭15の外形に倣って配置した中立軸Tから遠い鉄筋16aと、中立軸Tに近い鉄筋16bとで補強された構成としている。しかし、杭15の中立軸Tから遠い鉄筋16aの上端部を、周辺に基礎梁3の下面3aから所定の高さLを有する空隙部17を形成してから定着させ、同空隙部17の高さLを、基礎梁3の下面3a位置で、全て(但し、この限りでない。)の鉄筋16a、16bの歪みが略等しくなる高さに設定した構成としている。すなわち、図13に示すように、歪みが集中する基礎梁3の下面3a位置近傍において、鉄筋16aの周辺に空隙部17を形成することで、鉄筋16aが基礎梁3に拘束されない箇所を形成し、当該拘束されていない箇所で鉄筋16aの伸びを吸収して歪みを小さくし、もともと歪みが小さい鉄筋16bと歪みを等しくしている。 Concrete piles 15 a building element of the present embodiment (hereinafter, simply abbreviated as pile 15.) Is usually reinforced concrete piles and substantially similarly to distant reinforcing bars 16a from the neutral axis T 6 arranged following the contour of the pile 15 If, and the reinforced structure between the reinforcing bar 16b close to the neutral axis T 6. However, the upper end portion of the far reinforcing bar 16a from the neutral axis T 6 of pile 15, is fixed after forming the cavity portion 17 having a height L 1 from the lower surface 3a of a predetermined fundamental beam 3 around, the air gap 17 of the height L 1, the lower surface 3a position of the footing beams 3, all (but shall not apply.) rebar 16a of has a configuration in which distortion of 16b was set to be substantially equal height. That is, as shown in FIG. 13, in the vicinity of the position of the lower surface 3 a of the foundation beam 3 where strain is concentrated, a space 17 is formed around the reinforcing bar 16 a to form a portion where the reinforcing bar 16 a is not restrained by the foundation beam 3. In the unconstrained portion, the elongation of the reinforcing bar 16a is absorbed to reduce the distortion, and the distortion is made equal to the reinforcing bar 16b that originally has a small distortion.

その結果、杭15は地震などによる曲げモーメントが作用すると、杭15の中立軸Tから遠い鉄筋16aだけでなく、中立軸Tに近い鉄筋16bも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鉄筋16a、16bの耐力を十分に有効利用することができる。 As a result, when a bending moment due to an earthquake or the like acts on the pile 15, not only the reinforcing bar 16 a far from the neutral axis T 6 of the pile 15 but also the reinforcing bar 16 b near the neutral axis T 6 is plasticized at substantially the same time, thereby absorbing energy. The proof stress of all the reinforcing bars 16a and 16b can be fully utilized effectively.

本実施例の杭15は鉄筋コンクリート造であるが、鉄骨鉄筋コンクリート造でも同様に実施できる。   Although the pile 15 of this embodiment is reinforced concrete, it can be similarly applied to steel reinforced concrete.

本実施例の空隙部17は基礎梁3の内部に形成したが、杭15の内部に形成しても良い。要するに、前記空隙部17は基礎梁3との接合位置近傍に形成していれば良い。   Although the gap portion 17 of this embodiment is formed inside the foundation beam 3, it may be formed inside the pile 15. In short, the gap 17 may be formed in the vicinity of the joint position with the foundation beam 3.

次に、請求項7に記載した発明に係る補強鋼材の耐力を有効利用した建築部材を、図14に基づいて説明する。   Next, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 7 will be described with reference to FIG.

本実施例の建築部材である鋼管杭18(以下、単に杭18と省略する。)は、通例の三重鋼管杭と略同様に、地盤に打設した杭18の中立軸Tから遠い鋼管19aと、中立軸Tに近い鋼管19bと、その間に配置された鋼管19cとで構成している。しかし、杭18の中立軸Tから遠い鋼管19aの上端部を、周辺に基礎梁3の下面3aから所定の高さLを有する空隙部20を形成してから定着させ、更に前記鋼管19aの内側に配置した鋼管19cの上端部も、周辺に基礎梁3の下面3aから所定の高さLを有する空隙部21を形成してから定着させている。そして、前記空隙部20、21の高さL、Lを、基礎梁3の下面3a位置で、全ての鋼管19a〜19cの歪みが略等しくなるように、杭18の中立軸Tから離れるにしたがい、高く設定した構成としている。すなわち、空隙部20、21を形成しなかった場合の鋼管19a、19cの歪みは、中立軸Tから離れるにしたがい大きくなるので、その歪みの大きさに倣った長さの空隙部20、21を、それぞれ鋼管19a、19cの周辺に形成して、同鋼管19a、19cが基礎梁3に拘束されない箇所を形成し、当該拘束されていない箇所で鋼管19a、19cの伸びを吸収して相互の歪みを等しくすると共に小さくし、もともと歪みが小さい鋼管19bと歪みを等しくしている。 Steel pipe pile 18 architectural member of the present embodiment (hereinafter, simply abbreviated as pile 18.) Is a triple steel pipe pile and substantially similarly to customary distant steel 19a from the neutral axis T 7 of piles 18 that Da設to ground When, are composed of a steel pipe 19b close to the neutral axis T 7, a steel pipe 19c disposed therebetween. However, the upper end portion of the far steel pipe 19a from the neutral axis T 7 of pile 18, is fixed after forming the gap portion 20 having a predetermined height L 2 in the periphery from the lower surface 3a of the foundation beam 3, further wherein the steel pipe 19a the upper end of the steel pipe 19c disposed in the inside, and allowed to settle after forming a gap portion 21 having a predetermined height L 3 from the lower surface 3a of the foundation beam 3 around. Then, the heights L 2 and L 3 of the gaps 20 and 21 are set from the neutral axis T 7 of the pile 18 so that the strains of all the steel pipes 19 a to 19 c are substantially equal at the position of the lower surface 3 a of the foundation beam 3. The higher the setting, the higher the setting. That is, the steel pipe 19a in the case of not forming the gap portion 20 and 21, distortion of 19c are neutral axis becomes larger as the distance from the T 7, the gap portions 20 and 21 of a length that follows the magnitude of the strain Are formed around the steel pipes 19a and 19c, respectively, where the steel pipes 19a and 19c are not restrained by the foundation beam 3, and the elongation of the steel pipes 19a and 19c is absorbed at the unconstrained parts. The strain is made equal and smaller, and the strain is made equal to that of the steel pipe 19b that originally has a small strain.

その結果、杭18は地震などによる曲げモーメントが作用すると、杭18の中立軸Tから遠い鋼管19aだけでなく、中立軸Tに近い鉄筋19b、更にはその間に配置した鋼管19cも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鋼管19a〜19cの耐力を十分に有効利用することができる。 As a result, the pile 18 is bending moment acts due to an earthquake, as well as far steel 19a from the neutral axis T 7 of piles 18, rebar 19b close to the neutral axis T 7, the steel pipe 19c also substantially the same for further disposed therebetween It becomes the structure which can be plasticized at time and can exhibit an energy absorption function, and can fully utilize the yield strength of all the steel pipes 19a-19c.

次に、請求項8に記載した発明に係る補強鋼材の耐力を有効利用した建築部材を、図15に基づいて説明する。   Next, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 8 will be described with reference to FIG.

本実施例の建築部材である鉄筋コンクリート柱22(以下、単に柱22と省略する。)は、通例の鉄筋コンクリート柱と略同様に、柱22の外形に倣って配置した中立軸Tから遠い鉄筋23aと、中立軸Tに近い鉄筋23bとで補強された構成とし、各々の鉄筋23a、23bの上端部を上階梁8に定着させ、下端部を下階梁(図示を省略)に定着させている。しかし、柱22の中立軸Tから遠い鉄筋23aの上端部を、周辺に上階梁8の下面8aから所定の高さLを有する空隙部24を形成してから定着させ、同空隙部24の高さLを、上階梁8の下面8a位置で、全て(但し、この限りでない。)の鉄筋23a、23bの歪みが略等しくなる高さに設定した構成としている。すなわち、歪みが集中する上階梁8の下面8a位置近傍において、鉄筋23aの周辺に空隙部24を形成することで、鉄筋23aが上階梁8に拘束されない箇所を形成し、当該拘束されていない箇所で鉄筋23aの伸びを吸収して歪みを小さくし、もともと歪みが小さい鉄筋23bと歪みを等しくしている。 Concrete Columns 22 is a building component according to the present embodiment (hereinafter, simply abbreviated as column 22.) Is substantially the same as the customary reinforced concrete column, farther rebar 23a from the neutral axis T 8 arranged following the outline of the pillar 22 If, as a reinforced structure between the reinforcing bar 23b close to the neutral axis T 8, each of the reinforcing bars 23a, the upper portion of 23b is fixed to the upper Kaihari 8, to fix the lower portion under Kaihari (not shown) ing. However, the upper end portion of the far reinforcing bar 23a from the neutral axis T 8 of column 22, is fixed after forming the gap portion 24 having a predetermined height L 4 from the lower surface 8a of Uekaihari 8 around, the air gap the height L 4 of 24, the lower surface 8a position of Uekaihari 8, all (but shall not apply.) rebar 23a, has a configuration that is set to the height distortion and 23b are substantially equal. In other words, in the vicinity of the position of the lower surface 8a of the upper floor beam 8 where the strain concentrates, by forming the gap 24 around the reinforcing bar 23a, a portion where the reinforcing bar 23a is not restrained by the upper floor beam 8 is formed and restrained. The distortion of the reinforcing bar 23a is absorbed at a place where there is no distortion to reduce the distortion, and the distortion is made equal to that of the reinforcing bar 23b which originally has a small distortion.

その結果、柱22は地震などによる曲げモーメントが作用すると、柱22の中立軸Tから遠い鉄筋23aだけでなく、中立軸Tに近い鉄筋23bも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鉄筋23a、23bの耐力を十分に有効利用することができる。 As a result, when a bending moment due to an earthquake or the like acts on the column 22, not only the reinforcing bar 23 a far from the neutral axis T 8 of the column 22 but also the reinforcing bar 23 b near the neutral axis T 8 is plasticized at substantially the same time, thereby absorbing energy. The proof stress of all the reinforcing bars 23a and 23b can be fully utilized effectively.

本実施例の柱22は鉄筋コンクリート造であるが、鉄骨鉄筋コンクリート造でも同様に実施できる。   Although the column 22 of this embodiment is reinforced concrete, it can be similarly applied to steel reinforced concrete.

本実施例の空隙部24は上階梁8の内部に形成したが、下階梁の内部に形成したり、柱22の内部に形成しても良い。要するに、前記空隙部24は上階梁8又は下階梁との接合位置近傍に形成していれば良い。   Although the gap portion 24 of this embodiment is formed inside the upper floor beam 8, it may be formed inside the lower floor beam or inside the column 22. In short, the gap 24 may be formed in the vicinity of the joint position with the upper floor beam 8 or the lower floor beam.

次に、請求項9に記載した発明に係る補強鋼材の耐力を有効利用した建築部材を、図16に基づいて説明する。   Next, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 9 will be described with reference to FIG.

本実施例の建築部材であるコンクリート充填鋼管柱25(以下、単に柱25と省略する。)は、通例のコンクリート充填鋼管柱と略同様に、柱25の中立軸Tから遠い鋼管26aと、中立軸Tに近い鋼管26bと、その間に配置された鋼管26cとで補強された構成とし、各々の鋼管26a〜26cの上端部を上階梁8に定着させ、下端部を下階梁(図示を省略)に定着させている。しかし、柱25の中立軸Tから遠い鋼管26aの上端部を、周辺に上階梁8の下面8aから所定の高さLを有する空隙部27を形成して定着させ、更に前記鋼管26aの内側に配置した鋼管26cの上端部を、周辺に上階梁8の下面8aから所定の高さLを有する空隙部28を形成してから定着させている。そして、空隙部27、28の高さL、Lを、上階梁8の下面8a位置で、全ての鋼管26a〜26cの歪みが略等しくなるように、柱25の中立軸Tから離れるにしたがい、高く設定した構成としている。すなわち、空隙部27、28を形成しなかった場合の鋼管26a、26cの歪みは、中立軸Tから離れるにしたがい大きくなるので、その歪みの大きさに倣った長さの空隙部27、28を、鋼管26a、26cの周辺に形成して、同鋼管26a、26cが上階梁8に拘束されない箇所を形成し、当該拘束されていない箇所で鋼管26a、26cの伸びを吸収して相互の歪みを等しくすると共に小さくし、もともと歪みが小さい鋼管26bと歪みを等しくしている。 Concrete filled steel tube column 25 is a building element of the present embodiment (hereinafter, simply abbreviated as pillars 25.) Is substantially the same as the customary concrete-filled steel tube column, and far steel 26a from the neutral axis T 9 pillars 25, and a steel pipe 26b close to the neutral axis T 9, the structure reinforced with a steel pipe 26c disposed therebetween, the upper end portion of each of the steel pipe 26a~26c is fixed to the upper Kaihari 8, the lower the lower end Kaihari ( (Not shown). However, the upper end portion of the far steel pipe 26a from the neutral axis T 9 pillar 25, is fixed to form a gap portion 27 having a predetermined height L 5 from the lower surface 8a of Uekaihari 8 around, further the steel pipe 26a of the upper end portion of the steel pipe 26c disposed inwardly, thereby fixing after formation of a space portion 28 having a predetermined height L 6 from the lower surface 8a of Uekaihari 8 around. Then, the heights L 5 and L 6 of the gaps 27 and 28 are set so that the strains of all the steel pipes 26 a to 26 c are substantially equal at the position of the lower surface 8 a of the upper floor beam 8 from the neutral axis T 9 of the column 25. The higher the setting, the higher the setting. That is, the steel pipe 26a in the case of not forming the gap portion 27, distortion of 26c is neutral axis becomes larger as the distance from T 9, the gap portions 27 and 28 of a length that follows the magnitude of the strain Is formed around the steel pipes 26a and 26c, and the steel pipes 26a and 26c are formed at portions where the steel pipes 26a and 26c are not restrained by the upper floor beam 8, and the elongations of the steel pipes 26a and 26c are absorbed at the unconstrained portions. The strain is made equal and small, and the strain is made equal to that of the steel pipe 26b, which originally has a small strain.

その結果、柱25は地震などによる曲げモーメントが作用すると、柱25の中立軸Tから遠い鋼管26aだけでなく、中立軸Tに近い鋼管26b、更にはその間に配置した鋼管26cも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鋼管26a〜26cの耐力を十分に有効利用することができる。 As a result, posts 25, upon bending moment acts due to an earthquake, as well as far steel 26a from the neutral axis T 9 of post 25, near the steel pipe 26b to the neutral axis T 9, the steel pipe 26c also substantially the same for further disposed therebetween It becomes the structure which can be plasticized at time and can exhibit an energy absorption function, and can fully utilize the yield strength of all the steel pipes 26a-26c.

本実施例の空隙部27、28は上階梁8の内部に形成したが、下階梁の内部に形成しても良い。要するに、前記空隙部27、28は上階梁8又は下階梁との接合位置近傍に形成していれば良い。   Although the gaps 27 and 28 in this embodiment are formed inside the upper floor beam 8, they may be formed inside the lower floor beam. In short, the gaps 27 and 28 may be formed in the vicinity of the joint position with the upper floor beam 8 or the lower floor beam.

次に、請求項10に記載した発明に係る補強鋼材の耐力を有効利用した建築部材を、図17に基づいて説明する。   Next, a building member that effectively uses the proof stress of the reinforcing steel material according to the invention described in claim 10 will be described with reference to FIG.

本実施例の建築部材である鉄筋コンクリート梁29(以下、単に梁29と省略する。)は、通例の鉄筋コンクリート梁29と略同様に、梁29の外形に倣って配置した中立軸T10から遠い鉄筋30aと、中立軸T10に近い鉄筋30bとで補強された構成とし、各々の鉄筋30a、30bを左右の柱14、14に通し定着させている。しかし、梁29の中立軸T10から遠い鉄筋30aを、周辺に左側(但し、右側でも良く、更には両側でも良い。)の柱14の外周面14aから所定の長さLを有する空隙部31を形成してから定着させ、同空隙部31の長さLを、柱14の外周面14a位置で、全て(但し、この限りでない。)の鉄筋30a、30bの歪みが略等しくなる長さに設定した構成としている。すなわち、歪みが集中する柱14の外周面14a位置近傍において、鉄筋30aの周辺に空隙部31を形成することで、鉄筋30aが柱14に拘束されない箇所を形成し、当該拘束されていない箇所で鉄筋30aの伸びを吸収して歪みを小さくし、もともと歪みが小さい鉄筋30bと歪みを等しくしている。 Reinforced concrete beam 29 is a building element of the present embodiment (hereinafter, simply abbreviated as beam 29.) Is substantially the same as the usual reinforced concrete beams 29, farther rebar from the neutral axis T 10 arranged following the contour of the beam 29 and 30a, a reinforced structure between the reinforcing bar 30b close to the neutral axis T 10, are allowed to settle through each rebar 30a, and 30b to the left and right pillars 14 and 14. However, the farther rebar 30a from the neutral axis T 10 of the beam 29, the left side in the periphery (but may be on the right, and further may be on both sides.) Gap portion having a predetermined length L 7 from the outer peripheral surface 14a of the poles 14 31 is formed and fixed, and the length L 7 of the gap portion 31 is such that the distortions of all the reinforcing bars 30a and 30b are substantially equal at the position of the outer peripheral surface 14a of the column 14 (but not limited to this). The configuration is set as above. That is, in the vicinity of the position of the outer peripheral surface 14a of the column 14 where distortion is concentrated, by forming the gap portion 31 around the reinforcing bar 30a, a portion where the reinforcing bar 30a is not restrained by the column 14 is formed, and the portion where the reinforcing bar 30a is not restrained. The strain of the reinforcing bar 30a is absorbed to reduce the strain, and the strain is made equal to that of the reinforcing bar 30b having a small strain.

その結果、梁29は地震などによる曲げモーメントが作用すると、梁29の中立軸T10から遠い鉄筋30aだけでなく、中立軸T10に近い鉄筋30bも略同時期に塑性化させてエネルギー吸収機能を発揮させることができる構成となり、全ての鉄筋30a、30bの耐力を十分に有効利用することができる。 As a result, when a bending moment due to an earthquake or the like acts on the beam 29, not only the reinforcing bar 30 a far from the neutral axis T 10 of the beam 29 but also the reinforcing bar 30 b near the neutral axis T 10 is plasticized at substantially the same time, thereby absorbing energy. The proof stress of all the reinforcing bars 30a and 30b can be fully utilized effectively.

本実施例の梁29は鉄筋コンクリート造であるが、鉄骨鉄筋コンクリート造でも同様に実施できる。   Although the beam 29 of this embodiment is a reinforced concrete structure, a steel reinforced concrete structure can be similarly implemented.

本実施例の空隙部31は柱14の内部に形成したが、梁29の内部に形成しても良い。要するに、前記空隙部31は柱14との接合位置近傍に形成していれば良い。   Although the gap portion 31 of this embodiment is formed inside the column 14, it may be formed inside the beam 29. In short, the gap 31 may be formed in the vicinity of the joint position with the column 14.

なお、図示は省略するが、上記実施例で形成した空隙部17等に粘弾性体を充填した構成としても、実施例6〜10と同様の効果を期待できる(請求項11記載の発明)。   In addition, although illustration is abbreviate | omitted, even if it is the structure which filled the space | gap part 17 etc. which were formed in the said Example with the viscoelastic body, the effect similar to Examples 6-10 can be anticipated (invention of Claim 11).

以上に本発明の実施例を説明したが、本発明はこうした実施例に何ら限定されるものではなく、本発明の要旨を逸脱しない範囲において、種々の形態で実施し得る。   Although the embodiments of the present invention have been described above, the present invention is not limited to these embodiments and can be implemented in various forms without departing from the gist of the present invention.

実施例1の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート杭)の水平断面図である。It is a horizontal sectional view of the building member (steel reinforced concrete pile) which used effectively the proof stress of the reinforced steel material of Example 1. 実施例1の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート杭)の縦断面図である。It is a longitudinal cross-sectional view of the building member (reinforced concrete pile) which effectively used the proof stress of the reinforced steel material of Example 1. 実施例2の補強鋼材の耐力を有効利用した建築部材(三重鋼管杭)の水平断面図である。It is a horizontal sectional view of the building member (triple steel pipe pile) which used effectively the proof stress of the reinforced steel material of Example 2. 実施例2の補強鋼材の耐力を有効利用した建築部材(三重鋼管杭)の縦断面図である。It is a longitudinal cross-sectional view of the building member (triple steel pipe pile) which used effectively the proof stress of the reinforced steel material of Example 2. FIG. 実施例3の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート柱)の水平断面図である。It is a horizontal sectional view of the building member (steel reinforced concrete pillar) which used effectively the proof stress of the reinforced steel material of Example 3. 実施例3の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート柱)の縦断面図である。It is a longitudinal cross-sectional view of the building member (steel reinforced concrete pillar) which utilized effectively the proof stress of the reinforced steel material of Example 3. 実施例4の補強鋼材の耐力を有効利用した建築部材(コンクリート充填鋼管柱)の水平断面図である。It is a horizontal sectional view of the building member (concrete filling steel pipe column) which used effectively the proof stress of the reinforced steel material of Example 4. 実施例4の補強鋼材の耐力を有効利用した建築部材(コンクリート充填鋼管柱)の縦断面図である。It is a longitudinal cross-sectional view of the building member (concrete filling steel pipe column) which used effectively the proof stress of the reinforcement steel material of Example 4. FIG. 実施例5の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート梁)の中心軸と直交方向の垂直断面図である。It is a vertical sectional view in the direction orthogonal to the central axis of a building member (reinforced concrete beam) that effectively uses the proof stress of a reinforced steel material of Example 5. 実施例5の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート梁)の縦断面図である。It is a longitudinal cross-sectional view of the building member (reinforced concrete beam) which used effectively the proof stress of the reinforced steel material of Example 5. 実施例6の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート杭)の水平断面図である。It is a horizontal sectional view of the building member (reinforced concrete pile) which effectively used the proof stress of the reinforced steel material of Example 6. 実施例6の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート杭)の縦断面図である。It is a longitudinal cross-sectional view of the building member (reinforced concrete pile) which effectively used the proof stress of the reinforced steel material of Example 6. 杭に曲げモーメントが作用した際の鉄筋の歪み分布を示した図である。It is the figure which showed the distortion distribution of the reinforcing bar when the bending moment acted on the pile. 実施例7の補強鋼材の耐力を有効利用した建築部材(三重鋼管杭)の縦断面図である。It is a longitudinal cross-sectional view of the building member (triple steel pipe pile) which utilized effectively the proof stress of the reinforced steel material of Example 7. 実施例8の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート柱)の縦断面図である。It is a longitudinal cross-sectional view of the building member (steel reinforced concrete pillar) which utilized effectively the proof stress of the reinforced steel material of Example 8. 実施例9の補強鋼材の耐力を有効利用した建築部材(コンクリート充填鋼管柱)の縦断面図である。It is a longitudinal cross-sectional view of the building member (concrete filling steel pipe column) which used effectively the proof stress of the reinforcement steel material of Example 9. FIG. 実施例10の補強鋼材の耐力を有効利用した建築部材(鉄筋コンクリート梁)の縦断面図である。It is a longitudinal cross-sectional view of the building member (reinforced concrete beam) which used effectively the proof stress of the reinforced steel material of Example 10. FIG. 従来、杭に曲げモーメントが生じた際の鉄筋の歪み分布を示した図である。It is the figure which showed the distortion distribution of the reinforcing bar at the time of the bending moment having arisen conventionally in the pile.

符号の説明Explanation of symbols

1 鉄筋コンクリート杭
2 鉄筋
2a 杭の中立軸から遠い鉄筋
2b 杭の中立軸に近い鉄筋
杭の中立軸
3 基礎梁
3a 基礎梁の下面
4 三重鋼管杭
5a 杭の中立軸から遠い鋼管
5b 杭の中立軸に近い鋼管
5c 中立軸から遠い鋼管と近い鋼管との間に配置された鋼管
杭の中立軸
6 鉄筋コンクリート柱
7a 柱の中立軸から遠い鉄筋
7b 柱の中立軸に近い鉄筋
柱の中立軸
8 上階梁
8a 上階梁の下面
9 下階梁
9a 下階梁の上面
10 コンクリート充填鋼管柱
11a 柱の中立軸から遠い鋼管
11b 柱の中立軸に近い鋼管
11c 柱の中立軸から遠い鋼管と近い鋼管との間に配置された鋼管
柱の中立軸
12 鉄筋コンクリート梁
13a 梁の中立軸から遠い鉄筋
13b 梁の中立軸に近い鉄筋
梁の中立軸
14 柱
14a 柱の外周面
15 鉄筋コンクリート杭
16a 杭の中立軸から遠い鉄筋
16b 杭の中立軸に近い鉄筋
杭の中立軸
17 空隙部
空隙部の高さ
18 三重鋼管杭
19a 杭の中立軸から遠い鋼管
19b 杭の中立軸に近い鋼管
19c 杭の中立軸から遠い鋼管と近い鋼管との間に配置された鋼管
杭の中立軸
20、21 空隙部
、L 空隙部の高さ
22 鉄筋コンクリート柱
23a 柱の中立軸から遠い鉄筋
23b 柱の中立軸に近い鉄筋
柱の中立軸
24 空隙部
空隙部の高さ
25 コンクリート充填鋼管柱
26a 柱の中立軸から遠い鋼管
26b 柱の中立軸に近い鋼管
26c 柱の中立軸から遠い鋼管と近い鋼管との間に配置された鋼管
柱の中立軸
27、28 空隙部
、L 空隙部の高さ
29 鉄筋コンクリート梁
30a 梁の中立軸から遠い鉄筋
30b 梁の中立軸に近い鉄筋
10 梁の中立軸
31 空隙部
空隙部の長さ
1 Reinforced concrete pile 2 Reinforcing bar 2a Reinforcing bar far from the neutral axis of the pile 2b Reinforcing bar close to the neutral axis of the pile T 1 Neutral axis of the pile 3 Foundation beam 3a Bottom surface of the foundation beam 4 Triple steel pipe pile 5a Steel pipe far from the neutral axis of the pile 5b Steel pipe close to the neutral axis 5c Steel pipe arranged between the steel pipe far from the neutral axis and the steel pipe close to the neutral axis T 2 Pile neutral axis 6 Reinforced concrete column 7a Reinforcing bar far from the neutral axis 7b Reinforcing bar close to the neutral axis T 3 columns Neutral shaft 8 Upper beam 8a Lower surface of upper beam 9 Lower beam 9a Upper surface of lower beam 10 Concrete-filled steel pipe column 11a Steel pipe far from neutral axis 11b Steel pipe near column neutral axis 11c From neutral axis of column far steel is close steel and rebar T 5 beam neutral axis 14 poster near the neutral axis of the far rebar 13b beams from the neutral axis of the neutral axis 12 Concrete beams 13a beams arranged steel pipe T 4 poster between From the outer circumferential surface 15 reinforced concrete piles 16a piles neutral axis height 18 triple pipe pile 19a piles neutral axis 17 air gap L 1 gap portion of the reinforcing bar T 6 piles close to the neutral axis of the far rebar 16b piles from the neutral axis of 4a Column arranged steel tube T 7 neutral axis 20, 21 the height of the air gap L 2, L 3 void portion of the pile between the distant steel pipe and close the steel pipe from the neutral axis of the steel pipe 19c piles close to the neutral axis of the distant steel pipe 19b piles 22 Reinforced concrete column 23a Reinforcing bar far from the neutral axis of the column 23b Reinforcing bar close to the neutral axis of the column T Neutral shaft of the 8 columns 24 Void portion L 4 Height of the void portion 25 Concrete filled steel pipe column 26a Steel tube far from the neutral axis of the column 26b Column neutral axis 27, 28 air gap L 5 of the arranged steel tube T 9 poster between the far steel pipe and close the steel pipe from the neutral axis near the steel pipe 26c column the neutral axis of the, L 6 height 29 rebar air gap Neutral axis 31 air gap L 7 the length of the gap portion of the reinforcing bar T 10 beam close to the neutral axis of the far rebar 30b beams from the neutral axis of the concrete beam 30a Beam

Claims (11)

補強鋼材である鉄筋で補強されたコンクリート杭は、基礎との接合位置である同基礎の下面位置で鉄筋の応力比が略等しくなるように、杭の中立軸から離れるにしたがい、強度が大きい鉄筋を配置し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   Concrete piles reinforced with reinforcing steel bars are stronger as they are moved away from the neutral axis of the pile so that the stress ratio of the reinforcing bars is approximately equal at the bottom surface of the foundation, which is the position where the foundation is joined. A building member that effectively utilizes the strength of reinforcing steel, characterized in that the reinforcing bar is plasticized at approximately the same time by a bending moment acting during an earthquake or the like. 補強鋼材である鋼管が多重に配置された杭は、基礎との接合位置である同基礎の下面位置で鋼管の応力比が略等しくなるように、杭の中立軸から離れるにしたがい、強度が大きい鋼管を配置し、地震時などに作用する曲げモーメントによって鋼管を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   A pile with multiple steel pipes, which are reinforced steel, has high strength as it moves away from the neutral axis of the pile so that the stress ratio of the steel pipe is approximately equal at the bottom surface position of the foundation, which is the joint position with the foundation. A building member that effectively utilizes the strength of a reinforced steel, characterized by arranging steel pipes and plasticizing the steel pipes at approximately the same time by a bending moment acting during an earthquake. 補強鋼材である鉄筋で補強されたコンクリート柱は、梁との接合位置である下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置で、鉄筋の応力比が略等しくなるように、柱の中立軸から離れるにしたがい、強度が大きい鉄筋を配置し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   For concrete columns reinforced with reinforcing steel bars, the stress ratio of the reinforcing bars should be approximately equal at at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam, which is the joint position with the beam. The strength of the reinforced steel is characterized by the fact that as the distance from the neutral axis of the column increases, reinforcing bars with high strength are arranged and the reinforcing bars are plasticized almost simultaneously by bending moments acting during earthquakes, etc. Effectively used building materials. 補強鋼材である鋼管が多重に配置されたコンクリート充填鋼管柱は、梁との接合位置である下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置で、鋼管の応力比が略等しくなるように、柱の中立軸から離れるにしたがい、強度が大きい鋼管を配置し、地震時などに作用する曲げモーメントによって鋼管を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   A concrete-filled steel pipe column in which steel pipes, which are reinforcing steel materials, are arranged in multiple layers, has a steel pipe stress ratio of approximately at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam, which is the joint position with the beam. Reinforcement, characterized in that steel pipes with high strength are arranged and plasticized at almost the same time by bending moment acting during earthquakes, etc., as they are separated from the neutral axis of the column so as to be equal Building materials that effectively use the strength of steel. 補強鋼材である鉄筋で補強されたコンクリート梁は、柱との接合位置である同柱の外周面位置で鉄筋の応力比が略等しくなるように、梁の中立軸から離れるにしたがい、強度が大きい鉄筋を配置し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   Concrete beams reinforced with reinforcing steel bars are stronger as they are separated from the beam's neutral axis so that the stress ratio of the reinforcing bars is approximately equal at the outer peripheral surface of the column, which is the joint position with the column. A building member that effectively utilizes the strength of a reinforced steel, characterized by placing the reinforcing bars and plasticizing the reinforcing bars almost simultaneously with a bending moment acting during an earthquake. 補強鋼材である鉄筋で補強されたコンクリート杭は、基礎との接合位置である同基礎の下面位置近傍おいて、鉄筋の周辺に所定の高さの空隙部を形成しており、同空隙部の高さを、基礎の下面位置で鉄筋の歪みが略等しくなるように、杭の中立軸から離れるにしたがい、高く設定し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   A concrete pile reinforced with reinforcing steel reinforcing bars has a gap with a predetermined height around the reinforcing bars near the bottom surface of the foundation, which is the position where the foundation is joined. The height is set higher as it moves away from the neutral axis of the pile so that the strain of the reinforcing bar is almost equal at the bottom surface position of the foundation, and the reinforcing bar is plasticized at almost the same time by the bending moment acting during an earthquake etc. A construction member that effectively utilizes the proof stress of a reinforced steel material, characterized by having a configuration. 補強鋼材である鋼管が多重に配置された杭は、基礎との接合位置である同基礎の下面位置近傍において、鋼管の周辺に所定の高さの空隙部を形成しており、同空隙部の高さを、基礎の下面位置で鋼管の歪みが略等しくなるように、杭の中立軸から離れるにしたがい、高く設定し、地震時などに作用する曲げモーメントによって鋼管を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   A pile with multiple steel pipes, which are reinforcing steel materials, has a gap with a predetermined height around the steel pipe in the vicinity of the bottom surface of the foundation, which is the position where the foundation is joined. The height is set higher as the distance from the neutral axis of the pile is increased so that the strain of the steel pipe is approximately equal at the bottom surface position of the foundation, and the steel pipe is plasticized at approximately the same time by a bending moment that acts during an earthquake, etc. A construction member that effectively utilizes the proof stress of a reinforced steel material, characterized by having a configuration. 補強鋼材である鉄筋で補強されたコンクリート柱は、梁との接合位置である下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置近傍において、鉄筋の周辺に所定の高さの空隙部を形成しており、同空隙部の高さを、前記下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置で、鉄筋の歪みが略等しくなるように、柱の中立軸から離れるにしたがい、高く設定し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   A concrete column reinforced with reinforcing steel bars, which are reinforced steel, has a predetermined height around the reinforcing bars in the vicinity of at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam, which is the joint position with the beam. A gap is formed, and the height of the gap is set at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam so that the distortion of the reinforcing bar is substantially equal. A building member that effectively uses the strength of reinforced steel, characterized by the fact that it is set higher as it moves away from the vertical axis, and the rebar is plasticized at approximately the same time by a bending moment that acts during an earthquake. 補強鋼材である鋼管が多重に配置されたコンクリート充填鋼管柱は、梁との接合位置である下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置近傍において、鋼管の周辺に所定の高さの空隙部を形成しており、同空隙部の高さを、前記下階梁の上面位置又は上階梁の下面位置の少なくとも一方の位置で、鋼管の歪みが略等しくなるように、柱の中立軸から離れるにしたがい、高く設定し、地震時などに作用する曲げモーメントによって鋼管を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   A concrete-filled steel pipe column in which steel pipes, which are reinforced steel materials, are arranged in multiple locations is arranged around the steel pipe at the vicinity of at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam, which is the joint position with the beam. The height of the gap is set so that the strain of the steel pipe is substantially equal at at least one of the upper surface position of the lower floor beam and the lower surface position of the upper floor beam. A construction that makes effective use of the strength of reinforcing steel, characterized in that the steel pipe is plasticized almost simultaneously with the bending moment acting during earthquakes, etc., as it is set apart from the neutral axis of the column. Element. 補強鋼材である鉄筋で補強されたコンクリート梁は、柱との接合位置である同柱の外周面位置近傍において、鉄筋の周辺に所定の長さの空隙部を形成しており、同空隙部の長さを、柱の外周面位置で、鉄筋の歪みが略等しくなるように、梁の中立軸から離れるにしたがい、長く設定し、地震時などに作用する曲げモーメントによって鉄筋を略同時期に塑性化させる構成としたことを特徴とする、補強鋼材の耐力を有効利用した建築部材。   A concrete beam reinforced with reinforcing steel bars is a space with a predetermined length around the reinforcing bars in the vicinity of the outer peripheral surface of the column, which is the position where the column is joined. The length is set longer as the distance from the neutral axis of the beam increases so that the distortion of the rebar is approximately equal at the outer peripheral surface of the column, and the rebar is plasticized at approximately the same time by a bending moment acting during an earthquake, etc. A construction member that effectively utilizes the proof stress of a reinforced steel material, characterized in that the structure is made to be made into a structure. 空隙部に粘弾性体を充填していることを特徴とする、請求項6〜10のいずれか一に記載した補強鋼材の耐力を有効利用した建築部材。   The building member that effectively uses the proof stress of the reinforcing steel material according to any one of claims 6 to 10, wherein the void portion is filled with a viscoelastic body.
JP2005155220A 2005-05-27 2005-05-27 Building materials that effectively use the strength of reinforced steel Expired - Fee Related JP4722560B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005155220A JP4722560B2 (en) 2005-05-27 2005-05-27 Building materials that effectively use the strength of reinforced steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005155220A JP4722560B2 (en) 2005-05-27 2005-05-27 Building materials that effectively use the strength of reinforced steel

Publications (2)

Publication Number Publication Date
JP2006328843A true JP2006328843A (en) 2006-12-07
JP4722560B2 JP4722560B2 (en) 2011-07-13

Family

ID=37550808

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005155220A Expired - Fee Related JP4722560B2 (en) 2005-05-27 2005-05-27 Building materials that effectively use the strength of reinforced steel

Country Status (1)

Country Link
JP (1) JP4722560B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101025314B1 (en) * 2008-07-15 2011-03-29 (주)동명기술공단종합건축사사무소 Composite shell pile and construction method of the same
JP2019035306A (en) * 2017-08-22 2019-03-07 公益財団法人鉄道総合技術研究所 Reinforced concrete structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10299137A (en) * 1997-04-23 1998-11-10 Shimizu Corp Vibration control wall structure
JP2002097650A (en) * 2000-09-26 2002-04-02 Ohbayashi Corp Joining structure of pile head, and aseismatic pile
JP2004263497A (en) * 2003-03-04 2004-09-24 Sumitomo Mitsui Construction Co Ltd Semi-rigid connection structure for foundation of structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10299137A (en) * 1997-04-23 1998-11-10 Shimizu Corp Vibration control wall structure
JP2002097650A (en) * 2000-09-26 2002-04-02 Ohbayashi Corp Joining structure of pile head, and aseismatic pile
JP2004263497A (en) * 2003-03-04 2004-09-24 Sumitomo Mitsui Construction Co Ltd Semi-rigid connection structure for foundation of structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101025314B1 (en) * 2008-07-15 2011-03-29 (주)동명기술공단종합건축사사무소 Composite shell pile and construction method of the same
JP2019035306A (en) * 2017-08-22 2019-03-07 公益財団法人鉄道総合技術研究所 Reinforced concrete structure

Also Published As

Publication number Publication date
JP4722560B2 (en) 2011-07-13

Similar Documents

Publication Publication Date Title
JP2006226054A (en) Aseismic reinforcing method for existing reinforced concrete building with rigid frame structure
KR101139761B1 (en) Reinforcing wall for construction
JP6339923B2 (en) How to build a building frame
JP4722560B2 (en) Building materials that effectively use the strength of reinforced steel
JP4041004B2 (en) Frame structure
JP5868603B2 (en) Seismic reinforcement method for existing buildings
KR101638564B1 (en) seismic reinforcement apparatus and seismic reinforcement method using the same
CN104508219B (en) Antidetonation reinforcement structure
JP6754552B2 (en) Column beam frame
JP2008208612A (en) External aseismatic reinforcing structure
JP2019082056A (en) Construction method of roof of outdoor storage and roof frame
JP2008075314A (en) Aseismic control structure of connected buildings
JP2005083136A (en) Composite structure support
JP2004353351A (en) Upper extension method for existing building
JP2009281074A (en) Connecting vibration control structure of building
JP5142213B2 (en) Seismic reinforcement structure for viaduct
JP5069713B2 (en) Basic structure of buildings over railway tracks
JP5060842B2 (en) Damping structure
JP6452349B2 (en) Bending reinforcement structure of existing tower structure
JP2006037530A (en) Building structure skeleton and building structure making use thereof
JP2012233374A (en) Seismic reinforcement structure
JP2012233374A5 (en)
JP7155488B2 (en) Structural Seismic Reinforcement Structure
JP2005282229A (en) Vibration-control structure of building
JP2005264713A (en) Earthquake-proof building wall and structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080326

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100405

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110315

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110406

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140415

Year of fee payment: 3

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees