JP2006301851A - Progress management support device, progress management support method and progress management support program - Google Patents

Progress management support device, progress management support method and progress management support program Download PDF

Info

Publication number
JP2006301851A
JP2006301851A JP2005121060A JP2005121060A JP2006301851A JP 2006301851 A JP2006301851 A JP 2006301851A JP 2005121060 A JP2005121060 A JP 2005121060A JP 2005121060 A JP2005121060 A JP 2005121060A JP 2006301851 A JP2006301851 A JP 2006301851A
Authority
JP
Japan
Prior art keywords
work
progress
document
schedule
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005121060A
Other languages
Japanese (ja)
Inventor
Katsunori Yoshiji
克典 芳地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujifilm Business Innovation Corp
Original Assignee
Fuji Xerox Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Xerox Co Ltd filed Critical Fuji Xerox Co Ltd
Priority to JP2005121060A priority Critical patent/JP2006301851A/en
Publication of JP2006301851A publication Critical patent/JP2006301851A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Document Processing Apparatus (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To make a schedule consistent with the end limit of an electronic document preparation job. <P>SOLUTION: When the management of the progress of the preparation work of an electronic document attached with annotation for instructing a calibrating work is supported, an acquisition part 41A of a progress management server 40 acquires end limit information showing the end limit of the preparation work of the electronic document, and a schedule setting part 41B derives the execution schedule of the calibrating work instructed by the annotation until the end limit shown by the end limit information, and a secondary storage part 45 stores it, and a display part 53 of a client device 50 displays information showing the execution schedule stored in the secondary storage part 45. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、進捗管理支援装置、進捗管理支援方法及び進捗管理支援プログラムに係り、より詳しくは、校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援する進捗管理支援装置、進捗管理支援方法及び進捗管理支援プログラムに関する。   The present invention relates to a progress management support device, a progress management support method, and a progress management support program. More specifically, the present invention supports management of the progress of creation of an electronic document attached with a work instruction comment that instructs a proofreading work. The present invention relates to a progress management support device, a progress management support method, and a progress management support program.

近年、電子文書の任意位置に対して、当該電子文書の本文に影響を与えることなく、文字情報、画像情報、音声情報、リンク情報等の付加情報を添付する技術が広く用いられている。なお、当該付加情報を本明細書ではアノテーション(注釈)と総称する。   In recent years, a technique for attaching additional information such as character information, image information, audio information, and link information to an arbitrary position of an electronic document without affecting the text of the electronic document has been widely used. Note that the additional information is collectively referred to as an annotation in this specification.

このアノテーションを電子文書に添付することのできるシステムの例として、富士ゼロックス株式会社のDocuWorks(登録商標)や、米国Adobe社のAcrobat(登録商標)等がある。   Examples of systems that can attach this annotation to an electronic document include DocuWorks (registered trademark) of Fuji Xerox Co., Ltd. and Acrobat (registered trademark) of Adobe Corporation in the United States.

ところで、以上のようなアノテーションを電子文書に添付することのできるシステムの利用形態として、電子文書を作成する業務を実行するにあたり、当該電子文書の校正作業を指示するアノテーションを校正箇所に対して添付することにより、当該校正作業を校正者に対して指示する形態が考えられる。   By the way, as a form of use of a system that can attach annotations as described above to an electronic document, an annotation for instructing the proofreading operation of the electronic document is attached to the proofreading part when executing the task of creating the electronic document. Thus, a form in which the proofreading operation is instructed to the proofreader can be considered.

そして、この形態では、アノテーションにより指示された個々の校正作業の進捗状況を管理することが上記電子文書を作成する業務を滞りなく遂行する上で重要である。   In this embodiment, managing the progress of individual proofreading operations instructed by the annotation is important for carrying out the work of creating the electronic document without delay.

このため、上記校正作業の実行スケジュールを予め登録しておき、当該スケジュールに則って校正作業を進める業務形態が有効である。   For this reason, it is effective to register the execution schedule of the calibration work in advance and advance the calibration work in accordance with the schedule.

このような業務形態を支援するために適用できる従来の技術として、既に登録されているスケジュールとの関係から新たに登録されるスケジュールが実行可能かを判断し、無理のないスケジューリングを行うことを目的として、個人別スケジュール情報の登録、更新を行うスケジュール管理システムにおいて、登録されているスケジュール情報に基づいて所定の個人のスケジュールの実行可否を判定し、判定結果に基づいて当該個人のスケジュール情報を更新する技術(以下、「第1技術」という。)があった(例えば、特許文献1参照。)。   As a conventional technique that can be applied to support such business forms, the purpose is to determine whether a newly registered schedule is feasible from the relationship with a schedule that has already been registered, and to perform reasonable scheduling In a schedule management system for registering and updating individual schedule information, it is determined whether or not a predetermined individual schedule can be executed based on the registered schedule information, and the individual schedule information is updated based on the determination result. There is a technique (hereinafter referred to as “first technique”) (see, for example, Patent Document 1).

また、登録したスケジュールと関連事項を結び付けることによりスケジュール情報を一元的に管理することができるようにし、またスケジュールの関連事項の期限切れを告知することによりスケジュールのミスを防ぐことができるようにすることを目的として、スケジュールするための情報や操作情報等を入力する入力手段と、この入力手段からの情報に従ってスケジュール情報の登録/変更/削除を行うスケジュール情報管理手段と、上記スケジュール情報を記憶するスケジュール情報記憶手段と、上記スケジュール情報記憶手段に記憶されたスケジュール情報を表示手段に表示させるスケジュール表示手段とを備えたスケジュール管理システムにおいて、上記スケジュール情報記憶手段に記憶されたスケジュール情報と関連付けを持つメモ情報を記憶するメモ情報記憶手段と、当該メモ情報記憶手段の内容の登録/変更/削除を行うメモ情報管理手段と、上記メモ情報記憶手段の内容を上記表示手段に表示させるメモ表示手段と、上記メモ情報記憶手段に記憶されたメモ情報項目のうちの未対応分の情報でメモ告知期限になったとき当該メモ内容を上記表示手段に表示して告知するメモ告知手段とを設けた技術(以下、「第2技術」という。)もあった(例えば、特許文献2参照。)。
特開平5−134989号公報 特開平5−266028号公報
In addition, schedule information can be managed centrally by linking the registered schedule and related items, and schedule errors can be prevented by notifying the expiration of related items in the schedule. For this purpose, an input means for inputting information for scheduling, operation information, etc., a schedule information management means for registering / changing / deleting schedule information according to information from the input means, and a schedule for storing the schedule information In a schedule management system comprising information storage means and schedule display means for causing the display means to display schedule information stored in the schedule information storage means, a method having an association with the schedule information stored in the schedule information storage means Memo information storage means for storing information, memo information management means for registering / changing / deleting the contents of the memo information storage means, memo display means for displaying the contents of the memo information storage means on the display means, A technology provided with memo notification means for displaying and notifying the memo content on the display means when the memo notification deadline is reached due to unsupported information of the memo information items stored in the memo information storage means ( (Hereinafter, referred to as “second technique”) (see, for example, Patent Document 2).
Japanese Patent Laid-Open No. 5-13489 Japanese Patent Laid-Open No. 5-266028

ところで、前述したような、電子文書を作成する業務を遂行するにあたり、当該電子文書の校正作業を指示するアノテーションを校正箇所に対して添付することによって当該校正作業を校正者に対して指示する形態において、上記校正作業のスケジュールと上記電子文書の作成業務の終了期限を予め登録しておき、登録したスケジュールに則って校正作業を進める業務形態では、全ての校正作業が少なくとも上記終了期限までに終了している必要がある。   By the way, in performing the task of creating an electronic document as described above, a form in which the proofreading operation is instructed to the proofreader by attaching an annotation indicating the proofreading operation of the electronic document to the proofreading location. In the business mode in which the calibration work schedule and the electronic document creation work end deadline are registered in advance and the calibration work is performed in accordance with the registered schedule, all the calibration work is completed at least by the end deadline. Need to be.

これに対し、作成対象とする電子文書に対する複数の校正作業のスケジュールのみを予め登録しておき、当該複数の校正作業を上記電子文書の作成業務として取り纏めて実行する場合もあるが、この場合には、各校正作業の最終期限が上記電子文書の作成業務の終了期限と考えられるため、取り纏められた電子文書の作成業務が少なくとも上記複数の校正作業の最終期限までに終了している必要がある。   On the other hand, there may be a case where only a plurality of proofreading work schedules for electronic documents to be created are registered in advance, and the plurality of proofreading works are collectively executed as the electronic document creation work. Since the final deadline of each proofreading work is considered as the deadline for ending the above-mentioned electronic document creation work, the compiled electronic document creation work must be completed at least by the final deadline for the plurality of proofreading work .

しかしながら、上記第1技術では、主に会議開催を行う際の各個人のスケジュール管理を対象としており、当該技術を電子文書の作成業務に対するスケジュール管理に適用した場合には、各校正者個人のスケジュールを無理のないものとすることはできるものの、電子文書の作成業務の終了期限との間で矛盾のないスケジューリングを行うことはできない、という問題点があった。   However, the first technique described above mainly targets the schedule management of each individual when holding a meeting, and when the technique is applied to schedule management for electronic document creation work, the schedule of each proofreader individual However, there is a problem in that it is not possible to perform scheduling consistent with the end date of the electronic document creation work.

また、上記第2技術でも、スケジュールの関連事項の期限切れを告知することによりスケジュールのミスを防ぐことはできるものの、電子文書の作成業務の終了期限との間で矛盾のないスケジューリングを行うことはできない、という問題点があった。   In the second technique, it is possible to prevent scheduling mistakes by announcing the expiration of related items in the schedule, but it is not possible to perform scheduling that is consistent with the end date of electronic document creation work. There was a problem that.

本発明は上記問題点を解決するためになされたものであり、電子文書の作成業務の終了期限との間で矛盾のないスケジューリングを行うことができる進捗管理支援装置、進捗管理支援方法及び進捗管理支援プログラムを提供することを目的とする。   The present invention has been made to solve the above-described problems, and a progress management support apparatus, progress management support method, and progress management capable of performing scheduling consistent with an end date of an electronic document creation task. The purpose is to provide support programs.

上記目的を達成するために、請求項1記載の進捗管理支援装置は、校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援する進捗管理支援装置であって、前記電子文書の作成作業の終了期限を示す終了期限情報を取得する取得手段と、前記作業指示コメントにより指示された校正作業又は前記電子文書の作成作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出して記憶手段に記憶するスケジュール設定手段と、を備えている。   In order to achieve the above object, a progress management support apparatus according to claim 1 is a progress management support apparatus that supports management of a progress status of an electronic document creation work attached with a work instruction comment for instructing a proofreading work. Acquisition means for acquiring end deadline information indicating an end deadline of the creation work of the electronic document, and an execution schedule of the calibration work or the electronic document creation work instructed by the work instruction comment is indicated by the end deadline information. And a schedule setting means for deriving and storing in the storage means so as to end by the end deadline.

請求項1に記載の進捗管理支援装置は、校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援するものであり、前記電子文書の作成作業の終了期限を示す終了期限情報が取得手段によって取得される。なお、上記取得手段による取得には、キーボード、ポインティング・デバイス等の入力装置を介した取得の他、上記終了期限情報が予め記憶された記憶手段から読み出すことによる取得、インターネット、イントラネット、LAN(Local Area Network)等の通信回線を介した外部装置からの取得が含まれる。   The progress management support apparatus according to claim 1 supports management of a progress status of an electronic document creation work to which a work instruction comment for instructing a calibration work is attached, and an end time limit for the creation of the electronic document Is acquired by the acquisition means. The acquisition by the acquisition means includes acquisition through an input device such as a keyboard and a pointing device, as well as acquisition by reading out the expiration date information from a storage means in which the expiration date is stored in advance, the Internet, an intranet, a LAN (Local Acquisition from an external device via a communication line such as Area Network).

ここで、本発明では、スケジュール設定手段により、前記作業指示コメントにより指示された校正作業又は前記電子文書の作成作業の実行スケジュールが前記終了期限情報により示される終了期限までに終了するように導出されて記憶手段に記憶される。なお、上記記憶手段には、RAM(Random Access Memory)、EEPROM(Electrically Erasable and Programmable Read Only Memory)、フラッシュEEPROM(Flash EEPROM)等の半導体記憶素子、スマート・メディア(SmartMedia(登録商標))、フレキシブルディスク等の可搬記録媒体やハードディスク等の固定記録媒体、或いはネットワークに接続されたサーバ・コンピュータ等に設けられた外部記憶装置が含まれる。   Here, in the present invention, the schedule setting means derives the execution schedule of the proofreading work or the electronic document creation work instructed by the work instruction comment so as to be completed by the end deadline indicated by the end deadline information. Is stored in the storage means. The storage means includes a RAM (Random Access Memory), an EEPROM (Electrically Erasable and Programmable Read Only Memory), a semiconductor storage element such as a flash EEPROM (Flash EEPROM), a smart media (SmartMedia (registered trademark)), a flexible Examples include a portable recording medium such as a disk, a fixed recording medium such as a hard disk, or an external storage device provided in a server computer connected to a network.

このように、請求項1に記載の進捗管理支援装置によれば、校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援するにあたり、前記電子文書の作成作業の終了期限を示す終了期限情報を取得し、前記作業指示コメントにより指示された校正作業又は前記電子文書の作成作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出して記憶手段に記憶しているので、電子文書の作成業務の終了期限との間で矛盾のないスケジューリングを行うことができる。   As described above, according to the progress management support apparatus according to claim 1, the creation of the electronic document is supported in supporting the management of the progress of the creation of the electronic document to which the work instruction comment for instructing the calibration work is attached. End date information indicating the end date of the work is acquired, and the execution schedule of the proofreading work or the electronic document creation work instructed by the work instruction comment is derived to be finished by the end time indicated by the end time information. Therefore, it is possible to perform scheduling that is consistent with the end date of the electronic document creation work.

なお、本発明の前記スケジュール設定手段は、請求項2に記載の発明のように、前記電子文書に前記作業指示コメントが複数添付されており、当該複数の作業指示コメントにより指示された複数の校正作業の実行スケジュールを導出する場合、当該複数の校正作業を前記終了期限情報により示される終了期限までの期間内に並行して実行するか、又は1つずつ直列に実行するように前記実行スケジュールを導出するようにしてもよい。   The schedule setting means according to the present invention includes a plurality of work instruction comments attached to the electronic document, and a plurality of proofreadings specified by the plurality of work instruction comments. When deriving a work execution schedule, the plurality of calibration works are executed in parallel within a period up to an end deadline indicated by the end deadline information, or the execution schedules are executed in series one by one. It may be derived.

また、本発明は、請求項3に記載の発明のように、前記スケジュール設定手段により前記校正作業の実行スケジュールを導出する場合において、前記取得手段は、前記実行スケジュールの導出結果の修正指示を示す修正指示情報を更に取得し、前記スケジュール設定手段は、前記取得手段によって取得された前記修正指示情報により示される修正指示に応じて前記実行スケジュールの導出結果を修正するものとしてもよい。   Further, according to the present invention, when the execution schedule of the calibration work is derived by the schedule setting unit as in the invention according to claim 3, the acquisition unit indicates an instruction to correct the execution schedule derived result. Further, correction instruction information may be acquired, and the schedule setting unit may correct the execution schedule derivation result according to the correction instruction indicated by the correction instruction information acquired by the acquisition unit.

また、本発明は、請求項4に記載の発明のように、前記スケジュール設定手段によって前記記憶手段に記憶された前記実行スケジュールを示す情報を表示する表示手段を更に備えてもよい。なお、上記表示手段による表示には、可視表示、永久可視表示、可聴表示等が含まれる。   Further, as in the invention according to claim 4, the present invention may further comprise display means for displaying information indicating the execution schedule stored in the storage means by the schedule setting means. The display by the display means includes visible display, permanent visible display, audible display, and the like.

また、請求項4に記載の発明は、請求項5に記載の発明のように、前記取得手段は、前記校正作業の進捗度を示す進捗度情報を更に取得し、前記表示手段は、前記取得手段によって取得された前記進捗度情報により示される進捗度を更に表示するものとしてもよい。   According to a fourth aspect of the present invention, as in the fifth aspect of the present invention, the acquisition unit further acquires progress level information indicating a progress level of the calibration work, and the display unit includes the acquisition unit. The progress indicated by the progress information acquired by the means may be further displayed.

特に、請求項5に記載の発明は、請求項6に記載の発明のように、前記進捗度を前記終了期限情報により示される終了期限に近づくほど度合いが低くなるように修正する修正手段を更に備えてもよい。   In particular, the invention described in claim 5 further includes correction means for correcting the degree of progress so that the degree of progress becomes lower as the end date approaches the end date indicated by the end date information, as in the invention described in claim 6. You may prepare.

一方、上記目的を達成するために、請求項7記載の進捗管理支援方法は、校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援する進捗管理支援方法であって、前記電子文書の作成作業の終了期限を示す終了期限情報を取得し、前記作業指示コメントにより指示された校正作業又は前記電子文書の作成作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出して記憶手段に記憶するものである。   On the other hand, in order to achieve the above object, the progress management support method according to claim 7 is a progress management support method for supporting the management of the progress status of the creation work of an electronic document attached with a work instruction comment for instructing a proofreading work. Completion time limit information indicating an end time limit of the creation work of the electronic document is acquired, and an execution schedule of the calibration work or the creation work of the electronic document indicated by the work instruction comment is indicated by the end time limit information. It is derived so as to end by the end deadline and stored in the storage means.

従って、請求項7記載の進捗管理支援方法によれば、請求項1記載の発明と同様に作用するので、請求項1記載の発明と同様に、電子文書の作成業務の終了期限との間で矛盾のないスケジューリングを行うことができる。   Therefore, according to the progress management support method according to the seventh aspect, it operates in the same manner as the invention according to the first aspect. Scheduling without contradiction can be performed.

一方、上記目的を達成するために、請求項8記載の進捗管理支援プログラムは、校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援する進捗管理支援プログラムであって、前記電子文書の作成作業の終了期限を示す終了期限情報を取得する取得ステップと、前記作業指示コメントにより指示された校正作業又は前記電子文書の作成作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出して記憶手段に記憶するスケジュール設定ステップと、をコンピュータに実行させるものである。   On the other hand, in order to achieve the above object, the progress management support program according to claim 8 is a progress management support program that supports the management of the progress of the creation of an electronic document attached with a work instruction comment for instructing a proofreading work. An acquisition step of acquiring end deadline information indicating an end deadline of the electronic document creation work, and an execution schedule of the calibration work or the electronic document creation work instructed by the work instruction comment is the end deadline information. And a schedule setting step for deriving the program so as to be completed by the end deadline and storing the schedule in the storage means.

従って、請求項8記載の進捗管理支援プログラムによれば、コンピュータに対して請求項1記載の発明と同様に作用させることができるので、請求項1記載の発明と同様に、電子文書の作成業務の終了期限との間で矛盾のないスケジューリングを行うことができる。   Therefore, according to the progress management support program of the eighth aspect, it is possible to cause the computer to act in the same manner as the first aspect of the invention. Scheduling can be performed consistently with the deadline of the end.

本発明によれば、校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援するにあたり、前記電子文書の作成作業の終了期限を示す終了期限情報を取得し、前記作業指示コメントにより指示された校正作業又は前記電子文書の作成作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出して記憶手段に記憶しているので、電子文書の作成業務の終了期限との間で矛盾のないスケジューリングを行うことができる、という効果が得られる。   According to the present invention, in supporting the management of the progress of the creation of an electronic document to which a work instruction comment for instructing a calibration work is attached, end deadline information indicating an end deadline of the creation of the electronic document is acquired. Since the execution schedule of the calibration work instructed by the work instruction comment or the creation work of the electronic document is derived and stored in the storage means so as to be completed by the end deadline indicated by the end deadline information, There is an effect that it is possible to perform scheduling without contradiction with the end date of the document creation work.

以下、図面を参照して本発明の実施の形態について詳細に説明する。なお、ここでは、本発明をクライアント/サーバシステムとして構成された文書処理システムに適用した場合について説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. Here, a case where the present invention is applied to a document processing system configured as a client / server system will be described.

〔システム構成〕
図1は、本実施の形態に係る文書処理システム90の全体概略構成を示す図である。
〔System configuration〕
FIG. 1 is a diagram showing an overall schematic configuration of a document processing system 90 according to the present embodiment.

同図に示すように、文書処理システム90は、文書処理システム90において使用される電子データ(文書データに限らず、文書処理システム90で対応している他の電子的なデータの全てを含む)を処理するサーバシステム92と、文書処理システム90の利用者(後述するレビュアや作業実行者も含む。)が使用するクライアントシステム94と、を備えている。   As shown in the figure, the document processing system 90 includes electronic data used in the document processing system 90 (including not only document data but also all other electronic data supported by the document processing system 90). And a client system 94 used by users of the document processing system 90 (including reviewers and work performers described later).

サーバシステム92は、電子文書(以下、単に「文書」ともいう。)を管理する文書管理サーバ10及びアノテーションを管理するアノテーション管理サーバ20を有する。文書管理サーバ10は主として文書の保存と検索を行うサーバであり、アノテーション管理サーバ20は主として文書に添付されたアノテーションの保存と検索を行うサーバである。   The server system 92 includes a document management server 10 that manages electronic documents (hereinafter also simply referred to as “documents”) and an annotation management server 20 that manages annotations. The document management server 10 is a server that mainly stores and retrieves documents, and the annotation management server 20 is a server that mainly stores and retrieves annotations attached to documents.

このように、文書全体を管理する文書管理サーバ10と、電子文書に添付されたアノテーションを管理するアノテーション管理サーバ20とを設けることで、複数の電子文書に対する加筆修正が複数の利用者によって独自に行われる場合でも、最終的な電子文書や加筆修正等の内容に矛盾が生じることを回避することができる。   As described above, by providing the document management server 10 that manages the entire document and the annotation management server 20 that manages the annotations attached to the electronic document, additional corrections to a plurality of electronic documents can be independently performed by a plurality of users. Even when it is performed, it is possible to avoid a contradiction in the contents of the final electronic document, correction of correction, and the like.

例えば、何れかの利用者が電子文書の原本のある部分にアノテーションとして補足説明を加え、その一方で、他の利用者が同じ部分を削除するような修正を加えたときでも、それらの編集部分を文書管理サーバ10で管理している電子文書本体と対応付けてアノテーション管理サーバ20により登録しておくことで、電子文書本体やこれに対応する加筆修正等の内容に矛盾が生じることなく情報の管理を行うことができる。   For example, even if one user adds a supplementary explanation as an annotation to a certain part of the original electronic document, while another user makes a modification that deletes the same part, the edited part Is registered in the annotation management server 20 in association with the electronic document main body managed by the document management server 10, so that there is no inconsistency in the electronic document main body and content such as additional correction corresponding thereto. Management can be performed.

同図に示すように、文書管理サーバ10は、文書管理サーバ10全体の動作を司る制御部11と、各種プログラムの実行時におけるワークエリア等として用いられる主記憶部12と、液晶ディスプレイ等のディスプレイを含んで構成された表示部13と、キーボード及びマウス(ポインティング・デバイス)を含んで構成された操作部14と、後述する文書データベースDB1や各種プログラム、各種パラメータ情報等を記憶するための二次記憶部15と、外部装置との間での各種情報の授受を司る送受信部16と、を備えており、これら各部はシステムバスS1を介して電気的に接続されている。すなわち、本実施の形態に係る文書管理サーバ10は、通常のパーソナル・コンピュータ(以下、「PC」ともいう。)により構成されている。   As shown in the figure, the document management server 10 includes a control unit 11 that controls the overall operation of the document management server 10, a main storage unit 12 that is used as a work area when various programs are executed, and a display such as a liquid crystal display. , A display unit 13 including a keyboard, an operation unit 14 including a mouse and a pointing device, a document database DB1 to be described later, various programs, secondary parameters for storing various parameter information, and the like. A storage unit 15 and a transmission / reception unit 16 for exchanging various types of information between external devices are provided, and these units are electrically connected via a system bus S1. That is, the document management server 10 according to the present embodiment is configured by a normal personal computer (hereinafter also referred to as “PC”).

また、アノテーション管理サーバ20も、アノテーション管理サーバ20全体の動作を司る制御部21と、各種プログラムの実行時におけるワークエリア等として用いられる主記憶部22と、液晶ディスプレイ等のディスプレイを含んで構成された表示部23と、キーボード及びマウスを含んで構成された操作部24と、後述する付箋用アノテーションデータベースDB2、ペン入力用アノテーションデータベースDB3や各種プログラム、各種パラメータ情報等を記憶するための二次記憶部25と、外部装置との間での各種情報の授受を司る送受信部26と、を備えており、これら各部はシステムバスS2を介して電気的に接続されている。すなわち、本実施の形態に係るアノテーション管理サーバ20もまた、通常のPCにより構成されている。   The annotation management server 20 also includes a control unit 21 that controls the overall operation of the annotation management server 20, a main storage unit 22 that is used as a work area when various programs are executed, and a display such as a liquid crystal display. Secondary storage for storing a display unit 23, an operation unit 24 including a keyboard and a mouse, a sticky note annotation database DB2, a pen input annotation database DB3, various programs, various parameter information, etc. And a transmission / reception unit 26 for exchanging various types of information with an external device. These units are electrically connected via a system bus S2. That is, the annotation management server 20 according to the present embodiment is also configured by a normal PC.

一方、本実施の形態に係るサーバシステム92は、電子掲示板(Bulletin Board System)として機能するメッセージ共有サーバ30を有している。メッセージ共有サーバ30は主として上記電子掲示板上で交わされたメッセージの保存と検索を行うサーバである。   On the other hand, the server system 92 according to the present embodiment has a message sharing server 30 that functions as an electronic bulletin board (Bulletin Board System). The message sharing server 30 is a server that mainly stores and retrieves messages exchanged on the electronic bulletin board.

同図に示すように、メッセージ共有サーバ30も、メッセージ共有サーバ30全体の動作を司る制御部31と、各種プログラムの実行時におけるワークエリア等として用いられる主記憶部32と、液晶ディスプレイ等のディスプレイを含んで構成された表示部33と、キーボード及びマウスを含んで構成された操作部34と、後述するメッセージデータベースDB4や各種プログラム、各種パラメータ情報等を記憶するための二次記憶部35と、外部装置との間での各種情報の授受を司る送受信部36と、を備えており、これら各部はシステムバスS3を介して電気的に接続されている。すなわち、本実施の形態に係るメッセージ共有サーバ30もまた、通常のPCにより構成されている。   As shown in the figure, the message sharing server 30 also includes a control unit 31 that controls the overall operation of the message sharing server 30, a main storage unit 32 that is used as a work area when various programs are executed, and a display such as a liquid crystal display. A display unit 33 configured to include a keyboard and a mouse, a secondary storage unit 35 to store a message database DB4, various programs, various parameter information, and the like, which will be described later, And a transmission / reception unit 36 that exchanges various types of information with an external device, and these units are electrically connected via a system bus S3. That is, the message sharing server 30 according to the present embodiment is also configured by a normal PC.

ところで、本実施の形態に係る文書処理システム90は、電子文書に添付されたアノテーションを起点として、予め定められた複数のレビュア(レビュー者)によりレビューが行われるものとされており、当該レビューはメッセージ共有サーバ30によって提供される電子掲示板を用いて行われる。   By the way, the document processing system 90 according to the present embodiment is assumed to be reviewed by a plurality of predetermined reviewers (reviewers) starting from the annotation attached to the electronic document. This is performed using an electronic bulletin board provided by the message sharing server 30.

そして、本実施の形態に係るサーバシステム92は、上記アノテーション及びレビューに基づいて実行される、電子文書に対する校正作業の進捗状況の管理を行うと共に、当該校正作業を実行する作業者(以下、「作業実行者」という。)の管理を行う進捗管理サーバ40を有している。   Then, the server system 92 according to the present embodiment manages the progress of the proofreading work performed on the electronic document, which is executed based on the annotation and the review, and the worker who executes the proofreading work (hereinafter, “ It has a progress management server 40 that manages “work performers”).

同図に示すように、進捗管理サーバ40も、進捗管理サーバ40全体の動作を司る制御部41と、各種プログラムの実行時におけるワークエリア等として用いられる主記憶部42と、液晶ディスプレイ等のディスプレイを含んで構成された表示部43と、キーボード及びマウスを含んで構成された操作部44と、後述する作業者データベースDB5、進捗管理データベースDB6、スケジュール管理データベースDB7や各種プログラム、各種パラメータ情報等を記憶するための二次記憶部45と、外部装置との間での各種情報の授受を司る送受信部46と、を備えており、これら各部はシステムバスS4を介して電気的に接続されている。すなわち、本実施の形態に係る進捗管理サーバ40もまた、通常のPCにより構成されている。   As shown in the figure, the progress management server 40 also includes a control unit 41 that controls the overall operation of the progress management server 40, a main storage unit 42 that is used as a work area when various programs are executed, and a display such as a liquid crystal display. A display unit 43 including an operation unit 44 including a keyboard and a mouse, a worker database DB5, a progress management database DB6, a schedule management database DB7, various programs, various parameter information, and the like which will be described later. A secondary storage unit 45 for storing and a transmission / reception unit 46 for exchanging various types of information with an external device are provided, and these units are electrically connected via a system bus S4. . That is, the progress management server 40 according to the present embodiment is also configured by a normal PC.

そして、クライアントシステム94は、ペン入力(手書き入力)を行う際に用いられるペン型のアノテーションデバイス57を各々有する、文書処理システム90の各利用者毎に設けられた複数のクライアント装置50を含んで構成されている。   The client system 94 includes a plurality of client devices 50 provided for each user of the document processing system 90, each having a pen-type annotation device 57 used when performing pen input (handwriting input). It is configured.

同図に示すように、クライアント装置50も、クライアント装置50全体の動作を司る制御部51と、各種プログラムの実行時におけるワークエリア等として用いられる主記憶部52と、ディスプレイを含んで構成された表示部53と、キーボード及びマウスを含んで構成された操作部54と、各種プログラム、各種パラメータ情報等を記憶するための二次記憶部55と、外部装置との間での各種情報の授受を司る送受信部56と、を備えており、これら各部はシステムバスS5を介して電気的に接続されている。   As shown in the figure, the client device 50 is also configured to include a control unit 51 that controls the operation of the entire client device 50, a main storage unit 52 that is used as a work area when various programs are executed, and a display. Various information is exchanged between the display unit 53, an operation unit 54 including a keyboard and a mouse, a secondary storage unit 55 for storing various programs, various parameter information, and the like. And a transmission / reception unit 56 that controls them, and these units are electrically connected via a system bus S5.

クライアント装置50は、主記憶部52や二次記憶部55から読み出したデータや、送受信部56を介してサーバシステム92等から取得したデータに基づいて画像を表示部53に表示するように構成されている。   The client device 50 is configured to display an image on the display unit 53 based on data read from the main storage unit 52 or the secondary storage unit 55 or data acquired from the server system 92 or the like via the transmission / reception unit 56. ing.

なお、本実施の形態に係るクライアント装置50は、ディスプレイ表面にタッチパネル(図示省略。)が重ねられて構成されたタッチパネル・ディスプレイが設けられた表示部53を採用した、所謂タブレットPCとして構成されており、表示部53における表示面上をアノテーションデバイス57によって直接指示(手書き入力)することができる。   The client device 50 according to the present embodiment is configured as a so-called tablet PC that employs a display unit 53 provided with a touch panel display that is configured by overlapping a touch panel (not shown) on the display surface. Therefore, the annotation device 57 can directly instruct (handwritten input) on the display surface of the display unit 53.

このように、クライアント装置50は、紙の文書を読む際に当該文書に好きな形で下線や丸等のマークを付けたり、コメントを書き込んだりするのと同様に、アノテーションデバイス57を用いて書き込み入力が可能となっている。   As described above, when the client device 50 reads a paper document, the client device 50 writes the document using the annotation device 57 in the same way as adding a mark such as an underline or a circle to the document and writing a comment. Input is possible.

また、クライアント装置50は、以上のようなアノテーションデバイス57を用いた手書き入力機能の他、表示部53により文書を表示させた状態において、当該文書の任意の位置に所定形状(本実施の形態では、矩形状)の付箋を添付した状態とすることのできる付箋添付機能を備えている。ここで、当該付箋には、任意のコメントを直接記述したり、コメントや関連記事等のリンク先を示すリンク情報を関連付けたりすることができる。なお、付箋にリンク情報を関連付けた場合、当該リンク情報により示されるリンク先の情報が付箋に表示される。この場合に本実施の形態に係る文書処理システム90では、付箋添付機能によって文書に添付された付箋をアノテーションとしている。   In addition to the handwriting input function using the annotation device 57 as described above, the client device 50 can display a predetermined shape (in this embodiment) at an arbitrary position of the document in a state in which the display unit 53 displays the document. , A rectangular sticky note attached function is provided. Here, an arbitrary comment can be directly described in the tag, or link information indicating a link destination such as a comment or a related article can be associated with the tag. When link information is associated with a tag, the link destination information indicated by the link information is displayed on the tag. In this case, in the document processing system 90 according to the present embodiment, the tag attached to the document by the tag attachment function is used as an annotation.

このように、クライアント装置50は、紙の文書を読む際に当該文書に付箋を貼り付けるのと同様に、注目すべき箇所や校正作業を要する箇所等の任意の位置に対して付箋を添付した状態とすることができる。   As described above, the client device 50 attaches a sticky note to an arbitrary position such as a point to be noted or a point requiring calibration work, in the same manner as sticking a sticky note to a paper document when reading the paper document. State.

文書処理システム90は、以上のような文書管理サーバ10、アノテーション管理サーバ20、メッセージ共有サーバ30、進捗管理サーバ40、及び複数のクライアント装置50が、各々に備えられた送受信部を介し、ネットワーク60によって電気的に接続されて構成されている。なお、本実施の形態に係る文書処理システム90では、ネットワーク60としてインターネットを適用しているが、これに限らず、イントラネット、LAN、VAN(Value Added Network)、電話回線網、エコーネット、HomePNA等の各種ネットワークを単独又は組み合わせて適用することもできる。   The document processing system 90 includes a network 60 that includes the document management server 10, the annotation management server 20, the message sharing server 30, the progress management server 40, and a plurality of client devices 50 that are provided in each of them. It is configured to be electrically connected by. In the document processing system 90 according to the present embodiment, the Internet is applied as the network 60. However, the present invention is not limited to this, and is not limited to this. Intranet, LAN, VAN (Value Added Network), telephone line network, Echonet, HomePNA, etc. These networks can be applied alone or in combination.

本実施の形態に係る文書管理サーバ10、アノテーション管理サーバ20、メッセージ共有サーバ30、及び進捗管理サーバ40はHTTP(Hypertext Transfer Protocol)サーバとして機能し、各クライアント装置50はHTTPクライアントとして機能するものとされており、文書管理サーバ10、アノテーション管理サーバ20、メッセージ共有サーバ30、進捗管理サーバ40、及び各クライアント装置50はネットワーク60を介して相互にアクセスすることができる。   The document management server 10, annotation management server 20, message sharing server 30, and progress management server 40 according to the present embodiment function as an HTTP (Hypertext Transfer Protocol) server, and each client device 50 functions as an HTTP client. The document management server 10, the annotation management server 20, the message sharing server 30, the progress management server 40, and each client device 50 can access each other via the network 60.

そして、クライアント装置50においてアノテーションデバイス57を用いて手書き入力されたアノテーション(以下、「手書き入力アノテーション」ともいう。)や、付箋として添付されたアノテーション(以下、「付箋アノテーション」ともいう。)に関する情報は主記憶部52に一旦保持された後、所定のタイミングでアノテーション管理サーバ20にネットワーク60を介して送信され、文書本体と対応付けられて記憶される。そして、後にクライアント装置50において当該文書を読み出し表示する際には、当該文書に対して過去に添付されたアノテーションに関する情報に基づいて、当該文書と共にアノテーションを表示することができるものとされている。   Information relating to annotations handwritten by the client device 50 using the annotation device 57 (hereinafter also referred to as “handwritten input annotations”) and annotations attached as sticky notes (hereinafter also referred to as “sticky note annotations”). Is temporarily stored in the main storage unit 52, then transmitted to the annotation management server 20 via the network 60 at a predetermined timing, and stored in association with the document body. Then, when the document is read and displayed later on the client device 50, the annotation can be displayed together with the document based on the information regarding the annotation attached to the document in the past.

〔クライアント装置50の表示画面の構成〕
図2は、本実施の形態に係るクライアント装置50の表示部53によるアノテーションの添付に関する表示画面の概略構成を示す図である。
[Configuration of Display Screen of Client Device 50]
FIG. 2 is a diagram illustrating a schematic configuration of a display screen related to annotation attachment by the display unit 53 of the client device 50 according to the present embodiment.

同図に示すように、当該表示画面では、クライアント装置50の表示部53における表示エリア53Aに対して、各々所定の役割を有する複数のボタンを表示するためのエリアであるボタン表示エリア53Bと、アノテーションの添付対象とする文書84を表示するためのエリアである文書表示エリア53Cとが設けられている。   As shown in the figure, in the display screen, a button display area 53B that is an area for displaying a plurality of buttons each having a predetermined role on the display area 53A in the display unit 53 of the client device 50; A document display area 53C, which is an area for displaying the document 84 to be attached with the annotation, is provided.

本実施の形態に係るクライアント装置50では、上記複数のボタンとして、文書管理サーバ10において管理(記憶)されている文書を読み込む際に指定される文書読込みボタン70と、付箋アノテーションを文書に添付する際に指定される付箋ボタン72と、文書表示エリア53Cに表示された付箋アノテーション86や手書き入力アノテーション88を保存する際に指定される保存ボタン74と、アノテーション管理サーバ20において管理(記憶)されているアノテーションを検索して文書表示エリア53Cに表示させる際に指定される検索ボタン76とが、ボタン表示エリア53Bに表示される。   In the client device 50 according to the present embodiment, a document reading button 70 specified when reading a document managed (stored) in the document management server 10 and a tag annotation are attached to the document as the plurality of buttons. The annotation button 72 specified at the time, the save button 74 specified when saving the tag annotation 86 and the handwritten input annotation 88 displayed in the document display area 53C, and managed (stored) in the annotation management server 20. A search button 76 that is specified when an annotation is searched for and displayed in the document display area 53C is displayed in the button display area 53B.

また、上記複数のボタンとして、更に、後述するスケジューリング機能を実行する際に指定されるスケジュール設定ボタン78と、アノテーションにより指示された校正作業の進捗状況を示す進捗管理画面を表示部53に表示させる際に指定される進捗ボタン80と、表示されている文書のページを前後に捲るための前ページ送りボタン82A及び次ページ送りボタン82Bからなるページ捲りボタン82とが、ボタン表示エリア53Bに表示される。   Further, as the plurality of buttons, a schedule setting button 78 specified when executing a scheduling function to be described later, and a progress management screen showing the progress status of the calibration work designated by the annotation are displayed on the display unit 53. A progress button 80 specified at the time, and a page turning button 82 including a previous page forward button 82A and a next page forward button 82B for turning the page of the displayed document forward and backward are displayed in the button display area 53B. The

クライアント装置50は、本を読むようにページを捲りながらページ単位で表示を切り替えていく機能(ページ捲り表示機能)が搭載されており、このページ捲り表示機能を利用することで、例えば、取り込んだ多数の情報の中から所望の情報を素早く検索できるように構成されている。   The client device 50 is equipped with a function (page turning display function) for switching the display in units of pages while turning a page so as to read a book. By using this page turning display function, for example, capturing is performed. It is configured so that desired information can be quickly searched from a large number of information.

すなわち、このクライアント装置50における情報検索時には、前ページ送りボタン82A及び次ページ送りボタン82Bの2つのボタンをアノテーションデバイス57や、操作部54のキーボード、マウス等によりポインティング指定することによって、ページ捲り操作を行いながら所望のページ情報を表示部53に表示させることができる。   That is, when searching for information in the client device 50, the page turning operation is performed by specifying pointing with the annotation device 57, the keyboard of the operation unit 54, the mouse, or the like with the two buttons of the previous page forward button 82A and the next page forward button 82B. The desired page information can be displayed on the display unit 53 while performing the above.

また、クライアント装置50は、ページ捲りボタン82以外のボタンについても、アノテーションデバイス57や、操作部54のキーボード、マウス等によりポインティング指定することによって、当該ボタンに割り当てられた機能を実行させることができる。   Further, the client device 50 can execute the function assigned to the button by designating the buttons other than the page turning button 82 using the annotation device 57, the keyboard of the operation unit 54, the mouse, or the like. .

以上のように、本実施の形態に係るクライアント装置50では、表示部53の表示エリア53Aに表示させることで各種機能を実行させるためのボタンをソフトウェア的に設けているが、これに代えて、表示部53や操作部54等にハードウェアのボタンを設けたり、操作部54のキーボードにおける所定キーを各ボタンとして利用する形態とすることもできることは言うまでもない。   As described above, in the client device 50 according to the present embodiment, buttons for executing various functions by being displayed in the display area 53A of the display unit 53 are provided in software. It goes without saying that hardware buttons may be provided on the display unit 53, the operation unit 54, or the like, or predetermined keys on the keyboard of the operation unit 54 may be used as the buttons.

なお、本実施の形態に係るクライアント装置50では、前述したように、付箋アノテーションにリンク情報を関連付けた場合には当該リンク情報により示されるリンク先の情報が付箋アノテーションに表示されるが、この場合、当該情報を起点としたレビューが、予め定められた複数のレビュアによりメッセージ共有サーバ30によって提供される電子掲示板を用いて行われる。   In the client device 50 according to the present embodiment, as described above, when link information is associated with a tag annotation, the link destination information indicated by the link information is displayed on the tag annotation. The review starting from the information is performed using an electronic bulletin board provided by the message sharing server 30 by a plurality of predetermined reviewers.

そして、各レビュアにより当該電子掲示板を用いて交わされたメッセージは、対応する付箋アノテーションをアノテーションデバイス57や操作部54のキーボード、マウス等によりポインティング指定することによって表示部53の表示エリア53Aに表示することができる。   Messages exchanged by each reviewer using the electronic bulletin board are displayed in the display area 53A of the display unit 53 by pointing the corresponding tag annotations with the annotation device 57, the keyboard of the operation unit 54, the mouse, or the like. be able to.

なお、上記レビューは、コメントが直接記述された付箋アノテーションや、手書き入力アノテーションを起点として実施することも可能であるが、錯綜を回避するために、以下では、メッセージ共有サーバ30により提供される電子掲示板をリンク先としたリンク情報が関連付けられた付箋アノテーションのみを対象としてレビューを行うものとして説明する。   The review can be performed starting from a sticky note annotation in which a comment is directly described or a handwritten input annotation. However, in order to avoid complications, the electronic review provided by the message sharing server 30 will be described below. A description will be given assuming that the review is performed only on the tag annotation associated with the link information with the bulletin board as the link destination.

一方、本実施の形態に係るクライアント装置50には文書編集用の汎用のアプリケーション・プログラム(以下、「文書編集用AP」という。)がインストールされており、電子文書を編集する際には、当該文書編集用APを実行させることにより、編集対象とする電子文書が表示された状態の文書編集画面(図示省略。)を表示部53の表示エリア53Aに表示させた状態で編集作業を行うことになる。   On the other hand, a general-purpose application program for document editing (hereinafter referred to as “document editing AP”) is installed in the client device 50 according to the present embodiment. By executing the document editing AP, the editing operation is performed in a state where a document editing screen (not shown) in a state where an electronic document to be edited is displayed is displayed in the display area 53A of the display unit 53. Become.

そして、本実施の形態に係るクライアント装置50は、表示エリア53Aに複数の画面が表示できるものとして構成されており、電子文書に対する編集作業を当該電子文書に添付されたアノテーションを参照しつつ行う場合には、文書編集用APによる文書編集画面と、一例として図2に示したアノテーションの添付に関する表示画面とを、双方とも表示エリア53Aに表示して行うことになる。   The client device 50 according to the present embodiment is configured so that a plurality of screens can be displayed in the display area 53A, and an editing operation on the electronic document is performed with reference to the annotation attached to the electronic document. In this case, both the document editing screen by the document editing AP and the display screen related to the annotation attachment shown in FIG. 2 are displayed in the display area 53A.

〔文書管理サーバ10及び文書データベースDB1〕
ところで、本実施の形態に係る文書管理サーバ10は、電子文書を登録する「登録」と、電子文書を読み込む「文書読込み」を外部からの指示に応じて受け付ける。
[Document Management Server 10 and Document Database DB1]
By the way, the document management server 10 according to the present embodiment accepts “registration” for registering an electronic document and “document reading” for reading an electronic document in accordance with an instruction from the outside.

上記「登録」は、例えば‘http://datacenter.company.co.jp/access.cgi?DocumentID=8gjk3cl3’等のように、文書データベースDB1への文書の格納先を示すアドレスを示した登録したい文書へのURL(Uniform Resource Locators)等のパスやディレクトリへのパスで外部から与えることとする。   The “registration” is, for example, “http: // datacenter. company. co. jp / access. cgi? As shown in DocumentID = 8gjk3cl3 ′, it is given from the outside by a path such as a URL (Uniform Resource Locators) or a directory to a document to be registered indicating an address indicating a storage location of the document in the document database DB1. .

文書管理サーバ10は、与えられたパスが示す文書(群)に対し、順次、文書ID(Identification)を付与し、各文書ID毎に文書名と文書本文を文書データベースDB1に登録する。なお、本実施の形態に係る文書管理サーバ10では、上記文書IDとして文書データベースDB1に格納する文書毎にユニークなID番号が割り振られる。また、文書管理サーバ10は、登録指示された文書の文書ファイル名が同じでも複数回文書データベースDB1に投稿されていれば、異なる文書IDで登録するものとされている。   The document management server 10 sequentially assigns a document ID (Identification) to the document (group) indicated by the given path, and registers the document name and the document text in the document database DB1 for each document ID. In the document management server 10 according to the present embodiment, a unique ID number is assigned to each document stored in the document database DB1 as the document ID. Further, the document management server 10 registers with different document IDs as long as the document file name of the document instructed for registration is the same as long as it has been posted to the document database DB1 multiple times.

一方、本実施の形態に係る文書処理システム90では、当該文書処理システム90を用いて共通の目的を達成するために複数の利用者が共同で登録文書を用いた作業を行う単位を「タスク」と称し、登録文書が何れのタスクに属するかを示すタスク情報を各文書毎に文書データベースDB1に登録することができる。なお、上記タスク情報は、対応する文書を文書データベースDB1に登録する際や、登録後の任意のタイミングで、クライアント装置50を介するか、又は文書管理サーバ10によって直接に登録することができる。   On the other hand, in the document processing system 90 according to the present embodiment, a unit in which a plurality of users jointly use a registered document in order to achieve a common purpose using the document processing system 90 is a “task”. The task information indicating to which task a registered document belongs can be registered in the document database DB1 for each document. The task information can be registered via the client device 50 or directly by the document management server 10 when the corresponding document is registered in the document database DB1 or at an arbitrary timing after registration.

また、本実施の形態に係る文書処理システム90では、校正作業の進捗状況の管理を行う登録文書に対して業務IDが個別に付与されるものとされており、当該登録文書については業務IDも登録されることになる。   In the document processing system 90 according to the present embodiment, a business ID is individually assigned to a registered document for managing the progress of the proofreading work, and the business ID is also assigned to the registered document. Will be registered.

このとき、文書データベースDB1内のデータ構造は、一例として図3に示すようなものとなる。ここで、文書名又は文書本文はURL等の文書へのパスであってもよい。   At this time, the data structure in the document database DB1 is as shown in FIG. 3 as an example. Here, the document name or the document text may be a path to a document such as a URL.

なお、本実施の形態に係る文書処理システム90では、上記レビュアを、レビューの起点となった付箋アノテーションが添付されている文書が属するタスクに属される利用者であるものとしている。   In the document processing system 90 according to the present embodiment, the reviewer is assumed to be a user belonging to a task to which a document attached with a tag annotation that is a starting point of review belongs.

一方、何れかのクライアント装置50において文書読込みボタン70が指定されたことを検知すると、当該クライアント装置50は、その旨を示す情報を文書管理サーバ10に通知する。これに応じて文書管理サーバ10は、文書データベースDB1内の文書名の一覧を作成し、アクセス元のクライアント装置50に送信する。   On the other hand, when detecting that the document reading button 70 is designated in any of the client devices 50, the client device 50 notifies the document management server 10 of information indicating that. In response to this, the document management server 10 creates a list of document names in the document database DB1 and transmits it to the client device 50 that is the access source.

これに応じて当該クライアント装置50は、文書名の一覧をリストボックス等で表示し、利用者に選択を促す。これに応じて利用者により所望の文書名がアノテーションデバイス57や、操作部54のキーボード、マウス等によりポインティング指定されると、クライアント装置50は、指定された文書名を文書管理サーバ10に送信する。   In response to this, the client device 50 displays a list of document names in a list box or the like, and prompts the user to select. In response to this, when the user designates a desired document name with the annotation device 57 or the keyboard or mouse of the operation unit 54, the client device 50 transmits the designated document name to the document management server 10. .

これに応じて文書管理サーバ10は、当該クライアント装置50から受信した文書名に対応する文書本文及び文書IDを文書データベースDB1から読み出してクライアント装置50に送信する。これによって、クライアント装置50の表示部53における文書表示エリア53Cには、指定した文書名に対応する文書の本文が表示されることになる。   In response to this, the document management server 10 reads the document text and document ID corresponding to the document name received from the client device 50 from the document database DB1, and transmits the document text to the client device 50. As a result, the text of the document corresponding to the designated document name is displayed in the document display area 53C of the display unit 53 of the client device 50.

〔アノテーション管理サーバ20、付箋用アノテーションデータベースDB2、ペン入力用アノテーションデータベースDB3〕
一方、本実施の形態に係るアノテーション管理サーバ20は、「保存」と「検索」を外部からの指示に応じて受け付ける。
[Annotation management server 20, annotation database for sticky note DB2, annotation database for pen input DB3]
On the other hand, the annotation management server 20 according to the present embodiment accepts “save” and “search” according to instructions from the outside.

すなわち、何れかのクライアント装置50において表示部53により文書が表示された状態で当該文書に対してアノテーションが添付され、保存ボタン74が指定されたことを検知すると、当該クライアント装置50は、その旨を示す情報をアノテーション管理サーバ20に通知する。これにより、アノテーション管理サーバ20は、保存を指示されたアノテーションに関する情報を、当該アノテーションが添付された文書に対応付けて、当該アノテーションが付箋アノテーションである場合は付箋用アノテーションデータベースDB2に、当該アノテーションが手書き入力アノテーションである場合はペン入力用アノテーションデータベースDB3に、各々登録(格納)する。   That is, when it is detected that an annotation is attached to the document in a state where the document is displayed on the display unit 53 in any client device 50 and the save button 74 is designated, the client device 50 notifies that fact. Is sent to the annotation management server 20. As a result, the annotation management server 20 associates the information related to the annotation instructed to be saved with the document to which the annotation is attached, and when the annotation is a tag annotation, the annotation is stored in the tag annotation database DB2. If it is a handwritten input annotation, it is registered (stored) in the pen input annotation database DB3.

すなわち、例えば、何れかのクライアント装置50から「保存」の指示を受け付けたときにアノテーション管理サーバ20では、保存対象とするアノテーションが付箋アノテーションである場合には、以下に示すようにアノテーションの登録処理が行われる。   That is, for example, when the annotation management server 20 receives a “save” instruction from any of the client devices 50 and the annotation to be saved is a sticky note annotation, an annotation registration process is performed as shown below. Is done.

まず、アノテーション管理サーバ20は、保存対象とするアノテーションの添付されている位置を示す位置情報、当該アノテーションにリンクが張られている場合のリンク先、アノテーションが添付された文書の文書ID及び当該保存の指示を行ったクライアント装置50の端末IDがクライアント装置50から与えられる。また、このとき、保存対象とするアノテーションを添付した利用者のユーザ名(又はユーザID)及びアノテーションが添付された時刻(生成時刻)もクライアント装置50から与えられる。   First, the annotation management server 20 stores position information indicating a position where an annotation to be stored is attached, a link destination when the annotation is linked, a document ID of the document with the annotation attached, and the storage The client device 50 is given the terminal ID of the client device 50 that issued the instruction. At this time, the user name (or user ID) of the user to which the annotation to be stored is attached and the time (generation time) at which the annotation is attached are also given from the client device 50.

そして、アノテーション管理サーバ20は、アノテーションID、端末ID、ユーザID(又はユーザ名)、文書ID、位置情報、リンク先、生成時刻、及び進捗管理IDを、テーブル形式で付箋用アノテーションデータベースDB2に保存する。   The annotation management server 20 stores the annotation ID, terminal ID, user ID (or user name), document ID, position information, link destination, generation time, and progress management ID in the tag annotation database DB2 in a table format. To do.

このとき、付箋用アノテーションデータベースDB2内のデータ構造は、一例として図4に示すようなものとなる。   At this time, the data structure in the tag annotation database DB2 is as shown in FIG. 4 as an example.

同図において、アノテーションIDは、個々のアノテーションを管理するものであり、1付箋分のアノテーション毎にユニークなID番号が割り振られる。ここで、アノテーションIDは、クライアントシステム94側で発行する方式や、アノテーション管理サーバ20側で発行する方式がある。なお、少なくとも、アノテーションIDと文書IDの2つ組みで唯一である必要がある。与えられたアノテーションID又は上記2つ組みが新規でない場合は、そのアノテーションID又は上記2つ組みで示される行を上書きするものとする。   In the figure, the annotation ID is used to manage individual annotations, and a unique ID number is assigned to each annotation for one tag. Here, the annotation ID includes a method issued on the client system 94 side and a method issued on the annotation management server 20 side. It should be noted that at least two sets of annotation ID and document ID need to be unique. If the given annotation ID or the above-mentioned two-tuple is not new, the line indicated by that annotation ID or the above-mentioned two-tuple is overwritten.

また、端末IDは、クライアント装置50を唯一に識別するID番号である。ここで、端末IDは、利用者が使用しているクライアント装置50のハードウェアを直接示す場合もあれば、IP(Internet Protocol)アドレスやホスト名に対応するものであってもよい。また、ユーザID(又はユーザ名)は、クライアント装置50を操作している利用者を一意に識別するための情報であり、例えば、ログインユーザ名等に対応する。更に、文書IDは、対応するアノテーションが添付された文書の文書データベースDB1に登録されている文書IDである。   The terminal ID is an ID number that uniquely identifies the client device 50. Here, the terminal ID may directly indicate the hardware of the client device 50 used by the user, or may correspond to an IP (Internet Protocol) address or a host name. The user ID (or user name) is information for uniquely identifying the user who is operating the client device 50, and corresponds to, for example, a login user name. Further, the document ID is a document ID registered in the document database DB1 of a document to which a corresponding annotation is attached.

一方、位置情報は、1付箋分のアノテーションの添付位置を示す情報である。本実施の形態では、対応する文書IDにより示される文書内のページ番号と、当該ページ番号によって示されるページにおける位置座標(ここでは、アノテーションの左上角点及び右下角点の2点の座標)との組み合わせによって示される。なお、本実施の形態では、文書表示エリア53Cを横方向及び縦方向に、文書表示エリア53Cに表示されている文書の横方向サイズ及び縦方向サイズを基準としたサイズ(ここでは、横方向に表示文書の横方向サイズの1/50(50分の1)で、縦方向に表示文書の縦方向サイズの1/60(60分の1)のサイズ)の矩形領域でマトリクス状に区分し、各区分領域に対して左上角位置の領域から横方向に連続し、かつ右端位置の領域から次行の左端位置の領域に連続する順に連続した番号が予め付与されており、当該番号を上記位置座標として適用している。   On the other hand, the position information is information indicating the attachment position of the annotation for one sticky note. In the present embodiment, the page number in the document indicated by the corresponding document ID and the position coordinates on the page indicated by the page number (here, the coordinates of the two points of the upper left corner point and the lower right corner point of the annotation) Indicated by a combination of In the present embodiment, the document display area 53C is set in the horizontal and vertical directions, and the size based on the horizontal size and vertical size of the document displayed in the document display area 53C (here, in the horizontal direction). A rectangular area of 1/50 (1/50) of the horizontal size of the display document and 1/60 (1/60 of the vertical size of the display document) in the vertical direction is divided into a matrix. For each segmented area, a consecutive number is assigned in advance in the order from the area at the upper left corner position in the horizontal direction and from the area at the right end position to the area at the left end position of the next row, and the number is assigned to the above position. Applied as coordinates.

また、リンク先は、アノテーションに関連付けられたリンク情報を示す。なお、本実施の形態に係る文書処理システム90では、上記リンク情報を、一例として同図に示すように‘http://MessageServer/threadViewer?MessageId=1517’等のようにURL等のパスやディレクトリへのパスで与えることとする。   The link destination indicates link information associated with the annotation. In the document processing system 90 according to the present embodiment, as an example, the link information is represented as 'http: // MessageServer / threadViewer?' It is assumed that a path such as a URL or a path to a directory such as MessageId = 1517 'is given.

利用者は、添付するアノテーション毎にリンク先を設定することができる。なお、このリンク先は、アノテーションを添付する度に、或いはアノテーションの保存指示を発する度に設定可能である。   The user can set a link destination for each attached annotation. This link destination can be set every time an annotation is attached or every time an annotation save instruction is issued.

なお、本実施の形態に係る文書処理システム90では、リンクが張られている付箋アノテーションを、リンク先の情報が内部に表示された状態で表示するようにしている。例えば、図2に示す例では、‘内容検討’、‘意味不明’、‘削除’が、リンク先の情報として付箋アノテーション86に表示されている。   In the document processing system 90 according to the present embodiment, a tag annotation with a link is displayed in a state where the information of the link destination is displayed inside. For example, in the example illustrated in FIG. 2, “content review”, “unknown”, and “delete” are displayed on the tag annotation 86 as link destination information.

また、生成時刻は、クライアント装置50において1付箋分のアノテーションが添付された(表示エリア53Aに描画された)時刻であり、日付と時間からなる。これは、1付箋分のアノテーション毎に、クライアント装置50上で保存ボタン74を指定して保存した時刻とは別にサーバで一元的に管理されるようになっている。   The generation time is the time when an annotation for one sticky note is attached (drawn in the display area 53A) in the client device 50, and includes a date and time. This is managed for each annotation for one tag by the server separately from the time when the save button 74 is designated and saved on the client device 50.

更に、進捗管理IDは、上記電子掲示板にリンクが張られている付箋アノテーションについて、リンク先の情報及び当該情報を起点として行われるレビューに基づいて実行される校正作業の進捗状況を管理するためのものであり、リンクが張られている1付箋分の付箋アノテーション毎にユニークなIDが割り振られる。ここで、進捗管理IDは、クライアントシステム94側で発行する方式や、アノテーション管理サーバ20側で発行する方式がある。また、本実施の形態に係る文書処理システム90では、付箋アノテーションに対してメッセージ共有サーバ30により提供される電子掲示板のメッセージにリンクが張られたタイミングで、当該付箋アノテーションに対する進捗管理IDを付箋用アノテーションデータベースDB2に登録するようにしている。   Further, the progress management ID is for managing the progress status of the proofreading work executed on the basis of the link destination information and the review performed using the information as a starting point for the tag annotation linked to the electronic bulletin board. A unique ID is assigned to each sticky note annotation for one sticky note that is linked. Here, the progress management ID includes a method issued on the client system 94 side and a method issued on the annotation management server 20 side. In the document processing system 90 according to the present embodiment, the progress management ID for the sticky note annotation is used for the sticky note at the timing when the message on the electronic bulletin board provided by the message sharing server 30 is linked to the sticky note annotation. It is registered in the annotation database DB2.

以上が保存対象とするアノテーションが付箋アノテーションである場合についての説明であるが、これに対し保存対象とするアノテーションが手書き入力アノテーションである場合には、アノテーション管理サーバ20において以下に示すようにアノテーションの登録処理が行われる。   The above is a description of the case where the annotation to be saved is a tag annotation, but when the annotation to be saved is a handwritten input annotation, the annotation management server 20 uses the annotation as shown below. Registration processing is performed.

まず、アノテーション管理サーバ20は、保存対象とするアノテーションのアノテーション内容と当該アノテーションの位置情報と色や形状、アノテーションが添付された文書の文書ID及び当該保存の指示を行ったクライアント装置50の端末IDがクライアント装置50から与えられる。また、このとき、保存対象とするアノテーションを添付した利用者のユーザ名(又はユーザID)及びアノテーションが添付された時刻もクライアント装置50から与えられる。   First, the annotation management server 20 includes the annotation content of the annotation to be saved, the positional information and color and shape of the annotation, the document ID of the document with the annotation attached, and the terminal ID of the client device 50 that has given the saving instruction. Is provided from the client device 50. At this time, the client device 50 also gives the user name (or user ID) of the user who attached the annotation to be saved and the time when the annotation was attached.

そして、アノテーション管理サーバ20は、アノテーションID、端末ID、ユーザID(又はユーザ名)、文書ID、位置情報、アノテーション内容、色形状、線種、及び生成時刻を、テーブル形式でペン入力用アノテーションデータベースDB3に保存する。このとき、ペン入力用アノテーションデータベースDB3内のデータ構造は、一例として図5に示すようなものとなる。   Then, the annotation management server 20 includes an annotation ID, terminal ID, user ID (or user name), document ID, position information, annotation content, color shape, line type, and generation time in a pen input annotation database. Save to DB3. At this time, the data structure in the pen input annotation database DB3 is as shown in FIG. 5 as an example.

同図において、アノテーションID、端末ID、ユーザID、文書ID、位置情報、及び生成時刻は、前述した付箋用アノテーションデータベースDB2と同様のものである。但し、アノテーションIDに関しては、付箋用アノテーションデータベースDB2で登録されるものが1付箋毎に割り振られるものであるのに対し、ペン入力用アノテーションデータベースDB3では1ストローク毎に割り振られるものである点のみが異なる。   In the figure, the annotation ID, terminal ID, user ID, document ID, position information, and generation time are the same as those in the above-mentioned tag annotation database DB2. However, regarding the annotation ID, what is registered in the annotation database for sticky note DB2 is assigned for each sticky note, whereas it is assigned for each stroke in the annotation database DB3 for pen input. Different.

一方、同図におけるアノテーション内容は、1ストロークのアノテーションの軌跡情報であって、描画されたアノテーションを再現するために利用されるデータであり、例えば、ビットマップやベクトルデータ等のデータとなる。また、色形状は、アノテーションに使用されたインクの色や、円や四角等の形状情報である。更に、線種は、アノテーションの太さや実線或いは点線等といった線種を示す。   On the other hand, the annotation content in the figure is the trajectory information of one-stroke annotation, and is data used to reproduce the drawn annotation, for example, data such as bitmap or vector data. The color shape is the color of the ink used for the annotation and shape information such as a circle or a square. Further, the line type indicates a line type such as the thickness of the annotation, a solid line, or a dotted line.

一方、クライアント装置50は、表示部53の文書表示エリア53Cに文書が表示された状態において検索ボタン76が指定されたことを検知すると、その旨を示す情報をアノテーション管理サーバ20に通知する。これに応じてアノテーション管理サーバ20は、検索を指示されたアノテーションに関する情報を付箋用アノテーションデータベースDB2及びペン入力用アノテーションデータベースDB3から読み出す。   On the other hand, when the client device 50 detects that the search button 76 is specified in a state where the document is displayed in the document display area 53C of the display unit 53, the client device 50 notifies the annotation management server 20 of information indicating that. In response to this, the annotation management server 20 reads information related to the annotation for which the search has been instructed from the tag annotation database DB2 and the pen input annotation database DB3.

すなわち、アノテーション管理サーバ20は、クライアント装置50から「検索」の指示を受け付ける。このとき、アノテーション管理サーバ20は、文書IDとアノテーション添付範囲に関する情報をクライアント装置50から受け取る。そして、アノテーション管理サーバ20は、これらの情報(検索条件)に基づき、付箋用アノテーションデータベースDB2及びペン入力用アノテーションデータベースDB3を検索し、表示対象となり得るアノテーションに関する情報を読み出してアクセス元のクライアント装置50に送信する。   That is, the annotation management server 20 receives a “search” instruction from the client device 50. At this time, the annotation management server 20 receives information regarding the document ID and the annotation attachment range from the client device 50. Then, the annotation management server 20 searches the tag annotation database DB2 and the pen input annotation database DB3 based on the information (search conditions), reads out information related to annotations that can be displayed, and accesses the client device 50 as the access source. Send to.

これに応じて当該クライアント装置50では、アノテーション管理サーバ20から受信した情報によって示されるアノテーションを閲覧中の文書に重ねて表示する。なお、図2では、以上の処理によって文書84に付箋アノテーション86及び手書き入力アノテーション88が重ねて表示された状態の一例が示されている。   In response to this, the client device 50 displays the annotation indicated by the information received from the annotation management server 20 so as to overlap the document being browsed. FIG. 2 shows an example of a state in which the tag annotation 86 and the handwritten input annotation 88 are displayed superimposed on the document 84 by the above processing.

〔メッセージ共有サーバ30及びメッセージデータベースDB4〕
一方、本実施の形態に係るメッセージ共有サーバ30は、文書処理システム90の利用者による電子掲示板として機能するものである。
[Message sharing server 30 and message database DB4]
On the other hand, the message sharing server 30 according to the present embodiment functions as an electronic bulletin board by a user of the document processing system 90.

すなわち、文書処理システム90で取扱い対象としている何れかのクライアント装置50から上記電子掲示板に対してメッセージが書き込まれると、メッセージ共有サーバ30は、当該メッセージに関する情報をメッセージデータベースDB4に登録する。   That is, when a message is written from one of the client devices 50 to be handled by the document processing system 90 to the electronic bulletin board, the message sharing server 30 registers information about the message in the message database DB4.

電子掲示板では、通常、最初のメッセージが何れかの利用者によってタイトルと共に書き込まれ、それを参照した他の利用者から当該メッセージに関するメッセージが書き込まれ、更に、このメッセージに関するメッセージが他の利用者や最初にメッセージを書き込んだ利用者等によって書き込まれる、といったことが適宜行われる。この際、最初のメッセージ以外のメッセージには、最初のメッセージに設けられたタイトルに応じたタイトルが設けられることにより、タイトルを参照することによって、あるいは返信を作成する際に、返信メッセージに親となったメッセージのIDを埋め込むことで各メッセージの親子関係を把握することができる。   In an electronic bulletin board, the first message is usually written together with the title by one of the users, a message about the message is written from another user who refers to the message, and the message about the message is also sent to other users or The message is first written by the user who wrote the message first. At this time, a message other than the first message is provided with a title corresponding to the title provided in the first message, so that the reply message is referred to as a parent by referring to the title or when creating a reply. By embedding the ID of the received message, the parent-child relationship of each message can be grasped.

メッセージ共有サーバ30では、このように電子掲示板に対して各利用者から書き込まれたメッセージを当該メッセージに対応するタイトルと共にメッセージデータベースDB4に順次登録する。このとき、メッセージデータベースDB4内のデータ構造は、一例として図6に示すようなものとなる。   The message sharing server 30 sequentially registers the messages written from the users on the electronic bulletin board in this way in the message database DB4 together with the titles corresponding to the messages. At this time, the data structure in the message database DB4 is as shown in FIG. 6 as an example.

同図において、メッセージIDは、個々のメッセージを管理するものであり、各メッセージ毎にユニークなID番号が割り振られる。ここで、メッセージIDは、クライアントシステム94側で発行する方式や、メッセージ共有サーバ30側で発行する方式がある。   In the figure, a message ID manages each message, and a unique ID number is assigned to each message. Here, there are a method of issuing the message ID on the client system 94 side and a method of issuing on the message sharing server 30 side.

また、更新時刻は、電子掲示板にメッセージが書き込まれた時刻であり、日付と時間からなる。なお、本実施の形態では、当該更新時刻を、メッセージ共有サーバ30の制御部31に設けられている不図示のタイマによって計時されている日時情報を利用して登録するものとされているが、これに限らず、メッセージの書き込み元であるクライアント装置50からメッセージの書き込み時刻を示す情報が与えられ、これを登録する形態とすることもできる。   The update time is the time when the message is written on the electronic bulletin board, and consists of date and time. In this embodiment, the update time is registered using date and time information measured by a timer (not shown) provided in the control unit 31 of the message sharing server 30. However, the present invention is not limited to this, and information indicating the message writing time is given from the client device 50 that is the message writing source, and this can be registered.

また、直前メッセージIDは、対応するメッセージの親に当たるメッセージに割り振られたメッセージIDを示す情報であり、直後メッセージIDは、対応するメッセージの子に当たるメッセージに割り振られたメッセージIDを示す情報である。なお、本実施の形態に係る文書処理システム90では、対応するメッセージが最初のメッセージであり、親のメッセージを有しない場合の直前メッセージIDと、対応するメッセージが共通のタイトルに対する最後のメッセージであり、子のメッセージを有しない場合の直後メッセージIDとして、メッセージIDとして取り得ない情報(本実施の形態では‘0’)を登録するものとしている。   Further, the immediately preceding message ID is information indicating the message ID assigned to the message corresponding to the parent of the corresponding message, and the immediately following message ID is information indicating the message ID assigned to the message corresponding to the child of the corresponding message. In the document processing system 90 according to the present embodiment, the corresponding message is the first message, the immediately preceding message ID when there is no parent message, and the corresponding message is the last message for a common title. Information that cannot be taken as the message ID ('0' in the present embodiment) is registered as the message ID immediately after no child message.

同図に示す例では、各々メッセージIDが‘1517’、‘1518’、‘1519’とされたメッセージは直前メッセージIDが‘0’とされているため、最初のメッセージであることが分かる。また、メッセージIDが‘1519’とされたメッセージは、直前メッセージID及び直後メッセージIDの双方が‘0’とされているため、最初のメッセージであり、かつ子のメッセージを有しない、単一のメッセージであることが分かる。更に、メッセージIDが‘1520’とされたメッセージは、直前メッセージIDが‘1517’とされており、かつ直後メッセージIDが‘0’とされているため、メッセージIDが‘1517’とされたメッセージの子にあたるメッセージであり、かつ子のメッセージを有しないメッセージであることが分かる。   In the example shown in the figure, the messages with message IDs “1517”, “1518”, and “1519” are the first message because the immediately preceding message ID is “0”. The message with the message ID '1519' is the first message and has no child message because both the immediately preceding message ID and the immediately following message ID are '0'. It turns out that it is. Further, since the message ID is set to “1520”, the message ID is set to “1517” because the message ID is set to “1517” and the message ID immediately after is set to “0”. It can be seen that the message is a child's child message and has no child message.

一方、タイトルは、対応するメッセージに設けられたタイトルを示す情報であり、メッセージは、メッセージ本文を示す情報である。   On the other hand, the title is information indicating the title provided in the corresponding message, and the message is information indicating the message text.

メッセージ共有サーバ30は、何れかのクライアント装置50から電子掲示板の表示が指示されると、メッセージデータベースDB4から各メッセージに関する情報を読み出し、親子関係を識別可能に各メッセージのタイトルを一覧表示させることのできる情報を作成してアクセス元のクライアント装置50に送信する。これに応じて当該クライアント装置50では、受信した情報を用いて各メッセージのタイトルを一覧表示するので、当該クライアント装置50の利用者は、所望のタイトルをアノテーションデバイス57や、操作部54のキーボード、マウス等によりポインティング指定することによって当該タイトルに対応するメッセージを表示させたり、当該表示されたメッセージに対するメッセージの書き込み等を行うことになる。   When the message sharing server 30 is instructed to display the electronic bulletin board from any of the client devices 50, the message sharing server 30 reads information on each message from the message database DB4 and displays a list of the titles of each message so that the parent-child relationship can be identified. Information that can be created is generated and transmitted to the client device 50 of the access source. In response to this, the client device 50 displays a list of the titles of each message using the received information, so that the user of the client device 50 can select a desired title from the annotation device 57, the keyboard of the operation unit 54, By pointing with a mouse or the like, a message corresponding to the title is displayed, or a message is written to the displayed message.

〔進捗管理サーバ40、作業者データベースDB5、進捗管理データベースDB6、スケジュール管理データベースDB7〕
一方、本実施の形態に係る進捗管理サーバ40は、作業実行者の管理を行うと共に、電子掲示板にリンクが張られている付箋アノテーションについて、リンク先の情報及び当該情報を起点として行われるレビューに基づいて実行される校正作業の進捗状況の管理を行うものである。
[Progress management server 40, worker database DB5, progress management database DB6, schedule management database DB7]
On the other hand, the progress management server 40 according to the present embodiment manages the person who performs the task, and for the tag annotation that is linked to the electronic bulletin board, the link destination information and the review that is performed based on the information. The progress status of the calibration work executed based on the management is managed.

すなわち、何れかのクライアント装置50から作業実行者の登録の指示が行われた場合、進捗管理サーバ40は、当該作業実行者を作業者データベースDB5に登録する。なお、本実施の形態に係る文書処理システム90では、作業実行者がレビュアと兼任しているが、これに限らず、レビュア以外の文書処理システム90の利用者を作業実行者とすることもできる。   That is, when an instruction to register a work performer is given from any client device 50, the progress management server 40 registers the work performer in the worker database DB5. In the document processing system 90 according to the present embodiment, the work performer also serves as the reviewer. However, the present invention is not limited to this, and a user of the document processing system 90 other than the reviewer can be the work performer. .

図7には、本実施の形態に係る作業者データベースDB5のデータ構造の一例が示されている。   FIG. 7 shows an example of the data structure of the worker database DB5 according to the present embodiment.

同図において、タスク情報は、登録対象とする作業実行者を属させるタスクを特定するための情報であり、本実施の形態に係る進捗管理サーバ40では、前述した文書データベースDB1のタスク情報と同様のものを適用している。また、作業者IDは、個々の作業実行者を管理するものであり、各作業実行者毎にユニークなIDが割り振られる。ここで、作業者IDは、クライアントシステム94側で発行する方式や、進捗管理サーバ40側で発行する方式がある。すなわち、本実施の形態に係る文書処理システム90では、作業実行者をタスク単位で管理している。   In the figure, task information is information for specifying a task to which a work performer to be registered belongs. In the progress management server 40 according to the present embodiment, the task information is the same as the task information in the document database DB1 described above. Have applied. Further, the worker ID manages individual work performers, and a unique ID is assigned to each work performer. Here, the worker ID may be issued on the client system 94 side or on the progress management server 40 side. That is, in the document processing system 90 according to the present embodiment, work performers are managed in units of tasks.

また、同図における担当分野は、対応する作業実行者の専門分野を示すものであり、進捗管理サーバ40で取扱い対象としている専門分野(一例として、「コンピュータ分野」、「自然科学分野」、「政治分野」、「歴史分野」等)毎に予め割り当てられている数値情報が登録される。   Also, the field in charge in the figure indicates the field of expertise of the corresponding work performer, and the field of specialization (for example, “computer field”, “natural science field”, “ Preliminary numerical information is registered for each “political field”, “history field”, and the like.

なお、本実施の形態に係る文書処理システム90では、クライアント装置50によって作業実行者の登録を行う際に、当該クライアント装置50の利用者に対して、登録すべき作業実行者、当該作業実行者を属させるタスク及び当該作業実行者の担当分野の各情報を入力させ、これによって入力された情報を進捗管理サーバ40に送信するようにしており、進捗管理サーバ40では、クライアント装置50から受信された情報に基づいて作業者データベースDB5への作業実行者の登録を行うようにしているが、これに限定されず、例えば、当該情報を進捗管理サーバ40により直接入力して登録する形態とすることもできる。   Note that, in the document processing system 90 according to the present embodiment, when a work performer is registered by the client device 50, the work performer to be registered and the work performer to the user of the client device 50 are registered. Each information of the task to which the task belongs and the field in charge of the work performer is input, and the input information is transmitted to the progress management server 40, and the progress management server 40 receives the information from the client device 50. However, the present invention is not limited to this. For example, the information is directly input by the progress management server 40 and registered. You can also.

一方、本実施の形態に係る進捗管理サーバ40では、メッセージ共有サーバ30によって提供される電子掲示板上のメッセージにリンクが張られている付箋アノテーションについて、リンク先の情報及び当該情報を起点としたレビューに基づいて実行される校正作業の進捗状況を管理するための情報を進捗管理データベースDB6に登録する。   On the other hand, in the progress management server 40 according to the present embodiment, the information on the link destination and the review starting from the information about the tag annotation linked to the message on the electronic bulletin board provided by the message sharing server 30. Is registered in the progress management database DB6.

図8には、本実施の形態に係る進捗管理データベースDB6のデータ構造の一例が示されている。   FIG. 8 shows an example of the data structure of the progress management database DB6 according to the present embodiment.

同図において、進捗管理IDは、管理対象とする校正作業を特定するための情報であり、本実施の形態に係る進捗管理サーバ40では、前述した付箋用アノテーションデータベースDB2の進捗管理IDと同様のものを適用しており、進捗管理IDが付箋用アノテーションデータベースDB2に登録された際に当該進捗管理データベースDB6にも登録されるものとされている。   In the figure, the progress management ID is information for specifying the calibration work to be managed. In the progress management server 40 according to the present embodiment, the progress management ID is the same as the progress management ID of the tag annotation database DB2 described above. When the progress management ID is registered in the tag annotation database DB2, it is also registered in the progress management database DB6.

また、進捗度は、対応する進捗管理IDによって特定される校正作業の進捗の度合いを示す情報であり、本実施の形態に係る進捗管理サーバ40では、デフォルトとして校正作業の開始前の状態を示す情報(ここでは、‘0’)が登録され、校正作業が開始された後に作業実行者自身によって校正作業の進捗の度合いを示す情報(ここでは、校正作業終了の度合いを100%としたときのおおよその度合い)を、クライアント装置50を介して入力することによって更新されるものとしている。   The progress degree is information indicating the progress degree of the calibration work specified by the corresponding progress management ID, and the progress management server 40 according to the present embodiment indicates the state before the start of the calibration work as a default. Information (here, “0”) is registered and information indicating the degree of progress of the calibration work by the work performer after the calibration work is started (here, the degree of completion of the calibration work is 100%) Approximate degree) is updated by inputting via the client device 50.

また、ステータスは、対応する進捗管理IDによって特定される校正作業の進捗状況を予め定められた複数の段階で示す情報であり、本実施の形態に係る進捗管理サーバ40では、レビューの受け付け中である段階を示す「受付」、作業内容の検討中である段階を示す「検討」、実行した校正作業の承認待ちの段階を示す「承認待」、実行した校正作業の承認が得られて当該校正作業が完了した段階を示す「完了」の4段階を適用している。なお、実行した校正作業を承認する権限を有する承認者として、本実施の形態に係る文書処理システム90では、校正作業の実行対象とする文書が属するタスクに属される作業実行者のうちの予め定められたリーダとしているが、これに限らず、作業の承認者として予め定められた他の利用者を適用することもできる。   The status is information indicating the progress status of the calibration work specified by the corresponding progress management ID in a plurality of predetermined stages. The progress management server 40 according to the present embodiment is accepting the review. “Reception” indicating a stage, “Review” indicating the stage in which work content is being examined, “Waiting for approval” indicating the stage of waiting for approval of the performed calibration work, and approval of the performed calibration work being obtained Four stages of “complete” indicating the stage where the work is completed are applied. In the document processing system 90 according to the present embodiment, as an approver having the authority to approve the executed proofreading work, a predetermined one of work performers belonging to the task to which the document to be proofreaded belongs belongs. However, the present invention is not limited to this, and other users predetermined as work approvers can also be applied.

一方、作業実行者は、対応する進捗管理IDによって特定される校正作業を実行する作業実行者を特定するための情報であり、開始日は、当該校正作業の開始日を示す情報であり、終了予定日は、当該校正作業の終了予定日を示す情報であり、状態変更時刻は、対応するステータスが変更された日時を示す情報であり、更に状態変更者は、上記ステータスの更新者を示す情報である。   On the other hand, the work performer is information for identifying the work performer who executes the calibration work specified by the corresponding progress management ID, and the start date is information indicating the start date of the calibration work, and the end The scheduled date is information indicating the scheduled end date of the calibration work, the status change time is information indicating the date and time when the corresponding status is changed, and the status changer is information indicating the status updater. It is.

なお、本実施の形態に係る進捗管理サーバ40では、上記ステータスのデフォルトとして「受付」を示す情報を登録するようにしている。更に、本実施の形態に係る進捗管理サーバ40では、上記作業実行者として、作業者データベースDB5の作業者IDと同様の情報を適用している。また、本実施の形態に係る文書処理システム90では、作業実行者自身によってステータスを「検討」や、「承認待」、「完了」に変更するものとしている。また、本実施の形態に係る文書処理システム90では、予め定められたレビュア(例えば、タスクのリーダ等)によって上記作業実行者を登録するものとしている。   In the progress management server 40 according to the present embodiment, information indicating “acceptance” is registered as the default of the status. Furthermore, in the progress management server 40 according to the present embodiment, the same information as the worker ID in the worker database DB5 is applied as the worker. Further, in the document processing system 90 according to the present embodiment, the status is changed to “review”, “waiting for approval”, and “completed” by the work performer himself. Further, in the document processing system 90 according to the present embodiment, the work performer is registered by a predetermined reviewer (for example, a task leader).

また、本実施の形態に係る進捗管理サーバ40では、進捗管理IDが登録された日を上記開始日とし、当該開始日から所定期間後(例えば、2週間後)の日を上記終了予定日として自動的に登録している。更に、本実施の形態に係る進捗管理サーバ40では、上記状態変更者として、作業者データベースDB5の作業者IDと同様の情報を適用している。   Further, in the progress management server 40 according to the present embodiment, the date on which the progress management ID is registered is set as the start date, and the day after a predetermined period (for example, two weeks later) is set as the scheduled end date. Registered automatically. Furthermore, in the progress management server 40 according to the present embodiment, the same information as the worker ID in the worker database DB5 is applied as the state changer.

ところで、本実施の形態に係る進捗管理サーバ40は、クライアント装置50からの文書作成業務のスケジュールの登録指示を受け付け、当該スケジュールを示す情報をスケジュール管理データベースDB7に登録する。   By the way, the progress management server 40 according to the present embodiment receives an instruction to register a schedule for document creation work from the client device 50, and registers information indicating the schedule in the schedule management database DB7.

図9には、本実施の形態に係るスケジュール管理データベースDB7のデータ構造の一例が示されている。   FIG. 9 shows an example of the data structure of the schedule management database DB7 according to the present embodiment.

同図において、業務IDは、クライアント装置50を介してスケジュールの登録が指示された業務を特定するためのIDであり、各業務毎に異なる情報(本実施の形態では、数値情報)が割り振られる。なお、本実施の形態に係る文書処理システム90では、進捗管理サーバ40によって業務IDを生成するものとされているが、これに限らず、例えば、登録指示元のクライアント装置50が生成する形態とすることもできる。   In the figure, a business ID is an ID for identifying a business for which schedule registration is instructed via the client device 50, and different information (numerical information in the present embodiment) is assigned to each business. . In the document processing system 90 according to the present embodiment, the business management ID is generated by the progress management server 40. However, the present invention is not limited to this. For example, the client device 50 as the registration instruction source generates the business ID. You can also

また、業務名は、登録対象とする文書作成業務の名称を示す情報であり、開始日は、対応する文書作成業務の実行開始日を示す情報であり、終了期限は、対応する文書作成業務の終了期限日を示す情報であり、終了日は、対応する文書作成業務の実際の終了日を示す情報であり、メンバは、対応する文書作成業務の実行者(本実施の形態では、当該文書作成業務を主体的に実行する部署)を示す情報である。   The business name is information indicating the name of the document creation business to be registered, the start date is information indicating the execution start date of the corresponding document creation business, and the end deadline is the information on the corresponding document creation business. The end date is information indicating the actual end date of the corresponding document creation job, and the member is the person who executed the corresponding document creation job (in this embodiment, the document creation date). This is information indicating a department that performs business independently.

ところで、本実施の形態に係る進捗管理サーバ40は、文書作成業務から派生した文書作成業務も階層的に管理することができるものとして構成されている。   By the way, the progress management server 40 according to the present embodiment is configured to be able to hierarchically manage document creation tasks derived from document creation tasks.

このため、本実施の形態に係るスケジュール管理データベースDB7は、文書作成業務の階層構造を表現するために「上流業務ID」及び「下流業務ID」の2つの業務IDを有している。   For this reason, the schedule management database DB 7 according to the present embodiment has two business IDs of “upstream business ID” and “downstream business ID” in order to express the hierarchical structure of the document creation business.

「上流業務ID」は対応する文書作成業務に直上の階層の文書作成業務が存在する場合の当該文書作成業務の業務IDを示す情報であり、「下流業務ID」は対応する文書作成業務に直下の階層の文書作成業務が存在する場合の当該文書作成業務の業務IDを示す情報である。図9に示す例では、例えば、業務IDとして‘012345’が割り振られた業務名「報告書作成」の業務は、直上の階層に業務IDとして‘00742’が割り振られた文書作成業務が存在し、直下の階層に業務IDとして‘012355’が割り振られた文書作成業務(業務名「Aモジュール仕様書作成」の文書作成業務)が存在することを示している。また、業務IDとして‘012355’が割り振られた業務名「Aモジュール仕様書作成」の文書作成業務は、直上の階層に業務IDとして‘012345’が割り振られた文書作成業務が存在し、直下の階層には文書作成業務が存在しないことを示している。   “Upstream job ID” is information indicating the job ID of the document creation job when there is a document creation job at a level directly above the corresponding document creation job. “Downstream job ID” is directly below the corresponding document creation job. This is information indicating the job ID of the document creation job when there is a document creation job of a certain level. In the example shown in FIG. 9, for example, the business with the business name “report creation” to which “012345” is assigned as the business ID includes the document creation business to which “00742” is assigned as the business ID immediately above. This indicates that there is a document creation work (document creation work with the work name “A module specification creation”) to which “012355” is assigned as the work ID in the hierarchy immediately below. In addition, the document creation work with the work name “A module specification creation” to which “012355” is assigned as the work ID has a document creation work to which “012345” is assigned as the work ID immediately above the hierarchy. This indicates that there is no document creation job in the hierarchy.

なお、本実施の形態に係る文書処理システム90では、スケジュールの登録の指示元であるクライアント装置50から上記業務名、開始日、終了期限、及びメンバの各情報と、直上の文書作成業務が存在する場合の「上流業務ID」の情報が与えられるものとされている。   Note that in the document processing system 90 according to the present embodiment, the above-described business name, start date, end deadline, and member information from the client device 50 that is an instruction source for schedule registration, and the immediately above document creation business exist. In this case, information of “upstream business ID” is given.

また、本実施の形態に係る文書処理システム90では、スケジュールを登録する利用者として、登録対象とする業務を取り纏める所定のリーダを適用しているが、これに限らず、例えば、文書処理システム90の他の任意の利用者が登録するものとしてもよい。   In the document processing system 90 according to the present embodiment, as a user who registers a schedule, a predetermined reader that collects tasks to be registered is applied. However, the present invention is not limited to this. For example, a document processing system 90 other arbitrary users may be registered.

〔スケジューリング機能、進捗度修正機能〕
ところで、本実施の形態に係る文書処理システム90は、アノテーションにより指示された校正作業の実行スケジュールを自動的に設定するスケジューリング機能と、作業実行者によって入力されて進捗管理データベースDB6に登録された進捗度を、より実際の進捗状態に即したものに自動的に修正する進捗度修正機能と、を有している。
[Scheduling function, progress correction function]
By the way, the document processing system 90 according to the present embodiment has a scheduling function for automatically setting the execution schedule of the proofreading work instructed by the annotation, and the progress input by the work performer and registered in the progress management database DB6. And a progress correction function that automatically corrects the degree to a more appropriate one according to the actual progress state.

図10は、当該スケジューリング機能及び進捗度修正機能を実現するための文書処理システム90の機能的な構成を示すブロック図である。   FIG. 10 is a block diagram showing a functional configuration of the document processing system 90 for realizing the scheduling function and the progress correction function.

同図に示すように、スケジューリング機能及び進捗度修正機能を実現するために、進捗管理サーバ40は、取得部41A、スケジュール設定部41B、及び修正部41Cを備えている。   As shown in the figure, in order to realize the scheduling function and the progress correction function, the progress management server 40 includes an acquisition unit 41A, a schedule setting unit 41B, and a correction unit 41C.

本実施の形態に係る取得部41Aは、終了期限を示す情報(本発明の「終了期限情報」に相当。)を二次記憶部45のスケジュール管理データベースDB7から取得する(読み出す)ものとされている。   The acquisition unit 41A according to the present embodiment acquires (reads) information indicating the end deadline (corresponding to “end deadline information” of the present invention) from the schedule management database DB7 of the secondary storage unit 45. Yes.

また、本実施の形態に係るスケジュール設定部41Bは、アノテーションにより指示された複数の校正作業の開始日及び終了予定日を示す情報(本発明の「実行スケジュール」に相当。)を、取得部41Aによって取得された情報により示される終了期限までに終了するように導出して二次記憶部45の進捗管理データベースDB6に記憶するものとされている。   Further, the schedule setting unit 41B according to the present embodiment obtains information (corresponding to the “execution schedule” of the present invention) indicating start dates and scheduled end dates of a plurality of calibration operations instructed by the annotations 41A. Are derived so as to be completed by the end deadline indicated by the information obtained by the above, and stored in the progress management database DB6 of the secondary storage unit 45.

なお、本実施の形態に係るスケジュール設定部41Bでは、上記複数の校正作業を上記終了期限までの期間内に並行して実行するように上記開始日及び終了予定日を示す情報を導出するようにしている。   In the schedule setting unit 41B according to the present embodiment, information indicating the start date and the scheduled end date is derived so that the plurality of calibration operations are executed in parallel within the period until the end deadline. ing.

そして、スケジュール設定部41Bによって進捗管理データベースDB6に記憶された上記開始日及び終了予定日を示す情報は、何れかのクライアント装置50からの要求に応じて当該クライアント装置50の表示部53により表示されることになる。   The information indicating the start date and the scheduled end date stored in the progress management database DB6 by the schedule setting unit 41B is displayed on the display unit 53 of the client device 50 in response to a request from any client device 50. Will be.

一方、取得部41Aは、スケジュール設定部41Bによる上記複数の校正作業の開始日及び終了予定日を示す情報の導出結果の修正指示を示す修正指示情報を何れかのクライアント装置50から取得するものとされており、スケジュール設定部41Bは、取得部41Aによって取得された修正指示情報により示される修正指示に応じて上記導出結果を修正するものとされている。   On the other hand, the acquisition unit 41A acquires, from any client device 50, correction instruction information indicating a correction instruction of a derivation result of information indicating the start date and the scheduled end date of the plurality of calibration operations by the schedule setting unit 41B. The schedule setting unit 41B corrects the derivation result in accordance with the correction instruction indicated by the correction instruction information acquired by the acquisition unit 41A.

また、取得部41Aは、進捗度を示す情報(本発明の「進捗度情報」に相当。)を二次記憶部45の進捗管理データベースDB6から取得する(読み出す)ものとされており、当該情報により示される進捗度は、何れかのクライアント装置50からの要求に応じて当該クライアント装置50の表示部53により表示されることになる。   The acquisition unit 41A acquires (reads) information indicating the degree of progress (corresponding to “progress level information” of the present invention) from the progress management database DB6 of the secondary storage unit 45. The progress indicated by is displayed on the display unit 53 of the client device 50 in response to a request from any of the client devices 50.

そして、本実施の形態に係る修正部41Cは、進捗管理データベースDB6に記憶されている進捗度を示す情報をスケジュール管理データベースDB7に記憶されている終了期限を示す情報により示される終了期限に近づくほど度合いが低くなるように修正するものとされている。   Then, the correction unit 41C according to the present embodiment approaches the information indicating the degree of progress stored in the progress management database DB6 closer to the end date indicated by the information indicating the end date stored in the schedule management database DB7. It is supposed to be corrected so that the degree becomes low.

ところで、本実施の形態に係る文書処理システム90では、スケジューリング機能及び進捗度修正機能をソフトウェアの実行によって実現するものとされている。   By the way, in the document processing system 90 according to the present embodiment, the scheduling function and the progress correction function are realized by executing software.

次に、スケジューリング機能の実行時における作用の説明に先立ち、図11を参照して、スケジュール登録処理を実行する際の進捗管理サーバ40の作用を説明する。なお、図11は、何れかのクライアント装置50から文書作成業務のスケジュールの登録指示が受信された際に進捗管理サーバ40の制御部41により実行されるスケジュール登録処理プログラムの処理の流れを示すフローチャートであり、当該プログラムは二次記憶部45の所定領域に予め記憶されている。   Next, prior to the description of the operation at the time of executing the scheduling function, the operation of the progress management server 40 when executing the schedule registration process will be described with reference to FIG. FIG. 11 is a flowchart showing a flow of processing of a schedule registration processing program executed by the control unit 41 of the progress management server 40 when a document creation job schedule registration instruction is received from any of the client devices 50. The program is stored in advance in a predetermined area of the secondary storage unit 45.

まず、同図のステップ100では、予め定められたスケジュール登録画面を示す情報をアクセス元のクライアント装置50に送信し、次のステップ102にて、当該クライアント装置50からの所定情報の受信待ちを行う。   First, in step 100 in the figure, information indicating a predetermined schedule registration screen is transmitted to the client device 50 that is the access source, and in the next step 102, reception of predetermined information from the client device 50 is awaited. .

図12には、上記ステップ100の処理に応じてクライアント装置50の表示部53に表示されるスケジュール登録画面の一例が示されている。同図に示されるように、このスケジュール登録画面では、登録対象とする文書作成業務に関する各項目の入力を促すメッセージが表示されると共に、入力対象とする項目として、前述した上流業務ID、業務名、開始日、終了期限、及びメンバの各情報を入力するための矩形枠が表示される。同図に示されるようなスケジュール登録画面が表示部53に表示されると当該クライアント装置50の利用者(登録対象とする業務を取り纏めるリーダ)は、各矩形枠内に対応する情報を操作部54のキーボード、マウス等により入力した後、当該画面の最下に表示されている終了ボタンをポインティング指定する。これに応じて、当該利用者により入力された各情報が進捗管理サーバ40に送信される結果、上記ステップ102が肯定判定となってステップ104に移行する。   FIG. 12 shows an example of a schedule registration screen displayed on the display unit 53 of the client device 50 in accordance with the processing of step 100 described above. As shown in the figure, on this schedule registration screen, a message prompting entry of each item related to the document creation work to be registered is displayed, and the above-described upstream work ID and work name are included as the items to be entered. A rectangular frame for inputting the start date, end deadline, and member information is displayed. When a schedule registration screen as shown in the figure is displayed on the display unit 53, the user of the client device 50 (a reader who collects work to be registered) displays information corresponding to each rectangular frame in the operation unit. After inputting with the keyboard 54, mouse, etc., the end button displayed at the bottom of the screen is designated for pointing. In response to this, each information input by the user is transmitted to the progress management server 40. As a result, step 102 becomes affirmative and the process proceeds to step 104.

ステップ104では、スケジュール管理データベースDB7に登録されていない業務IDを生成し、次のステップ106にて、上記ステップ102において受信した情報及び上記ステップ104において生成した業務IDをスケジュール管理データベースDB7に登録する。   In step 104, a business ID not registered in the schedule management database DB7 is generated, and in the next step 106, the information received in step 102 and the business ID generated in step 104 are registered in the schedule management database DB7. .

次のステップ108では、上記ステップ102において受信した情報に上流業務IDが含まれていたか否かを判定し、肯定判定となった場合はステップ110に移行して、上記ステップ104において生成した業務IDを上記ステップ102において受信した上流業務IDを業務IDとする業務の下流業務IDとしてスケジュール管理データベースDB7に登録し、その後にステップ112に移行する。なお、上記ステップ108において否定判定となった場合には、ステップ110の処理を実行することなくステップ112に移行する。   In the next step 108, it is determined whether the information received in step 102 includes an upstream job ID. If the determination is affirmative, the process proceeds to step 110, and the job ID generated in step 104 is determined. Is registered in the schedule management database DB7 as a downstream business ID of a business whose business ID is the upstream business ID received in step 102, and then the process proceeds to step 112. If the determination at step 108 is negative, the process proceeds to step 112 without executing the process at step 110.

ステップ112では、上記ステップ104において生成した業務IDをアクセス元のクライアント装置50に送信することによって当該クライアント装置50の表示部53により生成した業務IDを表示させ、その後に本スケジュール登録処理プログラムを終了する。   In step 112, the business ID generated in step 104 is transmitted to the access source client device 50 to display the business ID generated by the display unit 53 of the client device 50, and then the schedule registration processing program is terminated. To do.

以上のようなスケジュール登録処理プログラムの実行によって、一例として図9に示されるスケジュール管理データベースDB7が逐次構築されると共に、スケジュールの登録者(以下、「スケジュール登録者」という。)に対して、自身がスケジュールを登録した業務に対して付与された業務IDを提示することができる。なお、スケジュール登録者に対する業務IDの提示のタイミングは以上のようなスケジュールの登録時のみに限らず、例えば、任意のタイミングでスケジュール登録者から業務IDの提示が要求された際に進捗管理サーバ40が提示する形態等とすることもできる。   By executing the schedule registration processing program as described above, the schedule management database DB7 shown in FIG. 9 as an example is sequentially constructed, and the schedule registrant (hereinafter referred to as “schedule registrant”) is himself / herself. Can present the business ID assigned to the business that registered the schedule. The timing of presenting the business ID to the schedule registrant is not limited to the time when the schedule is registered as described above. For example, when the schedule registrant requests presentation of the business ID at an arbitrary timing, the progress management server 40 It is also possible to adopt a form presented by

スケジュール登録者は、文書作成者に対して、文書作成業務のスケジュールを登録した旨を進捗管理サーバ40から提示された業務IDと共に通知する。なお、当該通知は、ネットワーク60を介して電子メール等により電子的に行ってもよいし、ネットワーク60を介することなく文書作成者に対して直接連絡することにより行ってもよい。   The schedule registrant notifies the document creator that the schedule of the document creation work has been registered, together with the work ID presented from the progress management server 40. The notification may be made electronically by e-mail or the like via the network 60, or may be made by directly contacting the document creator without going through the network 60.

上記通知を受けた文書作成者は、通知された業務IDに対応するスケジュールを参照し、当該スケジュールに応じた期間内で対応する文書を作成した後、作成した文書を通知された業務IDと共に文書データベースDB1に登録すると共に、各レビュアに対してレビュー対象とされる文書を登録した旨を業務IDと共に通知する。なお、当該通知も、ネットワーク60を介して電子メール等により電子的に行ってもよいし、ネットワーク60を介することなく各レビュアに対して直接連絡することにより行ってもよい。   The document creator who has received the notification refers to the schedule corresponding to the notified business ID, creates a corresponding document within a period according to the schedule, and then creates the document together with the notified business ID. In addition to registering in the database DB1, it notifies each reviewer that a document to be reviewed has been registered, together with a business ID. The notification may also be performed electronically by e-mail or the like via the network 60, or may be made by directly contacting each reviewer without going through the network 60.

そして、当該通知を受けた各レビュアは、メッセージ共有サーバ30により提供される電子掲示板により、当該通知により示される業務(文書作成業務)に関するメッセージ(議論)のやりとりを行うことになる。   Then, each reviewer who has received the notification exchanges messages (discussion) regarding the business (document creation business) indicated by the notification on the electronic bulletin board provided by the message sharing server 30.

次に、図13を参照して、スケジューリング機能の実行時における進捗管理サーバ40の作用を説明する。なお、図13は、クライアント装置50の表示部53に表示されているスケジュール設定ボタン78が予め定められた利用者(例えば、表示部53に表示されている文書が属するタスクのリーダ等)によって指定された際に進捗管理サーバ40の制御部41により実行されるスケジュール設定処理プログラムの処理の流れを示すフローチャートであり、当該プログラムは二次記憶部45の所定領域に予め記憶されている。   Next, the operation of the progress management server 40 when the scheduling function is executed will be described with reference to FIG. In FIG. 13, the schedule setting button 78 displayed on the display unit 53 of the client device 50 is designated by a predetermined user (for example, a reader of a task to which the document displayed on the display unit 53 belongs). 4 is a flowchart showing a flow of processing of a schedule setting processing program executed by the control unit 41 of the progress management server 40 when the processing is performed, and the program is stored in advance in a predetermined area of the secondary storage unit 45.

まず、同図のステップ200では、アクセス元のクライアント装置50において表示されている文書(以下、「処理対象文書」という。)に関する全てのステータスを示す情報を進捗管理データベースDB6から読み出し、次のステップ202にて、読み出したステータスを示す情報が「完了」となっていない校正作業が存在するか否かを判定して、否定判定となった場合は本スケジュール設定処理プログラムを終了し、肯定判定となった場合はステップ204に移行する。   First, in step 200 in the figure, information indicating all statuses regarding a document (hereinafter referred to as “processing target document”) displayed on the client device 50 of the access source is read from the progress management database DB6. At 202, it is determined whether or not there is a calibration work whose information indicating the read status is not “completed”. If the determination is negative, the schedule setting processing program is terminated, and an affirmative determination is made. If YES, step 204 follows.

ステップ204では、処理対象文書の業務IDを文書データベースDB1から読み出し、読み出した業務IDに対応する終了期限を示す情報をスケジュール管理データベースDB7から読み出す。   In step 204, the business ID of the document to be processed is read from the document database DB1, and information indicating the end deadline corresponding to the read business ID is read from the schedule management database DB7.

次のステップ206では、上記ステップ200において読み出したステータスを示す情報が「完了」となっていない校正作業の実行スケジュール(開始日及び終了予定日)を上記ステップ204において読み出した情報により示される終了期限までに終了するように導出する。   In the next step 206, the execution schedule (start date and scheduled end date) of the calibration work whose information indicating the status read in step 200 is not “completed” is the end deadline indicated by the information read in step 204. Derived to finish by.

なお、本実施の形態に係るスケジュール設定処理プログラムでは、上記校正作業の実行スケジュールを、現時点を開始日とし、上記終了期限を終了予定日とするように導出する。従って、スケジュールの導出対象となる校正作業が複数存在する場合は、当該複数の校正作業が全て並行して実行されるように上記実行スケジュールが導出されることになる。   In the schedule setting processing program according to the present embodiment, the calibration work execution schedule is derived such that the current date is the start date and the end deadline is the scheduled end date. Therefore, when there are a plurality of calibration operations to be derived from the schedule, the execution schedule is derived so that the plurality of calibration operations are all performed in parallel.

次のステップ208では、以上の処理によって導出した実行スケジュールを用いて、予め定められたフォーマットとされたスケジュールボードを示す画像データを作成してアクセス元のクライアント装置50に送信することにより、当該スケジュールボードを表示部53により表示させる処理を行い、その後に次のステップ210にて所定情報の入力待ちを行う。   In the next step 208, using the execution schedule derived by the above processing, image data indicating a schedule board having a predetermined format is created and transmitted to the client device 50 of the access source. A process of displaying the board by the display unit 53 is performed, and then the next step 210 waits for input of predetermined information.

図14には、上記ステップ208の処理によってクライアント装置50の表示部53に表示されるスケジュールボードの表示状態の一例が示されている。同図に示すように、本実施の形態に係るスケジュールボードでは、導出した実行スケジュールに対応する校正作業毎に、校正作業の内容を示す情報(ここでは、対応するアノテーションにおけるリンク先のメッセージ)と、導出した実行スケジュールを示す線図(導出した開始日を左端とし、導出した終了予定日を右端とした線図)が表示される。   FIG. 14 shows an example of the display state of the schedule board displayed on the display unit 53 of the client device 50 by the process of step 208 described above. As shown in the figure, in the schedule board according to the present embodiment, for each calibration work corresponding to the derived execution schedule, information indicating the content of the calibration work (here, a message linked to the corresponding annotation) and , A diagram showing the derived execution schedule (a diagram with the derived start date as the left end and the derived end date as the right end) is displayed.

同図に示されるようなスケジュールボードが表示部53に表示されると当該クライアント装置50の利用者(タスクのリーダ)は、表示されている実行スケジュールを修正する場合には、一例として図15に示すように、修正対象とする実行スケジュールを示す線図の時間経過方向(同図に示す例では、横方向)に対する移動やサイズの変更を操作部54のマウスを用いて行うことによって当該実行スケジュールを変更した後、当該画面の最下に表示されている修正ボタンをマウスにてポインティング指定する一方、表示されている実行スケジュールを修正することなく登録する場合には当該画面の最下に表示されている終了ボタンをマウスにてポインティング指定する。これに応じて上記ステップ210が肯定判定となってステップ212に移行する。   When the schedule board as shown in the figure is displayed on the display unit 53, the user (task leader) of the client device 50 modifies the displayed execution schedule as an example in FIG. As shown, the execution schedule can be changed by moving or changing the size of the diagram indicating the execution schedule to be corrected with respect to the time lapse direction (horizontal direction in the example shown in the figure) using the mouse of the operation unit 54. If you specify the correction button displayed at the bottom of the screen with the mouse and register it without correcting the displayed execution schedule, it will be displayed at the bottom of the screen. Pointing to the end button is specified with the mouse. Accordingly, step 210 is affirmative and the process proceeds to step 212.

ステップ212では、利用者によりスケジュールボード上で修正ボタンが指定されたか否かを判定することにより、利用者によって実行スケジュールの修正が指示されたか否かを判定し、肯定判定となった場合はステップ214に移行して、利用者により修正された実行スケジュールの終了予定日が処理対象文書の終了期限以前となっているか否かを判定することにより、利用者による修正結果が処理対象文書の作成業務のスケジュールと整合が取れているか否かを判定し、否定判定となった場合はステップ216に移行して、予め定められたフォーマットとされた警告画面を所定期間(ここでは、5秒間)だけアクセス元のクライアント装置50の表示部53に表示させる処理を実行し、その後に上記ステップ208に戻る。なお、上記ステップ214において肯定判定となった場合にはステップ218に移行する。   In step 212, it is determined whether or not the user has instructed correction of the execution schedule by determining whether or not a correction button has been designated on the schedule board by the user. The process proceeds to step 214, and it is determined whether or not the scheduled end date of the execution schedule corrected by the user is before the end date of the processing target document. It is determined whether or not it is consistent with the schedule, and if a negative determination is made, the process proceeds to step 216, and a warning screen having a predetermined format is accessed for a predetermined period (here, 5 seconds). The processing to be displayed on the display unit 53 of the original client device 50 is executed, and then the process returns to step 208. If the determination in step 214 is affirmative, the process proceeds to step 218.

図16には、上記ステップ216の処理によってアクセス元のクライアント装置50の表示部53に表示される警告画面の一例が示されている。同図に示されるような警告画面を参照することによって利用者は、自身の指定した修正内容が誤りであることを容易に把握することができる。   FIG. 16 shows an example of a warning screen displayed on the display unit 53 of the access source client device 50 by the process of step 216. By referring to the warning screen as shown in the figure, the user can easily grasp that the correction content designated by the user is incorrect.

ステップ218では、上記ステップ206の処理によって導出された実行スケジュールを利用者による修正内容に応じて修正した後、ステップ220に移行する。なお、上記ステップ212において否定判定となった場合には、上記ステップ214〜ステップ218の処理を実行することなくステップ220に移行する。   In step 218, the execution schedule derived by the processing in step 206 is corrected according to the correction contents by the user, and then the process proceeds to step 220. If a negative determination is made in step 212, the process proceeds to step 220 without executing the processes in steps 214 to 218.

ステップ220では、以上の処理によって得られた実行スケジュールを示す情報(開始日及び終了予定日を示す情報)を進捗管理データベースDB6の対応する欄に記憶(更新)し、その後に本スケジュール設定処理プログラムを終了する。   In step 220, information indicating the execution schedule (information indicating the start date and the scheduled end date) obtained by the above processing is stored (updated) in the corresponding column of the progress management database DB6, and then this schedule setting processing program Exit.

以上のようなスケジューリング機能の実行により、電子文書の作成業務の終了期限との間で矛盾のない校正作業のスケジューリングを行うことができると共に、当該スケジューリングの結果を必要に応じて修正することができる。   By executing the scheduling function as described above, it is possible to schedule a proofreading operation that is consistent with the end date of the electronic document creation work, and to correct the scheduling result as necessary. .

次に、図17を参照して、進捗度修正機能の実行時における進捗管理サーバ40の作用を説明する。なお、図17は、クライアント装置50の表示部53に表示されている進捗ボタン80が何れかの利用者によって指定された際に進捗管理サーバ40の制御部41により実行される進捗状況提示処理プログラムの処理の流れを示すフローチャートであり、当該プログラムも二次記憶部45の所定領域に予め記憶されている。   Next, with reference to FIG. 17, an operation of the progress management server 40 at the time of executing the progress correction function will be described. Note that FIG. 17 shows a progress status presentation processing program executed by the control unit 41 of the progress management server 40 when the progress button 80 displayed on the display unit 53 of the client device 50 is designated by any user. This process is also stored in advance in a predetermined area of the secondary storage unit 45.

まず、同図のステップ300では、予め定められた条件に合致する作業を提示対象作業として特定する。なお、本実施の形態では、上記予め定められた条件として、アクセス元のクライアント装置50の利用者が属するタスクに属される電子文書に添付されている付箋アノテーションで、進捗管理IDが付与された付箋アノテーションに基づいて行われる校正作業、という条件を適用している。   First, in step 300 in the figure, a task that matches a predetermined condition is specified as a presentation target task. In the present embodiment, as the predetermined condition, a sticky note to which a progress management ID is assigned by a sticky note attached to an electronic document belonging to a task to which the user of the access source client device 50 belongs. The condition of calibration work based on annotation is applied.

次のステップ302では、上記ステップ300において特定された提示対象作業に対応する進捗状況に関する情報を、進捗管理データベースDB6を始めとする各データベースから読み出し、次のステップ304では、読み出した情報を所定条件でソーティングする。なお、本実施の形態では、上記所定条件として、電子文書毎のソーティングを適用すると共に、同一文書内における作業実行者毎のソーティングを適用している。   In the next step 302, information relating to the progress status corresponding to the presentation target work specified in step 300 is read from each database including the progress management database DB6, and in the next step 304, the read information is read according to a predetermined condition. Sort by. In the present embodiment, sorting for each electronic document is applied as the predetermined condition, and sorting for each work performer in the same document is applied.

次のステップ306では、以上の処理によって得られた進捗度を示す情報をスケジュール管理データベースDB7に記憶されている対応する終了期限を示す情報により示される終了期限に近づくほど度合いが低くなるように修正する。   In the next step 306, the information indicating the degree of progress obtained by the above processing is corrected so that the degree becomes lower as it approaches the end time limit indicated by the information indicating the corresponding end time limit stored in the schedule management database DB7. To do.

ここで、本実施の形態に係る進捗状況提示処理プログラムでは、当該修正を次の(1)式により行うようにしている。ここで、SXは進捗管理データベースDB6に登録されている進捗度(作業実行者から申告された進捗度)を、NNは開始日からこの時点までの日数を、NTは開始日から終了予定日までの日数を、Sは修正後の進捗度を、各々表す。   Here, in the progress status presentation processing program according to the present embodiment, the correction is performed by the following equation (1). Here, SX is the degree of progress registered in the progress management database DB6 (the degree of progress declared by the work performer), NN is the number of days from the start date to this point, and NT is from the start date to the scheduled end date. , S represents the degree of progress after correction.

S=SX/(NN/NT) (1)
なお、進捗度を修正する演算式は(1)式に示されるものに限定されるものではなく、例えば、(1)式における(NN/NT)に対して所定の重み値を乗算した値で進捗度SXを除算する演算式等、進捗管理データベースDB6に記憶されている進捗度を上記終了期限に近づくほど度合いが低くなるように修正することができるものであれば如何なる演算式も適用できることは言うまでもない。
S = SX / (NN / NT) (1)
The arithmetic expression for correcting the degree of progress is not limited to that shown in the expression (1). For example, it is a value obtained by multiplying (NN / NT) in the expression (1) by a predetermined weight value. Any arithmetic expression can be applied as long as it can correct the degree of progress stored in the progress management database DB6 so that the degree becomes lower as it approaches the end deadline, such as an arithmetic expression for dividing the progress degree SX. Needless to say.

次のステップ308では、以上の処理によって得られた情報を用いて予め定められたレイアウトとされた進捗管理画面を示す画像データを作成し、次のステップ310にて、作成した画像データをアクセス元のクライアント装置50に送信することにより、当該クライアント装置50の表示部53に進捗管理画面を表示させ、その後に本進捗状況提示処理プログラムを終了する。   In the next step 308, image data indicating a progress management screen having a predetermined layout is created using the information obtained by the above processing, and in the next step 310, the created image data is stored in the access source. To the client device 50, the progress management screen is displayed on the display unit 53 of the client device 50, and then the progress status presentation processing program is terminated.

図18には、上記ステップ310の処理によってアクセス元のクライアント装置50の表示部53により表示される進捗管理画面の一例が示されている。同図に示されるように、この進捗管理画面では、文書名及びコメント内容(ここでは、付箋アノテーションに表示されるメッセージ)が表示されると共に、各コメント内容毎に、コメント内容に基づいて実行される校正作業の進捗度(上記ステップ306の処理によって修正された進捗度)、状態、担当者、納期、状態変更日時、状態変更者(各々進捗管理データベースDB6の「進捗度」、「ステータス」、「作業実行者」、「終了予定日」、「状態変更時刻」、「状態変更者」に対応)、コメント日時(メッセージデータベースDB4の「更新時刻」に対応)の各情報が表示される。   FIG. 18 shows an example of a progress management screen displayed by the display unit 53 of the client device 50 that is the access source by the process of step 310 described above. As shown in the figure, in this progress management screen, the document name and the comment content (here, the message displayed in the tag annotation) are displayed, and each comment content is executed based on the comment content. The progress of the calibration work (the progress corrected by the processing in step 306), the status, the person in charge, the delivery date, the status change date and time, the status changer (the “progress”, “status”, Information corresponding to “work performer”, “scheduled end date”, “status change time”, “status changer”) and comment date (corresponding to “update time” in the message database DB4) is displayed.

このような進捗管理画面を参照することにより、当該クライアント装置50の利用者は、自身が属するタスクに含まれる複数の作業の進捗状況を短時間で正確に把握することができる。   By referring to such a progress management screen, the user of the client device 50 can accurately grasp the progress status of a plurality of operations included in the task to which the client device 50 belongs in a short time.

以上詳細に説明したように、本実施の形態では、各々校正作業を指示する複数の作業指示コメント(ここでは、アノテーションのリンク先のメッセージ)が添付された電子文書の作成作業の進捗状況の管理を支援するにあたり、前記電子文書の作成作業の終了期限を示す終了期限情報を取得し、前記複数の作業指示コメントにより指示された複数の校正作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出して記憶手段(ここでは、二次記憶部45)に記憶し、前記記憶手段に記憶した前記実行スケジュールを示す情報を表示しているので、電子文書の作成業務の終了期限との間で矛盾のないスケジューリングを行うことができる。   As described above in detail, in this embodiment, management of the progress of the creation of an electronic document attached with a plurality of work instruction comments (here, messages linked to annotations) each instructing a calibration work is performed. , End date information indicating an end date of the creation of the electronic document is acquired, and execution schedules of a plurality of proofreading operations instructed by the plurality of operation instruction comments are ended by the end date indicated by the end date information Since the information indicating the execution schedule stored in the storage unit (here, the secondary storage unit 45) and stored in the storage unit is displayed. Scheduling that is consistent with the end deadline can be performed.

また、本実施の形態では、複数の校正作業の実行スケジュールを導出する場合、当該複数の校正作業を前記終了期限情報により示される終了期限までの期間内に並行して実行するように前記実行スケジュールを導出しているので、当該実行スケジュールを容易に導出することができる。   Also, in the present embodiment, when deriving a plurality of calibration work execution schedules, the execution schedules are executed in parallel within a period up to the end deadline indicated by the end deadline information. Therefore, the execution schedule can be easily derived.

また、本実施の形態では、前記実行スケジュールの導出結果の修正指示を示す修正指示情報を更に取得し、当該修正指示情報により示される修正指示に応じて前記実行スケジュールの導出結果を修正しているので、導出した実行スケジュールを適正化することができる。   Further, in the present embodiment, correction instruction information indicating a correction instruction for the execution schedule derivation result is further acquired, and the execution schedule derivation result is corrected in accordance with the correction instruction indicated by the correction instruction information. Therefore, the derived execution schedule can be optimized.

また、本実施の形態では、前記校正作業の進捗度を示す進捗度情報を取得して表示しているので、前記実行スケジュールに対する校正作業の進捗状態を容易に把握することができる。   In the present embodiment, since progress information indicating the progress of the calibration work is acquired and displayed, the progress of the calibration work with respect to the execution schedule can be easily grasped.

特に、本実施の形態では、前記進捗度を前記終了期限情報により示される終了期限に近づくほど度合いが低くなるように修正しているので、より実情に即した進捗度を把握することができる。   In particular, in the present embodiment, since the degree of progress is corrected so that the degree of progress becomes lower as it approaches the end deadline indicated by the end deadline information, the degree of progress more in line with the actual situation can be grasped.

以上、本発明を実施形態を用いて説明したが、本発明の技術的範囲は上記実施形態に記載の範囲には限定されない。発明の要旨を逸脱しない範囲で上記実施形態に多様な変更または改良を加えることができ、そのような変更または改良を加えた形態も本発明の技術的範囲に含まれる。   As mentioned above, although this invention was demonstrated using embodiment, the technical scope of this invention is not limited to the range as described in the said embodiment. Various changes or improvements can be added to the above-described embodiment without departing from the gist of the invention, and embodiments to which such changes or improvements are added are also included in the technical scope of the present invention.

また、上記の実施形態は、クレーム(請求項)にかかる発明を限定するものではなく、また実施形態の中で説明されている特徴の組合せの全てが発明の解決手段に必須であるとは限らない。前述した実施形態には種々の段階の発明が含まれており、開示される複数の構成要件における適宜の組合せにより種々の発明を抽出できる。実施形態に示される全構成要件から幾つかの構成要件が削除されても、効果が得られる限りにおいて、この幾つかの構成要件が削除された構成が発明として抽出され得る。   Further, the above embodiments do not limit the invention according to the claims (claims), and all combinations of features described in the embodiments are not necessarily essential to the solution means of the invention. Absent. The embodiments described above include inventions at various stages, and various inventions can be extracted by appropriately combining a plurality of disclosed constituent elements. Even if some constituent requirements are deleted from all the constituent requirements shown in the embodiment, as long as an effect is obtained, a configuration from which these some constituent requirements are deleted can be extracted as an invention.

例えば、上記実施の形態では、電子文書の作成作業の終了期限を示す終了期限情報を取得し、アノテーションにより指示された複数の校正作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出する場合について説明したが、本発明はこれに限定されるものではなく、電子文書の作成作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出する形態とすることもできる。   For example, in the above embodiment, the end deadline information indicating the end deadline of the electronic document creation work is acquired, and the execution schedules of a plurality of calibration work specified by the annotation are finished by the end deadline indicated by the end deadline information However, the present invention is not limited to this, and the execution schedule of the electronic document creation work is derived so as to be completed by the end deadline indicated by the end deadline information. It can also be.

この場合、上記複数の校正作業の実行スケジュール(開始日及び終了予定日を示す情報)を予め進捗管理データベースDB6に登録しておき、当該実行スケジュールにおける最終期限(一番遅い終了予定日)を上記電子文書の作成業務の終了期限として考え、当該複数の校正作業が行われる電子文書の作成業務の終了期限を示す情報を導出してスケジュール管理データベースDB7に登録することになる。   In this case, the execution schedule (information indicating the start date and the scheduled end date) of the plurality of calibration operations is registered in advance in the progress management database DB6, and the final deadline (latest scheduled end date) in the execution schedule is set as the above Considering the end date of the electronic document creation work, information indicating the end date of the electronic document creation work for which the plurality of proofreading operations are performed is derived and registered in the schedule management database DB7.

図19には、この形態におけるスケジュール設定処理プログラムの処理の流れの一例が示されている。なお、当該スケジュール設定処理プログラムが、クライアント装置50の表示部53に表示されているスケジュール設定ボタン78が予め定められた利用者(例えば、表示部53に表示されている文書が属するタスクのリーダ等)によって指定された際に進捗管理サーバ40の制御部41により実行されることは上記実施の形態と同様である。   FIG. 19 shows an example of the processing flow of the schedule setting processing program in this embodiment. It should be noted that the schedule setting processing program is a user whose schedule setting button 78 displayed on the display unit 53 of the client device 50 is predetermined (for example, a task leader to which the document displayed on the display unit 53 belongs, etc. ) Is executed by the control unit 41 of the progress management server 40 in the same manner as in the above embodiment.

まず、同図のステップ400では、アクセス元のクライアント装置50において表示されている文書(処理対象文書)に関する全てのステータスを示す情報を進捗管理データベースDB6から読み出し、次のステップ402にて、読み出したステータスを示す情報が「完了」となっていない校正作業が存在するか否かを判定して、否定判定となった場合は本スケジュール設定処理プログラムを終了し、肯定判定となった場合はステップ404に移行する。   First, in step 400 of the figure, information indicating all statuses regarding the document (processing target document) displayed on the client device 50 that is the access source is read from the progress management database DB6, and is read in the next step 402. It is determined whether there is a calibration work whose status information is not “completed”. If the determination is negative, the schedule setting processing program is terminated, and if the determination is affirmative, step 404 is performed. Migrate to

ステップ404では、上記ステップ400において読み出したステータスを示す情報が「完了」となっていない校正作業の実行スケジュール(開始日及び終了予定日)を進捗管理データベースDB6から読み出し、次のステップ406にて、読み出した実行スケジュールの最終終了予定日(最も遅い終了予定日)までに終了するように処理対象文書の実行スケジュールを導出する。   In step 404, the execution schedule (start date and scheduled end date) of the calibration work whose information indicating the status read in step 400 is not “completed” is read from the progress management database DB6, and in the next step 406, The execution schedule of the processing target document is derived so as to end before the final scheduled end date (latest scheduled end date) of the read execution schedule.

なお、本スケジュール設定処理プログラムでは、上記処理対象文書の実行スケジュールを、現時点を開始日とし、上記最終終了予定日を終了期限とするように導出する。   In this schedule setting processing program, the execution schedule of the processing target document is derived so that the current date is the start date and the final scheduled end date is the end date.

そして、次のステップ408にて、上記ステップ406の処理によって導出された処理対象文書の実行スケジュールを示す情報(開始日及び終了期限を示す情報)をスケジュール管理データベースDB7の対応する欄に記憶(更新)し、その後に本スケジュール設定処理プログラムを終了する。   In the next step 408, information indicating the execution schedule of the processing target document derived by the processing in step 406 (information indicating the start date and the end deadline) is stored (updated) in the corresponding column of the schedule management database DB7. Then, the schedule setting processing program is terminated.

以上のようなスケジューリング機能の実行によっても、電子文書の作成業務の終了期限との間で矛盾のないスケジューリングを行うことができる。   Even by executing the scheduling function as described above, it is possible to perform scheduling that is consistent with the end date of the electronic document creation work.

また、上記実施の形態では、スケジュール設定処理プログラムにおいて、複数の校正作業を文書作成業務の終了期限までの期間内に並行して実行するように各校正作業の実行スケジュールを導出する場合について説明したが、本発明はこれに限定されるものではなく、例えば、複数の校正作業を文書作成業務の終了期限までの期間内に1つずつ直列に実行するように各校正作業の実行スケジュールを導出する形態とすることもできる。   In the above-described embodiment, a case has been described in the schedule setting processing program in which the execution schedule of each proofreading work is derived so that a plurality of proofreading work is executed in parallel within the period until the end date of the document creation work. However, the present invention is not limited to this. For example, the execution schedule of each proofreading work is derived so that a plurality of proofreading work is executed one by one within a period until the end date of the document creation work. It can also be in the form.

図20には、この場合におけるスケジュールボードでの各校正作業の実行スケジュールの表示状態の一例が示されている。この場合も、上記実施の形態と同様の効果を奏することができる。   FIG. 20 shows an example of the display state of the execution schedule of each calibration work on the schedule board in this case. In this case as well, the same effects as in the above embodiment can be obtained.

更に、文書作成業務を実行する部署の当該文書作成業務における校正作業の処理の流れを示すワークフロー・テンプレートを進捗管理サーバ40に対して予め登録しておき、当該ワークフロー・テンプレートにより示される流れに則り、かつ処理対象文書の作成作業のスケジュール内に納めるように複数の校正作業の実行スケジュールを導出する形態とすることもできる。この場合、実際の校正作業の処理の流れに応じた実行スケジュールを導出することができ、利便性を向上させることができる。   Further, a workflow template indicating the flow of the proofreading process in the document creation work of the department that executes the document creation work is registered in advance in the progress management server 40, and the flow indicated by the workflow template is followed. In addition, it is also possible to derive a plurality of proofreading execution schedules so as to fit within the processing target document creation work schedule. In this case, it is possible to derive an execution schedule corresponding to the actual flow of the calibration work, and it is possible to improve convenience.

また、上記実施の形態では、複数の作業指示コメントにより指示された複数の校正作業の実行スケジュールを導出する場合について説明したが、本発明はこれに限定されるものではなく、1つの電子文書に対して1つの作業指示コメントが添付されており、当該作業指示コメントによって指示された1つの校正作業の実行スケジュールを導出する形態とすることができることは言うまでもない。この場合も、上記実施の形態と同様の効果を奏することができる。   In the above-described embodiment, a case has been described in which a plurality of calibration work execution schedules instructed by a plurality of work instruction comments are derived. However, the present invention is not limited to this, and a single electronic document is used. On the other hand, it is needless to say that one work instruction comment is attached, and an execution schedule of one calibration work instructed by the work instruction comment can be derived. In this case as well, the same effects as in the above embodiment can be obtained.

また、上記実施の形態では、進捗度を進捗管理画面(図18参照。)により単独で提示する場合について説明したが、本発明はこれに限定されるものではなく、例えば、一例として図21に示すように、進捗度を対応する校正作業の実際の実行スケジュールと並べて提示する形態とすることもできる。この場合も、上記実施の形態と同様の効果を奏することができる。   In the above embodiment, the case where the degree of progress is presented solely on the progress management screen (see FIG. 18) has been described. However, the present invention is not limited to this, and for example, FIG. As shown, the progress may be presented alongside the actual execution schedule of the corresponding calibration work. In this case as well, the same effects as in the above embodiment can be obtained.

また、上記実施の形態では、電子掲示板を用いてレビューを行う場合について説明したが、本発明はこれに限定されるものではなく、例えば、アノテーションを用いてレビューを行う形態とすることもできる。この場合、メッセージ共有サーバ30を用いる必要がなくなるため、文書処理システム90を低コストで構築することができる。   In the above-described embodiment, the case where the review is performed using the electronic bulletin board has been described. However, the present invention is not limited to this. For example, the review may be performed using the annotation. In this case, since it is not necessary to use the message sharing server 30, the document processing system 90 can be constructed at a low cost.

また、上記実施の形態では、付箋アノテーションに表示されている情報を起点としてレビューを行う場合について説明したが、本発明はこれに限定されるものではなく、例えば、手書き入力アノテーションにより示される情報を起点としてレビューを行う形態とすることもできる。この場合、付箋用アノテーションデータベースDB2に設けられている進捗管理IDと同様の情報をペン入力用アノテーションデータベースDB3に設けることになる。この場合も、上記実施の形態と同様の効果を奏することができる。   In the above embodiment, the case where the review is performed using the information displayed on the tag annotation as a starting point has been described. However, the present invention is not limited to this. For example, the information indicated by the handwritten input annotation A review may be performed as a starting point. In this case, information similar to the progress management ID provided in the tag annotation database DB2 is provided in the pen input annotation database DB3. In this case as well, the same effects as in the above embodiment can be obtained.

また、上記実施の形態では、付箋アノテーションにリンク先のメッセージ(電子掲示板上の起点メッセージ)を表示する場合について説明したが、本発明はこれに限定されるものではなく、例えば、当該付箋アノテーションに対して、利用者にコメント(校正作業を指示するコメント)を直接入力させ、当該コメントを表示する形態とすることもできる。この場合、当該付箋アノテーションに当該コメントに関して電子掲示板上で交わされたメッセージの起点メッセージをリンクするリンク情報を関連付ける形態とすることもできる。この場合も、上記実施の形態と同様の効果を奏することができる。   Further, in the above embodiment, the case where the link destination message (starting message on the electronic bulletin board) is displayed on the tag annotation has been described. However, the present invention is not limited to this, and for example, the tag annotation On the other hand, it is possible to directly input a comment (comment for instructing calibration work) and display the comment. In this case, it is also possible to associate link information for linking a starting message of a message exchanged on the electronic bulletin board regarding the comment with the tag annotation. In this case as well, the same effects as in the above embodiment can be obtained.

また、上記実施の形態では、付箋アノテーションに電子掲示板上で交わされた起点メッセージにリンクするリンク情報を関連付けした場合について説明したが、本発明はこれに限定されるものではなく、例えば、当該起点メッセージに代えて、当該起点メッセージを起点として交わされた他のメッセージにリンクするリンク情報を関連付けする形態とすることもできる。この場合、最も重要なメッセージや、最新のメッセージ等を付箋アノテーションに表示することができるようになり、利便性を向上させることができる。   Further, in the above embodiment, a case has been described in which the link information linked to the starting point message exchanged on the electronic bulletin board is associated with the tag annotation, but the present invention is not limited to this, for example, the starting point Instead of the message, link information linked to another message exchanged with the origin message as the origin may be associated. In this case, the most important message, the latest message, and the like can be displayed on the tag annotation, and convenience can be improved.

また、上記実施の形態では、ペン型のアノテーションデバイス57を用いて手書き入力を実現した場合について説明したが、本発明はこれに限定されるものではなく、例えば、キーボードやマウス等の入力・指示デバイスを用いて実現する形態とすることもできる。この場合、クライアント装置50としてタブレットPCを用いる必要がなくなるため、文書処理システム90を低コストで構築することができる。   In the above-described embodiment, the case where handwritten input is realized using the pen-type annotation device 57 has been described. However, the present invention is not limited to this, and for example, input / instructions such as a keyboard and a mouse It can also be realized by using a device. In this case, since it is not necessary to use a tablet PC as the client device 50, the document processing system 90 can be constructed at a low cost.

また、上記実施の形態では、本発明をクライアント/サーバシステムに適用した場合について説明したが、本発明はこれに限定されるものではなく、例えば、P2P(Peer to Peer)システムに適用する形態や、単体(スタンドアロン)の情報処理装置に適用する形態とすることもできる。ここで、本発明をP2Pシステムに適用する場合は、上記実施の形態で説明したサーバシステム92における各サーバの処理を各クライアント装置において実行可能とする。また、本発明を単体の情報処理装置に適用する場合にも、上記実施の形態で説明した各サーバの処理を当該情報処理装置において実行可能とするが、この場合は、各装置間の情報の送受を行うための処理や構成は必要がなくなる。これらの場合にも、上記実施の形態と同様の効果を奏することができる。   Further, although cases have been described with the above embodiment where the present invention is applied to a client / server system, the present invention is not limited to this, for example, a mode applied to a P2P (Peer to Peer) system, The present invention can also be applied to a single information processing apparatus. Here, when the present invention is applied to the P2P system, the processing of each server in the server system 92 described in the above embodiment can be executed in each client device. In addition, when the present invention is applied to a single information processing apparatus, the processing of each server described in the above embodiment can be executed in the information processing apparatus. There is no need for processing and configuration for sending and receiving. In these cases, the same effects as those of the above embodiment can be obtained.

また、上記実施の形態では、文書管理サーバ10、アノテーション管理サーバ20、メッセージ共有サーバ30及び進捗管理サーバ40を別体として構成した場合について説明したが、本発明はこれに限定されるものではなく、例えば、PC、ワークステーション等の単体(スタンドアロン)の情報処理装置にて各サーバの機能を実現する形態とすることもできる。この場合も、上記実施の形態と同様の効果を奏することができる。   In the above embodiment, the case where the document management server 10, the annotation management server 20, the message sharing server 30, and the progress management server 40 are configured as separate bodies has been described. However, the present invention is not limited to this. For example, the function of each server may be realized by a single (stand-alone) information processing apparatus such as a PC or a workstation. In this case as well, the same effects as in the above embodiment can be obtained.

また、上記実施の形態では、スケジューリング機能及び進捗度修正機能をソフトウェアによって実現した場合について説明したが、本発明はこれに限定されるものではなく、例えば、当該機能をハードウェアにより実現する形態とすることもできる。この場合の形態例としては、進捗管理サーバ40に、一例として図10に示した取得部41A、スケジュール設定部41B、及び修正部41Cと同様に作用する機能デバイスを設ける形態が例示できる。この場合は、上記実施の形態に比較して、スケジューリング機能及び進捗度修正機能の高速化が期待できる。   In the above embodiment, the case where the scheduling function and the progress correction function are realized by software has been described. However, the present invention is not limited to this. For example, the function is realized by hardware. You can also As an example of the form in this case, the form which provides the progress management server 40 with the functional device which acts similarly to the acquisition part 41A, the schedule setting part 41B, and the correction part 41C shown in FIG. 10 as an example can be illustrated. In this case, the scheduling function and the progress correction function can be expected to be faster than in the above embodiment.

また、上記実施の形態で示した各データベースのデータ構造(図3〜図9参照。)も一例であり、必要に応じて記憶する項目を追加したり、不要な項目を削除したりすることができることは勿論のこと、各項目の記憶内容も適宜変更可能であることは言うまでもない。   The data structure of each database shown in the above embodiment (see FIGS. 3 to 9) is also an example, and items to be stored may be added or unnecessary items may be deleted as necessary. Of course, it goes without saying that the contents stored in each item can be changed as appropriate.

また、上記実施の形態で示した各種処理プログラムの処理の流れ(図11、図13、図17、図19参照。)も一例であり、本発明の主旨を逸脱しない範囲内で適宜変更することができることも言うまでもない。   Further, the processing flow of the various processing programs shown in the above embodiment (see FIGS. 11, 13, 17, and 19) is also an example, and may be changed as appropriate without departing from the gist of the present invention. Needless to say, you can.

更に、システムを構築する上で各機能要素をサーバシステム92及びクライアントシステム94にどのように振り分けるかは上記実施の形態で説明したものに限定されず、システムを構築する上で都合のよい振り分けを行えばよいことも言うまでもない。   Further, how to distribute each functional element to the server system 92 and the client system 94 in constructing the system is not limited to that described in the above embodiment, and convenient distribution in constructing the system is possible. Needless to say, you can do it.

実施の形態に係る文書処理システムの全体構成を示す概略図である。1 is a schematic diagram showing an overall configuration of a document processing system according to an embodiment. 実施の形態に係るクライアント装置の表示部によるアノテーションの添付に関する表示画面の構成例を示す概略図である。It is the schematic which shows the structural example of the display screen regarding attachment of the annotation by the display part of the client apparatus which concerns on embodiment. 実施の形態に係る文書データベースのデータ構造の一例を示す模式図である。It is a schematic diagram which shows an example of the data structure of the document database which concerns on embodiment. 実施の形態に係る付箋用アノテーションデータベースのデータ構造の一例を示す模式図である。It is a schematic diagram which shows an example of the data structure of the annotation database for sticky notes which concerns on embodiment. 実施の形態に係るペン入力用アノテーションデータベースのデータ構造の一例を示す模式図である。It is a schematic diagram which shows an example of the data structure of the annotation database for pen input which concerns on embodiment. 実施の形態に係るメッセージデータベースのデータ構造の一例を示す模式図である。It is a schematic diagram which shows an example of the data structure of the message database which concerns on embodiment. 実施の形態に係る作業者データベースのデータ構造の一例を示す模式図である。It is a schematic diagram which shows an example of the data structure of the worker database which concerns on embodiment. 実施の形態に係る進捗管理データベースのデータ構造の一例を示す模式図である。It is a schematic diagram which shows an example of the data structure of the progress management database which concerns on embodiment. 実施の形態に係るスケジュール管理データベースのデータ構造の一例を示す模式図である。It is a schematic diagram which shows an example of the data structure of the schedule management database which concerns on embodiment. 実施の形態に係るスケジューリング機能及び進捗度修正機能を実現するための文書処理システムの機能的な構成を示すブロック図である。It is a block diagram which shows the functional structure of the document processing system for implement | achieving the scheduling function and progress correction function which concern on embodiment. 実施の形態に係るスケジュール登録処理プログラムの処理の流れを示すフローチャートである。It is a flowchart which shows the flow of a process of the schedule registration process program which concerns on embodiment. 実施の形態に係るスケジュール登録画面の表示状態の一例を示す概略図である。It is the schematic which shows an example of the display state of the schedule registration screen which concerns on embodiment. 実施の形態に係るスケジュール設定処理プログラムの処理の流れを示すフローチャートである。It is a flowchart which shows the flow of a process of the schedule setting process program which concerns on embodiment. 実施の形態に係るスケジュールボードの表示状態の一例を示す概略図である。It is the schematic which shows an example of the display state of the schedule board which concerns on embodiment. 実施の形態に係るスケジュール設定処理プログラムによって導出された校正作業の実行スケジュールに対する修正手順の説明に供する概略図である。It is the schematic with which it uses for description of the correction procedure with respect to the execution schedule of the calibration work derived | led-out by the schedule setting process program which concerns on embodiment. 実施の形態に係る警告画面の表示状態の一例を示す概略図である。It is the schematic which shows an example of the display state of the warning screen which concerns on embodiment. 実施の形態に係る進捗状況提示処理プログラムの処理の流れを示すフローチャートである。It is a flowchart which shows the flow of a process of the progress condition presentation process program which concerns on embodiment. 実施の形態に係る進捗管理画面の表示状態の一例を示す概略図である。It is the schematic which shows an example of the display state of the progress management screen which concerns on embodiment. 実施の形態に係るスケジュール設定処理プログラムの変形例の処理の流れを示すフローチャートである。It is a flowchart which shows the flow of a process of the modification of the schedule setting process program which concerns on embodiment. 実施の形態に係るスケジュール設定処理プログラムによる複数の校正作業の実行スケジュールの導出手順の変形例の説明に供する図であり、導出結果のスケジュールボードによる表示状態の一例を示す概略図である。It is a figure with which it uses for description of the modification of the derivation | leading-out procedure of the execution schedule of the some calibration work by the schedule setting process program which concerns on embodiment, and is the schematic which shows an example of the display state by the schedule board of a derivation result. 実施の形態に係る進捗度の提示方法の変形例の説明に供する概略図である。It is the schematic with which it uses for description of the modification of the presentation method of the progress which concerns on embodiment.

符号の説明Explanation of symbols

10 文書管理サーバ
20 アノテーション管理サーバ
30 メッセージ共有サーバ
40 進捗管理サーバ
41 制御部(取得手段、スケジュール設定手段、修正手段)
41A 取得部(取得手段)
41B スケジュール設定部(スケジュール設定手段)
41C 修正部(修正手段)
43 表示部
45 二次記憶部(記憶手段)
50 クライアント装置
53 表示部(表示手段)
60 ネットワーク
90 文書処理システム
92 サーバシステム
94 クライアントシステム
DESCRIPTION OF SYMBOLS 10 Document management server 20 Annotation management server 30 Message sharing server 40 Progress management server 41 Control part (acquisition means, schedule setting means, correction means)
41A acquisition unit (acquisition means)
41B Schedule setting section (schedule setting means)
41C Correction part (correction means)
43 Display unit 45 Secondary storage unit (storage means)
50 Client device 53 Display unit (display means)
60 network 90 document processing system 92 server system 94 client system

Claims (8)

校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援する進捗管理支援装置であって、
前記電子文書の作成作業の終了期限を示す終了期限情報を取得する取得手段と、
前記作業指示コメントにより指示された校正作業又は前記電子文書の作成作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出して記憶手段に記憶するスケジュール設定手段と、
を備えた進捗管理支援装置。
A progress management support device that supports the management of the progress of creation of an electronic document attached with a work instruction comment for instructing a proofreading work,
Acquisition means for acquiring end deadline information indicating an end deadline of the creation work of the electronic document;
A schedule setting means for deriving and storing the execution schedule of the proofreading work instructed by the work instruction comment or the creation work of the electronic document by the end deadline indicated by the end deadline information;
A progress management support device.
前記スケジュール設定手段は、前記電子文書に前記作業指示コメントが複数添付されており、当該複数の作業指示コメントにより指示された複数の校正作業の実行スケジュールを導出する場合、当該複数の校正作業を前記終了期限情報により示される終了期限までの期間内に並行して実行するか、又は1つずつ直列に実行するように前記実行スケジュールを導出する
請求項1記載の進捗管理支援装置。
The schedule setting means includes a plurality of the work instruction comments attached to the electronic document, and when deriving an execution schedule of a plurality of calibration work instructed by the plurality of work instruction comments, The progress management support apparatus according to claim 1, wherein the execution schedule is derived so as to be executed in parallel within a period until the end deadline indicated by the end deadline information, or to be executed in series one by one.
前記スケジュール設定手段により前記校正作業の実行スケジュールを導出する場合において、
前記取得手段は、前記実行スケジュールの導出結果の修正指示を示す修正指示情報を更に取得し、
前記スケジュール設定手段は、前記取得手段によって取得された前記修正指示情報により示される修正指示に応じて前記実行スケジュールの導出結果を修正する
請求項1又は請求項2記載の進捗管理支援装置。
In deriving the execution schedule of the calibration work by the schedule setting means,
The acquisition unit further acquires correction instruction information indicating a correction instruction of the execution schedule derivation result,
The progress management support apparatus according to claim 1, wherein the schedule setting unit corrects the derivation result of the execution schedule according to a correction instruction indicated by the correction instruction information acquired by the acquisition unit.
前記スケジュール設定手段によって前記記憶手段に記憶された前記実行スケジュールを示す情報を表示する表示手段
を更に備えた請求項1乃至請求項3の何れか1項記載の進捗管理支援装置。
The progress management support apparatus according to any one of claims 1 to 3, further comprising display means for displaying information indicating the execution schedule stored in the storage means by the schedule setting means.
前記取得手段は、前記校正作業の進捗度を示す進捗度情報を更に取得し、
前記表示手段は、前記取得手段によって取得された前記進捗度情報により示される進捗度を更に表示する
請求項4記載の進捗管理支援装置。
The acquisition means further acquires progress information indicating the progress of the calibration work,
The progress management support apparatus according to claim 4, wherein the display unit further displays a progress level indicated by the progress level information acquired by the acquisition unit.
前記進捗度を前記終了期限情報により示される終了期限に近づくほど度合いが低くなるように修正する修正手段
を更に備えた請求項5記載の進捗管理支援装置。
The progress management support apparatus according to claim 5, further comprising a correcting unit that corrects the progress degree so that the degree of progress decreases as the end time limit indicated by the end time limit information is approached.
校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援する進捗管理支援方法であって、
前記電子文書の作成作業の終了期限を示す終了期限情報を取得し、
前記作業指示コメントにより指示された校正作業又は前記電子文書の作成作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出して記憶手段に記憶する、
進捗管理支援方法。
A progress management support method for supporting the management of the progress of creation of an electronic document attached with a work instruction comment for instructing a proofreading work,
Obtaining end deadline information indicating an end deadline for the creation of the electronic document;
Deriving the execution schedule of the proofreading work instructed by the work instruction comment or the creation work of the electronic document so as to be completed by the end deadline indicated by the end deadline information and storing it in the storage means;
Progress management support method.
校正作業を指示する作業指示コメントが添付された電子文書の作成作業の進捗状況の管理を支援する進捗管理支援プログラムであって、
前記電子文書の作成作業の終了期限を示す終了期限情報を取得する取得ステップと、
前記作業指示コメントにより指示された校正作業又は前記電子文書の作成作業の実行スケジュールを前記終了期限情報により示される終了期限までに終了するように導出して記憶手段に記憶するスケジュール設定ステップと、
をコンピュータに実行させる進捗管理支援プログラム。
A progress management support program that supports the management of the progress of the creation of an electronic document attached with a work instruction comment that instructs a proofreading work,
An acquisition step of acquiring end deadline information indicating an end deadline of the creation of the electronic document;
A schedule setting step for deriving the execution schedule of the calibration work instructed by the work instruction comment or the creation work of the electronic document to be completed by the end deadline indicated by the end deadline information and storing the schedule in a storage unit;
A progress management support program that causes a computer to execute.
JP2005121060A 2005-04-19 2005-04-19 Progress management support device, progress management support method and progress management support program Pending JP2006301851A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005121060A JP2006301851A (en) 2005-04-19 2005-04-19 Progress management support device, progress management support method and progress management support program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005121060A JP2006301851A (en) 2005-04-19 2005-04-19 Progress management support device, progress management support method and progress management support program

Publications (1)

Publication Number Publication Date
JP2006301851A true JP2006301851A (en) 2006-11-02

Family

ID=37470081

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005121060A Pending JP2006301851A (en) 2005-04-19 2005-04-19 Progress management support device, progress management support method and progress management support program

Country Status (1)

Country Link
JP (1) JP2006301851A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011008354A (en) * 2009-06-23 2011-01-13 Ricoh Co Ltd Information processor, document data deletion method, and document data deletion program
JP2011060287A (en) * 2009-09-08 2011-03-24 Ricoh Co Ltd System and method for carrying out workflow service
JP2013097540A (en) * 2011-10-31 2013-05-20 Fujifilm Corp Electronic proofreading method and electronic proofreading system
JP2014135090A (en) * 2014-04-22 2014-07-24 Fujifilm Corp Electronic proof-reading system, method and program
JP2019061355A (en) * 2017-09-25 2019-04-18 株式会社ブルーオーシャンシステム Record management system, record management device, document approval device, document creation device, method, and program, and recording medium recorded program thereon
JP2020126299A (en) * 2019-02-01 2020-08-20 富士ゼロックス株式会社 Information processing apparatus and information processing program

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011008354A (en) * 2009-06-23 2011-01-13 Ricoh Co Ltd Information processor, document data deletion method, and document data deletion program
JP2011060287A (en) * 2009-09-08 2011-03-24 Ricoh Co Ltd System and method for carrying out workflow service
JP2013097540A (en) * 2011-10-31 2013-05-20 Fujifilm Corp Electronic proofreading method and electronic proofreading system
JP2014135090A (en) * 2014-04-22 2014-07-24 Fujifilm Corp Electronic proof-reading system, method and program
JP2019061355A (en) * 2017-09-25 2019-04-18 株式会社ブルーオーシャンシステム Record management system, record management device, document approval device, document creation device, method, and program, and recording medium recorded program thereon
JP2020126299A (en) * 2019-02-01 2020-08-20 富士ゼロックス株式会社 Information processing apparatus and information processing program
JP7358740B2 (en) 2019-02-01 2023-10-11 富士フイルムビジネスイノベーション株式会社 Information processing device and information processing program

Similar Documents

Publication Publication Date Title
US7979788B2 (en) Document processing apparatus, document processing method and storage medium storing document processing program
JP5028827B2 (en) Document management apparatus, document management method, and document management program
JP4517750B2 (en) Document processing system
US10198407B2 (en) System and method for dynamic linking between graphic documents and comment data bases
JP2006259918A (en) Progress management support device, method and program
JP2006301851A (en) Progress management support device, progress management support method and progress management support program
JP2007034526A (en) Progress management support device, progress management support method and progress management support program
JP2006004298A (en) Document processing apparatus, documents processing method, and document processing program
JP4581684B2 (en) Progress management support system
JP4734927B2 (en) Progress management support device and progress management support program
JP4793064B2 (en) Data processing system and program
JP2003067449A (en) Supporting system for design and manufacturing operation
JP4933721B2 (en) Document processing apparatus and document processing program
JP2003150762A (en) Cooperation method for project information and its system
JP2007058351A (en) Work execution support device, work execution support method and work execution support program
JP4613600B2 (en) Document review support system and document review support program
JP2006215901A (en) Material management system and program
JP4665504B2 (en) Document review support apparatus and document review support program
JP2006171999A (en) Document review supporting device, document review supporting method and document review supporting program
WO2011148872A1 (en) Groupware system and program
JP2006189959A (en) Progress management supporting apparatus, progress management supporting method, and progress management supporting program
US11868703B2 (en) System and method for dynamic linking between graphic documents and comment data bases
JP2006195548A (en) Progress management support device, progress management support method, and progress management support program
JP2006004361A (en) Document processing apparatus, document processing method, and document processing program
AU2017100608A4 (en) A Computer Implemented Tool for Document Verification