JP2006188926A - Frame body of composite sash - Google Patents

Frame body of composite sash Download PDF

Info

Publication number
JP2006188926A
JP2006188926A JP2005003039A JP2005003039A JP2006188926A JP 2006188926 A JP2006188926 A JP 2006188926A JP 2005003039 A JP2005003039 A JP 2005003039A JP 2005003039 A JP2005003039 A JP 2005003039A JP 2006188926 A JP2006188926 A JP 2006188926A
Authority
JP
Japan
Prior art keywords
vertical frame
indoor
frame
metal
sash
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005003039A
Other languages
Japanese (ja)
Other versions
JP4709553B2 (en
Inventor
Shigetetsu Motohashi
成哲 本橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shin Nikkei Co Ltd
Original Assignee
Shin Nikkei Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shin Nikkei Co Ltd filed Critical Shin Nikkei Co Ltd
Priority to JP2005003039A priority Critical patent/JP4709553B2/en
Publication of JP2006188926A publication Critical patent/JP2006188926A/en
Application granted granted Critical
Publication of JP4709553B2 publication Critical patent/JP4709553B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Door And Window Frames Mounted To Openings (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a frame body of a composite sash, which has a stile capable of reducing costs because it can be used for the composite sash and a metallic sash in common. <P>SOLUTION: In this frame body of the composite sash, upper and lower rails and left and right stiles are framed in a square shape, and inner and outer sashes are housed inside in a double sliding manner. In the stile 30 on the side of the arrangement of the outer sash, a first engaging part 31c is provided in a position near the indoor surface of the outer sash; a second engaging part 31d is provided on an indoor side more than the engaging part 31c; and a third engaging part 31e is provided at an indoor end. In a resin stile 32 which is provided on the indoor-side surface of the stile 30, a first part 32a to be engaged, which is to be engaged with the engaging part 31c of the stile 30, is provided at an outdoor-side end; an outdoor part 32b, which is formed in such a manner as to straddle the second engaging part 31d of the stile 30 toward the indoor side from the part 32a, is provided; and an indoor part 32d with the part 32e, which constitutes the indoor side from the outdoor part 32b and which is engaged with the engaging part 31e of the stile 30, is provided. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は建物躯体の開口部に取付けられ引き違い状の障子を納める複合サッシの枠体に関し、特に金属枠の室内側部に樹脂枠を係合取付した縦枠を有する複合サッシの枠体に関する。   The present invention relates to a frame of a composite sash that is attached to an opening of a building frame and houses a sliding shoji, and more particularly to a frame of a composite sash having a vertical frame in which a resin frame is engaged and attached to the interior side of a metal frame. .

従来から建物躯体の開口部に対して上下枠及び左右の縦枠を方形状に枠組みしてなる枠体を取付け、その内部に引き違い障子を納めてなる引き違いサッシが知られている。また、上下枠及び縦枠について、室外側は金属材で構成し、その室内側には樹脂材を配設してなる複合サッシの枠体も知られている。   2. Description of the Related Art Conventionally, a sliding sash is known in which a frame formed by rectangularly framed upper and lower frames and left and right vertical frames is attached to an opening of a building frame, and a sliding shoji is placed inside the frame. As for the upper and lower frames and the vertical frame, a composite sash frame is also known in which the outdoor side is made of a metal material and a resin material is arranged on the indoor side.

複合サッシの枠体の場合、左右の縦枠には枠体の内部に納められる外障子と内障子の配置に応じて、それぞれ異なる形状の樹脂縦枠が設けられる。外障子が配置される側の縦枠は、その室内端部から外障子の室内面が配置される位置までが室内側に露出するので、その範囲を覆うような樹脂縦枠を設ける。一方、内障子が配置される側の縦枠は、その室内端部から内障子の室内面が配置される位置までが室内側に露出するので、外障子側の樹脂縦枠に比べると小さい範囲を覆うような室内樹脂縦枠を設けている。このような樹脂縦枠を有した枠体としては、例えば特許文献1に挙げるようなものがある。
特開2002−180748号公報
In the case of a composite sash frame, the left and right vertical frames are provided with resin vertical frames having different shapes depending on the arrangement of the outer and inner shojis contained in the frame. Since the vertical frame on the side where the external shoji is arranged is exposed to the indoor side from the indoor end to the position where the indoor surface of the external paper is arranged, a resin vertical frame is provided so as to cover the range. On the other hand, the vertical frame on the side where the shingles are arranged is exposed to the indoor side from the indoor end to the position where the indoor surface of the inner shingles is arranged, so it is smaller than the resin vertical frame on the side of the shingles An indoor resin vertical frame is provided to cover the interior. As a frame having such a resin vertical frame, there is a frame as disclosed in Patent Document 1, for example.
JP 2002-180748 A

一方、金属材からなる金属サッシの枠体においても、室内側の結露防止のために枠体の室内側部にだけ樹脂枠を設ける場合がある。この場合は、縦枠に関しては左右とも室内外方向に短い室内樹脂縦枠を設ける。従来の枠体は、複合サッシの場合と金属サッシの場合とで金属枠を別々の形状としていた。したがって、複合サッシの金属枠において、外障子が配置される側の縦枠に室内樹脂縦枠を取付けることはできず、逆に金属サッシの金属枠において、外障子が配置される側の縦枠に樹脂縦枠を取付けることはできなかった。   On the other hand, even in a metal sash frame made of a metal material, a resin frame may be provided only on the indoor side portion of the frame body in order to prevent condensation on the indoor side. In this case, with respect to the vertical frame, a short indoor resin vertical frame is provided in the indoor / outdoor direction on both the left and right sides. In the conventional frame, the metal frame has different shapes for the composite sash and the metal sash. Therefore, in the metal frame of the composite sash, the indoor resin vertical frame cannot be attached to the vertical frame on the side where the shingles are arranged, and conversely the vertical frame on the side where the shingles are arranged in the metal frame of the metal sash. The resin vertical frame could not be attached to the.

本発明は、上記課題を解決すべくなされたものであり、複合サッシと金属サッシに兼用できてコストダウンを図ることのできる縦枠を有した複合サッシの枠体を提供することを目的とする。   The present invention has been made to solve the above-described problems, and an object of the present invention is to provide a composite sash frame body having a vertical frame that can be used both as a composite sash and a metal sash to reduce costs. .

上記課題を解決するため、本発明に係る複合サッシの枠体は、上下枠及び左右の縦枠を方形状に枠組みしてなり内部に内外障子を引き違い状に納める複合サッシの枠体において、
上記外障子が配置される側の縦枠は上記外障子の室内面近傍位置に第1係合部を備え、該第1係合部よりも室内側に第2係合部を備えると共に、室内端部に第3係合部を備え、
上記外障子が配置される側の縦枠の室内側面には、
室外側端部に設けられ上記縦枠の第1係合部に係合する第1被係合部と、該第1被係合部から室内側に向かって上記縦枠の第2係合部を跨ぐように形成された室外部と、該室外部より室内側を構成し上記縦枠の第3係合部に係合する第3被係合部を有した室内部とを備えてなる樹脂縦枠と、
室外側端部に設けられ上記縦枠の第2係合部に係合する第2被係合部と、該第2被係合部よりも室内側を構成し上記縦枠の第3係合部に係合する第3被係合部を有した室内部とを備えてなる室内樹脂縦枠と、
のいずれか1つを選択して設けてなることを特徴として構成されている。
In order to solve the above problems, the frame of the composite sash according to the present invention is a frame of the composite sash in which the upper and lower frames and the left and right vertical frames are framed in a rectangular shape, and the inner and outer shojis are accommodated in a sliding manner inside,
The vertical frame on the side where the external shoji is arranged is provided with a first engaging portion at a position near the indoor surface of the external shoji, with a second engaging portion on the indoor side of the first engaging portion, A third engagement portion is provided at the end,
On the indoor side of the vertical frame on the side where the above external shoji is placed,
A first engaged portion that is provided at an outdoor side end portion and engages with a first engaging portion of the vertical frame, and a second engaging portion of the vertical frame that extends from the first engaged portion toward the indoor side. A resin comprising: a room exterior formed so as to straddle a wall; and a room interior having a third engaged portion that is configured on the indoor side from the exterior and engages with the third engagement portion of the vertical frame. A vertical frame,
A second engaged portion that is provided at an outdoor side end portion and engages with a second engaging portion of the vertical frame; and a third engagement of the vertical frame that constitutes the indoor side of the second engaged portion. An indoor resin vertical frame comprising an indoor portion having a third engaged portion that engages with the portion;
Any one of these is selected and provided.

また、本発明に係る複合サッシの枠体は、上記樹脂縦枠の室外部は室内側端部に上記縦枠の第2係合部と係合する第2被係合部を備えてなることを特徴として構成されている。   In the frame body of the composite sash according to the present invention, the exterior of the resin vertical frame includes a second engaged portion that engages with the second engagement portion of the vertical frame at the indoor side end. It is configured as a feature.

さらに、本発明に係る複合サッシの枠体は、上記内障子が配置される側の縦枠は上記内障子の側面に跨がれる突出部を備え、上記外障子が配置される側の縦枠の第2係合部は上記突出部と見込方向略同位置に形成されてなることを特徴として構成されている。   Furthermore, in the frame body of the composite sash according to the present invention, the vertical frame on the side on which the inner impingement is arranged includes a projecting portion straddling the side surface of the inner impingement, and the vertical frame on the side on which the outer impediment is arranged. The second engaging portion is formed at substantially the same position as the protruding portion in the expected direction.

本発明に係る複合サッシの枠体によれば、外障子が配置される側の縦枠には外障子の室内面近傍位置に第1係合部を、それより室内側に第2係合部を備え、縦枠には、室外側端部で第1係合部と係合する第1被係合部と第2係合部を跨ぐように形成された室外部とを有した樹脂縦枠か、室外側端部で第2係合部と係合する第2被係合部を有した室内樹脂縦枠かを選択的に設けることにより、複合サッシとする場合に樹脂縦枠は第2係合部と干渉することなく縦枠に取付けることができ、また一方で縦枠には第2係合部よりも室内側部に設ける樹脂縦枠を取付けることもできるから、金属サッシで室内側部に樹脂材を設ける場合にも対応させることができる。すなわち、複合サッシと金属サッシで共用できる縦枠を有した複合サッシの枠体とすることができて、コストダウンを図ることができる。   According to the frame body of the composite sash according to the present invention, the vertical engagement frame on the side where the external shoji is arranged has the first engagement portion in the vicinity of the indoor surface of the external obstruction and the second engagement portion on the indoor side. The vertical frame includes a first engaged portion that engages with the first engaging portion at the outdoor end and an outdoor portion formed so as to straddle the second engaging portion. Or the indoor resin vertical frame having the second engaged portion that engages with the second engaging portion at the outdoor end, the resin vertical frame is the second when the composite sash is used. It can be attached to the vertical frame without interfering with the engaging part, and on the other hand, the resin vertical frame provided on the indoor side than the second engaging part can be attached to the vertical frame. It is possible to cope with the case where a resin material is provided in the portion. That is, the frame of the composite sash having a vertical frame that can be shared by the composite sash and the metal sash can be obtained, and the cost can be reduced.

また、本発明に係る複合サッシの枠体によれば、樹脂縦枠の室外部は室内側端部に縦枠の第2係合部と係合する第2被係合部を備えてなることにより、樹脂縦枠をより強固に縦枠に対して取付けることができる。   Further, according to the frame body of the composite sash according to the present invention, the exterior of the resin vertical frame includes the second engaged portion that engages with the second engagement portion of the vertical frame at the indoor side end. Thus, the resin vertical frame can be more firmly attached to the vertical frame.

さらに、本発明に係る複合サッシの枠体によれば、内障子が配置される側の縦枠は内障子の側面に跨がれる突出部を備え、外障子が配置される側の縦枠の第2係合部は突出部と見込方向略同位置に形成されてなることにより、金属サッシの場合であって室内側部に樹脂材を設ける際に、内障子用の突出部よりも室内側部に設けられる樹脂縦枠を縦枠に対し確実に取付けることができる。   Furthermore, according to the frame body of the composite sash according to the present invention, the vertical frame on the side where the inner impingement is arranged is provided with a projecting portion straddling the side surface of the inner impingement, and the vertical frame on the side on which the external obstacle is arranged. The second engaging portion is formed at substantially the same position as the projecting portion, so that in the case of a metal sash, when the resin material is provided on the indoor side portion, the second engaging portion is located on the indoor side more than the projecting portion for the inner pouch. The resin vertical frame provided in the portion can be securely attached to the vertical frame.

本発明の実施形態について図面に沿って詳細に説明する。本実施形態では、サッシを複合サッシとする場合と金属サッシとする場合とがあり、枠体1は縦枠30に取付けられる樹脂部材を除いて共通である。まず複合サッシの場合について説明する。図1は本実施形態における枠体を有するサッシの縦断面図であり、図2はサッシの横断面図である。本実施形態における複合サッシの基本構成は、建物開口部に取付けられる枠体1内に、外障子4と内障子5を引き違い状に納めてなるものである。   Embodiments of the present invention will be described in detail with reference to the drawings. In this embodiment, there are cases where the sash is a composite sash and a metal sash, and the frame 1 is common except for the resin member attached to the vertical frame 30. First, the case of a composite sash will be described. FIG. 1 is a longitudinal sectional view of a sash having a frame body in the present embodiment, and FIG. 2 is a transverse sectional view of the sash. The basic structure of the composite sash according to the present embodiment is that the outer shoji 4 and the inner shoji 5 are accommodated in the frame 1 attached to the building opening.

枠体1は、下枠10と上枠20及び左右の縦枠30、30を方形状に枠組みしてなるものである。下枠10は室外側の金属下枠11とその室内側に配設される樹脂下枠12とからなっている。また、上枠20は室外側の金属上枠21とその室内側に配設される樹脂上枠22とからなっている。さらに、外障子4が配置される側の縦枠30は金属縦枠31とその室内側に配設される樹脂縦枠32とから、内障子5が配置される側の縦枠30は金属縦枠31とその室内側に配設される室内樹脂縦枠33とからなっている。   The frame 1 is formed by framing a lower frame 10, an upper frame 20, and left and right vertical frames 30, 30 in a rectangular shape. The lower frame 10 includes a metal lower frame 11 on the outdoor side and a resin lower frame 12 disposed on the indoor side. The upper frame 20 includes a metal upper frame 21 on the outdoor side and a resin upper frame 22 disposed on the indoor side. Further, the vertical frame 30 on the side where the outer shoji 4 is arranged is composed of the metal vertical frame 31 and the resin vertical frame 32 arranged on the indoor side thereof. It consists of a frame 31 and an indoor resin vertical frame 33 disposed on the indoor side.

枠体1は、その見込方向中間位置に四周に渡って設けられるフィン8が建物躯体に当接し、ビス止めされることで固定されている。すなわち、このサッシはいわゆる半外付けサッシである。また、金属下枠11の室内面下端部には、室内側に向かって突出する固定部11dが形成されており、この固定部11dも建物躯体に対してビス止めされる。   The frame 1 is fixed by screwing the fins 8 provided at the intermediate position in the expected direction over the four circumferences in contact with the building frame. That is, this sash is a so-called semi-external sash. A fixing portion 11d that protrudes toward the indoor side is formed at the lower end of the indoor surface of the metal lower frame 11, and the fixing portion 11d is also screwed to the building frame.

外障子4と内障子5は、横框である下框40及び上框50と、左右の縦框60、60とを方形状に框組みしてなる框体2の内部に、ガラス体3を納めてなるものである。そして、框体2は、室外側に金属材を配し、室内側に樹脂材を配した複合材からなるものである。すなわち、下框40は、室外側の金属下框41と、その室内面に取付けられる樹脂下框42とから構成され、上框50は、室外側の金属上框51と、その室内面に取付けられる樹脂上框52とから構成され、縦框60は、室外側の金属縦框61と、その室内面に取付けられる樹脂縦框62とから構成される。下框40の下端部には、戸車43が設けられて、障子を下枠10のレール上で走行自在となるようにしている。   The external shoji 4 and the inner shoji 5 have the glass body 3 in the inside of the housing 2 formed by combining the lower arm 40 and the upper arm 50 that are lying down and the left and right longitudinal rods 60 and 60 in a square shape. It is something that you will pay. The housing 2 is made of a composite material in which a metal material is arranged on the outdoor side and a resin material is arranged on the indoor side. That is, the lower rod 40 is composed of an outdoor metal lower rod 41 and a resin lower rod 42 attached to the indoor surface, and the upper rod 50 is attached to the outdoor metal upper rod 51 and the indoor surface. The vertical gutter 60 is composed of a metal vertical gutter 61 on the outdoor side and a resin vertical gutter 62 attached to the indoor surface. A door wheel 43 is provided at the lower end of the lower rod 40 so that the shoji can run on the rail of the lower frame 10.

次に、枠体1を構成する各枠について説明する。下枠10を構成する金属下枠11の上面には、その長手方向略全長に渡って外レール11aと内レール11b及び網戸レール11cが形成されており、外レール11aは外障子4を、内レール11bは内障子5を、網戸レール11cは網戸(図示しない)を、それぞれサッシの長手方向に案内する。   Next, each frame constituting the frame body 1 will be described. On the upper surface of the metal lower frame 11 constituting the lower frame 10, an outer rail 11a, an inner rail 11b and a screen door rail 11c are formed over substantially the entire length in the longitudinal direction, and the outer rail 11a The rail 11b guides the inner door 5 and the screen door rail 11c guides the screen door (not shown) in the longitudinal direction of the sash.

樹脂下枠12は、内レール11bと金属下枠11の室内面との間に形成される凹部内に納められ、金属下枠11の室内面よりも室内側に向かって延出する室内延出部12aを有してなるものである。   The resin lower frame 12 is housed in a recess formed between the inner rail 11b and the interior surface of the metal lower frame 11, and extends in the room from the interior surface of the metal lower frame 11 toward the interior side. It has the part 12a.

上枠20を構成する金属上枠21の下面には、その長手方向略全長に渡って外レール21aと内レール21b及び網戸レール21cが形成されている。各レールは下枠10の各レールに対応して形成されており、外障子4と内障子5及び網戸(図示しない)をそれぞれサッシの長手方向に案内する。また、金属上枠21の室内側部には、樹脂上枠22が設けられ、その室内側は延出して室内延出部22aを形成する。   An outer rail 21a, an inner rail 21b, and a screen door rail 21c are formed on the lower surface of the metal upper frame 21 constituting the upper frame 20 over substantially the entire length in the longitudinal direction. Each rail is formed corresponding to each rail of the lower frame 10, and guides the outer shoji 4, the inner shoji 5 and the screen door (not shown) in the longitudinal direction of the sash. Moreover, the resin upper frame 22 is provided in the indoor side part of the metal upper frame 21, The indoor side is extended, and the indoor extension part 22a is formed.

次に、縦枠30について説明する。外障子4が配置される側の縦枠30を構成する金属縦枠31の内周面には、外障子4を閉じた状態でその側面と対向する位置に外突出部31aが長手方向略全長に渡って設けられる。また、内障子5が配置される側の縦枠30を構成する金属縦枠31の内周面には、内障子5を閉じた状態でその側面と対向する位置に内突出部31bが長手方向略全長に渡って設けられる。これらは、外障子4及び内障子5を閉じた際にサッシの気密性及び水密性を確保するために設けられている。   Next, the vertical frame 30 will be described. On the inner peripheral surface of the metal vertical frame 31 that constitutes the vertical frame 30 on the side where the external shoji 4 is arranged, the outer projecting portion 31a is provided at a position facing the side surface in a state in which the external obstruction 4 is closed, and substantially the entire length in the longitudinal direction. Is provided. Further, on the inner peripheral surface of the metal vertical frame 31 constituting the vertical frame 30 on the side where the inner impingement element 5 is disposed, an inner protruding portion 31b is provided in the longitudinal direction at a position facing the side surface in a state where the inner impeller 5 is closed. It is provided over almost the entire length. These are provided in order to ensure the airtightness and watertightness of the sash when the outer shoji 4 and inner shoji 5 are closed.

内障子5が配置される側の金属縦枠31に形成された内突出部31bの室内面根元部分には、長手方向略全長に渡り室内側に向かって開口する溝状の係合溝31fが形成されている。また、金属縦枠31の室内端部には、係合溝31fと対向する面を有するように突出した係合部31gが形成されている。そして、室内樹脂縦枠33が係合溝31fから係合部31g及びその室内側にかけて設けられる。   A groove-like engagement groove 31f that opens toward the indoor side over substantially the entire length in the longitudinal direction is formed in the inner surface base portion of the inner protrusion 31b formed on the metal vertical frame 31 on the side where the inner impeller 5 is disposed. Is formed. In addition, an engagement portion 31g protruding so as to have a surface facing the engagement groove 31f is formed at the indoor end portion of the metal vertical frame 31. The indoor resin vertical frame 33 is provided from the engaging groove 31f to the engaging portion 31g and the indoor side thereof.

室内樹脂縦枠33の室外側先端部は金属縦枠31の係合溝31fに係合し、室内側に形成された被係合部33aは、金属縦枠31の係合部31gに係合し、固定される。また、室内樹脂縦枠33は被係合部33aよりも室内側に向かって延出する室内延出部33bを有している。   The front end of the indoor resin vertical frame 33 is engaged with the engagement groove 31f of the metal vertical frame 31, and the engaged portion 33a formed on the indoor side is engaged with the engagement portion 31g of the metal vertical frame 31. And fixed. The indoor resin vertical frame 33 has an indoor extending portion 33b extending toward the indoor side from the engaged portion 33a.

図3には、外障子4が配置される側の縦枠30の横断面拡大図を示す。この図に示すように、外障子4が配置される側の金属縦枠31には、室外側から順に上述の外突出部31a、第1係合部31c、第2係合部31d、第3係合部31eが形成されている。第1係合部31cは先端が断面略コ字状となるように見付方向内側に突出して形成され、第2係合部31d、第3係合部31eはそれぞれ断面略L字状に形成される。第1係合部31cは外障子4の室内面近傍の位置に、第2係合部31dは内障子5が配置される側の金属縦枠31に形成された内突出部31bと見込方向略同位置に、第3係合部31eは金属縦枠31の室内側端部位置に、それぞれ形成されている。そして、樹脂縦枠32が第1係合部31cから第3係合部31e及びその室内側にかけて設けられる。   In FIG. 3, the cross-sectional enlarged view of the vertical frame 30 by the side where the shoji 4 is arrange | positioned is shown. As shown in this figure, the metal vertical frame 31 on the side where the external shoji 4 is disposed has the above-described outer projecting portion 31a, first engaging portion 31c, second engaging portion 31d, and third in order from the outdoor side. An engaging portion 31e is formed. The first engaging portion 31c is formed to protrude inward in the direction of finding so that the tip has a substantially U-shaped cross section, and the second engaging portion 31d and the third engaging portion 31e are each formed to have a substantially L-shaped cross section. Is done. The first engaging portion 31c is located at a position near the indoor surface of the external shoji 4, and the second engaging portion 31d is substantially the same as the inner projecting portion 31b formed on the metal vertical frame 31 on the side where the inner shroud 5 is disposed. In the same position, the third engaging portion 31e is formed at the indoor side end portion position of the metal vertical frame 31, respectively. A resin vertical frame 32 is provided from the first engaging portion 31c to the third engaging portion 31e and the indoor side thereof.

樹脂縦枠32は、金属縦枠31の第1係合部31cと係合する第1被係合部32aを室外側端部に有し、そこから室内側に向かって断面略コ字状であって金属縦枠31の第2係合部31dを跨ぐように形成された室外部32bを有している。また、そこからさらに室内側に向かって伸び、金属縦枠31と重合状態とされた室内部32dを有している。このように、本実施形態では樹脂縦枠32は第2係合部31dを跨ぐように形成されており、第2係合部31dと干渉することなく樹脂縦枠32を金属縦枠31に対して取付けることができる。   The resin vertical frame 32 has a first engaged portion 32a that engages with the first engagement portion 31c of the metal vertical frame 31 at the outdoor side end portion, and has a substantially U-shaped cross section from there toward the indoor side. And it has the outdoor part 32b formed so that the 2nd engaging part 31d of the metal vertical frame 31 might be straddled. Moreover, it has the indoor part 32d extended further toward the indoor side from there, and was made into the metal vertical frame 31 and the superposition | polymerization state. Thus, in this embodiment, the resin vertical frame 32 is formed so as to straddle the second engaging portion 31d, and the resin vertical frame 32 is made to the metal vertical frame 31 without interfering with the second engaging portion 31d. Can be installed.

金属縦枠31と重合状態となっている室内部32dにおいて、樹脂縦枠32は金属縦枠31と一体的に建物躯体に対しビス止めされる。室内部32dの端部には、金属縦枠31の第3係合部31eと係合する第3被係合部32eが形成されており、さらには金属縦枠31よりも室内側に延出する室内延出部32fが形成されている。   The resin vertical frame 32 is screwed to the building frame integrally with the metal vertical frame 31 in the indoor portion 32d in a superposed state with the metal vertical frame 31. A third engaged portion 32e that engages with the third engaging portion 31e of the metal vertical frame 31 is formed at the end of the indoor portion 32d, and further extends to the indoor side of the metal vertical frame 31. An indoor extension portion 32f is formed.

次に、金属サッシの場合について説明する。図4には、金属サッシの場合の縦断面図を、図5には、金属サッシの場合の横断面図を、それぞれ示す。本実施形態における金属サッシの基本構成は、建物開口部に取付けられる枠体1内に、外障子4と内障子5を引き違い状に納めてなるものである。   Next, the case of a metal sash will be described. 4 shows a longitudinal sectional view in the case of a metal sash, and FIG. 5 shows a transverse sectional view in the case of a metal sash. The basic structure of the metal sash according to the present embodiment is that the outer shoji 4 and the inner shoji 5 are housed in a framed manner in a frame 1 attached to the building opening.

外障子4と内障子5を構成する框体2は、全て金属材からなっている。すなわち、金属下框41と金属上框51、及び左右の金属縦框61、61により框体2が構成されている。この框体2の内部にガラス体3が納められ、外障子4と内障子5をそれぞれ構成する。   The casing 2 constituting the outer shoji 4 and the inner shoji 5 is made of a metal material. That is, the casing 2 is constituted by the metal lower rod 41, the metal upper rod 51, and the left and right metal vertical rods 61, 61. A glass body 3 is accommodated in the inside of the housing 2 and constitutes an external obstacle 4 and an internal obstacle 5 respectively.

枠体1については、下枠10と上枠20の構成は複合サッシの場合と同じである。また、縦枠30についても、金属縦枠31の構成と、内障子5が配置される側の金属縦枠31に設けられる室内樹脂縦枠33の構成は、複合サッシの場合と同じである。   As for the frame 1, the configurations of the lower frame 10 and the upper frame 20 are the same as in the case of the composite sash. In addition, regarding the vertical frame 30, the configuration of the metal vertical frame 31 and the configuration of the indoor resin vertical frame 33 provided on the metal vertical frame 31 on the side where the inner sward 5 is disposed are the same as in the case of the composite sash.

金属サッシの場合、外障子4が配置される側の金属縦枠31には、室内樹脂縦枠33が設けられる。金属サッシでは、室内側の結露を防止するために樹脂材を設けているので、室内外方向に長い樹脂縦枠32ではなく、金属縦枠31の室内側部のみを覆う室内樹脂縦枠33を設けることで、コストを抑えつつ上記機能を果たすことができる。   In the case of a metal sash, an indoor resin vertical frame 33 is provided on the metal vertical frame 31 on the side where the external shoji 4 is disposed. In the metal sash, a resin material is provided to prevent dew condensation on the indoor side. Therefore, the indoor resin vertical frame 33 that covers only the indoor side portion of the metal vertical frame 31 is used instead of the resin vertical frame 32 that is long in the indoor / outdoor direction. By providing, the said function can be fulfilled, suppressing cost.

図6には、外障子4が配置される側の縦枠30の横断面拡大図を示す。この図に示すように、外障子4が配置される側の金属縦枠31に取付けられる室内樹脂縦枠33は、室外側先端部が金属縦枠31の第2係合部31dに係合し、室内側に形成された被係合部33aは、金属縦枠31の係合部31gに係合し、固定される。また、室内樹脂縦枠33は被係合部33aよりも室内側に向かって延出する室内延出部33bを有している。   In FIG. 6, the cross-sectional enlarged view of the vertical frame 30 by the side where the shoji 4 is arrange | positioned is shown. As shown in this figure, the indoor resin vertical frame 33 attached to the metal vertical frame 31 on the side where the external shoji 4 is arranged engages the second engaging portion 31d of the metal vertical frame 31 at the outdoor front end. The engaged portion 33a formed on the indoor side engages with the engaging portion 31g of the metal vertical frame 31 and is fixed. The indoor resin vertical frame 33 has an indoor extending portion 33b extending toward the indoor side from the engaged portion 33a.

このように、外障子4が配置される側の金属縦枠31には、樹脂縦枠32を固定するための第1係合部31cと、室内樹脂縦枠33を固定するための第2係合部31dとが両方形成されており、樹脂縦枠32は第2係合部31dを跨ぐように形成されていることにより、この金属縦枠31は複合サッシと金属サッシの両方に用いることができ、部品を共用化することができるので、コストダウンを図ることができる。   In this way, the first engagement portion 31c for fixing the resin vertical frame 32 and the second engagement for fixing the indoor resin vertical frame 33 are fixed to the metal vertical frame 31 on the side where the external shoji 4 is arranged. Since both the joining portions 31d are formed and the resin vertical frame 32 is formed so as to straddle the second engaging portion 31d, the metal vertical frame 31 can be used for both the composite sash and the metal sash. In addition, since parts can be shared, costs can be reduced.

次に、本発明の第2の実施形態について説明する。図7は第2の実施形態において複合サッシとした場合の、外障子4が配置される側の縦枠30の横断面拡大図である。第2の実施形態では、図7に示した外障子4が配置される側の縦枠30以外のサッシの構成については、第1の実施形態と同様の構成からなっている。   Next, a second embodiment of the present invention will be described. FIG. 7 is an enlarged cross-sectional view of the vertical frame 30 on the side where the external shoji 4 is arranged when a composite sash is used in the second embodiment. In the second embodiment, the configuration of the sash other than the vertical frame 30 on the side where the external shovel 4 shown in FIG. 7 is arranged has the same configuration as that of the first embodiment.

外障子4が配置される側の金属縦枠31には、第1の実施形態と同様、室外側から順に第1係合部31cと第2係合部31d及び第3係合部31eが形成されている。ただし、第1係合部31cの形状が異なり、第2係合部31dと同様の断面略L字状に形成されている。このように、各係合部は樹脂縦枠32または室内樹脂縦枠33が係合できるように形成されていればよく、形状はこれらのものには限られない。   As in the first embodiment, a first engaging portion 31c, a second engaging portion 31d, and a third engaging portion 31e are formed in order from the outdoor side on the metal vertical frame 31 on the side where the external shoji 4 is disposed. Has been. However, the shape of the first engaging portion 31c is different, and the first engaging portion 31c has a substantially L-shaped cross section similar to the second engaging portion 31d. Thus, each engaging part should just be formed so that the resin vertical frame 32 or the indoor resin vertical frame 33 can engage, and a shape is not restricted to these.

金属縦枠31に取付けられる樹脂縦枠32は、室外側端部に金属縦枠31の第1係合部31cに係合する第1被係合部32aを有し、また、そこから室内側に向かって断面略コ字状であって金属縦枠31の第2係合部31dを跨ぐように形成された室外部32bを有している。また、室外部32bの端部には金属縦枠31の第2係合部31dと係合する第2被係合部32cが形成され、そこからさらに室内側に向かって伸び、金属縦枠31と重合状態とされた室内部32dを有している。室内部32dの構成は、第1の実施形態とほぼ同様であるが、室内部32dは室外部32bや室内延出部32fより1段引っ込んだ形状となっているため、カバー体32gを設けてビスを隠すと共に段差を解消する。   The resin vertical frame 32 attached to the metal vertical frame 31 has a first engaged portion 32a that engages with the first engagement portion 31c of the metal vertical frame 31 at the outdoor side end, and from there to the indoor side And has an outdoor part 32b formed so as to straddle the second engaging portion 31d of the metal vertical frame 31. A second engaged portion 32c that engages with the second engaging portion 31d of the metal vertical frame 31 is formed at the end of the outdoor portion 32b. It has the indoor part 32d made into the superposition | polymerization state. The configuration of the indoor portion 32d is substantially the same as that of the first embodiment, but the indoor portion 32d has a shape retracted by one step from the outdoor portion 32b and the indoor extension portion 32f, and therefore a cover body 32g is provided. Hide the screw and eliminate the step.

このように、第2の実施形態では、樹脂縦枠32の室外部32bが金属縦枠31の第2係合部31dを跨ぐだけでなく、それと係合する第2被係合部32cを有している点が第1の実施形態と異なっている。このように、樹脂縦枠32が第2被係合部32cを有していることにより、樹脂縦枠32を金属縦枠31に対してより強固に固定することができる。   Thus, in the second embodiment, the outdoor portion 32b of the resin vertical frame 32 not only straddles the second engagement portion 31d of the metal vertical frame 31, but also has the second engaged portion 32c that engages with the second engagement portion 31d. This is different from the first embodiment. Thus, since the resin vertical frame 32 has the second engaged portion 32 c, the resin vertical frame 32 can be more firmly fixed to the metal vertical frame 31.

また、図8は第2の実施形態において金属サッシとした場合の、外障子4が配置される側の縦枠30の横断面拡大図である。この図に示すように、金属サッシとする場合には、第1の実施形態と同様に外障子4が配置される側の金属縦枠31には、室内樹脂縦枠33が設けられる。この室内樹脂縦枠33は、室外側端部が金属縦枠31の第2係合部31dに係合し、室内側に形成された被係合部33aは、金属縦枠31の係合部31gに係合し、固定される。このように、第2の実施形態の金属縦枠31も、第1の実施形態の金属縦枠31と同様、複合サッシと金属サッシの両方に用いることができ、部品を共用化することができるので、コストダウンを図ることができる。   FIG. 8 is an enlarged cross-sectional view of the vertical frame 30 on the side where the external shoji 4 is arranged when the metal sash is used in the second embodiment. As shown in this figure, when a metal sash is used, an indoor resin vertical frame 33 is provided on the metal vertical frame 31 on the side where the external shoji 4 is arranged as in the first embodiment. The indoor resin vertical frame 33 is engaged with the second engaging portion 31 d of the metal vertical frame 31 at the outdoor side end, and the engaged portion 33 a formed on the indoor side is an engaging portion of the metal vertical frame 31. It is engaged with 31g and fixed. As described above, the metal vertical frame 31 of the second embodiment can be used for both the composite sash and the metal sash, as in the case of the metal vertical frame 31 of the first embodiment, and the parts can be shared. Therefore, cost reduction can be achieved.

以上、本発明の実施形態について説明したが、本発明の適用はこれらの実施形態には限られず、その技術的思想の範囲内において様々に適用されうるものである。   As mentioned above, although embodiment of this invention was described, application of this invention is not restricted to these embodiment, In the range of the technical idea, it can apply variously.

本実施形態における複合サッシの縦断面図である。It is a longitudinal cross-sectional view of the composite sash in this embodiment. 本実施形態における複合サッシの横断面図である。It is a cross-sectional view of the composite sash in this embodiment. 複合サッシの場合の外障子が配置される側の縦枠の横断面拡大図である。It is a cross-sectional enlarged view of the vertical frame by the side in which the external shoji in the case of a composite sash is arrange | positioned. 本実施形態における金属サッシの縦断面図である。It is a longitudinal cross-sectional view of the metal sash in this embodiment. 本実施形態における金属サッシの横断面図である。It is a cross-sectional view of the metal sash in this embodiment. 金属サッシの場合の外障子が配置される側の縦枠の横断面拡大図である。It is a cross-sectional enlarged view of the vertical frame by the side in which the external shoji in the case of a metal sash is arrange | positioned. 第2の実施形態において複合サッシの場合の外障子が配置される側の縦枠の横断面拡大図である。It is a cross-sectional enlarged view of the vertical frame by the side in which the external shoji in the case of a composite sash is arrange | positioned in 2nd Embodiment. 第2の実施形態において金属サッシの場合の外障子が配置される側の縦枠の横断面拡大図である。It is a cross-sectional enlarged view of the vertical frame of the side by which the external shoji in the case of a metal sash is arrange | positioned in 2nd Embodiment.

符号の説明Explanation of symbols

1 枠体
2 框体
3 ガラス体
4 外障子
5 内障子
10 下枠
20 上枠
30 縦枠
31 金属縦枠
31c 第1係合部
31d 第2係合部
31e 第3係合部
31g 係合部
32 樹脂縦枠
32a 第1被係合部
32b 室外部
32c 第2被係合部
32d 室内部
32e 第3被係合部
33 室内樹脂縦枠
DESCRIPTION OF SYMBOLS 1 Frame body 2 Housing | casing body 3 Glass body 4 External shoji 5 Endoscope 10 Lower frame 20 Upper frame 30 Vertical frame 31 Metal vertical frame 31c 1st engaging part 31d 2nd engaging part 31e 3rd engaging part 31g Engaging part 32 resin vertical frame 32a first engaged portion 32b outdoor portion 32c second engaged portion 32d indoor portion 32e third engaged portion 33 indoor resin vertical frame

Claims (3)

上下枠及び左右の縦枠を方形状に枠組みしてなり内部に内外障子を引き違い状に納める複合サッシの枠体において、
上記外障子が配置される側の縦枠は上記外障子の室内面近傍位置に第1係合部を備え、該第1係合部よりも室内側に第2係合部を備えると共に、室内端部に第3係合部を備え、
上記外障子が配置される側の縦枠の室内側面には、
室外側端部に設けられ上記縦枠の第1係合部に係合する第1被係合部と、該第1被係合部から室内側に向かって上記縦枠の第2係合部を跨ぐように形成された室外部と、該室外部より室内側を構成し上記縦枠の第3係合部に係合する第3被係合部を有した室内部とを備えてなる樹脂縦枠と、
室外側端部に設けられ上記縦枠の第2係合部に係合する第2被係合部と、該第2被係合部よりも室内側を構成し上記縦枠の第3係合部に係合する第3被係合部を有した室内部とを備えてなる室内樹脂縦枠と、
のいずれか1つを選択して設けてなることを特徴とする複合サッシの枠体。
In the frame of the composite sash, in which the upper and lower frames and the left and right vertical frames are framed in a square shape, and the inner and outer shoji are housed in a sliding manner,
The vertical frame on the side where the external shoji is arranged is provided with a first engaging portion at a position near the indoor surface of the external shoji, with a second engaging portion on the indoor side of the first engaging portion, A third engagement portion is provided at the end,
On the indoor side of the vertical frame on the side where the above external shoji is placed,
A first engaged portion that is provided at an outdoor side end portion and engages with a first engaging portion of the vertical frame, and a second engaging portion of the vertical frame that extends from the first engaged portion toward the indoor side. A resin comprising: a room exterior formed so as to straddle a wall; and a room interior having a third engaged portion that is configured on the indoor side from the exterior and engages with the third engagement portion of the vertical frame. A vertical frame,
A second engaged portion that is provided at an outdoor side end portion and engages with a second engaging portion of the vertical frame; and a third engagement of the vertical frame that constitutes the indoor side of the second engaged portion. An indoor resin vertical frame comprising an indoor portion having a third engaged portion that engages with the portion;
A frame body of a composite sash, wherein any one of the above is selected and provided.
上記樹脂縦枠の室外部は室内側端部に上記縦枠の第2係合部と係合する第2被係合部を備えてなることを特徴とする請求項1記載の複合サッシの枠体。   2. The composite sash frame according to claim 1, wherein the exterior of the resin vertical frame includes a second engaged portion that engages with a second engagement portion of the vertical frame at an indoor side end. body. 上記内障子が配置される側の縦枠は上記内障子の側面に跨がれる突出部を備え、上記外障子が配置される側の縦枠の第2係合部は上記突出部と見込方向略同位置に形成されてなることを特徴とする請求項1または2記載の複合サッシの枠体。   The vertical frame on the side where the inner shingles are arranged is provided with a projecting portion straddling the side surface of the inner shingles, and the second engaging portion of the vertical frame on the side on which the outer shingles are arranged is the projection direction with respect to the projecting portion 3. The composite sash frame according to claim 1, wherein the frame is formed at substantially the same position.
JP2005003039A 2005-01-07 2005-01-07 Composite sash frame Expired - Fee Related JP4709553B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005003039A JP4709553B2 (en) 2005-01-07 2005-01-07 Composite sash frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005003039A JP4709553B2 (en) 2005-01-07 2005-01-07 Composite sash frame

Publications (2)

Publication Number Publication Date
JP2006188926A true JP2006188926A (en) 2006-07-20
JP4709553B2 JP4709553B2 (en) 2011-06-22

Family

ID=36796364

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005003039A Expired - Fee Related JP4709553B2 (en) 2005-01-07 2005-01-07 Composite sash frame

Country Status (1)

Country Link
JP (1) JP4709553B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016118043A (en) * 2014-12-19 2016-06-30 株式会社Lixil Mounting structure of fitting frame and construction method of fitting frame
JP2020073778A (en) * 2015-12-25 2020-05-14 株式会社Lixil sash

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1061327A (en) * 1996-08-22 1998-03-03 Tateyama Alum Ind Co Ltd Heat insulating sash
JP2000192733A (en) * 2000-01-01 2000-07-11 Shin Nikkei Co Ltd Window frame
JP2001182433A (en) * 1999-12-28 2001-07-06 Ykk Architectural Products Inc Composite sash material
JP2002180748A (en) * 2000-12-11 2002-06-26 Shin Nikkei Co Ltd Window frame for combined sash

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1061327A (en) * 1996-08-22 1998-03-03 Tateyama Alum Ind Co Ltd Heat insulating sash
JP2001182433A (en) * 1999-12-28 2001-07-06 Ykk Architectural Products Inc Composite sash material
JP2000192733A (en) * 2000-01-01 2000-07-11 Shin Nikkei Co Ltd Window frame
JP2002180748A (en) * 2000-12-11 2002-06-26 Shin Nikkei Co Ltd Window frame for combined sash

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016118043A (en) * 2014-12-19 2016-06-30 株式会社Lixil Mounting structure of fitting frame and construction method of fitting frame
JP2020073778A (en) * 2015-12-25 2020-05-14 株式会社Lixil sash

Also Published As

Publication number Publication date
JP4709553B2 (en) 2011-06-22

Similar Documents

Publication Publication Date Title
JP2006188925A (en) Sash frame body
JP2009299440A (en) Sash
JP2006233452A (en) Resin sash
JP2009299437A (en) Sash
JP4709553B2 (en) Composite sash frame
JP4694433B2 (en) Inner window
JP2006188928A (en) Frame body of composite sash
JP4594723B2 (en) Composite sash frame
JP4583203B2 (en) Inward window
JP2011214283A (en) Frame body of composite sash
JP2014020153A (en) Opening device
JP2009299439A (en) Sash
JP4436267B2 (en) Inward window
JP2009133195A (en) Sash
JP2010070942A (en) Sash with flat sill
JP5306716B2 (en) Lower frame flat sash
JP5306704B2 (en) Sash window
JP2009084823A (en) Sash sill and sash
JP2014020151A (en) Opening device
JP2006188927A (en) Sliding screen of composite sash
JP2006233453A (en) Sash with flat sill
JP2009097220A (en) Guide rail of shutter system and the shutter system equipped with it
JP2009299442A (en) Sash
JP4570458B2 (en) Composite sash enclosure
JP4812341B2 (en) window

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070914

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20091221

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100120

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100628

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100819

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110307

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110318

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140325

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees