JP2006134181A - Project management system - Google Patents

Project management system Download PDF

Info

Publication number
JP2006134181A
JP2006134181A JP2004324201A JP2004324201A JP2006134181A JP 2006134181 A JP2006134181 A JP 2006134181A JP 2004324201 A JP2004324201 A JP 2004324201A JP 2004324201 A JP2004324201 A JP 2004324201A JP 2006134181 A JP2006134181 A JP 2006134181A
Authority
JP
Japan
Prior art keywords
project
information
approval
project management
client
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2004324201A
Other languages
Japanese (ja)
Inventor
Yasuki Sakai
康記 坂井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Software Engineering Co Ltd
Original Assignee
Hitachi Software Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Software Engineering Co Ltd filed Critical Hitachi Software Engineering Co Ltd
Priority to JP2004324201A priority Critical patent/JP2006134181A/en
Publication of JP2006134181A publication Critical patent/JP2006134181A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a project management system capable of achieving the promptness of approval work for fruit data and reducing a burden on a project manager or the like and of monitoring in real time an approval state by a customer for the fruit data by a high-level manager or the like. <P>SOLUTION: The project management system is provided with a shared server 100 accessible through a network 140 such as the Internet from respective client terminals 110, 120, 130 for the project manager, the customer, and the high-level manager. The shared server 100 stores the fruit data presented to the customer from the project manager in a given shared folder 101 to provide an access restriction by authentication processing by an authentication means 102. A registration means 103 and an approval information writing means 105 write presentation information or approval identification information on the fruit data stored on the shared folder and register presentation fruit information on a project management information database 107. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

本発明は、ソフトウェア開発プロジェクト(以下、単に「プロジェクト」とする。)の管理システムに関し、特に、プロジェクト管理者が顧客へ提出すべき設計書や契約書、ソースコードなどの成果物について、顧客による承認情報の一元管理を可能とする構成に関する。   The present invention relates to a management system for a software development project (hereinafter, simply referred to as “project”), and in particular, a product, such as a design document, a contract, and a source code, to be submitted to a customer by a project manager. The present invention relates to a configuration that enables unified management of approval information.

一般に、ソフトウエア開発プロジェクトにおいては、開発者による開発作業,プロジェクト管理者による進捗管理とともに、顧客とのやり取りが重要な要素となる。
このようなソフトウエア開発プロジェクトにおける顧客とのやり取りを支援するためのシステムとして、従来、進捗管理情報をWebサーバ上で一元管理するとともに、インターネット等のネットワークを介して、顧客側のクライアント端末からの閲覧を可能とした構成が公知となっている(例えば、特許文献1参照。)。
特開2003−308208号公報
In general, in a software development project, interaction with a customer is an important factor along with development work by a developer and progress management by a project manager.
As a system for supporting exchanges with customers in such software development projects, conventionally, progress management information is centrally managed on a Web server, and from a client terminal on the customer side via a network such as the Internet. The structure which enabled browsing is publicly known (for example, refer to patent documents 1).
JP 2003-308208 A

しかし、前記特許文献1に記載のシステムは、顧客に対し進捗管理情報のみを閲覧可能とするものであり、その他の情報、特に開発作業の成果物データについては閲覧を可能としたものではなかった。
ここで、ソフトウエア開発プロジェクトでは、成果物について顧客の承認が必要となっており、従来は、プロジェクト管理者により成果物データ等を電子媒体又は紙媒体で顧客に提出し、顧客の押印等による承認を受けていた。この場合、前記特許文献1に記載のシステムにおいても、成果物データの閲覧はできないため、従来と同様の方法により成果物データ等を提出して承認を受けることが必要であった。
従って、顧客との間で成果物データをやり取りするための作業に手間を要し、近時のソフトウエア開発プロジェクトにおける納期の短縮化,低コスト化に対応した作業の効率化を図ることができなかった。
この場合、電子メールシステムを利用して成果物データを送受信することにより、承認工程における作業の簡略化を図ることも考えられるが、電子メールシステムにおいて送受信可能なファイルが限られる場合等があり、全ての成果物データについて利用することが可能なものではなかった。
また、電子メールシステムを含む従来の方法により成果物データの承認を行った場合には、プロジェクト管理者以外の者(特に、全プロジェクトを管理する上級管理者等)が、顧客の承認工程に関する進捗状況を直接把握することができなかった。従って、プロジェクト管理者による進捗情報の登録がされなければ、成果物の承認工程に関する提出状況,承認状況等を管理することができないという問題があった。
However, the system described in Patent Literature 1 allows only the progress management information to be browsed by the customer, and does not allow browsing of other information, particularly product data of development work. .
Here, in the software development project, the customer needs to approve the deliverable. Conventionally, the deliverable data etc. is submitted to the customer by electronic or paper media by the project manager, and by the customer's seal etc. It was approved. In this case, since the product data cannot be browsed even in the system described in Patent Document 1, it is necessary to submit the product data and the like by the same method as before.
Therefore, the work for exchanging deliverable data with the customer is time-consuming, and it is possible to shorten the delivery time in the recent software development project and to improve the work efficiency corresponding to the cost reduction. There wasn't.
In this case, it may be possible to simplify the work in the approval process by sending and receiving deliverable data using an e-mail system, but there are cases where the files that can be sent and received in the e-mail system are limited, It was not possible to use all product data.
In addition, when product data is approved by a conventional method including an e-mail system, a person other than the project manager (especially a senior manager who manages all projects) can make progress on the customer's approval process. I could not grasp the situation directly. Accordingly, there is a problem that unless the progress information is registered by the project manager, it is not possible to manage the submission status, approval status, etc. regarding the product approval process.

本発明は前記課題を解決するためのものであり、セキュリティの確保された環境下で成果物データを共有することにより成果物データの承認作業の迅速化及びプロジェクト管理者等の負担軽減を図るとともに、成果物データに対する顧客の承認状況を上級管理者等がリアルタイムに監視することを可能とするプロジェクト管理システムを提供することを目的とする。   The present invention is to solve the above-mentioned problems, and by sharing the product data in a security-ensured environment, the work for approving the product data is accelerated and the burden on the project manager is reduced. An object of the present invention is to provide a project management system that enables senior managers to monitor the approval status of customers for deliverable data in real time.

前記課題を解決するため本発明は、ソフトウエア開発プロジェクトの管理者用クライアント及び顧客用クライアントからネットワークを介してアクセス可能に接続された共有サーバ内に、前記ソフトウエア開発プロジェクトの成果物データを格納する共有フォルダを備えるプロジェクト管理システムであって、前記プロジェクト管理システムは、各プロジェクトに関する管理情報を格納するプロジェクト管理情報格納手段と、前記プロジェクト管理者用クライアント又は前記顧客用クライアントからの認証要求に応じて、前記共有フォルダへのアクセス許可に関し、予め設定された認証情報に基づき認証処理を行う認証処理手段と、前記認証処理により前記共有フォルダへのアクセスが許可された顧客用クライアントによる前記成果物データに対する承認情報の入力を受付け、前記成果物データに承認識別情報を書き込むとともに、前記プロジェクト管理情報格納手段に承認情報を登録する承認情報書込手段とを備えることを特徴とする。
また、前記プロジェクト管理システムは、アクセスの許可されたプロジェクト管理者用クライアントによる前記共有フォルダ内への成果物データの格納を検出して、前記顧客用クライアントに対し、通知メールを送信する通知手段をさらに備えることを特徴とする。
また、前記通知手段は、前記承認情報書込手段により前記プロジェクト管理情報格納手段に承認情報が登録されたときに、前記管理者用クライアント端末に対し、通知メールを送信する手段を有することを特徴とする。
また、前記プロジェクト管理システムは、前記プロジェクト管理情報格納手段に格納された成果物承認情報を集計し、各プロジェクト毎に集計した提出成果物承認進捗情報を生成する集計処理手段をさらに備えることを特徴とする。
In order to solve the above-described problems, the present invention stores product data of the software development project in a shared server that is connected to the software development project manager client and customer client via a network. A project management system comprising: a shared folder for managing a project management information storing means for storing management information relating to each project; and responding to an authentication request from the client for project manager or the client for customer With respect to permission to access the shared folder, authentication processing means for performing authentication processing based on preset authentication information, and the deliverable data by the client for clients permitted to access the shared folder by the authentication processing Accepting an input of authorization information against writes the authorization identification information to the product data, characterized by comprising a authorization information writing means for registering authorization information to the project management information storage means.
In addition, the project management system detects a storage of the deliverable data in the shared folder by the project manager client permitted to access, and sends a notification mail to the customer client. It is further provided with the feature.
Further, the notifying means has means for transmitting a notice mail to the manager client terminal when approval information is registered in the project management information storing means by the approval information writing means. And
The project management system further includes a totalization processing unit that totals the product approval information stored in the project management information storage unit, and generates submission product approval progress information totaled for each project. And

以上の構成により本発明では、認証手段によりアクセス制限のされた共有サーバ上で顧客と成果物データを共有することにより、顧客による成果物の承認作業における負担軽減及び迅速化を図ることが可能となる。
また、顧客用クライアント端末による承認情報の入力を受付け、プロジェクト管理情報格納手段に登録することにより、プロジェクト管理者以外の上級管理者等も、承認工程における進捗状況をリアルタイムに把握することが可能となる。
また、成果物データ上に承認識別情報を書込むこととしたので、成果物データ自体を確認することによっても承認状況を容易に把握することが可能となる。
また、共有サーバ上に成果物データが格納された際に顧客用クライアントに通知するとともに、承認情報の登録をプロジェクト管理者用クライアントに通知する手段を備えることとしたので、承認作業を迅速に行うことが可能となる。
また、成果物データに対する承認情報を集計する手段を備えることとしたので、成果物に関する承認状況を含むソフトウエア開発プロジェクトの進捗情報をリアルタイムに管理することが可能となる。
With the above configuration, according to the present invention, it is possible to reduce and speed up the burden of the product approval work by the customer by sharing the product data with the customer on the shared server whose access is restricted by the authentication unit. Become.
In addition, by accepting the input of approval information from the client terminal for customers and registering it in the project management information storage means, it is possible for senior managers other than the project manager to grasp the progress in the approval process in real time. Become.
In addition, since the approval identification information is written on the product data, the approval status can be easily grasped by checking the product data itself.
In addition, when the deliverable data is stored on the shared server, the client client is notified, and the approval information registration is notified to the project manager client. It becomes possible.
In addition, since the means for counting the approval information for the product data is provided, it is possible to manage the progress information of the software development project including the approval status regarding the product in real time.

以下、本発明の一実施の形態に係るプロジェクト管理システムについて、図面に基づき説明する。
図1は、本発明の一実施の形態に係るプロジェクト管理システムの概略構成を示すブロック図である。
本実施の形態に係るプロジェクト管理システムは、プロジェクト管理者(以下、「PM」とする),顧客及び上級管理者用の各クライアント端末110,120,130からインターネット等のネットワーク140を介してアクセス可能な共有サーバ100を備えている。この場合、各クライアント端末110,120,130は、社内プロキシサーバによりインターネットへの接続が制御されていてもよい。
共有サーバ100は、所定の共有フォルダ101内に、プロジェクト管理者から顧客に提出される成果物データが格納されており、セキュリティの確保されたエクストラネット内に設置されている。ここでセキュリティの確保された環境とは、PM,顧客,上級管理者及び関連プログラムのみによりアクセス可能な環境を示し、例えば、ID,パスワードに基づく認証処理によるアクセス制限の設定を可能としている。この場合のアクセス制限の設定では、例えば、プロジェクト管理者用クライアント端末110は、担当するプロジェクトの成果物データの読取り,書込み,実行が許可され、顧客用クライアント端末120は、承認対象となる成果物データの読取りのみが許可される。
ここで、成果物とは、設計書,手段,契約書,仕様変更書,議事録等を含む。設計書とは、例えばシステムの基本的なアーキテクチャなどを記述した基本設計書、画面仕様、データベースのテーブル構造などを定めた外部仕様書などを指す。仕様変更書とは、PMと顧客との間で取り交わされる文書で、顧客が要求した仕様変更、またはPM側からの提案による仕様変更を相互に確認するためのものである。議事録は、PMと顧客の間で行われた打ち合わせ、会議などの議事録で、打ち合わせ、会議の内容の相互理解に漏れがないかを確認するためのものである。
共有サーバ100は、共有フォルダ101の他、認証手段102,登録手段103,通知手段104,承認情報書込手段105,集計手段106の各処理手段と、情報格納手段としてのプロジェクト管理情報データベース107とを備えている。
認証手段102は、各クライアント端末110,120,130からのアクセス要求に対する認証処理を行う。
登録手段103は、各クライアント端末110,120,130からの登録要求に対し、プロジェクト情報登録画面,提出成果物情報登録画面,承認情報登録画面を表示し、入力された情報をプロジェクト管理情報データベース107に格納する。また、共有フォルダ内に格納された成果物データに提出情報を書込むとともに、プロジェクト管理情報データベース107に登録する。
通知手段104は、共有フォルダ101内への成果物データの格納又は承認情報の登録があったときに、各クライアント端末110,120へ通知メールを送信する。
承認情報書込手段105は、顧客用クライアント端末120による承認情報の登録に応じて、成果物データに承認識別情報を書込むとともに、プロジェクト管理情報データベース107に承認情報を登録する。
集計手段106は、プロジェクト管理情報データベース107内の登録情報を集計して、上級管理者用クライアント端末130にプロジェクト状況一覧画面を表示する。
Hereinafter, a project management system according to an embodiment of the present invention will be described with reference to the drawings.
FIG. 1 is a block diagram showing a schematic configuration of a project management system according to an embodiment of the present invention.
The project management system according to the present embodiment can be accessed via the network 140 such as the Internet from the client terminals 110, 120, and 130 for project managers (hereinafter referred to as “PM”), customers, and senior managers. A shared server 100 is provided. In this case, each client terminal 110, 120, 130 may be controlled to connect to the Internet by an in-house proxy server.
The shared server 100 stores product data submitted from the project manager to the customer in a predetermined shared folder 101, and is installed in an extranet in which security is ensured. Here, the secured environment refers to an environment that can be accessed only by PM, customers, senior managers, and related programs. For example, access restriction can be set by authentication processing based on ID and password. In the access restriction setting in this case, for example, the project manager client terminal 110 is permitted to read, write, and execute the deliverable data of the project in charge, and the customer client terminal 120 accepts the deliverable to be approved. Only reading data is allowed.
Here, the deliverables include design documents, means, contracts, specification changes, minutes, etc. The design document refers to, for example, a basic design document that describes the basic architecture of the system, an external specification document that defines screen specifications, a database table structure, and the like. The specification change document is a document exchanged between the PM and the customer, and is for mutually confirming the specification change requested by the customer or the specification change proposed by the PM side. The minutes are used for confirming whether there is no omission in the mutual understanding of the contents of the meetings and meetings based on the minutes of meetings and meetings held between the PM and the customer.
The shared server 100 includes, in addition to the shared folder 101, each processing means such as an authentication means 102, a registration means 103, a notification means 104, an approval information writing means 105, a counting means 106, a project management information database 107 as an information storage means, It has.
The authentication unit 102 performs authentication processing for access requests from the client terminals 110, 120, and 130.
In response to a registration request from each of the client terminals 110, 120, and 130, the registration unit 103 displays a project information registration screen, a submitted product information registration screen, and an approval information registration screen, and the input information is displayed in the project management information database 107. To store. In addition, the submission information is written in the product data stored in the shared folder and registered in the project management information database 107.
The notification unit 104 transmits a notification mail to each of the client terminals 110 and 120 when product data is stored in the shared folder 101 or approval information is registered.
The approval information writing means 105 writes the approval identification information in the product data and registers the approval information in the project management information database 107 in response to the registration of the approval information by the client terminal for customer 120.
The aggregation means 106 aggregates registration information in the project management information database 107 and displays a project status list screen on the senior manager client terminal 130.

図2は、共有サーバ100内の認証手段102が行うアクセス認証処理手順を示す図である。
共有サーバ100内の認証手段102は、各クライアント端末からのアクセス要求を受付け(ステップ201)、アクセス要求に含まれるID,パスワードについてプロジェクト管理情報データベース106に含まれる認証情報テーブルを参照して認証処理を行う(ステップ202)。この場合、認証情報テーブルには、予めユーザID,パスワードと共に、アクセス権限が登録されており、各クライアント端末から取得したID,パスワードが、認証情報テーブルに登録されているものと一致する場合には、認証OKとして予め登録されたアクセス権限に基づき共有フォルダへのアクセスを許可する。一方、ユーザID,パスワードが認証情報テーブルに登録されていない場合には、アクセス不可画面を各クライアント端末に表示させる。
以上の処理により、認証OKとされたクライアント端末110,120,130からの要求に応じて、共有サーバ100は、共有フォルダへのアクセス,プロジェクト管理情報データベースへの情報登録等を行う(ステップ203)。
FIG. 2 is a diagram illustrating an access authentication processing procedure performed by the authentication unit 102 in the shared server 100.
The authentication unit 102 in the shared server 100 receives an access request from each client terminal (step 201), and refers to an authentication information table included in the project management information database 106 for an ID and a password included in the access request. (Step 202). In this case, in the authentication information table, the access authority is registered in advance together with the user ID and password, and when the ID and password acquired from each client terminal match those registered in the authentication information table. The access to the shared folder is permitted based on the access authority registered in advance as authentication OK. On the other hand, if the user ID and password are not registered in the authentication information table, an inaccessible screen is displayed on each client terminal.
Through the above processing, the shared server 100 performs access to the shared folder, registration of information in the project management information database, and the like in response to a request from the client terminals 110, 120, and 130 that have been authenticated (step 203). .

以下、本実施の形態に係るプロジェクト管理システムの行う処理の具体例を説明する。
まず、予め共有サーバ100の共有フォルダ101内に格納する成果物データに関するプロジェクト情報及び提出成果物情報の登録処理を行う。
プロジェクト情報登録画面では、管理対象となるプロジェクトについて、プロジェクトの名称,プロジェクト管理者名,顧客名,プロジェクト開始日,終了日等のプロフィール情報や、プロジェクトで発生したバグ数,解決したバグ数等の品質情報、目標原価,実績原価等の原価情報、プロジェクトの体制,プロジェクトで作成する成果物の規模,現時点での懸案事項、各工程の進捗状況(進捗率、遅れ日数等)等の入力を受付ける。プロジェクト情報の登録は、プロジェクト管理者により、プロフィールについては変更のある都度、それ以外の情報は週次など定期的に登録する。
提出成果物情報登録画面では、顧客に提出する成果物の名称,成果物の提出予定日,成果物の顧客による承認予定日,成果物量(設計書なら枚数、手段なら行数など)等の入力を受付ける。
なお、各登録画面では、処理者として、認証処理時に認証手段102がユーザIDに基づき取得したユーザ名を表示する。
Hereinafter, a specific example of processing performed by the project management system according to the present embodiment will be described.
First, registration processing of project information and submitted product information related to product data stored in the shared folder 101 of the shared server 100 in advance is performed.
On the project information registration screen, the project name, project manager name, customer name, project start date, end date, and other profile information, the number of bugs that occurred in the project, the number of bugs resolved, etc. Accepts input such as quality information, cost information such as target cost, actual cost, project system, scale of deliverables created in the project, current issues, progress of each process (progress rate, number of days delayed, etc.) . Project information is registered by the project manager whenever the profile changes, and other information is registered periodically, such as weekly.
On the submitted deliverable information registration screen, input the name of the deliverable to be submitted to the customer, the expected submission date of the deliverable, the expected approval date of the deliverable by the customer, the number of deliverables (number of designs, number of rows for means, etc.) Accept.
In each registration screen, the user name acquired by the authentication unit 102 based on the user ID during the authentication process is displayed as a processor.

図3は、プロジェクト情報登録画面の一つとして、プロフィール情報の登録画面を示す図である。
プロフィール情報登録画面300は、各プロジェクトを一意に識別するためのプロジェクト番号301と、プロジェクト名302と、顧客名303と、プロジェクト情報の登録日304と、プロジェクトの開始日305及び終了日306と、製品分野307と、検査区分308と、事業区分309と、作業場所310と、プロジェクト概要311と、対象業務分野312と、担当範囲313と、開発言語314と、規模(Ks)315と、取纏設計部署316と、プロジェクト管理者名317と、担当SE部署318と、担当設計部署319との各入力項目を有する。
プロジェクト番号301は、新規プロジェクト情報の登録の際に登録手段102が付与する。検査区分308は、プロジェクトに対してどのような検査を行うかを示す。事業区分309は、プロジェクトが対象とする事業の区分で、業務ソフト開発、基本ソフト開発などがある。作業場所310は、社内又は顧客先のいずれかが入力される。対象業務分野312は、プロジェクトで作成するシステムの属する業務形態で、C/S(クライアント・サーバ)、Webアプリケーションなどが該当する。担当範囲313は、プロジェクトがシステム構築全体のうちどの範囲を担当するかを示す。規模315は、プロジェクトで作成するシステムの手段の規模を示し、手段を作成しない工程の段階では予定値が入力される。手段を作成する工程では実績値が入力される。
FIG. 3 is a diagram showing a profile information registration screen as one of the project information registration screens.
The profile information registration screen 300 includes a project number 301 for uniquely identifying each project, a project name 302, a customer name 303, a project information registration date 304, a project start date 305, and an end date 306. Product field 307, inspection category 308, business category 309, work place 310, project summary 311, target business field 312, scope of responsibility 313, development language 314, scale (Ks) 315, summary Each input item includes a design department 316, a project manager name 317, a responsible SE department 318, and a responsible design department 319.
The registration number 102 is given to the project number 301 when registering new project information. The inspection section 308 indicates what inspection is performed on the project. The business category 309 is a business category targeted by the project and includes business software development and basic software development. As the work place 310, either in-house or a customer is input. The target business field 312 is a business form to which a system created by a project belongs, and corresponds to C / S (client / server), Web application, and the like. The assigned range 313 indicates which range the project is responsible for in the entire system construction. The scale 315 indicates the scale of the means of the system created in the project, and a planned value is input at the stage of the process where no means is created. In the step of creating the means, the actual value is input.

図4は、プロジェクト情報登録画面の一つとして、プロジェクト品質情報登録画面を示す図である。
プロジェクト品質情報登録画面400は、プロジェクトの品質,原価,体制,規模,懸案事項に関する情報を登録するものであり、プロジェクト番号401と、報告日402と、品質管理情報410,原価管理情報420,体制管理情報430,規模管理情報440,懸案事項管理情報450の各入力項目を有する。
品質,原価,懸案事項の各情報は週毎等、定期的に収集して、報告日の情報に基づき時系列で管理する。なお、体制、規模は、データに変化があったときのみ通常は管理すればよいが、本発明では便宜上、品質、原価、懸案と同様に管理する。
品質管理情報410としては、バグの摘出件数411と、摘出したバグの内、未解決件数412の各入力項目を有する。
原価管理情報420としては、目標原価421と、見積原価422と、現時点での実績原価423及び残り期間から想定した推測原価424の各入力項目を有する。
体制管理情報430としては、本社社員人数431及び外注先社員人数432の各入力項目を有する。
規模管理情報440としては、手段作成量の内、新規開発分441と、改造分442の各入力項目を有する。
懸案事項管理情報450は、懸案事項の総件数451及び未解決の件数452の各入力項目を有する。
FIG. 4 is a diagram showing a project quality information registration screen as one of the project information registration screens.
The project quality information registration screen 400 is for registering information relating to the quality, cost, system, scale, and pending matters of the project. The project number 401, report date 402, quality management information 410, cost management information 420, system Each input item includes management information 430, scale management information 440, and pending matter management information 450.
Information on quality, cost, and concerns is collected regularly, such as weekly, and is managed in time series based on information on the reporting date. It should be noted that the system and the scale are normally managed only when there is a change in the data, but in the present invention, for the sake of convenience, the system and the scale are managed in the same manner as the quality, cost, and concerns.
The quality management information 410 includes input items for the number of bugs to be extracted 411 and the number of unresolved cases 412 among the extracted bugs.
The cost management information 420 includes input items of a target cost 421, an estimated cost 422, an actual cost 423 at the present time, and an estimated cost 424 assumed from the remaining period.
The system management information 430 includes input items for the head office employee number 431 and the subcontractor employee number 432.
The scale management information 440 includes input items for a newly developed portion 441 and a modified portion 442 in the means creation amount.
The pending matter management information 450 includes input items for the total number of pending matters 451 and the number of outstanding issues 452.

図5は、プロジェクト情報登録画面の一つとして、進捗管理情報登録画面を示す図である。
工程進捗は品質などと同様、週毎など定期的に管理すべきものであり、本例に示す進捗管理情報登録画面500では、ソフトウエア開発プロジェクトに複数ある工程毎に時系列で入力項目を設定している。
進捗管理情報登録画面500は、プロジェクト番号で識別されるプロジェクト毎に表示され、報告日として情報登録日501が示される。
進捗管理情報登録画面500では、各工程毎に、工程名510と,当該工程の開始予定日511,開始実績日512,終了予定日513,終了実績日514,成果物量予定値515,成果物量実績値516,進捗率517,遅れ日数518の各入力項目を有している。
FIG. 5 is a diagram showing a progress management information registration screen as one of the project information registration screens.
As with quality, process progress should be managed on a regular basis, such as weekly. In the progress management information registration screen 500 shown in this example, input items are set in time series for each of the multiple processes in the software development project. ing.
The progress management information registration screen 500 is displayed for each project identified by the project number, and an information registration date 501 is shown as a report date.
On the progress management information registration screen 500, for each process, the process name 510, the scheduled start date 511, the scheduled start date 512, the scheduled finish date 513, the scheduled finish date 514, the planned deliverable amount value 515, the actual deliverable amount record. Each input item includes a value 516, a progress rate 517, and a delay days 518.

図6は、共有サーバ100の登録手段103が表示する提出成果物情報登録画面の一例を示す図である。
提出成果物情報登録画面600は、プロジェクト番号で識別されるプロジェクト毎に表示される。
提出成果物情報入力項目としては、成果物ファイルの格納予定位置601と、提出者602と、提出予定日603と、顧客承認予定日604と、成果物量予定値605との各データ項目を有する。格納予定位置601は、共有フォルダ101内の場所をフルパスで示す。提出者は、共有サーバ100の共有フォルダ101内に成果物を格納した者を示す。提出予定日603は、共有サーバ100の共有フォルダ101内に格納する予定日を示す。顧客承認予定日604は、顧客に成果物を承認してもらう予定日として、顧客とプロジェクト管理者との間で予め取り決められるものである。成果物予定値605は成果物をどのくらいの量作成する予定かを示すものであり、単位は、例えば設計書なら枚数である。
FIG. 6 is a diagram illustrating an example of a submission product information registration screen displayed by the registration unit 103 of the shared server 100.
The submitted product information registration screen 600 is displayed for each project identified by the project number.
The submitted product information input items include data items of a planned storage location 601 of the product file, a submitter 602, a scheduled submission date 603, a scheduled customer approval date 604, and a planned deliverable amount value 605. The planned storage location 601 indicates a location in the shared folder 101 with a full path. The submitter indicates a person who has stored the deliverable in the shared folder 101 of the shared server 100. The scheduled submission date 603 indicates a scheduled date to be stored in the shared folder 101 of the shared server 100. The customer approval scheduled date 604 is determined in advance between the customer and the project manager as a scheduled date for the customer to approve the deliverable. The planned deliverable value 605 indicates how much the deliverable is to be created, and the unit is, for example, the number of sheets in the case of a design document.

以上の各登録画面において、入力された情報に基づき、登録手段103は、プロジェクト管理情報データベース107に各プロジェクト情報を登録する。
また、プロジェクト管理者用端末110を介して共有フォルダ101内の所定の保存先に成果物が格納されると、登録手段103は、格納された成果物に提出日,提出者名を記述するとともに、プロジェクト管理情報データベース107に提出成果物情報として実績提出日,実績成果物量を登録する。
通知手段104は、プロジェクト管理情報データベース107に提出成果物情報が登録されると、予め設定された顧客用クライアント端末120のアドレスに、成果物名,プロジェクト名等を示した電子メールを送信する。
In each of the above registration screens, the registration unit 103 registers each piece of project information in the project management information database 107 based on the input information.
When the deliverable is stored in a predetermined storage location in the shared folder 101 via the project manager terminal 110, the registration unit 103 describes the submission date and the submitter name in the stored deliverable. The result submission date and the result deliverable amount are registered as the deliverable product information in the project management information database 107.
When the submitted product information is registered in the project management information database 107, the notification unit 104 transmits an e-mail indicating the product name, the project name, and the like to the address of the client terminal 120 for customer set in advance.

電子メールを受信した顧客用クライアント端末120では、顧客の操作に応じて、共有サーバ100にアクセスし、認証処理を行った後、承認情報登録画面を表示し、選択された成果物ファイルを表示する。
図7は、顧客用クライアント端末120に表示する承認情報登録画面の一例を示す図である。
承認情報登録画面700は、成果物ファイル名(フルパス)701,提出者702,提出日703,予定成果物量704,実績成果物量705の各表示部と、承認欄706,コメント欄707,承認者欄708,承認日欄709の各入力項目とを有する。
顧客により成果物ファイルが確認され、承認欄706,コメント欄707,承認者欄708,承認日欄709に入力がされ、登録ボタン710が押下されると、承認情報書込手段105が成果物データに承認識別情報としての承認日及び承認者を記述するとともにプロジェクト管理情報データベース107に承認情報を登録する。
通知手段104は、プロジェクト管理情報データベース107に承認情報が登録されると、予め設定されたプロジェクト管理者用クライアント端末110のアドレスに、プロジェクト番号,成果物ファイル名等を表示した承認登録の通知メールを送信する。
Upon receiving the e-mail, the client terminal for customer 120 accesses the shared server 100 according to the operation of the customer, performs the authentication process, displays the approval information registration screen, and displays the selected deliverable file. .
FIG. 7 is a diagram illustrating an example of an approval information registration screen displayed on the client terminal for customer 120.
The approval information registration screen 700 includes a display of a product file name (full path) 701, a submitter 702, a submission date 703, a planned product amount 704, and a result product amount 705, an approval column 706, a comment column 707, and an approver column. 708, and each input item of the approval date column 709.
When the product file is confirmed by the customer, input is made in the approval field 706, the comment field 707, the approver field 708, and the approval date field 709, and the registration button 710 is pressed, the approval information writing unit 105 outputs the product data. Describes the approval date and the approver as approval identification information, and registers the approval information in the project management information database 107.
When the approval information is registered in the project management information database 107, the notification means 104 displays an approval registration notification mail displaying the project number, product file name, etc. at the address of the client terminal 110 for the project manager set in advance. Send.

図8は、承認情報書込手段105による承認情報記述処理手順を示すフローチャートである。
承認情報書込手段105は、承認情報登録画面700において登録ボタン710が押下されると(ステップ801)、入力された承認情報を取得し(ステップ802)、成果物ファイル名(フルパス)に基づきファイルの種類を判定する(ステップ803)。
ファイルの種類が設計書,契約書,仕様変更書,議事録等の文書データの場合には、共有フォルダ101内の成果物データの所定の記述部に承認識別情報(承認日,承認者)を記述する(ステップ804)。
一方、ファイルの種類がプログラム(モジュール)の場合には、共有フォルダ101内の成果物データのソースのヘッダ部に承認識別情報(承認日,承認者)の情報を記述する(ステップ805)。
FIG. 8 is a flowchart showing an approval information description processing procedure by the approval information writing means 105.
When the registration button 710 is pressed on the approval information registration screen 700 (step 801), the approval information writing unit 105 acquires the input approval information (step 802) and creates a file based on the product file name (full path). Is determined (step 803).
When the file type is document data such as a design document, contract, specification change document, minutes, etc., approval identification information (approval date, approver) is added to a predetermined description part of the deliverable data in the shared folder 101. Describe (step 804).
On the other hand, when the file type is a program (module), information of approval identification information (approval date, approver) is described in the header part of the product data source in the shared folder 101 (step 805).

以下、各成果物データに対する承認識別情報の記述の具体例を図9〜13を用いて説明する。
図9は成果物の一つとしての設計書の一例を、図10は契約書の一例を、図11は仕様変更書の一例を、図12は議事録の一例を示す図である。また、図13はモジュールのソースコードの一例を示す図である。
図9〜図12に示すように、設計書,契約書,仕様変更書,議事録等の文書データの場合には、本文部901,1001,1101,1201の他に、提出日記述部911,1011,1111,1211、提出者名記述部912,1012,1112,1212、承認日記述部913,1013,1113,1213、承認者名記述部914,1014,1114,1214を有する。
提出日記述部911,1011,1111,1211及び提出者名記述部912,1012,1112,1212は、プロジェクト管理者により成果物が共有フォルダ101内に格納されたときに、登録手段103が記述する。
承認日記述部913,1013,1113,1213及び承認者名記述部914,1014,1114,1214には、顧客により承認情報が登録されたときに、承認情報書込手段104が記述する。
一方、図13に示すように、モジュールは、ヘッダ部1310と本文部1320とを有し、ヘッダ部1310には、モジュール名とともに、提出日記述部1311,提出者名記述部1312,承認日記述部1313,承認者名記述部1314を有する。
各記述部1311〜1314には、前述と同様に登録手段103又は承認情報書込手段105が所定の情報を記述する。
Hereinafter, specific examples of description of approval identification information for each product data will be described with reference to FIGS.
9 shows an example of a design document as one of the deliverables, FIG. 10 shows an example of a contract, FIG. 11 shows an example of a specification change document, and FIG. 12 shows an example of a minutes. FIG. 13 shows an example of the module source code.
As shown in FIGS. 9 to 12, in the case of document data such as a design document, a contract document, a specification change document, and minutes, in addition to a text part 901, 1001, 1101, 1201, a submission date description part 911, 1011, 1111, 1211, submitter name description units 912, 1012, 1112, 1212, approval date description units 913, 1013, 1113, 1213, and approver name description units 914, 1014, 1114, 1214.
The submission date description units 911, 1011, 1111, and 1211 and the submitter name description units 912, 1012, 1112, and 1212 are described by the registration means 103 when the deliverable is stored in the shared folder 101 by the project manager. .
When the approval information is registered by the customer, the approval information writing unit 104 describes the approval date description part 913, 1013, 1113, 1213 and the approver name description part 914, 1014, 1114, 1214.
On the other hand, as shown in FIG. 13, the module has a header part 1310 and a body part 1320. The header part 1310 includes a module name, a submission date description part 1311 and a submitter name description part 1312 and an approval date description. A section 1313 and an approver name description section 1314.
In each of the description units 1311 to 1314, the registration unit 103 or the approval information writing unit 105 describes predetermined information as described above.

図14は、プロジェクト管理情報データベース107を構成する提出成果物情報テーブルのデータ構造の一例を示す図である。
提出成果物情報テーブル1400は、提出成果物情報登録画面600及び承認情報登録画面700に登録された情報を格納するものであり、プロジェクト番号1401,成果物名1402,提出者1403,予定提出日1404,実績提出日1405,予定成果物量1406,実績成果物量1407,承認1408,コメント1409,承認者1410,承認情報の登録日1411,予定承認日1412,実績承認日1413の各データ項目を有する。
提出成果物情報テーブル1400では、承認1408及びコメント1409の内容について登録日1411毎に時系列で管理することとし、同一ファイル名の成果物データに対する承認の有無及びコメントの内容を全て記録する。
FIG. 14 is a diagram showing an example of the data structure of the submitted product information table constituting the project management information database 107.
The submission product information table 1400 stores information registered in the submission product information registration screen 600 and the approval information registration screen 700. The project number 1401, the product name 1402, the submitter 1403, and the scheduled submission date 1404 are stored. , Actual submission date 1405, scheduled product amount 1406, actual product amount 1407, approval 1408, comment 1409, approver 1410, approval information registration date 1411, scheduled approval date 1412, and actual approval date 1413.
In the submitted product information table 1400, the contents of the approval 1408 and the comment 1409 are managed in chronological order for each registration date 1411, and the presence or absence of approval for the product data with the same file name and the content of the comment are all recorded.

共有サーバ100の集計手段106は、上級管理者用クライアント端末130からの要求に応じて、プロジェクト管理情報データベース107内の各登録情報の集計結果に基づき、プロジェクト状況一覧画面を表示する。
図15は、集計手段106の行う処理として、予め定期的な集計設定がされている場合の処理手順を示すフローチャートである。
集計手段106は、設定時刻に起動し(ステップ1501)、プロジェクト管理情報データベース107を読込み、プロジェクト番号に基づき、プロジェクト情報及び提出成果物情報を収集して集計し(ステップ1502)、集計結果を一覧形式にまとめて、上級管理者用クライアント端末130からの要求に応じてWeb画面にプロジェクト状況一覧表示画面を表示する(ステップ1503)。
The tabulation means 106 of the shared server 100 displays a project status list screen based on the tabulation result of each registered information in the project management information database 107 in response to a request from the senior manager client terminal 130.
FIG. 15 is a flowchart showing a processing procedure in a case where periodic aggregation is set in advance as processing performed by the aggregation means 106.
The totaling means 106 starts at the set time (step 1501), reads the project management information database 107, collects project information and submitted product information based on the project number, totals (step 1502), and lists the total results. In summary, the project status list display screen is displayed on the Web screen in response to a request from the senior manager client terminal 130 (step 1503).

図16は、プロジェクト状況一覧表示画面の一つとして、登録されたプロフィール情報及び品質情報を表示する画面を示す図である。
図16に示すプロジェクト状況一覧表示画面では、図3,図4に示すプロフィール情報登録画面及び品質情報登録画面の入力項目に対応して、プロジェクト番号,プロジェクト名,顧客名等の各情報が表示される。
図17は、プロジェクト状況一覧表示画面の一つとして工程進捗情報及び提出成果物承認情報を表示する画面を示す図である。
図17に示すプロジェクト状況一覧表示画面は、図5に示す工程進捗情報登録画面の入力項目に対応する工程進捗情報表示部と、提出成果物の進捗情報の集計結果を示す提出成果物進捗情報表示部1710とを有する。
提出成果物進捗情報表示部1710において、プロジェクト番号1711が指定されると、共有サーバ100の集計部106は、図14に示す提出成果物情報テーブル1400に登録された情報の一覧を表示する。
FIG. 16 is a diagram showing a screen for displaying registered profile information and quality information as one of the project status list display screens.
In the project status list display screen shown in FIG. 16, information such as the project number, project name, and customer name is displayed corresponding to the input items on the profile information registration screen and the quality information registration screen shown in FIGS. The
FIG. 17 is a diagram showing a screen for displaying process progress information and submitted product approval information as one of the project status list display screens.
The project status list display screen shown in FIG. 17 includes a process progress information display section corresponding to the input items on the process progress information registration screen shown in FIG. Part 1710.
When the project number 1711 is specified in the submitted product progress information display unit 1710, the totaling unit 106 of the shared server 100 displays a list of information registered in the submitted product information table 1400 shown in FIG.

以上のように、本実施の形態に係るプロジェクト管理システムでは、認証手段によりアクセス制限のされた共有サーバ上で顧客と成果物データを共有することにより、顧客による成果物の承認作業における負担軽減及び迅速化を図ることが可能となる。
また、顧客用クライアント端末による承認情報の入力を受付け、プロジェクト管理情報格納手段に登録することにより、プロジェクト管理者以外の上級管理者等も、承認工程における進捗状況をリアルタイムに把握することが可能となる。
また、成果物データ上に承認識別情報を書込むこととしたので、成果物データ自体を確認することによっても承認状況を容易に把握することが可能となる。
また、共有サーバ上に成果物データが格納された際に顧客用クライアントに通知するとともに、承認情報の登録をプロジェクト管理者用クライアントに通知する手段を備えることとしたので、承認作業を迅速に行うことが可能となるとともに、承認進捗状況をリアルタイムに管理することが可能となる。
また、成果物データに対する承認情報を集計する手段を備えることとしたので、成果物に関する承認状況を含むソフトウエア開発プロジェクトの進捗情報をリアルタイムに管理することが可能となる。
また、顧客によるコメントを含む承認情報を時系列で管理することとしたので、承認有無及びコメントの内容を確認することにより、具体的な承認進捗状況を把握することが可能となる。
As described above, in the project management system according to the present embodiment, by sharing the deliverable data with the customer on the shared server whose access is restricted by the authentication unit, the burden on the work of approving the deliverable by the customer can be reduced. It is possible to speed up.
In addition, by accepting the input of approval information from the client terminal for customers and registering it in the project management information storage means, it is possible for senior managers other than the project manager to grasp the progress in the approval process in real time. Become.
In addition, since the approval identification information is written on the product data, the approval status can be easily grasped by checking the product data itself.
In addition, when the deliverable data is stored on the shared server, the client client is notified, and the approval information registration is notified to the project manager client. It becomes possible to manage the approval progress in real time.
In addition, since the means for counting the approval information for the product data is provided, it is possible to manage the progress information of the software development project including the approval status regarding the product in real time.
Since approval information including customer comments is managed in chronological order, it is possible to grasp the specific approval progress status by checking the approval status and the content of the comments.

なお、本発明は前記実施の形態に示すものに限らず、同様の処理を可能とするものであれば、サーバ装置の構成及び各データベース,テーブル構成等を変更してもよい。従って、各処理手段等を成果物データを格納する共有サーバとは別のサーバ装置に設けることとしてもよい。
また、アクセス制限に関する認証処理については、ID,パスワードの組合せによるものとしているが、他の情報により認証処理を行うこととしてもよい。
また、共有フォルダへの成果物データの格納は、プロジェクト管理者が行うこととしているが、これに限らず、予め指定された成果物データの格納先から成果物データをコピーして格納する手段を備えることとしてもよい。
Note that the present invention is not limited to the above-described embodiment, and the configuration of the server device, each database, and the table configuration may be changed as long as similar processing is possible. Therefore, each processing means and the like may be provided in a server device different from the shared server that stores the product data.
Further, although the authentication process related to access restriction is based on a combination of ID and password, the authentication process may be performed using other information.
In addition, the project manager stores the product data in the shared folder. However, the present invention is not limited to this, and means for copying and storing the product data from the storage destination of the product data designated in advance is stored. It is good also as providing.

本発明の一実施の形態に係るプロジェクト管理システムの概略構成を示すブロック図である。It is a block diagram which shows schematic structure of the project management system which concerns on one embodiment of this invention. 認証手段によるアクセス許可判定処理の概要を示すフローチャートである。It is a flowchart which shows the outline | summary of the access permission determination process by an authentication means. プロジェクト情報登録画面の一例を示す図である。It is a figure which shows an example of a project information registration screen. プロジェクト情報登録画面の一例を示す図である。It is a figure which shows an example of a project information registration screen. プロジェクト情報登録画面の一例を示す図である。It is a figure which shows an example of a project information registration screen. 提出成果物情報登録画面の一例を示す図である。It is a figure which shows an example of a submission product information registration screen. 承認情報登録画面の一例を示す図である。It is a figure which shows an example of an approval information registration screen. 承認情報書込手段による承認情報書込処理手順を示すフローチャートである。It is a flowchart which shows the approval information writing process procedure by the approval information writing means. 承認識別情報の書き込まれた成果物データの一例を示す図である。It is a figure which shows an example of the deliverable data in which approval identification information was written. 承認識別情報の書き込まれた成果物データの一例を示す図である。It is a figure which shows an example of the deliverable data in which approval identification information was written. 承認識別情報の書き込まれた成果物データの一例を示す図である。It is a figure which shows an example of the deliverable data in which approval identification information was written. 承認識別情報の書き込まれた成果物データの一例を示す図である。It is a figure which shows an example of the deliverable data in which approval identification information was written. 承認識別情報の書き込まれた成果物データの一例を示す図である。It is a figure which shows an example of the deliverable data in which approval identification information was written. 提出成果物情報テーブルのデータ構造の一例を示す図である。It is a figure which shows an example of the data structure of a submission product information table. 集計手段によるプロジェクト情報集計処理手順を示すフローチャートである。It is a flowchart which shows the project information totaling process procedure by a totaling means. プロジェクト状況一覧画面の一例を示す図である。It is a figure which shows an example of a project status list screen. プロジェクト状況一覧画面の一例を示す図である。It is a figure which shows an example of a project status list screen.

符号の説明Explanation of symbols

100 共有サーバ、101 共有フォルダ、102 認証手段、103 登録手段、104 通知手段、105 承認情報書込手段、106 集計手段、107 プロジェクト管理情報データベース、110 プロジェクト管理者用クライアント端末、120 顧客用クライアント端末、130 上級管理者用クライアント端末。
DESCRIPTION OF SYMBOLS 100 Shared server, 101 Shared folder, 102 Authentication means, 103 Registration means, 104 Notification means, 105 Approval information writing means, 106 Aggregation means, 107 Project management information database, 110 Client terminal for project manager, 120 Client terminal for customer , 130 Client terminal for senior managers.

Claims (4)

ソフトウエア開発プロジェクトの管理者用クライアント及び顧客用クライアントからネットワークを介してアクセス可能に接続された共有サーバ内に、前記ソフトウエア開発プロジェクトの成果物データを格納する共有フォルダを備えるプロジェクト管理システムであって、
前記プロジェクト管理システムは、
各プロジェクトに関する管理情報を格納するプロジェクト管理情報格納手段と、
前記プロジェクト管理者用クライアント又は前記顧客用クライアントからの認証要求に応じて、前記共有フォルダへのアクセス許可に関し、予め設定された認証情報に基づき認証処理を行う認証処理手段と、
前記認証処理により前記共有フォルダへのアクセスが許可された顧客用クライアントによる前記成果物データに対する承認情報の入力を受付け、前記成果物データに承認識別情報を書き込むとともに、前記プロジェクト管理情報格納手段に承認情報を登録する承認情報書込手段と
を備えることを特徴とするプロジェクト管理システム。
A project management system comprising a shared folder for storing deliverable data of the software development project in a shared server that is connected via a network from a client for a software development project administrator and a client for a customer. And
The project management system includes:
Project management information storage means for storing management information related to each project;
In response to an authentication request from the client for the project manager or the client for the client, an authentication processing means for performing an authentication process based on authentication information set in advance with respect to permission to access the shared folder;
Accepting input of approval information for the deliverable data by the client for clients permitted to access the shared folder by the authentication processing, writing approval identification information in the deliverable data, and approving to the project management information storage means A project management system comprising: an approval information writing means for registering information.
前記プロジェクト管理システムは、アクセスの許可されたプロジェクト管理者用クライアントによる前記共有フォルダ内への成果物データの格納を検出して、前記顧客用クライアントに対し、通知メールを送信する通知手段をさらに備えることを特徴とする請求項1に記載のプロジェクト管理システム。   The project management system further comprises notification means for detecting storage of deliverable data in the shared folder by a project manager client permitted to access and transmitting a notification mail to the client client. The project management system according to claim 1. 前記通知手段は、前記承認情報書込手段により前記プロジェクト管理情報格納手段に承認情報が登録されたときに、前記管理者用クライアント端末に対し、通知メールを送信する手段を有することを特徴とする請求項2に記載のプロジェクト管理システム。   The notification means includes means for transmitting a notification mail to the manager client terminal when approval information is registered in the project management information storage means by the approval information writing means. The project management system according to claim 2. 前記プロジェクト管理システムは、前記プロジェクト管理情報格納手段に格納された成果物承認情報を集計し、各プロジェクト毎に集計した提出成果物承認進捗情報を生成する集計処理手段をさらに備えることを特徴とする請求項1〜3のいずれかに記載のプロジェクト管理システム。

The project management system further includes a totalization processing unit that totals the product approval information stored in the project management information storage unit, and generates submitted product approval progress information totaled for each project. The project management system according to claim 1.

JP2004324201A 2004-11-08 2004-11-08 Project management system Pending JP2006134181A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004324201A JP2006134181A (en) 2004-11-08 2004-11-08 Project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004324201A JP2006134181A (en) 2004-11-08 2004-11-08 Project management system

Publications (1)

Publication Number Publication Date
JP2006134181A true JP2006134181A (en) 2006-05-25

Family

ID=36727661

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004324201A Pending JP2006134181A (en) 2004-11-08 2004-11-08 Project management system

Country Status (1)

Country Link
JP (1) JP2006134181A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017091010A (en) * 2015-11-04 2017-05-25 株式会社リコー Information processing apparatus, information processing system, method, and program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017091010A (en) * 2015-11-04 2017-05-25 株式会社リコー Information processing apparatus, information processing system, method, and program

Similar Documents

Publication Publication Date Title
US8935524B1 (en) Systems and methods for managing certificates
JP2006146892A (en) Realizing legally binding business contract through service management model
JP2020509483A (en) Systems and interfaces for managing temporary workers
GB2450220A (en) Managing electronic receipts
JP2009032171A (en) Extended guarantee system and method for controlling the same
JP5683939B2 (en) Document management device
US8788313B2 (en) Decentralised audit system in collaborative workflow environment
US20090177517A1 (en) System and method for tracking a contract
JP2021068294A (en) Management support device, management support system, and program
JP2010123014A (en) Server unauthorized-operation monitoring system
JP2017016636A (en) Information processing system, information processing device, information processing method, and program
US20190188762A1 (en) Information processing apparatus and information processing method
JP2006059164A (en) License management terminal, license management system, license management program, and license management method
US9514426B2 (en) System and method for providing enterprise information technology lifecycle tools synchronization platform
JP4328557B2 (en) Information processing apparatus and program
JP2006134181A (en) Project management system
US20210133833A1 (en) Information processing device, information processing method, and program
JP2013080297A (en) Integrated management system, integrated management method, and integrated management program
JP2005128796A (en) Project quality management system, method, and program, and service method
JP4119463B2 (en) Paid service consideration settlement system
JP6078270B2 (en) Program and information processing system
JP6442139B2 (en) Work support device, work support method, and work support program
JP7133496B2 (en) Influence range identification device and influence range identification method
JP6301622B2 (en) Information processing system and information processing method