JP2005341687A - Method for sharing upper branch line, common metal fitting of upper branch line and tension adjuster of upper branch line - Google Patents
Method for sharing upper branch line, common metal fitting of upper branch line and tension adjuster of upper branch line Download PDFInfo
- Publication number
- JP2005341687A JP2005341687A JP2004155756A JP2004155756A JP2005341687A JP 2005341687 A JP2005341687 A JP 2005341687A JP 2004155756 A JP2004155756 A JP 2004155756A JP 2004155756 A JP2004155756 A JP 2004155756A JP 2005341687 A JP2005341687 A JP 2005341687A
- Authority
- JP
- Japan
- Prior art keywords
- branch line
- upper branch
- cables
- tension
- shared
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
本発明は、電線・支線・ケーブル類等から構成される架空構造物の線路土木分野に利用される上部支線共用方法、上部支線共用金具、および上部支線張力調整具に関する。 The present invention relates to an upper branch line shared method, an upper branch line shared metal fitting, and an upper branch line tension adjuster used in the field civil engineering field of an aerial structure composed of electric wires, branch lines, cables, and the like.
電柱にケーブル類を引留める際に、支線が必要となる。図16に示すように、電柱100にケーブル111類を引き留める際に生じる、ケーブル111類の張力による電柱100への負荷を、支線121に分担させることにより、安全な設備の構成を可能とするものである(特許文献1、非特許文献1)。なお、図16では、アンカー131が支線121を地面に繋ぎ止める。
A branch line is required when securing cables to the utility pole. As shown in FIG. 16, it is possible to configure a safe facility by sharing the load on the utility pole 100 caused by the tension of the
ところで、電柱100にケーブルを追加する場合、電柱100に引き留めるケーブルの条数と同数の支線が必要となる。こうした形態としては、図17に示す通り、支線121に対して、追加したケーブル112用の上部支線122Aおよび下部支線122Bを共に追加する場合と、図18に示すように、上部支線123のみを追加し、下部支線は共用する場合とがある。なお、図17では、上部支線122Aと下部支線とが支線122を形成する。
ところで、支線を追加する形態の場合、電柱に引き留めるケーブルの条数と同数の支線およびアンカーが必要となり、支線の追加やアンカーの埋設等による、ケーブル追加の作業が煩雑になる。下部支線を共用する形態の場合、図19に示す通り、新たに上部支線123を追加することにより、既存の支線121がゆるんでしまうなど、張力F101の調整が非常に難しい。上部支線が増えるほど、その調整は困難となる。また、支線の追加、交換には、ケーブルの大きな張力を支線に分担させているため、極めて慎重でかつ危険な作業が要求される。 By the way, in the case of adding a branch line, the same number of branch lines and anchors as the number of cables to be retained on the utility pole are required, and the work of adding the cable due to the addition of the branch line or the embedment of the anchor becomes complicated. In the case where the lower branch line is shared, it is very difficult to adjust the tension F101, as shown in FIG. As the upper branch line increases, the adjustment becomes more difficult. In addition, when adding or replacing a branch line, since a large tension of the cable is shared by the branch line, extremely careful and dangerous work is required.
また、上部支線に用いているワイヤーから歩行者などの人体を守るために、支線には支線ガードが取り付けられている。このため、上部支線が複数条になると美観を損ねるといった理由で、付近住民からの苦情が発生することもある。こうした理由により、本来、支線をとるべきと考えられる設備に対して、支線をとることができず、不安全な設備を構築してしまう危険性がある。 Moreover, in order to protect human bodies, such as a pedestrian, from the wire used for the upper branch line, the branch line guard is attached to the branch line. For this reason, complaints from nearby residents may occur due to the loss of aesthetics when there are multiple upper branch lines. For these reasons, there is a risk that an unsafe facility may be constructed because the branch line cannot be taken with respect to the facility that is supposed to have a branch line.
本発明は、前記の課題を解決し、通常用地折衝や空間的制限、美観を損ねるといった理由で設置することが難しい支線を、容易かつ安全に低コストで設置することを可能にする上部支線共用方法、上部支線共用金具、および上部支線張力調整具を提供することを目的とする。 The present invention solves the above-mentioned problem, and it is possible to easily and safely install a branch line that is difficult to install due to reasons such as negotiating with a normal site, spatial limitations, and loss of aesthetics. It is an object to provide a method, an upper branch line common fitting, and an upper branch line tension adjuster.
前記課題を解決するために、請求項1の発明は、電柱に架設されている複数のケーブル類を引き留める際に、前記ケーブル類と同本数必要な上部支線について、前記各ケーブル類による張力を集中してこれらの上部支線を1本にまとめることを特徴とする上部支線共用方法である。
請求項2の発明は、請求項1に記載の上部支線共用方法において、前記上部支線を共用する際の前記電柱への不平衡荷重を、前記各上部支線による張力方向を同じにすることよって分散することを特徴とする。
請求項3の発明は、請求項1または2に記載の上部支線共用方法において、前記電柱に追加したケーブル類の各引き留め位置と、前記1本の上部支線との間に、伸縮可能な上部支線共用金具を設けて、この上部支線を上部共用にすることを特徴とする。
請求項4の発明は、請求項3に記載の上部支線共用方法において、前記1本の上部支線に、伸縮可能な上部支線張力調整具を取り付けて、この上部支線の張力を調整することを特徴とする。
請求項5の発明は、請求項3または4に記載の上部支線共用金具であって、上部支線側に固定される固定手段と、追加したケーブル類の引き留め位置側に取り付けられる接続手段と、前記固定手段と前記接続手段との間隔を調整する調整手段とを有することを特徴とする上部支線共用金具である。
請求項6の発明は、請求項5に記載の上部支線張力調整具であって、前記上部支線に固定される第1の固定手段と、前記上部支線に固定され、かつ、前記第1の固定手段の固定位置とは別の位置に固定される第2の固定手段と、前記第1の固定手段と前記第2の固定手段との間隔を調整する調整手段とを有することを特徴とする上部支線張力調整具である。
In order to solve the above-mentioned problem, the invention of
According to a second aspect of the present invention, in the upper branch line sharing method according to the first aspect, the unbalanced load applied to the utility pole when the upper branch line is shared is distributed by making the tension directions of the upper branch lines the same. It is characterized by doing.
According to a third aspect of the present invention, in the upper branch line sharing method according to the first or second aspect, the upper branch line that can be expanded and contracted between each retaining position of the cables added to the utility pole and the one upper branch line. A common metal fitting is provided, and this upper branch line is shared by the upper part.
According to a fourth aspect of the present invention, in the upper branch line sharing method according to the third aspect, an upper branch line tension adjuster that can be expanded and contracted is attached to the one upper branch line, and the tension of the upper branch line is adjusted. And
The invention according to claim 5 is the upper branch line shared metal fitting according to
The invention according to claim 6 is the upper branch line tension adjuster according to claim 5, wherein the first fixing means is fixed to the upper branch line, is fixed to the upper branch line, and the first fixing is performed. An upper portion comprising: a second fixing means fixed at a position different from the fixing position of the means; and an adjusting means for adjusting an interval between the first fixing means and the second fixing means. This is a branch tension adjuster.
本発明によれば、電柱に引き留められるケーブルが追加された際に必要な支線の追加を、容易にかつ安全に実施することがでる。つまり、経済性と美観の維持とを兼ね備えた設備構築を実現することを可能にする。 ADVANTAGE OF THE INVENTION According to this invention, the addition of a branch line required when the cable fastened to a utility pole is added can be implemented easily and safely. In other words, it is possible to realize equipment construction that combines economic efficiency and aesthetic maintenance.
つぎに、本発明を実施するための最良の形態について、図を用いて説明する。
[実施形態1]
図1は、本発明による上部支線共用方法を説明するための説明図である。通常、設備を新設する際には、地面に立てられた電柱1にケーブル2Aを引き留める。この場合、ケーブル2Aが引き留められた電柱1に対して、支線3を1つ設置する。このとき、ケーブル2Aの引留め位置Aに支線3の一端を取り付け、支線3の他端を、アンカー4によって地面に繋ぎ止める。支線3は、電柱1にケーブル2Aを引留める際に生じる、ケーブル2Aの張力による電柱1への負荷を分担する。
Next, the best mode for carrying out the present invention will be described with reference to the drawings.
[Embodiment 1]
FIG. 1 is an explanatory diagram for explaining an upper branch line sharing method according to the present invention. Normally, when installing a new facility, the
この後、さらに、ケーブルを追加する場合、電柱1にケーブル2Bを引き留める。このとき、ケーブル2Bの引留め位置Bと支線3の上部支線3Aとの間に、伸縮可能な棒状の上部支線共用金具10を上部支線の代わりとして取り付ける。この結果、ケーブル2Bの張力による電柱1への負荷を分担する。つまり、電柱1に架設されている複数のケーブル2A、2Bを引き留める際に、ケーブル2A、2Bによる張力を上部支線3Aに集中して、ケーブル2A、2Bに対して同本数必要な上部支線を1本にまとめている。
Thereafter, when a cable is further added, the
上部支線共用金具10の取り付けの際に、図2に示すように、電柱1と上部支線共用金具10との角度θ1が鈍角となるようにする。これにより、上部支線3Aの張力F1の方向が上部支線共用金具10に加わる力F2の方向と同じになり、ケーブル2Bにより電柱1に加わる負荷を支線3に分散することができる。なお、図1の1A、1Bは、引留め位置A、Bに取り付けられた、ケーブル2A、2Bを電柱1に固定するためのバンドである。
When attaching the upper branch line
図2の状態に対して、図3に示すように、電柱1と上部支線共用金具10との角度θ1が鋭角となるようにすると、上部支線共用金具10に加わる力F3が上部支線3Aの張力方向からずれてしまう。このため、支線として機能する十分な大きさの力を掛けることができず、かつ、負荷を分散することができない。
As shown in FIG. 3, when the angle θ1 between the
こうして、ケーブル2Bを追加する場合に、伸縮自在な上部支線共用金具10を用いて、支線3の上部共用とする施工により、電柱1に加わる負荷を分散することができる。また、上部共用の施工時には、図4に示すように、追加するケーブル2B〜2Cの数分だけ、アタッチメントである上部支線共用金具10を既存設備に追加し、さらに、図5に示すように、各上部支線共用金具10と電柱1との角度θ1、θ2が鈍角となるようにすることにより、容易で安全な設備の構築が可能である。なお、図5では、1A〜1Cがケーブル2A〜2C用のバンドである。
In this way, when the
[実施形態2]
図6は、本発明による上部支線共用金具を示す正面図である。この上部支線共用金具は、実施形態1に用いられている上部支線共用金具10である。図6の上部支線共用金具は、固定手段として固定部11と、調整手段としてねじ調整部12と、接続手段としてボルトフック部13とを備えている。
[Embodiment 2]
FIG. 6 is a front view showing the upper branch line shared metal fitting according to the present invention. This upper branch line shared bracket is the upper branch line shared
固定部11は、図7に示すように、上部支線3Aを挟んで固定するものであり、直方体形状の台座部分11A上に円筒形状の固定台11Bが形成されている。固定台11Bの側面には、押さえねじ11Cとナット11Dとによって押さえ曲板11Eが固定台11Bに対して移動可能に設けられている。押さえねじ11Cは、固定台11Bを貫通している。この構造の固定部11によれば、上部支線3Aを固定台11Bと押さえ曲板11Eとの間に挟み、ナット11Dで押さえ曲板11Eを固定台11Bの方に移動して、上部支線3Aを固定部11に固定する。
As shown in FIG. 7, the
前記の構造に加えて、固定部11の台座部分11Aの側面には、ねじ11Fが取り付けられ、ねじ11Fは固定部11に固定されている。
In addition to the structure described above, a
ねじ調整部12は、直方体形状をしたものであり、ねじ11Fが設けられている固定部11の側面と向かい合う、ねじ調整部12の側面には、ねじ穴12Aが開けられている。ねじ穴12Aには、ねじ11F用のねじが設けられ、ねじ穴12Aには、ねじ11Fが挿入可能である。この構造に加えて、ねじ調整部12の内部にはフック取り付け穴12Bが設けられ、ねじ穴12Aの底部分と向かい合う、ねじ調整部12の側面にはフック取り付け溝12Cが設けられている。フック取り付け穴12Bは円形状であり、フック取り付け溝12Cはフック取り付け穴12Bより小径の円形状をしている。フック取り付け溝12Cはフック取り付け穴12Bに貫通されている。
The screw adjusting portion 12 has a rectangular parallelepiped shape, and a screw hole 12A is formed on the side surface of the screw adjusting portion 12 facing the side surface of the fixing
ボルトフック部13は、一端が湾曲したかぎ型であり、かつ、他端が棒状をしたフック部分13Aを備えている。フック部分13Aの棒状側の端部は、ねじ調整部12のフック取り付け溝12Cを通り、フック取り付け穴12Bに達している。フック部分13Aの棒状の部分は、図8に示すように、ねじ調整部12のフック取り付け溝12C内を回転可能である。フック部分13Aの棒状の端部には、フック底板13Bが取り付けられている。フック底板13Bは、フック取り付け穴12B内を回転可能である。こうした構造のボルトフック部13は、ケーブル2Bのバンド1Bを固定するためのボルト1B1(図7)に引っ掛けられる。また、ねじ調整部12を矢印H方向(図8)に正逆回転することにより、ボルトフック部13から固定部11までの間隔を伸縮することができる。つまり、上部支線共用金具10は伸縮可能である。
The bolt hook portion 13 has a hook shape with one end curved, and a hook portion 13A having a rod shape at the other end. The rod-like end of the hook portion 13A passes through the hook attachment groove 12C of the screw adjustment portion 12 and reaches the hook attachment hole 12B. As shown in FIG. 8, the rod-shaped portion of the hook portion 13 </ b> A can rotate in the hook attachment groove 12 </ b> C of the screw adjustment portion 12. A hook bottom plate 13B is attached to the rod-shaped end of the hook portion 13A. The hook bottom plate 13B can rotate in the hook attachment hole 12B. The bolt hook portion 13 having such a structure is hooked on a
つぎに、本実施形態による上部支線共用金具を用いた上部支線共用方法について説明する。図9に示すように、ケーブル2Aが引き留められている電柱1に対して、新たにケーブル2Bを追加した場合、支線3を緊張させるターンバックル3Bが支線3の上部支線3Aに取り付けられているとき、図10(a)に示すように、追加されたケーブル2Bのバンド1Bに上部支線共用金具10のフック部分13Aを取り付け、固定部11を支線3の上部支線3Aに取り付ける。固定部11の取り付けの後、ねじ調整部12を回して上部支線共用金具10の長さを縮める。
Next, an upper branch line sharing method using the upper branch line sharing bracket according to the present embodiment will be described. As shown in FIG. 9, when a cable 2 </ b> B is newly added to the
この後、すでに取り付けられているターンバックル3Bを用いて、図10(b)に示すように、上部支線3Aを締め直すことにより、荷重がきちんと分担された上部共用形態を作り出すことができる。また、上部支線3Aを把持する固定部11の押さえ曲板11Eの形状に曲率半径をもたせることにより、上部支線3Aへの局所的な荷重も分散することが可能となる。さらに、別のケーブルが追加された際にも、同様の上部支線共用金具10を追加することにより、対応することが可能である。
Thereafter, by using the
[実施形態3]
本実施形態では、図11に示すように、実施形態2のターンバックル3Bが無い場合について説明する。
[Embodiment 3]
In the present embodiment, as shown in FIG. 11, a case where the
本実施形態では、ターンバックルが支線3に取り付けられていないので、ターンバックルの代わりに、図12に示す上部支線張力調整具を使用する。図12の上部支線張力調整具は、図6の上部支線共用金具と同じものである。なお、図12では、先に説明した図6と同一もしくは同一と見なされる構成要素には、それと同じ参照符号を付けて、その説明を省略している。図12では、第1の固定手段が固定部11であり、第2の固定手段がボルトフック部13であり、調整手段がねじ調整部12である。図12の上部支線張力調整具をターンバックルとして用いる場合、たとえば、上部支線3Aの環状部分3Bをボルトフック部13につなぐと共に、固定台11B、押さえねじ11C、ナット11D、および押さえ曲板11Eによって、上部支線3Aを固定部11に固定する。
In this embodiment, since the turnbuckle is not attached to the
この後、実施形態2と同様に、追加されたケーブル2Bのバンド1Bに上部支線共用金具10のフック部分13Aを取り付け、固定部11を支線3の上部支線3Aに取り付ける。固定部11の取り付けの後、ねじ調整部12を回して上部支線共用金具10の長さを縮める。そして、上部支線共用金具のねじ調整部12を回して、上部支線3Aを締め直し、かつ、上部支線張力調整具のねじ調整部12を回して、この上部支線張力調整具を縮めることにより、荷重がきちんと分担された上部共用形態を作り出すことができる。
Thereafter, similarly to the second embodiment, the hook portion 13A of the upper branch shared
ところで、上部支線張力調整具のねじ調整部12を回して、上部支線3Aを締め直す際に、固定部11とボルトフック部13との間の上部支線3Aが長くなって大きくたわむことがある。この場合には、図12の上部支線張力調整具の代わりに、図13の上部支線張力調整具を用いる。なお、図13では、先に説明した図6と同一もしくは同一と見なされる構成要素には、それと同じ参照符号を付けて、その説明を省略している。図13の上部支線張力調整具は、図12の上部支線張力調整具に対して、図14に示すように、固定部11と同じような固定部111を備えている。なお、図14は図13を矢印J方向から見た図である。
By the way, when the screw adjustment part 12 of the upper branch line tension adjusting tool is turned to retighten the
図13の上部支線張力調整具は上部支線共用金具の固定部を並列に2つ有するものである。この上部支線張力調整具を用いた場合、固定部11にて既存の上部支線3Aを固定し、ねじ調整部12にて上部支線3Aに張力を掛ける。この後、図15に示すように、上部支線3Aを切断し、上部支線3Aを固定部111に通して固定部111に固定する。これにより、上部支線3Aが切り離されて支線ロッド3Dとなり、支線ロッド3Dと上部支線3Aとの間の長さを、ねじ調整部12により極めて容易に調整することができる。なお、図15には、固定部11、111にて既存の上部支線3Aを固定した様子を示している。
The upper branch line tension adjuster of FIG. 13 has two fixing parts of the upper branch line common bracket in parallel. When this upper branch line tension adjusting tool is used, the existing
以上、この発明の実施形態を詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。 The embodiment of the present invention has been described in detail above, but the specific configuration is not limited to this embodiment, and even if there is a design change or the like without departing from the gist of the present invention, the present invention is not limited to this embodiment. included.
1 電柱
1A、1B バンド
2A、2B ケーブル
3 支線
3A 上部支線
3B ターンバックル
3C 環状部分
3D 支線ロッド
4 アンカー
10 上部支線共用金具
11 固定部
11A 台座部分
11B 固定台
11C 押さえねじ
11D ナット
11E 押さえ曲板
11F ねじ
12 ねじ調整部
12A ねじ穴
12B フック取り付け穴
12C フック取り付け溝
13 ボルトフック部
13A フック部分
13B フック底板
DESCRIPTION OF
Claims (6)
上部支線(3A)側に固定される固定手段(11)と、
追加したケーブル類の引き留め位置側に取り付けられる接続手段(13)と、
前記固定手段(11)と前記接続手段(13)との間隔を調整する調整手段(12)と、
を有することを特徴とする上部支線共用金具。 The upper branch line common bracket according to claim 3 or 4,
Fixing means (11) fixed to the upper branch line (3A) side;
A connection means (13) attached to the holding position side of the added cables;
An adjusting means (12) for adjusting an interval between the fixing means (11) and the connecting means (13);
A metal fitting for upper branch line, characterized by comprising:
前記上部支線(3A)に固定される第1の固定手段(11)と、
前記上部支線(3A)に固定され、かつ、前記第1の固定手段(11)の固定位置とは別の位置に固定される第2の固定手段(13)と、
前記第1の固定手段(11)と前記第2の固定手段(13)との間隔を調整する調整手段(12)と、
を有することを特徴とする上部支線張力調整具。 The upper branch line tension adjuster according to claim 5,
First fixing means (11) fixed to the upper branch line (3A);
Second fixing means (13) fixed to the upper branch line (3A) and fixed to a position different from the fixing position of the first fixing means (11);
Adjusting means (12) for adjusting the distance between the first fixing means (11) and the second fixing means (13);
An upper branch line tension adjuster characterized by comprising:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004155756A JP2005341687A (en) | 2004-05-26 | 2004-05-26 | Method for sharing upper branch line, common metal fitting of upper branch line and tension adjuster of upper branch line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004155756A JP2005341687A (en) | 2004-05-26 | 2004-05-26 | Method for sharing upper branch line, common metal fitting of upper branch line and tension adjuster of upper branch line |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2005341687A true JP2005341687A (en) | 2005-12-08 |
Family
ID=35494633
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2004155756A Pending JP2005341687A (en) | 2004-05-26 | 2004-05-26 | Method for sharing upper branch line, common metal fitting of upper branch line and tension adjuster of upper branch line |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2005341687A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100423033C (en) * | 2006-12-14 | 2008-10-01 | 魏有平 | Electrical pole dragline monitoring and alarming system |
KR100878486B1 (en) * | 2008-08-22 | 2009-01-13 | 주식회사 영화키스톤건축사사무소 | Guy-wire assembly of utility pole for distribution of electricity |
JP2010213470A (en) * | 2009-03-11 | 2010-09-24 | Chugoku Electric Power Co Inc:The | Method of transferring pole |
JP2021021225A (en) * | 2019-07-26 | 2021-02-18 | 株式会社大林組 | Support structure of earth-retaining wall and support method of earth-retaining wall |
-
2004
- 2004-05-26 JP JP2004155756A patent/JP2005341687A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100423033C (en) * | 2006-12-14 | 2008-10-01 | 魏有平 | Electrical pole dragline monitoring and alarming system |
KR100878486B1 (en) * | 2008-08-22 | 2009-01-13 | 주식회사 영화키스톤건축사사무소 | Guy-wire assembly of utility pole for distribution of electricity |
JP2010213470A (en) * | 2009-03-11 | 2010-09-24 | Chugoku Electric Power Co Inc:The | Method of transferring pole |
JP2021021225A (en) * | 2019-07-26 | 2021-02-18 | 株式会社大林組 | Support structure of earth-retaining wall and support method of earth-retaining wall |
JP7310406B2 (en) | 2019-07-26 | 2023-07-19 | 株式会社大林組 | Support structure for earth retaining wall and method for supporting earth retaining wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9777870B2 (en) | Bracket for seismic bracing of conduits | |
CN205578907U (en) | Anchor clamps of fixed cable | |
WO2016100273A1 (en) | Guy wire anchoring systems, brackets and kits | |
KR20210136944A (en) | Apparatus for preventing heavy equipment from approaching tower | |
KR101746564B1 (en) | Solar panel supporting system and constrcution method using the same | |
JP2005341687A (en) | Method for sharing upper branch line, common metal fitting of upper branch line and tension adjuster of upper branch line | |
WO2019097415A1 (en) | Device for strengthening and rigging trusses and method in which such device is applied | |
JP2009065804A (en) | Structure for joint use | |
CN110439350A (en) | A kind of low-voltage distributing line support bar | |
CN106871081A (en) | Anchor ear | |
US11569648B2 (en) | Joint-use bracket for installing communication lines on utility pole | |
JP3195789U (en) | Temporary utility pole support device | |
AU2019275579B2 (en) | A stand for a switchboard | |
JP7359014B2 (en) | Arms for cable installation | |
JP2006197666A (en) | Cable gripping metal | |
WO2023032066A1 (en) | Jig and laying method | |
KR101077224B1 (en) | Adapter for crossarm band | |
JP3196083U (en) | Concrete pole | |
JP2016037799A (en) | Collapse prevention tool | |
KR100517886B1 (en) | An apparatus for regulating the tension of messenger wire | |
KR102193185B1 (en) | Mounting bracket set | |
US20230085769A1 (en) | Joint-use bracket for installing communication lines on utility pole | |
KR200330550Y1 (en) | An apparatus for regulating the tension of messenger wire | |
JP2012149470A (en) | Electric pole support device | |
US8555603B1 (en) | Pole top extension |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060714 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080501 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080624 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20081021 |