JP2005232677A - Suspended scaffold assembling method, suspended scaffold disassembling method, and movable suspending tool for use therein - Google Patents

Suspended scaffold assembling method, suspended scaffold disassembling method, and movable suspending tool for use therein Download PDF

Info

Publication number
JP2005232677A
JP2005232677A JP2004039242A JP2004039242A JP2005232677A JP 2005232677 A JP2005232677 A JP 2005232677A JP 2004039242 A JP2004039242 A JP 2004039242A JP 2004039242 A JP2004039242 A JP 2004039242A JP 2005232677 A JP2005232677 A JP 2005232677A
Authority
JP
Japan
Prior art keywords
suspension
jig
scaffold
movable
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004039242A
Other languages
Japanese (ja)
Other versions
JP4407306B2 (en
Inventor
Hiroyuki Matsuhashi
弘幸 松橋
Masashi Funaki
正志 船木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2004039242A priority Critical patent/JP4407306B2/en
Publication of JP2005232677A publication Critical patent/JP2005232677A/en
Application granted granted Critical
Publication of JP4407306B2 publication Critical patent/JP4407306B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a suspended scaffold assembling method and a suspended scaffold disassembling method which bring reduction of a high-altitude workload and reduction of working steps without mounting of additional members to a main girder or working of the same beforehand, and are implemented by requiring minimum traffic regulation if necessary, and to provide a movable suspending tool for use in the methods. <P>SOLUTION: According to the suspended scaffold assembling method, by rolling the movable suspending tool 20 on a lower flange 1a of the main girder 1 of a bridge 9, a parent child pipe 4 is suspended on a workbench 30 in the vicinity of a pier 9 to assemble a suspended scaffold 40 for one unit, and then the assembled unit is moved and set to another pier 9, followed by repeatedly assembling the suspended scaffold 40 for the following units, on the workbench 30. In this manner only by moving the movable suspending tool 20 on the lower flange 1a of the main girder 1, necessity of preliminary mounting of a rail is dispensed with, and therefore corrosion of the rail by rainwater is eliminated. Further, only by assembling the suspended scaffold 40 for one unit, on the workbench 30 in the vicinity of the pier 9 and moving the assembled unit by means of the movable suspending 20, high-altitude workload on an overhanging location is reduced, and assembling of the suspended scaffold is efficiently carried out in a short period of time. Further, necessity of traffic regulation is drastically reduced. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

この発明は吊り足場の組立方法、解体方法およびこれらに用いる移動式吊り治具に関し、橋脚近傍の作業台上で1ユニットずつ組み立てて主桁をそのまま利用して移動させて設置できるようにしたものに関する。   The present invention relates to a method for assembling a suspension scaffold, a method for disassembling, and a movable suspension jig used therefor, which can be assembled on a work table near a pier, and can be moved and installed using a main girder as it is. About.

橋梁工事での塗装作業、ハイテンボルトの締め付け作業、あるいは付属物の取り付け作業などの各種作業を行う必要がある場合には、吊り足場の設置が必要となる。   When it is necessary to perform various operations such as painting work for bridge construction, high ten bolt tightening work, or attachment work, it is necessary to install a suspension scaffold.

このような吊り足場は、例えば図4に示すように、橋梁の主桁1に吊金具2を予め取り付けておき、これら吊金具2にチェーン3を掛けておやごパイプ4を吊り、各おやごパイプ4上にころばし5を渡し、ころばし5の上に足場板6を載せて固定し、足場板6の両側端に手すり7を設けるとともに、下部にネット8を設けるようにして設置されている。   For example, as shown in FIG. 4, such a suspension scaffold has a hanging bracket 2 attached in advance to a main girder 1 of a bridge, a chain 3 is hung on the hanging bracket 2, and a cage pipe 4 is hung. The roller 5 is passed over the pipe 4, the scaffold plate 6 is placed on the roller 5 and fixed, the handrail 7 is provided on both ends of the scaffold plate 6, and the net 8 is provided at the lower portion.

このような吊り足場を設置する場合には、作業者が橋脚の端部から順次組み立て行く必要があり、組み立てに長時間を要し、しかも高所作業となるとともに、橋梁が道路上の場合には、交通規制の必要がある。   When installing such a suspension scaffold, it is necessary for the worker to assemble from the end of the pier one after another, which takes a long time to assemble and is a work at a high place, and when the bridge is on the road. There is a need for traffic regulation.

そこで、特許文献1には、図5に示すように、橋梁の移動式防護工10が開示されており、主桁1の下フランジ1aなどに予めレール11を溶接などにより取り付けておき、そのレール11上を移動自在なローラ12を上部に仕込んだ治具13を介しておやごパイプ4を吊り下げて移動可能な吊足場14を組立て、それを順次引き出すように移動して設置するようにし、解体も設置と逆の手順で行うようにしている。   Therefore, as shown in FIG. 5, Patent Document 1 discloses a bridge movable protective work 10 in which a rail 11 is attached in advance to the lower flange 1a of the main girder 1 by welding or the like. 11 assemble a movable scaffold 14 by suspending the cage pipe 4 via a jig 13 having a roller 12 movable on the upper part 11 and moving it so that it can be pulled out sequentially, and installed. Dismantling is done in the reverse order of installation.

これにより、防護工の組立や解体の工程を短縮するとともに、安全度が増すようにしている。
特開平5−295712号公報
As a result, the process of assembling and dismantling the protective work is shortened and the safety level is increased.
Japanese Patent Laid-Open No. 5-295712

ところが、上記の移動式防護工10では、治具13を移動するため、主桁1に予めレール11を溶接する必要があり、その分工数およびコストが増大するとともに、吊足場14上での各種作業終了後、設置者から了解を得てレール11を取り付けた状態のままにすると、雨水が主桁1の下フランジ1a上に溜まり腐食の原因となるなどの問題がある。   However, since the jig 13 is moved in the mobile protective work 10 described above, it is necessary to weld the rail 11 to the main girder 1 in advance, which increases the number of man-hours and costs, and various types of work on the suspension scaffold 14. After the work is completed, if the installation is approved and the rail 11 is left attached, there is a problem that rainwater accumulates on the lower flange 1a of the main girder 1 and causes corrosion.

この発明はかかる従来技術の問題点に鑑みてなされたもので、主桁に予め部材の取り付けや加工を必要とせず、高所作業の減少および作業工程の短縮化を図るとともに、交通規制を行う場合にも最小限にすることができる吊り足場の組立方法、解体方法およびこれらに用いる移動式吊り治具を提供しようとするものである。   The present invention has been made in view of the problems of the prior art, and does not require the attachment or processing of members in advance in the main girder, and it is intended to reduce work at high places and shorten work processes and to regulate traffic. It is an object of the present invention to provide a method for assembling and disassembling a suspension scaffold that can be minimized, and a movable suspension jig used for these.

上記課題を解決するため、この発明の請求項1記載の吊り足場の組立方法は、橋梁の主桁の下フランジ上を転動して移動可能な移動式吊り治具を介して橋脚近傍の作業台上でおやごパイプを吊り下げて1ユニット分の吊り足場を組み立てた後、他方の橋脚側に移動して設置するとともに、前記作業台上で次ぎの1ユニット分の吊り足場を組み立てることを繰り返すようにしたことを特徴とするものである。   In order to solve the above-mentioned problem, the method for assembling a suspension scaffold according to claim 1 of the present invention is a work near the pier via a movable suspension jig that can move by rolling on the lower flange of the main girder of the bridge. After assembling the suspension scaffold for one unit by hanging the cocoon pipe on the table, move to the other pier side and install it, and assemble the next one scaffold for the unit on the workbench It is characterized by being repeated.

この吊り足場の組立方法によれば、橋梁の主桁の下フランジ上を転動して移動可能な移動式吊り治具を介して橋脚近傍の作業台上でおやごパイプを吊り下げて1ユニット分の吊り足場を組み立てた後、他方の橋脚側に移動して設置するとともに、前記作業台上で次ぎの1ユニット分の吊り足場を組み立てることを繰り返すようにしており、移動式吊り治具を主桁の下フランジ上を移動させることで、予めレールを取り付ける必要をなくして雨水による腐食の問題もなく、橋脚近傍の作業台上で1ユニット分の吊り足場を組み立てて移動式吊り治具で移動することで、張り出しながらの高所作業を減少するとともに、短時間に効率的に組み立てることができ、交通規制の必要も大幅に短縮できるようにしている。   According to the method of assembling the suspension scaffold, one unit is formed by suspending a gouger pipe on a work table near the pier via a movable suspension jig that can move by rolling on the lower flange of the main girder of the bridge. After assembling the suspension scaffold for the second minute, move to the other pier side, install it, and repeat the assembly of the next one scaffold for the unit on the workbench. By moving on the lower flange of the main girder, there is no need to attach rails in advance, and there is no problem of corrosion due to rainwater. By moving, the work in high places while overhanging can be reduced, it can be assembled efficiently in a short time, and the need for traffic regulation can be greatly shortened.

また、この発明の請求項2記載の吊り足場の組立方法は、請求項1記載の構成に加え、前記移動式吊り治具で移動した後、固定式吊り治具に盛り換えて前記吊り足場を設置するようにしたことを特徴とするものである。   According to a second aspect of the present invention, there is provided a method for assembling a suspended scaffold, in addition to the structure according to the first aspect, after moving with the movable suspension jig, replacing the suspended scaffold with a fixed suspension jig. It is characterized by being installed.

この吊り足場の組立方法によれば、前記移動式吊り治具で移動した後、固定式吊り治具に盛り換えて前記吊り足場を設置するようにしており、チェーンなどの固定式吊り治具に盛り変えることで、移動式吊り治具の必要個数を大幅に削減でき、吊り足場の設置コストの削減を図るようにしている。   According to this method of assembling a suspension scaffold, after moving with the movable suspension jig, the suspension scaffold is installed by replacing it with a stationary suspension jig. By changing the scale, the required number of mobile lifting jigs can be greatly reduced, and the installation cost of the suspension scaffolding can be reduced.

さらに、この発明の請求項3記載の吊り足場の解体方法は、橋梁の主桁の下フランジ上を転動して移動可能な移動式吊り治具を介しておやごパイプを吊り下げて組み立てられた吊り足場を、1ユニット分ずつに分離して橋脚近傍の作業台上に移動して解体することを繰り返すようにしたことを特徴とするものである。   Further, the disassembly method of the suspension scaffold according to claim 3 of the present invention is assembled by suspending the cage pipe through a movable suspension jig that is movable by rolling on the lower flange of the main girder of the bridge. The suspended scaffolding is separated into units, moved onto a workbench near the pier, and disassembled repeatedly.

この吊り足場の解体方法によれば、橋梁の主桁の下フランジ上を転動して移動可能な移動式吊り治具を介しておやごパイプを吊り下げて組み立てられた吊り足場を、1ユニット分ずつに分離して橋脚近傍の作業台上に移動して解体することを繰り返すようにしており、移動式吊り治具を主桁の下フランジ上を移動させることで、予めレールを取り付ける必要をなくして雨水による腐食の問題もなく、吊り足場を1ユニット分に分離して移動式吊り治具で橋脚近傍の作業台上に移動して解体することで、張り出しながらの高所作業を減少するとともに、短時間に効率的に解体することができ、交通規制の必要も大幅に短縮できるようにしている。   According to the method of dismantling the suspension scaffold, one unit of the suspension scaffold assembled by suspending the cage pipe through the movable suspension jig that can move by rolling on the lower flange of the main girder of the bridge. It is necessary to install the rail in advance by moving the movable suspension jig on the lower flange of the main girder by repeatedly separating it and moving it to the work table near the pier and dismantling it. Without the problem of corrosion caused by rainwater, the suspension scaffold is separated into one unit and moved to a workbench near the pier with a movable lifting jig to dismantle, thereby reducing the work at height while overhanging. At the same time, it can be dismantled efficiently in a short time, and the need for traffic regulation can be greatly shortened.

また、この発明の請求項4記載の吊り足場の解体方法は、請求項3記載の構成に加え、前記吊り足場を固定設置した固定式吊り治具から前記移動式吊り治具に盛り換えて移動し、解体するようにしたことを特徴とするものである。   According to a fourth aspect of the present invention, in addition to the structure described in the third aspect, the suspension scaffold dismantling method is moved from the fixed suspension jig in which the suspension scaffold is fixedly installed to the movable suspension jig. However, it is characterized by dismantling.

この吊り足場の解体方法によれば、前記吊り足場を固定設置した固定式吊り治具から前記移動式吊り治具に盛り換えて移動し、解体するようにしており、チェーンなどの固定式吊り治具から移動式吊り治具に盛り変えることで、移動式吊り治具の必要個数を大幅に削減でき、吊り足場の解体コストの削減を図るようにしている。   According to this method of dismantling the suspension scaffold, the suspension scaffold is moved from the fixed suspension jig in which the suspension scaffold is fixedly installed to the movable suspension jig, and is disassembled. By changing from a tool to a mobile suspension jig, the required number of mobile suspension jigs can be greatly reduced, and the cost of dismantling the suspension scaffold is reduced.

さらに、この発明の請求項5記載の移動式吊り治具は、橋梁の主桁の下フランジ上を転動して移動可能なローラを上部に備える治具本体と、この治具本体下部に連結可能に設けられおやごパイプを支持固定するパイプ固定金具とからなることを特徴とするものである。   Further, according to a fifth aspect of the present invention, there is provided a movable suspension jig comprising: a jig main body having a roller movable on the lower flange of the main girder of the bridge; It is characterized by comprising a pipe fixing bracket that is provided so as to support and fix the cage pipe.

この移動式吊り治具によれば、橋梁の主桁の下フランジ上を転動して移動可能なローラを上部に備える治具本体と、この治具本体下部に連結可能に設けられおやごパイプを支持固定するパイプ固定金具とで構成するようにしており、吊り足場のおやごパイプをパイプ固定治具で支持して治具本体に連結し、治具本体のローラを主桁の下フランジ上を移動させることで、組立後や解体前の吊り足場を移動でき、予めレールを取り付ける必要をなくして雨水による腐食の問題もなく、橋脚近傍の作業台上で1ユニット分の吊り足場を組み立てたり、解体することで、張り出しながらの高所作業を減少するとともに、短時間に効率的に組立および解体ができ、交通規制の必要も大幅に短縮できるようにしている。   According to this movable suspension jig, a jig body provided with a roller that can move by rolling on the lower flange of the main girder of the bridge, and a canopy pipe that can be connected to the lower part of the jig body. It is made up of a pipe fixing bracket that supports and secures, and the suspension pipe of the suspension scaffold is supported by the pipe fixing jig and connected to the jig main body, and the roller of the jig main body is placed on the lower flange of the main girder Can be used to move the suspension scaffold after assembly and before dismantling, and there is no problem of corrosion due to rain water without the need to attach rails in advance, and a suspension scaffold for one unit can be assembled on the work bench near the pier. By disassembling, it is possible to reduce the work in high places while overhanging, to efficiently assemble and disassemble in a short time, and to greatly reduce the need for traffic regulation.

また、この発明の請求項6記載の移動式吊り治具は、請求項5記載の構成に加え、前記治具本体に、前記主桁の下部フランジ下面に沿って転動する浮き上り防止ローラを設けたことを特徴とするものである。   According to a sixth aspect of the present invention, in addition to the structure according to the fifth aspect, a lifting prevention roller that rolls along the lower flange lower surface of the main girder is provided on the jig main body. It is characterized by providing.

この移動式吊り治具によれば、前記治具本体に、前記主桁の下部フランジ下面に沿って転動する浮き上り防止ローラを設けるようにしており、移動の際の浮き上りを防止して確実に移動できるようにしている。   According to this movable hanging jig, the jig body is provided with a lifting prevention roller that rolls along the lower surface of the lower flange of the main girder to prevent the lifting during movement. It can be moved reliably.

さらに、この発明の請求項7記載の移動式吊り治具は、請求項5または6記載の構成に加え、前記ローラおよび/または前記浮き上り防止ローラの表面を、硬質ゴムで構成したことを特徴とするものである。   Furthermore, the movable suspension jig according to claim 7 of the present invention is characterized in that, in addition to the structure according to claim 5 or 6, the surface of the roller and / or the anti-lifting roller is made of hard rubber. It is what.

この移動式吊り治具によれば、前記ローラおよび/または前記浮き上り防止ローラの表面を、硬質ゴムで構成するようにしており、これらのローラにより下フランジ上面や下フランジ下面の塗装などを損傷することなく移動できるようにしている。   According to this movable hanging jig, the surface of the roller and / or the anti-lifting roller is made of hard rubber, and these rollers damage the upper surface of the lower flange and the lower surface of the lower flange. To be able to move without having to.

この発明の請求項1記載の吊り足場の組立方法によれば、橋梁の主桁の下フランジ上を転動して移動可能な移動式吊り治具を介して橋脚近傍の作業台上でおやごパイプを吊り下げて1ユニット分の吊り足場を組み立てた後、他方の橋脚側に移動して設置するとともに、前記作業台上で次ぎの1ユニット分の吊り足場を組み立てることを繰り返すようにしたので、移動式吊り治具を主桁の下フランジ上を移動させることで、予めレールを取り付ける必要をなくして雨水による腐食の問題もなく、橋脚近傍の作業台上で1ユニット分の吊り足場を組み立てて移動式吊り治具で移動することで、張り出しながらの高所作業を減少することができるとともに、短時間に効率的に組み立てることができ、交通規制の必要も大幅に短縮することができる。   According to the method for assembling the suspension scaffold according to claim 1 of the present invention, the chair is placed on the work table near the pier via the movable suspension jig that can move by rolling on the lower flange of the main girder of the bridge. After suspending the pipe and assembling the suspension scaffold for one unit, moving to the other pier side and installing it, and repeating the assembly of the next one unit suspension scaffold on the workbench By moving the movable lifting jig on the lower flange of the main girder, there is no need to attach a rail in advance, and there is no problem of corrosion due to rainwater, and a suspension scaffold for one unit is assembled on the work bench near the pier. By moving with the movable lifting jig, it is possible to reduce the work at a high place while overhanging, to assemble efficiently in a short time, and to greatly reduce the need for traffic regulation.

また、この発明の請求項2記載の吊り足場の組立方法によれば、前記移動式吊り治具で移動した後、固定式吊り治具に盛り換えて前記吊り足場を設置するようにしたので、チェーンなどの固定式吊り治具に盛り変えることで、移動式吊り治具の必要個数を大幅に削減することができ、吊り足場の設置コストの削減を図ることができる。   Moreover, according to the assembly method of the suspension scaffold according to claim 2 of the present invention, after moving with the movable suspension jig, the suspension scaffold is installed by replacing the fixed suspension jig. By changing to a fixed suspension jig such as a chain, the required number of mobile suspension jigs can be greatly reduced, and the installation cost of the suspension scaffold can be reduced.

さらに、この発明の請求項3記載の吊り足場の解体方法によれば、橋梁の主桁の下フランジ上を転動して移動可能な移動式吊り治具を介しておやごパイプを吊り下げて組み立てられた吊り足場を、1ユニット分ずつに分離して橋脚近傍の作業台上に移動して解体することを繰り返すようにしたので、移動式吊り治具を主桁の下フランジ上を移動させることで、予めレールを取り付ける必要をなくして雨水による腐食の問題もなく、吊り足場を1ユニット分に分離して移動式吊り治具で橋脚近傍の作業台上に移動して解体することができ、張り出しながらの高所作業を減少することができるとともに、短時間に効率的に解体することができ、交通規制の必要も大幅に短縮することができる。   Furthermore, according to the method for disassembling the suspension scaffold according to claim 3 of the present invention, the cage pipe is suspended through a movable suspension jig that can move by rolling on the lower flange of the bridge main girder. Since the assembled suspension scaffold is separated into units and moved to a workbench near the pier and disassembled repeatedly, the movable suspension jig is moved on the lower flange of the main girder. Therefore, there is no need to attach rails in advance, and there is no problem of corrosion due to rainwater. The suspension scaffold can be separated into one unit and moved to a workbench near the pier with a mobile lifting jig and disassembled. It is possible to reduce the work at a high place while overhanging, to efficiently dismantle in a short time, and to greatly reduce the necessity of traffic regulation.

また、この発明の請求項4記載の吊り足場の解体方法によれば、前記吊り足場を固定設置した固定式吊り治具から前記移動式吊り治具に盛り換えて移動し、解体するようにしたので、チェーンなどの固定式吊り治具から移動式吊り治具に盛り変えることで、移動式吊り治具の必要個数を大幅に削減することができ、吊り足場の解体コストの削減を図ることができる。   According to the method for disassembling the suspension scaffold according to claim 4 of the present invention, the suspension scaffold is moved from the fixed suspension jig in which the suspension scaffold is fixedly installed to the movable suspension jig to be disassembled. Therefore, by changing from a fixed suspension jig such as a chain to a movable suspension jig, the required number of movable suspension jigs can be greatly reduced, and the cost of dismantling the suspension scaffold can be reduced. it can.

さらに、この発明の請求項5記載の移動式吊り治具によれば、橋梁の主桁の下フランジ上を転動して移動可能なローラを上部に備える治具本体と、この治具本体下部に連結可能に設けられおやごパイプを支持固定するパイプ固定金具とで構成するようにしたので、吊り足場のおやごパイプをパイプ固定治具で支持して治具本体に連結し、治具本体のローラを主桁の下フランジ上を移動させることで、組立後や解体前の吊り足場を移動することができ、予めレールを取り付ける必要をなくして雨水による腐食の問題もなく、橋脚近傍の作業台上で1ユニット分の吊り足場を組み立てたり、解体することで、張り出しながらの高所作業を減少することができるとともに、短時間に効率的に組立および解体ができ、交通規制の必要も大幅に短縮することができる。   Furthermore, according to the movable suspension jig according to claim 5 of the present invention, a jig main body provided with a roller which is movable by rolling on a lower flange of the main girder of the bridge, and a lower part of the jig main body Since it is made up of a pipe fixing bracket that can be connected to and fixed to the pipe, it supports the suspension scaffolding with the pipe fixing jig and connects it to the jig body. By moving the roller on the lower flange of the main girder, it is possible to move the suspension scaffold after assembly and before dismantling, and there is no need to attach a rail in advance, so there is no problem of corrosion due to rainwater, and work near the pier By assembling or dismantling the suspension scaffold for one unit on the table, it is possible to reduce the work at height while overhanging, and it is possible to assemble and dismantle efficiently in a short time, greatly increasing the need for traffic regulation. Shorten to Door can be.

また、この発明の請求項6記載の移動式吊り治具によれば、前記治具本体に、前記主桁の下部フランジ下面に沿って転動する浮き上り防止ローラを設けるようにしたので、移動の際の浮き上りを防止することができ、確実に移動することができる。   According to the movable suspension jig of claim 6 of the present invention, the jig main body is provided with a lifting prevention roller that rolls along the lower surface of the lower flange of the main girder. Can be prevented, and can move reliably.

さらに、この発明の請求項7記載の移動式吊り治具によれば、前記ローラおよび/または前記浮き上り防止ローラの表面を、硬質ゴムで構成するようにしたので、これらのローラにより下フランジ上面や下フランジ下面の塗装などを損傷することを防止して移動することができる。   Further, according to the movable suspension jig of the seventh aspect of the present invention, since the surface of the roller and / or the anti-lifting roller is made of hard rubber, the upper surface of the lower flange is formed by these rollers. It is possible to move while preventing damage to the paint on the lower surface of the lower flange.

以下、この発明の一実施の形態について図面を参照しながら詳細に説明する。
図1〜図3は、この発明の吊り足場の組立方法、解体方法およびこれらに用いる移動式吊り治具の一実施の形態にかかり、図1(a)は1ユニット分の吊り足場の正面図、(b)は箱桁に設置した状態の横断面図、(c)は鈑桁に設置した状態の横断面図、図2は移動式吊り治具の分解斜視図、図3は組立工程の説明図である。
Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.
FIGS. 1 to 3 relate to an embodiment of a method for assembling and disassembling a suspension scaffold according to the present invention and a mobile suspension jig used therefor, and FIG. 1 (a) is a front view of a suspension scaffold for one unit. , (B) is a cross-sectional view of the box girder, (c) is a cross-sectional view of the girder, FIG. 2 is an exploded perspective view of the movable lifting jig, and FIG. FIG.

この発明の吊り足場の組立方法および解体方法では、図1および図2に示すように、移動式吊り治具20が用いられ、例えば中空角パイプで構成された治具本体21の上部にローラ22が設けられ、このローラ22を橋梁の主桁1である、例えば箱桁1bあるいは鈑桁1cの下フランジ1aの上面を転動させて走行移動できるようになっている。   In the method for assembling and disassembling a suspension scaffold according to the present invention, as shown in FIGS. 1 and 2, a movable suspension jig 20 is used, and for example, a roller 22 is placed on the upper part of a jig body 21 made of a hollow square pipe. The roller 22 is configured to roll and move on the upper surface of the lower flange 1a of the main girder 1 of the bridge, for example, the box girder 1b or the girder 1c.

この移動式吊り治具20では、治具本体21のローラ22の下方に、下フランジ1aの下面に接触することで浮き上がりを防止する浮き上り防止ローラ23が取り付けてある。   In the movable hanging jig 20, a lifting prevention roller 23 is attached below the roller 22 of the jig body 21 to prevent the lifting by contacting the lower surface of the lower flange 1 a.

これら走行用のローラ22および浮き上り防止ローラ23は、その表面が硬質ゴム24とされ、塗装された下フランジ1aの上面や下面と接触して転動しても塗装面を損傷しないようにしてあり、例えば治具本体21に取り付けた固定軸にベアリングを介して回転可能に装着されている。   These running rollers 22 and lift prevention rollers 23 are made of hard rubber 24 so that they do not damage the painted surface even if they roll in contact with the upper and lower surfaces of the painted lower flange 1a. For example, it is rotatably mounted on a fixed shaft attached to the jig body 21 via a bearing.

このような治具本体21の下部は、角パイプを押しつぶした連結部21aが形成されてボルト孔25が形成してあり、この治具本体21の連結部21aの両側には、パイプ固定金具26が連結されるようになっている。   The lower part of the jig body 21 is formed with a connecting portion 21a formed by crushing a square pipe to form a bolt hole 25. On both sides of the connecting portion 21a of the jig body 21, pipe fixing metal fittings 26 are provided. Are connected.

このパイプ固定金具26には、吊り足場用のおやごパイプ4を取り付けるためのパイプ取付孔27が形成されるとともに、上部にボルト孔28が形成してあり、治具本体21下部のボルト孔25とこれらのボルト孔28とにボルト29を入れて連結される。   The pipe fixing bracket 26 is formed with a pipe attachment hole 27 for attaching the cat pipe 4 for the suspension scaffold, and a bolt hole 28 is formed at the upper part, and the bolt hole 25 at the lower part of the jig body 21 is formed. These bolt holes 28 are connected by inserting bolts 29.

このような移動式吊り治具20によれば、ローラ22を特別なレールなどを必要とせずに、主桁1の下フランジ1a上を転動させて走行移動することができ、予めレールを溶接するなどの工数を削減することができるとともに、レールを取り付けないので雨水などが溜まることもなく、腐蝕の原因となることもない。   According to such a movable hanging jig 20, the roller 22 can roll and move on the lower flange 1 a of the main girder 1 without requiring a special rail or the like, and the rail is welded in advance. In addition to reducing the number of man-hours required, the rails are not attached, so rainwater does not accumulate and does not cause corrosion.

また、走行用のローラ22および浮き上り防止ローラ23の表面を硬質ゴム24としたので、塗装された下フランジ1aの上面や下面と接触して転動しても塗装面を損傷することがなく、使用後の補修などの必要もない。   Further, since the surfaces of the running roller 22 and the lifting prevention roller 23 are made of hard rubber 24, the coated surface is not damaged even if it rolls in contact with the upper and lower surfaces of the painted lower flange 1a. There is no need for repair after use.

なお、浮き上り防止ローラは、移動式吊り治具の移動の際の浮上がりを主として防止するためのものであり、移動の際の力のかかる方向によっては省略するようにしても良い。   The lifting prevention roller is mainly for preventing the lifting of the movable hanging jig when moving, and may be omitted depending on the direction in which the force is applied when moving.

次に、このような移動式吊り治具20を用いて行う吊り足場の組立方法について、説明する。
主桁1を支える橋脚9,9の一方の近傍に作業台30を仮設し、この作業台30上で1ユニット分の吊り足場40を組み立てる。
Next, a method for assembling a suspension scaffold using such a movable suspension jig 20 will be described.
A work table 30 is temporarily installed in the vicinity of one of the piers 9 and 9 that support the main girder 1, and a suspension scaffold 40 for one unit is assembled on the work table 30.

すなわち、図1に示すように、主桁1の下フランジ1aの両側にそれぞれ対向させ連結部材41で互いを連結するとともに、主桁1に沿って複数(図示例では、3台)の移動式吊り治具20を配置し、治具本体21にボルト29で連結したパイプ固定金具26のパイプ取付孔27におやごパイプ4を取り付けて固定するとともに、おやごパイプ4,4同士を長さ方向に連結し、例えば、長さが6m程度で、主桁1の幅、例えば5〜6m程度の大きさの1ユニット分が連結される。なお、主桁1の長手方向も各移動式吊り治具20同士を必要に応じて連結部材41で連結する。   That is, as shown in FIG. 1, both sides of the lower flange 1a of the main girder 1 are opposed to each other by a coupling member 41, and a plurality of (three in the illustrated example) movable types are provided along the main girder 1. The suspension jig 20 is disposed, and the jog pipe 4 is attached and fixed to the pipe attachment hole 27 of the pipe fixing metal fitting 26 connected to the jig main body 21 by the bolt 29, and the jog pipes 4, 4 are arranged in the length direction. For example, one unit having a length of about 6 m and a width of the main beam 1, for example, a size of about 5 to 6 m is connected. In the longitudinal direction of the main beam 1, the movable suspension jigs 20 are connected by a connecting member 41 as necessary.

そして、おやごパイプ4上に直交させてころばし5を橋梁の幅方向に掛け渡した後、ころばし5上に足場板6を載置する。   Then, after rolling the roller 5 in the width direction of the bridge so as to be orthogonal to the baby pipe 4, the scaffold plate 6 is placed on the roller 5.

さらに、図示省略したが、両側端の足場板6の外側に手すりを設置するとともに、足場板6の下方にネットを取り付けて1ユニット分の吊り足場40の組立が完成する。   Further, although not shown in the drawings, handrails are installed outside the scaffolding plates 6 at both ends, and a net is attached below the scaffolding plates 6 to complete the assembly of the suspension scaffolding 40 for one unit.

こうして組み立てた1ユニット分の吊り足場40は、図3に示すように、他方の橋脚9側にローラ22を転動させて移動した後、ローラ22を図示しない輪止めなどで固定して所定位置に設置する。   As shown in FIG. 3, the suspended scaffolding 40 for one unit assembled in this way is moved by rolling the roller 22 toward the other bridge pier 9 side, and then fixed to a predetermined position by a roller stopper (not shown). Install in.

この1ユニット分の吊り足場40の移動は、図3(a)中に示すように、作業台30側から順次押し出すようにしたり、対岸の橋脚9側からロープ31などで引っ張るようにしたり、両橋脚9,9間に一組のシーブ32を設け、ループ状のロープ33を設置し、これに連結して引っ張るようにするほか、ローラ12自体に図示しない走行駆動装置を組み込んで自走式とするなど、いずれの方法であっても良い。   As shown in FIG. 3 (a), the suspension scaffold 40 for one unit can be sequentially pushed out from the work platform 30 side, pulled by the rope 31 or the like from the opposite pier 9 side, A set of sheaves 32 is provided between the piers 9 and 9 and a loop-shaped rope 33 is installed and connected to and pulled. In addition, a driving device (not shown) is incorporated in the roller 12 itself to be self-propelled. Any method may be used.

この1ユニット分の吊り足場40の移動を開始した後、あるいは移動し設置が完了した後、作業台30上では、次ぎの1ユニット分の吊り足場40の組立を行う。   After the movement of the suspension scaffold 40 for one unit is started or after the movement and installation is completed, the suspension scaffold 40 for the next one unit is assembled on the work table 30.

このような作業台30上での組立と移動を繰り返すことで必要なユニット数の吊り足場40,40を連結して吊り足場全体を完成する。   By repeating the assembly and movement on the work table 30, the suspension scaffolds 40, 40 of the necessary number of units are connected to complete the entire suspension scaffold.

なお、1ユニット分の吊り足場40を移動した後、図4に示した従来の吊足場2のように、吊金具2とチェーン3などの固定式吊り治具でおやごパイプ4を支持するように盛り換えても良く、図示しないレバーウインチなどで一旦荷重を支持した後、移動式吊り治具20を取り外して固定式吊り治具で荷重を支持するようにする。この場合、パイプ固定金具26にチェーン係止用の孔を形成しておくことで、パイプ固定金具26をそのまま使用して固定式吊り治具での支持を行うようにすることもできる。   In addition, after moving the suspension scaffold 40 for one unit, like the conventional suspension scaffold 2 shown in FIG. 4, the baby pipe 4 is supported by a fixed suspension jig such as the suspension bracket 2 and the chain 3. After the load is temporarily supported by a lever winch or the like (not shown), the movable suspension jig 20 is removed and the load is supported by the fixed suspension jig. In this case, by forming a hole for chain locking in the pipe fixing metal fitting 26, the pipe fixing metal fitting 26 can be used as it is and can be supported by a fixed lifting jig.

こうすることで、移動式吊り治具20の必要個数を2ユニットないし3ユニット分用意すれば良く、必用個数を大幅に削減することができ、吊り足場全体を設置する場合のコスト低減を図ることができる。   In this way, the necessary number of mobile lifting jigs 20 need only be prepared for 2 to 3 units, the necessary number can be greatly reduced, and the cost for installing the entire suspension scaffold can be reduced. Can do.

次に、吊り足場を解体する場合には、組立の場合と逆に、足場全体から1ユニット分の吊り足場40を分離し、これを移動式吊り治具20を介して作業台30上に移動して解体することを繰り返せば良い。   Next, when disassembling the suspension scaffold, contrary to the assembly, the suspension scaffold 40 for one unit is separated from the entire scaffold, and this is moved onto the work table 30 via the movable suspension jig 20. And then repeat the dismantling.

また、組立の際に固定式吊り治具に盛り換えた場合には、レバーウインチなどで荷重を支持した後、固定式吊り治具を取り外して移動式吊り治具20に荷重を移しかえるようにすれば良く、荷重を移しかえた後は、同様に1ユニットずつ移動式吊り治具20で移動させて解体することを繰り返せば良い。   In addition, when the assembly is replaced with a fixed suspension jig, the load is supported by a lever winch and the like, and then the fixed suspension jig is removed to transfer the load to the movable suspension jig 20. After the load has been transferred, it may be repeated by moving the mobile suspension jig 20 one unit at a time in the same manner.

以上、具体的に説明したように、この吊り足場の組立方法によれば、移動式吊り治具20を主桁1の下フランジ1a上を移動させることで、予めレールを取り付ける必要をなくして雨水による腐食の問題もなく、橋脚9近傍の作業台30上で1ユニット分の吊り足場40を組み立てて移動式吊り治具20で移動することで、張り出しながらの高所作業を減少することができるとともに、短時間に効率的に組み立てることができ、交通規制の必要も大幅に短縮することができる。   As specifically described above, according to the method for assembling the suspension scaffold, the movable suspension jig 20 is moved on the lower flange 1a of the main girder 1 so that it is not necessary to attach a rail in advance. There is no problem of corrosion due to the above. By assembling the suspension scaffold 40 for one unit on the work table 30 in the vicinity of the pier 9 and moving it with the movable suspension jig 20, it is possible to reduce the work at high places while projecting. At the same time, it can be assembled efficiently in a short time, and the need for traffic regulation can be greatly reduced.

また、この吊り足場の組立方法によれば、チェーンなどの固定式吊り治具に盛り変えることで、移動式吊り治具20の必要個数を大幅に削減することができ、吊り足場の設置コストの削減を図ることができる。   In addition, according to the method of assembling the suspension scaffold, the necessary number of the movable suspension jigs 20 can be significantly reduced by changing to a fixed suspension jig such as a chain. Reduction can be achieved.

さらに、この吊り足場の解体方法によれば、移動式吊り治具20を主桁1の下フランジ1a上を移動させることで、予めレールを取り付ける必要をなくして雨水による腐食の問題もなく、吊り足場を1ユニット分に分離して移動式吊り治具20で橋脚9近傍の作業台309上に移動して解体することができ、張り出しながらの高所作業を減少することができるとともに、短時間に効率的に解体することができ、交通規制の必要も大幅に短縮することができる。   Furthermore, according to the method for dismantling the suspension scaffold, the movable suspension jig 20 is moved on the lower flange 1a of the main girder 1 so that it is not necessary to attach a rail in advance and there is no problem of corrosion due to rainwater. The scaffold can be separated into one unit and moved to the work table 309 near the pier 9 with the movable suspension jig 20 to be disassembled, so that the work at high places while overhanging can be reduced and the time can be reduced. Can be dismantled efficiently, and the need for traffic regulation can be greatly reduced.

また、この吊り足場の解体方法によれば、チェーンなどの固定式吊り治具から移動式吊り治具20に盛り変えることで、移動式吊り治具20の必要個数を大幅に削減することができ、吊り足場の解体コストの削減を図ることができる。   In addition, according to this method of dismantling the suspension scaffold, the necessary number of the movable suspension jigs 20 can be greatly reduced by changing from a stationary suspension jig such as a chain to the movable suspension jig 20. The cost for dismantling the suspension scaffold can be reduced.

この発明の吊り足場の組立方法、解体方法およびこれらに用いる移動式吊り治具の一実施の形態にかかり、(a)は1ユニット分の吊り足場の正面図、(b)は箱桁に設置した状態の横断面図、(c)は鈑桁に設置した状態の横断面図である。It relates to an embodiment of a method for assembling and disassembling a suspension scaffold according to the present invention and a mobile suspension jig used therefor, (a) is a front view of a suspension scaffold for one unit, and (b) is installed in a box girder. (C) is a cross-sectional view in a state where it is installed on a girder. この発明の吊り足場の組立方法、解体方法およびこれらに用いる移動式吊り治具の一実施の形態にかかる移動式吊り治具の分解斜視図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an exploded perspective view of a mobile suspension jig according to an embodiment of a suspension scaffold assembly method, a disassembly method, and a mobile suspension jig used therefor according to the present invention. この発明の吊り足場の組立方法、解体方法およびこれらに用いる移動式吊り治具の一実施の形態にかかる組立工程の説明図である。It is explanatory drawing of the assembly process concerning one Embodiment of the assembly method of the suspension scaffold of this invention, a disassembly method, and the movable suspension jig used for these. 従来の吊り足場の横断面図である。It is a cross-sectional view of a conventional suspension scaffold. 従来の橋梁の移動式防護工の説明図である。It is explanatory drawing of the conventional mobile protective work of a bridge.

符号の説明Explanation of symbols

1 主桁
1a 下フランジ
1b 箱桁
1c 鈑桁
2 吊金具
3 チェーン
4 おやごパイプ
5 ころがし
6 足場板
7 手すり
8 ネット
9 橋脚
20 移動式吊り治具
21 治具本体
21a 連結部
22 ローラ(走行用)
23 浮き上り防止ローラ
24 硬質ゴム
25 ボルト孔(治具本体)
26 パイプ固定金具
27 パイプ取付孔
28 ボルト孔(パイプ固定金具)
29 ボルト
30 作業台
31 ロープ
32 シーブ
33 ロープ(ループ状)
40 吊り足場
41 連結部材

DESCRIPTION OF SYMBOLS 1 Main girder 1a Lower flange 1b Box girder 1c Girder 2 Suspension bracket 3 Chain 4 Oya pipe 5 Rolling 6 Scaffold plate 7 Handrail 8 Net 9 Bridge pier 20 Mobile suspension jig 21 Jig body 21a Connecting part 22 Roller (for traveling)
23 Lifting prevention roller 24 Hard rubber 25 Bolt hole (Jig body)
26 Pipe fixing bracket 27 Pipe mounting hole 28 Bolt hole (pipe fixing bracket)
29 Bolt 30 Worktable 31 Rope 32 Sheave 33 Rope (Loop)
40 Suspended scaffold 41 Connecting member

Claims (7)

橋梁の主桁の下フランジ上を転動して移動可能な移動式吊り治具を介して橋脚近傍の作業台上でおやごパイプを吊り下げて1ユニット分の吊り足場を組み立てた後、他方の橋脚側に移動して設置するとともに、前記作業台上で次ぎの1ユニット分の吊り足場を組み立てることを繰り返すようにしたことを特徴とする吊り足場の組立方法。 After assembling a suspension scaffold for one unit by hanging a wooden pipe on a work table near the pier via a movable lifting jig that can move by rolling on the lower flange of the main girder of the bridge, A method of assembling a suspension scaffold, wherein the assembly is performed by moving to the pier side and repeatedly assembling a suspension scaffold for the next one unit on the work table. 前記移動式吊り治具で移動した後、固定式吊り治具に盛り換えて前記吊り足場を設置するようにしたことを特徴とする請求項1記載の吊り足場の組立方法。 2. The method of assembling a suspension scaffold according to claim 1, wherein the suspension scaffold is installed after being moved by the movable suspension jig and replaced with a fixed suspension jig. 橋梁の主桁の下フランジ上を転動して移動可能な移動式吊り治具を介しておやごパイプを吊り下げて組み立てられた吊り足場を、1ユニット分ずつに分離して橋脚近傍の作業台上に移動して解体することを繰り返すようにしたことを特徴とする吊り足場の解体方法。 Work in the vicinity of the pier by separating the suspension scaffolds that are assembled by suspending the cage pipes through a movable suspension jig that can be moved by rolling on the lower flange of the main girder of the bridge. A method for dismantling a suspended scaffold, characterized by repeating the dismantling by moving to a table. 前記吊り足場を固定設置した固定式吊り治具から前記移動式吊り治具に盛り換えて移動し、解体するようにしたことを特徴とする請求項3記載の吊り足場の解体方法。 4. The method for disassembling a suspension scaffold according to claim 3, wherein the suspension scaffold is moved from the fixed suspension jig in which the suspension scaffold is fixedly installed to the movable suspension jig to be disassembled. 橋梁の主桁の下フランジ上を転動して移動可能なローラを上部に備える治具本体と、この治具本体下部に連結可能に設けられおやごパイプを支持固定するパイプ固定金具とからなることを特徴とする移動式吊り治具。 It consists of a jig body with an upper roller that can move by rolling on the lower flange of the main girder of the bridge, and a pipe fixing bracket that can be connected to the lower part of the jig body to support and fix the jog pipe. A mobile hanging jig characterized by that. 前記治具本体に、前記主桁の下部フランジ下面に沿って転動する浮き上り防止ローラを設けたことを特徴とする請求項5記載の移動式吊り治具。 6. The movable suspension jig according to claim 5, wherein a lifting prevention roller that rolls along the lower surface of the lower flange of the main girder is provided in the jig main body. 前記ローラおよび/または前記浮き上り防止ローラの表面を、硬質ゴムで構成したことを特徴とする請求項5または6記載の移動式吊り治具。

The movable suspension jig according to claim 5 or 6, wherein a surface of the roller and / or the anti-lifting roller is made of hard rubber.

JP2004039242A 2004-02-17 2004-02-17 How to assemble a suspended scaffold Expired - Fee Related JP4407306B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004039242A JP4407306B2 (en) 2004-02-17 2004-02-17 How to assemble a suspended scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004039242A JP4407306B2 (en) 2004-02-17 2004-02-17 How to assemble a suspended scaffold

Publications (2)

Publication Number Publication Date
JP2005232677A true JP2005232677A (en) 2005-09-02
JP4407306B2 JP4407306B2 (en) 2010-02-03

Family

ID=35015920

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004039242A Expired - Fee Related JP4407306B2 (en) 2004-02-17 2004-02-17 How to assemble a suspended scaffold

Country Status (1)

Country Link
JP (1) JP4407306B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008050811A (en) * 2006-08-23 2008-03-06 Ihi Corp Movable suspended scaffolding apparatus
JP2013234509A (en) * 2012-05-10 2013-11-21 Fukuto Kensetsu Kk Shaft excavation and soil-gathering method and shaft excavation and soil-gathering apparatus
JP2014015808A (en) * 2012-07-11 2014-01-30 Mitsui Eng & Shipbuild Co Ltd Method for constructing scaffold for rebuilding construction of bridge, and apparatus for constructing scaffold for construction
CN107542037A (en) * 2017-09-28 2018-01-05 谢晓燕 A kind of new supporting bracket of bridge construction
JP6271801B1 (en) * 2017-09-08 2018-01-31 新日鉄住金エンジニアリング株式会社 Road bridge inspection deck and road bridge inspection deck construction method
KR101825587B1 (en) * 2015-07-16 2018-02-05 (주)지아이건설 Temporary prestress deck for steel bridge.
JP2019143396A (en) * 2018-02-22 2019-08-29 三井住友建設株式会社 Suspended scaffold and bridge repair method
CN114232504A (en) * 2022-01-24 2022-03-25 岳西县彩虹瀑布旅游有限公司 Construction method of glass plank road in scenic spot

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008050811A (en) * 2006-08-23 2008-03-06 Ihi Corp Movable suspended scaffolding apparatus
JP2013234509A (en) * 2012-05-10 2013-11-21 Fukuto Kensetsu Kk Shaft excavation and soil-gathering method and shaft excavation and soil-gathering apparatus
JP2014015808A (en) * 2012-07-11 2014-01-30 Mitsui Eng & Shipbuild Co Ltd Method for constructing scaffold for rebuilding construction of bridge, and apparatus for constructing scaffold for construction
KR101825587B1 (en) * 2015-07-16 2018-02-05 (주)지아이건설 Temporary prestress deck for steel bridge.
JP6271801B1 (en) * 2017-09-08 2018-01-31 新日鉄住金エンジニアリング株式会社 Road bridge inspection deck and road bridge inspection deck construction method
JP2019049123A (en) * 2017-09-08 2019-03-28 新日鉄住金エンジニアリング株式会社 Road bridge inspection deck and road bridge inspection deck construction method
CN107542037A (en) * 2017-09-28 2018-01-05 谢晓燕 A kind of new supporting bracket of bridge construction
CN107542037B (en) * 2017-09-28 2018-12-04 谢志坚 A kind of supporting bracket of bridge construction
JP2019143396A (en) * 2018-02-22 2019-08-29 三井住友建設株式会社 Suspended scaffold and bridge repair method
JP7033825B2 (en) 2018-02-22 2022-03-11 三井住友建設株式会社 How to repair suspended scaffolding and bridges
CN114232504A (en) * 2022-01-24 2022-03-25 岳西县彩虹瀑布旅游有限公司 Construction method of glass plank road in scenic spot

Also Published As

Publication number Publication date
JP4407306B2 (en) 2010-02-03

Similar Documents

Publication Publication Date Title
JP6786070B2 (en) Permanent scaffolding installation method for bridge inspection
JP2009051574A (en) Scaffolding for construction work of elevator, and scaffolding installing method using the same
RU2492131C2 (en) Gantry appliance for mounting or servicing of heavy part of moving device
JP6876573B2 (en) Suspended scaffolding device
KR101948470B1 (en) Method for building aerial scaffolding
JP4407306B2 (en) How to assemble a suspended scaffold
JP6143071B2 (en) Building demolition method
JP2013256770A (en) Suspension frame for suspended scaffolding
JP2007046356A (en) Scaffold in bridge structure and its assembling method
JP6143070B2 (en) Building demolition method
JPH05295712A (en) Mobile protecting construction for bridge
KR101309119B1 (en) Pipe install device for bridges and it&#39;s pipe construction methods
KR100381724B1 (en) Inspection plate for a pier
JP2009161259A (en) Selfsustaining frame for conveyor
JP7430071B2 (en) Mobile scaffolding, mobile scaffolding system, and installation method of mobile scaffolding system
JP4425611B2 (en) Installation method of scaffolding for bridge girder repair painting work and scaffold equipment for bridge girder repair painting work
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
KR101807406B1 (en) Scaffolding equipment for bridge maintenance
JP2016014236A (en) Suspended scaffold
KR20070010522A (en) Transferring vehicle for inspecting and repairing bridge
JP6368628B2 (en) Mobile scaffold and inspection / repair method using the mobile scaffold
JP5074793B2 (en) Remodeling method of passenger conveyor and traveling roller unit used in the remodeling method
JP4516800B2 (en) How to build a suspended scaffold
JP2007186947A (en) Method of forming working scaffold on girder back face, and working scaffold on girder back face
KR200397441Y1 (en) Transferring vehicle for inspecting and repairing bridge

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061218

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090122

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090203

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090402

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091020

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091102

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121120

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121120

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees