Prior art keywords
passage block
bolt
hole
positioning pin
insertion hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003436247A
Other languages
Japanese (ja)
Other versions
JP4341052B2 (en
Inventor
Akira Yamada
山田  明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2003436247A priority Critical patent/JP4341052B2/en
Publication of JP2005164021A publication Critical patent/JP2005164021A/en
Application granted granted Critical
Publication of JP4341052B2 publication Critical patent/JP4341052B2/en
Priority to US12/659,641 priority patent/US8167511B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Valve Housings (AREA)
  • Connection Of Plates (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a connection device of a passage block which allows easy positioning of a bolt insertion hole of an upper step passage block and a tapped hole of a lower step passage block when attaching the upper passage block to the lower step passage block and capable of decreasing the number of bolts. <P>SOLUTION: The connection device of the passage block consists of the bolt through hole 13 and the pin insertion hole 14 formed at the upper step passage block 3, the tapped hole 15 and a non-tapped hole 16 formed at the lower step passage block 4, a bolt 11 inserted into the bolt insertion hole 13 and screwed to the tapped hole 15 and a positioning pin 12, with its lower end part fit into the non-tapped hole 16, inserted into the pin insertion hole 14. A notch part 17 is formed near a lower end of the positioning pin 12 and a protrusion part 18 to be fit with the notch part 17 is formed at an opening part of the non-tapped hole 16. The passage blocks 3, 4 connect with each other as even clamping is achieved when clamping force of the bolt 11 and the force of the lower end part of the positioning pin 12 pushing upward the protrusion part 18 of the non-tapped hole 16 are balanced. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

この発明は、流体制御装置に使用されるマスフローコントローラとこれに突き合わされるブロック状継手部材とを結合する際などに好適な通路ブロックの結合装置に関する。  The present invention relates to a coupling device for a passage block suitable for coupling a mass flow controller used in a fluid control device and a block joint member abutted against the mass flow controller.

半導体製造装置等に使用される流体制御装置は、種々の流体制御機器が複数列に配置されるとともに、隣り合う列の流体制御機器の流路同士が所定箇所において機器接続手段により接続されることにより構成されているが、近年、この種の流体制御装置では、マスフローコントローラや開閉弁などをチューブを介さずに接続する集積化が進められている。このような流体制御装置では、マスフローコントローラの両側面に通路ブロック(上段通路ブロック)が設けられ、これとブロック状継手部材(下段通路ブロック)とが上方からの2本のボルトにより結合されている(例えば、特許文献1)。
特開平8−326943号公報
In a fluid control device used in a semiconductor manufacturing apparatus or the like, various fluid control devices are arranged in a plurality of rows, and the flow paths of fluid control devices in adjacent rows are connected to each other at a predetermined location by device connection means. In recent years, in this type of fluid control device, integration of connecting a mass flow controller, an on-off valve, and the like without using a tube has been advanced. In such a fluid control device, a passage block (upper passage block) is provided on both side surfaces of the mass flow controller, and this is connected to a block-like joint member (lower passage block) by two bolts from above. (For example, patent document 1).
JP-A-8-326943

上記流体制御装置では、上段通路ブロックを下段通路ブロックに取り付ける工数が多数回あり、ボルトの締付け作業の効率化、特に、上段通路ブロックのボルト挿通孔と下段通路ブロックのねじ孔との位置決めおよびボルト本数の低減が重要課題となっている。  In the above fluid control device, there are many man-hours for attaching the upper passage block to the lower passage block, and the bolt tightening work efficiency is improved. In particular, the positioning of the bolt passage hole of the upper passage block and the screw hole of the lower passage block and the bolt Reduction of the number is an important issue.

この発明の目的は、上段通路ブロックを下段通路ブロックに取り付けるに際し、上段通路ブロックのボルト挿通孔と下段通路ブロックのねじ孔との位置決めが容易であり、しかも、ボルト本数を低減することが可能な通路ブロックの結合装置を提供することにある。  The object of the present invention is to easily position the bolt passage hole of the upper passage block and the screw hole of the lower passage block when attaching the upper passage block to the lower passage block, and to reduce the number of bolts. It is to provide a coupling device for a passage block.

第1の発明による通路ブロックの結合装置は、下向き開口を有する上段通路ブロックと上向き開口を有する下段通路ブロックとを開口同士を突き合わせてボルトにより結合する結合装置であって、上段通路ブロックに開口を挟むように形成されたボルト挿通孔およびピン挿通孔と、上段通路ブロックのボルト挿通孔およびピン挿通孔にそれぞれ対応するように下段通路ブロックに形成されたねじ孔および非ねじ孔と、上段通路ブロックのボルト挿通孔に挿通されて下段通路ブロックのねじ孔にねじ合わされているボルトと、上段通路ブロックのピン挿通孔に挿通されて下端部が下段通路ブロックの非ねじ孔に嵌め合わされている位置決めピンとからなり、位置決めピンの下端近くに切欠き部が形成されるとともに、非ねじ孔の径が位置決めピン下端部の径より大きくされて、位置決めピンの切欠き部に嵌まり合う突出部が非ねじ孔に形成されており、位置決めピンの切欠き部と非ねじ孔の突出部とが先に嵌め合わされ、その後にボルトが締め付けられ、この際、ボルトの締付け力と位置決めピン下端部が非ねじ孔の突出部を上向きに押す力とがバランスされることによって、均等締付けが達成されて通路ブロック同士が結合されることを特徴とするものである。  According to a first aspect of the present invention, there is provided a coupling device for a passage block, wherein the upper passage block having a downward opening and the lower passage block having an upward opening are joined to each other by a bolt and joined by a bolt, and the opening is formed in the upper passage block. Bolt insertion hole and pin insertion hole formed so as to sandwich, screw hole and non-screw hole formed in the lower passage block so as to correspond to the bolt insertion hole and pin insertion hole of the upper passage block, and the upper passage block, respectively A bolt inserted into the screw passage hole of the lower passage block and screwed into the screw hole of the lower passage block, and a positioning pin inserted into the pin insertion hole of the upper passage block and fitted to the non-screw hole of the lower passage block. A notch is formed near the lower end of the positioning pin, and the diameter of the non-screw hole is A protrusion that is larger than the diameter of the lower end and fits into the notch of the positioning pin is formed in the non-screw hole, and the notch of the positioning pin and the protrusion of the non-screw hole are fitted together first. Then, the bolt is tightened, and at this time, the bolt tightening force and the force at which the lower end portion of the positioning pin pushes the protruding portion of the non-threaded hole upward is balanced, so that the uniform tightening is achieved and the passage blocks are connected to each other. It is characterized by being combined.

第2の発明による通路ブロックの結合装置は、下向き開口を有する上段通路ブロックと上向き開口を有する下段通路ブロックとを開口同士を突き合わせてボルトにより結合する結合装置であって、上段通路ブロックに開口を挟むように形成されたボルト挿通孔およびピン挿通孔と、上段通路ブロックのボルト挿通孔に対応するように下段通路ブロックに形成されたねじ孔と、下段通路ブロック上面に上方突出状に形成されて上段通路ブロックのピン挿通孔に挿通されかつ上端部が同ブロックの上面よりも上方に突出する位置決めピンと、位置決めピンの上端部に嵌め合わせられた切欠き部および上段通路ブロックのボルト挿通孔に対応するボルト挿通孔を有し上段通路ブロックの上方に重ねられた締付け補助部材と、位置決めピンの上端部に設けられて締付け補助部材の切欠き部が位置決めピンの上端部に嵌め合わせられた後の締付け補助部材の上方への移動を阻止する抜け止め部と、締付け補助部材および上段通路ブロックの各ボルト挿通孔に挿通されて下段通路ブロックのねじ孔にねじ合わされたボルトとからなり、締付け補助部材は、位置決めピン中心軸とボルト中心軸とのちょうど中央において最も下方に突出する凸円弧状底面を有しており、ボルトを締め付けた際、ボルトの締付け力と抜け止め部が締付け補助部材を下向きに押す力とがバランスされることによって、均等締付けが達成されて通路ブロック同士が結合されることを特徴とするものである。  According to a second aspect of the present invention, there is provided a coupling device for a passage block, wherein the upper passage block having a downward opening and the lower passage block having an upward opening are joined to each other by a bolt and joined by a bolt, and the opening is formed in the upper passage block. A bolt insertion hole and a pin insertion hole formed so as to be sandwiched, a screw hole formed in the lower passage block so as to correspond to a bolt insertion hole of the upper passage block, and an upper protrusion formed on the upper surface of the lower passage block Corresponds to the positioning pin that is inserted into the pin passage hole of the upper passage block and the upper end protrudes above the upper surface of the block, the notch portion fitted to the upper end portion of the positioning pin, and the bolt insertion hole of the upper passage block A tightening auxiliary member that has a bolt insertion hole to be stacked above the upper passage block, and an upper end portion of the positioning pin. And a retaining portion for preventing the upward movement of the tightening auxiliary member after the notched portion of the tightening auxiliary member is fitted to the upper end of the positioning pin, and the bolts of the tightening auxiliary member and the upper passage block are inserted. The tightening auxiliary member has a convex arc-shaped bottom surface that protrudes downwards at the exact center between the positioning pin central axis and the bolt central axis. When the bolt is tightened, the tightening force of the bolt and the force with which the retaining part pushes the tightening auxiliary member downward is balanced, so that even tightening is achieved and the passage blocks are connected. It is what.

なお、この明細書において、通路ブロックは、直方体ブロックに貫通状の通路が設けられたもので、継手として使用されるものや開閉弁などの流体制御器に一体化されたブロック状部分または本体部分を含むものとする。  In this specification, a passage block is a rectangular parallelepiped block provided with a penetrating passage, and is used as a joint or a block-like part or body part integrated with a fluid controller such as an on-off valve. Shall be included.

第1および第2の発明の通路ブロックの結合装置によると、1本のボルトによって結合可能であるので、ボルト本数を低減することが可能であり、しかも、ボルト締付け前には、下段通路ブロックに対する上段通路ブロックの位置が位置決めピンにより規制されるので、ボルトをねじ孔にねじ合わせる作業が容易となる。  According to the coupling device for the passage block of the first and second inventions, since the coupling can be made by one bolt, the number of bolts can be reduced, and before the bolt tightening, the lower passage block can be reduced. Since the position of the upper passage block is regulated by the positioning pin, the operation of screwing the bolt into the screw hole becomes easy.

この発明の実施の形態を、以下図面を参照して説明する。以下の説明において、左右は各図(b)の左右をいい、同図の紙面表側を前、この逆を後というものとする。  Embodiments of the present invention will be described below with reference to the drawings. In the following description, the left and right refer to the left and right in each figure (b), and the front side of the drawing in FIG.

図1から図3までは、第1の発明の通路ブロックの結合装置の実施形態を示している。  1 to 3 show an embodiment of a coupling device for a passage block according to the first invention.

第1の発明による通路ブロックの結合装置(1)は、例えばマスフローコントローラ(2)に設けられかつ下向き開口(3a)を有する上段通路ブロック(3)と上向き開口(4a)を有する下段通路ブロック(4)とを開口(3a)(4a)同士をシール部材(5)を介して突き合わせてボルト(11)により結合するもので、上段通路ブロック(3)に開口(3a)を挟むように形成されたボルト挿通孔(13)およびピン挿通孔(14)と、上段通路ブロック(3)のボルト挿通孔(13)およびピン挿通孔(14)にそれぞれ対応するように下段通路ブロック(4)に形成されたねじ孔(15)および非ねじ孔(16)と、上段通路ブロック(3)のボルト挿通孔(13)に挿通されて下段通路ブロック(4)のねじ孔(15)にねじ合わされているボルト(11)と、上段通路ブロック(3)のピン挿通孔(14)に挿通されて下端部が下段通路ブロック(4)の非ねじ孔(16)に嵌め合わされている位置決めピン(12)とからなる。  The passage block coupling device (1) according to the first invention includes, for example, an upper passage block (3) having a downward opening (3a) and a lower passage block having an upward opening (4a) provided in the mass flow controller (2). 4) and the openings (3a) and (4a) are brought into contact with each other via a seal member (5) and joined by bolts (11), and are formed so that the opening (3a) is sandwiched between the upper passage block (3). The lower passage block (4) is formed so as to correspond to the bolt insertion hole (13) and the pin insertion hole (14) and the bolt insertion hole (13) and the pin insertion hole (14) of the upper passage block (3), respectively. The threaded hole (15) and the non-threaded hole (16), and the bolt passage hole (13) of the upper passage block (3) are inserted into the screw hole (15) of the lower passage block (4). The matching bolt (11) and the positioning pin (the lower end portion of which is fitted into the non-threaded hole (16) of the lower passage block (4) through the pin insertion hole (14) of the upper passage block (3). 12).

位置決めピン(12)の下端近くには、切欠き部(17)が形成されており、下段通路ブロック(4)の非ねじ孔(16)の開口部には、この切欠き部(17)に嵌まり合う突出部(18)が形成されている。  A notch (17) is formed near the lower end of the positioning pin (12), and the notch (17) is formed at the opening of the non-screw hole (16) of the lower passage block (4). The fitting part (18) which fits is formed.

下段通路ブロック(4)の非ねじ孔(16)の径は、位置決めピン(12)の下端部の径よりも大きくなされており、非ねじ孔(16)の開口部の径は、突出部(18)が設けられることによって、位置決めピン(12)の径よりもわずかに小さくなっている。突出部(18)は、非ねじ孔(16)の左面より右方にのびるように形成されており、下段通路ブロック(4)の非ねじ孔(16)よりも左の部分(4b)は、その他の部分よりもわずかに凹となるように削られている。したがって、図2に示すように、上段通路ブロック(3)が下段通路ブロック(4)に対して傾斜させられた状態において、位置決めピン(12)の下端部を非ねじ孔(16)に嵌め入れて、位置決めピン(12)の切欠き部(17)と非ねじ孔(16)の突出部(18)とを先に嵌め合わせることが可能とされ、これにより、下段通路ブロック(4)に対する上段通路ブロック(3)の位置決めがなされる。次いで、図3に示すように、上段通路ブロック(3)が下段通路ブロック(4)に重ね合わせ状態とされた際、位置決めピン(12)下端部が非ねじ孔(16)の突出部(18)を上向きに押す力が作用する。その後にボルト(11)が締め付けられ、この際、ボルト(11)の締付け力(ボルト(11)が下段通路ブロック(4)を上向きに引く力)と位置決めピン(12)下端部が非ねじ孔(16)の突出部(18)を上向きに押す力とがバランスされることによって、均等締付けが達成されて通路ブロック(3)(4)同士が結合される。  The diameter of the non-screw hole (16) of the lower passage block (4) is larger than the diameter of the lower end portion of the positioning pin (12), and the diameter of the opening of the non-screw hole (16) is the protrusion ( By providing 18), the diameter of the positioning pin (12) is slightly smaller. The protrusion (18) is formed so as to extend rightward from the left surface of the non-screw hole (16), and the portion (4b) on the left side of the non-screw hole (16) of the lower passage block (4) It is shaved to be slightly concave than the other parts. Therefore, as shown in FIG. 2, in the state where the upper passage block (3) is inclined with respect to the lower passage block (4), the lower end portion of the positioning pin (12) is fitted into the non-screw hole (16). Thus, the notch portion (17) of the positioning pin (12) and the protruding portion (18) of the non-screw hole (16) can be fitted together, whereby the upper stage relative to the lower passage block (4). The passage block (3) is positioned. Next, as shown in FIG. 3, when the upper passage block (3) is overlapped with the lower passage block (4), the lower end of the positioning pin (12) is the protrusion (18) of the non-screw hole (16). ) Is pressed upward. Thereafter, the bolt (11) is tightened. At this time, the tightening force of the bolt (11) (the force with which the bolt (11) pulls the lower passage block (4) upward) and the lower end of the positioning pin (12) are non-threaded holes. By balancing the upward pressing force of the protruding portion (18) of (16), uniform tightening is achieved and the passage blocks (3) and (4) are joined together.

第1の発明の通路ブロックの結合装置(1)によると、1本のボルト(11)によって結合可能であるので、ボルト本数を低減することが可能であり、しかも、ボルト締付け前には、下段通路ブロック(4)に対する上段通路ブロック(3)の位置が位置決めピン(12)により規制されるので、ボルト(11)をねじ孔(15)にねじ合わせる作業が容易となる。  According to the coupling device (1) of the passage block of the first invention, since it can be coupled by one bolt (11), it is possible to reduce the number of bolts, and before tightening the bolt, Since the position of the upper passage block (3) with respect to the passage block (4) is regulated by the positioning pin (12), the operation of screwing the bolt (11) into the screw hole (15) is facilitated.

図4から図6までは、第2の発明の通路ブロックの結合装置の実施形態を示している。  4 to 6 show an embodiment of the coupling device for the passage block of the second invention.

第2の発明による通路ブロックの結合装置(20)は、例えばマスフローコントローラ(2)に設けられかつ下向き開口(3a)を有する上段通路ブロック(3)と上向き開口(4a)を有する下段通路ブロック(4)とを開口(3a)(4a)同士をシール部材(5)を介して突き合わせてボルト(21)により結合するもので、上段通路ブロック(3)に開口を挟むように形成されたボルト挿通孔(23)およびピン挿通孔(24)と、上段通路ブロック(3)のボルト挿通孔(23)に対応するように下段通路ブロック(4)に形成されたねじ孔(25)と、下段通路ブロック(4)上面に上方突出状に形成されて上段通路ブロック(3)のピン挿通孔(24)に挿通されかつ上端部が同ブロック(3)の上面よりも上方に突出する位置決めピン(22)と、位置決めピン(22)の上端部に嵌め合わせられた切欠き部(31)および上段通路ブロック(3)のボルト挿通孔(23)に対応するボルト挿通孔(32)を有し上段通路ブロック(3)の上方に重ねられた締付け補助部材(30)と、位置決めピン(22)の上端部に設けられて締付け補助部材(30)の切欠き部(31)が位置決めピン(22)の上端部に嵌め合わせられた後の締付け補助部材(30)の上方への移動を阻止する抜け止め部(27)と、締付け補助部材(30)および上段通路ブロック(3)の各ボルト挿通孔(32)(23)に挿通されて下段通路ブロック(4)のねじ孔(25)にねじ合わされたボルト(21)とからなる。  The passage block coupling device (20) according to the second invention includes, for example, an upper passage block (3) having a downward opening (3a) and a lower passage block having an upward opening (4a) provided in the mass flow controller (2). 4) and the openings (3a) and (4a) are brought into contact with each other via a seal member (5) and joined by bolts (21). Bolt insertion formed so as to sandwich the opening in the upper passage block (3) A hole (23), a pin insertion hole (24), a screw hole (25) formed in the lower passage block (4) so as to correspond to the bolt insertion hole (23) of the upper passage block (3), and a lower passage The upper surface of the block (4) is formed so as to protrude upward, is inserted into the pin insertion hole (24) of the upper passage block (3), and the upper end protrudes upward from the upper surface of the block (3). The fixing pin (22), the notch (31) fitted to the upper end of the positioning pin (22), and the bolt insertion hole (32) corresponding to the bolt insertion hole (23) of the upper passage block (3) The fastening auxiliary member (30) overlaid on the upper passage block (3), and the notch (31) of the fastening auxiliary member (30) provided at the upper end of the positioning pin (22) is the positioning pin. Each of the retaining portion (27) that prevents the upward movement of the tightening auxiliary member (30) after being fitted to the upper end portion of (22), the tightening auxiliary member (30), and the upper passage block (3) It consists of a bolt (21) inserted through the bolt insertion hole (32) (23) and screwed into the screw hole (25) of the lower passage block (4).

位置決めピン(22)は、下端部におねじ部を有しており、下段ブロック(4)に設けられたねじ孔(26)にねじ合わされている。上端近くの部分が小径(22a)とされることによってその上端部が抜け止め部(27)とされている。  The positioning pin (22) has a threaded portion at the lower end and is screwed into a screw hole (26) provided in the lower block (4). The portion near the upper end has a small diameter (22a), so that the upper end is a retaining portion (27).

締付け補助部材(30)は、位置決めピン(22)中心軸とボルト(21)中心軸とのちょうど中央において最も下方に突出する凸円弧状底面(33)を有している。  The tightening auxiliary member (30) has a convex arc-shaped bottom surface (33) that protrudes downward most at the center between the center axis of the positioning pin (22) and the center axis of the bolt (21).

第2の発明による通路ブロックの結合装置(20)は、まず、図4に示すように、位置決めピン(22)を下段ブロック(4)に固定しておいてから、上段ブロック(3)のピン挿通孔(24)に位置決めピン(22)を挿通し、上段通路ブロック(3)と下段通路ブロック(4)とを重ね合わせる。これにより、下段通路ブロック(4)に対する上段通路ブロック(3)の位置が位置決めピン(22)により規制される。次いで、図5に示すように、締付け補助部材(30)を、その切欠き部(31)を位置決めピン(22)の小径部(22a)に嵌め合わせることにより、上段通路ブロック(3)の上に重ね合わせる。そして、ボルト(21)を締付け補助部材(30)および上段通路ブロック(3)の各ボルト挿通孔(32)(23)に挿通し、下段通路ブロック(4)のねじ孔(25)にねじ合わせる。このようにしてボルト(21)を締め付けることにより、ボルト(21)の締付け力(ボルト(21)が締付け補助部材(30)を下向きに押す力)と抜け止め部(27)が締付け補助部材(30)を下向きに押す力とがバランスされることによって、均等締付けが達成されて通路ブロック(3)(4)同士が結合される。  As shown in FIG. 4, the coupling device (20) for the passage block according to the second invention first fixes the positioning pin (22) to the lower block (4) and then the pin of the upper block (3). The positioning pin (22) is inserted into the insertion hole (24), and the upper passage block (3) and the lower passage block (4) are overlapped. Thereby, the position of the upper stage passage block (3) with respect to the lower stage passage block (4) is regulated by the positioning pin (22). Next, as shown in FIG. 5, the tightening auxiliary member (30) is fitted to the upper diameter passage block (3) by fitting its notch (31) to the small diameter portion (22a) of the positioning pin (22). To overlay. Then, the bolt (21) is inserted into the tightening auxiliary member (30) and the bolt insertion holes (32) and (23) of the upper passage block (3) and screwed into the screw holes (25) of the lower passage block (4). . By tightening the bolt (21) in this manner, the tightening force of the bolt (21) (the force by which the bolt (21) pushes the tightening auxiliary member (30) downward) and the retaining portion (27) become the tightening auxiliary member ( 30) is balanced against the downward pressing force, so that even tightening is achieved and the passage blocks (3) and (4) are joined together.

第2の発明の通路ブロックの結合装置(20)によると、1本のボルト(21)によって結合可能であるので、ボルト本数を低減することが可能であり、しかも、ボルト(21)締付け前には、下段通路ブロック(4)に対する上段通路ブロック(3)の位置が位置決めピン(22)により規制されるので、ボルト(21)をねじ孔にねじ合わせる作業が容易となる。  According to the coupling device (20) of the passage block of the second invention, since it can be coupled by one bolt (21), the number of bolts can be reduced, and before the bolt (21) is tightened. Since the position of the upper passage block (3) with respect to the lower passage block (4) is regulated by the positioning pin (22), the operation of screwing the bolt (21) into the screw hole is facilitated.

図7は、上記の第1および第2の発明による通路ブロックの結合装置の締付け状態を従来例と比較するグラフである。同グラフは、ボルト締付トルク(N・m)と推力(N)の関係を示しており、この結果から、発明品(第1および第2の発明による通路ブロックの結合装置)は、データ的には従来品(ボルトを2本使用するもの)と同じ性能であり、同等の締付け力を維持して、ボルトの締付け本数を半減できることが分かる。  FIG. 7 is a graph comparing the tightening state of the coupling device for the passage block according to the first and second inventions with a conventional example. The graph shows the relationship between the bolt tightening torque (N · m) and the thrust (N). From this result, the invention product (passage block coupling device according to the first and second inventions) is data-like. Is the same performance as the conventional product (using two bolts), and it can be seen that the number of bolts can be halved while maintaining the same tightening force.

なお、下段通路ブロック(4)は、マスフローコントローラ(2)に隣り合う流体制御機器(例えば開閉弁、フィルターなど)の本体(上段通路ブロックに相当)と上記と同じ結合装置または通常の2本のボルトによる結合装置により結合され、これにより、マスフローコントローラ(2)と流体制御機器とが下段通路ブロック(4)を介して連通される。上記実施形態では、マスフローコントローラ(2)に設けられた上段通路ブロック(3)とこれを他の流体制御機器に連通させる継手部材としての下段通路ブロック(4)とを結合する場合についてのみ説明したが、この発明による結合装置は、これに限らず、他の流体制御機器同士や他の流体制御機器と継手部材との結合に適用することができる。  The lower passage block (4) is composed of a main body (corresponding to the upper passage block) of a fluid control device (for example, an on-off valve, a filter, etc.) adjacent to the mass flow controller (2) and the same coupling device as described above or two ordinary passage devices. It couple | bonds with the coupling | bonding apparatus by a volt | bolt, and, thereby, a mass flow controller (2) and a fluid control apparatus are connected via a lower stage passage block (4). In the above-described embodiment, only the case where the upper passage block (3) provided in the mass flow controller (2) and the lower passage block (4) as a joint member for communicating with the other fluid control device are coupled is described. However, the coupling device according to the present invention is not limited to this, and can be applied to coupling between other fluid control devices or between another fluid control device and a joint member.

図1は、第1の発明による通路ブロックの結合装置の実施形態を示すもので、(a)は斜視図、(b)は正面断面図であり、結合の過程の内の最初の過程を示している。1A and 1B show an embodiment of a connecting device for passage blocks according to the first invention, wherein FIG. 1A is a perspective view and FIG. 1B is a front sectional view showing the first step of the connecting process. ing. 図2は、第1の発明による通路ブロックの結合装置の実施形態を示すもので、(a)は斜視図、(b)は正面断面図であり、結合の過程の内の中間の過程を示している。2A and 2B show an embodiment of a coupling device for passage blocks according to the first invention, wherein FIG. 2A is a perspective view and FIG. 2B is a front sectional view showing an intermediate process of the coupling processes. ing. 図3は、第1の発明による通路ブロックの結合装置の実施形態を示すもので、(a)は斜視図、(b)は正面断面図であり、結合完了状態を示している。FIGS. 3A and 3B show an embodiment of a coupling device for passage blocks according to the first invention, wherein FIG. 3A is a perspective view and FIG. 3B is a front sectional view showing a coupling completion state. 図4は、第2の発明による通路ブロックの結合装置の実施形態を示すもので、(a)は斜視図、(b)は正面断面図であり、結合の過程の内の最初の過程を示している。4A and 4B show an embodiment of a connecting device for passage blocks according to the second invention, wherein FIG. 4A is a perspective view and FIG. 4B is a front sectional view showing the first step of the connecting process. ing. 図5は、第2の発明による通路ブロックの結合装置の実施形態を示すもので、(a)は斜視図、(b)は正面断面図であり、結合の過程の内の中間の過程を示している。FIGS. 5A and 5B show an embodiment of a connecting device for a passage block according to the second invention, wherein FIG. 5A is a perspective view and FIG. 5B is a front sectional view showing an intermediate process among the connecting processes. ing. 図6は、第1の発明による通路ブロックの結合装置の実施形態を示すもので、(a)は斜視図、(b)は正面断面図であり、結合完了状態を示している。6A and 6B show an embodiment of a coupling device for passage blocks according to the first invention, wherein FIG. 6A is a perspective view and FIG. 6B is a front sectional view showing a coupling completion state. 図7は、第1および第2の発明による通路ブロックの結合装置の締付け状態を従来例と比較するグラフである。FIG. 7 is a graph comparing the tightening state of the coupling device of the passage block according to the first and second inventions with a conventional example.

符号の説明Explanation of symbols

(1) 通路ブロックの結合装置
(3) 上段通路ブロック
(3a) 下向き開口
(4) 下段通路ブロック
(4a) 上向き開口
(11) ボルト
(12) 位置決めピン
(13) ボルト挿通孔
(14) ピン挿通孔
(15) ねじ孔
(16) 非ねじ孔
(17) 切欠き部
(18) 突出部
(20) 通路ブロックの結合装置
(21) ボルト
(22) 位置決めピン
(23) ボルト挿通孔
(24) ピン挿通孔
(25) ねじ孔
(27) 抜け止め部
(30) 締付け補助部材
(31) 切欠き部
(32) ボルト挿通孔
(33) 凸円弧状底面
(1) Passage block coupling device (3) Upper passage block (3a) Downward opening (4) Lower passage block (4a) Upward opening (11) Bolt (12) Positioning pin (13) Bolt insertion hole (14) Pin insertion Hole (15) Screw hole (16) Non-screw hole (17) Notch (18) Projection (20) Passage block coupling device (21) Bolt (22) Positioning pin (23) Bolt insertion hole (24) Pin Insertion hole (25) Screw hole (27) Retaining part (30) Tightening auxiliary member (31) Notch part (32) Bolt insertion hole (33) Convex arc-shaped bottom

Claims (2)

下向き開口を有する上段通路ブロックと上向き開口を有する下段通路ブロックとを開口同士を突き合わせてボルトにより結合する結合装置であって、上段通路ブロックに開口を挟むように形成されたボルト挿通孔およびピン挿通孔と、上段通路ブロックのボルト挿通孔およびピン挿通孔にそれぞれ対応するように下段通路ブロックに形成されたねじ孔および非ねじ孔と、上段通路ブロックのボルト挿通孔に挿通されて下段通路ブロックのねじ孔にねじ合わされているボルトと、上段通路ブロックのピン挿通孔に挿通されて下端部が下段通路ブロックの非ねじ孔に嵌め合わされている位置決めピンとからなり、位置決めピンの下端近くに切欠き部が形成されるとともに、非ねじ孔の径が位置決めピン下端部の径より大きくされて、位置決めピンの切欠き部に嵌まり合う突出部が非ねじ孔に形成されており、位置決めピンの切欠き部と非ねじ孔の突出部とが先に嵌め合わされ、その後にボルトが締め付けられ、この際、ボルトの締付け力と位置決めピン下端部が非ねじ孔の突出部を上向きに押す力とがバランスされることによって、均等締付けが達成されて通路ブロック同士が結合されることを特徴とする通路ブロックの結合装置。  A coupling device that joins an upper passage block having a downward opening and a lower passage block having an upward opening by abutting each other with a bolt, and a bolt insertion hole and a pin insertion formed so as to sandwich the opening in the upper passage block A hole, a screw hole and a non-screw hole formed in the lower passage block so as to correspond to the bolt insertion hole and the pin insertion hole of the upper passage block, and the bolt passage hole of the upper passage block, respectively. A bolt that is screwed into the screw hole and a positioning pin that is inserted into the pin insertion hole of the upper passage block and the lower end portion is fitted into the non-screw hole of the lower passage block. And the diameter of the non-screw hole is made larger than the diameter of the lower end portion of the positioning pin. A protrusion that fits into the notch is formed in the non-threaded hole, and the notch of the positioning pin and the protrusion of the non-threaded hole are first fitted, and then the bolt is tightened. Passage block coupling characterized in that equal tightening is achieved and the passage blocks are joined together by balancing the tightening force of the positioning pin and the force with which the lower end of the positioning pin pushes the protrusion of the non-screw hole upward apparatus. 下向き開口を有する上段通路ブロックと上向き開口を有する下段通路ブロックとを開口同士を突き合わせてボルトにより結合する結合装置であって、上段通路ブロックに開口を挟むように形成されたボルト挿通孔およびピン挿通孔と、上段通路ブロックのボルト挿通孔に対応するように下段通路ブロックに形成されたねじ孔と、下段通路ブロック上面に上方突出状に形成されて上段通路ブロックのピン挿通孔に挿通されかつ上端部が同ブロックの上面よりも上方に突出する位置決めピンと、位置決めピンの上端部に嵌め合わせられた切欠き部および上段通路ブロックのボルト挿通孔に対応するボルト挿通孔を有し上段通路ブロックの上方に重ねられた締付け補助部材と、位置決めピンの上端部に設けられて締付け補助部材の切欠き部が位置決めピンの上端部に嵌め合わせられた後の締付け補助部材の上方への移動を阻止する抜け止め部と、締付け補助部材および上段通路ブロックの各ボルト挿通孔に挿通されて下段通路ブロックのねじ孔にねじ合わされたボルトとからなり、締付け補助部材は、位置決めピン中心軸とボルト中心軸とのちょうど中央において最も下方に突出する凸円弧状底面を有しており、ボルトを締め付けた際、ボルトの締付け力と抜け止め部が締付け補助部材を下向きに押す力とがバランスされることによって、均等締付けが達成されて通路ブロック同士が結合されることを特徴とする通路ブロックの結合装置。  A coupling device that joins an upper passage block having a downward opening and a lower passage block having an upward opening by abutting each other with a bolt, and a bolt insertion hole and a pin insertion formed so as to sandwich the opening in the upper passage block A hole, a screw hole formed in the lower passage block so as to correspond to a bolt insertion hole of the upper passage block, and an upper protrusion formed on the upper surface of the lower passage block so as to protrude upward and into the pin insertion hole of the upper passage block A positioning pin that protrudes upward from the upper surface of the block, a notch portion fitted to the upper end of the positioning pin, and a bolt insertion hole corresponding to the bolt insertion hole of the upper passage block, above the upper passage block The tightening auxiliary member placed on top of the positioning pin and the notch of the tightening auxiliary member provided at the upper end of the positioning pin are positioned. A retaining portion that prevents the upward movement of the tightening auxiliary member after being fitted to the upper end of the pin, and a bolt insertion hole of the tightening auxiliary member and the upper passage block to be inserted into the screw hole of the lower passage block. The tightening auxiliary member has a convex arc-shaped bottom surface that protrudes downwardly at the exact center between the positioning pin central axis and the bolt central axis. When the bolt is tightened, A passage block coupling device characterized in that equal tightening is achieved and the passage blocks are joined together by balancing the force and the force with which the retaining portion pushes the tightening auxiliary member downward.
JP2003436247A 2003-12-02 2003-12-02 Passage block coupling device Expired - Fee Related JP4341052B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2003436247A JP4341052B2 (en) 2003-12-02 2003-12-02 Passage block coupling device
US12/659,641 US8167511B2 (en) 2003-12-02 2010-03-16 Coupling apparatus for passage blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003436247A JP4341052B2 (en) 2003-12-02 2003-12-02 Passage block coupling device

Publications (2)

Publication Number Publication Date
JP2005164021A true JP2005164021A (en) 2005-06-23
JP4341052B2 JP4341052B2 (en) 2009-10-07

Family

ID=34736864

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003436247A Expired - Fee Related JP4341052B2 (en) 2003-12-02 2003-12-02 Passage block coupling device

Country Status (1)

Country Link
JP (1) JP4341052B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008146780A1 (en) * 2007-05-31 2008-12-04 Fujikin Incorporated Fluid control apparatus
DE102007002706B4 (en) * 2007-01-18 2011-02-24 Festo Ag & Co. Kg valve assembly

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007002706B4 (en) * 2007-01-18 2011-02-24 Festo Ag & Co. Kg valve assembly
US8066028B2 (en) 2007-01-18 2011-11-29 Festo Ag & Co. Kg Structure for mounting valve units on a valve support
WO2008146780A1 (en) * 2007-05-31 2008-12-04 Fujikin Incorporated Fluid control apparatus
JP2008298180A (en) * 2007-05-31 2008-12-11 Fujikin Inc Fluid control device
US8281816B2 (en) 2007-05-31 2012-10-09 Fujikin Incorporated Fluid control apparatus

Also Published As

Publication number Publication date
JP4341052B2 (en) 2009-10-07

Similar Documents

Publication Publication Date Title
CA2218318C (en) Fluid coupling
CN101311560B (en) Coupling assembly and coupling method thereof
JP5125228B2 (en) Fluid control device and assembly method thereof
JP3925930B2 (en) Pipe coupling
US20090261573A1 (en) Pipe joint
JPH09112760A (en) Connection device of copper pipe
JP4341052B2 (en) Passage block coupling device
JPH0674219A (en) Pipe connector
TW202032011A (en) Member for pump installation
KR101788002B1 (en) Coupling for pipe
JP2008298177A (en) Fluid control device
JP2011527524A (en) How to make a tight mate
US8167511B2 (en) Coupling apparatus for passage blocks
JP2005090681A (en) Clip
JP2006161650A (en) Throttle body fastening structure
JP2009121625A (en) Substrate connector
JP2021095971A (en) Clamp chain-type pipe joint
JPH0349354Y2 (en)
JP2022076260A (en) Fastening structure, valve using the same and connecting device
JP4599158B2 (en) Pipe fitting
JP2006183730A (en) Mounting structure of apparatus for fluid
JPH10288289A (en) Push ring aligning tool
JP2003194029A (en) Joining fixture
JP2006170262A (en) Joint structure of tube
KR200194963Y1 (en) A fitting for high presure hose

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060822

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090521

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090602

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090626

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120717

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4341052

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130717

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees