JP2005105800A - Tool for lifting reinforcing bar of floor and inserting spacer - Google Patents

Tool for lifting reinforcing bar of floor and inserting spacer Download PDF

Info

Publication number
JP2005105800A
JP2005105800A JP2003384363A JP2003384363A JP2005105800A JP 2005105800 A JP2005105800 A JP 2005105800A JP 2003384363 A JP2003384363 A JP 2003384363A JP 2003384363 A JP2003384363 A JP 2003384363A JP 2005105800 A JP2005105800 A JP 2005105800A
Authority
JP
Japan
Prior art keywords
shaft
floor
spacer
tool
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003384363A
Other languages
Japanese (ja)
Inventor
Isao Kumada
功 熊田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2003384363A priority Critical patent/JP2005105800A/en
Publication of JP2005105800A publication Critical patent/JP2005105800A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/169Tools or apparatus specially adapted for working-up reinforcement mats

Abstract

<P>PROBLEM TO BE SOLVED: To provide a tool for lifting a reinforcing bar set up in a reinforced concrete floor and also for inserting a spacer which gets covering of the concrete. <P>SOLUTION: The tool is characterized that a head of a shaft 2, which is an asymmetrically bent round pipe, is provided with a hook fitting 5 and a strut 4 as well as a grip 1 at the upper part of the shaft. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

発明の詳細な説明Detailed Description of the Invention

この発明は、鉄筋コンクリートの床に組まれた鉄筋を持ち上げ、コンクリートの被りを得るスペイサーを差し入れするための道具に関するものである。  The present invention relates to a tool for lifting a reinforcing bar assembled on a reinforced concrete floor and inserting a spacer for obtaining a concrete covering.

従来床に組まれた鉄筋は、バール等で持ち上げスペイサーを差し入れていた。  Conventionally, reinforcing bars built on the floor were lifted with a bar or the like and a spacer was inserted.

発明が解決しようとする課題Problems to be solved by the invention

これは次のような欠点があった。
イ.床に組まれた鉄筋と作業する人の重量を合わせた鉄筋をバールの先端より少し手前にコンクリートの製のサイコロ等を挾み、てこの要領で鉄筋を持ち上げのための、作業する人の腰に大きな負担がかかっていた。
ロ.床に組まれた二層の鉄筋の上層鉄筋に、うま型スペイサー等を差し入れは、長いバールの先端より少し手前に10cmぐらいの角材等を挾み、てこの要領で鉄筋を持ち上げ作業する人はその組まれた鉄筋が足場となり、作業に危険が伴い作業効率が悪かった。
ハ.上記の作業工法のため、所定の位置にスペイサーを入れるのが軽減されていたと思う。
本発明は、以上の欠点を解決するためになされたものである。
This has the following drawbacks.
A. Reinforce the worker's waist to lift the rebar in the manner of a lever by holding a concrete dice etc. slightly before the tip of the bar. Was a heavy burden.
B. If you insert a space spacer, etc., into the upper layer of the two layers of reinforcing bars on the floor, the person who lifts the reinforcing bars in the manner of a lever, rubs about 10cm squares, etc. slightly before the end of the long bar. The assembled rebars were used as scaffolding, and the work was dangerous and the work efficiency was poor.
C. Because of the above work method, I think it was reduced to put a spacer at a predetermined position.
The present invention has been made to solve the above drawbacks.

課題を解決するための手段Means for solving the problem

段違いに曲げたシャフト(2)の頭部に吊り金具(5)と支柱(4)を設ける、そしてシャフト(2)の上部にグリップ(1)を設ける。
本発明は、以上の構成よりなる床に組まれた鉄筋のコンクリートの被りを得るスペイサーを差し入れするための道具である。
A hanging bracket (5) and a support (4) are provided on the head of the shaft (2) bent in a stepwise manner, and a grip (1) is provided on the top of the shaft (2).
The present invention is a tool for inserting a spacer for obtaining a concrete covering of a reinforcing bar assembled on a floor having the above-described configuration.

以下、本発明の実施の形態を説明する。
(イ)金属を主材とし、図1・図2で示す細長い円形管のシャフト(2)を曲げ、頭部に吊り金具(5)と支柱(4)を設け、その上部にゴムのグリップ(1)を差し入れたものである。
(ロ)吊り金具(5)は、図1・図3で示す平鋼の上部に数ケ所のピンの通し穴(5)を設け、その下部を90度の捻り(5)を加え、その下部を45度外側へ曲げた平鋼外面の位置で垂直に曲げ、さらに水平に90度曲げ平坦(5)とした頭部に外れ止め(5)を設ける。
(ハ)支柱(4)は、図1・図3で示す平鋼の上部に数ケ所のピンの通し穴(4)を設け、その下部の両端にテーパー(4)をつけ、ボルト(7)の上部に設けた、みそ(7)に差し込み溶接(12)で固定する.次にボルト(7)のかぶよりナット(8)と、お椀形の支持台(9)と発条(10)を差し込みナット(11)で固定し、その発条(10)はナット(8)で締めつけボルト(7)に設けた穴(7)にR型ピン(7)を差し込みナット(8)のゆるみを防ぐ、さらにナット(11)のゆるみは図3で示すボルト(7)の頭部にかしめ(7)を加えナット(11)のゆるみを防ぐ。
(ニ)シャフト(2)は、図3で示す丸棒鋼の補強材(3)をシャフト(2)の途中に挿入することにより簡単な曲げ機でシャフト(2)の円形の変形が生じなく曲げられ、そのシャフト(2)の補強も得られその曲げ寸法は支柱(4)芯より80mmで内曲げ角度が90度、さらに上部に120mmで内曲げ角度が130度とする。さらにシャフト(2)頭部の吊り金具(5)と支柱(4)は芯々で約80mm間隔でそれぞれ縦長の開口とし、その開口の端部と吊り金具(5)・支柱(4)の外面との隙間を約5mm設ける。さらにシャフト(2)に支柱(4)と吊り金具(5)をピン固定とする横の穴(2)を設ける。
次に、シャフト(2)の頭部は丸板鋼のキャップ(2)を溶接(12)で固定し、その頭部の補強する、さらにシャフトの上部は通気口(1)を設けた、ゴムのグリップ(1)を両面テープを併用し差し込み固定する。
(ホ)図2で示す吊り金具(5)と支柱(4)は配筋された鉄筋の上げ高さに合わせリベット型ピン(6)と2枚の座金(6)を用いシャフト(2)と固定し、そのリベット型ピン(6)の穴(6)にR型ピン(6)を差し込みピンの外れを防ぐ。
本発明は、以上の構成よりなっている。
本発明を使用するときは、建築基準法に定められた鉄筋とコンクリートの被り厚さを得るため、床に配筋された鉄筋を持ち上げ所定のスペイサーを入れる場合、下記で実施例を説明する。
(ヘ)スペイサーの高さが50mmの場合、図4・図5で示す一層の床配筋はシャフト(2)頭部に設けた吊り金具(5)のピン差し込み穴は、穴(5)で支柱(4)のピン差し込み穴は、穴(5)に合わせ配筋された下端筋(13)に外れ止め(5)を設けた吊り金具(5)の頭部を差し入れ、シャフト(2)のグリップ(1)を片手で押し下げ下端筋(13)の下に所定のスペイサーブロック(15)を挿入し、この作業を所定の間隔にスペイサーを次から次へと挿入し作業が完了となる。
(ト)スペイサーの高さが150mmの場合、図6・図7で示す二層の床配筋は、上記(ホ)の方法で一度に二層の鉄筋を上げ、その下層の下端筋(13)にスペイサーブロック(15)を入れる。
次に、吊り金具(5)の穴の位置を穴(5)と支柱(4)の穴の位置を穴(4)に変え、外れ止め(5)を設けた吊り金具(5)の頭部を上層の下端筋(13)に差し入れ、シャフト(2)のグリップ(1)を片手で押し下げ上層下端筋(13)の下に所定の、うま型スペイサー(16)等を挿入しこの作業を所定の感覚にスペイサーを次から次へと挿入し作業が完了となる。
(チ)上層下端端の高さが150mm以上の場合、吊り金具(5)と支柱(4)に設けたピンの差し込み穴の位置を高く変えることにより対応できる。
(リ)床に組まれた配筋は垂直の移動はできるが水平の移動はできないため下記の各支点の組み合が対応している。
(ア)吊り金具(5)の下部を平坦としたことにより下端筋(13)とに滑りが生じる、さらにシャフト(2)に設けた挿入口(2)が前後に約5mmの隙間を設け、さらにリベット型ピン(6)で結合したことにより対応している。
(イ)シャフト(2)に設けた支柱(4)の挿入口(2)と支柱(4)が前後に約5mmの隙間を設け、それぞれをピンで結合し、さらにお椀型の支持台(9)の中に発条(10)を設けたことにより、その支柱(4)が下端筋(13)を持ち上げるとき前後に動くことによ対応している。
以上の説明により、この道具は片手で安定した作業が円滑に鉄筋の垂直の移動ができる。
Embodiments of the present invention will be described below.
(B) The main material is metal, the shaft (2) of the elongated circular tube shown in FIG. 1 and FIG. 2 is bent, the hanging bracket (5) and the support (4) are provided on the head, and the rubber grip ( 1) is inserted.
(B) The hanging bracket (5) is provided with several pin through holes (5 1 ) in the upper part of the flat steel shown in FIGS. 1 and 3, and the lower part is twisted by 90 degrees (5 3 ), The lower part is bent vertically at the position of the flat steel outer surface bent outward by 45 degrees, and further provided with a stopper (5 5 ) on the head that is bent horizontally by 90 degrees and flat (5 4 ).
(C) The strut (4) is provided with several pin through holes (4 1 ) in the upper part of the flat steel shown in FIGS. 1 and 3, and tapers (4 4 ) are attached to both ends of the lower part of the bolt ( 7) Insert into the miso (7 1 ) provided in the upper part and fix it by welding (12). Next, the nut (8), the bowl-shaped support base (9) and the ridge (10) are fixed with the insertion nut (11) from the cover of the bolt (7), and the ridge (10) is tightened with the nut (8). Insert an R-type pin (7 3 ) into the hole (7 2 ) provided in the bolt (7) to prevent the nut (8) from loosening. The loosening of the nut (11) is the head of the bolt (7) shown in FIG. Add caulking (7 4 ) to prevent loosening of the nut (11).
(D) The shaft (2) is bent without causing circular deformation of the shaft (2) with a simple bending machine by inserting the reinforcing material (3) of the round bar steel shown in FIG. 3 in the middle of the shaft (2). The shaft (2) is also reinforced, and the bending dimension is 80 mm from the core of the support column (4), the inner bending angle is 90 degrees, and the upper bending angle is 120 mm and the inner bending angle is 130 degrees. Further, the shaft (2) head hanging bracket (5) and the support column (4) are vertically opened at intervals of about 80 mm at the center, and the ends of the openings and the outer surfaces of the suspension bracket (5) and the column (4) A gap of about 5 mm is provided. Further, the shaft (2) is provided with a horizontal hole (2 4 ) for fixing the column (4) and the suspension fitting (5) to the pin.
Next, the head of the shaft (2) is fixed with a round steel plate cap (2 3 ) by welding (12), the head is reinforced, and the upper part of the shaft is provided with a vent (1 1 ). Insert and fix the rubber grip (1) with double-sided tape.
(E) The hanging metal fitting (5) and the support post (4) shown in FIG. 2 have a shaft (2) using a rivet-type pin (6) and two washers (6 2 ) in accordance with the height of the reinforcing bar. And the R-type pin (6 3 ) is inserted into the hole (6 1 ) of the rivet-type pin (6) to prevent the pin from coming off.
The present invention has the above configuration.
When using the present invention, in order to obtain the covering thickness of the reinforcing bars and concrete defined in the Building Standards Act, when the reinforcing bars arranged on the floor are lifted and a predetermined spacer is inserted, an embodiment will be described below.
(F) When the height of the spacer is 50 mm, the floor reinforcement shown in FIGS. 4 and 5 is the shaft (2) The pin insertion hole of the suspension fitting (5) provided on the head is the hole (5 1 ) In the pin insertion hole of the column (4), insert the head of the hanging bracket (5) provided with the stopper (5 5 ) into the lower end bar (13) aligned with the hole (5 2 ), and insert the shaft ( 2) Press down the grip (1) with one hand, insert a predetermined spacer block (15) under the lower end bars (13), insert the spacers one after another at predetermined intervals, and the operation is completed. Become.
(G) When the height of the spacer is 150 mm, the two-layer floor reinforcement shown in FIG. 6 and FIG. ) Is inserted into the spacer block (15).
Next, hanger (5) hole positions holes (5 2) and changing the position of the holes in the strut (4) into the hole (4 3), hanger provided the latch (5 5) (5) Is inserted into the upper lower end muscle (13), the grip (1) of the shaft (2) is pushed down with one hand, and a predetermined equine type spacer (16) is inserted under the upper lower end muscle (13). The work is completed by inserting the spacers one after another in a predetermined sense.
(H) When the height of the lower end of the upper layer is 150 mm or more, it can be dealt with by changing the position of the insertion hole of the pin provided in the hanging bracket (5) and the support column (4).
(I) The bar arrangements built on the floor can move vertically but not horizontally, so the following fulcrum combinations are supported.
(A) The lower part of the hanging metal fitting (5) is flattened to cause slippage to the lower end stripe (13), and the insertion opening (2 2 ) provided in the shaft (2) provides a clearance of about 5 mm in the front and rear. Furthermore, it corresponds by having connected with the rivet type pin (6).
(A) The insertion port (2 1 ) of the support column (4) provided on the shaft (2) and the support column (4) are provided with a clearance of about 5 mm in the front and rear, and each is connected with a pin. By providing the ridge (10) in 9), the support (4) moves back and forth when lifting the lower end muscle (13).
According to the above description, this tool can smoothly move the rebar in a stable manner with one hand.

発明の効果The invention's effect

以下、本発明を使用することによる効果を説明する。
(イ)床に配筋された鉄筋が片手で簡単に持ち上げられる。
(ロ)床の配筋の上に足を乗せ足場として安定したスペイサー入れができる。
(ハ)床の鉄筋のスペイサー入れ作業の効率が良くなる。
(ニ)発条が支持台の水平を保ち、片手で安定した自立が得られる。
(ホ)作業する人の腰にかかる負担が軽減される。
Hereinafter, the effect by using this invention is demonstrated.
(B) The reinforcing bars placed on the floor can be easily lifted with one hand.
(B) A stable spacer can be placed as a foothold by placing a foot on the bar arrangement on the floor.
(C) The efficiency of the work of inserting the spacers in the floor rebar is improved.
(D) The struts keep the support stand level and stable independence can be obtained with one hand.
(E) The burden on the waist of the worker is reduced.

本発明の斜視図Perspective view of the present invention 本発明の分解斜視図Exploded perspective view of the present invention 本発明の断面図Cross section of the present invention 本発明の実施例を示す断面図Sectional drawing which shows the Example of this invention 本発明の実施例を示す断面図Sectional drawing which shows the Example of this invention 本発明の実施例を示す断面図Sectional drawing which shows the Example of this invention 本発明の実施例を示す断面図Sectional drawing which shows the Example of this invention

符号の説明Explanation of symbols

1 グリップ 7 みぞ
通気口 7
2 シャフト 7 R型ピン
挿入口 7 かしめ
挿入口 8 ナット
キャップ 9 支持台
穴 9
3 補強材 10 発条
挿入口 11 ナット
穴 12 溶接
4 支柱 13 下端筋
穴 14 上端筋
穴 15 スペイサーブロック
穴 16 うま型スペイサー
テーパー 17 基線
5 吊り金具


捻り
平坦
外れ止め
6 リベット型ピン

座金
R型ピン
7 ボルト
1 grip 7 1 groove 1 1 vent 7 2 holes 2 shaft 7 3 R-type pin 2 1 insertion opening 7 4 caulking 2 2 insertion slot 8 nut 2 3 cap 9 supporting stand 2 4 holes 9 1 hole 3 reinforcement 10 power spring 3 1 Insertion Port 11 Nut 3 2 Hole 12 Welding 4 Strut 13 Lower Reinforcement 4 1 Hole 14 Upper Reinforcement 4 2 Hole 15 Spacer Block 4 3 Hole 16 Umbilical Spacer 4 4 Taper 17 Base Line 5 Hanging Bracket 5 1 Hole 5 2 Hole 5 3 Twist 5 4 Flat 5 5 Detachment 6 Rivet type pin 6 1 hole 6 2 Washer 6 3 R type pin 7 Bolt

Claims (1)

細長い円形管を段違いに曲げたシャフト(2)の頭部に吊り金具(5)と支柱(4)、さらに上部にグリップ(1)を設け、鉄筋を持ち上げスペイサーを差し入れの道具。A tool for lifting a rebar, inserting a spacer, providing a suspension fitting (5) and a support (4) on the head of a shaft (2) bent in an elongated circular tube, and a grip (1) on the top.
JP2003384363A 2003-09-26 2003-09-26 Tool for lifting reinforcing bar of floor and inserting spacer Pending JP2005105800A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003384363A JP2005105800A (en) 2003-09-26 2003-09-26 Tool for lifting reinforcing bar of floor and inserting spacer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003384363A JP2005105800A (en) 2003-09-26 2003-09-26 Tool for lifting reinforcing bar of floor and inserting spacer

Publications (1)

Publication Number Publication Date
JP2005105800A true JP2005105800A (en) 2005-04-21

Family

ID=34544795

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003384363A Pending JP2005105800A (en) 2003-09-26 2003-09-26 Tool for lifting reinforcing bar of floor and inserting spacer

Country Status (1)

Country Link
JP (1) JP2005105800A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3366866A1 (en) * 2017-02-27 2018-08-29 Rigit Tmi Tool for lifting and handling reinforcement steels
CN111501494A (en) * 2020-04-27 2020-08-07 五冶集团上海有限公司 Adjusting device and adjusting method for concrete pavement protective layer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3366866A1 (en) * 2017-02-27 2018-08-29 Rigit Tmi Tool for lifting and handling reinforcement steels
CN111501494A (en) * 2020-04-27 2020-08-07 五冶集团上海有限公司 Adjusting device and adjusting method for concrete pavement protective layer

Similar Documents

Publication Publication Date Title
JP2005105800A (en) Tool for lifting reinforcing bar of floor and inserting spacer
KR200419871Y1 (en) Metal insert built-in spacer
KR200331403Y1 (en) Lower working desk of gang form for a building
JPH08318322A (en) Reinforcing steel supporting column for reinforcing steel bending machine
JP4226195B2 (en) Concrete top edge spacer
JP4107663B2 (en) Bracket that stops nut rotation
JP2006152686A (en) Fixed metal fitting and bracing member
KR100804554B1 (en) Steel stand for working reinforcing rod for bridge for constructing bridge pier
JP3733303B2 (en) Bracket for temporary scaffold
CN207878904U (en) building scaffold
KR100583773B1 (en) supporter for form of concrete structure
CN217128616U (en) Steel frame structure for self-heat-preservation prefabricated wall
CN211572263U (en) Simple large-thickness stirrup steel bar
JP2017206859A (en) Assembling method of hanging foothold and a column used therefor
CN211691362U (en) Scaffold for building installation
JP3028763U (en) Simple scaffolding board
KR20240009052A (en) Rebar support chair
JP3830245B2 (en) Arch rib construction method
JP2987060B2 (en) Upper bar support jig for beam rebar assembly
JP2575865Y2 (en) Lower reinforcement support for pillar for assembling foundation reinforcement
KR200445954Y1 (en) A Base plate for Supporter
JPH0727297Y2 (en) Runner for mounting pillars of concrete formwork
JPH07572Y2 (en) Rebar spacing holder
KR19980026026U (en) Base for slab casting formwork
JP2003260673A (en) Wooden frame demolition tool