High-rise horizontal member jack-down method, and jack to be used for the same Download PDFInfo
- Publication number
- JP2005097865A JP2005097865A JP2003330131A JP2003330131A JP2005097865A JP 2005097865 A JP2005097865 A JP 2005097865A JP 2003330131 A JP2003330131 A JP 2003330131A JP 2003330131 A JP2003330131 A JP 2003330131A JP 2005097865 A JP2005097865 A JP 2005097865A
- Authority
- JP
- Japan
- Prior art keywords
- jack
- jacks
- small
- groups
- rise
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
Description
本発明は、コラムに設置するジャッキに水平送り装置を介して間接的に載承する高層横架物(橋桁、橋梁等)や、コラムに設置するジャッキに直接的に載承する高層横架物(ドームや大型倉庫の屋根骨組等)をコラムの支持部まで降下させるそのジャッキダウン方法及びその方法に使用するジャッキに関するものである。 The present invention relates to a high-rise horizontal object (bridge girder, bridge, etc.) that is mounted indirectly on a jack installed on a column via a horizontal feed device, or a high-rise horizontal object that is mounted directly on a jack installed on a column. The present invention relates to a jack down method for lowering a dome or a roof frame of a large warehouse to a column support and a jack used in the method.
従来、橋桁や橋梁は、地場ヤードで組み付けられる。そして、ピア(コラム)やベンド(コラム)に井桁状に積み重ねられた台用サンドル上に設置した水平送り装置の機能で前記コラム上方に送り込まれる。
その橋桁、橋梁等の架設体を前記コラム上のシューに支持させるジャッキダウンは下記の手順で行われる。
(1)台用サンドル100に設置する降下用ジャッキ200をジャッキアップして橋桁、橋梁等の架設体300を支承して水平送り装置Bを取り外せる状態にしてから、その架設体300コラム1に井桁状に積み重ねられた仮受け用サンドル400で支承し、水平送り装置Bを取り外す(図11、図12)。
(2)降下用ジャッキ200をジャッキダウンして架設体300を仮受け用サンドル400に支承させてから、降下用ジャッキ200をいったん台用サンドル100から移動させた後、上位段の台用サンドル100を取り外し、再び降下用ジャッキ200を低くなった台用サンドル100に設置する。
(3)降下用ジャッキ200をジャッキアップして架設体300を支承し、今度は上位段の仮受け用サンドル400を取り外す。
以後は(2)、(3)を繰り返して、台用サンドル100、仮受け用サンドル400各々の高さを徐々に低くしながらその架設体300を降下させて(図13)、シュー(沓座)5まで下降させて、同架設体300をシュー(沓座)5に支持させ、最後に降下用ジャッキ200を取外す(図14)。
ドームや大型倉庫の屋根骨組においても、地場ヤードで組み付けられ屋根骨組をコラムに井桁状に積重ねられた台用サンドル上の降下用ジャッキに直接クレーン等で吊り上げて設置し、前記(2)(3)の工程を繰り返して同様にその屋根骨組をコラム上の支持部まで下降させて、同屋根骨組を支持部に支持させ、最後に降下用ジャッキを取外す。
前記する高層横架物のジャッキダウンに関する先行技術文献の存在は、出願人としては不知である。
Conventionally, bridge girders and bridges are assembled in a local yard. Then, it is fed above the column by the function of a horizontal feeding device installed on a stand sander stacked in a cross-beam shape on a peer (column) or bend (column).
The jackdown for supporting the bridge girder, bridge and other erected bodies on the shoe on the column is performed in the following procedure.
(1) Jack up the
(2) The lowering
(3) Jack the descent jack 200 up to support the
Thereafter, the steps (2) and (3) are repeated, and the
The roof frame of a dome or a large warehouse is also installed by lifting it directly onto a jack for descent on a platform sanddle that is assembled at a local yard and stacked in a column shape on a column, using the crane (2) (3 In the same manner, the roof frame is lowered to the support part on the column, the roof frame is supported by the support part, and finally the lowering jack is removed.
The existence of prior art documents relating to the jackdown of the above-mentioned high-rise horizontal structure is unknown to the applicant.
ところで、前記する台用及び仮受け用として使用されるサンドルは、定尺寸法であり、中間高さに対しては調整プレート、楔等を使用している。そのため、高さ調整及び取り外しが非常に面倒且つ煩雑で、それも高所での作業になるため非常に危険である。
また、前記する降下用ジャッキは、コラム上の高層横架物の重量を1〜2台で受ける構成であるため、大型のものを必要とする。これを狭い空間で移動させたりする作業は大変である。
その上、前記する台用サンドル、仮受け用サンドル、降下用ジャッキの重量を加算すると、非常に高重量になり、これを支持するコラムの負担も大きなものとなる。
By the way, the above-described sanddle used for the table and the temporary holder has a fixed size, and an adjustment plate, a wedge, or the like is used for the intermediate height. Therefore, height adjustment and removal are very troublesome and cumbersome, which is also very dangerous because it is a work at a high place.
Moreover, since the jack for a descent mentioned above is the structure which receives the weight of the high-rise horizontal object on a column with 1 or 2 units | sets, a large sized thing is required. The operation of moving this in a narrow space is difficult.
In addition, when the weights of the stand sandals, the temporary receiving sandals, and the lowering jacks are added, the weight becomes very heavy, and the burden on the column supporting the weight becomes large.
本発明は上記従来事情に鑑みてなされたもので、その技術的課題は安全ナット付きの小型ジャッキ連結群を多段状に積み重ねて形成したジャッキ2群で高層横架物を交互に持ち替えて小型ジャッキ連結群の高さを徐々に低くしながらコラム上の支持部高さまで高層横架物をジャッキダウンさせることである。 The present invention has been made in view of the above-described conventional circumstances, and its technical problem is that a small jack can be obtained by alternately changing a high-rise horizontal object in two groups of jacks formed by stacking small jack connection groups with safety nuts in multiple stages. It is to jack down the high-rise horizontal object to the height of the support part on the column while gradually decreasing the height of the connection group.
前記課題を解決するために講じた技術的手段は、コラムに設置するジャッキに直接的または水平送り装置を介して間接的に支承する高層横架物のそのジャッキダウン方法において、前記ジャッキ(2)は、安全ナット付きの小型ジャッキを複数個水平方向に連結した小型ジャッキ連結群を、多段状に積み重ねた複数群で構成され、該小型ジャッキ複数群からなるジャッキ(2)を交互にジャッキダウン、ジャッキアップする2群に区分けして高層横架物を支承し、該2群のジャッキ(2A)(2B)を交互にジャッキダウン、ジャッキアップしてジャッキダウン時のそのジャッキ(2A)(2B)を上位段の小型ジャッキ連結群から取り外しジャッキアップ時に高層横架物を支承する作業を繰り返してコラム上の支持部までその高層横架物を下降させて、その支持部で高層横架物を支持することを特徴とする高層横架物のジャッキダウン方法である(請求項1)。ここで、前記高層横架物の一例として、橋桁または橋梁が挙げられる。そして、その場合の支持部はシュー(沓座)になる(請求項2)。 The technical means taken in order to solve the above-mentioned problem is that the jack (2) in the jack-down method for a high-rise horizontal object supported directly or indirectly via a horizontal feeding device to a jack installed on a column. Is composed of a plurality of groups of small jacks connected in a horizontal direction to a plurality of small jacks with safety nuts, and the jacks (2) consisting of the plurality of small jacks are alternately jacked down. Dividing into two groups to be jacked up and supporting a high-rise horizontal object, jacking down the two groups of jacks (2A) (2B) alternately, jacking up and jacking them down (2A) (2B) Is removed from the upper-stage small jack connection group, and the work of supporting the high-rise horizontal structure is repeated during jackup, and the high-level horizontal structure is removed to the support on the column. Tassels by a jack-down method of tall lateral bridging material, characterized in that to support the high-rise lateral bridging material at the supporting portion (claim 1). Here, as an example of the high-rise horizontal structure, a bridge girder or a bridge can be cited. And the support part in that case becomes a shoe (scorpio) (Claim 2).
上記手段は、コラム上に安全ナット付きの小型ジャッキ連結群を多段状に積重ねて形成した小型ジャッキ2群(2A)(2B)を従来の台用サンドル、仮受け用サンドル、降下用ジャッキとして機能させる。
即ち、ジャッキ(2A)(第1群)で高層横架物を支承している時に、ジャッキ(2B)(第2群)の上位段(小型ジャッキ連結群の上位段)を取り外し、今度はその低くなったジャッキ(2B)(第2群)をジャッキアップして高層横架物を支承して持ち替える。そしてジャッキ(2A)(第1群)の上位段(小型ジャッキ連結群の上位段)を取り外し、今度はその低くなったジャッキ(2A)(第1群)で高層横架物を支承して持ち替える。その工程を繰り返してジャッキ2群(2A)(2B)各々の高さを徐々に低くしていき、高層横架物をコラムの支持部高さまで下降させる。
The above means that the
That is, when a high-level horizontal object is supported by the jack (2A) (first group), the upper stage of the jack (2B) (second group) (the upper stage of the small jack connection group) is removed, and this time Jack up the lowered jack (2B) (second group), support the high-rise horizontal object, and change it. Then, remove the upper stage of the jack (2A) (first group) (the upper stage of the small jack connection group), and this time, the lower jack (2A) (first group) will support and hold the high-rise horizontal object. . The steps are repeated to gradually lower the height of each of the
また、その方法に使用するジャッキは、安全ナット付きの小型ジャッキを複数個水平方向に連結した小型ジャッキ連結群を、多段状に積み重ねた複数群で構成し、該小型ジャッキ複数群からなるジャッキ(2)を、交互にジャッキダウン、ジャッキアップしてコラム上で高層横架物を直接的または間接的に支承する2群に区分けし、各々の群のジャッキ(2A)(2B)は、ジャッキダウン時に上位段の小型ジャッキ連結群から取り外しジャッキアップ時に高層横架物を支承することを特徴とするものである。 In addition, the jack used in the method is composed of a plurality of groups of small jacks connected in a horizontal direction to a plurality of small jacks connected with a plurality of small jacks with safety nuts. 2) is alternately jacked down and jacked up to divide it into two groups that directly or indirectly support high-rise horizontal objects on the column. Jacks (2A) and (2B) of each group are jacked down. Sometimes it is removed from the upper-stage small jack connection group, and a high-rise horizontal object is supported when jacking up.
本発明は以上のように多段状に積み重ねられた安全ナット付きの小型ジャッキ連結群を多段状に積み重ねて構成されたジャッキ2群で高層横架物を交互に持ち替えて、2群のジャッキの高さを徐々に低くしながらコラム上の支持部高さまで高層横架物をジャッキダウンさせるジャッキダウン方法及びその方法で使用するジャッキであるため、スイッチ操作で群別に各小型ジャッキが同期して作動し、高さ調整が頗る簡単であり、井桁状に積み重ねられ調整プレートや楔等を必要箇所に介在したサンドルのように専門の作業者の依存しないと取り外し作業が実行できない従来比して大幅に作業性が向上され、しかも非常に安全である。
しかも、本発明の多段状に積重ねられた小型ジャッキ連結群からなるジャッキが従来の台用サンドル、仮受け用サンドル、降下用ジャッキの働きを兼務した上で上位段から取り外し可能な構成になっているため、高層横架物を徐々に低くする時に高層横架物と台用サンドルとの間の狭い空間を利用していちいち降下用ジャッキを移動させる労力を浪費させることがなくなり、更なる作業性の向上と共に、ジャッキダウン作業の大幅な短期化が図れる。
その上、ジャッキ2群は従来の台用サンドル、仮受け用サンドル、降下用ジャッキの総重量と比較して非常に軽量であり、これを支持するコラムに応力集中させない点でも実用的効果大なるものである。
In the present invention, as described above, the high-level horizontal structure is alternately changed in the two groups of the jacks configured by stacking the small jacks with the safety nuts stacked in a multi-stage shape in a multi-stage shape. This is a jack-down method for jacking up a high-rise horizontal object to the height of the support on the column while gradually reducing the height, and the jack used in that method. The height adjustment is easy, and it is much easier than the conventional one that can not be removed unless specialized workers rely on it, such as a sanddle that is stacked in a cross-beam shape and intervenes adjustment plates and wedges etc. Is improved and it is very safe.
In addition, the jack composed of the multi-stage stacked small jack connection group of the present invention is configured to be removable from the upper stage while serving as the conventional stand sanddle, temporary receiving sanddle, and descent jack. Therefore, when lowering the high-rise horizontal structure gradually, it is not necessary to waste the labor of moving the jack for descent by using the narrow space between the high-rise horizontal structure and the stand sander, and further workability is improved. As a result, the jack-down work can be significantly shortened.
In addition, the two groups of jacks are extremely light compared to the total weight of conventional stand sandals, temporary receiving sandals, and descending jacks, and are practically effective in that they do not concentrate stress on the columns that support them. Is.
コラムに設置して高層横架物を支承するジャッキは、安全ナット付きの小型ジャッキを複数個水平方向に連結した小型ジャッキ連結群を多段状に積み重ねた複数群で構成される。 A jack installed on a column and supporting a high-rise horizontal structure is composed of a plurality of groups in which a plurality of small jacks having safety nuts connected in a horizontal direction are stacked in a multi-stage manner.
該小型ジャッキ複数群からなるジャッキを交互にジャッキダウン、ジャッキアップする2群に区分けして高層横架物を支承する。 The small jacks are divided into two groups that are alternately jacked down and jacked up to support a high-rise horizontal object.
該2群のジャッキを交互にジャッキダウン、ジャッキアップしてジャッキダウン時のそのジャッキを上位段の小型ジャッキ連結群から取り外しジャッキアップ時に高層横架物を支承する作業を繰り返してコラム上の支持部までその高層横架物を下降させて、その支持部で高層横架物を支持する。 Supporting unit on the column by repeatedly jacking up and jacking up the two groups of jacks and removing the jack from the upper-level small jack connection group and supporting the high-rise horizontal object when jacking up The high-level horizontal object is lowered until the high-level horizontal object is supported by the support portion.
図1〜図10は本発明高層横架物のジャッキダウン方法及びその方法に使用するジャッキの実施の形態を示している。本説明では高層横架物が橋桁(主桁)である場合を説明する。 FIGS. 1-10 has shown the jackdown method of the high-rise horizontal object of this invention, and the embodiment of the jack used for the method. In this description, a case where the high-rise horizontal structure is a bridge girder (main girder) will be described.
コラム1は、ピアやベンド(仮支柱)であり、ベンドはピアに隣設して立設させてあり、このコラム1上にジャッキ2を設置する。
The
このジャッキ2は、安全ナット13付きの小型ジャッキ3を複数個水平方向に連結する小型ジャッキ連結群3’を多段状に積み重ねられた複数群で構成されている。
This
この小型ジャッキ3は、図5に示すように、ピストンロッド23外周面のネジ33に螺嵌する安全ナット13を備え、該安全ナット13をシリンダ43に締結してジャッキアップ、ジャッキダウン時に緩まないように構成された周知なものであり、そのシリンダ43は台座53を有し、またピストンロッド23先端には扛上板63が設けられている。
As shown in FIG. 5, the
そして、この小型ジャッキ3は、複数個の隣接する台座53を互いに解除可能に連結して形成された小型ジャッキ段を多段状に積み重ねると共に各段間において上位の台座53と下位の扛上板63とを同じく連結解除可能に連結して前記するジャッキ2(詳細には複数群)を構成している。
The
前記する連結部材4は、図5に示すように台座53、扛上板63の同一位置に開孔した取付孔14、14を挿通するボルト34、ナット44と一対の連結プレート24、24とからなっており、各段間の隣接する台座53、扛上板63に跨って上下から一対の連結プレート24、24をあてがい、取付孔14、14及び一対の連結プレート24、24を挿通するボルト34にナット44を弛緩可能に締結することによって、各段間の台座53と扛上板63とを連結すると共に各段間において隣接する台座53、53同士、扛上板63、63同士を各々連結している。
尚、最下段の小型ジャッキ連結群3’の隣接する台座53、53同士は、ジャッキ2の一体的な強度をアップさせるために互いに解除可能に連結するのが好ましいものである。
As shown in FIG. 5, the connecting member 4 includes a
In addition, it is preferable that the
前記ジャッキ2は、各コラム1の左右側部位に2群宛設置し、各左右側の2群のどちらか一方のジャッキ2最上段の扛上板63群に地場ヤードで組み付けられる主桁Aを各コラム1上方に送り込む水平送り装置Bを支持している。送り込み時には主桁A先端に手延べ機aを付設し、その手延べ機aの案内機能を利用する(図1、図2参照)。
The
前記のように水平送り装置Bで各コラム1に跨って送り込まれた主桁Aを支持部(シュー)5に支持させるべく前記ジャッキ2をジャッキダウンさせる。下記ではジャッキ2を第1群2A、第2群2Bに分けて、そのジャッキダウン工程を説明する。
As described above, the
(1)水平送り装置Bを支持しないジャッキ第2群2Bをジャッキアップして主桁Aを支承させてから、水平送り装置Bを取り外す(図6参照)。
(2)ジャッキ第1群2Aをジャッキアップして主桁Aを支承させてから、ジャッキ第2群2Bをジャッキダウンすると共にそのジャッキ第2群2Bの上位段の小型ジャッキ連結群3’の連結を解除し取り外す(図7、図8)。
(3)全高が低くなったジャッキ第2群2Bをジャッキアップして主桁Aを支承させてから、ジャッキ第1群2Aをジャッキダウンすると共にそのジャッキ第1群2Aの上位段の小型ジャッキ連結群3’の連結を解除し取り外す(図9)。
続いて(2)、(3)を繰り替えして支持部(シュー)5までジャッキダウンし、主桁Aを支持部(シュー)5で支持させ、最後に下段の小型ジャッキ連結群3’の連結を解除し取り外す(図10)。
即ち、ジャッキアップした時に全高が低くなったジャッキ第1群2A、第2群2Bで主桁Aを再び支承可能とするトータルストローク範囲でジャッキダウン時にそのジャッキ第1群A、第2群2Bの上位段の小型ジャッキ連結群3’を取り外し、ジャッキ第1群2A、第2群2Bで交互に主桁Aを持ち替えて、主桁Aをコラム1上の支持部(シュー)5までジャッキダウンするのである。図3はジャッキダウン時の途中工程を、図4は、下段の小型ジャッキ連結群3’を取り外した最終工程を示している。
(1) Jack the
(2) Jack up
(3)
Subsequently, (2) and (3) are repeated to jack down to the support part (shoe) 5, the main girder A is supported by the support part (shoe) 5, and finally the small
That is, when the jack is down in the total stroke range in which the main girder A can be supported again by the
尚、本実施の形態では橋桁(主桁)を例に採って説明したが、橋梁についても同様な工程でジャッキダウンし、ドームや大型倉庫の屋根骨組等の高層横架物は、前記するジャッキ2群にその高層横架物をクレーン等で直接した支承した後、前記(2)、(3)を繰り返して支持部までジャッキダウンする。 In this embodiment, the bridge girder (main girder) has been described as an example. However, the bridge is also jacked down in the same process, and a high-rise horizontal object such as a dome or a roof frame of a large warehouse is After supporting the high-rise horizontal object in two groups directly with a crane or the like, the above (2) and (3) are repeated to jack down to the support part.
1:コラム B:水平送り装置
3:小型ジャッキ 2:ジャッキ
2A:ジャッキ第1群 2B:ジャッキ第2群
A:橋桁(主桁) 5:支持部(シュー)
3’:小型ジャッキ連結群
1: Column B: Horizontal feed device 3: Small jack 2:
3 ': Small jack connection group
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003330131A JP2005097865A (en) | 2003-09-22 | 2003-09-22 | High-rise horizontal member jack-down method, and jack to be used for the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003330131A JP2005097865A (en) | 2003-09-22 | 2003-09-22 | High-rise horizontal member jack-down method, and jack to be used for the same |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2005097865A true JP2005097865A (en) | 2005-04-14 |
Family
ID=34459191
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003330131A Pending JP2005097865A (en) | 2003-09-22 | 2003-09-22 | High-rise horizontal member jack-down method, and jack to be used for the same |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2005097865A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016108771A (en) * | 2014-12-03 | 2016-06-20 | 大成建設株式会社 | Erection method of bridge girder |
CN106245529A (en) * | 2016-08-24 | 2016-12-21 | 中铁十七局集团有限公司铺架分公司 | Railway tee girder falls beam method safely and fast |
CN107165037A (en) * | 2017-04-11 | 2017-09-15 | 中铁十九局集团有限公司 | A kind of fall girder apparatus and fall beam construction method |
CN113684771A (en) * | 2021-09-23 | 2021-11-23 | 重庆单轨交通工程有限责任公司 | Method for replacing hinge shaft of straddle type monorail tension support |
CN115262415A (en) * | 2022-09-06 | 2022-11-01 | 中铁北京工程局集团第五工程有限公司 | Intelligent jacking method and device for bridge construction |
-
2003
- 2003-09-22 JP JP2003330131A patent/JP2005097865A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016108771A (en) * | 2014-12-03 | 2016-06-20 | 大成建設株式会社 | Erection method of bridge girder |
CN106245529A (en) * | 2016-08-24 | 2016-12-21 | 中铁十七局集团有限公司铺架分公司 | Railway tee girder falls beam method safely and fast |
CN106245529B (en) * | 2016-08-24 | 2018-04-06 | 中铁十七局集团有限公司铺架分公司 | Railway tee girder safely and fast falls beam method |
CN107165037A (en) * | 2017-04-11 | 2017-09-15 | 中铁十九局集团有限公司 | A kind of fall girder apparatus and fall beam construction method |
CN113684771A (en) * | 2021-09-23 | 2021-11-23 | 重庆单轨交通工程有限责任公司 | Method for replacing hinge shaft of straddle type monorail tension support |
CN115262415A (en) * | 2022-09-06 | 2022-11-01 | 中铁北京工程局集团第五工程有限公司 | Intelligent jacking method and device for bridge construction |
CN115262415B (en) * | 2022-09-06 | 2023-10-24 | 中铁北京工程局集团第五工程有限公司 | Intelligent jacking method and device for bridge construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5638949B2 (en) | Means for removing concrete formwork from concrete surface | |
CN102080357B (en) | Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket | |
CN109457930B (en) | Integral lifting steel platform for irregular wall construction and construction method thereof | |
JP5394334B2 (en) | Construction method of work floor for work at height | |
WO2017084113A1 (en) | Assembled lifting construction platform for pier column construction and construction method thereof | |
AU2018223908A1 (en) | Method for erecting a concrete structure and climbing formwork | |
KR20150082331A (en) | Scaffolding equipment for aggregate smokestack dismantling and dismantling method for aggregate smokestack using same equipment | |
WO1981001308A1 (en) | Folding scaffold system | |
JP5032787B2 (en) | Heavy equipment installation equipment | |
JP2009073599A (en) | Supporting structure of tower crane and climbing method | |
JP2006052733A (en) | Turbine shell jacking pocket | |
JP2005097865A (en) | High-rise horizontal member jack-down method, and jack to be used for the same | |
CN116324089A (en) | Template system and method | |
JP2005022771A (en) | Lifting/lowering device for heavy article | |
JP2999391B2 (en) | Demolition method of steel building | |
US3998029A (en) | Tower crane climbing | |
JP3523223B2 (en) | Demolition equipment for high-rise buildings | |
CN110805308B (en) | Method for installing and dismantling temporary support at top center of silo | |
JP2005350996A (en) | Bridge erection device and method | |
CN216663819U (en) | Bottom-detachable height-self-adjusting beam-falling cushion block device | |
JP6185001B2 (en) | Dismantling method of multi-legged steel chimney | |
CN220059026U (en) | A can assemble, adjustable interim fixed stay device for steel construction hoist and mount | |
JP5561707B2 (en) | How to dismantle tower buildings | |
CN114960454B (en) | Overweight upper beam construction support containing irregular decoration blocks and construction method thereof | |
CN209260721U (en) | A kind of device for removing foundation pit inner concrete bearing diagonal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050916 |
|
A977 | Report on retrieval |
Effective date: 20070713 Free format text: JAPANESE INTERMEDIATE CODE: A971007 |
|
A131 | Notification of reasons for refusal |
Effective date: 20070724 Free format text: JAPANESE INTERMEDIATE CODE: A131 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20071211 |