JP2005048963A - Heat pump device - Google Patents

Heat pump device Download PDF

Info

Publication number
JP2005048963A
JP2005048963A JP2003181988A JP2003181988A JP2005048963A JP 2005048963 A JP2005048963 A JP 2005048963A JP 2003181988 A JP2003181988 A JP 2003181988A JP 2003181988 A JP2003181988 A JP 2003181988A JP 2005048963 A JP2005048963 A JP 2005048963A
Authority
JP
Japan
Prior art keywords
unit
refrigerant
heat pump
pipe
inter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003181988A
Other languages
Japanese (ja)
Inventor
Kunimori Sekigami
邦衛 関上
Hideo Maeda
秀雄 前田
Sadahiro Takizawa
禎大 滝沢
Hajime Mutsukawa
元 六川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Sanyo Air Conditioners Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Sanyo Air Conditioners Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd, Sanyo Air Conditioners Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP2003181988A priority Critical patent/JP2005048963A/en
Publication of JP2005048963A publication Critical patent/JP2005048963A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2309/00Gas cycle refrigeration machines
    • F25B2309/06Compression machines, plants or systems characterised by the refrigerant being carbon dioxide
    • F25B2309/061Compression machines, plants or systems characterised by the refrigerant being carbon dioxide with cycle highest pressure above the supercritical pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/17Control issues by controlling the pressure of the condenser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B9/00Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point
    • F25B9/002Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point characterised by the refrigerant
    • F25B9/008Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point characterised by the refrigerant the refrigerant being carbon dioxide

Abstract

<P>PROBLEM TO BE SOLVED: To provide a heat pump device capable of realizing so-called charge-free in connecting pipes of inter-unit piping. <P>SOLUTION: In this heat pump device, a freezing cycle is constituted by circularly arranging a compressor 2, an evaporator 3, an electric expansion valve 5 and a gas cooler 11, one unit 41 provided with at least the gas cooler 11 among the components of the freezing cycle and the other unit 40 provided with at least the evaporator 3 are connected by the inter-unit piping 17, and a refrigerant reaching a supercritical pressure at its high-pressure side during the operation is sealed in the freezing cycle. This heat pump device comprises a measuring means 21 for measuring a state quantity at the high-pressure side, and a control means 23 for controlling a valve opening of the electric expansion valve in accordance with the state quantity measured by the measuring means, and keeping the state quantity at a specific state quantity. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、冷凍サイクル内へ、運転中に高圧側が超臨界圧力となる冷媒を封入したヒートポンプ装置に関する。
【0002】
【従来の技術】
一般に、圧縮機、蒸発器および電動膨張弁を備えた熱源側ユニットと、ガスクーラを備えた利用側ユニットとを、ユニット間配管で接続し、この冷凍サイクル内には、運転中に高圧側が超臨界圧力となる冷媒を封入したヒートポンプ装置が知られている(特許文献1参照)。
【0003】
この種のものでは、ヒートポンプ装置を現場施工する場合、別々に梱包して工場出荷された熱源側ユニットと、利用側ユニットとを、現場で、ユニット間配管を用いて配管接続するのが一般的である。
【0004】
なお、ヒートポンプ装置の用語は、いわゆるヒートポンプだけでなく、冷凍サイクルを含むものとする。
【0005】
【特許文献1】
特開2000−234811号公報
【0006】
【発明が解決しようとする課題】
従来の構成では、ユニット間配管の配管長が、通常の配管長よりも長くなった場合、現場配管長に見合った量の冷媒を、現場でチャージする必要が生じる。しかし、この場合、オーバーチャージが問題となる。特に、運転中に高圧側が超臨界圧力となる冷媒を封入したヒートポンプ装置では、オーバーチャージになった場合、電動膨張弁を絞る制御を行うと、冷媒が、ガスクーラに移動し、高圧圧力が異常上昇するという問題がある。
【0007】
そこで、本発明の目的は、上述した従来の技術が有する課題を解消し、ユニット間配管の配管接続時における、いわゆるチャージフリーを実現したヒートポンプ装置を提供することにある。
【0008】
【課題を解決するための手段】
請求項1に記載の発明は、圧縮機、蒸発器、電動膨張弁およびガスクーラを環状に配設して冷凍サイクルを構成し、これら冷凍サイクル構成品のうち、少なくともガスクーラを配設した一方のユニットと、少なくとも蒸発器を配設した他方のユニットとを、ユニット間配管で接続し、前記冷凍サイクル内には、運転中に高圧側が超臨界圧力となる冷媒を封入したヒートポンプ装置において、高圧側の状態量を測定する測定手段と、この測定手段により測定された状態量に応じて、前記電動膨張弁の弁開度を制御し、当該状態量を所定の状態量に維持する制御手段とを備えたことを特徴とする。
【0009】
請求項2に記載の発明は、圧縮機、蒸発器、および電動膨張弁を備えた熱源側ユニットと、ガスクーラを備えた利用側ユニットとを、ユニット間配管で接続し、この冷凍サイクル内には、運転中に高圧側が超臨界圧力となる冷媒を封入したヒートポンプ装置において、高圧側の状態量を測定する測定手段と、この測定手段により測定された状態量に応じて、前記電動膨張弁の弁開度を制御し、当該状態量を所定の状態量に維持する制御手段とを備えたことを特徴とする。
【0010】
請求項3に記載の発明は、請求項2記載のものにおいて、ユニット間配管の配管長の内、予定される最長の配管長に対応した量の冷媒を、予め、熱源側ユニットにチャージすることを特徴とする。
【0011】
請求項4記載の発明は、請求項2又は3に記載のものにおいて、電動膨張弁と圧縮機間の低圧配管に、余剰の冷媒を貯留する冷媒貯留装置を備え、ユニット間配管の配管長に応じ、前記制御手段による制御によって、冷媒貯留装置に余剰の冷媒を貯留することを特徴とする。
【0012】
請求項5に記載の発明は、請求項2記載のものにおいて、高圧側の目標状態量を、蒸発器の出口温度、出口圧力、及び給水等の利用側冷媒のパラメータに従って設定することを特徴とする。
【0013】
請求項6に記載の発明は、請求項4記載のものにおいて、前記冷媒貯留装置の容量が、熱源側ユニットと利用側ユニットとを、最長配管長のユニット間配管で接続した場合に必要な冷媒量と、最小配管長のユニット間配管で接続した場合に必要な冷媒量との差分に相当する冷媒量を保有できる容量以上に設定されていることを特徴とする。
【0014】
【発明の実施の形態】
以下、本発明におけるヒートポンプ装置の第1実施形態を、図1ないし図3の図面に基づき説明する。
【0015】
図1は、本発明におけるヒートポンプ装置の第1実施形態を示す冷媒回路図である。このヒートポンプ装置30は、圧縮機2、アキュムレータ4、蒸発器3、電動膨張弁5を備えた熱源側ユニット1と、ガスクーラ11、貯湯タンク13、循環ポンプ15を備えた給湯ユニット(利用側ユニット)10とを有し、これらをガス管31及び液管33からなるユニット間配管17で接続して構成されている。また、圧縮機2、アキュムレータ4、蒸発器3、電動膨張弁5及びガスクーラ11が環状に配設されてヒートポンプサイクルとしての冷凍サイクルを構成している。
【0016】
給湯ユニット10では、ガスクーラ11の一端がガス管31に接続され、ガスクーラ11の他端が液管33に接続されている。
【0017】
このガスクーラ11には、水配管16が接続され、この水配管16には、循環ポンプ15を介して、貯湯タンク13が接続されている。
【0018】
上記構成では、熱源側ユニット1、給湯ユニット10からなる冷凍サイクル内に、配管接続後の冷媒チャージフリーを念頭においた、適正量の二酸化炭素冷媒が封入されている。すなわち、この冷凍サイクル内には、ユニット間配管17の施工時における、予定される最大の配管長から、予定される最小の配管長までのいずれの配管長のユニット間配管17が使用されたとしても、配管接続後に冷媒チャージの必要がないチャージフリーを念頭においた、適正量の二酸化炭素冷媒が封入されている。具体的には、ユニット間配管17の配管長の内、予定される最長の配管長に対応した量の冷媒がチャージされており、いわゆる最大の配管長のユニット間配管17で施工した場合以外は、余剰となった液冷媒が、アキュムレータ(冷媒貯留装置)4内に貯留される。
【0019】
このアキュムレータ4の容量は、熱源側ユニット1と給湯ユニット10とを、最長配管長のユニット間配管17で接続した場合に必要な冷媒量と、最小配管長のユニット間配管17で接続した場合に必要な冷媒量との差分に相当する冷媒量を保有できる容量以上に設定されている。
【0020】
実際には、工場出荷の段階で、ユニット間配管17の配管長の内、予定される最長の配管長に対応した量の冷媒が、予め、熱源側ユニット1内にチャージされており、現場では、この熱源側ユニット1と、給湯ユニット10とを、ユニット間配管17で接続するものである。
【0021】
つぎに、ヒートポンプ装置30の動作を説明する。
【0022】
給湯ユニット10では、圧縮機2の吐出冷媒が、ガス管31を通じてガスクーラ11に導かれ、このガスクーラ11で、水配管16を通る水が加熱されて、高温となった水が貯湯タンク13に貯えられる。
【0023】
冷凍サイクルには、二酸化炭素冷媒が使用されており、高圧の高い超臨界サイクルとなるため、ガスクーラ11での利用側温度を高く設定することが可能になり、ここに貯えられた湯は、約80℃以上の高温になる。この貯湯タンク13に貯えられた湯は、図示を省略した配管を介して各種設備へ送られる。
【0024】
冷凍サイクル内に二酸化炭素冷媒が封入された場合、図2のエンタルピ・圧力(ps)線図に示すように、高圧ガス管11内は運転中に超臨界圧力で運転される。高圧ガス管31内が、超臨界圧力で運転される冷媒には、二酸化炭素冷媒のほかに、例えばエチレン、ディボラン、エタン、酸化窒素等が挙げられる。
【0025】
図2において、圧縮機出口は状態A、ガスクーラ11入口は状態Bで示される。冷媒は、ガスクーラ11を通って循環し、そこで状態Cまで冷却され、熱を水に放出する。ついで、冷媒は、電動膨張弁5での圧力低下により、状態Dに至り、ここではガス/液体の2相混合体が形成される。冷媒は、蒸発器3において、液相の蒸発により熱を吸収する。状態Eは、蒸発器出口の状態であり、ガス相の冷媒は、ここから圧縮機2の吸込管に向かう。
【0026】
上記超臨界サイクルにおいて、圧縮機2から吐出される高圧単相ガス冷媒は、凝縮されないが、ガスクーラ11において温度低下が起こる。ガスクーラ11における冷媒の最終温度は、水の温度よりも数度高い。そして、高圧ガスはガスクーラ11で、数度低い状態Cまで冷却される。
【0027】
CO2冷媒を用いたヒートポンプ装置では、図3のエントロピ・圧力(pi)線図に示すように、成績係数εを最大とするための高圧圧力(目標高圧圧力)が、圧縮機2の吸込状態(点a)、及び等温線cの条件から設定される。すなわち、ガスクーラ11における水の温度が高くなると、成績係数εは、圧縮圧力P2がある値の所で最大になる。圧縮機2の吸込状態a、および水温度tcが与えられた場合(点aでのエントロピiaは一定)、成績係数εを極大とするための圧縮圧力P2の値は、以下のように求められる。成績係数εの式
【0028】
【数1】

Figure 2005048963
【0029】
をP2で微分すれば、iaは不変であるから
【0030】
【数2】
Figure 2005048963
【0031】
従って、成績係数εが極大になるための条件式は
【0032】
【数3】
Figure 2005048963
【0033】
このサイクルを、図3に示すように、abcdとすれば、
【0034】
【数4】
Figure 2005048963
【0035】
は等温線tcの点cにおける接線の傾斜を表し、
【0036】
【数5】
Figure 2005048963
【0037】
は点aを通る等エントロピ線の点bにおける接線の傾斜を表す。これらの2接線と点aを通る水平線との交点をhおよびjとすれば、
【0038】
【数6】
Figure 2005048963
【0039】
ゆえに式(1)の条件は、
【0040】
【数7】
Figure 2005048963
【0041】
すなわち
【0042】
【数8】
Figure 2005048963
【0043】
この条件は点bおよびcを通る接線は点aを通る垂直線上の同一点eにおいて相交わることを示している。この条件を満足するように点b或いは点cの位置を定めれば、成績係数εは最大になる。等エントロピ線の曲率ははなはだ小さいから、第一次近似としてはこの線を直線と仮定し、従って、点jをaに一致させると、式(2)により点hも点aに一致する。ゆえに点aよりtcなる等温線に接線を引き接点をc1とすると、c1に相当する圧力が第一次近似のP2の値になる。第二次近似をするには、c1より水平線を引き等エントロピ線との交点をb1とし、b1よりそれに接線を引いてaを通る垂直線との交点よりtcなる等温線に接線を引き、その接点に相当する圧力が第二次近似のP2の値になる。これを数回繰り返すと、最後に正しいc点およびb点の位置が定まり、もっとも成績のよい冷凍サイクルが定まる。
【0044】
ここで、図3の点aは、冷媒の温度、圧力により定まり、等温線cは、ガスクーラ11を循環する給水温度+α℃(例えば、5℃程度)により定まる。従って、目標高圧圧力は、蒸発器3の出口温度と圧力、並びに給水温度のパラメータにより設定される。
【0045】
上記構成では、圧縮機2の吐出側に、高圧側の温度を測定する温度センサ20と、高圧側の圧力(状態量)を測定する圧力センサ(測定手段)21が設けられる。この圧力センサ21からの圧力信号は、コントローラ(制御手段)23に送られ、このコントローラ23は、測定された圧力に応じて、電動膨張弁5の弁開度を制御する。
【0046】
すなわち、このコントローラ23は、ユニット間配管17の配管長に関係なく、高圧側の圧力を所定の圧力に維持するように、電動膨張弁5の弁開度を制御する。例えば、ユニット間配管17の配管長が長い場合には、電動膨張弁5の弁開度を閉じ気味に制御して、高圧側の圧力を所定の圧力に維持する一方、アキュムレータ(冷媒貯留装置)4内の液冷媒の貯留量を減少させ、ユニット間配管17の配管長が短い場合には、電動膨張弁5の弁開度を開き気味に制御して、高圧側の圧力を所定の圧力に維持する一方、アキュムレータ内の液冷媒の貯留量を増大させる。
【0047】
これによれば、ユニット間配管17の配管長に応じ、コントローラ23による制御によって、アキュムレータ4に余剰の液冷媒を貯留するため、ユニット間配管17の配管長に応じた冷媒チャージが不要になり、いわゆるチャージフリーのヒートポンプ装置が提供される。
【0048】
前記した本発明におけるヒートポンプ装置の第1実施形態では、いわゆるチャージフリーが実現され、現場で、冷媒をチャージする必要がなくなる。そのため、オーバーチャージが解消され、オーバーチャージにより生じる問題が解消される。
【0049】
次に本発明におけるヒートポンプ装置の第2実施形態について、図4を用いて説明する。図4は第2実施形態のヒートポンプ装置の冷媒回路図である。なお、この第2実施形態の説明において、前記第1実施形態の構成要素に対応する構成要素には、同一符号を付して、その詳細な説明は省略する。
【0050】
このヒートポンプ装置30は、蒸発器3を備えたエバポレータユニット40と、圧縮機2、アキュムレータ4、電動膨張弁5、ガスクーラ11、貯湯タンク13および循環ポンプ15を備えた給湯ユニット(利用側ユニット)41とを有し、これらをガス管31、及び液管33からなるユニット間配管17で接続して構成されている。
【0051】
給湯ユニット41では、アキュムレータ4に繋がる一端がガス管31に接続され、電動膨張弁5に繋がる他端が液管33に接続されている。
【0052】
また、前記ガスクーラ11には、水配管16が接続され、この水配管16には循環ポンプ15を介して、貯湯タンク13が接続されている。
【0053】
上記構成では、エバポレータユニット40、給湯ユニット41からなる冷凍サイクル内に、配管接続後の冷媒チャージフリーを念頭においた、適正量の二酸化炭素冷媒が封入されている。すなわち、この冷凍サイクル内には、ユニット間配管17の施工時における、予定される最大の配管長から、予定される最小の配管長までのいずれの配管長のユニット間配管17が使用されたとしても、配管接続後に冷媒チャージの必要がないチャージフリーを念頭においた、適正量の二酸化炭素冷媒が封入されている。具体的には、ユニット間配管17の配管長の内、予定される最長の配管長に対応した量の冷媒がチャージされており、いわゆる最大の配管長のユニット間配管17で施工した場合以外は、余剰となった液冷媒が、アキュムレータ(冷媒貯留装置)4内に貯留される。
【0054】
このアキュムレータ4の容量は、エバポレータユニット40と給湯ユニット41とを、最長配管長のユニット間配管17で接続した場合に必要な冷媒量と、最小配管長のユニット間配管17で接続した場合に必要な冷媒量との差分に相当する冷媒量を保有できる容量以上に設定されている。
【0055】
実際には、工場出荷の段階で、ユニット間配管17の配管長の内、予定される最長の配管長に対応した量の冷媒が、予め、給湯ユニット41内にチャージされており、現場では、このエバポレータユニット40と、給湯ユニット41とを、ユニット間配管17で接続して構成されている。
【0056】
上記構成では、第1実施形態のヒートポンプ装置30と同様に、圧縮機2の吐出側に、高圧側の温度を測定する温度センサ20と、高圧側の圧力(状態量)を測定する圧力センサ(測定手段)21が設けられる。この圧力センサ21からの圧力信号は、コントローラ(制御手段)23に送られ、このコントローラ23は、測定された圧力に応じて、電動膨張弁5の弁開度を制御する。
【0057】
すなわち、このコントローラ23は、ユニット間配管17の配管長に関係なく、高圧側の圧力を所定の圧力に維持するように、電動膨張弁5の弁開度を制御する。例えば、ユニット間配管17の配管長が長い場合には、電動膨張弁5の弁開度を閉じ気味に制御して、高圧側の圧力を所定の圧力に維持する一方、アキュムレータ(冷媒貯留装置)4内の液冷媒の貯留量を減少させ、ユニット間配管17の配管長が短い場合には、電動膨張弁5の弁開度を開き気味に制御して、高圧側の圧力を所定の圧力に維持する一方、アキュムレータ内の液冷媒の貯留量を増大させる。
【0058】
これによれば、ユニット間配管17の配管長に応じ、コントローラ23による制御によって、アキュムレータ4に余剰の液冷媒を貯留するため、ユニット間配管17の配管長に応じた冷媒チャージが不要になり、いわゆるチャージフリーのヒートポンプ装置が提供される。
【0059】
この第2実施形態のヒートポンプ装置の動作説明は、前記した第1実施形態のヒートポンプ装置30の動作と同じであるため、その説明を省略する。
【0060】
以上、第1及び第2実施形態に基づいて本発明を説明したが、本発明は、これに限定されるものではない。
【0061】
【発明の効果】
本発明では、ユニット間配管の配管接続時における、いわゆるチャージフリーを実現することができる。
【図面の簡単な説明】
【図1】本発明の第1実施形態を示すヒートポンプ装置の冷媒回路図である。
【図2】超臨界サイクルのエンタルピ・圧力線図である。
【図3】超臨界サイクルのエントロピ・圧力線図である。
【図4】本発明の第2実施形態を示すヒートポンプ装置の冷媒回路図である。
【符号の説明】
1 熱源側ユニット(他方のユニット)
2 圧縮機
3 蒸発器
4 アキュムレータ(冷媒貯留装置)
5 電動膨張弁
10 給湯ユニット(一方のユニット)(利用側ユニット)
11 ガスクーラ
17 ユニット間配管
21 圧力センサ(測定手段)
23 コントローラ(制御手段)
31 ガス管
33 液管
40 エバポレータユニット(他方のユニット)
41 給湯ユニット(一方のユニット)[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a heat pump device in which a refrigerant whose high pressure side becomes a supercritical pressure during operation is enclosed in a refrigeration cycle.
[0002]
[Prior art]
Generally, a heat source side unit equipped with a compressor, an evaporator, and an electric expansion valve is connected to a use side unit equipped with a gas cooler with inter-unit piping, and in this refrigeration cycle, the high pressure side is supercritical during operation. There is known a heat pump device in which a refrigerant to be pressure is sealed (see Patent Document 1).
[0003]
With this type of equipment, when the heat pump device is installed on site, it is common to connect the heat source side unit separately packed and shipped from the factory to the user side unit using piping between units at the site. It is.
[0004]
Note that the term heat pump device includes not only a so-called heat pump but also a refrigeration cycle.
[0005]
[Patent Document 1]
Japanese Patent Laid-Open No. 2000-234811 [0006]
[Problems to be solved by the invention]
In the conventional configuration, when the pipe length of the inter-unit pipe becomes longer than the normal pipe length, it is necessary to charge the refrigerant in an amount corresponding to the site pipe length on the site. However, in this case, overcharge becomes a problem. In particular, in a heat pump device that contains a refrigerant whose high-pressure side becomes supercritical pressure during operation, if the electric expansion valve is controlled when overcharging occurs, the refrigerant moves to the gas cooler and the high-pressure pressure rises abnormally There is a problem of doing.
[0007]
Accordingly, an object of the present invention is to provide a heat pump device that solves the problems of the above-described conventional technology and realizes so-called charge-free operation when connecting pipes between units.
[0008]
[Means for Solving the Problems]
According to the first aspect of the present invention, a compressor, an evaporator, an electric expansion valve, and a gas cooler are annularly arranged to constitute a refrigeration cycle, and among these refrigeration cycle components, at least one unit in which a gas cooler is arranged And at least the other unit provided with the evaporator is connected by inter-unit piping, and in the refrigeration cycle, in the heat pump device in which the refrigerant whose high pressure side becomes supercritical pressure during operation is sealed, Measuring means for measuring the state quantity; and control means for controlling the valve opening of the electric expansion valve according to the state quantity measured by the measuring means and maintaining the state quantity at a predetermined state quantity. It is characterized by that.
[0009]
According to the second aspect of the present invention, a heat source side unit including a compressor, an evaporator, and an electric expansion valve is connected to a use side unit including a gas cooler by inter-unit piping. In a heat pump device in which a refrigerant whose high pressure side becomes supercritical pressure is sealed during operation, a measuring means for measuring a state quantity on the high pressure side, and a valve of the electric expansion valve according to the state quantity measured by the measuring means Control means for controlling the opening and maintaining the state quantity at a predetermined state quantity.
[0010]
The invention according to claim 3 is the one according to claim 2, wherein the heat source side unit is charged in advance with an amount of refrigerant corresponding to the longest expected pipe length among the pipe lengths of the inter-unit pipes. It is characterized by.
[0011]
Invention of Claim 4 is a thing of Claim 2 or 3, Comprising: The low pressure piping between an electric expansion valve and a compressor is equipped with the refrigerant | coolant storage apparatus which stores an excess refrigerant | coolant. Accordingly, excess refrigerant is stored in the refrigerant storage device under the control of the control means.
[0012]
The invention according to claim 5 is characterized in that, in the invention according to claim 2, the target state quantity on the high-pressure side is set according to the parameters of the refrigerant on the use side such as the outlet temperature of the evaporator, the outlet pressure, and water supply. To do.
[0013]
The invention according to claim 6 is the refrigerant according to claim 4, wherein the refrigerant storage device has a capacity required when the heat source side unit and the use side unit are connected by the inter-unit pipe having the longest pipe length. It is characterized by being set to be equal to or larger than the capacity capable of holding the refrigerant amount corresponding to the difference between the amount and the refrigerant amount required when connecting with the inter-unit pipe having the minimum pipe length.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, a first embodiment of a heat pump device according to the present invention will be described with reference to FIGS. 1 to 3.
[0015]
FIG. 1 is a refrigerant circuit diagram showing a first embodiment of a heat pump device according to the present invention. The heat pump device 30 includes a heat source side unit 1 including a compressor 2, an accumulator 4, an evaporator 3, and an electric expansion valve 5, and a hot water supply unit (use side unit) including a gas cooler 11, a hot water storage tank 13, and a circulation pump 15. 10 and these are connected by an inter-unit pipe 17 composed of a gas pipe 31 and a liquid pipe 33. Moreover, the compressor 2, the accumulator 4, the evaporator 3, the electric expansion valve 5, and the gas cooler 11 are arrange | positioned cyclically | annularly, and the refrigerating cycle as a heat pump cycle is comprised.
[0016]
In the hot water supply unit 10, one end of the gas cooler 11 is connected to the gas pipe 31, and the other end of the gas cooler 11 is connected to the liquid pipe 33.
[0017]
A water pipe 16 is connected to the gas cooler 11, and a hot water storage tank 13 is connected to the water pipe 16 via a circulation pump 15.
[0018]
In the above configuration, an appropriate amount of carbon dioxide refrigerant is sealed in the refrigeration cycle including the heat source unit 1 and the hot water supply unit 10 in consideration of refrigerant charge-free after pipe connection. That is, in this refrigeration cycle, the inter-unit pipe 17 having any pipe length from the maximum planned pipe length to the minimum planned pipe length when the inter-unit pipe 17 is constructed is used. However, an appropriate amount of carbon dioxide refrigerant is enclosed in consideration of charge-free, which does not require refrigerant charge after pipe connection. Specifically, the amount of refrigerant corresponding to the expected longest pipe length among the pipe lengths of the inter-unit pipes 17 is charged. The surplus liquid refrigerant is stored in the accumulator (refrigerant storage device) 4.
[0019]
The capacity of the accumulator 4 is determined when the heat source side unit 1 and the hot water supply unit 10 are connected by the inter-unit pipe 17 having the longest pipe length and the inter-unit pipe 17 having the minimum pipe length. The capacity is set to be equal to or larger than the capacity capable of holding the refrigerant amount corresponding to the difference from the necessary refrigerant amount.
[0020]
Actually, at the factory shipment stage, an amount of refrigerant corresponding to the longest expected pipe length of the pipe lengths of the inter-unit pipes 17 is charged in the heat source unit 1 in advance. The heat source side unit 1 and the hot water supply unit 10 are connected by an inter-unit pipe 17.
[0021]
Next, the operation of the heat pump device 30 will be described.
[0022]
In the hot water supply unit 10, the refrigerant discharged from the compressor 2 is guided to the gas cooler 11 through the gas pipe 31, and the water passing through the water pipe 16 is heated by the gas cooler 11, and the hot water is stored in the hot water storage tank 13. It is done.
[0023]
Since the refrigeration cycle uses a carbon dioxide refrigerant and becomes a supercritical cycle with a high pressure, it becomes possible to set a high use side temperature in the gas cooler 11, and the hot water stored here is about It becomes a high temperature of 80 ° C or higher. The hot water stored in the hot water storage tank 13 is sent to various facilities via a pipe not shown.
[0024]
When carbon dioxide refrigerant is sealed in the refrigeration cycle, the high-pressure gas pipe 11 is operated at a supercritical pressure during operation, as shown in the enthalpy / pressure (ps) diagram of FIG. In addition to the carbon dioxide refrigerant, for example, ethylene, diborane, ethane, nitric oxide and the like can be cited as the refrigerant in which the inside of the high-pressure gas pipe 31 is operated at a supercritical pressure.
[0025]
In FIG. 2, the compressor outlet is shown in state A, and the gas cooler 11 inlet is shown in state B. The refrigerant circulates through the gas cooler 11 where it is cooled to state C and releases heat into the water. Subsequently, the refrigerant reaches the state D due to the pressure drop at the electric expansion valve 5, where a gas / liquid two-phase mixture is formed. The refrigerant absorbs heat in the evaporator 3 by evaporation of the liquid phase. State E is the state of the evaporator outlet, and the gas-phase refrigerant is directed from here to the suction pipe of the compressor 2.
[0026]
In the supercritical cycle, the high-pressure single-phase gas refrigerant discharged from the compressor 2 is not condensed, but a temperature drop occurs in the gas cooler 11. The final temperature of the refrigerant in the gas cooler 11 is several degrees higher than the temperature of water. The high-pressure gas is cooled to a state C that is several degrees lower by the gas cooler 11.
[0027]
In the heat pump device using the CO2 refrigerant, as shown in the entropy / pressure (pi) diagram of FIG. 3, the high pressure pressure (target high pressure) for maximizing the coefficient of performance ε is the suction state of the compressor 2 ( It is set from the conditions of point a) and isotherm c. That is, when the temperature of water in the gas cooler 11 increases, the coefficient of performance ε becomes maximum at a certain value of the compression pressure P2. When the suction state a of the compressor 2 and the water temperature tc are given (the entropy ia at the point a is constant), the value of the compression pressure P2 for maximizing the coefficient of performance ε is obtained as follows. . Formula for coefficient of performance ε [0028]
[Expression 1]
Figure 2005048963
[0029]
If P is differentiated by P2, ia is invariant.
[Expression 2]
Figure 2005048963
[0031]
Therefore, the conditional expression for maximizing the coefficient of performance ε is:
[Equation 3]
Figure 2005048963
[0033]
If this cycle is abcd as shown in FIG.
[0034]
[Expression 4]
Figure 2005048963
[0035]
Represents the slope of the tangent at point c of the isotherm tc,
[0036]
[Equation 5]
Figure 2005048963
[0037]
Represents the slope of the tangent at point b of the isentropic line passing through point a. If the intersections of these two tangents and the horizontal line passing through point a are h and j,
[0038]
[Formula 6]
Figure 2005048963
[0039]
Therefore, the condition of equation (1) is
[0040]
[Expression 7]
Figure 2005048963
[0041]
That is, [0042]
[Equation 8]
Figure 2005048963
[0043]
This condition indicates that tangent lines passing through points b and c intersect at the same point e on a vertical line passing through point a. If the position of point b or point c is determined so as to satisfy this condition, the coefficient of performance ε is maximized. Since the curvature of the isentropic line is very small, this line is assumed to be a straight line as a first approximation. Therefore, when the point j is made to coincide with a, the point h also coincides with the point a according to the equation (2). Therefore, if a tangent line is drawn from the point a to the isothermal line tc and the contact point is c1, the pressure corresponding to c1 becomes the value of P2 of the first approximation. To make a second order approximation, draw a horizontal line from c1 and let the intersection point with the isentropic line be b1, draw a tangent line from b1 and draw a tangent line to the isothermal line tc from the intersection point with the vertical line passing through a, The pressure corresponding to the contact becomes the value of P2 of the second approximation. If this is repeated several times, the correct positions of c point and b point are finally determined, and the best refrigeration cycle is determined.
[0044]
Here, the point a in FIG. 3 is determined by the temperature and pressure of the refrigerant, and the isotherm c is determined by the feed water temperature circulating through the gas cooler 11 + α ° C. (for example, about 5 ° C.). Accordingly, the target high pressure is set by parameters of the outlet temperature and pressure of the evaporator 3 and the feed water temperature.
[0045]
In the above configuration, the temperature sensor 20 that measures the temperature on the high-pressure side and the pressure sensor (measuring means) 21 that measures the pressure (state quantity) on the high-pressure side are provided on the discharge side of the compressor 2. The pressure signal from the pressure sensor 21 is sent to a controller (control means) 23, which controls the valve opening degree of the electric expansion valve 5 in accordance with the measured pressure.
[0046]
That is, the controller 23 controls the valve opening degree of the electric expansion valve 5 so as to maintain the high-pressure side pressure at a predetermined pressure regardless of the pipe length of the inter-unit pipe 17. For example, when the pipe length of the inter-unit pipe 17 is long, the valve opening degree of the electric expansion valve 5 is controlled to close and the pressure on the high pressure side is maintained at a predetermined pressure, while the accumulator (refrigerant storage device) When the storage amount of the liquid refrigerant in 4 is reduced and the pipe length of the inter-unit pipe 17 is short, the opening degree of the electric expansion valve 5 is controlled to open and the pressure on the high pressure side is set to a predetermined pressure. While maintaining, the storage amount of the liquid refrigerant in the accumulator is increased.
[0047]
According to this, since the surplus liquid refrigerant is stored in the accumulator 4 under the control of the controller 23 according to the pipe length of the inter-unit pipe 17, the refrigerant charge according to the pipe length of the inter-unit pipe 17 becomes unnecessary. A so-called charge-free heat pump device is provided.
[0048]
In the first embodiment of the heat pump device according to the present invention described above, so-called charge-free is realized, and it is not necessary to charge the refrigerant on site. For this reason, overcharge is eliminated, and problems caused by overcharge are eliminated.
[0049]
Next, 2nd Embodiment of the heat pump apparatus in this invention is described using FIG. FIG. 4 is a refrigerant circuit diagram of the heat pump device of the second embodiment. In the description of the second embodiment, components corresponding to the components of the first embodiment are denoted by the same reference numerals, and detailed description thereof is omitted.
[0050]
The heat pump device 30 includes an evaporator unit 40 including an evaporator 3, a hot water supply unit (use side unit) 41 including a compressor 2, an accumulator 4, an electric expansion valve 5, a gas cooler 11, a hot water storage tank 13, and a circulation pump 15. These are connected by an inter-unit pipe 17 including a gas pipe 31 and a liquid pipe 33.
[0051]
In the hot water supply unit 41, one end connected to the accumulator 4 is connected to the gas pipe 31, and the other end connected to the electric expansion valve 5 is connected to the liquid pipe 33.
[0052]
A water pipe 16 is connected to the gas cooler 11, and a hot water storage tank 13 is connected to the water pipe 16 via a circulation pump 15.
[0053]
In the above configuration, an appropriate amount of carbon dioxide refrigerant is sealed in the refrigeration cycle including the evaporator unit 40 and the hot water supply unit 41 in consideration of refrigerant charge-free after the pipe connection. That is, in this refrigeration cycle, the inter-unit pipe 17 having any pipe length from the maximum planned pipe length to the minimum planned pipe length when the inter-unit pipe 17 is constructed is used. However, an appropriate amount of carbon dioxide refrigerant is enclosed in consideration of charge-free, which does not require refrigerant charge after pipe connection. Specifically, the amount of refrigerant corresponding to the expected longest pipe length among the pipe lengths of the inter-unit pipes 17 is charged. The surplus liquid refrigerant is stored in the accumulator (refrigerant storage device) 4.
[0054]
The capacity of the accumulator 4 is necessary when the evaporator unit 40 and the hot water supply unit 41 are connected by the inter-unit pipe 17 having the longest pipe length and the inter-unit pipe 17 having the minimum pipe length. The capacity is set to be equal to or greater than the capacity capable of holding the refrigerant amount corresponding to the difference from the refrigerant amount.
[0055]
Actually, an amount of refrigerant corresponding to the longest expected pipe length among the pipe lengths of the inter-unit pipes 17 is charged in the hot water supply unit 41 in advance at the factory shipment stage. The evaporator unit 40 and the hot water supply unit 41 are connected by an inter-unit pipe 17.
[0056]
In the above configuration, as with the heat pump device 30 of the first embodiment, on the discharge side of the compressor 2, a temperature sensor 20 that measures the temperature on the high-pressure side and a pressure sensor that measures the pressure (state quantity) on the high-pressure side ( Measuring means) 21 is provided. The pressure signal from the pressure sensor 21 is sent to a controller (control means) 23, which controls the valve opening degree of the electric expansion valve 5 in accordance with the measured pressure.
[0057]
That is, the controller 23 controls the valve opening degree of the electric expansion valve 5 so as to maintain the high-pressure side pressure at a predetermined pressure regardless of the pipe length of the inter-unit pipe 17. For example, when the pipe length of the inter-unit pipe 17 is long, the valve opening degree of the electric expansion valve 5 is controlled to close and the pressure on the high pressure side is maintained at a predetermined pressure, while the accumulator (refrigerant storage device) When the storage amount of the liquid refrigerant in 4 is reduced and the pipe length of the inter-unit pipe 17 is short, the opening degree of the electric expansion valve 5 is controlled to open and the pressure on the high pressure side is set to a predetermined pressure. While maintaining, the storage amount of the liquid refrigerant in the accumulator is increased.
[0058]
According to this, since the surplus liquid refrigerant is stored in the accumulator 4 by the control of the controller 23 according to the pipe length of the inter-unit pipe 17, the refrigerant charge according to the pipe length of the inter-unit pipe 17 becomes unnecessary. A so-called charge-free heat pump device is provided.
[0059]
The description of the operation of the heat pump device of the second embodiment is the same as the operation of the heat pump device 30 of the first embodiment described above, and therefore the description thereof is omitted.
[0060]
As mentioned above, although this invention was demonstrated based on 1st and 2nd embodiment, this invention is not limited to this.
[0061]
【The invention's effect】
In the present invention, it is possible to realize so-called charge-free at the time of pipe connection of the inter-unit pipe.
[Brief description of the drawings]
FIG. 1 is a refrigerant circuit diagram of a heat pump device showing a first embodiment of the present invention.
FIG. 2 is an enthalpy / pressure diagram of a supercritical cycle.
FIG. 3 is an entropy / pressure diagram of a supercritical cycle.
FIG. 4 is a refrigerant circuit diagram of a heat pump device showing a second embodiment of the present invention.
[Explanation of symbols]
1 Heat source side unit (the other unit)
2 Compressor 3 Evaporator 4 Accumulator (refrigerant storage device)
5 Electric expansion valve 10 Hot water supply unit (one unit) (use side unit)
11 Gas cooler 17 Inter-unit piping 21 Pressure sensor (measuring means)
23 Controller (control means)
31 Gas pipe 33 Liquid pipe 40 Evaporator unit (the other unit)
41 Hot water supply unit (one unit)

Claims (6)

圧縮機、蒸発器、電動膨張弁およびガスクーラを環状に配設して冷凍サイクルを構成し、これら冷凍サイクル構成品のうち、少なくともガスクーラを配設した一方のユニットと、少なくとも蒸発器を配設した他方のユニットとを、ユニット間配管で接続し、前記冷凍サイクル内には、運転中に高圧側が超臨界圧力となる冷媒を封入したヒートポンプ装置において、
高圧側の状態量を測定する測定手段と、
この測定手段により測定された状態量に応じて、前記電動膨張弁の弁開度を制御し、当該状態量を所定の状態量に維持する制御手段とを備えたことを特徴とするヒートポンプ装置。
A compressor, an evaporator, an electric expansion valve, and a gas cooler are annularly arranged to constitute a refrigeration cycle. Among these refrigeration cycle components, at least one unit provided with a gas cooler and at least an evaporator are provided. In the heat pump device in which the other unit is connected by inter-unit piping, and in the refrigeration cycle, a refrigerant whose high pressure side becomes supercritical pressure during operation is sealed,
Measuring means for measuring the state quantity on the high-pressure side;
A heat pump apparatus comprising: control means for controlling a valve opening degree of the electric expansion valve according to a state quantity measured by the measuring means and maintaining the state quantity at a predetermined state quantity.
圧縮機、蒸発器、および電動膨張弁を備えた熱源側ユニットと、ガスクーラを備えた利用側ユニットとを、ユニット間配管で接続し、この冷凍サイクル内には、運転中に高圧側が超臨界圧力となる冷媒を封入したヒートポンプ装置において、
高圧側の状態量を測定する測定手段と、
この測定手段により測定された状態量に応じて、前記電動膨張弁の弁開度を制御し、当該状態量を所定の状態量に維持する制御手段とを備えたことを特徴とするヒートポンプ装置。
A heat source side unit equipped with a compressor, an evaporator, and an electric expansion valve is connected to a user side unit equipped with a gas cooler with inter-unit piping. In this refrigeration cycle, the high pressure side is supercritical pressure during operation. In the heat pump device enclosing the refrigerant to be
Measuring means for measuring the state quantity on the high-pressure side;
A heat pump apparatus comprising: control means for controlling a valve opening degree of the electric expansion valve according to a state quantity measured by the measuring means and maintaining the state quantity at a predetermined state quantity.
ユニット間配管の配管長の内、予定される最長の配管長に対応した量の冷媒を、予め、熱源側ユニットにチャージすることを特徴とする請求項2に記載のヒートポンプ装置。The heat pump device according to claim 2, wherein the heat source side unit is charged in advance with an amount of refrigerant corresponding to the longest expected pipe length among the pipe lengths of the inter-unit pipes. 電動膨張弁と圧縮機間の低圧配管に、余剰の冷媒を貯留する冷媒貯留装置を備え、ユニット間配管の配管長に応じ、前記制御手段による制御によって、冷媒貯留装置に余剰の冷媒を貯留することを特徴とする請求項2又は3に記載のヒートポンプ装置。A low-pressure pipe between the electric expansion valve and the compressor is provided with a refrigerant storage device that stores excess refrigerant, and excess refrigerant is stored in the refrigerant storage device by the control of the control unit according to the pipe length of the inter-unit pipe. The heat pump apparatus according to claim 2 or 3, wherein 高圧側の目標状態量を、蒸発器の出口温度、出口圧力、及び給水等の利用側冷媒のパラメータに従って設定することを特徴とする請求項2に記載のヒートポンプ装置。3. The heat pump device according to claim 2, wherein the target state quantity on the high pressure side is set according to parameters of the use side refrigerant such as an outlet temperature of the evaporator, an outlet pressure, and water supply. 前記冷媒貯留装置の容量が、熱源側ユニットと利用側ユニットとを、最長配管長のユニット間配管で接続した場合に必要な冷媒量と、最小配管長のユニット間配管で接続した場合に必要な冷媒量との差分に相当する冷媒量を保有できる容量以上に設定されていることを特徴とする請求項4に記載のヒートポンプ装置。The capacity of the refrigerant storage device is necessary when the heat source side unit and the usage side unit are connected by the inter-unit pipe having the longest pipe length and the refrigerant quantity required by the inter-unit pipe having the minimum pipe length. The heat pump apparatus according to claim 4, wherein the heat pump apparatus is set to be equal to or larger than a capacity capable of holding a refrigerant amount corresponding to a difference from the refrigerant amount.
JP2003181988A 2003-05-30 2003-06-26 Heat pump device Pending JP2005048963A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003181988A JP2005048963A (en) 2003-05-30 2003-06-26 Heat pump device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003153804 2003-05-30
JP2003181988A JP2005048963A (en) 2003-05-30 2003-06-26 Heat pump device

Publications (1)

Publication Number Publication Date
JP2005048963A true JP2005048963A (en) 2005-02-24

Family

ID=34277139

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003181988A Pending JP2005048963A (en) 2003-05-30 2003-06-26 Heat pump device

Country Status (1)

Country Link
JP (1) JP2005048963A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009014322A (en) * 2007-07-09 2009-01-22 Mitsubishi Electric Corp Air conditioner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009014322A (en) * 2007-07-09 2009-01-22 Mitsubishi Electric Corp Air conditioner

Similar Documents

Publication Publication Date Title
JP6242321B2 (en) Air conditioner
JP4670329B2 (en) Refrigeration air conditioner, operation control method of refrigeration air conditioner, refrigerant amount control method of refrigeration air conditioner
JP5627417B2 (en) Dual refrigeration equipment
JP2007003169A (en) Refrigeration, hot water supply, and heating system using carbon dioxide as refrigerant, and condensing system used therein
US20070180853A1 (en) Refrigerator
JP4982224B2 (en) Refrigeration equipment
JP2008134031A (en) Refrigerating device using zeotropic refrigerant mixture
JP2009139014A (en) Air conditioner and operation control method for it
US20170191718A1 (en) Vapor compression system
CN107166580A (en) Air-conditioning and water-heating system
US11280525B2 (en) Refrigeration apparatus
JP5367100B2 (en) Dual refrigeration equipment
JP2006336943A (en) Refrigeration system, and cold insulation box
JP4442237B2 (en) Air conditioner
CN103776186A (en) Turbine refrigerator
JP2005214444A (en) Refrigerator
JP2008082601A (en) Heat pump hot water supply device
JP2005048963A (en) Heat pump device
JP2008196826A (en) Refrigerating cycle apparatus
JP2004257627A (en) Heat pump device
JP2004360952A (en) Heat pump device
JP2011149566A (en) Gas liquid separation type refrigeration device
JP2008267732A (en) Air-conditioning device
CN107178823A (en) Air-conditioning and water-heating system
JP2004226018A (en) Refrigeration unit

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Effective date: 20051206

Free format text: JAPANESE INTERMEDIATE CODE: A712

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051220

RD01 Notification of change of attorney

Effective date: 20060131

Free format text: JAPANESE INTERMEDIATE CODE: A7421

A977 Report on retrieval

Effective date: 20081003

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Effective date: 20081014

Free format text: JAPANESE INTERMEDIATE CODE: A131

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081211

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090707