JP2005005926A - Information processing system and resource utilization control method - Google Patents

Information processing system and resource utilization control method Download PDF

Info

Publication number
JP2005005926A
JP2005005926A JP2003165917A JP2003165917A JP2005005926A JP 2005005926 A JP2005005926 A JP 2005005926A JP 2003165917 A JP2003165917 A JP 2003165917A JP 2003165917 A JP2003165917 A JP 2003165917A JP 2005005926 A JP2005005926 A JP 2005005926A
Authority
JP
Japan
Prior art keywords
processing
load
network
information
information processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003165917A
Other languages
Japanese (ja)
Inventor
Takeshi Iizuka
剛 飯塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2003165917A priority Critical patent/JP2005005926A/en
Publication of JP2005005926A publication Critical patent/JP2005005926A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Multi Processors (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To improve the performance of an information processing system. <P>SOLUTION: This information system is provided with a plurality of processors for processing information (as an example, server devices 120 and 121, client devices 100 and 101) and a network to provide a plurality of transmission paths 150 to 153 for connecting those plurality of processors. The processing capabilities and processing loads of the plurality of processors and the processing capability and processing load of the network are used for evaluation, and the resource utilization control of the network and the plurality of processors is executed on the basis of the evaluation result. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
この発明は、情報の処理を行う処理装置をネットワークで接続することにより構成する情報処理システムに関するものである。
【0002】
【従来の技術】
従来から情報処理システムにおいては、ネットワークにおけるトポロジ情報とその処理能力(帯域)をもとにネットワークの通信経路制御が行われていた。しかし、この方法では、複数の通信経路があってもひとつの通信経路のみが固定的に使用されるため、その負荷が高くなり、システム性能を低下させるという問題があった。そこで、例えば、特開平6−85818や特開2002−16599等に示されるように、通信経路の制御においてネットワークの処理負荷(トラフィック)を考慮することにより、システム性能を向上させる方法がとられるようになった。
【0003】
特開平6−85818号公報の要約によると、「複数のLAN装置から構成されるネットワークに於いて、第1、第2の情報処理装置間に複数の通信経路が存在する場合、適切な通信経路を選択できるようにする。」という目的の構成として「アドレステーブル7には第1、第2の情報処理装置間に存在する複数の通信経路それぞれに対応する送信先のアドレスが格納されている。送受信制御機構5が第1の情報処理装置から第2の情報処理装置への送受信フレームを受信すると、経路設定機構2はアドレステーブル7を参照し、情報処理装置間に存在する通信経路に対応する送信先のアドレスを取得する。経路選択機構3は経路設定機構2が取得したアドレスの内、対応する通信経路が正常で且つトラヒックが最も低いものを選択し、選択したアドレスを設定送信先アドレスとし、且つ受信した送受信フレームを含む経路設定型送受信フレームをアドレス制御機構4、送受信制御機構6を介してLAN装置に送信する。」という例が開示されている。
【0004】
また、特開2002−16599号公報の要約によると、「ネットワークトラフィック計測情報に基づいて、制御サーバが保持するポリシーに応じた通信サービス品質保証制御等を自動的に行うネットワーク計測制御システムを提供する。」という課題の解決手段として「メータでネットワークトラフィックを計測し、計測したデータを制御サーバに転送する。制御サーバは、通信サービス品質保証制御等のためのポリシーを保持し、メータから収集した計測データを分析して、ポリシーに応じた制御指示をルータなどの対象機器に送信し、ルータが制御指示に従った制御を行うことにより、ネットワーク状況に応じたきめ細かな通信サービス品質保証制御が可能とする。」という例が開示されている。
【0005】
【特許文献1】
特開平6−85818号公報
【特許文献2】
特開2002−16599号公報
【0006】
【発明が解決しようとする課題】
従来の情報処理システムでは、資源利用制御において高々ネットワークの処理能力および処理負荷までしか評価に使用しないため、トラフィックが改善される場合であってもサーバ装置側の負荷が高い、あるいは、その逆の場合等、情報処理システム全体でのシステム性能向上が充分できないという問題点があった。
【0007】
この発明は、情報処理システム全体におけるシステム性能向上を可能にすることを目的とする。
【0008】
【課題を解決するための手段】
この発明に係る情報処理システムは、情報を処理する複数の処理装置と、
上記複数の処理装置を接続する複数の伝送路を提供するネットワークと
を備え、
上記複数の処理装置の処理能力と処理負荷及び上記ネットワークの処理能力と処理負荷とを用いて評価し、評価した結果に基づいて上記ネットワークと上記複数の処理装置との資源利用制御を行うことを特徴とする。
【0009】
【発明の実施の形態】
実施の形態1.
図1はこの発明による情報処理システムの構成図の一例である。
図1における情報処理システムの構成要素を説明する。
情報処理システムは、情報処理要求を発行するクライアント装置100、101と、クライアント装置100、101それぞれが接続されるクライアントネットワーク110、111とを備える。また、情報処理を実行するサーバ装置120、121と、サーバ装置120、121それぞれが接続されるサーバネットワーク130、131とを備える。また、クライアントネットワーク110、111と、サーバネットワーク130、131とを相互に接続するルータ装置140〜143、ルータ装置140〜143間を接続する伝送路150〜153である。
【0010】
伝送路150はルータ装置140とルータ装置141を接続しその帯域は100Mbps、伝送路151はルータ装置140とルータ装置142を接続しその帯域は100Mbps、伝送路152はルータ装置141とルータ装置143を接続しその帯域は100Mbps、伝送路153はルータ装置142とルータ装置143を接続しその帯域は200Mbpsであるとする。
また、情報処理システムは、サーバ装置120、121上のそれぞれで情報処理を行う業務160、161と、クライアント装置100とサーバ装置120との間のアクセス170と、クライアント装置101とサーバ装置121との間のアクセス173とを備える。
【0011】
次に、情報処理システムにおける資源利用方法について説明する。この発明による情報処理システムでは、ネットワークのトポロジ情報と処理能力(帯域)と処理負荷だけでなく、ネットワークに接続される処理装置(ここではサーバ装置とクライアント装置とを処理装置の一例とする)の処理能力と処理負荷をパラメータとして加味した式1(下記)によりコスト評価を行い、その利用方法を決定する。この評価に使われるパラメータは、予め与えられる初期値とする。
【0012】
A×Σ(ネットワークの処理コスト×処理負荷×負荷率)+B×Σ(サーバ装置の処理コスト×処理負荷×負荷率)+C×Σ(クライアント装置の処理コスト×処理負荷×負荷率)・・・式1
【0013】
ここで、ネットワークにおける処理コストは帯域(単位は100Mbps)の逆数、処理負荷はトラフィック(単位は100Mbps)、負荷率は帯域に対するトラフィック(そこを流れるトラフィックの合計)の割合とする。また、サーバ装置における処理コストは処理能力(単位は100MIPS)の逆数、処理負荷は業務実行に必要な処理能力(単位は100MIPS)、負荷率はその処理能力に対する処理負荷(サーバ装置で実行される業務の負荷の合計)の割合とする。クライアント装置における処理コストは処理能力(単位は100MIPS)の逆数、処理負荷はサーバ装置へのアクセスに必要な処理能力(単位は100MIPS)、負荷率は処理能力に対する処理負荷の割合とする。Aはネットワークでのコストに対する重み付け係数、Bはサーバ装置でのコストに対する重み付け係数、Cはクライアント装置でのコストに対する重み付け係数とする。
【0014】
図2は、図1に示した情報処理システムの構成において、図1とは異なる動作の一例を示した図である。
例えば、図2におけるクライアント装置100、101からサーバ装置120上で動作する業務160、161にアクセス170、172して処理する場合のコストは、式2のようになる。ここで、クライアント装置からサーバ装置上の業務にアクセスするために必要なネットワーク帯域は20Mbpsとする。サーバ装置120、121の処理能力はどちらも100MIPS、業務160、161による処理負荷はどちらも40MIPSとする。クライアント装置100、101の処理能力はどちらも50MIPS、処理負荷は30MIPSとする。
【0015】
A×{(100/100×20/100×20/100)+(100/100×20/100×20/100)+(100/100×20/100×20/100)}+B×{(100/100×40/100×80/100)+(100/100×40/100×80/100)}+C×{(100/50×30/50×30/50)+(100/50×30/50×30/50)}=0.12A+0.64B+1.44C・・・式2
【0016】
式1を使って図1におけるクライアント装置100、101、業務を実行するサーバ装置120、121、伝送路150〜153の各組合せに関して算出した結果を表1に示す。
【0017】
【表1】

Figure 2005005926
【0018】
組合せ番号200〜215の各組合せにおけるコスト評価結果中でコストの評価結果が最小となる組合せ番号204がシステム性能の最も良い組合せである。また組合せ番号202、213がシステム性能の最も悪い組合せである。本技術を用いた情報処理システムにおいては、上記評価結果をもとに、システム性能が最も良くなる組合せ番号204で示されるような、クライアント装置とサーバ装置の組合せおよび通信経路を取るよう制御される。この場合のクライアント装置とサーバ装置間のアクセスは、アクセス170、173で示される。
【0019】
以上のように、この発明に係る情報処理システムは、ネットワークおよびそれに接続される各種処理装置における処理能力と処理負荷をもとに評価を行い、ネットワークと処理装置の資源利用制御を行うことにより最適な資源利用方法を取るので、システム性能を向上させることができる。
なお、システム性能に関するパラメータだけでなく、装置やネットワークの使用料など発生費用を加味して評価してもよい。式3に示すように、式1に発生費用を重み付け係数Dとともに加算することにより、発生費用を含めたコスト評価を行うことができ、システム性能と発生費用のトレードオフが可能となる。
【0020】
A×Σ(ネットワークの処理コスト×処理負荷×負荷率)+B×Σ(サーバ装置の処理コスト×処理負荷×負荷率)+C×Σ(クライアント装置の処理コスト×処理負荷×負荷率)+D×Σ発生費用・・・式3
【0021】
また、以上では選択した資源利用方法を取った結果として期待されるコストを評価していたが、その資源利用方法を取るためにかかる移行コストを加味して評価してもよい。式4に示すように、現在の状態から新たな資源利用法に移行するコストを、その重み付け係数Eとともに加算することにより、移行にかかるコストとのトレードオフが可能となる。
【0022】
A×Σ(ネットワークの処理コスト×処理負荷×負荷率)+B×Σ(サーバ装置の処理コスト×処理負荷×負荷率)+C×Σ(クライアント装置の処理コスト×処理負荷×負荷率)+E×Σ移行コスト・・・式4
【0023】
また、コストの評価方法は式1、式3、式4に限定されない。ネットワーク、サーバ装置、クライアント装置に関するコストと、発生費用、移行コストの和を取る例を示したが、その他の方法であってもよいし、すべての要素を考慮してもしなくてもよい。
また、評価において優先度を加味してもよく、例えば重要な業務を実行するサーバ装置の処理負荷を低く抑えるよう制御してもよい。
また、コストの評価結果により最適な資源利用方法を取る場合を説明したが、それに限定されない。
また、処理装置がクライアント装置、サーバ装置であり、それぞれクライアントネットワーク、サーバネットワークに接続される構成を例に説明したが、その他の処理装置、その他のネットワークであってもよく、処理装置の数も限定されない。また処理装置の接続はネットワークの両端に限定されるものではない。
【0024】
以上のように、この発明に係る情報処理システム及び資源利用方法は、情報を処理する複数の処理装置(サーバ装置、クライアント装置は一例)と、上記複数の処理装置を接続する複数の伝送路を提供するネットワークとを備え、上記複数の処理装置の処理能力と処理負荷及び上記ネットワークの処理能力と処理負荷とを用いて評価し、評価した結果に基づいて上記ネットワークと上記複数の処理装置との資源利用制御を行うことによって、情報処理システムの性能向上を可能にする。
【0025】
また、処理装置及びネットワークそれぞれの処理能力と処理負荷とを用いて、上記複数の処理装置と上記複数の伝送路とから選択した処理装置と伝送路との複数の組合せそれぞれについて処理能力と処理負荷とを用いて計算し、複数の計算結果を用いることによって、計算結果を用いて、複数の組合せから一つの組合せを選択することが可能となる。
【0026】
さらに、上記組合せの処理能力と処理負荷とをパラメータとしてコストを計算する計算式を用いて複数の計算結果を取得し、取得した複数の計算結果に基づいて、上記複数の組合せから一つの組合せを選択することによって、所定のパラメータを用いて定量的に評価することが可能となる。また、パラメータの種類を変更・追加することによって、適切な評価結果を取得することが可能となる。
【0027】
また、パラメータとして採用する情報は、初期値として与えられている数値を用いることにより、効率よく計算することが可能となる。
【0028】
実施の形態2.
実施の形態1では、コスト評価に使われるパラメータが予め与えられる固定的な初期値であるとしたが、動的に変化する場合も考えられる。
図3は、例えば各装置が負荷測定機能を備え、その負荷測定結果をもとにコスト評価を行う情報処理システムの一例を示す。
図3において、図1と同じ符号で示した構成要素は、図1で説明した構成要素と同様であるため、説明を省略する。図3の情報処理システムは、さらに、負荷を測定する負荷測定モジュール180〜185を備える。負荷測定モジュール180〜183は、ルータ装置140〜143上それぞれに配置される。負荷測定モジュール184、185は、サーバ装置120、121上それぞれに配置される。
【0029】
次に動作について説明する。負荷測定モジュール180〜183は、ルータ装置140〜143上で、ルータ装置140〜143それぞれに接続される伝送路の処理負荷(トラフィック)を測定する。また、負荷測定モジュール184、185は、サーバ装置120、121上でサーバ装置120、121それぞれの処理負荷を測定する。
負荷測定モジュール180〜185が測定した処理負荷をもとに、式1を使ってコストを評価し、アクセス170、173に示されるように、コストの評価結果が最小となるクライアント装置とサーバ装置の組合せおよび通信経路を取るよう制御される。
【0030】
以上のように、この発明に係る情報処理システムは、ネットワークと処理装置の資源利用制御において、ネットワークおよび各処理装置における処理負荷を測定し、その測定結果を用いてコスト評価を行うため、処理負荷が変動する場合でも最適な資源利用方法を取るので、システム性能を向上させることができる。
なお、負荷測定モジュール180〜183はルータ装置140〜143上にあり、負荷測定モジュール184、185はサーバ装置120、121上にあるとしたが、その他の構成であってもよい。例えば、負荷測定モジュールが伝送路に接続される構成であってもよい。
【0031】
実施の形態3.
実施の形態1では、初期値として与えられるパラメータだけをもとにコスト評価を行っていたが、評価に用いるパラメータが変動することもあり得る。図4は、例えばネットワークのトラフィックが新たに加わった場合を説明する図である。図4において、図1と同じ符号で示した構成要素は、図1で説明した構成要素と同様であるため、説明を省略する。また、図4の情報処理システムは、さらに、外部からルータ装置141、143それぞれに接続される伝送路154、155、通信経路が変更されたクライアント装置101とサーバ装置間のアクセス174、伝送路155から伝送路154へのアクセス175とを備える。
【0032】
次に動作について説明する。まず初期状態として、実施の形態1と同様な条件を考える。クライアント装置100、101からサーバ装置上で動作する業務にアクセスして処理するコストを評価した結果、システム性能が最も良くなる表1中の組合せ番号204で示されるような、クライアント装置とサーバ装置の組合せおよび通信経路を取るよう制御される。この場合のクライアント装置とサーバ装置間のアクセスは、アクセス170、173で示される。
その後、外部からの伝送路155から伝送路154へのアクセスによるトラフィック(50Mbps)が発生すると、それを検出してそのトラフィックを加味して、式1によりコストの評価を再実行する。その結果を表2に示す。
【0033】
【表2】
Figure 2005005926
【0034】
新たに発生したトラフィックは、クライアント装置100、101、サーバ装置120、121に負荷を与えないため、システム性能が最も良くなるクライアント装置と業務を実行するサーバ装置の組合せは、組合せ番号204と同様になる。そのため、表2ではクライアント装置とサーバ装置の組合せはその組合せに絞り、通信経路の違いによるコストを評価する。また、伝送路154、155と、図4に含まれない外部の処理装置は評価に含めない。
組合せ番号220〜227の各組合せにおけるコスト評価結果中でコストの評価結果が最小となる組合せ番号222がシステム性能の最も良い組合せとなり、それぞれのアクセスは170、174、175のようになるよう制御される。その結果、外部からのトラフィックが付加される前には、クライアント装置100、101とサーバ装置間のアクセスは170、173であったのに対し、外部からのトラフィックが付加された後には、クライアント装置100、101とサーバ装置間のアクセスは170、174のように変更され、アクセス170、173のままとする場合よりもシステム性能が向上する。
【0035】
以上のように、この発明に係る情報処理システムは、ネットワークと処理装置の資源利用制御において、評価に用いるパラメータの変化を検出してコスト評価を再実行するため、パラメータが変動する場合でも最適な資源利用方法を取るので、システム性能を向上させることができる。
なお、以上の説明では、ネットワークの処理負荷が変動した場合を例に説明したが、変動するパラメータはそれに限定されず、例えばネットワークのトポロジ情報や帯域、処理装置の数や処理性能や処理負荷などであってもよい。
また、コスト評価で得られた最適な資源利用方法を取る例を示したが、それに限定されない。また、式4に示したように移行コストを加味して評価してもよい。
【0036】
実施の形態4.
図5は、コスト評価をネットワーク(ルータ装置)および各処理装置上で行う構成を示す。図5において、図1と同じ符号で示した構成要素は、図1で説明した構成要素と同様であるため、説明を省略する。また、図5の情報処理システムは、さらに、コスト管理モジュール190〜197を備える。
【0037】
コスト管理モジュール190〜197は、所定の処理を実行する処理装置と伝送路との組合せを上記複数の処理装置と上記複数の伝送路とから複数選択し、上記複数の組合せに対応する処理能力と処理負荷とを入力し、入力した処理能力と処理負荷とをパラメータとして、上記計算式を用いて複数の計算結果を取得し、取得した複数の計算結果に基づいて、上記複数の組合せから一つの組合せ(評価結果)を選択する。また、上記パラメータは、処理能力と処理負荷とに限定されることはなく、他の要素であってもよい。
処理装置は、コスト管理モジュール190〜197から評価結果を入力し、評価結果に基づいて、利用する資源を決定する。
【0038】
次に動作について説明する。まず、サーバ装置120、121上のコスト管理モジュール194、195は、そのサーバ装置120、121の処理能力、実行可能な業務、それにより発生する負荷の情報をルータ装置140、141上のコスト管理モジュール190、191に通知する。コスト管理モジュール190、191はその情報を記憶するとともに、各ルータ装置140、141と接続されるルータ装置および処理装置上のコスト管理モジュールにその情報を通知する。その際、あわせて、従来のOSPF(Open Short Path First)等のルーティングプロトコルと同様に、接続する装置のトポロジ情報とルータ装置間の伝送路の帯域情報をも通知する。これを繰り返すことにより、最終的に、情報処理システムにおけるすべてのネットワーク(ルータ装置)および処理装置(サーバ装置、クライアント装置)に、コスト計算に用いるパラメータであるサーバ装置120、121の処理能力、実行可能な業務、それにより発生する負荷、装置のトポロジ情報、帯域情報が通知されることになる。
【0039】
次に、クライアント装置100、101が業務実行を要求する場合には、まずクライアント装置100、101上のコスト管理モジュール196、197が、上記パラメータをもとに表1に示されるコスト評価を実行する。その結果、コストが最小となる組合せ番号204が最適と判断する。それをもとに、クライアント装置100はサーバ装置120上での業務160の実行要求を、クライアント装置101はサーバ装置121上での業務161の実行要求を発行する。
【0040】
ルータ装置140〜143上のコスト管理モジュール190〜193においても、表1に示されるコスト評価を実施する。その結果、コストが最小となる組合せ番号204が最適と判断する。それをもとに、ルータ装置140〜143は組合せ番号204で示される通信経路を使って、クライアント装置100、101からの業務160、161の実行要求を転送し、最終的にサーバ装置120、121に届ける。サーバ装置120、121はこの実行要求にもとづき、業務160、161を実行する。この結果、アクセス170、173に示されるように、コストの評価結果が最小となるクライアント装置とサーバ装置の組合せおよび通信経路を取るよう制御される。
【0041】
以上のように、この発明に係る情報処理システムは、ネットワークと処理装置の資源利用制御において、ネットワークおよび各処理装置においてコスト評価を実行することにより、最適な資源利用方法を取るので、システム性能を向上させることができる。なお、コスト管理モジュールは、ルータ装置と処理装置との少なくともいずれか一方に備えられている場合であってもよい。いずれかのコスト管理モジュールによって、資源利用制御が実施されればよい。
【0042】
実施の形態5.
図6は、コスト評価をネットワークおよび処理装置以外の評価装置上で行う構成の一例を示す。図6において、図1と同じ符号で示した構成要素は、図1で説明した構成要素と同様であるため、説明を省略する。また、図6の情報処理システムは、さらに、コスト評価装置198を備える。
【0043】
コスト評価装置198は、所定の処理を実行する処理装置と伝送路との組合せを上記複数の処理装置と上記複数の伝送路とから複数選択し、上記複数の組合せに対応する処理能力と処理負荷とを入力し、入力した処理能力と処理負荷とをパラメータとして、上記計算式を用いて複数の計算結果を取得し、取得した複数の計算結果に基づいて、上記複数の組合せから一つの組合せ(評価結果)を選択する。また、上記パラメータは、処理能力と処理負荷とに限定されることはなく、他の要素であってもよい。
処理装置(例えば、クライアント装置やサーバ装置)は、コスト管理装置から評価結果を入力し、評価結果に基づいて、利用する資源を決定する。
【0044】
次に動作について説明する。まず、サーバ装置120、121の処理能力、実行可能な業務、それにより発生する負荷の情報、ルータ装置140〜143が接続する装置のトポロジ情報とルータ装置間の伝送路の帯域情報といった、コスト評価に使われるパラメータがコスト評価装置198に設定または通知される。
次に、クライアント装置100、101が業務実行を要求する場合には、コスト評価装置198に最適な資源利用方法を問い合わせる。問い合わせを受けると、コスト評価装置198は、上記パラメータをもとに表1に示されるコスト評価を実行する。その結果、コストが最小となる組合せ番号204が最適と判断し、クライアント装置100、101に通知される。それをもとに、クライアント装置100はサーバ装置120上での業務160の実行要求を、クライアント装置101はサーバ装置121上での業務161の実行要求を発行する。
【0045】
ルータ装置140〜143は上記実行要求を受けると、コスト評価装置198に最適な資源利用方法を問い合わせ、コスト評価装置198からコストが最小となる組合せ番号204の通信経路情報が通知される。それをもとに、ルータ装置140〜143は組合せ番号204で示される通信経路を使って、クライアント装置100、101からの業務160、161の実行要求を転送し、最終的にサーバ装置120、121に届ける。サーバ装置120、121はこの実行要求にもとづき、業務160、161を実行する。この結果、アクセス170、173に示されるように、コストの評価結果が最小となるクライアント装置とサーバ装置の組合せおよび通信経路を取るよう制御される。
【0046】
以上のように、この発明に係る情報処理システムは、ネットワークと処理装置の資源利用制御において、コスト評価装置において集中的にコスト評価を実行することにより、最適な資源利用方法を取るので、システム性能を向上させることができる。
なお、コスト評価装置の接続は、図6の構成に限定されず、他の構成(他の構成への接続)であってもよい。
【0047】
実施の形態6.
図7は、シミュレーションにより、資源利用方法に応じたシステムの挙動を検証する構成の一例を示す。図7において、図1と同じ符号で示した構成要素は、図1で説明した構成要素と同様であるため、説明を省略する。また、図7の情報処理システムは、さらに、シミュレータ199を備える。
【0048】
シミュレータ199は、コスト評価装置198が選択した組合せを入力し、入力した組合せに基づいて、ネットワークと処理装置の資源利用についてシミュレーションを行う。
また、コスト評価装置198は、実施の形態5で説明した機能に加え、シミュレータ199へ、評価結果を通知するとともに、シミュレータ199が行ったシミュレーション結果を入力し、入力したシミュレーション結果をもとにネットワークと処理装置の資源利用制御を行う。
【0049】
次に動作について説明する。コスト評価装置198が、上記パラメータをもとに表1に示されるコスト評価を実施した結果、コストが最小となる組合せ番号204が最適と判断する段階までは、実施の形態5と同様である。その後、その組合せ番号204で示されるクライアント装置、サーバ装置、トポロジ情報、通信経路、業務に関わるパラメータをシミュレータ199に渡す。シミュレータは、これらを用いて、情報処理システムが組合せ番号204に相当する動作をする場合の挙動についてシミュレーションを実施する。
シミュレーションの結果、情報処理システムの挙動に問題がなく、良いシステム性能が得られることが検証されると、コストが最小となる組合せ番号204の情報がクライアント装置100、101に通知される。それ以降の動作は、実施の形態5と同様である。
【0050】
以上のように、この発明に係る情報処理システムは、ネットワークと処理装置の資源利用制御において、コスト評価結果を反映する前にシミュレーションにより検証することにより、システムの正常動作と、コスト評価の正当性を確認した後、最適な資源利用方法を取るので、システム性能とシステム信頼性を向上させることができる。
【0051】
実施の形態7.
図8は、処理装置がストレージ装置である構成の一例を示す。図8において、図1と同じ符号で示した構成要素は、図1で説明した構成要素と同様であるため、説明を省略する。また、図8の情報処理システムは、さらに、データ蓄積/供給の処理を行うストレージ装置300、301、ストレージ装置300、301それぞれが接続されるストレージネットワーク310、311とを備え、サーバ装置とストレージ装置間のアクセス320〜322を示している。
【0052】
次に、情報処理システムにおける資源利用方法について説明する。この発明による情報処理システムでは、ネットワークのトポロジ情報と処理能力(帯域)と処理負荷だけでなく、ネットワークに接続される処理装置(ここではサーバ装置とストレージ装置の例をあげる)の処理能力と処理負荷をパラメータとして加味した式5によりコスト評価を行い、どの資源を利用するかを決定する。
【0053】
A×Σ(ネットワークの処理コスト×処理負荷×負荷率)+B×Σ(サーバ装置の処理コスト×処理負荷×負荷率)+F×Σ(ストレージ装置の処理コスト×処理負荷×負荷率)・・・式5
【0054】
ここで、ネットワークにおける処理コストは帯域(単位は100Mbps)の逆数、処理負荷はトラフィック(単位は100Mbps)、負荷率は帯域に対するトラフィック(そこを流れるトラフィックの合計)の割合とする。また、サーバ装置における処理コストは処理能力(単位は100MIPS)の逆数、処理負荷は業務実行に必要な処理能力(単位は100MIPS)、負荷率はその処理能力に対する処理負荷(ストレージ装置での処理負荷の合計)の割合とする。ストレージ装置における処理コストは処理能力(単位は100Mbps)の逆数、処理負荷はサーバ装置からのアクセスに必要な処理能力(単位は100Mbps)、負荷率は処理能力に対する処理負荷の割合とする。Aはネットワークでのコストに対する重み付け係数、Bはサーバ装置でのコストに対する重み付け係数、Fはストレージ装置でのコストに対する重み付け係数とする。
【0055】
例えば、サーバ装置上の業務からストレージ装置にアクセスするために必要なネットワーク帯域は20Mbps、サーバ装置120、121の処理能力はどちらも100MIPS、業務160、161による処理負荷はどちらも40MIPS、ストレージ装置300、301の処理能力はそれぞれ200Mbps、100Mbpsとする場合に、サーバ装置120、121上で動作する業務160、161が、アクセス320と321の組合せ、またはアクセス320と322の組合せでストレージ装置にアクセスして処理する場合のコストは、それぞれ式6と式7のようになる。
【0056】
A×{(100/100×20/100×20/100)+(100/100×20/100×20/100)+(100/200×20/100×20/200)}+B×{(100/100×40/100×40/100)+(100/100×40/100×40/100)}+F×{(100/200×20/100×40/200)+(100/200×20/100×40/200)}=0.09A+0.32B+0.04F・・・式6
【0057】
A×{(100/100×20/100×20/100)+(100/100×20/100×20/100)}+B×{(100/100×40/100×40/100)+(100/100×40/100×40/100)}+F×{(100/200×20/100×20/200)+(100/100×20/100×20/100)}=0.08A+0.32B+0.05F・・・式7
【0058】
式6と式7のどちらのコスト評価が小さくなるかは、重み付け係数AとFの関係に依存する。重み付け係数AとFの関係が、A<Fであると式6のほうが小さく、A=Fであると式6と式7の値は等しく、A>Fであると式7のほうが小さくなる。
このようなコスト評価を、業務を実行するサーバ装置120、121、伝送路150〜153、ストレージ装置300、301の組合せについて実行して、その中でコストの評価結果が最小となる組合せとなるように、サーバ装置とストレージ装置および通信経路を取るよう制御される。
処理装置(サーバ装置、クライアント装置等)は、評価結果を入力し、上記評価結果に基づいて、利用する資源を決定する。
【0059】
以上のように、この発明に係る情報処理システムは、ネットワークと処理装置の資源利用制御において、ネットワークに接続される処理装置(ここではサーバ装置とストレージ装置)における処理能力と処理負荷をも評価に加えることにより、最適な資源利用方法を取るので、システム性能を向上させることができる。
なお、以上ではサーバ装置とストレージ装置間のアクセスに関して説明したが、それ以外であってもよく、例えばストレージ装置とストレージ装置間のアクセスや、サーバ装置とサーバ装置間のアクセスであってもよい。
【0060】
実施の形態1〜7で説明した情報処理システムは、パラメータ及び評価結果を格納する記憶装置、或いは、記憶領域を備える。記憶装置、或いは、記憶領域は、情報処理システム内のいずれかの装置に配置される。例えば、処理装置内、ルータ装置内、コスト評価装置内に備えられてよい。
【0061】
実施の形態8.
実施の形態4で示したコスト管理モジュール、実施の形態5で示したコスト評価装置とは、複数の処理装置の処理能力と処理負荷及びネットワークの処理能力と処理負荷とを用いて評価し、評価した結果に基づいて上記ネットワークと上記複数の処理装置との資源利用制御を行う構成要素の一例を示したものであり、これらに限られるわけではない。実施の形態1、2、3、7等においても、コスト管理モジュールやコスト評価装置を具体的な例として適用することは可能である。
また、コスト管理モジュールは、処理装置内に備えられるプロセッサの制御のもとで実行される。また、コスト評価装置もプロセッサを備え、プロセッサの制御のもとで、各機能を実行する。
【0062】
図9は、コスト評価装置198の構成の一例を示した図である。
実施の形態5で説明した動作を実現する構成の一例を示した図である。
入出力部410は、情報を入出力する。例えば、他の処理装置、ルータ装置、その他の装置との間で情報を入出力する。入出力部410は、ネットワークを介して情報を入出力する場合もあるし、入出力装置を介して情報を入出力する場合もある。入出力装置には、キーボード、マウス等の入力機器、モニタ、プリンタ等の出力機器、あるいは、外部装置としてドライブ等によって接続される記録媒体から情報を入出力する場合も含まれる。
資源リストメモリ420は、情報処理システムを構成する資源に関する情報を資源リストとして記録する記録領域である。例えば、資源の識別子、資源の名称、接続可能な処理装置、初期値等の情報を記録する。資源は、処理装置、伝送路、ルータ装置等が含まれる。初期値は、処理能力、処理負荷等、評価する場合にパラメータとして用いる初期値である。
評価結果メモリ430は、評価結果を記録する記録領域である。評価結果メモリ430は、例えば、表1、表2のテーブル(評価結果テーブル)を記録する。
【0063】
組合せ選択部440は、所定の処理を実行する処理装置と伝送路との組合せを上記複数の処理装置と上記複数の伝送路とから複数選択する。組合せ選択部440は、資源リストメモリ420に格納された資源リストを用いて処理装置と伝送路とルータ装置の組合せを作成する。作成した複数の組合せは、評価結果メモリ430へ評価結果テーブルとして書き込まれる。例えば、表1では、組合せ番号、クライアント装置、通信経路、サーバ装置の欄が書きこまれることになる。
計算部450は、選択した複数の組合せそれぞれについて、上記組合せの処理能力と処理負荷等をパラメータとしてコストを計算する計算式を用いて複数の計算結果を取得する。計算部450は、計算結果を、評価結果メモリ430のそれぞれ該当する組合せ番号の欄へ記録する。表1では、コストの欄が書きこまれる。パラメータの値は、資源リストメモリ420へ初期値として記録されている値を用いる場合であってもよい。また、現在のパラメータの値を用いて計算する場合は、計算部450は、入出力部410を介して、各資源に関するパラメータの値を入手する。
評価部460は、計算部450が計算した複数の計算結果を用いて、評価する。表1では、評価結果の欄が書きこまれることになる。表1の例では、評価部460は、最大、最小を評価している。次に、評価部460は、評価結果に基づいて、上記複数の組合せから一つの組合せを選択上記複数の組合せから一つの組合せを選択し、選択した結果を入出力部410を介して、処理装置、ルータ装置等へ出力する。
また、組合せ選択部440、計算部450、評価部460とを資源利用制御部470ともいう。図9に示した資源利用制御部470の構成は一例であり、図9の構成に限られることはない。
【0064】
なお、資源リストメモリ420へ記録される資源リストは、利用者によって用意された情報を書きこむ場合であってもよい。記録媒体を介して入力してもよいし、ネットワークを介して入力してもよい。また、処理装置、ルータ装置等の資源から情報が送信され、送信された情報を記録する場合であってもよい。
さらに、実施の形態4で説明したコスト管理モジュールも、図9で示した構成要素と同様の構成を有し、機能を実現してもよい。
【0065】
実施の形態9.
コスト管理モジュールやコスト評価装置が実施する資源利用制御の機能は、一部或いはすべてコンピュータで動作可能なプログラムにより構成することができる。これらのプログラムは、例えば、C言語により作成することができる。
また、コスト管理モジュールやコスト評価装置が実施する資源利用制御の機能は、ROM(Read Only Memory)に記憶されたファームウェアで実現されていても構わない。或いは、ソフトウェア或いは、ハードウェア或いは、ソフトウェアとハードウェアとファームウェアとの組み合わせで実施されても構わない。
また、上記プログラムは、記録媒体に記録される。記録媒体は、磁気ディスク装置、FD(Flexible Disk)、光ディスク、CD(コンパクトディスク)、MD(ミニディスク)、DVD(Digital Versatile Disk)等のその他の記録媒体による記録装置を用いても構わない。
また、上記プログラムは、コンピュータにロードされ、プロセッサの制御に基づいて実行される。
【0066】
上記プログラムは、少なくとも、下記の手順を実行する。
情報を処理する複数の処理装置と、上記複数の処理装置を接続する複数の伝送路を提供するネットワークとを備える情報処理システムにおいて、実施されることを前提とする。
(1)複数の処理装置の処理能力と処理負荷及び上記ネットワークの処理能力と処理負荷とを用いて評価する手順。
(2)評価した結果に基づいて上記ネットワークと上記複数の処理装置との資源利用制御を行う。
【0067】
また、上記プログラムに含まれる手順の実現にあたって、具体的には、次のような手順を用いることが可能である。
(1)所定の処理を実行する処理装置と伝送路との組合せを上記複数の処理装置と上記複数の伝送路とから複数選択する手順。
(2)選択した複数の組合せそれぞれについて処理能力と処理負荷とを用いて計算して複数の計算結果を取得する手順(より具体的には、上記組合せの処理能力と処理負荷とをパラメータとしてコストを計算する計算式を用いて複数の計算結果を取得する手順)。
(3)取得した複数の計算結果を用いて、上記複数の組合せから一つの組合せを選択上記複数の組合せから一つの組合せを選択する手順。
【0068】
【発明の効果】
この発明は以上説明したように、ネットワークおよびそれに接続される各種処理装置における処理能力と処理負荷をもとに評価を行い、ネットワークと処理装置の資源利用制御を行うことにより最適な資源利用方法を取るので、システム性能を向上させることができる。
【図面の簡単な説明】
【図1】実施の形態1の情報処理システムの構成の一例を表した図。
【図2】図1に示した情報処理システムの構成において、図1とは異なる動作の一例を示した図。
【図3】実施の形態2の情報処理システムの構成の一例であり、各装置が負荷測定機能を備え、その負荷測定結果をもとにコスト評価を行う場合を説明する図。
【図4】実施の形態3の情報処理システムの構成の一例であり、ネットワークのトラフィックが新たに加わった場合を説明する図。
【図5】実施の形態4の情報処理システムの構成の一例であり、コスト評価をネットワーク(ルータ装置)および各処理装置上で行う構成例を表す図。
【図6】実施の形態5の情報処理システムの構成の一例であり、コスト評価をネットワークおよび処理装置以外の評価装置上で行う構成の一例を示す図。
【図7】実施の形態6の情報処理システムの構成の一例であり、シミュレーションにより、資源利用方法に応じたシステムの挙動を検証する構成の一例を示す図。
【図8】実施の形態7の情報処理システムの構成の一例であり、処理装置がストレージ装置である構成の一例を示す図。
【図9】コスト評価装置198の構成の一例を示した図である。
【符号の説明】
100,101 クライアント装置、110,111 クライアントネットワーク、120,121 サーバ装置、130,131 サーバネットワーク、140,141,142,143 ルータ装置、150,151,152,153伝送路、160,161 業務、170,172,173,174,175 アクセス、180〜185 負荷測定モジュール、194〜197 コスト管理モジュール、198 コスト評価装置、199 シミュレータ、300,301ストレージ装置、310,311 ストレージネットワーク、320〜322アクセス、410 入出力部、420 資源リストメモリ、430 評価結果メモリ、440 組合せ選択部、450 計算部、460 評価部、470 資源利用制御部。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an information processing system configured by connecting processing devices for processing information through a network.
[0002]
[Prior art]
Conventionally, in an information processing system, network communication path control has been performed based on topology information in the network and its processing capability (bandwidth). However, this method has a problem that even if there are a plurality of communication paths, only one communication path is fixedly used, so that the load is increased and the system performance is lowered. Therefore, for example, as disclosed in JP-A-6-85818 and JP-A-2002-16599, a method for improving system performance by taking into account the processing load (traffic) of the network in the control of the communication path is taken. Became.
[0003]
According to the summary of Japanese Patent Laid-Open No. 6-85818, “in a network composed of a plurality of LAN devices, when there are a plurality of communication paths between the first and second information processing apparatuses, an appropriate communication path The address table 7 stores addresses of transmission destinations corresponding to a plurality of communication paths existing between the first and second information processing apparatuses. When the transmission / reception control mechanism 5 receives a transmission / reception frame from the first information processing apparatus to the second information processing apparatus, the path setting mechanism 2 refers to the address table 7 and corresponds to the communication path existing between the information processing apparatuses. The address selection mechanism 3 selects and selects the address that the corresponding communication path is normal and has the lowest traffic among the addresses acquired by the path setting mechanism 2. It was set destination address the address, routing type transceiver frame address control mechanism 4 and including the received reception frame, an example that. "Transmitted to the LAN device through the transmission and reception control mechanism 6 is disclosed.
[0004]
According to the summary of Japanese Patent Laid-Open No. 2002-16599, “a network measurement control system that automatically performs communication service quality assurance control or the like according to a policy held by a control server based on network traffic measurement information is provided. "Measure network traffic with a meter and transfer the measured data to the control server. The control server holds policies for communication service quality assurance control, etc., and collects the data collected from the meter." Analyzing data, sending control instructions according to policies to target devices such as routers, and routers performing control according to control instructions, enabling fine communication service quality assurance control according to network conditions An example is disclosed.
[0005]
[Patent Document 1]
Japanese Patent Laid-Open No. 6-85818
[Patent Document 2]
JP 2002-16599 A
[0006]
[Problems to be solved by the invention]
In the conventional information processing system, only the processing capacity and processing load of the network are used for evaluation at the most in resource usage control. Therefore, even when the traffic is improved, the load on the server device side is high, or vice versa. In some cases, the system performance of the entire information processing system cannot be improved sufficiently.
[0007]
An object of the present invention is to improve system performance in the entire information processing system.
[0008]
[Means for Solving the Problems]
An information processing system according to the present invention includes a plurality of processing devices that process information,
A network providing a plurality of transmission paths connecting the plurality of processing devices;
With
Evaluating using the processing capacity and processing load of the plurality of processing devices and the processing capacity and processing load of the network, and performing resource usage control between the network and the plurality of processing devices based on the evaluation result Features.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Embodiment 1 FIG.
FIG. 1 is an example of a configuration diagram of an information processing system according to the present invention.
The components of the information processing system in FIG. 1 will be described.
The information processing system includes client devices 100 and 101 that issue information processing requests, and client networks 110 and 111 to which the client devices 100 and 101 are connected, respectively. In addition, server devices 120 and 121 that execute information processing and server networks 130 and 131 to which the server devices 120 and 121 are connected are provided. Also, there are router devices 140 to 143 that connect the client networks 110 and 111 and the server networks 130 and 131 to each other, and transmission paths 150 to 153 that connect the router devices 140 to 143.
[0010]
The transmission line 150 connects the router device 140 and the router device 141 with a bandwidth of 100 Mbps, the transmission line 151 connects the router device 140 and the router device 142 with a bandwidth of 100 Mbps, and the transmission line 152 connects the router device 141 and the router device 143 with each other. It is assumed that the bandwidth is 100 Mbps and the transmission path 153 is the router device 142 and the router device 143, and the bandwidth is 200 Mbps.
In addition, the information processing system includes operations 160 and 161 that perform information processing on the server devices 120 and 121, access 170 between the client device 100 and the server device 120, and the client device 101 and the server device 121. Access 173 in between.
[0011]
Next, a resource utilization method in the information processing system will be described. In the information processing system according to the present invention, not only the topology information, processing capability (bandwidth) and processing load of the network, but also processing devices connected to the network (here, the server device and the client device are examples of processing devices). Cost evaluation is performed according to Formula 1 (below) with processing capacity and processing load as parameters, and the method of use is determined. The parameters used for this evaluation are initial values given in advance.
[0012]
A × Σ (network processing cost × processing load × load factor) + B × Σ (server device processing cost × processing load × load factor) + C × Σ (client device processing cost × processing load × load factor)... Formula 1
[0013]
Here, the processing cost in the network is the reciprocal of the bandwidth (the unit is 100 Mbps), the processing load is the traffic (the unit is 100 Mbps), and the load factor is the ratio of the traffic to the bandwidth (the total amount of traffic flowing there). The processing cost in the server device is the reciprocal of the processing capability (unit is 100 MIPS), the processing load is the processing capability necessary for business execution (unit is 100 MIPS), and the load factor is the processing load for the processing capability (executed by the server device). Total load of work). The processing cost in the client device is the reciprocal of the processing capability (unit is 100 MIPS), the processing load is the processing capability necessary for accessing the server device (unit is 100 MIPS), and the load factor is the ratio of the processing load to the processing capability. A is a weighting coefficient for the cost in the network, B is a weighting coefficient for the cost in the server apparatus, and C is a weighting coefficient for the cost in the client apparatus.
[0014]
FIG. 2 is a diagram illustrating an example of operations different from those in FIG. 1 in the configuration of the information processing system illustrated in FIG.
For example, the cost in the case of accessing 170 and 172 for the operations 160 and 161 operating on the server device 120 from the client devices 100 and 101 in FIG. Here, it is assumed that the network bandwidth necessary for accessing the business on the server device from the client device is 20 Mbps. The server 120 and 121 have both processing capacities of 100 MIPS, and the processing loads of the jobs 160 and 161 are both 40 MIPS. The client apparatuses 100 and 101 both have a processing capacity of 50 MIPS and a processing load of 30 MIPS.
[0015]
A × {(100/100 × 20/100 × 20/100) + (100/100 × 20/100 × 20/100) + (100/100 × 20/100 × 20/100)} + B × {(100 / 100 × 40/100 × 80/100) + (100/100 × 40/100 × 80/100)} + C × {(100/50 × 30/50 × 30/50) + (100/50 × 30 / 50 × 30/50)} = 0.12A + 0.64B + 1.44C Expression 2
[0016]
Table 1 shows the results calculated for each combination of the client apparatuses 100 and 101, the server apparatuses 120 and 121 that execute business, and the transmission paths 150 to 153 in FIG.
[0017]
[Table 1]
Figure 2005005926
[0018]
Of the cost evaluation results in the combinations of the combination numbers 200 to 215, the combination number 204 that minimizes the cost evaluation result is the best combination of system performance. Combination numbers 202 and 213 are the worst combination of system performance. In the information processing system using this technology, based on the evaluation result, control is performed so as to take the combination of the client device and the server device and the communication path as indicated by the combination number 204 that provides the best system performance. . Access between the client device and the server device in this case is indicated by accesses 170 and 173.
[0019]
As described above, the information processing system according to the present invention is optimized by performing evaluation based on the processing capability and processing load of the network and various processing devices connected thereto, and performing resource use control of the network and the processing device. The system performance can be improved because a simple resource utilization method is adopted.
The evaluation may be performed in consideration of not only the parameters related to the system performance but also the generated costs such as a device or network usage fee. As shown in Formula 3, by adding the generated cost together with the weighting coefficient D to Formula 1, it is possible to perform a cost evaluation including the generated cost, and it is possible to trade off the system performance and the generated cost.
[0020]
A × Σ (network processing cost × processing load × load factor) + B × Σ (server device processing cost × processing load × load factor) + C × Σ (client device processing cost × processing load × load factor) + D × Σ Occurrence cost ... Formula 3
[0021]
In addition, although the cost expected as a result of taking the selected resource utilization method has been evaluated above, the evaluation may be performed in consideration of the migration cost for taking the resource utilization method. As shown in Expression 4, by adding the cost for shifting from the current state to a new resource utilization method together with the weighting coefficient E, it is possible to trade off the cost for shifting.
[0022]
A × Σ (network processing cost × processing load × load factor) + B × Σ (server device processing cost × processing load × load factor) + C × Σ (client device processing cost × processing load × load factor) + E × Σ Migration cost: Formula 4
[0023]
Further, the cost evaluation method is not limited to Formula 1, Formula 3, and Formula 4. Although the example which takes the sum of the cost regarding a network, a server apparatus, and a client apparatus, generation | occurrence | production expense, and a migration cost was shown, another method may be sufficient and it is not necessary to consider all the elements.
Moreover, priority may be taken into consideration in the evaluation, and for example, control may be performed so as to suppress the processing load of the server device that performs important work.
Moreover, although the case where the optimal resource utilization method was taken with the cost evaluation result was demonstrated, it is not limited to it.
In addition, the processing apparatus is a client apparatus and a server apparatus, and the configuration is described as an example in which the processing apparatus is connected to the client network and the server network, respectively, but other processing apparatuses and other networks may be used, and the number of processing apparatuses It is not limited. Further, the connection of the processing devices is not limited to both ends of the network.
[0024]
As described above, the information processing system and the resource utilization method according to the present invention include a plurality of processing devices (an example of a server device and a client device) that process information and a plurality of transmission paths that connect the plurality of processing devices. A network to be provided, and evaluated using the processing capacity and processing load of the plurality of processing devices and the processing capacity and processing load of the network, and based on the evaluation results, the network and the plurality of processing devices By performing resource use control, it is possible to improve the performance of the information processing system.
[0025]
Further, the processing capacity and the processing load for each of a plurality of combinations of the processing apparatus and the transmission path selected from the plurality of processing apparatuses and the plurality of transmission paths using the processing capacity and the processing load of each of the processing apparatus and the network. And using a plurality of calculation results, it is possible to select one combination from a plurality of combinations using the calculation results.
[0026]
Further, a plurality of calculation results are obtained using a calculation formula for calculating a cost using the processing capacity and processing load of the combination as parameters, and one combination is obtained from the plurality of combinations based on the obtained plurality of calculation results. By selecting, it becomes possible to evaluate quantitatively using a predetermined parameter. In addition, it is possible to acquire an appropriate evaluation result by changing / adding the type of parameter.
[0027]
Further, the information adopted as the parameter can be efficiently calculated by using the numerical value given as the initial value.
[0028]
Embodiment 2. FIG.
In the first embodiment, the parameters used for cost evaluation are fixed initial values given in advance. However, there may be a case where the parameters change dynamically.
FIG. 3 shows an example of an information processing system in which each device has a load measurement function and performs cost evaluation based on the load measurement result.
In FIG. 3, the constituent elements denoted by the same reference numerals as those in FIG. 1 are the same as the constituent elements described in FIG. The information processing system in FIG. 3 further includes load measurement modules 180 to 185 that measure the load. The load measurement modules 180 to 183 are arranged on the router devices 140 to 143, respectively. The load measurement modules 184 and 185 are arranged on the server devices 120 and 121, respectively.
[0029]
Next, the operation will be described. The load measurement modules 180 to 183 measure the processing loads (traffic) of the transmission paths connected to the router devices 140 to 143 on the router devices 140 to 143, respectively. The load measurement modules 184 and 185 measure the processing loads of the server apparatuses 120 and 121 on the server apparatuses 120 and 121, respectively.
Based on the processing load measured by the load measurement modules 180 to 185, the cost is evaluated using Equation 1, and as shown in the access 170 and 173, the client device and the server device with the smallest cost evaluation result are shown. Controlled to take combination and communication paths.
[0030]
As described above, the information processing system according to the present invention measures the processing load in the network and each processing device in the resource usage control of the network and the processing device, and performs cost evaluation using the measurement result. Even when the value fluctuates, the optimum resource utilization method is adopted, so that the system performance can be improved.
Although the load measurement modules 180 to 183 are on the router devices 140 to 143 and the load measurement modules 184 and 185 are on the server devices 120 and 121, other configurations may be used. For example, the load measurement module may be configured to be connected to the transmission line.
[0031]
Embodiment 3 FIG.
In the first embodiment, the cost evaluation is performed based only on the parameter given as the initial value. However, the parameter used for the evaluation may vary. FIG. 4 is a diagram for explaining a case where network traffic is newly added, for example. In FIG. 4, the constituent elements denoted by the same reference numerals as those in FIG. 1 are the same as the constituent elements described in FIG. 4 further includes transmission paths 154 and 155 connected to the router apparatuses 141 and 143 from the outside, an access 174 between the client apparatus 101 and the server apparatus whose communication path has been changed, and a transmission path 155. And 175 to the transmission path 154.
[0032]
Next, the operation will be described. First, the same conditions as in the first embodiment are considered as an initial state. As a result of evaluating the cost of accessing and processing the business operating on the server device from the client devices 100 and 101, the client device and the server device as indicated by the combination number 204 in Table 1 that provides the best system performance. Controlled to take combination and communication paths. Access between the client device and the server device in this case is indicated by accesses 170 and 173.
Thereafter, when traffic (50 Mbps) due to access from the external transmission path 155 to the transmission path 154 is generated, the traffic is detected, the traffic is taken into account, and the cost evaluation is reexecuted by Equation 1. The results are shown in Table 2.
[0033]
[Table 2]
Figure 2005005926
[0034]
Since newly generated traffic does not give a load to the client apparatuses 100 and 101 and the server apparatuses 120 and 121, the combination of the client apparatus with the best system performance and the server apparatus that executes the business is the same as the combination number 204. Become. Therefore, in Table 2, the combination of the client device and the server device is narrowed down to that combination, and the cost due to the difference in the communication path is evaluated. Further, the transmission paths 154 and 155 and an external processing device not included in FIG. 4 are not included in the evaluation.
Among the cost evaluation results of the combination numbers 220 to 227, the combination number 222 that minimizes the cost evaluation result is the best combination of system performance, and each access is controlled to be 170, 174, and 175. The As a result, before the traffic from the outside is added, the access between the client devices 100 and 101 and the server device is 170 and 173, whereas after the traffic from the outside is added, the client device Access between the servers 100 and 101 and the server apparatus is changed to 170 and 174, and the system performance is improved as compared with the case where the accesses 170 and 173 are left as they are.
[0035]
As described above, the information processing system according to the present invention detects the change of the parameter used for the evaluation and re-executes the cost evaluation in the resource usage control of the network and the processing device, and therefore is optimal even when the parameter fluctuates. Since the resource utilization method is adopted, the system performance can be improved.
In the above description, the case where the processing load of the network fluctuates has been described as an example, but the fluctuating parameters are not limited thereto, for example, network topology information and bandwidth, the number of processing devices, processing performance, processing load, etc. It may be.
Moreover, although the example which takes the optimal resource utilization method obtained by cost evaluation was shown, it is not limited to it. Further, as shown in Expression 4, the evaluation may be performed in consideration of the transition cost.
[0036]
Embodiment 4 FIG.
FIG. 5 shows a configuration in which cost evaluation is performed on a network (router device) and each processing device. In FIG. 5, the constituent elements denoted by the same reference numerals as those in FIG. 1 are the same as the constituent elements described in FIG. The information processing system in FIG. 5 further includes cost management modules 190 to 197.
[0037]
The cost management modules 190 to 197 select a plurality of combinations of processing devices that execute predetermined processing and transmission paths from the plurality of processing devices and the plurality of transmission paths, and have a processing capability corresponding to the plurality of combinations. The processing load is input, using the input processing capacity and processing load as parameters, a plurality of calculation results are obtained using the above calculation formula, and one of the plurality of combinations is obtained based on the plurality of obtained calculation results. Select a combination (evaluation result). Further, the above parameters are not limited to the processing capacity and the processing load, and may be other elements.
The processing device inputs an evaluation result from the cost management modules 190 to 197 and determines a resource to be used based on the evaluation result.
[0038]
Next, the operation will be described. First, the cost management modules 194 and 195 on the server apparatuses 120 and 121 store the information on the processing capabilities of the server apparatuses 120 and 121, executable work, and load generated thereby, on the cost management modules on the router apparatuses 140 and 141. 190 and 191 are notified. The cost management modules 190 and 191 store the information and notify the information to the cost management modules on the router devices and processing devices connected to the router devices 140 and 141. At the same time, similarly to the conventional routing protocol such as OSPF (Open Short Path First), the topology information of the connected device and the bandwidth information of the transmission path between the router devices are also notified. By repeating this, the processing capacity of the server devices 120 and 121, which are parameters used for cost calculation, are finally executed on all networks (router devices) and processing devices (server devices and client devices) in the information processing system. A possible job, a load generated thereby, device topology information, and bandwidth information are notified.
[0039]
Next, when the client apparatuses 100 and 101 request business execution, first, the cost management modules 196 and 197 on the client apparatuses 100 and 101 execute the cost evaluation shown in Table 1 based on the above parameters. . As a result, the combination number 204 that minimizes the cost is determined to be optimal. Based on this, the client device 100 issues an execution request for the business 160 on the server device 120, and the client device 101 issues an execution request for the business 161 on the server device 121.
[0040]
The cost management modules 190 to 193 on the router devices 140 to 143 also perform the cost evaluation shown in Table 1. As a result, the combination number 204 that minimizes the cost is determined to be optimal. Based on this, the router apparatuses 140 to 143 use the communication path indicated by the combination number 204 to transfer the execution requests of the jobs 160 and 161 from the client apparatuses 100 and 101, and finally the server apparatuses 120 and 121. To deliver. The server apparatuses 120 and 121 execute the tasks 160 and 161 based on the execution request. As a result, as indicated by accesses 170 and 173, control is performed so that the combination of the client device and the server device and the communication path that minimize the cost evaluation result are taken.
[0041]
As described above, the information processing system according to the present invention adopts an optimal resource utilization method by performing cost evaluation in the network and each processing apparatus in the resource utilization control of the network and the processing apparatus. Can be improved. Note that the cost management module may be provided in at least one of the router device and the processing device. Resource usage control may be performed by any one of the cost management modules.
[0042]
Embodiment 5 FIG.
FIG. 6 shows an example of a configuration in which cost evaluation is performed on an evaluation device other than the network and the processing device. In FIG. 6, the components indicated by the same reference numerals as those in FIG. 1 are the same as the components described in FIG. Further, the information processing system of FIG.
[0043]
The cost evaluation device 198 selects a plurality of combinations of a processing device and a transmission path for executing a predetermined process from the plurality of processing devices and the plurality of transmission paths, and a processing capacity and a processing load corresponding to the plurality of combinations. , And using the input processing capacity and processing load as parameters, a plurality of calculation results are acquired using the above calculation formula, and one combination (from the plurality of combinations based on the acquired plurality of calculation results ( Select (Evaluation Result). Further, the above parameters are not limited to the processing capacity and the processing load, and may be other elements.
A processing device (for example, a client device or a server device) inputs an evaluation result from the cost management device and determines a resource to be used based on the evaluation result.
[0044]
Next, the operation will be described. First, cost evaluation such as processing capability of server apparatuses 120 and 121, executable work, information on load generated thereby, topology information of apparatuses connected to router apparatuses 140 to 143, and bandwidth information of transmission paths between router apparatuses. The parameters used in the above are set or notified to the cost evaluation device 198.
Next, when the client devices 100 and 101 request business execution, the cost evaluation device 198 is inquired about an optimal resource utilization method. Upon receiving the inquiry, the cost evaluation device 198 performs the cost evaluation shown in Table 1 based on the above parameters. As a result, the combination number 204 that minimizes the cost is determined to be optimal, and is notified to the client apparatuses 100 and 101. Based on this, the client device 100 issues an execution request for the business 160 on the server device 120, and the client device 101 issues an execution request for the business 161 on the server device 121.
[0045]
When the router apparatuses 140 to 143 receive the execution request, the cost evaluation apparatus 198 is inquired about an optimal resource utilization method, and the communication path information of the combination number 204 that minimizes the cost is notified from the cost evaluation apparatus 198. Based on this, the router apparatuses 140 to 143 use the communication path indicated by the combination number 204 to transfer the execution requests of the jobs 160 and 161 from the client apparatuses 100 and 101, and finally the server apparatuses 120 and 121. To deliver. The server apparatuses 120 and 121 execute the tasks 160 and 161 based on the execution request. As a result, as indicated by accesses 170 and 173, control is performed so that the combination of the client device and the server device and the communication path that minimize the cost evaluation result are taken.
[0046]
As described above, the information processing system according to the present invention adopts an optimal resource utilization method by performing cost evaluation intensively in the cost evaluation apparatus in the resource utilization control of the network and the processing apparatus. Can be improved.
Note that the connection of the cost evaluation apparatus is not limited to the configuration of FIG. 6, and may be another configuration (connection to another configuration).
[0047]
Embodiment 6 FIG.
FIG. 7 shows an example of a configuration for verifying the behavior of the system according to the resource utilization method by simulation. In FIG. 7, the constituent elements denoted by the same reference numerals as those in FIG. 1 are the same as the constituent elements described in FIG. The information processing system in FIG. 7 further includes a simulator 199.
[0048]
The simulator 199 inputs the combination selected by the cost evaluation device 198, and performs simulation on the resource use of the network and the processing device based on the input combination.
In addition to the functions described in the fifth embodiment, the cost evaluation apparatus 198 notifies the simulator 199 of the evaluation result, inputs the simulation result performed by the simulator 199, and performs a network based on the input simulation result. And resource usage control of the processing unit.
[0049]
Next, the operation will be described. Thereafter, the client device, server device, topology information, communication path, and business parameters indicated by the combination number 204 are passed to the simulator 199. The simulator uses these to simulate the behavior when the information processing system performs an operation corresponding to the combination number 204.
As a result of the simulation, when it is verified that there is no problem in the behavior of the information processing system and that good system performance can be obtained, the information of the combination number 204 that minimizes the cost is notified to the client apparatuses 100 and 101. The subsequent operation is the same as that of the fifth embodiment.
[0050]
As described above, the information processing system according to the present invention verifies the normal operation of the system and the validity of the cost evaluation by verifying by simulation before reflecting the cost evaluation result in the resource use control of the network and the processing device. After confirming the above, since the optimum resource utilization method is taken, system performance and system reliability can be improved.
[0051]
Embodiment 7 FIG.
FIG. 8 shows an example of a configuration in which the processing device is a storage device. In FIG. 8, the components indicated by the same reference numerals as those in FIG. 1 are the same as the components described in FIG. The information processing system in FIG. 8 further includes storage apparatuses 300 and 301 that perform data storage / supply processing, and storage networks 310 and 311 to which the storage apparatuses 300 and 301 are connected, respectively. Access 320-322 is shown.
[0052]
Next, a resource utilization method in the information processing system will be described. In the information processing system according to the present invention, not only the topology information, processing capability (bandwidth) and processing load of the network, but also the processing capability and processing of processing devices connected to the network (here, examples of server devices and storage devices are given). Cost evaluation is performed using Equation 5 with the load as a parameter, and which resource is used is determined.
[0053]
A × Σ (network processing cost × processing load × load factor) + B × Σ (server device processing cost × processing load × load factor) + F × Σ (storage device processing cost × processing load × load factor) Formula 5
[0054]
Here, the processing cost in the network is the reciprocal of the bandwidth (the unit is 100 Mbps), the processing load is the traffic (the unit is 100 Mbps), and the load factor is the ratio of the traffic to the bandwidth (the total amount of traffic flowing there). The processing cost in the server device is the reciprocal of the processing capability (unit is 100 MIPS), the processing load is the processing capability required for business execution (unit is 100 MIPS), and the load factor is the processing load for the processing capability (processing load in the storage device) Of the total). The processing cost in the storage apparatus is the reciprocal of the processing capacity (unit is 100 Mbps), the processing load is the processing capacity required for access from the server apparatus (unit is 100 Mbps), and the load factor is the ratio of the processing load to the processing capacity. A is a weighting coefficient for the cost in the network, B is a weighting coefficient for the cost in the server apparatus, and F is a weighting coefficient for the cost in the storage apparatus.
[0055]
For example, the network bandwidth required to access the storage device from the business on the server device is 20 Mbps, the processing capacities of the server devices 120 and 121 are both 100 MIPS, the processing loads due to the business operations 160 and 161 are both 40 MIPS, and the storage device 300 , 301 have processing capacities of 200 Mbps and 100 Mbps, respectively, the jobs 160 and 161 operating on the server devices 120 and 121 access the storage device by a combination of access 320 and 321 or a combination of access 320 and 322. The costs for processing are as shown in Equation 6 and Equation 7, respectively.
[0056]
A × {(100/100 × 20/100 × 20/100) + (100/100 × 20/100 × 20/100) + (100/200 × 20/100 × 20/200)} + B × {(100 / 100 × 40/100 × 40/100) + (100/100 × 40/100 × 40/100)} + F × {(100/200 × 20/100 × 40/200) + (100/200 × 20 / 100 × 40/200)} = 0.09A + 0.32B + 0.04F Expression 6
[0057]
A × {(100/100 × 20/100 × 20/100) + (100/100 × 20/100 × 20/100)} + B × {(100/100 × 40/100 × 40/100) + (100 /100×40/100×40/100)}+F×{(100/200×20/100×20/200)+(100/100×20/100×20/100)}=0.08A+0.32B+0. 05F ... Formula 7
[0058]
Which of the cost evaluations of Equation 6 and Equation 7 is smaller depends on the relationship between the weighting factors A and F. When the relationship between the weighting factors A and F is A <F, Equation 6 is smaller. When A = F, the values of Equation 6 and Equation 7 are equal, and when A> F, Equation 7 is smaller.
Such cost evaluation is performed on the combination of the server apparatuses 120 and 121, the transmission paths 150 to 153, and the storage apparatuses 300 and 301 that execute the business, so that the cost evaluation result becomes the minimum among them. The server device and the storage device are controlled to take communication paths.
A processing device (server device, client device, etc.) inputs an evaluation result and determines a resource to be used based on the evaluation result.
[0059]
As described above, the information processing system according to the present invention also evaluates the processing capability and processing load in the processing devices (here, the server device and the storage device) connected to the network in the resource usage control of the network and the processing device. In addition, since an optimal resource utilization method is taken, system performance can be improved.
Note that the access between the server device and the storage device has been described above, but other access methods may be used, such as access between the storage device and the storage device, or access between the server device and the server device.
[0060]
The information processing system described in the first to seventh embodiments includes a storage device that stores parameters and evaluation results, or a storage area. The storage device or the storage area is arranged in any device in the information processing system. For example, it may be provided in a processing device, a router device, or a cost evaluation device.
[0061]
Embodiment 8 FIG.
The cost management module shown in the fourth embodiment and the cost evaluation device shown in the fifth embodiment are evaluated using the processing capability and processing load of a plurality of processing devices and the processing capability and processing load of a network. Based on the result, an example of a component that performs resource use control between the network and the plurality of processing devices is shown, but the present invention is not limited to these. In the first, second, third, seventh, etc., it is possible to apply the cost management module and the cost evaluation device as specific examples.
The cost management module is executed under the control of a processor provided in the processing apparatus. The cost evaluation apparatus also includes a processor and executes each function under the control of the processor.
[0062]
FIG. 9 is a diagram illustrating an example of the configuration of the cost evaluation apparatus 198.
FIG. 10 is a diagram illustrating an example of a configuration that realizes the operation described in the fifth embodiment.
The input / output unit 410 inputs and outputs information. For example, information is input / output from / to other processing devices, router devices, and other devices. The input / output unit 410 may input / output information via a network or may input / output information via an input / output device. The input / output device includes a case where information is input / output from an input device such as a keyboard and a mouse, an output device such as a monitor and a printer, or a recording medium connected by a drive as an external device.
The resource list memory 420 is a recording area for recording information on resources constituting the information processing system as a resource list. For example, information such as a resource identifier, a resource name, a connectable processing device, and an initial value is recorded. Resources include processing devices, transmission paths, router devices, and the like. The initial value is an initial value used as a parameter when evaluating processing capacity, processing load, and the like.
The evaluation result memory 430 is a recording area for recording the evaluation result. The evaluation result memory 430 records, for example, the tables of Table 1 and Table 2 (evaluation result table).
[0063]
The combination selection unit 440 selects a plurality of combinations of processing apparatuses that execute predetermined processing and transmission paths from the plurality of processing apparatuses and the plurality of transmission paths. The combination selection unit 440 uses the resource list stored in the resource list memory 420 to create a combination of a processing device, a transmission path, and a router device. The created combinations are written in the evaluation result memory 430 as an evaluation result table. For example, in Table 1, columns of combination number, client device, communication path, and server device are written.
For each of the selected combinations, the calculation unit 450 acquires a plurality of calculation results using a calculation formula that calculates the cost using the processing capacity and processing load of the combination as parameters. The calculation unit 450 records the calculation result in the corresponding combination number column of the evaluation result memory 430. In Table 1, the cost column is written. The parameter value may be a value recorded in the resource list memory 420 as an initial value. When calculating using the current parameter values, the calculation unit 450 obtains the parameter values for each resource via the input / output unit 410.
The evaluation unit 460 performs evaluation using a plurality of calculation results calculated by the calculation unit 450. In Table 1, the evaluation result column is written. In the example of Table 1, the evaluation unit 460 evaluates the maximum and minimum. Next, the evaluation unit 460 selects one combination from the plurality of combinations based on the evaluation result, selects one combination from the plurality of combinations, and selects the selected result via the input / output unit 410. And output to the router device.
Further, the combination selection unit 440, the calculation unit 450, and the evaluation unit 460 are also referred to as a resource use control unit 470. The configuration of the resource usage control unit 470 illustrated in FIG. 9 is an example, and is not limited to the configuration of FIG.
[0064]
The resource list recorded in the resource list memory 420 may be a case where information prepared by the user is written. Input may be performed via a recording medium or via a network. Further, information may be transmitted from resources such as a processing device and a router device, and the transmitted information may be recorded.
Furthermore, the cost management module described in the fourth embodiment may have the same configuration as the components shown in FIG.
[0065]
Embodiment 9 FIG.
Some or all of the resource utilization control functions implemented by the cost management module and the cost evaluation apparatus can be configured by a computer-operable program. These programs can be created in C language, for example.
Further, the resource use control function implemented by the cost management module and the cost evaluation device may be realized by firmware stored in a ROM (Read Only Memory). Alternatively, it may be implemented by software, hardware, or a combination of software, hardware, and firmware.
The program is recorded on a recording medium. As the recording medium, a recording apparatus using another recording medium such as a magnetic disk device, an FD (Flexible Disk), an optical disc, a CD (Compact Disc), an MD (Mini Disc), or a DVD (Digital Versatile Disk) may be used.
The program is loaded on the computer and executed based on the control of the processor.
[0066]
The program executes at least the following procedure.
It is assumed that the present invention is implemented in an information processing system that includes a plurality of processing devices that process information and a network that provides a plurality of transmission paths that connect the plurality of processing devices.
(1) A procedure for evaluating using the processing capability and processing load of a plurality of processing devices and the processing capability and processing load of the network.
(2) Resource utilization control between the network and the plurality of processing devices is performed based on the evaluation result.
[0067]
In order to realize the procedures included in the program, specifically, the following procedures can be used.
(1) A procedure for selecting a plurality of combinations of processing devices and transmission paths for executing predetermined processing from the plurality of processing devices and the plurality of transmission paths.
(2) A procedure for calculating a plurality of selected combinations using the processing capacity and processing load and obtaining a plurality of calculation results (more specifically, the cost using the processing capacity and processing load of the combination as parameters) A procedure for obtaining a plurality of calculation results using a calculation formula for calculating).
(3) A procedure of selecting one combination from the plurality of combinations using the plurality of obtained calculation results, and selecting one combination from the plurality of combinations.
[0068]
【The invention's effect】
As described above, the present invention performs an evaluation based on the processing capacity and processing load in the network and various processing devices connected to the network, and performs resource usage control of the network and the processing device. Therefore, system performance can be improved.
[Brief description of the drawings]
FIG. 1 illustrates an example of a configuration of an information processing system according to a first embodiment.
2 is a diagram showing an example of an operation different from that in FIG. 1 in the configuration of the information processing system shown in FIG. 1;
FIG. 3 is a diagram illustrating an example of a configuration of an information processing system according to a second embodiment, in which each device has a load measurement function and performs cost evaluation based on the load measurement result.
FIG. 4 is a diagram illustrating an example of a configuration of an information processing system according to a third embodiment, and illustrates a case where network traffic is newly added.
5 is a diagram illustrating an example of a configuration of an information processing system according to a fourth embodiment, in which cost evaluation is performed on a network (router device) and each processing device. FIG.
6 is a diagram illustrating an example of a configuration of an information processing system according to a fifth embodiment, in which cost evaluation is performed on an evaluation device other than a network and a processing device. FIG.
7 is an example of a configuration of an information processing system according to a sixth embodiment, and illustrates an example of a configuration that verifies the behavior of a system according to a resource usage method by simulation. FIG.
FIG. 8 is a diagram illustrating an example of a configuration of an information processing system according to a seventh embodiment, in which a processing device is a storage device.
9 is a diagram showing an example of the configuration of a cost evaluation device 198. FIG.
[Explanation of symbols]
100, 101 Client device, 110, 111 Client network, 120, 121 Server device, 130, 131 Server network, 140, 141, 142, 143 Router device, 150, 151, 152, 153 Transmission path, 160, 161 Business, 170 , 172, 173, 174, 175 access, 180-185 load measurement module, 194-197 cost management module, 198 cost evaluation device, 199 simulator, 300, 301 storage device, 310, 311 storage network, 320-322 access, 410 Input / output unit, 420 resource list memory, 430 evaluation result memory, 440 combination selection unit, 450 calculation unit, 460 evaluation unit, 470 resource use control unit.

Claims (15)

情報を処理する複数の処理装置と、
上記複数の処理装置を接続する複数の伝送路を提供するネットワークと
を備え、
上記複数の処理装置の処理能力と処理負荷及び上記ネットワークの処理能力と処理負荷とを用いて評価し、評価した結果に基づいて上記ネットワークと上記複数の処理装置との資源利用制御を行うことを特徴とする情報処理システム。
A plurality of processing devices for processing information;
A network providing a plurality of transmission paths connecting the plurality of processing devices,
Evaluating using the processing capacity and processing load of the plurality of processing devices and the processing capacity and processing load of the network, and performing resource usage control between the network and the plurality of processing devices based on the evaluation result A featured information processing system.
上記情報処理システムは、所定の処理を実行する処理装置と伝送路との組合せを上記複数の処理装置と上記複数の伝送路とから複数選択し、選択した複数の組合せそれぞれについて処理能力と処理負荷とを用いて所定の計算式を計算して複数の計算結果を取得し、取得した複数の計算結果を用いて、上記ネットワークと上記複数の処理装置との資源利用制御を行うことを特徴とする請求項1記載の情報処理システム。The information processing system selects a plurality of combinations of a processing device and a transmission path for executing a predetermined process from the plurality of processing devices and the plurality of transmission paths, and each of the selected combination has a processing capacity and a processing load. To obtain a plurality of calculation results by calculating a predetermined calculation formula using and to perform resource use control between the network and the plurality of processing devices using the obtained plurality of calculation results The information processing system according to claim 1. 上記情報処理システムは、上記組合せの処理能力と処理負荷とをパラメータとしてコストを計算する計算式を用いて複数の計算結果を取得し、取得した複数の計算結果に基づいて、上記複数の組合せから一つの組合せを選択することを特徴とする請求項2記載の情報処理システム。The information processing system acquires a plurality of calculation results using a calculation formula that calculates a cost using the processing capacity and processing load of the combination as parameters, and based on the acquired plurality of calculation results, 3. The information processing system according to claim 2, wherein one combination is selected. 上記情報処理システムは、さらに、上記組合せの伝送路と処理装置とを利用することに伴って発生する費用を用いて評価することを特徴とする請求項1の情報処理システム。The information processing system according to claim 1, wherein the information processing system is further evaluated by using a cost generated by using the transmission path and the processing device of the combination. 上記情報処理システムは、さらに、選択された組合せの伝送路と処理装置へ移行する困難さとコストとの少なくともいずれかを評価することを特徴とする請求項1の情報処理システム。The information processing system according to claim 1, wherein the information processing system further evaluates at least one of a transmission path of the selected combination and a difficulty of shifting to a processing device and a cost. 上記ネットワークの処理負荷及び上記処理装置の処理負荷は、初期値として与えられることを特徴とする請求項1の情報処理システム。The information processing system according to claim 1, wherein the processing load of the network and the processing load of the processing device are given as initial values. 上記ネットワークは、ルータ装置を備え、
上記ルータ装置は、上記ネットワークの処理負荷及び上記処理装置の処理負荷として、情報処理システム動作中の処理負荷を測定する負荷測定モジュールを備え、
上記資源利用制御は、上記負荷測定モジュールが測定した処理負荷を用いて評価することを特徴とする請求項1の情報処理システム。
The network includes a router device,
The router device includes a load measurement module that measures a processing load during operation of the information processing system as a processing load of the network and a processing load of the processing device.
2. The information processing system according to claim 1, wherein the resource use control is evaluated using a processing load measured by the load measuring module.
上記情報処理システムは、評価に用いる処理能力と処理負荷との少なくともいずれか一方が変化したことを検出して再評価を行い、ネットワークと処理装置の資源利用制御を行うことを特徴とする請求項1の情報処理システム。2. The information processing system according to claim 1, wherein the information processing system detects a change in at least one of a processing capacity and a processing load used for evaluation, performs reevaluation, and performs resource use control of the network and the processing device. 1. Information processing system. 上記ネットワークは、ルータ装置を備え、
上記ルータ装置は、所定の処理を実行する処理装置と伝送路との組合せを上記複数の処理装置と上記複数の伝送路とから複数選択し、上記複数の組合せに対応する処理能力と処理負荷とを入力し、入力した処理能力と処理負荷とをパラメータとして、上記計算式を用いて複数の計算結果を取得し、取得した複数の計算結果に基づいて、上記複数の組合せから一つの組合せを選択するコスト管理モジュールを備えることを特徴とする請求項1記載の情報処理システム。
The network includes a router device,
The router device selects a plurality of combinations of a processing device and a transmission path for executing predetermined processing from the plurality of processing devices and the plurality of transmission paths, and has a processing capacity and a processing load corresponding to the plurality of combinations. Using the above processing capacity and processing load as parameters, obtain multiple calculation results using the above formula and select one combination from the multiple combinations based on the obtained multiple calculation results The information processing system according to claim 1, further comprising a cost management module.
上記複数の処理装置は、所定の処理を実行する処理装置と伝送路との組合せを上記複数の処理装置と上記複数の伝送路とから複数選択し、上記複数の組合せに対応する処理能力と処理負荷とを入力し、入力した処理能力と処理負荷とをパラメータとして、上記計算式を用いて複数の計算結果を取得し、取得した複数の計算結果に基づいて、上記複数の組合せから一つの組合せを選択するコスト管理モジュールを備えることを特徴とする請求項1記載の情報処理システム。The plurality of processing devices select a plurality of combinations of a processing device and a transmission path for executing predetermined processing from the plurality of processing devices and the plurality of transmission paths, and have a processing capability and processing corresponding to the plurality of combinations. The load is input, and the input processing capacity and processing load are used as parameters, and a plurality of calculation results are acquired using the above calculation formula, and one combination is selected from the plurality of combinations based on the acquired plurality of calculation results. The information processing system according to claim 1, further comprising: a cost management module that selects 上記情報処理システムは、さらに、所定の処理を実行する処理装置と伝送路との組合せを上記複数の処理装置と上記複数の伝送路とから複数選択し、上記複数の組合せに対応する処理能力と処理負荷とを入力し、入力した処理能力と処理負荷とをパラメータとして、上記計算式を用いて複数の計算結果を取得し、取得した複数の計算結果に基づいて、上記複数の組合せから一つの組合せを選択するコスト評価装置を備えることを特徴とする請求項1記載の情報処理システム。The information processing system further selects a plurality of combinations of processing devices that execute predetermined processing and transmission paths from the plurality of processing devices and the plurality of transmission paths, and has a processing capability corresponding to the plurality of combinations. The processing load is input, using the input processing capacity and processing load as parameters, a plurality of calculation results are obtained using the above calculation formula, and one of the plurality of combinations is obtained based on the plurality of obtained calculation results. The information processing system according to claim 1, further comprising a cost evaluation device that selects a combination. 上記情報処理システムは、さらに、上記コスト評価装置が選択した組合せを入力し、入力した組合せに基づいて、ネットワークと処理装置の資源利用についてシミュレーションを行うシミュレータを備えることを特徴とする請求項11の情報処理システム。12. The information processing system further includes a simulator for inputting a combination selected by the cost evaluation apparatus and simulating resource utilization of the network and the processing apparatus based on the input combination. Information processing system. 上記コスト評価装置は、上記シミュレータが行ったシミュレーション結果を入力し、入力したシミュレーション結果をもとにネットワークと処理装置の資源利用制御を行うことを特徴とする請求項12の情報処理システム。13. The information processing system according to claim 12, wherein the cost evaluation apparatus inputs a simulation result performed by the simulator and performs resource use control of the network and the processing apparatus based on the input simulation result. 上記複数の処理装置は、計算機とストレージ装置との少なくともいずれか一方を含むことを特徴とする請求項1から13いずれかに記載の情報処理システム。14. The information processing system according to claim 1, wherein the plurality of processing devices include at least one of a computer and a storage device. 情報を処理する複数の処理装置と、上記複数の処理装置を接続する複数の伝送路を提供するネットワークと備える情報システムの資源利用を制御する資源利用制御方法において、
上記複数の処理装置の処理能力と処理負荷及び上記ネットワークの処理能力と処理負荷とを用いて評価し、評価した結果に基づいて上記ネットワークと上記複数の処理装置との資源利用制御を行うことを特徴とする資源利用制御方法。
In a resource usage control method for controlling resource usage of an information system comprising a plurality of processing devices for processing information and a network for providing a plurality of transmission paths connecting the plurality of processing devices,
Evaluating using the processing capacity and processing load of the plurality of processing devices and the processing capacity and processing load of the network, and performing resource usage control between the network and the plurality of processing devices based on the evaluation result A characteristic resource use control method.
JP2003165917A 2003-06-11 2003-06-11 Information processing system and resource utilization control method Pending JP2005005926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003165917A JP2005005926A (en) 2003-06-11 2003-06-11 Information processing system and resource utilization control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003165917A JP2005005926A (en) 2003-06-11 2003-06-11 Information processing system and resource utilization control method

Publications (1)

Publication Number Publication Date
JP2005005926A true JP2005005926A (en) 2005-01-06

Family

ID=34092218

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003165917A Pending JP2005005926A (en) 2003-06-11 2003-06-11 Information processing system and resource utilization control method

Country Status (1)

Country Link
JP (1) JP2005005926A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006196003A (en) * 2005-01-13 2006-07-27 Korg Inc Voice processing method, audio processor, voice processing program, and storage medium storing it
JP2007193547A (en) * 2006-01-19 2007-08-02 Hitachi Ltd Compound type information platform device and method for managing same
JP2007226280A (en) * 2006-02-21 2007-09-06 Hitachi Ltd Computer resource assignment management method and device
WO2010106772A1 (en) * 2009-03-17 2010-09-23 日本電気株式会社 Distributed processing system and distributed processing method
WO2013042349A1 (en) * 2011-09-22 2013-03-28 日本電気株式会社 Device and method for determining allocation resources and resource provision system
CN106919152A (en) * 2015-12-28 2017-07-04 发那科株式会社 Creation data processing system including multiple process units

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006196003A (en) * 2005-01-13 2006-07-27 Korg Inc Voice processing method, audio processor, voice processing program, and storage medium storing it
JP2007193547A (en) * 2006-01-19 2007-08-02 Hitachi Ltd Compound type information platform device and method for managing same
JP4650278B2 (en) * 2006-01-19 2011-03-16 株式会社日立製作所 Complex information platform device and management method of complex information platform device
JP2007226280A (en) * 2006-02-21 2007-09-06 Hitachi Ltd Computer resource assignment management method and device
JP4594877B2 (en) * 2006-02-21 2010-12-08 株式会社日立製作所 Computer resource allocation management method and computer resource allocation management apparatus
WO2010106772A1 (en) * 2009-03-17 2010-09-23 日本電気株式会社 Distributed processing system and distributed processing method
US9167031B2 (en) 2009-03-17 2015-10-20 Nec Corporation Distributed processing system and distributed processing method
WO2013042349A1 (en) * 2011-09-22 2013-03-28 日本電気株式会社 Device and method for determining allocation resources and resource provision system
CN106919152A (en) * 2015-12-28 2017-07-04 发那科株式会社 Creation data processing system including multiple process units
JP2017120996A (en) * 2015-12-28 2017-07-06 ファナック株式会社 Manufacturing data processing system including plurality of manufacturing devices
US10310486B2 (en) 2015-12-28 2019-06-04 Fanuc Corporation Manufacturing data processing system having a plurality of manufacturing apparatuses
CN106919152B (en) * 2015-12-28 2019-11-01 发那科株式会社 Creation data processing system including multiple process units

Similar Documents

Publication Publication Date Title
US8918457B2 (en) Optimizing it infrastructure configuration
Chowdhury et al. Vineyard: Virtual network embedding algorithms with coordinated node and link mapping
US9152463B2 (en) Electronic data store
Chen et al. Reinforcement learning–based QoS/QoE‐aware service function chaining in software‐driven 5G slices
EP2890054B1 (en) System and method for designing a network for one or more entities in an enterprise
US8850449B2 (en) Method and apparatus for providing resource allocation policy
Marconett et al. Flowbroker: A software-defined network controller architecture for multi-domain brokering and reputation
JP4854078B2 (en) Method, system, and program for generating an annotated network topology
US20160234234A1 (en) Orchestrating the Use of Network Resources in Software Defined Networking Applications
JP5285083B2 (en) Method and apparatus for discovering topology in parallel
JP2010244528A (en) Method, computer program, and system for determining load capacity of server
WO2017050215A1 (en) System and method for control traffic balancing in in-band software defined networks
US8515726B2 (en) Method, apparatus and computer program product for modeling data storage resources in a cloud computing environment
US20230028646A1 (en) End-to-end path selection using dynamic software-defined cloud interconnect (sdci) tunnels
JP2006067401A (en) Computer system and band control method of computer system
JP2005005926A (en) Information processing system and resource utilization control method
JP2005182788A (en) System and method that employ process algebra to specify contract and utilize performance prediction implementation thereof to measure the same specification
US20210218653A1 (en) Systems and methods for dynamically optimizing tcp flow in wan networks
US20230113776A1 (en) Traffic application amount calculation apparatus, method and program
Alsheikhy ESTIMATING END-TO-END DELAY ON A NETWORKING ENVIRONMENT USING A DEVELOPED FRAMEWORK.
Nikolow et al. Policy-based sla storagemanagement model fordistributeddata storage services
Caminero et al. Performance evaluation of an autonomic network‐aware metascheduler for Grids
JP2010178243A (en) Network band control device, program for controlling network band, and recording medium
US11329895B2 (en) Method and system for measuring quality of global cloud network
US20230308392A1 (en) Linked Packet Tracing for Software Load Balancers

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20041026

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070911

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070925

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071113

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080603