JP2004205249A - Used electrical power presenting system, program, information storage medium, and used electrical power presenting method - Google Patents

Used electrical power presenting system, program, information storage medium, and used electrical power presenting method Download PDF

Info

Publication number
JP2004205249A
JP2004205249A JP2002371786A JP2002371786A JP2004205249A JP 2004205249 A JP2004205249 A JP 2004205249A JP 2002371786 A JP2002371786 A JP 2002371786A JP 2002371786 A JP2002371786 A JP 2002371786A JP 2004205249 A JP2004205249 A JP 2004205249A
Authority
JP
Japan
Prior art keywords
information
power consumption
management device
power
presentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2002371786A
Other languages
Japanese (ja)
Inventor
Osamu Domon
修 土門
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seiko Epson Corp
Original Assignee
Seiko Epson Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiko Epson Corp filed Critical Seiko Epson Corp
Priority to JP2002371786A priority Critical patent/JP2004205249A/en
Publication of JP2004205249A publication Critical patent/JP2004205249A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a used electrical power presenting system, a program, an information storage medium, and a used electrical power presenting method, for more appropriately presenting used electric energy. <P>SOLUTION: A server 300 is provided with a communication part 390 for receiving information on used electric energy from management apparatuses for managing the used electric energy, and an information generating part 316 for generating information for presentation used for presenting the used electric energy sorted according to its use purpose classification based on used electric energy data 322 and workplace condition data 324 representing workplace conditions in which the management apparatuses are associated with the use purpose classification of the management apparatuses. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、使用電力量提示システム、プログラム、情報記憶媒体および使用電力量提示方法に関する。
【0002】
【背景技術】
例えば、特許文献1等に記載されているように、ネットワークを使用した電力管理を行うための種々の方法が提案されている。
【0003】
特許文献1等に記載されている従来の方法では、管理対象の機器の特性を考慮しないで電力管理が行われている。
【0004】
例えば、特許文献1の図1等に示されるように、従来の方法では、使用電力量と管理対象の識別情報を示すデータに基づいて使用電力量が提示されていた。
【0005】
【特許文献1】
特開平9−84146号公報
【0006】
【発明が解決しようとする課題】
しかし、一般的な企業においては、分電盤等の使用電力量の管理機器から使用電力量を取得した場合、当該使用電力量の中には、職場固有設備による使用電力量と、共用設備による使用電力量が混在している。
【0007】
このような状況で取得された使用電力量を用いてユーザーに対してエネルギー省力化(いわゆる省エネ)等を促したとしても、努力した割には使用電力量が減らないといった事態が発生し、ユーザーのエネルギー省力化意識を削いでしまう。
【0008】
また、分電盤等の管理機器は、複数の職場にまたがって使用電力量を管理している場合があり、従来の方法では、職場ごとに適切に使用電力量を提示することは困難であった。
【0009】
さらに、停電時等においては、使用電力量が急激に増減する場合があり、このような異常事態においても、適切に使用電力量を提示することが求められている。
【0010】
本発明は、上記の課題に鑑みなされたものであり、その目的は、使用電力量をより適切に提示することが可能な使用電力量提示システム、プログラム、情報記憶媒体および使用電力量提示方法を提供することにある。
【0011】
【課題を解決するための手段】
上記課題を解決するため、本発明に係る使用電力量提示システムは、企業用の使用電力量提示システムにおいて、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を受信する通信手段と、
当該使用電力量情報と、職場状況を示す職場状況データとに基づき、ユーザーに提示する提示用情報を生成する情報生成手段と、
を含み、
前記職場状況データは、前記管理機器と、当該管理機器の使用目的種別とが関連づけられており、
前記情報生成手段は、前記提示用情報として、前記使用目的種別で区分して使用電力量を提示する情報を生成することを特徴とする。
【0012】
また、本発明に係るプログラムは、コンピュータにより読み取り可能なプログラムであって、
コンピュータを、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を通信手段に受信させる通信制御手段と、
当該使用電力量情報と、職場状況を示す職場状況データとに基づき、ユーザーに提示する提示用情報を生成する情報生成手段として機能させ、
前記職場状況データは、前記管理機器と、当該管理機器の使用目的種別とが関連づけられており、
前記情報生成手段は、前記提示用情報として、前記使用目的種別で区分して使用電力量を提示する情報を生成することを特徴とする。
【0013】
また、本発明に係る情報記憶媒体は、コンピュータにより読み取り可能な情報記憶媒体であって、上記手段としてコンピュータを機能させるためのプログラムを記憶したことを特徴とする。
【0014】
また、本発明に係る使用電力量提示方法は、企業用の使用電力量提示方法において、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を受信し、
当該使用電力量情報と、前記管理機器と、当該管理機器の使用目的種別とが関連づけられ、職場状況を示す職場状況データとに基づき、前記使用目的種別で区分して使用電力量を提示する提示用情報を生成することを特徴とする。
【0015】
本発明によれば、使用電力量提示システム等は、使用目的種別で区分して使用電力量を提示することにより、ユーザーが、例えば、職場固有の目的で使用された電力量なのか、屋外照明等の共用目的で使用された電力量なのか把握することができるため、使用電力量をより適切に提示することができる。
【0016】
また、前記使用電力量提示システム、前記プログラムおよび前記情報記憶媒体において、前記職場状況データは、前記管理機器が複数の職場の使用電力量を管理している場合、前記管理機器と、当該管理機器における職場ごとの電力供給割合とが関連づけられており、
前記情報生成手段は、前記提示用情報として、前記電力供給割合に応じた使用電力量を提示する情報を生成してもよい。
【0017】
また、前記使用電力量提示方法において、前記職場状況データは、前記管理機器が複数の職場の使用電力量を管理している場合、前記管理機器と、当該管理機器における職場ごとの電力供給割合とが関連づけられており、
前記提示用情報として、前記電力供給割合に応じた使用電力量を提示する情報を生成してもよい。
【0018】
これによれば、使用電力量提示システム等は、電力供給割合に応じた使用電力量を提示することにより、1つの管理機器が複数の職場の使用電力量を管理している場合であっても、職場ごとの使用電力量を適切に提示することができる。
【0019】
また、前記使用電力量提示システム、前記プログラムおよび前記情報記憶媒体において、前記提示用情報は、Web用情報であって、
前記通信手段は、当該Web用情報を、ネットワークを介してユーザーのコンピュータへ向け送信してもよい。
【0020】
また、前記使用電力量提示方法において、前記提示用情報は、Web用情報であって、
当該Web用情報を、ネットワークを介してユーザーのコンピュータへ向け送信してもよい。
【0021】
これによれば、使用電力量提示システム等は、ブラウザ等がインストールされたコンピュータを用いて使用電力量を表示することができる。
【0022】
また、前記使用電力量提示システム、前記プログラムおよび前記情報記憶媒体は、所定の判定を行う判定手段を含み、
前記通信手段は、ネットワークを介して前記管理機器が設置された場所の気象情報を受信し、
前記判定手段は、当該気象情報に基づき、使用電力量情報を受信する受信間隔を変更する必要があるかどうかを判定し、
前記受信手段は、必要があると判定された場合、受信間隔を変更してもよい。
【0023】
また、本発明に係る使用電力量提示方法は、企業用の使用電力量提示方法において、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を受信し、
ネットワークを介して前記管理機器が設置された場所の気象情報を受信し、
当該気象情報に基づき、使用電力量情報を受信する受信間隔を変更する必要があるかどうかを判定し、
必要がある場合、受信間隔を変更することを特徴とする。
【0024】
本発明によれば、使用電力量提示システム等は、例えば、落雷が予想される時刻になった場合に受信間隔を狭めることによって、受信間隔が標準の場合と比べてより多くの正常な測定データを得ることができるため、使用電力量をより適切に提示することができる。
【0025】
また、前記使用電力量提示システム、前記プログラムおよび前記情報記憶媒体において、前記判定手段は、前記気象情報に基づき、使用電力量を測定する測定間隔を変更する必要があるかどうかを判定し、
前記情報生成手段は、必要があると判定された場合、測定間隔を変更するための制御情報を生成し、
前記通信手段は、当該制御情報を前記管理機器へ向け送信してもよい。
【0026】
また、本発明に係る使用電力量提示方法は、企業用の使用電力量提示方法において、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を受信し、
ネットワークを介して前記管理機器が設置された場所の気象情報を受信し、
前記判定手段は、当該気象情報に基づき、使用電力量を測定する測定間隔を変更する必要があるかどうかを判定し、
必要がある場合、測定間隔を変更するための制御情報を生成し、
当該制御情報を前記管理機器へ向け送信することを特徴とする。
【0027】
本発明によれば、使用電力量提示システム等は、例えば、落雷が予想される時刻になった場合に測定間隔を狭めることによって、測定間隔が標準の場合と比べてより多くの正常な測定データを得ることができるため、使用電力量をより適切に提示することができる。
【0028】
また、前記使用電力量提示システム、前記プログラムおよび前記情報記憶媒体において、前記通信手段は、ユーザーの要求情報を受信し、
前記情報生成手段は、当該要求情報に応じた形式で前記提示用情報を生成してもよい。
【0029】
また、前記使用電力量提示方法において、ユーザーの要求情報を受信し、
当該要求情報に応じた形式で前記提示用情報を生成してもよい。
【0030】
これによれば、使用電力量提示システム等は、ユーザーの要求に応じた形式(例えば、棒グラフ形式、円グラフ形式等)で情報を提示することができる。
【0031】
【発明の実施の形態】
以下、本発明を、使用電力量提示システムに適用した場合を例に採り、図面を参照しつつ説明する。なお、以下に示す実施形態は、特許請求の範囲に記載された発明の内容を何ら限定するものではない。また、以下の実施形態に示す構成の全てが、特許請求の範囲に記載された発明の解決手段として必須であるとは限らない。
【0032】
(実施例)
図1は、本実施形態の一例に係るシステムの全体図である。
【0033】
本実施形態における企業用のシステムは、各職場10と、中央監視室20と、サーバールーム30と、これらを接続するネットワーク40と、インターネット50とを含んで構成されている。
【0034】
各職場10には、複数のPC100〜1〜100−nと、使用電力量を管理する管理機器の一種である複数の分電盤110−1〜110−nとが配置されている。また、中央監視室20には、使用電力量提示システムとして機能するワーステーション200が配置されている。
【0035】
また、サーバールーム30には、使用電力量提示システムとして機能するサーバー300が配置されている。
【0036】
ワークステーション200は、ネットワーク40を介して複数の分電盤110から使用電力量情報を受信し、当該使用電力量情報をサーバー300へ向け送信する。サーバー300は、当該使用電力量情報に基づき、PC100へ向け、分電盤110の使用目的種別で区分した使用電力量を提示する提示用情報を送信する。
【0037】
これにより、各職場10では、ユーザーは、PC100の画面に表示される使用電力量が提示された使用電力量提示画像を見ることができる。
【0038】
図2は、本実施形態の一例に係る使用電力量提示画像を示す図である。また、図3は、本実施形態の他の一例に係る使用電力量提示画像を示す図である。
【0039】
図2に示す使用電力量提示画像は、使用目的種別で区分されて使用電力量がグラフ化されたグラフ画像と、対象日、対象種別、対象項目、使用電力量、使用電力量を原油換算した原油換算値、使用電力量を金額換算した金額換算値を示す文字画像と、終了、ファイル・ダウンロードの操作を行うための操作用画像とを含む。
【0040】
グラフ画像は、基礎設備、照明・OA設備、生産設備の3つの使用目的種別で区分されて表示される。
【0041】
これにより、ユーザーは、PC100の使用電力のように職場固有の目的の照明・OA設備や生産設備で使用された電力量なのか、屋外照明等の共用目的の基礎設備で使用された電力量なのか把握することができる。これにより、ユーザーは、PC100の使用電力を低減することによって職場固有の目的で使用された電力量を低減することができるため、エネルギー省力化の意識を高めることができる。
【0042】
また、ユーザーは、ファイル・ダウンロードの操作を行うことによって提示用情報をファイル形式でダウンロードすることができる。そして、ユーザーは、ダウンロードしたデータを自分の目的に応じて加工することができる。
【0043】
次に、このような機能を実現するためのワークステーション200とサーバー300の機能ブロックについて説明する。
【0044】
図4は、本実施形態の一例に係るワークステーション200の機能ブロック図である。
【0045】
ワークステーション200は、ネットワークを介してPC100、分電盤110、サーバー300と情報を送受信する通信部290と、処理部210と、記憶部220と、タイマー部230とを含んで構成されている。
【0046】
また、処理部210は、データ処理部212と、判定部214とを含んで構成されている。
【0047】
また、記憶部220は、使用電力量データ222と、気象データ224と、判定用データ226とを記憶している。
【0048】
通信部290は、タイマー部230のタイマー値に基づき、所定時間間隔で複数の分電盤110から使用電力量情報を受信し、データ処理部212は、当該使用電力量情報を使用電力量データ222として記憶する。
【0049】
また、通信部290は、インターネット50を介して気象情報を提供しているWEBサーバーから分電盤110が配置された地域の気象情報を受信し、データ処理部212は、当該気象情報を気象データ224として記憶する。
【0050】
さらに、通信部290は、使用電力量データ222に基づく消費電力量情報をサーバー300へ向け送信する。
【0051】
図5は、本実施形態の一例に係るサーバー300の機能ブロック図である。
【0052】
サーバー300は、ネットワークを介してPC100、分電盤110、ワークステーション200と情報を送受信する通信部390と、処理部310と、記憶部320とを含んで構成されている。
【0053】
また、処理部310は、データ処理部312と、判定部314と、情報生成部316とを含んで構成されている。
【0054】
また、記憶部320は、消費電力量データ322と、職場状況データ324と、編集後データ326とを記憶している。
【0055】
ここで、使用電力量データ322と職場状況データ324のデータ構造について説明する。
【0056】
図6は、本実施形態の一例に係る使用電力量データ322と職場状況データ324のデータ構造を示す図である。
【0057】
使用電力量データ322は、測定した年、月、日、分電盤110を識別するためのアドレス等のデータと、測定時刻ごとの使用電力量を示すデータとが関連づけられている。
【0058】
また、職場状況データ324は、分電盤110のアドレスと、照明、基礎、生産等の設備の種別、職場を示すエリア、電力供給割合を示す%とが関連づけられ散る。このようなデータ構造を採用することにより、使用電力量退治システムは、図2、図3に示すような設備ごとに区分して使用電力量を提示することができる。
【0059】
なお、通信部390は、ワークステーション200から使用電力量情報を受信する。また、データ処理部312は、当該使用電力量情報を使用電力量データ322の一部として記憶し、使用電力量の原油換算値や金額換算値を演算し、使用電力量データ322の一部として記憶する。
【0060】
また、情報生成部316は、提示用情報を、PC100のブラウザで表示可能なWeb用情報として生成したり、PC100がダウンロード可能なファイル形式で生成し、編集後データ326として記憶する。
【0061】
なお、これらの各部を実現するためのハードウェアとしては、例えば、データ処理部212、312、判定部214、314、情報生成部316としては、例えば、CPU等、記憶部220、320としては、例えば、RAM等、タイマー部230としては、例えば、システムタイマー等、通信部290、390としては、例えば、LANボード等を用いて実現できる。
【0062】
また、ワークステーション200は、情報記憶媒体280に記憶されたプログラムを読み取ることによってこれらの各部として機能することが可能であり、サーバー300も、情報記憶媒体380に記憶されたプログラムを読み取ることによってこれらの各部として機能することが可能である。
【0063】
このような情報記憶媒体280、380としては、例えば、CD−ROM、DVD−ROM、ROM、RAM、HDD等を適用でき、そのプログラムの読み取り方式は接触方式であっても、非接触方式であってもよい。
【0064】
また、情報記憶媒体280、380に代えて、上述した各機能を実現するためのプログラム等を、伝送路を介してホスト装置等からダウンロードすることによって上述した各機能を実現することも可能である。
【0065】
次に、上述した各部を用いた使用電力量提示手順について説明する。
【0066】
図7は、本実施形態の一例に係る使用電力量提示手順を示すフローチャートである。
【0067】
まず、ワークステーション200は、インターネット50を介して気象情報を取得する(ステップS1)。
【0068】
判定部214は、気象データ224に基づき、使用電力量情報の取得間隔を変更する必要があるかどうかを判定する(ステップS2)。
【0069】
必要があると判定した場合、判定部214は、通信部290に使用電力量情報の取得間隔を変更するように命令を出す(ステップS3)。具体的には、判定部214は、例えば、落雷予測時刻になったら使用電力量情報の取得間隔を短くするように命令を出す。
【0070】
そして、通信部290は、各分電盤110から使用電力量情報を取得する(ステップS4)。
【0071】
判定部214は、使用電力量データ222を参照して異常値があるかどうかを判定する(ステップS5)。具体的には、例えば、落雷や停電等が発生した場合に異常値となる。
【0072】
異常値があると判定した場合、判定部214は、データ処理部212に使用電力量データ222を修正するように命令を出す。データ処理部212は、例えば、異常値のあった時間帯のデータを外し、残りの時間帯のデータに基づいて使用電力量データ222を修正する(ステップS6)。
【0073】
そして、ワークステーション200の通信部290は、サーバー300の通信部390へ向け、使用電力量データ222に基づく使用電力量情報を送信する(ステップS7)。
【0074】
情報生成部316またはデータ処理部312は、使用電力量データ322と職場状況データ324に基づき、編集後データ326を生成する(ステップS8)。
【0075】
情報生成部316は、各PC100からの入力情報に含まれる要求情報に応じて編集後データ326に基づき、提示用情報を生成する(ステップS9)。そして、通信部390は、要求元のPC100へ向け当該提示用情報を送信する。
【0076】
これにより。PC100は、図2や図3に示す使用電力量提示画像を表示したり、ファイルをダウンロードすることができる。
【0077】
以上のように、本実施形態によれば、使用電力量提示システムは、使用目的種別で区分して使用電力量を提示することにより、ユーザーが、例えば、職場固有の目的で使用された電力量なのか、屋外照明等の共用目的で使用された電力量なのか把握することができるため、使用電力量をより適切に提示することができる。
【0078】
また、本実施形態によれば、使用電力量提示システムは、電力供給割合に応じた使用電力量を提示することにより、1つの分電盤110が複数の職場の使用電力量を管理している場合であっても、職場ごとの使用電力量を適切に提示することができる。
【0079】
以上の効果により、ユーザーは、従来のように、自分の職場でエネルギー省力化を行っても、使用電力量が減らないといった事態の発生を防止できるため、ユーザーのエネルギー省力化の意識をより高めることができる。
【0080】
また、本実施形態によれば、使用電力量提示システムは、情報生成部316が編集後データ326に基づいてWeb用情報を生成することにより、各職場10の全ユーザーが、ブラウザ等がインストールされたPC100を用いて使用電力量を表示することができる。
【0081】
これにより、全ユーザーが、容易に使用電力量を把握することができ、エネルギー省力化の意識を高めることができる。
【0082】
また、本実施形態によれば、使用電力量提示システムは、例えば、落雷が予想される時刻になった場合に受信間隔を狭めることによって、受信間隔が標準の場合と比べてより多くの正常な使用電力量データ322を得ることができるため、使用電力量をより適切に提示することができる。
【0083】
さらに、本実施形態によれば、使用電力量提示システムは、ユーザーの要求に応じた形式(例えば、棒グラフ形式、円グラフ形式等)で情報を提示することができる。
【0084】
また、図6に示すように、使用電力量データ322は日付で区分して記憶され、職場状況データ324は種別、職場およびエリアで区分して記憶されているため、情報生成部316は、ユーザーの要求に応じて年、月、日といった時間単位、照明、基礎、生産といった設備単位、職場単位、職場をさらに細かく区分したエリア単位で提示用情報を生成することができる。
【0085】
その上、使用電力量提示システムは、編集後データ326をファイル形式でダウンロードさせることもできる。これにより、ユーザーの目的により適合した使用電力量を提示することができる。
【0086】
(変形例)
以上、本発明を適用した好適な実施の形態について説明してきたが、本発明の適用は上述した実施例に限定されない。
【0087】
例えば、上述した実施例では、落雷が予想される時刻になった場合に、ワークステーション200が受信間隔を狭めたが、分電盤110が測定間隔を狭めるように、情報生成部316が制御情報を生成し、通信部390が当該制御情報を分電盤110へ向け送信してもよい。
【0088】
これによっても、サーバー300は、測定間隔が標準の場合と比べてより多くの正常な使用電力量データ322を得ることができるため、使用電力量をより適切に提示することができる。
【0089】
また、上述した実施例では、使用電力量の管理機器として分電盤110を適用した場合を例に採り説明したが、分電盤110に代えて使用電力量を管理する種々の機器を適用可能である。
【0090】
さらに、上述した実施例では、使用電力量を提示したが、例えば、ガス等のエネルギー量を提示する場合に、本発明を適用してもよい。
【0091】
また、上述した実施例では、使用電力量提示システムをワークステーション200およびサーバー100を用いて実現したが、ワークステーション200およびサーバー100の機能を3台以上の装置に分散して実現してもよいし、1台の装置で実現してもよい。
【図面の簡単な説明】
【図1】本実施形態の一例に係るシステムの全体図である。
【図2】本実施形態の一例に係る使用電力量提示画像を示す図である。
【図3】本実施形態の他の一例に係る使用電力量提示画像を示す図である。
【図4】本実施形態の一例に係るワークステーションの機能ブロック図である。
【図5】本実施形態の一例に係るサーバーの機能ブロック図である。
【図6】本実施形態の一例に係る使用電力量データと職場状況データのデータ構造を示す図である。
【図7】本実施形態の一例に係る使用電力量提示手順を示すフローチャートである。
【符号の説明】
40 ネットワーク、 110 分電盤(管理機器)、 200 ワークステーション(使用電力量提示システム)、 214、314 判定部、 222、322 使用電力量データ、 224 気象データ、 226 判定用データ、 280、380 情報記憶媒体、 290、390 通信部、 300 サーバー(使用電力量提示システム)、 316 情報生成部
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a power usage presentation system, a program, an information storage medium, and a power consumption presentation method.
[0002]
[Background Art]
For example, as described in Patent Literature 1 and the like, various methods for performing power management using a network have been proposed.
[0003]
In the conventional method described in Patent Literature 1 or the like, power management is performed without considering the characteristics of a device to be managed.
[0004]
For example, as shown in FIG. 1 and the like of Patent Document 1, in the conventional method, the power consumption is presented based on the data indicating the power consumption and the identification information of the management target.
[0005]
[Patent Document 1]
JP-A-9-84146
[Problems to be solved by the invention]
However, in a general company, if the power consumption is acquired from a power distribution management device such as a distribution board, the power consumption includes the power consumption due to the workplace-specific equipment and the common power consumption. The power consumption is mixed.
[0007]
Even if the user is encouraged to save energy (so-called energy saving) using the power consumption acquired in such a situation, the power consumption does not decrease despite the efforts made. Energy awareness of energy saving.
[0008]
In addition, a management device such as a distribution board may manage the amount of electric power used over a plurality of workplaces, and it is difficult to appropriately present the amount of used electric power for each workplace using the conventional method. Was.
[0009]
Further, in the case of a power outage or the like, the amount of power consumption may rapidly increase or decrease. Even in such an abnormal situation, it is required to appropriately present the amount of power consumption.
[0010]
The present invention has been made in view of the above problems, and an object of the present invention is to provide a power consumption presentation system, a program, an information storage medium, and a power consumption presentation method capable of more appropriately presenting power consumption. To provide.
[0011]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, a power consumption presentation system according to the present invention is a power consumption presentation system for a company,
Communication means for receiving power usage information from at least one management device managing power usage;
Information generating means for generating presentation information to be presented to the user based on the power consumption information and workplace situation data indicating the workplace situation;
Including
The workplace situation data is associated with the management device and the purpose of use of the management device,
The information generation unit may generate, as the presentation information, information that presents the amount of power consumption classified according to the purpose of use.
[0012]
The program according to the present invention is a computer-readable program,
Computer
Communication control means for causing the communication means to receive the power consumption information from at least one management device managing the power consumption;
Based on the power consumption information and the workplace situation data indicating the workplace situation, function as information generation means for creating presentation information to be presented to the user,
The workplace situation data is associated with the management device and the purpose of use of the management device,
The information generation unit may generate, as the presentation information, information that presents the amount of power consumption classified according to the purpose of use.
[0013]
Further, an information storage medium according to the present invention is a computer-readable information storage medium, wherein a program for causing a computer to function as the above means is stored.
[0014]
The method for presenting power consumption according to the present invention is a method for presenting power consumption for a company,
Receiving power usage information from at least one management device managing the power usage;
The power usage information, the management device, and the usage purpose type of the management device are associated with each other, and the power usage is classified and presented based on the work purpose data indicating the workplace status. Generating application information.
[0015]
According to the present invention, the power consumption presentation system or the like presents the power consumption classified by use purpose type, so that the user can determine whether the power consumption has been used for a workplace-specific purpose. Since it is possible to know whether or not the power amount has been used for the purpose of sharing, etc., the used power amount can be presented more appropriately.
[0016]
In the power consumption presentation system, the program, and the information storage medium, the workplace situation data may include, when the management device manages the power consumption of a plurality of workplaces, the management device and the management device. Is linked to the workplace electricity supply rate in
The information generation unit may generate, as the presentation information, information for presenting a power consumption according to the power supply ratio.
[0017]
In the method of presenting power consumption, the workplace situation data may include, when the management device manages the power consumption of a plurality of workplaces, the management device and a power supply ratio for each workplace in the management device. Is associated with,
As the information for presentation, information for presenting the amount of power consumption according to the power supply ratio may be generated.
[0018]
According to this, the power consumption presentation system or the like presents the power consumption according to the power supply ratio, so that even when one management device manages the power consumption of a plurality of workplaces. In addition, the amount of electric power used for each workplace can be appropriately presented.
[0019]
Further, in the power consumption presentation system, the program, and the information storage medium, the presentation information is Web information,
The communication means may transmit the Web information to a user's computer via a network.
[0020]
In the method of presenting power consumption, the presentation information is Web information,
The Web information may be transmitted to a user's computer via a network.
[0021]
According to this, the power consumption presentation system or the like can display the power consumption using a computer in which a browser or the like is installed.
[0022]
Further, the used power amount presentation system, the program and the information storage medium include a determination unit for performing a predetermined determination,
The communication means receives, via a network, weather information of a place where the management device is installed,
The determination unit determines whether it is necessary to change a reception interval for receiving the power usage information based on the weather information,
The receiving means may change the receiving interval when it is determined that it is necessary.
[0023]
The method for presenting power consumption according to the present invention is a method for presenting power consumption for a company,
Receiving power usage information from at least one management device managing the power usage;
Receiving the weather information of the place where the management device is installed through a network,
Based on the weather information, determine whether it is necessary to change the reception interval for receiving the power usage information,
If necessary, the reception interval is changed.
[0024]
According to the present invention, the power usage presentation system and the like, for example, by narrowing the reception interval when lightning is expected time, more normal measurement data compared to the standard reception interval Can be obtained, so that the used power amount can be more appropriately presented.
[0025]
In the power consumption presentation system, the program, and the information storage medium, the determination unit determines whether it is necessary to change a measurement interval for measuring the power consumption based on the weather information,
The information generating means, when it is determined that it is necessary, generates control information for changing the measurement interval,
The communication unit may transmit the control information to the management device.
[0026]
The method for presenting power consumption according to the present invention is a method for presenting power consumption for a company,
Receiving power usage information from at least one management device managing the power usage;
Receiving the weather information of the place where the management device is installed through a network,
The determining means determines whether it is necessary to change the measurement interval for measuring the power consumption based on the weather information,
If necessary, generate control information to change the measurement interval,
The control information is transmitted to the management device.
[0027]
According to the present invention, the power usage presentation system, for example, by narrowing the measurement interval when the lightning strike is expected time, more normal measurement data compared to the standard measurement interval Can be obtained, so that the used power amount can be more appropriately presented.
[0028]
Further, in the power consumption presentation system, the program and the information storage medium, the communication unit receives user request information,
The information generating means may generate the presentation information in a format according to the request information.
[0029]
Further, in the method for presenting power consumption, receiving request information of a user,
The presentation information may be generated in a format according to the request information.
[0030]
According to this, the used power amount presentation system or the like can present information in a format (for example, a bar graph format, a pie graph format, or the like) according to a user's request.
[0031]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an example in which the present invention is applied to a power consumption presentation system will be described with reference to the drawings. The embodiments described below do not limit the contents of the invention described in the claims. In addition, all of the configurations described in the following embodiments are not necessarily indispensable as means for solving the invention described in the claims.
[0032]
(Example)
FIG. 1 is an overall view of a system according to an example of the present embodiment.
[0033]
The system for a company in the present embodiment includes each workplace 10, a central monitoring room 20, a server room 30, a network 40 connecting these, and the Internet 50.
[0034]
In each workplace 10, a plurality of PCs 100 to 1 to 100-n and a plurality of distribution boards 110-1 to 110-n, which are a kind of management device for managing power consumption, are arranged. In the central monitoring room 20, a workstation 200 functioning as a power consumption presentation system is arranged.
[0035]
In the server room 30, a server 300 functioning as a used power amount presentation system is arranged.
[0036]
The workstation 200 receives the power usage information from the plurality of distribution boards 110 via the network 40, and transmits the power usage information to the server 300. The server 300 transmits, to the PC 100, presentation information for presenting the power consumption classified by the use purpose type of the distribution board 110 to the PC 100 based on the power consumption information.
[0037]
Thereby, in each workplace 10, the user can see the used power amount presentation image showing the used power amount displayed on the screen of the PC 100.
[0038]
FIG. 2 is a diagram illustrating a used power amount presentation image according to an example of the present embodiment. FIG. 3 is a diagram illustrating a used power amount presentation image according to another example of the present embodiment.
[0039]
The power consumption presentation image shown in FIG. 2 is a graph image in which the power consumption is graphed by being classified according to the purpose of use, and the target date, the target type, the target item, the power consumption, and the power consumption are converted into crude oil. It includes a crude oil conversion value, a character image indicating a value converted from the amount of power used, and an operation image for performing an operation of ending and downloading a file.
[0040]
The graph images are displayed by being divided into three types of usage purposes: basic equipment, lighting / OA equipment, and production equipment.
[0041]
As a result, the user can determine whether the amount of power used for lighting / OA equipment or production equipment unique to the workplace, such as the power used by the PC 100, or the amount of power used for basic equipment for shared purposes such as outdoor lighting. Can be grasped. Thus, the user can reduce the amount of power used for a workplace-specific purpose by reducing the power consumption of the PC 100, and thus can raise awareness of energy saving.
[0042]
The user can download the presentation information in a file format by performing a file download operation. Then, the user can process the downloaded data according to his / her own purpose.
[0043]
Next, functional blocks of the workstation 200 and the server 300 for realizing such functions will be described.
[0044]
FIG. 4 is a functional block diagram of the workstation 200 according to an example of the present embodiment.
[0045]
The workstation 200 includes a communication unit 290 for transmitting and receiving information to and from the PC 100, the distribution board 110, and the server 300 via a network, a processing unit 210, a storage unit 220, and a timer unit 230.
[0046]
The processing unit 210 includes a data processing unit 212 and a determination unit 214.
[0047]
Further, the storage unit 220 stores power consumption data 222, weather data 224, and determination data 226.
[0048]
The communication unit 290 receives the power consumption information from the plurality of distribution boards 110 at predetermined time intervals based on the timer value of the timer unit 230, and the data processing unit 212 converts the power consumption information into the power consumption data 222. To be stored.
[0049]
The communication unit 290 receives the weather information of the area where the distribution board 110 is located from the WEB server that provides the weather information via the Internet 50, and the data processing unit 212 transmits the weather information to the weather data. 224.
[0050]
Further, the communication unit 290 transmits power consumption information based on the power consumption data 222 to the server 300.
[0051]
FIG. 5 is a functional block diagram of the server 300 according to an example of the present embodiment.
[0052]
The server 300 includes a communication unit 390 that transmits and receives information to and from the PC 100, the distribution board 110, and the workstation 200 via a network, a processing unit 310, and a storage unit 320.
[0053]
Further, the processing unit 310 includes a data processing unit 312, a determination unit 314, and an information generation unit 316.
[0054]
Further, the storage unit 320 stores power consumption data 322, workplace situation data 324, and post-edit data 326.
[0055]
Here, the data structure of the power consumption data 322 and the workplace situation data 324 will be described.
[0056]
FIG. 6 is a diagram illustrating a data structure of the power consumption data 322 and the workplace situation data 324 according to an example of the present embodiment.
[0057]
The power consumption data 322 is associated with data such as the measured year, month, day, and address for identifying the distribution board 110, and data indicating the power consumption at each measurement time.
[0058]
Further, the workplace status data 324 is scattered in which the address of the distribution board 110, the type of equipment such as lighting, foundation, and production, the area indicating the workplace, and the percentage indicating the power supply ratio are associated. By adopting such a data structure, the power consumption extermination system can present the power consumption separately for each facility as shown in FIGS.
[0059]
The communication unit 390 receives the power consumption information from the workstation 200. Further, the data processing unit 312 stores the power consumption information as a part of the power consumption data 322, calculates a crude oil conversion value or a money conversion value of the power consumption, and as a part of the power consumption data 322. Remember.
[0060]
The information generation unit 316 generates the presentation information as Web information that can be displayed on the browser of the PC 100, or generates the presentation information in a file format that can be downloaded by the PC 100, and stores it as the edited data 326.
[0061]
In addition, as hardware for realizing these units, for example, as the data processing units 212 and 312, the determination units 214 and 314, and the information generation unit 316, for example, a CPU and the like, and as the storage units 220 and 320, for example, For example, the timer unit 230 such as a RAM can be realized using a system timer or the like, and the communication units 290 and 390 can be realized using a LAN board or the like, for example.
[0062]
In addition, the workstation 200 can function as each of these units by reading a program stored in the information storage medium 280, and the server 300 also reads the program stored in the information storage medium 380 to read these programs. It is possible to function as each part of.
[0063]
As such information storage media 280, 380, for example, a CD-ROM, a DVD-ROM, a ROM, a RAM, an HDD, etc. can be applied. You may.
[0064]
Further, instead of the information storage media 280 and 380, it is also possible to realize the above-described functions by downloading a program or the like for realizing the above-described functions from a host device or the like via a transmission path. .
[0065]
Next, a procedure for presenting the power consumption using the above-described units will be described.
[0066]
FIG. 7 is a flowchart illustrating a procedure for presenting the power consumption according to an example of the present embodiment.
[0067]
First, the workstation 200 acquires weather information via the Internet 50 (Step S1).
[0068]
The determination unit 214 determines whether it is necessary to change the acquisition interval of the power usage information based on the weather data 224 (step S2).
[0069]
If it is determined that it is necessary, the determination unit 214 issues a command to the communication unit 290 to change the acquisition interval of the power usage information (step S3). Specifically, the determination unit 214 issues a command to shorten the acquisition interval of the power usage information when, for example, the lightning strike predicted time comes.
[0070]
Then, the communication unit 290 acquires the used power amount information from each distribution board 110 (Step S4).
[0071]
The determination unit 214 determines whether there is an abnormal value with reference to the power consumption data 222 (step S5). Specifically, for example, when a lightning strike or a power failure occurs, the value becomes an abnormal value.
[0072]
When it is determined that there is an abnormal value, the determination unit 214 instructs the data processing unit 212 to correct the power consumption data 222. The data processing unit 212, for example, removes the data in the time zone where the abnormal value was found, and corrects the power consumption data 222 based on the data in the remaining time zone (step S6).
[0073]
Then, the communication unit 290 of the workstation 200 transmits the power consumption information based on the power consumption data 222 to the communication unit 390 of the server 300 (Step S7).
[0074]
The information generation unit 316 or the data processing unit 312 generates the edited data 326 based on the power consumption data 322 and the workplace situation data 324 (Step S8).
[0075]
The information generation unit 316 generates presentation information based on the edited data 326 according to the request information included in the input information from each PC 100 (step S9). Then, communication unit 390 transmits the presentation information to requesting PC 100.
[0076]
By this. The PC 100 can display the used power amount presentation images shown in FIGS. 2 and 3 and can download a file.
[0077]
As described above, according to the present embodiment, the power consumption presentation system presents the power consumption classified by the use purpose type, thereby enabling the user to use, for example, the power consumption used for a workplace-specific purpose. Since it is possible to know whether the electric power is used for common purposes such as outdoor lighting or the like, the used electric energy can be presented more appropriately.
[0078]
Further, according to the present embodiment, the power consumption presentation system presents the power consumption according to the power supply ratio, so that one distribution board 110 manages the power consumption of a plurality of workplaces. Even in such a case, the amount of power consumption for each workplace can be appropriately presented.
[0079]
With the above effects, the user can prevent the situation where the energy consumption does not decrease even if the user saves energy in his or her own workplace as before, thereby raising the user's awareness of energy saving. be able to.
[0080]
Further, according to the present embodiment, in the power consumption presentation system, the information generation unit 316 generates Web information based on the edited data 326, so that all users of each workplace 10 can install a browser or the like. The used power amount can be displayed by using the PC 100.
[0081]
As a result, all users can easily grasp the amount of power consumption, and the awareness of energy saving can be raised.
[0082]
Further, according to the present embodiment, the power consumption presentation system, for example, by narrowing the reception interval when the lightning strike is expected time, more normal reception intervals compared to the standard reception interval Since the power consumption data 322 can be obtained, the power consumption can be presented more appropriately.
[0083]
Furthermore, according to the present embodiment, the power consumption presentation system can present information in a format (for example, a bar graph format, a pie graph format, or the like) according to a user's request.
[0084]
Also, as shown in FIG. 6, the power consumption data 322 is stored separately by date, and the workplace situation data 324 is stored separately by type, workplace and area. , The presentation information can be generated in units of time such as year, month and day, in units of equipment such as lighting, basics and production, in units of work, and in units of areas in which the work is further subdivided.
[0085]
In addition, the power usage presentation system can download the edited data 326 in a file format. As a result, it is possible to present the power consumption that is more suitable for the purpose of the user.
[0086]
(Modification)
The preferred embodiment to which the present invention is applied has been described above, but the application of the present invention is not limited to the above-described embodiment.
[0087]
For example, in the above-described embodiment, when the time when lightning strikes are expected, the workstation 200 narrows the reception interval, but the information generation unit 316 controls the control information so that the distribution board 110 narrows the measurement interval. May be generated, and the communication unit 390 may transmit the control information to the distribution board 110.
[0088]
Also in this case, the server 300 can obtain more normal power consumption data 322 as compared with the case where the measurement interval is standard, and thus can present the power consumption more appropriately.
[0089]
Further, in the above-described embodiment, the case where the distribution board 110 is applied as the power consumption management device has been described as an example, but various devices for managing the power consumption can be applied instead of the distribution board 110. It is.
[0090]
Further, in the above-described embodiment, the used electric energy is presented, but the present invention may be applied, for example, when presenting the energy amount of gas or the like.
[0091]
Further, in the above-described embodiment, the used power amount presentation system is realized by using the workstation 200 and the server 100. However, the functions of the workstation 200 and the server 100 may be realized by being distributed to three or more devices. Alternatively, it may be realized by one device.
[Brief description of the drawings]
FIG. 1 is an overall view of a system according to an example of an embodiment.
FIG. 2 is a diagram illustrating a used power amount presentation image according to an example of the present embodiment.
FIG. 3 is a diagram illustrating a used power amount presentation image according to another example of the embodiment.
FIG. 4 is a functional block diagram of a workstation according to an example of the embodiment.
FIG. 5 is a functional block diagram of a server according to an example of the embodiment.
FIG. 6 is a diagram illustrating a data structure of power consumption data and workplace situation data according to an example of the present embodiment.
FIG. 7 is a flowchart illustrating a procedure for presenting power consumption according to an example of the present embodiment.
[Explanation of symbols]
40 network, 110 distribution board (management equipment), 200 workstation (power consumption presentation system), 214, 314 judgment unit, 222, 322 power consumption data, 224 weather data, 226 judgment data, 280, 380 information Storage medium, 290, 390 communication unit, 300 server (power consumption presentation system), 316 information generation unit

Claims (11)

企業用の使用電力量提示システムにおいて、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を受信する通信手段と、
当該使用電力量情報と、職場状況を示す職場状況データとに基づき、ユーザーに提示する提示用情報を生成する情報生成手段と、
を含み、
前記職場状況データは、前記管理機器と、当該管理機器の使用目的種別とが関連づけられており、
前記情報生成手段は、前記提示用情報として、前記使用目的種別で区分して使用電力量を提示する情報を生成することを特徴とする使用電力量提示システム。
In the power consumption presentation system for companies,
Communication means for receiving power usage information from at least one management device managing power usage;
Information generating means for generating presentation information to be presented to the user based on the power consumption information and workplace situation data indicating the workplace situation;
Including
The workplace situation data is associated with the management device and the purpose of use of the management device,
The information generating means is characterized in that the information generating means generates, as the information for presentation, information for presenting the amount of used electric power classified according to the purpose of use.
請求項1において、
前記職場状況データは、前記管理機器が複数の職場の使用電力量を管理している場合、前記管理機器と、当該管理機器における職場ごとの電力供給割合とが関連づけられており、
前記情報生成手段は、前記提示用情報として、前記電力供給割合に応じた使用電力量を提示する情報を生成することを特徴とする使用電力量提示システム。
In claim 1,
The workplace situation data, when the management device manages the power consumption of a plurality of workplaces, the management device and the power supply ratio for each workplace in the management device is associated,
The power generation presentation system according to claim 1, wherein the information generation unit generates, as the presentation information, information for presenting a power consumption according to the power supply ratio.
請求項1、2のいずれかにおいて、
所定の判定を行う判定手段を含み、
前記通信手段は、ネットワークを介して前記管理機器が設置された場所の気象情報を受信し、
前記判定手段は、当該気象情報に基づき、使用電力量情報を受信する受信間隔を変更する必要があるかどうかを判定し、
前記受信手段は、必要があると判定された場合、受信間隔を変更することを特徴とする使用電力量提示システム。
In any one of claims 1 and 2,
Including a determination means for performing a predetermined determination,
The communication means receives, via a network, weather information of a place where the management device is installed,
The determination unit determines whether it is necessary to change a reception interval for receiving the power usage information based on the weather information,
The power consumption presentation system, wherein the receiving unit changes a reception interval when it is determined that the reception is necessary.
請求項3において、
前記判定手段は、前記気象情報に基づき、使用電力量を測定する測定間隔を変更する必要があるかどうかを判定し、
前記情報生成手段は、必要があると判定された場合、測定間隔を変更するための制御情報を生成し、
前記通信手段は、当該制御情報を前記管理機器へ向け送信することを特徴とする使用電力量提示システム。
In claim 3,
The determination means determines whether it is necessary to change the measurement interval for measuring the amount of power consumption based on the weather information,
The information generating means, when it is determined that it is necessary, generates control information for changing the measurement interval,
The communication means transmits the control information to the management device.
請求項1〜4のいずれかにおいて、
前記通信手段は、ユーザーの要求情報を受信し、
前記情報生成手段は、当該要求情報に応じた形式で前記提示用情報を生成することを特徴とする使用電力量提示システム。
In any one of claims 1 to 4,
The communication means receives user request information,
The information generating means generates the presentation information in a format according to the request information.
コンピュータにより読み取り可能なプログラムであって、
コンピュータを、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を通信手段に受信させる通信制御手段と、
当該使用電力量情報と、職場状況を示す職場状況データとに基づき、ユーザーに提示する提示用情報を生成する情報生成手段として機能させ、
前記職場状況データは、前記管理機器と、当該管理機器の使用目的種別とが関連づけられており、
前記情報生成手段は、前記提示用情報として、前記使用目的種別で区分して使用電力量を提示する情報を生成することを特徴とするプログラム。
A computer readable program,
Computer
Communication control means for causing the communication means to receive the power consumption information from at least one management device managing the power consumption;
Based on the power consumption information and the workplace situation data indicating the workplace situation, function as information generation means for creating presentation information to be presented to the user,
The workplace situation data is associated with the management device and the purpose of use of the management device,
The program, wherein the information generating means generates, as the presentation information, information for presenting a used power amount classified by the use purpose type.
コンピュータにより読み取り可能な情報記憶媒体であって、
請求項6に記載のプログラムを記憶したことを特徴とする情報記憶媒体。
An information storage medium readable by a computer,
An information storage medium storing the program according to claim 6.
企業用の使用電力量提示方法において、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を受信し、
当該使用電力量情報と、前記管理機器と、当該管理機器の使用目的種別とが関連づけられ、職場状況を示す職場状況データとに基づき、前記使用目的種別で区分して使用電力量を提示する提示用情報を生成することを特徴とする使用電力量提示方法。
In the method of presenting power consumption for companies,
Receiving power usage information from at least one management device managing the power usage;
The power usage information, the management device, and the usage purpose type of the management device are associated with each other, and the power usage is classified and presented based on the work purpose data indicating the workplace status. Power usage presentation method characterized by generating usage information.
請求項8において、
前記提示用情報は、Web用情報であって、
当該Web用情報を、ネットワークを介してユーザーのコンピュータへ向け送信することを特徴とする使用電力量提示方法。
In claim 8,
The presentation information is Web information,
A method for presenting power consumption, wherein the Web information is transmitted to a user's computer via a network.
企業用の使用電力量提示方法において、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を受信し、
ネットワークを介して前記管理機器が設置された場所の気象情報を受信し、
当該気象情報に基づき、使用電力量情報を受信する受信間隔を変更する必要があるかどうかを判定し、
必要がある場合、受信間隔を変更することを特徴とする使用電力量提示方法。
In the method of presenting power consumption for companies,
Receiving power usage information from at least one management device managing the power usage;
Receiving the weather information of the place where the management device is installed through a network,
Based on the weather information, determine whether it is necessary to change the reception interval for receiving the power usage information,
A method for presenting the amount of used electric power, wherein a reception interval is changed when necessary.
企業用の使用電力量提示方法において、
使用電力量を管理している少なくとも1つの管理機器から使用電力量情報を受信し、
ネットワークを介して前記管理機器が設置された場所の気象情報を受信し、
前記判定手段は、当該気象情報に基づき、使用電力量を測定する測定間隔を変更する必要があるかどうかを判定し、
必要がある場合、測定間隔を変更するための制御情報を生成し、
当該制御情報を前記管理機器へ向け送信することを特徴とする使用電力量提示方法。
In the method of presenting power consumption for companies,
Receiving power usage information from at least one management device managing the power usage;
Receiving the weather information of the place where the management device is installed through a network,
The determining means determines whether it is necessary to change the measurement interval for measuring the power consumption based on the weather information,
If necessary, generate control information to change the measurement interval,
Transmitting the control information to the management device.
JP2002371786A 2002-12-24 2002-12-24 Used electrical power presenting system, program, information storage medium, and used electrical power presenting method Withdrawn JP2004205249A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002371786A JP2004205249A (en) 2002-12-24 2002-12-24 Used electrical power presenting system, program, information storage medium, and used electrical power presenting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002371786A JP2004205249A (en) 2002-12-24 2002-12-24 Used electrical power presenting system, program, information storage medium, and used electrical power presenting method

Publications (1)

Publication Number Publication Date
JP2004205249A true JP2004205249A (en) 2004-07-22

Family

ID=32810575

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002371786A Withdrawn JP2004205249A (en) 2002-12-24 2002-12-24 Used electrical power presenting system, program, information storage medium, and used electrical power presenting method

Country Status (1)

Country Link
JP (1) JP2004205249A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010518795A (en) * 2007-02-02 2010-05-27 アズテック・アソシエイツ・インク Utility monitoring device, monitoring system and monitoring method thereof
JP2012181055A (en) * 2011-02-28 2012-09-20 Toshiba Corp Electronic apparatus and information output method
JP3179034U (en) * 2012-08-01 2012-10-11 有限会社あかつきプランニング Automatic power distribution management system
KR101225074B1 (en) 2010-12-23 2013-01-22 그린베일 주식회사 Monitoring system comparing power consumption and method thereof
JP2016077156A (en) * 2016-02-09 2016-05-12 京セラ株式会社 Power control device, display device, display method, and image generation program

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010518795A (en) * 2007-02-02 2010-05-27 アズテック・アソシエイツ・インク Utility monitoring device, monitoring system and monitoring method thereof
KR101225074B1 (en) 2010-12-23 2013-01-22 그린베일 주식회사 Monitoring system comparing power consumption and method thereof
JP2012181055A (en) * 2011-02-28 2012-09-20 Toshiba Corp Electronic apparatus and information output method
US8965540B2 (en) 2011-02-28 2015-02-24 Kabushiki Kaisha Toshiba Electronic apparatus and data output method
JP3179034U (en) * 2012-08-01 2012-10-11 有限会社あかつきプランニング Automatic power distribution management system
JP2016077156A (en) * 2016-02-09 2016-05-12 京セラ株式会社 Power control device, display device, display method, and image generation program

Similar Documents

Publication Publication Date Title
Jiang et al. Experiences with a high-fidelity wireless building energy auditing network
US9026261B2 (en) Methods and systems for managing energy usage in buildings
US9076103B2 (en) Device management system which cooperates with a power managment system for managing power consumption consumed by a plurality of electronic devices, control method for device management system, and storage medium
TW201203773A (en) Local power management unit and power management system employing the same
US20120078680A1 (en) Electrical Engineering And Capacity Management System And Method
CN111066218A (en) Systems, methods, and devices for remote power management and discovery
KR101136537B1 (en) System for measuring power using wireless personal area network
JP4585472B2 (en) Power quality monitoring device
JP2015133060A (en) Information processing system and power supply control method
GB2528607A (en) Monitoring system, facility management device, monitoring method, and program
CN106203880A (en) Report creation system
JP2011034205A (en) Co2 reduction media system and co2 reduction support method
JP2004205249A (en) Used electrical power presenting system, program, information storage medium, and used electrical power presenting method
JP2010072253A (en) Power consumption calculating device, power consumption calculating method, and program
JP2010072757A (en) Equipment management device, equipment management system, equipment management method, equipment management program, and recording medium recording the program
JP2008286538A (en) System and method for providing carbon dioxide information using energy composition information delivery
JP5132499B2 (en) State transition data generation device, state transition data generation method, and program
JP6021552B2 (en) Monitoring device, monitoring system, program, and monitoring method
WO2012040515A1 (en) Electrical engineering and capacity management system and method
JP6706141B2 (en) Power consumption application Decomposition device
JP5054551B2 (en) Standby power reduction support system, management server, and standby power reduction support method
JP2010033279A (en) Device for monitoring operation of air conditioner, operation-monitoring system, and operation-monitoring method
CN113409172A (en) Building ecological cloud platform, management method, program product and storage medium
JP2010214667A (en) Device, method and program for calculating power consumption, and recording medium in which the program is recorded
JP2012037339A (en) Power management system, and power management method

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20060307