JP2004204522A - Natural-ground reinforced earth method and natural-ground reinforced earth member used for it - Google Patents

Natural-ground reinforced earth method and natural-ground reinforced earth member used for it Download PDF

Info

Publication number
JP2004204522A
JP2004204522A JP2002374073A JP2002374073A JP2004204522A JP 2004204522 A JP2004204522 A JP 2004204522A JP 2002374073 A JP2002374073 A JP 2002374073A JP 2002374073 A JP2002374073 A JP 2002374073A JP 2004204522 A JP2004204522 A JP 2004204522A
Authority
JP
Japan
Prior art keywords
ground
bag
self
hardening filler
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002374073A
Other languages
Japanese (ja)
Other versions
JP3954964B2 (en
JP2004204522A5 (en
Inventor
和孝 ▲から▼崎
Kazutaka Karasaki
Keiichi Nakamura
圭一 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ashimori Industry Co Ltd
Original Assignee
Ashimori Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ashimori Industry Co Ltd filed Critical Ashimori Industry Co Ltd
Priority to JP2002374073A priority Critical patent/JP3954964B2/en
Publication of JP2004204522A publication Critical patent/JP2004204522A/en
Publication of JP2004204522A5 publication Critical patent/JP2004204522A5/ja
Application granted granted Critical
Publication of JP3954964B2 publication Critical patent/JP3954964B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a natural-ground reinforced earth method, in which the integrality of a ground and the natural-ground reinforced earth member is improved by preventing a dispersion into the ground of self-hardening fillers and the development of the crack of the fillers, the solidification strength of the fillers is enhanced by promoting the discharge of excess water or the like and the ground such as a face of a slope is stabilized, and a natural-ground reinforced earth member used for the method. <P>SOLUTION: In the natural-ground reinforced earth method in which a baggy body 3 in which a front end section having approximately the same length as the excavation length L of the excavated pit 2 is closed is inserted into the pit 2 formed by drilling the ground 1 and self-hardening fillers 5 are injected into the baggy body 3, the diameter of the baggy body 3, in which the fillers 5 are injected, is expanded at a value larger than the diameter D of at least the pit 3 extensively over an overall length by pressing and injecting the fillers 5 while a drainage material 4 is disposed extensively over the overall length on the surface of the baggy body 3. In the method, the baggy body is installed so that the end section of the material 4 is led out outside the pit 2. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、地山補強土工法及びそれに用いる地山補強土部材に関し、自硬性充填材の地盤中への散逸や固化した自硬性充填材のクラックの発生を防止することによって、地盤と地山補強土部材との一体性を高め、余剰水等の排出を促進することによって、自硬性充填材の固化強度を高め、法面等の地盤の安定化を図るようにした地山補強土工法及びそれに用いる地山補強土部材に関するするものである。
【0002】
【従来の技術】
従来、盛土、切土等からなる地盤の崩壊防止対策のために、地山補強土工法が広く採用されている。
この地山補強土工法は、対象となる地盤を穿孔して形成した掘削孔内に、鉄筋等の補強材を挿入するとともに、自硬性充填材を注入することにより、地盤を補強し、地盤全体の安定性を高めるものである(特許文献1、特許文献2参照)。
【0003】
ところで、上記従来の地山補強土工法においては、地盤を穿孔して形成した掘削孔内に自硬性充填材を直接注入するようにしているため、地盤の性状によっては、自硬性充填材が地盤中に散逸してしまい、所期の補強強度を得られなくなったり、固化した自硬性充填材にクラックが発生する等の問題があった。
さらに、自硬性充填材として汎用されるセメント系自硬性充填材が固化する際に生じる余剰水が地盤側に浸透したり、地盤側からの浸出水によって、地盤と固化した自硬性充填材の界面における付着力や地盤のせん断力が弱くなり、所期の補強強度を得られなくなる等の問題もあった。
【0004】
なお、アースアンカに関するものではあるが、自硬性充填材の地盤中への散逸や固化した自硬性充填材のクラックの発生を防止するために、本件出願人らは、先に地盤を穿孔して形成した掘削孔に、先端部が閉塞した袋状物を挿入し、該袋状物内に自硬性充填材を注入する方法(特許文献3参照)を提案したが、これによっても、セメント系自硬性充填材が固化する際に生じる余剰水や地盤側からの浸出水によって、地盤と固化した自硬性充填材の界面における付着力や地盤のせん断力が弱くなるという問題点は依然として解消することができず、これへの対処が要請されていた。
【0005】
【特許文献1】
特開2000−303480号公報
【特許文献2】
特開2002−4276号公報
【特許文献3】
実開平1−160032号公報
【0006】
【発明が解決しようとする課題】
本発明は、上記従来の地山補強土工法の有する問題点に鑑み、自硬性充填材の地盤中への散逸や固化した自硬性充填材のクラックの発生を防止することによって、地盤と地山補強土部材との一体性を高め、余剰水等の排出を促進することによって、自硬性充填材の固化強度を高め、法面等の地盤の安定化を図るようにした地山補強土工法及びそれに用いる地山補強土部材を提供することを目的とする。
【0007】
【課題を解決するための手段】
上記目的を達成するため、本発明の地山補強土工法は、地盤を穿孔して形成した掘削孔に、該掘削孔の掘削長と略同じ長さの先端部が閉塞した袋状物を挿入し、該袋状物内に自硬性充填材を注入する地山補強土工法において、前記自硬性充填材を加圧注入することにより、自硬性充填材を注入した袋状物を、その全長に亘って少なくとも掘削孔の径よりも大きく拡径させるとともに、袋状物の表面に、その全長に亘って、排水材を配設し、該排水材の端部が掘削孔外に導出されるように袋状物を設置することを特徴とする。
【0008】
この地山補強土工法は、地盤を穿孔して形成した掘削孔に、該掘削孔の掘削長と略同じ長さの先端部が閉塞した袋状物を挿入し、該袋状物内に自硬性充填材を注入する地山補強土工法において、前記自硬性充填材を加圧注入することにより、自硬性充填材を注入した袋状物を、その全長に亘って少なくとも掘削孔の径よりも大きく拡径させるようにしているので、自硬性充填材の地盤中への散逸や固化した自硬性充填材のクラックの発生を防止できるとともに、自硬性充填材を注入した袋状物の拡径によって、周囲の地盤が締め固められる上、さらに、地盤からの排水も促すことができる。
そして、袋状物の表面に、その全長に亘って、排水材を配設し、該排水材の端部が掘削孔外に導出されるように袋状物を設置することにより、セメント系自硬性充填材が固化する際に生じる余剰水や地盤側からの浸出水を、自硬性充填材及び地盤と密着した排水材を介して掘削孔外に排出することができる。
【0009】
この場合において、袋状物内に補強材を挿入することができる。
【0010】
これにより、自硬性充填材を補強するとともに、補強材によって周囲の地盤を補強し、地盤全体の安定性を一層高めることができる。
【0011】
また、袋状物に、少なくとも口元部で絞り込まれたものを用いることができる。
【0012】
これにより、袋状物が地盤と固化した自硬性充填材の界面における付着力や地盤のせん断力を一層向上することができる。
【0013】
また、袋状物に、凹凸形状を有するものを用いることができる。
【0014】
これにより、地盤と固化した自硬性充填材の界面における付着力を一層向上することができる。
【0015】
また、排水材に、合成樹脂製ネットからなるグリッド材を内側に、合成繊維製布からなるシート材を外側になるように積層した積層体を用いることができる。
【0016】
これにより、地盤から大きな圧力が加わる場合でも、セメント系自硬性充填材が固化する際に生じる余剰水や地盤側からの浸出水を、排水材を介して掘削孔外に円滑に排出することができる。
【0017】
また、上記地山補強土工法に用いる本発明の地山補強土部材は、地盤を穿孔して形成した掘削孔に挿入し、セメント系自硬性充填材が注入される、先端部が閉塞した繊維製の袋状物からなる地山補強部材において、袋状物の表面に、その全長に亘って、排水材を配設してなることを特徴とする。
【0018】
この地山補強土部材は、袋状物の表面に、その全長に亘って、排水材を配設するようにしているので、表面に排水材を配設した袋状物を、排水材地盤を穿孔して形成した掘削孔に挿入するだけで、本発明の地山補強土工法を、簡易かつ円滑に実施することができる。
【0019】
【発明の実施の形態】
以下、本発明の地山補強土工法及びそれに用いる地山補強土部材の実施の形態を図面に基づいて説明する。
【0020】
図1に、本発明の地山補強土工法の施工工程の一実施例を示す。
この地山補強土工法は、盛土、切土等からなる地盤1の崩壊防止対策のためになすもので、まず、地盤1に対して略水平に多数の掘削孔2を、上下方向及び水平方向に所定の間隔をあけて、ハンドオーガ、ドリル等の穿孔工具を用いて、穿孔する(図1(a))。
この場合、掘削孔2の径D及び掘削長Lは、地山補強土工法によって得ようとする補強強度、地盤の性状等に応じて設計するようにするが、例えば、掘削孔2の径Dは、φ80〜φ100mm程度、掘削長Lは、3〜5m程度に設定するようにする。
【0021】
このようにして形成した掘削孔2に、掘削孔2の掘削長Lと略同じ長さの先端部が閉塞した袋状物3を挿入し、この袋状物3内にセメント系等の自硬性充填材5を加圧注入するようにする(図1(b−1))。なお、袋状物3の口元部には、必要に応じて、自硬性充填材5の注入ホースの金具30bを接続するための口金具30aを取り付けることができ、これにより、自硬性充填材5の注入を円滑に行うことができる。
そして、袋状物3内に自硬性充填材5を加圧注入することにより、自硬性充填材5を注入した袋状物3を、その全長に亘って少なくとも掘削孔2の径Dよりも大きく拡径させるようにする(図1(b−2))。
【0022】
この場合、袋状物3内には、必要に応じて、鉄筋等の補強材6を、スペーサ61によって補強材6が掘削孔2の略中心に位置するように支持した状態で、挿入することができる。
なお、本実施例おいては、補強材6として、自硬性充填材5の付着性が良好な異形棒鋼(例えば、D19、D22等)を用いるようにしているが、このほか、通常の丸棒鋼やH型鋼等の形鋼等、任意の断面形状のものを用いることができ、さらには、材質も鋼材製のもののほか、FRP製のもの等を用いることができる。
これにより、自硬性充填材を補強するとともに、補強材によって周囲の地盤を補強し、地盤全体の安定性を一層高めることができる。
【0023】
ところで、本実施例において用いられる袋状物3には、合成繊維製織物からなり、図2(a)に示すような、口元部及び先端部が絞り込まれているもの(縦糸31:ナイロン1400T/4×320本、横糸32:ポリエステル1100T/4、8本/cm(大径部(φ180mm)の密度)、4.5本/cm(小径部(φ80mm)の密度))や、図2(b)に示すような、さらに、凹凸形状のもの(長手方向で径を異ならせたもの(大径部φ130mm、小径部φ80mm))を好適に用いることができる。
このように、袋状物3に口元部が絞り込まれているものを用いることにより、袋状物3への自硬性充填材の加圧注入を、円滑に行うことができ、袋状物3の拡径を、袋状物3の全長に亘って均等に行うことができ、地盤1と固化した自硬性充填材5の界面における付着力や地盤のせん断力を向上することができ、また、袋状物3に凹凸形状を有するものを用いることにより、地盤1と固化した自硬性充填材5の界面における付着力を向上することができる。
【0024】
また、本実施例において用いられる袋状物3は、その表面に、その全長に亘って、排水材4が配設されており、この排水材4の端部が掘削孔1外に導出されるように袋状物3を設置するようにする。
これにより、地盤1から大きな圧力が加わる場合でも、図1(c−1)、(c−2)に示すように、セメント系自硬性充填材5が固化する際に生じる余剰水や地盤1側からの浸出水を、排水材4を介して掘削孔2外に円滑に排出することができる。
【0025】
そして、図1(d)に示すように、排水材4の端部が掘削孔1外に導出されるように設置した袋状物3の口元部(口金具30a)には、余剰水や浸出水の排出に支障をきたさないようにしてキャップ7を配設するようにする。
【0026】
ところで、本実施例において用いられる袋状物3の表面に配設される排水材4には、図3に示すように、合成樹脂製ネット(高密度ポリエチレンネット、ネット線径φ1mm、目合6×6mm)からなるグリッド材41を内側に、合成繊維製布(ポリエステル長繊維製織布や不織布)からなるシート材42を外側になるように積層した積層体を用いることができる。
また、排水材4は、図3(a)に示すように、グリッド材41とシート材42からなるシート状の積層体を袋状物3の表面に配設するようにしたり、図3(b)に示すように、シート状のグリッド材41を筒状に形成したシート材42に挿入し、これを袋状物3の表面に被せるように配設するようにすることができる。
【0027】
そして、袋状物3と排水材4は、より具体的には、図4(a)に示すように、袋状物3内に補強材6を挿入し、その外周を袋状物3内に自硬性充填材5を加圧注入したときに袋状物3が拡径可能なようにビニルテープ等の伸張又は破断可能なテープ8(本明細書において、単に、「ビニルテープ8」という。)で巻いて止め、さらに、この袋状物3の表面にシート状のグリッド材41を筒状に形成したシート材42に挿入したもの(図3(b))を被せるように配設することにより、筒状の一体構造体を構成し、この一体構造体を掘削孔2に挿入するようにしたり、図4(b)に示すように、同様の袋状物3の外周を、シート状のグリッド材41で巻き、さらに、その外周を帯状のシート材42で巻いて、シート材42の終端をビニルテープ8で止めることにより、筒状の一体構造体を構成し、この一体構造体を掘削孔2に挿入するようにしたり、図4(c)に示すように、同様の袋状物3の表面に、グリッド材41とシート材42からなるシート状の積層体(図3(c))(この例では、3枚のシート状片)を配設し、さらに、その外周をビニルテープ8で巻くことにより、筒状の一体構造体を構成し、この一体構造体を掘削孔2に挿入するようにしたり、さらには、図4(d)に示すように、同様の袋状物3の表面に、グリッド材41とシート材42からなるシート状(帯状)の積層体(図3(c))(この例では、2本の帯状体)をたすき掛け状に巻いて配設することにより、筒状の一体構造体を構成し、この一体構造体を掘削孔2に挿入するようにすることができる。
ここで、図4(d)に示すように、シート状(帯状)の積層体をたすき掛け状に巻いて配設することにより、袋状物3内に自硬性充填材5を加圧注入することによって袋状物3が凹凸形状に拡径したとき、袋状物3の凹部に集まり、滞留し易いセメント系自硬性充填材が固化する際に生じる余剰水や地盤側からの浸出水を、排水材4を介して掘削孔1外に迅速かつ円滑に排出することができる。
【0028】
ところで、上記実施例においては、袋状物3と排水材4とを、別部材で構成するようにしたが、袋状物と排水材を、一体に構成することもできる。
具体的には、図5に示すように、縦糸31及び横糸32にマルチフィラメントを用いて地組織を構成し、これに、排水材として機能するモノフィラメント(φ1mm程度)からなる縦糸41aを織り込んだ二重組織の袋状物3Aと、図2(a)、(b)に示すような、合成繊維製織物からなる袋状物3Bとを重ねて用いるようにしている。
この場合、二重組織の袋状物3A内に補強材6を挿入し、その外周に合成繊維製織物からなる袋状物3Bを重ねて配し、ビニルテープ8で巻いて止めることにより、筒状の一体構造体を構成し、この一体構造体を掘削孔2に挿入するようにする。
なお、袋状物3Bの表面の表面に、さらに、合成繊維製布(ポリエステル長繊維製織布や不織布)からなるシート材を配し、ビニルテープ8で巻いて止めることもできる。
このように、袋状物と排水材を、一体に構成することにより、袋状物と排水材が分離して隙間が生じることを防止でき、これにより、セメント系自硬性充填材が固化する際に生じる余剰水や地盤側からの浸出水を掘削孔1外に迅速かつ円滑に排出することができる。
【0029】
以上説明したように、この地山補強土工法は、地盤1を穿孔して形成した掘削孔2に、掘削孔2の掘削長Lと略同じ長さの先端部が閉塞した袋状物3(3A、3B)を挿入し、この袋状物3内に自硬性充填材5を注入する地山補強土工法において、自硬性充填材4を加圧注入することにより、自硬性充填材5を注入した袋状物3を、その全長に亘って少なくとも掘削孔2の径Dよりも大きく拡径させるようにしているので、自硬性充填材5の地盤1中への散逸や固化した自硬性充填材5のクラックの発生を防止できるとともに、自硬性充填材5を注入した袋状物3の拡径によって、周囲の地盤1が締め固められる上、さらに、地盤1からの排水も促すことができる。
また、袋状物3(3A)の表面に、その全長に亘って、排水材4(41a)を配設し、排水材4の端部が掘削孔2外に導出されるように袋状物3を設置することにより、セメント系自硬性充填材が固化する際に生じる余剰水や地盤1側からの浸出水を、自硬性充填材5及び地盤1と密着した排水材4を介して掘削孔2外に排出することができる。
【0030】
以上、本発明の地山補強土工法及びそれに用いる地山補強土部材について、その実施例に基づいて説明したが、本発明は上記実施例に記載した構成(構成部材の材質、数値を含む。)に限定されるものではなく、その趣旨を逸脱しない範囲において適宜その構成を変更することができるものである。
【0031】
なお、本発明の名称の「地山補強土工法及びそれに用いる地山補強土部材」は、その主要な用途を明らかにするために付したものにすぎず、本発明は、地山補強土工法のほか、図6に示すような、アースアンカ9を用いるアースアンカ工法等の類似工法にも適用できるものであって、これを排除するものでない。
【0032】
【発明の効果】
本発明の地山補強土工法は、地盤を穿孔して形成した掘削孔に、該掘削孔の掘削長と略同じ長さの先端部が閉塞した袋状物を挿入し、該袋状物内に自硬性充填材を注入する地山補強土工法において、前記自硬性充填材を加圧注入することにより、自硬性充填材を注入した袋状物を、その全長に亘って少なくとも掘削孔の径よりも大きく拡径させるようにしているので、自硬性充填材の地盤中への散逸や固化した自硬性充填材のクラックの発生を防止できるとともに、自硬性充填材を注入した袋状物の拡径によって、周囲の地盤が締め固められる上、さらに、地盤からの排水も促すことができる。
そして、袋状物の表面に、その全長に亘って、排水材を配設し、該排水材の端部が掘削孔外に導出されるように袋状物を設置することにより、セメント系自硬性充填材が固化する際に生じる余剰水や地盤側からの浸出水を、自硬性充填材及び地盤と密着した排水材を介して掘削孔外に排出することができる。
そして、これらによって、余剰水や浸出水が短時間に排出されて自硬性充填材の強度発現を早くするとともに、袋状物を介して地盤と固化した自硬性充填材の界面における付着力や地盤のせん断力を向上することができ、地盤の性状や余剰水等の影響を受けることなく、所期の補強強度を得ることができ、短い施工期間で、地盤を補強し、地盤全体の安定性を確実に高めることができる。
また、セメント系自硬性充填材が固化する際に生じる余剰水(セメントアルカリ水)が地盤側に浸透することを防止でき、周囲の環境を保持することができる。
【0033】
また、袋状物内に補強材を挿入することにより、自硬性充填材を補強するとともに、補強材によって周囲の地盤を補強し、地盤全体の安定性を一層高めることができる。
【0034】
また、袋状物に、少なくとも口元部で絞り込まれたものを用いることにより、袋状物への自硬性充填材の加圧注入を、円滑に行うことができ、袋状物の拡径を、袋状物の全長に亘って均等に行うことができ、地盤と固化した自硬性充填材の界面における付着力や地盤のせん断力を一層向上することができる。
【0035】
また、袋状物に、凹凸形状を有するものを用いることにより、地盤と固化した自硬性充填材の界面における付着力を一層向上することができる。
【0036】
また、排水材に、合成樹脂製ネットからなるグリッド材を内側に、合成繊維製布からなるシート材を外側になるように積層した積層体を用いることにより、地盤から大きな圧力が加わる場合でも、セメント系自硬性充填材が固化する際に生じる余剰水や地盤側からの浸出水を、排水材を介して掘削孔外に円滑に排出することができる。
【0037】
また、本発明の地山補強土部材によれば、地山補強土部材は、袋状物の表面に、その全長に亘って、排水材を配設するようにしているので、表面に排水材を配設した袋状物を、排水材地盤を穿孔して形成した掘削孔に挿入するだけで、本発明の地山補強土工法を、簡易かつ円滑に実施することができる。
【図面の簡単な説明】
【図1】本発明の地山補強土工法の施工工程の一実施例を示し、(a)は穿孔工程、(b−1)は袋状物の挿入及び自硬性充填材の加圧注入工程、(b−2)は袋状物の拡径状態、(c−1)及び(c−2)は(b−2)のA部の拡大図で、セメント系自硬性充填材が固化する際に生じる余剰水や地盤側からの浸出水を、排水材を介して掘削孔外に排出する状態、(d)はキャップの配設した状態をそれぞれ示す説明図である。
【図2】袋状物の説明図である。
【図3】排水材の説明図である。
【図4】袋状物と排水材の組み合わせを示す説明図である。
【図5】袋状物と排水材を一体に構成した場合を示し、(a)は設置状態、(b)は袋状物の口元部、(c)は(a)のA−A断面図、(d)は組立工程をそれぞれ示す説明図である。
【図6】アースアンカ工法の説明図である。
【符号の説明】
1 地盤
2 掘削孔
3 袋状物
3A 袋状物
3B 袋状物
4 排水材
41 グリッド材
41a モノフィラメントからなる縦糸
42 シート材
5 自硬性充填材
6 補強材
7 キャップ
8 ビニルテープ
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a ground reinforcement method and a ground reinforcement member used for the method, by preventing the self-hardening filler from dispersing into the ground and generating cracks in the solidified self-hardening filler, whereby the ground and the ground are protected. A soil reinforcement method that enhances the integration with the reinforcing soil member and promotes the discharge of surplus water, etc., thereby increasing the solidification strength of the self-hardening filler material and stabilizing the ground such as slopes. The present invention relates to a ground reinforcing soil member used in the method.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, a ground reinforcement method has been widely used to prevent collapse of a ground made of an embankment, a cut, or the like.
This ground reinforcement method involves reinforcing the ground by inserting a reinforcing material such as reinforcing steel into the excavation hole formed by drilling the target ground, and injecting a self-hardening filler, thereby reinforcing the ground. (See Patent Literature 1 and Patent Literature 2).
[0003]
By the way, in the above-mentioned conventional ground reinforcement method, the self-hardening filler is directly injected into the excavation hole formed by drilling the ground. However, there are problems such that the desired reinforcing strength cannot be obtained and cracks occur in the solidified self-hardening filler.
Furthermore, surplus water generated when the cement-based self-hardening filler material, which is widely used as a self-hardening filler material, solidifies, penetrates into the ground side, and is leached from the ground side, causing an interface between the ground and the solidified self-hardening filler material. However, there was a problem that the adhesive strength and the shearing force of the ground became weak, and the desired reinforcing strength could not be obtained.
[0004]
Although it relates to an earth anchor, in order to prevent the diffusion of the self-hardening filler into the ground and the occurrence of cracks in the solidified self-hardening filler, the applicants have perforated the ground first. A method has been proposed in which a bag-like material having a closed end is inserted into the formed excavation hole and a self-hardening filler is injected into the bag-like material (see Patent Document 3). The problem that excess water and leaching water from the ground side generated when the hard filler solidifies weakens the adhesive force at the interface between the ground and the hardened self-hardening filler material and the shear force of the ground is still solved. It was not possible, and a response was requested.
[0005]
[Patent Document 1]
Japanese Patent Application Laid-Open No. 2000-303480 [Patent Document 2]
JP 2002-4276 A [Patent Document 3]
Japanese Utility Model Laid-Open No. 1-160032 [0006]
[Problems to be solved by the invention]
The present invention has been made in view of the above-mentioned problems of the conventional ground-reinforcement soil construction method, and prevents the self-hardening filler from dispersing into the ground and the occurrence of cracks in the solidified self-hardening filler, whereby the ground and the ground can be prevented. A soil reinforcement method that enhances the integration with the reinforcing soil member and promotes the discharge of surplus water, etc., thereby increasing the solidification strength of the self-hardening filler material and stabilizing the ground such as slopes. It is an object of the present invention to provide a ground reinforcing soil member used for it.
[0007]
[Means for Solving the Problems]
In order to achieve the above object, the ground reinforcement method according to the present invention inserts a bag-like material having a tip end substantially the same length as the excavation length of the excavation hole into an excavation hole formed by drilling the ground. And, in the ground reinforcement method of injecting a self-hardening filler into the bag-like material, the self-hardening filler is injected under pressure, so that the bag-like material injected with the self-hardening filler is extended over its entire length. The drainage material is disposed on the surface of the bag-like material over the entire length thereof, and the end of the drainage material is led out of the borehole. It is characterized in that a bag-like material is installed in the bag.
[0008]
According to this ground-reinforcement soil method, a bag-shaped object having a tip end substantially the same as the excavation length of the hole is inserted into a hole formed by drilling the ground, and the bag-shaped object is automatically inserted into the bag-shaped object. In the ground reinforcement reinforced earth method of injecting a hard filler, by injecting the self-hardening filler under pressure, the bag-like material into which the self-hardening filler has been injected is at least larger than the diameter of the excavation hole over its entire length. The diameter of the self-hardening filler is prevented from dissipating into the ground and cracking of the solidified self-hardening filler is prevented by expanding the diameter of the bag filled with the self-hardening filler. In addition, the surrounding ground is compacted, and further, drainage from the ground can be promoted.
Then, a drainage material is disposed on the surface of the bag-like material over the entire length thereof, and the bag-like material is placed so that the end of the drainage material is led out of the drilling hole, whereby the cement-based self-adhesive material is drained. Excess water and leaching water from the ground side generated when the hard filler is solidified can be discharged to the outside of the excavation hole through the self-hardening filler and a drainage material in close contact with the ground.
[0009]
In this case, a reinforcing material can be inserted into the bag.
[0010]
This makes it possible to reinforce the self-hardening filler, reinforce the surrounding ground with the reinforcing material, and further enhance the stability of the entire ground.
[0011]
In addition, a bag-like material narrowed down at least at a mouth portion can be used.
[0012]
This makes it possible to further improve the adhesive force at the interface between the self-hardening filler in which the bag-like material has solidified and the ground and the shearing force of the ground.
[0013]
In addition, a bag-shaped material having an uneven shape can be used.
[0014]
Thereby, the adhesive force at the interface between the ground and the solidified self-hardening filler can be further improved.
[0015]
Further, as the drainage material, a laminate in which a grid material made of a synthetic resin net is placed inside and a sheet material made of a synthetic fiber cloth is placed outside can be used.
[0016]
As a result, even when a large pressure is applied from the ground, surplus water and leachate from the ground side generated when the cement-based self-hardening filler solidifies can be smoothly discharged to the outside of the borehole through the drainage material. it can.
[0017]
In addition, the ground reinforcing soil member of the present invention used in the ground reinforcing soil construction method is inserted into an excavation hole formed by piercing the ground, a cement-based self-hardening filler is injected, and a fiber with a closed end is closed. A ground reinforcement member made of a bag-shaped material made of plastic, characterized in that a drainage material is provided on the surface of the bag-shaped material over the entire length thereof.
[0018]
Since the ground reinforcing soil member is provided with drainage material on the surface of the bag-like material over the entire length thereof, the bag-like material having the drainage material provided on the surface is provided with a drainage material ground. The ground reinforcement method of the present invention can be simply and smoothly carried out simply by inserting into the drilled hole formed by drilling.
[0019]
BEST MODE FOR CARRYING OUT THE INVENTION
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a ground reinforcing soil method of the present invention and a ground reinforcing soil member used therefor will be described with reference to the drawings.
[0020]
FIG. 1 shows an embodiment of the construction process of the ground reinforcement method according to the present invention.
This ground reinforcement method is intended to prevent the collapse of the ground 1 consisting of embankments, cuts, etc. First, a large number of excavation holes 2 are formed substantially horizontally with respect to the ground 1 in the vertical and horizontal directions. At predetermined intervals, holes are drilled using a drilling tool such as a hand auger or a drill (FIG. 1A).
In this case, the diameter D and the excavation length L of the excavation hole 2 are designed in accordance with the reinforcement strength, the properties of the ground, and the like to be obtained by the ground reinforcement method. Is set to about φ80 to φ100 mm, and the excavation length L is set to about 3 to 5 m.
[0021]
Into the drilling hole 2 formed in this way, a bag-like material 3 having a closed end portion having substantially the same length as the drilling length L of the drilling hole 2 is inserted. The filling material 5 is injected under pressure (FIG. 1 (b-1)). A mouthpiece 30a for connecting the fitting 30b of the injection hose for the self-hardening filler 5 can be attached to the mouth of the bag-shaped material 3 as necessary. Can be smoothly injected.
Then, by injecting the self-hardening filler material 5 into the bag-shaped material 3 under pressure, the bag-shaped material 3 into which the self-hardening filler material 5 is injected is made larger than at least the diameter D of the excavation hole 2 over the entire length thereof. The diameter is increased (FIG. 1 (b-2)).
[0022]
In this case, if necessary, the reinforcing member 6 such as a reinforcing bar is inserted into the bag-like material 3 in a state where the reinforcing member 6 is supported by the spacer 61 so that the reinforcing member 6 is located substantially at the center of the excavation hole 2. Can be.
In the present embodiment, as the reinforcing material 6, a deformed steel bar (for example, D19, D22, etc.) having good adhesion of the self-hardening filler 5 is used. Any cross-sectional shape such as steel or H-shaped steel can be used. Further, besides those made of steel, those made of FRP can be used.
This makes it possible to reinforce the self-hardening filler, reinforce the surrounding ground with the reinforcing material, and further enhance the stability of the entire ground.
[0023]
By the way, the bag-like material 3 used in the present embodiment is made of a synthetic fiber woven fabric and has a narrowed mouth and a tip as shown in FIG. 2A (warp yarn 31: nylon 1400T / 4 × 320 yarns, weft yarn 32: polyester 1100T / 4, 8 yarns / cm (density of large diameter portion (φ180 mm)), 4.5 yarns / cm (density of small diameter portion (φ80 mm)), FIG. ), Those having irregularities (those having different diameters in the longitudinal direction (large-diameter portion φ130 mm, small-diameter portion φ80 mm)) can be suitably used.
As described above, by using the bag-shaped material 3 whose mouth portion is narrowed down, the pressure injection of the self-hardening filler into the bag-shaped material 3 can be performed smoothly, and The diameter expansion can be performed uniformly over the entire length of the bag-like material 3, and the adhesive force at the interface between the ground 1 and the solidified self-hardening filler material 5 and the ground shearing force can be improved. The use of the material 3 having an uneven shape can improve the adhesive force at the interface between the ground 1 and the solidified self-hardening filler 5.
[0024]
Further, the bag-shaped material 3 used in the present embodiment has a drainage material 4 disposed on its surface over the entire length thereof, and an end of the drainage material 4 is led out of the drilling hole 1. So that the bag-like material 3 is installed.
Thereby, even when a large pressure is applied from the ground 1, as shown in FIGS. 1 (c-1) and (c-2), the excess water generated when the cement-based self-hardening Leachate can be discharged smoothly to the outside of the borehole 2 through the drainage material 4.
[0025]
As shown in FIG. 1 (d), excess water or leaching is applied to the mouth (the mouthpiece 30 a) of the bag-like material 3 installed so that the end of the drainage material 4 is led out of the excavation hole 1. The cap 7 is arranged so as not to hinder the discharge of water.
[0026]
As shown in FIG. 3, the drainage material 4 disposed on the surface of the bag 3 used in the present embodiment includes a synthetic resin net (high-density polyethylene net, net wire diameter φ1 mm, mesh size 6). A laminate having a grid material 41 made of (× 6 mm) inside and a sheet material 42 made of synthetic fiber cloth (woven or non-woven fabric made of polyester long fiber) laminated outside can be used.
Further, as shown in FIG. 3A, the drainage member 4 is configured such that a sheet-like laminate composed of a grid member 41 and a sheet member 42 is disposed on the surface of the bag-like material 3, or as shown in FIG. As shown in ()), the sheet-like grid member 41 can be inserted into a tubular sheet member 42 and disposed so as to cover the surface of the bag-like material 3.
[0027]
More specifically, as shown in FIG. 4A, the bag-shaped material 3 and the drainage material 4 are inserted into the bag-shaped material 3 with the reinforcing material 6 inserted into the bag-shaped material 3. A tape 8 such as a vinyl tape that can be stretched or broken so that the bag 3 can be expanded in diameter when the self-hardening filler 5 is injected under pressure (hereinafter, simply referred to as “vinyl tape 8”). Then, the bag-shaped material 3 is arranged so as to cover the surface of the bag-shaped material 3 with a sheet-shaped grid material 41 inserted into a cylindrical sheet material 42 (FIG. 3B). A cylindrical integral structure is formed, and the integral structure is inserted into the excavation hole 2 or, as shown in FIG. Material 41, and the outer periphery thereof is wound with a belt-shaped sheet material 42. To form a cylindrical integral structure, and insert the integral structure into the excavation hole 2 or, as shown in FIG. A sheet-like laminate (FIG. 3 (c)) (three sheet-like pieces in this example) composed of a grid material 41 and a sheet material 42 is provided, and the outer periphery thereof is wound with a vinyl tape 8. A cylindrical integrated structure is formed, and the integrated structure is inserted into the drilling hole 2. Further, as shown in FIG. A sheet-like (band-like) laminate (FIG. 3 (c)) (in this example, two belt-like bodies) composed of the material 41 and the sheet material 42 is wound in a cross-like shape and arranged, thereby providing a cylindrical shape. It is possible to form an integrated structure, and insert this integrated structure into the drill hole 2.
Here, as shown in FIG. 4 (d), the self-hardening filler 5 is injected into the bag 3 by pressure by winding the sheet-like (strip-like) laminate in a cross-like manner. When the bag-shaped material 3 expands into an uneven shape by this, it collects in the concave portion of the bag-shaped material 3 and removes excess water or leaching water from the ground side generated when the cement-based self-hardening filler material that easily stays solidifies. It can be quickly and smoothly discharged out of the excavation hole 1 through the drainage material 4.
[0028]
By the way, in the above-described embodiment, the bag-shaped material 3 and the drainage material 4 are formed as separate members, but the bag-shaped material and the drainage material may be integrally formed.
Specifically, as shown in FIG. 5, a ground structure is formed by using multifilaments for the warp yarns 31 and the weft yarns 32, and the warp yarns 41 a formed of monofilaments (about φ1 mm) functioning as drainage materials are woven. The bag-like material 3A having a heavy tissue and the bag-like material 3B made of a synthetic fiber fabric as shown in FIGS. 2A and 2B are used in an overlapping manner.
In this case, the reinforcing material 6 is inserted into the double-structured bag-shaped material 3A, the bag-shaped material 3B made of a synthetic fiber woven fabric is superposed on the outer periphery thereof, and the bag-shaped material 3B is wound with a vinyl tape 8 and stopped. The integrated structure is formed into a shape, and the integrated structure is inserted into the drill hole 2.
In addition, a sheet material made of a synthetic fiber cloth (a woven or non-woven cloth made of polyester long fiber) may be further disposed on the surface of the surface of the bag-like material 3B and wound with a vinyl tape 8 to stop.
In this way, by forming the bag-like material and the drainage material integrally, it is possible to prevent the bag-like material and the drainage material from being separated from each other and to form a gap. The surplus water and the seepage water generated from the ground side can be quickly and smoothly discharged out of the excavation hole 1.
[0029]
As described above, this ground-reinforcement soil method uses a bag-like material 3 (see FIG. 1) in which a tip having a length substantially equal to the excavation length L of the excavation hole 2 is closed in the excavation hole 2 formed by drilling the ground 1. 3A, 3B), and injects the self-hardening filler 5 into the bag-like material 3 and injects the self-hardening filler 5 by pressure injection of the self-hardening filler 4 in the ground reinforcement method. The expanded bag-shaped material 3 is expanded at least larger than the diameter D of the excavation hole 2 over the entire length thereof, so that the self-hardening filler material 5 is dissipated into the ground 1 or the solidified self-hardening filler material. 5 can be prevented from occurring, and the surrounding ground 1 can be compacted and the drainage from the ground 1 can be promoted by expanding the diameter of the bag-like material 3 into which the self-hardening filler 5 has been injected.
A drain 4 (41a) is provided on the surface of the bag 3 (3A) over the entire length thereof, and the end of the drain 4 is led out of the drill hole 2. 3, the excess water generated when the cement-based self-hardening filler is solidified and the leachate from the ground 1 are removed through the self-hardening filler 5 and the drainage material 4 which is in close contact with the ground 1. 2 can be discharged outside.
[0030]
As described above, the ground reinforcing soil method and the ground reinforcing soil member used in the present invention have been described based on the embodiments. However, the present invention includes the configurations (materials of constituent members and numerical values) described in the above embodiments. The configuration is not limited to the above, and the configuration can be appropriately changed without departing from the gist of the invention.
[0031]
The name of the present invention, “the ground reinforcement soil method and the ground reinforcement soil member used therefor” is merely used to clarify its main use. In addition, the present invention can be applied to a similar construction method such as an earth anchor construction method using an earth anchor 9 as shown in FIG. 6, but this is not excluded.
[0032]
【The invention's effect】
The ground reinforcement method according to the present invention includes the steps of: inserting a bag-like object having a tip end substantially the same length as the excavation length of the hole into a drilling hole formed by drilling the ground; In the ground reinforcement method of injecting a self-hardening filler into the ground, the self-hardening filler is injected under pressure so that the bag-like material into which the self-hardening filler has been injected is at least cut into the diameter of the excavation hole over its entire length. The diameter of the self-hardening filler is prevented from dissipating into the ground and cracking of the solidified self-hardening filler is prevented. Depending on the diameter, the surrounding ground can be compacted, and further, drainage from the ground can be promoted.
Then, a drainage material is disposed on the surface of the bag-like material over the entire length thereof, and the bag-like material is placed so that the end of the drainage material is led out of the drilling hole, whereby the cement-based self-adhesive material is drained. Excess water and leaching water from the ground side generated when the hard filler is solidified can be discharged to the outside of the excavation hole through the self-hardening filler and a drainage material in close contact with the ground.
By these means, surplus water and leachate are discharged in a short time to speed up the development of the strength of the self-hardening filler, and the adhesive force at the interface between the self-hardening filler solidified through the bag-like material and the ground, The shear strength of the ground can be improved, the desired reinforcement strength can be obtained without being affected by the properties of the ground, surplus water, etc., the ground can be reinforced in a short construction period, and the stability of the whole ground Can be reliably increased.
In addition, it is possible to prevent excess water (cement alkaline water) generated when the cement-based self-hardening filler solidifies from penetrating into the ground, and to maintain the surrounding environment.
[0033]
Further, by inserting a reinforcing material into the bag-like material, the self-hardening filler is reinforced, and the surrounding ground is reinforced by the reinforcing material, so that the stability of the entire ground can be further enhanced.
[0034]
In addition, by using a bag-shaped material that is squeezed at least at the mouth, pressure injection of the self-hardening filler into the bag-shaped material can be performed smoothly, and the diameter of the bag-shaped material can be increased. It can be performed uniformly over the entire length of the bag-like material, and the adhesive force at the interface between the ground and the solidified self-hardening filler and the shearing force of the ground can be further improved.
[0035]
Further, by using a bag-shaped material having an uneven shape, the adhesive force at the interface between the ground and the solidified self-hardening filler can be further improved.
[0036]
In addition, even when a large pressure is applied from the ground, by using a laminate in which a grid material made of a synthetic resin net is placed on the inside and a sheet material made of a synthetic fiber cloth is placed on the outside, the drainage material is used. Excess water and leaching water from the ground side generated when the cement-based self-hardening filler solidifies can be smoothly discharged to the outside of the borehole through the drainage material.
[0037]
Further, according to the ground reinforcing soil member of the present invention, since the ground reinforcing soil member is provided with a drainage material over the entire length of the surface of the bag-like material, the drainage material is provided on the surface. The ground reinforcement method of the present invention can be carried out simply and smoothly simply by inserting the bag-like material provided with the hole into the excavation hole formed by piercing the drainage material ground.
[Brief description of the drawings]
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 shows an embodiment of a construction step of a ground reinforcement method according to the present invention, wherein (a) is a perforation step, (b-1) is a step of inserting a bag-like material and injecting a self-hardening filler under pressure. , (B-2) is an enlarged view of the bag-like material, and (c-1) and (c-2) are enlarged views of the portion A of (b-2) when the cement-based self-hardening filler solidifies. FIG. 7 is an explanatory diagram showing a state in which surplus water generated from the ground and seepage water from the ground side are discharged to the outside of the excavation hole through a drainage material, and FIG.
FIG. 2 is an explanatory view of a bag.
FIG. 3 is an explanatory diagram of a drainage material.
FIG. 4 is an explanatory view showing a combination of a bag and a drainage material.
5A and 5B show a case where a bag-like material and a drainage material are integrally formed, (a) is an installed state, (b) is a mouth portion of the bag-like material, and (c) is a cross-sectional view taken along line AA of (a). (D) is an explanatory view showing an assembling process.
FIG. 6 is an explanatory view of an earth anchor method.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Ground 2 Drilling hole 3 Bag-shaped material 3A Bag-shaped material 3B Bag-shaped material 4 Drainage material 41 Grid material 41a Warp yarn made of monofilament 42 Sheet material 5 Self-hardening filler 6 Reinforcement 7 Cap 8 Vinyl tape

Claims (6)

地盤を穿孔して形成した掘削孔に、該掘削孔の掘削長と略同じ長さの先端部が閉塞した袋状物を挿入し、該袋状物内に自硬性充填材を注入する地山補強土工法において、前記自硬性充填材を加圧注入することにより、自硬性充填材を注入した袋状物を、その全長に亘って少なくとも掘削孔の径よりも大きく拡径させるとともに、袋状物の表面に、その全長に亘って、排水材を配設し、該排水材の端部が掘削孔外に導出されるように袋状物を設置することを特徴とする地山補強土工法。A ground material in which a bag-like material having a tip portion substantially the same length as the drilling length of the drilling hole is inserted into a drilling hole formed by drilling the ground, and a self-hardening filler is injected into the bag-like material. In the reinforced earth method, by injecting the self-hardening filler under pressure, the bag-like material into which the self-hardening filler is injected is expanded over its entire length at least larger than the diameter of the excavation hole. Drainage material is disposed on the surface of the object over the entire length thereof, and a bag-like material is installed so that an end of the drainage material is led out of the excavation hole. . 袋状物内に補強材を挿入することを特徴とする請求項1記載の地山補強土工法。The method according to claim 1, wherein a reinforcing material is inserted into the bag-like material. 袋状物が、少なくとも口元部で絞り込まれていることを特徴とする請求項1又は2記載の地山補強土工法。3. The method of reinforcing soil in the ground according to claim 1, wherein the bag-like material is narrowed down at least at a mouth portion. 袋状物が、凹凸形状を有することを特徴とする請求項1、2又は3記載の地山補強土工法。4. The method of reinforced earth construction according to claim 1, wherein the bag-like material has an uneven shape. 排水材が、合成樹脂製ネットからなるグリッド材を内側に、合成繊維製布からなるシート材を外側になるように積層した積層体からなることを特徴とする請求項1、2、3又は4記載の地山補強土工法。5. The drainage material is a laminate in which a grid material made of a synthetic resin net is laminated on the inside and a sheet material made of synthetic fiber cloth is laminated on the outside. The ground reinforcement method described. 地盤を穿孔して形成した掘削孔に挿入し、セメント系自硬性充填材が注入される、先端部が閉塞した繊維製の袋状物からなる地山補強部材において、袋状物の表面に、その全長に亘って、排水材を配設してなることを特徴とする地山補強土部材。Insert the ground into the excavation hole formed by drilling, cement-based self-hardening filler is injected, in the ground reinforcement member consisting of a fiber bag-like material with a closed end, on the surface of the bag-like material, A soil reinforcement material comprising a drainage material disposed over the entire length thereof.
JP2002374073A 2002-12-25 2002-12-25 Natural ground reinforced earth method and natural ground reinforced earth member used therefor Expired - Fee Related JP3954964B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002374073A JP3954964B2 (en) 2002-12-25 2002-12-25 Natural ground reinforced earth method and natural ground reinforced earth member used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002374073A JP3954964B2 (en) 2002-12-25 2002-12-25 Natural ground reinforced earth method and natural ground reinforced earth member used therefor

Publications (3)

Publication Number Publication Date
JP2004204522A true JP2004204522A (en) 2004-07-22
JP2004204522A5 JP2004204522A5 (en) 2006-01-26
JP3954964B2 JP3954964B2 (en) 2007-08-08

Family

ID=32812200

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002374073A Expired - Fee Related JP3954964B2 (en) 2002-12-25 2002-12-25 Natural ground reinforced earth method and natural ground reinforced earth member used therefor

Country Status (1)

Country Link
JP (1) JP3954964B2 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100823980B1 (en) 2007-01-31 2008-04-22 주식회사 동명건설엔지니어링 Drain combination paker type pressurization grouting equipment and the upward method using the same
JP2009235832A (en) * 2008-03-28 2009-10-15 Toru Imada Reinforcing method and structure for natural ground
KR101064340B1 (en) 2009-10-26 2011-09-14 심정훈 Prevention method of construction for slope land collapse
JP2011179272A (en) * 2010-03-03 2011-09-15 Railway Technical Research Institute Method of stabilizing slope by drainage body using filler
JP2011179271A (en) * 2010-03-03 2011-09-15 Railway Technical Research Institute Method of stabilizing slope using drainage material
JP2012046892A (en) * 2010-08-24 2012-03-08 Kajima Corp Drain pipe, installation method of drain pipe and drain method
KR101138023B1 (en) * 2009-12-31 2012-04-20 주식회사 서영엔지니어링 System for ground stabilization of reinforcement and drainage of fully compressed
JP2012184650A (en) * 2012-05-30 2012-09-27 Ohbayashi Corp Foundation reinforcement structure and construction method of foundation reinforcement structure
CN104727319A (en) * 2015-04-07 2015-06-24 兰州理工大学 Slope self-drainage anchor rod and construction method
CN106522193A (en) * 2016-12-01 2017-03-22 浙江海洋大学 Soft soil foundation treatment device and construction method thereof
WO2018096333A1 (en) * 2016-11-22 2018-05-31 Concrete Canvas Technology Ltd. Flexible composite
JP2021021264A (en) * 2019-07-29 2021-02-18 岡部株式会社 Packer for rock bolt and ground reinforcement structure using packer for rock bolt
JP7093939B1 (en) 2021-12-22 2022-07-01 株式会社カテックス Packer and ground reinforcement method using it

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101669872B1 (en) * 2014-12-05 2016-10-28 (주) 효창이엔지 A method for reinforcing flimsy ground using pack anchor for decreasing excess pore water pressure of flimsy ground

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100823980B1 (en) 2007-01-31 2008-04-22 주식회사 동명건설엔지니어링 Drain combination paker type pressurization grouting equipment and the upward method using the same
JP2009235832A (en) * 2008-03-28 2009-10-15 Toru Imada Reinforcing method and structure for natural ground
KR101064340B1 (en) 2009-10-26 2011-09-14 심정훈 Prevention method of construction for slope land collapse
KR101138023B1 (en) * 2009-12-31 2012-04-20 주식회사 서영엔지니어링 System for ground stabilization of reinforcement and drainage of fully compressed
JP2011179272A (en) * 2010-03-03 2011-09-15 Railway Technical Research Institute Method of stabilizing slope by drainage body using filler
JP2011179271A (en) * 2010-03-03 2011-09-15 Railway Technical Research Institute Method of stabilizing slope using drainage material
JP2012046892A (en) * 2010-08-24 2012-03-08 Kajima Corp Drain pipe, installation method of drain pipe and drain method
JP2012184650A (en) * 2012-05-30 2012-09-27 Ohbayashi Corp Foundation reinforcement structure and construction method of foundation reinforcement structure
CN104727319A (en) * 2015-04-07 2015-06-24 兰州理工大学 Slope self-drainage anchor rod and construction method
CN104727319B (en) * 2015-04-07 2016-05-11 兰州理工大学 A kind of side slope is from drainage anchor rod and construction method
WO2018096333A1 (en) * 2016-11-22 2018-05-31 Concrete Canvas Technology Ltd. Flexible composite
JP2020500114A (en) * 2016-11-22 2020-01-09 コンクリート キャンバス テクノロジー リミテッドConcrete Canvas Technology Ltd. Flexible composite material
JP7300176B2 (en) 2016-11-22 2023-06-29 コンクリート キャンバス テクノロジー リミテッド flexible composite
CN106522193A (en) * 2016-12-01 2017-03-22 浙江海洋大学 Soft soil foundation treatment device and construction method thereof
JP2021021264A (en) * 2019-07-29 2021-02-18 岡部株式会社 Packer for rock bolt and ground reinforcement structure using packer for rock bolt
JP7249231B2 (en) 2019-07-29 2023-03-30 岡部株式会社 Ground reinforcement structure using packer for rock bolts and packer for rock bolts
JP7093939B1 (en) 2021-12-22 2022-07-01 株式会社カテックス Packer and ground reinforcement method using it
JP2023093042A (en) * 2021-12-22 2023-07-04 株式会社カテックス Packer and ground reinforcement method using it

Also Published As

Publication number Publication date
JP3954964B2 (en) 2007-08-08

Similar Documents

Publication Publication Date Title
JP2004204522A (en) Natural-ground reinforced earth method and natural-ground reinforced earth member used for it
JP4296660B2 (en) Slope stabilization method
KR100978006B1 (en) Soil nailing method
JP4803472B1 (en) Ground stabilization method
KR20070114961A (en) Pressurized grouting packer with waterproof function
JP4696556B2 (en) Natural ground reinforcement earth construction method and natural ground reinforcement soil structure
JP6370645B2 (en) Slope stabilization method for seismic and rainproof measures of earth structures by using pressure injection type rod-shaped reinforcements
KR100633418B1 (en) Bamboo pole for drainage, reinforcing method for soft ground, and horizontal drainage method
KR100616359B1 (en) Support-pipe using method of soil nailing
JP2002309582A (en) Protective structure for face of slope, wall face, waterside face or the like
JP2010150821A (en) Method for reinforcing retaining wall
JP4961538B2 (en) Ground stabilization method
JP4208057B2 (en) Construction method of cast-in-place piles
JP4686064B2 (en) Cast-in-place pile method and its structure
JP2007262811A (en) Pile structure and pile member driving method
JP2004197350A (en) Construction method and structure for draining water from inside ground
JP4024064B2 (en) Revetment structure and revetment method
JP4364063B2 (en) Construction method of earth retaining bag and retaining wall
JP2004332295A (en) Freezing method of starting/arrival part of jacking pipe and segment for freezing work
JPH02304119A (en) Stabilizing construction method for slope
NL1016436C2 (en) Method for producing concrete pile in ground involves use of boring unit to create tubular opening in ground and after its withdrawal volume of opening is filled with concrete
JP3608120B2 (en) How to improve soft ground
JP3468749B2 (en) Construction method of parent pile horizontal sheet pile
JPH04194226A (en) Drain pipe for reinforcing slope
JP3373429B2 (en) Ground improvement method

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051206

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051206

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070213

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070424

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070427

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110511

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110511

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120511

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120511

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130511

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140511

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees