Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002295140A
Other languages
Japanese (ja)
Other versions
JP4291992B2 (en
Inventor
Eisaku Nanba
難 波 栄 作
Futoshi Kurokawa
黒 川   太
Tatsuo Ashiki
芦 木 達 雄
Katsutoshi Hisayoshi
久 芳 勝 利
Yoshihiro Motokura
本 蔵 義 弘
Yukihiko Tomizawa
冨 沢 幸 彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2002295140A priority Critical patent/JP4291992B2/en
Publication of JP2004131957A publication Critical patent/JP2004131957A/en
Application granted granted Critical
Publication of JP4291992B2 publication Critical patent/JP4291992B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a pressure predicting model construction system capable of accurately providing pressure distribution in water distribution pipes laid down in a water distribution block. <P>SOLUTION: This pressure predicting model construction system 4 comprises on-line measurement means 10a and 10b sending on-line data at an on-line measurement point 15 to later stages, an off-line measurement data storage means 22 storing off-line data measured at an off-line measurement point 16 beforehand and sending the data to the later stages, and a clustering means 23 classifying the on-line data and the off-line data into clusters. Also, the pressure predicting model construction system 4 comprises a first pressure predicting model construction means 24 on the off-line data in the same clusters as those of the on-line data and a main component calculation means 25 and a second pressure predicting model construction system 26 on the off-line data in the clusters different from those of the on-line data. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、配水ブロックに張り巡らされた配水管内の圧力の分布に関する推定モデルを構築する圧力推定モデル構築システムに関する。
【0002】
【従来の技術】
飲料水等の水を一般家庭等の需要家へ配水するための配水管網が、都市基盤の一つとして重要な役割を担っている。需要家への安定した水供給を実現するために、配水管網を管理する際、配水管内を常に適切な圧力に保持することが要求されている。
【0003】
一方、配水管内の圧力状態を把握することにより、(1)配水池等の水供給点から配水管内へ適切な水圧で水供給が行われているか、(2)水圧が不足している地域はないか、或いは(3)水圧が過剰となっている地域はないか、等の情報を得ることができるようになる。このため、配水管内を適切な圧力に保持するためには、配水管内の圧力状態を的確に把握することが非常に有効である。
【0004】
配水管内の圧力状態を把握するために様々な手法が考えられており、例えば図7に示されるような管網解析手法が従来より広く用いられている。
【0005】
配水管網は、図7に示すように、配水ブロック1の全域に設置された消火栓等の需要ポイント45への配水が可能となるように張り巡らされており、配水池等の水が配水注入部3を介して供給されるようになっている。そして、圧力計測器10aや流量計測器10bが配水管2の所定箇所に設置されており、この圧力計測器10aや流量計測器10bによって、配水管2内の圧力や水流量についてのデータが時々刻々と計測されるようになっている。計測された圧力データや流量データは、オンラインで各計測器10a、10bからオンラインデータDB(オンラインデータデータベース)21に送られて、オンラインデータとして計測日時とともに記憶されるようになっている。
【0006】
一方、オペレータ等が、特定の日時の配水管2内の圧力状態を知りたい場合には、この特定日時を日時設定手段50に入力する。入力された日時は、日時設定手段50からデータ取得手段51へと送られる。データ取得手段51は、日時設定手段50から送られてきた特定日時に対して計測日時が対応するオンラインデータをオンラインデータDB21から取得し、このオンラインデータを、データ表示手段52に送るとともに解析手段53に送るようになっている。
【0007】
データ表示手段52は、送られてきたオンラインデータを表示して、オペレータ等に当該オンラインデータを提示するようになっている。
【0008】
解析手段53は、管網解析技術によって、データ取得手段51から送られてくるオンラインデータと、別途設けられた物理情報DB(物理情報データベース)54から送られてくる物理情報と、に基づいて、配水管網の各箇所における圧力等を解析するようになっている。
【0009】
なお、物理情報DB54に格納されている物理情報は、配水管網の各箇所の配水管2の口径や管路長等の土木情報であって、解析手段53が配水管網の各箇所における圧力を解析する際に有用な情報を含んでいる。
【0010】
解析手段53で解析された配水管網の各箇所における圧力等は、解析結果表示手段55でオペレータ等に提示されるようになっている。
【0011】
そして、オペレータは、解析結果表示手段55で提示された情報を考慮して、配水管2内の圧力を管理しており、例えば、水圧不足や水圧過剰の地域を生じさせることなく、配水ブロック1の各需要ポイント45へ適切に配水されているか否か、等の管理を行うようになっている。
【0012】
【発明が解決しようとする課題】
上述のような管網解析手法によって配水管網の各箇所における圧力等を解析して、配水管2内の圧力状態を把握することが従来より行われている。
【0013】
しかしながら、上述のような管網解析手法では、配水管網の所定箇所に設置されている圧力計測器10aや流量計測器10bの計測値にのみ基づいて、配水管網の各箇所における圧力等を解析している。このため、配水ブロック1が広かったり、配水管網が複雑に形成されているような場合であって、適切な数の圧力計測器10aや流量計測器10bが適切に配置されていない場合には、精度良く、信頼性の高い解析を行うことが難しい。
【0014】
また、配水管網の各箇所における圧力等の解析結果は、物理情報DB54に格納されている物理情報によって大きく左右されるため、適切な物理情報を用いることが必要とされる。当該物理情報は、配水管網の大きさや構成に応じて決定されるが、物理情報を決定するために必要とされる配水管網の土木構造の把握、土木構造のデータ化、各需要ポイント45に対する需要量の割付、等の作業には多大な労力が必要とされ、多くの解析時間が必要とされる。また、配水管網の各箇所における圧力等の解析を精度良く行うためには、各需要ポイント45に対する需要量の割付、等の作業を正確に行う必要がある。しかしながら、このような作業を正確に行うことは非常に難しい。
【0015】
本発明はこのような点を考慮してなされたものであり、配水ブロックに張り巡らされた配水管内の圧力分布を精度良く求めることができる圧力推定モデル構築システムを提供することを目的とする。
【0016】
【課題を解決するための手段】
本発明は、配水ブロックに張り巡らされた配水管内の圧力分布に関する推定モデルを構築する圧力推定モデル構築システムであって、配水管のうち1以上の箇所に設けられたオンライン計測ポイントにおける配水管内の圧力および水流量のうち少なくともいずれか一方をオンラインデータとして計測し、当該オンラインデータをオンラインで後段に送る機能を有するオンライン計測手段と、配水管のうちオンライン計測ポイントとは異なる1以上の箇所に設けられたオフライン計測ポイントにおいて予め計測された配水管内の圧力をオフラインデータとして記憶し、当該オフラインデータを後段に送る機能を有するオフライン計測データ記憶手段と、オンライン計測手段及びオフライン計測データ記憶手段の後段に設けられ、オンライン計測手段から送られてくるオンラインデータと、オフライン計測データ記憶手段から送られてくるオフラインデータと、をクラスター分析によって各クラスターに分類する機能を有するクラスタリング手段と、クラスタリング手段の後段に設けられ、各オンラインデータと同一クラスターに分類される各オフラインデータについて、同一クラスターに分類される各オンラインデータに基づき、当該各オフラインデータに対応するオフライン計測ポイントにおける配水管内の圧力モデルである第1圧力推定モデルを構築する第1圧力推定モデル構築手段と、クラスタリング手段の後段に設けられ、各オンラインデータと異なるクラスターに分類される各オフラインデータについて、主成分分析を行って、当該各オフラインデータに対応する推定モデル入力値を演算する機能を有する主成分演算手段と、主成分演算手段の後段に設けられ、各オンラインデータと異なるクラスターに分類される各オフラインデータについて、当該各オフライン計測データに対応する推定モデル入力値に基づき、当該各オフラインに対応するオフライン計測ポイントにおける配水管内の圧力モデルである第2圧力推定モデルを構築する第2圧力推定モデル構築手段と、第1圧力推定モデル構築手段及び第2圧力推定モデル構築手段に接続され、第1圧力推定モデル構築手段によって構築される第1圧力推定モデルと、第2圧力推定モデル構築手段によって構築される第2圧力推定モデルと、から構成される圧力推定モデルを記憶する圧力推定モデル記憶手段と、を備えたことを特徴とする圧力推定モデル構築システムである。
【0017】
本発明の圧力推定モデル構築システムによれば、オンライン計測ポイントからオンラインで送られてくるオンラインデータに基づいて、オフライン計測ポイントにおける配水管内の圧力に関する圧力推定モデルが構築される。
【0018】
【発明の実施の形態】
以下、図面を参照して本発明の実施の形態について説明する。
【0019】
第1の実施の形態
図1及び図2は、本発明の第1の実施の形態を示す図である。図1は、圧力推定モデル構築システム全体の構成を示す概略図である。図2は、クラスター分析によって各クラスターに分類されたオンラインデータ及び各オフラインデータを示す。
【0020】
図1に示すように、配水ブロック1における消火栓等の複数の需要ポイント45に水を供給するために、配水管2が配水ブロック1の全域に渡って張り巡らされている。これにより、配水池等から送られてくる水は、配水注入部3を介して配水ブロック1内の配水管2に供給され、各需要ポイント45へ送られるようになっている。
【0021】
このような配水管2の各箇所における圧力推定モデルを構築するための圧力推定モデル構築システム4は、圧力計測器10a及び流量計測器10b(オンライン計測手段)と、当該圧力計測器10aおよび流量計測器10bに接続された圧力推定装置11と、を備えている。
【0022】
圧力計測器10a及び流量計測器10bは、配水管2のうち1以上の箇所(本実施の形態では3箇所)に設けられたオンライン計測ポイント15における配水管2内の圧力、水流量をオンラインデータとして計測する機能を有している。そして、圧力計測器10a及び流量計測器10bは、このようにして計測されたオンラインデータをオンラインで後段に送る機能を有している。
【0023】
圧力推定装置11は、圧力計測器10aおよび流量計測器10bに接続されたオンライン計測データDB21(オンライン計測データ記憶手段)と、オフライン計測データDB22(オフライン計測データ記憶手段)と、圧力計測器10a及び流量計測器10bとオフライン計測データDB22との後段に設けられたクラスタリング手段23と、クラスタリング手段23の後段に設けられた第1圧力推定モデル構築手段24と、クラスタリング手段23の後段に設けられた主成分演算手段25と、主成分演算手段25の後段に設けられた第2圧力推定モデル構築手段26と、第1圧力推定モデル構築手段24及び第2圧力推定モデル構築手段26に接続された推定モデルDB27(圧力推定モデル記憶手段)と、圧力計測器10a及び流量計測器10bとクラスタリング手段23との間に設けられたオンライン計測データDB21(オンライン計測データ記憶手段)と、オンライン計測データDB21及びオフライン計測データDB22とクラスタリング手段23との間に設けられたデータ取得手段29と、データ取得手段29とクラスタリング手段23との間に設けられた統計値演算手段30と、統計値演算手段30とクラスタリング手段23との間に設けられた正規化手段31と、推定モデルDB27に接続されたモデル表示手段32と、を備えている。
【0024】
オフライン計測データDB22は、配水管2のうちオンライン計測ポイント15とは異なる1以上の箇所(本実施の形態では3箇所)に設けられたオフライン計測ポイント16において、オフラインデータ計測手段33によって予め計測された配水管2内の圧力を、オフラインデータとして記憶するようになっている。すなわち、オフライン計測データDB22は、消火栓等のオフライン計測ポイント16において予め計測された配水管2内の圧力を、オフラインデータとしてその計測日時と併せて記憶するようになっている。
【0025】
なお、オフラインデータ計測手段33として、例えばハンディータイプの圧力計器等が用いられうる。そして、当該圧力計器等によって、オフライン計測ポイント16において、予め、数日間、計測された配水管2内の圧力が、オフラインデータとしてオフライン計測データDB22に記憶される。そして、オフライン計測データDB22は、記憶されているオフラインデータを、後段に設けられたデータ取得手段29に送ることができるようになっている。なお、オフライン計測データDB22は、オフライン計測ポイント16のうちの全部或いは一部におけるオフラインデータを、記憶すると共に後段に送ることができるようになっている。
【0026】
オンライン計測データDB21は、圧力計測器10a及び流量計測器10b(オンライン計測手段)による計測値を、その計測日時とともに記憶するようになっている。
【0027】
なお、オンライン計測データDB21に記憶されるオンラインデータの計測日時と、オフライン計測データDB22に記憶されるオフラインデータの計測日時と、は、相互に対応している。
【0028】
データ取得手段29は、オンライン計測データDB21に記憶されているオンラインデータを取得すると共に、オンライン計測データDB21から取得したオンラインデータの計測時刻に対応するオフラインデータをオフライン計測データDB22から取得する機能を有している。そして、データ取得手段29は、取得したオンラインデータ及びオフラインデータを後段に送る機能を有している。
【0029】
統計値演算手段30は、送られてくるオンラインデータ及びオフラインデータを統計化する機能を有している。
【0030】
本実施の形態ではこれらのオンラインデータ及びオフラインデータの「統計化」は、合計値、最小値、最大値、範囲、標準偏差、分散、平均値、中央値、変動係数、歪度、尖度、といった統計化項目が基本とされる。ただし、統計値演算手段30は、他の統計化項目に基づいて、オンラインデータ及びオフラインデータを「統計化」することも可能である。
【0031】
そして、統計値演算手段30は、統計化されたオンラインデータ及びオフラインデータを後段に送る機能を有している。統計値演算手段30から送られくるオンラインデータ及びオフラインデータは、統計値DB28に記憶された後に、正規化手段31へ送られる。
【0032】
正規化手段31は、送られてくるオンラインデータ及びオフラインデータを正規化して後段に送る機能を有している。このため、本実施の形態では、正規化手段31によって正規化されたオンラインデータ及びオフラインデータは、正規化手段31の後段に設けられたクラスタリング手段23に送られるようになっている。
【0033】
本実施の形態における正規化手段31は、統計値DB28に記憶されているオンラインデータ及びオフラインデータを用いて正規化するようになっており、統計値DB28に記憶されている「平均値」および「標準偏差」に基づき、以下の式(1a)(1b)によって、オンラインデータ及びオフラインデータを、平均=0.0、分散=1.0となるように変換して「正規化」するようになっている。
【0034】
【数1】

Figure 2004131957
すなわち、データ取得手段29で取得したオンラインデータおよびオフラインデータの各データ項目のそれぞれが、式(1a)(1b)によって変換されるようになっている。例えば図1 に示すように、オンラインデータとして配水管2内の水流量に関する1 点のデータ、及び、配水管2内の圧力に関する2 点のデータ、が圧力計測器10a及び流量計測器10bによって時々刻々と収集されており、データ取得手段29において、数時間に渡るオンラインデータ(水流量に関するデータが1 点、圧力に関するデータが2 点)を取得した場合について考えてみる。
【0035】
この場合、取得したデータのそれぞれをX1t,X2t,X3t とする(ここでt は時刻を表す)。まず、X1t を式(1a)(1b)のxに代入して標準化データz を得て、次にX2t を式(1a)(1b)のxに代入して標準化データz を得て、最後にX3t を式(1a)(1b)のxにして、標準化データz を得るようになっている。この作業により、オンラインデータ(水流量に関するデータが1 点、圧力に関するデータが2 点)は、平均が0 、標準偏差が1 、に標準化されたオンラインデータ(水流量に関するデータが1 点、圧力に関するデータが2 点)に変換されるようになっている。
【0036】
また、同様にして、オフラインデータは、平均が0 、標準偏差が1 、に標準化されたオフラインデータに変換されるようになっている。なお、このようにして標準化されたオンラインデータ及びオフラインデータを得る際には、統計値演算手段30にて演算した値が、式(1a)(1b)中の基データの平均値と標準偏差として用いられるようになっている。
【0037】
クラスタリング手段23は、オンライン計測データDB21、データ取得手段29、統計値演算手段30、統計値DB28及び正規化手段31を介して、圧力計測器10aおよび流量計測器10bから送られてくるオンラインデータと、データ取得手段29、統計値演算手段30、統計値DB28及び正規化手段31を介して、オフライン計測データDB22から送られてくるオフラインデータと、をクラスター分析によって各クラスターに分類する機能を有している。
【0038】
ここで「クラスター分析」とは、一般には、標本の中から等質なものをグループ化する作業を意味する。当該クラスター分析は、標本がどのようなグループに属するか不明であって、グループ数も分からない状態から始められる。そして、当該クラスター分析の目的は、標本を等質のグループやクラスターに分類することである。
【0039】
本実施の形態のクラスタリング手段23による、オンラインデータおよびオフラインデータについてのクラスター分析は、具体的には以下のようにして行われる。なお、本実施の形態においてクラスター分析の対象は「圧力」に関するデータのみであって、「水流量」に関するデータは対象とはならない。
【0040】
▲1▼ まず、固体間の距離と、クラスター間の距離と、を定義する。ここでいう「固体」とは、オンラインデータ若しくはオフラインデータに含まれる一つの信号のことを指している。そして、この固体間の距離を示す式として、例えば以下の表1に示すような種々の式が提案されており、本実施の形態では、表1に示されている「ユークリッド距離」を用いて固体間の距離を定義する。一方、クラスター間の距離を示す式として、例えば表2に示すような種々の式が提案されており、本実施の形態では、表2に示されているウォード法を用いてクラスター間の距離を定義する。
【0041】
【表1】
Figure 2004131957
【表2】
Figure 2004131957
なお、表1及び表2において、Xa及びXbは、オンラインデータ(圧力)若しくはオフラインデータを表し、d(Xa,Xb)はXaとXbとの距離を表し、dab→cは、あるクラスターABと、オンラインデータ若しくはオフラインデータ若しくはクラスターCと、の距離を表している。
【0042】
▲2▼ 次に、全ての固体間の距離を計算する。
【0043】
▲3▼ 次に、クラスター若しくは固体間の距離が最も近い固体を併合して一つのクラスターとする。
【0044】
▲4▼ 次に、上記の▲3▼で作成したクラスターを新しい固体とみなして、全ての固体間の距離を計算する。
【0045】
▲5▼ そして、上記の▲1▼〜▲4▼を繰り返して、全ての固体が一つのクラスターに含まれたところで終わる。
【0046】
本実施の形態では、上記の▲1▼〜▲5▼に従って、例えば図2に示すようなクラスター分析の結果を得ることができる。図2において、X軸(横軸)は、各オンラインデータ及び各オフラインデータに対応する各オフライン計測ポイント及び各オンライン計測ポイントを示しており、Y軸(縦軸)は、各オンラインデータ及び各オフラインデータに関するクラスター分析における類似度(距離)を示している。また、図2における線は、線が接続されている距離において同一クラスターとして扱うことができるということ表している。
【0047】
第1圧力推定モデル構築手段24は、各オンラインデータと同一クラスターに分類される各オフラインデータについて、同一クラスターに分類される各オンラインデータに基づき、当該各オフラインデータに対応するオフライン計測ポイント16における配水管2内の圧力モデルである第1圧力推定モデルを構築するようになっている。より具体的には、本実施の形態の第1圧力推定モデル構築手段24は、重回帰分析を用いて第1圧力推定モデルを構築するようになっており、各オフラインデータと同一クラスターに分類されるオンラインデータを、重回帰分析の入力値として用いるようになっている。
【0048】
以下、「重回帰分析」について説明する。
【0049】
重回帰分析では、N組の標本に対して、説明変量{xi1,xi2,…xip}と目的変量y(i=1,2,…,N)との間に次のような線形関係が成立すると仮定する。
【0050】
【数2】
Figure 2004131957
なお、β:偏回帰係数、e:残差を意味する。
【0051】
式(2)における各残差eは、「残差eは互いに独立で正規分布N(0,σ)に従う」という条件(残差の条件)を満足すると仮定する。そして、式(2)を行列形式で表現すると以下の式(3)のようになる。
【0052】
y=zβ+e ………………(3)
なお、式(3)中の行列は以下に示すとおりである。
【0053】
【数3】
Figure 2004131957
【数4】
Figure 2004131957
そして、b,b,…,bは、ελの平方和(以下の式(7)参照)が最小となるように決定される。
【0054】
【数5】
Figure 2004131957
式(7)では、未知数はb,b,…bであり、Sはb,b,…,bに関する2次関数であり、関数Sを最小にするb,b,…,bは、Sをb,b,…,bで偏微分し、値を0とおいた連立1次方程式の解として求めることができる。上記を解いて整理すると、以下の式(8)のような連立方程式が得られる。
【0055】
【数6】
Figure 2004131957
ここで、Sjjはxの偏差平方和、Sjkはxとxの偏差積和、Sjyはxとyの偏差積和であって、それぞれ以下の式(9)のように表される。
【0056】
【数7】
Figure 2004131957
従って、以下の式(11)によって偏回帰係数が求められる。
【0057】
b=S−1M ……………(11)
また、定数項は、以下の式(12)によって求められる。
【0058】
【数8】
Figure 2004131957
本実施の形態では、上述の重回帰分析において、説明変量xは、オンラインデータ若しくは主成分分析手段で得られた主成分得点に該当し、目的変量yは、オフラインデータに該当する。ここで、主成分得点とは、各サンプルの主成分の値を示している。
【0059】
そして、上述の重回帰分析を用いて構築された第1圧力推定モデルは、第1圧力推定モデル構築手段24から推定モデルDB27に送られるようになっている。
【0060】
主成分演算手段25は、各オンラインデータと異なるクラスターに分類される各オフラインデータについて、主成分分析を行って、当該各オフラインデータに対応する推定モデル入力値を演算する機能を有している。すなわち、主成分演算手段25は、クラスタリング手段23において各オンラインデータと異なるクラスターに分類される各オフラインデータに対して、最も近接するオンラインデータの属するクラスターについての主成分分析を行って、各オンラインデータと異なるクラスターに分類される各オフラインデータについての推定モデル入力値を演算するようになっている。そして、この演算された推定モデル入力値は、各オンラインデータ及びオフラインデータとともに、主成分演算手段25から第2圧力推定モデル構築手段26に送られるようになっている。
【0061】
ここで「主成分分析(Principal Component Analysis)」とは、一般には、互いに相関のある多種類の特性値をもつ情報を、互いに無相関な小数個の総合特性値に要約する方法である。
【0062】
主成分分析は、一般には、p個の変量x,x,・・・,xの有する情報を、以下の条件(a)、(b)を満足するm個(m≦p)の総合特性値(式(14))z,z,・・・,zに、要約することを意味し、zを第1主成分、zを第2主成分、zを第m主成分と呼ぶ。
【0063】
Figure 2004131957
【数9】
Figure 2004131957
条件(a) zとz(kはlではない;k、l=1,2,・・・、m)との相関はすべてゼロである。
【0064】
条件(b) zの分散(x,x,・・・,x)は、あらゆる1次式のもつ分散のうち最大である。zの分散は、zの分散と無関係なあらゆる1次式の中で最大である。以下同様にして、zの分散はz,z,・・・,zm−1のすべてと無関係な1次式の中で最大である。
【0065】
上述の条件(b)は、「主成分z,z,・・・zは、もとの特性値x,x,・・・,xのもつ情報の損失が最小になるように要約した結果である」ということを意味する。
【0066】
本実施の形態では、上述の主成分分析におけるx〜xは、クラスタリング手段23によってクラスター分析が行われた圧力に関するオンラインデータとオフラインデータとに該当する。
【0067】
例えば、クラスター分析によって図2に図示される結果が得られた場合、まず、オンライン計測ポイント15Aに対応するオンラインデータ(圧力)と、図2においてオンライン計測ポイント15Aの両隣に位置する各計測ポイント16K、16Lに対応するオフラインデータ(圧力)と、をx〜xとする。そして、当該x〜xについての主成分得点を演算して、圧力推定モデルを生成するようになっている。次に、オンライン計測ポイント15Aに対応するオンラインデータ(圧力)と図2においてオンライン計測ポイント15Aの両隣に位置するオフライン計測ポイントに対応するオフラインデータ(圧力)と、その左の圧力をその両隣の圧力をx〜xとして、当該x〜xについての主成分得点を演算して、圧力推定モデルを演算する。このような演算を繰り返すことにより、各オフラインデータに対応する各オフライン計測ポイントにおける圧力推定モデルが順々に演算され、全部のオフライン計測ポイントにおける圧力推定モデルが得られるようになっている。
【0068】
第2圧力推定モデル構築手段26は、各オンラインデータと異なるクラスターに分類される各オフラインデータについて、当該各オフラインデータに対応する推定モデル入力値に基づき、当該各オフラインに対応するオフライン計測ポイント16における配水管2内の圧力モデルである第2圧力推定モデルを構築するようになっている。より具体的には、第2圧力推定モデル構築手段26は、上述した重回帰分析を用いて第2圧力推定モデルを構築するようになっており、主成分演算手段25で演算された対応する推定モデル入力値を、重回帰分析の入力値として用いるようになっている。これにより、配水ブロック1に張り巡らされた配水管2のうち、各オンラインデータと異なるクラスターに分類された各オフラインデータに対応するオフライン計測ポイント16における、配水管2内の圧力モデルである第2の圧力推定モデルが構築される。そして、構築された第2の圧力推定モデルは、第2圧力推定モデル構築手段26から推定モデルDB27へ送られるようになっている。
【0069】
推定モデルDB27は、第1圧力推定モデル構築手段24によって構築されて送られてくる第1圧力推定モデルと、第2圧力推定モデル構築手段26によって構築されて送られてくる第2圧力推定モデルと、から構成される圧力推定モデルを記憶するようになっている。
【0070】
モデル表示手段32は、圧力推定モデル記憶手段に記憶されている圧力推定モデルを表示することができるようになっている。
【0071】
次に、このような構成からなる本実施の形態の作用について説明する。
【0072】
配水ブロック1の配水管2のうちオンライン計測ポイント15では、圧力計測器10aおよび流量計測器10bによって水圧および水流量が計測される。そして、これらの計測値は、圧力計測器10aおよび流量計測器10bからオンラインでオンライン計測データDB21へ送られて、オンラインデータとして計測日時と併せてオンライン計測データDB21に記憶される。
【0073】
一方、配水ブロック1の配水管2のうちオフライン計測ポイント16では、予め、ハンディータイプの圧力計器等によって水圧が計測されており、この計測された水圧データは、オフライン計測データとして計測日時と併せてオフライン計測データDB22に記憶される。
【0074】
そして、各オフライン計測ポイント16の圧力推定モデルのうちオペレータ等が必要としている所定日時がデータ取得手段29に入力されると、データ取得手段29は、入力された所定日時に対応するオンラインデータをオンライン計測データDB21から取得するとともに、入力された所定日時に対応するオフラインデータをオフライン計測データDB22から取得する。そして、データ取得手段29は、取得したオンラインデータ及びオフラインデータを、入力された当該所定日時とともに統計値演算手段30へ送る。
【0075】
そして、統計値演算手段30は、送られてくるオンラインデータを統計化すると共に、送られてくるオフラインデータを統計化する。なお、本実施の形態の統計値演算手段30によって演算される統計化項目には、正規化手段31によって用いられる「平均値」および「標準偏差」が含まれている。
【0076】
統計値演算手段30によって統計化されたオンラインデータ及びオフラインデータは、統計値DB28に記憶され、正規化手段31に送られる。
【0077】
正規化手段31に送られるオンラインデータ及びオフラインデータは、正規化手段31によって正規化される。この時、正規化手段31は、統計値DB28に記憶されているオンラインデータ及びオフラインデータについての「平均値」及び「標準偏差」と、上記の式(1a)(1b)と、に基づいて、オンラインデータ及びオフラインデータを、平均=0.0、分散=1.0となるように変換して「正規化」する。
【0078】
そして、正規化されたオンラインデータ及びオフラインデータは、正規化手段31から後段に設置されたクラスタリング手段23へ送られる。
【0079】
クラスタリング手段23に送られたオンラインデータ及びオフラインデータは、クラスタリング手段23によってクラスター分析が行われて、いくつかのクラスターに分類される。これにより、例えば図2に示すようなクラスター分析の結果を得ることができ、オンラインデータおよびオフラインデータは、クラスターA、クラスターB、クラスターC、クラスターDに分類される。例えばオフライン計測ポイント16Aに関するオフラインデータはクラスターAに分類され、オフライン計測ポイント16Jに関するオフラインデータはクラスターBに分類され、オフライン計測ポイント16Kに関するオフラインデータ及びオンライン計測ポイント15Aに関するオンラインデータはクラスターCに分類され、オフライン計測ポイント16Nに関するオフラインデータ及びオンライン計測ポイント15Bに関するオンラインデータはクラスターDに分類される。
【0080】
そして、各オンラインデータと同一クラスターに分類された各オフラインデータに対応する各オフライン計測ポイント16における圧力推定モデル(第1圧力推定モデル)が、第1圧力推定モデル構築手段24によって構築される。この時、第1圧力推定モデル構築手段24は、上述の重回帰分析を用いて第1圧力推定モデルを構築する。
【0081】
例えば、クラスター分析によって図2に示す結果が得られている場合には、オンラインデータに対応するオンライン計測ポイント15A及び15Bが属するクラスターC及びDを対象にして、第1圧力推定モデル構築手段は第1圧力推定モデルを構築する。この時、クラスターCでは、オンライン計測ポイント15Aに対応するオンラインデータ(配水管内の圧力及び水流量)が圧力推定モデルを構築する際の入力値とされ、クラスターDでは、オンライン計測ポイント15Bに対応するオンラインデータ(配水管内の圧力及び水流量)が圧力推定モデルを構築する際の入力値とされる。
【0082】
そして、構築されたこれらの第1圧力推定モデルは、推定モデルDB27に送られて、当該推定モデルDB27に記憶される。
【0083】
一方、各オンラインデータと異なるクラスターに分類された各オフラインデータは、主成分演算手段25によって上述の主成分分析が行われて、各オフラインデータに対応する推定モデル入力値が求められる。そして、各オンラインデータと異なるクラスターに分類された各オフラインデータに対応する各オフライン計測ポイント16における圧力推定モデル(第2圧力推定モデル)が、第2圧力推定モデル構築手段26によって構築される。この時、第2圧力推定モデル構築手段26は、上述の重回帰分析と推定モデル入力値とを用いて圧力推定モデルを構築する。
【0084】
例えば、クラスター分析によって図2に示す結果が得られている場合、主成分演算手段25では、各オンラインデータが属していないクラスターA及びBについての推定モデル入力値が求められる。この時、クラスターBに関して、オンラインデータが属している各クラスターのうち距離の近いクラスターを順次検索する。そして、オンラインデータの属するクラスターCがクラスターBに最も近接しているという検索結果が得られた場合には、クラスターCの主成分が、クラスターBに関する圧力推定モデルを構築する際の入力値となる。同様に、クラスターAは、オンラインデータの属するクラスターCが近接している。この時、クラスターAから見るとクラスターB及びクラスターCは同一クラスターと見れるので、クラスターAの圧力推定モデルを構築する際には、クラスターB及びクラスターCの主成分が入力値となる。
【0085】
そして、構築されたこれらの第2圧力推定モデルは、推定モデルDB27に送られて、当該推定モデルDB27に記憶される。
【0086】
そして、推定モデルDB27に記憶されている第1圧力推定モデル及び第2圧力推定モデルによって構成された圧力推定モデルが、モデル表示手段32において表示されて、オペレータ等に知らされる。
【0087】
以上説明したように、本実施の形態の圧力推定モデル構築システム4によれば、オフライン計測ポイント16における所定日時の圧力推定モデルが、オンライン計測ポイント15で計測されているオンラインデータを用いた形式で、統計値演算手段30、正規化手段31、クラスタリング手段23、第1圧力推定モデル構築手段24、主成分演算手段25及び第2圧力推定モデル構築手段26を介して構築される。これにより、オンライン計測ポイントにおける配水管内の圧力分布はオンラインデータとしてオンラインで得ることができ、オフライン計測ポイントにおける配水管内の圧力分布は、オンラインデータと予め計測されていたオフラインデータとに基づいて構築される圧力推定モデルによって得ることができる。これにより、配水ブロックにおけるオンライン計測ポイント及びオフライン計測ポイントにおける配水管内の圧力を精度良く求めることが可能となる。
【0088】
なお、オンライン計測ポイント15における配水管2の圧力は、圧力計測器10aによって計測され、オンラインでオンライン計測データDBに記憶されているので、オンライン計測ポイントにおける圧力推定モデルを構築しなくても、各オンライン計測ポイントにおける配水管2の圧力値を取得することができる。
【0089】
また、本実施の形態では、従来技術では必要とされていた配水ブロック1に張り巡らされた配水管2に関する複雑な物理情報は不要であり、オンラインで計測されたオンラインデータと、オフラインで計測されたオフライン計測ポイント16における過去の圧力データであるオフラインデータと、に基づいてオフライン計測ポイント16における圧力推定モデルが構築される。このように、計測したデータのみに基づいて圧力推定モデルを構築することができるので、圧力推定モデル構築システム4は簡素化され、圧力推定モデル構築時間が大幅に短縮されうる。
【0090】
また、統計値演算手段30や正規化手段31を介して、オンラインデータ及びオフラインデータをクラスター分析することにより、各オンラインデータ及び各オフラインデータを、より安定、正確に各クラスターに分類することができる。
【0091】
なお、オンライン計測ポイント15における配水管2内の圧力及び水流量のうち少なくともいずれか一方をオンラインデータとして扱うことも可能である。この場合であっても、上述の本実施の形態と同様の作用・効果を奏しうる。
【0092】
また、第2圧力推定モデル構築手段26は、主成分演算手段25によって演算された主成分のうち、全てを使用する必要はなく、一部のみを使用することも可能である。
【0093】
次に、本実施の形態の一変形例について説明する。
【0094】
本変形例による圧力推定モデル構築システムは、統計値演算手段30や正規化手段31が設けられていなくてもよい。
【0095】
この場合、データ取得手段29によって取得されたオンラインデータ及びオフラインデータは、直接的にクラスタリング手段23に送られる。クラスタリング手段23は、オンライン計測データDB21及びオフライン計測データDB22からデータ取得手段29を介して送られてくるオンラインデータ及びオフラインデータをクラスター分析するようになっている。
【0096】
これにより、各オンラインデータ及び各オフラインデータが各クラスタに分類されるので、上述の第1の実施の形態と同様にして、第1圧力推定モデル構築手段24、主成分演算手段25及び第2圧力推定モデル構築手段26によって、圧力推定モデルが構築される。
【0097】
従って、本変形例においても、オフライン計測ポイント16における圧力推定モデルを精度良く構築することができる。
【0098】
なお、クラスタリング手段では、様々な方に変換したオンラインデータ及びオフラインデータを用いてクラスタリングを行うことが可能である。すなわち、クラスタリング手段は、上述のように統計化・正規化を加えたデータや計測したままのデータの他に、周波数スペクトル等の他の形に変換したデータを用いて、クラスター分析を行うことができる。
【0099】
第2の実施の形態
図3及び図4は、本発明の第2の実施の形態を示す図である。図3は、ニューラル・ネットワークで用いられる「ユニット」を説明するための図である。図4は、ニューラル・ネットワークで用いられる「入力層」と「中間層」と「出力層」との関係を示す図である。
【0100】
第2の実施の形態では、第1圧力推定モデル構築手段24が、重回帰分析の代わりにニューラル・ネットワーク(Neural Network)を用いて第1圧力推定モデルを構築するようになっている。すなわち、第1圧力推定モデル構築手段24は、ニューラル・ネットワークを用いることにより、各オンラインデータと同一クラスターに分類された各オフラインデータに対応するオフライン計測ポイント16における配水管2内の圧力モデルである第1の圧力推定モデルを構築するようになっている。そして、構築された第1の圧力推定モデルは、第1圧力推定モデル構築手段24から推定モデルDB27へ送られるようになっている。
【0101】
一方、第2圧力推定モデル構築手段26も、重回帰分析の代わりに上述のニューラル・ネットワークを用いて第2の圧力推定モデルを構築するようになっている。すなわち、第2圧力推定モデル構築手段26は、ニューラル・ネットワークを用いることにより、各オンラインデータと異なるクラスターに分類された各オフラインデータに対応するオフライン計測ポイント16における配水管2内の圧力モデルである第2圧力推定モデルを構築するようになっている。そして、構築された第2の圧力推定モデルは、第2圧力推定モデル構築手段26から推定モデルDB27へ送られるようになっている。
【0102】
次に、図3及び図4を用いて、「ニューラル・ネットワーク(Neural Network)」について説明する。
【0103】
「ニューラル・ネットワーク(Neural Network)」とは、一般に、人間の神経細胞(ニューロン)をモデルとする人工的なシステムを指し、多入力1出力の「ユニット」の集合体として表現される。「ユニット」を図3に示す。ユニット間は神経繊維に対応する線で結ばれており、信号は、この線上を一方向にだけ伝わるようになっており、「重み(図3のw)」を付けられてユニットに入力し、応答関数による変換を経て出力するようになっている。つまり、システム全体としての入力信号が、各ユニットへの結合および変換出力を繰り返しながら次々と伝えられていき、最終的な出力信号が形成されることになる。ユニットの結びつき方、すなわち、ネットワークモデルとしては階層型と相互結合型とが提案されている。
【0104】
階層型ネットワークにおける信号は入力層から出力層へ向かう一方通行であり(図4参照)、層内で情報伝達も考えないのが一般的である。
【0105】
相互結合型ネットワークは、ある初期状態から出発し、安定状態になるまでネットワークの状態が変化する特性を有している。
【0106】
需要予測にNeural Networkを用いる場合、入出力が非線形であるため、応答関数にシグモイド関数を用いた3層の階層型ネットワークを採用する。尚、応答関数は中間層のみに用いられ、入力層及び出力層の出力値yは、y=Uとする。
【0107】
階層型ネットワークのシステム同定は、望ましい入出力が数組用意され(これを教示信号と呼ぶ)、Neural Networkがシステムの入出力関係を十分に近似するように重みを修正していくことによって行われる(これを学習と呼ぶ)。主な学習方法としてバックプロパゲーション法とカルマン・ニューロ法とがあるが、本実施の形態ではバックプロパゲーション法が用いられる。アルゴリズムは以下のようになる。
【0108】
〔ステップ1:各層の演算〕
入力層に与えられた信号から、以下の式(16)(17)で表されるニューロンモデルに従って、中間層及び出力層を演算する。
【0109】
すなわち、中間層の第jニューロンの出力Hは、式(16)のニューロンモデルを用いることにより得られる。
【0110】
【数10】
Figure 2004131957
なお、I:入力層第iニューロンの出力、H:中間層第jニューロンの出力、Wji:入力層第iニューロンと中間層第jニューロンの間の重み係数、1:入力層のニューロン数、f0:応答関数(シグモイド関数を使用)、を意味している。
【0111】
一方、出力層第kニューロンの出力Oは、式(17)のニューロンモデルを用いることにより得られる。
【0112】
【数11】
Figure 2004131957
なお、Hj:中間第jニューロンの出力、O:出力層第kニューロンの出力、Wkj:中間層第jニューロンと出力層第kニューロンの間の重み係数、m:中間層のニューロン数、を意味している。
【0113】
〔ステップ2:重みWの演算〕
出力層の第kニューロンの出力Oと出力層の第kニューロンの教示信号yとの自乗誤差の和を最小化するように、ネットワークの重み係数を修正して学習する。中間層と出力層との重み係数の学習は、以下の式(18)を用いてΔWkjを演算し、Wkjを修正するようになっている。
【0114】
Wkj(t+1)=Wkj(t)+ΔWkj(t)
ΔWkj(t)=−ε・dk(t)・Hj(t) …………(18)
dk(t)=Ok(t)−yk(t)
なお、t:学習回数、ε:1回の修正の大きさを決めるパラメータ、d:出力層の誤差、を意味している。
【0115】
一方、入力層と中間層との重み係数の学習は、以下の式(19)を用いてΔwjiを演算し、Wjiを修正するようになっている。
【0116】
【数12】
Figure 2004131957
なお、dj:中間層の逆伝搬誤差、f0:f0の微分、を意味している。
【0117】
更に、振動を減らし、学習の収束を早めるために、以下の式(20)を使う。
【0118】
ΔWkj(t)=−ε・dk(t)・Hj(t)+α・Wkj(t−1)
ΔWji(t)=−ε・dj(t)・Ii(t)+α・Wji(t−1) ………(20)
なお、α:安定のためのパラメータ、ε:1−α、を意味している。
【0119】
この学習の結果として得られる重み係数が、予測モデルとして記憶されるようになっている。
【0120】
また、ニューラルネットワークを用いた時には、過学習によるモデルのオーバーフィッティングが生じてしまうことが考えられるため、特願2000−021074「短気需要予測装置」に記憶されているようなオーバーフィティングを抑制する手段を付加することが好ましい。
【0121】
本実施の形態のニューラル・ネットワークにおいて、式(16)のIiは、上述の第1の実施の形態において説明した重回帰分析を用いて圧力推定モデルを構築した際に使用した入力値(オンラインデータ(圧力、流量)及び一部のオフラインデータ)に該当する。また、式(18)のyk(t)は、圧力推定モデルを構成するオフラインデータ(各オフライン計測ポイントにおける配水管2内の圧力)に対応する。その他の変数は、いわゆる内部変数(入出力以外の変数)に該当する。
【0122】
他の構成は図1及び図2に示す第1の実施の形態と略同一である。
【0123】
本実施の形態において、図1及び図2に示された第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。
【0124】
本実施の形態の圧力推定モデル構築システム4においても、上述の第1の実施の形態と同様に、配水ブロック1の配水管2のうちオンライン計測ポイント15において計測されたオンラインデータと、オフライン計測ポイント16において計測されたオフラインデータとは、データ取得手段29、統計値演算手段30、統計値DB28、正規化手段31及びクラスタリング手段23によって、いくつかのクラスターに分類される。
【0125】
そして、各オンラインデータと同一クラスターに分類された各オフラインデータに対応する各オフライン計測ポイント16における圧力推定モデル(第1圧力推定モデル)が、第1圧力推定モデル構築手段24によって構築される。この時、第1圧力推定モデル構築手段24は、ニューラル・ネットワークを用いて第1圧力推定モデルを構築する。そして、構築されたこれらの第1圧力推定モデルは、推定モデルDB27に送られて、当該推定モデルDB27に記憶される。
【0126】
一方、各オンラインデータと異なるクラスターに分類された各オフラインデータは、主成分演算手段25によって上述の主成分分析が行われて、各オフラインデータに対応する推定モデル入力値が求められる。そして、各オンラインデータと異なるクラスターに分類された各オフラインデータに対応する各オフライン計測ポイント16における圧力推定モデル(第2圧力推定モデル)が、第2圧力推定モデル構築手段26によって構築される。この時、第2圧力推定モデル構築手段26は、上述のニューラル・ネットワークと推定モデル入力値とを用いて圧力推定モデルを構築する。そして、構築されたこれらの第2圧力推定モデルは、推定モデルDB27に送られて、当該推定モデルDB27に記憶される。
【0127】
そして、推定モデルDB27に記憶されている第1圧力推定モデル及び第2圧力推定モデルによって構成された圧力推定モデルが、モデル表示手段32において表示されて、オペレータ等に知らされる。
【0128】
以上説明したように、本実施の形態の圧力推定モデル構築システム4においても、オフライン計測ポイント16における所定日時の圧力推定モデルが、オンラインで計測されているオンラインデータを用いた形式で構築される。このため、これにより、オフライン計測ポイント16における配水管2の圧力分布に関する推定モデルを、精度良く構築することができる。特に、本実施の形態においても、従来技術で必要とされていた配水管網に関する複雑な物理情報は不要なので、圧力推定モデル構築システム4を簡素化することができ、圧力推定モデル構築時間を大幅に短縮することができる。
【0129】
また、ニューラル・ネットワークを用いて圧力推定モデルを構築するので、2次以上の高次系の項も考慮して圧力推定モデルを構築することができ、非線形性の高いプロセスに対しても、精度良く圧力推定モデルを構築することができる。
【0130】
なお、本実施の一変形例として、統計値演算手段30や正規化手段31が設けられておらず、データ取得手段29によって取得されたオンラインデータ及びオフラインデータを直接的にクラスタリング手段23に送るような圧力推定モデル構築システム4であっても、上述した第2の実施の形態における場合と同様の作用・効果を奏しうる。
【0131】
第3の実施の形態
図5は、本発明の第3の実施の形態を示す図であり、圧力推定モデル構築システム全体の構成を示す概略図である。
【0132】
第3の実施の形態の圧力推定モデル構築システム4は、圧力推定装置11が支援手段35を更に有しており、当該支援手段35は、正規化手段31に接続される共に推定モデルDB27に接続された消火栓圧力推定手段36と、消火栓圧力推定手段36に接続された推定結果表示手段37と、を有している。
【0133】
消火栓圧力推定手段36は、現在時刻に対応するオンラインデータを正規化手段31から取得すると共に推定モデル記憶手段から圧力推定モデルを取得するようになっている。そして消火栓圧力推定手段36は、取得した現在時刻に対応するオンラインデータと圧力推定モデルとに基づいて、取得した圧力推定モデルに対応するオフライン計測ポイント16の配水管2内における現在時刻の圧力値を演算する機能を有している。
【0134】
推定結果表示手段37は、消火栓圧力推定手段36によって演算された圧力値を表示して、オペレータ等に当該圧力値を知らせることができるようになっている。
【0135】
他の構成は図1及び図2に示す第1の実施の形態と略同一である。
【0136】
図5において、図1及び図2に示された第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。
【0137】
本実施の形態の圧力推定モデル構築システム4においても、上述の第1の実施の形態と同様に、配水ブロック1の配水管2のうちオンライン計測ポイント15において計測されたオンラインデータと、オフライン計測ポイント16において計測されたオフラインデータと、データ取得手段29と、統計値演算手段30と、統計値DB28と、正規化手段31と、クラスタリング手段23と、第1モデル構築手段と、主成分演算手段25と、第2モデル構築手段と、に基づいて、オフライン計測ポイント16における所定日時の圧力推定モデルが得られ、当該圧力推定モデルは推定モデルDB27に記憶される。
【0138】
その後、消火栓圧力推定手段36が、現在時刻に対応するオンラインデータを正規化手段31から取得すると共に、取得したオンラインデータに対応する圧力推定モデルを推定モデルDB27から取得する。そして、消火栓圧力推定手段36は、取得した現在時刻に対応するオンラインデータと圧力推定モデルとに基づいて、取得した圧力推定モデルに対応するオフライン計測ポイント16の配水管2内における現在時刻の圧力値を演算する。
【0139】
消火栓圧力推定手段36によって演算された現在時刻に対応する圧力値は、推定結果表示手段37に送られて表示され、オペレータ等に知らせられる。
【0140】
なお、推定結果表示手段37における表示方法はどのようなものであってもよい。例えば、推定した圧力の値そのものを表示したり、2D形式や3D形式の圧力値の等高線で表示したりすることができるようになっている。また、消火栓圧力推定手段36によって推定された圧力が、予め設定されている許容可能な圧力範囲(運用圧力範囲)を逸脱する場合であっても、推定結果表示手段37は当該推定された圧力を表示することができるようになっている。
【0141】
以上説明したように、本実施の形態の圧力推定モデル構築システム4は、オンラインで計測されているオンラインデータを用いた形式で、各オフライン計測ポイント16における圧力推定モデルを構築することができる。
【0142】
更に、本実施の形態によれば、消火栓圧力推定手段36によって各オフライン計測ポイント16における現在時刻に対応する具体的な圧力値を推定することができる。
【0143】
次に、本実施の形態の一変形例について説明する。
【0144】
本発明による力推定モデル構築システムは、統計値演算手段30や正規化手段31が設けられていなくてもよい。
【0145】
この場合、データ取得手段29によって取得されたオンラインデータ及びオフラインデータは、直接的にクラスタリング手段23に送られる。クラスタリング手段23は、オンライン計測データDB21及びオフライン計測データDB22からデータ取得手段29を介して送られてくるオンラインデータ及びオフラインデータをクラスター分析するようになっている。
【0146】
また、消火栓圧力推定手段36は、オンライン計測データDB21に接続され、当該オンライン計測データDB21から現在時刻に対応するオンラインデータを取得するようになっている。
【0147】
他の構成は、上述した図5に示す第3の実施の形態と略同一であり、上述の第3の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。
【0148】
本変形例においても、各オフライン計測ポイント16における圧力推定モデルが、第1圧力推定モデル構築手段24及び第2圧力推定モデル構築手段26によって構築され、推定モデルDB27に記憶される。
【0149】
そして、消火栓圧力推定手段36は、現在時刻に対応するオンラインデータをオンライン計測データDB21から取得すると共に、このオンラインデータに対応する圧力推定モデルを推定モデルDB27から取得する。そして、消火栓圧力推定手段36は、取得したオンラインデータと圧力推定モデルとに基づいて、現在時刻に対応する各オフライン計測ポイント16における配水管2内の具体的な圧力値を演算する。
【0150】
消火栓圧力推定手段36によって演算された圧力値は、推定結果表示手段37に送られて表示される。
【0151】
以上説明したように、本変形例においても、圧力推定モデル構築システム4は、オンラインで計測されているオンラインデータを用いた形式で、各オフライン計測ポイント16における圧力推定モデルを構築することができる。
【0152】
また、消火栓圧力推定手段36によって各オフライン計測ポイント16における現在時刻に対応する具体的な圧力値を推定することができる。このため、例えば、配水ブロック1の全域に張り巡らされた配水管2の各箇所において、配水管内の圧力が、許容範囲(例えば、許容最低圧力以上であって許容最高圧力以下の範囲)となっているか否かを検証したりすることができる。
【0153】
なお、支援手段35の圧力推定手段36において必要とされるデータは、第1圧力推定モデル構築手段24及び第2圧力推定モデル構築手段26で使用した形式のデータである。従って、各モデル構築手段24,26が正規化されたデータを使用している場合には、圧力推定手段36も正規化されたデータを必要とし、各モデル構築手段24,26が計測したそのままのデータを使用している場合には、圧力推定手段36も計測したそのままのデータを必要とする。
【0154】
また、本実施の形態では、圧力推定手段36に入力されるデータは現在時刻に対応するものが想定されており、圧力推定手段36は、全てのオンラインデータを用いて圧力を推定するので、圧力計測器10a及び流量計測器10bから送られてくるオンラインデータは、全て圧力推定手段36に入力されるようになっている。
【0155】
第4の実施の形態
図6は、本発明の第4の実施の形態を示す図であり、圧力推定モデル構築システム全体の構成を示す概略図である。
【0156】
第4の実施の形態の圧力推定モデル構築システム4は、圧力推定装置11が検証手段40を更に備えており、当該検証手段40は、日時設定手段41と、日時設定手段41に接続されると共にオンライン計測データDB21に接続された日時指定データ取得手段42と、を有している。
【0157】
日時設定手段41は、各オフライン計測ポイント16における過去の所定日時の圧力を推定したい場合に、オペレータ等によって当該過去の所定日時が入力されるようになっている。
【0158】
なお、一定の検証期間の各オフライン計測ポイント16における圧力を推定する場合には、検証開始日時と検証終了日時とを設定するという方法が考えられる。検証開始日時と検証開始日時とを同一日とすることにより、特定日時の検証が可能となる。
【0159】
日時指定データ取得手段42は、日時設定手段41に入力された過去の所定日時に対応するオンラインデータをオンライン計測データ記憶手段から取得して、取得したオンラインデータを正規化手段31に送るようになっている。
【0160】
正規化手段31は、日時指定データ取得手段42から送られくるオンラインデータを正規化して、正規化したオンラインデータを消火栓圧力推定手段36に送る機能を更に有している。
【0161】
消火栓圧力推定手段36は、日時指定データ取得手段42から正規化手段31を介して送られくるオンラインデータに対応する圧力推定モデルを圧力推定モデル記憶手段から取得して、日時指定データ取得手段42から正規化手段31を介して送られくるオンラインデータと取得した圧力推定モデルとに基づいて、過去の所定日時における圧力推定値を演算する機能を更に有している。
【0162】
他の構成は図5に示す第3の実施の形態と略同一である。
【0163】
図6において、図5に示された第3の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。
【0164】
本実施の形態の圧力推定モデル構築システム4においても、上述の第1の実施の形態と同様に、配水ブロック1の配水管2のうちオンライン計測ポイント15において計測されたオンラインデータと、オフライン計測ポイント16において計測されたオフラインデータと、データ取得手段29と、統計値演算手段30と、統計値DB28と、正規化手段31と、クラスタリング手段23と、第1モデル構築手段と、主成分演算手段25と、第2モデル構築手段と、に基づいて、オフライン計測ポイント16における所定日時の圧力推定モデルが得られ、当該圧力推定モデルは推定モデルDB27に記憶される。
【0165】
そして、圧力を推定したい過去の所定日時が、オペレータ等によって日時設定手段41に入力される。日時設定手段41に入力された所定日時は、日時指定データ取得手段42に送られる。
【0166】
日時指定データ取得手段42は、日時設定手段41から送られてきた所定日時に対応するオンラインデータを、オンライン計測データDB21から取得する。そして、オンライン計測データDB21取得された当該オンラインデータは、日時指定データ取得手段42から正規化手段31に送られる。
【0167】
正規化手段31は、正規化手段31から送られてくるオンラインデータを正規化する。そして、正規化手段31は、正規化した当該オンラインデータを消火栓圧力推定手段36に送る。
【0168】
消火栓圧力推定手段36は、正規化手段31から送られてくるオンラインデータに対応する圧力推定モデルを推定モデルDB27から取得する。そして、消火栓圧力推定手段36は、正規化手段31から送られくるオンラインデータと、当該オンラインデータに対応する圧力推定モデルと、に基づいて、各オフライン計測ポイント16の配水管2内における過去の所定日時の圧力値を演算する。
【0169】
消火栓圧力推定手段36によって演算された過去の所定日時に対応する圧力値は、推定結果表示手段37に送られて表示され、オペレータ等に知らせられる。
【0170】
なお、推定結果表示手段37は、演算した圧力値を様々な手法で表示することが可能であり、例えば、一定の検証期間における圧力値を連続的に表示したり(連続再生表示)、当該検証期間のうちの任意時刻における圧力値を表示したり(任意時刻表示)、予め定められた指定時間前からの圧力偏差(圧力変動)を表示したりすることができる。なお、ここでいう「予め定められた指定時間」は、例えば、日時設定手段41を介してオペレータ等によって設定可能であるが、これに限定されるものではない。
【0171】
以上説明したように、本実施の形態の圧力推定モデル構築システム4では、オンラインで計測されているオンラインデータを用いた形式で、各オフライン計測ポイント16における圧力推定モデルを構築することができ、更に、消火栓圧力推定手段36によって各オフライン計測ポイント16における過去の所定日時に対応する具体的な圧力値を推定することができる。
【0172】
【発明の効果】
以上説明したように、本発明の圧力推定モデル構築システムよれば、配水ブロックに張り巡らされた配水管のうち、オンライン計測ポイントにおける配水管内の圧力分布はオンラインデータとしてオンラインで得ることができ、オフライン計測ポイントにおける配水管内の圧力分布は、オンラインデータと予め計測されていたオフラインデータとに基づいて構築される圧力推定モデルによって得ることができる。従って、本発明によれば、配水ブロックにおけるオンライン計測ポイント及びオフライン計測ポイントにおける配水管内の圧力を精度良く求めることが可能となる。
【図面の簡単な説明】
【図1】本発明の第1の実施の形態における圧力推定モデル構築システム全体の構成を示す概略図である。
【図2】クラスター分析によって各クラスターに分類されたオンラインデータ及び各オフラインデータを示す。
【図3】ニューラル・ネットワークで用いられる「ユニット」を説明するための図である。
【図4】ニューラル・ネットワークで用いられる「入力層」と「中間層」と「出力層」との関係を示す図である。
【図5】本発明の第3の実施の形態を示す図であり、圧力推定モデル構築システム全体の構成を示す概略図である。
【図6】本発明の第4の実施の形態を示す図であり、圧力推定モデル構築システム全体の構成を示す概略図である。
【図7】従来の圧力推定モデル構築システム全体の構成を示す概略図である。
【符号の説明】
1 配水ブロック
2 配水管
3 配水注入部
4 圧力推定モデル構築システム
10a 圧力計測器
10b 流量計測器(オンライン計測手段)
11 圧力推定装置
15 オンライン計測ポイント
16 オフライン計測ポイント
21 オンライン計測データDB(オンライン計測データ記憶手段)
22 オフライン計測データDB(オフライン計測データ記憶手段)
23 クラスタリング手段
24 第1圧力推定モデル構築手段
25 主成分演算手段
26 第2圧力推定モデル構築手段
27 推定モデルDB(圧力推定モデル記憶手段)
28 オンライン計測データDB(オンライン計測データ記憶手段)
29 データ取得手段
30 統計値演算手段
31 正規化手段
32 モデル表示手段[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a pressure estimation model construction system that constructs an estimation model for a pressure distribution in a water distribution pipe stretched around a water distribution block.
[0002]
[Prior art]
BACKGROUND ART A water distribution network for distributing water such as drinking water to consumers such as ordinary households plays an important role as one of the urban infrastructures. In order to realize stable water supply to consumers, it is required to always maintain an appropriate pressure inside the distribution pipe when managing the distribution pipe network.
[0003]
On the other hand, by grasping the pressure state in the distribution pipe, (1) whether water is being supplied from the water supply point such as a distribution reservoir to the distribution pipe at an appropriate water pressure, or (2) areas where the water pressure is insufficient It is possible to obtain information such as whether or not (3) there is an area where the water pressure is excessive. For this reason, in order to maintain the inside of the water distribution pipe at an appropriate pressure, it is very effective to accurately grasp the pressure state in the water distribution pipe.
[0004]
Various methods have been considered to grasp the pressure state in the water distribution pipe. For example, a pipe network analysis method as shown in FIG. 7 has been widely used.
[0005]
As shown in FIG. 7, the distribution pipe network is stretched so that water can be distributed to a demand point 45 such as a fire hydrant installed in the entire area of the distribution block 1. It is supplied via a section 3. The pressure measuring device 10a and the flow rate measuring device 10b are installed at predetermined positions of the water distribution pipe 2, and the pressure measuring device 10a and the flow rate measuring device 10b sometimes provide data on the pressure and the water flow rate in the water distribution pipe 2. It is being measured every moment. The measured pressure data and flow rate data are sent online from each of the measuring devices 10a and 10b to an online data DB (online data database) 21, and are stored as online data together with the measurement date and time.
[0006]
On the other hand, if the operator or the like wants to know the pressure state in the water distribution pipe 2 at a specific date and time, the operator inputs this specific date and time to the date and time setting means 50. The input date and time are sent from the date and time setting unit 50 to the data acquisition unit 51. The data acquisition means 51 acquires from the online data DB 21 online data whose measurement date and time correspond to the specific date and time sent from the date and time setting means 50, and sends the online data to the data display means 52 and the analysis means 53. To be sent to.
[0007]
The data display means 52 displays the sent online data and presents the online data to an operator or the like.
[0008]
The analysis means 53 is based on the online data sent from the data acquisition means 51 and the physical information sent from a separately provided physical information DB (physical information database) 54 by a pipe network analysis technique. It analyzes the pressure at each point in the distribution network.
[0009]
The physical information stored in the physical information DB 54 is civil engineering information such as the diameter of the water pipe 2 and the length of the pipeline at each location of the water distribution network, and the analysis means 53 determines the pressure at each location of the water distribution network. Contains useful information when analyzing.
[0010]
The pressure and the like at each point of the water distribution network analyzed by the analyzing means 53 are presented to an operator or the like by the analysis result displaying means 55.
[0011]
Then, the operator manages the pressure in the water distribution pipe 2 in consideration of the information presented by the analysis result display means 55. For example, the water distribution block 1 can be controlled without causing a water pressure shortage or water pressure excess area. It is managed whether or not the water is appropriately distributed to each demand point 45.
[0012]
[Problems to be solved by the invention]
Conventionally, the pressure state in the water distribution pipe 2 is grasped by analyzing the pressure and the like at each part of the water distribution pipe network by the pipe network analysis technique as described above.
[0013]
However, in the pipe network analysis method as described above, the pressure or the like at each point of the water distribution pipe network is determined based only on the measurement values of the pressure measuring device 10a and the flow rate measuring instrument 10b installed at a predetermined location of the water distribution pipe network. Analyzing. For this reason, in a case where the water distribution block 1 is wide or the distribution pipe network is formed in a complicated manner, and when an appropriate number of the pressure measuring devices 10a and the flow rate measuring devices 10b are not appropriately arranged, It is difficult to perform highly accurate and reliable analysis.
[0014]
In addition, since the analysis result of the pressure and the like at each point of the water distribution pipe network largely depends on the physical information stored in the physical information DB 54, it is necessary to use appropriate physical information. The physical information is determined according to the size and configuration of the water distribution network, but it is necessary to understand the civil structure of the water distribution network required to determine the physical information, to convert the civil structure into data, A large amount of labor is required for operations such as assigning a demand amount to the system, and a large amount of analysis time is required. In addition, in order to accurately analyze the pressure and the like at each point of the water distribution pipe network, it is necessary to accurately perform operations such as assigning a demand amount to each demand point 45. However, it is very difficult to perform such operations accurately.
[0015]
The present invention has been made in view of such a point, and an object of the present invention is to provide a pressure estimation model building system capable of accurately obtaining a pressure distribution in a water distribution pipe stretched around a water distribution block.
[0016]
[Means for Solving the Problems]
The present invention is a pressure estimation model construction system that constructs an estimation model for a pressure distribution in a water distribution pipe stretched around a water distribution block, and includes a pressure estimation model construction system in an online measurement point provided at one or more locations in the water distribution pipe. Online measurement means having a function of measuring at least one of pressure and water flow rate as online data and sending the online data to a subsequent stage online, and provided at one or more locations different from the online measurement point in the water distribution pipe. Offline measurement data storage means having a function of storing the pressure in the water distribution pipe measured in advance at the measured offline measurement point as offline data, and sending the offline data to a subsequent stage, and online measurement means and offline measurement data storage means at a subsequent stage. Provided, online measurement A clustering unit having a function of classifying online data sent from the stage and offline data sent from the offline measurement data storage unit into each cluster by cluster analysis; and For each offline data classified into the same cluster as the data, based on each online data classified into the same cluster, construct a first pressure estimation model which is a pressure model in the water distribution pipe at an offline measurement point corresponding to the respective offline data. Principal component analysis is performed on each of the offline data classified into a different cluster from each online data, provided at a stage subsequent to the first pressure estimation model building means and the clustering means. A principal component computing unit having a function of computing an input value; and an estimated model input provided at a subsequent stage of the principal component computing unit and corresponding to each offline measurement data for each offline data classified into a cluster different from each online data. Second pressure estimation model construction means for constructing a second pressure estimation model, which is a pressure model in the water distribution pipe at the offline measurement point corresponding to each offline, based on the value, the first pressure estimation model construction means, and the second pressure estimation A pressure estimation model which is connected to the model construction means and comprises a first pressure estimation model constructed by the first pressure estimation model construction means and a second pressure estimation model constructed by the second pressure estimation model construction means Pressure estimation model storage system, comprising: It is a system.
[0017]
According to the pressure estimation model construction system of the present invention, a pressure estimation model relating to the pressure in a water distribution pipe at an offline measurement point is constructed based on online data sent online from an online measurement point.
[0018]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0019]
First embodiment
FIG. 1 and FIG. 2 are diagrams showing a first embodiment of the present invention. FIG. 1 is a schematic diagram showing the configuration of the entire pressure estimation model construction system. FIG. 2 shows online data and offline data classified into each cluster by the cluster analysis.
[0020]
As shown in FIG. 1, a water distribution pipe 2 is stretched over the entire area of the water distribution block 1 to supply water to a plurality of demand points 45 such as fire hydrants in the water distribution block 1. Thereby, the water sent from the distribution reservoir or the like is supplied to the water distribution pipe 2 in the water distribution block 1 via the water distribution injection unit 3 and sent to each demand point 45.
[0021]
The pressure estimation model construction system 4 for constructing a pressure estimation model at each point of the water distribution pipe 2 includes a pressure measuring device 10a and a flow measuring device 10b (on-line measuring means), and the pressure measuring device 10a and the flow measuring device. And a pressure estimating device 11 connected to the vessel 10b.
[0022]
The pressure measuring device 10a and the flow rate measuring device 10b output the pressure and the water flow rate in the water distribution pipe 2 at one or more locations (three locations in the present embodiment) of the water distribution pipe 2 at online measurement points 15. It has a function to measure as. The pressure measuring device 10a and the flow rate measuring device 10b have a function of transmitting the online data measured in this way to a subsequent stage online.
[0023]
The pressure estimation device 11 includes an online measurement data DB21 (online measurement data storage unit), an offline measurement data DB22 (offline measurement data storage unit) connected to the pressure measurement device 10a and the flow measurement device 10b, and a pressure measurement device 10a Clustering means 23 provided after the flow rate measuring device 10 b and the offline measurement data DB 22, first pressure estimation model construction means 24 provided after the clustering means 23, and a main unit provided after the clustering means 23. The component calculation means 25, the second pressure estimation model construction means 26 provided at a stage subsequent to the principal component calculation means 25, and the estimation models connected to the first pressure estimation model construction means 24 and the second pressure estimation model construction means 26 DB27 (pressure estimation model storage means), pressure measuring device 10a and flow meter Online measurement data DB21 (online measurement data storage means) provided between the device 10b and the clustering means 23, and data acquisition means 29 provided between the online measurement data DB21 and the offline measurement data DB22 and the clustering means 23. A statistical value calculating means 30 provided between the data acquiring means 29 and the clustering means 23; a normalizing means 31 provided between the statistical value calculating means 30 and the clustering means 23; And a model display means 32 connected thereto.
[0024]
The offline measurement data DB 22 is measured in advance by the offline data measurement means 33 at one or more locations (three in this embodiment) different from the online measurement points 15 in the water distribution pipe 2. The pressure inside the distribution pipe 2 is stored as offline data. That is, the offline measurement data DB 22 stores the pressure in the water distribution pipe 2 measured in advance at the offline measurement point 16 such as a fire hydrant as offline data together with the measurement date and time.
[0025]
Note that, for example, a handy-type pressure gauge or the like can be used as the off-line data measurement unit 33. Then, at the offline measurement point 16, the pressure in the water distribution pipe 2 measured in advance at the offline measurement point 16 for a few days is stored in the offline measurement data DB 22 as offline data. The offline measurement data DB 22 can send the stored offline data to a data acquisition unit 29 provided at a subsequent stage. The off-line measurement data DB 22 can store the off-line data of all or a part of the off-line measurement points 16 and send it to the subsequent stage.
[0026]
The online measurement data DB 21 stores the values measured by the pressure measuring device 10a and the flow rate measuring device 10b (online measuring means) together with the measurement date and time.
[0027]
The measurement date and time of the online data stored in the online measurement data DB 21 and the measurement date and time of the offline data stored in the offline measurement data DB 22 correspond to each other.
[0028]
The data acquisition means 29 has a function of acquiring the online data stored in the online measurement data DB 21 and acquiring from the offline measurement data DB 22 offline data corresponding to the measurement time of the online data acquired from the online measurement data DB 21. are doing. The data acquisition means 29 has a function of transmitting the acquired online data and offline data to the subsequent stage.
[0029]
The statistic calculation means 30 has a function of statisticizing the transmitted online data and offline data.
[0030]
In the present embodiment, the "statisticalization" of these online data and offline data includes a total value, a minimum value, a maximum value, a range, a standard deviation, a variance, an average value, a median value, a coefficient of variation, a skewness, a kurtosis, Statistic items such as are basic. However, the statistic calculation means 30 can also "statisticize" the online data and the offline data based on other statistic items.
[0031]
The statistic calculation means 30 has a function of sending the statistical online data and offline data to the subsequent stage. The online data and the offline data sent from the statistical value calculating means 30 are sent to the normalizing means 31 after being stored in the statistical value DB 28.
[0032]
The normalizing means 31 has a function of normalizing the sent online data and offline data and sending the data to the subsequent stage. For this reason, in the present embodiment, the online data and the offline data normalized by the normalizing means 31 are sent to the clustering means 23 provided at the subsequent stage of the normalizing means 31.
[0033]
The normalizing means 31 in the present embodiment normalizes using the online data and the offline data stored in the statistical value DB 28, and “average value” and “average value” stored in the statistical value DB 28. Based on the “standard deviation”, the following formulas (1a) and (1b) are used to convert the online data and the offline data so that the mean = 0.0 and the variance = 1.0, and “normalize”. ing.
[0034]
(Equation 1)
Figure 2004131957
That is, each data item of the online data and the offline data acquired by the data acquisition means 29 is converted by the equations (1a) and (1b). For example, as shown in FIG. 1, as online data, 1 point data relating to the water flow rate in the water distribution pipe 2 and 2 point data relating to the pressure in the water distribution pipe 2 are sometimes referred to by the pressure measuring device 10a and the flow rate measuring device 10b. Consider a case in which the data acquisition unit 29 acquires online data (data on water flow rate is 1 point, data on pressure is 2 point) over a period of several hours.
[0035]
In this case, each of the acquired data is defined as X1t, X2t, X3t (where t represents time). First, X1t is expressed as x in Expressions (1a) and (1b).iTo obtain the standardized data z, and then X2t is expressed as x in equations (1a) and (1b).iTo obtain the standardized data z, and finally, X3t is expressed by x in Expressions (1a) and (1b).iTo obtain the standardized data z. By this work, the online data (water flow rate data 1 point, pressure data 2 point) is standardized online data (average 0, standard deviation 1) online data (water flow rate data 1 point, pressure related data) The data is converted to 2 points).
[0036]
Similarly, the off-line data is converted into off-line data standardized to have an average of 0 ° and a standard deviation of 1 °. When obtaining the standardized online data and offline data in this manner, the values calculated by the statistical value calculating means 30 are calculated as the average value and the standard deviation of the base data in the equations (1a) and (1b). Is being used.
[0037]
The clustering unit 23 includes the online measurement data DB 21, the data acquisition unit 29, the statistic calculation unit 30, the statistic DB 28, and the online data sent from the flow measurement unit 10b via the statistic DB 28 and the normalization unit 31. , A function of classifying the offline data sent from the offline measurement data DB 22 into each cluster via the data acquisition means 29, the statistical value calculation means 30, the statistical value DB 28, and the normalization means 31 by cluster analysis. ing.
[0038]
Here, “cluster analysis” generally means an operation of grouping homogeneous samples from among samples. The cluster analysis is started from a state in which the group to which the sample belongs is unknown and the number of groups is not known. The purpose of the cluster analysis is to classify the sample into homogeneous groups or clusters.
[0039]
The cluster analysis of the online data and the offline data by the clustering means 23 of the present embodiment is specifically performed as follows. Note that, in the present embodiment, the subject of the cluster analysis is only the data related to “pressure”, and the data related to “water flow rate” is not the subject.
[0040]
{Circle around (1)} First, the distance between solids and the distance between clusters are defined. The "solid" here refers to one signal included in online data or offline data. For example, various equations as shown in Table 1 below have been proposed as equations indicating the distance between the solids. In the present embodiment, the “Euclidean distance” shown in Table 1 is used. Define the distance between solids. On the other hand, various equations as shown in Table 2 have been proposed as equations indicating the distance between clusters. In the present embodiment, the distance between clusters is calculated using the Ward method shown in Table 2. Define.
[0041]
[Table 1]
Figure 2004131957
[Table 2]
Figure 2004131957
In Tables 1 and 2, Xa and Xb represent online data (pressure) or offline data, d (Xa, Xb) represents the distance between Xa and Xb, and dab → cRepresents the distance between a certain cluster AB and online data or offline data or cluster C.
[0042]
(2) Next, the distance between all the solids is calculated.
[0043]
{Circle around (3)} Next, the clusters or the solids having the shortest distance between the solids are merged into one cluster.
[0044]
{Circle around (4)} Next, the cluster created in the above paragraph (3) is regarded as a new solid, and the distance between all the solids is calculated.
[0045]
{Circle around (5)} Then, the above steps (1) to (4) are repeated to end when all the solids are included in one cluster.
[0046]
In the present embodiment, for example, a result of cluster analysis as shown in FIG. 2 can be obtained according to the above (1) to (5). In FIG. 2, the X axis (horizontal axis) shows each offline measurement point and each online measurement point corresponding to each online data and each offline data, and the Y axis (vertical axis) shows each online data and each offline data. The similarity (distance) in the cluster analysis on the data is shown. Also, the lines in FIG. 2 indicate that they can be treated as the same cluster at the distance where the lines are connected.
[0047]
The first pressure estimation model constructing unit 24 allocates each of the offline data classified into the same cluster as each online data based on each online data classified into the same cluster at the offline measurement point 16 corresponding to the respective offline data. A first pressure estimation model, which is a pressure model in the water pipe 2, is constructed. More specifically, the first pressure estimation model constructing means 24 of the present embodiment constructs the first pressure estimation model using multiple regression analysis, and is classified into the same cluster as each offline data. Online data is used as input values for multiple regression analysis.
[0048]
Hereinafter, the “multiple regression analysis” will be described.
[0049]
In multiple regression analysis, the explanatory variables {xi1, Xi2, ... xip} And the objective variable yiIt is assumed that the following linear relationship holds between (i = 1, 2,..., N).
[0050]
(Equation 2)
Figure 2004131957
Note that βi: Partial regression coefficient, ei: Means residual error.
[0051]
Each residual e in equation (2)iIs "residual eiAre independent of each other and have a normal distribution N (0, σ2)) (Residual condition). Then, when Expression (2) is expressed in a matrix format, Expression (3) below is obtained.
[0052]
y = zβ + e (3)
The matrix in the equation (3) is as shown below.
[0053]
(Equation 3)
Figure 2004131957
(Equation 4)
Figure 2004131957
And b0, B1, ..., bMIs ελ(See equation (7) below) is determined to be a minimum.
[0054]
(Equation 5)
Figure 2004131957
In equation (7), the unknown is b0, B1, ... bpAnd S is b0, B1, ..., bpWhich minimizes the function S0, B1, ..., bpGives b0, B1, ..., bp, And can be obtained as a solution of a system of linear equations with the value set to 0. By solving the above and arranging, a simultaneous equation such as the following equation (8) is obtained.
[0055]
(Equation 6)
Figure 2004131957
Where SJJIs xjThe sum of squared deviations of SjkIs xjAnd xkSum of deviation of SjayIs xjAnd y, which are represented by the following equation (9).
[0056]
(Equation 7)
Figure 2004131957
Therefore, the partial regression coefficient is obtained by the following equation (11).
[0057]
b = S-1M …………… (11)
The constant term is obtained by the following equation (12).
[0058]
(Equation 8)
Figure 2004131957
In the present embodiment, in the multiple regression analysis described above, the explanatory variable x corresponds to online data or a principal component score obtained by principal component analysis means, and the objective variable y corresponds to offline data. Here, the principal component score indicates the value of the principal component of each sample.
[0059]
Then, the first pressure estimation model constructed using the multiple regression analysis described above is sent from the first pressure estimation model construction means 24 to the estimation model DB 27.
[0060]
The principal component calculating means 25 has a function of performing a principal component analysis on each offline data classified into a cluster different from each online data, and calculating an estimated model input value corresponding to each offline data. That is, the principal component calculation means 25 performs a principal component analysis on the cluster to which the closest online data belongs to each offline data classified into a different cluster from each online data in the clustering means 23, An estimated model input value is calculated for each offline data classified into a different cluster. Then, the calculated estimated model input value is sent from the principal component calculation means 25 to the second pressure estimation model construction means 26 together with each online data and offline data.
[0061]
Here, "principal component analysis" is a method of summarizing information having various types of characteristic values that are mutually correlated into a small number of general characteristic values that are not correlated with each other.
[0062]
Principal component analysis generally consists of p variables x1, X2, ..., xpIs included in m (m ≦ p) total characteristic values (Equation (14)) z satisfying the following conditions (a) and (b):1, Z2, ..., zmMean to summarize, z1Is the first principal component, z2Is the second principal component, zmIs referred to as an m-th principal component.
[0063]
Figure 2004131957
(Equation 9)
Figure 2004131957
Condition (a)ZlAnd zkThe correlation with (k is not l; k, l = 1, 2,..., M) is all zero.
[0064]
Condition (b)Z1Variance (x1, X2, ..., xp) Is the largest of all linear variances. z2Is the variance of z1Is the largest of all linear equations independent of the variance of Similarly, zmThe variance of z1, Z2, ..., zm-1Is the largest of the linear equations independent of
[0065]
The above condition (b) satisfies “principal component z1, Z2, ... zmIs the original characteristic value x1, X2, ..., xpThis is the result of summarizing so that the loss of information possessed is minimized. "
[0066]
In the present embodiment, x in the above-described principal component analysis1~ XpCorresponds to the online data and the offline data related to the pressure subjected to the cluster analysis by the clustering means 23.
[0067]
For example, when the result illustrated in FIG. 2 is obtained by the cluster analysis, first, the online data (pressure) corresponding to the online measurement point 15A and the measurement points 16K located on both sides of the online measurement point 15A in FIG. , 16L, the offline data (pressure), and x1~ XpAnd And the x1~ XpIs calculated to generate a pressure estimation model. Next, the online data (pressure) corresponding to the online measurement point 15A, the offline data (pressure) corresponding to the offline measurement points located on both sides of the online measurement point 15A in FIG. X1~ XpAs x1~ XpThe pressure estimation model is calculated by calculating the principal component score for. By repeating such calculations, pressure estimation models at each offline measurement point corresponding to each offline data are sequentially calculated, and pressure estimation models at all offline measurement points can be obtained.
[0068]
The second pressure estimation model constructing means 26, for each offline data classified into a different cluster from each online data, based on the estimated model input value corresponding to each offline data, at the offline measurement point 16 corresponding to each offline. A second pressure estimation model, which is a pressure model in the water distribution pipe 2, is constructed. More specifically, the second pressure estimation model construction means 26 constructs a second pressure estimation model using the multiple regression analysis described above, and the corresponding pressure estimation model calculated by the principal component calculation means 25. Model input values are used as input values for multiple regression analysis. As a result, the pressure model in the water distribution pipe 2 at the offline measurement point 16 corresponding to each offline data classified into a cluster different from each online data among the water distribution pipes 2 stretched around the water distribution block 1. Is constructed. Then, the constructed second pressure estimation model is sent from the second pressure estimation model construction means 26 to the estimation model DB 27.
[0069]
The estimation model DB 27 includes a first pressure estimation model constructed and transmitted by the first pressure estimation model construction unit 24 and a second pressure estimation model constructed and transmitted by the second pressure estimation model construction unit 26. , Is stored.
[0070]
The model display means 32 can display the pressure estimation model stored in the pressure estimation model storage means.
[0071]
Next, the operation of the present embodiment having such a configuration will be described.
[0072]
At the online measurement point 15 in the water distribution pipe 2 of the water distribution block 1, the water pressure and the water flow rate are measured by the pressure measuring device 10a and the flow measuring device 10b. These measured values are sent from the pressure measuring device 10a and the flow rate measuring device 10b to the online measurement data DB 21 online, and are stored as online data in the online measurement data DB 21 together with the measurement date and time.
[0073]
On the other hand, at the off-line measurement point 16 in the water distribution pipe 2 of the water distribution block 1, the water pressure is measured in advance by a handy type pressure gauge or the like, and the measured water pressure data is used as offline measurement data together with the measurement date and time. It is stored in the offline measurement data DB 22.
[0074]
Then, when a predetermined date and time required by the operator or the like among the pressure estimation models at each offline measurement point 16 is input to the data acquisition unit 29, the data acquisition unit 29 converts the online data corresponding to the input predetermined date and time into online data. Offline data corresponding to the input predetermined date and time is obtained from the offline measurement data DB 22 while being obtained from the measurement data DB 21. Then, the data acquisition unit 29 sends the acquired online data and offline data to the statistical value calculation unit 30 together with the input predetermined date and time.
[0075]
Then, the statistical value calculation means 30 statisticizes the transmitted online data and quantifies the transmitted offline data. Note that the statistical items calculated by the statistical value calculating means 30 of the present embodiment include the “average value” and the “standard deviation” used by the normalizing means 31.
[0076]
The online data and offline data statistically calculated by the statistical value calculating means 30 are stored in the statistical value DB 28 and sent to the normalizing means 31.
[0077]
The online data and the offline data sent to the normalizing means 31 are normalized by the normalizing means 31. At this time, the normalizing means 31 calculates the “average value” and “standard deviation” of the online data and the offline data stored in the statistical value DB 28 and the above equations (1a) and (1b). The online data and the offline data are converted and “normalized” so that the average = 0.0 and the variance = 1.0.
[0078]
Then, the normalized online data and offline data are sent from the normalizing means 31 to the clustering means 23 provided at the subsequent stage.
[0079]
The online data and the offline data sent to the clustering unit 23 are subjected to cluster analysis by the clustering unit 23 and are classified into several clusters. Thereby, for example, a result of the cluster analysis as shown in FIG. 2 can be obtained, and the online data and the offline data are classified into cluster A, cluster B, cluster C, and cluster D. For example, the offline data related to the offline measurement point 16A is classified into the cluster A, the offline data related to the offline measurement point 16J is classified into the cluster B, and the offline data related to the offline measurement point 16K and the online data related to the online measurement point 15A are classified into the cluster C. , The offline data related to the offline measurement point 16N and the online data related to the online measurement point 15B are classified into the cluster D.
[0080]
Then, the first pressure estimation model construction means 24 constructs a pressure estimation model (first pressure estimation model) at each offline measurement point 16 corresponding to each offline data classified into the same cluster as each online data. At this time, the first pressure estimation model construction means 24 constructs a first pressure estimation model using the multiple regression analysis described above.
[0081]
For example, when the results shown in FIG. 2 are obtained by the cluster analysis, the first pressure estimation model constructing unit performs the first pressure estimation model construction on the clusters C and D to which the online measurement points 15A and 15B corresponding to the online data belong. 1 Build a pressure estimation model. At this time, in the cluster C, the online data (pressure and water flow rate in the water distribution pipe) corresponding to the online measurement point 15A is used as an input value when constructing the pressure estimation model, and in the cluster D, the online data corresponds to the online measurement point 15B. Online data (pressure and water flow in the distribution pipe) is used as an input value when constructing a pressure estimation model.
[0082]
Then, these constructed first pressure estimation models are sent to the estimation model DB 27 and stored in the estimation model DB 27.
[0083]
On the other hand, each offline data classified into a cluster different from each online data is subjected to the above-described principal component analysis by the principal component calculating means 25, and an estimated model input value corresponding to each offline data is obtained. Then, a pressure estimation model (second pressure estimation model) at each offline measurement point 16 corresponding to each offline data classified into a different cluster from each online data is constructed by the second pressure estimation model construction means 26. At this time, the second pressure estimation model construction means 26 constructs a pressure estimation model using the multiple regression analysis described above and the estimation model input value.
[0084]
For example, when the results shown in FIG. 2 are obtained by the cluster analysis, the principal component calculation unit 25 obtains the estimated model input values for the clusters A and B to which each online data does not belong. At this time, with respect to the cluster B, a cluster having a short distance is sequentially searched among the clusters to which the online data belongs. Then, when a search result that the cluster C to which the online data belongs is closest to the cluster B is obtained, the main component of the cluster C is an input value when constructing a pressure estimation model for the cluster B. . Similarly, the cluster A is close to the cluster C to which the online data belongs. At this time, from the viewpoint of the cluster A, the clusters B and C can be regarded as the same cluster. Therefore, when constructing the pressure estimation model of the cluster A, the main components of the clusters B and C are input values.
[0085]
Then, these constructed second pressure estimation models are sent to the estimation model DB 27 and stored in the estimation model DB 27.
[0086]
Then, the pressure estimation model constituted by the first pressure estimation model and the second pressure estimation model stored in the estimation model DB 27 is displayed on the model display means 32 to be notified to the operator or the like.
[0087]
As described above, according to the pressure estimation model construction system 4 of the present embodiment, the pressure estimation model at a predetermined date and time at the offline measurement point 16 is formed in a format using the online data measured at the online measurement point 15. , Statistical value calculation means 30, normalization means 31, clustering means 23, first pressure estimation model construction means 24, principal component calculation means 25, and second pressure estimation model construction means 26. Thereby, the pressure distribution in the water distribution pipe at the online measurement point can be obtained online as online data, and the pressure distribution in the water distribution pipe at the offline measurement point is constructed based on the online data and the offline data measured in advance. Pressure estimation model. Thereby, it is possible to accurately obtain the pressure in the water distribution pipe at the online measurement point and the offline measurement point in the water distribution block.
[0088]
In addition, since the pressure of the water distribution pipe 2 at the online measurement point 15 is measured by the pressure measuring device 10a and stored online in the online measurement data DB, each pressure can be set without building a pressure estimation model at the online measurement point. The pressure value of the water distribution pipe 2 at the online measurement point can be obtained.
[0089]
Further, in the present embodiment, complicated physical information on the water distribution pipe 2 stretched around the water distribution block 1 which is required in the conventional technology is unnecessary, and online data measured online and offline data measured offline A pressure estimation model at the off-line measurement point 16 is constructed based on the off-line data that is the past pressure data at the off-line measurement point 16. As described above, since the pressure estimation model can be constructed based only on the measured data, the pressure estimation model construction system 4 can be simplified, and the pressure estimation model construction time can be significantly reduced.
[0090]
Further, by performing a cluster analysis of the online data and the offline data via the statistical value calculating means 30 and the normalizing means 31, each online data and each offline data can be more stably and accurately classified into each cluster. .
[0091]
Note that at least one of the pressure and the water flow rate in the water distribution pipe 2 at the online measurement point 15 can be treated as online data. Even in this case, the same operation and effect as the above-described embodiment can be obtained.
[0092]
In addition, the second pressure estimation model construction means 26 does not need to use all of the principal components calculated by the principal component calculation means 25, and may use only some of them.
[0093]
Next, a modified example of the present embodiment will be described.
[0094]
In the pressure estimation model construction system according to the present modification, the statistical value calculation means 30 and the normalization means 31 may not be provided.
[0095]
In this case, the online data and the offline data acquired by the data acquisition unit 29 are sent directly to the clustering unit 23. The clustering unit 23 performs a cluster analysis of the online data and the offline data sent from the online measurement data DB 21 and the offline measurement data DB 22 via the data acquisition unit 29.
[0096]
As a result, each online data and each offline data are classified into each cluster. Therefore, similarly to the above-described first embodiment, the first pressure estimation model construction unit 24, the principal component calculation unit 25, and the second pressure The pressure estimation model is constructed by the estimation model construction means 26.
[0097]
Therefore, also in this modification, a pressure estimation model at the offline measurement point 16 can be constructed with high accuracy.
[0098]
Note that the clustering means can perform clustering using online data and offline data converted to various types. That is, the clustering means can perform cluster analysis using data converted into another form such as a frequency spectrum, in addition to the data subjected to the statistic and normalization and the data as measured as described above. it can.
[0099]
Second embodiment
FIG. 3 and FIG. 4 are diagrams showing a second embodiment of the present invention. FIG. 3 is a diagram for explaining “units” used in the neural network. FIG. 4 is a diagram showing the relationship between the “input layer”, “intermediate layer”, and “output layer” used in the neural network.
[0100]
In the second embodiment, the first pressure estimation model constructing means 24 constructs the first pressure estimation model using a neural network (Neural @ Network) instead of the multiple regression analysis. That is, the first pressure estimation model constructing means 24 is a pressure model in the water distribution pipe 2 at the offline measurement point 16 corresponding to each offline data classified into the same cluster as each online data by using a neural network. A first pressure estimation model is constructed. The constructed first pressure estimation model is sent from the first pressure estimation model construction means 24 to the estimation model DB 27.
[0101]
On the other hand, the second pressure estimation model constructing means 26 also constructs a second pressure estimation model using the above-described neural network instead of the multiple regression analysis. That is, the second pressure estimation model construction means 26 is a pressure model in the water distribution pipe 2 at the offline measurement point 16 corresponding to each offline data classified into a different cluster from each online data by using a neural network. A second pressure estimation model is constructed. Then, the constructed second pressure estimation model is sent from the second pressure estimation model construction means 26 to the estimation model DB 27.
[0102]
Next, a “neural network (Neural @ Network)” will be described with reference to FIGS. 3 and 4.
[0103]
The “neural network (Neural @ Network)” generally refers to an artificial system that models human nerve cells (neurons), and is expressed as a set of “units” with multiple inputs and one output. The "unit" is shown in FIG. The units are connected by a line corresponding to the nerve fiber, and the signal is transmitted on this line only in one direction.*) ”Is input to the unit and output after conversion by a response function. In other words, the input signal of the entire system is successively transmitted while repeating the coupling and conversion output to each unit, and a final output signal is formed. Hierarchy type and mutual connection type are proposed as a method of unit connection, that is, a network model.
[0104]
Signals in a hierarchical network are one-way from the input layer to the output layer (see FIG. 4), and it is general that information transmission is not considered in the layer.
[0105]
An interconnected network has the property that the state of the network changes from a certain initial state to a stable state.
[0106]
When Neural @ Network is used for demand forecasting, a three-layer hierarchical network using a sigmoid function as a response function is adopted because input and output are nonlinear. Note that the response function is used only for the intermediate layer, and the output value y of the input layer and the output layer is y = U.
[0107]
The system identification of the hierarchical network is performed by preparing several sets of desired inputs and outputs (referred to as teaching signals) and modifying the weights so that the Neural @ Network sufficiently approximates the input / output relationship of the system. (This is called learning). There are a back propagation method and a Kalman neuro method as main learning methods, and the back propagation method is used in the present embodiment. The algorithm is as follows.
[0108]
[Step 1: calculation of each layer]
The intermediate layer and the output layer are calculated from the signals supplied to the input layer according to the neuron model represented by the following equations (16) and (17).
[0109]
That is, the output H of the j-th neuron in the intermediate layerjIs obtained by using the neuron model of Expression (16).
[0110]
(Equation 10)
Figure 2004131957
Note that Ii: Output of the i-th neuron in the input layer, Hj: Output of the jth neuron in the hidden layer, Wji: Weight coefficient between the i-th neuron in the input layer and the j-th neuron in the intermediate layer, 1: the number of neurons in the input layer, f0: response function (using a sigmoid function).
[0111]
On the other hand, the output O of the k-th neuron in the output layerkIs obtained by using the neuron model of Expression (17).
[0112]
[Equation 11]
Figure 2004131957
Hj: output of the intermediate j-th neuron, Ok: Output of the k-th neuron in the output layer, Wkj: weight coefficient between the j-th neuron in the intermediate layer and the k-th neuron in the output layer, and m: the number of neurons in the intermediate layer.
[0113]
[Step 2: Calculation of Weight W]
Output O of kth neuron in output layerkAnd the teaching signal y of the k-th neuron in the output layerkThe learning is performed by modifying the weighting factors of the network so as to minimize the sum of the square errors of the network. The learning of the weight coefficient between the hidden layer and the output layer is performed by using the following equation (18).kjAnd calculate WkjIs to be fixed.
[0114]
Wkj (t + 1) = Wkj (t) + ΔWkj (t)
ΔWkj (t) = − ε · dk (t) · Hj (t) (18)
dk (t) = Ok (t) -yk (t)
Here, t: the number of times of learning, ε: a parameter for determining the magnitude of one correction, dk: Means an error in the output layer.
[0115]
On the other hand, learning of the weight coefficient between the input layer and the intermediate layer is performed by using the following equation (19).jiAnd calculate WjiIs to be fixed.
[0116]
(Equation 12)
Figure 2004131957
Dj: back propagation error of the intermediate layer, f0: differentiation of f0.
[0117]
Further, the following equation (20) is used in order to reduce oscillation and speed up convergence of learning.
[0118]
ΔWkj (t) = − ε · dk (t) · Hj (t) + α · Wkj (t−1)
ΔWji (t) = − ε · dj (t) · Ii (t) + α · Wji (t−1) (20)
Note that α: a parameter for stability, ε: 1−α.
[0119]
The weight coefficient obtained as a result of this learning is stored as a prediction model.
[0120]
In addition, when a neural network is used, overfitting of the model due to over-learning may occur. Therefore, overfitting stored in Japanese Patent Application No. 2000-021074 “short-term demand forecasting device” is suppressed. It is preferable to add means.
[0121]
In the neural network according to the present embodiment, Ii in Expression (16) is an input value (on-line data) used when the pressure estimation model is constructed using the multiple regression analysis described in the first embodiment. (Pressure, flow rate) and some offline data). Further, yk (t) in the equation (18) corresponds to offline data (pressure in the water distribution pipe 2 at each offline measurement point) constituting the pressure estimation model. Other variables correspond to so-called internal variables (variables other than input / output).
[0122]
Other configurations are substantially the same as those of the first embodiment shown in FIGS.
[0123]
In this embodiment, the same parts as those in the first embodiment shown in FIGS. 1 and 2 are denoted by the same reference numerals, and detailed description thereof will be omitted.
[0124]
Also in the pressure estimation model construction system 4 of the present embodiment, as in the first embodiment described above, the online data measured at the online measurement point 15 in the water distribution pipe 2 of the water distribution block 1 and the offline measurement point The offline data measured in 16 is classified into several clusters by a data acquisition unit 29, a statistical value calculation unit 30, a statistical value DB 28, a normalization unit 31, and a clustering unit 23.
[0125]
Then, the first pressure estimation model construction means 24 constructs a pressure estimation model (first pressure estimation model) at each offline measurement point 16 corresponding to each offline data classified into the same cluster as each online data. At this time, the first pressure estimation model construction means 24 constructs a first pressure estimation model using a neural network. Then, these constructed first pressure estimation models are sent to the estimation model DB 27 and stored in the estimation model DB 27.
[0126]
On the other hand, each offline data classified into a cluster different from each online data is subjected to the above-described principal component analysis by the principal component calculating means 25, and an estimated model input value corresponding to each offline data is obtained. Then, a pressure estimation model (second pressure estimation model) at each offline measurement point 16 corresponding to each offline data classified into a different cluster from each online data is constructed by the second pressure estimation model construction means 26. At this time, the second pressure estimation model construction means 26 constructs a pressure estimation model using the above-described neural network and the estimation model input value. Then, these constructed second pressure estimation models are sent to the estimation model DB 27 and stored in the estimation model DB 27.
[0127]
Then, the pressure estimation model constituted by the first pressure estimation model and the second pressure estimation model stored in the estimation model DB 27 is displayed on the model display means 32 to be notified to the operator or the like.
[0128]
As described above, also in the pressure estimation model construction system 4 of the present embodiment, the pressure estimation model at a predetermined date and time at the offline measurement point 16 is constructed in a format using online data measured online. Therefore, an estimation model relating to the pressure distribution of the water distribution pipe 2 at the off-line measurement point 16 can be accurately constructed. In particular, also in the present embodiment, since the complicated physical information on the water distribution network required in the prior art is unnecessary, the pressure estimation model construction system 4 can be simplified, and the time required for constructing the pressure estimation model is greatly reduced. Can be shortened.
[0129]
In addition, since the pressure estimation model is constructed using a neural network, the pressure estimation model can be constructed in consideration of the terms of the second-order and higher-order systems. A pressure estimation model can be constructed well.
[0130]
As a modification of the present embodiment, the statistical data calculating means 30 and the normalizing means 31 are not provided, and the online data and the offline data obtained by the data obtaining means 29 are directly sent to the clustering means 23. Even the pressure estimation model construction system 4 can provide the same operation and effect as those in the above-described second embodiment.
[0131]
Third embodiment
FIG. 5 is a diagram showing the third embodiment of the present invention, and is a schematic diagram showing the configuration of the entire pressure estimation model construction system.
[0132]
In the pressure estimation model construction system 4 according to the third embodiment, the pressure estimation device 11 further includes a support unit 35, and the support unit 35 is connected to the normalization unit 31 and connected to the estimation model DB 27. Hydrant pressure estimating means 36 and an estimation result display means 37 connected to the hydrant pressure estimating means 36.
[0133]
The hydrant pressure estimation means 36 acquires online data corresponding to the current time from the normalization means 31 and acquires a pressure estimation model from the estimation model storage means. Then, the hydrant pressure estimating means 36 calculates the pressure value at the current time in the water distribution pipe 2 of the offline measurement point 16 corresponding to the obtained pressure estimation model based on the online data and the pressure estimation model corresponding to the obtained current time. It has the function of calculating.
[0134]
The estimation result display means 37 is configured to display the pressure value calculated by the fire hydrant pressure estimation means 36 so as to notify an operator or the like of the pressure value.
[0135]
Other configurations are substantially the same as those of the first embodiment shown in FIGS.
[0136]
In FIG. 5, the same parts as those in the first embodiment shown in FIGS. 1 and 2 are denoted by the same reference numerals, and detailed description thereof will be omitted.
[0137]
In the pressure estimation model construction system 4 of the present embodiment, the online data measured at the online measurement point 15 in the water distribution pipe 2 of the water distribution block 1 and the offline measurement point are also similar to the first embodiment. 16, the data acquisition means 29, the statistical value calculating means 30, the statistical value DB 28, the normalizing means 31, the clustering means 23, the first model building means, and the principal component calculating means 25 And a second model construction means, a pressure estimation model at a predetermined date and time at the offline measurement point 16 is obtained, and the pressure estimation model is stored in the estimation model DB 27.
[0138]
Thereafter, the hydrant pressure estimating means 36 acquires the online data corresponding to the current time from the normalizing means 31 and acquires the pressure estimation model corresponding to the acquired online data from the estimation model DB 27. Then, the hydrant pressure estimating means 36 calculates the pressure value at the current time in the water distribution pipe 2 at the offline measurement point 16 corresponding to the obtained pressure estimation model based on the online data and the pressure estimation model corresponding to the obtained current time. Is calculated.
[0139]
The pressure value corresponding to the current time calculated by the hydrant pressure estimating means 36 is sent to the estimation result displaying means 37 and displayed, and is notified to an operator or the like.
[0140]
The display method of the estimation result display means 37 may be any method. For example, it is possible to display the estimated pressure value itself, or to display the pressure value in a 2D format or a 3D format by contour lines. Further, even when the pressure estimated by the hydrant pressure estimating means 36 deviates from a preset allowable pressure range (operating pressure range), the estimation result displaying means 37 displays the estimated pressure. It can be displayed.
[0141]
As described above, the pressure estimation model construction system 4 of the present embodiment can construct a pressure estimation model at each offline measurement point 16 in a format using online data measured online.
[0142]
Further, according to the present embodiment, a specific pressure value corresponding to the current time at each off-line measurement point 16 can be estimated by the fire hydrant pressure estimating means 36.
[0143]
Next, a modified example of the present embodiment will be described.
[0144]
In the force estimation model construction system according to the present invention, the statistical value calculation means 30 and the normalization means 31 may not be provided.
[0145]
In this case, the online data and the offline data acquired by the data acquisition unit 29 are sent directly to the clustering unit 23. The clustering unit 23 performs a cluster analysis of the online data and the offline data sent from the online measurement data DB 21 and the offline measurement data DB 22 via the data acquisition unit 29.
[0146]
The fire hydrant pressure estimating means 36 is connected to the online measurement data DB 21 and acquires online data corresponding to the current time from the online measurement data DB 21.
[0147]
The other configuration is substantially the same as that of the above-described third embodiment shown in FIG. 5, and the same parts as those of the above-described third embodiment are denoted by the same reference numerals, and detailed description is omitted.
[0148]
Also in the present modification, the pressure estimation model at each offline measurement point 16 is constructed by the first pressure estimation model construction means 24 and the second pressure estimation model construction means 26 and stored in the estimation model DB 27.
[0149]
Then, the hydrant pressure estimating means 36 acquires online data corresponding to the current time from the online measurement data DB 21 and acquires a pressure estimation model corresponding to the online data from the estimation model DB 27. Then, the hydrant pressure estimating means 36 calculates a specific pressure value in the water distribution pipe 2 at each offline measurement point 16 corresponding to the current time based on the acquired online data and the pressure estimation model.
[0150]
The pressure value calculated by the hydrant pressure estimation means 36 is sent to the estimation result display means 37 and displayed.
[0151]
As described above, also in the present modification, the pressure estimation model construction system 4 can construct a pressure estimation model at each offline measurement point 16 in a format using online data measured online.
[0152]
Further, a specific pressure value corresponding to the current time at each offline measurement point 16 can be estimated by the fire hydrant pressure estimating means 36. For this reason, for example, in each location of the water distribution pipe 2 stretched over the entire area of the water distribution block 1, the pressure in the water distribution pipe becomes an allowable range (for example, a range of not less than an allowable minimum pressure and not more than an allowable maximum pressure). Can be verified.
[0153]
The data required by the pressure estimating means 36 of the support means 35 is data in the format used by the first pressure estimating model building means 24 and the second pressure estimating model building means 26. Therefore, when each of the model construction means 24 and 26 uses the normalized data, the pressure estimating means 36 also needs the normalized data, and If the data is used, the pressure estimation means 36 also needs the measured data as it is.
[0154]
In the present embodiment, it is assumed that the data input to the pressure estimating means 36 corresponds to the current time, and the pressure estimating means 36 estimates the pressure using all the online data. All the online data sent from the measuring device 10a and the flow measuring device 10b are input to the pressure estimating means 36.
[0155]
Fourth embodiment
FIG. 6 is a diagram showing the fourth embodiment of the present invention, and is a schematic diagram showing the configuration of the entire pressure estimation model construction system.
[0156]
In the pressure estimation model construction system 4 according to the fourth embodiment, the pressure estimation device 11 further includes a verification unit 40, and the verification unit 40 is connected to the date / time setting unit 41 and the date / time setting unit 41. And date / time designation data acquisition means 42 connected to the online measurement data DB 21.
[0157]
The date and time setting means 41 is configured to input the past predetermined date and time by an operator or the like when estimating the pressure at the past predetermined date and time at each offline measurement point 16.
[0158]
When estimating the pressure at each offline measurement point 16 during a certain verification period, a method of setting a verification start date and time and a verification end date and time is conceivable. By setting the verification start date and time and the verification start date and time to be the same day, it is possible to verify the specific date and time.
[0159]
The date / time designation data acquiring unit 42 acquires online data corresponding to a past predetermined date and time input from the date / time setting unit 41 from the online measurement data storage unit, and sends the acquired online data to the normalization unit 31. ing.
[0160]
The normalizing means 31 further has a function of normalizing the online data sent from the date / time designation data obtaining means 42 and sending the normalized online data to the hydrant pressure estimating means 36.
[0161]
The fire hydrant pressure estimating means 36 acquires a pressure estimation model corresponding to the online data sent from the date / time designation data acquisition means 42 via the normalization means 31 from the pressure estimation model storage means, and It further has a function of calculating an estimated pressure value at a predetermined date and time in the past based on the online data sent via the normalizing means 31 and the acquired pressure estimation model.
[0162]
Other configurations are substantially the same as those of the third embodiment shown in FIG.
[0163]
6, the same parts as those in the third embodiment shown in FIG. 5 are denoted by the same reference numerals, and detailed description is omitted.
[0164]
In the pressure estimation model construction system 4 of the present embodiment, the online data measured at the online measurement point 15 in the water distribution pipe 2 of the water distribution block 1 and the offline measurement point are also similar to the first embodiment. 16, the data acquisition means 29, the statistical value calculating means 30, the statistical value DB 28, the normalizing means 31, the clustering means 23, the first model building means, and the principal component calculating means 25 And a second model construction means, a pressure estimation model at a predetermined date and time at the offline measurement point 16 is obtained, and the pressure estimation model is stored in the estimation model DB 27.
[0165]
Then, a predetermined date and time in the past for which pressure is to be estimated is input to the date and time setting means 41 by an operator or the like. The predetermined date and time input to the date and time setting unit 41 is sent to the date and time designation data acquisition unit 42.
[0166]
The date and time designation data acquisition unit 42 acquires the online data corresponding to the predetermined date and time sent from the date and time setting unit 41 from the online measurement data DB 21. Then, the online data acquired by the online measurement data DB 21 is sent from the date / time designation data acquiring unit 42 to the normalizing unit 31.
[0167]
The normalization unit 31 normalizes the online data sent from the normalization unit 31. Then, the normalizing means 31 sends the normalized online data to the hydrant pressure estimating means 36.
[0168]
The fire hydrant pressure estimating means 36 acquires a pressure estimating model corresponding to the online data sent from the normalizing means 31 from the estimating model DB 27. Then, the hydrant pressure estimating means 36 determines a past predetermined value in the water distribution pipe 2 of each offline measuring point 16 based on the online data sent from the normalizing means 31 and a pressure estimation model corresponding to the online data. Calculate the date and time pressure value.
[0169]
The pressure value corresponding to the past predetermined date and time calculated by the hydrant pressure estimating means 36 is sent to the estimation result display means 37 and displayed, and is notified to an operator or the like.
[0170]
The estimation result display means 37 can display the calculated pressure value by various methods. For example, the estimation result display means 37 continuously displays the pressure value in a certain verification period (continuous reproduction display), It is possible to display a pressure value at an arbitrary time in the period (arbitrary time display) or to display a pressure deviation (pressure fluctuation) from a predetermined time before a predetermined time. The “predetermined designated time” here can be set by, for example, an operator via the date and time setting unit 41, but is not limited to this.
[0171]
As described above, the pressure estimation model construction system 4 of the present embodiment can construct a pressure estimation model at each offline measurement point 16 in a format using online data measured online. The hydrant pressure estimating means 36 can estimate a specific pressure value corresponding to a predetermined date and time in the past at each offline measurement point 16.
[0172]
【The invention's effect】
As described above, according to the pressure estimation model building system of the present invention, among the distribution pipes stretched around the distribution block, the pressure distribution in the distribution pipe at the online measurement point can be obtained online as online data, and the offline The pressure distribution in the distribution pipe at the measurement point can be obtained by a pressure estimation model constructed based on online data and offline data measured in advance. Therefore, according to the present invention, it is possible to accurately obtain the pressure in the water distribution pipe at the online measurement point and the offline measurement point in the water distribution block.
[Brief description of the drawings]
FIG. 1 is a schematic diagram showing a configuration of an entire pressure estimation model construction system according to a first embodiment of the present invention.
FIG. 2 shows online data and offline data classified into each cluster by cluster analysis.
FIG. 3 is a diagram for explaining “units” used in a neural network.
FIG. 4 is a diagram showing a relationship between an “input layer”, an “intermediate layer”, and an “output layer” used in a neural network.
FIG. 5 is a diagram illustrating a third embodiment of the present invention, and is a schematic diagram illustrating a configuration of an entire pressure estimation model construction system.
FIG. 6 is a diagram illustrating a fourth embodiment of the present invention, and is a schematic diagram illustrating a configuration of an entire pressure estimation model construction system.
FIG. 7 is a schematic diagram showing the configuration of the entire conventional pressure estimation model construction system.
[Explanation of symbols]
1 Water distribution block
2 Water pipe
3) Water distribution injection section
4 Pressure estimation model construction system
10a pressure measuring instrument
10b flow meter (online measuring means)
11 Pressure estimation device
15 Online measurement point
16 Offline measurement point
21. Online measurement data DB (online measurement data storage means)
22 Offline measurement data DB (offline measurement data storage means)
23 clustering means
24. Means for constructing first pressure estimation model
25 Principal component calculation means
26 Second pressure estimation model construction means
27 ° estimation model DB (pressure estimation model storage means)
28 Online measurement data DB (Online measurement data storage means)
29 Data acquisition means
30 Statistical value calculation means
31 normalization means
32 model display means

Claims (12)

配水ブロックに張り巡らされた配水管内の圧力分布に関する推定モデルを構築する圧力推定モデル構築システムであって、
配水管のうち1以上の箇所に設けられたオンライン計測ポイントにおける配水管内の圧力および水流量のうち少なくともいずれか一方をオンラインデータとして計測し、当該オンラインデータをオンラインで後段に送る機能を有するオンライン計測手段と、
配水管のうちオンライン計測ポイントとは異なる1以上の箇所に設けられたオフライン計測ポイントにおいて予め計測された配水管内の圧力をオフラインデータとして記憶し、当該オフラインデータを後段に送る機能を有するオフライン計測データ記憶手段と、
オンライン計測手段及びオフライン計測データ記憶手段の後段に設けられ、オンライン計測手段から送られてくるオンラインデータと、オフライン計測データ記憶手段から送られてくるオフラインデータと、をクラスター分析によって各クラスターに分類する機能を有するクラスタリング手段と、
クラスタリング手段の後段に設けられ、各オンラインデータと同一クラスターに分類される各オフラインデータについて、同一クラスターに分類される各オンラインデータに基づき、当該各オフラインデータに対応するオフライン計測ポイントにおける配水管内の圧力モデルである第1圧力推定モデルを構築する第1圧力推定モデル構築手段と、
クラスタリング手段の後段に設けられ、各オンラインデータと異なるクラスターに分類される各オフラインデータについて、主成分分析を行って、当該各オフラインデータに対応する推定モデル入力値を演算する機能を有する主成分演算手段と、
主成分演算手段の後段に設けられ、各オンラインデータと異なるクラスターに分類される各オフラインデータについて、当該各オフライン計測データに対応する推定モデル入力値に基づき、当該各オフラインに対応するオフライン計測ポイントにおける配水管内の圧力モデルである第2圧力推定モデルを構築する第2圧力推定モデル構築手段と、
第1圧力推定モデル構築手段及び第2圧力推定モデル構築手段に接続され、第1圧力推定モデル構築手段によって構築される第1圧力推定モデルと、第2圧力推定モデル構築手段によって構築される第2圧力推定モデルと、から構成される圧力推定モデルを記憶する圧力推定モデル記憶手段と、
を備えたことを特徴とする圧力推定モデル構築システム。
A pressure estimation model construction system for constructing an estimation model for a pressure distribution in a water distribution pipe stretched around a water distribution block,
Online measurement having a function of measuring at least one of pressure and water flow rate in a water distribution pipe at online measurement points provided at one or more locations in a water distribution pipe as online data, and sending the online data to a subsequent stage online. Means,
Off-line measurement data having a function of storing, as offline data, the pressure in the water distribution pipe previously measured at an offline measurement point provided at one or more points different from the online measurement point in the water distribution pipe, and sending the offline data to a subsequent stage. Storage means;
Provided after the online measurement means and the offline measurement data storage means, the online data sent from the online measurement means and the offline data sent from the offline measurement data storage means are classified into clusters by cluster analysis. Clustering means having a function;
The pressure in the water distribution pipe at the offline measurement point corresponding to each offline data, based on each online data classified into the same cluster, for each offline data classified into the same cluster, provided at the subsequent stage of the clustering means. First pressure estimation model construction means for constructing a first pressure estimation model as a model;
Principal component calculation provided at the subsequent stage of the clustering means and having a function of performing principal component analysis on each offline data classified into a different cluster from each online data and calculating an estimated model input value corresponding to each offline data Means,
Provided at the subsequent stage of the principal component calculation means, for each offline data classified into a different cluster from each online data, based on an estimated model input value corresponding to each offline measurement data, at an offline measurement point corresponding to each offline Second pressure estimation model construction means for constructing a second pressure estimation model that is a pressure model in the water distribution pipe;
A first pressure estimation model connected to the first pressure estimation model construction means and the second pressure estimation model construction means and constructed by the first pressure estimation model construction means and a second pressure estimation model constructed by the second pressure estimation model construction means. Pressure estimation model, pressure estimation model storage means for storing a pressure estimation model composed of,
A pressure estimation model construction system comprising:
第1圧力推定モデル構築手段は、重回帰分析を用いて第1圧力推定モデルを構築し、
第2圧力推定モデル構築手段は、重回帰分析を用いて第2圧力推定モデルを構築する
ことを特徴とする請求項1に記載の圧力推定モデル構築システム。
The first pressure estimation model construction means constructs a first pressure estimation model using multiple regression analysis,
The pressure estimation model construction system according to claim 1, wherein the second pressure estimation model construction means constructs the second pressure estimation model using multiple regression analysis.
第1圧力推定モデル構築手段は、ニューラル・ネットワークを用いて第1圧力推定モデルを構築し、
第2圧力推定モデル構築手段は、ニューラル・ネットワークを用いて第2圧力推定モデルを構築する
ことを特徴とする請求項1に記載の圧力推定モデル構築システム。
The first pressure estimation model construction means constructs a first pressure estimation model using a neural network,
The pressure estimation model construction system according to claim 1, wherein the second pressure estimation model construction means constructs the second pressure estimation model using a neural network.
オンライン計測手段とクラスタリング手段との間に設けられ、オンライン計測手段による計測値を記憶するオンライン計測データ記憶手段と、
オンライン計測データ記憶手段及びオフライン計測データ記憶手段とクラスタリング手段との間に設けられ、オンライン計測データ記憶手段に記憶されているオンラインデータを取得すると共に、オンライン計測データ記憶手段から取得したオンラインデータの計測時刻に対応するオフラインデータをオフライン計測データ記憶手段から取得して、取得したオンラインデータ及びオフラインデータを後段に送る機能を有するデータ取得手段と、
を更に備えたことを特徴とする請求項1乃至3のいずれかに記載の圧力推定モデル構築システム。
An online measurement data storage unit provided between the online measurement unit and the clustering unit, and storing a measurement value by the online measurement unit;
The online measurement data storage means and the offline measurement data storage means are provided between the clustering means and acquire online data stored in the online measurement data storage means and measure the online data acquired from the online measurement data storage means. Data acquisition means having a function of acquiring offline data corresponding to time from the offline measurement data storage means, and sending the acquired online data and offline data to a subsequent stage,
The pressure estimation model construction system according to any one of claims 1 to 3, further comprising:
データ取得手段とクラスタリング手段との間に設けられ、送られてくるオンラインデータ及びオフラインデータを統計化し、統計化されたオンラインデータ及びオフラインデータを後段に送る機能を有する統計値演算手段を更に備えた
ことを特徴とする請求項4に記載の圧力推定モデル構築システム。
Further provided is a statistic calculation means provided between the data acquisition means and the clustering means, which has a function of statisticizing the transmitted online data and offline data and transmitting the statisticized online data and offline data to the subsequent stage. The pressure estimation model construction system according to claim 4, characterized in that:
データ取得手段とクラスタリング手段との間に設けられ、送られてくるオンラインデータ及びオフラインデータを正規化して後段へ送る機能を有する正規化手段を更に備えた
ことを特徴とする請求項4に記載の圧力推定モデル構築システム。
5. The apparatus according to claim 4, further comprising a normalizing unit provided between the data acquiring unit and the clustering unit, the normalizing unit having a function of normalizing the transmitted online data and offline data and transmitting the data to a subsequent stage. Pressure estimation model construction system.
統計値演算手段とクラスタリング手段との間に設けられ、送られてくるオンラインデータ及びオフラインデータを正規化して後段へ送る機能を有する正規化手段を更に備えた
ことを特徴とする請求項5に記載の圧力推定モデル構築システム。
6. The apparatus according to claim 5, further comprising a normalizing means provided between the statistical value calculating means and the clustering means and having a function of normalizing the sent online data and offline data and sending the data to a subsequent stage. Pressure estimation model construction system.
オンライン計測データ記憶手段に接続されると共に推定モデル記憶手段に接続され、現在時刻に対応するオンラインデータをオンライン計測データ記憶手段から取得すると共に当該オンラインデータに対応する圧力推定モデルを推定モデル記憶手段から取得し、取得した現在時刻に対応するオンラインデータと圧力推定モデルとに基づいて、取得した圧力推定モデルに対応するオフライン計測ポイントの配水管内における現在時刻の圧力値を演算する機能を有する消火栓圧力推定手段を更に備えた
ことを特徴とする請求項4乃至7のいずれかに記載の圧力推定モデル構築システム。
Connected to the online measurement data storage means and connected to the estimation model storage means, obtains online data corresponding to the current time from the online measurement data storage means, and obtains a pressure estimation model corresponding to the online data from the estimation model storage means. Fire hydrant pressure estimation having a function of calculating the pressure value at the current time in the water pipe of the offline measurement point corresponding to the acquired pressure estimation model based on the acquired online data and the pressure estimation model corresponding to the acquired current time The pressure estimation model construction system according to any one of claims 4 to 7, further comprising means.
正規化手段に接続されると共に推定モデル記憶手段に接続され、現在時刻に対応するオンラインデータを正規化手段から取得すると共に推定モデル記憶手段から圧力推定モデルを取得し、取得した現在時刻に対応するオンラインデータと圧力推定モデルとに基づいて、取得した圧力推定モデルに対応するオフライン計測ポイントの配水管内における現在時刻の圧力値を演算する機能を有する消火栓圧力推定手段
を更に備えたことを特徴とする請求項6又は7のいずれかに記載の圧力推定モデル構築システム。
Connected to the normalization means and connected to the estimation model storage means, acquires online data corresponding to the current time from the normalization means, acquires a pressure estimation model from the estimation model storage means, and corresponds to the acquired current time. A hydrant pressure estimating means having a function of calculating a pressure value at a current time in a water distribution pipe of an offline measurement point corresponding to the obtained pressure estimation model based on the online data and the pressure estimation model, is further provided. The pressure estimation model construction system according to claim 6.
過去の所定日時が入力される日時設定手段と、
日時設定手段に接続されると共にオンライン計測データ記憶手段に接続され、日時設定手段に入力された過去の所定日時に対応するオンラインデータをオンライン計測データ記憶手段から取得して、取得したオンラインデータを正規化手段に送る日時指定データ取得手段と、を更に備え、
正規化手段は、日時指定データ取得手段から送られくるオンラインデータを正規化して、正規化したオンラインデータを消火栓圧力推定手段に送る機能を更に有し、
消火栓圧力推定手段は、日時指定データ取得手段から正規化手段を介して送られくるオンラインデータに対応する圧力推定モデルを圧力推定モデル記憶手段から取得して、日時指定データ取得手段から正規化手段を介して送られくるオンラインデータと取得した圧力推定モデルとに基づいて、過去の所定日時における圧力推定値を演算する機能を更に有する
ことを特徴とする請求項9に記載の圧力推定モデル構築システム。
Date and time setting means for inputting a predetermined date and time in the past;
Connected to the date and time setting means and connected to the online measurement data storage means, the online data corresponding to the past predetermined date and time input to the date and time setting means is acquired from the online measurement data storage means, and the acquired online data is normalized. Date and time designation data acquisition means to be sent to the conversion means,
The normalizing means normalizes the online data sent from the date and time designation data acquiring means, and further has a function of sending the normalized online data to the hydrant pressure estimating means.
The hydrant pressure estimating means acquires the pressure estimation model corresponding to the online data sent from the date / time designation data acquisition means via the normalization means from the pressure estimation model storage means, and executes the normalization means from the date / time designation data acquisition means. The pressure estimation model construction system according to claim 9, further comprising a function of calculating a pressure estimation value at a predetermined date and time in the past based on the online data sent via the PC and the acquired pressure estimation model.
消火栓圧力推定手段に接続され、消火栓圧力推定手段によって演算された圧力値を表示する推定結果表示手段を更に備えたことを特徴とする請求項8乃至10のいずれかに記載の圧力推定モデル構築システム。The pressure estimation model construction system according to any one of claims 8 to 10, further comprising estimation result display means connected to the hydrant pressure estimation means and displaying the pressure value calculated by the hydrant pressure estimation means. . 圧力推定モデル記憶手段に接続され、圧力推定モデル記憶手段に記憶されている圧力推定モデルを表示するモデル表示手段を更に備えたことを特徴とする請求項1乃至11のいずれかに記載の圧力推定モデル構築システム。The pressure estimation according to any one of claims 1 to 11, further comprising model display means connected to the pressure estimation model storage means and displaying the pressure estimation model stored in the pressure estimation model storage means. Model building system.
JP2002295140A 2002-10-08 2002-10-08 Pressure estimation model construction system Expired - Lifetime JP4291992B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002295140A JP4291992B2 (en) 2002-10-08 2002-10-08 Pressure estimation model construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002295140A JP4291992B2 (en) 2002-10-08 2002-10-08 Pressure estimation model construction system

Publications (2)

Publication Number Publication Date
JP2004131957A true JP2004131957A (en) 2004-04-30
JP4291992B2 JP4291992B2 (en) 2009-07-08

Family

ID=32285487

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002295140A Expired - Lifetime JP4291992B2 (en) 2002-10-08 2002-10-08 Pressure estimation model construction system

Country Status (1)

Country Link
JP (1) JP4291992B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007170021A (en) * 2005-12-21 2007-07-05 Toshiba Corp Water distribution and pipeline information analysis system
JP2010121298A (en) * 2008-11-17 2010-06-03 Toshiba Corp Unknown water volume prediction device and unknown water volume prediction system
JP2019079320A (en) * 2017-10-25 2019-05-23 株式会社東芝 End pressure control support device, end pressure control support method and computer program
JP2020038460A (en) * 2018-09-03 2020-03-12 株式会社東芝 Apparatus and method for end-pressure control assistance and computer program
CN111270728A (en) * 2020-01-21 2020-06-12 重庆垫江水务有限公司 Gravity type constant pressure water supply method
CN112594553A (en) * 2020-12-07 2021-04-02 熊猫智慧水务有限公司 Pipe network pressure regulation and control method based on pressure target curve

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007170021A (en) * 2005-12-21 2007-07-05 Toshiba Corp Water distribution and pipeline information analysis system
JP2010121298A (en) * 2008-11-17 2010-06-03 Toshiba Corp Unknown water volume prediction device and unknown water volume prediction system
JP2019079320A (en) * 2017-10-25 2019-05-23 株式会社東芝 End pressure control support device, end pressure control support method and computer program
JP7067895B2 (en) 2017-10-25 2022-05-16 株式会社東芝 End pressure control support device, end pressure control support method and computer program
JP2020038460A (en) * 2018-09-03 2020-03-12 株式会社東芝 Apparatus and method for end-pressure control assistance and computer program
JP7182961B2 (en) 2018-09-03 2022-12-05 株式会社東芝 Terminal pressure control support device, terminal pressure control support method and computer program
CN111270728A (en) * 2020-01-21 2020-06-12 重庆垫江水务有限公司 Gravity type constant pressure water supply method
CN112594553A (en) * 2020-12-07 2021-04-02 熊猫智慧水务有限公司 Pipe network pressure regulation and control method based on pressure target curve

Also Published As

Publication number Publication date
JP4291992B2 (en) 2009-07-08

Similar Documents

Publication Publication Date Title
CN107153874B (en) Water quality prediction method and system
CN109376925B (en) Dynamic self-adaptive optimization method for node flow of water supply pipe network
JP4914457B2 (en) Automatic virtual measurement system and method
CN106644162B (en) Ring main unit wire core temperature soft measurement method based on neighborhood preserving embedding regression algorithm
CN109992921B (en) On-line soft measurement method and system for thermal efficiency of boiler of coal-fired power plant
Wu et al. Prediction of stress intensity factors in pavement cracking with neural networks based on semi-analytical FEA
CN110009614A (en) Method and apparatus for output information
CN116150897A (en) Machine tool spindle performance evaluation method and system based on digital twin
CN115310361B (en) Underground coal mine dust concentration prediction method and system based on WGAN-CNN
CN113469470B (en) Energy consumption data and carbon emission correlation analysis method based on electric brain center
CN108491931A (en) A method of non-destructive testing precision is improved based on machine learning
CN115438726A (en) Device life and fault type prediction method and system based on digital twin technology
JP4291992B2 (en) Pressure estimation model construction system
CN113393057A (en) Wheat yield integrated prediction method based on deep fusion machine learning model
CN116702638A (en) Double-layer intelligent diagnosis method and system for sedimentation disease of drainage pipeline
WO2011162592A1 (en) A method and system for validating energy measurement in a high pressure gas distribution network
JP2006209331A (en) Equipment diagnostic device and measuring unit diagnostic device on network
CN113849943A (en) Water supply network node water demand amount checking method coupled with pressure prior information
CN110990938B (en) Soft measurement method for tunnel face in rock digging state
CN116663419A (en) Sensorless equipment fault prediction method based on optimized Elman neural network
CN115618735A (en) Facility structure health monitoring method based on digital twins and related device
CN115359197A (en) Geological curved surface reconstruction method based on spatial autocorrelation neural network
Aramane et al. Iot and neural network based multi region and simultaneous leakage detection in pipelines
Marwala Finite-element-model updating using a Bayesian approach
JP3771858B2 (en) Apparatus optimum design support method, apparatus optimum design support system, and computer program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050805

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080214

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080422

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080618

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090106

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090220

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090313

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090406

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120410

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130410

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140410

Year of fee payment: 5