JP2004092313A - Metal joint for building units - Google Patents
Metal joint for building units Download PDFInfo
- Publication number
- JP2004092313A JP2004092313A JP2002257960A JP2002257960A JP2004092313A JP 2004092313 A JP2004092313 A JP 2004092313A JP 2002257960 A JP2002257960 A JP 2002257960A JP 2002257960 A JP2002257960 A JP 2002257960A JP 2004092313 A JP2004092313 A JP 2004092313A
- Authority
- JP
- Japan
- Prior art keywords
- unit
- floor
- building
- joining
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
この発明は、建物ユニット用接合金具に関するものである。
【0002】
【従来の技術】
予め工場で製造したほぼ箱状の建物ユニットを建築現場へ複数輸送し、建築現場で複数の建物ユニットを組み立てることにより、短期間でユニット建物を構築するようにしたユニット工法が従来より行われている。
【0003】
このようなユニット工法では、下階の建物ユニット(下階ユニット)の上に上階の建物ユニット(上階ユニット)をオーバーハング(張出)させて設置することがある。
【0004】
例えば、特公平8−14151号公報(特許第2110058号)のものでは、下階ユニットの上に上階ユニットをオーバーハングさせると共に、下階ユニットのオーバーハング側の2本の柱の上端部からオーバーハング方向へ張出部材を設けて、この張出部材で上階ユニットのオーバーハング部を支持させるようにしている。
【0005】
【発明が解決しようとする課題】
しかしながら、このような上記公報のユニット建物では、下階ユニットに設けられた張出部材は、対応する上階ユニットのオーバーハング部のみを個別に支持する構造となっていたため、下階ユニットと上階ユニットとをそれぞれ隣接配置した場合に、隣接するオーバーハング部の支持構造の間に何らの連携関係も存在しないこととなるので、ユニット建物に水平力が作用した際に、隣接するオーバーハング部の先端部分の間にズレ変位が生じ易いなどの問題があった。
【0006】
また、下階ユニットの柱と上階ユニットの下梁とを接合し、更に、オーバーハング部の補強として下階ユニットの柱に水平ブレス材の端部を接合する構造を採用した場合には、これらが交錯して複雑な構造となってしまうという問題があった。
【0007】
更に、下階ユニットの妻ジョイントピースで上階ユニットとの接合を行った場合、建物ユニットの外側からの接合作業ができなくなるため、接合部位直上の床板を切欠く必要が生じ、以て、床板割付けが複雑となるという問題があった。
【0008】
そこで、本発明の目的は、上記の問題点を解消し、構造の単純化と床板割付けの容易化を得ることができる建物ユニット用接合金具を提供することにある。
【0009】
【課題を解決するための手段】
上記課題を解決するために、請求項1に記載された発明では、下階建物ユニットと、該下階建物ユニットの上部にオーバーハング状態で載置された上階建物ユニットとを接合する建物ユニット用接合金具であって、接合金具本体が、下階建物ユニットのユニット柱上端側面に接合可能な下階柱接合部と、上階建物ユニットの下梁に接合可能な上階下梁接合部と、ブレス材の端部を接合可能なブレス材接合部とを一体的に備えた建物ユニット用接合金具を特徴としている。
【0010】
このように構成された請求項1にかかる発明によれば、下階柱との接合機能と、上階下梁との接合機能と、ブレス材との接合機能という3つの接合機能を1つの金具にまとめたことにより、納りが単純化され、コスト低減を得ることができる。また、建物ユニットの外側からの接合作業が可能となるので、接合部位直上の床板を切欠く必要がなくなり、床板割付けが容易となる。
【0011】
【発明の実施の形態】
以下、本発明を具体化した実施の形態について、図示例と共に説明する。
【0012】
図1〜図9は、この発明の実施の形態を示すものである。
【0013】
まず、全体的な構成を説明すると、図1に示すように、複数の下階建物ユニット1A,1Bが隣接配置されている。そして、各下階建物ユニット1A,1Bの上部にはそれぞれ上階建物ユニット2A,2Bが複数隣接状態で載置されている。以上により、ユニット建物4が構成されている。なお、上記のユニット建物4の構成は、説明の都合上、単純化したものであり、実際には上記に限られるものでない。また、各建物ユニットは、居室ユニットに限らず、バルコニーユニットなどであっても良い。
【0014】
このユニット建物4では、各上階建物ユニット2A,2Bの一部が下階建物ユニット1A,1Bに対し外方へ張出して(オーバーハングして)オーバーハング部5を形成している。
【0015】
そして、下階建物ユニット1A,1Bの相隣接する上縁部間、および、上階建物ユニット2A,2Bの相隣接する下縁部間の少なくとも一方から外方へ延出する延出梁6が設けられ、この延出梁6の延出部6aによって上階建物ユニット2A,2Bのオーバーハング部5を同時に支持するようにしている。
【0016】
そして、下階建物ユニット1A,1Bの隣接しない側の上縁部から延出梁6とほぼ平行な片持梁7が突設され、片持梁7と延出梁6とによって上階建物ユニット2A,2Bのオーバーハング部5を支持するようにしている。
【0017】
更に、複数の延出梁6の外方端間、または、延出梁6と片持梁7の外方端間に渡し梁8が架設されている。
【0018】
そして、下階建物ユニット1A,1B、上階建物ユニット2A,2Bの天井面や床面に対し、水平ブレス9(ブレス材)を設ける。この水平ブレス9は、予め工場で取付けておくようにする。
【0019】
更に、延出梁6と片持梁7との間に水平ブレス10(ブレス材)を設ける。この水平ブレス10は、現地施工とする。
【0020】
ここで、各建物ユニットは、図2に示すように、4本のユニット柱11の上下端間をジョイントピース12を介してそれぞれ上梁14と下梁15(図5、図6参照)とで連結してなるボックスラーメン構造の鉄骨枠に面パネルを取付けた鉄骨系ユニットとする。
【0021】
上記した構成に対しこの発明では、下階建物ユニット1A,1Bと、この下階建物ユニット1A,1Bの上部にオーバーハング状態で載置された上階建物ユニット2A,2Bとの間の接合に、図6から図9に示すような、建物ユニット用接合金具21を用いる。
【0022】
この建物ユニット用接合金具21は、接合金具本体22に、下階建物ユニット1A,1Bのユニット柱11上端側面に接合可能な下階柱接合部23と、上階建物ユニット2A,2Bの下梁15(特に下面)に接合可能な上階下梁接合部24と、ブレス材10の端部を接合可能なブレス材接合部25とを一体的に備えている。
【0023】
ここで、下階柱接合部23は略垂直なプレート状をしている。また、上階下梁接合部24は略水平なプレート状をしている。ブレス材接合部25は略水平なプレート状をしている。
【0024】
下階柱接合部23、上階下梁接合部24、ブレス材接合部25には、それぞれ、ボルト固定用の、ボルト孔26が形成されている。
【0025】
次に、この実施の形態の作用について説明する。
【0026】
建物ユニット用接合金具21の下階柱接合部23を、ボルトを用いて下階建物ユニット1A,1Bのユニット柱11上端側面に接合する。そして、建物ユニット用接合金具21の上階下梁接合部24を、ボルトを用いて上階建物ユニット2A,2Bの下梁15(特に下面)に接合する。更に、建物ユニット用接合金具21のブレス材接合部25に、ボルトを用いてブレス材10の端部を接合する。
【0027】
このように、下階ユニット柱11との接合機能と、上階の下梁15との接合機能と、ブレス材10との接合機能という3つの接合機能を1つの金具(建物ユニット用接合金具21)にまとめたことにより、納りが単純化され、コスト低減を得ることができる。また、建物ユニットの外側からの接合作業が可能となるので、接合部位直上の床板を切欠く必要がなくなり、床板割付けが容易となる。
【0028】
【発明の効果】
以上説明してきたように、請求項1の発明によれば、下階柱との接合機能と、上階下梁との接合機能と、ブレス材との接合機能という3つの接合機能を1つの金具にまとめたことにより、納りが単純化され、コスト低減を得ることができる。また、建物ユニットの外側からの接合作業が可能となるので、接合部位直上の床板を切欠く必要がなくなり、床板割付けが容易となる、という実用上有益な効果を発揮し得る。
【図面の簡単な説明】
【図1】本発明の実施の形態の全体斜視図である。
【図2】図1の下階建物ユニットの上面部分の水平断面図である。
【図3】図1の部分拡大図である。
【図4】上階建物ユニットの下面部分の部分拡大図である。
【図5】図4の側面図である。
【図6】建物ユニット用接合金具の斜視図である。
【図7】図6の平面図である。
【図8】図7の正面図である。
【図9】図8の側面図である。
【符号の説明】
1A,1B 下階建物ユニット
2A,2B 上階建物ユニット
10 ブレス材
11 ユニット柱
15 下梁
21 建物ユニット用接合金具
22 接合金具本体
23 下階柱接合部
24 上階下梁接合部
25 ブレス材接合部[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a joint fitting for a building unit.
[0002]
[Prior art]
Conventionally, unit construction methods have been performed in which a plurality of almost box-shaped building units manufactured in advance at a factory are transported to a construction site, and a plurality of building units are assembled at the construction site so that a unit building is constructed in a short time. I have.
[0003]
In such a unit construction method, an upper-floor building unit (upper-floor unit) may be installed overhanging (overhanging) on a lower-floor building unit (lower-floor unit).
[0004]
For example, in Japanese Patent Publication No. Hei 8-14151 (Patent No. 2110058), an upper floor unit is overhanged on a lower floor unit, and at the same time, two pillars on the overhang side of the lower floor unit are overhanged. An overhang member is provided in the overhang direction, and the overhang portion of the upper floor unit is supported by the overhang member.
[0005]
[Problems to be solved by the invention]
However, in such a unit building of the above publication, the overhanging members provided on the lower floor unit have a structure that individually supports only the overhang portion of the corresponding upper floor unit. When the floor units are arranged adjacent to each other, there is no cooperative relationship between the support structures of the adjacent overhang portions, so when a horizontal force acts on the unit building, the adjacent overhang portions There is a problem in that a displacement is easily generated between the tip portions of the two.
[0006]
Also, in the case where a structure in which the pillar of the lower floor unit is joined to the lower beam of the upper floor unit, and the end of the horizontal breath material is joined to the pillar of the lower floor unit as a reinforcement of the overhang portion, There is a problem that these intersect to form a complicated structure.
[0007]
Furthermore, if the lower floor unit is joined to the upper floor unit using the wife joint piece, it becomes impossible to join from the outside of the building unit, and it is necessary to cut out the floor plate immediately above the joint. There was a problem that allocation was complicated.
[0008]
Therefore, an object of the present invention is to solve the above-mentioned problems and to provide a fitting for a building unit capable of simplifying the structure and facilitating floor panel layout.
[0009]
[Means for Solving the Problems]
In order to solve the above-mentioned problem, in the invention described in claim 1, a building unit that joins a lower-floor building unit and an upper-floor building unit placed in an overhang state on an upper portion of the lower-floor building unit. A joint fitting for a lower-strength column joint that can be joined to a unit pillar upper end side surface of a lower-floor building unit, and an upper-floor lower beam joint that can be joined to a lower beam of an upper-floor building unit. The present invention is characterized by a joint fitting for a building unit integrally provided with a breath material joining portion capable of joining an end of the breath material.
[0010]
According to the invention according to claim 1 configured as described above, the three joining functions of the joining function with the lower story column, the joining function with the upper story lower beam, and the joining function with the breath material are combined into one metal fitting. As a result, the cost can be reduced by simplifying the arrangement. In addition, since the joining operation can be performed from the outside of the building unit, it is not necessary to cut out the floor plate immediately above the joining portion, and the floor plate can be easily allocated.
[0011]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0012]
1 to 9 show an embodiment of the present invention.
[0013]
First, the overall configuration will be described. As shown in FIG. 1, a plurality of lower-
[0014]
In this unit building 4, a part of each upper-
[0015]
An extending
[0016]
A
[0017]
Further, a
[0018]
Then, a horizontal breath 9 (breath material) is provided on the ceiling and floor surfaces of the lower-
[0019]
Further, a horizontal breath 10 (a breath material) is provided between the
[0020]
Here, as shown in FIG. 2, each building unit has an
[0021]
In contrast to the above-described configuration, in the present invention, the joining between the lower-
[0022]
The joining metal fitting 21 for a building unit includes a joining
[0023]
Here, the lower column joint 23 has a substantially vertical plate shape. The upper-floor lower beam joint 24 has a substantially horizontal plate shape. The breath material joint 25 has a substantially horizontal plate shape.
[0024]
A
[0025]
Next, the operation of this embodiment will be described.
[0026]
The lower-floor
[0027]
As described above, the three joining functions of the joining function with the lower
[0028]
【The invention's effect】
As described above, according to the first aspect of the present invention, the three joining functions of the joining function with the lower story column, the joining function with the upper story lower beam, and the joining function with the breath material are combined into one metal fitting. As a result, the cost can be reduced by simplifying the arrangement. In addition, since the joining operation from the outside of the building unit can be performed, it is not necessary to cut out the floor plate immediately above the joining portion, so that the floor plate can be easily allocated, which has a practically useful effect.
[Brief description of the drawings]
FIG. 1 is an overall perspective view of an embodiment of the present invention.
FIG. 2 is a horizontal sectional view of an upper surface portion of the lower-floor building unit in FIG. 1;
FIG. 3 is a partially enlarged view of FIG. 1;
FIG. 4 is a partially enlarged view of a lower surface portion of the upper floor building unit.
FIG. 5 is a side view of FIG. 4;
FIG. 6 is a perspective view of a joint fitting for a building unit.
FIG. 7 is a plan view of FIG. 6;
FIG. 8 is a front view of FIG. 7;
FIG. 9 is a side view of FIG.
[Explanation of symbols]
1A, 1B Lower-
Claims (1)
接合金具本体が、下階建物ユニットのユニット柱上端側面に接合可能な下階柱接合部と、上階建物ユニットの下梁に接合可能な上階下梁接合部と、ブレス材の端部を接合可能なブレス材接合部とを一体的に備えたことを特徴とする建物ユニット用接合金具。A lower unit building unit and a building unit joining fitting for joining an upper unit building unit placed in an overhang state on an upper portion of the lower unit building unit,
The joint fitting body joins the lower story column joint that can be joined to the upper side of the unit pillar of the lower building unit, the upper story lower beam joint that can be joined to the lower beam of the upper building unit, and the end of the breath material A joint fitting for a building unit, which is integrally provided with a possible breath material joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002257960A JP3944033B2 (en) | 2002-09-03 | 2002-09-03 | Bonding bracket for building unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002257960A JP3944033B2 (en) | 2002-09-03 | 2002-09-03 | Bonding bracket for building unit |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004092313A true JP2004092313A (en) | 2004-03-25 |
JP3944033B2 JP3944033B2 (en) | 2007-07-11 |
Family
ID=32062749
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002257960A Expired - Fee Related JP3944033B2 (en) | 2002-09-03 | 2002-09-03 | Bonding bracket for building unit |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3944033B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561523A (en) * | 2012-01-17 | 2012-07-11 | 湖南省金为型材有限公司 | Connection component for upright post and cross beam |
-
2002
- 2002-09-03 JP JP2002257960A patent/JP3944033B2/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561523A (en) * | 2012-01-17 | 2012-07-11 | 湖南省金为型材有限公司 | Connection component for upright post and cross beam |
CN102561523B (en) * | 2012-01-17 | 2014-03-19 | 湖南省金为型材有限公司 | Connection component for upright post and cross beam |
Also Published As
Publication number | Publication date |
---|---|
JP3944033B2 (en) | 2007-07-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2002097722A (en) | Unit type building and corner reinforcing material therefor | |
JP5123602B2 (en) | Unit type building and construction method of unit type building | |
JP2004092313A (en) | Metal joint for building units | |
JP2001164658A (en) | Beam joining structure and unit building | |
JPH1061025A (en) | Unit building and construction method thereof | |
JPH11131663A (en) | Frame body | |
JP4676609B2 (en) | Unit building | |
JP3887233B2 (en) | Unit building | |
JP3886826B2 (en) | Building unit and construction method | |
JP2018115491A (en) | Building structure | |
JPH09317197A (en) | Reinforcing method unit building and building unit | |
JP3359417B2 (en) | Building unit, unit building and construction method of unit building | |
JP3670940B2 (en) | Unit building and building unit | |
JP3574625B2 (en) | Unit building and its construction method | |
JP2000265568A (en) | Unit building | |
JP2015200139A (en) | Building having alcove structure | |
JP2002294873A (en) | Unit building and corner reinforcing material for unit building | |
JP4104246B2 (en) | Unit building and its construction method | |
JPH1061026A (en) | Unit building and reinforcing beam thereof | |
JP2001020386A (en) | Beam connection structure | |
JP2003082768A (en) | Unit building | |
JP2003064774A (en) | Unit building | |
JPH0988184A (en) | Unit type building | |
JPH1061022A (en) | Unit building and construction method thereof | |
JP2005307642A (en) | Unit building and method of constructing the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050711 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070302 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070314 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070406 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 3944033 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110413 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120413 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130413 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140413 Year of fee payment: 7 |
|
LAPS | Cancellation because of no payment of annual fees |