JP2004088840A - Power transmission plan making method and program - Google Patents

Power transmission plan making method and program Download PDF

Info

Publication number
JP2004088840A
JP2004088840A JP2002243607A JP2002243607A JP2004088840A JP 2004088840 A JP2004088840 A JP 2004088840A JP 2002243607 A JP2002243607 A JP 2002243607A JP 2002243607 A JP2002243607 A JP 2002243607A JP 2004088840 A JP2004088840 A JP 2004088840A
Authority
JP
Japan
Prior art keywords
power
transmission plan
demand
heat
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002243607A
Other languages
Japanese (ja)
Other versions
JP3942512B2 (en
Inventor
Mikiya Ishii
石井 幹也
Mitsuaki Yamazaki
山崎 詳明
Yasuki Kubota
久保田 泰基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2002243607A priority Critical patent/JP3942512B2/en
Publication of JP2004088840A publication Critical patent/JP2004088840A/en
Application granted granted Critical
Publication of JP3942512B2 publication Critical patent/JP3942512B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a power transmission plan making method which can make an appropriate power transmission plan by deriving power which can be transmitted to external consumers from a power generation system. <P>SOLUTION: This power transmission plan making method makes the plan of a power transmission from the power generation system. The system is equipped with a singular or plural power generation facilities, and a singular or plural power consumption devices receiving power required for operation from the above power generation facility to consumers. The method includes a power demand decision process which decides the temporal fluctuation properties of power demand of each of the above singular or plural power consumption devices; a surplus power estimation process which estimates the temporal fluctuation properties of surplus power in the above power generation system, referring to the temporal fluctuation properties of the above power demand and the temporal fluctuation properties of the surplus power by the above singular or plural power generation facilities; and a power transmission plan making process which makes the power transmission plan of the transmission power transmittable to the above consumers, based on the surplus power estimated in the above surplus power estimation process. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、発電システムから需要家に対する電力送電計画を作成する送電計画作成方法および送電計画作成プログラムに関する。
【0002】
【従来の技術】
電力小売事業の自由化の流れを受けて、既存の電力会社以外であっても発電設備を有する者は、発電により得られた電力を需要家に販売することができるようになった。例えば、ダムを管理するダム管理所などでは放水の際にタービンを回して発電を行って、ダム管理所自身で使用される電力を賄うことが従来から行われているが、今後は、自身で使用した後の余剰電力を販売することも可能となる。
【0003】
つまり、発電設備(例えば、ダム)と電力消費装置(例えば、ダム管理所)とからなる発電システムが構築され、その発電システムにおける余剰電力(発電設備での発電電力から、ダム管理所での消費電力を減算したもの)を外部に送電して販売するという電力小売事業を行うことができる。但し、電力小売事業を実施する電力事業者は、既存の電力会社が保有する送電線を使用して電力の送電を行う場合、所定期間内の、需要家における電力需要量と発電システムからの送電電力量とを一致させる同時同量制御を達成しなければならないことがある。
【0004】
【発明が解決しようとする課題】
しかしながら、従来は、発電設備と電力消費装置とを備えた発電システムにおいて、発電電力に占めるその電力消費装置における電力需要の割合が大きい場合、外部に送電可能な余剰電力を高い精度で見積もることが困難であった。上述したように、同時同量制御を達成するためには、正確な余剰電力を見積もることが必要であるのだが、従来のシステムでは外部に送電可能な余剰電力が正確に見積もられていないため、同時同量制御を達成できるかどうかが不確定となっていた。
【0005】
本発明は上記の問題点に鑑みてなされたものであり、その目的は、発電システムから外部の需要家に対して送電可能な電力を導出して、電力の適切な送電計画を作成可能な送電計画作成方法および送電計画作成プログラムを提供する点にある。
【0006】
【課題を解決するための手段】
上記課題を解決するための本発明に係る送電計画作成方法の第一の特徴構成は、特許請求の範囲の欄の請求項1に記載の如く、単数または複数の発電設備と、運転に必要な電力を前記単数または複数の発電設備から受ける単数または複数の電力消費装置とを備える発電システムから需要家への送電計画を作成する送電計画作成方法であって、前記単数または複数の電力消費装置のそれぞれの電力需要の時間変動特性を決定する電力需要決定工程と、前記電力需要の時間変動特性と前記単数または複数の発電設備による発電電力の時間変動特性とを参照して、前記発電システムにおける余剰電力の時間変動特性を推定する余剰電力推定工程と、前記需要家へ送電可能な送電電力の送電計画を、前記余剰電力推定工程で推定された余剰電力に基づいて作成する送電計画作成工程とを含む点にある。
【0007】
上記課題を解決するための本発明に係る送電計画作成方法の第二の特徴構成は、特許請求の範囲の欄の請求項2に記載の如く、上記第一の特徴構成に加えて、前記電力需要決定工程において、前記単数または複数の電力消費装置を、定常パターンで運転される第1の装置と特定のイベントの発生に関連して運転される第2の装置とに分類して、前記電力需要の時間変動特性を決定する点にある。ここで、定常パターンとは、その電力消費装置にとっての既定の運転パターンである。その結果、定常パターンで運転を行う電力消費装置の電力需要の時間変動特性は既知であるか、または非常に高い精度で見積もることができる。
【0008】
上記課題を解決するための本発明に係る送電計画作成方法の第三の特徴構成は、特許請求の範囲の欄の請求項3に記載の如く、上記第二の特徴構成に加えて、前記第2の装置の前記電力需要の時間変動特性が、前記イベントの実施スケジュールに基づいて決定される点にある。
【0009】
上記課題を解決するための本発明に係る送電計画作成方法の第四の特徴構成は、特許請求の範囲の欄の請求項4に記載の如く、上記第一から第三の何れかの特徴構成に加えて、前記発電システムが、前記発電設備の一部または全部として熱と電気とを併せて発生する熱電併給設備及び前記熱電併給設備から受けた熱を利用して運転を行う単数または複数の熱消費装置を備えてなり、前記単数または複数の熱消費装置のそれぞれの熱需要の時間変動特性を決定する熱需要決定工程を含み、前記単数または複数の発電設備による前記発電電力の時間変動特性が、前記熱需要の時間変動特性に対応して熱を供給するように前記熱電併給設備を運転させた場合に発生する電力の時間変動特性を参照して決定される点にある。
【0010】
上記課題を解決するための本発明に係る送電計画作成方法の第五の特徴構成は、特許請求の範囲の欄の請求項5に記載の如く、上記第四の特徴構成に加えて、前記熱需要決定工程において、前記単数または複数の熱消費装置を、定常パターンで運転される第3の装置と特定のイベントの発生に関連して運転される第4の装置とに分類して、前記熱需要の時間変動特性を決定する点にある。
【0011】
上記課題を解決するための本発明に係る送電計画作成方法の第六の特徴構成は、特許請求の範囲の欄の請求項6に記載の如く、上記第五の特徴構成に加えて、前記第4の装置の前記熱需要の時間変動特性が、前記イベントの実施スケジュールに基づいて決定される点にある。
【0012】
上記課題を解決するための本発明に係る送電計画作成方法の第七の特徴構成は、特許請求の範囲の欄の請求項7に記載の如く、上記第一から第六の何れかの特徴構成に加えて、前記単数または複数の発電設備が、前記発電システム内における廃熱を利用して発電を行う熱電変換設備を備え、前記熱電変換設備が利用可能な廃熱量の時間変動特性を決定する廃熱量決定工程を含み、前記単数または複数の発電設備による前記発電電力の時間変動特性が、前記廃熱量決定工程で決定された廃熱量を利用して前記熱電変換設備を運転させた場合に発生する電力の時間変動特性を参照して決定される点にある。
【0013】
上記課題を解決するための本発明に係る送電計画作成プログラムの特徴構成は、特許請求の範囲の欄の請求項8に記載の如く、請求項1から請求項7の何れか1項に記載の送電計画作成方法の前記各工程をコンピュータに実行させるためのプログラムである点である。
【0014】
以下に作用並びに効果を説明する。
本発明に係る送電計画作成方法の第一の特徴構成によれば、電力需要決定工程において、前記単数または複数の電力消費装置のそれぞれの電力需要の時間変動特性を決定し、余剰電力推定工程において、前記電力需要の時間変動特性と前記発電設備による発電電力の時間変動特性とを参照して、前記発電システムにおける余剰電力の時間変動特性を推定し、送電計画作成工程において、前記需要家へ送電可能な送電電力の送電計画を、前記余剰電力推定工程で推定された余剰電力に基づいて作成することで、この発電システムから需要家へ電力を送電する際に同時同量制御が要求されていても、送電可能電力(余剰電力)が高い精度で推測されているため、その同時同量制御の達成が容易になる。
【0015】
本発明に係る送電計画作成方法の第二の特徴構成によれば、上記単数または複数の電力消費装置が、定常パターンで運転される第1の装置と特定のイベントの発生に関連して運転される第2の装置とに分類されることで、上記第1の装置の電力需要の時間変動特性を高い精度で見積もることができ、第2の装置の電力需要の時間変動特性は既知ではないものの、特定のイベントが発生した場合を想定して、その際の電力需要の時間変動特性を見積もることができる。
【0016】
本発明に係る送電計画作成方法の第三の特徴構成によれば、上記イベントの実施スケジュールに基づいて上記第2の装置の運転スケジュールを決定することができるため、各装置による電力の消費スケジュール(電力需要の時間変動特性)を正確に見積もることができる。
【0017】
本発明に係る送電計画作成方法の第四の特徴構成によれば、熱需要決定工程において、前記単数または複数の熱消費装置のそれぞれの熱需要の時間変動特性が決定されることで、その熱需要の時間変動特性に対応して熱を供給するように前記熱電併給設備を運転させた場合に発生する電力の時間変動特性を正確に見積もることができる。その結果、この発電システムから需要家へ電力を送電する際に同時同量制御が要求されていても、送電可能電力(余剰電力)を高い精度で推測することができるため、適切な送電計画に基づいて容易に同時同量制御を達成することができる。
【0018】
本発明に係る送電計画作成方法の第五の特徴構成によれば、上記単数または複数の熱消費装置が、定常パターンで運転される第3の装置と特定のイベントの発生に関連して運転される第4の装置とに分類されることで、上記第3の装置の熱需要の時間変動特性を高い精度で見積もることができ、第4の装置の熱需要の時間変動特性は既知ではないものの、特定のイベントが発生した場合を想定して、その際の熱需要の時間変動特性を見積もることができる。
【0019】
本発明に係る送電計画作成方法の第六の特徴構成によれば、上記イベントの実施スケジュールに基づいて上記第4の装置の運転スケジュールを決定することができるため、各装置による熱の消費スケジュール(熱需要の時間変動特性)を正確に見積もることができる。
【0020】
本発明に係る送電計画作成方法の第七の特徴構成によれば、発電システム内において熱が発生しており、前記単数または複数の発電設備が、その廃熱を利用して発電を行う熱電変換設備を含んでいる場合、廃熱量決定工程において、前記熱電変換設備が利用可能な廃熱量の時間変動特性が決定されることで、その廃熱量を利用して前記熱電変換設備を運転させた場合に発生する電力の時間変動特性を正確に見積もることができる。その結果、この発電システムから需要家へ電力を送電する際に同時同量制御が要求されていても、送電可能電力(余剰電力)を高い精度で推測することができるため、適切な送電計画に基づいて容易に同時同量制御を達成することができる。
【0021】
本発明に係る送電計画作成プログラムの特徴構成によれば、コンピュータ上で送電計画作成方法における各工程を実行させることで、本発明に係る送電計画作成方法による上述の効果と同様の効果を得ることができる。
【0022】
【発明の実施の形態】
図1は、発電システム3で発生された電力を送電線を介して需要家6に送電するための送電計画を作成する際の情報と電力との流れを概略的に示す図である。
【0023】
発電システム3は、発電設備1と、運転に必要な電力を発電設備から受ける電力消費装置2とからなり、余剰電力を送電線を介して外部の需要家に送電することができる。但し、発電設備1の発電電力に占める電力消費装置2の電力需要の割合が大きい場合には、需要家6に対して送電可能な余剰電力が電力消費装置2の電力需要に応じて大きく変動し、不確定となる可能性が高い。その結果、需要家6から送電要求を受けた電気事業者5は、送電計画作成システム4から発電システム3の正確な送電計画(送電電力の時間変動特性)を受け取り、それに基づいて需要家6との間で電力供給契約を結ぶ必要がある。尚、図1では1つの送電計画作成システム4に対して1つの発電システム3が接続されている場合を示しているが、1つの送電計画作成システム4に対して複数の発電システム3が接続されている場合でも構わない。
【0024】
発電システム3において、電力消費装置2は複数種に分類され、本実施形態では、後述するように第1電力消費装置2aと第2電力消費装置2bと第3電力消費装置2cとに分類している。第1電力消費装置2aは、定常パターンで運転されるため、電力需要の時間変動特性が既知である、或いは、電力需要の時間変動特性を非常に高い精度で見積もることができるものである。第2電力消費装置2bおよび第3電力消費装置2cは、定常パターンでの運転が行われないために電力需要の時間変動特性は未知であるが、特定のイベントの発生に関連して運転されるため、そのイベントの実施スケジュールを参照して電力需要の時間変動特性を見積もることができるものである。
【0025】
そのイベントとしては、具体的な実施スケジュールが指定される「LNG船の入港」や、具体的な実施スケジュールが指定されない「ガスの生産」などが挙げられる。従って、「LNG船の入港」というイベントが発生した場合には、イベントの実施スケジュール(例えば、LNG船の着桟予定日時)に基づいて、各電力消費装置の運転スケジュールも容易に決定され、その結果、電力需要の時間変動特性の決定が行われる。尚、すべての電力消費装置の内、どの電力消費装置(単数または複数)が、例えば「LNG船の入港」というイベントの発生に伴って運転されるのかは送電計画作成システム4にとって既知である。また、「ガスの生産」というイベントが発生すれば、どのようなガスをどれだけ生産するのかといったイベント(生産計画)に基づいて、電力消費装置の運転スケジュールに関する情報が決定され、更にその運転スケジュールに関する情報を参照して電力需要の時間変動特性を見積もることができる。同様に、すべての電力消費装置の内、どの電力消費装置(単数または複数)が、「ガスの生産」というイベントの発生に伴って運転されるのかは送電計画作成システム4にとって既知である。
【0026】
従って、送電計画作成システム4においては、第3電力消費装置2cの生産計画に関する情報を収集して、第3電力消費装置2cによる運転スケジュールを決定する運転スケジュール決定手段7と、第2電力消費装置2bおよび運転スケジュール決定手段7から運転スケジュールに関する情報を収集して、第2電力消費装置2bおよび第3電力消費装置2cによる電力需要の時間変動特性を決定する電力需要決定手段8とを備えてなる。
【0027】
尚、図1では、第1電力消費装置2a、第2電力消費装置2b、及び第3電力消費装置2cのそれぞれから送電計画作成システム4へ、電力需要の時間変動特性、運転スケジュール、及び生産計画に関する情報が送信されるように便宜的に図示しているが、実際にはそれらの情報を管理する装置が別途設けられ、送電計画作成システム4において自動的に利用可能な状態に置かれているものとする。
【0028】
次に、電力消費装置2(2a〜2c)による電力需要の時間変動特性に関する情報は、余剰電力推定手段9に収集される。この余剰電力推定手段9は、発電設備1の発電電力の時間変動特性に関する情報も収集する。その結果、余剰電力推定手段9は、発電電力の時間変動特性と電力需要の時間変動特性とを参照して、発電システム3における余剰電力の時間変動特性を推定することができる。
【0029】
余剰電力の時間変動特性に関する情報は送電計画作成手段10に収集され、送電計画作成手段10は需要家6へ送電可能な送電電力の送電計画(送電電力の時間変動特性)を、上記余剰電力に基づいて作成して、電気事業者5にその計画を伝達する。ここで、30分毎の送電計画(30分毎の送電電力の時間変動特性)を作成する必要がある場合には、少なくとも30分毎の電力消費装置2の運転スケジュールを用いて30分毎の電力需要の時間変動特性を決定しておくことが好ましい。
【0030】
以上のように送電計画作成システム4は、情報入力と、情報処理と、情報出力という機能によって構築されることから、情報入出力部と演算処理部と情報記憶部という一般的なハードウェアによって構成されるコンピュータによって実現することが可能である。従って、以下の実施形態では、本発明に係る送電計画作成方法をコンピュータによって実現された送電計画作成システム4で実行させる場合の例を、そのコンピュータの表示装置における表示画面例を図示して説明する。
【0031】
また、以下の実施形態においては発電システム3として、図2に示すように、LNG(液化天然ガス)船からLNGを受け入れて貯蔵するLNG受入・貯蔵設備とガス製造設備とからなる設備を例に挙げて本発明の説明を行う。LNG受入・貯蔵設備およびガス製造設備のそれぞれは、原動機、ポンプ、計測機器、空調機器、事務機器、照明機器などの各種電力消費装置2を備えて構成され、それらの電力消費装置2に対して電力を供給するために単数または複数台の発電設備1が設けられている。
【0032】
<電力需要決定工程>
図3〜図5に例示するのは、上述の第1電力消費装置2a〜第3電力消費装置2cにおける電力需要の時間変動特性の決定が送電計画作成システム4において行われる電力需要決定工程の表示画面例である。
まず、図3に示すのは、運転が定常パターン(既定の運転パターン)で行われることで、その電力需要の時間変動特性が既知である、或いは、電力需要の時間変動特性を非常に高い精度で見積もることができる第1電力消費装置2aの場合である。このような第1電力消費装置2aとしては、例えば、照明装置や、ポンプなどのように一定出力で一定期間の運転を行うような装置が該当する。第1電力消費装置2aの電力需要の時間変動特性に関する情報は予め作成されており、送電計画作成システム4において自動的に利用可能な状態に置かれている。或いは、送電計画作成システム4の操作者が、第1電力消費装置2aの電力需要の時間変動特性を送電計画システム4に対して入力してもよい。その結果、第1電力消費装置2aの電力需要の時間変動特性が決定される。
【0033】
従って、図3の表示例において「大型の循環水ポンプ」の場合には、4月5日〜4月11日まで連続して230(kW)の需要があり、「小型の循環水ポンプ」についても、4月5日〜4月11日まで連続して50(kW)の需要があることが数値入力欄21から分かる。尚、ここで表示された情報は送電計画作成システム4の操作者によって数値入力欄21(電力需要(kW)と30分毎のチェックボックス)に入力されたものである。
【0034】
従って、電力需要欄20に示すような第1電力消費装置2aの内の「大型の循環水ポンプ」の電力需要の時間変動特性が、時刻0時〜24時まで230(kW)の一定電力であるという情報が余剰電力推定手段9に伝達される。他にも、第1電力消費装置2aの内の「夜間照明」が、時刻0時〜6時までと時刻18時〜24時までの間で電力需要(例えば、10kW)があるという情報が余剰電力推定手段9に伝達される。
【0035】
次に、図4に示すのは、特定のイベントの発生に関連して運転されることで、電力需要決定手段8が、そのイベントの実施スケジュールを参照して電力需要の時間変動特性を見積もることができる第2電力消費装置2bの場合である。そのイベントとしては「LNG船の入港」や、「ガスの生産」などが挙げられる。このようなイベントの実施スケジュールに関する情報は予め作成されており、送電計画作成システム4において自動的に利用可能な状態に置かれている。或いは、送電計画作成システム4の操作者が、所定のイベントの実施スケジュールに関する情報を送電計画システム4に対して入力してもよい。
【0036】
図4に示すのはその具体的な例であり、LNG船からLNG受入・貯蔵設備へLNGを受け入れる際の電力需要の時間変動特性が、実施スケジュールの一例であるLNG船の着桟予定日時と離桟予定日時に基づいて決定される場合の例である。ここでのLNG受入・貯蔵設備は天然ガスを高圧で取り扱う設備と中圧で取り扱う設備というように複数の電力消費装置で構築されており、各設備を運転させた場合の電力需要と、上述の着桟予定日時と離桟予定日時に基づく各設備の運転スケジュールを示す。具体的には、LNG貯蔵設備は、電力需要が760(kW)である高圧専用設備と、電力需要が760(kW)の高圧部門および電力需要が520(kW)の中圧部門を備えてなる中・高圧用設備A、同じく電力需要が760(kW)の高圧部門および電力需要が520(kW)の中圧部門を備えてなる中・高圧用設備B、電力需要が380(kW)の中圧専用設備の4つの電力消費装置群で構成される。図4(b)に示す需要電力の数値は、送電計画作成システム4の操作者によって入力されたものである。そして、その操作者はイベントの実施スケジュールに関する情報である着桟予定日時と離桟予定日時についても同様に入力を行う。
【0037】
図4(b)に示されているように、電力需要決定手段8は、着桟予定日時と離桟予定日時が決まれば、LNG船の着桟予定日時から離桟予定日時の2時間後までは、中・高圧用設備Aの高圧部門と、中・高圧用部門Bの中圧部門と、中圧専用設備とが運転を行うという既定の運転スケジュールを所持しているため、電力需要決定手段8はその間の電力需要を760(kW)+520(kW)+380(kW)=1660(kW)と自動的に決定する。また、着桟予定日時の2時間前から着桟予定日時までは、中・高圧用設備Aの高圧部門と、中圧専用設備とが運転を行うというスケジュールも所持しているため、電力需要決定手段8はその間の電力需要を760(kW)+380(kW)=1140(kW)と自動的に決定する。同様に、着桟予定日時の10時間前から着桟予定日時の2時間前までと、離桟予定日時の2時間後から離桟予定日時の10時間後までとは、中・高圧用設備Aの高圧部門と、中圧専用設備とが運転を行うという運転スケジュールも所持しており、電力需要決定手段8はその間の電力需要を520(kW)+380(kW)=900(kW)と自動的に決定する。更に、着桟予定日時の10時間前までと、離桟予定日時の10時間後以降とは、中圧専用設備が運転を行うという運転スケジュールも所持しており、電力需要決定手段8はその間の電力需要を380(kW)と自動的に決定する。
【0038】
以上の結果、LNG船からLNG受入・貯蔵設備(電力消費装置2の一種)へLNGを受け入れる際の電力需要の30分毎の時間変動特性は、図4(a)に示すようなグラフで決定される。
【0039】
次に、図5に示すのは、「ガスの生産」というイベントについて、生産物であるガスの生産計画に関する情報が既知であることで、運転スケジュール決定手段7がその生産計画に関する情報を参照して運転スケジュール(イベントの実施スケジュール)に関する情報を決定することができ、更に電力需要決定手段8がその運転スケジュールに関する情報を参照して電力需要の時間変動特性を決定することができる場合の例である。この生産計画に関する情報は、予め作成されており、送電計画作成システム4において自動的に利用可能な状態に置かれている。或いは、送電計画作成システム4の操作者が、第3電力消費装置2cを用いた生産計画を送電計画システム4に対して入力してもよい。以下には、送電計画作成システム4の操作者が、第3電力消費装置2cを用いた生産計画を送電計画システム4に対して入力した場合について例示する。
【0040】
図2に例示したようなガス製造設備において、例えば、時刻12時30分〜時刻18時45分の間に60km/hでガスを製造し、ガス需要家へ送出するというガス送出計画(生産計画)が図5の数値入力欄25に入力されると、運転スケジュール決定手段7は、予め保持しているガス製造設備(第3電力消費装置2c)の生産能力(例えば、1時間に何kmのガスを生産できるかという情報)を考慮して、ガス製造設備がどういうスケジュールで運転を行うのかという運転スケジュール(「ガスの生産」というイベントの実施スケジュール)を自動的に決定する。この運転スケジュールは電力需要決定手段8に伝達され、電力需要決定手段8は、ガス製造設備(LNGポンプ、海水ポンプなどの複数の電力消費設備2c)の定格電力などを考慮して、電力需要欄24に示すような電力需要の時間変動特性を自動的に決定する。
【0041】
<余剰電力推定工程>
以上のように決定された電力需要の時間変動特性は余剰電力推定手段9に伝達され、図6に示すように全ての電力消費装置による電力需要の合計が自動的に導出される。また、図7に示すような発電設備1からの発電電力の時間変動特性も余剰電力推定手段9に伝達されるため、発電電力から電力需要を減算することで発電システム3の余剰電力の時間変動特性が余剰電力推定手段9によって推定される。ここで、発電設備1は、予想気温(燃料濃度が外気温で変化し、発電電力に影響を与えるため)、運転台数から発電電力を推定することができる。
【0042】
<送電計画作成工程>
図8に示すのは送電計画が作成される画面例である。ここでは、余剰電力推定手段9によって推定された余剰電力の時間変動特性が送電可能電力として、まずグラフ表示されている。更に、送電計画作成システム4の操作者が数値入力欄26に予め入力している電力値が、この発電システム3から送電線を介して需要家6へ送電したい電力(送電予定)である送電計画電力としてグラフ表示されている。送電計画作成手段10は、送電計画電力が送電可能電力(余剰電力)を超えていないと判定した場合にはその送電計画電力の時間変動特性を承認して、それを送電計画として作成し、電気事業者5へ送電計画電力の時間変動特性を伝達する。
【0043】
或いは、送電計画作成手段10が、導出された余剰電力(送電可能電力)よりも所定値以下の値を自動的に送電計画電力として設定することもできる。例えば、余剰電力(送電可能電力)よりも300(kW)だけ小さい電力値を送電計画電力として自動的に設定することもできる。その場合、演算された余剰電力(送電可能電力)よりも300(kW)だけ小さい電力値が数値入力欄26に表示されるとともにグラフ表示されるのだが、その数値入力欄26の送電計画電力値は送電計画作成システム4の操作者によって変更することもできる。
【0044】
以上のように、発電システム3内の電力需要が多いことで、発電システム3からの送電電力の見積もりが困難であるような場合であっても、本発明に係る送電計画作成方法を採用することで、送電可能電力の時間変動特性を高い精度で導出することができる。その結果、この送電計画を受信した電気事業者は、需要家6との間で電力供給契約を結ぶ際に、その送電計画を参照して発電システム3からの送電電力と需要家6の電力需要とが整合するように調整し、同時同量制御を達成することができる。
【0045】
<別実施形態>
<1>
図1に例示した発電システム3は、発電設備1と、運転に必要な電力をその発電設備から受ける電力消費装置2とを備えているが、別実施形態として図9に例示する発電システム30は、発電専用設備としての発電設備1に加えて、熱と電気を併せて発生し、他の装置に供給可能な熱電併給設備11と、発電システム30内における廃熱を利用して発電を行う熱電変換設備13と、熱電併給設備11から受けた熱を利用して運転される単数または複数の熱消費装置12とを備えて構成される。尚、図1に例示していた電気事業者5と需要家6についての記載は同様であるため、図9からは省略する。
【0046】
上述の実施形態において電力消費装置2を複数種に分類したのと同様に、熱消費装置12も複数種に分類され、ここでは、後述するように第1熱消費装置12aと第2熱消費装置12bと第3熱消費装置12cとに分類している。第1熱消費装置12aは、定常パターンで運転されるため、熱需要の時間変動特性が既知である、或いは、熱需要の時間変動特性を非常に高い精度で見積もることができるものである(熱需要決定工程)。第2熱消費装置12bおよび第3熱消費装置12cは、定常パターンでの運転が行われないために熱需要の時間変動特性は未知であるが、特定のイベントの発生に関連して運転されるため、そのイベントの実施スケジュールを参照して熱需要の時間変動特性を見積もることができるものである(熱需要決定工程)。
【0047】
そのイベントの例としては「ガスの生産」などが挙げられ、どのようなガスをどれだけ生産するのかといったイベント(生産計画)に基づいて、液体のLNGを加熱して気化させるための熱消費装置12cの運転スケジュールに関する情報が決定され、更にその運転スケジュールに関する情報を参照して熱需要の時間変動特性を見積もることができる。或いは、生産計画のような抽象的な情報が収集されるのではなく、運転スケジュールに関する情報が収集可能であるような場合には、その熱消費装置12bの運転スケジュールを参照して熱需要の時間変動特性が見積もられる。
【0048】
ここで、あるイベントが発生した場合、すべての熱消費装置の内、どの熱消費装置(単数または複数)がそのイベントの発生に伴って運転されるのかは送電計画作成システム40にとって既知である。これは上述したように電力消費装置2についても同様であり、各イベントが発生する場合には、そのイベントの実施のための運転対象装置(単数または複数の電力消費装置または単数または複数の熱消費装置、或いはそれらの組み合わせ)が予め決められているものとする。
【0049】
従って、送電計画作成システム40においては、第3熱消費装置12cの生産計画に関する情報を収集して、第3熱消費装置12cによる運転スケジュールを決定する運転スケジュール決定手段7と、第2熱消費装置12bおよび運転スケジュール決定手段7から運転スケジュールに関する情報を収集して、第2熱消費装置12bおよび第3熱消費装置12cによる熱需要の時間変動特性を決定する熱需要決定手段14とを備えてなる。尚、図1を参照して上述したのと同様に、運転スケジュール決定手段7は、第3電力消費装置2cの生産計画に関する情報を収集して、第3電力消費装置2cによる運転スケジュールを決定し、電力需要決定手段8は、第2電力消費装置2bおよび運転スケジュール決定手段7から運転スケジュールに関する情報を収集して、第2電力消費装置2bおよび第3電力消費装置2cによる電力需要の時間変動特性を決定する。
【0050】
尚、図9では、第1熱消費装置12a、第2熱消費装置12b、及び第3熱消費装置12cのそれぞれから送電計画作成システム40へ、熱需要の時間変動特性、運転スケジュール、及び生産計画に関する情報が送信されるように便宜的に図示し、第1電力消費装置2a、第2電力消費装置2b、及び第3電力消費装置2cのそれぞれから送電計画作成システム40へ、電力需要の時間変動特性、運転スケジュール、及び生産計画に関する情報が送信されるように便宜的に図示しているが、実際にはそれらの情報を管理する装置が別途設けられ、送電計画作成システム40において自動的に利用可能な状態に置かれているものとする。
【0051】
次に、熱消費装置12(12a〜12c)による熱需要の時間変動特性に関する情報(言い換えると、熱電併給設備11から熱消費装置12に供給される熱量)は廃熱量決定手段15に伝達され、熱消費装置12に消費されなかった熱量が、熱電変換設備13による熱電変換運転において利用可能な発電システム30内の廃熱量の時間変動特性として決定される(廃熱量決定工程)。尚、発電システム30内に熱を発生させるような装置が別途存在する場合には、その発熱量の時間変動特性も考慮して上記廃熱量の時間変動特性が決定される。
【0052】
また、熱消費装置12(12a〜12c)による熱需要の時間変動特性に関する情報は発電電力決定手段16にも伝達されることで、その熱需要の時間変動特性に対応して熱を供給するように熱電併給設備11を運転させた場合に発生する電力の時間変動特性が決定される。更に、熱電変換設備13による熱電変換運転に利用可能な発電システム30内の廃熱量の時間変動特性に関する情報が発電電力決定手段16に伝達されることで、その廃熱量を利用して上記熱電変換設備13を運転させた場合に発生する電力の時間変動特性が決定される。
【0053】
従って、余剰電力推定手段9では、電力消費装置2(2a〜2c)による電力需要の時間変動特性に関する情報と、発電電力(発電専用の発電設備1による発電電力と、熱電併給設備11による発電電力と、熱電変換設備13による発電電力との合計)の時間変動特性に関する情報とが収集される。発電設備1による発電電力はほぼ一定であるが、予想気温(燃料濃度が外気温で変化し、発電電力に影響を与えるため)を考慮して更に正確な発電電力を推定することができる。その結果、余剰電力推定手段9は、発電電力の時間変動特性と、上述の実施形態と同様にして導出される電力消費装置2による電力需要の時間変動特性とを参照して、発電システム30における余剰電力の時間変動特性を推定することができる。
【0054】
余剰電力の時間変動特性に関する情報は送電計画作成手段10に伝達され、送電計画作成手段10は需要家6(図9には図示せず)へ送電可能な送電電力の送電計画(送電電力の時間変動特性)を上記余剰電力に基づいて作成して、電気事業者5(図9には図示せず)にその計画を伝達する。ここで、30分毎の送電計画(30分毎の送電電力の時間変動特性)を作成する必要がある場合には、少なくとも30分毎の熱消費装置2の運転スケジュールを用いて30分毎の熱需要の時間変動特性と、少なくとも30分毎の電力消費装置2の運転スケジュールを用いて30分毎の電力需要の時間変動特性を決定しておくことが好ましい。
【0055】
以下に別実施形態の具体例を説明する。
発電システム30としては図10に示すように、LNG(液化天然ガス)船からLNGを受け入れて貯蔵するLNG受入・貯蔵設備とガス製造設備とからなる設備を例に挙げる。LNG受入・貯蔵設備およびガス製造設備のそれぞれは、原動機、ポンプ、計測機器、空調機器、事務機器、照明機器などの各種電力消費装置2と、LNGを加熱して気化させるための加熱装置や空調機器(例えば、ガスヒートポンプ:GHP)などの熱消費装置12とを備えて構成される。そのため、発電専用の発電設備1に加えて、熱と電気とを併せて供給する熱電併給設備(コジェネレーション設備)11が設けられている。また、LNG受入・貯蔵設備およびガス製造設備からの廃熱を利用して稼動することができる熱電変換設備(例えば、スチームタービン設備)13も設けられている。つまり、発電システム30は、発電設備1と、熱電併給設備11と、熱電変換設備13と、電力消費装置2と、熱消費装置12とを備えて構成される。
【0056】
まず、図3〜図5を参照して説明したのと同様の手法で、各電力消費装置2における電力需要の時間変動特性の決定が送電計画作成システム40において行われ(電力需要決定工程)、決定された電力需要の時間変動特性が余剰電力推定手段に伝達される。従って、この発電システム30の発電電力の時間変動特性が決定されれば、余剰電力の時間変動特性も推定することができる。発電システム30の発電電力の時間変動特性は、発電設備1の発電電力と、熱電併給設備11の発電電力と、熱電変換設備13の発電電力との和であることから、それぞれの発電電力の時間変動特性を正確に決定することが要求される。
【0057】
電力消費装置2の電力需要の時間変動特性を決定する際に例示したのと同様の「ガスの生産」というイベントが発生する場合、生産物であるガスの生産計画に関する情報が既知であることで、運転スケジュール決定手段7がその生産計画に関する情報を参照して、すべての熱消費装置の内、どの熱消費装置(単数または複数)がどのような運転スケジュール(イベントの実施スケジュール)に基づく運転を行うのかを決定することができる。更に、熱需要決定手段14がその運転スケジュールに関する情報を参照して、運転対象とする熱消費装置の熱需要の時間変動特性を決定することができる。具体的には、LNGを加熱して気化させる際に必要な熱量はガスの生産量から推定されるため、加熱装置(熱消費装置12cの一例)の運転スケジュールがまず決定され、その運転スケジュールを参照して熱需要の時間変動特性が決定される(熱需要決定工程)。尚、「生産計画」のように抽象的な情報ではなく、イベントの実施スケジュール(熱消費装置12bの運転スケジュール)が与えられた場合には、熱需要決定手段14がその運転スケジュールに従って熱消費装置12bの熱需要の時間変動特性を決定する(熱需要決定工程)。他にも、GHPなどを利用した空調装置(熱消費装置12aの一例)が定常パターン(既定の運転パターン)で運転される場合には、その運転パターンから熱需要の時間変動パターンが容易に決定される。
【0058】
次に、以上のように決定された熱需要の時間変動特性に関する情報は、発電電力決定手段16と廃熱量決定手段15に伝達される。廃熱量決定手段15では上述の廃熱量決定工程が実行され、熱電変換設備13において利用可能な廃熱量の時間変動特性が決定される。その結果、熱電併給設備11による発電電力の時間変動特性と熱電変換設備13による発電電力の時間変動特性とが決定される。従って、余剰電力推定手段9では、発電専用の発電設備1による発電電力と、熱電併給設備11による発電電力と、熱電変換設備13による発電電力との合計の時間変動特性が決定され、上述の電力需要決定工程で導出された、各電力消費装置2における電力需要の時間変動特性を参照して、発電システム30における余剰電力の時間変動特性が推定される。その後、余剰電力の時間変動特性に関する情報は送電計画作成手段10に伝達され、送電計画作成手段10は需要家6(図9には図示せず)へ送電可能な送電電力の送電計画(送電電力の時間変動特性)を上記余剰電力に基づいて作成して、電気事業者5(図9には図示せず)にその計画を伝達する。
【0059】
<2>
次に、本発明に係る送電計画作成方法の各工程を実行させるための送電計画作成プログラムについて説明する。
上述の送電計画作成方法は、上記電力需要決定工程と上記余剰電力推定工程と上記送電計画作成行程とを実行させることのできる送電計画作成プログラム、または上述の各工程に加えて上記熱需要決定工程および上記廃熱量決定工程の少なくとも一方を実行させることのできる送電計画作成プログラムを送電計画作成システム4(または送電計画作成システム40)上で起動することで実現される。送電計画作成システム4(または送電計画作成システム40)は、所定のプログラムを実行可能な演算処理部、メモリ、ハードディスクドライブなどの記憶部を備えてなる情報処理装置を用いて実現可能であり、一般的なコンピュータを用いることもできる。尚、上述の各工程を実行するためには、上記送電計画作成システム4(または送電計画作成システム40)にインストールされたオペレーティングシステムなどによる基本機能として具備されているプログラムや既存のプログラムが利用されることもある。また、送電計画作成システム4(または送電計画作成システム40)が単数または複数台のコンピュータにより構築されている場合には、本発明に係る送電計画作成プログラムの一部または全部が各コンピュータにインストールされ、各工程が別々のコンピュータ上で実行される場合もある。
【0060】
<3>
次に、上記送電計画作成プログラムを格納したコンピュータ読み取り可能な記録媒体について説明する。
コンピュータ(送電計画作成システム4(または送電計画作成システム40))に本発明に係る送電計画作成方法の各工程を実行させるための送電計画作成プログラムを実行するためには、その送電計画作成プログラムを、上記コンピュータ(送電計画作成システム4(または送電計画作成システム40))が読み取り可能な記録媒体(例えば、ハードディスクやCD−ROMなど)に格納しておく必要がある。そのためには、上記送電計画作成プログラムを上記ハードディスクドライブにダウンロードしておくか、または、上記送電計画作成プログラムを記録したCD−ROMを上記コンピュータが読み出し可能な状態に設置しておけばよい。
【0061】
ここで、上述の各工程は、上記コンピュータ(送電計画作成システム4(または送電計画作成システム40))の基本機能として具備されているプログラムや既存のプログラムを利用して実現されることもあるが、汎用コンピュータにおいて必ずしもこれらのプログラムがインストール済みとは限らないので、上記記録媒体にこれらのプログラムの一部または全部を記録しておいても構わない。尚、上記記録媒体は必ずしも物理的に単体の媒体である必要はない。例えば、複数のCD−ROMや、上記送電計画作成システム4(または送電計画作成システム40)に接続された他の情報処理装置が管理する記録媒体上に上記プログラムが分散して配置されていても構わない。
【図面の簡単な説明】
【図1】送電計画作成システムを中心に、情報および電力の流れを示す概略図である。
【図2】発電システムの具体例の概略図である。
【図3】送電計画作成システムの表示装置の画面例を示す図である。
【図4】送電計画作成システムの表示装置の画面例を示す図である。
【図5】送電計画作成システムの表示装置の画面例を示す図である。
【図6】送電計画作成システムの表示装置の画面例を示す図である。
【図7】送電計画作成システムの表示装置の画面例を示す図である。
【図8】送電計画作成システムの表示装置の画面例を示す図である。
【図9】送電計画作成システムを中心に、情報および電力の流れを示す別の概略図である。
【図10】発電システムの別の具体例の概略図である。
【符号の説明】
1 発電設備
2 電力消費装置
3 発電システム
4 送電計画作成システム
5 電気事業者
6 需要家
7 運転スケジュール決定手段
8 電力需要決定手段
9 余剰電力推定手段
10 送電計画作成手段
11 熱電併給設備
12 熱消費装置
13 熱電変換設備
14 熱需要決定手段
15 廃熱量決定手段
16 発電電力決定手段
20 電力需要欄
21 数値入力欄
22 電力需要欄
23 数値入力欄
24 電力需要欄
25 数値入力欄
26 数値入力欄
30 発電システム
40 送電計画作成システム
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a power transmission plan creation method and a power transmission plan creation program for creating a power transmission plan for a customer from a power generation system.
[0002]
[Prior art]
Following the liberalization of the electric power retail business, those who have power generation facilities other than the existing electric power companies can now sell the electric power obtained by the electric power generation to consumers. For example, dam management offices that manage dams use a turbine to generate electricity when discharging water to supply power used by the dam management office itself. It is also possible to sell surplus power after use.
[0003]
In other words, a power generation system including a power generation facility (for example, a dam) and a power consuming device (for example, a dam management station) is constructed, and surplus power in the power generation system (from power generated by the power generation facility to consumption at the dam management center). The power retail business of transmitting the power (after subtracting the power) to the outside and selling it can be performed. However, when conducting power retailing using a transmission line owned by an existing power company, a power company that conducts a power retailing business needs to determine the amount of power demanded by customers and the transmission from the power generation system within a predetermined period. It may be necessary to achieve simultaneous equal control to match the amount of power.
[0004]
[Problems to be solved by the invention]
However, conventionally, in a power generation system including a power generation facility and a power consumption device, when the ratio of the power demand of the power consumption device to the generated power is large, the surplus power that can be transmitted to the outside can be estimated with high accuracy. It was difficult. As described above, in order to achieve simultaneous same-quantity control, it is necessary to accurately estimate surplus power.However, in conventional systems, surplus power that can be transmitted to the outside is not accurately estimated. However, it was uncertain whether simultaneous simultaneous control could be achieved.
[0005]
The present invention has been made in view of the above problems, and an object of the present invention is to derive power that can be transmitted from an electric power generation system to an external customer, and to create an appropriate power transmission plan for power transmission. Another object of the present invention is to provide a plan creation method and a transmission plan creation program.
[0006]
[Means for Solving the Problems]
A first characteristic configuration of the power transmission plan creating method according to the present invention for solving the above-mentioned problems is as described in claim 1 of the claims, in which one or a plurality of power generation facilities and an operation required for the operation are provided. A power transmission plan creation method for creating a power transmission plan to a customer from a power generation system including one or more power consumption devices receiving power from the one or more power generation facilities, wherein the one or more power consumption devices A power demand determining step of determining a time variation characteristic of each power demand, and referring to the time variation characteristic of the power demand and the time variation characteristic of the power generated by the one or more power generation facilities, to find a surplus in the power generation system. A surplus power estimation step of estimating a time variation characteristic of power, and a transmission plan of transmission power that can be transmitted to the customer, based on the surplus power estimated in the surplus power estimation step. Lies in the fact that includes a power transmission planning process to create Te.
[0007]
A second feature configuration of the power transmission plan creation method according to the present invention for solving the above-mentioned problem is that, in addition to the first feature configuration, as described in claim 2 of the claims section, In the demand determining step, the one or more power consuming devices are classified into a first device operated in a steady pattern and a second device operated in connection with occurrence of a specific event, and The point is to determine the time-varying characteristics of demand. Here, the steady pattern is a predetermined operation pattern for the power consuming device. As a result, the time-varying characteristics of the power demand of the power consuming device operating in the steady pattern are known or can be estimated with very high accuracy.
[0008]
A third characteristic configuration of the power transmission plan creation method according to the present invention for solving the above-mentioned problem is, in addition to the second characteristic configuration, as described in claim 3 of the claims section, The time variation characteristic of the power demand of the second device is determined based on an execution schedule of the event.
[0009]
A fourth characteristic configuration of the method for creating a power transmission plan according to the present invention for solving the above-mentioned problems is as described in any one of the first to third characteristic configurations as described in claim 4 of the claims. In addition, the power generation system operates as a part or all of the power generation equipment utilizing heat received from the heat and power supply equipment and the heat and power supply equipment that generates heat and electricity together. Comprising a heat consuming device, including a heat demand determining step of determining a time variation characteristic of heat demand of each of the one or more heat consuming devices, and a time variation characteristic of the generated power by the one or more power generation facilities However, it is determined with reference to the time-varying characteristics of electric power generated when the cogeneration system is operated so as to supply heat in accordance with the time-varying characteristics of the heat demand.
[0010]
A fifth characteristic configuration of the power transmission plan creation method according to the present invention for solving the above-described problem is, as described in claim 5 in the claims section, in addition to the fourth characteristic configuration, In the demand determining step, the one or more heat consuming devices are classified into a third device operated in a steady pattern and a fourth device operated in connection with occurrence of a specific event, and The point is to determine the time-varying characteristics of demand.
[0011]
A sixth characteristic configuration of the power transmission plan creation method according to the present invention for solving the above-described problem is, in addition to the fifth characteristic configuration, as described in claim 6 in the claims section, The time variation characteristic of the heat demand of the device of the fourth aspect is determined based on the execution schedule of the event.
[0012]
A seventh characteristic configuration of the method for creating a power transmission plan according to the present invention for solving the above-mentioned problems is as described in any one of the first to sixth characteristic configurations as described in claim 7 in the claims section. In addition, the one or more power generation facilities include a thermoelectric conversion facility that generates power using waste heat in the power generation system, and determines a time variation characteristic of a waste heat amount that can be used by the thermoelectric conversion facility. Including a waste heat amount determination step, the time variation characteristic of the generated power by the one or more power generation facilities occurs when the thermoelectric conversion facility is operated using the waste heat amount determined in the waste heat amount determination step. That is, it is determined with reference to the time-varying characteristics of the power.
[0013]
The feature configuration of the power transmission plan creation program according to the present invention for solving the above-mentioned problems is as described in any one of claims 1 to 7 as described in claim 8 of the claims. This is a program for causing a computer to execute each of the steps of the power transmission plan creation method.
[0014]
The operation and effect will be described below.
According to the first characteristic configuration of the power transmission plan creation method according to the present invention, in the power demand determining step, the time variation characteristic of the power demand of each of the one or more power consuming devices is determined, and in the surplus power estimation step Estimating a time variation characteristic of surplus power in the power generation system by referring to a time variation characteristic of the power demand and a time variation characteristic of power generated by the power generation equipment, and transmitting power to the customer in the power transmission plan creating step. By creating a possible transmission power transmission plan based on the surplus power estimated in the surplus power estimation step, simultaneous power control is required when power is transmitted from this power generation system to the customer. Also, since the transmittable power (surplus power) is estimated with high accuracy, it is easy to achieve the simultaneous and equal amount control.
[0015]
According to the second characteristic configuration of the power transmission plan creation method according to the present invention, the one or more power consuming devices are operated in association with the first device operated in a steady pattern and the occurrence of a specific event. Is classified into the second device, the time variation characteristic of the power demand of the first device can be estimated with high accuracy. Although the time variation characteristic of the power demand of the second device is not known, Assuming that a specific event has occurred, it is possible to estimate the time variation characteristics of the power demand at that time.
[0016]
According to the third characteristic configuration of the power transmission plan creation method according to the present invention, since the operation schedule of the second device can be determined based on the execution schedule of the event, the power consumption schedule of each device ( The time variation characteristic of the power demand) can be accurately estimated.
[0017]
According to the fourth characteristic configuration of the power transmission plan creation method according to the present invention, in the heat demand determining step, the time variation characteristic of the heat demand of each of the one or more heat consuming devices is determined, and the heat demand is determined. It is possible to accurately estimate a time-varying characteristic of electric power generated when the cogeneration system is operated so as to supply heat in accordance with a time-varying characteristic of demand. As a result, even if simultaneous power control is required when power is transmitted from the power generation system to the customer, the transmittable power (surplus power) can be estimated with high accuracy, so that an appropriate power transmission plan Based on this, simultaneous equal-quantity control can be easily achieved.
[0018]
According to the fifth characteristic configuration of the power transmission plan creation method according to the present invention, the one or more heat consuming devices are operated in association with the third device operated in a steady pattern and the occurrence of a specific event. By being classified as the fourth device, the time variation characteristic of the heat demand of the third device can be estimated with high accuracy. Although the time variation characteristic of the heat demand of the fourth device is not known, Assuming that a specific event has occurred, it is possible to estimate the time variation characteristics of the heat demand at that time.
[0019]
According to the sixth characteristic configuration of the power transmission plan creation method according to the present invention, since the operation schedule of the fourth device can be determined based on the execution schedule of the event, the heat consumption schedule of each device ( The time variation characteristic of heat demand) can be accurately estimated.
[0020]
According to the seventh characteristic configuration of the power transmission plan creation method according to the present invention, heat is generated in the power generation system, and the one or more power generation facilities generate power using the waste heat thereof. When equipment is included, in the waste heat amount determining step, the time variation characteristic of the waste heat amount that can be used by the thermoelectric conversion equipment is determined, and the thermoelectric conversion equipment is operated using the waste heat amount. It is possible to accurately estimate the time variation characteristics of the electric power generated in the system. As a result, even if simultaneous power control is required when power is transmitted from the power generation system to the customer, the transmittable power (surplus power) can be estimated with high accuracy, so that an appropriate power transmission plan Based on this, simultaneous equal-quantity control can be easily achieved.
[0021]
According to the characteristic configuration of the power transmission plan creation program according to the present invention, the same effects as the above-described effects of the power transmission plan creation method according to the present invention can be obtained by executing each step of the power transmission plan creation method on a computer. Can be.
[0022]
BEST MODE FOR CARRYING OUT THE INVENTION
FIG. 1 is a diagram schematically illustrating a flow of information and power when creating a power transmission plan for transmitting power generated by the power generation system 3 to a customer 6 via a power transmission line.
[0023]
The power generation system 3 includes a power generation facility 1 and a power consuming device 2 that receives power required for operation from the power generation facility, and can transmit surplus power to an external customer via a transmission line. However, when the ratio of the power demand of the power consuming device 2 to the power generated by the power generation facility 1 is large, the surplus power that can be transmitted to the customer 6 greatly fluctuates according to the power demand of the power consuming device 2. , Is highly likely to be uncertain. As a result, the electric power company 5 that has received the power transmission request from the customer 6 receives the accurate power transmission plan (time-varying characteristics of the transmitted power) of the power generation system 3 from the power transmission plan creation system 4, and based on that, It is necessary to sign a power supply contract between Although FIG. 1 shows a case where one power generation system 3 is connected to one power transmission plan creation system 4, a plurality of power generation systems 3 are connected to one power transmission plan creation system 4. It does not matter if you do.
[0024]
In the power generation system 3, the power consumption devices 2 are classified into a plurality of types. In the present embodiment, as described later, the power consumption devices 2 are classified into a first power consumption device 2a, a second power consumption device 2b, and a third power consumption device 2c. I have. Since the first power consuming device 2a is operated in a steady pattern, the time variation characteristic of the power demand is known, or the time variation characteristic of the power demand can be estimated with very high accuracy. Since the second power consuming device 2b and the third power consuming device 2c do not operate in a steady pattern, the time variation characteristics of the power demand are unknown, but are operated in association with the occurrence of a specific event. Therefore, it is possible to estimate the time variation characteristics of the power demand with reference to the event execution schedule.
[0025]
Examples of the event include "LNG ship entry into port" where a specific implementation schedule is specified, and "gas production" where a specific implementation schedule is not specified. Therefore, when the event “LNG ship entering port” occurs, the operation schedule of each power consuming device is easily determined based on the event execution schedule (for example, the scheduled date and time of landing of the LNG ship). As a result, the time variation characteristic of the power demand is determined. It is known to the power transmission plan creation system 4 which power consuming device (single or plural) of all the power consuming devices is operated, for example, in response to the occurrence of the event “LNG ship entering port”. When an event “gas production” occurs, information on the operation schedule of the power consuming device is determined based on an event (production plan) such as what kind of gas is produced and how much gas is produced. With reference to the information about the power demand, the time variation characteristic of the power demand can be estimated. Similarly, it is known to the power transmission planning system 4 which power consuming device or devices among all the power consuming devices will be operated in response to the occurrence of the event “production of gas”.
[0026]
Therefore, the power transmission plan creation system 4 collects information on the production plan of the third power consuming device 2c and determines the operation schedule by the third power consuming device 2c, and the second power consuming device. 2b and a power demand determining means 8 that collects information on the operation schedule from the driving schedule determining means 7 and determines the time-varying characteristics of the power demand by the second power consuming device 2b and the third power consuming device 2c. .
[0027]
In FIG. 1, each of the first power consuming device 2a, the second power consuming device 2b, and the third power consuming device 2c sends a power demand time variation characteristic, an operation schedule, and a production plan to the power transmission plan creation system 4. Although the information is illustrated for the sake of convenience for transmission, a device for managing such information is actually provided separately and is automatically available in the power transmission plan creation system 4. Shall be.
[0028]
Next, information on the time variation characteristics of the power demand by the power consuming devices 2 (2a to 2c) is collected by the surplus power estimating means 9. The surplus power estimating means 9 also collects information on the time variation characteristics of the power generated by the power generation facility 1. As a result, the surplus power estimation means 9 can estimate the time fluctuation characteristics of the surplus power in the power generation system 3 with reference to the time fluctuation characteristics of the generated power and the time fluctuation characteristics of the power demand.
[0029]
Information on the time variation characteristics of the surplus power is collected by the power transmission plan creation unit 10, and the power transmission plan creation unit 10 converts the transmission plan of the transmission power that can be transmitted to the customer 6 (the time variation characteristic of the transmission power) into the surplus power. Based on the plan, the plan is transmitted to the electric utility 5. Here, when it is necessary to create a power transmission plan every 30 minutes (a time variation characteristic of the transmitted power every 30 minutes), at least every 30 minutes using the operation schedule of the power consuming device 2 every 30 minutes. It is preferable to determine the time variation characteristics of the power demand.
[0030]
As described above, since the power transmission plan creation system 4 is constructed by functions of information input, information processing, and information output, it is configured by general hardware such as an information input / output unit, an arithmetic processing unit, and an information storage unit. Computer can be realized. Therefore, in the following embodiment, an example in which the power transmission plan creation method according to the present invention is executed by the power transmission plan creation system 4 implemented by a computer will be described with reference to a display screen example on a display device of the computer. .
[0031]
In the following embodiment, as an example of the power generation system 3, as shown in FIG. 2, a facility including an LNG receiving / storing facility for receiving and storing LNG from an LNG (liquefied natural gas) ship and a gas manufacturing facility will be described. The present invention will be described below. Each of the LNG receiving / storing facility and the gas producing facility includes various power consuming devices 2 such as a prime mover, a pump, a measuring device, an air conditioner, an office device, and a lighting device. One or more power generation facilities 1 are provided to supply electric power.
[0032]
<Power demand decision process>
FIG. 3 to FIG. 5 show examples of the display of the power demand determining step in which the determination of the time variation characteristic of the power demand in the first power consuming device 2a to the third power consuming device 2c is performed in the power transmission plan creation system 4. It is an example of a screen.
First, FIG. 3 shows that the operation is performed in a steady pattern (predetermined operation pattern), so that the time variation characteristic of the power demand is known, or the time variation characteristic of the power demand is extremely accurate. This is the case of the first power consuming device 2a which can be estimated by the following equation. Such a first power consuming device 2a corresponds to, for example, a lighting device or a device such as a pump that operates for a certain period of time with a certain output. Information on the time-varying characteristics of the power demand of the first power consuming device 2a has been created in advance, and is automatically available in the power transmission plan creation system 4. Alternatively, the operator of the power transmission plan creation system 4 may input the time variation characteristics of the power demand of the first power consuming device 2a to the power transmission planning system 4. As a result, the time variation characteristic of the power demand of the first power consuming device 2a is determined.
[0033]
Therefore, in the display example of FIG. 3, in the case of “large circulating water pump”, there is a demand of 230 (kW) continuously from April 5 to April 11, and “small circulating water pump” Also, it can be seen from the numerical value input field 21 that there is a demand of 50 (kW) continuously from April 5 to April 11. The information displayed here is input by the operator of the power transmission plan creation system 4 into the numerical value input field 21 (power demand (kW) and a check box every 30 minutes).
[0034]
Therefore, as shown in the power demand column 20, the time variation characteristic of the power demand of the “large circulating water pump” in the first power consuming device 2a is a constant power of 230 (kW) from time 0 to 24:00. Information that there is is transmitted to surplus power estimation means 9. In addition, information indicating that there is a power demand (for example, 10 kW) between “0:00 to 6:00” and “18:00 to 24:00” in “night lighting” in the first power consuming device 2a is excessive. The power is transmitted to the power estimating means 9.
[0035]
Next, what is shown in FIG. 4 is that the operation is performed in association with the occurrence of a specific event, and the power demand determining means 8 estimates the time variation characteristics of the power demand with reference to the execution schedule of the event. This is the case of the second power consuming device 2b which can perform the following. The events include "LNG ship entering port" and "Gas production". Information on such an event execution schedule is created in advance, and is automatically available in the power transmission plan creation system 4. Alternatively, the operator of the power transmission plan creation system 4 may input information on the execution schedule of the predetermined event to the power transmission plan system 4.
[0036]
FIG. 4 shows a specific example, in which the time-varying characteristics of the power demand when LNG is received from the LNG ship to the LNG receiving / storage facility, the time-varying characteristics of the LNG ship, which is an example of the implementation schedule, This is an example of a case where it is determined based on the scheduled leaving date and time. The LNG receiving / storage facility here is constructed with a plurality of power consuming devices, such as a facility that handles natural gas at high pressure and a facility that handles natural gas at medium pressure, and the power demand when each facility is operated and the power demand described above. The operation schedule of each facility based on the scheduled arrival date and time and the scheduled departure date and time is shown. Specifically, the LNG storage facility includes a high-voltage dedicated facility with a power demand of 760 (kW), a high-pressure section with a power demand of 760 (kW), and a medium-pressure section with a power demand of 520 (kW). Medium-high pressure equipment A, also medium-high pressure equipment B comprising a high-voltage section with power demand of 760 (kW) and a medium-pressure section with power demand of 520 (kW), with power demand of 380 (kW) It consists of a group of four power consuming devices of dedicated pressure equipment. The numerical values of the demand power shown in FIG. 4B are input by the operator of the power transmission plan creation system 4. Then, the operator also inputs the scheduled arrival date and the scheduled departure date and time, which are information on the event execution schedule, in the same manner.
[0037]
As shown in FIG. 4 (b), when the scheduled berthing date and the scheduled berthing date and time are determined, the power demand determining means 8 operates from the scheduled berthing date and time of the LNG ship to two hours after the scheduled berthing date and time. Has a predetermined operation schedule in which the high pressure section of the medium / high pressure facility A, the medium pressure section of the middle / high pressure section B, and the medium pressure dedicated facility operate, so that the power demand determining means 8 automatically determines the power demand during that time as 760 (kW) +520 (kW) +380 (kW) = 1660 (kW). Also, from 2 hours before the scheduled date and time of the berthing to the scheduled date and time of the berthing, there is a schedule that the high-pressure department of the medium- and high-pressure facility A and the medium-pressure dedicated facility are in operation. The means 8 automatically determines the power demand during that time as 760 (kW) +380 (kW) = 1140 (kW). Similarly, the medium / high-pressure facility A is defined as 10 hours before the scheduled arrival date to 2 hours before the scheduled arrival date and 2 hours after the scheduled release date to 10 hours after the scheduled release date. Of the high-voltage department and the medium-voltage dedicated equipment also have an operation schedule, and the power demand determining means 8 automatically sets the power demand between them to 520 (kW) +380 (kW) = 900 (kW). To decide. Furthermore, 10 hours before the scheduled arrival date and after and 10 hours after the scheduled release date, there is also an operation schedule in which the medium-pressure dedicated equipment operates, and the power demand determining means 8 performs the operation during that time. The power demand is automatically determined to be 380 (kW).
[0038]
As a result, the time-varying characteristics of the power demand every 30 minutes when LNG is received from the LNG ship to the LNG receiving / storage facility (a type of power consuming device 2) is determined by a graph as shown in FIG. Is done.
[0039]
Next, FIG. 5 shows that the operation schedule determining means 7 refers to the information on the production plan for the event “production of gas” because the information on the production plan of the gas, which is a product, is known. In this example, the power demand determining means 8 can determine the time-varying characteristics of the power demand by referring to the information on the operation schedule. is there. The information on the production plan is created in advance, and is automatically available in the power transmission plan creation system 4. Alternatively, the operator of the power transmission plan creation system 4 may input a production plan using the third power consuming device 2c to the power transmission planning system 4. Hereinafter, a case where the operator of the power transmission plan creation system 4 inputs a production plan using the third power consuming device 2c to the power transmission planning system 4 will be exemplified.
[0040]
In a gas production facility as illustrated in FIG. 2, for example, 60 km between time 12:30 and time 18:45. 3 When a gas delivery plan (production plan) for producing gas at / h and sending the gas to the gas consumer is entered in the numerical value input field 25 of FIG. 5, the operation schedule determination means 7 sets the gas production The production capacity of the equipment (third power consuming device 2c) (for example, how many km per hour) 3 In consideration of the information on whether the gas can be produced, the operation schedule (execution schedule of an event called “gas production”) of what kind of schedule the gas production facility operates is automatically determined. This operation schedule is transmitted to the power demand determining means 8, and the power demand determining means 8 considers the rated power of the gas production facilities (the plurality of power consuming facilities 2c such as LNG pumps and seawater pumps) and the like, and considers the power demand column. 24, the time variation characteristic of the power demand is automatically determined.
[0041]
<Excess power estimation process>
The time variation characteristic of the power demand determined as described above is transmitted to the surplus power estimation means 9, and the total of the power demand by all the power consuming devices is automatically derived as shown in FIG. Further, the time variation characteristic of the generated power from the power generation equipment 1 as shown in FIG. 7 is also transmitted to the surplus power estimating means 9, so that the time variation of the surplus power of the power generation system 3 is obtained by subtracting the power demand from the generated power. The characteristics are estimated by the surplus power estimation means 9. Here, the power generation equipment 1 can estimate the generated power from the expected temperature (since the fuel concentration changes at the outside temperature and affects the generated power) and the number of operating units.
[0042]
<Transmission plan creation process>
FIG. 8 shows an example of a screen on which a power transmission plan is created. Here, the time-varying characteristics of the surplus power estimated by the surplus power estimation means 9 are first graphically displayed as transmittable power. Further, the electric power value previously input by the operator of the electric power transmission plan creation system 4 into the numerical value input field 26 is the electric power to be transmitted from the electric power generation system 3 to the customer 6 via the electric power transmission line (the electric power transmission plan). The graph is displayed as power. When determining that the transmission plan power does not exceed the transmittable power (surplus power), the power transmission plan creation means 10 approves the time-varying characteristic of the power transmission plan power, creates it as a power transmission plan, and The time variation characteristic of the transmission planned power is transmitted to the enterprise 5.
[0043]
Alternatively, the power transmission plan creating means 10 can automatically set a value equal to or less than a predetermined value than the derived surplus power (transmittable power) as the power transmission plan power. For example, a power value smaller by 300 (kW) than surplus power (transmittable power) can be automatically set as the power transmission planned power. In this case, a power value smaller by 300 (kW) than the calculated surplus power (transmittable power) is displayed in the numerical value input column 26 and is displayed in a graph. Can also be changed by the operator of the power transmission plan creation system 4.
[0044]
As described above, even when it is difficult to estimate the transmission power from the power generation system 3 because the power demand in the power generation system 3 is large, the power transmission plan creation method according to the present invention may be employed. Thus, the time variation characteristic of the transmittable power can be derived with high accuracy. As a result, when the electric power company that has received the power transmission plan makes a power supply contract with the customer 6, the electric power company refers to the power transmission plan and refers to the transmission power from the power generation system 3 and the power demand of the customer 6. Are adjusted so as to match with each other, so that the simultaneous same amount control can be achieved.
[0045]
<Another embodiment>
<1>
The power generation system 3 illustrated in FIG. 1 includes a power generation facility 1 and a power consumption device 2 that receives power required for operation from the power generation facility. As another embodiment, a power generation system 30 illustrated in FIG. In addition to the power generation facility 1 as a power generation-dedicated facility, a combined heat and power generation facility 11 that generates heat and electricity together and can be supplied to other devices, and a thermoelectric generator that generates power using waste heat in the power generation system 30 It is configured to include a conversion facility 13 and one or more heat consuming devices 12 operated using heat received from the combined heat and power facility 11. Note that the description about the electric utility 5 and the customer 6 illustrated in FIG. 1 is the same, and is omitted from FIG.
[0046]
Similarly to the case where the power consuming devices 2 are classified into a plurality of types in the above-described embodiment, the heat consuming devices 12 are also classified into a plurality of types. Here, a first heat consuming device 12a and a second heat consuming device are described below. 12b and the third heat consuming device 12c. Since the first heat consuming device 12a is operated in a steady pattern, the time variation characteristic of the heat demand is known, or the time variation characteristic of the heat demand can be estimated with extremely high accuracy (heat). Demand determination process). Since the second heat consuming device 12b and the third heat consuming device 12c do not operate in a steady pattern, the time variation characteristics of the heat demand are unknown, but are operated in association with the occurrence of a specific event. Therefore, the time variation characteristic of the heat demand can be estimated with reference to the execution schedule of the event (heat demand determination step).
[0047]
An example of such an event is "gas production". A heat consuming device for heating and vaporizing liquid LNG based on an event (production plan) such as what kind of gas and how much gas to produce. The information on the operation schedule of 12c is determined, and the time variation characteristics of the heat demand can be estimated with reference to the information on the operation schedule. Alternatively, when it is not possible to collect abstract information such as a production plan, but to collect information on an operation schedule, the time of heat demand is referred to by referring to the operation schedule of the heat consuming device 12b. Fluctuation characteristics are estimated.
[0048]
Here, when a certain event occurs, it is known to the power transmission plan creation system 40 which of the heat consuming devices (one or more) of all the heat consuming devices is operated in accordance with the occurrence of the event. The same applies to the power consuming device 2 as described above. When each event occurs, the operation target device (one or more power consuming devices or one or more heat consuming devices) for the execution of the event. Device or a combination thereof) is determined in advance.
[0049]
Accordingly, the power transmission plan creation system 40 collects information on the production plan of the third heat consuming device 12c and determines the operation schedule by the third heat consuming device 12c, and the second heat consuming device. A heat demand determining means for collecting information on the operation schedule from the operation schedule determining means and determining a time-varying characteristic of heat demand by the second heat consuming device and the third heat consuming device; . As described above with reference to FIG. 1, the operation schedule determining means 7 collects information on the production plan of the third power consuming device 2c and determines the operation schedule by the third power consuming device 2c. , The power demand determining means 8 collects information about the operation schedule from the second power consuming device 2b and the operation schedule determining means 7, and the time variation characteristic of the power demand by the second power consuming device 2b and the third power consuming device 2c. To determine.
[0050]
Note that, in FIG. 9, the first heat consuming device 12a, the second heat consuming device 12b, and the third heat consuming device 12c each transmit a time variation characteristic of heat demand, an operation schedule, and a production plan to the power transmission plan creation system 40. For convenience, the information about the power demand is transmitted from each of the first power consuming device 2a, the second power consuming device 2b, and the third power consuming device 2c to the power transmission plan creation system 40. Although the information is shown for the sake of convenience so that the information on the characteristics, operation schedule, and production plan is transmitted, actually, a device for managing the information is separately provided and automatically used in the power transmission plan creation system 40. It shall be in a state where it is possible.
[0051]
Next, information on the time variation characteristics of the heat demand by the heat consuming devices 12 (12a to 12c) (in other words, the amount of heat supplied to the heat consuming device 12 from the cogeneration facility 11) is transmitted to the waste heat amount determining means 15, The amount of heat not consumed by the heat consuming device 12 is determined as a time-varying characteristic of the amount of waste heat in the power generation system 30 that can be used in the thermoelectric conversion operation by the thermoelectric conversion equipment 13 (a waste heat amount determining step). When a device that generates heat is separately provided in the power generation system 30, the time variation characteristic of the waste heat amount is determined in consideration of the time variation characteristic of the heat generation amount.
[0052]
Further, information on the time-varying characteristics of the heat demand by the heat consuming devices 12 (12a to 12c) is also transmitted to the generated power determining means 16, so that heat is supplied in accordance with the time-varying characteristics of the heat demand. The time variation characteristic of the electric power generated when the combined heat and power supply equipment 11 is operated is determined. Further, information on the time variation characteristic of the amount of waste heat in the power generation system 30 that can be used for the thermoelectric conversion operation by the thermoelectric conversion equipment 13 is transmitted to the generated power determining means 16, and the thermoelectric conversion is performed using the amount of waste heat. The time variation characteristic of the power generated when the facility 13 is operated is determined.
[0053]
Therefore, the surplus power estimating means 9 includes information on the time variation characteristics of the power demand by the power consuming devices 2 (2a to 2c), the generated power (the power generated by the power generation facility 1 dedicated to power generation, and the power generated by the cogeneration facility 11). (Sum of the power generated by the thermoelectric conversion equipment 13) and information on the time-varying characteristics of the thermoelectric conversion equipment 13. Although the power generated by the power generation facility 1 is substantially constant, more accurate power generation can be estimated in consideration of the expected temperature (since the fuel concentration changes at the outside temperature and affects the power generated). As a result, the surplus power estimating means 9 refers to the time variation characteristic of the generated power and the time variation characteristic of the power demand by the power consuming device 2 derived in the same manner as in the above-described embodiment. It is possible to estimate a time variation characteristic of surplus power.
[0054]
Information on the time-varying characteristics of the surplus power is transmitted to the power transmission plan creation means 10, and the power transmission plan creation means 10 transmits the power transmission plan (transmission power time) of the transmission power that can be transmitted to the customer 6 (not shown in FIG. 9). A fluctuation characteristic) is created based on the surplus power, and the plan is transmitted to the electric utility 5 (not shown in FIG. 9). Here, when it is necessary to create a power transmission plan every 30 minutes (a time-varying characteristic of the transmitted power every 30 minutes), at least every 30 minutes by using the operation schedule of the heat consuming device 2 every 30 minutes. It is preferable to determine the time variation characteristics of the power demand every 30 minutes using the time variation characteristics of the heat demand and the operation schedule of the power consuming device 2 at least every 30 minutes.
[0055]
Hereinafter, a specific example of another embodiment will be described.
As an example of the power generation system 30, as shown in FIG. 10, a facility including an LNG receiving / storing facility for receiving and storing LNG from a LNG (liquefied natural gas) ship and a gas producing facility will be described. Each of the LNG receiving / storing equipment and the gas production equipment includes various power consuming devices 2 such as a motor, a pump, a measuring device, an air conditioner, an office device, and a lighting device, and a heating device and an air conditioner for heating and vaporizing LNG. A heat consuming device 12 such as a device (for example, a gas heat pump: GHP) is provided. Therefore, in addition to the power generation facility 1 dedicated to power generation, a cogeneration facility (cogeneration facility) 11 that supplies both heat and electricity is provided. In addition, a thermoelectric conversion facility (for example, a steam turbine facility) 13 that can operate using waste heat from the LNG receiving and storing facility and the gas production facility is also provided. That is, the power generation system 30 includes the power generation facility 1, the cogeneration facility 11, the thermoelectric conversion facility 13, the power consuming device 2, and the heat consuming device 12.
[0056]
First, in a manner similar to that described with reference to FIGS. 3 to 5, the time variation characteristic of the power demand in each power consuming device 2 is determined in the power transmission plan creation system 40 (power demand determining step), The determined time variation characteristic of the power demand is transmitted to surplus power estimation means. Therefore, if the time variation characteristic of the generated power of the power generation system 30 is determined, the time variation characteristic of the surplus power can also be estimated. The time variation characteristic of the power generated by the power generation system 30 is the sum of the power generated by the power generation facility 1, the power generated by the cogeneration facility 11, and the power generated by the thermoelectric conversion facility 13. It is required to accurately determine the fluctuation characteristics.
[0057]
When the same event as “gas production” occurs when determining the time variation characteristic of the power demand of the power consuming device 2, the information on the gas production plan as the product is known. The operation schedule determining means 7 refers to the information on the production plan and determines which one of the heat consuming devices (single or plural) among all the heat consuming devices is operated based on what operation schedule (event execution schedule). You can decide what to do. Further, the heat demand determining means 14 can determine the time variation characteristic of the heat demand of the heat consuming device to be operated by referring to the information on the operation schedule. Specifically, since the amount of heat required to heat and vaporize LNG is estimated from the gas production amount, the operation schedule of the heating device (an example of the heat consuming device 12c) is first determined, and the operation schedule is determined. The time variation characteristic of the heat demand is determined with reference to the heat demand determining step. When an event execution schedule (operation schedule of the heat consuming device 12b) is given instead of abstract information such as a “production plan”, the heat demand determining unit 14 determines the heat consuming device according to the operation schedule. The time variation characteristic of the heat demand of 12b is determined (heat demand determining step). In addition, when an air conditioner using GHP or the like (an example of the heat consuming device 12a) is operated in a steady pattern (predetermined operation pattern), a time variation pattern of heat demand is easily determined from the operation pattern. Is done.
[0058]
Next, the information on the time variation characteristic of the heat demand determined as described above is transmitted to the generated power determining means 16 and the waste heat amount determining means 15. The waste heat amount determining means 15 performs the above-described waste heat amount determination step, and determines the time variation characteristic of the waste heat amount that can be used in the thermoelectric conversion facility 13. As a result, the time variation characteristics of the power generated by the cogeneration facility 11 and the time variations of the power generated by the thermoelectric conversion facility 13 are determined. Therefore, the surplus power estimation means 9 determines the total time variation characteristic of the power generated by the power generation facility 1 dedicated to power generation, the power generated by the cogeneration facility 11, and the power generated by the thermoelectric conversion facility 13. The temporal fluctuation characteristic of the surplus power in the power generation system 30 is estimated with reference to the temporal fluctuation characteristic of the power demand in each power consuming device 2 derived in the demand determining step. Thereafter, information on the time-varying characteristics of the surplus power is transmitted to the power transmission plan creation means 10, and the power transmission plan creation means 10 transmits the power transmission plan (transmission power) of the transmission power that can be transmitted to the customer 6 (not shown in FIG. 9). (A time-varying characteristic) is created based on the surplus power, and the plan is transmitted to the electric utility 5 (not shown in FIG. 9).
[0059]
<2>
Next, a power transmission plan creation program for executing each step of the power transmission plan creation method according to the present invention will be described.
The above-described power transmission plan creation method includes a power transmission plan creation program capable of executing the power demand determination step, the surplus power estimation step, and the power transmission plan creation step, or the heat demand determination step in addition to the above-described steps. And a power transmission plan creation program that can execute at least one of the waste heat amount determination steps is activated on the power transmission plan creation system 4 (or the power transmission plan creation system 40). The power transmission plan creation system 4 (or the power transmission plan creation system 40) can be realized by using an information processing apparatus including an arithmetic processing unit capable of executing a predetermined program, a memory, and a storage unit such as a hard disk drive. A typical computer can also be used. In order to execute each of the above-described steps, a program provided as a basic function of an operating system or the like installed in the power transmission plan creation system 4 (or the power transmission plan creation system 40) or an existing program is used. Sometimes. When the power transmission plan creation system 4 (or the power transmission plan creation system 40) is constructed by one or more computers, a part or all of the power transmission plan creation program according to the present invention is installed in each computer. In some cases, each step is executed on a separate computer.
[0060]
<3>
Next, a computer-readable recording medium storing the power transmission plan creation program will be described.
In order to execute a power transmission plan creation program for causing a computer (the power transmission plan creation system 4 (or the power transmission plan creation system 40)) to execute each step of the power transmission plan creation method according to the present invention, the power transmission plan creation program must be executed. It is necessary to store the information in a recording medium (for example, a hard disk or a CD-ROM) readable by the computer (the power transmission plan creation system 4 (or the power transmission plan creation system 40)). For this purpose, the power transmission plan creation program may be downloaded to the hard disk drive, or a CD-ROM in which the power transmission plan creation program is recorded may be set in a state where the computer can read the program.
[0061]
Here, each of the above-mentioned steps may be realized using a program provided as a basic function of the computer (the power transmission plan creation system 4 (or the power transmission plan creation system 40)) or an existing program. Since these programs are not always installed in a general-purpose computer, some or all of these programs may be recorded on the recording medium. The recording medium does not necessarily need to be a physically single medium. For example, even if the program is distributed and arranged on a plurality of CD-ROMs or a recording medium managed by another information processing device connected to the power transmission plan creation system 4 (or the power transmission plan creation system 40). I do not care.
[Brief description of the drawings]
FIG. 1 is a schematic diagram showing a flow of information and power, mainly in a power transmission plan creation system.
FIG. 2 is a schematic diagram of a specific example of a power generation system.
FIG. 3 is a diagram illustrating an example of a screen of a display device of the power transmission plan creation system.
FIG. 4 is a diagram illustrating an example of a screen of a display device of the power transmission plan creation system.
FIG. 5 is a diagram illustrating an example of a screen of a display device of the power transmission plan creation system.
FIG. 6 is a diagram illustrating an example of a screen of a display device of the power transmission plan creation system.
FIG. 7 is a diagram illustrating an example of a screen of a display device of the power transmission plan creation system.
FIG. 8 is a diagram illustrating an example of a screen of a display device of the power transmission plan creation system.
FIG. 9 is another schematic diagram showing the flow of information and power, mainly in the power transmission plan creation system.
FIG. 10 is a schematic diagram of another specific example of the power generation system.
[Explanation of symbols]
1 Power generation facilities
2 Power consumption devices
3 Power generation system
4 Power transmission plan creation system
5 Electricity companies
6 consumers
7 Operation schedule determination means
8 Electricity demand determination means
9 Surplus power estimation means
10 Power transmission plan creation means
11 Combined heat and power equipment
12 Heat consuming equipment
13 thermoelectric conversion equipment
14 Heat demand determination means
15 Waste heat quantity determination means
16 Generated power determination means
20 Power demand column
21 Numeric input box
22 Power demand column
23 Numeric input box
24 Power demand column
25 Numeric input box
26 Numerical value input field
30 Power generation system
40 Power transmission plan creation system

Claims (8)

単数または複数の発電設備と、運転に必要な電力を前記単数または複数の発電設備から受ける単数または複数の電力消費装置とを備える発電システムから需要家への送電計画を作成する送電計画作成方法であって、
前記単数または複数の電力消費装置のそれぞれの電力需要の時間変動特性を決定する電力需要決定工程と、
前記電力需要の時間変動特性と前記単数または複数の発電設備による発電電力の時間変動特性とを参照して、前記発電システムにおける余剰電力の時間変動特性を推定する余剰電力推定工程と、
前記需要家へ送電可能な送電電力の送電計画を、前記余剰電力推定工程で推定された余剰電力に基づいて作成する送電計画作成工程とを含む送電計画作成方法。
A power transmission plan creation method for creating a power transmission plan to a customer from a power generation system including one or more power generation facilities and one or more power consumption devices receiving power required for operation from the one or more power generation facilities. So,
A power demand determining step of determining a time-varying characteristic of the power demand of each of the one or more power consuming devices;
A surplus power estimation step of estimating a time variation characteristic of surplus power in the power generation system, with reference to the time variation characteristic of the power demand and the time variation characteristic of the power generated by the one or more power generation facilities,
A power transmission plan creating step of creating a power transmission plan of the transmission power that can be transmitted to the customer based on the surplus power estimated in the surplus power estimation step.
前記電力需要決定工程において、前記単数または複数の電力消費装置を、定常パターンで運転される第1の装置と特定のイベントの発生に関連して運転される第2の装置とに分類して、前記電力需要の時間変動特性を決定する請求項1に記載の送電計画作成方法。In the power demand determining step, the one or more power consuming devices are classified into a first device operated in a steady pattern and a second device operated in connection with occurrence of a specific event, The power transmission plan creation method according to claim 1, wherein a time variation characteristic of the power demand is determined. 前記第2の装置の前記電力需要の時間変動特性が、前記イベントの実施スケジュールに基づいて決定される請求項2に記載の送電計画作成方法。The power transmission plan creation method according to claim 2, wherein the time variation characteristic of the power demand of the second device is determined based on an execution schedule of the event. 前記発電システムが、前記発電設備の一部または全部として熱と電気とを併せて発生する熱電併給設備及び前記熱電併給設備から受けた熱を利用して運転を行う単数または複数の熱消費装置を備えてなり、
前記単数または複数の熱消費装置のそれぞれの熱需要の時間変動特性を決定する熱需要決定工程を含み、
前記単数または複数の発電設備による前記発電電力の時間変動特性が、前記熱需要の時間変動特性に対応して熱を供給するように前記熱電併給設備を運転させた場合に発生する電力の時間変動特性を参照して決定される請求項1から請求項3の何れか1項に記載の送電計画作成方法。
The power generation system includes a cogeneration system that generates heat and electricity together as part or all of the power generation facility, and one or more heat consuming devices that operate using heat received from the cogeneration facility. Be prepared
A heat demand determining step of determining a time-varying characteristic of heat demand of each of the one or more heat consuming devices,
The time variation characteristic of the generated power by the one or more power generation facilities is a time variation of power generated when the cogeneration system is operated to supply heat corresponding to the time variation characteristic of the heat demand. The power transmission plan creation method according to any one of claims 1 to 3, wherein the method is determined with reference to characteristics.
前記熱需要決定工程において、前記単数または複数の熱消費装置を、定常パターンで運転される第3の装置と特定のイベントの発生に関連して運転される第4の装置とに分類して、前記熱需要の時間変動特性を決定する請求項4に記載の送電計画作成方法。In the heat demand determining step, the one or more heat consuming devices are classified into a third device operated in a steady pattern and a fourth device operated in connection with occurrence of a specific event, The power transmission plan creation method according to claim 4, wherein the time variation characteristic of the heat demand is determined. 前記第4の装置の前記熱需要の時間変動特性が、前記イベントの実施スケジュールに基づいて決定される請求項5に記載の送電計画作成方法。The power transmission plan creation method according to claim 5, wherein the time variation characteristic of the heat demand of the fourth device is determined based on an execution schedule of the event. 前記単数または複数の発電設備が、前記発電システム内における廃熱を利用して発電を行う熱電変換設備を含み、
前記熱電変換設備が利用可能な廃熱量の時間変動特性を決定する廃熱量決定工程を含み、
前記単数または複数の発電設備による前記発電電力の時間変動特性が、前記廃熱量決定工程で決定された廃熱量を利用して前記熱電変換設備を運転させた場合に発生する電力の時間変動特性を参照して決定される請求項1から請求項6の何れか1項に記載の送電計画作成方法。
The one or more power generation equipment includes a thermoelectric conversion equipment that generates power using waste heat in the power generation system,
The thermoelectric conversion equipment includes a waste heat amount determining step of determining a time-varying characteristic of the available waste heat amount,
The time variation characteristic of the generated power by the one or more power generation facilities is a time variation characteristic of the power generated when the thermoelectric conversion facility is operated using the waste heat determined in the waste heat determination step. The power transmission plan creation method according to any one of claims 1 to 6, wherein the power transmission plan creation method is determined by reference.
請求項1から請求項7の何れか1項に記載の送電計画作成方法の前記各工程をコンピュータに実行させるための送電計画作成プログラム。A power transmission plan creation program for causing a computer to execute the respective steps of the power transmission plan creation method according to any one of claims 1 to 7.
JP2002243607A 2002-08-23 2002-08-23 Transmission plan creation method and transmission plan creation program Expired - Fee Related JP3942512B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002243607A JP3942512B2 (en) 2002-08-23 2002-08-23 Transmission plan creation method and transmission plan creation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002243607A JP3942512B2 (en) 2002-08-23 2002-08-23 Transmission plan creation method and transmission plan creation program

Publications (2)

Publication Number Publication Date
JP2004088840A true JP2004088840A (en) 2004-03-18
JP3942512B2 JP3942512B2 (en) 2007-07-11

Family

ID=32052324

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002243607A Expired - Fee Related JP3942512B2 (en) 2002-08-23 2002-08-23 Transmission plan creation method and transmission plan creation program

Country Status (1)

Country Link
JP (1) JP3942512B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009060720A (en) * 2007-08-31 2009-03-19 Chugoku Electric Power Co Inc:The Estimation system and method for amount of selling electric power
WO2021240924A1 (en) * 2020-05-28 2021-12-02 株式会社日立製作所 Power generation planning device and power generation planning method
TWI809497B (en) * 2020-11-13 2023-07-21 日商日立製作所股份有限公司 Power generation planning device and power generation planning method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08186932A (en) * 1995-01-04 1996-07-16 Nippon Steel Corp Apparatus for estimating power consumption
JPH09179604A (en) * 1995-09-13 1997-07-11 Toshiba Corp System and method for controlling operation of plant
JP2001073799A (en) * 1999-09-06 2001-03-21 Central Res Inst Of Electric Power Ind Gas turbine for generation and thermoelectric co-supply equipment
JP2002123578A (en) * 2000-08-10 2002-04-26 Osaka Gas Co Ltd Electric power retail system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08186932A (en) * 1995-01-04 1996-07-16 Nippon Steel Corp Apparatus for estimating power consumption
JPH09179604A (en) * 1995-09-13 1997-07-11 Toshiba Corp System and method for controlling operation of plant
JP2001073799A (en) * 1999-09-06 2001-03-21 Central Res Inst Of Electric Power Ind Gas turbine for generation and thermoelectric co-supply equipment
JP2002123578A (en) * 2000-08-10 2002-04-26 Osaka Gas Co Ltd Electric power retail system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009060720A (en) * 2007-08-31 2009-03-19 Chugoku Electric Power Co Inc:The Estimation system and method for amount of selling electric power
WO2021240924A1 (en) * 2020-05-28 2021-12-02 株式会社日立製作所 Power generation planning device and power generation planning method
TWI809497B (en) * 2020-11-13 2023-07-21 日商日立製作所股份有限公司 Power generation planning device and power generation planning method

Also Published As

Publication number Publication date
JP3942512B2 (en) 2007-07-11

Similar Documents

Publication Publication Date Title
Zhang et al. Hourly electricity demand response in the stochastic day-ahead scheduling of coordinated electricity and natural gas networks
US6697951B1 (en) Distributed electrical power management system for selecting remote or local power generators
US8069077B2 (en) Electric-power-generating-facility operation management support system, electric-power-generating-facility operation management support method, and program for executing support method, and program for executing operation management support method on computer
JP6262934B2 (en) Method, system, and computer program product for scheduling demand events
JP2002015036A (en) Electric energy control method and electric energy control device
WO2004070907A2 (en) Energy grid management method
JP5479779B2 (en) Energy saving operation support device and method for displaying the power saving effect of energy saving operation
JP2007065954A (en) Power market analysis support system and method, and program
JP2018106431A (en) Facility equipment operation plan generation apparatus and method
JP2015069545A (en) Power management device, power management method, and program
JP2020102142A (en) Power transaction system and power transaction method
US20130197706A1 (en) Systems and Methods for Dynamic Islanding to Minimize Load Shed During Restoration After a Fault
US9502898B2 (en) Systems and methods for managing a power distribution system
JP2006260088A (en) Power transaction evaluation support system and method, program, server and terminal
JP2005025377A (en) Power transaction price predicting system, power transaction price predicting method and program for predicting power transaction price
WO2016139836A1 (en) System for formulating operation plan for power generation facility, and method for formulating operation plan for power generation facility
JP2009142023A (en) Integrated management system and program of wide area power data
US20130275290A1 (en) Surplus electricity trading system, auction system, and surplus electricity trading method
JP3942512B2 (en) Transmission plan creation method and transmission plan creation program
JP6668209B2 (en) Plan creation device, plan creation method, program, data, and generator control device
JP2004282898A (en) Power supply and demand control system
JP2006260431A (en) Power bid price decision support system
JP3880471B2 (en) Power generation planning method
JP7033370B2 (en) Information processing equipment, information processing methods, and their programs
JP2007265008A (en) Co2 emission basic unit requirement calculation system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050208

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061016

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061102

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061228

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070327

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070403

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100413

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130413

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130413

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees