JP2004069240A - Installation structure of air conditioner, and installation method for the air conditioner - Google Patents
Installation structure of air conditioner, and installation method for the air conditioner Download PDFInfo
- Publication number
- JP2004069240A JP2004069240A JP2002232087A JP2002232087A JP2004069240A JP 2004069240 A JP2004069240 A JP 2004069240A JP 2002232087 A JP2002232087 A JP 2002232087A JP 2002232087 A JP2002232087 A JP 2002232087A JP 2004069240 A JP2004069240 A JP 2004069240A
- Authority
- JP
- Japan
- Prior art keywords
- air conditioner
- elastic member
- hole
- holding spring
- temporary holding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Drying Of Solid Materials (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
本発明は、空気調和機の施工構造及びその施工方法に関する。特に、空気調和機を天井裏などに吊下げ施工するための構造とその施工方法に関する。
【0002】
【背景技術】
温風を吹き出すことによって浴室内を暖房したり、浴室内に吊下げられた洗濯物などを乾燥させるための浴室暖房乾燥機(空気調和機)が従来より使用されている。このような浴室暖房乾燥機には、壁掛け型のものと天井取付け型のものとがある。
【0003】
このうち天井取付型の浴室暖房乾燥機は、浴室暖房乾燥機本体を浴室の天井裏に設置し、浴室暖房乾燥機本体の下面を覆うようにして天井の下面にフロントカバー(化粧カバー)を配置されるものであって、浴室暖房乾燥機本体を天井裏に隠すことができるので、浴室内をすっきりとさせることができる。
【0004】
図1は天井裏に施工された浴室暖房乾燥機1の設置状態の一例を示す概略側面図、図2はその概略断面図である。符号4で示すものは、内部を循環する温水と空気とを熱交換させることにより、通過する空気を加熱するための熱交換器である。この浴室暖房乾燥機1にあっては、循環ファン5をモータ駆動すると、循環ファン5によってフロントカバー3の吸込口6から吸い込まれた浴室内の空気は、熱交換器4を通過することによって加熱され、ファンケーシングを兼ねた送風路7に導かれてフロントカバー3の吹出口8から温風として吹き出される。
【0005】
このような浴室暖房乾燥機1を施工する際には、天井パネル13にあけられた開口14から浴室暖房乾燥機本体2を天井裏に持ち上げ、天井から下がっている4本の吊ボルト(アンカーボルト)10を浴室暖房乾燥機本体2のケーシング9に設けられた吊ボルト用凹部15に位置させ、吊ボルト用凹部15の底面11に開口されている装着孔に吊ボルト10を挿通させ、ナット16で挟んでケーシング9を吊ボルト10に連結する。こうしてケーシング9のフランジ12を天井パネル13の下面に当てるようにして施工した後、浴室暖房乾燥機本体2の下面を覆うようにして天井パネル13の下にフロントカバー3を取付ける。
【0006】
しかしながら、このような施工方法では、浴室暖房乾燥機本体2を天井裏まで持ち上げて吊ボルト用凹部15の底面11に吊ボルト10を挿通させた後、浴室暖房乾燥機本体2を天井裏から落下しないよう支えながら、各吊ボルト10にナット16を締め付けて浴室暖房乾燥機本体2の4箇所を順次吊ボルト10に支持させていかなければならない。そのため、浴室暖房乾燥機本体2を支持する作業者と、各吊ボルト10に順次ナット16を締め付けて浴室暖房乾燥機本体2を支持させる作業者との最低2名の作業者が必要であった(浴室暖房乾燥機本体2の重量などによっては、さらに多人数の作業者が必要になる。)。
【0007】
また、吊ボルト10を4箇所の装着孔に通した状態に維持しながら、その一方で各吊ボルト10にそれぞれナット16を締付ける作業も非常に難しかった。
【0008】
本発明は上記の従来例の問題点に鑑みてなされたものであり、その目的とするところは、天井裏などにおいて容易に施工することができる空気調和機の施工構造と、その施工方法を提供することにある。
【0009】
【発明の開示】
本発明の請求項1に係る発明は、上方から垂下された吊ボルトを空気調和機の取付け箇所に設けられた孔に挿通させ、前記孔よりも上において吊ボルトに取り付けられた上締付け具と前記孔よりも下において吊ボルトに取り付けられた下締付け具で空気調和機を吊ボルトに支持させた空気調和機の施工構造において、空気調和機を仮保持させるための仮保持用バネ部材を前記上締付け具に支持させ、当該仮保持用バネ部材を上方から空気調和機の前記孔に挿通させ、前記上締付け具と前記下締付け具との間に空気調和機の前記取付け箇所を挟持させたことを特徴としている。ここで、上締付け具及び下締付け具は、吊ボルトに取付けられるものであるから、少なくとも雌ネジ孔を有しており、例えばナット状の部分を有している。
【0010】
請求項1に記載の発明にあっては、このような構成を有しているので、請求項6に記載の施工方法のように、上方から垂下された吊ボルトに仮保持用バネ部材を保持した上締付け具を取り付け、前記上締付け具の下から、空気調和機の取付け箇所に設けられた孔に吊ボルトを挿通させ、前記仮保持用バネ部材を上方から空気調和機の前記孔に挿通させ、仮保持用バネ部材によって空気調和機を仮保持させた後、前記孔の下から吊ボルトに下締付け具を取り付け、上締付け具と下締付け具の間に空気調和機の前記取付け箇所を挟持させることにより空気調和機を支持させることができる。
【0011】
このように、本発明によれば、吊ボルトに取付けられた仮保持部材によって空気調和機を仮保持させることができるので、その後における、下締付け具を吊ボルトに取付けて下締付け具を空気調和機の取付け箇所に締め付けて空気調和機を支持させるまでの工程を容易に行うことができ、省力化又は省人化を図ることができる。典型的な場合には、一人で空気調和機の天井裏への取付け作業を行なうことができる。しかも、最終的な形態においては、空気調和機の取付け箇所が上締付け具と下締付け具によって挟持されるので、空気調和機は吊ボルトにしっかりと固定される。
【0012】
本発明の請求項2に記載の実施態様は、請求項1に記載の空気調和機の施工構造における前記上締付け具が、ナット及び弾性部材により構成されており、当該弾性部材を空気調和機の前記取付け箇所の上面に当接させていることを特徴としている。
【0013】
この実施態様によれば、上締付け具の一部を構成する弾性部材が空気調和機の取付け箇所の上面に当接しているので、空気調和機の振動を弾性部材によって吸収することができ、上締付け具に制振作用を持たせることができ、振動音やびびり音などが発生するのを防止することができる。
【0014】
本発明の請求項3に記載の実施態様は、請求項1又は2に記載の空気調和機の施工構造における前記下締付け具が、ナット及び弾性部材により構成されており、当該弾性部材を空気調和機の前記取付け箇所の下面に当接させていることを特徴としている。
【0015】
この実施態様によれば、下締付け具の一部を構成する弾性部材が空気調和機の取付け箇所の下面に当接しているので、空気調和機の振動を弾性部材によって吸収することができ、上締付け具に制振作用を持たせることができ、振動音やびびり音などが発生するのを防止することができる。
【0016】
本発明の請求項4に記載の実施態様は、請求項1、2又は3に記載の空気調和機の施工構造において、空気調和機のケーシングの上面又は側面に凹部を形成し、当該凹部の底面に位置する前記取付け箇所に前記孔を設けたことを特徴としている。
【0017】
この実施態様にあっては、ケーシングの上面又は側面に設けた凹部(後述の実施形態でいう吊ボルト用凹部)に孔を開口して吊ボルトを通すようにしているので、1本の吊ボルトはケーシングの一箇所に通すだけでよく、施工を簡略化することができる。しかも、凹部の底面に孔を設けることで、上締付け具と下締付け具で挟んで固定する取付け箇所を空気調和機の下部に位置させることができる。
【0018】
本発明の請求項5に記載の実施態様は、請求項1、2、3又は4に記載の空気調和機の施工構造における前記仮保持用バネ部材が、弾性変位して内側へ向けて引っ込むようになった一対の水平な支持面と、上向きの力を受けて前記支持面を内側へ向けて引っ込ませるようになったガイド面とを備えたことを特徴としている。
【0019】
この実施態様によれば、上締付け具及び仮保持用バネ部材を取付けた吊ボルトを取付け箇所の孔に通して押し上げると、孔の縁がガイド面(後述の実施形態では、ガイド片によって構成される。)に当たって支持面(後述の実施形態では、支持片によって構成される。)を引っ込め、取付け箇所が支持面の上に抜けると支持面が元の位置に弾性復帰するので、取付け箇所が支持面の上に乗って空気調和機が仮保持用バネ部材によって仮保持される。
【0020】
【発明の実施の形態】
(第1の実施形態)
図3は本発明の一実施形態による浴室暖房乾燥機(空気調和機)の構造を示す概略断面図であり、図4はその浴室暖房乾燥機本体の概略上面図である。この浴室暖房乾燥機21は、主として浴室暖房乾燥機本体22とフロントカバー23によって構成されている。この浴室暖房乾燥機本体22にあっては、下面開口したケーシング24の内部にファン収納部25と換気装置収納部26とが設けられ、ケーシング24の下端部外周にフランジ27が周設されている。また、ケーシング24の外周面には、上面からフランジ27の近くにまで亘って窪んだ吊ボルト用凹部28が複数箇所に設けられており、吊ボルト用凹部28の底面(以下、取付け箇所という。)には、吊ボルト29を通すことができる長方形状をした貫通孔30が開口されている。ファン収納部25の下部には、ほぼ筒状をした送風路31が設けられている。
【0021】
ファン収納部25内には、クロスフローファンのような循環ファン32が設置されており、ファン収納部25の吸引側には熱交換器33が設けられている。空気を加熱するための手段としては、電気ヒータなどでもよいが、この実施形態では、熱源機から供給される温水を循環させ、温水と浴室から吸引した空気とを熱交換させて空気を加熱する熱交換器33を用いている。
【0022】
また、換気装置収納部26内には、シロッコファン34とモータ35によって構成された換気装置36が納められており、換気装置36の吹出し方向では、ケーシング24に排気口(図示せず)が開口されている。
【0023】
また、天井裏に施工された浴室暖房乾燥機本体22は、図3に示されているように、吊下げ支持具37を用いて、梁やスラブから垂下されている複数本(例えば、3本ないし4本)の吊ボルト29に吊り下げるようにして天井裏で支持されている。浴室暖房乾燥機本体22は、フランジ27を天井パネル38の下面に当接させるようにして天井パネル38の開口39に嵌め込まれており、浴室暖房乾燥機本体22の下面は天井パネル38の下に配設されたフロントカバー23によって覆われている。
【0024】
しかして、循環ファン32を回転させると、フロントカバー23の吸込口40から浴室暖房乾燥機本体22内に吸込まれた浴室内の空気は、熱交換器33を通過する際に熱交換器33内部を流れる温水と熱交換することによって加熱され、熱交換器33で加熱された温風は循環ファン32によって送風路31から送り出され、吹出口41から浴室へ吹き出される。なお、送風路31内には、モータ(図示せず)で駆動される風向板42が設けられており、風向板42の傾きを変えることで吹出口41からの温風吹出し方向を調整することができる。
【0025】
このような浴室暖房乾燥機21によれば、吹出口41から浴室内に温風を吹き出させることによって浴室内の暖房を行うことができる。また、浴室内に洗濯物などを吊しておくことにより、浴室を衣類乾燥室として使用することもできる。
【0026】
また、モータ35によってシロッコファン34を回転させれば、換気装置36によって浴室内の湿気を含んだ空気を強制的に屋外へ排出することができる。
【0027】
次に、上記のような浴室暖房乾燥機21を天井裏に施工するための構造について説明する。図5は吊ボルト29に取付けられていて浴室暖房乾燥機本体22を支持している吊下げ支持具37の構造を示す正面図であり、図6は図5のX−X線断面図である。また、図7は吊下げ支持具37の分解斜視図である。吊下げ支持具37は、図7のように、上ナット43、仮保持用バネ部材44、上弾性部材45、下弾性部材46、下ナット47から構成されている。
【0028】
仮保持用バネ部材44は、板金を折り曲げ加工したものであって、図7に示すように、吊ボルト29を挿通させることができる通孔48を中央部に開口された水平片49の両端から弾性片50が垂下され、弾性片50の下端から外側へ向けて水平に支持片51が延出され、支持片51の先端から内側へ向けて斜め下りにガイド片52が延出されている。図6に示すように、この仮保持用バネ部材44の幅は、ケーシング24に開口された装着孔30の幅よりも若干狭くなっており、水平片49の長さも装着孔30の長さよりも短くなっており、仮保持用バネ部材44の長さは装着孔30の長さよりも長くなっている。
【0029】
図5及び図6に示されているように、上ナット43は吊ボルト29に螺合されており、通孔48に吊ボルト29を挿通された仮保持用バネ部材44は上ナット43によって保持されている。すなわち、上ナット43は仮保持用バネ部材44と一体化されており、上ナット43を吊ボルト29に取付けられたとき仮保持用バネ部材44を保持できるようになっている。例えば、仮保持用バネ部材44の水平片49の上面に溶接等によって上ナット43を接合させておいてもよく、水平片49の通孔48に上ナット43の下面に設けた突起などを回転自在に連結させておいてもよい。施工状態においては、この仮保持用バネ部材44は、ケーシング24の取付け箇所の上面側から装着孔30に挿通されており、弾性片50及び支持片51が装着孔30を通過し、支持片51の上面がケーシング24の下面に対向している。
【0030】
上弾性部材45はゴムやプラスチック等の弾性を有する材料によって製作されており、装着孔30の幅よりも大きな幅を有する横長矩形状をした弾性押え部53の下面から軸部54を垂設し、弾性押え部53から軸部54にかけて貫通孔55が設けられている。上弾性部材45は、弾性を有する一方で、ケーシング24の取付け箇所の上面を押えることができるだけの剛性を有している。例えば、ゴムや軟質プラスチックからなる弾性押え部53の内部に金属製の芯材をインサートしておいてもよく、あるいはポリエチレンのように適度の弾性を有する硬質プラスチックである程度の厚みを持たせて上弾性部材45を成形しておいてもよい。この上弾性部材45は、弾性押え部53の上面を接着剤や両面粘着テープなどによって仮保持用バネ部材44の水平片49下面に接着されている。施工状態においては、上弾性部材45の貫通孔55には吊ボルト29が挿通されており、弾性押え部53の両側部下面がケーシング24の上面に当接している。
【0031】
下弾性部材46はゴムやプラスチック等の弾性を有する材料によって、装着孔30よりも大きな直径を有する円柱状に成形されており、上面には上弾性部材45の軸部54がほぼぴったりとはまり込む嵌合孔56が貫通している。下弾性部材46は、ケーシング24の下面側で吊ボルト29を挿通されており、下弾性部材46の下面側で吊ボルト29に螺合された下ナット47を締め付けることにより上弾性部材45の弾性押え部53と下弾性部材46の上面との間に装着孔30の縁(つまり、ケーシング24の取付け箇所)を挟み込んでいる。
【0032】
この結果、浴室暖房乾燥機本体22は、吊下げ支持具37によって、装着孔30に挿通させた複数本、例えば4本ないし3本の吊ボルト29に吊下げるようにして支持される。また、浴室暖房乾燥機本体22は、上弾性部材45と下弾性部材46との間に挟み込むようにして支持されているので、浴室暖房乾燥機本体22内部のモータ等の振動も上弾性部材45や下弾性部材46で吸収させることができ、振動音を低減させることができる。
【0033】
次に、図8及び図9に従って浴室暖房乾燥機21を天井裏に施工する手順を説明する。まず、図8(a)に示すように、各々の吊ボルト29に上ナット43と仮保持用バネ部材44と上弾性部材45を取り付ける。上ナット43と仮保持用バネ部材44とは一体化されており、上弾性部材45は仮保持用バネ部材44の下面に接着されているので、上ナット43を吊ボルト29に螺合させるだけで上ナット43と仮保持用バネ部材44と上弾性部材45を吊ボルト29に取り付けることができる。これらを吊ボルト29に取り付けた後、上ナット43を回すことによって各吊ボルト29に取り付けられている仮保持用バネ部材44及び上弾性部材45の天井パネル38からの高さがほぼ同じ高さとなるように調整する。
【0034】
ついで、浴室暖房乾燥機本体22を天井パネル38の開口39内に納入して天井裏へ持ち上げる。このとき、各吊ボルト29がケーシング24の吊ボルト用凹部28内に位置するようにし、吊ボルト29の下端部を吊ボルト用凹部28の底面に開口された装着孔30に挿入させる。各吊ボルト29が装着孔30に入ったら浴室暖房乾燥機本体22を持ち上げ、そのまま浴室暖房乾燥機本体22を上方へ押し上げる。
【0035】
浴室暖房乾燥機本体22を上方へ押し上げると、図8(b)に示すように、ケーシング24の装着孔30の縁が仮保持用バネ部材44のガイド片52に当たる。さらに、浴室暖房乾燥機本体22を押し上げると、装着孔30の縁によってガイド片52が内側へ押し込まれるので、図8(c)に示すように、弾性片50が内側へ弾性的に屈曲することによって支持片51及びガイド片52が内側へ引っ込み、装着孔30の縁が支持片51の先端を越えて上方へ移動する。
【0036】
装着孔30の縁が支持片51を超えると、弾性片50の弾性復帰力によって支持片51及びガイド片52が元の位置に戻る。よって、浴室暖房乾燥機本体22を支持していた手を離すと、図9(d)に示すように、ケーシング24の取付け箇所が支持片51の上に乗って仮保持される。よって、作業者は、この時点で浴室暖房乾燥機本体22を支持する作業から解放される。
【0037】
ついで、図9(e)に示すように、各吊ボルト29に下弾性部材46と下ナット47を取り付け、下ナット47を回して締め付ける。このとき上弾性部材45の軸部54は下弾性部材46の嵌合孔56内にはまり込み、上弾性部材45と下弾性部材46の軸心が一致させられる。下ナット47を強く締め付けると、ケーシング24の取付け箇所の下面は下弾性部材46によって押し上げられ、図9(f)に示すように、吊ボルト用凹部28の底面が弾性押え部53と下弾性部材46との間に強く挟み込まれて支持される。なお、こうして施工が完了した状態においては、図9(f)に示すように、ケーシング24は仮保持用バネ部材44の支持片51から浮き上がっていてもよく、支持片51の上に乗っていても差し支えない。この後、浴室暖房乾燥機本体22の下面に、フロントカバー23を取り付ける。
【0038】
仮保持用バネ部材44を用いなければ、浴室暖房乾燥機本体22を仮保持させることができないので、図9(e)のように下弾性部材46と下ナット47を各吊ボルト29に取り付けて下ナット47を締め付ける間も浴室暖房乾燥機本体22を手で支持している必要があり、少なくとも二人以上でないと作業することができない。これに対し、このような実施形態の施工方法によれば、浴室暖房乾燥機本体22を仮保持用バネ部材44で仮保持させた状態で、下弾性部材46や下ナット47を取り付けることができるので、省力化することができ、一人で浴室暖房乾燥機21を施工することも可能になる。
【0039】
仮保持用バネ部材44で浴室暖房乾燥機本体22を支持しているだけであると、浴室暖房乾燥機本体22が仮保持用バネ部材44から浮き上がる。また、ケーシング24の吊ボルト用凹部28の底面を弾性押え部53で押えるようにする場合でも、装着孔30の縁を弾性押え部53と支持片51との間に嵌め込みやすくするためには、弾性押え部53の下面と支持片51の上面との距離をケーシング24の装着孔30の縁の厚みよりも大きくして余裕を持たせておく必要があり、その場合には装着孔30の縁の上面と弾性押え部53の下面との間に隙間が生じる。その結果、地震や大型車両の走行時の振動などによって浴室暖房乾燥機本体22が浮き上がったり、揺れ動いたりする恐れがある。そこで、本発明においては、最終的な施工状態においては、ケーシング24を上ナット43及び上弾性部材45と下弾性部材46及び下ナット47とで締め付けて固定し、浴室暖房乾燥機本体22が揺れ動いたり、浮き上がったりしないようにしている。よって、浴室暖房乾燥機本体22が確実に固定され、振動音やびびり音などが発生する恐れが無くなる。さらに、ケーシング24は上弾性部材45と下弾性部材46との間に挟み込まれているので、これら弾性部材45、46によって振動を吸収させることができる。特に、ケーシング24が支持片51から浮いていれば、浴室暖房乾燥機本体22と仮保持用バネ部材44との間で振動音等が発生する恐れがない。
【0040】
さらに、ケーシング24には、吊ボルト用凹部28を設けて吊ボルト用凹部28を吊ボルト用凹部28の底面に開口された装着孔30だけに通せばよいようにしているので、各吊ボルト29を浴室暖房乾燥機本体22のケーシング24に通し易くなり、より一層施工を簡略化することができる。
【0041】
なお、上記実施形態においては、上ナット43の下に仮保持用バネ部材44を位置させたが、仮保持用バネ部材44の水平片49の下面に上ナット43を一体化させてもよい。また、2つの上ナット43の間に仮保持用バネ部材44の水平片49を挟み込むようにすれば、仮保持用バネ部材44と上ナット43が別個に形成されていてもよい。
【0042】
(第2の実施形態)
図10は本発明の別な実施形態に用いられる吊下げ支持具37の構造を示す分解斜視図である。この実施形態で用いられている仮保持用バネ部材44では、弾性片50、支持片51及びガイド片52の幅は装着孔30の幅よりも狭くなっているが、水平片49の両側縁からは張出し部49aが水平に延出されていて、水平片49全体の幅は装着孔30の幅よりも広くなっている。また、下弾性部材46には吊ボルト29を挿通させるための貫通孔58があいている。
【0043】
よって、この仮保持用バネ部材44では、張出し部49aと下弾性部材46との間にケーシング24を挟み込むことによってケーシング24を掴み、各吊ボルト29で浴室暖房乾燥機本体22を支持させることができる。なお、この仮保持用バネ部材44が金属製である場合には、水平片49の下面にゴム、軟質プラスチック、発泡プラスチック等の弾性シート57を貼り付けておいてもよい。
【0044】
このような実施形態によれば、上弾性部材45を省くことができるので、部品点数を削減でき、コスト面でも有利となり、施工も簡略化される。
【0045】
【発明の効果】
本発明の請求項1の空気調和機の吊下げ構造、又は、本発明の請求項6の空気調和機の施工方法によれば、吊ボルトに取付けられた仮保持部材によって空気調和機を仮保持させることができるので、その後における、下締付け具を吊ボルトに取付けて下締付け具を空気調和機の取付け箇所に締め付けて空気調和機を支持させるまでの工程を容易に行うことができ、省力化又は省人化を図ることができる。典型的な場合には、一人で空気調和機の天井裏への取付け作業を行なうことができる。しかも、最終的な形態においては、空気調和機の取付け箇所が上締付け具と下締付け具によって挟持されるので、空気調和機は吊ボルトにしっかりと固定される。
【0046】
また、本発明の請求項2に記載の実施態様によれば、上締付け具の一部を構成する弾性部材が空気調和機の取付け箇所の上面に当接しているので、空気調和機の振動を弾性部材によって吸収することができ、上締付け具に制振作用を持たせることができ、振動音やびびり音などが発生するのを防止することができる。
【0047】
本発明の請求項3に記載の実施態様によれば、下締付け具の一部を構成する弾性部材が空気調和機の取付け箇所の下面に当接しているので、空気調和機の振動を弾性部材によって吸収することができ、上締付け具に制振作用を持たせることができ、振動音やびびり音などが発生するのを防止することができる。
【0048】
本発明の請求項4に記載の実施態様によれば、ケーシングの上面又は側面に設けた凹部に孔を開口して吊ボルトを通すようにしているので、1本の吊ボルトはケーシングの一箇所に通すだけでよく、施工を簡略化することができる。しかも、凹部の底面に孔を設けることで、上締付け具と下締付け具で挟んで固定する取付け箇所を空気調和機の下部に位置させることができる。
【0049】
本発明の請求項5に記載の実施態様によれば、上締付け具及び仮保持用バネ部材を取付けた吊ボルトを取付け箇所の孔に通して押し上げると、孔の縁がガイド面に当たって支持面を引っ込め、取付け箇所が支持面の上に抜けると支持面が元の位置に弾性復帰するので、取付け箇所が支持面の上に乗って空気調和機が仮保持用バネ部材によって仮保持される。
【図面の簡単な説明】
【図1】天井裏に施工された浴室暖房乾燥機の設置状態の一例を示す概略側面図である。
【図2】同上の浴室暖房乾燥機の概略断面図である。
【図3】本発明の一実施形態による浴室暖房乾燥機(空気調和機)の構造を示す概略断面図である。
【図4】同上の浴室暖房乾燥機を構成する浴室暖房乾燥機本体の概略上面図である。
【図5】吊ボルトに取付けられた吊下げ支持具の構造を示す正面図である。
【図6】図5のX−X線断面図である。
【図7】図5に示した吊下げ支持具の分解斜視図である。
【図8】(a)(b)(c)は、浴室暖房乾燥機本体を天井裏に施工する手順を説明する図である。
【図9】(d)(e)(f)は同上の続図である。
【図10】本発明の別な実施形態に用いられる吊下げ支持具の構造を示す分解斜視図である。
【符号の説明】
22 浴室暖房乾燥機本体
24 ケーシング
28 吊ボルト用凹部
29 吊ボルト
30 装着孔
37 吊下げ支持具
43 上ナット
44 仮保持用バネ部材
45 上弾性部材
46 下弾性部材
47 下ナット
50 弾性片
51 支持片
52 ガイド片[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a construction structure of an air conditioner and a construction method thereof. In particular, the present invention relates to a structure for hanging an air conditioner under a ceiling or the like, and a method of executing the structure.
[0002]
[Background Art]
2. Description of the Related Art A bathroom heater / dryer (air conditioner) for heating a bathroom by blowing out hot air or drying laundry suspended in the bathroom has been used. Such bathroom heating dryers include a wall-mounted type and a ceiling-mounted type.
[0003]
Among these, the ceiling-mounted bathroom heater / dryer has a bathroom heater / dryer body installed behind the ceiling of the bathroom, and a front cover (decorative cover) placed on the lower surface of the ceiling so as to cover the lower surface of the bathroom heater / dryer body. Since the main body of the bathroom heater / dryer can be hidden behind the ceiling, the interior of the bathroom can be refreshed.
[0004]
FIG. 1 is a schematic side view showing an example of an installation state of a bathroom heating /
[0005]
When such a bathroom heating /
[0006]
However, in such a construction method, the bathroom heater / dryer
[0007]
Further, while maintaining the state where the hanging
[0008]
The present invention has been made in view of the problems of the conventional example described above, and an object of the present invention is to provide a construction structure of an air conditioner that can be easily constructed behind a ceiling and a construction method thereof. Is to do.
[0009]
DISCLOSURE OF THE INVENTION
The invention according to
[0010]
According to the first aspect of the present invention, since such a configuration is provided, the temporary holding spring member is held by the hanging bolts suspended from above as in the construction method of the sixth aspect. The upper tightening tool is attached, and a suspension bolt is inserted from below the upper tightening tool into a hole provided at the mounting location of the air conditioner, and the temporary holding spring member is inserted from above into the hole of the air conditioner. After the air conditioner is temporarily held by the temporary holding spring member, a lower fastening tool is attached to the suspension bolt from below the hole, and the mounting location of the air conditioner is located between the upper fastening tool and the lower fastening tool. The air conditioner can be supported by being sandwiched.
[0011]
As described above, according to the present invention, the air conditioner can be temporarily held by the temporary holding member attached to the suspension bolt, so that the lower fastener is attached to the suspension bolt and the lower fastener is air-conditioned. It is possible to easily perform the process of tightening the air conditioner at the mounting position of the air conditioner and supporting the air conditioner, thereby achieving labor saving or labor saving. In a typical case, the work of installing the air conditioner above the ceiling can be performed by one person. Moreover, in the final form, the mounting location of the air conditioner is sandwiched between the upper fastener and the lower fastener, so that the air conditioner is firmly fixed to the suspension bolt.
[0012]
In an embodiment according to a second aspect of the present invention, in the construction structure for an air conditioner according to the first aspect, the upper tightening member is configured by a nut and an elastic member, and the elastic member is connected to the air conditioner. It is characterized in that it is in contact with the upper surface of the attachment location.
[0013]
According to this embodiment, since the elastic member forming a part of the upper tightening tool is in contact with the upper surface of the mounting location of the air conditioner, the vibration of the air conditioner can be absorbed by the elastic member. The vibration damping action can be imparted to the fastener, so that the generation of vibration noise and chatter noise can be prevented.
[0014]
In an embodiment according to
[0015]
According to this embodiment, since the elastic member forming a part of the lower fastener is in contact with the lower surface of the mounting location of the air conditioner, the vibration of the air conditioner can be absorbed by the elastic member. The vibration damping action can be imparted to the fastener, so that the generation of vibration noise and chatter noise can be prevented.
[0016]
According to a fourth aspect of the present invention, in the construction of an air conditioner according to the first, second or third aspect, a concave portion is formed on an upper surface or a side surface of a casing of the air conditioner, and a bottom surface of the concave portion. The hole is provided at the attachment position located at the position.
[0017]
In this embodiment, since a hole is opened in a concave portion (a concave portion for a suspension bolt in an embodiment described later) provided on the upper surface or a side surface of the casing so that the suspension bolt passes therethrough, one suspension bolt is provided. Need only be passed through one location of the casing, and the construction can be simplified. In addition, by providing a hole in the bottom surface of the concave portion, the mounting portion sandwiched and fixed between the upper fastener and the lower fastener can be located at the lower part of the air conditioner.
[0018]
In an embodiment according to
[0019]
According to this embodiment, when the suspension bolt to which the upper fastening tool and the temporary holding spring member are attached is pushed up through the hole at the attachment location, the edge of the hole is formed by the guide surface (in the embodiment described later, the guide piece is formed by a guide piece). In this case, the support surface (in the embodiment described later, constituted by a support piece) is retracted, and when the attachment portion comes out above the support surface, the support surface is elastically returned to the original position. The air conditioner is temporarily held on the surface by the temporary holding spring member.
[0020]
BEST MODE FOR CARRYING OUT THE INVENTION
(1st Embodiment)
FIG. 3 is a schematic sectional view showing the structure of a bathroom heater / dryer (air conditioner) according to an embodiment of the present invention, and FIG. 4 is a schematic top view of the bathroom heater / dryer main body. The bathroom heating /
[0021]
A
[0022]
Further, a
[0023]
Also, as shown in FIG. 3, the bathroom heating /
[0024]
When the
[0025]
According to such a bathroom heating /
[0026]
In addition, if the
[0027]
Next, a structure for installing the bathroom heating /
[0028]
The temporary
[0029]
As shown in FIGS. 5 and 6, the
[0030]
The upper
[0031]
The lower
[0032]
As a result, the bathroom heater / dryer
[0033]
Next, the procedure for installing the bathroom heating /
[0034]
Next, the bathroom heater /
[0035]
When the bathroom heater /
[0036]
When the edge of the mounting
[0037]
Next, as shown in FIG. 9E, a lower
[0038]
If the temporary
[0039]
If only the bathroom heating /
[0040]
Furthermore, the
[0041]
In the above embodiment, the temporary
[0042]
(Second embodiment)
FIG. 10 is an exploded perspective view showing a structure of a hanging
[0043]
Therefore, in the temporary
[0044]
According to such an embodiment, since the upper
[0045]
【The invention's effect】
According to the air conditioner suspension structure of the first aspect of the present invention or the air conditioner construction method of the sixth aspect of the present invention, the air conditioner is temporarily held by the temporary holding member attached to the suspension bolt. Therefore, the subsequent process of attaching the lower fastener to the hanging bolt and tightening the lower fastener to the mounting location of the air conditioner to support the air conditioner can be easily performed, thereby saving labor. Alternatively, labor saving can be achieved. In a typical case, the work of installing the air conditioner above the ceiling can be performed by one person. Moreover, in the final form, the mounting location of the air conditioner is sandwiched between the upper fastener and the lower fastener, so that the air conditioner is firmly fixed to the suspension bolt.
[0046]
Further, according to the embodiment of the present invention, since the elastic member forming a part of the upper tightening tool is in contact with the upper surface of the mounting location of the air conditioner, vibration of the air conditioner is reduced. It can be absorbed by the elastic member, the upper tightening tool can have a vibration damping action, and it is possible to prevent generation of vibration noise and chatter noise.
[0047]
According to the third aspect of the present invention, since the elastic member forming a part of the lower fastener is in contact with the lower surface of the mounting location of the air conditioner, the vibration of the air conditioner is reduced by the elastic member. Thus, the upper fastener can have a vibration damping effect, and the generation of vibration noise and chatter noise can be prevented.
[0048]
According to the embodiment described in
[0049]
According to the embodiment described in
[Brief description of the drawings]
FIG. 1 is a schematic side view showing an example of an installation state of a bathroom heating / drying machine installed under a ceiling.
FIG. 2 is a schematic sectional view of the bathroom heating / drying machine.
FIG. 3 is a schematic sectional view showing the structure of a bathroom heating / drying machine (air conditioner) according to an embodiment of the present invention.
FIG. 4 is a schematic top view of a bathroom heating / drying device constituting the bathroom heating / drying device.
FIG. 5 is a front view showing the structure of a hanging support attached to the hanging bolt.
FIG. 6 is a sectional view taken along line XX of FIG. 5;
FIG. 7 is an exploded perspective view of the hanging support shown in FIG.
FIGS. 8 (a), (b) and (c) are diagrams for explaining a procedure for installing a bathroom heating / drying apparatus body under the ceiling.
9 (d), (e) and (f) are continuation diagrams of the above.
FIG. 10 is an exploded perspective view showing a structure of a hanging support used in another embodiment of the present invention.
[Explanation of symbols]
22 Bathroom heating dryer
24 Casing
28 recess for hanging bolt
29 Hanging bolt
30 mounting holes
37 Suspension support
43 Upper nut
44 Temporary Holding Spring Member
45 Upper elastic member
46 Lower elastic member
47 Lower nut
50 elastic pieces
51 Supporting piece
52 Guide Piece
Claims (6)
空気調和機を仮保持させるための仮保持用バネ部材を前記上締付け具に支持させ、当該仮保持用バネ部材を上方から空気調和機の前記孔に挿通させ、前記上締付け具と前記下締付け具との間に空気調和機の前記取付け箇所を挟持させたことを特徴とする空気調和機の施工構造。A hanging bolt hanging from above is inserted through a hole provided at the mounting location of the air conditioner, and an upper tightening tool attached to the hanging bolt above the hole and attached to the hanging bolt below the hole. In the construction structure of an air conditioner in which the air conditioner is
A temporary holding spring member for temporarily holding the air conditioner is supported by the upper tightening tool, and the temporary holding spring member is inserted from above into the hole of the air conditioner, and the upper tightening tool and the lower tightening tool are inserted. An installation structure for an air conditioner, characterized in that the mounting portion of the air conditioner is sandwiched between the components.
前記上締付け具の下から、空気調和機の取付け箇所に設けられた孔に吊ボルトを挿通させる工程と、
前記仮保持用バネ部材を上方から空気調和機の前記孔に挿通させ、仮保持用バネ部材によって空気調和機を仮保持させる工程と、
前記孔の下から吊ボルトに下締付け具を取り付け、上締付け具と下締付け具の間に空気調和機の前記取付け箇所を挟持させることにより空気調和機を支持させる工程と、
を備えた空気調和機の施工方法。A step of attaching an upper tightening tool holding the temporary holding spring member to the hanging bolt suspended from above,
From the bottom of the upper fastener, a step of inserting a suspension bolt into a hole provided at a mounting location of the air conditioner,
A step of inserting the temporary holding spring member from above into the hole of the air conditioner, and temporarily holding the air conditioner by the temporary holding spring member,
A step of attaching the lower fastener to the suspension bolt from below the hole, and supporting the air conditioner by sandwiching the mounting portion of the air conditioner between the upper fastener and the lower fastener,
Construction method of air conditioner equipped with.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002232087A JP3838176B2 (en) | 2002-08-08 | 2002-08-08 | Air conditioner construction structure and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002232087A JP3838176B2 (en) | 2002-08-08 | 2002-08-08 | Air conditioner construction structure and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004069240A true JP2004069240A (en) | 2004-03-04 |
JP3838176B2 JP3838176B2 (en) | 2006-10-25 |
Family
ID=32017649
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002232087A Expired - Fee Related JP3838176B2 (en) | 2002-08-08 | 2002-08-08 | Air conditioner construction structure and construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3838176B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018000017A1 (en) * | 2016-06-30 | 2018-01-04 | Air Diffusion Agencies Pty Ltd | Mount improvements |
CN112797572A (en) * | 2020-12-31 | 2021-05-14 | 南京丹腾智能科技有限公司 | Remote intelligent operation and maintenance system of central air conditioner |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109974280A (en) * | 2019-03-28 | 2019-07-05 | 成玉贵 | The method of new blower damping noise reduction |
-
2002
- 2002-08-08 JP JP2002232087A patent/JP3838176B2/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018000017A1 (en) * | 2016-06-30 | 2018-01-04 | Air Diffusion Agencies Pty Ltd | Mount improvements |
AU2017289294B2 (en) * | 2016-06-30 | 2023-01-19 | Air Diffusion Agencies Pty Ltd | Mount improvements |
CN112797572A (en) * | 2020-12-31 | 2021-05-14 | 南京丹腾智能科技有限公司 | Remote intelligent operation and maintenance system of central air conditioner |
Also Published As
Publication number | Publication date |
---|---|
JP3838176B2 (en) | 2006-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2592546A1 (en) | Ventilation exhaust fan | |
WO2011007541A1 (en) | Ventilation/air-conditioning device | |
JP2009030938A (en) | Air conditioning device | |
JP2004069240A (en) | Installation structure of air conditioner, and installation method for the air conditioner | |
AU741436B2 (en) | Fixing device and fixing structure for air conditioner | |
KR100977666B1 (en) | Apparatus for fixing air conditioning ventilater | |
JP2004085001A (en) | Indoor unit of air conditioner | |
WO2013138367A1 (en) | Hvac base and return air system | |
KR100843458B1 (en) | Heat exchanger structure of a air conditioner indoor device | |
JP4523822B2 (en) | Embedded ceiling air conditioner | |
JP3297837B2 (en) | Ceiling-mounted air conditioner | |
JP2002130797A (en) | Ceiling-mounted air conditioner | |
CN216629207U (en) | Electric host convenient to installation of LED sterilamp | |
JP2727736B2 (en) | Ceiling-mounted air conditioner | |
JP3717620B2 (en) | Air conditioner | |
JP2000055552A (en) | Bathroom heater/dryer | |
JPH033882Y2 (en) | ||
WO2007086640A2 (en) | Indoor unit of air conditioner | |
JP3688472B2 (en) | Bathroom heating dryer | |
CN207741288U (en) | A kind of pillar holder and air conditioner | |
JP3913365B2 (en) | Bathroom heating dryer | |
JP2000055550A (en) | Bathroom heater/dryer | |
KR200460996Y1 (en) | Chamber Unit for Air Conditioning | |
JPH0144987Y2 (en) | ||
JP5394976B2 (en) | Holding member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040521 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060418 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060613 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060711 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060724 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
LAPS | Cancellation because of no payment of annual fees |