JP2004062862A - Managing system of equipment, operation information creation device, and managing device - Google Patents

Managing system of equipment, operation information creation device, and managing device Download PDF

Info

Publication number
JP2004062862A
JP2004062862A JP2003095426A JP2003095426A JP2004062862A JP 2004062862 A JP2004062862 A JP 2004062862A JP 2003095426 A JP2003095426 A JP 2003095426A JP 2003095426 A JP2003095426 A JP 2003095426A JP 2004062862 A JP2004062862 A JP 2004062862A
Authority
JP
Japan
Prior art keywords
information
equipment
air conditioner
operation information
creates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003095426A
Other languages
Japanese (ja)
Inventor
Masataka Iwata
岩田 正崇
Masayasu Kitamura
北村 真安
Jia Ikeda
池田 滋亜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Priority to JP2003095426A priority Critical patent/JP2004062862A/en
Publication of JP2004062862A publication Critical patent/JP2004062862A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a managing system of equipment which reduces a load of a managing device, an operation information creation device and the managing device. <P>SOLUTION: The managing system 1 of the equipment for creating operation information of the equipment 10 based on equipment information of the equipment 10 is provided with the managing device 30 and the operation information creation device 40. The managing device 30 acquires or receives equipment information of the equipment 10 from the equipment 10. Furthermore, the managing device 30 creates intermediate information based on the equipment information. The operation information creation device 40 acquires or receives the intermediate information from the managing device 30. Furthermore, the operation information creation device 40 creates the operation information based on the intermediate information. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、設備機器の管理システム、運用情報作成装置および管理装置、特に、設備機器の機器情報を元に運用情報を作成するための設備機器の管理システム、運用情報作成装置および管理装置に関する。
【0002】
【従来の技術】
従来から、建物(ビル、住宅等)に設置された設備機器(空調機器、照明機器、給湯機器等)を管理する設備機器の管理システムが知られている。このシステムにおいては、設備機器の管理を行う管理装置が、設備機器から設備機器に関する機器情報を取得または受信する。機器情報としては、管理装置が設備機器の管理を行うために用いられる様々なデータが考えられる。例えば、機器情報は、設備機器の消費電力・設備機器の運転異常の有無・設備機器の稼働内容などである。さらに、管理装置は、これらの機器情報を元にして運用情報を作成する。例えば、運用情報は、設備機器の消費電力・設備機器の運転異常の有無・設備機器の稼働状況・設備機器の制御を行うことの有用性などを示す報告書である。
【0003】
この運用情報により、ユーザは設備機器をより有効に使用することができる。
【0004】
【発明が解決しようとする課題】
しかし、機器情報は管理装置が設備機器の管理を行うために用いられる様々なデータであるので、その情報量は膨大である。また、管理装置は、運用情報を作成するための専用装置ではなく、他の処理(設備機器の管理など)も同時に行う汎用装置である。すなわち、管理装置は、膨大な情報量の機器情報を元にして、他の処理を行うのと同時に運用情報を作成する必要がある。このため、設備機器の管理システムにおいては、管理装置に大きな負担がかかっている。
【0005】
本発明の課題は、管理装置の負担を軽減させる設備機器の管理システム、運用情報作成装置および管理装置を提供することにある。
【0006】
【課題を解決するための手段】
請求項1に係る設備機器の管理システムは、設備機器の機器情報を元に設備機器の運用情報を作成するための設備機器の管理システムであって、管理装置と、運用情報作成装置とを備える。管理装置は、設備機器の機器情報を設備機器から取得または受信する。さらに、管理装置は、機器情報を元に中間情報を作成する。運用情報作成装置は、管理装置から中間情報を取得または受信する。さらに、運用情報作成装置は、中間情報を元に運用情報を作成する。例えば、設備機器が空調機の場合、設備機器の機器情報は、空調機の運転状態や消費電力などである。
【0007】
この設備機器の管理システムでは、管理装置が設備機器から機器情報を取得または受信する。そして、管理装置は、この機器情報を元に中間情報を作成する。その後、運用情報作成装置が、中間情報を取得または受信し、中間情報を元にして運用情報を作成する。
ここでは、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。その結果、管理装置の負担が軽減される。
【0008】
請求項2に係る設備機器の管理システムは、請求項1に記載の設備機器の管理システムであって、管理装置がさらに機器情報を保持する。さらに、管理装置は、この機器情報を元に中間情報を作成する。
ここでは、管理装置が機器情報を保持することにより、管理装置が一定期間についての中間情報を作成することができる。このため、運用情報作成装置が一定期間についての運用情報を作成することができる。その結果、この設備機器の管理システムでは、作成される運用情報の有用性が向上する。
【0009】
請求項3に係る設備機器の管理システムは、請求項1または2に記載の設備機器の管理システムであって、管理装置がさらに機器関連情報を収集する。さらに、管理装置は、機器関連情報と機器情報とを元にして中間情報を作成する。例えば、設備機器が空調機の場合、機器関連情報は、空調機の設置場所付近の気温・湿度、空調機の設置される建物における電気基本料金、力率割引率などである。
【0010】
ここでは、管理装置が機器関連情報と機器情報とを元にして中間情報を作成する。このため、管理装置が機器情報に機器関連情報を加味した運用情報を作成することができる。その結果、この設備機器の管理システムでは、運用情報の有用性が向上する。
請求項4に係る設備機器の管理システムは、請求項1から3のいずれかに記載の設備機器の管理システムであって、管理装置はさらに機器情報を元に設備機器を制御する。
【0011】
ここでは、管理装置が機器情報を元に設備機器を制御するため、設備機器の運転状況や設備機器の設置される周囲の環境に即した設備機器の制御を行うことができる。その結果、設備機器がより適切に稼働される。
請求項5に係る設備機器の管理システムは、請求項1から3のいずれかに記載の設備機器の監視システムであって、運用情報は複数種類あり、中間情報は1つである。
【0012】
ここでは、管理装置が1つの中間情報を作成し、運用情報作成装置がその1つの中間情報を元に複数種類の運用情報を作成する。このため、運用情報の作成作業工数を削減することができる。また、中間情報が1つであるので、情報管理にかかる手間を低減できる。
請求項6に係る設備機器の監視システムは、請求項5に記載の設備機器の監視システムであって、運用情報は、デマンド制御に関する情報、省エネルギー制御に関する情報、およびデマンド制御に関する情報と省エネルギー制御に関する情報とから導き出されるエネルギー情報である。
【0013】
ここでは、運用情報作成装置によって作成される運用情報が、デマンド制御に関する情報、省エネルギー制御に関する情報、およびデマンド制御に関する情報と省エネルギー制御に関する情報とから導き出されるエネルギー情報である。このため、デマンド制御による省エネルギー効果あるいは省コスト効果、省エネルギー制御による省エネルギー効果あるいは省コスト効果、およびデマンド制御と省エネルギー制御とを併せた省エネルギー効果あるいは省コスト効果などについて比較検討できる。
【0014】
請求項7に係る設備機器の監視システムは、請求項5または6に記載の設備機器の監視システムであって、選択手段をさらに備える。選択手段は、複数種類の運転情報の中から所望の運用情報を選択する。なお、ここで、選択手段は、管理装置あるいは運用情報作成装置に設けられてもよいし、別途設けられてもよい。ただし、別途設けられる場合は、選択手段はネットワークなどを介して管理装置あるいは運用情報作成装置に接続される必要がある。
【0015】
ここでは、選択手段が、複数種類の運転情報の中から所望の運用情報を選択する。このため、選択手段における選択操作が管理装置あるいは運用情報作成装置に反映されるように設定できれば、所望の運情情報を作成するために必要な機器情報を1つの中間情報にまとめることができる。したがって、より自由度の高い情報管理をすることができる。
【0016】
請求項8に係る運用情報作成装置は、設備機器の機器情報を元に中間情報を作成する管理装置と接続される運用情報作成装置であって、第1通信手段と、第1作成手段とを備える。この第1通信手段は、管理装置から中間情報を取得する。この第1作成手段は、中間情報を元に運用情報を作成する。
ここでは、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。その結果、管理装置の負担が軽減される。
【0017】
請求項9に係る管理装置は、設備機器の運用情報を作成する運用情報作成装置と接続される管理装置であって、第2通信手段と、第2作成手段と、提供手段とを備える。第2通信手段は、設備機器の機器情報を取得または受信する。第2作成手段は、機器情報を元に中間情報を作成する。提供手段は、中間情報を運用情報作成装置に提供する。
【0018】
ここでは、管理装置が機器情報を元に中間情報を作成した後、提供手段により中間情報が運用情報作成装置に提供される。そして、運用情報作成装置が、中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。これにより、管理装置の負担が軽減される。
【0019】
【発明の実施の形態】
<空調機の管理システム1の構成>
本発明の一実施形態にかかる空調機の管理システム1の概略構成を図1に示す。
この空調機の管理システム1は、主に、空調機10と、コントローラ20と、サーバ30と、報告書作成装置40とから構成される。この空調機の管理システム1によって空調機10の運用状況を示す運用報告書が作成される。
【0020】
(空調機10)
空調機10とコントローラ20との詳細な構成を図2に示す。
空調機10は、ビルや住宅などユーザの建物2内に設置され、通信線を介してコントローラ20と接続される。空調機10は、コントローラ20から送信される制御指令を元に電気を動力源として冷房・暖房・除湿などの運転を行い、室内の空気の調和を行う。この空調機10は、室内の壁面や天井などに取り付けられる室内機11と、室外に設置される室外機12とから構成される。室外機12内には室外熱交換機や圧縮機などが収納され、室内機11内には室内熱交換機が収納されている。そして、各熱交換機、圧縮機、各種バルブ、これらを接続する冷媒配管などが、冷媒回路を構成している。
【0021】
また、空調機10は、コントローラ20からの求めに応じて空調機情報をコントローラ20に対して送信する。空調機情報としては、室内機11の設置される室内の気温および湿度や、空調機10の消費電力量、冷房・暖房・除湿・送風等の運転モードなどがある。空調機10が空調機情報を取得するために、空調機10に内蔵あるいは接続される温度センサ、湿度センサ、電力計、運転モードを判定する判定装置などが用いられる。さらに、空調機10は、空調機10を稼働させるための制御指令をコントローラ20から受信し、この制御指令を元に冷房・暖房・除湿などの運転を行う。
【0022】
(コントローラ20)
コントローラ20は、空調機10が設置される建物2内の制御室や管理室などに設置され、通信線を介して空調機10に接続される。コントローラ20は、空調機10の制御を行う。
このコントローラ20は、一定時間ごともしくは所定の時間に空調機10に対して空調機情報を提供するよう要求し、空調機10から空調機情報を取得する。例えば、コントローラ20は、1時間ごとに空調機10に対して空調機情報を提供するよう要求し、空調機10から空調機情報を取得する。そして、コントローラ20は、空調機10から取得した空調機情報をサーバ30に対して送信する。
【0023】
また、コントローラ20は、空調機10から受信した空調機情報を元に空調機10を適切に稼働させる制御指令を作成する。例えば、コントローラ20は、空調機10の消費電力量を元に、一定の消費電力量を超えないように空調機10を稼働させる制御指令を作成する。そして、コントローラ20は、作成した制御指令を空調機10に対して送信する。
【0024】
なお、本実施形態に係る空調機の管理システム1においては、コントローラ20が空調機情報を得るために、コントローラ20が一定時間ごともしくは所定の時間に空調機10に対して空調機情報を提供するよう要求し空調機10から空調機情報を取得している。これに代えて、空調機10が一定時間毎もしくは所定の時間にコントローラ20に対して空調機情報を送信してもよい。
【0025】
(サーバ30)
サーバ30は、空調機10またはコントローラ20のメーカーなどにより空調機10を一括管理するための管理センタ内に設けられ、インターネットなどのネットワークもしくは専用回線を介して各建物2のコントローラ20と接続される。そして、サーバ30において、空調機情報を元に中間ファイルが作成される。また、サーバ30は、サーバ通信部31と、データベース32と、集計エンジン33とを有する(図1参照)。
【0026】
サーバ通信部31は、コントローラ20から送信される空調機情報を受信する。そして、サーバ通信部31は、サーバ30において作成される中間ファイルを報告書作成装置40に対して送信する。
データベース32は、コントローラ20から受信した空調機10の空調機情報をユーザ毎に分類し、時系列的に保持する。さらに、データベース32は、報告書作成装置40において運用報告書を作成するための作成ツール42を保持する。そして、データベース32は、報告書作成装置40の求めに応じて作成ツール42をダウンロードさせる。
【0027】
集計エンジン33は、インターネットなどのネットワークを介してサーバ30外の外部データベース50と接続される。集計エンジン33は、定期的に外部データベース50から空調機10の運転に関する運転関連情報を収集し、運転関連情報をデータベース32に保持させる。この運転関連情報は、ユーザの建物2付近の気象データ(気温、湿度など)などである。そして、集計エンジン33は、運転関連情報とデータベース32に保持される空調機情報とを元に中間ファイルを作成する。この中間ファイルは、報告書作成装置40において運用報告書を作成する元となるデータである。
【0028】
なお、本実施形態に係る空調機の管理システム1においては、集計エンジン33が、定期的に外部データベース50から空調機10の運転に関する運転関連情報を収集している。これに代えて、集計エンジン33が報告書作成装置40の求めに応じて外部データベース50から空調機10の運転に関する運転関連情報を収集してもよい。
【0029】
サーバ30は、さらに、中間ファイルを作成する以外の処理を行う。例えば、サーバ30は、コントローラ20を介して空調機10の管理を行う。具体的には、サーバ30は、コントローラ20より送信される空調機10の空調機情報を分析し、空調機10の運転状況を確認する。サーバ30において、空調機10の運転状況が異常であると判断される場合には、サーバ30に接続される表示部(図示せず)にその旨が表示される。空調機10のメンテナンス担当者などが空調機10の運転異常を認識した場合、これらのメンテナンス担当者などが、空調機10の設置される現地に向かい、空調機10の運転状況の確認を行う。
【0030】
なお、本実施形態に係る空調機の管理システム1においては、空調機情報がコントローラ20からサーバ30に対して送信される。これに代えて、コントローラ20が空調機情報を保持し、サーバ30がこの空調機情報を読み込んでもよい。
(報告書作成装置40)
報告書作成装置40は、空調機10のメーカーやその代理店などに設置され、インターネットなどのネットワークや専用回線などを介してサーバ30と接続される。空調機の管理システム1の管理者や代理店の担当者など(使用者)は、この報告書作成装置40に必要な項目を入力し、空調機10の運用報告書を作成することができる。この報告書作成装置40は、主に、作成装置通信部41と、作成ツール42とから構成される。
【0031】
作成装置通信部41は、報告書作成装置40の使用者の求めに応じてサーバ30に対して中間ファイルを提供するよう要求し、サーバ30から中間ファイルを受信する。さらに、作成装置通信部41は、報告書作成装置40の求めに応じてサーバ30に対して作成ツール42を提供するよう要求し、サーバ30から作成ツール42を取得する。
【0032】
なお、本実施形態に係る空調機の管理システム1においては、作成ツール42が、ネットワークや通信回線を介してサーバ30から報告書作成装置40にダウンロードされている。これに代えて、作成ツール42が、CD−ROMなどの記憶媒体に記憶され、報告書作成装置40に取得されてもよい。
また、本実施形態に係る空調機の管理システム1においては、作成装置通信部41がサーバ30から中間ファイルを受信している。これに代えて、作成ツール42がサーバ30に対して中間ファイルを提供するよう要求し、サーバ30から中間ファイルを受信してもよい。
【0033】
作成ツール42は、使用者の入力項目に応じて作成装置通信部41に対して中間ファイルを取得するよう要求する。そして、作成ツール42は、作成装置通信部41が受信する中間ファイルを元に空調機10の運用報告書を作成する。
図3に報告書作成装置40を用いて報告書を作成する際に、使用者が報告書作成装置40に入力する項目を示す。報告書作成日は、実際に報告書を作成する日付である。運用期間は、報告書に記載される空調機10の運用期間である。電気料金基本単価は、空調機10の動力源である電気の基本料金である。力率割引率は、空調機10の消費電力に応じて割引される電気料金の割引率である。目標電力設定値は、空調機10の稼働時において消費電力量が一定量を超えないように空調機10を制御させる際に目標となる電力値である。観測地点は、ユーザの建物2に最寄りの気象台・測候所・アメダス観測所の名称である。
【0034】
なお、本実施形態に係る空調機の管理システム1においては、基本料金単価・力率割引率・目標電力設定値を使用者が入力している。これに代えて、データベース32がユーザ毎のこれらのデータを保持し、中間ファイル作成の際にこれらのデータが自動的に考慮に入れられるようにしてもよい。
なお、本実施形態に係る空調機の管理システム1においては、サーバ30が報告書作成装置40に対して中間ファイルを送信する。これに代えて、サーバ30が中間ファイルを保持し、報告書作成装置40がこの中間ファイルを読み込んでもよい。
【0035】
また、本実施形態に係る空調機の管理システム1においては、報告書作成装置40が空調機10のメーカーやメーカーの代理店などに設けられている。これに代えて、報告書作成装置40が空調機10の設置される建物2やこの建物2の管理を行う管理者の元に設けられてもよい。
〔運用報告書〕
運用報告書は、報告書作成装置40において中間ファイルを元に作成され、空調機10の運転情報を示す。例えば、空調機10の稼働時において消費電力量が一定量を超えないように空調機10の制御を行う場合、運用報告書は、この制御を行った実施時間・この制御による電気基本料金の低減額などを示す。
【0036】
なお、本実施形態に係る空調機の管理システム1においては、運用報告書は、空調機10の運転情報を示しているが、これに代えて空調機10の故障情報などを示してもよい。
<運用報告書の作成>
以下に、本システムにおいて空調機10の運用報告書が作成される過程を説明する。図4に空調機10の運用報告書が作成されるまでのフローを示す。なお、作成ツール42は、すでに報告書作成装置40に取得されているものとする。
【0037】
まず、空調機10の空調機情報がサーバ30に蓄積されるまでの過程を説明する。始めに、ユーザにより空調機10が稼働される(ステップS101)。そして、空調機情報を要求する指令が、コントローラ20により空調機10に対して1時間毎に送信される(ステップS102)。この指令が空調機10により受信される。そして、空調機情報が、空調機10によりコントローラ20に対して送信される(ステップS103)。空調機情報は、コントローラ20に受信され、コントローラ20によりサーバ30に対して送信される(ステップS104)。そして、空調機情報は、サーバ30のデータベース32に保持される(ステップS105)。
【0038】
次に、空調機10の運用報告書が作成される際の過程を説明する。まず、報告書作成装置40の使用者が、図3に示される入力項目を報告書作成装置40に入力する(ステップS106)。項目の入力終了後、入力項目に対応した中間ファイルを要求する指令が報告書作成装置40から、サーバ30に対して送信される(ステップS107)。この指令を受けたサーバ30の集計エンジン33は、入力項目に対応する空調機情報と気象データとをデータベース32から収集する(ステップS108)。そして、集計エンジン33は、収集した空調機情報と気象データとを元に中間ファイルを作成する(ステップS109)。その後、作成された中間ファイルは、サーバ通信部31により報告書作成装置40に対して送信される(ステップS110)。報告書作成装置40は、サーバ30から中間ファイルを受信し、この中間ファイルを元に空調機10の運用報告書を作成する(ステップS111)。その後、報告書作成装置40により作成された空調機10の運用報告書は、ユーザの元に届けられ、空調機10をより有効に使用するために用いられる。
【0039】
次に、空調機10の運用報告書が作成される過程を具体的に説明する。
まず、空調機10が、稼働され、コントローラ20によりデマンド制御が行われる。デマンド制御とは、空調機10の任意の30分間に消費する平均消費電力量(電気料金算定の基準となる)が目標消費電力量以下に保たれるように空調機10の稼働状況を制御することである。そして、コントローラ20は1時間毎に空調機10からデマンド制御実績データなどの空調機情報を入手する。これらの空調機情報は、コントローラ20によりサーバ30に送信され、データベース32に蓄積される。
【0040】
その後、報告書作成装置40から中間ファイルを提供するよう指令が送られると、集計エンジン33が気象データとデマンド制御実績データとデータベース32から収集する。そして、集計エンジン33は気象データとデマンド制御実績データとを元に中間ファイルを作成する。中間ファイルは、空調機10のデマンド制御を行った運用効果の計算結果である。そして、集計エンジン33は、中間ファイルを報告書作成装置33に対して送信する。
【0041】
報告書作成装置40は、中間ファイルを受信し、この中間ファイルを元にデマンド制御実績報告書を作成する。このデマンド制御実績報告書には、デマンド制御実施による電気基本料金の低減額・デマンド制御の実施時間数および日数・気候によるデマンド目標電力値の調整範囲などが数式・表・グラフなどで表される。
【0042】
<本システムの特徴>
(1)
従来の空調機の管理システムにおいては、サーバが運用報告書を作成している。しかし、本発明の一実施の形態に係る空調機の管理システム1では、サーバ30が空調機情報を元に中間ファイルを作成し、報告書作成装置40が中間ファイルを元に運用報告書を作成する。つまり、サーバ30に多大な負担がかかる運用報告書の作成を報告書作成装置40が行う。このため、サーバ30の負担が軽減される。
【0043】
(2)
サーバ30のデータベース32は、コントローラ20から一定時間毎もしくは所定の時間に送信される空調機情報を順次、保持する。そして、サーバ30においてこれらの空調機情報を元に中間ファイルが作成され、報告書作成装置40において中間ファイルを元に運用報告書が作成される。このため、運用報告書は、時系列的なデータをも含む空調機10の運転情報などを示すことができる。その結果、運用報告書の有用性がさらに高まる。
【0044】
(3)
サーバ30の集計エンジン33は、ユーザの建物2付近の気象データなどと空調機情報を元に中間ファイルを作成する。そして、報告書作成装置40において、この中間ファイルを元に運用報告書が作成される。このため、運用報告書は、空調機10の稼働時の気象状況を考慮に入れた空調機10の運転情報などを示すことができる。その結果、運用報告書の有用性がさらに高まる。
【0045】
(4)
コントローラ20は、空調機10の空調機情報を元に空調機10が適切に稼働するよう制御を行う。このため、コントローラ20は、空調機10の運転状況や空調機10の設置される周囲の環境に即した制御を行うことができる。その結果、空調機10がより適切に稼働される。
【0046】
(5)
空調機10の運用報告書は、報告書作成装置40により作成される。このため、サーバ30の負担が軽減される。その結果、サーバ30が中間ファイルを作成する以外の処理(空調機10の管理など)を行う場合でも、サーバ30の処理能力の低下を防止できる。
【0047】
<空調機の管理システム1の変形例>
(1)
先の一実施形態に係る空調機の管理システム1では1つの中間ファイルから1つの運用報告書が作成されていたが、これに代えて、1つの中間ファイルから複数の運用報告書が作成されてもよい。例えば、建物2に設置されるコントローラ20がデマンド制御だけでなく省エネルギー制御も行っていた場合、建物2の管理者などは、デマンド制御によってもたらされた効果だけ、省エネルギー制御によってもたらされた効果だけでなく、エネルギーあるいはコストという観点から両方併せた効果を見たいということがある。ここで、デマンド制御に関する情報と省エネルギー制御に関する情報とを両方含む中間ファイルを作成することができれば、その中間ファイルからデマンド制御によってもたらされた効果に関する運用報告書、省エネルギー制御によってもたらされた効果に関する運用報告書、および両方併せた効果に関する運用報告書を一度に作成することができる。このようにすれば、上述したような場合であっても、いちいち3つの中間のファイルを作成する必要はない。さらに、中間ファイルが1つであるので、ファイル管理も非常に行いやすくなるという長所がある。また、このように常に3つの運用報告書を作成する必要がないということであれば、建物2の管理者などに対してWeb画面上などにおいて必要な運用報告書を選択させて、必要なときだけに上述したような方法を採るということも考えられる。このようにすれば、不要なファイルを作成せずにすむ。このため、ファイルの管理が行いやすくなる。
【0048】
(2)
先の一実施形態に係る空調機の管理システム1ではデマンド制御実績報告書が適宜作成されたが、これに代えて、所定の条件に至ったときに(例えば、1か月の目標電力を2回連続で超過した場合など。)自動的に環境ISO(ISO14001)用の是正処置文書が作成されるようにしてもよい。この是正処置文書が自動的にエネルギー管理者に送信されればさらに好ましい。このようにすれば、エネルギー管理者は、目標電力を遵守するために適切な処置を迅速に施すことができる。したがって、環境ISOの認証審査において減点対象にされるおそれを積極的に取り除くことができる。引いては、認証が剥奪されるおそれも取り除かれることになる。
【0049】
【発明の効果】
請求項1に係る発明では、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。これにより、管理装置の負担が軽減される。
【0050】
請求項2に係る発明では、管理装置が機器情報を保持することにより、管理装置が一定期間についての中間情報を作成することができる。このため、運用情報作成装置が一定期間についての運用情報を作成することができる。その結果、この設備機器の管理システムでは、作成される運用情報の有用性が向上する。
請求項3に係る発明では、管理装置が機器関連情報と機器情報とを元にして中間情報を作成する。このため、管理装置が機器情報に機器関連情報を加味した運用情報を作成することができる。その結果、この設備機器の管理システムでは、運用情報の有用性が向上する。
【0051】
請求項4に係る発明では、管理装置が機器情報を元に設備機器を制御するため、設備機器の運転状況や設備機器の設置される周囲の環境に即した設備機器の制御を行うことができる。その結果、設備機器がより適切に稼働される。
請求項5に係る発明では、管理装置が1つの中間情報を作成し、運用情報作成装置がその1つの中間情報を元に複数種類の運用情報を作成する。このため、運用情報の作成作業工数を削減することができる。また、中間情報が1つであるので、情報管理にかかる手間を低減できる。
【0052】
請求項6に係る発明では、運用情報作成装置によって作成される運用情報が、デマンド制御に関する情報、省エネルギー制御に関する情報、およびデマンド制御に関する情報と省エネルギー制御に関する情報とから導き出されるエネルギー情報である。このため、デマンド制御による省エネルギー効果あるいは省コスト効果、省エネルギー制御による省エネルギー効果あるいは省コスト効果、およびデマンド制御と省エネルギー制御とを併せた省エネルギー効果あるいは省コスト効果などについて比較検討できる。
【0053】
請求項7に係る発明では、選択手段が、複数種類の運転情報の中から所望の運用情報を選択する。このため、選択手段における選択操作が管理装置あるいは運用情報作成装置に反映されるように設定できれば、所望の運情情報を作成するために必要な機器情報を1つの中間情報にまとめることができる。したがって、より自由度の高い情報管理をすることができる。
【0054】
請求項8に係る発明では、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。これにより、管理装置の負担が軽減される。
請求項9に係る発明では、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。これにより、管理装置の負担が軽減される。
【図面の簡単な説明】
【図1】本発明の一実施形態にかかる空調機の管理システムの概略構成図。
【図2】空調機とコントローラとの詳細構成図。
【図3】報告書作成時の入力項目表。
【図4】空調機10の運用報告書が作成されるまでのフロー図。
【符号の説明】
1    空調機の管理システム(設備機器の管理システム)
10    空調機(設備機器)
20    コントローラ(管理装置)
30    サーバ(管理装置)
31    サーバ通信部(第2通信手段)
33    集計エンジン(第2作成手段)
40    報告書作成装置(運用情報作成装置)
41    作成装置通信部(第1通信手段)
42    作成ツール(第2作成手段)
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an equipment management system, an operation information creation device, and a management device, and more particularly to an equipment management system, an operation information creation device, and a management device for creating operation information based on equipment information of equipment.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, there has been known an equipment management system for managing equipment (air conditioning equipment, lighting equipment, hot water equipment, etc.) installed in a building (building, house, etc.). In this system, a management device that manages the equipment acquires or receives equipment information on the equipment from the equipment. As the device information, various data used for the management device to manage the facility device can be considered. For example, the equipment information includes power consumption of the equipment, presence / absence of abnormal operation of the equipment, and operation contents of the equipment. Further, the management device creates operation information based on the device information. For example, the operation information is a report indicating power consumption of the equipment, presence / absence of operation abnormality of the equipment, operation status of the equipment, usefulness of controlling the equipment, and the like.
[0003]
With this operation information, the user can use the equipment more effectively.
[0004]
[Problems to be solved by the invention]
However, since the device information is various data used by the management device to manage the equipment, the amount of information is enormous. The management device is not a dedicated device for creating operation information, but is a general-purpose device that simultaneously performs other processes (such as management of equipment). In other words, the management device needs to create operation information at the same time as performing other processing based on the device information having a huge amount of information. For this reason, in the management system of equipment, a heavy load is placed on the management device.
[0005]
An object of the present invention is to provide a management system for equipment, an operation information creation device, and a management device that reduce the load on the management device.
[0006]
[Means for Solving the Problems]
An equipment management system according to claim 1 is a equipment management system for creating operation information of equipment based on equipment information of equipment, and includes a management device and an operation information creation device. . The management device acquires or receives device information of the facility device from the facility device. Further, the management device creates intermediate information based on the device information. The operation information creation device acquires or receives intermediate information from the management device. Further, the operation information creation device creates operation information based on the intermediate information. For example, when the equipment is an air conditioner, the equipment information of the equipment is the operating state of the air conditioner, power consumption, and the like.
[0007]
In this equipment management system, the management device acquires or receives equipment information from equipment. Then, the management device creates intermediate information based on the device information. Thereafter, the operation information creating device acquires or receives the intermediate information, and creates the operation information based on the intermediate information.
Here, after the management device creates the intermediate information based on the device information, the operation information creation device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. As a result, the burden on the management device is reduced.
[0008]
An equipment management system according to a second aspect is the equipment management system according to the first aspect, wherein the management device further holds equipment information. Further, the management device creates intermediate information based on the device information.
Here, since the management device holds the device information, the management device can create the intermediate information for a certain period. Therefore, the operation information creation device can create operation information for a certain period. As a result, in the facility equipment management system, the usefulness of the created operation information is improved.
[0009]
An equipment management system according to a third aspect is the equipment management system according to the first or second aspect, wherein the management device further collects equipment-related information. Further, the management device creates intermediate information based on the device-related information and the device information. For example, when the equipment is an air conditioner, the device-related information includes the temperature and humidity near the installation location of the air conditioner, the basic electricity rate in the building where the air conditioner is installed, the power factor discount rate, and the like.
[0010]
Here, the management device creates intermediate information based on the device-related information and the device information. For this reason, the management device can create operation information in which device-related information is added to device information. As a result, in the equipment system management system, the usefulness of the operation information is improved.
An equipment management system according to a fourth aspect is the equipment management system according to any one of the first to third aspects, wherein the management device further controls the equipment based on the equipment information.
[0011]
Here, since the management device controls the equipment based on the equipment information, the equipment can be controlled in accordance with the operation status of the equipment and the surrounding environment where the equipment is installed. As a result, the equipment is operated more appropriately.
A facility equipment management system according to claim 5 is the facility equipment monitoring system according to any one of claims 1 to 3, wherein there are a plurality of types of operation information and one piece of intermediate information.
[0012]
Here, the management device creates one piece of intermediate information, and the operation information creation device creates a plurality of types of operation information based on the one piece of intermediate information. Therefore, the number of man-hours for creating operation information can be reduced. In addition, since there is only one piece of intermediate information, the labor required for information management can be reduced.
A facility device monitoring system according to claim 6 is the facility device monitoring system according to claim 5, wherein the operation information is information on demand control, information on energy saving control, information on demand control, and information on energy saving control. Energy information derived from information.
[0013]
Here, the operation information created by the operation information creation device is information on demand control, information on energy saving control, and energy information derived from information on demand control and information on energy saving control. Therefore, the energy saving effect or cost saving effect by the demand control, the energy saving effect or the cost saving effect by the energy saving control, and the energy saving effect or the cost saving effect by combining the demand control and the energy saving control can be compared and examined.
[0014]
An equipment monitoring system according to claim 7 is the equipment monitoring system according to claim 5 or 6, further comprising a selection unit. The selection means selects desired operation information from a plurality of types of operation information. Here, the selection means may be provided in the management device or the operation information creation device, or may be provided separately. However, if provided separately, the selection means needs to be connected to the management device or the operation information creation device via a network or the like.
[0015]
Here, the selection means selects desired operation information from a plurality of types of operation information. For this reason, if setting can be made so that the selection operation by the selection means is reflected on the management device or the operation information creation device, it is possible to combine the device information necessary for creating desired traffic information into one piece of intermediate information. Therefore, information management with a higher degree of freedom can be performed.
[0016]
An operation information creation device according to claim 8, wherein the operation information creation device is connected to a management device that creates intermediate information based on the device information of the equipment, wherein the first communication unit and the first creation unit Prepare. The first communication unit acquires the intermediate information from the management device. The first creating means creates operation information based on the intermediate information.
Here, after the management device creates the intermediate information based on the device information, the operation information creation device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. As a result, the burden on the management device is reduced.
[0017]
A management device according to a ninth aspect is a management device connected to an operation information creation device that creates operation information of facility equipment, and includes a second communication unit, a second creation unit, and a provision unit. The second communication unit acquires or receives device information of the facility device. The second creating means creates intermediate information based on the device information. The providing means provides the intermediate information to the operation information creating device.
[0018]
Here, after the management device creates the intermediate information based on the device information, the providing device provides the intermediate information to the operation information creating device. Then, the operation information creating device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. Thereby, the burden on the management device is reduced.
[0019]
BEST MODE FOR CARRYING OUT THE INVENTION
<Configuration of Air Conditioner Management System 1>
FIG. 1 shows a schematic configuration of an air conditioner management system 1 according to an embodiment of the present invention.
The air conditioner management system 1 mainly includes an air conditioner 10, a controller 20, a server 30, and a report creation device 40. An operation report indicating the operation status of the air conditioner 10 is created by the air conditioner management system 1.
[0020]
(Air conditioner 10)
FIG. 2 shows a detailed configuration of the air conditioner 10 and the controller 20.
The air conditioner 10 is installed in a user's building 2 such as a building or a house, and is connected to the controller 20 via a communication line. The air conditioner 10 performs operations such as cooling, heating, and dehumidification using electricity as a power source based on a control command transmitted from the controller 20 to perform harmony of indoor air. The air conditioner 10 includes an indoor unit 11 attached to a wall surface or a ceiling in the room, and an outdoor unit 12 installed outside the room. An outdoor heat exchanger, a compressor, and the like are housed in the outdoor unit 12, and an indoor heat exchanger is housed in the indoor unit 11. Each of the heat exchangers, the compressor, the various valves, and the refrigerant pipes connecting these components constitute a refrigerant circuit.
[0021]
In addition, the air conditioner 10 transmits air conditioner information to the controller 20 in response to a request from the controller 20. The air conditioner information includes the temperature and humidity of the room in which the indoor unit 11 is installed, the power consumption of the air conditioner 10, and operation modes such as cooling, heating, dehumidifying, and blowing. In order for the air conditioner 10 to acquire the air conditioner information, a temperature sensor, a humidity sensor, a power meter, a determination device for determining an operation mode, and the like, which are built in or connected to the air conditioner 10, are used. Further, the air conditioner 10 receives a control command for operating the air conditioner 10 from the controller 20, and performs operations such as cooling, heating, and dehumidification based on the control command.
[0022]
(Controller 20)
The controller 20 is installed in a control room or a management room in the building 2 in which the air conditioner 10 is installed, and is connected to the air conditioner 10 via a communication line. The controller 20 controls the air conditioner 10.
The controller 20 requests the air conditioner 10 to provide the air conditioner information at regular time intervals or at a predetermined time, and acquires the air conditioner information from the air conditioner 10. For example, the controller 20 requests the air conditioner 10 to provide the air conditioner information every hour, and acquires the air conditioner information from the air conditioner 10. Then, the controller 20 transmits the air conditioner information acquired from the air conditioner 10 to the server 30.
[0023]
Further, the controller 20 creates a control command for appropriately operating the air conditioner 10 based on the air conditioner information received from the air conditioner 10. For example, based on the power consumption of the air conditioner 10, the controller 20 creates a control command for operating the air conditioner 10 so as not to exceed a certain power consumption. Then, the controller 20 transmits the created control command to the air conditioner 10.
[0024]
In the air conditioner management system 1 according to the present embodiment, the controller 20 provides the air conditioner information to the air conditioner 10 at regular intervals or at a predetermined time so that the controller 20 obtains the air conditioner information. Request from the air conditioner 10 to obtain the air conditioner information. Alternatively, the air conditioner 10 may transmit the air conditioner information to the controller 20 at regular time intervals or at a predetermined time.
[0025]
(Server 30)
The server 30 is provided in a management center for collectively managing the air conditioner 10 by a manufacturer of the air conditioner 10 or the controller 20 and is connected to the controller 20 of each building 2 via a network such as the Internet or a dedicated line. . Then, in the server 30, an intermediate file is created based on the air conditioner information. The server 30 includes a server communication unit 31, a database 32, and a tallying engine 33 (see FIG. 1).
[0026]
The server communication unit 31 receives the air conditioner information transmitted from the controller 20. Then, the server communication unit 31 transmits the intermediate file created in the server 30 to the report creation device 40.
The database 32 classifies the air conditioner information of the air conditioners 10 received from the controller 20 for each user, and stores the information in chronological order. Further, the database 32 holds a creation tool 42 for creating an operation report in the report creation device 40. Then, the database 32 causes the creation tool 42 to be downloaded in response to a request from the report creation device 40.
[0027]
The counting engine 33 is connected to an external database 50 outside the server 30 via a network such as the Internet. The counting engine 33 periodically collects operation-related information on the operation of the air conditioner 10 from the external database 50 and causes the database 32 to store the operation-related information. The driving-related information includes weather data (temperature, humidity, etc.) near the building 2 of the user. Then, the counting engine 33 creates an intermediate file based on the operation-related information and the air conditioner information held in the database 32. This intermediate file is data from which the report creation device 40 creates an operation report.
[0028]
In the air conditioner management system 1 according to the present embodiment, the counting engine 33 periodically collects operation-related information on the operation of the air conditioner 10 from the external database 50. Alternatively, the counting engine 33 may collect operation-related information on the operation of the air conditioner 10 from the external database 50 in response to a request from the report creation device 40.
[0029]
The server 30 further performs processing other than creating an intermediate file. For example, the server 30 manages the air conditioner 10 via the controller 20. Specifically, the server 30 analyzes the air conditioner information of the air conditioner 10 transmitted from the controller 20, and confirms the operation status of the air conditioner 10. When the server 30 determines that the operation state of the air conditioner 10 is abnormal, the display unit (not shown) connected to the server 30 indicates the fact. When the maintenance person of the air conditioner 10 or the like recognizes the operation abnormality of the air conditioner 10, the maintenance person or the like goes to the site where the air conditioner 10 is installed and checks the operation status of the air conditioner 10.
[0030]
In the air conditioner management system 1 according to the present embodiment, the air conditioner information is transmitted from the controller 20 to the server 30. Alternatively, the controller 20 may hold the air conditioner information, and the server 30 may read the air conditioner information.
(Report preparation device 40)
The report creation device 40 is installed in the manufacturer of the air conditioner 10 or its agent, and is connected to the server 30 via a network such as the Internet or a dedicated line. An administrator of the air conditioner management system 1 or a person in charge of a distributor (user) can input necessary items to the report creation device 40 and create an operation report of the air conditioner 10. The report creation device 40 mainly includes a creation device communication unit 41 and a creation tool 42.
[0031]
The creation device communication unit 41 requests the server 30 to provide an intermediate file in response to a request of the user of the report creation device 40, and receives the intermediate file from the server 30. Further, the creation device communication unit 41 requests the server 30 to provide the creation tool 42 in response to the request of the report creation device 40, and acquires the creation tool 42 from the server 30.
[0032]
In the air conditioner management system 1 according to the present embodiment, the creation tool 42 is downloaded from the server 30 to the report creation device 40 via a network or a communication line. Alternatively, the creation tool 42 may be stored in a storage medium such as a CD-ROM and acquired by the report creation device 40.
Further, in the air conditioner management system 1 according to the present embodiment, the creating device communication unit 41 receives an intermediate file from the server 30. Alternatively, the creation tool 42 may request the server 30 to provide the intermediate file and receive the intermediate file from the server 30.
[0033]
The creation tool 42 requests the creation device communication unit 41 to acquire an intermediate file according to the input items of the user. Then, the creation tool 42 creates an operation report of the air conditioner 10 based on the intermediate file received by the creation device communication unit 41.
FIG. 3 shows items that the user inputs to the report creation device 40 when creating a report using the report creation device 40. The report creation date is the date when the report is actually created. The operation period is an operation period of the air conditioner 10 described in the report. The basic electricity rate unit price is a basic electricity rate that is a power source of the air conditioner 10. The power factor discount rate is a discount rate of the electricity rate that is discounted according to the power consumption of the air conditioner 10. The target power set value is a target power value when controlling the air conditioner 10 so that the power consumption does not exceed a certain amount when the air conditioner 10 is operating. The observation point is the name of a meteorological observatory, weather station, or AMeDAS observatory closest to the building 2 of the user.
[0034]
In the air conditioner management system 1 according to the present embodiment, the user inputs the basic unit price, the power factor discount rate, and the target power set value. Alternatively, the database 32 may hold these data for each user, and these data may be automatically taken into account when creating the intermediate file.
In the air conditioner management system 1 according to the present embodiment, the server 30 transmits the intermediate file to the report creation device 40. Alternatively, the server 30 may hold the intermediate file, and the report creation device 40 may read the intermediate file.
[0035]
Further, in the air conditioner management system 1 according to the present embodiment, the report creation device 40 is provided in a maker of the air conditioner 10, a distributor of the maker, or the like. Instead, the report creation device 40 may be provided to the building 2 in which the air conditioner 10 is installed or to a manager who manages the building 2.
[Operation Report]
The operation report is created by the report creation device 40 based on the intermediate file, and indicates the operation information of the air conditioner 10. For example, when the air conditioner 10 is controlled so that the power consumption does not exceed a certain amount during the operation of the air conditioner 10, the operation report indicates the execution time of the control and the reduction of the basic electricity rate by the control. Indicates the amount.
[0036]
In the air conditioner management system 1 according to the present embodiment, the operation report indicates the operation information of the air conditioner 10, but may alternatively indicate failure information of the air conditioner 10 or the like.
<Preparation of operation report>
Hereinafter, a process of creating an operation report of the air conditioner 10 in the present system will be described. FIG. 4 shows a flow until an operation report of the air conditioner 10 is created. It is assumed that the creation tool 42 has already been acquired by the report creation device 40.
[0037]
First, a process until the air conditioner information of the air conditioner 10 is stored in the server 30 will be described. First, the user operates the air conditioner 10 (step S101). Then, a command requesting the air conditioner information is transmitted from the controller 20 to the air conditioner 10 every hour (step S102). This command is received by the air conditioner 10. Then, the air conditioner information is transmitted from the air conditioner 10 to the controller 20 (Step S103). The air conditioner information is received by the controller 20, and transmitted to the server 30 by the controller 20 (Step S104). Then, the air conditioner information is stored in the database 32 of the server 30 (Step S105).
[0038]
Next, a process when an operation report of the air conditioner 10 is created will be described. First, the user of the report creation device 40 inputs the input items shown in FIG. 3 to the report creation device 40 (step S106). After the entry of the items is completed, a command requesting an intermediate file corresponding to the input items is transmitted from the report creation device 40 to the server 30 (step S107). Upon receiving this command, the counting engine 33 of the server 30 collects air conditioner information and weather data corresponding to the input items from the database 32 (step S108). Then, the counting engine 33 creates an intermediate file based on the collected air conditioner information and weather data (step S109). Thereafter, the created intermediate file is transmitted to the report creation device 40 by the server communication unit 31 (step S110). The report creation device 40 receives the intermediate file from the server 30, and creates an operation report of the air conditioner 10 based on the intermediate file (Step S111). After that, the operation report of the air conditioner 10 created by the report creation device 40 is delivered to the user and used to more effectively use the air conditioner 10.
[0039]
Next, a process of creating an operation report of the air conditioner 10 will be specifically described.
First, the air conditioner 10 is operated, and demand control is performed by the controller 20. The demand control is to control the operating state of the air conditioner 10 so that the average power consumption (which is a reference for calculating the electricity rate) consumed by the air conditioner 10 during an arbitrary 30 minutes is maintained at or below the target power consumption. That is. Then, the controller 20 obtains air conditioner information such as demand control result data from the air conditioner 10 every hour. The air conditioner information is transmitted to the server 30 by the controller 20 and stored in the database 32.
[0040]
Thereafter, when a command to provide an intermediate file is sent from the report creation device 40, the aggregation engine 33 collects the weather data, the demand control performance data, and the database 32. Then, the counting engine 33 creates an intermediate file based on the weather data and the demand control result data. The intermediate file is a calculation result of the operation effect of performing the demand control of the air conditioner 10. Then, the counting engine 33 transmits the intermediate file to the report creation device 33.
[0041]
The report creation device 40 receives the intermediate file and creates a demand control performance report based on the intermediate file. In this demand control performance report, the amount of reduction of the basic electricity charge by the demand control, the number of hours and days of the demand control, the adjustment range of the demand target power value by the climate, and the like are expressed by formulas, tables, and graphs. .
[0042]
<Features of this system>
(1)
In a conventional air conditioner management system, a server creates an operation report. However, in the air conditioner management system 1 according to one embodiment of the present invention, the server 30 creates an intermediate file based on the air conditioner information, and the report creation device 40 creates an operation report based on the intermediate file. I do. That is, the report creation device 40 creates an operation report that places a heavy burden on the server 30. Therefore, the load on the server 30 is reduced.
[0043]
(2)
The database 32 of the server 30 sequentially holds air conditioner information transmitted from the controller 20 at regular time intervals or at predetermined time intervals. Then, the server 30 creates an intermediate file based on the air conditioner information, and the report creation device 40 creates an operation report based on the intermediate file. For this reason, the operation report can indicate operation information of the air conditioner 10 including time-series data. As a result, the usefulness of the operation report is further enhanced.
[0044]
(3)
The tallying engine 33 of the server 30 creates an intermediate file based on weather data near the building 2 of the user and air conditioner information. Then, the report creation device 40 creates an operation report based on the intermediate file. For this reason, the operation report can indicate the operation information of the air conditioner 10 in consideration of the weather condition when the air conditioner 10 is operating. As a result, the usefulness of the operation report is further enhanced.
[0045]
(4)
The controller 20 controls the air conditioner 10 to operate properly based on the air conditioner information of the air conditioner 10. For this reason, the controller 20 can perform control according to the operating condition of the air conditioner 10 and the surrounding environment where the air conditioner 10 is installed. As a result, the air conditioner 10 is operated more appropriately.
[0046]
(5)
The operation report of the air conditioner 10 is created by the report creation device 40. Therefore, the load on the server 30 is reduced. As a result, even when the server 30 performs a process other than creating an intermediate file (such as managing the air conditioner 10), it is possible to prevent a decrease in the processing capacity of the server 30.
[0047]
<Modification of Air Conditioner Management System 1>
(1)
In the air conditioner management system 1 according to the previous embodiment, one operation report is created from one intermediate file. Instead, a plurality of operation reports are created from one intermediate file. Is also good. For example, when the controller 20 installed in the building 2 performs not only the demand control but also the energy saving control, the manager of the building 2 determines only the effect brought about by the demand control and the effect brought about by the energy saving control. Not only that, but you also want to see the combined effects of energy and cost. Here, if an intermediate file including both information on demand control and information on energy saving control can be created, an operation report on the effect brought about by demand control from the intermediate file, the effect brought about by energy saving control And an operational report on the combined effects of the two. In this way, there is no need to create three intermediate files each time, even in the case described above. Further, since there is one intermediate file, there is an advantage that file management becomes very easy. In addition, if it is not necessary to always create three operation reports in this way, the manager of the building 2 is required to select a necessary operation report on a Web screen or the like. However, it is conceivable that the above-described method is employed only. In this way, unnecessary files are not created. For this reason, file management becomes easier.
[0048]
(2)
In the air conditioner management system 1 according to the previous embodiment, the demand control result report is appropriately created. However, instead of this, when a predetermined condition is reached (for example, the target power for one month is reduced by 2). Corrective action documents for environmental ISO (ISO 14001) may be automatically created. More preferably, this corrective action document is automatically sent to the energy manager. In this way, the energy manager can quickly take appropriate measures to comply with the target power. Therefore, it is possible to positively remove the possibility of being deducted in the environmental ISO certification examination. As a result, the risk that authentication will be deprived will be eliminated.
[0049]
【The invention's effect】
In the invention according to claim 1, after the management device creates the intermediate information based on the device information, the operation information creating device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. Thereby, the burden on the management device is reduced.
[0050]
According to the second aspect of the present invention, since the management device holds the device information, the management device can create the intermediate information for a certain period. Therefore, the operation information creation device can create operation information for a certain period. As a result, in the facility equipment management system, the usefulness of the created operation information is improved.
In the invention according to claim 3, the management device creates intermediate information based on the device-related information and the device information. For this reason, the management device can create operation information in which device-related information is added to device information. As a result, in the equipment system management system, the usefulness of the operation information is improved.
[0051]
In the invention according to claim 4, since the management device controls the equipment based on the equipment information, it is possible to control the equipment in accordance with the operation status of the equipment and the surrounding environment where the equipment is installed. . As a result, the equipment is operated more appropriately.
In the invention according to claim 5, the management device creates one piece of intermediate information, and the operation information creation device creates a plurality of types of operation information based on the one piece of intermediate information. Therefore, the number of man-hours for creating operation information can be reduced. In addition, since there is only one piece of intermediate information, the labor required for information management can be reduced.
[0052]
In the invention according to claim 6, the operation information created by the operation information creation device is information on demand control, information on energy saving control, and energy information derived from information on demand control and information on energy saving control. Therefore, the energy saving effect or cost saving effect by the demand control, the energy saving effect or the cost saving effect by the energy saving control, and the energy saving effect or the cost saving effect by combining the demand control and the energy saving control can be compared and examined.
[0053]
In the invention according to claim 7, the selection means selects desired operation information from a plurality of types of operation information. For this reason, if setting can be made so that the selection operation by the selection means is reflected on the management device or the operation information creation device, it is possible to combine the device information necessary for creating desired traffic information into one piece of intermediate information. Therefore, information management with a higher degree of freedom can be performed.
[0054]
In the invention according to claim 8, after the management device creates the intermediate information based on the device information, the operation information creating device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. Thereby, the burden on the management device is reduced.
In the invention according to claim 9, after the management device creates the intermediate information based on the device information, the operation information creating device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. Thereby, the burden on the management device is reduced.
[Brief description of the drawings]
FIG. 1 is a schematic configuration diagram of an air conditioner management system according to an embodiment of the present invention.
FIG. 2 is a detailed configuration diagram of an air conditioner and a controller.
FIG. 3 is a list of input items when a report is created.
FIG. 4 is a flowchart until an operation report of the air conditioner 10 is created.
[Explanation of symbols]
1 air conditioner management system (facility equipment management system)
10 air conditioners (equipment)
20 Controller (management device)
30 server (management device)
31 server communication unit (second communication means)
33 Aggregation engine (second creation means)
40 Report creation device (operation information creation device)
41 creator communication unit (first communication means)
42 creation tool (second creation means)

Claims (9)

設備機器(10)の機器情報を元に設備機器(10)の運用情報を作成するための設備機器の管理システムであって、
前記設備機器(10)の機器情報を前記設備機器(10)から取得または受信し、前記機器情報を元に中間情報を作成する管理装置(30)と、
前記管理装置(30)から前記中間情報を取得または受信し、前記中間情報を元に前記設備機器(10)の運用情報を作成する運用情報作成装置(40)と、を備える設備機器の管理システム(1)。
An equipment management system for creating operation information of equipment (10) based on equipment information of equipment (10),
A management device (30) that acquires or receives device information of the facility device (10) from the facility device (10) and creates intermediate information based on the device information;
An operation information creation device (40) that acquires or receives the intermediate information from the management device (30) and creates operation information of the equipment (10) based on the intermediate information. (1).
前記管理装置(30)は、さらに前記機器情報を保持し、保持される前記機器情報を元に前記中間情報を作成する、
請求項1に記載の設備機器の管理システム(1)。
The management device (30) further holds the device information and creates the intermediate information based on the held device information.
An equipment management system (1) according to claim 1.
前記管理装置(30)は、さらに機器関連情報を収集し、前記機器関連情報と前記機器情報とを元にして前記中間情報を作成する、
請求項1または2に記載の設備機器の管理システム(1)。
The management device (30) further collects device-related information, and creates the intermediate information based on the device-related information and the device information.
An equipment management system (1) according to claim 1 or 2.
前記管理装置(30)は、さらに、前記機器情報を元に前記設備機器(10)を適切に制御する、
請求項1から3のいずれかに記載の設備機器の管理システム(1)。
The management device (30) further appropriately controls the equipment (10) based on the device information.
An equipment management system (1) according to any one of claims 1 to 3.
前記運用情報は、複数種類あり、
前記中間情報は、1つである、
請求項1から3のいずれかに記載の設備機器の監視システム(1)
The operation information has a plurality of types,
The intermediate information is one,
A monitoring system (1) for facility equipment according to any one of claims 1 to 3.
前記運用情報は、デマンド制御に関する情報、省エネルギー制御に関する情報、およびデマンド制御に関する情報と省エネルギー制御に関する情報とから導き出されるエネルギー情報である、
請求項5に記載の設備機器の監視システム(1)。
The operation information is information on demand control, information on energy saving control, and energy information derived from information on demand control and information on energy saving control,
A facility equipment monitoring system (1) according to claim 5.
複数種類の前記運転情報の中から所望の前記運用情報を選択する選択手段をさらに備える、
請求項5または6に記載の設備機器の監視システム(1)。
Further comprising a selection means for selecting desired operation information from a plurality of types of the operation information,
A facility equipment monitoring system (1) according to claim 5 or 6.
設備機器(10)の機器情報を元に中間情報を作成する管理装置(30)と接続され、運用情報を作成する運用情報作成装置であって、
前記管理装置(30)から前記中間情報を取得または受信する第1通信手段(41)と、
前記中間情報を元に運用情報を作成する第1作成手段(42)と、
を備える運用情報作成装置(40)。
An operation information creation device that is connected to a management device (30) that creates intermediate information based on device information of the equipment (10) and creates operation information,
First communication means (41) for acquiring or receiving the intermediate information from the management device (30);
First creation means (42) for creating operation information based on the intermediate information;
An operation information creation device (40) comprising:
設備機器(10)の運用情報を作成する運用情報作成装置(40)と接続される管理装置であって、
前記設備機器(10)の機器情報を取得または受信する第2通信手段(31)と、
前記機器情報を元に中間情報を作成する第2作成手段(33)と、
前記中間情報を前記運用情報作成装置(40)に提供する提供手段(31)と、
を備える管理装置(30)。
A management device connected to an operation information creation device (40) for creating operation information of the equipment (10),
A second communication unit (31) for acquiring or receiving device information of the facility device (10);
Second creating means (33) for creating intermediate information based on the device information;
Providing means (31) for providing the intermediate information to the operation information creating device (40);
A management device (30) comprising:
JP2003095426A 2002-06-05 2003-03-31 Managing system of equipment, operation information creation device, and managing device Pending JP2004062862A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003095426A JP2004062862A (en) 2002-06-05 2003-03-31 Managing system of equipment, operation information creation device, and managing device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2002164020 2002-06-05
JP2003095426A JP2004062862A (en) 2002-06-05 2003-03-31 Managing system of equipment, operation information creation device, and managing device

Publications (1)

Publication Number Publication Date
JP2004062862A true JP2004062862A (en) 2004-02-26

Family

ID=31949330

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003095426A Pending JP2004062862A (en) 2002-06-05 2003-03-31 Managing system of equipment, operation information creation device, and managing device

Country Status (1)

Country Link
JP (1) JP2004062862A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005315466A (en) * 2004-04-27 2005-11-10 Mitsubishi Electric Building Techno Service Co Ltd Cold remote monitoring system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005315466A (en) * 2004-04-27 2005-11-10 Mitsubishi Electric Building Techno Service Co Ltd Cold remote monitoring system

Similar Documents

Publication Publication Date Title
EP2071251A1 (en) Air-conditioning control intermediate device, air-conditioning control system, air-conditioning control method, and air-conditioning control program
JP2011036084A (en) Consumer energy management system
JP2014236605A (en) Management system of air-conditioner
JP2008232531A (en) Remote performance monitoring device and method
JP2010025504A (en) Group control device and group control system
JP2008025908A (en) Optimization control support system
JP2011248568A (en) Energy management system
JP4899979B2 (en) Air conditioning control system
JP2009115392A (en) Energy-saving control system
JP2014185832A (en) Air conditioning system, air conditioning control device, and air conditioning system control method
KR101994695B1 (en) Management system and controlling method for an Air conditioner
JP5936714B2 (en) System controller, facility management system, demand control method and program
WO2019176546A1 (en) Air-conditioning control device, air-conditioning system, air-conditioning control method, and program
JP5951270B2 (en) Air conditioner power consumption management control system, server device, client device, and air conditioner power consumption management control method
JP5136403B2 (en) Equipment control system
JP2015124901A (en) Air conditioning system
JP4586927B2 (en) Equipment management system
JP2011038682A (en) Equipment management system
JP6730536B1 (en) Air conditioner, operation control method and program
JP2020165642A (en) Air conditioning system, server system, network, method for controlling air conditioning system, and method for controlling network
JP2020165642A5 (en) How to control a server system, network, air conditioning system connected to the server system, and how to control the network
WO2017199298A1 (en) Air conditioning system
JP2004062862A (en) Managing system of equipment, operation information creation device, and managing device
JP5131185B2 (en) Equipment control system
WO2020203842A1 (en) Maintenance contract fee calculation system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040427

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050701

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050705

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050822

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050920

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051114

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060207