JP2004062862A - Managing system of equipment, operation information creation device, and managing device - Google Patents
Managing system of equipment, operation information creation device, and managing device Download PDFInfo
- Publication number
- JP2004062862A JP2004062862A JP2003095426A JP2003095426A JP2004062862A JP 2004062862 A JP2004062862 A JP 2004062862A JP 2003095426 A JP2003095426 A JP 2003095426A JP 2003095426 A JP2003095426 A JP 2003095426A JP 2004062862 A JP2004062862 A JP 2004062862A
- Authority
- JP
- Japan
- Prior art keywords
- information
- equipment
- air conditioner
- operation information
- creates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Air Conditioning Control Device (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
本発明は、設備機器の管理システム、運用情報作成装置および管理装置、特に、設備機器の機器情報を元に運用情報を作成するための設備機器の管理システム、運用情報作成装置および管理装置に関する。
【0002】
【従来の技術】
従来から、建物(ビル、住宅等)に設置された設備機器(空調機器、照明機器、給湯機器等)を管理する設備機器の管理システムが知られている。このシステムにおいては、設備機器の管理を行う管理装置が、設備機器から設備機器に関する機器情報を取得または受信する。機器情報としては、管理装置が設備機器の管理を行うために用いられる様々なデータが考えられる。例えば、機器情報は、設備機器の消費電力・設備機器の運転異常の有無・設備機器の稼働内容などである。さらに、管理装置は、これらの機器情報を元にして運用情報を作成する。例えば、運用情報は、設備機器の消費電力・設備機器の運転異常の有無・設備機器の稼働状況・設備機器の制御を行うことの有用性などを示す報告書である。
【0003】
この運用情報により、ユーザは設備機器をより有効に使用することができる。
【0004】
【発明が解決しようとする課題】
しかし、機器情報は管理装置が設備機器の管理を行うために用いられる様々なデータであるので、その情報量は膨大である。また、管理装置は、運用情報を作成するための専用装置ではなく、他の処理(設備機器の管理など)も同時に行う汎用装置である。すなわち、管理装置は、膨大な情報量の機器情報を元にして、他の処理を行うのと同時に運用情報を作成する必要がある。このため、設備機器の管理システムにおいては、管理装置に大きな負担がかかっている。
【0005】
本発明の課題は、管理装置の負担を軽減させる設備機器の管理システム、運用情報作成装置および管理装置を提供することにある。
【0006】
【課題を解決するための手段】
請求項1に係る設備機器の管理システムは、設備機器の機器情報を元に設備機器の運用情報を作成するための設備機器の管理システムであって、管理装置と、運用情報作成装置とを備える。管理装置は、設備機器の機器情報を設備機器から取得または受信する。さらに、管理装置は、機器情報を元に中間情報を作成する。運用情報作成装置は、管理装置から中間情報を取得または受信する。さらに、運用情報作成装置は、中間情報を元に運用情報を作成する。例えば、設備機器が空調機の場合、設備機器の機器情報は、空調機の運転状態や消費電力などである。
【0007】
この設備機器の管理システムでは、管理装置が設備機器から機器情報を取得または受信する。そして、管理装置は、この機器情報を元に中間情報を作成する。その後、運用情報作成装置が、中間情報を取得または受信し、中間情報を元にして運用情報を作成する。
ここでは、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。その結果、管理装置の負担が軽減される。
【0008】
請求項2に係る設備機器の管理システムは、請求項1に記載の設備機器の管理システムであって、管理装置がさらに機器情報を保持する。さらに、管理装置は、この機器情報を元に中間情報を作成する。
ここでは、管理装置が機器情報を保持することにより、管理装置が一定期間についての中間情報を作成することができる。このため、運用情報作成装置が一定期間についての運用情報を作成することができる。その結果、この設備機器の管理システムでは、作成される運用情報の有用性が向上する。
【0009】
請求項3に係る設備機器の管理システムは、請求項1または2に記載の設備機器の管理システムであって、管理装置がさらに機器関連情報を収集する。さらに、管理装置は、機器関連情報と機器情報とを元にして中間情報を作成する。例えば、設備機器が空調機の場合、機器関連情報は、空調機の設置場所付近の気温・湿度、空調機の設置される建物における電気基本料金、力率割引率などである。
【0010】
ここでは、管理装置が機器関連情報と機器情報とを元にして中間情報を作成する。このため、管理装置が機器情報に機器関連情報を加味した運用情報を作成することができる。その結果、この設備機器の管理システムでは、運用情報の有用性が向上する。
請求項4に係る設備機器の管理システムは、請求項1から3のいずれかに記載の設備機器の管理システムであって、管理装置はさらに機器情報を元に設備機器を制御する。
【0011】
ここでは、管理装置が機器情報を元に設備機器を制御するため、設備機器の運転状況や設備機器の設置される周囲の環境に即した設備機器の制御を行うことができる。その結果、設備機器がより適切に稼働される。
請求項5に係る設備機器の管理システムは、請求項1から3のいずれかに記載の設備機器の監視システムであって、運用情報は複数種類あり、中間情報は1つである。
【0012】
ここでは、管理装置が1つの中間情報を作成し、運用情報作成装置がその1つの中間情報を元に複数種類の運用情報を作成する。このため、運用情報の作成作業工数を削減することができる。また、中間情報が1つであるので、情報管理にかかる手間を低減できる。
請求項6に係る設備機器の監視システムは、請求項5に記載の設備機器の監視システムであって、運用情報は、デマンド制御に関する情報、省エネルギー制御に関する情報、およびデマンド制御に関する情報と省エネルギー制御に関する情報とから導き出されるエネルギー情報である。
【0013】
ここでは、運用情報作成装置によって作成される運用情報が、デマンド制御に関する情報、省エネルギー制御に関する情報、およびデマンド制御に関する情報と省エネルギー制御に関する情報とから導き出されるエネルギー情報である。このため、デマンド制御による省エネルギー効果あるいは省コスト効果、省エネルギー制御による省エネルギー効果あるいは省コスト効果、およびデマンド制御と省エネルギー制御とを併せた省エネルギー効果あるいは省コスト効果などについて比較検討できる。
【0014】
請求項7に係る設備機器の監視システムは、請求項5または6に記載の設備機器の監視システムであって、選択手段をさらに備える。選択手段は、複数種類の運転情報の中から所望の運用情報を選択する。なお、ここで、選択手段は、管理装置あるいは運用情報作成装置に設けられてもよいし、別途設けられてもよい。ただし、別途設けられる場合は、選択手段はネットワークなどを介して管理装置あるいは運用情報作成装置に接続される必要がある。
【0015】
ここでは、選択手段が、複数種類の運転情報の中から所望の運用情報を選択する。このため、選択手段における選択操作が管理装置あるいは運用情報作成装置に反映されるように設定できれば、所望の運情情報を作成するために必要な機器情報を1つの中間情報にまとめることができる。したがって、より自由度の高い情報管理をすることができる。
【0016】
請求項8に係る運用情報作成装置は、設備機器の機器情報を元に中間情報を作成する管理装置と接続される運用情報作成装置であって、第1通信手段と、第1作成手段とを備える。この第1通信手段は、管理装置から中間情報を取得する。この第1作成手段は、中間情報を元に運用情報を作成する。
ここでは、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。その結果、管理装置の負担が軽減される。
【0017】
請求項9に係る管理装置は、設備機器の運用情報を作成する運用情報作成装置と接続される管理装置であって、第2通信手段と、第2作成手段と、提供手段とを備える。第2通信手段は、設備機器の機器情報を取得または受信する。第2作成手段は、機器情報を元に中間情報を作成する。提供手段は、中間情報を運用情報作成装置に提供する。
【0018】
ここでは、管理装置が機器情報を元に中間情報を作成した後、提供手段により中間情報が運用情報作成装置に提供される。そして、運用情報作成装置が、中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。これにより、管理装置の負担が軽減される。
【0019】
【発明の実施の形態】
<空調機の管理システム1の構成>
本発明の一実施形態にかかる空調機の管理システム1の概略構成を図1に示す。
この空調機の管理システム1は、主に、空調機10と、コントローラ20と、サーバ30と、報告書作成装置40とから構成される。この空調機の管理システム1によって空調機10の運用状況を示す運用報告書が作成される。
【0020】
(空調機10)
空調機10とコントローラ20との詳細な構成を図2に示す。
空調機10は、ビルや住宅などユーザの建物2内に設置され、通信線を介してコントローラ20と接続される。空調機10は、コントローラ20から送信される制御指令を元に電気を動力源として冷房・暖房・除湿などの運転を行い、室内の空気の調和を行う。この空調機10は、室内の壁面や天井などに取り付けられる室内機11と、室外に設置される室外機12とから構成される。室外機12内には室外熱交換機や圧縮機などが収納され、室内機11内には室内熱交換機が収納されている。そして、各熱交換機、圧縮機、各種バルブ、これらを接続する冷媒配管などが、冷媒回路を構成している。
【0021】
また、空調機10は、コントローラ20からの求めに応じて空調機情報をコントローラ20に対して送信する。空調機情報としては、室内機11の設置される室内の気温および湿度や、空調機10の消費電力量、冷房・暖房・除湿・送風等の運転モードなどがある。空調機10が空調機情報を取得するために、空調機10に内蔵あるいは接続される温度センサ、湿度センサ、電力計、運転モードを判定する判定装置などが用いられる。さらに、空調機10は、空調機10を稼働させるための制御指令をコントローラ20から受信し、この制御指令を元に冷房・暖房・除湿などの運転を行う。
【0022】
(コントローラ20)
コントローラ20は、空調機10が設置される建物2内の制御室や管理室などに設置され、通信線を介して空調機10に接続される。コントローラ20は、空調機10の制御を行う。
このコントローラ20は、一定時間ごともしくは所定の時間に空調機10に対して空調機情報を提供するよう要求し、空調機10から空調機情報を取得する。例えば、コントローラ20は、1時間ごとに空調機10に対して空調機情報を提供するよう要求し、空調機10から空調機情報を取得する。そして、コントローラ20は、空調機10から取得した空調機情報をサーバ30に対して送信する。
【0023】
また、コントローラ20は、空調機10から受信した空調機情報を元に空調機10を適切に稼働させる制御指令を作成する。例えば、コントローラ20は、空調機10の消費電力量を元に、一定の消費電力量を超えないように空調機10を稼働させる制御指令を作成する。そして、コントローラ20は、作成した制御指令を空調機10に対して送信する。
【0024】
なお、本実施形態に係る空調機の管理システム1においては、コントローラ20が空調機情報を得るために、コントローラ20が一定時間ごともしくは所定の時間に空調機10に対して空調機情報を提供するよう要求し空調機10から空調機情報を取得している。これに代えて、空調機10が一定時間毎もしくは所定の時間にコントローラ20に対して空調機情報を送信してもよい。
【0025】
(サーバ30)
サーバ30は、空調機10またはコントローラ20のメーカーなどにより空調機10を一括管理するための管理センタ内に設けられ、インターネットなどのネットワークもしくは専用回線を介して各建物2のコントローラ20と接続される。そして、サーバ30において、空調機情報を元に中間ファイルが作成される。また、サーバ30は、サーバ通信部31と、データベース32と、集計エンジン33とを有する(図1参照)。
【0026】
サーバ通信部31は、コントローラ20から送信される空調機情報を受信する。そして、サーバ通信部31は、サーバ30において作成される中間ファイルを報告書作成装置40に対して送信する。
データベース32は、コントローラ20から受信した空調機10の空調機情報をユーザ毎に分類し、時系列的に保持する。さらに、データベース32は、報告書作成装置40において運用報告書を作成するための作成ツール42を保持する。そして、データベース32は、報告書作成装置40の求めに応じて作成ツール42をダウンロードさせる。
【0027】
集計エンジン33は、インターネットなどのネットワークを介してサーバ30外の外部データベース50と接続される。集計エンジン33は、定期的に外部データベース50から空調機10の運転に関する運転関連情報を収集し、運転関連情報をデータベース32に保持させる。この運転関連情報は、ユーザの建物2付近の気象データ(気温、湿度など)などである。そして、集計エンジン33は、運転関連情報とデータベース32に保持される空調機情報とを元に中間ファイルを作成する。この中間ファイルは、報告書作成装置40において運用報告書を作成する元となるデータである。
【0028】
なお、本実施形態に係る空調機の管理システム1においては、集計エンジン33が、定期的に外部データベース50から空調機10の運転に関する運転関連情報を収集している。これに代えて、集計エンジン33が報告書作成装置40の求めに応じて外部データベース50から空調機10の運転に関する運転関連情報を収集してもよい。
【0029】
サーバ30は、さらに、中間ファイルを作成する以外の処理を行う。例えば、サーバ30は、コントローラ20を介して空調機10の管理を行う。具体的には、サーバ30は、コントローラ20より送信される空調機10の空調機情報を分析し、空調機10の運転状況を確認する。サーバ30において、空調機10の運転状況が異常であると判断される場合には、サーバ30に接続される表示部(図示せず)にその旨が表示される。空調機10のメンテナンス担当者などが空調機10の運転異常を認識した場合、これらのメンテナンス担当者などが、空調機10の設置される現地に向かい、空調機10の運転状況の確認を行う。
【0030】
なお、本実施形態に係る空調機の管理システム1においては、空調機情報がコントローラ20からサーバ30に対して送信される。これに代えて、コントローラ20が空調機情報を保持し、サーバ30がこの空調機情報を読み込んでもよい。
(報告書作成装置40)
報告書作成装置40は、空調機10のメーカーやその代理店などに設置され、インターネットなどのネットワークや専用回線などを介してサーバ30と接続される。空調機の管理システム1の管理者や代理店の担当者など(使用者)は、この報告書作成装置40に必要な項目を入力し、空調機10の運用報告書を作成することができる。この報告書作成装置40は、主に、作成装置通信部41と、作成ツール42とから構成される。
【0031】
作成装置通信部41は、報告書作成装置40の使用者の求めに応じてサーバ30に対して中間ファイルを提供するよう要求し、サーバ30から中間ファイルを受信する。さらに、作成装置通信部41は、報告書作成装置40の求めに応じてサーバ30に対して作成ツール42を提供するよう要求し、サーバ30から作成ツール42を取得する。
【0032】
なお、本実施形態に係る空調機の管理システム1においては、作成ツール42が、ネットワークや通信回線を介してサーバ30から報告書作成装置40にダウンロードされている。これに代えて、作成ツール42が、CD−ROMなどの記憶媒体に記憶され、報告書作成装置40に取得されてもよい。
また、本実施形態に係る空調機の管理システム1においては、作成装置通信部41がサーバ30から中間ファイルを受信している。これに代えて、作成ツール42がサーバ30に対して中間ファイルを提供するよう要求し、サーバ30から中間ファイルを受信してもよい。
【0033】
作成ツール42は、使用者の入力項目に応じて作成装置通信部41に対して中間ファイルを取得するよう要求する。そして、作成ツール42は、作成装置通信部41が受信する中間ファイルを元に空調機10の運用報告書を作成する。
図3に報告書作成装置40を用いて報告書を作成する際に、使用者が報告書作成装置40に入力する項目を示す。報告書作成日は、実際に報告書を作成する日付である。運用期間は、報告書に記載される空調機10の運用期間である。電気料金基本単価は、空調機10の動力源である電気の基本料金である。力率割引率は、空調機10の消費電力に応じて割引される電気料金の割引率である。目標電力設定値は、空調機10の稼働時において消費電力量が一定量を超えないように空調機10を制御させる際に目標となる電力値である。観測地点は、ユーザの建物2に最寄りの気象台・測候所・アメダス観測所の名称である。
【0034】
なお、本実施形態に係る空調機の管理システム1においては、基本料金単価・力率割引率・目標電力設定値を使用者が入力している。これに代えて、データベース32がユーザ毎のこれらのデータを保持し、中間ファイル作成の際にこれらのデータが自動的に考慮に入れられるようにしてもよい。
なお、本実施形態に係る空調機の管理システム1においては、サーバ30が報告書作成装置40に対して中間ファイルを送信する。これに代えて、サーバ30が中間ファイルを保持し、報告書作成装置40がこの中間ファイルを読み込んでもよい。
【0035】
また、本実施形態に係る空調機の管理システム1においては、報告書作成装置40が空調機10のメーカーやメーカーの代理店などに設けられている。これに代えて、報告書作成装置40が空調機10の設置される建物2やこの建物2の管理を行う管理者の元に設けられてもよい。
〔運用報告書〕
運用報告書は、報告書作成装置40において中間ファイルを元に作成され、空調機10の運転情報を示す。例えば、空調機10の稼働時において消費電力量が一定量を超えないように空調機10の制御を行う場合、運用報告書は、この制御を行った実施時間・この制御による電気基本料金の低減額などを示す。
【0036】
なお、本実施形態に係る空調機の管理システム1においては、運用報告書は、空調機10の運転情報を示しているが、これに代えて空調機10の故障情報などを示してもよい。
<運用報告書の作成>
以下に、本システムにおいて空調機10の運用報告書が作成される過程を説明する。図4に空調機10の運用報告書が作成されるまでのフローを示す。なお、作成ツール42は、すでに報告書作成装置40に取得されているものとする。
【0037】
まず、空調機10の空調機情報がサーバ30に蓄積されるまでの過程を説明する。始めに、ユーザにより空調機10が稼働される(ステップS101)。そして、空調機情報を要求する指令が、コントローラ20により空調機10に対して1時間毎に送信される(ステップS102)。この指令が空調機10により受信される。そして、空調機情報が、空調機10によりコントローラ20に対して送信される(ステップS103)。空調機情報は、コントローラ20に受信され、コントローラ20によりサーバ30に対して送信される(ステップS104)。そして、空調機情報は、サーバ30のデータベース32に保持される(ステップS105)。
【0038】
次に、空調機10の運用報告書が作成される際の過程を説明する。まず、報告書作成装置40の使用者が、図3に示される入力項目を報告書作成装置40に入力する(ステップS106)。項目の入力終了後、入力項目に対応した中間ファイルを要求する指令が報告書作成装置40から、サーバ30に対して送信される(ステップS107)。この指令を受けたサーバ30の集計エンジン33は、入力項目に対応する空調機情報と気象データとをデータベース32から収集する(ステップS108)。そして、集計エンジン33は、収集した空調機情報と気象データとを元に中間ファイルを作成する(ステップS109)。その後、作成された中間ファイルは、サーバ通信部31により報告書作成装置40に対して送信される(ステップS110)。報告書作成装置40は、サーバ30から中間ファイルを受信し、この中間ファイルを元に空調機10の運用報告書を作成する(ステップS111)。その後、報告書作成装置40により作成された空調機10の運用報告書は、ユーザの元に届けられ、空調機10をより有効に使用するために用いられる。
【0039】
次に、空調機10の運用報告書が作成される過程を具体的に説明する。
まず、空調機10が、稼働され、コントローラ20によりデマンド制御が行われる。デマンド制御とは、空調機10の任意の30分間に消費する平均消費電力量(電気料金算定の基準となる)が目標消費電力量以下に保たれるように空調機10の稼働状況を制御することである。そして、コントローラ20は1時間毎に空調機10からデマンド制御実績データなどの空調機情報を入手する。これらの空調機情報は、コントローラ20によりサーバ30に送信され、データベース32に蓄積される。
【0040】
その後、報告書作成装置40から中間ファイルを提供するよう指令が送られると、集計エンジン33が気象データとデマンド制御実績データとデータベース32から収集する。そして、集計エンジン33は気象データとデマンド制御実績データとを元に中間ファイルを作成する。中間ファイルは、空調機10のデマンド制御を行った運用効果の計算結果である。そして、集計エンジン33は、中間ファイルを報告書作成装置33に対して送信する。
【0041】
報告書作成装置40は、中間ファイルを受信し、この中間ファイルを元にデマンド制御実績報告書を作成する。このデマンド制御実績報告書には、デマンド制御実施による電気基本料金の低減額・デマンド制御の実施時間数および日数・気候によるデマンド目標電力値の調整範囲などが数式・表・グラフなどで表される。
【0042】
<本システムの特徴>
(1)
従来の空調機の管理システムにおいては、サーバが運用報告書を作成している。しかし、本発明の一実施の形態に係る空調機の管理システム1では、サーバ30が空調機情報を元に中間ファイルを作成し、報告書作成装置40が中間ファイルを元に運用報告書を作成する。つまり、サーバ30に多大な負担がかかる運用報告書の作成を報告書作成装置40が行う。このため、サーバ30の負担が軽減される。
【0043】
(2)
サーバ30のデータベース32は、コントローラ20から一定時間毎もしくは所定の時間に送信される空調機情報を順次、保持する。そして、サーバ30においてこれらの空調機情報を元に中間ファイルが作成され、報告書作成装置40において中間ファイルを元に運用報告書が作成される。このため、運用報告書は、時系列的なデータをも含む空調機10の運転情報などを示すことができる。その結果、運用報告書の有用性がさらに高まる。
【0044】
(3)
サーバ30の集計エンジン33は、ユーザの建物2付近の気象データなどと空調機情報を元に中間ファイルを作成する。そして、報告書作成装置40において、この中間ファイルを元に運用報告書が作成される。このため、運用報告書は、空調機10の稼働時の気象状況を考慮に入れた空調機10の運転情報などを示すことができる。その結果、運用報告書の有用性がさらに高まる。
【0045】
(4)
コントローラ20は、空調機10の空調機情報を元に空調機10が適切に稼働するよう制御を行う。このため、コントローラ20は、空調機10の運転状況や空調機10の設置される周囲の環境に即した制御を行うことができる。その結果、空調機10がより適切に稼働される。
【0046】
(5)
空調機10の運用報告書は、報告書作成装置40により作成される。このため、サーバ30の負担が軽減される。その結果、サーバ30が中間ファイルを作成する以外の処理(空調機10の管理など)を行う場合でも、サーバ30の処理能力の低下を防止できる。
【0047】
<空調機の管理システム1の変形例>
(1)
先の一実施形態に係る空調機の管理システム1では1つの中間ファイルから1つの運用報告書が作成されていたが、これに代えて、1つの中間ファイルから複数の運用報告書が作成されてもよい。例えば、建物2に設置されるコントローラ20がデマンド制御だけでなく省エネルギー制御も行っていた場合、建物2の管理者などは、デマンド制御によってもたらされた効果だけ、省エネルギー制御によってもたらされた効果だけでなく、エネルギーあるいはコストという観点から両方併せた効果を見たいということがある。ここで、デマンド制御に関する情報と省エネルギー制御に関する情報とを両方含む中間ファイルを作成することができれば、その中間ファイルからデマンド制御によってもたらされた効果に関する運用報告書、省エネルギー制御によってもたらされた効果に関する運用報告書、および両方併せた効果に関する運用報告書を一度に作成することができる。このようにすれば、上述したような場合であっても、いちいち3つの中間のファイルを作成する必要はない。さらに、中間ファイルが1つであるので、ファイル管理も非常に行いやすくなるという長所がある。また、このように常に3つの運用報告書を作成する必要がないということであれば、建物2の管理者などに対してWeb画面上などにおいて必要な運用報告書を選択させて、必要なときだけに上述したような方法を採るということも考えられる。このようにすれば、不要なファイルを作成せずにすむ。このため、ファイルの管理が行いやすくなる。
【0048】
(2)
先の一実施形態に係る空調機の管理システム1ではデマンド制御実績報告書が適宜作成されたが、これに代えて、所定の条件に至ったときに(例えば、1か月の目標電力を2回連続で超過した場合など。)自動的に環境ISO(ISO14001)用の是正処置文書が作成されるようにしてもよい。この是正処置文書が自動的にエネルギー管理者に送信されればさらに好ましい。このようにすれば、エネルギー管理者は、目標電力を遵守するために適切な処置を迅速に施すことができる。したがって、環境ISOの認証審査において減点対象にされるおそれを積極的に取り除くことができる。引いては、認証が剥奪されるおそれも取り除かれることになる。
【0049】
【発明の効果】
請求項1に係る発明では、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。これにより、管理装置の負担が軽減される。
【0050】
請求項2に係る発明では、管理装置が機器情報を保持することにより、管理装置が一定期間についての中間情報を作成することができる。このため、運用情報作成装置が一定期間についての運用情報を作成することができる。その結果、この設備機器の管理システムでは、作成される運用情報の有用性が向上する。
請求項3に係る発明では、管理装置が機器関連情報と機器情報とを元にして中間情報を作成する。このため、管理装置が機器情報に機器関連情報を加味した運用情報を作成することができる。その結果、この設備機器の管理システムでは、運用情報の有用性が向上する。
【0051】
請求項4に係る発明では、管理装置が機器情報を元に設備機器を制御するため、設備機器の運転状況や設備機器の設置される周囲の環境に即した設備機器の制御を行うことができる。その結果、設備機器がより適切に稼働される。
請求項5に係る発明では、管理装置が1つの中間情報を作成し、運用情報作成装置がその1つの中間情報を元に複数種類の運用情報を作成する。このため、運用情報の作成作業工数を削減することができる。また、中間情報が1つであるので、情報管理にかかる手間を低減できる。
【0052】
請求項6に係る発明では、運用情報作成装置によって作成される運用情報が、デマンド制御に関する情報、省エネルギー制御に関する情報、およびデマンド制御に関する情報と省エネルギー制御に関する情報とから導き出されるエネルギー情報である。このため、デマンド制御による省エネルギー効果あるいは省コスト効果、省エネルギー制御による省エネルギー効果あるいは省コスト効果、およびデマンド制御と省エネルギー制御とを併せた省エネルギー効果あるいは省コスト効果などについて比較検討できる。
【0053】
請求項7に係る発明では、選択手段が、複数種類の運転情報の中から所望の運用情報を選択する。このため、選択手段における選択操作が管理装置あるいは運用情報作成装置に反映されるように設定できれば、所望の運情情報を作成するために必要な機器情報を1つの中間情報にまとめることができる。したがって、より自由度の高い情報管理をすることができる。
【0054】
請求項8に係る発明では、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。これにより、管理装置の負担が軽減される。
請求項9に係る発明では、管理装置が機器情報を元に中間情報を作成した後、運用情報作成装置が中間情報を元に運用情報を作成する。管理装置に多大な負担をかける運用情報の作成を運用情報作成装置が行うので、管理装置における作業量が減少する。これにより、管理装置の負担が軽減される。
【図面の簡単な説明】
【図1】本発明の一実施形態にかかる空調機の管理システムの概略構成図。
【図2】空調機とコントローラとの詳細構成図。
【図3】報告書作成時の入力項目表。
【図4】空調機10の運用報告書が作成されるまでのフロー図。
【符号の説明】
1 空調機の管理システム(設備機器の管理システム)
10 空調機(設備機器)
20 コントローラ(管理装置)
30 サーバ(管理装置)
31 サーバ通信部(第2通信手段)
33 集計エンジン(第2作成手段)
40 報告書作成装置(運用情報作成装置)
41 作成装置通信部(第1通信手段)
42 作成ツール(第2作成手段)[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an equipment management system, an operation information creation device, and a management device, and more particularly to an equipment management system, an operation information creation device, and a management device for creating operation information based on equipment information of equipment.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, there has been known an equipment management system for managing equipment (air conditioning equipment, lighting equipment, hot water equipment, etc.) installed in a building (building, house, etc.). In this system, a management device that manages the equipment acquires or receives equipment information on the equipment from the equipment. As the device information, various data used for the management device to manage the facility device can be considered. For example, the equipment information includes power consumption of the equipment, presence / absence of abnormal operation of the equipment, and operation contents of the equipment. Further, the management device creates operation information based on the device information. For example, the operation information is a report indicating power consumption of the equipment, presence / absence of operation abnormality of the equipment, operation status of the equipment, usefulness of controlling the equipment, and the like.
[0003]
With this operation information, the user can use the equipment more effectively.
[0004]
[Problems to be solved by the invention]
However, since the device information is various data used by the management device to manage the equipment, the amount of information is enormous. The management device is not a dedicated device for creating operation information, but is a general-purpose device that simultaneously performs other processes (such as management of equipment). In other words, the management device needs to create operation information at the same time as performing other processing based on the device information having a huge amount of information. For this reason, in the management system of equipment, a heavy load is placed on the management device.
[0005]
An object of the present invention is to provide a management system for equipment, an operation information creation device, and a management device that reduce the load on the management device.
[0006]
[Means for Solving the Problems]
An equipment management system according to claim 1 is a equipment management system for creating operation information of equipment based on equipment information of equipment, and includes a management device and an operation information creation device. . The management device acquires or receives device information of the facility device from the facility device. Further, the management device creates intermediate information based on the device information. The operation information creation device acquires or receives intermediate information from the management device. Further, the operation information creation device creates operation information based on the intermediate information. For example, when the equipment is an air conditioner, the equipment information of the equipment is the operating state of the air conditioner, power consumption, and the like.
[0007]
In this equipment management system, the management device acquires or receives equipment information from equipment. Then, the management device creates intermediate information based on the device information. Thereafter, the operation information creating device acquires or receives the intermediate information, and creates the operation information based on the intermediate information.
Here, after the management device creates the intermediate information based on the device information, the operation information creation device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. As a result, the burden on the management device is reduced.
[0008]
An equipment management system according to a second aspect is the equipment management system according to the first aspect, wherein the management device further holds equipment information. Further, the management device creates intermediate information based on the device information.
Here, since the management device holds the device information, the management device can create the intermediate information for a certain period. Therefore, the operation information creation device can create operation information for a certain period. As a result, in the facility equipment management system, the usefulness of the created operation information is improved.
[0009]
An equipment management system according to a third aspect is the equipment management system according to the first or second aspect, wherein the management device further collects equipment-related information. Further, the management device creates intermediate information based on the device-related information and the device information. For example, when the equipment is an air conditioner, the device-related information includes the temperature and humidity near the installation location of the air conditioner, the basic electricity rate in the building where the air conditioner is installed, the power factor discount rate, and the like.
[0010]
Here, the management device creates intermediate information based on the device-related information and the device information. For this reason, the management device can create operation information in which device-related information is added to device information. As a result, in the equipment system management system, the usefulness of the operation information is improved.
An equipment management system according to a fourth aspect is the equipment management system according to any one of the first to third aspects, wherein the management device further controls the equipment based on the equipment information.
[0011]
Here, since the management device controls the equipment based on the equipment information, the equipment can be controlled in accordance with the operation status of the equipment and the surrounding environment where the equipment is installed. As a result, the equipment is operated more appropriately.
A facility equipment management system according to claim 5 is the facility equipment monitoring system according to any one of claims 1 to 3, wherein there are a plurality of types of operation information and one piece of intermediate information.
[0012]
Here, the management device creates one piece of intermediate information, and the operation information creation device creates a plurality of types of operation information based on the one piece of intermediate information. Therefore, the number of man-hours for creating operation information can be reduced. In addition, since there is only one piece of intermediate information, the labor required for information management can be reduced.
A facility device monitoring system according to claim 6 is the facility device monitoring system according to claim 5, wherein the operation information is information on demand control, information on energy saving control, information on demand control, and information on energy saving control. Energy information derived from information.
[0013]
Here, the operation information created by the operation information creation device is information on demand control, information on energy saving control, and energy information derived from information on demand control and information on energy saving control. Therefore, the energy saving effect or cost saving effect by the demand control, the energy saving effect or the cost saving effect by the energy saving control, and the energy saving effect or the cost saving effect by combining the demand control and the energy saving control can be compared and examined.
[0014]
An equipment monitoring system according to claim 7 is the equipment monitoring system according to claim 5 or 6, further comprising a selection unit. The selection means selects desired operation information from a plurality of types of operation information. Here, the selection means may be provided in the management device or the operation information creation device, or may be provided separately. However, if provided separately, the selection means needs to be connected to the management device or the operation information creation device via a network or the like.
[0015]
Here, the selection means selects desired operation information from a plurality of types of operation information. For this reason, if setting can be made so that the selection operation by the selection means is reflected on the management device or the operation information creation device, it is possible to combine the device information necessary for creating desired traffic information into one piece of intermediate information. Therefore, information management with a higher degree of freedom can be performed.
[0016]
An operation information creation device according to claim 8, wherein the operation information creation device is connected to a management device that creates intermediate information based on the device information of the equipment, wherein the first communication unit and the first creation unit Prepare. The first communication unit acquires the intermediate information from the management device. The first creating means creates operation information based on the intermediate information.
Here, after the management device creates the intermediate information based on the device information, the operation information creation device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. As a result, the burden on the management device is reduced.
[0017]
A management device according to a ninth aspect is a management device connected to an operation information creation device that creates operation information of facility equipment, and includes a second communication unit, a second creation unit, and a provision unit. The second communication unit acquires or receives device information of the facility device. The second creating means creates intermediate information based on the device information. The providing means provides the intermediate information to the operation information creating device.
[0018]
Here, after the management device creates the intermediate information based on the device information, the providing device provides the intermediate information to the operation information creating device. Then, the operation information creating device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. Thereby, the burden on the management device is reduced.
[0019]
BEST MODE FOR CARRYING OUT THE INVENTION
<Configuration of Air Conditioner Management System 1>
FIG. 1 shows a schematic configuration of an air conditioner management system 1 according to an embodiment of the present invention.
The air conditioner management system 1 mainly includes an
[0020]
(Air conditioner 10)
FIG. 2 shows a detailed configuration of the
The
[0021]
In addition, the
[0022]
(Controller 20)
The
The
[0023]
Further, the
[0024]
In the air conditioner management system 1 according to the present embodiment, the
[0025]
(Server 30)
The
[0026]
The
The
[0027]
The counting
[0028]
In the air conditioner management system 1 according to the present embodiment, the counting
[0029]
The
[0030]
In the air conditioner management system 1 according to the present embodiment, the air conditioner information is transmitted from the
(Report preparation device 40)
The
[0031]
The creation
[0032]
In the air conditioner management system 1 according to the present embodiment, the
Further, in the air conditioner management system 1 according to the present embodiment, the creating
[0033]
The
FIG. 3 shows items that the user inputs to the
[0034]
In the air conditioner management system 1 according to the present embodiment, the user inputs the basic unit price, the power factor discount rate, and the target power set value. Alternatively, the
In the air conditioner management system 1 according to the present embodiment, the
[0035]
Further, in the air conditioner management system 1 according to the present embodiment, the
[Operation Report]
The operation report is created by the
[0036]
In the air conditioner management system 1 according to the present embodiment, the operation report indicates the operation information of the
<Preparation of operation report>
Hereinafter, a process of creating an operation report of the
[0037]
First, a process until the air conditioner information of the
[0038]
Next, a process when an operation report of the
[0039]
Next, a process of creating an operation report of the
First, the
[0040]
Thereafter, when a command to provide an intermediate file is sent from the
[0041]
The
[0042]
<Features of this system>
(1)
In a conventional air conditioner management system, a server creates an operation report. However, in the air conditioner management system 1 according to one embodiment of the present invention, the
[0043]
(2)
The
[0044]
(3)
The tallying
[0045]
(4)
The
[0046]
(5)
The operation report of the
[0047]
<Modification of Air Conditioner Management System 1>
(1)
In the air conditioner management system 1 according to the previous embodiment, one operation report is created from one intermediate file. Instead, a plurality of operation reports are created from one intermediate file. Is also good. For example, when the
[0048]
(2)
In the air conditioner management system 1 according to the previous embodiment, the demand control result report is appropriately created. However, instead of this, when a predetermined condition is reached (for example, the target power for one month is reduced by 2). Corrective action documents for environmental ISO (ISO 14001) may be automatically created. More preferably, this corrective action document is automatically sent to the energy manager. In this way, the energy manager can quickly take appropriate measures to comply with the target power. Therefore, it is possible to positively remove the possibility of being deducted in the environmental ISO certification examination. As a result, the risk that authentication will be deprived will be eliminated.
[0049]
【The invention's effect】
In the invention according to claim 1, after the management device creates the intermediate information based on the device information, the operation information creating device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. Thereby, the burden on the management device is reduced.
[0050]
According to the second aspect of the present invention, since the management device holds the device information, the management device can create the intermediate information for a certain period. Therefore, the operation information creation device can create operation information for a certain period. As a result, in the facility equipment management system, the usefulness of the created operation information is improved.
In the invention according to claim 3, the management device creates intermediate information based on the device-related information and the device information. For this reason, the management device can create operation information in which device-related information is added to device information. As a result, in the equipment system management system, the usefulness of the operation information is improved.
[0051]
In the invention according to claim 4, since the management device controls the equipment based on the equipment information, it is possible to control the equipment in accordance with the operation status of the equipment and the surrounding environment where the equipment is installed. . As a result, the equipment is operated more appropriately.
In the invention according to claim 5, the management device creates one piece of intermediate information, and the operation information creation device creates a plurality of types of operation information based on the one piece of intermediate information. Therefore, the number of man-hours for creating operation information can be reduced. In addition, since there is only one piece of intermediate information, the labor required for information management can be reduced.
[0052]
In the invention according to claim 6, the operation information created by the operation information creation device is information on demand control, information on energy saving control, and energy information derived from information on demand control and information on energy saving control. Therefore, the energy saving effect or cost saving effect by the demand control, the energy saving effect or the cost saving effect by the energy saving control, and the energy saving effect or the cost saving effect by combining the demand control and the energy saving control can be compared and examined.
[0053]
In the invention according to claim 7, the selection means selects desired operation information from a plurality of types of operation information. For this reason, if setting can be made so that the selection operation by the selection means is reflected on the management device or the operation information creation device, it is possible to combine the device information necessary for creating desired traffic information into one piece of intermediate information. Therefore, information management with a higher degree of freedom can be performed.
[0054]
In the invention according to claim 8, after the management device creates the intermediate information based on the device information, the operation information creating device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. Thereby, the burden on the management device is reduced.
In the invention according to claim 9, after the management device creates the intermediate information based on the device information, the operation information creating device creates the operation information based on the intermediate information. Since the operation information creation device creates the operation information that places a heavy burden on the management device, the amount of work in the management device is reduced. Thereby, the burden on the management device is reduced.
[Brief description of the drawings]
FIG. 1 is a schematic configuration diagram of an air conditioner management system according to an embodiment of the present invention.
FIG. 2 is a detailed configuration diagram of an air conditioner and a controller.
FIG. 3 is a list of input items when a report is created.
FIG. 4 is a flowchart until an operation report of the
[Explanation of symbols]
1 air conditioner management system (facility equipment management system)
10 air conditioners (equipment)
20 Controller (management device)
30 server (management device)
31 server communication unit (second communication means)
33 Aggregation engine (second creation means)
40 Report creation device (operation information creation device)
41 creator communication unit (first communication means)
42 creation tool (second creation means)
Claims (9)
前記設備機器(10)の機器情報を前記設備機器(10)から取得または受信し、前記機器情報を元に中間情報を作成する管理装置(30)と、
前記管理装置(30)から前記中間情報を取得または受信し、前記中間情報を元に前記設備機器(10)の運用情報を作成する運用情報作成装置(40)と、を備える設備機器の管理システム(1)。An equipment management system for creating operation information of equipment (10) based on equipment information of equipment (10),
A management device (30) that acquires or receives device information of the facility device (10) from the facility device (10) and creates intermediate information based on the device information;
An operation information creation device (40) that acquires or receives the intermediate information from the management device (30) and creates operation information of the equipment (10) based on the intermediate information. (1).
請求項1に記載の設備機器の管理システム(1)。The management device (30) further holds the device information and creates the intermediate information based on the held device information.
An equipment management system (1) according to claim 1.
請求項1または2に記載の設備機器の管理システム(1)。The management device (30) further collects device-related information, and creates the intermediate information based on the device-related information and the device information.
An equipment management system (1) according to claim 1 or 2.
請求項1から3のいずれかに記載の設備機器の管理システム(1)。The management device (30) further appropriately controls the equipment (10) based on the device information.
An equipment management system (1) according to any one of claims 1 to 3.
前記中間情報は、1つである、
請求項1から3のいずれかに記載の設備機器の監視システム(1)The operation information has a plurality of types,
The intermediate information is one,
A monitoring system (1) for facility equipment according to any one of claims 1 to 3.
請求項5に記載の設備機器の監視システム(1)。The operation information is information on demand control, information on energy saving control, and energy information derived from information on demand control and information on energy saving control,
A facility equipment monitoring system (1) according to claim 5.
請求項5または6に記載の設備機器の監視システム(1)。Further comprising a selection means for selecting desired operation information from a plurality of types of the operation information,
A facility equipment monitoring system (1) according to claim 5 or 6.
前記管理装置(30)から前記中間情報を取得または受信する第1通信手段(41)と、
前記中間情報を元に運用情報を作成する第1作成手段(42)と、
を備える運用情報作成装置(40)。An operation information creation device that is connected to a management device (30) that creates intermediate information based on device information of the equipment (10) and creates operation information,
First communication means (41) for acquiring or receiving the intermediate information from the management device (30);
First creation means (42) for creating operation information based on the intermediate information;
An operation information creation device (40) comprising:
前記設備機器(10)の機器情報を取得または受信する第2通信手段(31)と、
前記機器情報を元に中間情報を作成する第2作成手段(33)と、
前記中間情報を前記運用情報作成装置(40)に提供する提供手段(31)と、
を備える管理装置(30)。A management device connected to an operation information creation device (40) for creating operation information of the equipment (10),
A second communication unit (31) for acquiring or receiving device information of the facility device (10);
Second creating means (33) for creating intermediate information based on the device information;
Providing means (31) for providing the intermediate information to the operation information creating device (40);
A management device (30) comprising:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003095426A JP2004062862A (en) | 2002-06-05 | 2003-03-31 | Managing system of equipment, operation information creation device, and managing device |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002164020 | 2002-06-05 | ||
JP2003095426A JP2004062862A (en) | 2002-06-05 | 2003-03-31 | Managing system of equipment, operation information creation device, and managing device |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2004062862A true JP2004062862A (en) | 2004-02-26 |
Family
ID=31949330
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003095426A Pending JP2004062862A (en) | 2002-06-05 | 2003-03-31 | Managing system of equipment, operation information creation device, and managing device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2004062862A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005315466A (en) * | 2004-04-27 | 2005-11-10 | Mitsubishi Electric Building Techno Service Co Ltd | Cold remote monitoring system |
-
2003
- 2003-03-31 JP JP2003095426A patent/JP2004062862A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005315466A (en) * | 2004-04-27 | 2005-11-10 | Mitsubishi Electric Building Techno Service Co Ltd | Cold remote monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2071251A1 (en) | Air-conditioning control intermediate device, air-conditioning control system, air-conditioning control method, and air-conditioning control program | |
JP2011036084A (en) | Consumer energy management system | |
JP2014236605A (en) | Management system of air-conditioner | |
JP2008232531A (en) | Remote performance monitoring device and method | |
JP2010025504A (en) | Group control device and group control system | |
JP2008025908A (en) | Optimization control support system | |
JP2011248568A (en) | Energy management system | |
JP4899979B2 (en) | Air conditioning control system | |
JP2009115392A (en) | Energy-saving control system | |
JP2014185832A (en) | Air conditioning system, air conditioning control device, and air conditioning system control method | |
KR101994695B1 (en) | Management system and controlling method for an Air conditioner | |
JP5936714B2 (en) | System controller, facility management system, demand control method and program | |
WO2019176546A1 (en) | Air-conditioning control device, air-conditioning system, air-conditioning control method, and program | |
JP5951270B2 (en) | Air conditioner power consumption management control system, server device, client device, and air conditioner power consumption management control method | |
JP5136403B2 (en) | Equipment control system | |
JP2015124901A (en) | Air conditioning system | |
JP4586927B2 (en) | Equipment management system | |
JP2011038682A (en) | Equipment management system | |
JP6730536B1 (en) | Air conditioner, operation control method and program | |
JP2020165642A (en) | Air conditioning system, server system, network, method for controlling air conditioning system, and method for controlling network | |
JP2020165642A5 (en) | How to control a server system, network, air conditioning system connected to the server system, and how to control the network | |
WO2017199298A1 (en) | Air conditioning system | |
JP2004062862A (en) | Managing system of equipment, operation information creation device, and managing device | |
JP5131185B2 (en) | Equipment control system | |
WO2020203842A1 (en) | Maintenance contract fee calculation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040427 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050701 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050705 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050822 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050920 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20051114 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20060207 |