JP2004053035A - Chute structure - Google Patents

Chute structure Download PDF

Info

Publication number
JP2004053035A
JP2004053035A JP2002206684A JP2002206684A JP2004053035A JP 2004053035 A JP2004053035 A JP 2004053035A JP 2002206684 A JP2002206684 A JP 2002206684A JP 2002206684 A JP2002206684 A JP 2002206684A JP 2004053035 A JP2004053035 A JP 2004053035A
Authority
JP
Japan
Prior art keywords
chute
plate
sintering machine
sus304
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002206684A
Other languages
Japanese (ja)
Inventor
Kazuaki Kawanaka
川中 一哲
Takahisa Shiraishi
白石 高久
Hideo Sasaoka
笹岡 英雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Metal Mining Co Ltd
Original Assignee
Sumitomo Metal Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Mining Co Ltd filed Critical Sumitomo Metal Mining Co Ltd
Priority to JP2002206684A priority Critical patent/JP2004053035A/en
Publication of JP2004053035A publication Critical patent/JP2004053035A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To alleviate periodic salamander picking work and repairing work of a chute for placing a burnt matter on a conveyor when a sintered mass of zinc/lead is produced by a Dwight Lloyd sintering machine. <P>SOLUTION: In the structure of a chute under a crusher disposed at the discharge end of a Dwight Lloyd sintering machine, a plate material made of a corrosion-proof material, preferably a stainless steel plate, is suspended removably at a position where the burnt matter falls to touch the chute. A stainless plate of SUS304 is more preferably employed in viewpoint of low price. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、非鉄金属製錬の焼結工程で使用されるドワイトロイド式焼結機により焼成された焼成物の搬送に使用するシュートの構造に関するものである。
【0002】
【従来の技術】
非鉄金属製錬の焼結工程の一例としてドワイトロイド型焼結機を用いた亜鉛・鉛焼結塊の製造工程がある。この工程では、亜鉛硫化精鉱と、鉛硫化精鉱と、その他亜鉛や鉛を比較的高濃度で含有する酸化鉱原料と、該焼結工程で発生する返し鉱とを調湿して造粒し、焼結原料となるペレットを得ている。なお、返し鉱は後述するように脱硫と塊状化が不十分なものであり、次工程の溶鉱炉に装入することが適さないものである。
【0003】
このようにして得られたペレットは焼結機上方のホッパー内に装入される。このホッパーは通常第一ホッパーと第二ホッパーとに二分割されている。このホッパーの下部には無限縁式に回転するパレットが設けられており、第一ホッパーからこのパレット上に高さが約5cmになるようペレットが切り出される。次いで、このペレット層は点火炉内に移行する。点火炉内では、バーナーによりペレット層を上方から加熱し、着火させる。この点火炉内ではパレット下方に設けられたウインドボックスによりパレット上方から下方にガス引きして硫化物を着火、燃焼させ点火層を形成する。
【0004】
次に、第二ホッパーよりこの点火層の上にペレットが切り出される。点火層を含むペレット層の厚さは、ペレットの大きさや炉内のドラフトにより大きく影響されるが、通常、点火層を含む全鉱層高さは35cm程度とされている。この後、焼結炉内ではパレット下方から酸素を含むガスが供給され、点火層が保有する熱が上層に移動して乾燥・加熱が行われ、更に酸素が供給されることで硫化物の酸化反応が生じて昇温するといった現象が下層から上層に向かって順次連続して進行する。この焼結反応では、鉱層温度は最高で1200〜1300℃に達し、焼成物の一部が半溶融状態となり集合して焼結塊を生成する。
【0005】
酸化反応が終了した後は、同じくパレット下方から供給される低温のガスにより焼成物の冷却が進み、焼結機の排出端に達する。焼結機排出端には第一のクラッシャーがあり、パレットから落下した焼成物がこのクラッシャーを通過し、シュートを介してパンコンベアー上に排出されて、更に第二のクラッシャーに供給される。このように幾段かのクラッシャーを通し、その後で塊状物として残ったものだけを次工程である熔鉱炉に供給し、その他は返し鉱とする。
【0006】
ところで、焼結機内部では下方の鉱層に比較して上方の鉱層は反応終了後の冷却が充分でなく、焼成物が高温状態のまま、一部は半溶融状態のままで焼結機排出端に達して第一のクラッシャーに供給されることがある。従って、第一のクラッシャー下のシュートは、最も高温の焼成物と接触するため、シュートの損傷がひどく定期的に補修が必要となっている。また半溶融状態の焼成物が付着し、冷却されて固着するいわゆるベコ付きも顕著であり、放置すると焼成物の排出が困難となることから、約4〜7週間毎に4時間から8時間の定期的なベコ取り作業とシュートの補修作業が必要であるという問題があった。
【0007】
【発明が解決しようとする課題】
本発明は、ドワイトロイド焼結機で亜鉛・鉛焼結塊を製造するに際し、焼成物を搬送するパンコンベアー上に焼成物を乗せるためのシュートの定期的なベコ取り作業とシュートの補修作業を軽減しうるシュート構造の提供を目的とする。
【0008】
【課題を解決するための手段】
本発明のシュート構造は、ドワイトロイド式焼結機排出端に設けられるクラッシャー下のシュートの構造であり、焼成物が落下し、該シュートと接触する部位に耐食性材料でできた板材、好ましくはステンレス板をチェーン等により取り外し可能に吊り下げてなるシュート構造である。
【0009】
また、ステンレス板としては安価の点よりSUS304がより好ましい。
【0010】
【発明の実施の形態】
図1に本発明のシュート構造例を示した。図1ではドワイトロイド焼結機の第一のクラッシャー下シュート内側に長さ1500mm×幅600mm×厚さ9mmのSUS304製の板をチェーンにより吊り下げている。吊り下げは、焼結機から焼成物が排出される方向のシュート4面のうち1面だけとした。この部分に高温の焼結塊が落下するからである。なお、ステンレス板以外に対摩耗性材料の板材を用いても良い。
【0011】
同様な目的を持ってシュート本体を構成する鉄板上に耐磨耗性の材料などを取替え可能な方法で固定し、定期的に磨耗面だけを取り替えるものがあるが、これでは本体の耐久性は向上するものの半溶融物の付着は避けられずベコ取り作業は避けられない。これに対して本発明の構造では、ステンレス板をチェーンで吊り下げるため、焼成物がステンレス板に衝突する際に発生する振動を利用してベコ付着防止を可能としている。
【0012】
また、一般的な板材の固定方法であるボルト止めや溶接に比較して、あらかじめチェーンを固定したステンレス板を用意しておけば、取り替え時間と作業負荷を劇的に低減することが可能となる。
【0013】
なお、本発明は、非鉄金属の焼結工程に限らず、各種の高温条件下で発生するシュートの損傷やベコ付着防止に適用可能であり、吊り下げる板材の大きさはドワイトロイド焼結機第一クラッシャー下シュートの大きさと、焼成物の落下範囲とを考慮して選定する。
【0014】
また、ステンレス板としては安価の点よりSUS304が好ましく、交換頻度と交換作業の負荷を軽減するため板厚を9mm程度とすることが好ましい。
【0015】
【実施例】
次に、実施例を用いて、本発明をさらに説明する。
(実施例1)
長さ1500mm×幅600mm×厚さ6mmのSUS304板をチェーンにより吊り下げ図1のホッパー構造を設けた。このホッパー構造を有するドワイトロイド焼結機を用いて以下の操業を行った。
【0016】

Figure 2004053035
操業開始6週間後のベコの付着状況とベコ除去作業に要した時間と吊り下げたステンレス板の状態と交換に要した時間を表1に示した。ベコの付着は少なく、ベコ除去作業は必要ない程度であった。しかし、点検時にSUS304板にクラックが認められたため、新たなSUS304板に交換した。この交換作業に要した時間は30分であった。
【0017】
(実施例2)
長さ1500mm×幅600mm×厚さ12mmのSUS304板をチェーンにより吊り下げ、実施例1と同様の条件で操業を行った。操業開始6週間後と12週間後とのベコの付着状況とベコ除去作業に要した時間、吊り下げたSUS304板の状態、交換に要した時間を表1に合わせて示した。
6週間後の点検時ではベコの付着はやや多く、ベコ除去作業に30分程度が必要とされた。なお、SUS304板に若干の減肉はあったものの、クラック発生などの異常は認められなかった。
12週間後の点検時にはSUS304板にクラックが確認されたため、取り替え作業を行った。この交換作業に要した時間は30分であった。
【0018】
(実施例3)
長さ1500mm×幅600mm×厚さ9mmのSUS304板をチェーンにより吊り下げ、実施例1と同様の条件で操業を行った。操業開始6週間後と12週間後とのベコの付着状況とベコ除去作業に要した時間、吊り下げたSUS304板の状態、交換に要した時間を表1に合わせて示した。
6週間後の点検時ではベコの付着は少なく、ベコ除去作業は不必要であった。板材に若干の減肉はあったものの、クラック発生などの異常は認められなかった。
12週間後の点検時にはSUS304板にクラックが確認されたため、取り替え作業を行った。この交換作業に要した時間は30分であった。
【0019】
(比較例1)
SUS304板を吊り下げず、そのままとした以外は実施例1と同様の条件で操業を行った。操業開始6週間後の状態とSUS304板の交換に要した時間およびベコ付着状況とベコ除去作業に要した時間を表1に合わせて示した。なお、シュート4面のうち焼成物が衝突する面のベコの付着が顕著で、この部分のベコの除去に、表1に示したように180分必要であった。
また、ベコを除去した後のシュート内面は減肉化が進んでおり、内面に補強鉄板を溶接するために更に120分を要した。この時間を表1の交換作業欄に記載した。
【0020】
(比較例2)
長さ150mm×幅60mm×厚さ9mmのSUS304板をシュート内面にボルトで固定した。固定後、実施例1と同様な条件で操業を行った。操業開始6週間後と12週間後とのベコの付着状況とベコの除去作業に要した時間とSUS304板の状態と交換に要した時間を表1に合わせて示した。
操業開始6週間後の点検時、シュート4面のうち焼成物が特に衝突する面へのベコの付着が顕著で、この面のベコの除去に必要とされた時間は120分であった。SUS304板に若干の減肉はあったものの、クラック発生などの異常は認められなかった。
操業開始12週間後の点検時に6週間後と同程度のベコの付着が有り、ベコの除去作業に120分が必要とされた。更にSUS304板の1部に減肉によるクラックが確認できたため、SUS304板を取り替えた。この取り替え作業に120分が必要とされた。
【0021】
【表1】
Figure 2004053035
【0022】
【発明の効果】
本発明のシュート構造ではステンレス板をチェーン吊り下げ、シュート面を保護する。チェーンで吊り下げているため、焼結塊とステンレス板との接触による衝撃により、ベコの付着量を低減できる。また、ステンレス板の取り替えも簡単であり、補修整備を短時間で終了することが可能である。このため、生産性を大きく向上させることが可能である。
【図面の簡単な説明】
【図1】ドワイトロイド焼結機第一クラッシャー下のシュート構造の概略説明図である。[0001]
TECHNICAL FIELD OF THE INVENTION
TECHNICAL FIELD The present invention relates to a structure of a chute used for transporting a fired product fired by a Dwyroid type sintering machine used in a sintering process of nonferrous metal smelting.
[0002]
[Prior art]
As an example of the sintering process of the nonferrous metal smelting, there is a manufacturing process of a zinc / lead sintered mass using a Dwyroid type sintering machine. In this step, the zinc sulfide concentrate, the lead sulfide concentrate, other oxide ore raw materials containing a relatively high concentration of zinc and lead, and the return ore generated in the sintering process are subjected to moisture conditioning and granulation. As a result, pellets as sintering raw materials are obtained. As described later, return ore has insufficient desulfurization and agglomeration, and is not suitable for charging the blast furnace in the next step.
[0003]
The pellets thus obtained are charged into a hopper above the sintering machine. This hopper is usually divided into a first hopper and a second hopper. A pallet that rotates in an infinite edge manner is provided below the hopper, and pellets are cut out from the first hopper onto the pallet so as to have a height of about 5 cm. This pellet layer then moves into the ignition furnace. In the ignition furnace, the pellet layer is heated from above by a burner and ignited. In the ignition furnace, gas is drawn downward from above the pallet by a wind box provided below the pallet to ignite and burn the sulfide to form an ignition layer.
[0004]
Next, pellets are cut out from the second hopper on the ignition layer. Although the thickness of the pellet layer including the ignition layer is greatly affected by the size of the pellet and the draft in the furnace, the height of the entire ore layer including the ignition layer is usually about 35 cm. Thereafter, in the sintering furnace, a gas containing oxygen is supplied from below the pallet, and the heat held by the ignition layer moves to the upper layer, where drying and heating are performed. The phenomenon that a reaction occurs and the temperature rises proceeds continuously from the lower layer to the upper layer. In this sintering reaction, the temperature of the ore layer reaches a maximum of 1200 to 1300 ° C., and a part of the fired material becomes a semi-molten state and aggregates to form a sintered mass.
[0005]
After the oxidation reaction is completed, the calcined material is cooled by the low-temperature gas supplied from the lower part of the pallet, and reaches the discharge end of the sintering machine. There is a first crusher at the discharge end of the sintering machine, and the fired material dropped from the pallet passes through the crusher, is discharged onto a pan conveyor via a chute, and is further supplied to a second crusher. In this way, the mixture passes through several stages of crushers, and thereafter, only what remains as a lump is supplied to the smelting furnace which is the next step, and the others are turned ore.
[0006]
By the way, in the sintering machine, the upper ore layer is not sufficiently cooled after the reaction, compared with the lower ore layer, and the fired material remains in a high temperature state, and a part remains in a semi-molten state. May be supplied to the first crusher. Therefore, since the chute under the first crusher comes into contact with the highest temperature fired material, the chute is severely damaged and needs to be periodically repaired. Also, the so-called stickiness that the semi-molten fired material adheres, cools and adheres is remarkable, and it becomes difficult to discharge the fired material if left unattended. There was a problem that periodic beveling work and chute repair work were required.
[0007]
[Problems to be solved by the invention]
In the present invention, when manufacturing zinc and lead sintered ingots with a Dwyroid sintering machine, the periodic work of removing the chute and the work of repairing the chute for placing the fired material on a pan conveyor that conveys the fired material are performed. It is intended to provide a shoot structure that can be reduced.
[0008]
[Means for Solving the Problems]
The chute structure of the present invention is a chute structure below the crusher provided at the discharge end of the Dwyroid type sintering machine, and a plate made of a corrosion-resistant material, preferably stainless steel, is formed at a site where the fired material falls and comes into contact with the chute. A chute structure in which a plate is detachably hung by a chain or the like.
[0009]
In addition, SUS304 is more preferable as the stainless steel plate because of its low cost.
[0010]
BEST MODE FOR CARRYING OUT THE INVENTION
FIG. 1 shows an example of a chute structure according to the present invention. In FIG. 1, a SUS304 plate having a length of 1500 mm, a width of 600 mm and a thickness of 9 mm is suspended by a chain inside the first crusher lower chute of the Dwyroid sintering machine. Only one of the four chutes in the direction in which the fired material was discharged from the sintering machine was suspended. This is because a high-temperature sinter lump falls on this portion. In addition, a plate material of an abrasion-resistant material other than the stainless steel plate may be used.
[0011]
For the same purpose, the chute body is fixed on the iron plate by a replaceable method such as abrasion-resistant material, etc., and only the wear surface is periodically replaced. Although improved, adhesion of semi-molten matter is unavoidable, and beveling work is inevitable. On the other hand, in the structure of the present invention, since the stainless steel plate is hung by the chain, it is possible to prevent the sticking of the stick by utilizing the vibration generated when the fired material collides with the stainless steel plate.
[0012]
Also, compared to bolting or welding, which is a general method of fixing plate materials, if a stainless steel plate with a fixed chain is prepared in advance, replacement time and work load can be dramatically reduced. .
[0013]
The present invention is applicable not only to the non-ferrous metal sintering process but also to the prevention of chute damage and sticking of sticks generated under various high-temperature conditions. The selection is made in consideration of the size of the chute below the crusher and the falling range of the fired material.
[0014]
In addition, SUS304 is preferable as the stainless steel plate in terms of inexpensiveness, and the plate thickness is preferably about 9 mm in order to reduce the frequency of replacement and the load of replacement work.
[0015]
【Example】
Next, the present invention will be further described using examples.
(Example 1)
A SUS304 plate having a length of 1500 mm × a width of 600 mm × a thickness of 6 mm was hung by a chain to provide a hopper structure shown in FIG. The following operation was performed using the Dwyroid sintering machine having the hopper structure.
[0016]
Figure 2004053035
Table 1 shows the state of adhesion of beko, the time required for beko removal work, the state of the suspended stainless steel plate, and the time required for replacement six weeks after the start of operation. There was little adhesion of the beko, and the work of removing the beko was unnecessary. However, a crack was found in the SUS304 plate at the time of the inspection, so the SUS304 plate was replaced with a new SUS304 plate. The time required for this replacement work was 30 minutes.
[0017]
(Example 2)
An SUS304 plate having a length of 1500 mm, a width of 600 mm and a thickness of 12 mm was suspended by a chain, and the operation was performed under the same conditions as in Example 1. Table 1 also shows the state of stickiness and the time required for the stick removal operation, the state of the suspended SUS304 plate, and the time required for replacement between 6 weeks and 12 weeks after the start of the operation.
At the time of the inspection six weeks later, the sticks were slightly more attached, and it took about 30 minutes to remove the sticks. In addition, although the SUS304 plate was slightly reduced in thickness, no abnormality such as crack generation was observed.
At the time of inspection after 12 weeks, cracks were found on the SUS304 plate, so replacement work was performed. The time required for this replacement work was 30 minutes.
[0018]
(Example 3)
A SUS304 plate having a length of 1500 mm, a width of 600 mm and a thickness of 9 mm was suspended by a chain, and the operation was performed under the same conditions as in Example 1. Table 1 also shows the state of stickiness and the time required for the stick removal operation, the state of the suspended SUS304 plate, and the time required for replacement between 6 weeks and 12 weeks after the start of the operation.
At the time of the inspection six weeks later, there was little adhesion of the beko, and the beko removal operation was unnecessary. Although the thickness of the plate material was slightly reduced, no abnormality such as crack generation was observed.
At the time of inspection after 12 weeks, cracks were found on the SUS304 plate, so replacement work was performed. The time required for this replacement work was 30 minutes.
[0019]
(Comparative Example 1)
The operation was carried out under the same conditions as in Example 1 except that the SUS304 plate was not suspended and was left as it was. Table 1 also shows the state six weeks after the start of the operation, the time required for replacing the SUS304 plate, the state of sticking, and the time required for the sheet removing operation. It should be noted that among the four chutes, the sticking of the swarf on the surface where the fired material collides was remarkable, and it took 180 minutes as shown in Table 1 to remove the swarf in this part.
Further, the inner surface of the chute after removing the bevel has been reduced in thickness, and it took another 120 minutes to weld a reinforcing iron plate to the inner surface. This time is shown in the replacement work column in Table 1.
[0020]
(Comparative Example 2)
A SUS304 plate having a length of 150 mm, a width of 60 mm and a thickness of 9 mm was fixed to the inner surface of the chute with bolts. After fixing, operation was performed under the same conditions as in Example 1. Table 1 also shows the adhesion state of the vegetation, the time required for the vegetation removal operation, the state of the SUS304 plate, and the time required for replacement at 6 and 12 weeks after the start of the operation.
At the time of the inspection six weeks after the start of the operation, the stick of the fired material was particularly noticeable on the surface of the four chutes on which the fired material collides. Although the SUS304 plate was slightly reduced in thickness, no abnormality such as crack generation was observed.
At the inspection 12 weeks after the commencement of the operation, there was almost the same sticking of beko as after 6 weeks, and it took 120 minutes to remove the beko. Further, since cracks due to wall thinning were confirmed in a part of the SUS304 plate, the SUS304 plate was replaced. This replacement took 120 minutes.
[0021]
[Table 1]
Figure 2004053035
[0022]
【The invention's effect】
In the chute structure of the present invention, the stainless plate is suspended from the chain to protect the chute surface. Since it is hung by a chain, the amount of sticks can be reduced by the impact of the contact between the sintered mass and the stainless steel plate. Further, the replacement of the stainless steel plate is easy, and the repair and maintenance can be completed in a short time. For this reason, productivity can be greatly improved.
[Brief description of the drawings]
FIG. 1 is a schematic explanatory view of a chute structure below a first crusher of a Dwyroid sintering machine.

Claims (3)

ドワイトロイド式焼結機排出端に設けられるクラッシャー下のシュートの構造であり、焼成物が落下し、該シュートと接触する部位に耐食性板材をチェーン等により取り外し可能に吊り下げ、焼成物が該耐食性板材と接触するように構成されていることを特徴とするシュート構造。This is the structure of a chute below the crusher provided at the discharge end of the Dwyroid type sintering machine. A chute structure configured to be in contact with a plate material. 耐食性板材がステンレス板である請求項1記載のシュート構造。The chute structure according to claim 1, wherein the corrosion-resistant plate is a stainless plate. 耐食性板材がSUS304製の板である請求項1または2記載のシュート構造。The chute structure according to claim 1 or 2, wherein the corrosion-resistant plate is a plate made of SUS304.
JP2002206684A 2002-07-16 2002-07-16 Chute structure Pending JP2004053035A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002206684A JP2004053035A (en) 2002-07-16 2002-07-16 Chute structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002206684A JP2004053035A (en) 2002-07-16 2002-07-16 Chute structure

Publications (1)

Publication Number Publication Date
JP2004053035A true JP2004053035A (en) 2004-02-19

Family

ID=31931347

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002206684A Pending JP2004053035A (en) 2002-07-16 2002-07-16 Chute structure

Country Status (1)

Country Link
JP (1) JP2004053035A (en)

Similar Documents

Publication Publication Date Title
JP5734946B2 (en) Steel production equipment, steel making method, and method of using electric energy in the steel production equipment
CN108796217B (en) Device and method for recycling zinc-containing and iron-containing dust mud
CN102618733A (en) Smelting recovery method for pure titanium waste blocks
KR100648386B1 (en) Recovering method of aluminium metal from Waste Aluminium Can
CN108912493A (en) A method of graphene wheel hub is produced using pulverized fuel ash carbon dioxide
WO2017090258A1 (en) Core sand regeneration apparatus
CN201926303U (en) Sintering machine with sintered clinker crushing device
JP2004053035A (en) Chute structure
US20030136226A1 (en) Method and an apparatus for recovery of metals
US2943930A (en) Scrap refining process and product
KR20110113223A (en) The method of manufacture for iron lump of iron dust used plasma
CN210085533U (en) Cold aluminium sediment regeneration cyclic utilization system
JP7260778B2 (en) Method for producing sintered ore
CN209901926U (en) Hot rolling strip steel head production line
JP2010270954A (en) Operation method of rotary kiln
CN110814297A (en) Fire grate demoulding and firing method
CN105400919A (en) Uniform spreading device for blast furnace smelting
KR101848263B1 (en) Method for Steelmaking Refining Process using Iron Cast Dust
JP3075721B2 (en) Operating method of moving bed type reduction furnace
JP2006118769A (en) Stand for supporting sintering cake
CN110284009B (en) Copper matte converting method and equipment
CN213421863U (en) Feeding mechanism of electric arc furnace
WO2009095942A1 (en) Iron metallurgical plant
KR101265682B1 (en) Recovering apparatus of used can and chip
USRE25034E (en) Proler