JP2004052234A - Horizontal support material with nut and upper building frame support structure - Google Patents

Horizontal support material with nut and upper building frame support structure Download PDF

Info

Publication number
JP2004052234A
JP2004052234A JP2002206845A JP2002206845A JP2004052234A JP 2004052234 A JP2004052234 A JP 2004052234A JP 2002206845 A JP2002206845 A JP 2002206845A JP 2002206845 A JP2002206845 A JP 2002206845A JP 2004052234 A JP2004052234 A JP 2004052234A
Authority
JP
Japan
Prior art keywords
nut
floor
horizontal support
support member
lintel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002206845A
Other languages
Japanese (ja)
Other versions
JP3943453B2 (en
Inventor
Hideyuki Kaneko
金子 秀之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2002206845A priority Critical patent/JP3943453B2/en
Publication of JP2004052234A publication Critical patent/JP2004052234A/en
Application granted granted Critical
Publication of JP3943453B2 publication Critical patent/JP3943453B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a horizontal support material such as a lintel for easily fixing and supporting an upper building frame of a building, simplifying construction work at a job site, and shortening a construction period, and an upper building frame support structure supported by this horizontal support material. <P>SOLUTION: The lintel 1 with a nut supports an upper story floor part 7 and an upper story wall part 76 arranged in an upper part, and has a lintel body 2, the nut 3 for threadedly engaging with a girth bolt 73 arranged in the upper story floor part 7 and the upper story wall part 76 and a male screw part 40 arranged in a lower part of the nut 3. The nut 3 is fixed to the lintel body 2 by screwing the male screw part 40 by filling an adhesive 5 in a prepared hole 22 arranged on an upper surface 21 of the lintel body 2. The upper story floor part 7 and the upper story wall part 76 are installed on this lintel 1 with the nut, and are connected by the girth bolt 3, and the upper story floor part 7 and the upper story wall part 76 are installed on the lintel 1 with the nut. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、住宅などにおいて上階床部下面に取り付けられるナット付き水平支持材及び建物の上部躯体の支持構造に関する。
【0002】
【背景の技術】
住宅の構築においては、その工業化が進み、例えば、壁や床、屋根といった構成要素を予め工場にてパネル化しておき、施工現場でこれらのパネルを組み立てることにより、住宅を構築するといったパネル工法が一部に採用されている。
このパネル工法で使用される壁パネルは、框材を矩形枠状に組み立てるとともにこの矩形枠の内部に補強用桟材を縦横に組み付けてなる枠体の表裏両面に合板等からなる面材を取り付けたものであり、中空部を備えている。また、床パネルは框材を矩形状に組み立てるとともにこの矩形枠の内部に補強用桟材を縦横に組み付けてなる枠体の一方の表面に合板等からなる面材を取り付けたものである。
【0003】
このパネル工法では、例えば特開平10−054413号公報に示すように、上階の壁パネルが組み付けられている。
まず、下階の壁パネルの上階に床部(床パネル等で構成される)を介して上階の壁パネルを立設する一方で、胴差ボルトをその下端部が下階の壁パネルの中空部内に配置され、かつその上端部が上階の壁パネルの中空部内に配置されるようにして、下階の壁パネルと上階の壁パネルとに亙って設ける。ここで、下階の壁パネルの上端部、上階の壁パネルの下端部及び床部には、胴差ボルトが通される貫通孔が予め形成されており、胴差ボルトはこれらの貫通孔を通って下階の壁パネルと上階の壁パネルとに亙って設けられる。ついで、胴差ボルトの下端部に座金を外挿した後にナットを螺合させる一方で、胴差ボルトの上端部に座金を外挿した後にナットを螺合させることで、下階の壁パネルと上階の壁パネルとを連結する。
【0004】
ところで、上述したパネル工法においては、上階の壁パネルを上階の床パネルを介して下階の壁パネルに連結し、該下階の壁パネルに支持させているが、上階の壁パネルを上階の床パネルを挟んで中空部を備えていないまぐさに連結し、これら壁パネル及び床パネルを支持させる場合は、例えば図12及び図13に示すような構造が採用されている。
【0005】
すなわち、床パネル131上に壁パネル132を建て起こす前に、床パネル131に形成されたボルト挿通孔133に胴差ボルト134を挿通するとともに、床パネル131の枠材131aに形成された切欠部135を介して、胴差ボルト134の下端にナット136を螺合させる。この状態で、床パネル131上に壁パネル132を建て起こした後、胴差ボルト134の上端を壁パネル132のボルト挿通孔137に挿通するとともに、その胴差ボルト134の上端にナット138を螺合させて、壁パネル132を床パネル131に締め付け固定する。
【0006】
続いて、床パネル131の切欠部135の両側開口面にパッキン材139を接着剤により接着して、床パネル131の枠材131aと床パネル131を支持するマグサ140との間の表面段差を補修する。この状態で、各パッキン材139及びマグサ140の表面にガセット合板141を接着剤により接着するとともに、各ガセット合板141上から床パネル131の枠材131a及びマグサ140に複数の釘142を打ち込む。これにより、床パネル131とマグサ140との間を接合固定するとともに、床パネル131の切欠部135の両側開口面を閉塞している。
【0007】
【発明が解決しようとする課題】
しかし、上述したように上階の壁パネルを上階の床パネルを挟んでまぐさと連結することで前記上階の壁パネル及び上階の床パネル等の上部躯体をまぐさに支持させる構造においては、前述のように、床パネル131と壁パネル132との締め付け固定、及び床パネル131とマグサ140との間の固定を別々に行っているため、現場施工が面倒で手間がかかる。
【0008】
本発明の課題は、上部に設けられる床パネルなどの上部躯体を容易に固定して支持することができ、現場施工の簡略化及び施工期間の短縮化を図ることができるまぐさ等の水平支持材及びこの水平支持材により支持される上部躯体の支持構造を提供することである。
【0009】
【課題を解決するための手段】
以上の課題を解決するため、請求項1記載の発明は、例えば、図5に示すように、
上部に設けられる建物の上部躯体(例えば、上階壁部76及び上階床部7)を支持するナット付き水平支持材(例えばナット付きまぐさ1)であって、
支持材本体(例えばまぐさ本体2)と、前記上部躯体に設けられるボルト(例えば胴差ボルト73)と螺合するナット3と、ナット3の下部に設けられた雄ネジ部40とを備え、
前記ナット3は、前記雄ネジ部40を支持材本体2の上面21に設けられた下穴22に接着剤5を充填してねじ込むことで前記支持材本体2に固定されていることを特徴とする。
【0010】
請求項1記載の発明によれば、支持材本体2に、上部躯体に設けられるボルト73と螺合するナット3が雄ネジ部40及び接着剤5を介して固定されているので、上部躯体の下部に取り付ける際に、前記上部躯体のボルト73に前記ナット3を螺合するだけで、前記上部躯体は支持材本体2に連結固定される。これにより、上部躯体をナット付き水平支持材に取り付けて支持させる作業を容易に行うことができ、現場施工での簡略化は勿論のこと施工期間の短縮化を図ることができる。すなわち、水平支持材2上に上部躯体をとりつける際に、従来と異なり、水平支持材と上部躯体、つまり上階床部の下部とを接続するための金具、例えば、ガセット合板等を必要とせずに容易に固定支持させることができる。
【0011】
ここで、前記水平支持材は、建物躯体の一部、特に建物躯体の下部躯体を構成し、水平に設置され、その上部に設けられる上部躯体、例えば、上面に載置される上階床部を支持するものであればどのようなものでもよく、例えば、下階部分分に離間配置された壁間の開口部の上側に配置される部材、特に梁やまぐさ等でもよい。
また、前記ナット3と雄ネジ部40とは一体のものとして構成されていてもよいし、また、雄ネジ部40を支持材本体2に固着した後、前記雄ネジ部40にナット3の下端部32を螺合してなるものとしてもよい。その際、ナット3における雄ネジ部40が螺合した下端部より上方の部分では、上階床部7に設けられるボルト73を確実に螺合できるように構成されている。つまり、ボルト73が確実に螺合できる分のネジ深さを有するものとする。
【0012】
請求項2記載の発明は、請求項1記載のナット付き水平支持材において、例えば図9に示すように、
前記雄ネジ部40の上部に、前記ナット3の下端部32が螺合されたナット用雄ネジ部41が設けられ、
このナット用雄ネジ部41の上部には、前記ナット3内に収納され、前記雄ネジ部40を下穴22にねじ込むためのねじ込み部42が設けられていることを特徴とする。
【0013】
請求項2記載の発明によれば、前記雄ネジ部40の上部に、前記ナット3の下端部32が螺合されたナット用雄ネジ部41が設けられていることにより、ナット3と雄ネジ部40とは分割可能であるとともに、雄ネジ部40のナット用雄ネジ部41の上部には前記ナット3内に収納され、前記雄ネジ部40を下穴22にねじ込むためのねじ込み部42が設けられているので、支持材本体2にねじ込み部を介して雄ネジ部40をねじ込んだ後で、ねじ込まれた雄ネジ部40の上部のナット用雄ネジ部41にナット3の下端部32を螺合することで、ナット3を支持材本体2に固定することができる。
つまり、ナット3及び雄ネジ部40を一体に形成する必要がなく、その成形にかかるコストを削減することができる。
【0014】
請求項3記載の発明は、請求項1または2記載のナット付き水平支持材において、例えば、図1に示すように、
雄ネジ部40の外径と下穴22の内径は略同一であることを特徴とする。
【0015】
請求項3記載の発明によれば、雄ネジ部40の外径と下穴22の内径は略同一であるので、前記雄ネジ部40は、接着剤5が充填された下穴22に容易にねじ込むことができるとともに、充填された接着剤5を介して強固に支持材本体2に止着される。
したがって、ナット3を前記支持材本体2に強固に固定することができる。
【0016】
請求項4記載の発明は、請求項1〜3のいずれか一項に記載のナット付き水平支持材10において、例えば図8に示すように、
前記ナット3は、上方からボルト73を挿入できるように前記支持材本体2A内部に固定されていることを特徴とする。
【0017】
請求項4記載の発明によれば、上階床部7に設けられるボルト73に螺合されるナット3が、支持材本体2A内に、上方から前記ボルト73を挿入できるように固定されているので、支持材本体2Aからナット3が外部に露出することがない。つまり、水平支持材を現場に搬入する際に、複数の支持材本体2を積み重ねて運搬することができる。
【0018】
請求項5記載の発明は、請求項1〜3のいずれか一項に記載のナット付き水平支持材において、例えば図1に示すように、
前記ナット3は前記支持材本体2の上面21に取り付けられていることを特徴とする。
【0019】
請求項5記載の発明によれば、支持材本体2の上面21からナット3が突出した状態となり、上部躯体を上部に設けて連結させる際に、ナット3の位置を容易に視認でき、前記上階床部7に設けられるボルト73に簡単に螺合することができる。
【0020】
請求項6記載の発明は、請求項1〜3のいずれか一項に記載のナット付き水平支持材上に設けられる建物の上部躯体の支持構造において、例えば、図10に示すように、
前記上部躯体(例えば上階壁部76及び上階床部7)には、前記ナット付き水平支持材(例えばナット付きまぐさ10)のナット3に螺合するボルト73が設けられ、
前記ボルト73が前記ナット付き水平支持材10のナット3に螺合することで、前記上部躯体76,7は前記ナット付き水平支持材10に支持されていることを特徴とする。
【0021】
請求項6記載の発明によれば、ナット付き水平支持材上に設けられる上部躯体が、上部躯体に設けられたボルトをナット付き水平支持材のナットに螺合されることで前記ナット付き水平支持材に支持されているので、ナット付き水平支持材10に上部躯体7,76を取り付ける際に、前記ボルトをナット付き水平支持材10のナット3に螺合させるだけで、前記上部躯体76,7をナット付き水平支持材10に容易に連結して支持させることができる。これにより、上部躯体と水平支持部材とを連結して、前記上部躯体を支持させる作業を現場施工での簡略化は勿論のこと施工期間の短縮化を図ることができる。
【0022】
請求項7記載の発明は、例えば図10に示すように、
請求項4記載のナット付き水平支持材10上に、ナット付き水平支持材のナット3に連通する床側連通孔74が形成された上階床部7が載置され、
上階床部7上に、前記上階床部とともに建物の上部躯体を構成するとともに、前記床側連通孔74に連通する壁側連通孔75が形成された上階壁部76が立設され、
前記壁側連通孔75及び床側連通孔74に、上端が前記上階壁部76内で係止されるボルト73が挿通されて前記上階床部7の下面71から下方に突出し、前記ナット付き水平支持材10のナット3に螺合することで上階床部7及び上階壁部76はナット付き水平支持材10に連結されていることを特徴とする。
【0023】
請求項7記載の発明によれば、ナット3が上方からボルト73を挿入できるように支持材本体2A内部に固定されているナット付き水平支持材上に、床側連通孔74が形成された上階床部7が載置され、この上階床部7上に、前記床側連通孔74に連通する壁側連通孔75が形成された上階壁部76が立設され、上端が前記上階壁部内で係止されるとともに前記壁側連通孔75及び床側連通孔74に挿通されて前記上階床部7の下面から下方に突出するボルト73が前記ナット3に螺合されることでナット付き水平支持材10が上階床部7及び上階壁部76に連結されているので、ナット付き水平支持材10に上部躯体を構成する上階床部7及び上階壁部76を設けて支持させる際に、上階壁部76の壁側連通孔75及び上階床部7の床側連通孔74にボルト73を挿通してナット付き水平支持材10のナット3に螺合させるだけで、前記上階壁部76及び上階床部7をナット付き水平支持材10に連結できる。
【0024】
したがって、ナット付き水平支持材10上に載置された上階床部7上で該上階床部7及び上階壁部76のナット付き水平支持材10への取付作業を容易に行うことができる。すなわち、従来と異なり、水平支持材となるまぐさを上階床部に取り付ける際に、水平支持材と上階床部7とを接続するための金具、例えば、ガセット合板等を必要とせず、さらに、上階床部7の下方で、上階床部7とこの上階床部7上に立設された上階壁部76とをボルト73で連結するためのボルト73とナット3の締結作業を行う必要がなく、上階床部7上にて、水平支持材10に上階床部7及び上階壁部76を容易に連結することで、前記上階床部を前記上階壁部とともにナット付き水平支持材10に容易に支持させることができる。
【0025】
請求項8記載の発明は、例えば図5に示すように、請求項5記載のナット付き水平支持材1上に、下面71にナット3が挿入される切欠部77と切欠部77に連通する床側連通孔74とが形成された上階床部7が、前記切欠部77内にナット3を収容し且つ該ナット3と床側連通孔74とが連通した状態で載置され、
前記上階床部7上に、前記上階床部7とともに建物の上部躯体を構成するとともに、前記床側連通孔74に連通する壁側連通孔75が形成された上階壁部76が立設され、
前記壁側連通孔75及び床側連通孔74に、上端が前記上階壁部76内で係止されるボルト73が挿通されて、このボルト73の下端部を前記ナット付き水平支持材のナット3に螺合することで上階床部7及び上階壁部76がナット付き水平支持材1に連結されていることを特徴とする。
【0026】
請求項8記載の発明によれば、ナット3が支持材本体2の上面21に取り付けられているナット付き水平支持材1上に、前記ナット3が挿入される切欠部77と、切欠部77に連通する床側連通孔74とが形成された上階床部7が、前記切欠部77にナット3を収容した状態で載置され、この上階床部7上に、前記床側連通孔74に連通する壁側連通孔75が形成された上階壁部76が立設され、上端が前記上階壁部内で係止されるとともに前記壁側連通孔75及び床側連通孔74に挿通されたボルト73が前記ナット3に螺合されることでナット付き水平支持材1が上階床部7及び上階壁部76に連結されているので、ナット付き水平支持材1上に上部躯体を構成する上階壁部及び上階床部7を設けて支持させる際に、上階床部を前記水平支持材1上に載置し、この上階床部上に上階壁部76を立設し、前記上階壁部76の壁側連通孔75及び上階床部7の床側連通孔74にボルト73を挿通してナット付き水平支持材のナット3に螺合させるだけで、前記上階壁部76及び上階床部7をナット付き水平支持材1に連結させることができる。
【0027】
したがって、ナット付き水平支持材1上に載置された上階床部7上で該上階床部7及び上階壁部76のナット付き水平支持材1への取付作業を容易に行うことができる。すなわち、従来と異なり、水平支持材であるまぐさに上階床部7を取り付ける際に、水平支持材と上階床部とを接続するための金具、例えば、ガセット合板等を必要とせず、さらに、上階床部7とこの上階床部7上に立設された上階壁部76とをボルト73で連結するためのボルト73とナット3の締結作業を上階床部7の下方で行う必要がなく、上階床部7上にて水平支持材に上階床部7及び上階壁部76を容易に連結することで、前記上階床部7を上階壁部とともに前記水平支持材1に容易に支持させることができる。
さらに、ナット付き水平支持材上に前記上階床部7を載置する際に、上階床部7を水平支持材上面から突出するナット3に、下面71の切欠部77を合わせて設置することができ、上階床部7の設置位置の位置決めを容易に行うことができる。
【0028】
請求項9記載の発明は、請求項8記載のナット付き水平支持材の取付構造において、例えば図に示すように、
床側連通孔74と切欠部とは同一の内径であることを特徴とする。
【0029】
請求項9記載の発明によれば、前記床側連通孔74と前記切欠部77とは同一の内径であるので、上階床部7に床側連通孔74と切欠部77を形成する作業を同一の穿孔作業で行うことができ、ナット付き水平支持材1上に載置される上部躯体の上階床部7の製作を容易に行うことができる。
【0030】
【発明の実施の形態】
以下、図を参照して本発明の実施の形態を詳細に説明する。
まず、構成を説明する。
図1に示すナット付きまぐさ(水平支持材)1は、上部に設けられる上階床部7を支持する(図5参照)ものであり、まぐさ本体2と、まぐさ本体2の上面21に取り付けられ、且つ上階床部7に設けられるボルト73と螺合するナット3と、ナット3の下部に設けられるとともにナット3を前記まぐさ本体2に固定する雄ネジ部40とを備え、ナット3は、雄ネジ部40をまぐさ本体2の上面21に設けられた下穴22に、接着剤5を充填してねじ込むことでまぐさ本体2に固定されている。
【0031】
まぐさ本体2は、直方体の角材であり、建物内において下部躯体の上部分、ここでは、下階に離間して配置された壁の上端部間に、前記壁間に亘って架設され、下方に開口部を形成するものである。なお、本実施の形態では、上階床部7を構成する床パネル7a,7bの下面71に、上面21を当接させた状態で取り付けるられるものとしている。
【0032】
雄ネジ部40は、この実施の形態ではコーチボルトの軸部により構成され、その上部にナット3の下端部が螺合されたナット用雄ネジ部41が設けられている。また、このナット用雄ネジ部41の上部には、雄ネジ部40をまぐさ本体2にねじ込むためのねじ込み部42が設けられており、これら雄ネジ部40、ナット用雄ネジ部41及びねじ込み部42は全て同一軸心を有する軸部材4として一体に成形されたものである。さらに雄ネジ部40の外周には、基端から先端まで軸方向に沿う溝部44が形成されている。この溝部44は、雄ネジ部40を接着剤5が充填された下穴22にねじ込む際に、下穴22内における余剰の接着剤5を上方に案内するためのものである。
【0033】
ねじ込み部42は、その外径がナット用雄ネジ部41の外径が小さく前記ナット3内に収納されている。また、ねじ込み部42は、本実施の形態では六角柱状の部材からなり、めがねレンチなどの工具の連結部に内嵌されるようになっている。また、ねじ込み部42は、六角柱状としたがこれに限らず、角形の穴を有する筒状部材から構成し、この角形の穴にレンチ、ドライバー、スパナなどの工具を嵌めて、工具を介して雄ネジ部40をねじ込むようにしてもよい。
このように構成された雄ネジ部40は、接着剤5を充填させた下穴22ねじ込まれている。また、本実施の形態では雄ネジ部40の外径と下穴22の内径は略同一としている。
【0034】
ナット3は、その下端部で雄ネジ部40に設けられたナット用雄ネジ部41に螺合されることで、上方でボルト73を螺合可能な状態、つまり、ボルト73が確実に螺合できるネジ孔深さを有し、雄ネジ部40に固着されたものとなっている。 そして、雄ネジ部40を介してまぐさ本体2の上面21に取り付けられた状態となっている。ここで、ナット3と軸部材4とは、ナット3の下部に雄ネジ部40が設けられるような一体のものとして構成されていてもよい。ナット3と軸部材とが一体のものであれば、まぐさ本体2への取付作業が容易に行える。
【0035】
図3及び図4にナット付きまぐさ1の製作方法を示す。
図3(a)で示すように、まず、まぐさ本体2の上面21に穿孔機81で所定の内径を有する下穴22を穿孔する。このときの内径は、後でねじ込まれる雄ネジ部40の外径に対応させた長さとし、本実施の形態では、雄ネジ部40の外径及び全長と略同じ長さの内径及び全長を有する下穴22を形成する。
このように雄ネジ部40の外径と下穴22の内径が略同一であることにより、雄ネジ部40は、接着剤5が充填された下穴22に容易にねじ込むことができるとともに、充填された接着剤5を介して強固にまぐさ本体2に止着され、ナット3をまぐさ本体2に強固に固定できるようになっている。
【0036】
そして、図3(b)に示すように、まぐさ本体2に形成された下穴22内に接着剤容器82により接着剤5を注入して充填する。
次いで、この接着剤5が充填された下穴22に、ねじ込み部42とねじ込み工具、例えば、レンチ、スパナ、ドライバー等の工具を連結させて雄ネジ部40を、その軸を中心に回転させることでねじ込み、まぐさ本体2の上面21からナット用雄ネジ部41が突出した状態にさせる。
そして、雄ネジ部40を所定の深さまでねじ込んだ後、工具をねじ込み部42から外し、図4に示すように、まぐさ本体2に止着された雄ネジ部40の上部のナット用雄ネジ部41に、ナット3の下端部を螺合させることで、ナット付きまぐさ1を作成する。
【0037】
次に、ナット付きまぐさ1上に建物の上部躯体である上階床部及び上階床部上に立設される上階壁部を取り付けて支持させた構造を説明する。なお、ナット付きまぐさ1は、どのように構築された住宅に用いられても良いが、この実施の形態では、パネル工法により構築される住宅に適用されるものとし、上階床部、上階壁部はそれぞれ床パネル7a,7b及び壁パネルにより構成されるものとして説明する。
【0038】
図5に示すナット付きまぐさ1の取り付け構造では、ナット付きまぐさ1上に、下面71にナット3が挿入される切欠部77と、切欠部77に連通する床側連通孔74が形成された上階床部7が前記切欠部77内にナット3が収容され且つ該ナット3と床側連通孔74とが連通した状態で載置されている。
上階床部7は、床パネル7a,7bを並べることで構成されており、床側連通孔74は胴差しボルト73が挿通する内径を有し、切欠部77はナット3が内部で収容される内径を有している。ここでは、切欠部77と、上階床部7の上下に貫通する床側連通孔74とは同一の内径となっており、同一の穴を穿孔することで形成されている。さらに、上階床部7上には、床側連通孔74に連通する壁側連通孔75が形成された上階壁部76が立設されている。
【0039】
上階壁部76は、壁パネルにより構成され内部に中空部を有するととともに、壁パネルの本体となる矩形枠を構成する下框材に上下に連通する壁側連通孔75が形成されている。この壁側連通孔75は、床側連通孔74の内径と略同一の内径を有するものであり、胴差ボルト73の軸部が挿通されている。
そして、壁側連通孔75及び床側連通孔74に、胴差ボルト73が挿通されてナット付きまぐさ1のナット3に螺合することでナット付きまぐさは上階床部7及び上階壁部76に連結されている。つまり、胴差ボルト73の上端部は、上階壁部76内部で座金86を介してナット87により止着され、上階壁部76を構成する壁パネルの下側横框材761上面に係止された状態となっている。
この胴差ボルト73、上階床部7を介してナット付きまぐさ1は上階床部7に取り付けられた状態となっている。
【0040】
次に、ナット付きまぐさ1上に上部躯体を構成する上階床部7及び上階壁部76を設けて支持させる方法を説明する。
まず、例えば工場等にて、ナット付きまぐさ1を作成し、建築現場に搬入した後、図6(a)に示すように、所定の箇所に設置する。図6(a)では、壁パネル91を接合してなる下階壁部9の上端部に平板状の補強材92を介してまぐさ受け金具93が取り付けられ、このまぐさ受け金具93にナット付きまぐさ1の一端部を嵌め込み、まぐさ本体2が下階壁部9に対して直交し、且つ上面21が下階壁部9の上面94と略面一となるように配置されている。
このように下階壁部9のまぐさ受け金具93に嵌め込まれたナット付きまぐさ1の下部には開口部95が形成された状態となる。
【0041】
なお、図示しないが、ナット付きまぐさ1の他端部は、建物の下部躯体を構成する下階の内壁を構成する壁パネルの側端面の上部に接合される等して固定され、これらまぐさ受け金具93等を介して下階壁部9や下階の内壁により支持された状態となっている。
このように所定の箇所に設置されたナット付きまぐさ1では、まぐさ本体2の上面21からナット3が上方に突出した状態となっており、このナット付きまぐさ1の上部に、吊り治具85を介して吊り上げられた上階床部7を構成する床パネル7aを設置する(図6(b)参照)。なお、吊り治具85はクレーン等のワイヤーの先端に取り付けられて、吊り上げ自在となっている。また、ナット付きまぐさ1上に載置される上階床部7は、端面どうしを合わせた複数の床パネル7a,7bにより構成され、これら床パネル7a,7bの端面にはそれぞれ上下方向に延在する溝が形成され、床パネル7a,7b端面どうしを合わせることで、床側連通孔74及び切欠部77が形成されるものとなっている。
【0042】
ナット付きまぐさ1の上に上階床部7を構成する床パネル7aを設置する際には、まぐさ本体2の上面21にナット3が突出した状態で取り付けられているので、このナット3に床パネル7aの切欠部77となる溝を合わせるようにして載置できる。つまり、上階床部7の下面71に取り付けられる際に、ナット3の位置を容易に視認して、上階床部7に設けられるボルト73に螺合することができ、ナット3を床パネル7aの位置決めに用いて正確な設置箇所に床パネル7aを載置することができる。
そして、図7に示すように、上方から胴差ボルト73の軸部をナット3に螺合させることで、胴差ボルト73の上端部を床パネル7aの上面から上方に突出させるとともに、既に載置された床パネル7aに並べるように、床パネル7bを載置する。
【0043】
このとき載置される床パネル7bは、胴差ボルト73の先端部に端面の溝部を合わせて載置させることができ、その載置作業が容易なものとなっている。
このようにナット付きまぐさ1上に床パネル7a,7bを並べて載置した後、床パネル7a,7bどうしの接合部分に上階壁部76となる壁パネルを、壁側連通孔に胴差ボルト73の先端部を挿入させて立設するとともに、壁パネルの中空部内で座金86を介してナット87を螺合することでナット付きまぐさ1、上階床部7及び上階壁部76を連結することで、上階壁部76とナット付きまぐさ1をと締結させ、上階壁部76及び上階床部7等からなる建物の上部躯体をナット付きまぐさ1に取り付け、支持させた状態にする。
【0044】
また、雄ネジ部40の上部に、ナット3の下端部32が螺合されたナット用雄ネジ部41が設けられていることにより、ナット3と雄ネジ部40とは分割可能であるとともに、雄ネジ部40のナット用雄ネジ部41の上部には、ナット用雄ネジ部41より外径が小さくナット3内に収納され、雄ネジ部40を下穴22にねじ込むためのねじ込み部42が設けられているので、まぐさ本体2にねじ込み部を介して雄ネジ部40をねじ込んだ後で、ねじ込まれた雄ネジ部40の上部のナット用雄ネジ部41にナット3の下端部32を螺合することで、ナット3をまぐさ本体2に固定することができる。
つまり、ナット3及び雄ネジ部40を一体に形成する必要がなく、その成形にかかるコストを削減することができる。
【0045】
また、上階床部7及び上階壁部76等から構成される上部躯体をナット付きまぐさ1に取り付ける作業の際に、ナット3がまぐさ本体2の上面21に取り付けられているナット付きまぐさ1上に、ナット3が挿入される切欠部77と、切欠部77に連通する床側連通孔74とが形成された上階床部7が、切欠部77にナット3を収容した状態で載置され、この上階床部7上に、床側連通孔74に連通する壁側連通孔75が形成された上階壁部76が立設され、壁側連通孔75及び床側連通孔74に挿通され、且つ上端が上階壁部76内で螺合されたナット87により壁パネルの横框材761に係止されるボルト73がナット3に螺合されることでナット付きまぐさ1が上階床部7及び上階壁部76に連結されているので、ナット付きまぐさ1を上階床部7に取り付ける際に、上階壁部76の壁側連通孔75及び上階床部7の床側連通孔74にボルト73を挿通してナット付きまぐさのナット3に螺合させるだけで、上階壁部76及び上階床部7をナット付きまぐさ1に連結できる。
【0046】
したがって、ナット付きまぐさ1上に載置された上階床部7上で上部壁部76及び上部床部7等からなる上部躯体とナット付きまぐさとの連結作業を容易に行うことができ、従来と異なり、上階床部7をまぐさに取り付ける際に、まぐさと上階床部7とを接続するための金具、例えば、ガセット合板等を必要とせず、さらに、上階床部7とこの上階床部7上に立設された上階壁部76とをボルト73で連結するためのボルト73とナット3の締結作業を上階床部7の下方で行う必要がなく、上階床部7上にて上階床部7及び上階壁部76をまぐさ1に容易に連結することで容易に取り付けまぐさ1に支持させることができる。
【0047】
詳細には、床パネルと壁パネルとの締め付け固定、及び床パネルとマグサとの接合を同時に行うことができ、現場施工を簡略化、施工期間の短縮化を図ることができるとともに、組付け強度を向上させることができる。さらに、まぐさに外装材が取り付けられる場合でもまぐさと床パネルとの接合にガセット合板を用いることがないので、ガセット合板が邪魔になることなく容易に外装材の取付作業を行うことができる。
【0048】
上記実施の形態におけるナット付きまぐさ1では、ナット3はまぐさ本体2の上面21に上方に突出するように固定された構成としたが、これに限らず、ナット3をまぐさ本体2内に設けた構成としてもよい。この一例を変形例として説明する。
【0049】
[変形例]
図8及び図9に示すナット付きまぐさ10は、上部に上部躯体が設けられるものであり、まぐさ本体の構成のみ異なりその他の構成はナット付きまぐさ1と略同様なものである。したがって同様の構成要素については同符号を付して説明は省略する。
ナット付きまぐさ10は、まぐさ本体2Aと、ボルト73と螺合するナット3と、ナット3の下部に設けられるとともにナット3を前記まぐさ本体2に固定する雄ネジ部40とを備え、ナット3は、雄ネジ部40をまぐさ本体2Aの上面21から鉛直下方に穿孔された下穴22Aに、接着剤5を充填してねじ込むことでまぐさ本体2に固定されている。
【0050】
まぐさ本体2Aは、直方体の角材であり、建物内の開口部の上方、ここでは建物の下階の躯体部分である離間して配置された壁どうしの上端部間に架設されるものである。
本変形例では、図10に示すように、ナット付きまぐさ10は、その上に、建物の上部躯体を構成する上階床部7Aと上階壁部76Aとが設けられ、上面21Aが上階床部7Aを構成する床パネルの下面71Aに当接された状態で上部躯体を支持するものである。
このまぐさ本体2Aに穿孔された下穴22Aは、まぐさ本体2Aの上面に形成され、ナット3の外径を有するとともにナット3の長さ分の深さを有する座掘部221と、座掘部221の下部に配置され、座掘部221と連通するとともに雄ネジ部40がねじ込まれる下穴本体部222とを有する。
【0051】
座掘部221と下穴本体部222とは同軸心を有し、下穴本体部222内に雄ネジ部40がねじ込まれることで、この雄ネジ部40を介してナット3は、その上端面がまぐさ本体2Aの上面21Aより低く座掘部221内に収納された状態でまぐさ本体2Aに固定されている。これにより、ナット3は、上方からボルト73を挿入できるようにまぐさ本体2A内部に固定された状態となっている。
なお、下穴本体部222の内径と雄ネジ部40の外径とは略同一のものとなっている。
【0052】
上述したナット付きまぐさ10の製作方法は、最初にまぐさ本体2Aに下穴22Aを穿孔する際に、雄ネジ部40用の下穴本体部222と、ナット3が収納される座掘部221とを穿孔する。その後の工程は上述したナット付きまぐさ1の製作工程と同様であり、つまり、まぐさ本体2Aに形成された下穴本体部222内に接着剤5を充填させ、その接着剤が充填された下穴本体部222に雄ネジ部40を、その上部に設けられたナット用雄ネジ部41が座掘部221内の下部に配置される状態になるまでねじ込む。そして、座掘部221内のナット用雄ネジ部41にナット3の下端部を螺合させて、ナット3の上端がまぐさ本体2Aの上面21Aよりも高さが低くなる位置となるようにして、ナット3を雄ネジ部40に固着させることで、ナット付きまぐさ10が製作される。
【0053】
このように製作されたナット付きまぐさ10上に上階床部及び上階壁部を有する建物の上部躯体を取り付け支持させた構造を図10を参照して説明する。なお、ナット付きまぐさ10は、どのように構築された住宅に用いられても良いが、上述したナット付きまぐさ1と同様に、パネル工法により構築される住宅に適用されるものとし、ここでは、上述したナット付きまぐさ1による上階床パネル及び上階壁パネルなどからなる上部躯体の取付構造においてナット付きまぐさ1に代えてナット付きまぐさ10とした構造として説明する。
【0054】
図10に示すナット付きまぐさ10により支持される上部躯体の支持構造では、ナット付きまぐさ10上に、ナット付きまぐさのナット3に連通する床側連通孔74Aが形成された上階床部7が載置され、この上階床部7上に、前記床側連通孔74Aに連通する壁側連通孔75が形成された上階壁部76が立設されている。
そして、壁側連通孔75及び床側連通孔74Aに、胴差ボルト73Aが挿通されて上階床部7の下面71から下方に突出し、前記ナット付きまぐさ10のナット3に螺合することでナット付きまぐさ10が上階床部7及び上階壁部76に連結されている。なお、上階床部7に形成された床側連通孔74は胴差しボルト73が挿通する内径を有する。
【0055】
胴差ボルト73Aは、上述した胴差ボルト73より軸部が長く、その上端部は、上階壁部76内部で座金86を介してナット87により止着され、上階壁部を構成する壁パネルの下側横框材761に係止された状態となっている。
また、胴差ボルト73Aの下端部は床部7の下面71から下方に突出して、ナット付きまぐさ10の座掘部221内のナット3に螺合され、この胴差ボルト73を介して上階床部7とナット付きまぐさ10とは締結されている。これにより、上階床部7及び上階壁部76はナット付きまぐさ10に支持された状態となっている。
【0056】
上記変形例のナット付きまぐさ10によれば、ナット付きまぐさ10に上階床部7及び上階壁部76を取り付ける際に、上階壁部76の壁側連通孔75及び上階床部7の床側連通孔74に上端が前記上階壁部内でナット87に螺合されたボルト73を挿通してナット付きまぐさ10のナット3に螺合させるだけで、上階壁部76及び上階床部7をナット付きまぐさ10に連結させることができ、ナット付きまぐさ10上に載置された上階床部7上で該上階床部7及び上階壁部76をナット付きまぐさ10に取り付けて支持させる作業を容易に行うことができる。すなわち、従来と異なり、まぐさに上階床部7を取り付ける際に、まぐさと上階床部7とを接合するための金具、例えば、ガセット合板等を必要とせず、さらに、上階床部7の下方で、上階床部7とこの上階床部7上に立設された上階壁部76とをボルト73で連結するためのボルト73とナット3の締結作業等を上階床部下方で行う必要がなく、上階床部7上にて、ナット付きまぐさ10に上階床部7及び上階壁部76を容易に連結することで、上階床部7及び上階壁部76をナット付きまぐさ10に容易に取り付けて支持させることができる。
【0057】
また、このナット付きまぐさ10の設置方法及び、このまぐさ上に上階床部7及び上階壁部76を取り付けて支持させる方法は、まず、例えば工場等にて、ナット付きまぐさ1を作成し、建築現場に搬入した後、図11(a)に示すように、所定の箇所に設置する。このとき、ナット3はまぐさ本体2A内に収納された状態であるので、ナット付きまぐさ10を積み重ねて搬入することができる。すなわち、通常の角材のまぐさと外形的には変化がないので、まぐさ本体2Aに取り付けられているナットを気にせずに、その運搬作業を容易に行うことができるものとなっている。
図11(a)では、壁パネル91を接合してなる下階壁部9の上端部に平板状の補強材92を介してまぐさ受け金具93が取り付けられ、このまぐさ受け金具93にナット付きまぐさ1の一端部を嵌め込み、まぐさ本体2Aが下階壁部9に対して直交し、且つ上面21が下階壁部9の上面94と略面一となるように配置されている。このように下階壁部9のまぐさ受け金具93に嵌め込まれたナット付きまぐさ10の下部には開口部95が形成された状態となる。
【0058】
なお、図示しないが、ナット付きまぐさ1の他端部は、下階の内壁を構成する壁パネルの側端面の上部に接合される等して固定され、これらまぐさ受け金具93等を介して下階壁部9や下階の内壁により支持されるとともにこれら下階壁部9や下階の内壁とともに建物の下部躯体を構成するものとなっている。
そして、ナット付きまぐさ10の上面に、吊り治具85を介して吊り上げられた上階床部7を構成する床パネルを設置する(図11(b)参照)。なお、ナット付きまぐさ10上に載置される上階床部7Aは、上述したものと同様に端面どうしを合わせた複数の床パネルにより構成され、これら床パネルの端面にはそれぞれ上下方向に延在する溝が形成され、床パネル端面どうしを合わせることで、床側連通孔74Aが形成されるものとなっている。
【0059】
そして、上方から胴差ボルト73A(図10参照)の軸部をナット3に螺合させることで、胴差ボルト73Aの上端部を床パネルの上面から上方に突出させるとともに、既に載置された床パネルに並べるように、床パネルを載置する。
このとき載置される床パネルは、胴差ボルト73Aの先端部に端面の溝部を合わせて載置させることができ、その載置作業が容易なものとなっている。
このようにナット付きまぐさ1上に床パネルを並べて載置した後、床パネルどうしの接合部分に上階壁部76となる壁パネルを、壁側連通孔に胴差ボルト73Aの先端部を挿入させて立設するとともに、壁パネルの中空部内で座金86を介してナット87を螺合することでナット付きまぐさ10、上階床部7及び上階壁部76を連結することで、ナット付きまぐさ10を上階床部7Aに取り付けた状態にする。
【0060】
上記実施の形態では、まぐさを水平支持材として説明したが、建物躯体の一部、特に建物躯体の下部躯体を構成し、水平に設置され、その上部に設けられる上部躯体、例えば、上面に載置される上階床部を支持するものであればどのようなものでもよく、例えば、梁としてもよい。
なお、上記実施の形態及び変形例では、ナット3と雄ネジ部40とは別体のものとして説明したが、ナット3と雄ネジ部40とを一体のものとして構成されていてもよい。
また、上階床部及び上階壁部等の構成も任意であり、例えば、上階壁部を壁パネルとしたが、これに限らず、角材を用いてもよい。その他、具体的な構成要素等についても適宜に変更可能であることは勿論である。
【0061】
【発明の効果】
請求項1記載の発明によれば、支持材本体に、上階床部に設けられるボルトと螺合するナットが雄ネジ部及び接着剤を介して固定されているので、上階床部の下部に取り付ける際に、前記上部躯体のボルトに前記ナットを螺合するだけで、前記上部躯体は支持材本体に固定される。これにより、上部躯体をナット付き水平支持材に取り付けて支持させる作業を容易に行うことができ、現場施工での簡略化は勿論のこと施工期間の短縮化を図ることができる。
すなわち、水平支持材を上部躯体の下部にとりつける際に、従来と異なり、水平支持材と上部躯体、つまり上階床部の下部とを接続するための金具、例えば、ガセット合板等を必要とせずに容易に固定支持させることができる。
【0062】
請求項2記載の発明によれば、請求項記載の発明と同様の効果を得ることができるとともに、前記雄ネジ部の上部に、前記ナットの下端部が螺合されたナット用雄ネジ部が設けられていることにより、ナットと雄ネジ部とは分割可能であるとともに、雄ネジ部のナット用雄ネジ部の上部には、前記ナット内に収納され、前記雄ネジ部を下穴にねじ込むためのねじ込み部が設けられているので、支持材本体にねじ込み部を介して雄ネジ部をねじ込んだ後で、ねじ込まれた雄ネジ部の上部のナット用雄ネジ部にナットの下端部を螺合することで、ナットを支持材本体に固定することができる。
つまり、ナット及び雄ネジ部を一体に形成する必要がなく、その成形にかかるコストを削減することができる。
【0063】
請求項3記載の発明によれば、請求項または記載の発明と同様の効果を得ることができるとともに、雄ネジ部の外径と下穴の内径は略同一であるので、前記雄ネジ部は、接着剤が充填された下穴に容易にねじ込むことができるとともに、充填された接着剤を介して強固に支持材本体に止着される。
したがって、ナットを前記支持材本体に強固に固定することができる。
【0064】
請求項4記載の発明によれば、請求項1〜3のいずれか一項に記載の発明と同様の効果を得ることができるとともに、上階床部に設けられるボルトに螺合されるナットが、支持材本体内に、上方から前記ボルトを挿入できるように固定されているので、支持材本体からナットが外部に露出することがない。
つまり、水平支持材を現場に搬入する際に、複数の支持材本体を積み重ねて運搬することができる。
【0065】
請求項5記載の発明によれば、請求項1〜3のいずれか一項に記載の発明と同様の効果を得ることができるとともに、支持材本体の上面からナットが突出した状態となり、上階床部の下面に取り付けられる際に、ナットの位置を容易に視認することができ、前記上階床部に設けられるボルトに簡単に螺合することができる。
【0066】
請求項6記載の発明によれば、ナット付き水平支持材に上部躯体を取り付ける際に、前記ボルトをナット付き水平支持材のナットに螺合させるだけで、前記上部躯体をナット付き水平支持材に容易に支持させることができ、上部躯体と水平支持部材とを連結して、前記上部躯体を支持させる作業を現場施工での簡略化は勿論のこと施工期間の短縮化を図ることができる。
【0067】
請求項7記載の発明によれば、ナット付き水平支持材に上部躯体を構成する上階床部及び上階壁部を支持させる際に、上階壁部の壁側連通孔及び上階床部の床側連通孔にボルトを挿通してナット付き水平支持材のナットに螺合させるだけで、前記上階壁部及び上階床部をナット付き水平支持材に連結できるので、その作業をナット付き水平支持材上に載置された上階床部上で容易に行うことができ、前記上階床部及び前記上階壁部をナット付き水平支持材に容易に支持させることができる。
【0068】
請求項8記載の発明によれば、ナット付き水平支持材に上部躯体を構成する上階壁部及び上階床部を支持させる際に、上階床部を前記水平支持材上に載置し、この上階床部上に上階壁部を立設し、前記上階壁部の壁側連通孔及び上階床部の床側連通孔にボルトを挿通してナット付き水平支持材のナットに螺合させるだけで、前記上階壁部及び上階床部をナット付き水平支持材に連結させることができるので、ナット付き水平支持材上に載置された上階床部上でその作業を容易に行うことができ、前記上階床部7及び上階壁部を前記水平支持材に容易に支持させることができる。
さらに、ナット付き水平支持材上に前記上階床部7を載置する際に、上階床部を水平支持材上面から突出するナットに、下面の切欠部を合わせて設置することができ、上階床部の設置位置の位置決めを容易に行うことができる。
【0069】
請求項9記載の発明によれば、請求項記載の発明と同様の効果を得ることができるとともに、前記床側連通孔と前記切欠部とは同一の内径であるので、上階床部に床側連通孔と切欠部を形成する作業を同一の穿孔作業で行うことができ、ナット付き水平支持材上に載置される上部躯体の上階床部の製作を容易に行うことができる。
【図面の簡単な説明】
【図1】本発明を適用した一実施の形態のナット付きまぐさの構成を示す斜視図である。
【図2】図1のナット付きまぐさの構成を示す分解斜視図である。
【図3】図1のナット付きまぐさの作成工程を示す図である。
【図4】図1のナット付きまぐさの作成工程を示す図である。
【図5】本発明を適用した一実施の形態のナット付きまぐさが上階床部に取り付けられた状態を示す概略断面図である。
【図6】図1のナット付きまぐさを上階床部に取り付ける工程を示す図である。
【図7】図1のナット付きまぐさを上階床部に取り付ける工程を示す図である。
【図8】本発明を適用した一実施の形態のナット付き水平支持材の変形例の構成を示すナット付きまぐさの要部断面図である。
【図9】図8のナット付きまぐさの構成を示す分解斜視図である。
【図10】本発明を適用した変形例としてのナット付きまぐさが上階床部に取り付けられた状態を示す概略断面図である。
【図11】図8に示す変形例としてのナット付きまぐさを上階床部に取り付ける工程を示す図である。
【図12】従来のまぐさの取付構造を示す要部分解斜視図である。
【図13】図12のまぐさの取付構造の要部断面図である。
【符号の説明】
1,10 ナット付きまぐさ(ナット付き水平支持材)
2,2A   まぐさ本体(水平支持材本体)
3   ナット
40   雄ネジ部
5   接着剤
7   上階床部(建物の上部躯体)
21,21A   まぐさ本体の上面(水平支持材本体の上面)
22   下穴
32   ナットの下端部
41   ナット用雄ネジ部
42   ねじ込み部
71,71A   上階床部の下面
73,73A   胴差ボルト(ボルト)
74,74A   床側連通孔
75   壁側連通孔
76   上階壁部(建物の上部躯体)
77   切欠部
222  下穴本体部(下穴)
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a horizontal support member with a nut attached to the lower surface of an upper floor in a house or the like, and a support structure for an upper frame of a building.
[0002]
[Background technology]
In the construction of houses, the industrialization has progressed. For example, a panel construction method in which components such as walls, floors, and roofs are panelized in advance at a factory and these panels are assembled at a construction site to construct a house. Some have been adopted.
The wall panel used in this panel construction method is to assemble the frame material into a rectangular frame shape, and attach reinforcing bars to the inside of this rectangular frame vertically and horizontally. And has a hollow portion. The floor panel is constructed by assembling a frame material into a rectangular shape, and attaching a face material made of plywood or the like to one surface of a frame formed by assembling reinforcing bars vertically and horizontally inside the rectangular frame.
[0003]
In this panel method, an upper floor wall panel is assembled, for example, as disclosed in Japanese Patent Application Laid-Open No. 10-054413.
First, an upper floor wall panel is erected on the upper floor of a lower floor wall panel via a floor (consisting of a floor panel or the like), and the lower end of the body difference bolt is attached to the lower floor wall panel. And the upper end thereof is disposed in the hollow portion of the upper-floor wall panel so as to cover the lower-floor wall panel and the upper-floor wall panel. Here, through holes through which the body difference bolts are formed are formed in advance at the upper end of the lower floor wall panel, the lower end of the upper floor wall panel, and the floor. Through the lower floor wall panel and the upper floor wall panel. Then, while extrapolating the washer to the lower end of the body difference bolt and screwing the nut, while screwing the nut after extrapolating the washer to the upper end of the body difference bolt, the lower floor wall panel and Connects to upper floor wall panels.
[0004]
By the way, in the above-described panel construction method, the upper floor wall panel is connected to the lower floor wall panel via the upper floor panel, and is supported by the lower floor wall panel. Is connected to a lintel having no hollow portion with a floor panel on the upper floor interposed therebetween to support the wall panel and the floor panel, for example, a structure as shown in FIGS. 12 and 13 is employed.
[0005]
That is, before erecting the wall panel 132 on the floor panel 131, the body difference bolt 134 is inserted into the bolt insertion hole 133 formed in the floor panel 131, and the notch formed in the frame 131 a of the floor panel 131. A nut 136 is screwed into the lower end of the body difference bolt 134 via 135. In this state, after erecting the wall panel 132 on the floor panel 131, the upper end of the body difference bolt 134 is inserted into the bolt insertion hole 137 of the wall panel 132, and the nut 138 is screwed into the upper end of the body difference bolt 134. Then, the wall panel 132 is fastened and fixed to the floor panel 131.
[0006]
Subsequently, a packing material 139 is adhered to both open surfaces of the cutout 135 of the floor panel 131 with an adhesive to repair a surface step between the frame 131a of the floor panel 131 and the magsa 140 supporting the floor panel 131. I do. In this state, the gusset plywood 141 is adhered to the surface of each packing material 139 and the magsa 140 with an adhesive, and a plurality of nails 142 are driven from above each gusset plywood 141 into the frame material 131 a of the floor panel 131 and the magsa 140. Thus, the floor panel 131 and the magsa 140 are joined and fixed, and the opening surfaces on both sides of the cutout 135 of the floor panel 131 are closed.
[0007]
[Problems to be solved by the invention]
However, as described above, the structure in which the upper frame such as the upper-floor wall panel and the upper-floor floor panel is supported in the lintel by connecting the upper-floor wall panel to the lintel with the upper-floor floor panel interposed therebetween. As described above, since the fastening between the floor panel 131 and the wall panel 132 and the fastening between the floor panel 131 and the magsa 140 are separately performed, the on-site construction is troublesome and troublesome.
[0008]
An object of the present invention is to provide a horizontal support such as a lintel that can easily fix and support an upper frame such as a floor panel provided at an upper portion, and can simplify the on-site construction and shorten the construction period. It is an object of the present invention to provide a support structure for the upper skeleton supported by the material and the horizontal support.
[0009]
[Means for Solving the Problems]
In order to solve the above problems, the invention described in claim 1 is, for example, as shown in FIG.
A horizontal support member with a nut (for example, a lintel 1 with a nut) for supporting an upper frame (for example, an upper floor wall portion 76 and an upper floor portion 7) of a building provided at an upper portion,
A support member main body (for example, a lintel main body 2), a nut 3 screwed with a bolt (for example, a body difference bolt 73) provided on the upper skeleton, and a male screw portion 40 provided below the nut 3;
The nut 3 is fixed to the support material main body 2 by filling the adhesive 5 into the prepared hole 22 provided on the upper surface 21 of the support material main body 2 and screwing the male screw portion 40 into the pilot hole. I do.
[0010]
According to the first aspect of the present invention, the nut 3 to be screwed with the bolt 73 provided on the upper skeleton is fixed to the support member main body 2 via the male screw portion 40 and the adhesive 5. At the time of attachment to the lower part, the upper body is connected and fixed to the support material main body 2 only by screwing the nut 3 into the bolt 73 of the upper body. This makes it possible to easily perform the work of attaching and supporting the upper skeleton to the horizontal support member with nuts, thereby simplifying the on-site construction and shortening the construction period. That is, when mounting the upper frame on the horizontal support 2, unlike the related art, a metal fitting for connecting the horizontal frame and the upper frame, that is, the lower portion of the upper floor, such as gusset plywood, is not required. Can be easily fixed and supported.
[0011]
Here, the horizontal support member constitutes a part of the building frame, particularly a lower frame of the building frame, and is horizontally installed, and an upper frame provided on the upper portion thereof, for example, an upper floor portion mounted on the upper surface. Any member may be used as long as it supports the member, for example, a member, especially a beam or a lintel, arranged above the opening between the walls spaced apart from each other on the lower floor portion.
Further, the nut 3 and the male screw part 40 may be configured as an integral body, or after the male screw part 40 is fixed to the support member main body 2, the lower end of the nut 3 is attached to the male screw part 40. The portion 32 may be screwed. At this time, a portion of the nut 3 above the lower end portion where the male screw portion 40 is screwed is configured so that the bolt 73 provided on the upper floor 7 can be securely screwed. In other words, the bolt 73 has a screw depth enough to be securely screwed.
[0012]
According to a second aspect of the present invention, in the horizontal support member with a nut according to the first aspect, for example, as shown in FIG.
On the upper part of the male screw part 40, a nut male screw part 41 to which the lower end part 32 of the nut 3 is screwed is provided,
A screwing portion 42 for receiving the male screw portion 40 into the pilot hole 22 is provided above the male screw portion 41 for the nut.
[0013]
According to the invention described in claim 2, the nut 3 and the male screw are provided on the upper portion of the male screw 40 by providing the male screw 41 for the nut into which the lower end 32 of the nut 3 is screwed. In addition to being dividable from the portion 40, a screwing portion 42 for screwing the male screw portion 40 into the pilot hole 22 is housed in the nut 3 above the male screw portion 41 for the nut of the male screw portion 40. Since the male screw part 40 is screwed into the support member main body 2 via the screwed part, the lower end part 32 of the nut 3 is attached to the male screw part 41 for the nut on the screwed male screw part 40. By screwing, the nut 3 can be fixed to the support member main body 2.
That is, it is not necessary to integrally form the nut 3 and the male screw portion 40, and the cost for molding the nut 3 can be reduced.
[0014]
According to a third aspect of the present invention, in the horizontal support member with a nut according to the first or second aspect, for example, as shown in FIG.
The outer diameter of the male screw portion 40 and the inner diameter of the pilot hole 22 are substantially the same.
[0015]
According to the third aspect of the present invention, since the outer diameter of the male screw portion 40 and the inner diameter of the pilot hole 22 are substantially the same, the male screw portion 40 can be easily inserted into the pilot hole 22 filled with the adhesive 5. It can be screwed in and is firmly fixed to the support material body 2 via the filled adhesive 5.
Therefore, the nut 3 can be firmly fixed to the support member main body 2.
[0016]
According to a fourth aspect of the present invention, in the horizontal support member 10 with a nut according to any one of the first to third aspects, for example, as shown in FIG.
The nut 3 is fixed inside the support body 2A so that the bolt 73 can be inserted from above.
[0017]
According to the fourth aspect of the present invention, the nut 3 screwed to the bolt 73 provided on the upper floor 7 is fixed in the support member main body 2A so that the bolt 73 can be inserted from above. Therefore, the nut 3 is not exposed to the outside from the support material main body 2A. That is, when carrying the horizontal support member to the site, the plurality of support member main bodies 2 can be stacked and transported.
[0018]
According to a fifth aspect of the present invention, in the horizontal support member with a nut according to any one of the first to third aspects, for example, as shown in FIG.
The nut 3 is mounted on the upper surface 21 of the support body 2.
[0019]
According to the invention as set forth in claim 5, the nut 3 projects from the upper surface 21 of the support material main body 2, and when the upper frame is provided on the upper portion and connected thereto, the position of the nut 3 can be easily visually recognized. The bolts 73 provided on the floor 7 can be easily screwed.
[0020]
The invention according to claim 6 provides a support structure for an upper skeleton of a building provided on the horizontal support member with nuts according to any one of claims 1 to 3, for example, as shown in FIG.
The upper frame (for example, the upper floor wall portion 76 and the upper floor portion 7) is provided with a bolt 73 to be screwed to the nut 3 of the horizontal support member with the nut (for example, the lintel 10 with the nut).
The upper frames 76 and 7 are supported by the nut-supported horizontal support 10 by screwing the bolts 73 to the nuts 3 of the nut-supported horizontal support 10.
[0021]
According to the invention as set forth in claim 6, the upper frame provided on the horizontal support member with the nut is screwed with the nut provided on the upper frame with the nut of the horizontal support member with the nut, so that the horizontal support with the nut is provided. When the upper frames 7, 76 are mounted on the horizontal support 10 with nuts, the bolts are screwed into the nuts 3 of the horizontal support 10 with nuts. Can be easily connected to and supported by the horizontal support member 10 with a nut. Accordingly, the work of connecting the upper skeleton and the horizontal support member to support the upper skeleton can be simplified not only in the on-site construction but also in the shortening of the construction period.
[0022]
The invention according to claim 7 is, for example, as shown in FIG.
An upper floor part 7 having a floor-side communication hole 74 communicating with the nut 3 of the nut-supported horizontal support is placed on the nut-supported horizontal support 10 according to claim 4,
On the upper floor 7, an upper floor wall 76, which forms an upper frame of the building together with the upper floor and has a wall-side communication hole 75 communicating with the floor-side communication hole 74, is provided upright. ,
A bolt 73 whose upper end is locked in the upper floor wall portion 76 is inserted into the wall side communication hole 75 and the floor side communication hole 74 to protrude downward from the lower surface 71 of the upper floor portion 7, and the nut The upper floor 7 and the upper wall 76 are connected to the horizontal supporting member 10 by being screwed into the nut 3 of the horizontal supporting member 10.
[0023]
According to the invention described in claim 7, the floor-side communication hole 74 is formed on the nut-supported horizontal support member fixed inside the support member main body 2A so that the nut 3 can insert the bolt 73 from above. The floor portion 7 is placed, and an upper floor wall portion 76 having a wall-side communication hole 75 communicating with the floor-side communication hole 74 is erected on the upper floor portion 7. A bolt 73 that is locked in the floor wall and inserted through the wall-side communication hole 75 and the floor-side communication hole 74 and protrudes downward from the lower surface of the upper floor 7 is screwed into the nut 3. Since the horizontal support member 10 with the nut is connected to the upper floor 7 and the upper wall portion 76, the upper floor portion 7 and the upper wall portion 76 constituting the upper frame are connected to the horizontal support member 10 with the nut. When it is provided and supported, the wall-side communication hole 75 of the upper-floor wall portion 76 and the floor-side Only the hole 74 by inserting bolts 73 screwed into the nut 3 of the nut with the horizontal support member 10, the on Kaikabe portion 76 and the upper floor portion 7 can be coupled to the nut with a horizontal support 10.
[0024]
Therefore, the upper floor 7 and the upper floor wall 76 can be easily attached to the horizontal support 10 with nuts on the upper floor 7 placed on the horizontal support 10 with nuts. it can. That is, unlike the conventional case, when attaching the lintel to be the horizontal support to the upper floor, there is no need for a metal fitting for connecting the horizontal support and the upper floor 7, for example, gusset plywood or the like, Further, a bolt 73 and a nut 3 for connecting the upper floor 7 and the upper wall 76 erected on the upper floor 7 with the bolt 73 below the upper floor 7. There is no need to perform work, and the upper floor 7 and the upper wall 76 can be easily connected to the horizontal support member 10 on the upper floor 7, so that the upper floor can be connected to the upper wall. It can be easily supported by the horizontal support member 10 with the nut together with the portion.
[0025]
The invention according to claim 8 is, for example, as shown in FIG. 5, a notch 77 in which the nut 3 is inserted into the lower surface 71 and a floor communicating with the notch 77 on the nut-supported horizontal support 1 according to claim 5. The upper floor 7 in which the side communication hole 74 is formed receives the nut 3 in the notch 77 and is placed in a state where the nut 3 and the floor communication hole 74 communicate with each other.
An upper floor wall 76 is formed on the upper floor 7 so as to form an upper frame of the building together with the upper floor 7 and has a wall-side communication hole 75 communicating with the floor-side communication hole 74. Established
A bolt 73 whose upper end is locked in the upper floor wall portion 76 is inserted into the wall-side communication hole 75 and the floor-side communication hole 74, and the lower end of the bolt 73 is connected to the nut of the nut-supported horizontal support member. 3, the upper floor 7 and the upper wall 76 are connected to the horizontal support 1 with nuts.
[0026]
According to the eighth aspect of the present invention, the notch 77 into which the nut 3 is inserted and the notch 77 are provided on the nut-supported horizontal support 1 on which the nut 3 is mounted on the upper surface 21 of the support main body 2. An upper floor part 7 having a floor side communication hole 74 communicating therewith is placed with the nut 3 housed in the notch 77, and the floor side communication hole 74 is placed on the upper floor part 7. An upper floor wall portion 76 having a wall side communication hole 75 communicating therewith is erected, and an upper end is locked in the upper floor wall portion and inserted into the wall side communication hole 75 and the floor side communication hole 74. The bolt 73 is screwed onto the nut 3 to connect the horizontal support 1 with nuts to the upper floor 7 and the upper wall 76, so that the upper frame is placed on the horizontal support 1 with nut. When the upper floor wall and the upper floor 7 to be configured are provided and supported, the upper floor is It is placed on the holding material 1, and an upper floor wall 76 is erected on the upper floor, and a wall-side communication hole 75 of the upper floor wall 76 and a floor-side communication hole 74 of the upper floor 7. The upper floor wall portion 76 and the upper floor portion 7 can be connected to the horizontal support member 1 with nuts only by inserting the bolts 73 into the nuts and screwing the nuts to the nut 3 of the horizontal support member with nuts.
[0027]
Therefore, the upper floor 7 and the upper wall 76 can be easily attached to the horizontal support 1 with nuts on the upper floor 7 placed on the horizontal support 1 with nuts. it can. That is, unlike the related art, when the upper floor 7 is attached to a lintel that is a horizontal support, metal fittings for connecting the horizontal support and the upper floor, such as gusset plywood, are not required. Further, the bolts 73 and the nuts 3 for connecting the upper floor 7 and the upper wall 76 erected on the upper floor 7 with bolts 73 are connected to the lower part of the upper floor 7. The upper floor 7 and the upper wall can be easily connected to the horizontal support material on the upper floor 7 by easily connecting the upper floor 7 and the upper wall 76 to the horizontal floor. It can be easily supported by the horizontal support 1.
Further, when placing the upper floor unit 7 on the horizontal support member with nuts, the upper floor unit 7 is installed by aligning the notch 77 of the lower surface 71 with the nut 3 projecting from the upper surface of the horizontal support member. Therefore, the position of the upper floor 7 can be easily determined.
[0028]
According to a ninth aspect of the present invention, in the mounting structure for a horizontal support member with a nut according to the eighth aspect, for example, as shown in the drawing,
The floor side communication hole 74 and the notch have the same inner diameter.
[0029]
According to the ninth aspect of the present invention, since the floor-side communication hole 74 and the notch 77 have the same inner diameter, the work of forming the floor-side communication hole 74 and the notch 77 in the upper floor 7 is performed. The same drilling operation can be performed, and the upper floor 7 of the upper frame placed on the horizontal support 1 with nuts can be easily manufactured.
[0030]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
First, the configuration will be described.
The lintel with nuts (horizontal support member) 1 shown in FIG. 1 supports an upper floor 7 provided at an upper portion (see FIG. 5), and includes a lintel main body 2 and an upper surface 21 of the lintel main body 2. And a male screw part 40 provided at the lower part of the nut 3 and fixing the nut 3 to the lintel body 2; The nut 3 is fixed to the lintel main body 2 by filling the adhesive 5 into a prepared hole 22 provided in the upper surface 21 of the lintel main body 40 and screwing the male screw portion 40.
[0031]
The lintel main body 2 is a rectangular parallelepiped timber, and is erected between the upper portions of the lower skeleton in the building, here, between the upper ends of the walls arranged apart from each other on the lower floor. The openings are formed in the openings. In the present embodiment, it is assumed that the upper panel 21 is attached to the lower surfaces 71 of the floor panels 7a and 7b constituting the upper floor 7 with the upper surface 21 abutting thereon.
[0032]
In this embodiment, the male screw portion 40 is formed by a shaft portion of a coach bolt, and a male screw portion 41 for a nut into which a lower end portion of the nut 3 is screwed is provided on an upper portion thereof. A screwing portion 42 for screwing the male screw portion 40 into the lintel main body 2 is provided above the male screw portion 41 for the nut, and the male screw portion 40, the male screw portion 41 for the nut, and the screwing portion 42 are provided. The portions 42 are all integrally formed as the shaft members 4 having the same axis. Further, a groove portion 44 is formed on the outer periphery of the male screw portion 40 along the axial direction from the base end to the tip end. The groove portion 44 is for guiding the excess adhesive 5 in the pilot hole 22 upward when the male screw portion 40 is screwed into the pilot hole 22 filled with the adhesive 5.
[0033]
The external diameter of the threaded portion 42 is smaller than the external diameter of the male screw portion 41 for the nut, and is housed in the nut 3. Further, in the present embodiment, the screwed portion 42 is formed of a hexagonal column-shaped member, and is fitted inside a connecting portion of a tool such as an eyeglass wrench. The screwed portion 42 is formed in a hexagonal column shape, but is not limited thereto. The screwed portion 42 is formed of a cylindrical member having a square hole, and a tool such as a wrench, a screwdriver, or a spanner is fitted into the square hole, and the screw is inserted through the tool. The male screw portion 40 may be screwed.
The male screw part 40 configured as described above is screwed into the prepared hole 22 filled with the adhesive 5. In the present embodiment, the outer diameter of the male screw portion 40 and the inner diameter of the pilot hole 22 are substantially the same.
[0034]
The nut 3 is screwed at its lower end to the male screw 41 for the nut provided on the male screw 40 so that the bolt 73 can be screwed upward, that is, the bolt 73 is securely screwed. It has a screw hole depth capable of being fixed to the male screw part 40. And it is in the state attached to the upper surface 21 of the lintel main body 2 via the male screw portion 40. Here, the nut 3 and the shaft member 4 may be configured as an integral member such that the male screw portion 40 is provided below the nut 3. If the nut 3 and the shaft member are integrated, the work of attaching to the lintel main body 2 can be easily performed.
[0035]
3 and 4 show a method of manufacturing the lintel 1 with a nut.
As shown in FIG. 3A, first, a pilot hole 22 having a predetermined inner diameter is drilled on the upper surface 21 of the lintel main body 2 by a drilling machine 81. The inner diameter at this time is a length corresponding to the outer diameter of the male screw portion 40 to be screwed later, and in the present embodiment, the inner diameter and the entire length are substantially the same as the outer diameter and the entire length of the male screw portion 40. A pilot hole 22 is formed.
Since the outer diameter of the male screw portion 40 and the inner diameter of the pilot hole 22 are substantially the same, the male screw portion 40 can be easily screwed into the pilot hole 22 filled with the adhesive 5 and filled. The nut 3 is firmly fixed to the lintel main body 2 via the applied adhesive 5 so that the nut 3 can be firmly fixed to the lintel main body 2.
[0036]
Then, as shown in FIG. 3 (b), the adhesive 5 is injected and filled into the prepared hole 22 formed in the lintel main body 2 by the adhesive container 82.
Next, the screwed portion 42 and a screwing tool, for example, a tool such as a wrench, a spanner, a screwdriver or the like are connected to the prepared hole 22 filled with the adhesive 5, and the male screw portion 40 is rotated about its axis. To make the male screw portion 41 for the nut project from the upper surface 21 of the lintel main body 2.
Then, after screwing the male screw portion 40 to a predetermined depth, the tool is removed from the screw portion 42, and as shown in FIG. 4, a male screw for nut on the upper portion of the male screw portion 40 fixed to the lintel body 2. The lower leg of the nut 3 is screwed into the portion 41 to form the lintel 1 with the nut.
[0037]
Next, a description will be given of a structure in which an upper floor, which is an upper frame of a building, and an upper floor wall, which is erected on the upper floor, are attached and supported on the lintel 1 with nuts. Note that the lintel 1 with nuts may be used for a house constructed in any manner, but in this embodiment, it is applied to a house constructed by a panel method, The description will be made assuming that the floor wall portion is constituted by floor panels 7a and 7b and a wall panel, respectively.
[0038]
In the attachment structure of the lintel 1 with nut shown in FIG. 5, a notch 77 into which the nut 3 is inserted on the lower surface 71 and a floor side communication hole 74 communicating with the notch 77 are formed on the lintel 1 with nut. The upper floor 7 is placed with the nut 3 accommodated in the notch 77 and the nut 3 and the floor-side communication hole 74 communicating with each other.
The upper floor portion 7 is configured by arranging floor panels 7a and 7b. The floor side communication hole 74 has an inner diameter through which the body insertion bolt 73 is inserted, and the cutout portion 77 accommodates the nut 3 therein. It has an inside diameter that is Here, the cut-out portion 77 and the floor-side communication hole 74 penetrating up and down the upper floor 7 have the same inner diameter, and are formed by drilling the same hole. Further, an upper floor wall 76 having a wall-side communication hole 75 communicating with the floor-side communication hole 74 is provided on the upper floor 7.
[0039]
The upper floor wall portion 76 is formed of a wall panel and has a hollow portion therein, and a wall-side communication hole 75 that vertically communicates with a lower frame material forming a rectangular frame that is a main body of the wall panel is formed. . The wall-side communication hole 75 has substantially the same inner diameter as the inner diameter of the floor-side communication hole 74, and the shaft of the body difference bolt 73 is inserted therethrough.
Then, by inserting the body difference bolt 73 into the wall-side communication hole 75 and the floor-side communication hole 74 and screwing the nut 3 into the nut 3 of the lintel 1 with the nut, the lintel with the nut becomes the upper floor 7 and the upper floor. It is connected to the wall 76. In other words, the upper end of the body difference bolt 73 is fastened by the nut 87 via the washer 86 inside the upper floor wall 76 and is engaged with the upper surface of the lower horizontal frame member 761 of the wall panel constituting the upper floor wall 76. It has been stopped.
The lintel 1 with nuts is attached to the upper floor 7 via the body difference bolt 73 and the upper floor 7.
[0040]
Next, a method of providing and supporting the upper floor 7 and the upper wall 76 constituting the upper frame on the lintel 1 with nuts will be described.
First, at a factory or the like, a lintel 1 with a nut is created, carried into a construction site, and then installed at a predetermined location as shown in FIG. In FIG. 6A, a lintel support 93 is attached to the upper end of the lower-floor wall portion 9 formed by joining the wall panels 91 via a flat reinforcing member 92, and a nut is attached to the lintel support 93. One end of the attached lintel 1 is fitted, and the lintel main body 2 is arranged so as to be orthogonal to the lower floor wall 9 and the upper surface 21 is substantially flush with the upper surface 94 of the lower floor wall 9. .
An opening 95 is formed in the lower part of the lintel 1 with the nut fitted in the lintel fitting 93 of the lower floor wall 9 in this manner.
[0041]
Although not shown, the other end of the lintel 1 with nuts is fixed by being joined to an upper portion of a side end surface of a wall panel constituting an inner wall of a lower floor constituting a lower frame of the building. It is in a state of being supported by the lower-floor wall portion 9 and the inner wall of the lower floor via the receiving fitting 93 and the like.
In the lintel 1 with a nut installed at a predetermined position as described above, the nut 3 projects upward from the upper surface 21 of the lintel main body 2. The floor panel 7a constituting the upper floor 7 suspended via the fixture 85 is installed (see FIG. 6B). The lifting jig 85 is attached to the tip of a wire such as a crane and can be lifted freely. The upper floor 7 placed on the lintel 1 with nuts is composed of a plurality of floor panels 7a and 7b whose end faces are aligned with each other. An extending groove is formed, and the floor side communication holes 74 and the cutout portions 77 are formed by aligning the end faces of the floor panels 7a and 7b.
[0042]
When the floor panel 7a constituting the upper floor 7 is installed on the lintel 1 with nuts, the nut 3 is attached to the upper surface 21 of the lintel main body 2 in a protruding state. The floor panel 7a can be placed in such a manner that the groove serving as the cutout portion 77 of the floor panel 7a is aligned with the groove. That is, when the nut 3 is attached to the lower surface 71 of the upper floor 7, the position of the nut 3 can be easily visually recognized and screwed to the bolt 73 provided on the upper floor 7, so that the nut 3 can be attached to the floor panel. The floor panel 7a can be placed at an accurate installation location using the positioning of the floor panel 7a.
Then, as shown in FIG. 7, by screwing the shaft portion of the body difference bolt 73 to the nut 3 from above, the upper end portion of the body difference bolt 73 is projected upward from the upper surface of the floor panel 7a, and is already mounted. The floor panel 7b is placed so as to be arranged on the placed floor panel 7a.
[0043]
At this time, the floor panel 7b to be mounted can be mounted by aligning the groove on the end face with the tip of the body difference bolt 73, and the mounting operation is easy.
After the floor panels 7a and 7b are placed side by side on the lintel 1 with the nuts as described above, the wall panel serving as the upper floor wall portion 76 is joined to the joint between the floor panels 7a and 7b, and the wall side communication hole is inserted into the wall-side communication hole. The tip of the bolt 73 is inserted and erected, and a nut 87 is screwed into the hollow portion of the wall panel through a washer 86 to thereby provide a nut-shaped lintel 1, the upper floor 7 and the upper wall 76. To connect the upper floor wall 76 and the lintel 1 with a nut, and attach the upper frame of the building composed of the upper floor wall 76 and the upper floor 7 to the lintel 1 with the nut and support it. State.
[0044]
In addition, the nut 3 and the lower end 32 of the nut 3 are provided on the upper part of the male screw 40, so that the nut 3 and the male screw 40 can be divided. Above the male screw part 41 for the nut of the male screw part 40, a screw-in part 42 for accommodating the male screw part 40 into the pilot hole 22 is housed in the nut 3 and has a smaller outer diameter than the male screw part 41 for the nut. Since the male screw portion 40 is screwed into the lintel body 2 via the screw portion, the lower end portion 32 of the nut 3 is attached to the male screw portion 41 for the nut on the screwed male screw portion 40. By screwing, the nut 3 can be fixed to the lintel main body 2.
That is, it is not necessary to integrally form the nut 3 and the male screw portion 40, and the cost for molding the nut 3 can be reduced.
[0045]
When the upper frame composed of the upper floor 7 and the upper wall 76 is attached to the lintel 1 with nuts, the nut 3 is attached to the upper surface 21 of the lintel main body 2. A state in which the nut 3 is accommodated in the notch 77 on the lintel 1 in which a notch 77 into which the nut 3 is inserted and a floor-side communication hole 74 communicating with the notch 77 are formed. An upper floor wall portion 76 having a wall-side communication hole 75 communicating with the floor-side communication hole 74 is erected on the upper floor portion 7, and the wall-side communication hole 75 and the floor-side communication A bolt 73 is inserted into the hole 74 and the upper end is screwed into the horizontal frame member 761 of the wall panel by a nut 87 screwed into the upper floor wall portion 76. Since the upper floor 1 is connected to the upper floor 7 and the upper wall 76, the lintel 1 When attaching to the upper floor 7, bolts 73 are inserted into the wall-side communication hole 75 of the upper floor wall 76 and the floor-side communication hole 74 of the upper floor 7, and screwed into the nut 3 of the lintel with a nut. By simply doing so, the upper floor wall 76 and the upper floor 7 can be connected to the lintel 1 with nuts.
[0046]
Therefore, it is possible to easily perform the connection work between the upper skeleton including the upper wall portion 76 and the upper floor portion 7 and the lintel with the nut on the upper floor 7 placed on the lintel 1 with the nut, Unlike the related art, when the upper floor 7 is attached to the lintel, a metal fitting for connecting the lintel to the upper floor 7 such as a gusset plywood is not required. There is no need to perform the work of fastening the bolts 73 and the nuts 3 for connecting the upper floor wall 76 erected on the upper floor 7 with the bolts 73 below the upper floor 7, and By easily connecting the upper floor 7 and the upper wall 76 to the lintel 1 on the floor 7, the lintel 1 can be easily supported by the attached lintel.
[0047]
Specifically, the floor panel and the wall panel can be simultaneously tightened and fixed, and the floor panel and the magsa can be joined at the same time, simplifying on-site construction, shortening the construction period, and assembling strength. Can be improved. Furthermore, even when an exterior material is attached to the lintel, the gusset plywood is not used for joining the lintel to the floor panel, so that the exterior material can be easily attached without the gusset plywood becoming an obstacle.
[0048]
In the lintel 1 with a nut in the above embodiment, the nut 3 is fixed to the upper surface 21 of the lintel main body 2 so as to protrude upward. However, the present invention is not limited to this. May be provided. This example will be described as a modification.
[0049]
[Modification]
The lintel with nut 10 shown in FIGS. 8 and 9 is provided with an upper frame at the top, and differs only in the configuration of the lintel body, and the other configuration is substantially the same as the lintel 1 with nut. Therefore, the same components are denoted by the same reference numerals, and description thereof is omitted.
The lintel 10 with a nut includes a lintel main body 2A, a nut 3 screwed with a bolt 73, and a male screw portion 40 provided below the nut 3 and fixing the nut 3 to the lintel main body 2, The nut 3 is fixed to the lintel main body 2 by filling the adhesive 5 into a prepared hole 22A drilled vertically downward from the upper surface 21 of the lintel main body 2A and screwing the same.
[0050]
The lintel main body 2A is a rectangular parallelepiped timber, and is installed above an opening in a building, in this case, between upper ends of spaced-apart walls, which are skeletons on the lower floor of the building. .
In this modification, as shown in FIG. 10, the lintel 10 with nuts is provided with an upper floor 7A and an upper wall 76A which constitute an upper frame of the building, and the upper surface 21A has an upper surface 21A. The upper frame is supported in a state of being in contact with the lower surface 71A of the floor panel constituting the floor 7A.
A prepared hole 22A drilled in the lintel body 2A is formed on the upper surface of the lintel body 2A, and has a dug portion 221 having an outer diameter of the nut 3 and a depth corresponding to the length of the nut 3; It has a pilot hole main body part 222 which is arranged below the dug part 221 and communicates with the dug part 221 and into which the male screw part 40 is screwed.
[0051]
The digging portion 221 and the pilot hole main body portion 222 have a coaxial center, and the male screw portion 40 is screwed into the pilot hole main body portion 222, so that the nut 3 passes through the male screw portion 40 and the upper end surface thereof. The lintel main body 2A is fixed to the lintel main body 2A in a state of being stored in the dug portion 221 lower than the upper surface 21A. As a result, the nut 3 is fixed inside the lintel main body 2A so that the bolt 73 can be inserted from above.
Note that the inner diameter of the pilot hole main body 222 and the outer diameter of the male screw part 40 are substantially the same.
[0052]
The above-described method of manufacturing the lintel 10 with a nut includes a pit portion 22 in which the nut 3 is housed and a pilot hole main portion 222 for the male screw portion 40 when first drilling the pilot hole 22A in the lintel body 2A. 221 is perforated. Subsequent steps are the same as the above-described manufacturing steps of the lintel 1 with a nut, that is, the adhesive 5 is filled in the prepared main body part 222 formed in the lintel main body 2A, and the adhesive is filled. The male screw part 40 is screwed into the pilot hole main body part 222 until the male screw part 41 for nut provided on the upper part thereof is arranged in the lower part in the digging part 221. Then, the lower end portion of the nut 3 is screwed into the male screw portion 41 for the nut in the dug portion 221 so that the upper end of the nut 3 is at a position where the height is lower than the upper surface 21A of the lintel body 2A. By fixing the nut 3 to the male screw portion 40, the lintel 10 with the nut is manufactured.
[0053]
A structure in which an upper frame of a building having an upper floor and an upper wall is mounted and supported on the nut lintel 10 thus manufactured will be described with reference to FIG. Note that the lintel 10 with nuts may be used for a house constructed in any manner. However, like the lintel 1 with nuts described above, it shall be applied to a house constructed by a panel method. In the following, a description will be given as to a structure in which the lintel 10 with nuts is used instead of the lintels 1 with nuts in the mounting structure of the upper frame composed of the upper floor panel, the upper floor wall panel, and the like using the lintels 1 with nuts described above.
[0054]
In the supporting structure of the upper skeleton supported by the lintel 10 with a nut shown in FIG. 10, an upper floor having a floor-side communication hole 74A communicating with the nut 3 of the lintel with a nut is formed on the lintel 10 with a nut. The upper floor portion 76 is provided with a wall-side communication hole 75 communicating with the floor-side communication hole 74A.
Then, the body difference bolt 73A is inserted into the wall-side communication hole 75 and the floor-side communication hole 74A, protrudes downward from the lower surface 71 of the upper-floor floor portion 7, and screwed into the nut 3 of the nut-attached lintel 10. The lintel 10 with nut is connected to the upper floor 7 and the upper wall 76. The floor side communication hole 74 formed in the upper floor 7 has an inner diameter through which the body insertion bolt 73 is inserted.
[0055]
The body difference bolt 73A has a shaft portion longer than that of the body difference bolt 73 described above, and the upper end thereof is fastened by a nut 87 via a washer 86 inside the upper floor wall part 76 to form a wall constituting the upper floor wall part. It is in a state of being locked to the lower horizontal frame member 761 of the panel.
The lower end of the body difference bolt 73A projects downward from the lower surface 71 of the floor 7 and is screwed into the nut 3 in the digging part 221 of the lintel 10 with a nut. The floor 7 and the lintel 10 with nuts are fastened. Thus, the upper floor 7 and the upper wall 76 are supported by the lintel 10 with nuts.
[0056]
According to the lintel with nut 10 of the above-described modification, when the upper floor 7 and the upper wall 76 are attached to the lintel 10 with nut, the wall-side communication hole 75 and the upper floor of the upper floor 76 are attached. By simply inserting a bolt 73 screwed into a nut 87 in the upper floor wall into the floor side communication hole 74 of the part 7 and screwing the bolt 73 to the nut 3 of the lintel 10 with a nut, the upper floor wall 76 And the upper floor 7 can be connected to the lintel 10 with a nut, and the upper floor 7 and the upper wall 76 are laid on the upper floor 7 placed on the lintel 10 with the nut. The operation of attaching and supporting the lintel with a nut 10 can be easily performed. That is, unlike the related art, when the upper floor 7 is attached to the lintel, a metal fitting for joining the lintel to the upper floor 7 such as a gusset plywood is not required. Below the upper floor 7, the bolts 73 and the nuts 3 for connecting the upper floor 7 and the upper wall 76 standing on the upper floor 7 with bolts 73 are used for the upper floor. The upper floor 7 and the upper floor can be easily connected to the lintel 10 with nuts on the upper floor 7 without having to perform the operation below the upper floor. The wall portion 76 can be easily attached to and supported by the lintel 10 with the nut.
[0057]
In addition, the method of installing the lintel 10 with nuts and the method of mounting and supporting the upper floor 7 and the upper wall 76 on the lintel are as follows. Is prepared and carried into a construction site, and then installed at a predetermined location as shown in FIG. At this time, since the nuts 3 are housed in the lintel main body 2A, the lintels 10 with nuts can be stacked and carried. That is, since there is no change in the outer shape from that of the ordinary lintel, it is possible to carry out the transport operation easily without worrying about the nut attached to the lintel main body 2A.
In FIG. 11A, a lintel support 93 is attached to the upper end of the lower floor wall 9 formed by joining the wall panels 91 via a flat reinforcing member 92, and a nut is attached to the lintel support 93. One end of the attached lintel 1 is fitted, and the lintel main body 2A is arranged so as to be orthogonal to the lower floor wall 9 and the upper surface 21 is substantially flush with the upper surface 94 of the lower floor wall 9. . An opening 95 is formed in the lower part of the lintel 10 with the nut fitted in the lintel fitting 93 of the lower-floor wall 9 in this way.
[0058]
Although not shown, the other end of the lintel 1 with the nut is fixed by being joined to an upper portion of a side end surface of a wall panel constituting an inner wall of the lower floor, and the like, and is fixed through the lintel receiving bracket 93 and the like. In addition to being supported by the lower floor wall 9 and the lower floor inner wall, the lower floor wall 9 and the lower floor inner wall constitute a lower frame of the building.
Then, on the upper surface of the lintel 10 with the nuts, a floor panel constituting the upper floor unit 7 suspended via the suspension jig 85 is installed (see FIG. 11B). The upper floor 7A to be placed on the lintel 10 with nuts is composed of a plurality of floor panels whose end faces are joined together in the same manner as described above. Extending grooves are formed, and the floor-side communication holes 74A are formed by aligning the floor panel end faces.
[0059]
Then, by screwing the shaft of the body difference bolt 73A (see FIG. 10) to the nut 3 from above, the upper end of the body difference bolt 73A protrudes upward from the upper surface of the floor panel and is already placed. Place the floor panels so that they line up with the floor panels.
At this time, the floor panel to be placed can be placed by aligning the groove of the end face with the tip of the body difference bolt 73A, and the placing operation is easy.
After the floor panels are placed side by side on the lintel 1 with the nuts as described above, the wall panel serving as the upper floor wall portion 76 is provided at the joint between the floor panels, and the tip end of the body difference bolt 73A is provided at the wall side communication hole. By inserting and standing, and connecting nut lintel 10, upper floor 7 and upper wall 76 by screwing nut 87 through washer 86 in the hollow part of the wall panel, The lintel with a nut 10 is attached to the upper floor 7A.
[0060]
In the above embodiment, the lintel was described as a horizontal support member, but a part of the building skeleton, in particular, constitutes a lower skeleton of the building skeleton, is horizontally installed, and an upper skeleton provided on the upper part thereof, for example, on the upper surface. Any material may be used as long as it supports the upper floor to be placed, for example, a beam.
In the above-described embodiment and the modification, the nut 3 and the male screw portion 40 are described as being separate from each other. However, the nut 3 and the male screw portion 40 may be integrally formed.
The configuration of the upper floor, the upper floor wall, etc. is also arbitrary. For example, the upper floor wall is a wall panel, but the present invention is not limited to this, and a square bar may be used. In addition, it goes without saying that specific components and the like can be appropriately changed.
[0061]
【The invention's effect】
According to the first aspect of the present invention, since the nut to be screwed to the bolt provided on the upper floor is fixed to the support member via the male screw and the adhesive, the lower part of the upper floor is provided. At the time of mounting on the upper body, the upper body is fixed to the supporting member main body only by screwing the nut to the bolt of the upper body. This makes it possible to easily perform the work of attaching and supporting the upper skeleton to the horizontal support member with nuts, thereby simplifying the on-site construction and shortening the construction period.
That is, when attaching the horizontal support to the lower part of the upper skeleton, unlike the related art, a metal fitting for connecting the horizontal support and the upper skeleton, that is, the lower part of the upper floor, does not require a gusset plywood or the like. Can be easily fixed and supported.
[0062]
According to the second aspect of the present invention, the same effects as those of the first aspect can be obtained, and a male screw part for a nut in which a lower end part of the nut is screwed is provided above the male screw part. By being provided, the nut and the male screw portion can be divided, and the upper portion of the nut screw portion of the male screw portion is housed in the nut, and the male screw portion is screwed into the pilot hole. After the male screw is screwed into the support material body via the screw, the lower end of the nut is screwed into the male screw for the nut above the screwed male screw. By joining, the nut can be fixed to the support material main body.
That is, it is not necessary to integrally form the nut and the male screw portion, and the cost for molding the nut and the male screw portion can be reduced.
[0063]
According to the third aspect of the present invention, the same effects as those of the first aspect can be obtained, and the outer diameter of the male screw portion and the inner diameter of the pilot hole are substantially the same. It can be easily screwed into the prepared hole filled with the adhesive, and is firmly fixed to the support material body via the filled adhesive.
Therefore, the nut can be firmly fixed to the support member main body.
[0064]
According to the invention as set forth in claim 4, the same effect as the invention as set forth in any one of claims 1 to 3 can be obtained, and the nut screwed to the bolt provided on the upper floor is provided. Since the bolt is fixed in the support body so that the bolt can be inserted from above, the nut is not exposed to the outside from the support body.
That is, when the horizontal support member is carried into the site, a plurality of support member bodies can be stacked and transported.
[0065]
According to the fifth aspect of the invention, the same effects as those of the first to third aspects of the invention can be obtained, and the nut projects from the upper surface of the support member main body. When the nut is attached to the lower surface of the floor, the position of the nut can be easily visually recognized, and the nut can be easily screwed into a bolt provided on the upper floor.
[0066]
According to the invention as set forth in claim 6, when the upper frame is attached to the horizontal support with nuts, the upper frame is attached to the horizontal support with nuts only by screwing the bolts to the nuts of the horizontal support with nuts. The work can be easily supported, and the work of connecting the upper skeleton and the horizontal support member to support the upper skeleton can be simplified in the on-site construction as well as the construction period can be shortened.
[0067]
According to the invention of claim 7, when the upper floor and the upper wall constituting the upper frame are supported by the horizontal support member with the nut, the wall-side communication hole of the upper floor and the upper floor are formed. The upper floor wall and the upper floor can be connected to the horizontal support member with nuts only by inserting bolts into the floor side communication holes and screwing the nuts to the nuts of the horizontal support member with nuts. It can be easily carried out on the upper floor part mounted on the horizontal support member with the nut, and the upper floor part and the upper floor wall can be easily supported by the horizontal support member with nuts.
[0068]
According to the invention described in claim 8, when the upper floor wall and the upper floor constituting the upper frame are supported by the horizontal support with nuts, the upper floor is placed on the horizontal support. An upper-floor wall is erected on the upper-floor floor, and bolts are inserted into the wall-side communication holes of the upper-floor wall and the floor-side communication holes of the upper-floor floor, and nuts of the nut-supported horizontal support member are provided. The upper floor wall and the upper floor can be connected to the nut-supported horizontal support simply by screwing the upper floor with the nut, so that the work can be performed on the upper floor placed on the nut-supported horizontal support. Can be easily performed, and the upper floor 7 and the upper wall can be easily supported by the horizontal support member.
Further, when placing the upper floor unit 7 on the horizontal support member with nuts, the upper floor unit can be installed by aligning the notch on the lower surface with the nut protruding from the upper surface of the horizontal support member, Positioning of the installation position of the upper floor can be easily performed.
[0069]
According to the ninth aspect of the present invention, the same effect as that of the first aspect can be obtained, and the floor side communication hole and the cutout have the same inner diameter. The operation of forming the side communication hole and the cutout portion can be performed by the same drilling operation, and the upper floor portion of the upper frame placed on the horizontal support member with the nut can be easily manufactured.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a configuration of a lintel with a nut according to an embodiment to which the present invention is applied.
FIG. 2 is an exploded perspective view showing the configuration of the lintel with a nut in FIG. 1;
FIG. 3 is a view showing a step of preparing the lintel with a nut shown in FIG. 1;
FIG. 4 is a view showing a process of producing the lintel with a nut in FIG. 1;
FIG. 5 is a schematic cross-sectional view showing a state in which a lintel with a nut according to one embodiment of the present invention is attached to an upper floor.
FIG. 6 is a view showing a step of attaching the lintel with nuts of FIG. 1 to an upper floor.
FIG. 7 is a view showing a step of attaching the lintel with the nut of FIG. 1 to the upper floor.
FIG. 8 is a sectional view of a main part of a lintel with a nut, showing a configuration of a modification of the horizontal support member with a nut according to one embodiment of the present invention.
FIG. 9 is an exploded perspective view showing the configuration of the lintel with a nut in FIG. 8;
FIG. 10 is a schematic cross-sectional view showing a state in which a lintel with a nut as a modification to which the present invention is applied is mounted on an upper floor.
11 is a view showing a step of attaching a lintel with a nut as a modification shown in FIG. 8 to an upper floor.
FIG. 12 is an exploded perspective view of a main part showing a conventional lintel mounting structure.
13 is a cross-sectional view of a main part of the lintel mounting structure of FIG. 12;
[Explanation of symbols]
1,10 Forage with nut (horizontal support material with nut)
2,2A lintel body (horizontal support body)
3 nuts
40 Male thread
5 adhesive
7 Upper floor (upper body of building)
21, 21A Top of lintel body (top of horizontal support material body)
22 pilot hole
32 Lower end of nut
41 Male thread for nut
42 screwed part
71, 71A Lower surface of upper floor
73, 73A Body difference bolt (bolt)
74, 74A Floor side communication hole
75 Wall side communication hole
76 Upper floor wall (upper frame of building)
77 Notch
222 pilot hole main body (pilot hole)

Claims (9)

上部に設けられる建物の上部躯体を支持するナット付き水平支持材であって、
支持材本体と、前記上部躯体に設けられるボルトと螺合するナットと、ナットの下部に設けられた雄ネジ部とを備え、
前記ナットは、前記雄ネジ部を支持材本体の上面に設けられた下穴に接着剤を充填してねじ込むことで前記支持材本体に固定されていることを特徴とするナット付き水平支持材。
A horizontal support member with a nut for supporting an upper frame of a building provided at an upper part,
Support member body, comprising a nut to be screwed with a bolt provided in the upper frame, and a male screw portion provided in the lower portion of the nut,
The horizontal support member with a nut, wherein the nut is fixed to the support member body by filling the adhesive into a pilot hole provided on an upper surface of the support member body and screwing the male screw portion.
請求項1記載のナット付き水平支持材において、
前記雄ネジ部の上部に、前記ナットの下端部が螺合されたナット用雄ネジ部が設けられ、
このナット用雄ネジ部の上部には、前記ナット内に収納され、前記雄ネジ部を下穴にねじ込むためのねじ込み部が設けられていることを特徴とするナット付き水平支持材。
The horizontal support member with a nut according to claim 1,
An upper part of the male screw part is provided with a male screw part for a nut to which a lower end part of the nut is screwed,
A horizontal support member with a nut, which is provided in an upper portion of the male screw portion for the nut, the screw portion being housed in the nut and screwing the male screw portion into the prepared hole.
請求項1または2記載のナット付き水平支持材において、
雄ネジ部の外径と下穴の内径は略同一であることを特徴とするナット付き水平支持材。
The horizontal support member with a nut according to claim 1 or 2,
A horizontal support member with a nut, characterized in that the outer diameter of the male screw portion and the inner diameter of the pilot hole are substantially the same.
請求項1〜3のいずれか一項に記載のナット付き水平支持材において、
前記ナットは、上方からボルトを挿入できるように前記支持材本体内部に固定されていることを特徴とするナット付き水平支持材。
The horizontal support member with a nut according to any one of claims 1 to 3,
A horizontal support member with a nut, wherein the nut is fixed inside the support member main body so that a bolt can be inserted from above.
請求項1〜3のいずれか一項に記載のナット付き水平支持材において、
前記ナットは前記支持材本体の上面に取り付けられていることを特徴とするナット付き水平支持材。
The horizontal support member with a nut according to any one of claims 1 to 3,
The said nut is attached to the upper surface of the said support material main body, The horizontal support material with a nut characterized by the above-mentioned.
請求項1〜3のいずれか一項に記載のナット付き水平支持材上に設けられる建物の上部躯体の支持構造において、
前記上部躯体には、前記ナット付き水平支持材のナットに螺合するボルトが設けられ、
前記ボルトが前記ナット付き水平支持材のナットに螺合することで、前記上部躯体は前記ナット付き水平支持材に支持されていることを特徴とする上部躯体の支持構造。
A support structure for an upper frame of a building provided on the horizontal support member with nuts according to any one of claims 1 to 3,
The upper frame is provided with a bolt that is screwed to a nut of the horizontal support member with the nut,
An upper frame supporting structure, wherein the bolt is screwed into a nut of the horizontal supporting member with a nut, whereby the upper frame is supported by the horizontal supporting member with a nut.
請求項4記載のナット付き水平支持材上に、ナット付き水平支持材のナットに連通する床側連通孔が形成された上階床部が載置され、
上階床部上に、前記上階床部とともに建物の上部躯体を構成するとともに、前記床側連通孔に連通する壁側連通孔が形成された上階壁部が立設され、
前記壁側連通孔及び床側連通孔に、上端が前記上階壁部内で係止されたボルトが挿通されて前記上階床部の下面から下方に突出し、前記ナット付き水平支持材のナットに螺合することで上階床部及び上階壁部はナット付き水平支持材に連結されていることを特徴とする上部躯体の支持構造。
An upper floor portion having a floor-side communication hole formed thereon, which communicates with the nut of the horizontal support member with a nut, is placed on the horizontal support member with the nut according to claim 4,
On the upper floor portion, an upper floor wall portion, which forms an upper frame of the building together with the upper floor portion and in which a wall-side communication hole communicating with the floor-side communication hole is formed, is erected.
In the wall-side communication hole and the floor-side communication hole, a bolt whose upper end is locked in the upper-floor wall portion is inserted and protrudes downward from the lower surface of the upper-floor portion. An upper frame supporting structure, wherein the upper floor and the upper wall are connected to a horizontal support member with nuts by screwing.
請求項5記載のナット付き水平支持材上に、下面にナットが挿入される切欠部と切欠部に連通する床側連通孔とが形成された上階床部が、前記切欠部内にナットを収容し且つ該ナットと床側連通孔とが連通した状態で載置され、
前記上階床部上に、前記上階床部とともに建物の上部躯体を構成するとともに、前記床側連通孔に連通する壁側連通孔が形成された上階壁部が立設され、
前記壁側連通孔及び床側連通孔に、上端が前記上階壁部内で係止されたボルトが挿通されて、このボルトの下端部を前記ナット付き水平支持材のナットに螺合することで、上階床部及び上階壁部がナット付き水平支持材に連結されていることを特徴とする上部躯体の支持構造。
An upper floor portion, in which a notch portion into which the nut is inserted on the lower surface and a floor-side communication hole communicating with the notch portion are formed on the horizontal support member with the nut according to claim 5, wherein the nut is accommodated in the notch portion. And the nut and the floor side communication hole are placed in communication with each other,
On the upper floor portion, an upper floor wall portion is formed, together with the upper floor portion, forming an upper frame of the building, and an upper floor wall portion formed with a wall-side communication hole communicating with the floor-side communication hole,
By inserting a bolt whose upper end is locked in the upper floor wall into the wall-side communication hole and the floor-side communication hole, and screwing the lower end of the bolt to the nut of the horizontal support member with the nut. An upper floor unit and an upper floor wall unit are connected to a horizontal support member with a nut.
請求項8記載のナット付き水平支持材の取付構造において、床側連通孔と切欠部とは同一の内径であることを特徴とする上部躯体の支持構造。9. The support structure for an upper skeleton according to claim 8, wherein the floor side communication hole and the notch have the same inner diameter.
JP2002206845A 2002-07-16 2002-07-16 Support structure of upper frame Expired - Fee Related JP3943453B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002206845A JP3943453B2 (en) 2002-07-16 2002-07-16 Support structure of upper frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002206845A JP3943453B2 (en) 2002-07-16 2002-07-16 Support structure of upper frame

Publications (2)

Publication Number Publication Date
JP2004052234A true JP2004052234A (en) 2004-02-19
JP3943453B2 JP3943453B2 (en) 2007-07-11

Family

ID=31931459

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002206845A Expired - Fee Related JP3943453B2 (en) 2002-07-16 2002-07-16 Support structure of upper frame

Country Status (1)

Country Link
JP (1) JP3943453B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118805A (en) * 2017-12-30 2018-06-05 浙江亚厦装饰股份有限公司 Partition wall door opening component and its installation method
JP2021050467A (en) * 2019-09-20 2021-04-01 積水ハウス株式会社 Joint structure and method of constructing joint structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118805A (en) * 2017-12-30 2018-06-05 浙江亚厦装饰股份有限公司 Partition wall door opening component and its installation method
JP2021050467A (en) * 2019-09-20 2021-04-01 積水ハウス株式会社 Joint structure and method of constructing joint structure
JP7276038B2 (en) 2019-09-20 2023-05-18 積水ハウス株式会社 Joined structure and construction method for joined structure

Also Published As

Publication number Publication date
JP3943453B2 (en) 2007-07-11

Similar Documents

Publication Publication Date Title
JP6983901B2 (en) Connectivity systems and methods for prefabricated volumetric construction modules
JP2004052234A (en) Horizontal support material with nut and upper building frame support structure
JP2005098078A (en) Building unit and its joint structure
JP2007120100A (en) Unit house assembly structure, anchor bolt error adjusting fitting used for it, and method of installing unit house assembly structure using anchor bolt error adjusting fitting
JP2008057257A (en) Pillar fastener, decorative cover covering the same and pillar fastening structure using these
JP2006214268A (en) Method of connecting foundation members, columns or beams in a wooden building
JP2005146515A (en) Wooden building connection metal fitting and building construction method using the same
JP3822717B2 (en) Pillar-to-column-to-beam joint hardware, stigma-to-leg beam joint structure using the hardware, and a building unit having the structure
JP3916963B2 (en) spiral staircase
JP2001107465A (en) Prefabricated frame structure of building unit body
JPH0750521Y2 (en) Positioning tool for building unit
JP2002322735A (en) Heavy iron column and beam fixing method for low- storied house
CN112302174B (en) Building, frame structure thereof and building method
JPH04203054A (en) Column member structure
JPH09158327A (en) Extension method of unit type building and extending building unit thereof
JP2817655B2 (en) Fixtures for wooden buildings
JPH03194044A (en) Unit dwelling house
KR830002140B1 (en) Assembly method of building
JPH10219954A (en) Handrail support, its manufacture and method for executing handrail support
JP2001107456A (en) Column base structure in wooden rigid frame
JPH06173341A (en) Construction for wooden house
JP4047784B2 (en) Building structure with wall panels
JP2001207550A (en) Building unit, foundation for extension of building, and building extension method for unit type building
JP2820542B2 (en) Box-type housing unit manufacturing method
JP4430461B2 (en) Connecting structure of wall panel and magsa

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050408

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061013

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061212

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070205

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070327

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070405

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100413

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100413

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110413

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110413

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120413

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120413

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130413

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130413

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140413

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees