JP2004044972A JP2002205642A JP2002205642A JP2004044972A JP 2004044972 A JP2004044972 A JP 2004044972A JP 2002205642 A JP2002205642 A JP 2002205642A JP 2002205642 A JP2002205642 A JP 2002205642A JP 2004044972 A JP2004044972 A JP 2004044972A
Authority
JP
Japan
Prior art keywords
water supply
hot water
main
supply device
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002205642A
Other languages
Japanese (ja)
Inventor
Akira Kumagai
熊谷 明
Kazunari Taguchi
田口 和成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rinnai Corp
Original Assignee
Rinnai Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rinnai Corp filed Critical Rinnai Corp
Priority to JP2002205642A priority Critical patent/JP2004044972A/en
Priority to AU2003213464A priority patent/AU2003213464B2/en
Publication of JP2004044972A publication Critical patent/JP2004044972A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Housings, Intake/Discharge, And Installation Of Fluid Heaters (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To reduce an installation space of a combined hot water supply device and to improve the earthquake protection in a case when a hot water supply device is configurated by combining a plurality of general purpose hot water supply units. <P>SOLUTION: This combined hot-water supply device is configurated by selectively combining at least one of a first auxiliary hot water supply device 10b provided with a first auxiliary hot water supply unit 3b on a first auxiliary frame 2b having the shape same as a main frame, and a second auxiliary hot water supply device 10 provided with a second auxiliary hot water supply unit 3c on a cubic second auxiliary frame 3c having a lateral width and a height same as those of the main frame, to a main hot water supply device 10a provided with a main hot water supply unit 3a on the cubic main frame 2a. The frames are respectively provided with at least one piping piece of a main gas pipe piece 62, a main water pipe piece 42 and a joined tapping pipe piece 52, and the piping pieces are connected through flexible pipes 40, 50. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、複数の給湯器を並設して構成される連結給湯装置に関する。
【0002】
【従来の技術】
ホテルや総合病院等の多数の個所に適宜給湯を行う必要がある設備に給湯器を使用する場合、給湯器の給湯能力は全給湯個所で同時に使用される場合を想定して余裕をもって設計される。
【0003】
この場合、大型の給湯器を新たに設計して製作することもできるが、最小の加熱量において熱交換器を過熱させることのない最低作動水量が大きくなり、給湯量が少ない場合には使用できない。このため、汎用の小型給湯器の何台かを連結し、連結給湯装置として構成するのがよい。
【0004】
このような連結給湯装置は、例えば特許第2767500号公報が知られている。汎用の給湯器としては、例えば筐体を備え、該筐体内には熱交換器が設けられ、該熱交換器に上水を供給する給水管と出湯管とが接続されている。熱交換器の加熱源であるガスバーナーには燃料ガスを供給するガス管が接続されている。これらの管の他端は、筐体の下面に設けた配管接続部にそれぞれ接続されている。そして、必要とする給湯能力に応じて使用する給湯器の個数が決定される。
【0005】
連結給湯装置を設置する場合、使用する給湯器の個数に応じて所定の場所に断面T字形の架台フレームを設置する。この場合、架台フレームの上部の前面及び背面にはそれぞれ2台の給湯器が並べて取付け可能である。
【0006】
架台フレームに給湯器を取付けた後、架台フレームの下部に、水源に接続したパイプ状の元給水管、各給湯個所に通じるパイプ状の合流出湯管及びガス源に接続したパイプ状の元ガス管の各配管を設置する。そして、各給湯器の各配管接続部と各配管との間に、分岐給水管、分岐出湯管及び分岐ガス管の各分岐管をそれぞれ接続した後、必要な電気配線などが行われる。
【0007】
【発明が解決しようとする課題】
上記のものでは、4台以上の給湯器を使用する場合、別の架台フレームを並設し、該架台フレームに所定台数の給湯器をさらに取付けて連結給湯装置を構成する。この場合、架台フレームの下側にそれぞれ設けた元給水管、合流出湯管及び元ガス管の各配管は継手を介して接続するか、または長い一本の配管を、各フレーム枠を橋渡して配設される。
【0008】
ところが、これでは、例えば地震が発生してその振動が例えば継手や配管などに加わると継手や配管に直接ストレスが加わり、継手でシール不良を生じたり、配管が破損したりする可能性がある。
【0009】
また、断面T字形の架台フレームの上部に重量のある複数の給湯器を取付けるので、架台フレームに耐震性を持たせるために、例えば架台フレームの設置面積を大きくする必要があり、架台フレーム自体が大型化するという問題があった。
【0010】
そこで、本発明は、上記点に鑑み、設置スペースが小さくでき、その上、耐震性に優れた連結給湯装置を提供することを課題とする。
【0011】
【課題を解決するための手段】
この課題を解決するため、本発明の連結給湯装置は、直方体の主架台上に主給湯器を設けた主給湯装置を備え、該主給湯装置に、前記主架台と同一の形状を有する第1従架台上に第1従給湯器を設けた第1従給湯装置であって主給湯装置の一側に並べて設置可能なものと、前記主架台と同一の横幅及び高さを有する直方体の第2従架台上に第2従給湯器を設けた第2従給湯装置であって主給湯装置及び第1従給湯装置の背面に並べて設置可能なものとから選択した少なくとも1台を、各架台が相互に密接するように連結し、必要な給湯能力にする連結給湯装置であって、前記各架台の内部に、前記主給湯器、第1従給湯器及び第2従給湯器の熱交換器の加熱手段に燃料ガスを供給するガス管の一端が接続された元ガス管片、熱交換器への給水管の一端が接続された元水管片及び熱交換器からの出湯管の一端が接続された合流出湯管片の少なくともいずれか1本の配管片をそれぞれ設け、各配管片を可撓性を有するフレキ管を介して接続したことを特徴とする。
【0012】
本発明によれば、全給湯個所で同時に使用される場合を想定して必要な給湯能力を算出し、主給湯装置に連結する従給湯装置の台数を決定する。設置現場で、主給湯装置を先ず設置し、主給湯装置に一台の従給湯装置を連結する。
【0013】
その際、主架台と第1従架台を相互に密接させて各給湯装置を連結する。従給湯装置を連結した後、各架台の内部に設けた元ガス管片、元水管片及び合流出湯管片のいずれかを、各配管片を可撓性を有するフレキ管を介して接続する。
【0014】
この場合、各配管片間にフレキ管が存在するので、例えば地震が発生しても、その振動をフレキ管によって吸収させることができ、各配管に不必要なストレスが加わることはない。
【0015】
次いで、同様の手順で、必要な従給湯装置が連結される。この場合、各架台は1台の各給湯器を支持すればよいので、その設置面積を必要以上に大きくする必要はない。また、各架台を相互に密接させて設置するので、連結給湯装置自体に一体感を持たせることができる。
【0016】
この場合、第1、第2及び第3の各架台を締結手段を介して相互に締着しておけば、各架台の安定性が増加してさらに耐震性を向上させることができる。
【0017】
【発明の実施の形態】
図1乃至図4を参照して、1は、汎用の給湯器を連結して構成した本発明の連結給湯装置を示す。該連結給湯装置1は主給湯装置10aを有する。主給湯装置10aは、四角柱のフレームから構成した直方体の主架台2aを有し、その上面に設けた天板21aは給湯器の載置部として形成され、該載置部には、汎用の小型給湯器(例えば、50号)である主給湯器3aが載置されている。
【0018】
主給湯装置10aの一側(本実施の形態では、図2の右側)には、2台の第1従給湯装置10bが並んで連結されている。第1従給湯装置10bは、主架台2aと同一形態の第1従架台2bを有し、載置部である天板21bには、主給湯器3aと同一の給湯能力を有する第1従給湯器3bがそれぞれ載置されている。
【0019】
一端に位置する第1従給湯装置10bの背面には1台の第2従給湯装置10cが連結されている。第2従給湯装置10cは、主架台2aと同一の横幅と高さを有するように四角柱のフレームから構成した直方体の第2従架台2cを有し、その上面に設けた天板21cには、主給湯器3aと同一の給湯の能力を有する第2従給湯器3cが、主給湯器3aと背向させて載置されている。
【0020】
この場合、主給湯装置10a、第1従給湯装置10b及び第2従給湯装置10cは、主架台2a、第1従架台2b及び第2従架台2cが相互に密接するように連結される。尚、主架台2a、第1従架台2b及び第2従架台2cの相互が密接する個所に、例えば保温材を設けて気密性を高めるようにしてもよい。
【0021】
主給湯器3a並びに第1及び第2の各従給湯器3b、3cは、筐体31を有し、該筐体31内には、加熱源であるガスバーナーを有する熱交換器(図示せず)が設けられている。
【0022】
該熱交換器には上水を供給する給水管と出湯管とがそれぞれ接続されていると共に、ガスバーナーには比例弁を介して燃料ガスを供給するガス管が接続されている。これらの管の他端は、筐体21の下面を貫通して設けた配管接続部22a、22b、22cにそれぞれ接続されている。
【0023】
ここで、主給湯装置10aに、第1及び第2の各従給湯装置10b、10cを連結した後、水源に接続した元給水管4、各給湯個所Pに通じる合流出湯管5及びガス源に接続した元ガス管6の各配管を設置すると共に、該各配管4、5、6と各配管接続部22a、22b、22cとの間を分岐給水管41、分岐出湯管51及び分岐ガス管61でそれぞれ接続する必要がある。
【0024】
この場合、主架台2a並びに第1及び第2の各従架台2b、2cの内部空間(第1空間)に、元給水管4、合流出湯管5及び元ガス管6の全配管を配置したのでは、作業空間が狭くなり、その接続作業が面倒となる。
【0025】
本実施の形態では、主架台2a及び第1従架台2bの天板21a、21bの面積を、主給湯器3a及び第1従給湯器3bの筐体31下面の面積より大きく設定すると共に、主架台2a及び第1従架台2bに、主給湯器3a及び第1従給湯器3bをそれぞれ載置したときに主給湯器3a及び第1従給湯器3bの背面に少なくとも1本の配管4、5、6の収容を可能とする第2空間が形成されるように載置部を天板21a、21bの正面側に配置した(図2、図3参照)。天板21a、21bの正面側に位置する載置部を除く部分を配管配置部とした。
【0026】
この場合、例えば各配管接続部22a、22b、22cでのシール不良の確認がし難い元ガス管6を空間に配置するのがよい。
【0027】
第2従架台2cの天板21cの面積は、第2従給湯器3cの筐体31下面の面積より大きいが、連結給湯装置1の設置面積を小さくするため第1従架台2bの天板21bの面積より小さく設定し、第2従架台2cに第2従給湯器3cを載置したとき元ガス管6への分岐ガス管61の配管を可能とする第3空間が第2従給湯器3cの背面に形成されるように載置部を天板21cの正面側に配置した(図3参照)。天板21cの正面側に位置する載置部を除く部分を配管配置部とした。
【0028】
また、主架台2a、第1従架台2b及び第2従架台2cの載置部の所定の位置には、断面略I字形の支持部材23が設けられ、主給湯器3a、第1従給湯器3b及び第2従給湯器3cが天板21a、21b、21cと共に該支持部材23にも固定されている(図4参照)。
【0029】
主架台2a、第1従架台2b及び第2従架台2cの各配管配置部の略中央部には、ジョイント部24が該天板21を貫通して設られている。該ジョイント部24には、第2空間に配設される元ガス管6から分岐した分岐ガス管61と、主架台2a、第1従架台2b及び第2従架台2cの内部空間にそれぞれ配置され筐体31下面の燃料ガス用の配管接続部22cへの接続を可能とする接続管62とが接続される。
【0030】
これにより、元ガス管6への分岐ガス管61の一端の接続作業が他の広い場所で行ない得るので、配管接続作業をさらに迅速にできる。
【0031】
主架台2a及び第1従架台2bの配管配置部にはまた、所定の間隔を置いて2個の配管支持部材25が配置されている。配管支持部材25は、元ガス管6の外形に対応したU字形の先端部を有し、元ガス管6を支持する。また、配管支持部材25の先端部の天面にはねじ孔が設けられ、元ガス管6を配管支持部材25上に載置した後Uボルトを用いて元ガス管6を固定できる。
【0032】
ここで、連結給湯装置1の設置場所で、主架台2a、第1従架台2b及び第2従架台2cの内部空間に元給水管4及び合流出湯管5を設置するのでは、その設置作業が面倒になる。本実施形態では、配管作業を効率的に行い得るように、主架台2a、第1従架台2b及び第2架台2cの内部空間には、元給水管4及び合流出湯管5を構成する元給水管片42及び合流出湯管片52をそれぞれ設けている。
【0033】
この場合、元給水管片42及び合流出湯管片52は、各給湯器の給水及び出湯用の配管接続部22a、22bに一端が接続された分岐給水管41及び分岐出湯管51によって吊設されている。
【0034】
ここで、連結給湯装置1の設置場所で、各架台2a、2b、2cの内部空間に元給水管4及び合流出湯管5を設置するのでは、その設置作業が面倒になる。本実施形態では、配管作業を効率的に行い得るように、第1、第2及び第3の各架台2a、2b、2cの内部空間には、元給水管4及び合流出管5を構成する給水管片42及び合流出湯管片52をそれぞれ設けている。
【0035】
この場合、給水管片42及び合流出湯管片52は、各給湯器の給水及び出湯用の配管接続部22a、22bに一端が接続された分岐給水管41及び分岐出湯管51によって吊設されている。
【0036】
ここで、各給水管片42及び各合流出湯管片52相互を剛性を有するパイプ状配管で接続したのでは、例えば地震が発生すると、継手や配管にストレスが加わり、接続部でシール不良を生じたり、配管が破損したりする可能性がある。
【0037】
本実施の形態では、各架台2a、2b、2cを相互に密接させて各給湯装置10a、10b、10cを連結した後、各給水管片42及び各合流出湯管片52相互をフレキ管40、50を介して接続することとした。
【0038】
これにより、地震が発生しても、その振動をフレキ管40、50によって吸収させることができ、不必要なストレスが加わることはない。
【0039】
また、主給湯装置10aに、複数の第1及び第2の各給湯装置10b、10cを連結する場合、例えば長さが相違する配管等の複数の連結用部品を在庫しておく必要はなく、例えばその管理が容易になる。
【0040】
出荷段階では、主架台2aの内部の配管片42、52の他端にはめくら板(図示せず)を装着し、第1及び第2の各従架台2b、2cの内部に設けた各配管片42、52の両端は開放されている。
【0041】
また、図5を参照して、部品点数を減らしてコストを低くするため、出荷段階では、主架台2aの前面、両側面及び背面に架台2a内部の気密性を保持する化粧パネル26a、26b、26cが装着されている。第1従架台2bにはまた、前面及び背面に化粧パネル26a、26cが装着されている。
【0042】
この場合、主架台2a及び第1従架台2bの前面並びに主架台2aの両側面の化粧パネル26a、26bは着脱自在である。そして、第1従給湯装置10bが連結される主架台2a側面の化粧パネル26bを一端取外し、第1従給湯装置10bを連結した後第1従架台2bの開放した側面にその取外した化粧パネル26bを装着する。
【0043】
他方で、第1従給湯装置10bの背面に連結される第2従給湯装置10cの第2従架台2cでは、その前面、両側面及び背面に第2従架台2c内部の気密性を保持する化粧パネル26d、26e、26fが装着され、その前面及び両側面の化粧パネル26d、26eは着脱自在である。
【0044】
第1従給湯装置10bへの連結時、第1及び第2の各従架台2b、2cの化粧パネル26c、26fを相互に密接させて設置する。この場合、フレキ管40、50が配管できるように、主架台2a、第1架台2b及び第2従架台2cの背面側の化粧パネル26c、26fには、所定面積の開口26gが形成され、出荷段階では開口26gにはめくら板26hが装着されている。
【0045】
尚、第2従給湯装置10cを複数台連結する場合には、主給湯装置10aに第1従給湯装置10bを連結するときのように、1台の第2従架台2cにのみ側面パネル26eを装着するようにしてもよい。
【0046】
また、主架台2aに設けた元給水管片42及び合流出湯管片52の一端を主架台2aの一方の側板(図1の右側)から貫通させて設け、突出した各配管片42、52の端部にフランジ43、53を設けてもよい。これにより、主架台2aの外側で元給水管4及び合流出湯管5の接続作業が行い得る。
【0047】
ところで、連結給湯装置1から出湯個所までの出湯管の距離がある場合でも直に給湯できるようするのがよい。本実施の形態では、主架台2aには、循環ポンプ71と膨張タンク72とが設けられ、循環ポンプ71及び膨張タンク72を各配管片42、52に接続している。
【0048】
また、主架台2a、第1従架台2b及び第2従架台2cは、例えば地震等に備えて設置場所でアンカーボルト等を用いて固定する必要がある。この場合、主架台2a、第1従架台2b及び第2従架台2cを相互に密接させて設置した後にアンカーボルトで固着する作業は困難な場合が多い。
【0049】
本実施の形態では、図6に示すように、主架台2aと一方の第1従架台2bとの相互に密接した設置を可能とする第2ベース枠81と、他方の第1従架台2bと第2従架台2cとの相互に密接した設置を可能とする第3ベース枠82とを使用して連結給湯装置1を設置することとした。
【0050】
この場合、主架台2a及び第1従架台2bの底面の横方向の両端に、前後方向に突出させて2枚の固定プレート27aを設ける共に、第2従架台2cの横方向の両端に、第2従給湯器3c側にのみ突出させて2枚の固定プレート27bを設けた。固定プレート27a、27bの長手方向の両端部には、所定の口径の孔28がそれぞれ開設されている。
【0051】
金属製の第2ベース枠81は、薄板を長方形に組合せて形成され、その横幅W1は主架台2aと第1従架台2bとの横幅の和にほぼ一致させ、その奥行き寸法L1は、固定プレート27aの長さにほぼ対応させている。
【0052】
主架台2aと第1従架台2bとを密接させて設置した場合、固定プレート27aの孔28に一致する位置に、上方に向かって突出させた8本の固定ボルト83をそれぞれ設けた。
【0053】
第3ベース枠82もまた、金属製薄板を長方形に組合せて形成され、その横幅W2は、第1または第2の従架台2b、2cの横幅にほぼ一致し、その奥行き寸法L2は、第1従架台2b及び第2従架台2cの奥行き寸法の和にほぼ対応している。
【0054】
第1従架台2aと第2従架台2cとを密接させて設置した場合、固定プレート27aに設けた6個の孔28に一致する位置に、上方に向かって突出させた6本の固定ボルト83がそれぞれ設けられている。
【0055】
連結給湯装置1の設置時、各固定ボルト83を各固定プレート27a、27bの孔28内を挿通させ、例えばナットを用いて締結する。これにより、主架台2a、第1従架台2b及び第2従架台2cを、第2及び第3の各ベース枠81、82に固着できる。
【0056】
尚、第2従給湯装置10cの第2従架台2cは、第2従給湯器3c側の両端でのみ第3ベース枠82に固着されているが、例えば、相互に密接する第1従架台2bのフレームと固定ボルトを使用して締結すれば、第2従架台2cが不安定になることはない。
【0057】
また、主給湯装置10aの主架台2aの固定のみを可能とする同形態の第1ベース枠(図示せず)を加えて、3種類のベース枠を用意しておけば、主給湯装置10aに、第1及び第2の各従給湯装置10b、10cのうちいずれか何台かを連結する場合でも、そのレイアウトに応じて事前にベース枠を敷設できる。
【0058】
次に、図1乃至図6を参照して、本発明の連結給湯装置1の設置手順を説明する。先ず、全給湯個所Pで同時に使用される場合を想定して必要な給湯能力を算出し、主給湯装置10aに連結する第1及び第2の従給湯装置10b、10cの台数を決定する。
【0059】
次いで、設置場所でのメンテナンススペース等を考慮して連結給湯装置1のレイアウトを決定し、それに応じて第1及び第2の従給湯装置10b、10cを割り当てる。本実施の形態では、上述したように、主給湯装置10aに、2台の第1従給湯装置10bと1台の第2従給湯装置10cを連結する。
【0060】
この場合、レイアウトに応じて、部品点数が少なくなるようにベース枠81、82を選択する。連結給湯装置1の設置現場で、そのレイアウトに沿ってベース枠81、82を並べて敷設し(図4参照)、例えばアンカーボルトを使用して固着する。
【0061】
そして、敷設した第2ベース枠81の一端に、主給湯装置10aを設置する(図2の左側)。この場合、固定ボルト83を各固定プレート27aの孔28内を挿通させて設置し、ナットを用いて締結して固着する。その際、一側面の化粧パネル26b及び給水及び出湯用の配管片42、52に装着しためくら板を取外しておく。
【0062】
次ぎに、主給湯装置10aの一側に1台の第1従給湯装置10bを、第2ベース枠81の右側に位置する4本の固定ボルト83を各固定プレート27aの孔28内を挿通させて設置し、ナットを用いて締結して固着する。次いで、主給湯装置10a及び第1従給湯装置10bの給水及び出湯用の配管片42、52をフレキ管40、50を介してそれぞれ接続する。
【0063】
同様の手順で、他の第1従給湯装置10bを、第3ベース枠82の前面側に設置して固着する。その後、第1従給湯装置10b相互の給水及び出湯用の配管片42、52をフレキ管40、50を介してそれぞれ接続する。
【0064】
次いで、他の従給湯装置10bの背面に、同様の手順で、第2従給湯装置10cを、第3ベース枠82の後側の2本の固定ボルト83を固定プレート27bの孔28内を挿通させて設置し、ナットを用いて締結して固着する(図6参照)。
【0065】
この場合、化粧プレート26c、26fに設けた開口26gに装着しためくら板26hを取外しておく。そして、各開口26gを介して第1及び第2の各従給湯装置10b、10c相互の給水及び出湯用の配管片42、52をフレキ管40、50dでそれぞれ接続する。
【0066】
尚、給水及び出湯用の配管片42、52と、フレキ管40、50との間にそれぞれエルボ管を設けてもよい。第2従架台2cに設けた給水及び出湯用の配管片42、52の他端には、取外しためくら板を装着する。
【0067】
次いで、並設した主給湯装置10aと第1従給湯装置10bの各給湯器3a、3bの背面に形成された第2空間であって配管支持部材25上に一本の元ガス管6を載置する。この場合、異なる場所において元ガス管6には、主架台2a、第1従架台2b及び第2従架台2cのジョイント部24の位置に対応させて燃料ガス用の分岐ガス管61の一端を予め接続する。
【0068】
そして、各分岐ガス管61が所定の間隔を置いて接続された元ガス管6を配管支持部材25上に載置し、分岐ガス管61の他端を各ジョイント部24に接続した後、Uボルトを用いて元ガス管6を固定する。尚、接続作業が完了した元ガス管6をカバーで覆うこともできる。
【0069】
最後に必要な電気配線を行う。この場合、図7に示すように、主給湯器3aの背面の支持部材23に、電源ケーブル接続部91を設けてもよい。この場合、電源ケーブル接続部91の上側にコンセント92を設けると共に、第1及び第2従給湯装置10b、10cの第1及び第2の各従給湯器2b、2cに、先端に接続プラグを設けた電源ケーブルを出荷時に配線しておけば、コンセント92にプラグを差しこむだけで第1及び第2の各従給湯装置10b、10cに電気供給できる。これにより、主給湯装置10aにのみ必要な電気配線を行えばよく、設置作業をさらに簡素化できる。
【0070】
尚、本実施の形態では、主給湯器3a、第1従給湯器3b及び第2従給湯器3cの給湯能力を同一としたが、これに限定されるものではなく、筐体21の大きさが同一であれば各給湯器の給湯能力を相違させてもよい。
【0071】
また、本実施の形態では、第2空間に1本の元ガス管6を設置することとしたが、さらに耐震性を向上させるため、元ガス管6を構成するガス管用の配管片を配管支持部材24上に事前に載置して固定しておき、主給湯装置10aに第1従給湯装置10bを連結した後、ガス用の各配管片をフレキ管で連結してもよい。
【0072】
【発明の効果】
以上説明したように、本発明の連結給湯装置では、設置スペースが小さくでき、その上、耐震性にも優れているという効果を奏する。
【図面の簡単な説明】
【図1】本発明の連結給湯装置の斜視図
【図2】図1に示す連結給湯装置の正面図
【図3】図1に示す連結給湯装置の上面図
【図4】図1に示す連結給湯装置の側面図
【図5】各給湯装置を相互に連結する前の各々の給湯装置を示す斜視図
【図6】フレーム枠の敷設を説明する図
【図7】連結給湯装置の設置状況を説明する図
【符号の説明】
1  連結給湯装置
2a、2b、2c 架台
10a 主給湯装置
10b 第1従給湯装置
10c 第2従給湯装置
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a connected hot water supply device configured by arranging a plurality of hot water heaters in parallel.
[0002]
[Prior art]
When using a water heater for equipment that needs to supply hot water to a number of places such as hotels and general hospitals as appropriate, the hot water supply capacity of the water heater is designed with a margin assuming that it will be used at all hot water supply points at the same time .
[0003]
In this case, a large water heater can be newly designed and manufactured, but the minimum amount of working water that does not overheat the heat exchanger with the minimum amount of heating increases, and it cannot be used when the amount of hot water is small. . For this reason, it is preferable to connect several general-purpose small-sized water heaters to form a connected water heater.
[0004]
Such a connected hot-water supply device is known, for example, from Japanese Patent No. 2767500. As a general-purpose water heater, for example, a housing is provided, a heat exchanger is provided in the housing, and a water supply pipe for supplying clean water to the heat exchanger and a tapping pipe are connected. A gas pipe that supplies fuel gas is connected to a gas burner that is a heat source of the heat exchanger. The other ends of these pipes are connected to pipe connection parts provided on the lower surface of the housing. Then, the number of hot water heaters to be used is determined according to the required hot water supply capacity.
[0005]
When installing a connected hot water supply apparatus, a gantry frame having a T-shaped cross section is installed at a predetermined location according to the number of water heaters to be used. In this case, two water heaters can be mounted side by side on the front and back of the upper portion of the gantry frame.
[0006]
After attaching the water heater to the gantry frame, at the bottom of the gantry frame, a pipe-shaped original water pipe connected to a water source, a pipe-shaped combined outflow hot water pipe connected to each hot water supply point, and a pipe-shaped original gas pipe connected to a gas source Install each piping. After connecting the branch water supply pipe, the branch hot water pipe, and the branch gas pipe between each pipe connection part of each water heater and each pipe, necessary electric wiring and the like are performed.
[0007]
[Problems to be solved by the invention]
In the above, when four or more water heaters are used, another gantry frame is juxtaposed, and a predetermined number of water heaters are further attached to the gantry frame to constitute a combined hot water heater. In this case, the respective pipes of the main water supply pipe, the combined outflow hot water pipe and the main gas pipe provided on the lower side of the gantry frame are connected via joints, or one long pipe is distributed by bridging each frame. Is established.
[0008]
However, in this case, for example, when an earthquake occurs and the vibration is applied to, for example, a joint or a pipe, a stress is directly applied to the joint or the pipe, which may cause a seal failure at the joint or damage the pipe.
[0009]
Also, since a plurality of heavy water heaters are mounted on the upper part of the gantry frame having a T-shaped cross section, it is necessary to increase the installation area of the gantry frame, for example, in order to make the gantry frame have earthquake resistance. There was a problem of being larger.
[0010]
In view of the above, it is an object of the present invention to provide a connected hot water supply apparatus that can reduce the installation space and has excellent earthquake resistance.
[0011]
[Means for Solving the Problems]
In order to solve this problem, a connected hot water supply device of the present invention includes a main hot water supply device having a main hot water supply device provided on a rectangular parallelepiped main base, and the main hot water supply device has a first shape having the same shape as the main base. A first auxiliary hot water supply device provided with a first auxiliary hot water supply device on a support base, which can be installed side by side with the main hot water supply device; and a second rectangular parallelepiped having the same width and height as the main mount. At least one selected from a second hot water supply device having a second hot water supply device provided on a pedestal stand, which can be installed side by side on the back of the main hot water supply device and the first hot water supply device, and A hot water supply device which is connected closely to the hot water supply and has a required hot water supply capacity, wherein heating of the heat exchangers of the main water heater, the first sub water heater and the second sub water heater is provided inside each of the mounts. Original gas pipe piece connected to one end of the gas pipe that supplies fuel gas to the means, water supply to the heat exchanger At least one of a main water pipe piece connected to one end of the pipe and a combined water pipe piece connected to one end of a tapping pipe from the heat exchanger. It is characterized by being connected via a pipe.
[0012]
According to the present invention, the required hot water supply capacity is calculated assuming that the hot water supply units are used simultaneously in all the hot water supply locations, and the number of slave hot water supply devices connected to the main hot water supply device is determined. At the installation site, the main hot water supply device is first installed, and a single hot water supply device is connected to the main hot water supply device.
[0013]
At this time, the main gantry and the first sub gantry are brought into close contact with each other and the hot water supply devices are connected. After connecting the subordinate hot water supply devices, one of the original gas pipe pieces, the original water pipe pieces, and the combined outflow hot water pipe pieces provided inside each stand is connected to each of the pipe pieces via a flexible flexible pipe.
[0014]
In this case, since the flexible pipe exists between the respective pipe pieces, even if an earthquake occurs, for example, the vibration can be absorbed by the flexible pipe, and unnecessary stress is not applied to each pipe.
[0015]
Next, the necessary hot water supply device is connected in the same procedure. In this case, since each stand only needs to support one water heater, it is not necessary to increase the installation area more than necessary. In addition, since the mounts are installed close to each other, the connected hot water supply apparatus itself can have a sense of unity.
[0016]
In this case, if the first, second, and third gantry are fastened to each other via the fastening means, the stability of each gantry is increased, and the earthquake resistance can be further improved.
[0017]
BEST MODE FOR CARRYING OUT THE INVENTION
Referring to FIGS. 1 to 4, reference numeral 1 denotes a connected hot water supply apparatus of the present invention configured by connecting general-purpose water heaters. The connected hot water supply device 1 has a main hot water supply device 10a. The main hot water supply device 10a has a rectangular parallelepiped main gantry 2a composed of a quadrangular prism frame, and a top plate 21a provided on the upper surface thereof is formed as a mounting portion of a water heater. A main water heater 3a, which is a small water heater (for example, No. 50), is mounted.
[0018]
On one side of the main hot water supply device 10a (the right side in FIG. 2 in the present embodiment), two first subordinate hot water supply devices 10b are connected side by side. The first auxiliary hot water supply device 10b has a first auxiliary gantry 2b having the same form as the main gantry 2a, and a first auxiliary hot water supply having the same hot water supply capability as the main hot water heater 3a is provided on the top plate 21b serving as a mounting portion. Each of the containers 3b is placed.
[0019]
One second hot water supply device 10c is connected to the back surface of the first hot water supply device 10b located at one end. The second subordinate hot water supply device 10c has a rectangular parallelepiped second subordinate base 2c formed of a quadrangular prism frame so as to have the same width and height as the main mount 2a, and a top plate 21c provided on the upper surface thereof. A second sub water heater 3c having the same hot water supply capability as the main water heater 3a is placed facing the main water heater 3a.
[0020]
In this case, the main hot water supply device 10a, the first auxiliary hot water supply device 10b, and the second auxiliary hot water supply device 10c are connected so that the main gantry 2a, the first auxiliary gantry 2b, and the second auxiliary gantry 2c are in close contact with each other. Note that, for example, a heat insulating material may be provided at a place where the main gantry 2a, the first sub gantry 2b, and the second sub gantry 2c are in close contact with each other to improve airtightness.
[0021]
The main water heater 3a and the first and second sub water heaters 3b, 3c each have a housing 31 in which a heat exchanger (not shown) having a gas burner as a heating source is provided. ) Is provided.
[0022]
A water supply pipe for supplying tap water and a tapping pipe are respectively connected to the heat exchanger, and a gas pipe for supplying fuel gas via a proportional valve is connected to the gas burner. The other ends of these pipes are connected to pipe connection parts 22a, 22b, and 22c provided through the lower surface of the housing 21, respectively.
[0023]
Here, after the first and second subordinate hot water supply devices 10b and 10c are connected to the main hot water supply device 10a, the main hot water supply pipe 4 connected to the water source, the combined outflow hot water pipe 5 leading to each hot water supply point P, and the gas source are connected to the main hot water supply device 10a. Each pipe of the connected original gas pipe 6 is installed, and a branch water supply pipe 41, a branch tapping pipe 51, and a branch gas pipe 61 are provided between the pipes 4, 5, and 6 and the pipe connection parts 22 a, 22 b, and 22 c. It is necessary to connect with each.
[0024]
In this case, in the internal space (first space) of the main gantry 2a and the first and second sub gantry 2b, 2c, all the pipes of the original water supply pipe 4, the combined outflow hot water pipe 5, and the original gas pipe 6 are arranged. In such a case, the work space becomes narrow, and the connection work becomes troublesome.
[0025]
In the present embodiment, the areas of the top plates 21a and 21b of the main gantry 2a and the first sub gantry 2b are set larger than the areas of the lower surfaces of the housings 31 of the main water heater 3a and the first sub water heater 3b. When the main water heater 3a and the first water heater 3b are respectively mounted on the gantry 2a and the first water heater 2b, at least one pipe 4, 5 is provided on the back of the main water heater 3a and the first water heater 3b. , 6 are arranged on the front side of the top plates 21a, 21b so as to form a second space (see FIGS. 2 and 3). Portions of the top plates 21a and 21b other than the placement portion located on the front side were used as piping arrangement portions.
[0026]
In this case, for example, it is preferable to dispose the source gas pipe 6 in the space, in which it is difficult to confirm the sealing failure at each of the pipe connection parts 22a, 22b, 22c.
[0027]
The area of the top plate 21c of the second base 2c is larger than the area of the lower surface of the housing 31 of the second water heater 3c, but the top plate 21b of the first base 2b is reduced in order to reduce the installation area of the connected hot water supply device 1. Is set smaller than the area of the second sub-water heater 3c, and the third space that enables the branch gas pipe 61 to be connected to the original gas pipe 6 when the second sub-water heater 3c is mounted on the second sub-mount 2c is the second sub-water heater 3c. The mounting portion was arranged on the front side of the top plate 21c so as to be formed on the back surface of the top plate (see FIG. 3). The portion excluding the mounting portion located on the front side of the top plate 21c was defined as a piping arrangement portion.
[0028]
Further, a support member 23 having a substantially I-shaped cross section is provided at a predetermined position of the mounting portion of the main gantry 2a, the first sub gantry 2b, and the second sub gantry 2c, and the main water heater 3a and the first water heater are provided. 3b and the second subordinate water heater 3c are fixed to the support member 23 together with the top plates 21a, 21b, 21c (see FIG. 4).
[0029]
At substantially the center of each piping arrangement portion of the main gantry 2a, the first gantry 2b, and the second gantry 2c, a joint portion 24 is provided to penetrate the top plate 21. In the joint portion 24, a branch gas pipe 61 branched from the original gas pipe 6 provided in the second space and internal spaces of the main gantry 2a, the first gantry 2b, and the second gantry 2c are arranged. A connection pipe 62 that allows connection to the fuel gas pipe connection portion 22c on the lower surface of the housing 31 is connected.
[0030]
Thereby, the connection work of one end of the branch gas pipe 61 to the original gas pipe 6 can be performed in another wide place, so that the pipe connection work can be further speeded up.
[0031]
Two piping support members 25 are also arranged at predetermined intervals in the piping arrangement portions of the main gantry 2a and the first sub gantry 2b. The pipe support member 25 has a U-shaped tip corresponding to the outer shape of the original gas pipe 6 and supports the original gas pipe 6. In addition, a screw hole is provided on the top surface of the distal end portion of the pipe support member 25, and after the original gas pipe 6 is placed on the pipe support member 25, the original gas pipe 6 can be fixed using a U bolt.
[0032]
Here, if the main water supply pipe 4 and the combined outflow hot water pipe 5 are installed in the internal space of the main gantry 2a, the first sub gantry 2b, and the second sub gantry 2c at the installation location of the connection hot water supply apparatus 1, the installation work is required. It becomes troublesome. In the present embodiment, the main water supply pipe 4 and the combined outflow hot water pipe 5 are provided in the internal spaces of the main gantry 2a, the first sub gantry 2b, and the second gantry 2c so that the piping work can be performed efficiently. A pipe piece 42 and a combined outflow hot water pipe piece 52 are provided.
[0033]
In this case, the original water supply pipe piece 42 and the combined outflow hot water pipe piece 52 are suspended by a branch water supply pipe 41 and a branch hot water pipe 51 each having one end connected to the pipe connection portions 22a, 22b for water supply and tapping of each water heater. ing.
[0034]
Here, if the original water supply pipe 4 and the combined outflow hot water pipe 5 are installed in the internal space of each of the gantry 2a, 2b, 2c at the installation location of the connection hot water supply apparatus 1, the installation work becomes troublesome. In the present embodiment, the original water supply pipe 4 and the combined outflow pipe 5 are configured in the internal spaces of the first, second, and third gantry 2a, 2b, and 2c so that the pipe work can be performed efficiently. A water supply pipe piece 42 and a combined outflow hot water pipe piece 52 are provided.
[0035]
In this case, the water supply pipe piece 42 and the combined outflow hot water pipe piece 52 are suspended by a branch water supply pipe 41 and a branch hot water pipe 51, one ends of which are connected to the pipe connection portions 22a and 22b for water supply and tapping of each water heater. I have.
[0036]
Here, when each water supply pipe piece 42 and each combined outflow hot water pipe piece 52 are connected to each other with a pipe-like pipe having rigidity, for example, when an earthquake occurs, stress is applied to the joints and pipes, resulting in poor sealing at the connection portion. Or the piping may be damaged.
[0037]
In the present embodiment, after each of the gantry 2a, 2b, 2c is brought into close contact with each of the hot water supply devices 10a, 10b, 10c, each of the water supply pipe pieces 42 and each of the combined outflow hot water pipe pieces 52 are connected to the flexible pipe 40, It was decided to connect via 50.
[0038]
Thereby, even if an earthquake occurs, the vibration can be absorbed by the flexible pipes 40 and 50, and unnecessary stress is not applied.
[0039]
When connecting the plurality of first and second water heaters 10b and 10c to the main water heater 10a, there is no need to stock a plurality of connecting parts such as pipes having different lengths, for example. For example, the management becomes easy.
[0040]
At the time of shipment, a blind plate (not shown) is attached to the other ends of the pipe pieces 42, 52 inside the main gantry 2a, and each pipe provided inside the first and second sub gantry 2b, 2c. Both ends of the pieces 42 and 52 are open.
[0041]
Referring to FIG. 5, decorative panels 26a, 26b, which maintain the airtightness of the inside of the gantry 2a, are provided on the front, both sides and the back of the main gantry 2a at the shipping stage in order to reduce the number of parts and reduce the cost. 26c is mounted. Decorative panels 26a and 26c are mounted on the front and back surfaces of the first gantry 2b.
[0042]
In this case, the front panels of the main gantry 2a and the first sub gantry 2b and the decorative panels 26a, 26b on both sides of the main gantry 2a are detachable. One end of the decorative panel 26b on the side of the main base 2a to which the first subordinate hot water supply device 10b is connected is removed, and after the first subordinate hot water supply device 10b is connected, the removed decorative panel 26b is attached to the open side surface of the first subordinate base 2b. Attach.
[0043]
On the other hand, the second sub-mount 2c of the second sub-water supply device 10c connected to the back surface of the first sub-water supply device 10b has a front surface, both side surfaces, and a back surface that retains the airtightness inside the second sub-water supply device 2c. The panels 26d, 26e, 26f are mounted, and the decorative panels 26d, 26e on the front and both sides thereof are detachable.
[0044]
At the time of connection to the first hot water supply device 10b, the decorative panels 26c, 26f of the first and second gantry 2b, 2c are installed in close contact with each other. In this case, the decorative panels 26c and 26f on the rear side of the main frame 2a, the first frame 2b and the second sub-frame 2c are formed with openings 26g having a predetermined area so that the flexible tubes 40 and 50 can be piped. At the stage, a blind plate 26h is mounted on the opening 26g.
[0045]
When a plurality of second subordinate hot water supply devices 10c are connected, the side panel 26e is connected to only one second subordinate hot plate 2c as in the case of connecting the first subordinate hot water supply device 10b to the main hot water supply device 10a. You may make it attach.
[0046]
One end of the main water supply pipe piece 42 and one end of the combined outflow hot water pipe piece 52 provided on the main gantry 2a are provided so as to penetrate from one side plate (the right side in FIG. 1) of the main gantry 2a. Flanges 43 and 53 may be provided at the ends. Thereby, the connection work of the main water supply pipe 4 and the combined hot water pipe 5 can be performed outside the main gantry 2a.
[0047]
By the way, it is preferable that hot water can be directly supplied even when there is a distance of a tapping pipe from the connected hot water supply device 1 to a tapping point. In the present embodiment, a circulating pump 71 and an expansion tank 72 are provided on the main gantry 2a, and the circulating pump 71 and the expansion tank 72 are connected to the respective pipe pieces 42 and 52.
[0048]
In addition, the main gantry 2a, the first gantry 2b, and the second gantry 2c need to be fixed using anchor bolts or the like at an installation location in preparation for, for example, an earthquake. In this case, it is often difficult to fix the main gantry 2a, the first sub gantry 2b, and the second sub gantry 2c closely to each other and then fix them with the anchor bolts.
[0049]
In the present embodiment, as shown in FIG. 6, a second base frame 81 that enables the main base 2a and one of the first sub-bases 2b to be installed close to each other, and the other first sub-base 2b The connected hot water supply apparatus 1 is installed using the third base frame 82 that enables the installation to be in close contact with the second gantry 2c.
[0050]
In this case, two fixing plates 27a are provided at both lateral ends of the bottom surfaces of the main gantry 2a and the first sub gantry 2b so as to protrude in the front-rear direction. Two fixing plates 27b are provided so as to protrude only toward the side of the secondary water heater 3c. Holes 28 having a predetermined diameter are formed at both ends in the longitudinal direction of the fixing plates 27a and 27b.
[0051]
The second base frame 81 made of metal is formed by combining thin plates into a rectangle, the width W1 of which is substantially equal to the sum of the widths of the main gantry 2a and the first gantry 2b, and the depth dimension L1 of which is fixed plate. The length substantially corresponds to the length of 27a.
[0052]
When the main gantry 2a and the first gantry 2b are installed close to each other, eight fixing bolts 83 projecting upward are provided at positions corresponding to the holes 28 of the fixing plate 27a.
[0053]
The third base frame 82 is also formed by combining thin metal plates in a rectangular shape, the width W2 of the third base frame 82 substantially corresponds to the width of the first or second gantry 2b, 2c, and the depth L2 of the third base frame 82 is the first width. This substantially corresponds to the sum of the depth dimensions of the sub-base 2b and the second sub-base 2c.
[0054]
When the first base 2a and the second base 2c are installed close to each other, six fixing bolts 83 projecting upward are provided at positions corresponding to the six holes 28 provided in the fixing plate 27a. Are provided respectively.
[0055]
When the connection hot water supply device 1 is installed, the fixing bolts 83 are inserted through the holes 28 of the fixing plates 27a and 27b and fastened using, for example, nuts. Thus, the main gantry 2a, the first gantry 2b, and the second gantry 2c can be fixed to the second and third base frames 81, 82.
[0056]
Although the second gantry 2c of the second hot water supply device 10c is fixed to the third base frame 82 only at both ends on the side of the second hot water supply device 3c, for example, the first gantry 2b is in close contact with each other. The second sub-mount 2c will not be unstable if it is fastened to the frame using fixing bolts.
[0057]
In addition, if a first base frame (not shown) of the same form that enables only fixing of the main gantry 2a of the main hot water supply device 10a is added and three types of base frames are prepared, the main hot water supply device 10a can be provided. Even when any one of the first and second hot water supply devices 10b and 10c is connected, a base frame can be laid in advance according to the layout.
[0058]
Next, an installation procedure of the coupled hot water supply device 1 of the present invention will be described with reference to FIGS. First, the necessary hot water supply capacity is calculated assuming that the hot water supply points P are used simultaneously, and the number of first and second subordinate hot water supply apparatuses 10b and 10c connected to the main hot water supply apparatus 10a is determined.
[0059]
Next, the layout of the connected hot water supply device 1 is determined in consideration of the maintenance space at the installation location and the like, and the first and second subordinate hot water supply devices 10b and 10c are allocated accordingly. In the present embodiment, as described above, two first sub-water heaters 10b and one second sub-water heater 10c are connected to main water heater 10a.
[0060]
In this case, the base frames 81 and 82 are selected so as to reduce the number of parts according to the layout. At the installation site of the connection hot water supply device 1, the base frames 81 and 82 are laid side by side along the layout (see FIG. 4), and are fixed using, for example, anchor bolts.
[0061]
Then, the main hot water supply device 10a is installed at one end of the laid second base frame 81 (left side in FIG. 2). In this case, the fixing bolts 83 are installed so as to be inserted through the holes 28 of the fixing plates 27a, and fastened and fixed using nuts. At this time, the blinds are attached to the decorative panel 26b on one side and the pipe pieces 42 and 52 for water supply and hot water supply, and the blind plate is removed.
[0062]
Next, one first hot water supply device 10b is inserted into one side of the main hot water supply device 10a, and four fixing bolts 83 located on the right side of the second base frame 81 are inserted into the holes 28 of each fixing plate 27a. And fix it with a nut. Next, pipes 42 and 52 for water supply and hot water supply of the main hot water supply device 10a and the first subordinate hot water supply device 10b are connected via flexible pipes 40 and 50, respectively.
[0063]
In the same procedure, another first subordinate hot water supply device 10b is installed and fixed to the front side of the third base frame 82. Thereafter, the pipe pieces 42, 52 for water supply and tapping of the first subordinate hot water supply device 10b are connected via flexible pipes 40, 50, respectively.
[0064]
Next, the second sub-water heater 10c and the two fixing bolts 83 on the rear side of the third base frame 82 are inserted into the back surface of the other sub-water heater 10b in the holes 28 of the fixing plate 27b in the same procedure. Then, it is fastened and fixed using a nut (see FIG. 6).
[0065]
In this case, the blind plate 26h is attached to the opening 26g provided in the decorative plates 26c and 26f, and the blind plate 26h is removed. And the pipe pieces 42 and 52 for water supply and tapping between the first and second subordinate water supply devices 10b and 10c are connected to the respective flexible pipes 40 and 50d through the respective openings 26g.
[0066]
In addition, an elbow pipe may be provided between the pipe pieces 42 and 52 for water supply and tapping and the flexible pipes 40 and 50, respectively. A detachable blind plate is attached to the other end of the water supply and tapping pipe pieces 42 and 52 provided on the second sub stand 2c.
[0067]
Next, one original gas pipe 6 is mounted on the pipe support member 25 in the second space formed on the back surface of each of the water heaters 3a and 3b of the main water heater 10a and the first slave water heater 10b arranged in parallel. Place. In this case, one end of the branch gas pipe 61 for the fuel gas is previously added to the source gas pipe 6 at a different location in accordance with the positions of the joint portions 24 of the main gantry 2a, the first gantry 2b, and the second gantry 2c. Connecting.
[0068]
Then, the original gas pipe 6 to which each branch gas pipe 61 is connected at a predetermined interval is placed on the pipe support member 25, and the other end of the branch gas pipe 61 is connected to each joint part 24. The original gas pipe 6 is fixed using bolts. Note that the original gas pipe 6 for which the connection operation has been completed can be covered with a cover.
[0069]
Finally, perform the necessary electrical wiring. In this case, as shown in FIG. 7, a power cable connecting portion 91 may be provided on the support member 23 on the back surface of the main water heater 3a. In this case, an outlet 92 is provided above the power cable connecting portion 91, and a connection plug is provided at the tip of each of the first and second water heaters 2b, 2c of the first and second water heaters 10b, 10c. If the power cable is wired at the time of shipment, the power can be supplied to the first and second subordinate hot water supply devices 10b and 10c only by inserting the plug into the outlet 92. Thus, the electric wiring required only for the main hot water supply device 10a may be performed, and the installation work can be further simplified.
[0070]
In the present embodiment, the main water heater 3a, the first sub water heater 3b, and the second sub water heater 3c have the same hot water supply capacity. However, the present invention is not limited to this. May be different, the hot water supply capacity of each water heater may be different.
[0071]
Further, in the present embodiment, one source gas pipe 6 is installed in the second space. However, in order to further improve earthquake resistance, a pipe piece for the gas pipe constituting the source gas pipe 6 is supported by a pipe. After placing and fixing on the member 24 in advance and connecting the first subordinate hot water supply device 10b to the main hot water supply device 10a, each gas pipe piece may be connected by a flexible pipe.
[0072]
【The invention's effect】
As described above, the combined hot water supply apparatus of the present invention has an effect that the installation space can be reduced, and furthermore, it is excellent in earthquake resistance.
[Brief description of the drawings]
1 is a perspective view of a connected hot water supply apparatus of the present invention; FIG. 2 is a front view of the connected hot water supply apparatus shown in FIG. 1; FIG. 3 is a top view of the connected hot water supply apparatus shown in FIG. 1; FIG. FIG. 5 is a side view of the hot water supply device. FIG. 5 is a perspective view showing each hot water supply device before connecting the hot water supply devices to each other. FIG. 6 is a diagram illustrating the installation of a frame. FIG. Diagram to be explained [Explanation of reference numerals]
DESCRIPTION OF SYMBOLS 1 Connected hot water supply device 2a, 2b, 2c Stand 10a Main hot water supply device 10b 1st secondary hot water supply device 10c 2nd secondary hot water supply device

Claims (2)

直方体の主架台上に主給湯器を設けた主給湯装置を備え、該主給湯装置に、前記主架台と同一の形状を有する第1従架台上に第1従給湯器を設けた第1従給湯装置であって主給湯装置の一側に並べて設置可能なものと、前記主架台と同一の横幅及び高さを有する直方体の第2従架台上に第2従給湯器を設けた第2従給湯装置であって主給湯装置及び第1従給湯装置の背面に並べて設置可能なものとから選択した少なくとも1台を、各架台が相互に密接するように連結し、必要な給湯能力にする連結給湯装置であって、
前記各架台の内部に、前記主給湯器、第1従給湯器及び第2従給湯器の熱交換器の加熱手段に燃料ガスを供給するガス管の一端が接続された元ガス管片、熱交換器への給水管の一端が接続された元水管片及び熱交換器からの出湯管の一端が接続された合流出湯管片の少なくともいずれか1本の配管片をそれぞれ設け、各配管片を可撓性を有するフレキ管を介して接続したことを特徴とする連結給湯装置。
A first water heater having a main water heater provided on a rectangular parallelepiped main gantry, wherein the first water heater is provided on the first gantry having the same shape as the main water heater; A hot water supply device which can be installed side by side on one side of the main hot water supply device, and a second sub water heater provided with a second sub water heater on a rectangular parallelepiped second sub stand having the same width and height as the main base. At least one hot water supply device selected from a main hot water supply device and a hot water supply device that can be arranged side by side on the back of the first subordinate hot water supply device is connected so that the respective bases are in close contact with each other, and is connected to a required hot water supply capacity. A water heater,
Inside each of the mounts, a source gas pipe piece connected to one end of a gas pipe for supplying a fuel gas to a heating means of a heat exchanger of the main water heater, the first water heater, and the second water heater, At least one pipe piece of the original water pipe piece connected to one end of the water supply pipe to the exchanger and the combined outflow pipe piece connected to one end of the tapping pipe from the heat exchanger is provided. A connected hot-water supply device connected via a flexible pipe having flexibility.
前記主架台、第1従架台及び第2従架台を締結手段を介して相互に締着したことを特徴とする請求項1記載の連結給湯装置。The hot water supply apparatus according to claim 1, wherein the main gantry, the first gantry, and the second gantry are fastened to each other via fastening means.
JP2002205642A 2002-07-15 2002-07-15 Combined hot water supply device Pending JP2004044972A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2002205642A JP2004044972A (en) 2002-07-15 2002-07-15 Combined hot water supply device
AU2003213464A AU2003213464B2 (en) 2002-07-15 2003-07-15 Combined hot-water supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002205642A JP2004044972A (en) 2002-07-15 2002-07-15 Combined hot water supply device

Publications (1)

Publication Number Publication Date
JP2004044972A true JP2004044972A (en) 2004-02-12

Family

ID=31710890

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002205642A Pending JP2004044972A (en) 2002-07-15 2002-07-15 Combined hot water supply device

Country Status (2)

Country Link
JP (1) JP2004044972A (en)
AU (1) AU2003213464B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013002786A (en) * 2011-06-21 2013-01-07 Noritz Corp Hot water supply system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08291638A (en) * 1995-04-24 1996-11-05 Oobayashi Doro Kk Liquid storage tank and construction thereof
DE19912930A1 (en) * 1999-03-22 2000-09-28 Simplex Wilfer Gmbh & Co Wall mounting device for esp. heating radiators with flexible connection pipes and wall-mounted pipe bending device
JP2001330326A (en) * 2000-05-22 2001-11-30 Corona Corp Storage-type water-heating apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013002786A (en) * 2011-06-21 2013-01-07 Noritz Corp Hot water supply system

Also Published As

Publication number Publication date
AU2003213464B2 (en) 2008-09-11
AU2003213464A1 (en) 2004-01-29

Similar Documents

Publication Publication Date Title
RU2364058C2 (en) Base support with case for holding plug-in units
JP2004044972A (en) Combined hot water supply device
JP3979893B2 (en) Connected water heater
JP2004044973A (en) Combined hot water supply device
KR100448605B1 (en) Stand for hot-water supply
JP2006328664A (en) Wall panel and method of manufacturing the same
JP2001317765A (en) Support for cold/hot water pipe for cooling/heating device which is set between floor surface and floor panel of office building, and for business machine cord
CN109506507A (en) A kind of high temperature and pressure solid-state heat reservoir
US1888900A (en) Radiator
JP4889543B2 (en) Foundation block and foundation structure using foundation block
JP2547294Y2 (en) Floor heating panel placed at the connection with the heat source unit
KR20100134980A (en) Heating and cooling devices by thermionic conduction panel assembly type
JP3343306B2 (en) Kitchenware mounting bracket and piping wiring unit
JPH0718897Y2 (en) Seamless floor air conditioning floor board
JP6854175B2 (en) Underfloor heating system, building and unit building
JPH07332547A (en) Fixing device for header
JPH10213328A (en) Air conditioner for flooring tatami
JPH0553124B2 (en)
JP2939879B2 (en) Method of forming floor heating device
CA2044153A1 (en) Device for the temperating of premises
JPH04359724A (en) Floor air conditioning structure
RU2160944C1 (en) Thermoelectric generator
JPS5924050A (en) Apparatus for connecting upper and lower curtain units in unit type curtain wall having temperature control function
JPS6237049Y2 (en)
GB2345530A (en) A floor heating system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040909

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070227

A02 Decision of refusal

Effective date: 20070703

Free format text: JAPANESE INTERMEDIATE CODE: A02