JP2004019313A - Support for anchor bolt - Google Patents
Support for anchor bolt Download PDFInfo
- Publication number
- JP2004019313A JP2004019313A JP2002177425A JP2002177425A JP2004019313A JP 2004019313 A JP2004019313 A JP 2004019313A JP 2002177425 A JP2002177425 A JP 2002177425A JP 2002177425 A JP2002177425 A JP 2002177425A JP 2004019313 A JP2004019313 A JP 2004019313A
- Authority
- JP
- Japan
- Prior art keywords
- bolt
- support
- anchor bolt
- anchor
- holding portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
この発明は、コンクリート製布基礎に埋設されるアンカーボルト(柱緊結用アンカーボルトを含む)を、コンクリート打設前に布基礎用型枠に位置決めするアンカーボルトの位置決め用支持具に関する。
【0002】
【従来の技術】
布基礎に埋設するアンカーボルトには、土台を固定するための土台固定用アンカーボルトと、柱に固定したホールダウン金物を碇着するための柱緊結用アンカーボルトとがある。
これらのアンカーボルトはいずれも土台に設けた孔を貫通するので、正確に位置決めして布基礎に埋設しなければならない。
また、柱に近接して埋設する柱緊結用アンカーボルトでは、柱太さ寸法(例えば、120×120角、105×105角)によって柱芯からの位置が異なるうえ、柱の側面基部に筋かいを設置するか否かによって、アンカーボルトを布基礎の通り芯(幅方向の中心線)上に埋設する場合と、通り芯からシフトした位置に埋設する場合とがある。
このように、布基礎の構築に当って、アンカーボルトの位置決めは種々であり、また、その本数も多いので、正確な位置にセットするために非常な手間を要する。
【0003】
しかし、従来の支持具は、アンカーボルトを保持させる構造が、支持具に設けてある筒体にアンカーボルトを下方から差込み、上端部にナットを螺合させてこのナットを前記の筒体に係合させるものなので、型枠中にコンクリートを打設するとき、その勢力でアンカーボルトが上方へ、筒体からぬけ出るように移動してしまう恐れがあり、アンカーボルトの下部を鉄筋に緊縛する補助具を用いたりしている。また、柱緊結用アンカーボルトの場合、土台のアンカーボルト貫通個所に筋かいの基部が存在すると、これに対応させてアンカーボルトの位置をシフトさせる必要があるが、その処理が面倒である。
【0004】
【発明が解決しようとする課題】
この発明は、布基礎に埋設するアンカーボルト(土台固定用あるいは柱緊結用)を布基礎用型枠に対して簡単、確実に位置決めすることができる支持具の提供を課題とする。
【0005】
【課題を解決するための手段】
型枠の天端に架ける支持部とアンカーボルトを保持するボルト保持部を有する。型枠は、対向して設置された布基礎用型枠である。
支持部はボルト保持部の両端に位置し、型枠の天端に係合する横面部を有する。支持部はボルト保持部と一体の場合と別部材の場合があり、別部材の場合、前記横面部(第1の横面部)の他に第2の横面部を有し、この横面部でボルト保持部と結合される。そして、ボルト保持部との結合を調節可能なものとすることにより、ボルト保持部の両端に結合する支持部の間隔を布基礎の幅寸法に応じて選択可能とする。
【0006】
別部材とした支持部は、第1の横面部と第2の横面部及びこれらをクランク形に連結する縦面部を備えた構造とし、第2の横面部でボルト保持部と結合し、第1の横面部を型枠の天端に係合する部分とする。これにより、この支持具では、ボルト保持部を両側の型枠の間に、型枠天端面よりもほぼ縦面部の長さ分だけ下方へ吊り下げて使用できる。このため、ボルト保持部の押しねじの位置が低いので、埋設するアンカーボルトの布基礎天端面からの突出量が少なく設計されているアンカーボルトの場合にも、押しねじが必ずアンカーボルトの布基礎から突出している部分ヘ当接し、アンカーボルトを安定して支持することができる。すなわち、アンカーボルト支持具としての適用範囲が広い。
【0007】
ボルト保持部は、ボルト挿通孔とボルト挿通孔へ直交する押しねじを備える。ボルト挿通孔は、保持部の長手方向ほぼ中央に上下方向に貫通して設ける。また、押しねじは、先端部側面に円錐面を備え、円錐面でアンカーボルトを支持部壁に押圧して固定する。
この構造によると、アンカーボルトは、押しねじの先端部円錐面で保持部壁に押圧されるので、円錐面のくさび効果によって支持具ヘ強固に保持される。このため、コンクリート打設時にもアンカーボルトが上下に移動したり、振動で外れてしまったりすることがない。
【0008】
ボルト挿通孔は円形であるが、1個だけではなく、押しねじ先端部の両側となる位置に2個の挿通部を設けることがある。すなわち、押しねじの先端部円錐面は、アンカーボルトが左右のどちら側にあっても、あるいは両側にあってもその円錐面でアンカーボルトを強固に押圧できる配置とする。この時、一方である第1のボルト挿通部を保持部の長手方向で中央に配置すると、他方である第2のボルト挿通部は中央からシフトする。そして、支持具を第1のボルト挿通部が布基礎の通り芯上となるように配置すると、第2のボルト挿通部は布基礎の幅方向で通り芯からシフトした位置となり、筋かいなどが存在するときなど、必要に応じてアンカーボルトをこれらと干渉しない位置へ簡単に配置することができる。
【0009】
ボルト保持部は左右反転して使用できる構造とすることがある。すなわち、支持部とボルト保持部が一体である場合には支持具全体を反転することでボルト保持部を反転し、支持部とボルト保持部が別部材の場合にはボルト保持部だけを反転できる構造とする。
この構成では、アンカーボルトの配置を通り芯から左側へシフトした場合と右側ヘシフトした場合のいずれにも対応することができるので、柱緊結用アンカーボルトの位置決めに便利である。
【0010】
【発明の実施の形態】
図1は、第1の実施形態としてのアンカーボルトの支持具1を示し、フーチング2の上に既に設置した布基礎用型枠3にセットしてある。符号4はアンカーボルトであり、布基礎コンクリートに基部を埋設する。符号5は定規であり、支持具1自体の位置決めに用いる。上面に芯ラインd1,d2を直交させて設けてあり、これを布基礎の通り芯P(通常、型枠に水糸を張って示されている)に合わせて用いる。
【0011】
支持具1(図2,3)は、ボルト保持部6と支持部7及び押しねじ8を備える。
保持部6は鋼板をコ字形に屈曲し上板9と下板10及び背板11を形成した形態を基本とし、上板9と下板10に貫通して同じ位置にボルト挿通孔12を設けてある。また、背板11の中央部に雌ねじが形成され、これに蝶ねじ形で、先端を円錐面とした押しねじ8を螺合してある。押しねじ8(図4)はその前後方向の軸線が後述のボルト挿通部16の中心に対して左右方向へ少し外れた位置に配置されている。これは、押しねじ8をねじ込むと先端の円錐面でアンカーボルト4に当接させるためである。
【0012】
支持部7は、この実施形態において上板9の両端(左右端部)における横面部13と縦面部14とからなり、保持部6と一体に形成されている。横面部13と縦面部14は、上板9にのみ形成され、横面部13が保持部6における上下方向寸法の略中間部に位置する配置となっている。
ボルト挿通孔12は前方から後方へ横断する方向に切り欠いた導入路15とその後端部にボルト保持部6の中央(両側の支持部7の中央)に位置させたボルト挿通部16を備える。
アンカーボルトは通常M16を用いるので導入路15の幅やボルト挿通部16の直径はこれに合わせ、若干大きい程度とする。
【0013】
アンカーボルト4の上部をボルト保持部6のボルト挿通部16に挿通して押しねじ8で固定することにより、支持具1にアンカーボルト4を取付けておく。押しねじ8をねじ込むと先端の円錐面がアンカーボルト4をボルト保持部6の保持部壁へ押し付け、アンカーボルト4を支持具1へ固定できるが、円錐面で押圧するくさび効果によって、その押圧力は強く、アンカーボルト4と支持具1は、アンカーボルト4が押しねじ4の先端面でボルトの軸線と直交する方向から押圧されるよりも強固に固定される。
【0014】
ついで、支持具1を図1のように型枠3の天端に両側の横面部13,13を載せて安定させた後、定規5を用いて支持具1の位置を定め、その位置で前記の横面部13,13を釘打ちやクランプ17で固定する。なお、支持具1自体の位置決めには、アンカーボルト4を直接、通り芯Pに一致させることもある。
ついで、コンクリートを打設する。支持具1に対するアンカーボルト4の固定は強固であり、また、支持具1自体も型枠3にしっかりと固定されるので、コンクリート打設の勢力でアンカーボルト4の位置が狂ってしまう事態は生じない。
【0015】
図5は、第2の実施形態であり、第1の実施形態とはボルト挿通孔12の構成が異なる。すなわち、ボルト挿通孔12は導入路15の両側に第1のボルト挿通部16a,第2のボルト挿通部16bを有し、導入路15に対して左右対称の配置となっている。この場合、第1のボルト挿通部16aはボルト保持部6の中央(左右の支持部7,7の中央)に配置するので、第2のボルト挿通部16bは、布基礎の通り芯Pからシフトした位置(例えば28mm)となる。筋かいなどが存在してアンカーボルト4の位置を布基礎の幅方向で左右にシフトさせる必要があるとき、第2のボルト挿通部16bを選択することで簡単に対応することができる。また、ボルト保持部6を左右反転させると、第1のボルト挿通部16aの位置は変わらないが、第2のボルト挿通部16bの位置は反対側の対称位置となり、これにアンカーボルト4を固定すると、前記とは逆方向にシフトさせることができる。
なお、押しねじ8の軸心は第1、第2のボルト挿通部16a,16bの中間部に設定してあり、ねじ込むと先端の円錐面がボルト挿通部16a,16bに装着したアンカーボルト4のいずれにも当接しこれを押圧する配置となっている。
【0016】
図6〜8は第3の実施形態であり、第1の実施形態とはボルト保持部6と支持部7の構成が異なる。この実施形態においては、保持部6と支持部7が別部材であり、左右の支持部7,7の間隔を選択可能となっている。また、支持部7が第1横面部18と第2横面部19及びこれらをクランク形に連結した縦面部20とから成っている。そして、ボルト保持部6を中央にしてボルト保持部の両端に支持部7,7を対向させて(左右対称に)配置し、それぞれの第2横面部19をボルト保持部6の上板9にねじ21により固定してある。ねじ21による固定位置は、ボルト保持部6の上板9に3段階の孔を設けることで布基礎の幅寸法に合わせて選択可能となっている。
【0017】
第1の実施形態と同様に、支持具1にアンカーボルト4を押しねじ8で固定しておき、これを型枠3に配置する。この場合、支持部7の縦面部20は第1、第2の実施例に比較して長く、第1横面部18は、型枠3の天端に係合させるためのものとしているので、この実施形態では、ボルト保持部6が型枠3の天端面よりも下方へ吊り下げられた態様で使用される。
このため、押しねじ8の上下方向位置は低く、アンカーボルト4の上部が布基礎の天端面から突出する量が少ない場合でも充分にアンカーボルト4を支持具1へ固定することができる。
【0018】
図示していないが、第4の実施形態として、第3の実施形態におけるボルト保持部6の下板10にも上板9と同様に、ねじ21をねじ込む孔を設け、また、ボルト挿通部16を第2の実施形態と同様に、導入路15を中心に対称に設けた構成とすることがある。この構成によれば、第3の実施形態のように吊り下げタイプであっても、同じ支持具1を用いてアンカーボルトをシフト位置に配置することができる。
【0019】
【発明の効果】
支持具はアンカーボルトを押しねじの先端円錐面で押圧する構造としているので、支持具に対するアンカーボルトの固定が確実である。また、押しねじによる押圧部分は円錐面なので、アンカーボルトが押しねじの左右どちら側に配置されても同じ押しねじで押圧することができる。
ボルト保持部に2個のボルト挿通部を有し、一方は布基礎の通り芯位置とし、他方をシフトさせたものでは、挿通部を選択するだけでアンカーボルトの配置を簡単にシフトさせることができる。また、ボルト保持部を左右反転すれば、前記のシフト位置と逆の対称位置へシフトさせることも簡単にできる。
支持具のボルト保持部と支持部を別部材とすることにより、布基礎の幅寸法に対応した支持具を簡単に得られる。
また、支持部の縦面部を長くして、支持具を吊り下げタイプとすることにより、布基礎天端面からの突出量が少ないアンカーボルトの配置にも支障なく使用でき、利用範囲が広い。
【図面の簡単な説明】
【図1】使用状態で示す斜視図(第1の実施形態)
【図2】斜視図
【図3】分解して示す斜視図
【図4】平面図
【図5】平面図(第2の実施形態)
【図6】側面図(第3の実施形態)
【図7】平面図
【図8】正面図
【符号の説明】
1 アンカーボルトの支持具
2 フーチング
3 型枠
4 アンカーボルト
5 定規
6 ボルト保持部
7 支持部
8 押しねじ
9 上板
10 下板
11 背板
12 ボルト挿通孔
13 横面部
14 縦面部
15 導入路
16,16a,16b ボルト挿通部
17 クランプ
18 第1の横面部
19 第2の横面部
20 縦面部
21 ねじ
P・・・通り芯
d1、d2・・・芯ライン[0001]
TECHNICAL FIELD OF THE INVENTION
BACKGROUND OF THE
[0002]
[Prior art]
Anchor bolts embedded in a cloth foundation include a base fixing anchor bolt for fixing a base and a column fastening anchor bolt for anchoring a hole-down hardware fixed to a column.
Since all of these anchor bolts pass through holes provided in the base, they must be accurately positioned and embedded in the fabric foundation.
Further, in the anchor bolt for column fastening buried near the pillar, the position from the pillar core differs depending on the pillar thickness dimension (for example, 120 × 120 square, 105 × 105 square), and the base of the side of the pillar is reinforced. Depending on whether or not the anchor is installed, there are cases where the anchor bolt is embedded on the core (widthwise center line) of the cloth foundation and where the anchor bolt is embedded at a position shifted from the core.
As described above, when constructing the fabric foundation, the positioning of the anchor bolts is various, and the number of anchor bolts is large.
[0003]
However, in the conventional support device, the structure for holding the anchor bolt is such that the anchor bolt is inserted from below into a cylinder provided on the support device, and a nut is screwed into an upper end portion, and the nut is engaged with the cylinder. When concrete is poured into the formwork, the anchor bolts may move upward and out of the cylindrical body due to the force, and the lower part of the anchor bolts is tied to the reinforcing steel. Or using tools. In addition, in the case of the anchor bolt for column fastening, if the base of the brace is present at the place where the anchor bolt penetrates on the base, it is necessary to shift the position of the anchor bolt in correspondence with this, but the processing is troublesome.
[0004]
[Problems to be solved by the invention]
SUMMARY OF THE INVENTION It is an object of the present invention to provide a support which can easily and surely position an anchor bolt (for fixing a base or fastening a column) embedded in a cloth foundation with respect to a cloth foundation formwork.
[0005]
[Means for Solving the Problems]
It has a support part that is hung on the top end of the formwork and a bolt holding part that holds the anchor bolt. The formwork is a fabric formwork for fabric foundation that is installed facing the formwork.
The support portion is located at both ends of the bolt holding portion and has a lateral surface portion that engages with the top end of the formwork. The support portion may be integrated with the bolt holding portion or may be a separate member. In the case of a separate member, the support portion has a second lateral surface portion in addition to the lateral surface portion (first lateral surface portion), and the lateral surface portion includes a bolt. Combined with the holding part. And by making the connection with the bolt holding portion adjustable, the interval between the support portions connected to both ends of the bolt holding portion can be selected according to the width dimension of the cloth foundation.
[0006]
The supporting portion as a separate member has a structure including a first lateral surface portion, a second lateral surface portion, and a vertical surface portion connecting the first lateral surface portion and the second lateral surface portion in a crank shape, and is coupled to the bolt holding portion at the second lateral surface portion. Is a portion to be engaged with the top end of the formwork. Thus, in this support, the bolt holding portion can be used by being suspended between the molds on both sides by a length substantially equal to the length of the vertical surface portion from the top end surface of the mold. For this reason, the position of the push screw of the bolt holding part is low, so even if the anchor bolt is designed so that the amount of protrusion of the embedded anchor bolt from the top end face is small, the push screw must be Abuts on a portion projecting from the anchor bolt, and can stably support the anchor bolt. That is, the range of application as an anchor bolt support is wide.
[0007]
The bolt holding portion includes a bolt insertion hole and a set screw orthogonal to the bolt insertion hole. The bolt insertion hole is provided substantially vertically at the center of the holding portion in the vertical direction. Further, the push screw has a conical surface on the side surface of the distal end portion, and presses and fixes the anchor bolt against the support portion wall with the conical surface.
According to this structure, since the anchor bolt is pressed against the holding portion wall by the conical surface of the tip end portion of the push screw, the anchor bolt is firmly held on the support by the wedge effect of the conical surface. For this reason, the anchor bolts do not move up and down or come off due to vibration even during concrete casting.
[0008]
Although the bolt insertion hole is circular, not only one but also two insertion portions may be provided at positions on both sides of the tip end of the set screw. That is, the conical surface of the tip of the push screw is arranged so that the anchor bolt can be firmly pressed by the conical surface regardless of whether the anchor bolt is on the left or right side or on both sides. At this time, if one of the first bolt insertion portions is disposed at the center in the longitudinal direction of the holding portion, the other second bolt insertion portion shifts from the center. Then, when the support is arranged such that the first bolt insertion portion is on the core as the cloth base, the second bolt insertion portion is at a position shifted from the core in the width direction of the cloth base, and the struts are not formed. When necessary, such as when the anchor bolts are present, the anchor bolts can be easily arranged at positions where they do not interfere with them.
[0009]
The bolt holding portion may have a structure that can be used by turning left and right. That is, when the support portion and the bolt holding portion are integral, the bolt holding portion can be inverted by inverting the entire support, and when the support portion and the bolt holding portion are separate members, only the bolt holding portion can be inverted. Structure.
In this configuration, it is possible to cope with both the case where the arrangement of the anchor bolt is shifted from the center to the left and the case where the arrangement is shifted to the right, so that it is convenient to position the anchor bolt for column fastening.
[0010]
BEST MODE FOR CARRYING OUT THE INVENTION
FIG. 1 shows an
[0011]
The support 1 (FIGS. 2 and 3) includes a
The
[0012]
In this embodiment, the
The
Since the anchor bolt usually uses M16, the width of the
[0013]
The
[0014]
Next, the
Next, concrete is poured. Since the
[0015]
FIG. 5 shows a second embodiment, which differs from the first embodiment in the configuration of the bolt insertion holes 12. That is, the
The axial center of the
[0016]
FIGS. 6 to 8 show a third embodiment, which differs from the first embodiment in the configuration of the
[0017]
As in the first embodiment, an
For this reason, the vertical position of the
[0018]
Although not shown, as a fourth embodiment, similarly to the
[0019]
【The invention's effect】
Since the support has a structure in which the anchor bolt is pressed by the tip conical surface of the push screw, the anchor bolt is securely fixed to the support. Further, since the pressing portion by the pressing screw is a conical surface, the pressing can be performed by the same pressing screw regardless of whether the anchor bolt is disposed on the left or right side of the pressing screw.
The bolt holding part has two bolt insertion parts, one of which is located at the center of the fabric base and the other is shifted, the arrangement of the anchor bolts can be easily shifted simply by selecting the insertion part. it can. In addition, if the bolt holding portion is turned left and right, it can be easily shifted to a symmetrical position opposite to the above shift position.
By forming the bolt holding portion and the support portion of the support member as separate members, a support device corresponding to the width dimension of the fabric base can be easily obtained.
In addition, since the vertical portion of the support portion is elongated and the support tool is of a hanging type, it can be used without any problem even when an anchor bolt having a small protrusion amount from the cloth foundation top end surface is used, and the range of use is wide.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a use state (first embodiment).
FIG. 2 is a perspective view. FIG. 3 is an exploded perspective view. FIG. 4 is a plan view. FIG. 5 is a plan view (second embodiment).
FIG. 6 is a side view (third embodiment).
FIG. 7 is a plan view. FIG. 8 is a front view.
DESCRIPTION OF
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002177425A JP2004019313A (en) | 2002-06-18 | 2002-06-18 | Support for anchor bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002177425A JP2004019313A (en) | 2002-06-18 | 2002-06-18 | Support for anchor bolt |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2004019313A true JP2004019313A (en) | 2004-01-22 |
Family
ID=31175465
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002177425A Pending JP2004019313A (en) | 2002-06-18 | 2002-06-18 | Support for anchor bolt |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2004019313A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006104839A (en) * | 2004-10-07 | 2006-04-20 | Kanai:Kk | Anchor bolt support |
JP2020125628A (en) * | 2019-02-05 | 2020-08-20 | 株式会社コングロ | Anchor bolt holder |
JP7333662B1 (en) | 2022-03-14 | 2023-08-25 | ゲートアップ合同会社 | Fixing member fixing device, fixing girder fixing device, and fixing member fixing method |
-
2002
- 2002-06-18 JP JP2002177425A patent/JP2004019313A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006104839A (en) * | 2004-10-07 | 2006-04-20 | Kanai:Kk | Anchor bolt support |
JP2020125628A (en) * | 2019-02-05 | 2020-08-20 | 株式会社コングロ | Anchor bolt holder |
JP7220578B2 (en) | 2019-02-05 | 2023-02-10 | 株式会社コングロ | anchor bolt retainer |
JP7333662B1 (en) | 2022-03-14 | 2023-08-25 | ゲートアップ合同会社 | Fixing member fixing device, fixing girder fixing device, and fixing member fixing method |
JP2023133989A (en) * | 2022-03-14 | 2023-09-27 | ゲートアップ合同会社 | Anchorage member fixing device, fixing girder fixing device, and anchorage member fixing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2004019313A (en) | Support for anchor bolt | |
JP2011026930A (en) | Three-dimensionally crossing reinforcement fastener | |
JP3740232B2 (en) | Anchor bolt mounting bracket | |
JP3600972B2 (en) | Hanging hardware for reinforced concrete blocks | |
JP6133606B2 (en) | Anchor bolt support device | |
JP3658707B2 (en) | Support structure for fixed formwork | |
KR200408480Y1 (en) | mounting fixed tool of mold | |
JPS5923161Y2 (en) | Concrete formwork support fittings | |
JPH05287754A (en) | Anchor bolt positioning tool | |
JP4038086B2 (en) | Bracing unit mounting structure | |
JP2714767B2 (en) | Auxiliary device for supporting upright formwork | |
JPS5938524Y2 (en) | Anchor bolt support for concrete foundation | |
KR200347320Y1 (en) | A Sheeting reinforcement Structure Clamp of Construct | |
JP4531224B2 (en) | Anchor bolt retainer when placing concrete foundation | |
JP3044532U (en) | Fixed rack for clothesline | |
JP3040794U (en) | Support columns for corners of concrete foundation forming panels | |
JPS609333Y2 (en) | Bata material support bracket | |
JPS636369Y2 (en) | ||
JPH0352912Y2 (en) | ||
JPH078721Y2 (en) | Buried pipe fixing metal fittings for hollow reinforced concrete structures | |
JP2001254416A (en) | Support leg fixing structure of bathroom unit | |
JP2879437B1 (en) | Formwork installation members on retaining walls | |
JP2004019312A (en) | Anchor bolt positioning device | |
JP3023561U (en) | Cone anchor bolt free inclination angle set hardware | |
JPH0314253U (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Effective date: 20050411 Free format text: JAPANESE INTERMEDIATE CODE: A621 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20061130 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070220 |
|
A02 | Decision of refusal |
Effective date: 20070626 Free format text: JAPANESE INTERMEDIATE CODE: A02 |