JP2003330534A - Plant operation monitoring device - Google Patents

Plant operation monitoring device

Info

Publication number
JP2003330534A
JP2003330534A JP2002133563A JP2002133563A JP2003330534A JP 2003330534 A JP2003330534 A JP 2003330534A JP 2002133563 A JP2002133563 A JP 2002133563A JP 2002133563 A JP2002133563 A JP 2002133563A JP 2003330534 A JP2003330534 A JP 2003330534A
Authority
JP
Japan
Prior art keywords
various
plant
correspondence
expansion
operator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002133563A
Other languages
Japanese (ja)
Inventor
Takayuki Kudo
孝行 工藤
Hiroshi Aiba
浩 相羽
Toshikazu Tanba
俊和 丹葉
Hiroki Yamaguchi
太樹 山口
Takuro Nakano
琢朗 中野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2002133563A priority Critical patent/JP2003330534A/en
Publication of JP2003330534A publication Critical patent/JP2003330534A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • User Interface Of Digital Computer (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a plant operation monitoring device for reducing a load on an operator when detecting an alarm and a condition change in an operation of the plant, receiving an outset notification, and deploying a countermeasure of an abnormal outset factor. <P>SOLUTION: The plant operation monitoring device comprises a plant alarm monitor means, a plant condition monitor means and a plant operation condition monitor means. The plant operation monitoring device further comprises a database for deploying countermeasures to a variety of factors storing methods of deploying countermeasures for the operator to deal with a variety of detected factors, and a means for adding a countermeasure deployment method for adding and outputting a countermeasure deployment method for the operator to deal with the detected factor from each means by using the database for deploying countermeasures to a variety of factors. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、原子力および火力
プラント等の運転・監視を効率よく行うプラント運転監
視装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a plant operation monitoring device for efficiently operating and monitoring nuclear power plants and thermal power plants.

【0002】[0002]

【従来の技術】従来のプラント運転監視装置は、プラン
トの警報監視結果および状態変化検出結果を運転員に通
知することは可能であったが、警報発生およびその状態
変化の要因に対する対応展開は、運転員の運転経験、ノ
ウハウに依存していた。
2. Description of the Related Art Conventional plant operation monitoring devices have been capable of notifying operators of plant alarm monitoring results and state change detection results. It depended on the operator's driving experience and know-how.

【0003】図18は、従来の要因発生から対応操作ま
でのプラント運転監視装置のブロック構成図である。同
図に示すように、プラント運転監視装置1aは、プラン
トデータ入力装置1と、プラント警報監視手段2と、プ
ラント警報監視用データベース3と、プラント状態監視
手段4と、プラント状態監視用データベース5と、プラ
ント運転状態監視手段6と、プラント運転状態監視用デ
ータベース7と、出力装置10とおよび表示装置11と
から構成されている。
FIG. 18 is a block diagram of a conventional plant operation monitoring apparatus from the occurrence of a factor to the corresponding operation. As shown in the figure, the plant operation monitoring device 1a includes a plant data input device 1, a plant alarm monitoring unit 2, a plant alarm monitoring database 3, a plant state monitoring unit 4, and a plant state monitoring database 5. It comprises a plant operating state monitoring means 6, a plant operating state monitoring database 7, an output device 10 and a display device 11.

【0004】これらの構成要素の作用は、以下のとおり
である。プラントデータ入力装置1は、プラント2aに
設けられたセンサーおよび制御装置からプラントデータ
を入力する。
The operation of these components is as follows. The plant data input device 1 inputs plant data from a sensor and a control device provided in the plant 2a.

【0005】プラント警報監視手段2は、プラントデー
タ入力装置1に取込まれたプラントデータについて、プ
ラント警報監視用データベース3中の警報判定基準と比
較して警報の判定を行い、判定結果を出力装置10およ
び表示装置11に送る。
The plant alarm monitoring means 2 compares the plant data taken into the plant data input device 1 with an alarm determination standard in the plant alarm monitoring database 3 to determine an alarm, and outputs the determination result to the output device. 10 and display device 11.

【0006】プラント状態監視手段4は、プラントデー
タ入力装置1に取込まれた、プラント警報発生に至る前
のプラント周辺データについて、プラント状態監視用デ
ータベース5中のプラント状態変化基準と比較してプラ
ント状態変化の判定を行い、判定結果を出力装置10お
よび表示装置11に送る。
[0006] The plant state monitoring means 4 compares the plant peripheral data, which has been taken into the plant data input device 1 and before the occurrence of a plant alarm, with the plant state change reference in the plant state monitoring database 5, and compares The state change is determined and the determination result is sent to the output device 10 and the display device 11.

【0007】プラント運転状態監視手段6は、プラント
データ入力装置1に取込まれたプラント本体性能に係る
データについて、プラント運転状態監視用データベース
7中のプラント運転状態変化基準と比較してプラント運
転状態変化の判定を行い、判定結果を出力装置10およ
び表示装置11に送る。
The plant operating state monitoring means 6 compares the plant main body performance data taken into the plant data input device 1 with the plant operating state change reference in the plant operating state monitoring database 7 to determine the plant operating state. The change is determined and the determination result is sent to the output device 10 and the display device 11.

【0008】表示装置11は、警報表示、状態変化表示
および運転状態変化表示を行う。
The display device 11 provides an alarm display, a state change display and an operating state change display.

【0009】運転員は、これらの表示を確認すると、本
人の判断によって個別機能メニューを選択して、各種要
因に対して機能展開することにより対応操作を行ってい
た。
When the operator confirms these displays, he / she selects the individual function menu according to his / her judgment and performs the corresponding operation by developing the function for various factors.

【0010】個別機能メニューには、系統図表示40
と、操作用系統図表示41と、操作用画面表示(8操作
端等)42と、操作用ガイダンス表示43と、制御装置
制御状態表示(進行状態)44と、制御装置操作ガイダ
ンス表示45と、トレンド画面表示46と、装置(ネッ
トワーク)故障個所特定表示47と、警報発生操作ガイ
ダンス48と、プラント運転状態表示49と、プラント
運転操作画面表示50および運転操作ガイダンス表示5
1があり、夫々のメニューの表示手段によって表示され
る。
A system diagram display 40 is displayed in the individual function menu.
An operation system diagram display 41, an operation screen display (e.g., 8 operation ends) 42, an operation guidance display 43, a control device control state display (progress state) 44, and a control device operation guidance display 45. Trend screen display 46, device (network) failure location identification display 47, alarm generation operation guidance 48, plant operation status display 49, plant operation operation screen display 50, and operation operation guidance display 5
1 and is displayed by the display means of each menu.

【0011】このように、プラントの状態変化に対して
警報通知及び状態変化通知および運転状態変化通知が表
示されると、運転員は、個人の運転経験やノウハウに従
って、それらの変化要因に対する対応展開を行ってい
た。
As described above, when the alarm notification, the status change notification, and the operation status change notification are displayed for the status change of the plant, the operator develops a response to those change factors in accordance with the personal operating experience and know-how. Was going on.

【0012】また、それらの対応展開においては、どの
要因に対して、どのような操作であったのかの記録、す
なわち履歴が残されていなかった。
Further, in the corresponding development, a record of what kind of operation was performed for which factor, that is, a history was not left.

【0013】[0013]

【発明が解決しようとする課題】従来のプラント運転監
視装置においては、プラントの状態変化検出および警報
発生の検出を運転員に通知することは可能であったが、
それらの通知に対する対応展開方法は、運転員の運転経
験、ノウハウに従って、個別機能メニューを選択してい
たものであり、かつ、それらの要因展開についても、ど
の要因に対してどのような操作を実施したかを記録する
手段を備えていなかった。
In the conventional plant operation monitoring device, it is possible to notify the operator of the detection of the change in the state of the plant and the detection of the alarm generation.
The method of responding to those notifications was to select individual function menus according to the operating experience and know-how of the operator, and regarding the factor development, what operation was performed for which factor. It had no means of recording what it did.

【0014】本発明は、プラントの状態変化検出および
警報発生の検出を通知するにあたり、それらの検出要因
に対する運転の対応展開方法を付加して通知し、運転員
は、その付加情報に基いて対応操作方法をそのまま展開
することにより、運転操作上の負担を軽減し、かつ、運
転員の対応操作を記録してデータベースを補完すること
により、操作し易く、効率のよいプラント運転監視装置
を提供することを目的とする。
According to the present invention, in notifying the detection of the change in the state of the plant and the detection of the alarm occurrence, the method of developing the correspondence of the operation to these detection factors is added and notified, and the operator responds based on the additional information. By deploying the operation method as it is, the burden on the operation operation is reduced, and by recording the corresponding operation of the operator and complementing the database, an easy-to-operate and efficient plant operation monitoring device is provided. The purpose is to

【0015】[0015]

【課題を解決するための手段】このような目的を達成す
るために、請求項1記載のプラント運転監視制御装置
は、プラントの運転状態を監視するための各検出部から
出力されるプラントのデータからプラントの異常および
該当する検出要因を求めて出力するプラント警報監視手
段と、プラントの状態変化および該当する検出要因を求
めて出力するプラント状態監視手段と、プラントの運転
状態変化および検出要因を求めて出力するプラント運転
状態監視手段とを具備するプラント運転監視装置におい
て、プラント警報監視手段、プラント状態監視手段およ
びプラント運転状態監視手段からの各種検出要因に対す
る運転員の対応展開方法を格納した各種要因対応展開用
データベースと、各種要因対応展開用データベースを用
いて、プラント警報監視手段、プラント状態監視手段お
よびプラント運転状態監視手段からの検出要因に、検出
要因に対する運転員の対応展開方法を付加して出力する
各種要因に対する対応展開方法付加手段とを具備するこ
とを特徴とする。
In order to achieve such an object, the plant operation monitoring control apparatus according to claim 1 outputs plant data output from each detecting section for monitoring the operating state of the plant. From the plant alarm monitoring means to obtain and output the plant abnormality and the corresponding detection factor, the plant state monitoring means to obtain and output the plant state change and the corresponding detection factor, and the plant operation state change and the detection factor In a plant operation monitoring device having a plant operation state monitoring means for outputting as output, various factors storing a plant alarm monitoring means, a plant state monitoring means and a method of deploying the operator's response to various detection factors from the plant operation state monitoring means A plant alarm is generated by using the corresponding expansion database and the expansion database for various factors. And a method for adding a correspondence expansion method to various factors that outputs by adding the expansion method of the operator's correspondence to the detection factor to the detection factors from the visual means, the plant state monitoring means, and the plant operation state monitoring means. To do.

【0016】これによれば、プラントの状態変化および
その警報の通知だけでなく、プラントの状態変化に対す
る運転員の対応展開方法を付加して通知することによ
り、従来のように運転員の運転経験やノウハウに依存す
ることがなくなり、運転員の操作負荷を軽減することが
できる。
According to this, not only the notification of the change of the plant state and its alarm, but also the notification of the operation change of the plant for the change of the plant state is added to notify the operator, so that the operating experience of the operator can be increased as in the conventional case. It is possible to reduce the operation load on the operator because it does not depend on or know-how.

【0017】請求項2記載のプラント運転監視制御装置
は、請求項1のプラント運転監視制御装置において、各
種検出要因に対する対応展開方法付加手段からの対応展
開方法を受取り、対応展開方法に必要な各種展開機能の
中から、運転員の要求操作により所定の機能を選択する
各種対応展開手段と、各種対応展開手段により選択され
た機能が系統図である場合、この系統図を表示する系統
図提供手段とをさらに具備する。
According to a second aspect of the present invention, there is provided a plant operation monitoring and control apparatus according to the first aspect, which receives the corresponding expansion method from the corresponding expansion method addition means for various detection factors, and various kinds of necessary expansion methods. Various corresponding expansion means for selecting a predetermined function according to an operation requested by an operator from the expansion functions, and a system diagram providing means for displaying this system diagram when the functions selected by the various correspondence expansion means are system diagrams And further.

【0018】これによれば、運転員は、通知された状態
から操作に必要な系統図へ速やかに切り替えを行うこと
により、プラント運転監視操作を容易に、かつ効率的に
行うことができる。
According to this, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the system diagram necessary for the operation.

【0019】請求項3記載のプラント運転監視制御装置
は、請求項1記載のプラント運転監視制御装置におい
て、各種検出要因に対する対応展開方法付加手段からの
対応展開方法を受け、対応展開方法に必要な各種展開機
能の中から、運転員の要求操作により所定の機能を選択
する各種対応展開手段と、各種対応展開手段により選択
された機能が操作用系統図である場合、この操作用系統
図を表示する操作用系統図提供手段とをさらに具備する
ことを特徴とする。
The plant operation monitoring and control apparatus according to claim 3 is the plant operation monitoring and control apparatus according to claim 1, which receives a response expansion method from the response expansion method adding means for various detection factors, and is required for the response expansion method. If the corresponding expansion means for selecting a predetermined function from the various expansion functions according to the operation requested by the operator and the function selected by the various expansion means are operation system diagrams, this operation system diagram is displayed. And an operating system diagram providing means for performing the operation.

【0020】これにより、運転員は、通知された状態か
ら操作に必要な操作用系統図へ速やかに切り替えを行う
ことにより、プラント運転監視操作を容易に、かつ効率
的に行うことができる。
Thus, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the operation system diagram necessary for the operation.

【0021】請求項4記載のプラント運転監視制御装置
は、請求項1のプラント運転監視制御装置において、各
種検出要因に対する対応展開方法付加手段からの対応展
開方法を受け、対応展開方法に必要な各種展開機能の中
から、運転員の要求操作により所定の機能を選択する各
種対応展開手段と、各種対応展開手段により選択された
機能が操作用図面である場合、この操作用図面を表示す
る操作用図面提供手段とをさらに具備することを特徴と
する。
According to a fourth aspect of the present invention, there is provided the plant operation monitoring and control apparatus according to the first aspect, wherein the response development method adding means for responding to various detection factors receives a corresponding development method, and various types of correspondence development methods are required. Various corresponding expansion means for selecting a predetermined function from the expansion functions according to an operation requested by an operator, and when the function selected by the various expansion means is an operation drawing, an operation drawing for displaying this operation drawing And a drawing providing means.

【0022】これにより、運転員は通知された状態から
操作に必要な操作用画面へ速やかに切り替えを行うこと
により、プラント運転監視操作を容易に、かつ効率的に
行うことができる。
As a result, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the operation screen required for the operation.

【0023】請求項5記載のプラント運転監視制御装置
は、請求項1記載のプラント運転監視制御装置におい
て、各種検出要因に対する対応展開方法付加手段からの
対応展開方法を受け、対応展開方法に必要な各種展開機
能の中から、運転員の要求操作により所定の機能を選択
する各種対応展開手段と、各種対応展開手段により選択
された機能が操作用ガイダンスである場合、この操作用
ガイダンスを表示する操作用ガイダンス提供手段とをさ
らに具備する。
The plant operation monitoring and controlling apparatus according to a fifth aspect is the plant operation monitoring and controlling apparatus according to the first aspect, which receives a response developing method from response developing method adding means for various detection factors, and is required for the response developing method. Various corresponding expansion means for selecting a predetermined function from the various expansion functions by an operation requested by an operator, and when the function selected by the various expansion means is the operation guidance, an operation for displaying this operation guidance And a guidance providing means for use.

【0024】これにより、運転員は、通知された状態か
ら操作に必要な操作用ガイダンスへ速やかに切り替えを
行うことにより、プラント運転監視操作を容易に、かつ
孤立的に行うことができる。
As a result, the operator can easily and independently perform the plant operation monitoring operation by quickly switching from the notified state to the operation guidance necessary for the operation.

【0025】請求項6記載のプラント運転監視制御装置
は、請求項1のプラント運転監視制御装置において、各
種検出要因に対する対応展開方法付加手段からの対応展
開方法を受け、対応展開方法に必要な各種展開機能の中
から、運転員の要求操作により所定の機能を選択する各
種対応展開手段と、各種対応展開手段により選択された
機能が制御装置制御状態である場合、この制御装置制御
状態を表示する制御装置制御状態提供手段とをさらに具
備することを特徴とする。
According to a sixth aspect of the present invention, there is provided the plant operation monitoring and control apparatus according to the first aspect, wherein the response development method adding means for responding to various detection factors receives a corresponding development method, and various types of correspondence development methods are required. Various corresponding expansion means for selecting a predetermined function according to an operation requested by an operator from the expansion functions, and when the functions selected by the various correspondence expansion means are in the control device control state, this control device control state is displayed. A control device control state providing means is further provided.

【0026】これにより、運転員は、通知された状態か
ら操作に必要な制御装置制御状態へ速やかに切り替えを
行うことにより、プラント運転監視操作を容易に、かつ
効率的に行うことができる。
As a result, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the control device control state necessary for the operation.

【0027】請求項7記載のプラント運転監視制御装置
は、請求項1のプラント運転監視制御装置において、各
種検出要因に対する対応展開方法付加手段からの対応展
開方法を受け、対応展開方法に必要な各種展開機能の中
から、運転員の要求操作により所定の機能を選択する各
種対応展開手段と、各種対応展開手段により選択された
機能が制御装置操作ガイダンスである場合、この制御装
置操作ガイダンスを表示する制御装置操作ガイダンス提
供手段とをさらに具備することを特徴とする。
According to a seventh aspect of the present invention, there is provided the plant operation monitoring and control apparatus according to the first aspect, wherein the response development method adding means for responding to various detection factors receives a corresponding development method, and various types of correspondence development methods are required. When various corresponding expansion means for selecting a predetermined function from the expansion functions by the operation requested by the operator and the function selected by the various expansion means are the control device operation guidance, this control device operation guidance is displayed. A control device operation guidance providing means is further provided.

【0028】これにより、運転員は、通知された状態か
ら操作に必要な制御装置操作ガイダンスへ速やかに切り
替えを行うことにより、プラント運転監視操作を容易
に、かつ効率的に行うことができる。
Thus, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the control device operation guidance necessary for the operation.

【0029】請求項8記載のプラント運転監視制御装置
は、請求項1のプラント運転監視制御装置において、各
種検出要因に対する対応展開方法付加手段からの対応展
開方法を受け、対応展開方法に必要な各種展開機能の中
から、運転員の要求操作により所定の機能を選択する各
種対応展開手段と、各種対応展開手段により選択された
機能がトレンド画面である場合、このトレンド画面を表
示するトレンド画面提供手段とをさらに具備することを
特徴とする。
The plant operation monitoring and controlling apparatus according to claim 8 is the plant operation monitoring and controlling apparatus according to claim 1, which receives a corresponding expansion method from a corresponding expansion method adding means for various detection factors, and various kinds required for the corresponding expansion method. Various expansion means for selecting a predetermined function from the expansion functions by an operation requested by an operator, and a trend screen providing means for displaying the trend screen when the function selected by the various expansion means is a trend screen And is further provided.

【0030】これにより、運転員は、通知された状態か
ら操作に必要なトレンド画面へ速やかに切り替えを行う
ことにより、プラント運転監視操作を容易に、かつ効率
的に行うことができる。
As a result, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the trend screen required for the operation.

【0031】請求項9記載のプラント運転監視制御装置
は、請求項1のプラント運転監視制御装置において、各
種検出要因に対する対応展開方法付加手段からの対応展
開方法を受け、対応展開方法に必要な各種展開機能の中
から、運転員の要求操作により所定の機能を選択する各
種対応展開手段と、各種対応展開手段により選択された
機能が装置(ネットワーク)故障箇所特定表示である場
合、この装置(ネットワーク)故障箇所特定表示を表示す
る装置(ネットワーク)故障箇所特定表示提供手段とをさ
らに具備することを特徴とする。
According to a ninth aspect of the present invention, there is provided the plant operation monitoring and control apparatus according to the first aspect of the present invention, in which the response expansion method from the response expansion method adding means for various detection factors is received, and various types of correspondence expansion methods are required. When the corresponding expansion means for selecting a predetermined function from the expansion functions according to the operation requested by the operator and the function selected by the various expansion means is the device (network) failure location identification display, this device (network ) A device (network) for displaying a failure point identification display is further provided with a failure point identification display providing means.

【0032】これにより、運転員は、通知された状態か
ら操作に必要な装置(ネットワーク)故障箇所特定へ速や
かに切り替えを行うことにより、プラント運転監視操作
を容易に、かつ効率的に行うことができる。
As a result, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the device (network) fault location required for the operation. it can.

【0033】請求項10記載のプラント運転監視制御装
置は、請求項1のプラント運転監視制御装置において、
各種検出要因に対する対応展開方法付加手段からの対応
展開方法を受け、対応展開方法に必要な各種展開機能の
中から、運転員の要求操作により所定の機能を選択する
各種対応展開手段と、各種対応展開手段により選択され
た機能が警報発生操作ガイダンスである場合、この警報
発生操作ガイダンスを表示する警報発生操作ガイダンス
提供手段とをさらに具備することを特徴とする。
A plant operation monitoring and controlling apparatus according to claim 10 is the plant operation monitoring and controlling apparatus according to claim 1,
Responsive to various detection factors Corresponding deploying means that receives the deploying method from the deploying means and selects the predetermined function from the various deploying functions required for the deploying method by the operation requested by the operator. When the function selected by the expanding means is the alarm generation operation guidance, it further comprises alarm generation operation guidance providing means for displaying the alarm generation operation guidance.

【0034】これにより、運転員は、通知された状態か
ら操作に必要な警報発生操作ガイダンスへ速やかに切り
替えを行うことにより、プラント運転監視操作を容易
に、か効率的に行うことができる。
As a result, the operator can easily or efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the alarm generation operation guidance necessary for the operation.

【0035】請求項11記載のプラント運転監視制御装
置は、請求項1のプラント運転監視制御装置において、
各種検出要因に対する対応展開方法付加手段からの対応
展開方法を受け、対応展開方法に必要な各種展開機能の
中から、運転員の要求操作により所定の機能を選択する
各種対応展開手段と、各種対応展開手段により選択され
た機能がプラント運転状態(自動運転進行状態)画面で
ある場合、このプラント運転状態(自動運転進行状態)
画面を表示するプラント運転状態(自動運転進行状態)
画面提供手段とをさらに具備することを特徴とする。
The plant operation monitoring and controlling apparatus according to claim 11 is the plant operation monitoring and controlling apparatus according to claim 1,
Responsive to various detection factors Corresponding deploying means that receives the deploying method from the deploying means and selects the predetermined function from the various deploying functions required for the deploying method by the operation requested by the operator. When the function selected by the expanding means is the plant operation status (automatic operation progress status) screen, this plant operation status (automatic operation progress status)
Plant operation status that displays a screen (Automatic operation progress status)
A screen providing means is further provided.

【0036】これにより、運転員は通知された状態から
操作に必要なプラント運転状態(自動運転進行状態)画
面へ速やかに切り替えを行うことにより、プラント運転
監視操作を容易に、かつ効率的に行うことができる。
Thus, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the plant operation state (automatic operation progress state) screen required for the operation. be able to.

【0037】請求項12記載のプラント運転監視制御装
置は、請求項1のプラント運転監視制御装置において、
各種検出要因に対する対応展開方法付加手段からの対応
展開方法を受け、対応展開方法に必要な各種展開機能の
中から、運転員の要求操作により所定の機能を選択する
各種対応展開手段と、各種対応展開手段により選択され
た機能がプラント運転操作(指令)画面である場合、こ
のプラント運転操作(指令)画面を表示するプラント運
転操作(指令)画面提供手段とをさらに具備することを
特徴とする。
A plant operation monitoring and controlling apparatus according to claim 12 is the plant operation monitoring and controlling apparatus according to claim 1,
Responsive to various detection factors Corresponding deploying means that receives the deploying method from the deploying means and selects the predetermined function from the various deploying functions required for the deploying method by the operation requested by the operator. When the function selected by the expansion means is a plant operation operation (command) screen, it further comprises a plant operation operation (command) screen providing means for displaying this plant operation operation (command) screen.

【0038】これにより、運転員は、通知された状態か
ら操作に必要なプラント運転に対する操作(指令)画面
へ速やかに切り替えを行うことにより、プラント運転監
視操作を容易に、かつ効率的に行うことができる。
As a result, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the operation (command) screen for the plant operation necessary for the operation. You can

【0039】請求項13記載のプラント運転監視制御装
置は、請求項1のプラント運転監視制御装置において、
各種検出要因に対する対応展開方法付加手段からの対応
展開方法を受け、対応展開方法に必要な各種展開機能の
中から、運転員の要求操作により所定の機能を選択する
各種対応展開手段と、各種対応展開手段により選択され
た機能がプラント運転操作(指令)ガイダンス画面であ
る場合、このプラント運転操作(指令)ガイダンス画面
を表示するプラント運転操作(指令)ガイダンス画面提
供手段とをさらに具備することを特徴とする。
A plant operation monitoring and controlling apparatus according to claim 13 is the plant operation monitoring and controlling apparatus according to claim 1,
Responsive to various detection factors Corresponding deploying means that receives the deploying method from the deploying means and selects the predetermined function from the various deploying functions required for the deploying method by the operation requested by the operator. When the function selected by the expanding means is a plant operation operation (command) guidance screen, a plant operation operation (command) guidance screen providing means for displaying this plant operation operation (command) guidance screen is further provided. And

【0040】これにより、運転員は、通知された状態か
ら操作に必要なプラント運転に対する操作(指令)ガイ
ダンス画面へ速やかに切り替えを行うことにより、プラ
ント運転監視操作を容易に、かつ効率的に行うことがで
きる。
As a result, the operator can easily and efficiently perform the plant operation monitoring operation by quickly switching from the notified state to the operation (command) guidance screen for the plant operation necessary for the operation. be able to.

【0041】請求項14記載のプラント運転監視制御装
置は、請求項2乃至13のプラント運転監視制御装置に
おいて、各種対応展開手段からの要求を受けて各種機能
が画面表示された際の操作履歴を、帳票として各種対応
展開用操作履歴出力装置に出力する各種対応展開運転員
操作記録手段を、さらに具備することを特徴とする。
A plant operation monitoring and controlling apparatus according to a fourteenth aspect is the plant operation monitoring and controlling apparatus according to any one of the second to thirteenth aspects, in which an operation history when various functions are displayed on the screen in response to requests from various corresponding expanding means. Further, it is characterized by further comprising various corresponding deployment operator operation recording means for outputting to the various correspondence deployment operation history output device as a form.

【0042】これにより、プラント状態の変化に対して
各種画面への展開がどの様に行われたかを容易に確認す
ることができる。
As a result, it is possible to easily confirm how the development on various screens has been performed with respect to the change in the plant state.

【0043】請求項15記載のプラント運転監視制御装
置は、請求項2乃至13のプラント運転監視制御装置に
おいて、各種対応展開手段からの要求を受けて各種機能
が画面表示された際の操作履歴を、各種対応展開操作履
歴データベースに保存する各種対応展開運転員操作記録
手段を、さらに具備することを特徴とする。
A plant operation monitoring control apparatus according to a fifteenth aspect is the plant operation monitoring control apparatus according to any one of the second to thirteenth aspects, in which the operation history when various functions are displayed on the screen in response to requests from various corresponding expansion means. Various corresponding deployment operator operation recording means for storing in the various correspondence deployment operation history database is further provided.

【0044】これにより、過去のプラント状態の変化に
対する対応操作の履歴をデータベースから容易に確認す
ることができる。
With this, it is possible to easily confirm the history of the corresponding operation with respect to the past change of the plant state from the database.

【0045】請求項16記載のプラント運転監視制御装
置は、請求項2乃至13のプラント運転監視制御装置に
おいて、各種対応展開手段からの要求を受けて各種機能
が画面表示された際の操作履歴を、各種対応展開操作履
歴データベースに保存し、これに保存されている展開操
作履歴情報を記録媒体に出力する各種対応展開運転員操
作記録手段を、さらに具備することを特徴とする。
According to a sixteenth aspect of the plant operation monitoring and control apparatus, in the plant operation monitoring and control apparatus of the second to thirteenth aspects, an operation history when various functions are displayed on the screen in response to requests from various corresponding expansion means. Further, it is characterized by further comprising various corresponding deployment operator operation recording means for storing the various correspondence deployment operation history database and outputting the stored deployment operation history information to a recording medium.

【0046】これにより、過去の展開操作履歴を記録媒
体に出力して、異なる装置とのデータの受け渡しを容易
に行うことができる。
Thus, the past expansion operation history can be output to the recording medium to easily exchange data with different devices.

【0047】請求項17記載のプラント運転監視制御装
置は、請求項2乃至13のプラント運転監視制御装置に
おいて、各種対応展開手段からの要求を受けて各種機能
が画面表示された際の操作履歴を、各種対応展開操作履
歴データベースに保存し、これに保存されている展開操
作履歴情報を、帳票として各種対応展開操作履歴出力装
置に出力する各種対応展開運転員操作記録手段を、さら
に具備することを特徴とする。
A plant operation monitoring and controlling apparatus according to a seventeenth aspect is the plant operation monitoring and controlling apparatus according to any one of the second to thirteenth aspects, in which an operation history when various functions are displayed on the screen in response to requests from various corresponding expanding means. Further, it is further provided with various corresponding deployment operator operation recording means for saving the deployment operation history information stored in the various correspondence deployment operation history database and outputting the stored deployment operation history information as a form to the various support deployment operation history output device. Characterize.

【0048】これにより、過去の展開操作履歴を帳票に
出力し、対応操作を容易に確認することができる。
As a result, the past expansion operation history can be output to the form and the corresponding operation can be easily confirmed.

【0049】[0049]

【発明の実施の形態】(第1の実施の形態:請求項1に
対応)図1は、本発明の第1の実施の形態に係るプラン
ト運転監視装置のブロック構成図である。同図に示すよ
うに、プラント運転監視装置1aは、プラントデータ入
力装置1と、プラント警報監視手段2と、プラント警報
監視用データベース3と、プラント状態監視手段4と、
プラント状態監視用データベース5と、プラント運転状
態監視手段6と、プラント運転状態監視用データベース
7と、各種要因に対する対応展開方法付加手段8と、各
種要因対応展開用データベース9と、出力装置10と、
表示装置11とから構成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS (First Embodiment: Corresponding to Claim 1) FIG. 1 is a block diagram of a plant operation monitoring apparatus according to a first embodiment of the present invention. As shown in the figure, the plant operation monitoring device 1a includes a plant data input device 1, a plant alarm monitoring means 2, a plant alarm monitoring database 3, and a plant state monitoring means 4.
A plant state monitoring database 5, a plant operating state monitoring means 6, a plant operating state monitoring database 7, a response expansion method addition means 8 for various factors, a various factor response deployment database 9, and an output device 10.
It is composed of a display device 11.

【0050】これらの構成要素は、以下のとおり作用す
る。プラントデータ入力装置1は、プラント2aに設け
られたセンサーおよび制御装置からプラントデータを入
力する。
These components operate as follows. The plant data input device 1 inputs plant data from a sensor and a control device provided in the plant 2a.

【0051】プラント警報監視手段2は、プラントデー
タ入力装置1に取込まれたプラントデータについて、プ
ラント警報監視用データベース3中の警報判定基準と比
較して警報の判定を行い、判定結果を出力装置10およ
び表示装置11に送る。
The plant alarm monitoring means 2 compares the plant data taken into the plant data input device 1 with the alarm determination criteria in the plant alarm monitoring database 3 to determine an alarm, and outputs the determination result to the output device. 10 and display device 11.

【0052】プラント状態監視手段4は、プラントデー
タ入力装置1に取込まれたプラント周辺データの中で、
警報発生には至らないデータについて、プラント状態監
視用データベース5中のプラント状態変化基準と比較し
てプラント状態変化の判定を行い、判定結果を出力装置
10および表示装置11に送る。
The plant state monitoring means 4 includes, in the plant peripheral data fetched by the plant data input device 1,
For data that does not cause an alarm, the plant state change is compared with the plant state change reference in the plant state monitoring database 5 to determine the plant state change, and the determination result is sent to the output device 10 and the display device 11.

【0053】プラント運転状態監視手段6は、プラント
データ入力装置1に取込まれたプラント本体の性能を示
すデータについて、プラント運転状態監視用データベー
ス7中のプラント運転状態変化基準と比較してプラント
運転状態変化の判定を行い、判定結果を出力装置10お
よび表示装置11に送る。
The plant operation state monitoring means 6 compares the data indicating the performance of the plant main body taken into the plant data input device 1 with the plant operation state change reference in the plant operation state monitoring database 7 to perform plant operation. The state change is determined and the determination result is sent to the output device 10 and the display device 11.

【0054】各種要因に対する対応展開方法付加手段8
は、プラント警報監視手段2、プラント状態監視手段
4、プラント運転状態監視手段6からの警報ありまたは
状態変化有りの判定結果に対して、各種要因対応展開用
データベース9を用いて対応展開の情報を付加して、出
力装置10および表示装置11へ出力し、運転員に判定
結果および対応展開情報を通知する。
Corresponding expansion method adding means 8 for various factors
Using the database 9 for deploying various factor correspondences for the determination results from the plant alarm monitoring means 2, the plant state monitoring means 4, and the plant operating state monitoring means 6 indicating the presence of an alarm or the presence of a state change. In addition, it outputs to the output device 10 and the display device 11, and notifies the operator of the determination result and the corresponding development information.

【0055】このように、第1の実施の形態によれば、
プラントの状態変化に対して警報通知および状態変化通
知のみでなく、その状態変化に対する運転員の対応展開
方法を付加して運転員に通知することができるので、従
来のように運転員の運転経験やノウハウに依存しない
で、蓄積・確立された対応展開方法を適用することがで
きる。従って、運転員の操作負荷が軽減され、効率的な
運転・監視を行うことができる。
As described above, according to the first embodiment,
Not only alarm notifications and status change notifications for plant status changes, but also operator notification methods can be added by adding the operator's response development method to those status changes. It is possible to apply the accumulated and established correspondence development method without depending on the knowledge and know-how. Therefore, the operation load on the operator is reduced, and efficient operation / monitoring can be performed.

【0056】(第2の実施の形態:請求項2に対応)図
2は、本発明の第2の実施の形態に係るプラント運転監
視装置のブロック構成図である。同図は、第1の実施の
形態におけるブロック構成に、各種対応展開手段12
と、系統図提供手段13とを加えて構成されている。
(Second Embodiment: Corresponding to Claim 2) FIG. 2 is a block diagram of a plant operation monitoring apparatus according to a second embodiment of the present invention. In the figure, various correspondence expansion means 12 are added to the block configuration in the first embodiment.
And a system diagram providing means 13 are added.

【0057】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0058】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8から出力装置10および表示装置11
への出力と同様の情報を受けて、その対応展開に必要な
系統図を選択し、系統図提供手段13へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the correspondence developing method adding means 8 for the various factors, the output device 10 and the display device 11.
Upon receiving the same information as that output to, the system diagram necessary for the corresponding expansion is selected and output to the system diagram providing unit 13.

【0059】系統図提供手段13は、当該出力を受け
て、運転員の要求操作により該当系統図を表示する。
Upon receiving the output, the system diagram providing means 13 displays the relevant system diagram according to the operation requested by the operator.

【0060】このように、第2の実施の形態によれば、
運転員は通知された状態から操作に必要な系統図へ速や
かに切り替えを行うことにより、プラント運転監視操作
を容易に行うことができる。
As described above, according to the second embodiment,
The operator can easily perform the plant operation monitoring operation by quickly switching from the notified state to the system diagram necessary for the operation.

【0061】(第3の実施の形態)図3は、本発明の第
3の実施の形態に係るプラント運転監視制御装置のブロ
ック構成図である。同図は、第1の実施の形態における
ブロック構成に、各種対応展開手段12と、操作用系統
図提供手段14とを加えて構成されている。
(Third Embodiment) FIG. 3 shows the third embodiment of the present invention.
FIG. 3 is a block configuration diagram of a plant operation monitoring control device according to an embodiment of FIG. This figure is configured by adding various correspondence expanding means 12 and operation system diagram providing means 14 to the block configuration in the first embodiment.

【0062】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0063】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な操作用系統図を選択し、操作用系統図提供手段14へ
出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the operation system diagram necessary for the corresponding development is selected and output to the operation system diagram providing unit 14.

【0064】操作用系統図提供手段14は、当該出力を
受けて、運転員の要求操作により該当操作用系統図を表
示する。
The operation system diagram providing means 14 receives the output and displays the operation system diagram according to the operation requested by the operator.

【0065】このように、第3の実施の形態によれば、
運転員は通知された状態から操作に必要な操作用系統図
へ速やかに切り替えを行うことにより、プラント運転監
視操作を容易に行うことができる。
As described above, according to the third embodiment,
The operator can easily perform the plant operation monitoring operation by quickly switching from the notified state to the operation system diagram necessary for the operation.

【0066】(第4の実施の形態)図4は、本発明の第
4の実施の形態に係るプラント運転監視制御装置のブロ
ック構成図である。同図は、第1の実施の形態における
ブロック構成に、各種対応展開手段12と、操作用画面
提供手段15とを加えて構成されている。
(Fourth Embodiment) FIG. 4 shows the fourth embodiment of the present invention.
FIG. 6 is a block configuration diagram of a plant operation monitoring control device according to an embodiment of FIG. This figure is configured by adding various correspondence expanding means 12 and operation screen providing means 15 to the block configuration in the first embodiment.

【0067】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as the operation of the first embodiment, the description thereof will be omitted.

【0068】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な操作用画面を選択し、操作用画面提供手段15へ出力
する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the operation screen necessary for the corresponding expansion is selected and output to the operation screen providing unit 15.

【0069】操作用画面提供手段15は、当該出力を受
けて、運転員の要求操作により該当操作用画面を表示す
る。
Upon receiving the output, the operation screen providing means 15 displays the corresponding operation screen according to the operation requested by the operator.

【0070】このように、第4の実施の形態によれば、
運転員は通知された状態から操作に必要な操作用画面へ
速やかに切り替えを行うことが可能となり、プラント運
転監視操作を容易に行うことができる。
As described above, according to the fourth embodiment,
The operator can quickly switch from the notified state to the operation screen required for operation, and can easily perform plant operation monitoring operation.

【0071】(第5の実施の形態)図5は、第5の実施
の形態に係るプラント運転監視制御装置のブロック構成
図である。同図は、第1の実施の形態におけるブロック
構成に、各種対応展開手段12と、操作用ガイダンス提
供手段16とを加えて構成されている。
(Fifth Embodiment) FIG. 5 is a block diagram of a plant operation monitoring and controlling apparatus according to the fifth embodiment. This figure is configured by adding various correspondence developing means 12 and operation guidance providing means 16 to the block configuration of the first embodiment.

【0072】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0073】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な操作用ガイダンスを選択し、操作用ガイダンス提供手
段16へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the operation guidance necessary for the corresponding development is selected and output to the operation guidance providing unit 16.

【0074】操作用ガイダンス提供手段16は、当該出
力を受けて、運転員の要求操作により該当操作用ガイダ
ンスを表示する。
Upon receiving the output, the operation guidance providing means 16 displays the operation guidance according to the operation requested by the operator.

【0075】このように、第5の実施の形態によれば、
運転員は通知された状態から操作に必要な操作用ガイダ
ンスへ速やかに切り替えを行うことにより、プラント運
転監視操作を容易に行うことができる。
As described above, according to the fifth embodiment,
The operator can easily perform the plant operation monitoring operation by quickly switching from the notified state to the operation guidance necessary for the operation.

【0076】(第6の実施の形態)図6は、第6の実施
の形態に係るプラント運転監視制御装置のブロック構成
図である。同図は、第1の実施の形態におけるブロック
構成に、各種対応展開手段12と、制御装置制御状態表
示提供手段17とを加えて構成されている。
(Sixth Embodiment) FIG. 6 is a block diagram of a plant operation monitoring and controlling apparatus according to the sixth embodiment. This figure is configured by adding various correspondence expanding means 12 and control device control state display providing means 17 to the block configuration in the first embodiment.

【0077】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0078】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な制御装置制御状態表示を選択し、制御装置制御状態表
示提供手段17へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the control device control status display necessary for the corresponding expansion is selected and output to the control device control status display providing means 17.

【0079】制御装置制御状態表示提供手段17は、当
該出力を受けて、運転員の要求操作により制御装置制御
状態を表示する。
The control device control state display providing means 17 receives the output and displays the control device control state according to the operation requested by the operator.

【0080】このように、第6の実施の形態によれば、
運転員は通知された状態から操作に必要な制御装置制御
状態へ速やかに切り替えを行うことにより、プラント運
転監視操作を容易に行うことができる。
As described above, according to the sixth embodiment,
The operator can easily perform the plant operation monitoring operation by quickly switching from the notified state to the control device control state necessary for the operation.

【0081】(第7の実施の形態)図7は、本発明の第
7の実施の形態に係るプラント運転監視装置のブロック
構成図である。同図は、第1の実施の形態におけるブロ
ック構成に、各種対応展開手段12と、制御装置操作ガ
イダンス提供手段18とを加えて構成されている。
(Seventh Embodiment) FIG. 7 is a block diagram of a plant operation monitoring apparatus according to a seventh embodiment of the present invention. This figure is configured by adding various correspondence developing means 12 and control device operation guidance providing means 18 to the block configuration of the first embodiment.

【0082】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0083】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な制御装置操作ガイダンスを選択し、制御装置操作ガイ
ダンス表示提供手段18へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the control device operation guidance necessary for the corresponding development is selected and output to the control device operation guidance display providing means 18.

【0084】制御装置操作ガイダンス提供手段18は、
当該出力を受けて、運転員の要求操作により制御装置操
作ガイダンスを表示する。
The control device operation guidance providing means 18 is
Upon receiving the output, the controller operation guidance is displayed according to the operation requested by the operator.

【0085】このように、第7の実施の形態によれば、
運転員は通知された状態から操作に必要な制御装置操作
ガイダンスへ速やかに切り替えを行うことにより、プラ
ント運転監視操作を容易に行うことができる。
As described above, according to the seventh embodiment,
The operator can easily perform the plant operation monitoring operation by quickly switching from the notified state to the control device operation guidance necessary for the operation.

【0086】(第8の実施の形態)図8は、本発明の第8
の実施の形態に係るプラント運転状態監視装置のブロッ
ク構成図である。同図は、第1の実施の形態におけるブ
ロック構成に、各種対応展開手段12と、トレンド画面
提供手段19とを加えて構成されている。
(Eighth Embodiment) FIG. 8 shows an eighth embodiment of the present invention.
It is a block configuration diagram of a plant operating state monitoring device according to the embodiment of. This figure is configured by adding various correspondence expanding means 12 and trend screen providing means 19 to the block configuration in the first embodiment.

【0087】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
The constituent elements other than these added constituent elements operate in the same manner as the operation in the first embodiment, and the description thereof will be omitted.

【0088】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
なトレンド画面を選択し、トレンド画面提供手段19へ
出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the trend screen required for the corresponding development is selected and output to the trend screen providing means 19.

【0089】トレンド画面提供手段19は、当該出力を
受けて、運転員の要求操作によりトレンド画面を表示す
る。
The trend screen providing means 19 receives the output and displays the trend screen according to the operation requested by the operator.

【0090】このように、第8の実施の形態によれば、
運転員は通知された状態から操作に必要なトレンド画面
へ速やかに切り替えを行うことにより、プラント運転監
視操作を容易に行うことができる。
As described above, according to the eighth embodiment,
The operator can easily perform the plant operation monitoring operation by quickly switching from the notified state to the trend screen necessary for the operation.

【0091】(第9の実施の形態)図9は、本発明の第9
の実施の形態に係るプラント運転監視制御装置のブロッ
ク構成図である。同図は、第1の実施の形態におけるブ
ロック構成に、各種対応展開手段12と、ネットワーク
故障個所特定表示提供手段20とを加えて構成されてい
る。
(Ninth Embodiment) FIG. 9 shows a ninth embodiment of the present invention.
It is a block configuration diagram of a plant operation monitoring control device according to the embodiment of. This figure is configured by adding various correspondence expanding means 12 and network failure point identification display providing means 20 to the block configuration in the first embodiment.

【0092】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
The constituent elements other than these added constituent elements operate in the same manner as the operation in the first embodiment, and the description thereof will be omitted.

【0093】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
なネットワーク故障個所表示を選択し、ネットワーク故
障個所表示提供手段20へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the network failure point display necessary for the corresponding deployment is selected and output to the network failure point display providing means 20.

【0094】ネットワーク故障個所表示提供手段20
は、当該出力を受けて、運転員の要求操作によりネット
ワーク故障個所を表示する。
Network failure point display providing means 20
Receives the output and displays the network failure point according to the operation requested by the operator.

【0095】このように、第9の実施の形態によれば、
運転員は通知された状態から操作に必要なネットワーク
故障個所表示へ速やかに切り替えを行うことが可能とな
り、プラント運転監視操作を容易に行うことができる。
As described above, according to the ninth embodiment,
The operator can quickly switch from the notified state to the network failure location display required for operation, and can easily perform plant operation monitoring operation.

【0096】(第10の実施の形態)図10は、本発明
の第10の実施の形態に係るプラント運転監視制御装置
に係るブロック構成図である。同図は、第1の実施の形
態におけるブロック構成に、各種対応展開手段12と、
警報発生操作ガイダンス提供手段21とを加えて構成さ
れている。
(Tenth Embodiment) FIG. 10 is a block diagram of a plant operation monitoring and controlling apparatus according to a tenth embodiment of the present invention. In the figure, the various configuration expansion means 12 is added to the block configuration in the first embodiment,
An alarm generation operation guidance providing means 21 is additionally provided.

【0097】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0098】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な警報発生操作ガイダンスを選択し、警報発生操作ガイ
ダンス提供手段21へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the alarm generation operation guidance necessary for the corresponding development is selected and output to the alarm generation operation guidance providing unit 21.

【0099】警報発生操作ガイダンス提供手段21は、
当該出力を受けて、運転員の要求操作により警報発生操
作ガイダンスを表示する。
The alarm generation operation guidance providing means 21 is
Upon receiving the output, the warning generation operation guidance is displayed according to the operation requested by the operator.

【0100】このように、第10の実施の形態によれ
ば、運転員は通知された状態から操作に必要な警報発生
操作ガイダンスへ速やかに切り替えを行うことにより、
プラント運転監視操作を容易に行うことができる。
As described above, according to the tenth embodiment, the operator promptly switches from the notified state to the alarm generation operation guidance necessary for the operation.
The plant operation monitoring operation can be easily performed.

【0101】(第11の実施の形態)図11は、本発明の
第11の実施の形態に係るプラント運転監視制御装置のブ
ロック構成図である。同図は、第1の実施の形態におけ
るブロック構成に、各種対応展開手段12と、プラント
運転状態画面提供手段22とを加えて構成されている。
(Eleventh Embodiment) FIG. 11 is a block diagram of a plant operation monitoring and controlling apparatus according to an eleventh embodiment of the present invention. This figure is configured by adding various correspondence expanding means 12 and plant operating state screen providing means 22 to the block configuration in the first embodiment.

【0102】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0103】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
なプラント運転状態画面、例えば自動運転進行状態画面
等を選択し、プラント運転状態画面提供手段22へ出力
する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the plant operation status screen required for the corresponding deployment, for example, the automatic operation progress status screen, is selected and output to the plant operation status screen providing unit 22.

【0104】プラント運転状態画面提供手段22は、当
該出力を受けて、運転員の要求操作によりプラント運転
状態画面を表示する。
Upon receiving the output, the plant operation status screen providing means 22 displays the plant operation status screen according to the operation requested by the operator.

【0105】このように、第11の実施の形態によれ
ば、運転員は通知された状態から操作に必要なプラント
運転状態画面へ速やかに切り替えを行うことにより、プ
ラント運転監視操作を容易に行うことができる。
As described above, according to the eleventh embodiment, the operator can easily perform the plant operation monitoring operation by quickly switching from the notified state to the plant operation state screen required for the operation. be able to.

【0106】(第12の実施の形態)図12は、本発明
の第12の実施の形態に係るプラント運転監視制御装置の
ブロック構成図である。同図は、第1の実施の形態にお
けるブロック構成に、各種対応展開手段12と、プラン
ト運転用操作画面提供手段23とを加えて構成されてい
る。
(Twelfth Embodiment) FIG. 12 is a block diagram of a plant operation monitoring and controlling apparatus according to the twelfth embodiment of the present invention. This figure is configured by adding various correspondence expanding means 12 and plant operation operation screen providing means 23 to the block configuration in the first embodiment.

【0107】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0108】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
なプラント運転用操作(指令)画面を選択し、プラント
運転用操作画面提供手段23へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
Upon receiving the same information as the output to 1, the plant operation operation (command) screen required for the corresponding development is selected and output to the plant operation operation screen providing unit 23.

【0109】プラント運転用操作画面提供手段23は、
当該出力を受けて、運転員の要求操作によりプラント運
転用操作画面を表示する。
The operation screen providing means 23 for plant operation is
Upon receiving the output, the operation screen for plant operation is displayed according to the operation requested by the operator.

【0110】このように、第12の実施の形態によれ
ば、運転員は通知された状態から操作に必要なプラント
運転用操作画面へ速やかに切り替えを行うことにより、
プラント運転監視操作を容易に行うことができる。
As described above, according to the twelfth embodiment, the operator promptly switches from the notified state to the plant operation operation screen required for the operation.
The plant operation monitoring operation can be easily performed.

【0111】(第13の実施の形態)図13は、本発明
の第13の実施の形態に係るプラント運転監視制御装置
のブロック構成図である。同図は、第1の実施の形態に
おけるブロック構成に、各種対応展開手段12と、プラ
ント運転用操作ガイダンス画面提供手段24とを加えて
構成されている。
(Thirteenth Embodiment) FIG. 13 is a block diagram of a plant operation monitoring and controlling apparatus according to the thirteenth embodiment of the present invention. This figure is configured by adding various correspondence expanding means 12 and a plant operation operation guidance screen providing means 24 to the block configuration in the first embodiment.

【0112】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0113】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
なプラント運転用操作(指令)ガイダンスを選択し、プ
ラント運転用操作ガイダンス画面提供手段24へ出力す
る。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
1 receives the same information as the output to 1, and selects the plant operation operation (command) guidance necessary for the corresponding development and outputs it to the plant operation operation guidance screen providing means 24.

【0114】プラント運転用操作ガイダンス画面提供手
段24は、当該出力を受けて、運転員の要求操作により
プラント運転用操作ガイダンスを表示する。
Upon receiving the output, the plant operation operation guidance screen providing means 24 displays the plant operation operation guidance according to the operation requested by the operator.

【0115】このように、第13の実施の形態によれ
ば、運転員は通知された状態から操作に必要なプラント
運転用操作ガイダンスへ速やかに切り替えを行うことに
より、プラント運転監視操作を容易に行うことができ
る。
As described above, according to the thirteenth embodiment, the operator can easily perform the plant operation monitoring operation by quickly switching from the notified state to the operation guidance for plant operation necessary for the operation. It can be carried out.

【0116】(第14の実施の形態:請求項14に対
応)図14は、本発明の第14の実施の形態に係るプラ
ント運転監視制御装置のブロック構成図である。同図
は、第1の実施の形態におけるブロック構成に、各種対
応展開手段12と、各種表示提供手段13乃至24と、
各種対応展開運転員操作記録手段30と、各種対応展開
用操作履歴出力装置31を加えて構成されている。
(Fourteenth Embodiment: Corresponding to Claim 14) FIG. 14 is a block diagram of a plant operation monitoring control apparatus according to a fourteenth embodiment of the present invention. In the figure, in addition to the block configuration according to the first embodiment, various correspondence developing means 12 and various display providing means 13 to 24,
Various correspondence deployment operator operation recording means 30 and various correspondence deployment operation history output device 31 are added.

【0117】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0118】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な画面表示を選択し、各種画面表示提供手段13乃至2
4のいずれか1手段へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
1 receives the same information as the output to 1, and selects the screen display necessary for the corresponding expansion, and various screen display providing means 13 to 2
Output to any one of 4 means.

【0119】各種画面表示提供手段13乃至24のいず
れか1手段は、当該出力を受けて、運転員の要求操作に
よりプラント運転用操作ガイダンスを表示する。
Upon receipt of the output, any one of the various screen display providing means 13 to 24 displays the operation guidance for plant operation according to the operation requested by the operator.

【0120】これと同時に、各種対応展開手段12は、
要因発生以降の運転員による展開操作の情報を、各種対
応展開運転員操作記録手段30へ出力する。
At the same time, the various correspondence developing means 12
Information on the deployment operation by the operator after the occurrence of the factor is output to various corresponding deployment operator operation recording means 30.

【0121】各種対応展開運転員操作記録手段30は、
各種画面表示提供手段13乃至24へ展開操作された操作
履歴を各種対応展開用操作履歴出力装置31へ出力す
る。
Various corresponding deployment operator operation recording means 30
The operation history output to the various screen display providing means 13 to 24 is output to the corresponding operation operation output device for expansion 31.

【0122】このように、第14の実施の形態によれ
ば、プラント状態の変化に対して各種画面への展開がど
の様に行われたかを容易に再確認することができる。
As described above, according to the fourteenth embodiment, it is possible to easily reconfirm how the development on various screens was performed with respect to the change in the plant state.

【0123】(第15の実施の形態:請求項15に対
応)図15は、本発明の第15の実施の形態にかかるプ
ラント運転監視制御装置のブロック構成図である。同図
は、第1の実施の形態におけるブロック構成に、各種対
応展開手段12と、各種表示画面提供手段13乃至24
と、各種対応展開運転員操作記録手段30と、各種対応
展開用操作履歴データベース31とを加えて構成されて
いる。
(Fifteenth Embodiment: Corresponding to Claim 15) FIG. 15 is a block diagram of a plant operation monitoring and controlling apparatus according to the fifteenth embodiment of the present invention. In the figure, the block structure in the first embodiment is provided with various correspondence expanding means 12 and various display screen providing means 13 to 24.
And various correspondence deployment operator operation recording means 30 and various correspondence deployment operation history database 31.

【0124】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0125】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な画面表示を選択し、各種画面表示提供手段13乃至2
4のいずれか1手段へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
1 receives the same information as the output to 1, and selects the screen display necessary for the corresponding expansion, and various screen display providing means 13 to 2
Output to any one of 4 means.

【0126】各種画面表示提供手段13乃至24のいず
れか1手段は、当該出力を受けて、運転員の要求操作に
よりプラント運転用操作ガイダンスを表示する。
Upon receipt of the output, any one of the various screen display providing means 13 to 24 displays the operation guidance for plant operation according to the operation requested by the operator.

【0127】これと同時に、各種対応展開手段12は、
要因発生以降の運転員による展開操作の情報を、各種対
応展開運転員操作記録手段30へ出力する。
At the same time, the various correspondence expanding means 12
Information on the deployment operation by the operator after the occurrence of the factor is output to various corresponding deployment operator operation recording means 30.

【0128】各種対応展開運転員操作記録手段30は、
各種画面表示提供手段13乃至24へ展開操作された操
作履歴を各種対応展開用操作履歴データベース32に保
存する。
Various correspondence deployment operator operation recording means 30
The operation history expanded into the various screen display providing means 13 to 24 is stored in the various correspondence expansion operation history database 32.

【0129】このように、第15の実施の形態によれ
ば、プラント状態の変化に対して各種画面への展開がど
の様に行われたかを容易に確認することができる。
As described above, according to the fifteenth embodiment, it is possible to easily confirm how the expansion to various screens is performed with respect to the change in the plant state.

【0130】(第16の実施の形態)図16は、本発明
の第16の実施の形態に係るプラント運転監視制御装置
のブロック構成図である。
(Sixteenth Embodiment) FIG. 16 is a block diagram of a plant operation monitoring and controlling apparatus according to the sixteenth embodiment of the present invention.

【0131】同図は、第1の実施の形態におけるブロッ
ク構成に、各種対応展開手段12と、各種表示提供手段
13乃至24と、各種対応展開運転員操作記録手段30
と、各種対応展開用操作履歴データベース32と、各種
対応展開用操作履歴記録媒体出力装置33とを加えて構
成されている。これらの追加した構成要素以外の構成要
素は、第1の実施の形態における作用と同様に作用する
ので説明は省略する。
In the figure, the various configuration expansion means 12 and various display providing means are added to the block configuration of the first embodiment.
13 to 24 and various corresponding deployment operator operation recording means 30
And an operation history database 32 for various correspondence expansion, and an operation history recording medium output device 33 for various correspondence expansion. Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0132】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な画面表示を選択し、各種画面表示提供手段13乃至2
4のいずれか1手段へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
1 receives the same information as the output to 1, and selects the screen display necessary for the corresponding expansion, and various screen display providing means 13 to 2
Output to any one of 4 means.

【0133】各種画面表示提供手段13乃至24のいず
れか1手段は、当該出力を受けて、運転員の要求操作に
よりプラント運転用操作ガイダンスを表示する。
Upon receipt of the output, any one of the various screen display providing means 13 to 24 displays the operation guidance for plant operation according to the operation requested by the operator.

【0134】これと同時に、各種対応展開手段12は、
要因発生以降の運転員による展開操作の情報を、各種対
応展開運転員操作記録手段30へ出力する。
At the same time, the various correspondence expanding means 12
Information on the deployment operation by the operator after the occurrence of the factor is output to various corresponding deployment operator operation recording means 30.

【0135】各種対応展開運転員操作記録手段30は、
各種画面表示提供手段13乃至24へ展開操作された操作
履歴を各種対応展開用操作履歴データベース32へ保存
し、保存した各種対応展開用操作履歴データベース32
から、展開操作履歴情報を各種対応展開用操作履歴記録
媒体33に出力する。
Various corresponding deployment operator operation recording means 30
The operation history expanded to the various screen display providing means 13 to 24 is stored in the corresponding correspondence expansion operation history database 32, and the corresponding correspondence expansion operation history database 32 is stored.
Output the expansion operation history information to the corresponding expansion operation history recording medium 33.

【0136】このように、第16の実施の形態によれ
ば、過去の展開操作履歴を記録媒体に出力し、異なる装
置とのデータの受け渡しを容易に行うことができる。
As described above, according to the sixteenth embodiment, the past expansion operation history can be output to the recording medium, and the data can be easily exchanged with a different device.

【0137】(第17の実施の形態)図17は、本発明
の第17の実施の形態に係るプラント運転監視制御装置
のブロック構成図である。同図は、第1の実施の形態に
おけるブロック構成に、各種対応展開手段12と、各種
表示提供手段13乃至24と、各種対応展開運転員操作
記録手段30と、各種対応展開用操作履歴出力装置31
と、各種対応展開用操作履歴データベース32とを加え
て構成されている。
(Seventeenth Embodiment) FIG. 17 is a block diagram of a plant operation monitoring and controlling apparatus according to a seventeenth embodiment of the present invention. In the figure, in the block configuration according to the first embodiment, various correspondence developing means 12, various display providing means 13 to 24, various correspondence developing operator operation recording means 30, and various correspondence expanding operation history output device. 31
And various correspondence expansion operation history database 32.

【0138】これらの追加した構成要素以外の構成要素
は、第1の実施の形態における作用と同様に作用するの
で説明は省略する。
Since the constituent elements other than these added constituent elements operate in the same manner as in the first embodiment, the description thereof will be omitted.

【0139】追加した構成要素は、以下のとおり作用す
る。各種対応展開手段12は、各種要因に対する対応展
開方法付加手段8からの出力装置10および表示装置1
1への出力と同様の情報を受けて、その対応展開に必要
な画面表示を選択し、各種画面表示提供手段13乃至2
4のいずれか1手段へ出力する。
The added components operate as follows. The various correspondence developing means 12 includes the output device 10 and the display device 1 from the correspondence developing method adding means 8 for various factors.
1 receives the same information as the output to 1, and selects the screen display necessary for the corresponding expansion, and various screen display providing means 13 to 2
Output to any one of 4 means.

【0140】各種画面表示提供手段13乃至24のいず
れか1手段は、当該出力を受けて、運転員の要求操作に
よりプラント運転用操作ガイダンスを表示する。
Upon receiving the output, any one of the various screen display providing means 13 to 24 displays the operation guidance for plant operation according to the operation requested by the operator.

【0141】これと同時に、各種対応展開手段12は、
要因発生以降の運転員による展開操作の情報を、各種対
応展開運転員操作記録手段30へ出力する。
At the same time, the various correspondence expanding means 12
Information on the deployment operation by the operator after the occurrence of the factor is output to various corresponding deployment operator operation recording means 30.

【0142】各種対応展開運転員操作記録手段30は、
各種画面表示提供手段13乃至24へ展開操作された操作
履歴を各種対応展開用操作履歴データベース32へ保存
し、保存した各種対応展開用操作履歴データベース32
から、展開操作履歴情報を帳票として各種対応展開用操
作履歴出力装置31に出力する。
Various corresponding deployment operator operation recording means 30
The operation history expanded to the various screen display providing means 13 to 24 is stored in the corresponding correspondence expansion operation history database 32, and the corresponding correspondence expansion operation history database 32 is stored.
Output the expansion operation history information as a form to the various correspondence expansion operation history output device 31.

【0143】このように、第17の実施の形態によれ
ば、過去の展開操作履歴を帳票に出力し、対応操作を容
易に確認することができる。
As described above, according to the seventeenth embodiment, the past expansion operation history can be output to the form and the corresponding operation can be easily confirmed.

【0144】[0144]

【発明の効果】以上述べたように、本発明によるプラン
ト運転監視装置によれば、プラントの運転における状態
変化および警報発生が検出されて通知を受けた際に、検
出件名にそのまま対応できる要因の展開を行うことがで
きるので、運転員の負荷が軽減され、また、運転員の要
因展開操作履歴を保存・蓄積することにより、効率的な
運転操作方法を構築することができる。
As described above, according to the plant operation monitoring apparatus of the present invention, when the state change and the alarm occurrence in the operation of the plant are detected and the notification is given, it is possible to directly deal with the detection subject. Since the expansion can be performed, the load on the operator is reduced, and an efficient operation method can be constructed by saving and accumulating the factor expansion operation history of the operator.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1の実施形態を示すプラント運転監
視装置のブロック構成図。
FIG. 1 is a block configuration diagram of a plant operation monitoring apparatus showing a first embodiment of the present invention.

【図2】本発明の第2の実施形態を示すプラント運転監
視装置のブロック構成図。
FIG. 2 is a block configuration diagram of a plant operation monitoring apparatus showing a second embodiment of the present invention.

【図3】本発明の第3の実施形態を示すプラント運転監
視装置のブロック構成図。
FIG. 3 is a block configuration diagram of a plant operation monitoring apparatus showing a third embodiment of the present invention.

【図4】本発明の第4の実施形態を示すプラント運転監
視装置のブロック構成図。
FIG. 4 is a block configuration diagram of a plant operation monitoring apparatus showing a fourth embodiment of the present invention.

【図5】本発明の第5の実施形態を示すプラント運転監
視装置のブロック構成図。
FIG. 5 is a block configuration diagram of a plant operation monitoring apparatus showing a fifth embodiment of the present invention.

【図6】本発明の第6の実施形態を示すプラント運転監
視装置のブロック構成図。
FIG. 6 is a block configuration diagram of a plant operation monitoring apparatus showing a sixth embodiment of the present invention.

【図7】本発明の第7の実施形態を示すプラント運転監
視装置のブロック構成図。
FIG. 7 is a block configuration diagram of a plant operation monitoring apparatus showing a seventh embodiment of the present invention.

【図8】本発明の第8の実施形態を示すプラント運転監
視装置のブロック構成図。
FIG. 8 is a block configuration diagram of a plant operation monitoring apparatus showing an eighth embodiment of the present invention.

【図9】本発明の第9の実施形態を示すプラント運転監
視装置のブロック構成図。
FIG. 9 is a block configuration diagram of a plant operation monitoring apparatus showing a ninth embodiment of the present invention.

【図10】本発明の第10の実施形態を示すプラント運
転監視装置のブロック構成図。
FIG. 10 is a block configuration diagram of a plant operation monitoring apparatus showing a tenth embodiment of the present invention.

【図11】本発明の第11の実施形態を示すプラント運
転監視装置のブロック構成図。
FIG. 11 is a block configuration diagram of a plant operation monitoring apparatus showing an eleventh embodiment of the present invention.

【図12】本発明の第12の実施形態を示すプラント運
転監視装置のブロック構成図。
FIG. 12 is a block configuration diagram of a plant operation monitoring apparatus showing a twelfth embodiment of the present invention.

【図13】本発明の第13の実施形態を示すプラント運
転監視装置のブロック構成図。
FIG. 13 is a block configuration diagram of a plant operation monitoring apparatus showing a thirteenth embodiment of the present invention.

【図14】本発明の第14の実施形態を示すプラント運
転監視装置のブロック構成図。
FIG. 14 is a block configuration diagram of a plant operation monitoring apparatus showing a fourteenth embodiment of the present invention.

【図15】本発明の第15の実施形態を示すプラント運
転監視装置のブロック構成図。
FIG. 15 is a block configuration diagram of a plant operation monitoring apparatus showing a fifteenth embodiment of the present invention.

【図16】本発明の第16の実施形態を示すプラント運
転監視装置のブロック構成図。
FIG. 16 is a block configuration diagram of a plant operation monitoring apparatus showing a sixteenth embodiment of the present invention.

【図17】本発明の第17の実施形態を示すプラント運
転監視装置のブロック構成図。
FIG. 17 is a block configuration diagram of a plant operation monitoring apparatus showing a seventeenth embodiment of the present invention.

【図18】従来の変化発生から対応操作までのプラント
運転監視装置のブロック構成図。
FIG. 18 is a block configuration diagram of a conventional plant operation monitoring device from occurrence of change to corresponding operation.

【符号の説明】[Explanation of symbols]

1a…プラント運転監視装置、2a…プラント、1…プ
ラントデータ入力装置、2…プラント警報監視手段、3
…プラント警報監視用データベース、4…プラント状態
監視手段、5…プラント状態監視用データベース、6…
プラント運転状態監視手段、7…プラント運転状態監視
用データベース(プラント自動運転用含む)、8…各種要
因に対する対応展開方法付加手段、9…各種要因に対す
る対応展開方法付加用データベース、10…プラント状
態変化出力装置、11…プラント状態変化表示装置、1
2…各種要因に対する展開手段、13…各種要因に対し
ての操作として系統図画面を提供する手段、14…各種
要因に対しての操作として操作用系統図画面を提供する
手段、15…各種要因に対しての操作として操作用画面
を提供する手段、16…各種要因に対しての操作として
操作用画面のガイダンス画面を提供する手段、17…各
種要因に対しての操作として制御装置制御状態表示画面
(制御状態進行表示も含む)を提供する手段、18…各種
要因に対しての操作として制御装置の操作ガイダンス画
面を提供する手段、19…各種要因に対しての操作とし
てトレンド画面を提供する手段、20…各種要因に対し
ての操作として装置(ネットワーク含む)故障箇所特定用
画面を提供する手段、21…各種要因に対しての操作と
して警報発生時の操作ガイダンス画面を提供する手段、
22…各種要因に対しての操作としてプラント運転状態
表示画面を提供する手段、23…各種要因に対しての操
作としてプラント運転に対する操作画面を提供する手
段、24…各種要因に対しての操作としてプラント運転
に対する操作ガイダンス画面を提供する手段、30…各
種要因に対する運転員の対応展開操作を記録する手段、
31…各種要因に対する運転員の対応展開操作を出力す
る手段、32…各種要因に対する運転員の対応展開操作
を記録する操作履歴データベース、33…各種要因に対
する運転員の対応展開操作記録を出力する記録媒体、4
0…系統図画面を提供する手段、41…操作用系統図画
面を提供する手段、42…操作用画面を提供する手段、
43…操作用画面のガイダンス画面を提供する手段、4
4…制御装置制御状態表示画面(制御状態進行表示も含
む)を提供する手段、45…制御装置の操作ガイダンス
画面を提供する手段、46…トレンド画面を提供する手
段、47…装置(ネットワーク含む)故障箇所特定用画面
を提供する手段、48…警報発生時の操作ガイダンス画
面を提供する手段、49…プラント運転状態表示画面を
提供する手段、50…プラント運転に対する操作画面を
提供する手段、51…プラント運転に対する操作ガイダ
ンス画面を提供する手段
1a ... Plant operation monitoring device, 2a ... Plant, 1 ... Plant data input device, 2 ... Plant alarm monitoring means, 3
... Plant alarm monitoring database, 4 ... Plant status monitoring means, 5 ... Plant status monitoring database, 6 ...
Plant operating state monitoring means, 7 ... Plant operating state monitoring database (including automatic plant operation), 8 ... Response expansion method addition means for various factors, 9 ... Response expansion method addition database for various factors, 10 ... Plant state change Output device, 11 ... Plant status change display device, 1
2 ... Expansion means for various factors, 13 ... Means for providing a system diagram screen as an operation for various factors, 14 ... Means for providing an operation system diagram screen as an operation for various factors, 15 ... Various factors Means for providing an operation screen as an operation for 16 ... Means for providing a guidance screen for an operation screen as an operation for various factors, 17 ... Control device control status display as an operation for various factors screen
Means for providing (including control state progress display), 18 ... means for providing an operation guidance screen of the control device as an operation for various factors, 19 ... means for providing a trend screen as an operation for various factors , 20 ... Means for providing a device (including network) failure location specifying screen as an operation for various factors, 21 ... Means for providing an operation guidance screen at the time of alarm generation as an operation for various factors,
22 ... Means for providing a plant operation status display screen as an operation for various factors, 23 ... Means for providing an operation screen for plant operation as an operation for various factors, 24 ... As an operation for various factors Means for providing an operation guidance screen for plant operation, 30 ... means for recording the operator's response deployment operation to various factors,
31 ... Means for outputting operator's corresponding expansion operation for various factors, 32 ... Operation history database for recording operator's corresponding expansion operation for various factors, 33 ... Record for outputting operator's corresponding expansion operation record for various factors Medium, 4
0 ... Means for providing system diagram screen, 41 ... Means for providing operation system diagram screen, 42 ... Means for providing operation screen,
43 ... Means for providing guidance screen of operation screen, 4
4 ... Means for providing control device control status display screen (including control status progress display), 45 ... Means for providing operation guidance screen of control device, 46 ... Means for providing trend screen, 47 ... Device (including network) Means for providing a screen for specifying a failure location, 48 ... Means for providing an operation guidance screen when an alarm is issued, 49 ... Means for providing a plant operation status display screen, 50 ... Means for providing an operation screen for plant operation, 51 ... Means to provide operation guidance screen for plant operation

フロントページの続き (72)発明者 丹葉 俊和 東京都府中市東芝町1番地 株式会社東芝 府中事業所内 (72)発明者 山口 太樹 東京都府中市東芝町1番地 株式会社東芝 府中事業所内 (72)発明者 中野 琢朗 東京都府中市東芝町1番地 株式会社東芝 府中事業所内 Fターム(参考) 5E501 AC02 AC32 BA05 CA03 EA34 FA13 FA14 FA43 5H223 AA01 EE06 Continued front page    (72) Inventor Toshikazu Tanba             No. 1 Toshiba-cho, Fuchu-shi, Tokyo Toshiba Corporation             Fuchu Office (72) Inventor Taiki Yamaguchi             No. 1 Toshiba-cho, Fuchu-shi, Tokyo Toshiba Corporation             Fuchu Office (72) Inventor Takuro Nakano             No. 1 Toshiba-cho, Fuchu-shi, Tokyo Toshiba Corporation             Fuchu Office F-term (reference) 5E501 AC02 AC32 BA05 CA03 EA34                       FA13 FA14 FA43                 5H223 AA01 EE06

Claims (17)

【特許請求の範囲】[Claims] 【請求項1】 プラントの運転状態を監視するための各
検出部から入力されるプラントデータから前記プラント
の異常および該当する検出要因を求めて出力するプラン
ト警報監視手段と、前記プラントの状態変化および該当
する検出要因を求めて出力するプラント状態監視手段
と、前記プラントの運転状態変化および検出要因を求め
て出力するプラント運転状態監視手段とを具備するプラ
ント運転監視装置において、 前記プラント警報監視手段、プラント状態監視手段およ
びプラント運転状態監視手段からの各種検出要因に対す
る運転員の対応展開方法を格納した各種要因対応展開用
データベースと、 前記各種要因対応展開用データベースを用いて、前記プ
ラント警報監視手段、プラント状態監視手段およびプラ
ント運転状態監視手段からの検出要因に、前記検出要因
に対する運転員の対応展開方法を付加して出力する各種
要因に対する対応展開方法付加手段とを具備することを
特徴とするプラント運転監視装置。
1. A plant alarm monitoring unit for obtaining and outputting an abnormality of the plant and a corresponding detection factor from plant data input from each detection unit for monitoring the operating state of the plant, and a state change of the plant, In a plant operation monitoring device comprising a plant state monitoring means for obtaining and outputting a corresponding detection factor, and a plant operation state monitoring means for obtaining and outputting an operating state change and detection factors of the plant, the plant alarm monitoring means, Various factor response deployment database that stores the operator's response deployment method for various detection factors from plant state monitoring means and plant operation state monitoring means, and using the various factor response deployment database, the plant alarm monitoring means, From the plant condition monitoring means and the plant operating condition monitoring means Factors out, plant operation monitoring apparatus characterized by comprising a corresponding expansion method adding means for various factors to be output by adding the corresponding method of developing the operator with respect to the detection factors.
【請求項2】 前記各種検出要因に対する対応展開方法
付加手段からの対応展開方法を受取り、前記対応展開方
法に必要な各種展開機能の中から、運転員の要求操作に
より所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能が系統図で
ある場合、この系統図を表示する系統図提供手段とをさ
らに具備することを特徴とする請求項1記載のプラント
運転監視装置。
2. Various types of receiving a corresponding expansion method from the corresponding expansion method adding means for the various detection factors, and selecting a predetermined function from various expansion functions required for the corresponding expansion method by an operation requested by an operator. The plant operation monitoring system according to claim 1, further comprising: correspondence expansion means; and a system diagram providing means for displaying the system diagram when the function selected by the various correspondence expansion means is a system diagram. apparatus.
【請求項3】 前記各種検出要因に対する対応展開方法
付加手段からの対応展開方法を受け、前記対応展開方法
に必要な各種展開機能の中から、運転員の要求操作によ
り所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能が操作用系
統図である場合、この操作用系統図を表示する操作用系
統図提供手段とをさらに具備することを特徴とする請求
項1記載のプラント運転監視装置。
3. Various types of receiving a corresponding expansion method from the corresponding expansion method adding means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method by an operation requested by an operator. The system further comprises: correspondence expansion means, and operation system diagram providing means for displaying the operation system diagram when the function selected by the various correspondence expansion means is the operation system diagram. 1. The plant operation monitoring device according to 1.
【請求項4】 前記各種検出要因に対する対応展開方法
付加手段からの対応展開方法を受け、前記対応展開方法
に必要な各種展開機能の中から、運転員の要求操作によ
り所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能が操作用図
面である場合、この操作用図面を表示する操作用図面提
供手段とをさらに具備することを特徴とする請求項1記
載のプラント運転監視装置。
4. Various types for receiving a corresponding expansion method from the corresponding expansion method adding means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method by an operation requested by an operator. The correspondence development means and the operation drawing providing means for displaying the operation drawing when the function selected by the various correspondence development means is an operation drawing, are further provided. Plant operation monitoring device.
【請求項5】 前記各種検出要因に対する対応展開方法
付加手段からの対応展開方法を受け、前記対応展開方法
に必要な各種展開機能の中から、運転員の要求操作によ
り所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能が操作用ガ
イダンスである場合、この操作用ガイダンスを表示する
操作用ガイダンス提供手段とをさらに具備することを特
徴とする請求項1記載のプラント運転監視装置。
5. Various types of receiving a corresponding expansion method from the corresponding expansion method adding means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method by an operation requested by an operator. The correspondence development means and, when the function selected by the various correspondence development means is an operation guidance, an operation guidance providing means for displaying the operation guidance, further comprising: Plant operation monitoring device.
【請求項6】 前記各種検出要因に対する対応展開方法
付加手段からの対応展開方法を受け、前記対応展開方法
に必要な各種展開機能の中から、運転員の要求操作によ
り所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能が制御装置
制御状態である場合、この制御装置制御状態を表示する
制御装置制御状態提供手段とをさらに具備することを特
徴とする請求項1記載のプラント運転監視装置。
6. Various types for receiving a corresponding expansion method from the corresponding expansion method addition means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method by an operation requested by an operator. The apparatus further comprises: correspondence expansion means; and control equipment control status providing means for displaying the control equipment control status when the functions selected by the various correspondence expansion means are in the control equipment control status. 1. The plant operation monitoring device according to 1.
【請求項7】 前記各種検出要因に対する対応展開方法
付加手段からの対応展開方法を受け、前記対応展開方法
に必要な各種展開機能の中から、運転員の要求操作によ
り所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能が制御装置
操作ガイダンスである場合、この制御装置操作ガイダン
スを表示する制御装置操作ガイダンス提供手段とをさら
に具備することを特徴とする請求項1記載のプラント運
転監視装置。
7. Various types of receiving a corresponding expansion method from the corresponding expansion method adding means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method by an operation requested by an operator. The method further comprises: correspondence expansion means; and when the function selected by the various correspondence expansion means is a control device operation guidance, a control device operation guidance providing means for displaying the control device operation guidance. 1. The plant operation monitoring device according to 1.
【請求項8】 前記各種検出要因に対する対応展開方法
付加手段からの対応展開方法を受け、前記対応展開方法
に必要な各種展開機能の中から、運転員の要求操作によ
り所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能がトレンド
画面である場合、このトレンド画面を表示するトレンド
画面提供手段とをさらに具備することを特徴とする請求
項1記載のプラント運転監視装置。
8. Various types of receiving a corresponding expansion method from the corresponding expansion method adding means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method according to an operation requested by an operator. The plant operation monitoring according to claim 1, further comprising: correspondence expansion means and trend screen providing means for displaying the trend screen when the function selected by the various correspondence expansion means is a trend screen. apparatus.
【請求項9】 前記各種検出要因に対する対応展開方法
付加手段からの対応展開方法を受け、前記対応展開方法
に必要な各種展開機能の中から、運転員の要求操作によ
り所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能が装置故障
箇所特定表示である場合、この装置故障箇所特定表示を
表示する装置故障箇所特定表示提供手段とをさらに具備
することを特徴とする請求項1記載のプラント運転監視
装置。
9. Various types of receiving a corresponding expansion method from the corresponding expansion method adding means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method by an operation requested by an operator. And a device failure location specifying display providing means for displaying the device failure location specifying display when the function selected by the various correspondence expanding means is the device failure location specifying display. The plant operation monitoring device according to claim 1.
【請求項10】 前記各種検出要因に対する対応展開方
法付加手段からの対応展開方法を受け、前記対応展開方
法に必要な各種展開機能の中から、運転員の要求操作に
より所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能が警報発生
操作ガイダンスである場合、この警報発生操作ガイダン
スを表示する警報発生操作ガイダンス提供手段とをさら
に具備することを特徴とする請求項1記載のプラント運
転監視装置。
10. Various types of receiving a corresponding expansion method from the corresponding expansion method addition means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method by an operation requested by an operator. The method further comprises: correspondence expansion means and alarm generation operation guidance providing means for displaying the alarm generation operation guidance when the function selected by the various correspondence expansion means is the alarm generation operation guidance. 1. The plant operation monitoring device according to 1.
【請求項11】 前記各種検出要因に対する対応展開方
法付加手段からの対応展開方法を受け、前記対応展開方
法に必要な各種展開機能の中から、運転員の要求操作に
より所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能がプラント
運転状態画面である場合、このプラント運転状態画面を
表示するプラント運転状態画面提供手段とをさらに具備
することを特徴とする請求項1記載のプラント運転監視
装置。
11. Various types of receiving a corresponding expansion method from the corresponding expansion method addition means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method by an operation requested by an operator. The method further comprises: correspondence expansion means, and plant operation status screen providing means for displaying the plant operation status screen when the function selected by the various correspondence expansion means is a plant operation status screen. 1. The plant operation monitoring device according to 1.
【請求項12】 前記各種検出要因に対する対応展開方
法付加手段からの対応展開方法を受け、前記対応展開方
法に必要な各種展開機能の中から、運転員の要求操作に
より所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能がプラント
運転操作画面である場合、このプラント運転操作画面を
表示するプラント運転操作画面提供手段とをさらに具備
することを特徴とする請求項1記載のプラント運転監視
装置。
12. Various types of receiving a corresponding expansion method from the corresponding expansion method addition means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method by an operation requested by an operator. The method further comprises: correspondence expansion means, and plant operation operation screen providing means for displaying the plant operation operation screen when the function selected by the various correspondence expansion means is a plant operation operation screen. 1. The plant operation monitoring device according to 1.
【請求項13】 前記各種検出要因に対する対応展開方
法付加手段からの対応展開方法を受け、前記対応展開方
法に必要な各種展開機能の中から、運転員の要求操作に
より所定の機能を選択する各種対応展開手段と、 前記各種対応展開手段により選択された機能がプラント
運転操作ガイダンス画面である場合、このプラント運転
操作ガイダンス画面を表示するプラント運転操作ガイダ
ンス画面提供手段とをさらに具備することを特徴とする
請求項1記載のプラント運転監視装置。
13. Various types of receiving a corresponding expansion method from the corresponding expansion method adding means for the various detection factors and selecting a predetermined function from the various expansion functions required for the corresponding expansion method according to an operation requested by an operator. And a plant operation guidance screen providing means for displaying the plant operation guidance screen when the function selected by the various correspondence development means is a plant operation guidance screen. The plant operation monitoring device according to claim 1.
【請求項14】 前記各種対応展開手段からの要求を受
けて各種機能が画面表示された際の操作履歴を、帳票と
して各種対応展開用操作履歴出力装置に出力する各種対
応展開運転員操作記録手段を、さらに具備することを特
徴とする請求項2乃至13記載のプラント運転監視装
置。
14. Various corresponding deployment operator operation recording means for outputting an operation history when various functions are displayed on a screen in response to a request from the various corresponding deployment means to a various corresponding deployment operation history output device as a form. The plant operation monitoring device according to claim 2, further comprising:
【請求項15】 前記各種対応展開手段からの要求を受
けて各種機能が画面表示された際の操作履歴を、各種対
応展開操作履歴データベースに保存する各種対応展開運
転員操作記録手段を、さらに具備することを特徴とする
請求項2乃至13記載のプラント運転監視装置。
15. A various corresponding deployment operator operation recording means for storing an operation history when various functions are displayed on the screen in response to a request from the various corresponding deployment operating means in a various corresponding deployment operation history database. The plant operation monitoring device according to claim 2, wherein
【請求項16】 前記各種対応展開手段からの要求を受
けて各種機能が画面表示された際の操作履歴を、各種対
応展開操作履歴データベースに保存し、これに保存され
ている展開操作履歴情報を記録媒体に出力する各種対応
展開運転員操作記録手段を、さらに具備することを特徴
とする請求項2乃至13記載のプラント運転監視装置。
16. An operation history when various functions are displayed on a screen in response to a request from the various correspondence expanding means is stored in a various correspondence expanding operation history database, and the expanding operation history information stored therein is stored. 14. The plant operation monitoring device according to claim 2, further comprising various corresponding deployment operator operation recording means for outputting to a recording medium.
【請求項17】 前記各種対応展開手段からの要求を受
けて各種機能が画面表示された際の操作履歴を、各種対
応展開操作履歴データベースに保存し、これに保存され
ている展開操作履歴情報を、帳票として各種対応展開操
作履歴出力装置に出力する各種対応展開運転員操作記録
手段を、さらに具備することを特徴とする請求項2乃至
13記載のプラント運転監視装置。
17. An operation history when various functions are displayed on a screen in response to a request from the various correspondence expanding means is stored in a various correspondence expanding operation history database, and the expanding operation history information stored therein is stored. 14. The plant operation monitoring device according to claim 2, further comprising various corresponding deployment operator operation recording means for outputting to the various corresponding deployment operation history output device as a form.
JP2002133563A 2002-05-09 2002-05-09 Plant operation monitoring device Pending JP2003330534A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002133563A JP2003330534A (en) 2002-05-09 2002-05-09 Plant operation monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002133563A JP2003330534A (en) 2002-05-09 2002-05-09 Plant operation monitoring device

Publications (1)

Publication Number Publication Date
JP2003330534A true JP2003330534A (en) 2003-11-21

Family

ID=29696500

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002133563A Pending JP2003330534A (en) 2002-05-09 2002-05-09 Plant operation monitoring device

Country Status (1)

Country Link
JP (1) JP2003330534A (en)

Similar Documents

Publication Publication Date Title
JP2007193419A (en) Plant monitoring device
KR20140073043A (en) Application service system of smart terminal for watching power equipment
US8713236B2 (en) Maintenance guidance display device, maintenance guidance display method, and maintenance guidance display program
CA2758682C (en) Plant control system, data to be equalized selection apparatus, and data to be equalized selection method
JPH11149312A (en) Plant monitoring device and recording medium recording plant monitoring program
JP2003330534A (en) Plant operation monitoring device
KR101447031B1 (en) System for searching emergency operating procedure in nuclear power plant and method thereof
JP6779761B2 (en) Plant operating equipment
JPH1031795A (en) Device and method for displaying electronic manual and monitoring device
JP2007200092A (en) Numerical control system equipped with fan motor device
JPH10111712A (en) Alarm monitoring device
JP4730211B2 (en) Data processing apparatus and data processing method
JPH08129474A (en) Screen display device
JP2003234838A (en) Remote maintenance device, method for controlling remote maintenance device, control program and recording medium
JPH06289847A (en) Display device
JP7127616B2 (en) Information processing device, alarm management system, and alarm management method
JP2006235890A (en) Operation support system and operation support method
JPS63228398A (en) Plant monitor
JPH0723481A (en) Monitor controller
JPH07244696A (en) Building management system
JP2000181529A (en) Plant monitoring device
JP3483757B2 (en) Plant monitoring system and operation history method of this plant monitoring system
JPH0844424A (en) Plant monitoring device
JPH10320034A (en) Plant monitoring controller
JPH05296889A (en) Monitoring apparatus of plant

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070724

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080304