JP2003327382A - Temporarily installed operation switch for passenger conveyor - Google Patents

Temporarily installed operation switch for passenger conveyor

Info

Publication number
JP2003327382A
JP2003327382A JP2002137352A JP2002137352A JP2003327382A JP 2003327382 A JP2003327382 A JP 2003327382A JP 2002137352 A JP2002137352 A JP 2002137352A JP 2002137352 A JP2002137352 A JP 2002137352A JP 2003327382 A JP2003327382 A JP 2003327382A
Authority
JP
Japan
Prior art keywords
operation switch
renewal
control panel
passenger conveyor
balustrade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002137352A
Other languages
Japanese (ja)
Inventor
Hiroyuki Hagitani
浩之 萩谷
Hideaki Kuno
秀明 久野
Toshiaki Kamiyama
利明 上山
Yoshihiko Asakawa
芳彦 浅川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2002137352A priority Critical patent/JP2003327382A/en
Publication of JP2003327382A publication Critical patent/JP2003327382A/en
Pending legal-status Critical Current

Links

Landscapes

  • Escalators And Moving Walkways (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a temporarily installed operation switch for a passenger conveyor, usable after completing the renewal of an existing control panel before completing the renewal of a balustrade. <P>SOLUTION: At the time when the renewal of at least the control panel into a new control panel is completed except a balustrade part 1 and a step, the operation switch 4 is mounted on the balustrade part 1 and a cable with a connector 6 is used for connecting the operation switch 4 to the new control panel. After the renewal into the new control panel, the operation switch 4 is removed from the balustrade part 1 and used as a working operation device. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、乗客コンベアの仮
設操作スイッチに係り、乗客コンベアの段階的リニュー
アル方法に好適な乗客コンベアの仮設操作スイッチに関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary operation switch for a passenger conveyor, and more particularly to a temporary operation switch for a passenger conveyor suitable for a stepwise renewal method for the passenger conveyor.

【0002】[0002]

【従来の技術】エスカレーターやオートライン等の乗客
コンベアの操作スイッチは、従来、特開2000−26
4566号公報に、乗客コンベアの欄干に張設される内
面パネルの所定の位置に取付穴を設け、操作スイッチを
取付穴に直接挿着し、固定用部材を用いて操作スイッチ
を内面パネルに固定する技術が提案されている。
2. Description of the Related Art Operation switches for passenger conveyors such as escalator and auto line have been conventionally disclosed in Japanese Patent Laid-Open No. 2000-26.
No. 4566 discloses a mounting hole provided at a predetermined position of an inner panel stretched on a balustrade of a passenger conveyor, an operation switch is directly inserted into the mounting hole, and the operation switch is fixed to the inner panel using a fixing member. The technology to do is proposed.

【0003】また、乗客コンベアのリニューアルに関す
る技術は、従来、乗客コンベアのリニューアル作業全体
を、この乗客コンベアの所定部分毎にリニューアルする
複数の工程に分割し、乗客コンベアが利用されない時間
帯に、複数の前記工程のそれぞれ個別に完了させていく
ようにした乗客コンベアのリニューアル方法が提案され
ていた。
Further, in the technology related to the renewal of the passenger conveyor, conventionally, the entire renewal work of the passenger conveyor is divided into a plurality of steps for renewing each predetermined portion of the passenger conveyor, and a plurality of steps are performed during a time period when the passenger conveyor is not used. A passenger conveyor renewal method has been proposed in which each of the above steps is completed individually.

【0004】[0004]

【発明が解決しようとする課題】上記従来の技術におけ
る乗客コンベアのリニューアルは、リレー制御方式から
マイクロコンピューター制御とするため、新規制御盤に
リニューアルすると、リレー制御対応の旧操作スイッチ
はマイクロコンピューター化された新制御盤に対し、機
能の違いや接点構成の違い等により使用できず、新しい
操作スイッチに取替える必要があった。
Since the renewal of the passenger conveyor in the above-mentioned prior art is changed from the relay control system to the microcomputer control, when the new control panel is renewed, the old operation switch corresponding to the relay control is converted into a microcomputer. The new control panel could not be used due to differences in functions and contact configurations, and it was necessary to replace it with a new operation switch.

【0005】また、リニューアル前の旧欄干に新しい操
作スイッチを取付けて使用すると、欄干をリニューアル
した後、操作スイッチが汚れたり傷ついたりしている問
題が発生する。
Further, if a new operation switch is attached to the old balustrade before renewal and used, the problem arises that the operation switch is dirty or damaged after the balustrade is renewed.

【0006】本発明の目的は、制御盤のリニューアル完
了から欄干のリニューアル完了まで使用できる乗客コン
ベアの仮設操作スイッチを提供することにある。
An object of the present invention is to provide a temporary operation switch for a passenger conveyor that can be used from the completion of renewal of a control panel to the completion of renewal of a balustrade.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に、請求項1の発明は、無端状に連結され、乗客を乗せ
て移動する複数のステップと、これらのステップを駆動
させる駆動機構を有する駆動装置と、この駆動装置の駆
動機構を制御し、この駆動装置に含まれる制御盤と、乗
客コンベアの上部に設けられる照明部と、前記ステップ
の両側に設けられる欄干と、これらの欄干のそれぞれの
上部に沿って設けられ、複数の前記ステップと同期して
移動するハンドレールとを備え、この乗客コンベアの所
定部分毎にリニューアルする複数の工程に分割して行な
うリニューアル方法における乗客コンベアの仮設操作ス
イッチにおいて、前記欄干及び前記ステップを除き、少
なくとも前記制御盤を新規制御盤へのリニューアルが完
了した時点で、前記欄干部に取付ける操作スイッチと、
この操作スイッチと前記新規制御盤とを接続するコネク
タ付のケーブルとを備えたものである。
In order to achieve the above object, the invention of claim 1 has a plurality of steps connected endlessly to move a passenger and a driving mechanism for driving these steps. A drive device having, a drive panel of the drive device is controlled, a control panel included in the drive device, a lighting unit provided on an upper part of the passenger conveyor, a balustrade provided on both sides of the step, and a balustrade of these balustrades. Temporary installation of the passenger conveyor in the renewal method, which is provided along each upper part and includes a handrail that moves in synchronization with the plurality of steps, and is divided into a plurality of steps for renewing each predetermined portion of the passenger conveyor. Except for the balustrade and the step, at least when the control panel is completely renewed to a new control panel, And the operation switch attached to the balustrade,
A cable with a connector for connecting the operation switch and the new control panel is provided.

【0008】また請求項2の発明は、前記新規制御盤へ
のリニューアル完了後、前記操作スイッチは、前記欄干
から取外して作業用運転装置として使用するようにした
ものである。
According to a second aspect of the present invention, after the renewal of the new control panel is completed, the operation switch is detached from the balustrade and used as a working operation device.

【0009】このようにしたので、新規制御盤へのリニ
ューアルが完了して欄干部のリニューアルが完了するま
での期間、旧欄干部に取付けた操作スイッチを仮設操作
スイッチとして使用して、欄干部のリニューアル完了時
には新規の操作スイッチとするので、仮設操作スイッチ
として使い回しができるとともに、欄干部をリニューア
ルするときの作業用運転装置として使用できるので、効
率良いリニューアル作業が行なえる。
Because of this, the operation switch attached to the old balustrade is used as a temporary operation switch until the renewal of the new control panel is completed and the renewal of the balustrade is completed. Since a new operation switch is used when the renewal is completed, it can be used as a temporary operation switch and can be used as a work operation device when the balustrade is renewed, so efficient renewal work can be performed.

【0010】[0010]

【発明の実施の形態】以下本発明の一実施形態を図1〜
図5に基づき説明する。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of the present invention will be described below with reference to FIGS.
It will be described with reference to FIG.

【0011】図1は本発明に係る乗客コンベアの仮設操
作スイッチの一実施形態を示す欄干リニューアル前のエ
スカレーター下部側面図、図2は図1に用いる仮設操作
スイッチの正面図、図3は図1のA−A断面図、図4は
エスカレーターの段階的リニューアルの手順を説明する
フローチャート、図5はリニューアル完了後の図1に相
当するエスカレーター下部側面図である。
FIG. 1 is a side view of a lower portion of an escalator before a balustrade renewal showing an embodiment of a temporary operation switch for a passenger conveyor according to the present invention, FIG. 2 is a front view of the temporary operation switch used in FIG. 1, and FIG. 3 is FIG. 4 is a sectional view taken along line AA of FIG. 4, FIG. 4 is a flow chart for explaining the procedure of the stepwise renewal of the escalator, and FIG. 5 is a side view of the lower portion of the escalator corresponding to FIG.

【0012】図1〜図3において、欄干部1に設けられ
る柱2の間には、リレー制御方式の図示しない既設制御
盤に接続される既設操作スイッチ3が取付けられ、既設
制御盤をマイコン制御方式の図示しない新規制御盤にリ
ニューアルすると、既設操作スイッチ3の下方の柱2の
間に仮設操作スイッチ4が取付けられる。ここで、仮設
操作スイッチ4は、カバーケース付きの一体型構造をし
ており、ケース内側から両側の柱4に向かって取付ボル
ト5を締め付けて固定され、マイコン制御方式の図示し
ない新規制御盤に着脱自在に接続されるコネクタ6を有
している。
1 to 3, an existing operation switch 3 connected to an existing control panel (not shown) of a relay control system is attached between columns 2 provided in the balustrade 1, and the existing control panel is controlled by a microcomputer. When a new control panel (not shown) of the system is renewed, the temporary operation switch 4 is mounted between the pillars 2 below the existing operation switch 3. Here, the temporary operation switch 4 has an integral structure with a cover case, is fixed by tightening the mounting bolts 5 from the inside of the case to the pillars 4 on both sides, and is mounted on a new control panel (not shown) of the microcomputer control system. It has a connector 6 that is detachably connected.

【0013】次に、エスカレーターの段階的リニューア
ル工法を説明する。
Next, the stepwise renewal method of the escalator will be described.

【0014】図4において、第1に、リレー制御方式の
既設制御盤からマイコン制御方式の新規制御盤にリニュ
ーアルする制御リニューアルの手順は、図示しない既設
制御盤、図示しないモーター、図示しない駆動装置等を
取外すとともに、既設操作スイッチ3と図示しない既設
制御盤の接続線を含む配線を切断し(手順S1)、図示
しない新規制御盤、図示しないモーター、図示しない駆
動装置等を取付けるとともに、これら配線の接続作業を
行ない(手順S2)、上述したように仮設操作スイッチ
4を欄干部1である柱2の間に取付けるとともに、仮設
操作スイッチ4と図示しない新規制御盤の接続をコネク
タ6を介して行ない、仮設操作スイッチ4での運転状態
の確認を行ない(手順S3)、制御リニューアルは完了
する。
In FIG. 4, firstly, the control renewal procedure for renewing from an existing control panel of a relay control system to a new control panel of a microcomputer control system is as follows: an existing control panel (not shown), a motor (not shown), a drive device (not shown), etc. In addition to removing the existing operation switch 3, the wiring including the connection line between the existing operation switch 3 and the existing control panel (not shown) is cut (procedure S1), a new control panel (not shown), a motor (not shown), a drive device (not shown), etc. are attached, and Connection work is performed (procedure S2), as described above, the temporary operation switch 4 is mounted between the pillars 2 which are the balustrade parts 1, and the temporary operation switch 4 and a new control panel (not shown) are connected via the connector 6. The operating state is confirmed by the temporary operation switch 4 (step S3), and the control renewal is completed.

【0015】この制御リニューアルが完了した段階で、
エスカレーターを利用することが可能となるので、一旦
お客様に引き渡すことができる。
When the control renewal is completed,
Since it becomes possible to use the escalator, it can be handed over to the customer.

【0016】次の段階として、図示しないステップや欄
干部1を新規のものにリニューアルする欄干リニューア
ルの手順は、仮設操作スイッチ4を柱2から取外し(手
順S4)、この仮設操作スイッチ4を床等に置いて図示
しない新規制御盤と再配線を行なって作業用運転装置と
して使用できるようにし(手順S5)、作業用運転装置
として仮設操作スイッチ4を用いて図示しないステップ
や柱2を含む欄干部1等を取外す作業を行ない(手順S
6)、図示しないステップや新規欄干部7等の設置作業
を行なうとともに、図5に示すように、新規操作スイッ
チ8を新規欄干部7の外デッキ9に組込み(手順S
7)、図示しない新規制御盤と仮設操作スイッチ4の配
線を外すとともに、図示しない新規制御盤と新規操作ス
イッチ8との配線接続を行ない、新規操作スイッチ8で
の運転状態の確認を行ない(手順S8)、欄干リニュー
アルの作業を完了する。
As a next step, the steps (not shown) and the procedure of the balustrade renewal for renewing the balustrade part 1 to a new one are to remove the temporary operation switch 4 from the pillar 2 (step S4), and then move the temporary operation switch 4 to the floor or the like. And a re-wiring with a new control panel (not shown) so that it can be used as a working operation device (step S5), and a balustrade including steps and columns 2 (not shown) using the temporary operation switch 4 as a working operation device. Work to remove the 1st grade etc. (Procedure S
6) In addition to performing steps (not shown) and installing the new balustrade 7, etc., as shown in FIG. 5, the new operation switch 8 is installed in the outer deck 9 of the new balustrade 7 (step S
7) The wiring of the new control panel (not shown) and the temporary operation switch 4 is removed, and the wiring of the new control panel (not shown) and the new operation switch 8 is connected to confirm the operating state of the new operation switch 8 (procedure). S8), the work of redesigning the balustrade is completed.

【0017】本実施形態によれば、手順S3の制御リニ
ューアル終了後から手順S4の欄干リニューアルを開始
する間は、仮設操作スイッチ4でエスカレーターの利用
が可能となるので、欄干リニューアルの時期が遅れても
お客様やエスカレーターの利用者に迷惑を掛けることは
ない。
According to this embodiment, since the escalator can be used by the temporary operation switch 4 after the control renewal of step S3 is completed and the balustrade renewal of step S4 is started, the time of the parapet renewal is delayed. Does not bother customers and escalator users.

【0018】[0018]

【発明の効果】本発明によれば、新規制御盤へのリニュ
ーアルが完了して欄干部のリニューアルが完了するまで
の期間、旧欄干部に取付けた操作スイッチを仮設操作ス
イッチとして使用して、欄干部のリニューアル完了時に
は新規の操作スイッチとするので、仮設操作スイッチと
して使い回しができるとともに、欄干部をリニューアル
するときの作業用運転装置として使用できるので、効率
良いリニューアル作業が行なえる。
According to the present invention, the operation switch attached to the old balustrade part is used as a temporary operation switch during the period from the completion of the renewal to the new control panel to the completion of the renewal of the balustrade part. Since the new operation switch is used when the renewal of the hanging part is completed, it can be used as a temporary operation switch and can be used as a work driving device when the balustrade part is renewed, so efficient renewal work can be performed.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る乗客コンベアの仮設操作スイッチ
の一実施形態を示す欄干リニューアル前のエスカレータ
ー下部側面図である。
FIG. 1 is a side view of a lower portion of an escalator before a balustrade renewal showing an embodiment of a temporary operation switch for a passenger conveyor according to the present invention.

【図2】図1に用いる仮設操作スイッチの正面図であ
る。
FIG. 2 is a front view of a temporary operation switch used in FIG.

【図3】図1のA−A断面図である。3 is a cross-sectional view taken along the line AA of FIG.

【図4】エスカレーターの段階的リニューアルの手順を
説明するフローチャートである。
FIG. 4 is a flowchart illustrating a procedure of a gradual renewal of an escalator.

【図5】リニューアル完了後の図1に相当するエスカレ
ーター下部側面図である。
5 is a side view of the lower portion of the escalator corresponding to FIG. 1 after completion of renewal.

【符号の説明】[Explanation of symbols]

1 仮設操作スイッチ 2 接続用コネクタ 3 既設操作スイッチ 4 欄干用柱 5 新設操作スイッチ 6 仮設操作スイッチ取付用ボルト 1 Temporary operation switch 2 Connector for connection 3 Existing operation switch 4 Parapet columns 5 New operation switch 6 Temporary operation switch mounting bolt

───────────────────────────────────────────────────── フロントページの続き (72)発明者 上山 利明 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 浅川 芳彦 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 Fターム(参考) 3F321 AA09 CE16 GA05 HA06    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Toshiaki Ueyama             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System (72) Inventor Yoshihiko Asakawa             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System F term (reference) 3F321 AA09 CE16 GA05 HA06

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 無端状に連結され、乗客を乗せて移動す
る複数のステップと、これらのステップを駆動させる駆
動機構を有する駆動装置と、この駆動装置の駆動機構を
制御し、この駆動装置に含まれる制御盤と、乗客コンベ
アの上部に設けられる照明部と、前記ステップの両側に
設けられる欄干と、これらの欄干のそれぞれの上部に沿
って設けられ、複数の前記ステップと同期して移動する
ハンドレールとを備え、この乗客コンベアの所定部分毎
にリニューアルする複数の工程に分割して行なうリニュ
ーアル方法における乗客コンベアの仮設操作スイッチに
おいて、前記欄干及び前記ステップを除き、少なくとも
前記制御盤を新規制御盤へのリニューアルが完了した時
点で、前記欄干部に取付ける操作スイッチと、この操作
スイッチと前記新規制御盤とを接続するコネクタ付のケ
ーブルとを備えたことを特徴とする乗客コンベアの仮設
操作スイッチ。
1. A driving device having a plurality of steps connected endlessly to move a passenger, and a driving mechanism for driving the steps, and controlling the driving mechanism of the driving device. A control panel included, a lighting unit provided at the top of the passenger conveyor, balustrades provided on both sides of the step, and provided along the upper part of each of these balustrades, and move in synchronization with the plurality of steps. In the temporary operation switch of the passenger conveyor in the renewal method performed by dividing into a plurality of steps for renewing each predetermined portion of the passenger conveyor, including a handrail, at least the control panel is newly controlled except for the balustrade and the step. When the renewal to the board is completed, the operation switch attached to the balustrade part, this operation switch and the new A temporary operation switch for a passenger conveyor, comprising: a cable with a connector for connecting to a control panel.
【請求項2】 請求項1記載の乗客コンベアの仮設操作
スイッチにおいて、前記新規制御盤へのリニューアル完
了後、前記操作スイッチは、前記欄干から取外して作業
用運転装置として使用するようにしたことを特徴とする
乗客コンベアの仮設操作スイッチ。
2. The temporary operation switch for the passenger conveyor according to claim 1, wherein after the renewal to the new control panel is completed, the operation switch is detached from the balustrade and used as a working operation device. Characteristic passenger conveyor temporary operation switch.
JP2002137352A 2002-05-13 2002-05-13 Temporarily installed operation switch for passenger conveyor Pending JP2003327382A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002137352A JP2003327382A (en) 2002-05-13 2002-05-13 Temporarily installed operation switch for passenger conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002137352A JP2003327382A (en) 2002-05-13 2002-05-13 Temporarily installed operation switch for passenger conveyor

Publications (1)

Publication Number Publication Date
JP2003327382A true JP2003327382A (en) 2003-11-19

Family

ID=29699134

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002137352A Pending JP2003327382A (en) 2002-05-13 2002-05-13 Temporarily installed operation switch for passenger conveyor

Country Status (1)

Country Link
JP (1) JP2003327382A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019224882A1 (en) * 2018-05-21 2019-11-28 三菱電機株式会社 Renewal method for passenger conveyor
US20220194745A1 (en) * 2019-08-06 2022-06-23 Mitsubishi Electric Corporation Method of renewing passenger conveyor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019224882A1 (en) * 2018-05-21 2019-11-28 三菱電機株式会社 Renewal method for passenger conveyor
US20220194745A1 (en) * 2019-08-06 2022-06-23 Mitsubishi Electric Corporation Method of renewing passenger conveyor
US11724918B2 (en) * 2019-08-06 2023-08-15 Mitsubishi Electric Corporation Method of renewing passenger conveyor

Similar Documents

Publication Publication Date Title
DE69835003D1 (en) Automatic start-up controller for a field-oriented elevator motor drive system
JP2003327382A (en) Temporarily installed operation switch for passenger conveyor
JP2007161447A (en) Skirt guard device of passenger conveyor
JP2007119167A (en) Temporarily installed operation device for passenger conveyor
JP6129725B2 (en) Passenger conveyor
JP4815277B2 (en) Passenger conveyor
WO2019224882A1 (en) Renewal method for passenger conveyor
JP2006206282A (en) Passenger conveyor
JP2000026060A (en) Controller for passenger conveyer
JP2000118937A (en) Controller for passenger conveyor
JP2000289963A (en) Passenger conveyor
JP4355163B2 (en) Renewal method of passenger conveyor
JPH11314870A (en) Winding machine for elevator
JP3889092B2 (en) Passenger conveyor and repair method for existing passenger conveyor
JP4097765B2 (en) Elevator old and new control unit replacement method and modernization shielding plate used therefor
JP2575001B2 (en) Passenger conveyor
JP2000281270A (en) Passenger conveyor
JP2002104760A (en) Renewal method of passenger conveyer
JP2002104759A (en) Renewal method of passenger conveyer
JP2002003143A (en) Moving rail cleaning device for passenger conveyor
JP2003321181A (en) Renewal of passenger conveyor drive device
KR20100023397A (en) Control device for lamp of construction equipment
JP3310929B2 (en) Elevator repair method
JP3506930B2 (en) Passenger conveyor
JP2000289964A (en) Passenger conveyor