JP2003316933A - System and method for task performance control - Google Patents

System and method for task performance control

Info

Publication number
JP2003316933A
JP2003316933A JP2002118331A JP2002118331A JP2003316933A JP 2003316933 A JP2003316933 A JP 2003316933A JP 2002118331 A JP2002118331 A JP 2002118331A JP 2002118331 A JP2002118331 A JP 2002118331A JP 2003316933 A JP2003316933 A JP 2003316933A
Authority
JP
Japan
Prior art keywords
work
performance
management
information
business
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002118331A
Other languages
Japanese (ja)
Inventor
Kazuhiro Takase
和博 高瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MSES KK
Original Assignee
MSES KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MSES KK filed Critical MSES KK
Priority to JP2002118331A priority Critical patent/JP2003316933A/en
Publication of JP2003316933A publication Critical patent/JP2003316933A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To solve such problems with a system and a method for task performance control that, when the task performance control in which a task set by a requester is performed by a performer is performed through a network, it is difficult to impartially express and transfer the contents of the set task desired by the requester and the contents of the track records of the task performed by the performer only by electronic information, the contents of the set task exchanged through the network and the control conditions for performing the task are separated from the track records of performance of the task, and the performance of the requested task as requested and the achievement of the control thereof are obstructed. <P>SOLUTION: In this task performance control system, a mechanism 3 for performing the control of the task comprises a difference analysis means 5 and servers 7 and 8. A difference between the contents of the set task obtained from the servers 7 and 8 through the network 10 and the information on the track records of the task performance is analyzed, the results of the performance of the task are summarized and reported, the problems and requests on the information on the results are received from the requester to characterize the contents of the set task and the conditions for a task performance control. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、電子化された業務
遂行関係情報をネットワークを介してやり取りし、処理
することにより、受託した業務遂行管理の精度と効率を
上げるようにした業務遂行管理システムおよび方法に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a business performance management system for improving the accuracy and efficiency of contracted business performance management by exchanging and processing computerized business performance related information via a network. And about the method.

【0002】[0002]

【従来の技術】最近では、各種の業務処理にコンピュー
タが使われ、これらの多数のコンピュータや電子通信網
を通じて相互に情報のやり取りをするコンピュータネッ
トワーク(以下、単にネットワークという)が普及し、
例えば、LANやインターネットを介して、商取引や情
報の授受が図られるようになってきている。
2. Description of the Related Art Recently, computers have been used for various business processes, and computer networks (hereinafter simply referred to as networks) for exchanging information with each other through a large number of these computers and electronic communication networks have become widespread.
For example, commercial transactions and exchange of information have become possible via LAN and the Internet.

【0003】このようにネットワークを利用して業務の
遂行の管理を行なう場合、その業務遂行の情報の処理の
仕方は業務の完遂に大きく関係する。また、電子的に業
務遂行に関連する情報処理を行なって、業務遂行の完成
度を高めるためには、情報入手や情報処理の方法やシス
テムに相応の仕組が必要となる。
In the case of managing the execution of business using the network as described above, the method of processing the information of the business execution is greatly related to the completion of the business. Further, in order to electronically perform information processing related to business execution and improve the degree of completion of business execution, it is necessary to have a mechanism suitable for the method and system of information acquisition and information processing.

【0004】[0004]

【発明が解決しようとする課題】業務の遂行を電子化さ
れた情報(以下、電子情報ともいう)を基に管理する試
みは、従来から種々行なわれている。例えば、特定の人
や団体から、その人や団体に代わってまたは、その人や
団体のために、或条件の基で遂行するように依頼を受け
た業務(以下設定業務ともいう)についての業務の遂行
を管理をする場合に、設定業務を遂行する個人や団体、
事業体等の業務の実施者(以下単に実施者ともいう)に
設定業務の内容を伝えると共に、業務遂行の途中を含め
て業務遂行の状況を逐次、把握して電子情報化したり、
また、業務遂行が完了したときは、電子情報で業務遂行
実績をまとめるようにすることは行なわれている。
Various attempts have heretofore been made to manage the performance of work based on computerized information (hereinafter also referred to as electronic information). For example, a job (hereinafter also referred to as a setting job) requested by a specific person or group to perform on behalf of or for that person or group under certain conditions. When managing the execution of, the individual or group that performs the setting work,
In addition to communicating the contents of the setting work to the implementer of the business such as a business entity (hereinafter also simply referred to as the implementer), the status of the work execution including the middle of the work execution is sequentially grasped and converted into electronic information,
In addition, when the work execution is completed, the work execution results are summarized by electronic information.

【0005】しかし、設定業務の内容に関する情報(以
下設定情報という)や実施者が業務の遂行をした実績と
して報告してくる情報(以下実績情報という)に限ら
ず、人手によって遂行される種々の業務の遂行やその管
理に関する内容を細大漏らさずに電子情報化することは
至難である。また、電子情報による管理において、関連
する設定業務や業務実績を、従来の現場の説明や現場監
督者によって直接に行なわれる人的な管理と同様なレベ
ルで伝えることは不可能である。
However, the information is not limited to information relating to the contents of the setting work (hereinafter referred to as setting information) or information reported by the practitioner as a result of the performance of the work (hereinafter referred to as performance information), and various types of manual execution are performed. It is extremely difficult to digitize the contents of business execution and management without leaking details. Further, in the management by electronic information, it is impossible to convey the related setting work and work performance at the same level as the conventional explanation of the site and the personal management directly performed by the site supervisor.

【0006】また、従来の現場説明や現場監督者による
人的な管理と同様なレベルの情報の伝達を図ると、その
情報量が著しく増大し、伝達すべき情報と情報のノイズ
とが混在して、必要な情報の伝達が十分には果たせなく
なることが多い。
[0006] Further, if the same level of information as in the conventional site explanation and human management by the site supervisor is attempted to be transmitted, the amount of the information is remarkably increased, and the information to be transmitted and the noise of the information are mixed. In many cases, the necessary information cannot be transmitted sufficiently.

【0007】更にまた、これらの業務遂行に関する情報
の不備や遺漏が、依頼者や業務の実施者のいずれにも不
満足な結果をもたらすおそれがある。業務情報や業務実
績情報のいずれに不備や遺漏があっても業務の完遂を期
すことができず、これらが電子情報を利用した業務遂行
管理システムの実用化の妨げになる。
[0007] Furthermore, there is a possibility that the deficiency or omission of information relating to the performance of these tasks may bring unsatisfactory results to both the requester and the person who carries out the task. Even if there is a deficiency or omission in any of the business information and business performance information, the business cannot be completed, and these impede the practical implementation of the business performance management system using electronic information.

【0008】本発明は、上述のように、従来の業務遂行
管理システムが有する課題を解決し、ネットワークを利
用して業務の遂行管理を実現させたものであり、ネット
ワークの特質を生かして、業務の依頼者や業務の実施者
のいずれにとっても納得のいく業務の遂行を可能にし、
かつ、従来の業務遂行の管理システムよりも人手を少な
くし、効率を向上させた業務遂行管理システムおよび方
法を提供することを目的とする。
As described above, the present invention solves the problems of the conventional work performance management system and realizes work performance management by using a network. Enables the execution of work that is satisfactory to both the client and the implementer of the work,
Further, it is an object of the present invention to provide a work performance management system and method that has less manpower than the conventional work performance management system and has improved efficiency.

【0009】また、本発明は、業務の遂行管理を行なう
際に使用する電子情報の処理において、誤った情報や偽
の情報の混入を極力回避して、信頼性と客観性を高めた
監視システムを備え、業務の遂行成果の完成度を高める
ことができる業務遂行管理システムおよび方法を提供す
ることを目的とする。
Further, the present invention, in processing electronic information used when performing work management, avoids mixing of erroneous information or false information as much as possible, thereby improving reliability and objectivity. It is an object of the present invention to provide a business performance management system and method capable of increasing the degree of completion of business performance results.

【0010】[0010]

【課題を解決するための手段】上記目的を達成するた
め、請求項1に記載の発明は、依頼者から遂行の依頼を
受けた業務を実施者に遂行させるとともに、その遂行管
理をコンピュータネットワーク経由で行なう業務遂行管
理システムにおいて、業務の遂行管理をする業務遂行管
理機構は、電子情報の差異分析手段及び情報の授受を管
理するサーバを備え、コンピュータネットワークを介し
て入力された業務遂行の実績情報と依頼業務の内容とを
差異分析手段で分析し、業務遂行実績に差異分析結果を
加味した業務遂行の成果を依頼者に報告する手段と、成
果報告に関連して依頼者から受けた課題や要望を依頼業
務の内容及び業務遂行の管理条件の中に逐次組込む手段
とを有していることを特徴とする業務遂行管理システム
である。
In order to achieve the above object, the invention according to claim 1 allows an implementer to perform a task requested to be performed by a client, and manages the performance via a computer network. In the business performance management system performed by, the business performance management mechanism for managing the performance of business is equipped with electronic information difference analysis means and a server for managing the transfer of information, and the business performance record information input via the computer network. And the contents of the requested work are analyzed by the difference analysis means, and the means of reporting the work execution result in which the difference analysis result is added to the work execution result to the requester, and the problem received from the requester in relation to the result report and It is a business performance management system characterized by having means for sequentially incorporating a request into the content of a requested business and management conditions for business performance.

【0011】これにより、種々の依頼業務の遂行の管理
をする際に、依頼業務の実績情報はネットワークを介し
て取入れられ、この実績情報と設定情報と比較した差異
分析結果を加味した業務遂行の成果を依頼者に報告し、
成果報告に関連して依頼者から受けた課題や要望を依頼
業務の内容及び業務遂行の管理条件の中に組込むことに
より、個々の依頼業務の遂行管理に重要な情報を中核に
次第に各依頼業務の遂行管理に固有の設定情報や管理条
件が形成されるので、各依頼業務の内容は個々の業務遂
行管理に適した内容に特徴づけられ、業務遂行の管理の
ための項目やその内容が電子情報の特徴を生かして例え
ば、その業務に固有のチェックシートのような形に完成
させることができる。
As a result, when managing the performance of various requested jobs, the performance information of the requested jobs is taken in through the network, and the performance of the jobs is performed in consideration of the difference analysis result comparing this performance information and the setting information. Report the results to the client,
By incorporating the issues and requests received from the requester in relation to the result report into the contents of the requested work and the management conditions of the performance of the work, each requested work is gradually increased with the information important for the management of the performance of the individual work requested. Since the setting information and management conditions specific to the performance management of the job execution are formed, the contents of each requested job are characterized by the contents suitable for the individual job execution management, and the items for managing the job execution and their contents are electronically managed. By utilizing the characteristics of the information, for example, it can be completed in the form of a check sheet unique to the business.

【0012】また、業務遂行に伴って新しい課題や要望
が出るごとに、逐次、これらの課題や要望を依頼業務の
設定情報や業務遂行の管理条件の中に組込むので、依頼
業務の遂行管理は、従来の画一的、固定的な設定情報や
管理条件に基づく業務遂行管理ではなく、各依頼業務に
最も適した重点的な管理項目に的を絞った業務遂行の管
理が可能になり、限られた電子情報の基でも、各業務に
固有の設定情報と管理条件に従った高度な業務の遂行管
理ができる。
[0012] Further, whenever a new task or request is issued as the task is performed, these tasks or requests are successively incorporated into the setting information of the task task or the management conditions for task task execution. Instead of the conventional work management based on uniform and fixed setting information and management conditions, it is possible to manage the work execution focusing on the priority management items most suitable for each requested work, Even based on the obtained electronic information, it is possible to perform advanced work performance management according to the setting information and management conditions unique to each work.

【0013】請求項2に記載の発明は、依頼者から遂行
の依頼を受けた業務を実施者に遂行させるとともに、そ
の遂行管理をコンピュータネットワーク経由で行なう業
務遂行管理システムにおいて、業務の遂行管理をする業
務遂行管理機構は、電子情報の差異分析手段、情報の授
受を管理するサーバを備えると共に、業務遂行の監視シ
ステムを有し、コンピュータネットワークを介して入力
された業務遂行の実績情報及び監視システムから入力さ
れた監視情報と依頼業務の内容とを差異分析手段で分析
し、業務遂行実績に差異分析結果を加味した業務遂行の
成果を依頼者に報告する手段と、成果報告に関連して依
頼者から受けた業務遂行に関する課題や要望を実施者に
提示する手段と、依頼業務の内容及び業務遂行の管理条
件の中に業務遂行に関する課題や要望を逐次組込む手段
と、実施者に対価の給付を行なう手段とを備えたことを
特徴とする業務遂行管理システムである。
According to the second aspect of the present invention, in the business performance management system for causing a practitioner to carry out a business requested to be carried out by a client, and managing the performance through a computer network, the business performance management is performed. The business performance management mechanism includes an electronic information difference analysis means, a server that manages information transfer, and a business performance monitoring system. The business performance record information and the monitoring system input via a computer network. A means for analyzing the monitoring information and the contents of the requested work by the difference analysis means, and reporting to the requester the result of the work execution which added the result of the difference analysis to the work execution result, and the request related to the result report. The means of presenting to the practitioner the issues and requests regarding the performance of work received from a person, and the performance of the business within the contents of the requested business and the management conditions for the performance of the business. A task executing management system characterized by comprising means for incorporating sequentially issues and requirements regarding, and means for performing payment of consideration to the practitioner.

【0014】これにより、上述した請求項1に係る発明
の作用に加えて、業務遂行管理に必要な設定情報や管理
条件及び実施者によって遂行された実績情報等をネット
ワークを介して取入れて、各依頼業務に固有の業務遂行
管理に基づく業務の遂行管理を効率よく遂行することが
できる。また、監視システムを備え、ネットワークを介
して入力される監視情報を加味して業務遂行の成果を得
るようにすることにより、依頼業務の遂行者から入力さ
れる業務遂行の実績情報やその関係情報に虚偽の情報が
混入したり、情報システム等の誤作動に伴って生じる異
常な情報の混入を極力回避し、業務の遂行の管理の精度
や業務の遂行の完遂度や信頼性を高められることができ
る。
Thus, in addition to the operation of the invention according to claim 1 described above, setting information necessary for business performance management, management conditions, performance information executed by the practitioner, etc. are taken in via the network, It is possible to efficiently perform work management based on work performance management unique to the requested work. In addition, by providing a monitoring system and obtaining the results of the work execution by adding the monitoring information input via the network, the performance information of the work execution and the related information input by the performer of the requested work. It is possible to improve the accuracy of business execution management, the degree of completion of business execution, and the reliability by avoiding as much as possible the inclusion of false information or abnormal information resulting from malfunction of information systems etc. You can

【0015】請求項3に記載の発明は、依頼者から遂行
の依頼を受けた業務を実施者に遂行させるとともに、そ
の遂行管理をコンピュータネットワーク経由で管理する
方法において、業務の遂行管理をする業務遂行管理機構
には、依頼業務の設定情報を得るステップと、コンピュ
ータネットワークを介して業務の遂行実績情報を得るス
テップと、依頼業務の内容を設定した情報と業務遂行の
実績情報との差異分析をするステップと、差異分析結果
を加味した業務遂行の成果を依頼者に報告するステップ
と、業務遂行の成果情報に対する課題や要望を依頼者か
ら受けるステップと、業務遂行に関する課題や要望を実
施者に提示するステップと、依頼業務の内容及び業務遂
行の管理条件の中に上記課題や要望を逐次組込むステッ
プとを備えたことを特徴とする業務遂行管理の方法であ
る。
According to a third aspect of the invention, in the method of causing a practitioner to perform a job requested to be performed by a client and managing the execution management via a computer network, the job management is performed. The performance management mechanism includes a step of obtaining setting information of the requested business, a step of acquiring performance information of the business via a computer network, and an analysis of the difference between the information setting the content of the requested business and the performance information of the business performance. To report to the requester the results of the work execution in consideration of the difference analysis result, the step of receiving from the requester the issues and requests for the result information of the work execution, and the issues and requests related to the work execution to the implementer. Providing a step of presenting and a step of successively incorporating the above-mentioned tasks and requests in the content of the requested work and the management conditions for performing the work Is a method of business operations management, it characterized.

【0016】これにより、種々の依頼業務の遂行の管理
をする際に、依頼業務の実績情報はネットワークを介し
て取入れられ、この実績情報と設定情報と比較した差異
分析結果を加味した業務遂行の成果を依頼者に報告し、
成果報告に関連して依頼者から受けた課題や要望を依頼
業務の内容及び業務遂行の管理条件の中に逐次組込むこ
とにより、個々の依頼業務の遂行管理に重要な情報を中
核に次第に各依頼業務の遂行管理に固有の設定情報や管
理条件が形成されるので、各依頼業務の内容は個々の業
務遂行に適した内容に特徴付けられ、業務遂行の管理の
ための項目や管理情報をいたずらに増大させることな
く、ネットワークを介した業務遂行管理をすることがで
きる。
As a result, when the execution of various requested jobs is managed, the performance information of the requested jobs is taken in through the network, and the performance of the operations is performed in consideration of the difference analysis result obtained by comparing this performance information with the setting information. Report the results to the client,
By sequentially incorporating the issues and requests received from the requester in relation to the result report into the contents of the requested work and the management conditions of the work execution, each request is gradually made centering on the information important for the execution management of each request work. Since setting information and management conditions specific to job execution management are formed, the content of each requested job is characterized by content suitable for individual job execution, and the items and management information for managing job execution are mischievous. It is possible to manage the business performance via the network without increasing the number.

【0017】また、業務遂行に伴う新しい課題や要望が
出るごとに、逐次、これらの課題や要望を依頼業務の設
定情報や業務遂行の管理条件の中に組込むので、依頼業
務の遂行管理は、従来の画一的、固定的な設定情報や管
理条件に基づく業務遂行管理ではなく、各依頼業務に最
も適した重点的な管理項目に的を絞った業務遂行の管理
が可能になり、限られた電子情報の基でも、各業務に固
有の設定情報と管理条件に従った高度な業務遂行の管理
をすることができる。
Further, whenever a new task or request is issued along with the execution of a task, these tasks or requests are successively incorporated into the setting information of the requested task or the management conditions of the task to be performed. It is possible to manage the work performance focusing on the priority management items most suitable for each requested work, instead of the conventional work management based on uniform and fixed setting information and management conditions. Based on the electronic information, it is possible to manage the advanced work performance according to the setting information and management conditions unique to each work.

【0018】請求項4に記載の発明は、依頼者から遂行
の依頼を受けた業務を実施者に遂行させるとともに、そ
の遂行をコンピュータネットワーク経由で管理する方法
において、業務の遂行管理をする業務遂行管理機構に
は、依頼業務の内容を設定した情報や業務遂行の管理条
件をコンピュータネットワークを介して得るステップ
と、業務の遂行実績情報をコンピュータネットワークを
介して得るステップと、業務遂行に関する監視情報をコ
ンピュータネットワークを介して得るステップと、業務
遂行の実績情報及び監視情報と依頼業務の設定情報とを
差異分析し管理条件を加味しつつ業務遂行の成果情報に
まとめるステップと、該業務遂行の成果を依頼者に報告
するステップと、成果報告に関連して依頼者から受けた
業務遂行に関する課題や要望を実施者に提示するステッ
プと、依頼業務の内容及び業務遂行の管理条件の中に業
務遂行に関する課題や要望を逐次組込んで依頼業務の遂
行に関する新たな設定情報及び管理条件を作るステップ
とを備えたことを特徴とする業務遂行管理の方法であ
る。
According to a fourth aspect of the invention, in the method of causing a practitioner to perform a task requested to be performed by a client and managing the execution through a computer network, the task execution management is performed. The management mechanism has a step of obtaining information setting the contents of the requested work and a management condition of the work execution via a computer network, a step of obtaining work performance record information via the computer network, and monitoring information on the work execution. A step of obtaining via a computer network, a step of analyzing the performance information and monitoring information of the work execution and the setting information of the requested work and collecting the result information of the work execution while adding management conditions, and the result of the work execution. Steps to report to the client and issues related to performance of work received from the client in relation to the result report A step of presenting a request to the practitioner, and a step of creating new setting information and management conditions relating to the performance of the requested business by sequentially incorporating the tasks and requests related to the business performance in the content of the requested business and the management conditions of the business performance. It is a method of business performance management characterized by having.

【0019】これにより、上述した請求項3に係る発明
の作用に加えて、業務遂行管理に必要な設定情報や管理
条件及び実施者によって遂行された実績情報等をネット
ワークを介して取入れて、各依頼業務に固有の業務遂行
管理に基づく業務の遂行管理を効率よく遂行することが
できる。また、監視システムを備え、ネットワークを介
して入力される監視情報を加味して業務遂行の成果を得
るようにすることにより、依頼業務の遂行者から入力さ
れる業務遂行の実績情報やその関係情報に虚偽の情報が
混入したり、情報システム等の誤作動に伴って生じる誤
った情報の混入を極力回避し、業務の遂行の管理の精度
や業務の遂行の完遂度や信頼性を高めることができる。
Thus, in addition to the operation of the invention according to claim 3 described above, setting information and management conditions necessary for business performance management, performance information performed by the practitioner, etc. are taken in via the network, It is possible to efficiently perform work management based on work performance management unique to the requested work. In addition, by providing a monitoring system and obtaining the results of the work execution by adding the monitoring information input via the network, the performance information of the work execution and the related information input by the performer of the requested work. It is possible to increase the accuracy of business execution management, the degree of completion of business execution, and the reliability by avoiding as much as possible the mixture of false information and the incorrect information that occurs due to malfunction of the information system etc. it can.

【0020】請求項5に記載の発明は、請求項2に記載
の業務遂行の監視システムが、依頼業務の実施者による
業務の遂行を電子情報に変換する電気的検知装置と該検
知装置で得られた情報を業務遂行管理機構へ送信する送
信装置とを有していることを特徴とする業務遂行管理シ
ステムである。
According to a fifth aspect of the present invention, the work performance monitoring system according to the second aspect is provided with an electrical detection device for converting the performance of the work performed by a person who carries out the requested work into electronic information, and the detection device. And a transmitting device for transmitting the obtained information to a work performance management mechanism.

【0021】これにより、上述した請求項2に係る発明
の作用に加えて、ネットワークを介して監視システムか
ら送信し入力される監視情報を加味して業務遂行の成果
を得るようにすることにより、依頼業務の遂行者から入
力される業務遂行の実績情報やその関係情報に虚偽の情
報が混入したり、情報システム等の誤作動に伴って生じ
る誤った情報の混入を効果的に回避し、業務の遂行の管
理の精度や業務の遂行の完遂度や信頼性を更に高めるこ
とができる。
[0021] Thus, in addition to the operation of the invention according to claim 2 described above, by providing the monitoring information transmitted and input from the monitoring system via the network to obtain the result of the business execution, It effectively avoids the mixing of false information in the performance information of the business execution and the related information input by the person who performs the requested business, and the mixing of false information caused by the malfunction of the information system, etc. It is possible to further improve the accuracy of management of execution of tasks, the degree of completion of tasks, and reliability.

【0022】請求項6に記載の発明は、請求項4に記載
の業務遂行の管理の方法における業務遂行に関する監視
情報が、業務の実施者による依頼業務の遂行を電子情報
に変換し、コンピュータネットワークを介して業務遂行
管理機構へ自動的に送信する機能を備えた監視システム
から送られた情報であることを特徴とする業務遂行管理
の方法である。
According to a sixth aspect of the invention, the monitoring information relating to the business performance in the method of managing the business performance according to the fourth aspect converts the performance of the requested business by the business operator into electronic information, and the computer network It is a method of managing work performance, characterized in that the information is sent from a monitoring system having a function of automatically transmitting to the work performance managing mechanism via.

【0023】これにより、上述した請求項4に係る発明
の作用に加え、ネットワークを介して監視システムから
自動的に入力される監視情報を加味した業務遂行の成果
を得るようにすることにより、依頼業務の遂行者から入
力される業務遂行の実績情報やその関係情報に虚偽の情
報が混入したり、情報システム等の誤作動に伴って生じ
る異常な情報の混入を効果的に回避し、業務の遂行の管
理の精度や業務の遂行の完遂度や信頼性を更に高めるこ
とができる。
Thus, in addition to the operation of the invention according to claim 4 as described above, the request is made by obtaining the result of the work execution in consideration of the monitoring information automatically input from the monitoring system via the network. It effectively avoids mixing false information into work performance information and related information input by a person who performs work, and mixing abnormal information that occurs due to malfunction of an information system. It is possible to further improve the accuracy of management of execution and the degree of completion and reliability of execution of work.

【0024】[0024]

【発明の実施の形態】以下、図面を用いて、本発明の実
施の形態を説明する。図1は、本発明の一実施の形態を
示す業務遂行管理システムの全体構成図である。図1の
業務遂行管理システムにおいて1は、対価や代償を払っ
て業務の遂行を他の人や団体等に依頼する人や団体或い
は事業体(以下単に依頼者という)である。2は、依頼
を受けて設定業務の遂行をする人や団体または事業体等
の業務の実施者である。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is an overall configuration diagram of a work performance management system showing an embodiment of the present invention. In the business performance management system of FIG. 1, reference numeral 1 denotes a person, a group, or a business entity (hereinafter simply referred to as a client) who pays a price or a price and requests another person, a group, or the like to perform the business. Reference numeral 2 is a person who performs a setting work upon receiving a request, an implementer of a work such as a group or a business entity.

【0025】3は、委託を受けて実施者2によって行わ
れる設定業務の遂行の管理をする人や団体または事業体
等の業務遂行管理機構(以下単に業務遂行管理機構とい
う)である。なお、業務遂行管理機構は、ネットワーク
における位置付けとしては、ネットワークを介して情報
の授受をしたり、電子情報の処理や業務遂行のための情
報管理をする機能を有した機関(以下サイトオーナとも
いう)であることが好ましい。
Reference numeral 3 denotes a business performance management mechanism (hereinafter simply referred to as a business performance management mechanism) such as a person, a group or a business entity that manages the performance of the setting business performed by the practitioner 2 upon being entrusted. Incidentally, the business performance management mechanism, as a position in the network, is an organization (hereinafter also referred to as a site owner) having a function of exchanging information via the network and processing of electronic information and information management for business performance. ) Is preferable.

【0026】業務遂行管理機構3がサイトオーナであれ
ば、業務遂行に関連するサイトを開く権利を使って、実
施者1や依頼者2の受付をしたり、登録情報を管理した
り、別サイトの情報を開くなど、業務の進捗管理やリア
ルタイムに業務の遂行の質の検査と管理ができるなど、
依頼者1や実施者2との情報の授受や業務の遂行進捗の
管理が容易になる。業務遂行管理機構3は、中央制御装
置4、差異分析手段5、共通データベース6(以下で
は、データベースをDBと略記する)、業務管理受付サ
ーバ7、実績入手サーバ8及び検収受付処理装置9を備
え、業務管理受付サーバ7及び実績入手サーバ8はネッ
トワーク10に接続されている。
If the business performance management mechanism 3 is the site owner, the right to open a site related to business performance is used to accept the practitioner 1 and the requester 2, manage registration information, and manage another site. Information such as opening information about the progress of work and checking and managing the quality of work in real time.
It becomes easy to exchange information with the requester 1 and the practitioner 2 and manage the progress of the work. The work performance management mechanism 3 includes a central control device 4, a difference analysis unit 5, a common database 6 (hereinafter, the database is abbreviated as DB), a work management reception server 7, a result acquisition server 8 and an acceptance reception processing device 9. The business management reception server 7 and the result acquisition server 8 are connected to the network 10.

【0027】業務遂行管理機構の中央制御装置4は、業
務管理受付サーバ7を介して、依頼者1から委託された
設定業務の実施者2による設定業務の遂行の管理情報を
受付けるとともに、実績入手サーバ8を介して実施者2
による設定業務の遂行実績(以下単に業務遂行実績とも
いう)の報告を受け、かつ、検収受付処理装置9を介し
て依頼者1と実施者2と業務遂行管理機構3との間及び
依頼者1と実施者2との間での情報を管理して、設定業
務ができるだけ、依頼者1の要望に沿った内容で遂行さ
れるよう情報の授受を行ない、受取った情報の処理分
析、処理結果を記憶、保管したり出力するために、差異
分析手段5や共通DB6を制御する装置である。
The central control unit 4 of the business performance management mechanism accepts management information of performance of the setting business by the practitioner 2 of the setting business outsourced from the client 1 through the business management receiving server 7 and obtains the results. Performer 2 via server 8
A report of the performance performance of the setting business (hereinafter, also simply referred to as the business performance performance) is received by the client, and the client 1 and the practitioner 2 and the business performance management mechanism 3 and the client 1 via the inspection acceptance processing device 9. The information between the person and the practitioner 2 is managed, information is exchanged so that the setting work can be performed according to the request of the client 1 as much as possible, and the processing analysis and the processing result of the received information are performed. It is a device for controlling the difference analysis means 5 and the common DB 6 for storing, storing and outputting.

【0028】差異分析手段5は、詳細については後述す
るように、依頼者1から受託した業務遂行管理の内容と
業務遂行実績とを比較分析する装置である。共通DB6
は依頼者1から委託を受けた設定業務の内容や遂行の条
件等の情報、実施者2から報告のあった業務遂行実績の
情報及び業務遂行管理機構3で処理し、まとめをした成
果情報等を記憶させる種々のDBの集合体である。共通
DB6には、業務管理受付サーバ7、実績入手サーバ
8、検収受付処理装置9及び中央制御装置4から随時ア
クセスして、各DBに保管されている情報を利用した
り、再度、記憶し保管させることができるようにしてい
る。
As will be described later in detail, the difference analysis means 5 is a device for comparing and analyzing the contents of the work execution management entrusted by the client 1 and the work execution results. Common DB6
Is information such as the contents of the setting work entrusted by the client 1 and the conditions of execution, the information on the work performance reported by the practitioner 2, and the result information processed and summarized by the work performance management mechanism 3. Is a collection of various DBs that store The common DB 6 is accessed from the business management reception server 7, the result acquisition server 8, the inspection reception processing device 9 and the central control device 4 as needed to use the information stored in each DB or to store and store it again. I am allowed to do it.

【0029】業務管理受付サーバ7は、ネットワーク1
0を介して、業務管理設定IO(IOは入出力装置の略
記であり、以下同様の意味で使用する)11にも接続さ
れており、中央制御装置4と共に共通DB6を使いなが
ら、依頼者1からの業務の遂行管理の委託の受付、受託
した業務遂行管理の内容の確認、依頼者1から業務遂行
管理を受託したことを実施者2に連絡する処理、或いは
依頼者1から受託した業務の遂行を管理するときの管理
の内容を実施者2に確認して共通DB6に保管する等の
機能を備えたサーバである。
The business management reception server 7 is the network 1
It is also connected to a business management setting IO (IO is an abbreviation for an input / output device and is used in the same meaning below) 11 via 0, and while using the common DB 6 together with the central control device 4, the client 1 Acceptance of business performance management from the client, confirmation of the contents of the business performance management that was entrusted, processing for notifying the practitioner 2 that the business performance management was commissioned from the client 1, or the business contracted from the client 1. It is a server having a function of confirming the content of management when managing the execution with the practitioner 2 and storing it in the common DB 6.

【0030】また、業務管理受付サーバ7は、業務の遂
行管理を希望し、業務遂行管理の委託の可能性を照会す
る依頼者1が、ネットワーク10を介して、随時アクセ
スすることができる装置でもある。
Further, the work management reception server 7 is a device that can be accessed by the client 1 who wishes to perform work management and inquires about the possibility of entrusting the work management through the network 10 at any time. is there.

【0031】業務管理設定IO11はネットワーク10
に接続されて依頼者1が、業務遂行管理を希望する業務
の内容を入力したり、委託の条件を読み取ることができ
る端末装置である。この業務管理設定IO11は、依頼
者1の所有であっても業務遂行管理機構3の専用端末の
いずれであっても良い。随時、ネットワーク10に接続
をして、該ネットワーク10を介して業務遂行管理機構
3の業務管理受付サーバ7に接続するものであり、例え
ば、PC(パソコン)や表示装置つきの端末機器などの
入出力装置が用いられる。しかし、ネットワーク10の
環境の整備具合や通信情報機器の都合によっては、業務
遂行管理機構3の専用回線や専用端末としての業務管理
設定IO11を介して業務管理の委託情報を入力するよ
うにしてもよい。
The business management setting IO11 is the network 10
Is a terminal device which is connected to the client 1 so that the client 1 can input the content of the business for which the business performance management is desired and can read the conditions of the consignment. This job management setting IO11 may be owned by the client 1 or a dedicated terminal of the job performance management mechanism 3. It connects to the network 10 at any time and connects to the business management reception server 7 of the business performance management mechanism 3 via the network 10. For example, input / output of a PC (personal computer) or a terminal device with a display device. The device is used. However, depending on the condition of the environment of the network 10 and the convenience of communication information equipment, the task management entrustment information may be input via the task management setting IO11 as a dedicated line or a terminal of the task performance management mechanism 3. Good.

【0032】また、業務管理の委託は、依頼者本人が委
託情報を入力することに限定されるものではなく、依頼
者1の代理人や依頼者1の要請を受けて業務管理の委託
情報の入力を手伝う人によって業務管理の委託情報を入
力しても構わない。
Further, the entrustment of business management is not limited to the requester himself inputting the entrustment information, and the entrustment information of the business management is received at the request of the agent of the client 1 or the client 1. The person who helps the input may input the business management consignment information.

【0033】実績入手サーバ8は、中央制御装置4とと
もに共通DB6を使いながら実施者2が遂行した実績の
受付や、受付けた実績の内容の確認処理をし、共通DB
6に保管するサーバである。このために、実績入手サー
バ8はネットワーク10を介して業務の実施者2側の実
績報告IO12につながることができる。依頼者1から
設定業務の遂行の依頼を受け、業務遂行管理機構3の管
理下にある実施者2は、業務の遂行のたびごとに随時、
実績報告IO12から実績入手サーバ8にアクセスし
て、遂行依頼を受けた業務に関して、その業務の遂行の
実績を入力することができる。
The achievement acquisition server 8 accepts the achievements performed by the practitioner 2 while using the common DB 6 together with the central controller 4 and confirms the contents of the received achievements.
6 is a server for storage. Therefore, the result acquisition server 8 can be connected to the result report IO12 on the side of the operator 2 of the work via the network 10. The practitioner 2 under the control of the work performance management mechanism 3 receives a request from the client 1 to carry out the setting work, and at any time every time the work is carried out.
It is possible to access the performance acquisition server 8 from the performance report IO12 and input the performance performance of the business with respect to the business for which the performance request is received.

【0034】実績報告IO12も業務管理設定IO11
と同様に、ネットワーク10に接続して実施者2が業務
遂行の実績を入力したり、業務遂行管理機構3からの照
会に応じて、必要な情報を入力することができる装置で
あり、例えば、PCや表示装置つきの端末機器などの入出
力装置である。
The performance report IO12 is also the business management setting IO11.
Similarly to the above, the device is a device that can be connected to the network 10 to allow the practitioner 2 to input a performance record of work execution and to input necessary information in response to an inquiry from the work execution management mechanism 3. Input / output devices such as PCs and terminal devices with display devices.

【0035】なお、本発明では、説明の便宜上、業務管
理設定IO11と実績報告IO12及び、後述する成果
報告検収IO13、対価等給付IO14等を区別して表
示しているが、これらのIOは、各機能の説明の便宜上
区別しているのであって、機器の構成の上からは、全く
同じハード機器をソフト的に共用しても使用可能なもの
であり、各IOは、依頼者1の所有であっても業務遂行
管理機構3の専用端末のいずれであっても良い。
Note that, in the present invention, for convenience of explanation, the business management setting IO11 and the performance report IO12, and the result report acceptance IO13 and the consideration payment benefit IO14, which will be described later, are displayed separately. For the sake of convenience of explanation of the functions, they are distinguished from each other, and from the viewpoint of the configuration of the device, they can be used even if the same hardware device is shared by software, and each IO is owned by the client 1. Alternatively, it may be any of the dedicated terminals of the work performance management mechanism 3.

【0036】検収受付処理装置9は、中央制御装置4と
ともに共通DB6を使いながら、実施者2が遂行した業
務の実績を業務遂行の成果報告としてまとめ、これを依
頼者1に報告して当該成果の検収を受けたり、業務の遂
行成果に基づく依頼者1の要望事項を入手したり、実施
者2に業務遂行に対する対価等を給付したり、依頼者1
から受けた要望事項或いはこれらの過程で生じる課題を
新たな業務管理事項として実施者2に提示したり、これ
らの情報を共通DB6に保管する装置である。
The inspection acceptance processing device 9 uses the common DB 6 together with the central control device 4 to compile the results of the work performed by the practitioner 2 as a work performance result report, and reports this to the requester 1 and outputs the result. Received the request of the client 1 based on the results of the job execution, paid the practitioner 2 compensation for the job execution, and requested the client 1
It is a device that presents the request received from the user or the problem that arises in these processes to the practitioner 2 as a new task management item, and stores these information in the common DB 6.

【0037】検収受付処理装置9は、図1においては、
成果報告検収IO13及び対価等給付IO14に接続さ
れている。検収受付処理装置9は、ネットワーク10に
接続されているときはサーバとしての機能も備えている
が、依頼者1や実施者2において、成果報告検収IO1
3や対価等給付IO14等のIO装置或いはネットワー
ク10の環境が整っていないときは、検収受付処理装置
9は、ネットワーク10を用いた情報の授受の代わり
に、検収受付処理装置9で成果報告書や検収書類、要望
書等の書類を作成し、これら紙情報によって依頼者1や
実施者2と情報の授受をすることができる機能を有した
装置でもある。
The acceptance acceptance processing device 9 is shown in FIG.
It is connected to the performance report acceptance IO13 and consideration payment IO14. The acceptance acceptance processing device 9 also has a function as a server when it is connected to the network 10, but the requester 1 and the practitioner 2 have the result report acceptance IO1.
When the environment of the IO device such as 3 or the payment of benefits such as IO 14 or the environment of the network 10 is not prepared, the acceptance reception processing device 9 uses the acceptance reception processing device 9 instead of exchanging information using the network 10 and outputs the result report. It is also a device having a function of creating documents such as inspection documents, request documents, etc., and exchanging information with the client 1 and the practitioner 2 based on the paper information.

【0038】この検収受付処理装置9からは、これらの
情報の授受のみならず、業務の遂行の成果報告書やその
成果の検収の要請が依頼者1に伝えられたり、実施者2
に対しては、財貨の給付を行う等の機能も必要なので、
必ずしも、電子的な入出力装置に限定されないで、依頼
者1や実施者2との連携が行われるようにシステムが構
成されている。
From the inspection acceptance processing device 9, not only the information is sent and received, but also a report of the result of the performance of the work and a request for the acceptance of the result are transmitted to the client 1 or the practitioner 2
For that, since functions such as payment of goods are also necessary,
The system is not necessarily limited to the electronic input / output device, and the system is configured to cooperate with the client 1 and the practitioner 2.

【0039】なお、成果報告検収IO13及び対価等給
付IO14は、上述した業務管理設定IO11や実績報
告IO12と同様に、ネットワーク10に接続されて随
時依頼者1や実施者2に情報を提供したり、依頼者1や
実施者2から必要な情報の入力をすることができ、例え
ば、PCや表示装置つきの端末機器などの入出力装置が用
いられる。
The result report acceptance IO 13 and the consideration payment IO 14 are connected to the network 10 and provide information to the requester 1 and the practitioner 2 at any time, similarly to the business management setting IO 11 and the result report IO 12 described above. The required information can be input from the client 1 and the practitioner 2. For example, an input / output device such as a PC or a terminal device with a display device is used.

【0040】このような、図1のシステムにおける情報
の流れと処理の概要を説明する。
The flow of information and the outline of processing in the system shown in FIG. 1 will be described.

【0041】業務の遂行の管理の委託を業務遂行管理機
構3に希望する依頼者1は、まず、業務遂行依頼の内容
を実施者2に伝え、業務遂行に関する実施者2の合意が
得られた後、業務管理設定IO11を介して、業務遂行
管理機構3の業務管理受付サーバ7にアクセスし、業務
管理の委託情報を入力する。
The client 1 who wishes to outsource the management of business execution to the business performance management mechanism 3 first conveys the content of the business performance request to the practitioner 2, and the practitioner 2's agreement regarding business performance is obtained. After that, the business management acceptance server 7 of the business performance management mechanism 3 is accessed via the business management setting IO11 to input the business management consignment information.

【0042】この場合に、図1では、依頼者1が実施者
2に直接に業務の遂行の依頼をし、遂行すべき業務の内
容を実施者2に伝えた後、その業務の遂行管理を業務遂
行管理機構3に委託する事例を示している。しかし、業
務の遂行の依頼の形態は、依頼者1が実施者2に直接、
業務の遂行の依頼をするばかりでなく、実施者から業務
遂行の依頼を待機中という登録を受けている業務遂行管
理機構3が、依頼者1の要請に応じて、実施者2に業務
遂行の依頼をすることも行なわれる。
In this case, in FIG. 1, the client 1 directly requests the practitioner 2 to carry out the work, informs the practitioner 2 of the contents of the work to be carried out, and then manages the performance of the work. An example of entrusting the work performance management mechanism 3 is shown. However, regarding the form of request for execution of work, the client 1 directly asks the practitioner 2
In addition to requesting the execution of the work, the work execution management mechanism 3 which has been registered by the practitioner to wait for the request to perform the work executes the work to the practitioner 2 in response to the request from the client 1. Requests are also made.

【0043】本発明は、業務の遂行管理に関するもので
あって、業務の遂行実施者2を誰が選任したかは、本発
明には直接的には関係せず、実質的な差がないので以下
の説明においては、業務の遂行依頼者1が実施者2に業
務の遂行依頼を直接に行なった事例を中心にして説明を
する。
The present invention relates to the management of the execution of the work, and it is not directly related to the present invention as to who has selected the person 2 who carries out the work. In the explanation, the explanation will focus on the case where the job execution requester 1 directly requests the practitioner 2 to execute the job.

【0044】業務遂行管理機構3は、業務管理受付サー
バ7によって依頼者1から、業務の遂行管理の照会を受
け、業務管理委託の情報の入力があったとき、ネットワ
ーク10や業務管理設定IO11を介して依頼者1側
と、上述したような情報の授受を行なって業務遂行管理
の受託をする。一方、業務遂行管理機構はネットワーク
10を介して、実施者2と連絡をして、設定業務の遂行
の管理を受託した旨の了解を取得して業務遂行の管理を
開始する。
The business performance management mechanism 3 receives a query of business performance management from the client 1 by the business management reception server 7 and inputs information on the business management consignment to the network 10 and the business management setting IO11. The above-mentioned information is exchanged with the client 1 side through the contract, and the business performance management is entrusted. On the other hand, the business performance management mechanism contacts the practitioner 2 via the network 10, obtains the consent that the management of the performance of the setting business has been accepted, and starts the management of the business performance.

【0045】業務遂行管理機構3は、設定業務の遂行管
理を開始した後、実施者2とは、ネットワーク10や実
績報告IO12や対価等給付IO14を介して情報の授
受を行なうことにより、依頼者1から受託した管理業務
が、実施者2によって依頼者1の希望する内容で遂行さ
れるように業務の遂行の管理を行なう。
After starting the performance management of the setting business, the business performance management mechanism 3 sends and receives information to and from the practitioner 2 via the network 10, the performance report IO12, and the compensation benefit IO14. Management of the execution of the work is performed so that the management work entrusted from 1 will be carried out by the practitioner 2 with the contents desired by the client 1.

【0046】また、業務遂行管理機構3は、依頼者1か
ら業務遂行管理を受託するときに、依頼者1と実施者2
との間で行った設定業務の内容を設定情報として依頼者
1から入力されており、この設定情報の内容と、実施者
2から入力のあった遂行実績とを差異分析手段5で分析
処理した結果を、成果報告として、依頼者1に報告す
る。
Further, when the work performance management mechanism 3 accepts the work performance management from the client 1, the client 1 and the practitioner 2
The contents of the setting work performed between the client and the client are input from the client 1 as the setting information, and the contents of this setting information and the performance record input from the practitioner 2 are analyzed by the difference analysis means 5. The result is reported to the client 1 as a result report.

【0047】成果報告について依頼者1の検収が得られ
ると、業務遂行管理機構3には、依頼者1との委託条件
に従って、対価等給付IO14を介して業務の実施者2
に対価等の給付を行なう。
When the client 1 receives the acceptance of the result report, the job performance management mechanism 3 executes the job 2 via the consideration payment IO 14 in accordance with the conditions of entrustment with the client 1.
To pay compensation.

【0048】この検収時に、業務遂行管理機構は、業務
遂行に関する課題や依頼者1側の要望(以下これらの課
題や要望をまとめて、単に要望ともいう)の提出を依頼
者1に求める。この要望は、次回の業務遂行時に、実現
されるように実施者2に提示される。
At the time of this inspection, the business performance management mechanism requests the client 1 to submit a task related to business performance and a request from the client 1 side (hereinafter, these tasks and requests are collectively referred to as simply a request). This request is presented to the practitioner 2 so that it will be realized at the time of performing the next work.

【0049】これら依頼者1と、実施者2と業務遂行管
理機構3との間の情報の授受や対価の給付等は、ネット
ワーク10を介して相互の連携が行なわれるように設計
されている。
The transfer of information, the payment of compensation, etc. between the client 1, the practitioner 2 and the work performance management mechanism 3 are designed to be mutually linked through the network 10.

【0050】このような業務遂行管理システムを提供で
きれば、依頼者1は、個人であれ事業体であれ、適宜、
実施者2を選んで業務の遂行の依頼を行ない、かつ、そ
の業務遂行管理は、電子情報やネットワークを通じて、
例えば、第三者である業務遂行管理機構3に依頼して、
設定した設定業務の完遂を期すことができる。また、業
務の遂行を依頼した依頼者1が自己の所有する財産や金
銭等の財貨を業務遂行管理機構3に預託し、依頼者1の
業務の遂行管理や依頼業務の完遂時に、業務遂行の代償
としての金銭対価や財産分与等の実施者2への給付を、
業務遂行管理機構3が依頼者1に代わって行なうように
することも実現可能になる。
If such a work performance management system can be provided, the client 1 regardless of whether it is an individual or a business entity,
The practitioner 2 is selected to request the execution of work, and the work execution management is performed through electronic information or a network.
For example, by requesting a business performance management mechanism 3 which is a third party,
It is possible to expect completion of the set work that has been set. Further, the client 1 who requests the performance of the business deposits the property and money such as money owned by himself / herself with the business performance management mechanism 3, and manages the performance of the business of the client 1 and the completion of the requested business. Payment to the practitioner 2 such as monetary consideration and property sharing as compensation,
It is also feasible for the work performance management mechanism 3 to perform on behalf of the client 1.

【0051】図2は、このような業務遂行管理システム
における、依頼者1側の装置の詳細を示す図である。依
頼者1が実施者2に業務の遂行依頼をした後に、業務の
遂行管理を業務遂行管理機構3に依頼する場合を例に図
示している。業務遂行管理機構3は、多くの依頼者1か
ら種々の業務の遂行管理の受託をして、業務管理の事業
をしている。図2では、依頼者1および業務管理設定I
O11を複数図示し、これにより、多くの依頼者1から
の各種の業務に関して、それぞれ独立に業務の遂行管理
の委託を随時受付けられることを示している。通信制御
部15は、ネットワーク10を介して、多くの依頼者1
が業務管理設定IO11を用い、業務遂行管理機構3に
業務遂行管理の委託の照会や業務遂行管理の依頼をして
きたときや、業務遂行管理機構3が依頼者1に成果報告
をしたり、依頼者1から要望事項を入手するときに、こ
れらの情報を業務管理受付サーバ7に取り込んだり、実
施者2や監査システムに情報を発信制御をする装置であ
る。共通DB6は、業務管理受付サーバ7、検収受付処
理装置9等からアクセスできる共通のDBとして、設定
業務DB16、業務実績成果DB17、差異分析結果D
B18、検収要望DB19、財貨等管理DB20、監視
監査DB21などのDBを備えている。業務管理受付サ
ーバ7は、上述のように、依頼者1からの照会や委託に
対して、その受付や受託の連絡、依頼者1から委託のあ
った業務の管理等を行なう装置である。内部には、委託
受付処理部34、預託財貨管理部35、契約書類処理部
36等を有している。業務管理受付サーバ7は、ネット
ワーク10を介して入力された設定業務遂行に関する委
託情報を委託受付処理部34で受付、判断し、不備がな
いように整えて、設定業務DB16に保管する。また、
依頼者1から預託された財貨に関する情報は、預託財貨
管理部35で受付し、整理して、財貨等管理DB20に
保管する。更に、契約書類管理部36は、依頼者1と実
施者2との間の契約や業務遂行管理機構と依頼者1との
間の受託契約や関連する実施者2との間の契約に不備が
ないように判断し、整えて設定業務DB16に記憶し保
管させる。検収受付処理装置9は、上述のように、依頼
者1や実施者2との情報の授受や情報の管理をするため
に、業務管理処理部22、成果報告処理部23、差異報
告処理部24、要望管理処理部25、書類作成部26を
備えている。
FIG. 2 is a diagram showing the details of the apparatus on the client 1 side in such a work performance management system. An example is shown in which the client 1 requests the practitioner 2 to execute a job and then requests the job execution management mechanism 3 to manage the execution of the job. The business performance management mechanism 3 accepts contracts for performance management of various business from many clients 1 and conducts business of business management. In FIG. 2, the client 1 and the business management setting I
O11 is shown in a plurality of figures, whereby it is shown that, with respect to various jobs from a large number of clients 1, the commissioning of job execution management can be independently accepted at any time. The communication control unit 15 uses the network 10 to send many clients 1
Using the business management setting IO11, when the business performance management mechanism 3 inquires about the business performance management consignment or requests the business performance management, or the business performance management mechanism 3 reports the results to the requester 1 or requests it. The device is a device that, when obtaining a request from the person 1, acquires these pieces of information in the business management reception server 7 and controls transmission of the information to the person 2 and the audit system. The common DB 6 is a common DB that can be accessed from the business management reception server 7, the inspection reception processing device 9, etc., and is a setting business DB 16, a business performance result DB 17, and a difference analysis result D.
B18, inspection request DB19, goods management DB20, monitoring audit DB21 and other DBs are provided. As described above, the business management reception server 7 is a device that, in response to an inquiry or a consignment from the client 1, reports the reception or the consignment, manages the work entrusted by the client 1, and the like. Inside, it has a consignment acceptance processing unit 34, a deposited goods management unit 35, a contract document processing unit 36, and the like. The business management reception server 7 receives, judges by the consignment reception processing unit 34, the consignment information relating to the setting business performance input via the network 10, arranges it so that there is no defect, and stores it in the setting business DB 16. Also,
Information on the goods deposited by the client 1 is received by the deposited goods management unit 35, arranged, and stored in the goods management DB 20. Further, the contract document management unit 36 has no deficiency in the contract between the requester 1 and the practitioner 2, the contract between the work performance management mechanism and the requester 1, or the contract between the practitioner 2 concerned. It is judged not to exist, and it is arranged and stored in the setting work DB 16 for storage. As described above, the inspection acceptance processing device 9 exchanges information with the requester 1 and the practitioner 2 and manages the information in order to manage the information. A request management processing unit 25 and a document creation unit 26 are provided.

【0052】検収受付処理装置9は、上述のように、共
通DB6、中央制御装置4、差異分析手段5を使いなが
ら、設定業務が実施者2によって完遂されるように、管
理をする装置である。
As described above, the inspection acceptance processing device 9 is a device that manages the setting work to be completed by the practitioner 2 while using the common DB 6, the central control device 4, and the difference analysis means 5. .

【0053】成果報告処理部23では、予め決められた
時、或いは、随時に実施者2によって入力されてくる業
務遂行の実績情報や定期的或いはバッチ処理で業務実績
成果DB17から取出された実績情報に、差異分析結果
DB18の差異情報の内容や監視監査DB21の監視監
査情報を加味しながら、実績情報の分析処理を行ない成
果報告にまとめるところである。
In the result report processing section 23, the performance information of the business performance input by the practitioner 2 at a predetermined time or at any time, and the performance information retrieved from the business performance result DB 17 by the regular or batch processing. In addition, while adding the content of the difference information in the difference analysis result DB 18 and the monitoring audit information in the monitoring audit DB 21, the result information is analyzed and summarized in the result report.

【0054】各期末や、予め依頼者1と合意された期間
ごとに、実績情報を分析処理し、まとめられた情報は、
受託した業務管理に関する業務遂行の成果情報として業
務実績成果DB17に保管される。
At the end of each period, or for each period agreed with the client 1 in advance, the result information is analyzed and summarized, and the collected information is
It is stored in the business performance result DB 17 as result information of business performance related to the contracted business management.

【0055】差異報告処理部24は、実施者2から得ら
れた業務遂行の実績情報を業務管理受託時に依頼者1か
ら入手した設定情報や業務遂行の管理条件と比較してそ
の差異分析を行なうところである。また、差異分析処理
では、実施者2からの実績報告と監視システム27から
の監視監査の実績情報と比較する処理も行なわれる。い
ずれの差異分析も、後に図14に基づいて詳細に説明す
るように、実施者2からの実績報告の入力があるたび
に、リアルタイムで処理をしてもよいが、中央制御装置
4や差異分析手段5の作動状況をみて、適宜、バッチ処
理されるようにしても良い。
The difference report processing unit 24 compares the performance information of the job execution obtained from the practitioner 2 with the setting information and the management conditions of the job execution obtained from the client 1 at the time of the job management contract and analyzes the difference. By the way. In the difference analysis process, a process of comparing the performance report from the practitioner 2 with the performance information of the monitoring audit from the monitoring system 27 is also performed. As described in detail later with reference to FIG. 14, any of the difference analyzes may be processed in real time each time a performance report is input from the practitioner 2, but the central controller 4 and the difference analysis may be performed. Depending on the operating condition of the means 5, batch processing may be appropriately performed.

【0056】バッチ処理の場合は、入力実績を保管して
ある業務実績成果DB17や監視監査DB21からの情
報を抽出して差異分析が行なわれる。
In the case of batch processing, the difference analysis is performed by extracting information from the business performance result DB 17 or the monitoring audit DB 21 in which the input performance is stored.

【0057】一方、実施者2から実績報告があるごと
に、リアルタイムで設定情報と比較し、差異分析をし
て、設定情報との差異を解消するように、常に実施者2
に働きかけるようにしてもよい。このようなリアルタイ
ムの実績内容の確認システムを組み込めば、設定情報及
び監視監査情報のいずれについても、実施者2による業
務の遂行実績との間に差異が生じ難くなり、業務完遂の
実効を上げることができる。差異分析手段5を構成する
差異報告処理部24によって得られた差異分析結果は、
逐次、差異分析結果DB18に保管される。
On the other hand, each time there is a performance report from the practitioner 2, the practitioner 2 is constantly compared so as to compare with the setting information in real time, analyze the difference, and eliminate the difference from the setting information.
May be encouraged. Incorporating such a real-time performance confirmation system makes it difficult for the setting information and monitoring audit information to differ from the performance performance of the work performed by the practitioner 2 and to improve the effectiveness of work completion. You can The difference analysis result obtained by the difference report processing unit 24 constituting the difference analysis means 5 is
The results are sequentially stored in the difference analysis result DB 18.

【0058】成果報告処理部23は、得られた成果情報
または、業務実績成果DB17に保管されている成果情
報を、予め決められた期間ごとに、成果報告書の形にま
とめて、依頼者1に報告し、依頼者1の検収を要請す
る。このとき、成果報告処理部23は、差異分析結果D
B18に保管されている関係の差異分析結果も成果報告
書と併せて依頼者1に報告する。
The result report processing unit 23 collects the obtained result information or the result information stored in the business performance result DB 17 in a form of a result report for each predetermined period, and requests the client 1 And request the inspection of Client 1. At this time, the result report processing unit 23 determines that the difference analysis result D
The result of the difference analysis of the relationship stored in B18 is also reported to the client 1 together with the result report.

【0059】業務遂行管理機構3から成果報告を受け取
った依頼者1は、成果報告を検討し、業務の遂行に納得
すれば、その期間の業務は依頼した内容で完遂されたと
して扱われる。依頼者1は、成果検収書類に検収印を付
して、業務遂行管理機構3に返送する。
Upon receipt of the result report from the work performance management mechanism 3, the client 1 considers the result report and, if he is satisfied with the work, the work for that period is treated as having been completed with the requested contents. The client 1 attaches an inspection stamp to the result inspection document and returns it to the business performance management mechanism 3.

【0060】もし、業務の遂行に不満があったり、課題
や要望等の問題があれば、後に詳しく説明するように、
依頼者1の立場での要望事項を検収時の付帯事項として
業務遂行管理機構3に提示する。
If there is a dissatisfaction with the performance of the work or a problem such as a problem or a request, as will be described in detail later,
Requests from the perspective of the client 1 are presented to the work performance management mechanism 3 as incidental items at the time of inspection.

【0061】要望管理処理部25は、依頼者1から寄せ
られた要望事項を、業務管理の受託をしたときの契約条
件と比較考量したり、その比較結果や差異分析結果を実
施者2に提示したりするなど、後に図16で詳細に説明
するような形で要望事項の処理をして、新たな設定業務
や管理条件としての妥当性を確認した後、設定業務DB
16に保管をする。
The request management processing unit 25 weighs the request sent from the client 1 with the contract conditions when the business management is entrusted, and presents the comparison result and the difference analysis result to the practitioner 2. After processing the requested items in a manner described in detail later with reference to FIG. 16 and confirming the validity as a new setting operation or management condition, the setting operation DB
Store in 16.

【0062】また、要望管理処理部25は、成果報告の
検収に付随して依頼者1から業務遂行に関する要望が出
されてきたときに、要望事項の内容や実施者2への連絡
についての取扱いの判断を行い、かつ、これらを設定業
務DB16に保管する装置である。詳細は、後の図16
で詳述するが、例えば、依頼者1からの要望事項が業務
遂行受託時の条件の範囲外であるときも、預託されてい
る財貨の量にゆとりがあって財貨の給付条件を変更でき
るときや、実施者2の能力にゆとりがあるときは、業務
遂行管理機構3は業務管理の条件を変えてでも新要望事
項の採用に協力をして、できる限り依頼者1の希望する
形で業務が完遂されるように管理する。
Further, the request management processing section 25 handles the content of the request and the contact to the practitioner 2 when the requester 1 makes a request regarding the performance of the work accompanying the inspection of the result report. Is a device for making the above determination and storing them in the setting work DB 16. For details, see FIG.
For example, when the request from the client 1 is outside the scope of the conditions for outsourcing the work, for example, when the amount of goods deposited can be changed and the benefit conditions of the goods can be changed. Alternatively, when the capability of the practitioner 2 is sufficient, the work performance management mechanism 3 cooperates with the adoption of new requirements even if the conditions of work management are changed, and works as requested by the client 1 as much as possible. Manage to be completed.

【0063】書類作成部26は、これら業務遂行管理機
構3と依頼者1との間の手続において、依頼者1側が、
業績成果報告検収IO13を使える環境に無いときや、
ネットワーク10経由では却って依頼者1や実施者2と
業務遂行管理機構3との間の手続が煩雑となるようなと
きに、情報の授受を書面でできるようにするために、報
告書や検収書類、要望書等の情報を紙に印刷をして書類
にするところである。これにより、業務遂行管理機構3
と依頼者1や実施者2との関係は、成果報告や成果の検
収、要望事項の入手や実施者2への対価の給付或いは、
受託した業務の管理条件の変更の検討などについては、
紙情報によっても相互に授受をすることができるシステ
ムが構成される。
In the procedure between the work performance management mechanism 3 and the client 1, the document creator 26
Business performance report inspection When the inspection IO13 is not available,
In order to make it possible to send and receive information in writing when the procedure between the requester 1 or the practitioner 2 and the work performance management mechanism 3 becomes complicated via the network 10, a report or inspection document is required. Information such as a request form is printed on paper to form a document. As a result, the business performance management mechanism 3
The relationship between the client and the client 1 and the practitioner 2 is that the result report, the inspection of the result, the acquisition of the requested items, the payment of the consideration to the practitioner 2, or the
Regarding examination of changes in management conditions of contracted work,
A system that enables mutual exchange by paper information is also configured.

【0064】業務遂行管理機構3は、業務遂行の成果報
告に対して、依頼者1の検収が得られれば、その間の業
務遂行は完遂されたものとして扱い、その期間の業務管
理も一応の区切りをつける。
The business performance management mechanism 3 handles the business performance during the period when the client 1 receives the acceptance of the result report of the business performance, and treats the business performance during that period as completed. Turn on.

【0065】この後、契約受託の条件に従って業務遂行
管理機構は、業務遂行管理の費用を銀行決済等の形で受
領をするとともに、実施者2に対しては、業務遂行管理
契約の当初に、依頼者1が預託をしている財貨があれ
ば、その中から、予め決められた対価を実施者2に給付
する。
After that, the business performance management mechanism receives the business performance management cost in the form of bank settlement or the like according to the contract acceptance condition, and at the beginning of the business performance management contract to the practitioner 2. If the client 1 deposits the goods, the practitioner 2 is provided with a predetermined consideration from the deposit.

【0066】実施者2に対する対価としての財貨の給付
の情報と、給付後に依頼者1から預託されている財貨の
残高等の管理結果は、財貨等管理DB20に保管され
る。
Information on the payment of the goods as compensation for the practitioner 2 and the management result such as the balance of the goods deposited by the client 1 after the payment are stored in the goods management DB 20.

【0067】次に、図2の業務遂行管理機構3と依頼者
1との間の情報の授受や情報の処理及び業務の遂行管理
の委託を業務遂行管理機構3が受託するまでの情報の流
れと処理について、業務管理受託のフローチャートを示
す図13を参照に従い説明をする。
Next, the flow of information until the business performance management mechanism 3 entrusts the transfer of information between the business performance management mechanism 3 of FIG. 2 and the client 1 and the processing of information and the commissioning of business performance management. The process and the process will be described with reference to FIG. 13 showing a flowchart of the business management contract.

【0068】まず、設定業務の遂行の管理を業務遂行管
理機構3に委託することを望む依頼者1は、上述のよう
に、遂行すべき業務の内容を実施者2に伝えて業務の遂
行の依頼する。
First, the client 1 who desires to outsource the management of the execution of the setting job to the job execution management mechanism 3 transmits the contents of the job to be executed to the practitioner 2 as described above. Request.

【0069】この後、依頼者1は、業務管理設定IO1
1、ネットワーク10を介して、業務遂行管理機構3の
業務管理受付サーバ7に業務の遂行管理の情報(後述す
る図4に基づいて詳細に説明する業務遂行管理委託の内
容)を入力して、業務の遂行管理を委託する(図13の
ステップ1301に示す委託入力)。
After this, the requester 1 selects the business management setting IO1.
1. Through the network 10, input the information of job execution management (contents of job execution management entrustment described in detail with reference to FIG. 4 described later) to the job management reception server 7 of the job execution management mechanism 3, Outsource work performance management (contract input shown in step 1301 in FIG. 13).

【0070】このとき、業務管理受付サーバ7は、新た
な業務管理の委託があると、新たな受付番号と業務管理
に必要な項目と各項目の情報の保管メモリ領域を設定業
務DB16の中に確保する。
At this time, when a new business management is entrusted, the business management reception server 7 stores a new reception number, items required for business management, and a storage memory area for information of each item in the setting business DB 16. Secure.

【0071】ステップ1302では、業務管理の委託を
受付けた業務管理受付サーバ7が、業務の遂行管理に必
要な情報が入力されたかどうかの確認と設定業務DB1
6において示されている業務管理受託をするときに必要
な各項目の内容を充足しているかどうか、処理判断をす
るステップである。具体的には、設定業務DB16の中
では、図5に例示するように、業務管理を受託するとき
に必要な諸々の項目が予め決められていて、少なくと
も、それらの項目の内容を充足するだけの情報が業務管
理受付サーバ7に入力されないと、業務遂行管理の受託
ができない。業務管理を受託するときに必要な項目の内
容は、後で詳細に説明をするように、例えば、図5に示
すようなものがある。
In step 1302, the business management reception server 7 that has received the business management consignment confirms whether or not the information necessary for the business execution management has been input and sets the setting business DB 1
This is a step of making a process judgment as to whether or not the contents of the respective items required when the work management contract shown in 6 is satisfied. Specifically, as illustrated in FIG. 5, various items necessary for entrusting business management are predetermined in the setting business DB 16, and at least the contents of those items are satisfied. If the information of is not input to the business management reception server 7, the business execution management cannot be entrusted. The contents of the items required when the work management is entrusted are, for example, as shown in FIG. 5, as will be described in detail later.

【0072】ステップ1303は、設定業務DB16に
おいて、業務管理を受託するときに必要な項目の内容の
充足を判断処理するステップである。必要な情報が入力
されていないときは、依頼者1に対して再度、情報の依
頼を要請する。
Step 1303 is a step of determining whether or not the setting management DB 16 is satisfied with the contents of the items necessary for accepting business management. When the necessary information is not entered, the requester 1 is requested to request the information again.

【0073】ステップ1303においては、業務管理受
託に必要な項目の内容が充足されているときは、次のス
テップ1304に進む。
In step 1303, when the contents of the items required for the business management contract are satisfied, the process proceeds to the next step 1304.

【0074】ステップ1304では、依頼者1が業務遂
行の委託時に入力した図4に示す項目の事項に受託番号
を付し、委託入力の内容確認を依頼者1にして、誤入力
や誤入力のままでの業務の受託を防止するとともに、業
務遂行管理機構3による業務管理の受託を実施者2に連
絡する。このとき、設定業務DB16の内容としては、
受付番号や受付日の記録が保管されているが、図5の表
向きの表示としては、受付番号は受託番号に変り、受付
日は受託日に変わる。
In step 1304, the consignment number is attached to the items of the items shown in FIG. 4 input by the requester 1 at the time of entrusting the business execution, and the requester 1 confirms the contents of the entrustment input to confirm the incorrect or incorrect input It prevents the entrustment of the work up to now and informs the implementer 2 of the entrustment of the work management by the work performance management mechanism 3. At this time, as the contents of the setting work DB 16,
Although the receipt number and the record of the receipt date are kept, the receipt number changes to the acceptance number and the acceptance date changes as the face-up display in FIG.

【0075】ステップ1305は、業務管理に関する実
施者2の同意を得るステップである。業務遂行管理機構
3による業務遂行管理及び実施者が遂行すべき設定業務
の内容について実施者2の同意が得られれば次のステッ
プ1306に進む。
Step 1305 is a step of obtaining the consent of the practitioner 2 regarding business management. If the practitioner 2 obtains the consent of the work performance management by the work performance management mechanism 3 and the contents of the setting work to be performed by the practitioner, the process proceeds to the next step 1306.

【0076】もし、業務遂行管理機構3による業務管理
について、実施者2の同意が得られないときは、再びス
テップ1301に戻る。依頼者1は、入力のやり直しを
したり、実施者2が同意しなかった事項を訂正したり、
依頼者1と実施者2とが協議をして同意されるように委
託情報を再入力をする。
If the practitioner 2 does not agree with the task management by the task performance management mechanism 3, the process returns to step 1301 again. The client 1 redoes the input, corrects the matters that the practitioner 2 did not agree with,
Re-enter the consignment information so that the requester 1 and the practitioner 2 discuss and agree.

【0077】ステップ1306は、依頼者1が実施者2
との間で設定した業務の内容と依頼者1が業務遂行管理
機構3に委託した業務管理の内容との整合を図るステッ
プである。
In step 1306, the requester 1 is the implementer 2
This is a step for matching the content of the business set between the above and the content of the business management entrusted to the business performance management mechanism 3 by the client 1.

【0078】仮に、実施者2が依頼者1から依頼を受け
た業務遂行遂行の内容と、業務遂行管理機構3が委託を
受けた業務管理の内容とに差があるときは、業務遂行管
理機構3が再度依頼者1及び実施者2と協議をした後
に、業務遂行管理機構3と依頼者1と実施者2との三者
で納得のいく業務遂行の内容を設定し、その内容は、設
定業務DB16に保管される。
If the practitioner 2 has a difference between the content of the business execution performed by the requester 1 and the content of the business management outsourced by the business execution management mechanism 3, the business execution management mechanism After 3 again consults with the requester 1 and the practitioner 2, the business execution management mechanism 3, the requester 1 and the practitioner 2 set the content of the plausible work execution, and the content is set. It is stored in the work DB 16.

【0079】ステップ1307は、業務遂行管理機構3
が受託をした業務管理の内容や管理条件を整理して依頼
者1と実施者2に連絡し、依頼者1と実施者2と業務遂
行管理機構3との三者の間に、遂行の実績や成果報告時
の管理条件に関して、齟齬が生じないように確認をする
ステップである。
In step 1307, the work performance management mechanism 3
Organized the contents and management conditions of the business management entrusted by the contractor, contacted the requester 1 and the practitioner 2, and carried out the performance record between the requester 1, the practitioner 2, and the business performance management mechanism 3. This is a step to check the management conditions when reporting results and results so that no discrepancies occur.

【0080】設定情報と管理条件に関して、依頼者と実
施者と業務遂行管理機構の三者間に齟齬があっては、成
果のまとめや成果の評価の基準に差を生じることにな
り、遂行の管理の目標も定まりにくい。業務の遂行を依
頼者1の満足のいく形に完遂させたり、業務の遂行が完
遂されるように管理をすることは至難となるからであ
る。ステップ1308は、このようにして、業務遂行管
理機構3が受託し、依頼者1や実施者2との合意が得ら
れた業務管理の内容と業務遂行管理の条件を業務設定D
Bに保管するステップである。これにより、業務遂行管
理機構3による業務遂行管理の準備態勢が整い、委託業
務遂行管理の受託の行程は終了する。
Regarding the setting information and management conditions, if there is a discrepancy between the requester, the practitioner, and the work performance management organization, there will be a difference in the criteria for summarizing the results and evaluating the results. It is also difficult to set management goals. This is because it is extremely difficult to complete the execution of work in a satisfactory manner for the client 1 and to manage the work so that it is completed. In step 1308, in this way, the business execution management mechanism 3 is entrusted, and the business management content and the business execution management conditions that have been agreed with the requester 1 and the practitioner 2 have been set.
This is the step of storing in B. As a result, the work performance management mechanism 3 prepares for the work performance management, and the process of entrusting the work performance management is completed.

【0081】次に、依頼者1から業務の遂行管理を受託
するときに必要な項目を示す図4に従い、本実施の形態
の業務遂行管理のシステムにおいて業務の遂行管理を受
託するときの内容の説明をする。
Next, referring to FIG. 4 showing the items necessary when entrusting the business execution management from the client 1, the contents when entrusting the business execution management in the business performance management system of the present embodiment are described. Explain.

【0082】図4において、日付401は、依頼者1が
業務管理を委託した日である。この日付は、この後、業
務遂行管理機構3によって業務遂行管理が受託される
と、受託確認書における図4の内容としては、受託され
た日に変わって表示される。後述するDBの中では、受
付の日付も受託の日付も記録されている。
In FIG. 4, the date 401 is the date on which the client 1 entrusts business management. When the business performance management mechanism 3 accepts the business performance management thereafter, this date is displayed instead of the date of the trustee as the content of FIG. 4 in the trust confirmation. In the DB described below, the date of acceptance and the date of acceptance are also recorded.

【0083】依頼者402は、業務遂行管理機構3に財
貨を預託し、業務の遂行の管理を委託する個人や団体や
事業体である。業務遂行管理の依頼は、依頼者本人ばか
りでなく、業務の遂行を希望する依頼者の代理人によっ
ても行なうことができるが、本発明の説明では、本人と
代理人を区別しないで、依頼者として扱う。設定業務D
B16の情報としては、依頼者本人が402の項目の依
頼者として記憶保管される。
The client 402 is an individual, a group, or a business entity that deposits goods in the business performance management mechanism 3 and outsources management of business performance. The request for job performance management can be made not only by the client himself but also by the agent of the client who desires to perform the job, but in the description of the present invention, the client and the agent are not distinguished, and the client Treat as. Setting work D
As the information of B16, the requester himself is stored and stored as the requester of the item 402.

【0084】これは、例えば、遂行管理をする業務が或
る地区の自然保護であって、依頼者が自然保護団体とい
う事態もあり得るからである。この依頼者1へは、将
来、業務遂行管理機構から成果報告書が届き、この依頼
者1の検収を求められることになる。
This is because, for example, the task of performance management may be nature conservation in a certain area, and the client may be a nature conservation organization. In the future, a result report will be delivered to the client 1 from the business performance management organization, and the client 1 will be required to inspect the client.

【0085】実施者403は、依頼者1から業務の遂行
の依頼を受けて業務を遂行する人や事業体などである。
業務遂行管理をされる当事者となり得る者である。一般
的には、業務遂行管理機構3が依頼者1からの要請を受
けて業務遂行の実施者2を選任することもある。また、
特別な場合には、業務遂行管理機構3がその業務遂行管
理機構3の中に実施者2を有することも有り得る。この
ような場合は、業務の遂行の実績管理に対して十分な監
視監査システムが働くようにする必要がある。
The practitioner 403 is a person or a business entity that performs a task in response to a request from the client 1 to perform the task.
A person who can be a party who manages business performance. In general, the work performance management mechanism 3 may select a work performance performer 2 in response to a request from the client 1. Also,
In a special case, the work performance management mechanism 3 may have the practitioner 2 in the work performance management mechanism 3. In such a case, it is necessary to operate a sufficient monitoring and auditing system for managing the performance of business execution.

【0086】契約期間404は、業務遂行管理機構3に
業務管理を委託する契約書とその契約書の契約期間を示
す項である。
The contract period 404 is a term indicating a contract for outsourcing business management to the business performance management mechanism 3 and a contract period of the contract.

【0087】管理番号405は、業務管理が受託される
までは、受付番号であるが、受託された後は、受託番号
となる。
The management number 405 is a reception number until the business management is entrusted, but after it is entrusted, it becomes a consignment number.

【0088】管理期間406は、個々の業務について、
その遂行の管理をする期間である。業務が一つしかない
ときは、契約期間と同じこともある。しかし、業務遂行
管理機構3が、同じ依頼者1から複数の業務管理の遂行
の管理を預かるときには、契約期間を長期に結び、この
期間中はいずれの業務管理も同様な契約で管理されるよ
うにすると、財貨の管理や対価の給付において依頼者1
の利便が図られることになる。
The management period 406 is for each job.
This is the period for managing the execution. When there is only one task, it may be the same as the contract period. However, when the business performance management mechanism 3 entrusts the management of the performance of a plurality of business managements from the same client 1, the contract period is extended and all business managements are managed under the same contract during this period. Then, the client 1 in managing the goods and paying the consideration
Will be convenient.

【0089】管理条件407は、依頼者1が希望する業
務の遂行の管理条件である。どのような業務を、いつま
でにどのような形で遂行するかという条件の項である。
管理条件によっては、業務の完遂度や業務遂行の評価も
変わってくる。
The management condition 407 is a management condition for performing the work desired by the client 1. It is a section on the condition of what kind of work is to be performed in what form.
Depending on the management conditions, the degree of completion of work and the evaluation of work execution also change.

【0090】また、管理条件には、個々の業務遂行につ
いての管理の重要度(業務遂行管理において重点をおい
てチェックする項目と通常チェック項目の重み付け)や
遂行管理の厳密度(管理許容度)も必要に応じて規定さ
れる。、管理条件は、業務委託の当初は、必ずしも明確
にはできないこともあり、この場合は、実施者2によっ
て業務が遂行され、成果報告がなされ、依頼者の検収が
あるごとに、依頼者1の要望を聞き、要望事項に沿っ
て、管理条件を補充訂正するような柔軟性を業務遂行管
理に持たせれば、依頼者1の希望に沿った形で次第に充
実される。
Further, the management conditions include the importance of management (weighting of items to be checked with emphasis in work management and normal check items) and strictness of performance management (management allowance) for individual work performance. Is also defined as necessary. The management conditions may not always be clear at the beginning of the outsourcing. In this case, the requester 1 is requested every time the requester 2 performs the work, reports the results, and receives the acceptance. If the business performance management has flexibility to supplement and correct management conditions according to the requirements of the client, it will be gradually enhanced in accordance with the request of the client 1.

【0091】管理条件の変更については、実施者2の同
意を得ることも必要であり、受託の経費の条件に影響を
及ぼすこともある。
Regarding the change of the management condition, it is necessary to obtain the consent of the practitioner 2, which may affect the condition of the cost of entrustment.

【0092】設定業務内容408は、依頼者1が実施者
2との間で行なった業務遂行の依頼をした業務の内容で
ある。管理条件と同じこともあるが、依頼者1と実施者
2とが予め業務遂行管理機構の委託契約とは独立して業
務の遂行の合意をしているときは、管理条件と一致する
ようにすることができないこともある。
The set work content 408 is the content of the work requested by the client 1 with the practitioner 2 to carry out the work. It may be the same as the management condition, but if the client 1 and the practitioner 2 have agreed in advance to carry out the work independently of the contract contract of the work execution management mechanism, they should match the management condition. There are things you can't do.

【0093】業務遂行管理機構3としては、契約当初の
設定業務の内容を基に、依頼者1からの要望を取り入れ
つつ、業務遂行の管理の内容や管理条件と決めた内容
を、最終的に受託した管理の内容として、設定業務DB
16に保管記憶し、依頼者1が希望する内容に、可及的
に業務の遂行が行なわれるようにする。
The work performance management mechanism 3 incorporates the request from the client 1 on the basis of the contents of the setting work at the beginning of the contract, and finally determines the contents of management of work performance and the contents decided as management conditions. Setting business DB as the contents of the entrusted management
The data is stored and stored in 16, and the work is performed as much as possible according to the contents desired by the client 1.

【0094】このために、後述する図13のステップ1
306では、設定業務の内容と業務管理の内容との実質
的な整合をとっている。
For this purpose, step 1 of FIG.
In 306, the contents of the setting work and the contents of the work management are substantially matched.

【0095】預託財貨事項409は、業務遂行管理機構
3が依頼者1から業務遂行管理を受託するときに、業務
の実施者2に業務遂行の対価を払うことを前提とし、そ
の支払うべき対価として依頼者1から預かった財貨に関
連する事項を記載する項目である。
The deposited goods item 409 is premised on the fact that when the business performance management mechanism 3 receives the business performance management from the client 1, it is premised that the business operator 2 is paid for the business performance. It is an item that describes matters related to the goods deposited from the client 1.

【0096】この預託財貨409の項の内容には、預託
を受けた時期、預かった財貨、例えば、不動産、有価証
券、通貨、その他の財貨等の種類と量、及び給付後の残
りの価値等が記憶される。
The contents of the deposited goods 409 include the time when the deposit was taken, the kind of deposited goods such as real estate, securities, currency, and other kinds of goods, and the remaining value after payment. Is memorized.

【0097】給付事項410には、実施者2に対価とし
て給付される財貨の種類や量及び給付の時期、給付の実
績等が記載される。
The benefit item 410 describes the type and amount of goods to be paid to the practitioner 2, the timing of the benefit, the actual performance of the benefit, and the like.

【0098】図5は、本実施の形態で示す業務遂行管理
システムで使用する設定業務DB16(図2及び図3参
照)の内容を示す。
FIG. 5 shows the contents of the setting job DB 16 (see FIGS. 2 and 3) used in the job performance management system shown in this embodiment.

【0099】業務管理受付サーバ7は、業務遂行管理の
受託を、この設定業務DB16で管理する。設定業務D
B16の502から510の項には、業務遂行管理の受
託内容を示す図4の402から410の項の情報を記憶
しておく。
The business management acceptance server 7 manages the commissioning of business performance management in the setting business DB 16. Setting work D
The items 502 to 510 of B16 store the information of the items 402 to 410 of FIG.

【0100】要望事項511には、遂行管理を受託する
ときは、充足の必要はない。しかし、業務遂行の成果を
報告し、検収を得るごとに依頼者1からの出てくる要望
や課題を記憶、保管したり、保管された内容を修正する
可能性のある項目である。この項目の充実やこの項目の
適切な運用が業務遂行管理の充実度や遂行成果に対する
依頼者の満足度にもつながるものである。
The requirement 511 does not need to be satisfied when the performance management is entrusted. However, this is an item that may report and store the results of the work execution and store or store the requests and issues that the client 1 issues each time the inspection is obtained, and may modify the stored contents. Enrichment of this item and proper operation of this item will lead to enhancement of work performance management and satisfaction of client with respect to performance results.

【0101】管理情報512は、この業務遂行管理の受
託をした図5の各項目について、その管理を行なう間に
生じてくる諸事項の実行のフラグ情報を記憶するもので
ある。従って、図5のいずれかの項目に、何らかの処理
を要する情報が記憶され、その対応が未処理というとき
は、512の管理情報の項目の値は、「未整備や未処
理」になり、処理が終われば、「処理済」になる。
The management information 512 stores, for each item in FIG. 5 for which this work performance management has been entrusted, execution flag information for execution of various items that occur during the management. Therefore, when information that needs some processing is stored in any of the items in FIG. 5 and the correspondence is unprocessed, the value of the item 512 of the management information is “unmaintained or unprocessed”, and When is finished, it will be "processed".

【0102】例えば、受託に関する依頼者1と業務遂行
管理機構3との間の契約関係書類の整備に関しては、受
託の当初には、充足すべき項目になっていない。しか
し、実際に業務遂行管理を始めるまでには、契約関係書
類が整っていることが必要であり、遂行管理を開始する
時点で契約の関係書類が揃ったか否かのフラグ情報を記
憶させる。
For example, with regard to the preparation of contract-related documents between the client 1 and the business performance management mechanism 3 regarding the outsourcing, it is not an item to be satisfied at the beginning of the outsourcing. However, it is necessary that the contract related documents are prepared by the time the actual work performance management is started, and the flag information indicating whether or not the contract related documents are prepared at the time of starting the performance management is stored.

【0103】また、その後に、管理業務の実行の中で、
依頼者1の検収があった後に、実施者2への給付(給付
事項510の項)が行なわれたか否かのフラグ情報の記
憶、また、依頼者1による成果の検収の場合に、依頼者
1から要望事項が提示(要望事項511の項)されたと
きの実施者2への了解や設定業務の内容や管理条件の変
更の処理がすんだか否かのフラグ情報の記憶等がなされ
る。
After that, in the execution of the management task,
After the acceptance of the client 1 is stored, flag information indicating whether or not the benefit to the practitioner 2 (the item of benefit item 510) is performed, and in the case of the acceptance of the results by the client 1, the client When the request item is presented from 1 (the item of request item 511), it is understood to the practitioner 2, and the flag information indicating whether the contents of the setting work or the process of changing the management condition has been completed is stored.

【0104】この設定業務DB16は、この後、管理番
号505の項の受託番号をガイドに、業務管理受付サー
バ7、実績入手サーバ8及び検収受付処理装置9のアク
セスを受け、図6〜図12で詳細に説明するように、差
異分析処理のための設定業務や要望事項の内容の提供、
成果情報処理のための管理条件や要望事項の内容の提
供、依頼者1からの要望事項の受け入れ処理時の設定業
務や管理条件内容の提供或いは、実施者2への対価の給
付時の預託財貨の内容の提供等の情報の提供をする。
After that, the setting work DB 16 is accessed by the work management reception server 7, the result acquisition server 8 and the inspection reception processing device 9 by using the consignment number of the management number 505 as a guide, and the setting work DB 16 will be described with reference to FIGS. As described in detail in, the provision of the setting work and the content of the request for the difference analysis processing,
Provision of management conditions and contents of requests for result information processing, provision of setting operations and management condition contents at the time of acceptance processing of requests from the client 1, or deposit money at the time of payment of consideration to the practitioner 2. Providing information such as the provision of the contents of.

【0105】また、依頼者1から新たな要望事項(新た
な業務の遂行の追加、業務遂行に関する新たな要望、対
価の給付に関する新たな条件等)が提示されたときは、
一旦は、要望事項の項目511に要望を記憶保管し、管
理情報512のフラグは未処理となる。
Further, when the client 1 presents a new request item (addition of execution of new work, new request regarding performance of work, new condition regarding payment of consideration, etc.),
Once the request is stored and stored in the item 511 of the request item, the flag of the management information 512 is unprocessed.

【0106】その後、業務管理処理部22によって、こ
の新しい要望事項や課題が、受託時の契約の条件の範囲
内であると判断されたり、範囲外であっても、実施者2
の了解が得られたり、受託契約時の条件を変更するなど
して、新しい遂行管理の条件として容認されると判断さ
れたときは、511の要望事項は、新たな設定業務の内
容や管理条件として506や507の項に記憶される。
この後、管理情報512のフラグは処理済みになり、要
望事項の項511は次の新しい要望事項が保管できる状
態になる。
Thereafter, the work management processing unit 22 judges that the new requirements and problems are within the range of the contract conditions at the time of entrustment, or even if they are out of the range, the practitioner 2
If it is judged that the new performance management conditions are acceptable, such as when the approval of the above is obtained or the conditions at the time of consignment contract are changed, the requirements of 511 are the contents of the new setting work and the management conditions. Are stored in the items 506 and 507.
After this, the flag of the management information 512 has been processed, and the request item 511 is ready to store the next new request.

【0107】このようにして新たな課題や要望は、その
受託番号の業務の設定業務の内容(506の項)や設定
業務遂行の管理条件(507の項)に取り込まれ、各受
託業務に固有の設定業務の内容や遂行の管理条件とな
る。また、これらの設定業務の内容や管理条件を表形式
に加工して提供すれば、その受託業務を遂行した後の実
績報告のチェックシートや業務遂行管理のための管理シ
ートに使用でき、業務遂行管理を効率化させることもで
きる。もし、実施者において受け入れられない条件であ
れば、依頼者と実施者とで相談や協議をして、決まった
内容で改めて要望事項として業務遂行管理機構3への再
提示を求めたり、対価の給付条件を変更して実施者2に
了解をもらうことも必要になる。
In this way, the new task or request is incorporated into the contents of the setting work (section 506) of the work of the consignment number and the management conditions (section 507) for performing the setting work, and is unique to each consignment work. It becomes the contents of setting work and management condition of execution. In addition, if the contents and management conditions of these setting operations are processed and provided in a table format, they can be used as a check sheet for performance reports after performing the outsourced operations and a management sheet for managing the execution of operations. Management can also be made efficient. If the condition cannot be accepted by the practitioner, the client and the practitioner will consult and discuss with each other and request the business performance management mechanism 3 to re-present it as a request with a predetermined content, or It is also necessary to change the payment conditions and obtain the consent of the practitioner 2.

【0108】その結果として、給付の条件に変更があれ
ばその内容は、この財貨管理DB20に記憶し保管され
る。
As a result, if there is a change in the condition of payment, the content thereof is stored and stored in the goods management DB 20.

【0109】また、設定業務DB16のその他の項目の
内容も、実績入手サーバ8や検収受付処理装置9からの
アクセスを受けて、実施者2から入力があった実績報告
から成果報告を得るための情報処理や、依頼者1に業務
遂行の成果報告をするときの期限管理のデータ或いは、
監視監査報告を加味しながら差異報告を演算処理すると
きの基礎的なデータや管理条件の記憶場所として使用さ
れる。
The contents of the other items in the setting work DB 16 are also accessed by the result acquisition server 8 and the inspection acceptance processing device 9 to obtain the result report from the result report input by the practitioner 2. Data for information processing and deadline management when reporting results of business execution to the client 1 or
It is used as a storage location for basic data and management conditions when processing difference reports while adding monitoring audit reports.

【0110】業務遂行管理機構3は、業務遂行管理に伴
う経費の受取や実施者2に対する対価の支払いについて
は、通常は、依頼者1が指定する銀行への請求書によっ
てその決済を終る。
The business performance management mechanism 3 normally completes the settlement of the expenses associated with the business performance management and the payment of the compensation to the practitioner 2 by the bill to the bank designated by the client 1.

【0111】しかし、依頼者1が銀行預金以外の財貨
で、必要な経費や実施者2の業務遂行に対する対価の給
付を望むときには、依頼者1から銀行預金に替わる財貨
の預託を受け、その財貨の中から、業務受託時の契約に
基づいて、業務遂行管理に伴う経費や実施者2に対する
財貨の給付を行なうようにすることも、業務遂行管理業
務の一環としている。この財貨等管理DB20で管理す
る。
However, when the client 1 wants to pay necessary expenses and consideration for the performance of the practitioner's 2 business with a commodity other than a bank deposit, the client 1 deposits the commodity in place of the bank deposit and receives the deposit. Among them, the provision of expenses related to business performance management and the payment of goods to the practitioner 2 based on the contract at the time of business consignment is also part of the business performance management business. It is managed by this goods etc. management DB20.

【0112】図8は、このような場合における、本実施
の形態の業務遂行管理システムで使用する財貨等管理D
B20(図2及び図3参照)の内容を示す。
FIG. 8 shows the management D of goods and the like used in the business performance management system of this embodiment in such a case.
The contents of B20 (see FIGS. 2 and 3) are shown.

【0113】財貨等管理DBの、日付801の項には、
財貨の預託を受けた日付の情報を記憶しておく。
[0113] The item of the date 801 in the goods management DB,
The information on the date when the deposit of the goods is received is stored.

【0114】預託者802の項には、財貨を預託した人
の情報を記憶しておく。この場合の預託者は業務遂行管
理を依頼する依頼者本人でなく、依頼者のために実際に
財貨を管理している、例えば,成人後見人のような人で
あれば、後見人の人が預託をした人として記憶管理され
る。
In the section of depositor 802, information on the person who deposits the goods is stored. In this case, the depositor is not the client who requests the performance management, but the person who actually manages the goods for the client. For example, in the case of an adult guardian, the guardian deposits the deposit. It is managed as a person who did.

【0115】管理番号803の項には、業務遂行管理機
構3が依頼者1から業務の遂行を受託したときの受託番
号や受託時の契約番号が記憶される。この財貨等の管理
は、必ずしも、受託した業務ごとに行なう必要はなく、
このために、複数の業務遂行の管理を受託しているとき
は、これらを包括する契約として、この財貨等管理DB
20を設けて、複数の業務遂行の受託業務にまたがる財
貨の管理や対価の給付の管理が行なえるようにしても良
い。
[0115] In the item of management number 803, the consignment number when the business performance management mechanism 3 has entrusted the performance of the business from the client 1 and the contract number at the time of the consignment are stored. This management of goods and the like does not necessarily have to be performed for each contracted work,
For this reason, when entrusted with the management of the execution of multiple tasks, this asset management DB
20 may be provided so that the management of goods and the payment of consideration over a plurality of outsourced business operations can be managed.

【0116】契約期間804の項は、業務遂行管理の受
託期間または業務遂行管理を包括する契約期間が記載さ
れる項である。業務遂行管理機構の業務管理処理部22
は、この財貨等管理期間が業務遂行管理の期間と同じか
またはそれ以上の期間であることを管理している。これ
は、業務遂行をする実施者に対する対価の支払いを確実
にするためである。
[0116] The contract term 804 is a term in which a contract period for business performance management or a contract period including business performance management is described. Business management processing unit 22 of the business performance management mechanism
Manages that the management period of the goods, etc. is the same as or longer than the period of business performance management. This is to ensure payment of consideration to the practitioner who performs the work.

【0117】業務内容805の項には、依頼者から受託
した遂行管理対象の業務の内容が記憶される。遂行管理
を委託された業務遂行管理機構3が、どのような業務の
遂行成果に対価を給付するかという関係を、管理番号と
共に複数管理にして業務管理の誤りを防ぐためである。
In the item of work contents 805, the contents of the work to be performed and managed by the client are stored. This is because the business performance management mechanism 3, which is entrusted with performance management, manages the relationship of what business performance results should be paid in consideration together with the management number so as to prevent business management errors.

【0118】財貨種別806の項には、預託を受けた財
貨の種別が記憶される。種別には、現金、有価証券、貴
金属、書画骨董美術品、家屋敷、土地等の不動産等に限
らず、実施者に対する財貨の給付として実施者が了解す
るものであれば、賃借権等の無形の資産もこの財貨とし
て用いられる。
[0118] In the item of goods type 806, the kind of goods deposited is stored. The types are not limited to cash, securities, precious metals, antiques for calligraphy, real estate such as houses, land, etc., as long as the implementer understands that the benefit of the goods is the intangible right such as lease The assets of are also used as this goods.

【0119】本発明の業務遂行管理システムは、通常の
業務管理と異なり、依頼者と実施者との間の業務遂行の
合意を業務遂行管理機構が第三者的に管理する形態も含
んで業務の遂行管理をするような管理構成をしているの
で、業務遂行の対価の種類や給付のあり方も、依頼者と
実施者の合意であれば、金銭的な決済に限らず、業務遂
行管理機構は、受託時の契約書に決められている内容
で、対価の給付等を行なう。
The business performance management system of the present invention, unlike the normal business management, includes a mode in which the business performance management mechanism manages the business performance agreement between the client and the practitioner in a third party. Since the management structure is designed to manage the performance of the business, the business performance management mechanism is not limited to monetary settlement as long as the client and the practitioner agree on the type of business performance compensation and benefits. Pays the compensation in accordance with the contents specified in the contract at the time of entrustment.

【0120】例えば、依頼者と実施者とが親子の場合に
は、依頼者が親、業務遂行をする実施者が子供、業務遂
行に対する対価が、依頼者である親の所有する不動産や
資産となり得るその他の権利というようなこともある。
このようなときにも、依頼者から管理を受託した業務遂
行管理機構は、依頼者である親を本発明の業務遂行管理
システムの顧客として扱い、できる限り、受託時の契約
或いは、その後の成果報告の検収時の要望や条件に従っ
て、実施者である子供に依頼者から受託した業務の完遂
を求め、その対価としての財貨の給付を依頼者から提示
されている条件に従って実行する。
For example, when the requester and the practitioner are parents and children, the client is the parent, the practitioner who performs the work is the child, and the consideration for the work is the real estate or assets owned by the parent who is the requester. There are also other rights to get.
Even in such a case, the business performance management mechanism that has been entrusted with the management by the client treats the parent who is the client as a client of the business performance management system of the present invention, and, as far as possible, makes a contract at the time of entrustment or the subsequent results According to the request and conditions at the time of inspection of the report, the child who is the implementer is requested to complete the work entrusted by the client, and the compensation of the goods is executed according to the condition presented by the client.

【0121】量目807の項には、預託を受けた財貨の
種別ごとの金額や量目が記憶し、保管される。財貨に
は、現金(銀行決済分として金融機関に預けられている
ものは除く)、有価証券、貴金属、書画骨董美術品、家
屋敷、土地等の不動産、賃借権等、各種のものがあり、
DBは、財貨の種別に応じた量目を個別に管理する構成
としている。
In the item of quantity item 807, the amount and quantity item for each type of deposited goods are stored and stored. There are various types of goods, such as cash (excluding those deposited at financial institutions as bank payments), securities, precious metals, antiques for calligraphy, art, houses, real estate such as land, lease rights, etc.
The DB is configured to individually manage the quantity corresponding to the type of goods.

【0122】給付条件808の項には、業務遂行に対す
る財貨の給付条件が記憶される項である。財貨には、8
06の項で説明したように、種々の財貨があり、依頼者
としては、業務の遂行の成果に応じて、これらの財貨の
中のどの財貨をどれほどの額(量目)分を、いつの時点
で実施者に対価として給付するのかは、現金のようには
管理できないためにこの項目が設けられる。
[0122] The item of payment condition 808 is a item in which the payment condition of goods for business performance is stored. 8 for goods
As described in section 06, there are various kinds of goods, and as a client, depending on the outcome of the performance of the work, which of these goods is what amount (quantity) and when This item is provided because it is not possible to manage whether to pay the practitioner as consideration in the same way as cash.

【0123】業務遂行管理機構は、依頼者の多岐にわた
る管理要請に応じるために、各財貨ごとに、これらの給
付条件をDBとして記憶し、管理する構成としている。
The business performance management mechanism is configured to store and manage these benefit conditions as a DB for each goods in order to meet a variety of management requests from the client.

【0124】給付記録809の項には、業務遂行に対す
る財貨の給付の記録が記憶される。業務遂行管理機構
は、業務の遂行の成果に応じて、種々の財貨の中のどの
財貨をどれほどの量目、いつ実施者に対価として給付し
たかを記録し、残る財貨の量を予測することも、財貨の
管理上欠かせない。
The section of the benefit record 809 stores a record of benefits of goods for business performance. The Business Execution Management Organization records the amount of each of the various commodities, the amount of the commodities, and the time when the practitioner is paid in consideration, and predicts the amount of the remaining commodities according to the result of the performance of the business. However, it is essential for the management of goods.

【0125】業務遂行管理機構3は、多岐にわたる財貨
の預かりと給付の管理を確実に行なうために、各財貨の
給付の実態の記録と給付後の各財貨の価値を管理し、業
務の遂行や実施者2への対価の給付に遺漏のない構成と
している。
The job performance management mechanism 3 records the actual condition of the benefits of each product and manages the value of each product after the payment in order to ensure the management of a wide variety of products and the management of benefits. There is no omission in the payment of compensation to the practitioner 2.

【0126】要望事項810の項には、業務遂行の成果
報告に対する依頼者1からの検収及び要望に関連する事
項が記憶される。業務遂行管理機構3としては、依頼者
1から業務の遂行管理の委託を受け、一定の期間の成果
報告をして依頼者1の検収を得て、実施者2に対価の給
付ができれば、成果報告をした期間における業務遂行の
管理の業務は完了する。
In the item of request item 810, items related to the inspection and request from the client 1 for the result report of the work execution are stored. The business performance management mechanism 3 receives the performance management of the business from the client 1, reports the results for a certain period of time, obtains the acceptance of the client 1, and if the practitioner 2 can pay the compensation, the results will be obtained. The work of managing work performance in the reporting period is completed.

【0127】管理情報811の項は、入力があった図8
の財貨管理の項目に関して、その管理を行なう間に生じ
てくる諸事項の実行のフラグ情報を記憶する項である。
従って、図8のいずれかの項目に、何らかの処理を要す
る情報が記憶され、その対応が未処理というときは、8
11の管理情報の項目の値は、「未整備や未処理」にな
り、処理が終われば、「処理済」になる。
The item of the management information 811 is shown in FIG.
This is a term for storing flag information for execution of various items that occur during the management of the goods management item.
Therefore, when information that requires some processing is stored in any item of FIG. 8 and the correspondence is unprocessed,
The value of the item 11 of the management information is “unprepared or unprocessed”, and is “processed” when the processing is completed.

【0128】例えば、財貨を預かっているが、期限がき
てもその財貨の給付が実現される条件になっていないた
めに、依頼者1に照会をしているようなときは、811
の管理情報の項目の値は、「未処理」になり、条件が整
って給付が入力されれば、「処理済」になる。
For example, when the customer 1 is referred to because the goods are deposited, but the condition for the benefits of the goods to be realized even when the deadline expires, 811
The value of the item of the management information of is “unprocessed”, and if the condition is satisfied and the benefit is input, it becomes “processed”.

【0129】また、検収時に依頼者から要望事項が提示
されて、その要望事項の追加実施を、実施者に要請して
了解を求めている間は、811の管理情報の項目の値
は、「照会中」になり、条件が整うような入力があれ
ば、「処理済」になる。
Further, while the requester is presented with the request at the time of inspection and the request is made to the implementer for the additional implementation of the request, the value of the item 811 of the management information is " If there is an input that meets the conditions, the status will be "Inquiring", and the status will be "Processed".

【0130】図3は、図1の業務管理システムにおける
実施者2側との関係の詳細を示す図である。図3におい
て、図1及び図2と同じ機器は、同じ図番を付して説明
を簡略化している。
FIG. 3 is a diagram showing the details of the relationship with the practitioner 2 side in the business management system of FIG. In FIG. 3, the same devices as those in FIGS. 1 and 2 are given the same drawing numbers to simplify the description.

【0131】図3は、本発明の業務遂行管理システムの
実施の形態における、実施者側装置の詳細を示す図であ
る。業務遂行管理機構3は、多くの実施者2による業務
の遂行を管理しているので、業務遂行管理機構3と実施
者2との関係を示す図3では、実績報告IO12を複数
図示し、これにより、実施者2が各種の業務に関して業
務遂行をし、その遂行実績を随時、ネットワーク10を
介して入力できるようにしていることを示している。ま
た、後述する監視システム27から監視や監査の情報を
入手するための監査入力IO28がネットワーク10を介
して接続されている。実績入手サーバ8は、実施者2か
ら業務遂行の実績報告を受けたり、監視システム27か
ら監視実績や監査実績の情報の入力を受付けたり、受付
けた実績の内容の確認連絡をしつつ受託をした業務の遂
行管理を行なう装置である。内部には、実績受付処理部
29、実績管理部30及び監査等管理部31などを備え
ている。
FIG. 3 is a diagram showing details of the practitioner side device in the embodiment of the work performance management system of the present invention. Since the work performance management mechanism 3 manages the performance of the work by many practitioners 2, FIG. 3 showing the relationship between the work performance management mechanism 3 and the practitioner 2 shows a plurality of performance report IO12. This shows that the practitioner 2 carries out work relating to various works, and the performance record can be input via the network 10 at any time. Further, an audit input IO 28 for obtaining monitoring and audit information from a monitoring system 27 described later is connected via the network 10. The actual result acquisition server 8 receives the actual result report of the work execution from the practitioner 2, accepts the input of the information of the actual monitoring results and the actual audit results from the monitoring system 27, and confirms the contents of the accepted actual results and performs the contract. It is a device that manages the performance of work. The result reception processing unit 29, the result management unit 30, the audit management unit 31, and the like are provided inside.

【0132】検収受付処理装置9は、図2で説明したと
同様に、共通DB6を使いながら、依頼者1から受託し
た依頼者1の業務の遂行が実施者2によって完遂される
ように中央制御装置4とともに管理をする装置である。
As in the case described with reference to FIG. 2, the inspection acceptance processing unit 9 uses the common DB 6 and performs central control so that the practitioner 2 completes the work of the client 1 entrusted by the client 1. It is a device that manages together with the device 4.

【0133】検収受付処理装置9には、図2で説明した
業務管理処理部22、成果報告処理部23、差異報告処
理部24、要望管理処理部25、書類作成部26以外
に、更に、監視監査処理部32及び対価等給付処理部3
3を備えている。また、検収受付処理装置9は、共通D
B6の設定業務DB16、業務実績成果DB17、差異
分析結果DB18、検収要望DB19、財貨等管理DB
20、監視監査DB21等にアクセスして読み取りや記
憶保管などの情報の授受ができる構成を有している。
In addition to the operation management processing unit 22, the result report processing unit 23, the difference report processing unit 24, the request management processing unit 25, and the document preparation unit 26 described in FIG. Audit processing section 32 and consideration payment processing section 3
Equipped with 3. Further, the inspection acceptance processing device 9 has a common D
Setting business DB16 of B6, business performance result DB17, difference analysis result DB18, inspection request DB19, goods management DB
20, the monitoring audit DB 21 and the like can be accessed to exchange information such as reading and storage.

【0134】業務管理処理部22は、上述のように、実
施者2が入力してくる業務遂行の実績報告や監視システ
ム27から入力してくる監査実績入力を基に、依頼者1
から受託した業務の遂行を、依頼者1と合意した内容と
期間通りに遂行されるように中央制御装置4とともに管
理をする装置である。
As described above, the work management processing section 22 determines the client 1 based on the work performance record input by the practitioner 2 and the audit record input from the monitoring system 27.
It is a device that manages, together with the central control device 4, the performance of the work entrusted by the client to the client according to the contents and the period agreed with the client 1.

【0135】対価等給付処理部33は、業務遂行管理機
構3から依頼者1にした業務遂行の成果報告書に対する
依頼者1の検収が終了したときに、図16に示す成果の
検収と給付のフローチャートで詳述するようにして、依
頼者1から預託されている財貨を、依頼者1との間で合
意されていた条件に従い、実施者2に対価として給付を
する装置である。
When the client 1 completes the inspection of the performance report of the business performance performed by the business performance management mechanism 3 to the client 1, the consideration payment processing unit 33 receives the results and the payment of the results shown in FIG. As described in detail in the flow chart, this is a device for paying the goods deposited by the client 1 to the practitioner 2 as consideration in accordance with the conditions agreed with the client 1.

【0136】対価等給付処理部33は、依頼者1から預
託されている財貨の一部を実施者2に給付した後の残価
を評価し、残価が不足してくれば、依頼者1に預託財貨
を増やす等の働きかけをして、実施者2による業務遂行
に対する給付が確実に行われるように管理し、実施者2
への給付面からも、受託した業務が依頼者1の希望する
形で完遂されるようにしている。
The consideration payment processing unit 33 evaluates the residual value after a part of the goods deposited by the client 1 is paid to the practitioner 2, and if the residual value becomes insufficient, the client 1 The practitioner 2 will be managed to ensure that the practitioner 2 will be provided with benefits for the performance of work by encouraging the practitioner 2 to increase the deposit money.
In terms of benefits to the client, the entrusted work is completed in the form requested by the client 1.

【0137】監視監査処理部32は、後述する監視シス
テム27から、監査入力IO28及びネットワーク10、
監査等管理部31を介して入力され、監視監査DB21
に保管されている監視実績情報や監査実績情報を抽出
し、これらを比較評価したり、追加の監視監査情報を要
求したりしつつ、業務遂行の実態を分析処理して監視監
査DB21に保管する装置である。
The monitoring / inspection processing unit 32 receives the audit input IO 28 and the network 10 from the monitoring system 27 described later.
It is input via the audit management unit 31, and the monitoring audit DB 21
The monitoring record information and the audit record information stored in are extracted and compared and evaluated, and while requesting additional monitoring audit information, the actual state of the work execution is analyzed and stored in the monitoring audit DB 21. It is a device.

【0138】監視システム27は、図には示していない
が、監視機関と監査機関とを備えている。監視機関は、
実施者2の業務遂行を実施者2と独立して監視する装置
である。
Although not shown in the figure, the monitoring system 27 includes a monitoring organization and an auditing organization. The monitoring agency
This is a device that monitors the performance of work performed by the practitioner 2 independently of the practitioner 2.

【0139】すなわち、監視機関は、監視機関に属する
人手によって実施者2による設定業務の遂行を監視する
ようにしても良いが、実施者2による業務遂行の実態を
第三者的又は電気的な検知装置を用いて検出し、この結
果をネットワーク10経由で業務遂行管理機構3に入力
する自動の機器や装置であっても良い。例えば、設定業
務の遂行の現場に設置された監視カメラや映像記録装置
を備えた自動監視装置或いはこれらの自動監視装置の代
替機能を有する時間記録装置付きの感応スイッチや光セ
ンサ式スイッチやその他の自動作動の監視記録装置によ
っても構成することができる。
That is, the monitoring organization may monitor the performance of the setting operation by the practitioner 2 manually by a person who belongs to the monitoring organization. It may be an automatic device or apparatus that detects using a detection device and inputs the result to the work performance management mechanism 3 via the network 10. For example, an automatic monitoring device equipped with a monitoring camera or a video recording device installed at the site of performing setting work, or a sensitive switch with a time recording device having an alternative function of these automatic monitoring devices, an optical sensor type switch, or other It can also be constituted by an automatic operation monitoring recording device.

【0140】この監視システム27において、業務遂行
の実績情報に関する監視監査を更に厳密に行なう必要が
あるときに、監視機関とは独立した組織、例えば、人や
事業体或いは検知機器で構成された監査機関を組合わせ
るというように、監視システムを独立した複数の監視機
関と監査機関とに分けた構成とするのが好ましい。
In this monitoring system 27, when it is necessary to more strictly monitor and audit the performance information of the work execution, an audit independent of the monitoring organization, for example, an audit composed of a person, a business entity, or a detection device. It is preferable that the monitoring system is divided into a plurality of independent monitoring organizations and an auditing organization, such as a combination of organizations.

【0141】監視システム27に備える監査機関は、業
務遂行管理において特に必要なときに設けられる機関で
あり、実施者2の業務遂行や監視機関の監視業務活動を
監視機関とは独立して監査する装置または人や事業体で
ある。監査機関は、例えば、業務遂行管理機構3が内部
や関連する組織として実施者2を有していて、実施者2
と業務遂行管理者3とが業務的に関係を有しているよう
なときに、その業務遂行の管理の客観性を維持するため
などのときに設置すると良い。また、監査機関は、事業
解析や経営診断のように特別な場合は、専門の会計監査
法人や弁護士等、人や事業体組織でなければできないも
のもあるが、監査の内容によっては、監視装置と同様な
自動機器装置で作られた独立の自動監査装置であっても
よい。
The auditing system provided in the monitoring system 27 is a system provided especially when it is necessary for business performance management, and audits the business performance of the practitioner 2 and the monitoring business activity of the monitoring business independently of the monitoring business. A device or person or business entity. In the auditing organization, for example, the work performance management mechanism 3 has the practitioner 2 as an internal or related organization.
It is advisable to install the service management manager 3 in order to maintain the objectivity of management of the business performance when the business performance manager 3 and the business performance manager 3 have a business relationship. In addition, in the special case such as business analysis and management diagnosis, an auditing organization can only be done by a person or business organization such as a specialized accounting audit firm or lawyer. It may be an independent automatic inspection device made of the same automatic equipment.

【0142】このような監視システムを用いれば、監査
入力IO28を介して業務遂行管理機構3に報告され監視
監査DB記憶保管される情報に誤った情報や客観性を伴
わない情報が、極力、混入しないようにすることができ
る。
By using such a monitoring system, erroneous information or information without objectivity is mixed as much as possible with the information reported to the work performance management mechanism 3 via the audit input IO 28 and stored in the monitoring audit DB. You can choose not to.

【0143】業務遂行管理機構3は、監視システム27
から入力され、監視監査DB21に保管されている業務
遂行の監視監査情報を必要に応じて(バッチ処理)抽出
し、監視監査処理部32によって整理し、加工をして、
成果報告書のための情報として監視・監査DB21に保
管する。
The work performance management mechanism 3 has a monitoring system 27.
When necessary (batch processing), the monitoring audit information of the work performance, which is input from the monitoring audit DB 21 and stored in the monitoring audit DB 21, is extracted, organized by the monitoring audit processing unit 32, and processed.
It is stored in the monitoring / auditing DB 21 as information for the result report.

【0144】この処理において、例えば、監視システム
27からの入力が、監視実績情報しかないときや、監視
実績情報を監査実績情報とが内容的に一致しているとき
は監視監査DB21には監視実績情報だけが監視情報と
して保管され、監視監査情報は参考情報としてDBに保
管される。これにより、業務管理処理部22で種々の業
務遂行実績情報を基に業務成果情報をまとめるときに処
理判断に情報量がいたずらに増大しないようにしてい
る。通信制御部15は、実績報告IO12や監査入力I
O28、ネットワーク10を介して、実施者2や監視シ
ステム27から業務遂行管理機構3に、業務遂行の実績
報告や監視監査実績の入力があったとき、これらの情報
を実績入手サーバ8に取り込んだり、逆に実績入手サー
バ8や検収受付処理装置9から実施者2や監視システム
27に入力された情報を確認のために入力者に発信する
制御装置である。
In this processing, for example, when the input from the monitoring system 27 is only the monitoring record information or when the monitoring record information matches the audit record information, the monitoring record is stored in the monitoring audit DB 21. Only information is stored as monitoring information, and monitoring audit information is stored in the DB as reference information. As a result, when the work management processing unit 22 puts together work result information based on various work performance record information, the amount of information does not unnecessarily increase in processing judgment. The communication control unit 15 uses the performance report IO12 and the audit input I.
When the practitioner 2 or the monitoring system 27 inputs a performance report of the business performance or a monitoring audit performance to the business performance management mechanism 3 via O28 or the network 10, the information acquisition server 8 fetches these information. Conversely, it is a control device that sends the information input from the record acquisition server 8 or the inspection acceptance processing device 9 to the practitioner 2 or the monitoring system 27 to the input person for confirmation.

【0145】次に、本発明の実施の形態の業務遂行管理
システムにおける図3の業務遂行管理機構3と実施者2
との間の、情報の授受や情報の処理及び実施者2からの
業務遂行実績報告の処理と業務遂行成果がまとめられる
までの情報の流れと処理について、業務遂行実績報告処
理のフローチャートを示す図14を参照しつつ説明をす
る。
Next, the work performance management mechanism 3 and the practitioner 2 of FIG. 3 in the work performance management system of the embodiment of the present invention.
The figure which shows the flowchart of the work performance result report process about the information flow and the process of exchanging information between the and The description will be made with reference to 14.

【0146】実施者2は、依頼者1から業務の遂行依頼
を受け、業務遂行管理機構3による業務遂行に同意した
後、これら業務遂行管理に関連する契約で決められた条
件、例えば、一定の期限ごとに又は、区分された業務を
遂行するごとに業務遂行管理機構3へアクセスし、実績
報告IO12及びネットワーク10を介して業務遂行管
理機構3の実績入手サーバ8に業務遂行の実績を入力す
る。
The practitioner 2 receives a work execution request from the client 1 and after agreeing to the work execution by the work execution management mechanism 3, the practitioner 2 receives a condition determined by a contract relating to these work execution managements, for example, a certain amount. The job performance management mechanism 3 is accessed for each deadline or each time a classified job is carried out, and the business performance results are input to the performance acquisition server 8 of the business performance management mechanism 3 via the performance report IO 12 and the network 10. .

【0147】ステップ1401は実施者2が実績報告I
O12を介して、実績入手サーバ8へ業務を遂行した実
績を入力するステップである。
In step 1401, the practitioner 2 reports the performance report I.
This is a step of inputting the result of performing the work to the result acquisition server 8 via O12.

【0148】ステップ1402では、入力された実績の
内容を、実績受付処理部29で預かった後、すぐに実施
者に送り返すことにより入力された情報の内容の確認を
して、誤入力を防ぐと同時に、実績情報を処理判断する
ステップである。換言すれば、実績情報を受付けた実績
入手サーバ8の実績受付処理部29が、業務の遂行の成
果を判断処理するのに必要な情報の入力がされたかどう
かの確認をするステップである。具体的には、業務実績
成果DB17に設けられている項目、例えば、実績期間
や実績内容の項目、管理条件の中の重要な事項を充足す
るだけの情報が実績入手サーバ8に入力されないと、最
終的には業務遂行管理の成果報告ができなくなる。
At step 1402, after the contents of the input results are stored in the results reception processing unit 29, they are immediately returned to the practitioner to confirm the contents of the input information and prevent erroneous input. At the same time, this is a step of processing and determining the actual result information. In other words, this is a step of confirming whether or not the record acceptance processing unit 29 of the record acquisition server 8 that has received record information has input the information necessary for determining and processing the result of the performance of the work. Specifically, unless the items provided in the business performance result DB 17, for example, the items of the performance period and the performance content, and the important items in the management conditions are input to the performance acquisition server 8, Eventually, it will not be possible to report the results of work performance management.

【0149】このようなとき、実績受付処理部29は、
情報の内容の確認とあわせて、該当項目の実績内容の充
足を実施者2に要求する。業務遂行管理の成果報告をす
るときに必要な内容の項目は、後で詳細に説明をするよ
うに、図6に示すようなものがある。
In such a case, the record acceptance processing section 29
In addition to confirming the information content, the practitioner 2 is requested to satisfy the actual content of the corresponding item. Items of contents necessary for reporting the result of the work performance management are as shown in FIG. 6, as will be described in detail later.

【0150】ステップ1403は、実績入力において、
業務遂行の成果報告をするときに必要な業務実績成果D
B17の項目の内容を充足する情報の入力の有無の判断
処理をするステップである。必要な情報が入力されてい
ないときは、実施者2に対して再度、実績情報の入力を
要請する。
Step 1403 is for inputting the results.
Work performance result D required when reporting work performance results
This is a step of determining whether or not information that satisfies the contents of the item B17 is input. If the necessary information has not been input, the practitioner 2 is requested to input the performance information again.

【0151】ステップ1403において、成果報告に必
要な項目の内容が充足されているときは、次のステップ
1404に進む。ステップ1404では、入力された実
績と同じ時の監視情報を監視監査DB21から抽出し、
業務遂行実績と比較し、差異分析をする。この差異分析
は、業務遂行管理コストはかかるが、好ましくは実績入
力のあったときに、リアルタイムに監視監査情報と比較
処理されることが好ましい。監視監査情報と異なる実績
情報は、誤入力の可能性が高く、成果報告を作成する時
に、成果として扱われなくなり、依頼者1による満足を
得難くするから、実施者2において早期に実績報告の修
正をする可能性が高いからである。
In step 1403, when the contents of the items necessary for the result report are satisfied, the process proceeds to the next step 1404. In step 1404, the monitoring information at the same time as the input result is extracted from the monitoring audit DB 21,
Perform a difference analysis by comparing with the work performance record. Although this difference analysis requires a work performance management cost, it is preferable that the difference analysis is performed in real time in comparison with the monitoring and auditing information. The performance information that is different from the monitoring audit information is likely to be erroneously input, and will not be treated as a result when creating the result report, making it difficult for the client 1 to satisfy the requester. This is because there is a high possibility of making corrections.

【0152】ステップ1405は、業務遂行の実績入力
において、報告された実績の内容と監視監査情報との間
に、著しく大きな差異がないことの判断をするステップ
である。監視監査情報との差異が著しく大きな実績報告
は、誤入力の可能性があり、上述したように、業務遂行
の成果報告をするときに、業務遂行の成果として扱われ
なくなる可能性が高い。実施者2において早期に正しい
遂行実績情報の入力を要請する。
Step 1405 is a step of judging that there is no remarkably large difference between the contents of the reported performance and the monitoring audit information in inputting the performance of the work performance. A performance report that has a significantly large difference from the monitoring audit information may be erroneously input, and as described above, when reporting a business performance result, it is highly likely that it will not be treated as a business performance result. The practitioner 2 is requested to input correct performance record information at an early stage.

【0153】ステップ1405において、実績情報と監
視監査情報との差異が殆どないとき或いは、その差異が
業務遂行の管理条件に照らして実質的な差としてみなさ
れないと判断されるときは、次のステップ1406に進
む。
In step 1405, when there is almost no difference between the record information and the monitoring audit information, or when it is determined that the difference is not considered as a substantial difference in light of the management conditions for business execution, the next step Proceed to 1406.

【0154】ステップ1406は、このようにして、実
施者2から業務遂行の実績として実績入手サーバ8に入
力された情報が、後刻に、バッチ処理で業務遂行の成果
としてまとめる時に必要な内容を有していると確認され
た実績情報を業務実績成果DB17に保管するステップ
である。
In step 1406, the information input from the practitioner 2 to the performance acquisition server 8 as a performance record of work in this way has necessary contents when the results of the work performance are put together in a batch process later. This is a step of storing the performance information confirmed to be in the business performance result DB 17.

【0155】ステップ1407は、業務遂行管理機構3
の差異分析手段5によって、バッチ処理で、実績情報と
設定業務の内容との差異分析をする準備として、まず、
設定業務の内容や管理条件を設定業務DB16から抽出
し、予め決められた業務遂行の管理期間における実績報
告の内容を業務実績成果DB17から抽出し、実績報告
に対応した業務遂行関連の監視監査情報を監視監査DB
21から抽出するステップである。
Step 1407 is the business performance management mechanism 3.
First, as a preparation for performing a difference analysis between the performance information and the contents of the setting work by the batch processing by the difference analysis means 5 of
The contents and management conditions of the setting work are extracted from the setting work DB 16, the contents of the performance report in the predetermined management period of the work performance are extracted from the work performance result DB 17, and the work execution related monitoring audit information corresponding to the performance report is extracted. Monitoring DB
It is the step of extracting from 21.

【0156】ステップ1408は、ステップ1407で
得られた、情報を基に業務遂行の実績と依頼業務内容と
を比較し、差異分析処理を差異分析手段5で行なうステ
ップである。
Step 1408 is a step in which the result of job execution is compared with the requested job content based on the information obtained in step 1407, and the difference analysis means 5 performs the difference analysis processing.

【0157】差異分析手段5は、設定業務DB16、業
務実績成果DB17及び、監視監査DB21に保管され
ている情報を基に、依頼者1に報告をする期間ごと、或
いは、実施者から入力された実績情報及び監視監査シス
テム27から入力され、監視監査DB21に貯えられて
いる情報が整う毎に、依頼者が業務の遂行を依頼した設
定業務の内容と業務実績の内容との差異の有無及び実施
者2から業務実績として入力された通りに業務が遂行さ
れたものであるかどうか、設定業務、遂行業務実績、遂
行実体監査に関する各DB16、17、21の情報を比
較処理、差異の分析、判断をして、その結果を差異分析
結果DB18に保管する。
The difference analysis means 5 is input based on the information stored in the setting work DB 16, the work performance result DB 17 and the monitoring audit DB 21 at every reporting period to the client 1 or by the implementer. Every time the information input from the performance information and the monitoring and auditing system 27 and stored in the monitoring and auditing DB 21 is prepared, whether or not there is a difference between the contents of the setting work requested by the client to carry out the work and the contents of the work performance, and execution. Person 2 whether or not the work is performed as input as the work result, setting work, performance of the work performance, information of each DB16,17,21 relating to the performance substance audit, comparison processing, analysis of difference, judgment Then, the result is stored in the difference analysis result DB 18.

【0158】設定業務の内容以上に業務が遂行されたと
か、設定業務の内容の通りに業務が遂行されたとの判断
結果のもの。業務遂行実績と設定業務との差が小さいた
めに、または、差はあるが管理条件(図5の508の
項)と比較評価した結果、実質的に完遂されたと認めら
れるもの。業務遂行実績と設定業務との差は小さいが、
管理条件と比較評価した結果、業務遂行実績としては充
分とは認められないもの。業務遂行実績と設定業務との
差があって業務遂行実績とは認められないもの等の分析
処理が差異分析手段5によって行なわれる。
The result of the judgment that the work is performed more than the contents of the setting work or the work is performed according to the contents of the setting work. It is recognized that the job performance is substantially completed because the difference between the job performance record and the set job is small, or there is a difference, but as a result of comparative evaluation with the management condition (item 508 in FIG. 5). Although the difference between work performance and setting work is small,
As a result of comparison and evaluation with the management conditions, it is not recognized as a sufficient performance record. The difference analyzing means 5 performs an analysis process of a job performance record and a setting job that are not recognized as a job performance record.

【0159】ステップ1409は、このようにして、得
られた差異分析の結果を、後刻に、バッチ処理で業務遂
行の成果報告として総合的に判断処理する時に使用する
情報として差異分析結果DB18に保管するステップで
ある。
In step 1409, the difference analysis result thus obtained is stored in the difference analysis result DB 18 as information to be used later for comprehensive judgment processing as a work performance result report in batch processing. It is a step to do.

【0160】ステップ1410は、このようにして、実
施者2から業務遂行管理機構3に入力された業務遂行管
理の実績情報を、差異分析結果DB18から得られた差
異分析情報や、業務遂行管理の管理条件等を勘案しなが
らバッチ処理で判断し、業務遂行の成果情報にまとめ、
得られた結果を、業務遂行管理の成果情報として、業務
実績成果DB17に保管するステップである。
In step 1410, the work performance management performance information input from the practitioner 2 to the work performance management mechanism 3 in this manner is used as the difference analysis information obtained from the difference analysis result DB 18 and the work performance management information. Judging by batch processing while considering management conditions, etc.
This is a step of storing the obtained result in the work performance result DB 17 as work performance management result information.

【0161】これにより、業務遂行管理機構3による業
務遂行管理の成果報告の準備態勢が整い、業務遂行実績
情報の処理が終了する。
As a result, the preparation for the performance report of the business performance management by the business performance management mechanism 3 is ready, and the processing of the business performance record information is completed.

【0162】図6に、本発明の実施の形態の業務遂行管
理のシステムで、実施者2から業務遂行管理機構3に入
力される業務遂行実績報告の内容を示す。
FIG. 6 shows the contents of the work performance record which is input from the practitioner 2 to the work performance management mechanism 3 in the work performance management system according to the embodiment of the present invention.

【0163】図6において、日付601の項は、簡略化
して示しているが、実施者2が実績報告の入力をした日
時及び実施者2が業務を遂行した日である。この項にお
ける業務を遂行した日や時間は、成果報告書で使用され
るほかに、この後、監視システム27からの監視監査報
告と比較するときの基にもなるものである。
In FIG. 6, the item of date 601 is shown in a simplified manner, but it is the date and time when the practitioner 2 inputs the performance report and the date when the practitioner 2 performs the work. The day and time of performing the work in this section are used not only in the result report but also as a basis for later comparison with the monitoring audit report from the monitoring system 27.

【0164】実施者603の項は、実施者2が団体や事
業体である場合に、好ましくは、業務を実際に遂行した
人が記載される。これは、後刻に、依頼者1の要請で業
務遂行機構3などからす遂行の照会をするときに必要と
されたり、依頼者1から見て、顔が分かるなどという直
接的な関係を有する事項だからである。
[0164] When the practitioner 2 is an organization or a business entity, the section of the practitioner 603 preferably describes the person who actually performed the work. This is a matter that has a direct relationship such that it is required when the client 1 makes an inquiry about the performance of the job execution mechanism 3 or the like at a later time, and the client 1 can see the face. That's why.

【0165】管理番号604の項は、業務遂行管理機構
3が受託した業務遂行管理の受託番号の項である。
The item of the management number 604 is the item of the contract number of the business execution management contracted by the business execution management mechanism 3.

【0166】設定業務605の項は、設定業務DB16
に記憶されている設定業務の内容と同じであるが、成果
報告を受取った依頼者1が、実績と比較して見る時の便
宜のために簡略化して、受託した業務の内容として表示
され遂行の成果がわかりやすくなるようにしている項で
ある。
The item of setting work 605 is the setting work DB 16
Although it is the same as the contents of the setting work stored in, the requester 1 who received the result report simplifies it for convenience when comparing it with the actual result and displays it as the contents of the commissioned work. This item makes it easier to understand the results of.

【0167】実績期間606の項は、業務遂行がなされ
た期間である。実施者2に対する対価の給付にも関係を
する期間である。原則的には、図5の設定業務内容50
6や管理条件508で決められた期間を基に示される。
The item of the actual result period 606 is a period during which the work is performed. This period is also related to the payment of consideration to the practitioner 2. In principle, the setting work content 50 in FIG.
6 and the management condition 508.

【0168】実績607の項は、依頼者1が実施者2と
の間で行なった業務遂行の依頼に基づいて実施者2が遂
行した業務の実績内容の項である。この実績内容は、実
施者2が業務遂行管理機構3に入力し、報告をしてきた
内容であって、実体がどのようになっているかとは別で
ある。業務遂行管理機構3としては、図14で説明をし
たように、実績内容を設定業務内容や監視監査情報の内
容と比較して、業務遂行の実体を示す成果報告や差異分
析の結果として依頼者1に報告をする。
The item of the actual result 607 is the item of the actual result contents of the work performed by the practitioner 2 based on the request of the work execution performed by the client 1 with the practitioner 2. The contents of the results are contents that the practitioner 2 inputs into the work performance management mechanism 3 and reports, and is different from what the entity actually is. As described in FIG. 14, the work performance management mechanism 3 compares the performance contents with the contents of the set work contents and the monitoring audit information, and outputs the result report showing the substance of the work performance and the result of the difference analysis to the client. Report to 1.

【0169】差異報告608は、図14のフローチャー
トで説明をした差異分析の結果として、差異分析結果D
B18に記憶されている情報の中から、成果報告時に特
に必要と判断される事項を記載する項目である。次項の
成果報告の内容で業務遂行管理の結果が十分なときは、
その場合は、差異報告の項の差異なしの記述となり、差
異がないという報告の基になる。
The difference report 608 is the difference analysis result D as the result of the difference analysis described in the flowchart of FIG.
From the information stored in B18, it is an item that describes items that are judged to be particularly necessary when reporting the results. When the results of business performance management are sufficient according to the contents of the result report in the next section,
In that case, the description of no difference in the section of difference report will be the basis of the report that there is no difference.

【0170】成果内容609の項は、業務遂行管理機構
3が依頼者1から委託を受けて、実施者2の業務遂行を
管理し評価してまとめた結果を記すところである。
The item of the result contents 609 is the result of the work performance management mechanism 3 commissioned by the client 1 to manage, evaluate, and summarize the work performance of the practitioner 2.

【0171】依頼者1は、業務の遂行が大方において得
心のいく成果と感じ満足しているときは、この成果内容
を見て、自分の心証を改めて確認し、検収をすることが
できる。しかし、業務の遂行に不足や疑義を感じている
ときは、成果内容609と併せて、項目603〜608
の諸項目の内容を詳しく検討した後に検収をしたり、要
望を出すことになる。
[0171] When the client 1 feels that the performance of the work is a conspicuous achievement in most cases and is satisfied, he / she can look at the contents of the achievement and reconfirm his / her heart's mind, and accept the inspection. However, if you feel that your work is insufficient or suspicious, along with the result content 609, you should check the items 603 to 608.
After examining the contents of the various items in detail, the inspection will be made and a request will be made.

【0172】検収給付610の項は、図6に記載されて
いるような内容の成果報告を受取った後の依頼者1の検
収や、検収後に行なわれる実施者2への給付関連事項の
内容の項である。実施者2に対価として給付される財貨
の種類や量及び給付の時期、給付の実績等が記載され
る。
The item of acceptance payment 610 is for the acceptance of the client 1 after receiving the result report having the contents as shown in FIG. 6 and the contents of the benefit-related matters to the practitioner 2 performed after the acceptance. Is a term. The type and amount of goods to be paid to the practitioner 2, the timing of the payment, the actual performance of the payment, etc. are described.

【0173】要望事項611の項は、前回の検収時に依
頼者1から提示された要望事項の項である。依頼者1が
成果報告書を見るときの参考に記載される。
The request item 611 is a request item presented by the client 1 at the time of the previous inspection. It is described as a reference when the client 1 views the achievement report.

【0174】図7は、本実施の形態で示す業務遂行管理
システムで使用する業務実績成果DB17(図2及び図
3参照)の内容を示す。
FIG. 7 shows the contents of the business performance result DB 17 (see FIGS. 2 and 3) used in the business performance management system shown in this embodiment.

【0175】実績入手サーバ8は実績受付処理部29を
介して、実施者2から入力された業務遂行実績を、この
業務実績成果DB17で管理する。
The performance acquisition server 8 manages the business performance results input by the practitioner 2 via the performance reception processing unit 29 in the business performance results DB 17.

【0176】実績入手サーバ8は、新たな業務遂行実績
の入力が有ると、入力の日付および業務管理の受託番号
と業務実績の管理に必要な項目と各項目の情報の保管メ
モリ領域を業務実績成果DB17の中に確保する。
When a new job performance record is input, the record acquisition server 8 stores the record of the input date, the work management consignment number, the items required for managing the job record, and the storage memory area of the information of each item as the job record. It secures in result DB17.

【0177】業務実績成果DBの701の項は、実績の
入力があった日の項である。702から708の項に
は、入力された業務実績の602から608の項の情報
710の項には611の項の情報を記憶しておく。
[0177] The item 701 of the work result database is the item on which the result was input. In the items 702 to 708, the information 710 in the information 710 in the items 602 to 608 of the input work record is stored.

【0178】管理情報711は、この業務実績の入力が
あった図7の各項目について、その管理を行なう間に生
じてくる諸事項の実行のフラグ情報を記憶するものであ
る。図7のいずれかの項目に、何らかの処理を要する情
報が記憶され、その対応が未処理というときは、711
の管理情報の項目の値は、「未整備や未処理」になり、
処理が終われば、「処理済」になる。
The management information 711 stores flag information of execution of various items that occur during the management of each item in FIG. 7 for which this work record has been input. Information that requires some kind of processing is stored in any of the items in FIG.
The value of the management information item of is "Undeveloped or unprocessed",
When the processing is completed, it becomes “processed”.

【0179】例えば、依頼者1と実施者2との合意に従
う業務遂行の管理条件によれば、期間内の実績として入
力されるべき事項が入力されていないような場合には、
実施者2からの実績入力の限りでは、実績の項目の内容
は充足されていない。この未充足部分に対して、再入力
や、業務が実際に遂行されていないときには、遂行後に
入力するように照会をして、その照会に応じた入力があ
ったか否かのフラグ情報を711に記憶させる。その
後、再入力があれば、実績項目の充足はされたとして、
フラグは「処理済」になる。また、このような再入力の
あったときは、対応する監査情報の入力も必要であるこ
とが多い。仮に監査情報の入力の照会をして、その照会
に応じた入力があったか否かについても、管理情報に関
する711の項のフラグを用い、監査情報の入力の有無
の情報を記憶させる。
For example, according to the management condition of the work performance according to the agreement between the requester 1 and the practitioner 2, when the matter that should be input as the actual result within the period is not input,
As far as the actual result is input from the practitioner 2, the contents of the actual item are not satisfied. For this unsatisfied part, re-input or when the work is not actually executed, it is inquired to input after the execution, and flag information indicating whether or not there is an input according to the inquiry is stored in 711. Let After that, if there is a re-entry, it is considered that the achievement items have been satisfied,
The flag becomes "processed". Further, when such re-input is performed, it is often necessary to input corresponding audit information. Even if the inquiry about the input of the audit information is made and whether or not there is an input according to the inquiry, the flag of the item 711 regarding the management information is used to store the information about the presence or absence of the input of the audit information.

【0180】さらにまた、このようにして得られた実績
の情報が、成果報告書として依頼者1に提供されたかど
うかの情報の記憶、その後は、成果報告書に対する検収
が得られたかどうかの情報の記憶等、このDBの各項目
の情報の出入りに伴う処理の有無の情報も管理情報71
1の項で管理される。この業務実績成果DB17には、
この後、管理番号の項704の受託番号をガイドに、検
収受付処理装置9のアクセスを受け、図14〜図16で
詳細に説明するように、差異分析処理や成果情報処理の
ための業務遂行実績情報の提供や得られた業務遂行成果
情報等が記憶し、保管される。
[0180] Furthermore, storage of information as to whether or not the information on the results thus obtained was provided to the client 1 as a result report, and thereafter, information on whether or not an acceptance was obtained for the result report. Information regarding the presence or absence of processing associated with the entry and exit of information on each item of this DB, such as the storage of
It is managed in section 1. In this business performance result DB17,
Thereafter, the acceptance number of the management number item 704 is used as a guide to access the inspection acceptance processing device 9, and as described in detail with reference to FIGS. 14 to 16, work for difference analysis processing and result information processing is performed. Provision of performance information and obtained work performance result information are stored and stored.

【0181】図9は、図14のステップ1408で得ら
れた差異分析結果を記憶し保管する差異分析結果DB1
8の内容を示す。中央制御装置4は、差異分析手段5
が、差異分析を開始するときは、その実績情報の受託番
号に対応して、入力される差異分析情報を記憶する保管
メモリ領域を差異分析結果DB18の中に確保する。
FIG. 9 is a difference analysis result DB 1 for storing and storing the difference analysis result obtained in step 1408 of FIG.
8 shows the contents. The central control unit 4 uses the difference analysis means 5
However, when the difference analysis is started, a storage memory area for storing the input difference analysis information is secured in the difference analysis result DB 18 corresponding to the acceptance number of the record information.

【0182】中央制御装置4の差異分析手段5及び差異
報告処理部24は、図14のフローチャート(ステップ
1407〜1409)で説明したように、業務遂行の実
績をバッチ処理で分析しながら差異分析結果を得る。差
異分析結果は、依頼者1の業務の遂行に関する成果報告
書の基礎情報または成果報告の一部として使用される。
The difference analysis means 5 and the difference report processing unit 24 of the central control unit 4 analyze the result of the job execution by batch processing as described in the flowchart (steps 1407 to 1409) of FIG. To get The difference analysis result is used as a part of the basic information or the result report of the result report regarding the performance of the work of the client 1.

【0183】図9において、日付901の項は、差異分
析手段5や報告処理部24が実施者2の実績報告につい
て、差異分析をした日の項である。
In FIG. 9, the item of the date 901 is the item of the day on which the difference analysis means 5 and the report processing unit 24 performed the difference analysis on the performance report of the practitioner 2.

【0184】管理番号902の項は、業務遂行管理機構
3が依頼者1から業務の遂行管理を受託した業務遂行管
理の受託番号の項である。
[0184] The item of management number 902 is the item of the contract number of the business performance management contracted by the client 1 from the requester 1 for the business performance management.

【0185】設定業務内容903の項は、設定業務DB
16に記憶されている設定業務内容506と同じ内容で
あり、実施者2からの実績報告と比較し差異分析をする
時の基準として使用される。
The item of setting work contents 903 is the setting work DB
The content is the same as the setting work content 506 stored in 16, and is used as a standard when performing difference analysis by comparing with the performance report from the practitioner 2.

【0186】管理条件904は、設定業務DB16に記
憶されている管理条件の内容508と同じである。管理
条件は、設定業務内容と実施者2からの実績報告とを比
較して差異分析をする時の評価の条件や基準として使用
される。例えば、ステップ1408で説明をしたよう
に、業務遂行実績と設定業務との差だけでは、本質的な
差異分析はできず、管理条件と比較評価した結果、差が
或る程度あっても実質的に完遂されたと認められるもの
がある一方で、差が小さくても、管理条件を基準に比較
評価した結果、業務遂行実績としては不充分と認められ
るものが出てくる。
The management condition 904 is the same as the content 508 of the management condition stored in the setting work DB 16. The management condition is used as an evaluation condition or standard when performing difference analysis by comparing the set work content with the performance report from the practitioner 2. For example, as described in step 1408, the essential difference analysis cannot be performed only by the difference between the job performance record and the set job, and as a result of the comparative evaluation with the management condition, there is a substantial difference. However, even if the difference is small, as a result of comparative evaluation based on the management conditions, some are found to be insufficient as the business performance record.

【0187】実績期間905は、実施者2から報告され
た業務遂行の実績の期間である。この期間を、実施者2
からの実績報告の期間に合わせることにより、実績ごと
の監視監査情報との比較がやり易くなり、業務遂行の実
体が掌握し易くなり、差異分析も簡便化される。
The actual result period 905 is the actual result period of the work performance reported by the practitioner 2. Implementer 2
According to the period of the performance report from, the comparison with the monitoring and auditing information for each performance is facilitated, the substance of business execution is easily grasped, and the difference analysis is also simplified.

【0188】依頼者1との契約で決まった期間に対応し
て成果報告書を作成するときは、この実績期間の中で、
契約によって決められた期間に該当する期間の情報を抽
出してまとめれば、成果報告の期間に沿った差異報告が
得られる。
[0188] When creating a result report in correspondence with the period determined by the contract with the client 1, within this actual period,
If the information for the period corresponding to the period determined by the contract is extracted and summarized, the difference report according to the period of the result report can be obtained.

【0189】遂行実績906は、上記実績期間中に実施
者2が遂行したとして入力のあった業務の実績である。
実質的には、上記の実績期間905の項目と遂行実績9
06の項目の内容は、実施者2からの実績報告の内容を
保管している図7の706と707の項目の内容と同じ
である。
The performance record 906 is the record of the work input by the practitioner 2 during the performance period.
Substantially, the items of the above performance period 905 and the performance record 9
The content of the item of 06 is the same as the content of the items of 706 and 707 of FIG. 7 in which the content of the performance report from the practitioner 2 is stored.

【0190】監視監査情報907は、上記実績期間90
5の項目と遂行実績906の項目の期間に合わせて得ら
れた監視監査の情報を記憶する項目である。
The monitoring audit information 907 is the above-mentioned actual period 90.
This is an item for storing the information of the monitoring audit obtained in accordance with the period of the item of 5 and the item of the performance record 906.

【0191】差異情報908は、図14のフローチャー
トに示すように、実施者2から報告のあった業務遂行実
績を監視監査情報と比較評価する一方、904の項の管
理条件を加味しながら設定業務内容と業務遂行実績とを
比較し、差異分析処理をした結果得られた情報である。
As shown in the flow chart of FIG. 14, the difference information 908 compares and evaluates the work performance record reported by the practitioner 2 with the monitoring and auditing information, while adding the management condition of item 904 to set the work. It is the information obtained as a result of comparing the content with the business performance record and performing the difference analysis processing.

【0192】給付事項909は、依頼者から受託した設
定業務の内容等と業務遂行の実績との間に差異があると
きに、依頼者1と契約した時の給付の条件に当てはめ
て、どのような給付がなされるかの情報を保管している
項目である。この909の項は、成果報告処理部23
が、依頼者1に対する成果報告書を作成するときに検収
後の対価の給付を簡便にするための項目である。
How to apply the benefit item 909 to the condition of benefit when the contract is made with the client 1 when there is a difference between the contents of the setting service entrusted by the client and the performance of the job execution? It is an item that stores information on whether various benefits are provided. This item 909 is the result report processing unit 23.
Is an item for simplifying the payment of the consideration after acceptance when preparing the result report for the client 1.

【0193】例えば、成果報告を受取った依頼者1が検
収をするときに、設定業務や管理条件と遂行成果と差異
報告をどのように取扱い、対価がどのように決定される
かは、各業務の内容や依頼者1の考えかたによっても異
なるものであり、このような給付の実体の情報もこの項
目に記憶し、保管される。
For example, when the client 1 who receives the result report receives an inspection, how to handle the setting work, the management condition, the performance result and the difference report and how the price is determined are determined by each work. It depends on the content of the request and the way of thinking of the client 1. The information on the substance of such benefit is also stored and stored in this item.

【0194】管理情報910は、この差異分析の処理が
行なわれる間に、図9の各項目について、生じてくる諸
事項の実行のフラグ情報を記憶するものである。従っ
て、図9のいずれかの項目に、何らかの処理を要する情
報が記憶され、その対応が未処理というときは、910
の管理情報の項の値は、「未整備や未処理」になり、処
理が終われば、「処理済」になる。
The management information 910 stores flag information for execution of various matters that occur with respect to each item in FIG. 9 while the difference analysis process is performed. Therefore, when information that requires some processing is stored in any item of FIG. 9 and the correspondence is unprocessed, 910
The value of the item of the management information of is "unprepared or unprocessed" and becomes "processed" when the processing is completed.

【0195】例えば、差異分析処理の間に、903の項
の設定業務の内容や904の項の管理条件の解釈に疑義
があるときは、依頼者1に照会したり依頼者1と協議を
して決定される。このとき、その回答が得られる迄は、
差異分析処理が中断され、差異分析に必要な情報の入力
があったか否かのフラグ情報を910に記憶させる。そ
の後、疑義を解消するような内容が依頼者1から得られ
れば、フラグは「処理済」になり、差異分析処理が継続
される。
For example, during the difference analysis process, if there is any doubt about the contents of the setting work of the item 903 or the interpretation of the management conditions of the item 904, refer to the client 1 or consult with the client 1. Will be decided. At this time, until the answer is obtained,
The difference analysis process is interrupted, and flag information indicating whether or not the information necessary for the difference analysis is input is stored in 910. After that, if the requester 1 obtains the content that resolves the doubt, the flag becomes "processed" and the difference analysis process is continued.

【0196】次に、図3に示す監視システム27による
監視監査情報の入力について、図15のフローチャート
を参照しつつ説明をする。
Next, the input of the monitoring audit information by the monitoring system 27 shown in FIG. 3 will be described with reference to the flowchart of FIG.

【0197】業務遂行管理機構3において、依頼者1か
ら委託を受けた業務を依頼者1から委託を受けた内容で
完遂させるためには、実施者2の管理や対価の給付を管
理するだけでは充分でない。依頼者1からの依頼に応じ
た業務の遂行がどの程度実行されているかは、実施者2
からの実績報告だけではその完遂の度合いもわからな
い。このために、実施者2による業務の遂行の実態を監
視し、実施者2の業務遂行の実績に対して必要な監視を
するシステムが必要になる。図3の監視システム27
は、このような監視監査情報を業務遂行管理機構に入力
するシステムである。
In order to complete the work entrusted by the client 1 with the contents entrusted by the client 1 in the business performance management mechanism 3, it is only necessary to manage the practitioner 2 and the payment of compensation. Not enough. The practitioner 2 determines how much work is performed according to the request from the client 1.
It is not possible to know the degree of completion only from the performance report from. Therefore, a system is required to monitor the actual condition of the work performed by the practitioner 2 and to monitor the actual performance of the work performed by the practitioner 2. Monitoring system 27 of FIG.
Is a system for inputting such monitoring and auditing information to the business performance management mechanism.

【0198】監視システム27からの監視情報は、好ま
しくは、ネットワーク10を通じて常時受信可能にし、
実績入手サーバ8、監査等管理部31によって監視監査
DB21に保管される。
The monitoring information from the monitoring system 27 is preferably always receivable through the network 10,
It is stored in the monitoring and inspection DB 21 by the result acquisition server 8 and the inspection management unit 31.

【0199】仮に、常時受信の態勢にないときでも、実
施者2が、設定業務を遂行中は、その設定業務の監視監
査情報が入力されるように監視システムを稼動させる。
Even if the system is not ready for constant reception, the practitioner 2 operates the monitoring system so that the monitoring audit information of the setting job is input during the setting job.

【0200】図15では、監視システム27の監視機関
や監査機関と業務遂行管理機構3との間の、情報の授受
や情報の処理及び収集した情報の判断処理をして監視情
報を監視監査DB21に保管するまでの情報の流れと処
理についてのフローチャートが示されている。
In FIG. 15, the monitoring information is sent to and received from the monitoring organization or auditing organization of the monitoring system 27 and the work performance management mechanism 3, and the information is processed and the collected information is determined to monitor the monitoring information. A flow chart of the flow of information and processing until storage is shown.

【0201】業務遂行管理機構3は実施者2から業務遂
行の実績報告が入力された時に監視システム27からの
情報が来ていないときは、改めて監視システム27にア
クセスして、監視実績情報を監視監査処理部に入力する
ようにしている。
When the performance report of the business execution is input from the practitioner 2 and the information from the monitoring system 27 is not received, the business performance management mechanism 3 accesses the monitoring system 27 again to monitor the monitoring performance information. It is input to the audit processing section.

【0202】これは、実施者2からの実績情報に対する
監視情報をできる限り同時期に確実に入手し、信頼性の
ある情報を基に、実績情報の差異分析を行なうことがで
きるようにすると共に、仮に、監視監査情報の入力がな
いときは、監視システム27の故障の発生も予測するな
ど、システムの欠陥を早期に発見し、監視情報の入力漏
れの発生をできる限り減らして、業務成果報告の信頼度
を向上させる。
This is to make it possible to reliably obtain the monitoring information for the performance information from the practitioner 2 at the same time as much as possible, and to perform the difference analysis of the performance information based on the reliable information. If there is no monitoring audit information input, it is possible to detect system defects early by, for example, predicting the occurrence of a failure in the monitoring system 27, and reduce the occurrence of monitoring information input errors as much as possible, and report business results. Improve the reliability of.

【0203】監視システム27と業務遂行管理機構3と
は、常にネットワーク10を介して接続されているとき
ばかりではない。通常は、監視システム27と業務遂行
管理機構3とは情報の授受が行なわれておらずに、情報
の授受が必要なときにのみ、監視システム27から業務
遂行管理機構3に情報が入力されることもある。
The monitoring system 27 and the work performance management mechanism 3 are not always connected via the network 10. Normally, information is not exchanged between the monitoring system 27 and the work performance management mechanism 3, and information is input from the monitoring system 27 to the work performance management mechanism 3 only when information needs to be transferred. Sometimes.

【0204】このため、業務遂行管理機構3は、業務遂
行の管理を受託したときの条件(設定業務の内容や管理
条件)、例えば、一定の時間ごと、または、実施者2か
ら業務遂行の実績情報が実績入手サーバ8に入力される
ごとに、監視システム27監視機関にアクセスして、業
務遂行の監視情報を収集できるようにしている(図15
のステップ1501)。このとき、監視システム27に
監査機関が備えられているときは、監査情報も収集でき
るようにする(図15のステップ1505)。また、業
務遂行管理機構3の実績入手サーバ8は、新たな業務に
関して、最初に監視監査情報を収集するときに、受託番
号と、その受託番号に係る業務の管理に必要な項目と各
項目の情報の保管メモリ領域を監視監査DB21の中に
確保する。
For this reason, the work performance management mechanism 3 determines the conditions under which the management of the work performance is entrusted (contents of set work and management conditions), for example, at regular intervals or from the practitioner 2 as a result of the work performance. Each time the information is input to the performance acquisition server 8, the monitoring system 27 is accessed to the monitoring organization so that the monitoring information of the work performance can be collected (FIG. 15).
Step 1501). At this time, if the monitoring system 27 is equipped with an auditing organization, the auditing information can also be collected (step 1505 in FIG. 15). Further, the result acquisition server 8 of the work performance management mechanism 3 collects the monitoring audit information for a new work for the first time, and the consignment number, the items necessary for managing the work related to the consignment number, and each item. A storage memory area for information is secured in the monitoring audit DB 21.

【0205】ステップ1502及びステップ1506で
は、監視実績情報や監査実績情報が実績入手サーバ8に
入力される。このとき、監視システム27の監視機関が
自動監視装置のように連続して情報が送られてきている
ときは、実績入手サーバ8で受信されている監視システ
ム27からの情報が実績情報の受信のステップ1502
となる。また、監視システム27に監査機関があるとき
は、ステップ1506において、ステップ1502と同
様にして、実績入手サーバ8に監査実績情報が入力され
る。
In step 1502 and step 1506, the monitoring record information and the audit record information are input to the record acquisition server 8. At this time, when the monitoring organization of the monitoring system 27 is continuously sending information like an automatic monitoring device, the information from the monitoring system 27 received by the performance acquisition server 8 is the reception of the performance information. Step 1502
Becomes If the monitoring system 27 has an auditing organization, the audit record information is input to the record acquisition server 8 in step 1506 as in step 1502.

【0206】ステップ1503では、監視監査情報の入
力を受けた実績入手サーバ8が、監査等管理部31を用
いて、これらの監視監査情報を監視監査DB21に記憶
し、保管させる。
In step 1503, the record acquisition server 8 which receives the input of the monitoring audit information uses the audit management unit 31 to store and store the monitoring audit information in the monitoring audit DB 21.

【0207】成果報告については、業務管理を依頼者1
から受託をするときに、報告すべき必要な成果項目が予
め決められている。監視監査DB21は、少なくとも、
それらの項目について、実施者2からの実績報告の内容
を監視したり監査するための情報が実績入手サーバ8に
保管されていないときは、業務遂行管理についての成果
報告ができなくなる。
Regarding the result report, the client 1
The required outcome items to be reported are pre-determined when the work is entrusted by the company. The monitoring audit DB 21 is at least
If information for monitoring or auditing the contents of the performance report from the practitioner 2 is not stored in the performance acquisition server 8 for those items, the performance report for the work performance management cannot be performed.

【0208】監視監査に必要な内容は、受託した個々の
遂行管理業務の設定の内容によって異なり、一様ではな
いが、共通して必要な項目には、後述するように、例え
ば、図10に示すようなものがある。
The contents required for the monitoring and auditing vary depending on the contents of the setting of the individual performance management work entrusted, and are not uniform, but the commonly necessary items are, for example, as shown in FIG. There is something like the one shown.

【0209】ステップ1507は、監視監査実績として
入力され監視監査DB21に記憶された情報の内容を判
断して、業務遂行の成果報告を作成するときに必要な情
報が入力されているかどうか、また、業務管理受託をし
たときの設定条件を基に、実績情報との差異分析をする
ために必要な情報が監視監査DB21の関連項目として
充足されているかどうかを処理判断するステップであ
る。
[0209] In step 1507, the contents of the information input as the monitoring audit record and stored in the monitoring audit DB 21 are judged to determine whether or not the information necessary for creating the work performance result report has been input. This is a step of processing and judging whether or not the information necessary for analyzing the difference from the performance information is satisfied as a related item of the monitoring and auditing DB 21 based on the setting condition when the business management contract is accepted.

【0210】なお、必要な情報が入力されていないとき
は、ステップ1501やステップ1505に戻り監視シス
テム27や監視監査DB21の中に連続した情報として
記録されている情報に対して再度アクセスをして、必要
な情報の収集をしたり、監査機関に照会をして情報の収
集をする。
If the necessary information has not been input, the process returns to step 1501 or step 1505 to re-access the information recorded as continuous information in the monitoring system 27 or monitoring audit DB 21. , Collect necessary information or refer to an auditing authority to collect information.

【0211】ステップ1507において、業務管理受託
に必要な項目の内容が充足されているときは、次のステ
ップ1508に進む。
[0211] In step 1507, when the contents of the items required for the business management contract are satisfied, the process proceeds to the next step 1508.

【0212】ステップ1508は、監視情報と監査情報
との内容を比較、処理をするステップである。監視シス
テム27は、図3でも説明したように、図の中ではあた
かも一つのシステムのように描いているが、監視システ
ム27は監視機関と監査機関という二つの独立した組織
や機器からできている。
In step 1508, the contents of the monitoring information and the audit information are compared and processed. As described in FIG. 3, the monitoring system 27 is drawn as if it were one system in the figure, but the monitoring system 27 is made up of two independent organizations and devices, that is, a monitoring body and an auditing body. .

【0213】このため、実施者2からの業務遂行の実績
情報に対する監視情報と監査情報とが常に一致している
とは限らない。このようなときに、どちらの情報に信憑
性が高いか、どちらの情報を成果報告に使用するかとい
うような判断は、実績入手サーバ8では行なわない。こ
の判断は監視監査処理部32によって行なわれる。
Therefore, the monitoring information and the audit information for the performance information of the work execution from the practitioner 2 do not always match. In such a case, the achievement acquisition server 8 does not judge which information has high credibility and which information is used for the result report. This determination is made by the monitoring / inspection processing unit 32.

【0214】ステップ1509は、実績情報と監視機関
からの情報又は監査機関からの情報との差異との比較処
理判断において、実績情報と重大な差があるかどうか判
断するステップである。
[0214] Step 1509 is a step of judging whether or not there is a significant difference from the performance information in the comparison processing judgment of the performance information and the difference from the monitoring organization or the information from the auditing organization.

【0215】ステップ1509において、実績情報と監
視機関又は監査機関との情報の差がないとき、または、
差があっても軽微なときは、ステップ1511に進む。
[0215] In step 1509, when there is no difference between the record information and the information of the monitoring organization or the inspection organization, or
If there is a slight difference, the process proceeds to step 1511.

【0216】1511は、監視監査DB21に監視情報
及び監査情報を保管するステップである。図15の実施
の形態においては、ステップ1509において重大な相
違がないときは、監視情報だけが最終的に監視監査DB
21に記憶されるように記されている。しかし、実態と
しては、監視監査DB21には、総ての情報が記憶され
ていて、後刻に監視監査処理部による情報処理などのと
きに必要があれば随時アクセスして差異分析や成果報告
の処理、判断の情報として使用される。
Reference numeral 1511 is a step of storing the monitoring information and the audit information in the monitoring audit DB 21. In the embodiment of FIG. 15, when there is no significant difference in step 1509, only the monitoring information finally becomes the monitoring audit DB.
21 to be stored. However, as a matter of fact, all the information is stored in the monitoring and auditing DB 21, and if necessary at the time of information processing by the monitoring and auditing processing unit later, it is accessed at any time to perform difference analysis and result report processing. , Used as judgment information.

【0217】実績情報と監視機関又は監査機関との情報
の差が小さい時には、業務の効率を上げるために、これ
らの情報を通常の監視監査実績報告とみなして、例え
ば、監視情報だけが差異分析や差異分析報告に使用され
ることもある。また、実績情報と監視機関又は監査機関
との間に重大な相違がないときに、監視情報を中核に備
えた情報処理をすると、報告書類における情報の錯綜や
情報量の増大を防ぎ簡潔な成果報告をする上でも効果が
ある。
When the difference between the performance information and the information of the monitoring organization or the auditing organization is small, in order to improve the efficiency of the work, these pieces of information are regarded as a normal monitoring audit performance report, and for example, only the monitoring information is subjected to the difference analysis. It may also be used for differential analysis reporting. In addition, when there is no significant difference between the performance information and the monitoring organization or auditing organization, information processing with monitoring information at the core prevents complicated information in the report documents and increases in the amount of information, resulting in simple results. It is also effective in reporting.

【0218】これにより、業務遂行管理機構3による差
異分析や成果報告書作成のデータの準備が整い、監視シ
ステム27による監視監査情報の入力の行程は終了す
る。
As a result, the data for the difference analysis and the creation of the result report by the work performance management mechanism 3 are ready, and the process of inputting the monitoring audit information by the monitoring system 27 is completed.

【0219】図10は、本実施の形態の業務遂行管理シ
ステムで使用する監視監査DB21(図2及び図3参
照)の内容を示す。
FIG. 10 shows the contents of the monitoring and auditing DB 21 (see FIGS. 2 and 3) used in the work performance management system of this embodiment.

【0220】監査等管理部31は、監視システム27か
ら実績入手サーバ8を経て業務遂行管理機構3に入力さ
れた監視監査実績の情報を、この監視監査DB21に記
憶し、管理する。
The audit management unit 31 stores in the monitoring audit DB 21 the information on the monitoring audit results input from the monitoring system 27 via the result acquisition server 8 to the work performance management mechanism 3, and manages the information.

【0221】図10に示す1001の項は、監視または
監査実績の情報の入力があった日時の項である。
[0221] The item 1001 shown in Fig. 10 is the item of the date and time when the information of the monitoring or auditing result was input.

【0222】依頼者1002、実施者1003、管理番
号1004、設定業務内容1005、管理条件1006
の項には、図4で説明をした依頼者402、実施者40
3、管理番号405、設定業務内容406、管理条件4
08の項の説明と同様な内容が記録される。
Requester 1002, Performer 1003, Management number 1004, Setting work content 1005, Management condition 1006
In the section of, the requester 402 and the practitioner 40 explained in FIG.
3, management number 405, setting work content 406, management condition 4
Contents similar to those described in the section 08 are recorded.

【0223】実績期間1007の項は、監視監査情報が
入力された期間の項である。監視監査DB21の内容
は、実施者2からの業務遂行実績に関連する監視監査情
報であるので、この項は、業務遂行がなされた実績期間
(図7の706の項)と一致させてあれば、実施者2か
らの実績報告の内容を評価しやすくなって好ましい。原
則的には、図5の設定業務内容506や管理条件508
で決められている期間を基に記憶される。
The item of the actual period 1007 is the item of the period in which the monitoring audit information is input. Since the contents of the monitoring audit DB 21 are the monitoring audit information related to the work performance record from the practitioner 2, if this item is matched with the performance period (706 item in FIG. 7) in which the work performance is performed. It is preferable because the contents of the performance report from the practitioner 2 can be easily evaluated. In principle, the setting work content 506 and the management condition 508 of FIG.
It is stored based on the period determined in.

【0224】遂行実績1008の項は、オンタイムに実
施者の業務遂行を監視監査する便宜のために実施者2が
業務を遂行した実績として入力した内容を保管する項で
ある。
The item of performance record 1008 is a item for storing the contents input as the record of performance of the work by the practitioner 2 for the convenience of monitoring and auditing the work performance of the practitioner on time.

【0225】監視監査情報1009の項は、監視システ
ム27の監視機関や監査機関によって得られた監視監査
情報が記憶される項である。しかし、先にも述べたよう
に、監査情報を得ることはそれだけ余分の管理経費を要
することであり、監査情報については、特別な場合にし
か要請されないので、常に入力されるわけではない。こ
のために、特に監査情報が必要な場合以外は監査情報の
入力は監視監査DB21の充足項目とされていない。監
査情報が必要な場合には、監査機関が設けられ、監査機
関が備えられた管理条件のときに、監視監査情報100
9の項に監査情報の入力がなければ、後述する管理情報
1011の項のフラグが「未処理」となり、監査情報が
入力されるようにしている。
The item of the monitoring audit information 1009 is a item in which the monitoring audit information of the monitoring system 27 or the monitoring audit information obtained by the auditing organization is stored. However, as described above, obtaining audit information requires extra management expense, and audit information is not always input because it is only required in special cases. For this reason, the input of the audit information is not a satisfying item of the monitoring audit DB 21 unless the audit information is particularly required. When audit information is required, an auditing organization is provided, and the monitoring audit information 100 is provided when the auditing organization has the management condition.
If the audit information is not input in the item of item 9, the flag of the item of management information 1011 described later is “unprocessed”, and the audit information is input.

【0226】差異情報1010には、図15のステップ
1508及び1509で説明した監視情報と監査情報と
の差異ないしは実施者2からの実績情報と監視情報又は
監査情報との重大な差異についての情報が記憶される項
である。この差異情報は、監視システム27における、
監視機関や監査機関の構築や評価に役立つばかりでな
く、後述する差異分析において設定業務や実施者2から
の遂行実績を評価する上でも重要な情報であり、これら
の情報の評価を迅速に行なうために効果のある項目であ
る。
The difference information 1010 includes information about the difference between the monitoring information and the audit information described in steps 1508 and 1509 of FIG. 15 or the significant difference between the performance information from the practitioner 2 and the monitoring information or the audit information. This is a stored item. This difference information is
Not only is it useful for constructing and evaluating monitoring organizations and auditing organizations, but it is also important information for evaluating the setting work and the performance record from the practitioner 2 in the difference analysis described later, and this information is evaluated quickly. This is an effective item.

【0227】管理情報1011は、この業務実績の入力
があった図10の各項目について、監視監査の情報の管
理を行なう間に生じてくる諸事項の実行のフラグ情報を
記憶する。図10のいずれかの項目に、何らかの処理を
要する情報が記憶され、その対応が未処理というとき
は、1011の管理情報の項目は、「未整備や未処理」
になり、処理が終われば、「処理済」になる。
The management information 1011 stores, for each item in FIG. 10 in which this work record has been input, flag information for execution of various items that occur during the management of monitoring audit information. Information that requires some processing is stored in any of the items in FIG. 10, and when the correspondence is unprocessed, the item of management information 1011 is “unmaintained or unprocessed”.
When the processing is completed, it becomes “processed”.

【0228】例えば、図15のステップ1507におい
て、監視監査DB21に入力すべき項目の内容が充足さ
れていないという場合には、ステップ1501に戻り、
再度の監視監査をした後にその結果を監視監査情報とし
て入力するように照会をしたときは、フラグ情報を10
11に記憶させる。その後、監視監査DB21の項目が
充足されるように情報の再入力があり、必要な内容を有
する監視監査情報と判断されたときは、新たな監視監査
情報としてDBに記憶され、管理情報1011のフラグ
は処理済みになる。管理情報1011の項は次の新しい
事項を管理できる状態になる。
For example, in step 1507 of FIG. 15, when the contents of the items to be input to the monitoring and auditing DB 21 are not satisfied, the process returns to step 1501.
When a query is made to input the result as monitoring audit information after another monitoring audit, the flag information is set to 10
11 is stored. After that, when information is re-input so that the items of the monitoring audit DB 21 are satisfied and it is determined that the monitoring audit information has necessary contents, it is stored in the DB as new monitoring audit information, and the management information 1011 The flag is processed. The item of management information 1011 is in a state where the following new items can be managed.

【0229】この監視監査DB21は、この後、管理番
号の項の受託番号をガイドに、検収受付処理装置9のア
クセスを受け、図14〜図16で詳細に説明するよう
に、差異分析処理や成果情報処理のときの監視監査情報
の提供に使用される。
Thereafter, the monitoring / inspection DB 21 is accessed by the inspection acceptance processing device 9 with the accession number in the item of the management number as a guide, and as described in detail with reference to FIGS. It is used to provide monitoring audit information at the time of result information processing.

【0230】このような監視監査システムは、依頼者1
から受託をした業務遂行管理について効率を上げ、精度
の高い実績をもたらすことに効果が大きい。
[0230] Such a monitoring and auditing system is provided by the client 1
It has a great effect on improving the efficiency of the work execution management entrusted by the company and providing highly accurate results.

【0231】次に、業務遂行管理システムにおける図3
の業務遂行管理機構3と依頼者1及び実施者2との間
の、実績情報の授受や処理及び成果情報へのまとめ並び
に依頼者1による成果報告の検収と業務遂行管理機構3
から業務遂行の実施者2に対する給付までの情報の流れ
と処理について、成果の検収と実施者への給付のフロー
チャート(図16)を参照しつつ説明する。
Next, FIG. 3 in the work performance management system
Of performance information between the client 3 and the client 1 and the practitioner 2 and processing of the result information, and collection of the result information, and acceptance of the result report by the client 1 and the client 3
The flow and processing of information from to the execution of benefits to the practitioner 2 will be described with reference to the flow chart of acceptance of results and payment to the practitioner (FIG. 16).

【0232】まず、業務遂行管理機構3は、この業務遂
行管理の受託契約で決められた条件、例えば、一定の期
限ごとに又は、区分された業務を遂行するごとに、その
期間中の業務遂行の成果を報告書の形(ネットワーク1
0が使用できる場合は、紙情報ではなく、通信データ情
報であるが、図16の説明では、業務遂行管理機構3か
ら依頼者1に提出される成果報告を成果報告書という)
で依頼者1に提出するために、共通DB6の業務実績成
果DB17にアクセスして設定業務の内容及び成果情報
を入手し成果報告書を作成する。(図16のステップ1
601)。ステップ1602は、業務遂行の成果報告書
を依頼者1に届け、依頼者1の検収を要請するステップ
である。
[0232] First, the business performance management mechanism 3 performs the business performance during the period defined by the contract contract for the business performance management, for example, every fixed period of time or every time when the divided business is performed. The results of the report form (Network 1
When 0 can be used, it is not the paper information but the communication data information, but in the explanation of FIG. 16, the result report submitted from the work performance management mechanism 3 to the client 1 is called the result report.)
In order to submit the result to the client 1, the work result result DB 17 of the common DB 6 is accessed to obtain the contents of the setting work and the result information and create the result report. (Step 1 of FIG. 16
601). Step 1602 is a step of delivering a result report of work execution to the client 1 and requesting the client 1 to inspect.

【0233】ステップ1603では、依頼者1から成果
の検収印(サインその他公的に認められた証拠となる検
収の形態なら捺印でなくても良いが、ここでは、捺印で
統一して説明する)を受ける。また、同時に依頼者1か
ら業務遂行の成果あるいは、業務遂行の条件等について
の要望があればこれを受取るステップである。
At step 1603, the acceptance stamp of the result from the client 1 (not necessarily the signature if it is a signature or any other form of inspection that is a publicly recognized evidence, but here, it will be explained by unifying with the stamp). Receive. Further, at the same time, if there is a request from the client 1 about the result of the work execution, the condition of the work execution, or the like, this is a step of receiving the request.

【0234】ステップ1604は、依頼者1からの要望
事項があったかなかったかを判断処理するステップであ
る。仮に要望事項がなければ、ステップ1605に進
み、検収要望DB19に検収印の付された検収書類等を
保管する。これにより、報告書で成果報告をした業務の
遂行や、その期間の管理業務に関しては、依頼者1の要
望のとおりに業務が完遂されたとして関連する対価の給
付等の関連の処理が行なわれる。
[0234] Step 1604 is a step for judging whether or not there is a request from the requester 1. If there are no desired items, the process proceeds to step 1605, and the inspection request DB 19 stores the inspection documents with the inspection stamp. As a result, regarding the performance of the work whose result is reported in the report and the management work for that period, the related work such as the payment of the related consideration as the work is completed as requested by the client 1 is performed. .

【0235】ステップ1606業務遂行の対価を実施者
2へ給付するステップである。ここには、特別には、記
載されていないが、このとき同時に、業務遂行管理機構
3も、業務の受託契約時に定めた業務遂行管理のための
管理費用を受託契約に従って銀行などから受領する。
Step 1606 This is a step of providing the practitioner 2 with compensation for performing the work. Although not specifically described here, at the same time, the business performance management mechanism 3 also receives a management cost for business performance management determined at the time of the business contract from a bank or the like in accordance with the contract.

【0236】要望事項の判断をする1604のステップ
で依頼者1からの要望事項があると判断されたときは、
ステップ1607に進む。すなわち、依頼者1が検収を
する時には、依頼者1側に実績成果報告書や差異報告書
の形で報告をして成果の検収を受けるばかりでなく、依
頼者1からは、その検収のたびごとに、業務遂行に関す
る要望を業務遂行管理機構3に伝えられ、受託した設定
業務が確実に遂行されるような方策が講じられる。
When it is determined that there is a request from the client 1 in the step 1604 of determining the request,
Proceed to step 1607. That is, when the client 1 carries out the inspection, not only does the client 1 report in the form of a performance result report or a difference report to receive the results, but Each time, a request regarding business performance is transmitted to the business performance management mechanism 3, and measures are taken to ensure that the commissioned setting business is carried out.

【0237】依頼者から新たな要望が提示されたとき
は、その要望について、受託当初の契約内容の見直し、
実施者2の同意、更には、その要望に応じた給付の見直
しも生じる。しかし、受託した業務遂行の完遂管理のた
めには、依頼者1の要望事項は極力取り入れ、遂行業務
の内容や対価等の給付との関係を実施者2と調整をした
上で、新たな設定業務として決定される。
[0237] When a new request is presented by the client, the contract content at the time of consignment regarding the request is reviewed,
The consent of the practitioner 2 and the review of benefits according to the request will also occur. However, in order to manage the completion of the contracted work execution, the request of the client 1 is taken in as much as possible, and the relationship between the contents of the work performed and the benefits such as compensation is adjusted with the practitioner 2, and a new setting is made. Determined as business.

【0238】このようにして、成果の検収ごとにあるい
は、当事者間で予め合意された時期ごとに検討され、当
事者間で合意された課題や要望事項は、その受託番号の
業務の設定業務の内容や設定業務遂行の管理条件に取り
込まれ、その受託業務に固有の新しい設定業務の内容や
設定業務遂行の管理条件となり、引き続き実施者が行な
う業務遂行の管理のための固有の管理シートやチェック
シートとして完成されていく。
In this way, the issues and requests that have been examined for each inspection of the results or each time agreed by the parties in advance and agreed between the parties are the contents of the task setting business for the consignment number. And the management conditions for setting work execution, which become the contents of new setting work specific to the contracted work and the management conditions for setting work execution, and the unique management sheet and check sheet for managing the work execution performed by the implementer. Will be completed as.

【0239】このような管理シートは、情報量としては
多くないが、依頼者が望む個々の業務の遂行の内容に最
も近く、このような設定業務の内容や管理条件を基に業
務遂行管理をすれば、個々の業務ごとに業務遂行管理に
適した形の設定業務の内容や管理条件を電子情報で作り
上げることができ、このように個別化された情報に基づ
いて業務遂行管理をすることにより、ネットワークや電
子情報に基づく業務遂行管理が可能になる。
Although such a management sheet does not have a large amount of information, it is the closest to the contents of the execution of the individual work desired by the client, and the work execution management is performed based on the contents of such setting work and management conditions. By doing so, it is possible to create the contents and management conditions of setting work in a form suitable for work execution management for each work by electronic information, and by performing work execution management based on such individualized information , Business performance management based on network and electronic information becomes possible.

【0240】また、このようにして作り上げられた業務
遂行管理システムにおいては、情報の行き違いは少なく
なり、無駄を排し、ネットワークを介して業務の遂行を
より簡便に、効率よく、経済的に完遂させることができ
る。
Further, in the business performance management system thus constructed, the difference in information is reduced, waste is eliminated, and the business is accomplished more easily, efficiently and economically through the network. Can be made.

【0241】業務遂行管理機構3は、依頼者1による、
検収が終わった後、設定業務の遂行に対する給付、例え
ば、対価の支払いや財産の分与或いはこれに代わる適当
な財貨の給付を実施者2に行なう。このとき、上述した
依頼者1からの要望事項が実施者2に提示され、依頼者
1、実施者2、業務遂行管理機構3との間で再確認され
た後、次回の実績報告は、新しい要望事項を含めた設定
業務に従って業務の遂行が行なわれることとなる。
The work performance management mechanism 3 is operated by the client 1.
After the inspection is completed, the practitioner 2 is provided with a payment for performing the setting work, for example, payment of consideration, distribution of property, or payment of an appropriate commodity instead. At this time, after the above-mentioned request from the requester 1 is presented to the practitioner 2 and reconfirmed between the requester 1, the practitioner 2 and the work performance management mechanism 3, the next performance report is new. The work will be performed according to the setting work including the requirements.

【0242】検収とこれに付帯する要望事項は、共通D
Bの検収要望DB19に、給付の内容や給付成果は、財
貨管理DB20に保管される。また、上述の実績成果報
告や差異報告、検収依頼書の発行やそのための期限管
理、更には、依頼者1の検収結果や要望事項の受取りや
実施者2への提示並びに業務遂行に対する給付の管理等
は、他のDBと整合を取りながら、関連するDBに保管
される。
The inspection and the requirements attached to it are common D
The content of the benefit and the benefit result are stored in the inspection request DB 19 of B, and in the goods management DB 20. In addition, the above-mentioned performance result report, difference report, issuance of inspection request form and deadline management therefor, and further, acceptance of the inspection result and request items of the client 1 and presentation to the practitioner 2 and management of benefits for performance of work. Etc. are stored in the related DB while matching with other DBs.

【0243】ステップ1607は要望事項の内容が、業
務遂行管理を受託した時の契約、その後に修正された契
約に規定の業務管理の範囲内か、この受託契約の範囲を
超えた要望事項かの判断処理をするステップである。
At step 1607, it is determined whether the content of the request is within the scope of business management prescribed in the contract when the business performance management is entrusted, and the contract modified after that, or the request beyond the scope of this contract. This is a step of performing a judgment process.

【0244】本発明の業務遂行管理システムでは、業務
遂行管理機構3が依頼者1の要望を可能な範囲で合理的
に実現するような業務遂行管理をするためにこのような
ステップ1607が設けられている。
In the work performance management system of the present invention, such a step 1607 is provided in order for the work performance management mechanism 3 to manage the work performance so as to reasonably realize the request of the client 1 as much as possible. ing.

【0245】仮に、依頼者1からの要望が、これまでの
契約の内容、例えば、設定業務として合意した業務の範
囲を超えたり、契約の対象外の事項も包含しているとき
は、ステップ1608に進み次の処理をする。
If the request from the client 1 exceeds the contents of the contract so far, for example, the range of the business agreed as the setting business, or the matters not covered by the contract are included, step 1608. And proceed to the next processing.

【0246】ステップ1608では、これまでの契約の
内容の範囲を超え、契約の対象外の事項も包含している
要望事項があったときに、その実現のために新たな設定
業務の内容、業務遂行の管理条件、同じく管理経費、遂
行成果に対する実施者2への対価の給付条件等(設定業
務DB16の諸項目)に関して見直し、協議をし、依頼
者1、実施者2、業務遂行管理機構3との間での合意を
得て、修正契約等によって、対価と業務遂行管理の内容
の再設定をする。
At step 1608, when there is a request item that exceeds the scope of the contract contents up to now and includes items not covered by the contract, the contents of the new setting work and the work are newly set for realizing the request. Performance management conditions, management costs, payment conditions for performance results to the practitioner 2 (various items in the setting work DB 16) are reviewed and discussed, and the client 1, the practitioner 2, and the work performance management mechanism 3 are reviewed. After obtaining an agreement with the company, the contents of the consideration and work performance management will be reset by the amendment contract.

【0247】ステップ1609では、このようにして新
たに決定された設定業務の内容や管理条件、給付事項等
を設定業務DB16の該当項目(図5参照)に記憶し、
保管する。依頼者1から検収を受けたこれまでの成果に
対する対価は、ステップ1606において実施者2に給
付される。ただし、図16では、依頼者1からの要望事
項に沿って認められた新しい要望事項や管理条件を、念
のために、実施者2に確認するステップ1611を設
け、実施者2が、新しい設定業務の内容を確認した後に
対価の給付をする内容が示されている。
At step 1609, the contents, management conditions, benefits, etc. of the setting work newly determined in this way are stored in the corresponding items (see FIG. 5) of the setting work DB 16,
store. The consideration for the results so far received from the client 1 is paid to the practitioner 2 in step 1606. However, in FIG. 16, a step 1611 for confirming to the practitioner 2 new request items and management conditions recognized along with the request items from the client 1 is provided just in case, and the practitioner 2 sets new settings. After confirming the content of the work, the content of payment of compensation is shown.

【0248】ステップ1610は、ステップ1608
で、依頼者1からの要望が、これまでの契約の内容の範
囲内にある事項に留まっていると判断されたときに、新
しい要望事項を検収要望DB19の該当項目に記憶し、
保管するステップである。
The step 1610 is the step 1608.
Then, when it is determined that the request from the client 1 is limited to the items within the scope of the contract so far, new request items are stored in the corresponding items of the inspection request DB 19,
This is the step of storing.

【0249】ステップ1611は、実施者2から出され
た新しい要望事項を実施者2に提示して、今後の業務の
内容として遂行時に採用を要請するステップである。
Step 1611 is a step of presenting new demands issued by the practitioner 2 to the practitioner 2 and requesting adoption at the time of execution as the contents of future work.

【0250】これらの処理が終了した後に、業務遂行の
対価が実施者2へ給付され、同時に、業務遂行管理機構
3も、管理費用を受領する(ステップ1606)。ステ
ップ1612は、成果報告が依頼者1によって検収さ
れ、実施者2には、契約に従って対価の給付が行なわれ
たことの内容、例えば、給付の時期、給付した財貨の種
類や量等を財貨等管理DB20に記憶させ保管するステ
ップである。
After these processings are completed, the practitioner 2 is paid a compensation for the work performance, and at the same time, the work performance management mechanism 3 also receives the management cost (step 1606). In step 1612, the result report is inspected by the client 1, and the practitioner 2 is informed of the contents of the payment of the consideration in accordance with the contract, such as the timing of the payment, the type and amount of the paid goods, etc. This is a step of storing and storing in the management DB 20.

【0251】業務遂行の管理の成果の報告と依頼者によ
る検収及び実施者への給付は、このようなステップを経
て終了する。
[0251] The reporting of the achievement of the management of the work performance, the acceptance by the client, and the payment to the practitioner are completed through such steps.

【0252】図11は、依頼者1に提出する業務遂行の
成果報告書の内容を示す図である。
FIG. 11 is a diagram showing the contents of a work performance result report submitted to the client 1.

【0253】図11において、日付1101の項は、成
果報告書を作成した日付である。成果報告書は、契約で
定めた時に、実施者2に提出できるように、中央制御装
置4が成果報告処理部23をバッチ処理で稼動させて、
業務実績成果DB17、差異分析結果DB18、監視監
査DB21などから成果報告関連の情報を呼び出して処
理し、予め成果報告書としてまとめている。仮に、報告
書を作成した後に、これらのDBに新たな情報の入力が
あって、この情報によって成果報告書も修正されるよう
な時には、この日付の項も修正報告書の作成日に変わ
る。
In FIG. 11, the item of date 1101 is the date when the result report was created. The central control unit 4 operates the result report processing unit 23 in batch processing so that the result report can be submitted to the practitioner 2 when determined by the contract.
Information related to the result report is called from the work performance result DB 17, the difference analysis result DB 18, the monitoring audit DB 21, and the like, and is compiled in advance as a result report. If, after the report is created, new information is input to these DBs, and the result report is also modified by this information, the date section also changes to the modified report creation date.

【0254】管理番号1102の項は、業務遂行管理機
構3が依頼者1から業務遂行管理を受託したときの受託
番号である。
[0254] The item of management number 1102 is a consignment number when the business performance management mechanism 3 receives the business performance management from the client 1.

【0255】設定業務内容1103の項は、図5に示し
た設定業務DB16に記憶されている設定業務内容50
6と同様な内容である。この項目は、依頼者1が、業務
遂行の成果との比較を容易にし、検収を簡便にするため
に、設定業務の内容を簡略化して記載した項である。
The item of setting work contents 1103 is the setting work contents 50 stored in the setting work DB 16 shown in FIG.
The contents are the same as in item 6. This item is a section in which the client 1 simplifies and describes the contents of the setting work in order to facilitate the comparison with the result of the work execution and to facilitate the inspection.

【0256】実施者1104の項には、依頼者からの依
頼に従って特定の業務の遂行をした人や事業体が記され
る。この項の実施者2の記載は、できる限り、依頼者1
が実施者2の顔を認識できるように記載すれば、成果報
告書を受取った依頼者1が業務遂行の内容を理解し易い
ので好ましい。
[0256] In the section of the practitioner 1104, the person or business entity that has performed the specific work according to the request from the client is described. As much as possible, the description of practitioner 2 in this section is for client 1
Is preferable so that the face of the practitioner 2 can be recognized so that the client 1 who receives the result report can easily understand the contents of the work execution.

【0257】遂行期間1105の項は、成果報告書によ
って、成果としている業務の遂行期間である。成果報告
書の内容は、依頼者1の検収及び実施者2に対する対価
の給付に関係をする期間であるので、図5に示す設定業
務DBの内容で示す設定業務内容506や管理条件50
8の項で決められた期間を基に記載される。
The item of the performance period 1105 is the performance period of the work which is the result according to the result report. Since the content of the result report is a period related to the acceptance of the client 1 and the payment of the consideration to the practitioner 2, the setting work contents 506 and the management conditions 50 shown in the contents of the setting work DB shown in FIG.
It is described based on the period determined in section 8.

【0258】遂行成果1106の項は、依頼者1が実施
者2に行なった業務遂行の依頼に基づいて、実施者2が
遂行した業務の成果の内容を記す項目である。この遂行
成果の内容は、上述のように、業務実績成果DB17、
差異分析結果DB18、監視監査DB21などから情報
を抽出し、設定業務内容や管理条件を勘案しながら、バ
ッチ処理でまとめられた内容である。
The item of the performance result 1106 is an item for describing the contents of the result of the work performed by the practitioner 2 based on the request for the work performance performed by the client 1 to the practitioner 2. As described above, the contents of this execution result are the business performance result DB 17,
The information is extracted from the difference analysis result DB 18, the monitoring audit DB 21, and the like, and the contents are summarized by batch processing in consideration of the setting work contents and management conditions.

【0259】業務遂行管理条件1107の項は、図9の
差異分析結果DBの管理条件でも説明をしたように、業
務遂行の実績を評価する基準を保管するところである。
業務遂行管理の成果は、業務遂行実績と設定業務との差
の単なる比較でなく、その差が業務遂行の中で占める重
要性を加味して判断されるのであり、管理条件は、この
重要性の判断の基準になるものである。
As described in the management condition of the difference analysis result DB of FIG. 9, the item of the work performance management condition 1107 stores the criteria for evaluating the performance of the work performance.
The result of work performance management is judged not only by comparing the difference between the work performance record and the set work but also by considering the importance of the difference in the work performance. Will be the basis for the judgment.

【0260】差異報告1108の項は、図14に示した
業務遂行実績報告処理のフローチャートで説明をした差
異分析処理の結果として、差異分析結果DB18に記憶
されている情報の中から、成果報告書を読むときの参考
に必要と判断される事項を記載する項目である。
The item of the difference report 1108 is the result report from the information stored in the difference analysis result DB 18 as the result of the difference analysis process described in the flowchart of the work performance record reporting process shown in FIG. It is an item that describes matters that are considered necessary for reference when reading.

【0261】検収日1109の項は、業務遂行管理機構
3が提出したこの期間の成果報告書の内容が依頼者1に
とって、得心のいく業務の遂行がなされているとして検
収をした日を記憶させる項目である。この検収日の項目
には、依頼者1が検収をした日が記される。この検収日
は、実施者2及び業務遂行管理機構3にとっては、この
成果報告書の遂行期間の業務に関して、一応の完了をし
たことの証拠になるものである。この検収によって、実
施者2は業務遂行の対価として、予め契約で決められた
財貨の給付を受け、業務遂行管理機構3は、この期間の
管理の対価を受領することができる基準日として記載さ
れる。
In the item of acceptance date 1109, the date of acceptance of the contents of the result report submitted by the work performance management mechanism 3 for the requester 1 is recorded as if the client 1 performed the work well. It is an item to be made. In the item of the acceptance date, the date when the client 1 accepts the acceptance is recorded. The date of acceptance is, for the practitioner 2 and the work performance management mechanism 3, a proof that the work in the performance period of the result report has been completed. As a result of this inspection, the practitioner 2 receives the payment of the goods determined in advance as the consideration for the work execution, and the work execution management mechanism 3 is described as the reference date on which the consideration for the management during this period can be received. It

【0262】要望事項1110の項は、前回の検収時に
依頼者1から提示された要望事項が記載される。成果報
告書を依頼者1が見るときの参考になる項目である。図
16の成果の検収と実施者2への給付のフローチャート
でも説明したように、要望事項は業務遂行受託時の業務
範囲内であれ、業務範囲外であれ、設定業務の内容とし
て図5のような形で設定業務DB16に記憶されてい
る。しかし、最も新しい要望事項は、業務遂行管理の委
託をしている依頼者の最大の関心事であるので、成果報
告書では、特別に項を設けて記載するようにしている。
In the item of request 1110, the request presented by the client 1 at the time of the previous inspection is described. It is an item to be referred to when the client 1 views the result report. As described in the flowchart of the inspection of the results and the payment to the practitioner 2 of FIG. 16, whether the request is within the business scope at the time of commissioning the business performance or outside the business scope, the content of the setting business is as shown in FIG. It is stored in the setting work DB 16 in various forms. However, since the newest request is the greatest concern of the client who outsources the business performance management, a special section is set in the result report.

【0263】図12は、本実施の形態で示す業務遂行管
理システムで使用する検収要望DB19(図2及び図3
参照)の内容を示す。
FIG. 12 shows the acceptance request DB 19 (see FIGS. 2 and 3) used in the work performance management system shown in this embodiment.
Refer to).

【0264】中央制御装置4及び成果報告処理部23
は、実施者2から入力された業務遂行実績を基に、差異
分析結果DB18、監視監査DB21の情報を参照しな
がら業務成果をまとめ、成果内容として、業務実績成果
DB17で記憶し、管理している(図14のフローチャ
ート参照)。
Central control unit 4 and result report processing unit 23
On the basis of the work performance record input by the practitioner 2, referring to the information of the difference analysis result DB 18 and the monitoring audit DB 21, collects the work results, stores the result contents in the work result result DB 17, and manages them. (See the flowchart in FIG. 14).

【0265】この内容は、上述のように、成果報告書と
して依頼者1に提示され、依頼者1の検収を受ける。検
収されれば、その成果報告をした期間については、受託
した業務の遂行の管理が完了する。
As described above, the contents are presented to the client 1 as a result report, and the client 1 receives the inspection. If it is accepted, the management of the performance of the contracted work will be completed for the period of reporting the result.

【0266】この場合に、検収に付帯して、依頼者1か
ら課題や要望が出されたとき、その要望事項を管理する
DBが図12の検収要望DBの内容である。
In this case, when the requester 1 issues a task or request in association with the inspection, the DB for managing the requested items is the content of the inspection request DB in FIG.

【0267】検収要望DBの1201の項は、成果報告
書を依頼者1に提示した日である。1202から121
0の項には、成果報告書の内容を示す図11の1102
から1110の項の情報を記憶しておく。管理情報12
11の項は、検収要望DBの内容を示す図12の各項目
のいずれかについて、その管理を行なう間に生じてくる
諸事項の実行のフラグ情報を記憶する項目である。図1
2のいずれかの項目に、何らかの処理を要する情報が記
憶され、その対応が未処理というときは、1211の管
理情報の項目の値は、「未整備や未処理」になり、処理
が終われば、「処理済」になる。このように本発明の実
施の形態の業務遂行管理システムによれば、情報通信シ
ステムを利用して業務の遂行の管理を行なう場合に、電
子システムを業務の遂行の障害とするのでなく、むし
ろ、業務遂行に関連する情報を電子的に処理して、業務
遂行の完成度を高めることができる。
The item 1201 in the inspection request DB is the date when the result report is presented to the client 1. 1202 to 121
The item 0 indicates 1102 of FIG. 11 showing the contents of the result report.
The information in the items 1 to 1110 is stored. Management information 12
The item 11 is an item for storing flag information for execution of various items that occur during the management of any of the items in FIG. 12 showing the contents of the inspection request DB. Figure 1
When information that requires some processing is stored in any of items 2 and the correspondence is unprocessed, the value of the item 1211 of the management information becomes “unmaintained or unprocessed”, and when the processing is completed. , "Processed". As described above, according to the business performance management system of the embodiment of the present invention, when the business performance management is performed using the information communication system, the electronic system does not hinder the performance of the business, but rather, Information related to business execution can be electronically processed to enhance the completion of business execution.

【0268】依頼者から遂行管理を要請された設定業務
や設定業務の遂行するときの情報の授受において、業務
や遂行成果の情報処理の中に差異分析という情報処理手
段を組み合わせ、電子情報による不足部分をシステム的
に補うようにすることにより、電子情報という形では業
務の全てを表現できないという業務遂行管理上の欠点を
克服して、業務の完遂度を高めることができる。
[0268] In the exchange of setting work for which execution control has been requested by the client and information when performing the setting work, the information processing means called difference analysis is combined with the information processing of the work and the result of execution to make a shortage due to electronic information. By supplementing the parts systematically, it is possible to overcome the drawback in business performance management in which all of the business cannot be expressed in the form of electronic information, and it is possible to increase the degree of completion of the business.

【0269】これにより、ネットワークなどを介して電
子的に業務遂行関係情報を基に業務を目標通りに遂行さ
せるシステムが構築されるものである。電子情報化が難
しいために生じる業務内容や業務遂行の情報の曖昧さ、
不備や遺漏を少なくして、電子情報や情報通信システム
を利用した業務遂行管理システムの実用化を促進する。
As a result, a system for electronically performing a task as desired based on the task performance relation information via a network or the like is constructed. Ambiguity of business content and business execution information that arises because it is difficult to digitalize information,
To reduce the number of deficiencies and omissions and promote the commercialization of business performance management systems that use electronic information and information communication systems.

【0270】[0270]

【実施例】本発明の業務遂行管理システムを墓参や墓苑
の管理に適用した実施例について説明をする。
[Embodiment] An embodiment in which the business performance management system of the present invention is applied to management of a grave visitor or a graveyard will be described.

【0271】この実施例の場合、本発明の業務遂行管理
システムにおける依頼者は、例えば、埋葬された本人又
は、本人の遺志を次いだその遺族(以下では、本人遺族
という)、実施者が僧侶や庭師や花屋(以下では墓苑内
業者という)、業務遂行管理機構が霊園管理組合に相当
する当事者であり、依頼者から依頼を受けて遂行する業
務には、墓の清掃管理や墓参等の墓守や年回忌等の行事
等(以下では、墓守等という)の仕事が遂行業務に相当
するとして説明をする。
In the case of this embodiment, the client in the business performance management system of the present invention is, for example, the person buried, or the bereaved family who follows the will of the person himself (hereinafter referred to as the bereaved family). Monks, gardeners, florists (hereinafter referred to as graveyard companies), and the Business Execution Management Organization are the parties equivalent to the cemetery management union, and for the work to be carried out upon request from the client, grave cleaning management, grave attendance, etc. It is explained that the tasks such as the gravekeeper and the annual memorial service (hereinafter referred to as the gravekeeper) correspond to the work performed.

【0272】本人遺族は、本人の死後も、自分の墓苑の
墓守等の仕事が本人の希望するような形で行なわれるよ
うに希望して、これを遺言にして残したり、子供や親族
に伝え、一定の対価の支払や遺産相続の手当てをしてい
る。
The person's bereaved family hopes that even after the person's death, the work such as grave guarding of his or her graveyard will be performed in the form he or she desires, and this will be left as a will or left to children and relatives. Reportedly, they pay a certain amount of money and pay for inheritance.

【0273】このような本人遺族の希望を、子供や親族
がどの程度忠実に、実行してくれるかは本人遺族にとっ
ては、重大な関心事であり、その遂行管理を確実に実行
してくれることを望んでいる。
It is a serious concern for the bereaved family to have their children and relatives faithfully carry out the hopes of the bereaved family as described above, and it is necessary to surely carry out the execution management. Wants

【0274】また、本人遺族が、存命中であっても、病
院に入院をしていたりして、直接に墓守等の仕事ができ
ないときも、死後において、墓守等の仕事がどのように
確実に実行されるかの心配は尽きない。
Even when the surviving family member is alive and stays in a hospital and cannot directly perform work such as grave protection, how to ensure grave protection work after death. There is no end to worry about whether it will be implemented.

【0275】このようなときに、これらの墓守等の仕事
は、本人遺族が適当な業者に、直接に依頼をすることも
あるが、本人遺族が病院に入院をしていたり海外に住む
等して、直接に依頼をすることができないときは、本人
遺族の子供や親族を使って、墓苑内業者に墓守等の仕事
を代行をさせる。例えば、墓の清掃や植栽の手入れ等の
仕事を遂行すべき時期やこれらの手入を庭師に依頼し、
仏花を墓に供えるべき量や時期及び花活けの手入れを花
屋に依頼し、読経及び卒塔婆の建立や慰霊の時期を僧侶
に依頼し、場合によっては墓参を子供たちに依頼するこ
とになる。
In such a case, the family survivor may directly request an appropriate contractor to carry out such work as a grave keeper, but the family survivor may be hospitalized in a hospital or live abroad. When it is not possible to request directly, use the children and relatives of the bereaved family to have a graveyard in-house contractor perform the work such as grave guarding. For example, ask the gardener when you should perform tasks such as cleaning the grave and caring for the planting,
A flower shop is asked to provide the amount and time of Buddha flowers to be offered to the grave and the maintenance of flower arrangements, and a monk is requested to read the sutras and the construction of a bastard or a memorial service. In some cases, the children are asked to visit the grave.

【0276】本人遺族は、これらの依頼した墓守等の仕
事が、墓苑内業者によって確実に遂行されることを確認
するすべがない場合も少なくない。本人遺族とすれば、
墓守等の仕事(設定業務)が、本人の死後も希望する形
で確実に実行されるように、第三者的な管理者、例え
ば、霊園管理組合(業務遂行管理機構)等に委託する事
も望んでいる。
In many cases, the survivor of the person himself has no way of confirming that the requested grave guardian's work is surely performed by the graveyard contractor. For the bereaved family,
Entrust a third-party manager, such as a cemetery management association (business performance management organization), to ensure that the work (setting work) such as tomb protection is carried out in the desired manner even after the person's death. Also wants.

【0277】この場合に、霊園管理組合が、業務遂行管
理機構として、本発明の業務遂行管理システムの構成員
としての機能を備えていることが必要であり、可能であ
れば、霊園管理組合が本発明の業務遂行管理システムの
ネットワークのサイトオーナであることが好ましい。仮
に、霊園管理組合がネットワークを介した情報の授受を
したり、電子情報の処理や管理をする機能を有したサイ
トオーナでなければ、サイトオーナのような法人や事業
体が業務遂行管理機構になってもよいが、都合上、霊園
管理組合にサイトオーナと同様な電子情報の授受や処
理、管理の機能が有るとして説明を続ける。
In this case, it is necessary that the cemetery management association has a function as a member of the business performance management system of the present invention as a business performance management mechanism. The site owner of the network of the business performance management system of the present invention is preferable. If the cemetery management association is not a site owner that has the function of exchanging information via the network and processing and managing electronic information, a corporation or business entity such as a site owner becomes the business performance management mechanism. However, for the sake of convenience, the cemetery management union will continue to explain that it has the same electronic information transfer, processing, and management functions as the site owner.

【0278】本人遺族の希望として業務遂行の委託を霊
園管理組合にする本人遺族やその子供や親族は、まず、
霊園管理組合の業務管理受付サーバにアクセスし、上記
した墓守等の仕事の遂行を墓苑内業者に依頼すること
と、墓苑内業者が墓守等の仕事を依頼した内容(設定業
務の内容)の通りに遂行されるように管理する業務を霊
園管理組合に委託したい旨の入力をする。
As the wishes of the bereaved family, the bereaved family, their children and relatives who entrust the entrustment of business execution to the cemetery management union are as follows.
Access to the business management reception server of the cemetery management association and request the graveyard in-house company to perform the above-mentioned work such as grave keeper, and the graveyard in-house company requested the grave keeper work (contents of setting work) Input that you want to entrust the management operations to the cemetery management union so that it will be performed as described in.

【0279】霊園管理組合は、本人遺族やその子供等か
らの委託として照会、入力された内容を検討し、墓守等
の業務遂行の管理に必要な情報が入力されたかどうかの
確認及び墓守等の遂行管理を受託するとときに必要な各
項目(上述した設定業務のDBの項目)の内容を充足し
ているかどうかを判断し、各項目の内容が充足されてい
れば、委託された業務遂行管理を受託する。
[0279] The cemetery management union examines the contents entered and inquired as a consignment from the surviving family member or their children, confirms whether the information necessary for managing the performance of duties such as the grave guard has been entered, and confirms whether the grave guard etc. When entrusted with performance management, it is judged whether the contents of each item (DB item of the setting work described above) required when fulfilled are fulfilled, and if the contents of each item are fulfilled, the commissioned work performance management Entrust.

【0280】次に、霊園管理組合は墓苑内業者の庭師、
花屋及び僧侶等の墓苑内業者に対し、本人遺族から墓守
等の仕事の遂行管理を受託したことを連絡すると共に、
本人遺族が希望をしている墓守等の仕事の内容(上述し
た設定業務の内容)を伝えて、墓苑内業者と本人遺族と
霊園管理組合との間に墓守等の仕事の内容に齟齬が無い
ことを確認する。
[0280] Next, the cemetery management association is a gardener who is a graveyard contractor.
In addition to informing the graveyard contractors such as florists and monks that the bereaved family has been entrusted with the performance management of tasks such as grave protection,
Communicate the contents of the work (contents of the above-mentioned setting work) such as grave guards that the bereaved family hopes, and there is a discrepancy in the work contents such as grave guards between the graveyard company, the survivor and the cemetery management association. Make sure there isn't one.

【0281】このとき、墓苑内業者のいずれかが、霊園
管理組合による墓守等の仕事の業務遂行管理に反対をす
れば、この業務遂行管理の業務の受託はできないことに
なる。
At this time, if any of the graveyard contractors opposes the work performance management of the work such as the grave guard by the cemetery management association, the work management work cannot be entrusted.

【0282】また、本人遺族やその子供などから墓苑内
業者が直接に依頼を受けた墓守等の仕事と、霊園管理組
合から墓苑内業者に確認の連絡があった仕事の内容とに
違いのあるときは、仕事の内容を調整して、例えば、墓
の清掃や植栽の手入れをする等の業務をする時と手入れ
の形、仏花を墓に供えるべきタイミングと花活けの手入
れの時、お供えする飲食物の種類から量や銘柄、或い
は、墓前での読経及び卒塔婆の建立の時期や慰霊の行事
の時期や対価について、本人遺族と墓苑内業者と霊園管
理組合との間で合意ができる条件を決めた後に、業務遂
行管理が受託される。
[0282] Also, there is a difference between the work of the grave guardian who was directly requested by the bereaved family and their children, and the contents of the work which the cemetery management association contacted the graveyard dealer for confirmation. If there is, adjust the content of the work, for example, when doing work such as cleaning the grave or caring for planting, the shape of the care, the timing when the Buddha flower should be offered to the grave and the maintenance of flower arrangement. Agree between the bereaved family, the graveyard in-house contractor and the cemetery management union about the amount and brand of food and drink to be offered, the timing of the sutra and the construction of the baton in front of the grave, the timing of the memorial service and the price. After deciding the conditions under which work can be done, work performance management is entrusted.

【0283】この場合に墓苑内業者に支払われる仕事の
対価及び霊園管理組合に支払われる管理の対価は遺族の
銀行預金からの支払であったり、霊園管理組合に預託さ
れた現金での決済になる。
In this case, the consideration for the work paid to the contractor in the graveyard and the consideration for the management paid to the cemetery management association are payments from the bank deposit of the bereaved family or settlement with cash deposited at the cemetery management association. Become.

【0284】一方、本人遺族の遺志を受けて、本人遺族
のために墓守等の仕事に関与する子供や親族の人々がい
るときは、霊園管理組合は、本人遺族から預託を受けて
いる財産や信託を受けている財貨を、本人遺族から受託
したときの条件に従って子供や親族に給付をしたり、遺
言の執行をする。
[0284] On the other hand, when there are children or relatives who are involved in work such as tomb guards for the bereaved family after receiving the will of the bereaved family, the cemetery management union will lose the property or property entrusted by the bereaved family. Payment of benefits to the children and relatives and execution of wills according to the conditions under which the trustees received the trust.

【0285】この後、墓苑内業者は、それぞれの立場
で、依頼を受けた植栽や清掃、仏花のお供えや読経、慰
霊などのお勤めを行なう。遂行した実績情報はネットワ
ークを通じて霊園管理組合に伝えられる。
[0285] After that, the graveyard contractors carry out their duties such as planting and cleaning upon request, offering of Buddha flowers, sutra reading, and memorial service from their respective positions. Information on the results achieved is transmitted to the cemetery management association through the network.

【0286】霊園管理組合は、入力された内容を確認し
て、実施形態で述べた業務実績DBの項目を充足してい
れば、この実績内容を受理しこのDBに記録し保管す
る。
The cemetery management association confirms the input contents, and if the items of the work performance DB described in the embodiment are satisfied, the performance contents are accepted and recorded and stored in this DB.

【0287】一方、業務遂行管理を受託した、霊園管理
組合としては、業務遂行管理をシステム的に行なうため
に、墓苑内に、カード認識装置や個人識別装置、自動検
知装置や監視カメラ、等の監視システムを設置して、業
務遂行の状況の情報を入手し、この情報を監視監査DB
に記録、保管をする。
On the other hand, as a cemetery management association that has been entrusted with business performance management, in order to systematically perform business performance management, a card recognition device, a personal identification device, an automatic detection device, a surveillance camera, etc. are placed in the graveyard. Installed a monitoring system to obtain information on the status of business execution and monitor this information
Record and store.

【0288】また、霊園管理組合は、随時、墓苑内業者
からの実績情報の入力に対応して、監視システムからの
情報を参照して、墓苑内業者からの実績情報が誤入力や
偽情報の入力でないことの確認をすることもできる。
Further, the cemetery management union occasionally refers to the information from the monitoring system in response to the input of the performance information from the graveyard in-house supplier, and the performance information from the graveyard in-house supplier is erroneously input or false. You can also confirm that you are not entering information.

【0289】例えば、庭師から墓の清掃や植栽の手入れ
等の仕事を遂行をしたという実績情報の入力や、花屋か
ら、仏花を備えたとの入力があれば、監視カメラで清掃
の具合や植栽の手入れの状況や仏花の備えられた状況を
確認する。また、僧侶から読経やその他のお勤め、年回
忌のお勤めをしたとの入力があれば、寺の本殿内の記録
として残されている人の動きの検知装置や個人認識装置
や音声検知装置の記録データから、実施された時期のデ
ータや時間短縮の再生による方法で確認をする。
[0289] For example, if the gardener inputs performance information indicating that he / she has carried out work such as cleaning the grave or caring for the planting, or if the florist inputs that the Buddhist flowers are provided, the condition of cleaning with the surveillance camera Check the condition of planting and the condition of Buddha flowers. In addition, if there is an input from the monk that he has worked as a sutra or other work, or a yearly memorial service, a record of the person's movement detection device, personal recognition device or voice detection device recorded in the main hall of the temple From the data, confirm the data at the time of implementation and the method of regenerating the time reduction.

【0290】霊園管理組合は、業務遂行を管理する立場
から、所有するコンピュタを使って、このようにして得
られた業務遂行の実績情報と監視監査情報とをそれぞれ
のDBから抽出し、バッチ処理で、墓苑内業者が入力し
てきた実績の内容を本人遺族から受託した墓守等の仕事
の内容(設定業務の内容)と比較し、その差異の分析を
する。
From the standpoint of managing business performance, the cemetery management association uses its own computer to extract the business performance record information and the monitoring audit information obtained in this way from their respective DBs, and perform batch processing. Then, the contents of the results entered by the graveyard contractor are compared with the contents of the work (setting contents) of the grave guardian etc. entrusted by the bereaved family, and the difference is analyzed.

【0291】この差異分析は、単純に情報を比較するの
でなく、霊園管理組合が本人遺族から受託した墓守等の
仕事の評価の基準(管理条件)を参考に、重み付けをし
て判断される。年回忌の日を間違えることはないが、例
えば、情報としては、一つの数字の小さな差であって
も、このような重要な事項の失念や間違いは、業務遂行
の内容としては、重大な不作為であり、重要な差異とし
ての対応が必要になる。
This difference analysis is judged not by simply comparing the information, but by weighting it with reference to the evaluation criteria (management conditions) of the work such as tomb guards entrusted by the cemetery management association from the bereaved family. There is no mistake in the date of annual memorial day, but for example, even if there is a small difference in one number as information, such forgetfulness and mistakes of important matters are serious inaction as the contents of business execution. Therefore, it is necessary to deal with it as an important difference.

【0292】また重要な事項の欠落があれば、本人遺族
に連絡をするよりも、墓苑内業者に遂行を促す方が、依
頼者の納得が得られて好ましいときもある。
If there is a lack of important matters, it may be preferable that the client in the graveyard is encouraged to carry out the operation rather than contacting the bereaved family.

【0293】このようにして、業務遂行実績と監視情報
との差異分析、実績情報の評価や比較判断が終われば、
依頼を受けた墓守等の仕事の成果としてまとめられ、こ
の成果情報は業務実績成果DBに保管され、業務遂行成
果の処理が完了する。
In this way, when the difference analysis between the business performance record and the monitoring information, the evaluation of the performance information and the comparison judgment are completed,
It is put together as a result of the work such as the grave guard who received the request, and this result information is stored in the work result result DB, and the processing of the work execution result is completed.

【0294】霊園管理組合は、この後、成果情報を、業
務遂行を受託したときに決められた期間ごとに、成果報
告書の形にまとめて、本人遺族に報告し、検収を要請す
る。このとき、霊園管理組合は、差異分析結果DBに保
管されている差異分析結果も墓守等の仕事の成果報告書
と併せて依頼者に報告して、本人遺族の検収を受ける。
After that, the cemetery management union collects the result information in the form of a result report for each period determined when the work is entrusted, reports it to the bereaved family, and requests the inspection. At this time, the cemetery management association also reports the difference analysis result stored in the difference analysis result DB to the client together with the work result report of the grave guardian and the like, and receives the inspection of the surviving family member.

【0295】本人遺族は、成果報告書を受取った後、依
頼した墓守等の仕事が期待通りに遂行されていると納得
したときは、そのまま検収の印を押してその期間の業務
の遂行管理は終了したとして扱うことを了解すればよ
い。
After receiving the result report, if the person's survivor is satisfied that the requested grave guardian's work is being performed as expected, he / she will mark the inspection as it is, and the work management for that period will end. All you have to do is understand that you handle it.

【0296】霊園管理組合はこの検収の後、仕事の対価
を霊園管理組合へ支払ったり、霊園管理組合自身が依頼
を受けた墓守等の仕事の管理費用を受領する。
After this inspection, the cemetery management union pays the consideration for the work to the cemetery management union, or receives the management cost of the work such as the grave guard requested by the cemetery management union itself.

【0297】一方、本人遺族が報告書の内容に不備や改
良点を感じれば、検収時の付帯事項として霊園管理組合
に対し墓守等の仕事に関する要望や課題を出すことがで
きる。
On the other hand, if the surviving family feels that the content of the report is inadequate or points to be improved, the cemetery management association can make a request or issue regarding work such as tomb protection as an incidental item at the time of inspection.

【0298】霊園管理組合としては、本人遺族から新た
な課題や要望が提示されたときは、その要望等につい
て、受託当初或いはその後に修正をした墓守等の仕事の
設定内容と比較をして、設定業務内容の範囲内であれ
ば、その要望などをそれまでの仕事の内容(設定業務内
容)や仕事の管理条件に追加したり、内容を修正して、
次からの墓守等の仕事の基準とする。
When a new problem or request is presented by the survivor of the cemetery, the cemetery management union compares the request with the setting contents of the work such as the grave guard who modified the contractor at the beginning or afterwards. If it is within the scope of the setting work content, add the request etc. to the work content (setting work content) and the management condition of the work until then, modify the content,
It will be the standard for work such as grave guarding from the next time.

【0299】仮に、受託時に合意した仕事の範囲外であ
れば、墓守等の仕事の内容の見直しをしたり、墓苑内業
者と協議して新たな仕事としての同意を得たり、更に
は、その要望を新たな仕事として設定業務内容とすると
きは、その仕事の内容に応じた給付の見直しをする。
[0299] If it is out of the scope of the work agreed upon at the time of entrustment, the contents of the work such as the grave keeper may be reviewed, the new work may be agreed upon in consultation with the graveyard contractor, and further, When setting the request as a new job and setting it as a work content, review the benefits according to the content of the work.

【0300】このような要望事項や課題を設定業務の内
容に取り入れることは、本人遺族から委託を受けた仕事
の遂行をネットワークを通じて確実に管理をするシステ
ムにおいては、極めて重要なことである。
Incorporation of such requests and tasks into the contents of the setting work is extremely important in a system that surely manages the execution of the work entrusted by the bereaved family through the network.

【0301】墓守等の仕事の内容は、表向きは同じよう
な仕事であるが、具体的な仕事の内容や管理条件になる
と、宗教や流派の違い、家の格式や墓の状況、経済状況
や個人の好みによって千差万別であり、その全てを網羅
する墓守等の仕事の設定業務の内容や管理条件は存在し
ないか、存在していても、膨大な情報量になって、従来
の管理方法では実質的に業務の遂行の管理が不能になる
可能性が高い。
The contents of work such as grave guards are ostensibly the same, but when it comes to concrete work contents and management conditions, differences in religion and style, state of the house, grave situation, economic situation, etc. There are various things depending on personal preference, and there is no job setting or management condition such as tomb guards that covers all of them, or even if it exists, it will be a huge amount of information and conventional management It is highly possible that the method will substantially lose control of the performance of work.

【0302】これに対して、本発明のように、設定業務
の内容や管理条件の修正に柔軟性を持たせた業務遂行管
理システムにすれば、千差万別な設定業務の内容や管理
条件を電子情報で表すことにより、極めて詳細に、依頼
者の希望に応じた固有の設定業務の内容や管理条件にま
とめられ、依頼を受けた個々の業務に固有の業務遂行の
管理が確実に実現されるようになる。換言すれば、本発
明の業務遂行管理システムによれば、業務に対する課題
や要望が具体的であるほど、設定業務の内容が明確化さ
れ、依頼者も実施者も満足のいく業務の遂行がなされ
る。
On the other hand, in the case of the job performance management system of the present invention, which has flexibility to correct the contents and management conditions of the setting work, the contents and management conditions of the setting work are varied. By representing the information as electronic information, it is possible to manage in a very detailed manner the contents and management conditions of the unique setting work according to the requester's request, and the management of the work execution unique to the individual work requested. Will be done. In other words, according to the business performance management system of the present invention, the more specific the task or request for the business, the clearer the contents of the setting business, and the more satisfying the performance of the business by both the requester and the implementer. It

【0303】墓守等の仕事に限らず、業務の内容(設定
業務の内容)を電子情報だけで表現することは、至難で
ある。具体的な仕事の内容や管理条件を文字や電子情報
で全て表すように工夫をしても、曖昧さや不備や遺漏が
避けられない。
It is extremely difficult to express the contents of work (contents of setting work) only by electronic information, not limited to work such as tomb guards. Even if it is devised so that all concrete work contents and management conditions are expressed in text or electronic information, ambiguity, inadequacies and omissions cannot be avoided.

【0304】このような環境下において業務の遂行管理
を電子情報で受託し、業務の遂行管理を実現させる一つ
の方法が本発明であり、個々の墓守等の業務ごとに個別
に、かつ、本人遺族の要望や課題をできるだけ取入れ、
その業務に固有の内容として詳細に規定された設定業務
の内容や管理条件を業務遂行管理に適した形の電子情報
(設定業務DB)で作り上げ、このように個別化された
内容の電子情報に基づいて業務遂行管理をすることによ
り、ネットワークや電子情報に基づく業務遂行管理が実
現される。
[0304] One of the methods of entrusting work management with electronic information and realizing work management in such an environment is the present invention, and the work is managed individually for each work such as individual grave guards. Incorporate the bereaved family's requests and issues as much as possible,
The contents and management conditions of the setting work, which are specified in detail as the contents specific to the work, are created with electronic information (setting work DB) in a form suitable for work performance management, and the individualized electronic information is created in this way. By performing work execution management based on the above, work execution management based on the network and electronic information is realized.

【0305】本発明は、このような電子情報で表現され
た設定業務の内容や管理条件に、依頼者の要望や業務遂
行上の課題を逐次書き加えることができるようにするこ
とで電子情報による管理上の弊害を解決をしている。
The present invention makes it possible to sequentially add the request of the client and the task to be performed to the contents of the setting work and the management conditions expressed by such electronic information, so that the electronic information can be obtained. We are solving the negative effects on management.

【0306】次に、業務遂行管理システムをマンション
管理に使用した実施例について説明をする。
Next, an example in which the business performance management system is used for condominium management will be described.

【0307】この実施例の場合、本発明の業務遂行管理
システムにおける依頼者は、例えば、マンションに居住
する人或いはマンションを所有する人または、これらの
人々で作られたマンション管理組合等(以下では、居住
者等という)が相当し、実施者がマンションのメンテナ
ンスや補修工事をする建築業者やインテリア業者、電気
工事者、水道ガス工事等の施工業者(以下では単に施工
業者という)に相当し、業務遂行管理機構がマンション
管理会社に相当する当事者である。
In the case of this embodiment, the client in the business performance management system of the present invention is, for example, a person resident in the condominium, a person who owns the condominium, a condominium management association made by these people (hereinafter, , Resident, etc.), which corresponds to a contractor who carries out maintenance and repair work on the condominium, an electrician, an electrician, and a water gas construction operator (hereinafter simply referred to as a contractor). The Business Execution Management Organization is a party equivalent to a condominium management company.

【0308】依頼者から依頼を受けて遂行する業務に
は、マンションの照明器具や消耗品の交換や機器のメン
テナンス、建屋の損傷個所や水漏れの修理或いはマンシ
ョン外壁の補修や塗装、改修工事等(以下では、補修等
という)の仕事が遂行業務に相当する。
[0308] The work carried out upon request from the client includes replacement of lighting equipment and consumables in the condominium, maintenance of equipment, repair of damaged parts and water leaks in the building, repair of the outer wall of the condominium, painting, repair work, etc. The work (hereinafter referred to as repair, etc.) corresponds to the performance work.

【0309】このような補修等の仕事を、施工業者がど
のように実行してくれるかは、居住者等にとって重大な
関心事であり、補修等を確実に施工してもらうために、
補修等の仕事を、居住者等が選んだ施工業者に、直接に
依頼をすることもある。しかし、居住者等では、施工業
者の選定や施工管理が難しく、依頼した補修等の仕事
が、施工業者によって確実に遂行されることを確認する
方法がわからない場合も少なくない。
[0309] How the contractor carries out such work such as repair is a serious concern for residents and the like, and in order to ensure that repair work is carried out,
In some cases, the work such as repair work may be directly requested to the contractor selected by the resident. However, it is often the case that the resident or the like has difficulty in selecting a contractor and managing the contractor, and does not know how to confirm that the requested contractor's work is surely performed by the contractor.

【0310】居住者等とすれば、補修等の仕事(設定業
務)が、希望する内容で確実に実行されるように、第三
者的な管理者、例えば、マンション管理会社(業務遂行
管理機構)等に委託する事ができれば、任せたいという
希望もある。
For residents, etc., a third party administrator, for example, a condominium management company (business performance management organization) should ensure that repair work (setting work) is carried out with desired content. If you can outsource it to others, there is also a desire to leave it to you.

【0311】このような場合に、マンション管理会社
が、本発明の業務遂行管理機構として機能するために
は、マンション管理会社が本発明の業務遂行管理システ
ムのネットワークのサイトオーナであることが好まし
い。仮に、マンション管理会社がサイトオーナでないと
きは、サイトオーナの機能をもった事業体を介在させて
もよいが、説明の都合上、マンション管理会社にサイト
オーナと同様な電子情報の授受や処理、管理の機能が有
るとして説明を続ける。
In such a case, in order for the condominium management company to function as the business performance management mechanism of the present invention, it is preferable that the condominium management company is the site owner of the network of the business performance management system of the present invention. If the condominium management company is not the site owner, a business entity having the function of the site owner may be interposed, but for convenience of explanation, the condominium management company receives and processes electronic information similar to the site owner, The explanation is continued assuming that there is a management function.

【0312】マンションの補修等の業務の遂行管理をマ
ンション管理会社に委託する居住者等は、まず、マンシ
ョン管理会社の業務管理受付サーバにアクセスし、上記
した補修等の仕事を施工業者に依頼したいということ
と、居住者等が依頼した内容(設定業務の内容)の通り
に施工業者が補修等の施工をするように管理、監督(業
務の遂行管理)をする業務をマンション管理会社に委託
したい旨の入力をする。
Residents who outsource the performance management of condominium repair work to the condominium management company first want to access the business management reception server of the condominium management company and request the contractor to perform the above-mentioned repair work. That is, I want to outsource the work of managing and supervising (execution management of work) to the condominium management company so that the contractor will perform repair work etc. according to the contents requested by residents etc. (contents of setting work) Enter the message.

【0313】マンション管理会社は、居住者等からの業
務遂行管理の委託の照会をネットワーク経由で受付け、
入力された補修等の業務の内容や管理条件を検討する。
マンション補修等の業務遂行の管理に必要な情報が居住
者等から入力されたかどうかの確認及び補修等の遂行管
理を受託するとときに必要な各項目(上述した設定業務
のDBの項目)の内容を充足しているかどうかを判断
し、各項目の内容が充足されていれば、委託の照会に応
じて、業務遂行の管理を受託する。
[0313] The condominium management company accepts inquiries about entrustment of business performance management from residents and the like through the network,
Examine the entered work content such as repairs and management conditions.
Contents of each item (DB item of setting work mentioned above) required when confirming whether information necessary for management of work performance such as condominium repair is input from residents etc. and entrusting performance management of repair work etc. If the contents of each item are satisfied, management of business performance is entrusted in response to an inquiry of entrustment.

【0314】次に、マンション管理会社は予め管理会社
に登録されている施工業者の中から、居住者等から受託
した補修等の仕事の内容に適した業者を選定し、補修等
の仕事の発注をする。併せて、業務遂行の管理を受託し
たことと居住者等が希望をしている補修等の仕事の内容
(上述した設定業務の内容)を伝えて、補修等の仕事を
するのに必要な契約をする。この場合に、できる限り、
施工業者と居住者等とマンション管理会社との間に補修
等の仕事の内容に齟齬が無いことを確認する。
Next, the condominium management company selects, from the contractors registered in advance with the management company, a company suitable for the content of the work such as repair entrusted by the resident, etc., and places an order for the work such as repair. do. At the same time, the contract necessary for carrying out work such as repair work, etc. by notifying that the work management has been entrusted and the work contents such as repair work that the residents desire (the above-mentioned setting work contents). do. In this case, if possible,
Confirm that there is no discrepancy in the contents of work such as repair work between the contractor, residents, and the condominium management company.

【0315】この実施例の場合、施工業者はマンション
管理組合に予め登録され業務遂行の管理を承知している
業者であるとすれば、その前提で登録もされており、マ
ンション管理会社による補修等の仕事の依頼及び業務遂
行の管理に反対をすることはない。
In the case of this embodiment, if the construction company is a company registered in advance in the condominium management association and aware of the management of business performance, it is also registered on the premise, and repair by the condominium management company etc. We will not oppose the management of the work requests and performance of the work.

【0316】仮に、居住者等から施工業者に補修等の仕
事を直接に依頼し、その後に業務遂行の管理をマンショ
ン管理会社が受託したようなときに、施工業者が受注し
た補修等の仕事の内容と、マンション管理会社から施工
業者に確認の連絡をした仕事の内容とに違いのあるとき
は、補修等の仕事の内容を管理条件や対価と併せて調整
して、居住者等と施工業者とマンション管理会社との間
で合意ができる条件を決めた後に、業務遂行管理が受託
される。
If, for example, a resident or the like directly requests a contractor to perform work such as repair, and then the condominium management company entrusts the management of work execution to the contractor, the contractor will receive an order for repair work. If there is a difference between the contents and the contents of the work that the condominium management company contacted the contractor for confirmation, the contents of the work such as repairs are adjusted along with the management conditions and consideration, and the residents and the contractor After deciding the terms that can be agreed with the condominium management company, business execution management will be entrusted.

【0317】この後、施工業者は、依頼を受けた仕事、
例えば、マンションのメンテナンス、損傷個所や水漏れ
の修理或いはマンション外壁の補修や塗装、改修工事等
を行なう。仕事を遂行した実績情報はネットワークを通
じてマンション管理会社に伝えられる。
[0317] After this, the contractor,
For example, maintenance of a condominium, repair of a damaged portion or water leak, repair of the outer wall of the condominium, painting, repair work, and the like are performed. The performance information of the work performed is transmitted to the condominium management company through the network.

【0318】マンション管理会社は、入力された実績情
報の内容を確認して、実施形態で述べた業務実績DBの
項目を充足していれば、この実績内容を受理しこのDB
に記録し保管する。
The condominium management company confirms the contents of the input performance information, and if the items of the business performance DB described in the embodiment are satisfied, the content of the performance is accepted and this DB is accepted.
Record and store in.

【0319】一方、業務遂行管理を受託した、マンショ
ン管理会社としては、業務遂行管理をシステム的に行な
うために、マンション内に、施工業者の勤怠のカード認
識装置や作業員や監督者の個人識別装置、仕事の監視カ
メラ、等の監視システムを設置して、業務遂行の状況の
情報を入手し、この情報を監視監査DBに記録し、保管
をする。また、マンション管理会社は、随時、施工業者
から入力される実績情報に対応して、監視システムから
の情報、例えば、ネットワークを介して監視カメラで得
られる施工の進行状況を参照して、施工業者からの実績
情報が誤入力や偽情報の入力でないことの確認をするこ
ともできる。。
On the other hand, as a condominium management company entrusted with work performance management, in order to systematically perform work performance management, a card recognition device for the attendance of the contractor and personal identification of workers and supervisors in the condominium. A monitoring system such as a device, a work monitoring camera, etc. is installed to obtain information on the status of work execution, record this information in a monitoring audit DB, and store it. In addition, the condominium management company occasionally refers to the information from the monitoring system, for example, the progress status of the construction obtained by the surveillance camera via the network, in response to the record information input from the construction firm, and the construction firm It is also possible to confirm that the performance information from is not an incorrect input or false input. .

【0320】マンション管理会社は、業務遂行を管理す
る立場から、所有するコンピュータを使って、このよう
にして得られた業務遂行の実績情報と監視監査情報とを
それぞれのDBから抽出し、バッチ処理で、施工業者が
入力してきた実績の内容を設定業務の内容(居住者等か
ら受託した補修等の仕事の内容)と比較し、その差異の
分析をする。
From the standpoint of managing business execution, the condominium management company uses its own computer to extract the business execution performance information and the monitoring audit information thus obtained from the respective DBs, and perform batch processing. Then, the contents of the results entered by the contractor are compared with the contents of the setting work (the contents of work such as repairs entrusted by residents etc.) and the difference is analyzed.

【0321】この差異分析は、単純に情報を比較するの
でなく、マンション管理会社が居住者等から受託した補
修等の仕事の評価の基準(管理条件)を参考に、重み付
けをして判断される。例えば、マンションの外壁や構造
部分の補修に関する実績情報は、設定業務の内容とが小
さな差であっても、業務遂行の内容としては、将来的に
は重大な問題を可能性が高く、重要な差異としての対応
が必要になる。
This difference analysis is judged not by simply comparing information, but by weighting with reference to the evaluation criteria (management conditions) of work such as repair contracted by the condominium management company from residents etc. . For example, performance information on repair of exterior walls and structural parts of condominiums is highly important because it may cause serious problems in the future even if there is a small difference from the contents of setting work. It is necessary to deal with the difference.

【0322】また重要な事項の欠落があれば、居住者等
に連絡をするよりも、施工業者に設定業務の内容通りの
施工を促す方が、依頼者の納得が得られて好ましい。
If there are any missing important items, it is preferable to encourage the contractor to carry out the work according to the contents of the setting work rather than to contact the resident or the like, because the client can be satisfied.

【0323】このようにして、業務遂行実績と監視情報
との差異分析、実績情報の評価や比較判断が終われば、
依頼を受けた補修等の仕事の成果としてまとめられ、こ
の成果情報は業務実績成果DBに保管され、業務遂行成
果の処理が完了する。
In this way, when the difference analysis between the business performance record and the monitoring information, the evaluation of the performance information and the comparison judgment are completed,
The results of the requested work such as repair work are summarized, and this result information is stored in the business performance result DB, and the processing of the business performance results is completed.

【0324】マンション管理会社は、この後、成果情報
を、業務遂行を受託したときに決められた期限或いは期
間ごとに、成果報告書の形にまとめて、居住者等に報告
し、検収を要請する。このとき、マンション管理会社
は、差異分析結果DBに保管されている差異分析結果も
補修等の仕事の成果報告書と併せて依頼者に報告して、
居住者等の検収を受ける。
After that, the condominium management company compiles the result information in the form of a result report for each deadline or period determined when the work is entrusted, reports it to the resident, etc., and requests inspection. To do. At this time, the condominium management company also reports the result of the difference analysis stored in the difference analysis result DB to the client together with the result report of work such as repair,
Receive inspection by residents.

【0325】居住者等は、成果報告書を受取った後、依
頼した補修等の仕事が期待通りに遂行されていると納得
したときは、そのまま検収の印を押してその期間の業務
の遂行管理は終了したとして扱うことを了解すればよ
い。
After receiving the result report, when the resident or the like is satisfied that the requested repair work is being carried out as expected, the resident or the like simply puts a mark on the inspection and manages the performance of work during that period. All you have to do is to treat it as finished.

【0326】マンション管理会社は検収が終了した後、
仕事の対価をマンション管理会社へ支払ったり、マンシ
ョン管理会社自身が依頼を受けた補修等の仕事の遂行管
理費用を居住者等がお金を預けてある銀行から受領す
る。
After the inspection of the condominium management company is completed,
They pay the price of the work to the condominium management company, or receive the work management cost of the repair, etc. requested by the condominium management company from the bank where the resident etc. deposits the money.

【0327】一方、居住者等が報告書の内容に不備や改
良点を感じれば、検収時の付帯事項としてマンション管
理会社に対し補修等の仕事に関する要望や課題を出すこ
とができる。
On the other hand, if the resident or the like feels that the contents of the report are inadequate or points to be improved, the condominium management company can make a request or an issue regarding work such as repair as an incidental item at the time of inspection.

【0328】マンション管理会社としては、居住者等か
ら新たな課題や要望が提示されたときは、その要望等に
ついて、業務遂行管理の受託の当初或いはその後に修正
をした補修等の仕事の設定内容と比較をして、設定業務
内容の範囲内であれば、その要望などをそれまでの仕事
の内容(設定業務内容)や仕事の管理条件に追加した
り、設定業務内容を修正して、新しい設定業務内容や管
理条件が次からの補修等の仕事の遂行管理の基準とす
る。
As a condominium management company, when a new subject or request is presented by a resident, etc., the setting contents of the work such as repair, which is modified at the beginning or after the commissioning of the work performance management, regarding the request etc. If it is within the scope of the setting work content, add the request etc. to the contents of the work (setting work contents) and the management conditions of the work until then, or modify the setting work contents to make a new The set work content and management conditions are used as the basis for performance management of work such as repairs from the next time.

【0329】仮に、居住者からの課題や要望が、受託時
に合意した設定業務内容の範囲外であれば、補修等の仕
事の内容の見直しをしたり、施工業者と協議して新たな
仕事としての同意を得たり、更には、その要望を新たな
仕事として設定業務内容を決めるときは、その仕事の内
容に応じた対価の見直しをする。
If the subject or request from the resident is outside the scope of the set work contents agreed upon at the time of entrustment, the contents of the work such as repairs will be reviewed or a new work will be made after consultation with the contractor. When obtaining the consent of the above, or when deciding the work content to be set as a new job, review the consideration according to the content of the work.

【0330】このような要望事項や課題を設定業務の内
容に逐次取り入れて、個々のマンションに固有の設定業
務の内容や管理条件を作り上げ、これに基づいて業務の
施工管理をすることは、居住者等から委託を受けた仕事
の遂行をネットワークを通じて確実に管理をするシステ
ムや電子情報を用いた業務遂行管理においては、特に重
要なことである。
By successively incorporating such requirements and issues into the contents of the setting work, the contents and management conditions of the setting work peculiar to each condominium are made up, and the construction management of the work is based on this This is especially important for business performance management using a system or electronic information that reliably manages the performance of work outsourced by a person or the like via a network.

【0331】電子情報は、本来的に、業務の内容(設定
業務の内容)を適切に表現をするのに適した言語でな
い。いわんや、どのマンションにも共通して適用できる
ように補修等の仕事を共通の管理シートでまとめて表現
して管理することは、至難である。建物の大きさや構
造、建物の向きや日照、地盤等の立地条件により、不具
合や異常の出現の個所や頻度は個々に異なり、それぞれ
のマンションに特徴のある業務の内容や管理条件を文字
や電子情報で全て表すように工夫をしても、曖昧さや不
備や遺漏が避けられない上に、電子情報の内容は錯綜す
る。このようなマンションの補修等の業務遂行の管理を
電子情報で表し、ネットワークを通じてその業務の遂行
の管理の受託をし、業務の遂行管理をする一つの方法
は、例えば、本発明のようにして、個々の補修等の業務
ごとに設定業務の内容や管理条件を業務遂行管理に適し
た形の電子情報で作り上げ、このように個別化された情
報に基づいて業務遂行管理をすることにより、ネットワ
ークや電子情報に基づく業務遂行管理が実現される。
Electronic information is not originally a language suitable for appropriately expressing the contents of work (contents of setting work). In other words, it is extremely difficult to collectively express and manage work such as repair work with a common management sheet so that it can be commonly applied to any condominium. Depending on the size and structure of the building, the direction of the building, the location of the sun, and the ground, etc., the location and frequency of occurrence of defects and abnormalities may differ, and the content and management conditions of the business that characterize each condominium may be written or electronic. Even if it is devised to represent everything with information, ambiguity, inadequacies and omissions cannot be avoided, and the contents of electronic information are complicated. One method of expressing the management of business execution such as repair of an apartment by electronic information, entrusting the management of the business execution through the network, and managing the business execution is, for example, as in the present invention. By creating the contents and management conditions of the set work for each work such as individual repairs with electronic information in a form suitable for work performance management, and managing the work performance based on such individualized information, network Business management based on electronic information is realized.

【0332】設定業務の内容や管理条件の追加や修正に
柔軟性を持たせて、依頼者によって要望されたり課題を
指摘されて設定業務の内容や管理条件に書き加えたり修
正すれば、その修正や加筆の限りにおいては、電子情報
が内包する曖昧さや不備が解消され、その業務に固有の
設定業務や管理条件をより明確にすることができる。
If the client is requested or pointed out by adding or modifying the contents or management conditions of the setting work by adding or modifying the contents or management conditions of the setting work, the correction can be made. As far as editing is possible, the ambiguity and deficiency contained in electronic information can be resolved, and setting work and management conditions unique to the work can be made clearer.

【0333】このような過程を経てでき上がった設定業
務の内容や管理条件は、情報量としては多くなっても、
依頼者が望む管理の内容に最も近い固有の管理基準にな
り、このように差別化された設定業務の内容や管理条件
を基に業務遂行管理をすれば、ネットワークを通じてや
り取りされる電子情報であっても業務の内容の行き違い
は少なくなり、無駄を排して、依頼業務の遂行をより簡
便に、効率よく、経済的に完遂させることができる。
[0333] The contents of the setting work and the management conditions completed through such a process are large in the amount of information,
It becomes the unique management standard that is the closest to the management content desired by the client, and if business performance management is performed based on such differentiated setting content and management conditions, it will be electronic information exchanged through the network. However, the difference in the content of the work is reduced, waste can be eliminated, and the requested work can be completed more easily, efficiently, and economically.

【0334】このような業務には、上記した墓参ばかり
でなく、介護業務、ツアー旅行、ソフト開発業務、種々
の調査業務、マンション管理、墓の管理、遺言の執行代
行業務等があり実施例で示すように、いずれの業務にも
広く適用して電子情報による業務の遂行管理を実用化さ
せるものである。
[0334] Such work includes not only the above-mentioned grave visitation but also nursing care work, tour travel, software development work, various investigation works, condominium management, grave management, execution of wills, etc. As shown in the figure, the present invention is widely applied to any work, and the execution management of the work by electronic information is put into practical use.

【0335】このように本発明の実施の形態や実施例で
示す業務遂行管理システムによれば、ネットワークを利
用して業務の遂行の管理を行なう場合に、電子システム
を業務の遂行の障害とするのでなく、むしろ、業務遂行
に関連する情報を電子的に処理して、業務遂行の完成度
を高めることができる。
As described above, according to the business performance management system shown in the embodiments and examples of the present invention, the electronic system is an obstacle to the performance of business when managing the performance of business by using the network. Rather, information related to business execution can be electronically processed to enhance the completion of business execution.

【0336】また、ネットワークを利用して業務遂行管
理を行なう場合に、依頼者から遂行管理を要請された設
定業務や設定業務の遂行するときの情報の授受におい
て、業務や遂行成果の情報処理の中に差異分析という情
報処理手段を組み合わせ、電子情報による不足部分をシ
ステム的に補うようにすることにより、電子情報という
形では業務の全てを表現できないという業務遂行管理上
の欠点を克服して、業務の完遂度を従来の管理以上に高
めることができる。
In the case of performing work performance management by using the network, the information processing of the work and the performance result is performed in the transfer of the setting work requested by the client for the performance management and the information when the setting work is performed. By combining the information processing means called difference analysis in the inside and systematically compensating for the lack of electronic information, we overcome the shortcomings in business execution management that it is not possible to express all the business in the form of electronic information, The degree of completion of work can be increased more than the conventional management.

【0337】また、この発明の業務遂行管理では、電子
情報の内容が変更や修正が容易という特質を生かして、
各業務に固有の業務内容や業務遂行の管理条件として業
務遂行関ん理機構のDBに逐次組込まれ、次の業務遂行
に使用されるシステムとなっているので、電子情報の媒
体を使いながら、各設定業務の内容や業務遂行の管理条
件は固有の内容として個々に明確化され、各業務内容に
応じて信頼性の高い業務遂行管理が可能になる。
Further, in the business performance management of the present invention, the characteristic that the contents of electronic information can be easily changed or modified,
It is a system that is sequentially incorporated into the DB of the Business Execution Management Mechanism as the business content specific to each business and the management condition of the business execution, and is used for the next business execution. Therefore, while using the electronic information medium, The contents of each setting work and the management conditions for the work execution are individually clarified as unique contents, and highly reliable work execution management can be performed according to each work content.

【0338】これにより、ネットワークを介して電子的
に業務遂行関係情報の授受を行ない、この情報を基に業
務を目標通りに遂行させるシステムが構築されるもので
ある。
As a result, a system for electronically exchanging work execution related information via the network and executing the work as intended based on this information is constructed.

【0339】また、電子情報化が難しいために生じる業
務内容や業務遂行の情報の不備や遺漏を少なくして、電
子情報やネットワークを利用した業務遂行管理システム
の実用化を促進する。
Further, it is possible to reduce the deficiencies and omissions of the work content and the information on the work execution caused by the difficulty in computerization, and promote the practical use of the work execution management system using the electronic information and the network.

【0340】また、ネットワークの特質を生かして、従
来の業務遂行の管理システムよりも人手を少なくし、か
つ、業務の依頼人や業務の遂行者のいずれにとっても満
足のいく業務の遂行を可能にした業務遂行管理システム
を提供することができる。
Further, by taking advantage of the characteristics of the network, it is possible to reduce the number of manpower as compared with the conventional management system for performing work and to perform the work which is satisfactory to both the requester of the work and the performer of the work. It is possible to provide a business performance management system that has performed.

【0341】本発明は、予め業務の内容が設定されてい
る設定業務について、その業務が設定された内容や条件
の通りに完遂されるように第三者(業務遂行管理機構)
に委託するような事例について広く適用できる業務遂行
管理システムである。
According to the present invention, with respect to the set work for which the contents of the work have been set in advance, a third party (work execution management mechanism) can execute the work according to the set contents and conditions.
It is a work performance management system that can be widely applied to cases that are outsourced to.

【0342】さらに、また、業務遂行の管理を依頼者自
身で行ない、かつ、その業務遂行管理は、第三者である
人や団体、または事業体等に委託して、設定した業務の
完遂を期すことも比較的簡単にできる。
Furthermore, the client himself / herself manages the execution of work, and the work execution management is outsourced to a person, group, business entity or the like who is a third party to complete the set work. It's relatively easy to do.

【0343】さらにまた、業務の遂行を依頼した依頼人
が自己の所有する財産や金銭等の財貨を業務遂行管理機
構に預託し、依頼人の業務の遂行管理や依頼業務の完遂
時に、業務遂行の代償としての金銭対価や財産分与等の
給付を依頼人に代わって行うようにすることも実現可能
になる。
Furthermore, the client who requested the performance of the business deposits the property and money such as money owned by himself / herself with the business performance management organization, and manages the performance of the business of the client and the completion of the requested business. It is also feasible to make payments such as monetary consideration and property distribution on behalf of the client.

【0344】[0344]

【発明の効果】以上説明したように、本発明はネットワ
ークなどを介して入力された電子情報を用いて業務遂行
の管理を行なうシステムや方法において、管理に使用す
る業務の設定情報や管理条件に柔軟性を持たせたシステ
ムであり、業務遂行の管理に必要な情報をネットワーク
を介して取入れ、それぞれの業務遂行の管理に固有な内
容にした設定情報や管理条件に基づいて業務の遂行管理
をするようにしたのであるから、電子情報をもとにする
業務遂行管理でありながら、業務遂行の管理のための情
報がいたずらに増加することを防ぎ、簡単に実現できな
かった電子情報に基づく業務遂行の管理を、実用化でき
る。
As described above, according to the present invention, in the system and method for managing the business performance by using the electronic information inputted through the network, the setting information and the management condition of the business to be used for the management are set. It is a flexible system that takes in information necessary for managing work execution through a network and manages work execution based on setting information and management conditions that are unique to each work execution management. Therefore, even though the business performance management is based on electronic information, it is possible to prevent the information for management of business performance from increasing unnecessarily and to perform business based on electronic information that could not be easily realized. The management of performance can be put to practical use.

【0345】また、電子情報を用いて構築された各業務
の設定情報や業務遂行の管理条件についても、業務遂行
に伴って生じる新しい課題や要望が出るごとに、これら
の課題や要望を依頼された業務の設定情報や業務遂行の
管理条件の中に逐次組込むことができるので、業務の内
容及び業務遂行の管理条件は、各依頼業務に最も適した
重点的な管理内容に的が絞られ、高度な業務遂行管理が
可能になる。
With respect to the setting information of each job constructed using electronic information and the management conditions for the job execution, each time a new task or request arises accompanying the job execution, these tasks and requests are requested. Since it can be sequentially incorporated into the setting information of the business and the management condition of the business execution, the content of the business and the management condition of the business execution are focused on the focused management content most suitable for each requested business, Advanced work performance management is possible.

【0346】また、本発明のような業務遂行管理システ
ムや方法における業務遂行管理機構は、主にネットワー
クを介して情報の授受をする第三者的な管理機構なの
で、業務の依頼者は、業務遂行に伴う課題や要望を気兼
ねなく提示することができ、従来の人的な業務遂行管理
の場合と比較して、私情を挟まずに客観性を高めた業務
遂行の管理をすることができ、この面からも仕事の完遂
度を向上させる。
Further, since the business performance management mechanism in the business performance management system and method according to the present invention is a third-party management mechanism that mainly sends and receives information via a network, the client of the business It is possible to present the tasks and requests accompanying the execution without hesitation, and it is possible to manage the execution of the operation with a higher degree of objectivity without interposing personal feelings, as compared with the conventional case of managing the execution of a person. , From this aspect as well, improve the degree of completion of work.

【0347】さらにまた、各依頼業務の遂行管理は、個
々の依頼業務ごとに特徴付けられた業務内容と管理情報
に基づいた業務遂行管理となるので、限られた電子情報
でも高度で信頼性の高い業務遂行の管理が可能となる。
Furthermore, since the performance management of each requested business is the business performance management based on the business content and management information characterized for each requested business, even limited electronic information is highly sophisticated and reliable. It is possible to manage high work performance.

【図面の簡単な説明】[Brief description of drawings]

【図1】業務遂行管理システムの全体構成図である。FIG. 1 is an overall configuration diagram of a work performance management system.

【図2】業務遂行管理システムにおける依頼者側装置の
詳細を示す構成図である。
FIG. 2 is a configuration diagram showing details of a client-side device in the work performance management system.

【図3】業務遂行管理システムにおける実施者側装置の
詳細を示す構成図である。
FIG. 3 is a configuration diagram showing details of a practitioner side device in the work performance management system.

【図4】業務管理委託と受託の内容を示す図である。FIG. 4 is a diagram showing the contents of business management consignment and entrustment.

【図5】設定業務DBの内容を示す図である。FIG. 5 is a diagram showing the contents of a setting work DB.

【図6】業務実績報告の内容を示す図である。FIG. 6 is a diagram showing the contents of a business performance report.

【図7】業務実績と成果DBの内容を示す図である。FIG. 7 is a diagram showing the contents of a business record and a result DB.

【図8】財貨等管理DBの内容を示す図である。FIG. 8 is a diagram showing the contents of a goods DB management DB.

【図9】再分析結果DBの内容を示す図である。FIG. 9 is a diagram showing the contents of a reanalysis result DB.

【図10】監視監査DBの内容を示す図である。FIG. 10 is a diagram showing the contents of a monitoring audit DB.

【図11】成果報告の内容を示す図である。FIG. 11 is a diagram showing the contents of a result report.

【図12】検収要望DBの内容を示す図である。FIG. 12 is a diagram showing the contents of an inspection request DB.

【図13】業務管理受託のフローチャートを示す図であ
る。
FIG. 13 is a diagram showing a flowchart of business management contract.

【図14】業務遂行実績報告処理のフローチャートを示
す図である。
FIG. 14 is a diagram showing a flowchart of a work performance record reporting process.

【図15】監視システムによる監視監査情報の入力のフ
ローチャートを示す図である。
FIG. 15 is a diagram showing a flowchart of inputting monitoring audit information by the monitoring system.

【図16】成果の検収と実施者への給付のフローチャー
トを示す図である。
FIG. 16 is a diagram showing a flowchart of acceptance inspection of results and payment of benefits to implementers.

【符号の説明】[Explanation of symbols]

1 依頼者 2 実施者 3 業務遂行管理機構 4 中央制御装置 5 差異分析手段 6 共通DB 7 業務受付サーバ 8 実績入手サーバ 9 検収受付サーバ 10 ネットワーク 11 業務管理設定IO 12 実績報告IO 13 成果報告IO 14 対価等給付IO 15 通信制御部 27 監査システム 28 監査入力IO 1 Client 2 Implementer 3 Business Performance Management Organization 4 Central control unit 5 Difference analysis means 6 common DB 7 Business reception server 8 achievement acquisition server 9 Acceptance acceptance server 10 network 11 Business management setting IO 12 Performance report IO 13 Results report IO 14 consideration payment IO 15 Communication control unit 27 Audit system 28 Audit Input IO

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 依頼者から遂行の依頼を受けた業務を実
施者に遂行させるとともに、その遂行管理をコンピュー
タネットワーク経由で行なう業務遂行管理システムにお
いて、業務の遂行管理をする業務遂行管理機構は、電子
情報の差異分析手段及び情報の授受を管理するサーバを
備え、コンピュータネットワークを介して入力された業
務遂行の実績情報と依頼業務の内容とを差異分析手段で
分析し、業務遂行実績に差異分析結果を加味した業務遂
行の成果を依頼者に報告する手段と、成果報告に関連し
て依頼者から受けた課題や要望を依頼業務の内容及び業
務遂行の管理条件の中に逐次組込む手段とを有している
ことを特徴とする業務遂行管理システム。
1. A business performance management system that manages performance of business in a business performance management system for causing a practitioner to carry out a business requested to be performed by a client and managing the performance via a computer network. Equipped with electronic information difference analysis means and a server that manages the exchange of information, the difference analysis means analyzes the performance information of requested work and the contents of the requested work input through the computer network, and the difference analysis is performed on the performance results. A means to report the results of the work execution considering the results to the client, and a means to incorporate the issues and requests received from the client in connection with the result report into the contents of the requested work and the management conditions of the work execution one by one. A business performance management system characterized by having.
【請求項2】 依頼者から遂行の依頼を受けた業務を実
施者に遂行させるとともに、その遂行管理をコンピュー
タネットワーク経由で行なう業務遂行管理システムにお
いて、業務の遂行管理をする業務遂行管理機構は、電子
情報の差異分析手段、情報の授受を管理するサーバを備
えると共に、業務遂行の監視システムを有し、コンピュ
ータネットワークを介して入力された業務遂行の実績情
報及び監視システムから入力された監視情報と依頼業務
の内容とを差異分析手段で分析し、業務遂行実績に差異
分析結果を加味した業務遂行の成果を依頼者に報告する
手段と、成果報告に関連して依頼者から受けた業務遂行
に関する課題や要望を実施者に提示する手段と、依頼業
務の内容及び業務遂行の管理条件の中に業務遂行に関す
る課題や要望を逐次組込む手段と、実施者に対価の給付
を行なう手段とを備えたことを特徴とする業務遂行管理
システム。
2. A business performance management system for managing the performance of business in a business performance management system for causing a practitioner to carry out a business requested to be carried out by a client and managing the performance through a computer network. The system includes an electronic information difference analysis unit, a server that manages the exchange of information, and a business performance monitoring system. The business performance record information input via a computer network and the monitoring information input from the monitoring system are provided. A means for analyzing the contents of the requested work with a difference analysis means and reporting the result of the work execution that adds the difference analysis result to the work execution result to the client and the work execution received from the client in relation to the result report. A means for presenting issues and requests to the practitioner, and the issues and requests related to business execution in the content of requested business and management conditions for business execution A work performance management system comprising means for incorporating and means for paying a compensation to an implementer.
【請求項3】 依頼者から遂行の依頼を受けた業務を実
施者に遂行させるとともに、その遂行管理をコンピュー
タネットワーク経由で管理する方法において、業務の遂
行管理をする業務遂行管理機構には、依頼業務の設定情
報を得るステップと、コンピュータネットワークを介し
て業務の遂行実績情報を得るステップと、依頼業務の内
容を設定した情報と業務遂行の実績情報との差異分析を
するステップと、差異分析結果を加味した業務遂行の成
果を依頼者に報告するステップと、業務遂行の成果情報
に対する課題や要望を依頼者から受けるステップと、業
務遂行に関する課題や要望を実施者に提示するステップ
と、依頼業務の内容及び業務遂行の管理条件の中に上記
課題や要望を逐次組込むステップとを備えたことを特徴
とする業務遂行管理の方法。
3. In a method of causing an implementer to perform a job requested by a client to perform the job and managing the job execution via a computer network, the job execution management mechanism for managing the job is requested to The step of obtaining the setting information of the task, the step of obtaining the achievement information of the task through the computer network, the step of analyzing the difference between the information setting the contents of the requested task and the achievement information of the task, and the difference analysis result. The step of reporting the results of the business execution to the client, the step of receiving the issues and requests from the client for the information on the results of the business execution, the step of presenting the issues and requests regarding the business execution to the practitioner, and the requested business Business execution management characterized by the steps of sequentially incorporating the above-mentioned issues and requests into the content and management conditions for business execution the method of.
【請求項4】 依頼者から遂行の依頼を受けた業務を実
施者に遂行させるとともに、その遂行をコンピュータネ
ットワーク経由で管理する方法において、業務の遂行管
理をする業務遂行管理機構には、依頼業務の内容を設定
した情報や業務遂行の管理条件をコンピュータネットワ
ークを介して得るステップと、業務の遂行実績情報をコ
ンピュータネットワークを介して得るステップと、業務
遂行に関する監視情報をコンピュータネットワークを介
して得るステップと、業務遂行の実績情報及び監視情報
と依頼業務の設定情報とを差異分析し管理条件を加味し
つつ業務遂行の成果情報にまとめるステップと、該業務
遂行の成果を依頼者に報告するステップと、成果報告に
関連して依頼者から受けた業務遂行に関する課題や要望
を実施者に提示するステップと、依頼業務の内容及び業
務遂行の管理条件の中に業務遂行に関する課題や要望を
逐次組込んで依頼業務の遂行に関する新たな設定情報及
び管理条件を作るステップとを備えたことを特徴とする
業務遂行管理の方法。
4. In a method of causing a practitioner to perform a job requested to be performed by a client and managing the execution of the job via a computer network, the job execution management mechanism that manages the job is requested to Of obtaining information on which the contents of the above are set and management conditions for business execution via a computer network, obtaining performance record information of the business via the computer network, and obtaining monitoring information on the business execution via the computer network. And a step of analyzing the difference between the performance information and the monitoring information of the work execution and the setting information of the requested work and collecting the result information of the work execution while adding management conditions, and a step of reporting the result of the work execution to the requester. , Presents to the practitioner the issues and requests regarding the performance of work received from the client in relation to the result report And a step of creating new setting information and management conditions relating to the performance of the requested business by sequentially incorporating tasks and requests relating to the performance of the business into the contents of the requested business and the management conditions of the business performance. How to manage work performance.
【請求項5】 業務遂行の監視システムが、依頼業務の
実施者による業務の遂行を電子情報に変換する電気的検
知装置と該検知装置で得られた情報を業務遂行管理機構
へ送信する送信装置とを有していることを特徴とする、
請求項2に記載の業務遂行管理システム。
5. A business performance monitoring system, an electrical detection device for converting the performance of a work performed by a requesting business operator into electronic information, and a transmission device for transmitting the information obtained by the detection device to a business performance management mechanism. Characterized by having,
The business performance management system according to claim 2.
【請求項6】 業務遂行に関する監視情報が、業務の実
施者による依頼業務の遂行を電子情報に変換し、コンピ
ュータネットワークを介して業務遂行管理機構へ自動的
に送信する機能を備えた監視システムから送られた情報
であることを特徴とする請求項4に記載の業務遂行管理
の方法。
6. A monitoring system having a function of converting monitoring information related to business execution into electronic information of the execution of requested business operation by an operator of the business and automatically transmitting the information to a business operation management mechanism via a computer network. The business performance management method according to claim 4, wherein the information is sent information.
JP2002118331A 2002-04-19 2002-04-19 System and method for task performance control Pending JP2003316933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002118331A JP2003316933A (en) 2002-04-19 2002-04-19 System and method for task performance control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002118331A JP2003316933A (en) 2002-04-19 2002-04-19 System and method for task performance control

Publications (1)

Publication Number Publication Date
JP2003316933A true JP2003316933A (en) 2003-11-07

Family

ID=29535257

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002118331A Pending JP2003316933A (en) 2002-04-19 2002-04-19 System and method for task performance control

Country Status (1)

Country Link
JP (1) JP2003316933A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008071308A (en) * 2006-09-15 2008-03-27 Takeshi Hamada Deposit management system supporting aged and handicapped using network
JP2009534736A (en) * 2006-04-21 2009-09-24 ディーエムディー カンパニー リミテッド Network-based information technology solution development management system and method
JP2009237956A (en) * 2008-03-27 2009-10-15 Hitachi Ltd Contract content setting system and contract content setting method
JP2014164344A (en) * 2013-02-21 2014-09-08 Yahoo Japan Corp Problem sharing device, problem sharing method, and program
WO2016088386A1 (en) * 2014-12-01 2016-06-09 株式会社日立システムズ Wellbeing support management system, wellbeing support management method
JP2020166381A (en) * 2019-03-28 2020-10-08 重政 河合 Method for religious service, computer program, and religious service examination device
JP2020166872A (en) * 2020-05-27 2020-10-08 重政 河合 Method for religious service, computer program, and religious service examination device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009534736A (en) * 2006-04-21 2009-09-24 ディーエムディー カンパニー リミテッド Network-based information technology solution development management system and method
JP2008071308A (en) * 2006-09-15 2008-03-27 Takeshi Hamada Deposit management system supporting aged and handicapped using network
JP2009237956A (en) * 2008-03-27 2009-10-15 Hitachi Ltd Contract content setting system and contract content setting method
JP2014164344A (en) * 2013-02-21 2014-09-08 Yahoo Japan Corp Problem sharing device, problem sharing method, and program
WO2016088386A1 (en) * 2014-12-01 2016-06-09 株式会社日立システムズ Wellbeing support management system, wellbeing support management method
CN105849767A (en) * 2014-12-01 2016-08-10 株式会社日立系统 Wellbeing support management system, wellbeing support management method
JP2020166381A (en) * 2019-03-28 2020-10-08 重政 河合 Method for religious service, computer program, and religious service examination device
JP2020166872A (en) * 2020-05-27 2020-10-08 重政 河合 Method for religious service, computer program, and religious service examination device
JP7269655B2 (en) 2020-05-27 2023-05-09 重政 河合 Ritual method, computer program, and ritual examination device

Similar Documents

Publication Publication Date Title
US10713676B1 (en) Method and system for managing distributor information
US6941305B2 (en) Customer management system for automobile sales industry
Fong Relative CEO underpayment and CEO behaviour towards R&D spending
US8355926B1 (en) Health and life sciences medicaid high performance capability assessment
US20030225683A1 (en) Electronic bid/proposal system for the construction industry
US20030074273A1 (en) Apparatus and method for facilitating trade
JP2003504701A (en) Portfolio investment guidelines / compliance and financial fund management system
KR101435615B1 (en) System and method for managing the real estate trust
US20230075217A1 (en) Method for evaluation and payout of parametric risk-coverage for hard-to-insure risks using distributed ledger and associated system
JP2003316933A (en) System and method for task performance control
Clerkin et al. Integrating AIS and contemporary technologies
US20050246213A1 (en) Method and system for planning and facilitating a venture
JP2009230380A (en) Support method and support system of maintenance procedure processing, and computer program for making computer execute support of maintenance procedure processing
KR20170014338A (en) Erp system having a structure of modularized frame
JP2005134937A (en) Financing examination system and financing examination program
KR20210110531A (en) Method for transparent real estate transactions
KR20060123983A (en) System for credit examination of banking organ and method thereof
KR100428070B1 (en) System and method for checking operation state of information system and media for storing program source thereof
KR20070116359A (en) Real estate construction system using for internet
KR20090035292A (en) Financing-linkage resource planning system for small enterprise&#39;s specific business needs
Uddin Prospects and challenges of e-procurement in government purchases: a study on e-procurement in LGED, Narayanganj District
US20230334576A1 (en) System architecture for a digital platform
KR20020031612A (en) Management analysis application system and method for real property complex information consturuction be based on judgment valuation
US20240087063A1 (en) Computer-implemented document transformation systems and methods
Suprapto et al. The Effectiveness of Application of the Confins System in Consumer Service at BFI Gorontalo

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050408

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080205

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080610