JP2003316401A - Watching control system - Google Patents

Watching control system

Info

Publication number
JP2003316401A
JP2003316401A JP2002124471A JP2002124471A JP2003316401A JP 2003316401 A JP2003316401 A JP 2003316401A JP 2002124471 A JP2002124471 A JP 2002124471A JP 2002124471 A JP2002124471 A JP 2002124471A JP 2003316401 A JP2003316401 A JP 2003316401A
Authority
JP
Japan
Prior art keywords
control
wireless
plant equipment
control means
wireless terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002124471A
Other languages
Japanese (ja)
Inventor
Mitsuteru Kano
充照 加納
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nissin Electric Co Ltd
Original Assignee
Nissin Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nissin Electric Co Ltd filed Critical Nissin Electric Co Ltd
Priority to JP2002124471A priority Critical patent/JP2003316401A/en
Publication of JP2003316401A publication Critical patent/JP2003316401A/en
Pending legal-status Critical Current

Links

Abstract

<P>PROBLEM TO BE SOLVED: To provide a watching control system which can restrict rights of control of a plant machinery when a plurality of radio terminals can be operated at field-side. <P>SOLUTION: In this system, at the case that a central watching control panel 10 has the rights of control of a plant machinery 80, when an operation that the rights of control are switched from the central watching control panel side to radio terminals 20, 30 by the radio terminal 20, for example, is performed; the terminal 20 is made to notify to another radio terminal 30 and the central watching control panel 10 that the operation is performed. The rights of control are restricted so that only the radio terminal 20 which switched over the rights of control of the plant machinery 80 to the field-side can perform the control and operation of the plant machinery 80, until it abandons the rights of control. Furthermore, when the switching operation is performed by the other radio terminal 30 at the time that the ratio terminal 20 holds the rights of control, the information that the switching operation is performed by the other radio terminal 30 is notified to the radio terminal 20 with the management number of the radio terminal 30. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、 プラント機器を
監視・制御する監視制御システムであって、無線端末を
用いてプラント機器の設置場所でプラント機器を制御可
能な監視制御システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a supervisory control system for monitoring and controlling plant equipment, and more particularly to a supervisory control system capable of controlling plant equipment at a place where the plant equipment is installed by using a wireless terminal.

【0002】[0002]

【従来の技術】水処理システムや交通管制システムなど
では、複数の場所の水量や交通量を監視制御するため、
使用するプラント機器が分散して配置されている。各プ
ラント機器の制御装置(現場操作盤)は、メンテナンス
や事故発生後の復旧などのためにプラント機器の近くに
設置している。また、複数のプラント機器を集中的に監
視制御する方が効率的であるため、中央監視室を設け
て、そこに各プラント機器の監視・制御装置を設置して
いる。
2. Description of the Related Art In a water treatment system, a traffic control system, etc., in order to monitor and control the water volume and traffic volume at a plurality of places,
The plant equipment to be used is distributed and arranged. The control device (field control panel) for each plant device is installed near the plant device for maintenance and restoration after an accident. Further, since it is more efficient to centrally monitor and control a plurality of plant equipment, a central monitoring room is provided and a monitoring / control device for each plant equipment is installed therein.

【0003】図4は、従来の監視制御システムの構成を
簡略的に示したブロック図である。プラント機器140
を監視・制御する監視制御システム101は、図4に示
したように、中央監視制御盤110、現場操作盤12
0、及び補助リレー盤130により構成されている。
FIG. 4 is a block diagram schematically showing the structure of a conventional supervisory control system. Plant equipment 140
As shown in FIG. 4, the monitoring control system 101 that monitors and controls the central monitoring control panel 110 and the site control panel 12
0 and the auxiliary relay board 130.

【0004】中央監視制御盤110は、プラント機器1
40を制御するための操作スイッチ111を備えてい
る。
The central monitoring and control panel 110 is a plant device 1
An operation switch 111 for controlling the 40 is provided.

【0005】現場操作盤120は、プラント機器140
を制御するための操作スイッチ121、及びプラント機
器140の制御を中央監視制御盤110と現場操作盤1
20とのどちらが行うかを切り替えるための制御権切り
替えスイッチ122を備えている。
The field control panel 120 is a plant device 140.
The operation switch 121 for controlling the plant and the control of the plant equipment 140 are controlled by the central monitoring control panel 110 and the field operation panel 1.
The control right changeover switch 122 is provided for switching which of 20 and 20 performs.

【0006】補助リレー盤130は、中央監視制御盤1
10の操作スイッチ111からのON/OFF信号をプ
ラント機器140に伝達するリレー接点又はシーケンサ
のポジション(以下、POSと称する)131、現場操
作盤120の操作スイッチ121からのON/OFF信
号をプラント機器140に伝達するPOS132、及び
現場操作盤120の操作スイッチ122からの中央監視
制御盤110(中央側)/現場操作盤120(現場側)
の制御権切り替え信号に応じて、POS131からの信
号と、POS132からの信号と、を切り替えてプラン
ト機器140に伝達するPOS133を備えている。
The auxiliary relay board 130 is the central monitoring and control board 1
A relay contact or a position (hereinafter, referred to as POS) 131 of a sequencer for transmitting an ON / OFF signal from the operation switch 111 of 10 to the plant equipment 140, and an ON / OFF signal from the operation switch 121 of the field operation panel 120 to the plant equipment. POS 132 transmitted to 140, and central monitoring control panel 110 (center side) / operation panel 120 (site side) from operation switch 122 of site operation panel 120.
A POS 133 that switches between a signal from the POS 131 and a signal from the POS 132 and transmits the signal to the plant equipment 140 according to the control right switching signal of.

【0007】なお、監視制御システム101では、メン
テナンス時などにおける事故防止のために、中央監視制
御盤110と、現場操作盤120と、のいずれがプラン
ト機器100の制御権を保持させるかは、現場操作盤1
20でのみ設定できるようになっている。また、監視制
御システム101では、説明を簡略化するために、操作
スイッチを最低限の数量にしているが、実際の監視制御
システムは複数の操作スイッチを備えている。
In the supervisory control system 101, which one of the central supervisory control panel 110 and the site operation panel 120 retains the control right of the plant equipment 100 in order to prevent accidents during maintenance, etc. Control panel 1
Only 20 can be set. Further, in the supervisory control system 101, the number of operation switches is set to the minimum number in order to simplify the description, but the actual supervisory control system includes a plurality of operation switches.

【0008】次に、監視制御システム101の動作につ
いて、現場でメンテナンスを実施する場合について説明
する。
Next, the operation of the supervisory control system 101 will be described for the case where maintenance is performed on site.

【0009】(1)中央→現場制御権切り替え メンテナンスの実施前は、監視員が中央監視室の中央監
視制御盤110によってプラント機器140の監視制御
を行っている。この時、プラント機器140の制御権
は、中央監視制御盤110(以下、中央側とも言う。)
にあり、この状態では現場操作盤120(以下、現場側
とも言う。)からの操作はロックされている。
(1) Central → Site Control Right Switching Before the maintenance is performed, the supervisor controls the plant equipment 140 by the central supervisory control panel 110 in the central supervisory room. At this time, the control right of the plant device 140 is controlled by the central monitoring control panel 110 (hereinafter, also referred to as the central side).
In this state, the operation from the site operation panel 120 (hereinafter, also referred to as the site side) is locked.

【0010】まず、保守員は、通信機器(例えば、電話
など)を用いて、メンテナンスを開始する旨を中央監視
室の監視員に連絡の上、現場操作盤120の制御権切り
替えスイッチ122を中央側から現場側に切り替える。
これに伴い、コントロールセンタ内に設置された補助リ
レー盤130のPOS133が現場側に切り替わり、プ
ラント機器140への現場操作盤120からの操作が有
効となり、中央監視制御盤110からの操作はロックさ
れる。つまり、プラント機器140の制御権は、現場側
が保持することになる。
First, the maintenance staff uses a communication device (for example, a telephone) to inform the supervisor in the central monitoring room that maintenance is to be started, and then the control right changeover switch 122 of the site control panel 120 is centrally operated. Side to the site side.
Along with this, the POS 133 of the auxiliary relay panel 130 installed in the control center is switched to the site side, the operation from the site operation panel 120 to the plant equipment 140 becomes effective, and the operation from the central monitoring control panel 110 is locked. It That is, the control right of the plant equipment 140 is held by the site side.

【0011】(2)プラント機器制御 保守員は、現場操作盤120の操作スイッチ121をO
NからOFFに切り替える。これに伴い、補助リレー盤
130のPOS132がOFFに切り替えられて、プラ
ント機器140の制御が実行される。つまり、操作スイ
ッチ121の上記の操作により、プラント機器140が
運転状態から停止状態へ切り替えられる。保守員は、プ
ラント機器140が停止状態になると、メンテナンスを
実行する。
(2) The plant equipment control maintenance worker turns on the operation switch 121 of the site operation panel 120.
Switch from N to OFF. Along with this, the POS 132 of the auxiliary relay board 130 is switched to OFF, and the control of the plant equipment 140 is executed. That is, the plant device 140 is switched from the operating state to the stopped state by the above operation of the operation switch 121. The maintenance staff performs maintenance when the plant device 140 is stopped.

【0012】続いて、保守員は、メンテナンスが終了す
るとプラント機器140の動作確認を行うために、現場
操作盤120の操作スイッチ121をOFFからONに
切り替える。これに伴い、補助リレー盤130のPOS
132がONに切り替えられて、プラント機器140の
制御が実行される。つまり、操作スイッチ121の切り
替えにより、プラント機器140が停止状態から運転状
態へ切り替えられる。保守員は、プラント機器140が
運転状態になると、動作確認を実行する。
Next, when the maintenance is completed, the maintenance staff switches the operation switch 121 of the site operation panel 120 from OFF to ON in order to confirm the operation of the plant equipment 140. Along with this, the POS of the auxiliary relay panel 130
132 is switched to ON, and the plant device 140 is controlled. That is, by switching the operation switch 121, the plant device 140 is switched from the stopped state to the operating state. When the plant device 140 is in the operating state, the maintenance staff executes an operation check.

【0013】(3)現場→中央制御権切り替え 保守員は、プラント機器140の動作確認が完了する
と、制御権を中央監視制御盤に切り替えるために、現場
操作盤120の操作スイッチ122を現場側から中央側
に切り替える。これにより、POS133が中央側に切
り替わり、中央監視制御盤110にてプラント機器14
0の制御が可能になり、現場操作盤120からの操作が
ロックされる。中央監視室の監視員は、これ以降、中央
監視制御盤110で、通常通りプラント機器140の監
視・制御を行うことができる。
(3) Site-to-central control right switching When the operation confirmation of the plant equipment 140 is completed, the maintenance staff switches the control right to the central supervisory control panel from the site side by operating the operation switch 122 of the site control panel 120. Switch to the center side. As a result, the POS 133 is switched to the center side, and the plant equipment 14 is switched by the central monitoring and control panel 110.
The control from 0 becomes possible, and the operation from the site operation panel 120 is locked. After that, the supervisor in the central monitoring room can monitor and control the plant equipment 140 as usual using the central monitoring and control panel 110.

【0014】上記の監視制御システム101では、現場
操作盤120がプラント機器140の近くに設置されて
いるが、多少離れた位置に設置されていた。そのため、
保守員が1人でメンテナンスを行う場合、現場操作盤1
20とプラント機器140との間を行き来しながら作業
を行わなければならなかった。また、保守員が2人でメ
ンテナンスを行う場合、現場操作盤120を操作する保
守員と、プラント機器140を確認する保守員と、が通
信機器で連絡しながら作業を行わなければならなかっ
た。このように、いずれにしても、不便な作業を強いら
れることが多かった。
In the above-mentioned supervisory control system 101, the site operation panel 120 is installed near the plant equipment 140, but it is installed at a slightly distant position. for that reason,
On-site control panel 1 when one maintenance person performs maintenance
The work had to be done back and forth between the 20 and the plant equipment 140. Further, when the maintenance personnel perform maintenance by two persons, the maintenance personnel who operates the site operation panel 120 and the maintenance personnel who confirms the plant equipment 140 must perform the work while communicating with each other through communication equipment. As described above, in any case, inconvenient work is often required.

【0015】そこで、現場操作盤120の代わりとし
て、無線端末を用いてプラント機器の操作が可能な監視
制御システムが提案されている。図5は、図4とは異な
る従来の監視制御システムの構成を簡略的に示したブロ
ック図である。図5に示したように、プラント機器21
0を監視・制御する監視制御システム102は、中央監
視制御盤150、無線端末160、予備用の無線端末1
70、無線基地局180、サーバ190、及び補助リレ
ー盤200により構成されている。
Therefore, instead of the site operation panel 120, there has been proposed a monitoring control system capable of operating plant equipment by using a wireless terminal. FIG. 5 is a block diagram schematically showing the configuration of a conventional supervisory control system different from that of FIG. As shown in FIG. 5, the plant equipment 21
The monitoring control system 102 for monitoring and controlling 0 includes a central monitoring control panel 150, a wireless terminal 160, and a standby wireless terminal 1.
70, a wireless base station 180, a server 190, and an auxiliary relay board 200.

【0016】中央監視制御盤150は、監視制御システ
ム101の中央監視制御盤110と同様の構成であり、
プラント機器210を制御するための操作スイッチ15
1を備えている。
The central supervisory control board 150 has the same structure as the central supervisory control board 110 of the supervisory control system 101,
Operation switch 15 for controlling the plant equipment 210
1 is provided.

【0017】無線端末160は、プラント機器210を
制御するための操作スイッチ161、及びプラント機器
210の制御権を中央監視制御盤150と、無線端末1
60及び無線端末170と、に切り替えるための制御権
切り替えスイッチ162を備えている。また、無線端末
160は、補助リレー盤200へ信号を無線で送信する
ための通信部163を備えている。
The wireless terminal 160 includes an operation switch 161 for controlling the plant equipment 210, and a central monitoring control panel 150 for controlling the plant equipment 210 and the wireless terminal 1.
60 and the wireless terminal 170, and a control right switching switch 162 for switching between the wireless communication terminal 60 and the wireless terminal 170. The wireless terminal 160 also includes a communication unit 163 for wirelessly transmitting a signal to the auxiliary relay board 200.

【0018】無線端末170は、無線端末160と同様
の構成であり、プラント機器210を制御するための操
作スイッチ171、及びプラント機器210の制御権を
切り替えるための切り替えスイッチ172を備えてい
る。また、無線端末170は、補助リレー盤200へ信
号を無線で送信するための通信部173を備えている。
The wireless terminal 170 has the same structure as the wireless terminal 160, and includes an operation switch 171 for controlling the plant equipment 210 and a changeover switch 172 for switching the control right of the plant equipment 210. The wireless terminal 170 also includes a communication unit 173 for wirelessly transmitting a signal to the auxiliary relay board 200.

【0019】無線基地局180は、無線端末160及び
無線端末170から送信された信号をサーバ190へ伝
達する中継装置である。また、無線基地局180は、無
線端末160及び無線端末170と無線で通信するため
の無線通信部181を備えている。
The radio base station 180 is a relay device for transmitting the signals transmitted from the radio terminals 160 and 170 to the server 190. The wireless base station 180 also includes a wireless communication unit 181 for wirelessly communicating with the wireless terminals 160 and 170.

【0020】サーバ190は、無線端末160,170
からの制御信号を、補助リレー盤200の制御信号に変
換するための装置である。
The server 190 includes wireless terminals 160 and 170.
It is a device for converting the control signal from the control signal of the auxiliary relay board 200.

【0021】補助リレー盤200は、中央監視制御盤1
50の操作スイッチ151からのON/OFF信号をプ
ラント機器210に伝達するPOS201、無線端末1
60,170の操作スイッチ161,171からのON
/OFF信号をプラント機器210に伝達するPOS2
02、及び無線端末160,170の操作スイッチ16
2,172からの中央/現場の制御権切り替え信号に応
じて、POS201からの信号と、POS202からの
信号と、を切り替えてプラント機器210に伝達するP
OS203を備えている。
The auxiliary relay board 200 is a central monitoring control board 1
POS 201 that transmits an ON / OFF signal from operation switch 151 of 50 to plant equipment 210, wireless terminal 1
ON from operation switches 161 and 171 of 60 and 170
POS2 that transmits the ON / OFF signal to the plant equipment 210
02 and the operation switches 16 of the wireless terminals 160 and 170
2, 172 switches the signal from the POS 201 and the signal from the POS 202 according to the central / site control right switching signal, and transmits the signal to the plant equipment 210.
The OS 203 is provided.

【0022】監視制御システム102において、無線端
末160,170は、監視制御システム101の現場操
作盤120が有するプラント機器の監視や制御を行うこ
とができる。また、これに加えて、容易に持ち運び可能
である。したがって、無線基地局180に対して送信し
た電波の届く範囲であれば、任意の場所からプラント機
器210の運転や停止などの制御が可能である。また、
中央側と現場側との制御権の切り替えも容易に行うこと
ができる。
In the supervisory control system 102, the wireless terminals 160 and 170 can monitor and control the plant equipment included in the on-site operation panel 120 of the supervisory control system 101. In addition to this, it is easily portable. Therefore, it is possible to control the operation and stop of the plant equipment 210 from any place within the range where the radio wave transmitted to the radio base station 180 can reach. Also,
The control right can be easily switched between the central side and the site side.

【0023】よって、1人の保守員が無線端末160を
操作しながら、プラント機器210の設置場所でメンテ
ナンスなどを行うことが可能となり、メンテナンスなど
の作業効率を向上させることができた。
Therefore, it becomes possible for one maintenance person to perform maintenance or the like at the installation location of the plant equipment 210 while operating the wireless terminal 160, and it has been possible to improve work efficiency such as maintenance.

【0024】[0024]

【発明が解決しようとする課題】監視制御システム10
2では、主に無線端末160を使用してプラント機器2
10の制御を行い、無線端末160が故障した場合など
に予備として無線端末170を使用することを想定して
設計されていた。そのため、監視制御システム102で
は、無線端末160及び無線端末170の操作の重複を
防止する構成を備えておらず、現場側でプラント機器2
10の制御を行っている際に、無線端末160及び無線
端末170を共に使用すると、事故が発生する危険性が
高かった。
The supervisory control system 10
2 mainly uses the wireless terminal 160 to operate the plant equipment 2
10 was controlled, and the wireless terminal 170 was designed to be used as a spare when the wireless terminal 160 fails. Therefore, the monitoring control system 102 does not have a configuration for preventing duplication of the operations of the wireless terminals 160 and 170, and the plant device 2 is
If both the wireless terminal 160 and the wireless terminal 170 are used during the control of 10, there is a high risk of an accident.

【0025】例えば、保守員Aが無線端末160を携帯
し、保守員Bが無線端末170を携帯しているとする。
保守員Aが無線端末160の操作スイッチ162を中央
側から現場側に切り替えると、プラント機器210の制
御権が現場側に切り替わる。これにより、プラント機器
210の制御や、現場側と中央側との制御権の切り替え
は、無線端末160でも無線端末170でも操作可能と
なってしまう。そのため、保守員Aが無線端末160を
操作してプラント機器210のメンテナンスを実施して
いる場合に、誤って保守員Bが無線端末170を操作し
てしまうと、プラント機器210が保守員Aの意図しな
い動作をして、事故が発生する可能性があり、非常に危
険である。
For example, it is assumed that the maintenance person A carries the wireless terminal 160 and the maintenance person B carries the wireless terminal 170.
When the maintenance worker A switches the operation switch 162 of the wireless terminal 160 from the center side to the site side, the control right of the plant equipment 210 is switched to the site side. As a result, the control of the plant equipment 210 and the switching of the control right between the site side and the center side can be operated by the wireless terminal 160 or the wireless terminal 170. Therefore, when the maintenance staff A operates the wireless terminal 160 to perform maintenance on the plant equipment 210, and the maintenance staff B mistakenly operates the wireless terminal 170, the plant equipment 210 becomes Accidents may occur due to unintended operation, which is extremely dangerous.

【0026】そこで、本発明は、上記の課題を解決する
ために、現場側で複数の無線端末を操作可能な場合に、
プラント機器の制御権を制限可能な監視制御システムを
提供することを目的とする。
Therefore, in order to solve the above-mentioned problems, the present invention is directed to a case where a plurality of wireless terminals can be operated on the site side.
An object of the present invention is to provide a supervisory control system capable of limiting the control right of plant equipment.

【0027】[0027]

【課題を解決するための手段】この発明は、上記の課題
を解決するための手段として、以下の構成を備えてい
る。
The present invention has the following structure as means for solving the above problems.

【0028】(1)プラント機器を設置場所で制御可能
な複数の無線制御手段と、該プラント機器を監視・制御
する中央監視制御手段と、該無線制御手段と該中央監視
制御手段とのどちらが該プラント機器を制御するか制御
権を切り替える制御権切り替え手段と、該複数の無線制
御手段から操作要求があった場合に、1つの無線制御手
段のみが該プラント機器を制御するように管理する管理
手段と、該無線制御手段と該管理手段との通信を中継す
る無線中継手段と、を備えたことを特徴とする。
(1) A plurality of wireless control means capable of controlling the plant equipment at the installation location, a central monitoring control means for monitoring and controlling the plant equipment, and which of the wireless control means and the central monitoring control means is used. Control right switching means for controlling the plant equipment or switching the control right, and management means for managing so that only one wireless control means controls the plant equipment when there is an operation request from the plurality of wireless control means. And wireless relay means for relaying communication between the wireless control means and the management means.

【0029】この構成においては、監視制御システム
は、複数の無線制御手段から操作要求があっても、1つ
の無線制御手段のみが該プラント機器を制御するように
管理手段で管理する。したがって、他の無線端末からプ
ラント機器に対して操作を誤って行った場合でも、事故
の発生を防止することが可能となる。
In this configuration, the supervisory control system manages by the management means such that only one wireless control means controls the plant equipment even if there is an operation request from the plurality of wireless control means. Therefore, it is possible to prevent the occurrence of an accident even when the wireless device is erroneously operated on the plant equipment.

【0030】(2)前記無線制御手段は、前記中央監視
制御手段から前記無線制御手段に制御権を切り替える制
御権切り替え手段を備え、前記管理手段は、前記プラン
ト機器の制御権を前記複数の無線制御手段のいずれも保
持していない時に、前記制御権切り替え手段の操作があ
った無線制御手段のみに制御権を付与し、該制御権付与
後は他の無線制御手段の操作を無効にすることを特徴と
する。
(2) The wireless control means includes control right switching means for switching the control right from the central supervisory control means to the wireless control means, and the management means controls the control right of the plant equipment to the plurality of wireless devices. When none of the control means is held, the control right is given only to the wireless control means that has operated the control right switching means, and the operation of the other wireless control means is invalidated after the control right is given. Is characterized by.

【0031】この構成においては、プラント機器の制御
権を複数の無線制御手段のいずれも保持していない時
に、制御権切り替え手段の操作があった無線制御手段の
みに制御権を付与し、該制御権付与後は他の無線制御手
段の操作を無効にする。したがって、制御権切り替え手
段の操作があった無線制御手段のみがプラント機器の制
御権を保持するので、無線制御手段の操作者は、他の無
線端末から操作があってもプラント機器は動作しないの
で、事故などの発生を心配することなく作業を行うこと
が可能となる。
In this configuration, when the control right of the plant equipment is not held by any of the plurality of wireless control means, the control right is given only to the wireless control means that has been operated by the control right switching means, and the control is performed. After the right is granted, the operation of other wireless control means is invalidated. Therefore, since only the wireless control means that has operated the control right switching means retains the control right of the plant equipment, the operator of the wireless control means does not operate the plant equipment even if an operation is performed from another wireless terminal. It is possible to work without worrying about the occurrence of an accident.

【0032】(3)前記管理手段は、前記無線制御手段
に付与した制御権を解除可能な非常時操作手段を備えた
ことを特徴とする。
(3) The management means is provided with an emergency operation means capable of releasing the control right given to the wireless control means.

【0033】この構成においては、非常時操作手段で無
線制御手段に付与した制御権を解除可能である。したが
って、プラント機器の制御権を保持している無線制御手
段が故障した場合は、非常時操作手段を操作して、プラ
ント機器の制御権を解除できるので、監視制御システム
全体をリセットすることなく、他の無線制御手段でプラ
ント機器の操作を行うことが可能となる。
In this structure, the control right given to the wireless control means can be released by the emergency operation means. Therefore, if the wireless control means holding the control right of the plant equipment fails, the emergency operation means can be operated to release the control right of the plant equipment, without resetting the entire supervisory control system. It becomes possible to operate the plant equipment by other wireless control means.

【0034】(4)前記管理手段は、前記プラント機器
の制御権を前記複数の無線制御手段のいずれも保持して
いない時に、1つの前記無線制御手段で操作を開始する
ための操作要求を行うと、該無線制御手段から操作要求
があったことを他の無線制御手段へ通知することを特徴
とする。
(4) The management means issues an operation request for starting an operation with one wireless control means when the control right of the plant equipment is not held by any of the plurality of wireless control means. Then, the fact that there is an operation request from the wireless control means is notified to another wireless control means.

【0035】この構成においては、複数の無線制御手段
のいずれもプラント機器の制御権を保持していない時
に、1つの前記無線制御手段で操作を開始するための操
作要求があった場合、管理手段は、他の無線制御手段へ
その旨を通知する。したがって、プラント機器の制御権
を操作要求があった無線制御手段がこれから保持するこ
とを他の無線制御手段の操作者は把握することが可能に
なる。
In this configuration, when none of the plurality of wireless control means has the control right of the plant equipment and there is an operation request for starting the operation by one wireless control means, the management means Notifies other wireless control means to that effect. Therefore, it becomes possible for the operator of the other wireless control means to know that the wireless control means that has made an operation request will retain the control right for the plant equipment.

【0036】(5)前記管理手段は、1つの前記無線制
御手段が前記プラント機器の制御権を保持している時
に、他の前記無線制御手段から操作要求があると、該制
御権を保持している無線制御手段へ他の前記無線制御手
段から操作要求があったことを通知することを特徴とす
る。
(5) The management unit holds the control right when one of the wireless control units holds the control right of the plant equipment and when there is an operation request from another wireless control unit. The wireless control means is informed that there is an operation request from another wireless control means.

【0037】この構成においては、1つの無線制御手段
がプラント機器の制御権を保持している場合、管理手段
は、他の無線制御手段から操作要求があると、制御権を
保持している無線制御手段へ他の無線制御手段から操作
要求があったことを通知する。したがって、プラント機
器の制御権を保持している無線端末の操作者は、操作要
求があった無線端末の操作者に対して、プラント機器の
制御権の解放が必要か否か確認することが可能となる。
In this configuration, when one wireless control means holds the control right of the plant equipment, the management means receives the control right from another wireless control means, and the wireless holding the control right. The control means is notified that there is an operation request from another wireless control means. Therefore, the operator of the wireless terminal holding the control right of the plant equipment can confirm with the operator of the wireless terminal that has made the operation request whether or not the control right of the plant equipment needs to be released. Becomes

【0038】(6)前記管理手段は、所定の一定時間を
計時する計時手段を備え、1つの前記無線制御手段が前
記プラント機器の制御権を保持している時に、該無線制
御手段から前記プラント機器の操作要求があると、他の
前記無線制御手段及び前記中央監視制御手段へその旨を
通知するとともに、該計時手段で計時を開始し、該計時
手段が計時を完了後に、前記プラント機器の操作を行う
ことを特徴とする。
(6) The management means includes a clock means for clocking a predetermined fixed time, and when one of the wireless control means holds the control right of the plant equipment, the wireless control means controls the plant. When there is a device operation request, other wireless control means and the central monitoring control means are notified of that fact, and the time counting means starts time counting, and after the time counting means completes the time counting, the plant equipment It is characterized by performing an operation.

【0039】この構成においては、1つの無線制御手段
がプラント機器の制御権を保持している場合に、この無
線制御手段がプラント機器の操作要求を行うと、他の無
線制御手段及び中央監視制御手段へその旨を通知すると
ともに、計時手段で計時を開始して、計時手段が計時を
完了後に、前記プラント機器の操作を行う。したがっ
て、無線制御手段によってプラント機器の操作が開始さ
れることが把握できる。また、プラント機器の操作を実
施しない方が良い場合は、無線制御手段の操作者に操作
の中止を依頼することも可能である。
In this configuration, when one wireless control means holds the control right of the plant equipment and the wireless control means makes an operation request for the plant equipment, the other wireless control means and the central supervisory control are performed. Notifying the means to that effect, the timekeeping means starts the timekeeping, and after the timekeeping means completes the timekeeping, the plant equipment is operated. Therefore, it can be understood that the operation of the plant equipment is started by the wireless control means. If it is better not to operate the plant equipment, it is possible to request the operator of the wireless control means to stop the operation.

【0040】(7)前記管理手段は、前記プラント機器
で事故が発生したことを検知する事故検知手段と、該事
故検知手段が事故を検知すると全無線制御手段及び中央
監視制御手段へその旨を通知する通知手段と、を備えた
ことを特徴とする。
(7) The management means notifies the accident detection means for detecting the occurrence of an accident in the plant equipment, and to the all wireless control means and the central monitoring control means when the accident detection means detects an accident. And a notification means for notifying.

【0041】この構成においては、プラント機器で事故
が発生したことを事故検知手段で検知すると、通知手段
によって全無線制御手段及び中央監視制御手段へ事故が
発生したことが通知される。したがって、プラント機器
の監視員や保守員などの関係者が事故発生を直ちに把握
でき、事故に対して迅速に行動することが可能になる。
In this configuration, when the accident detection means detects that an accident has occurred in the plant equipment, the notification means notifies all wireless control means and the central monitoring control means of the occurrence of the accident. Therefore, a person involved such as a plant equipment monitor or a maintenance person can immediately grasp the occurrence of the accident, and can quickly act on the accident.

【0042】[0042]

【発明の実施の形態】図1は、本発明の実施形態に係る
監視制御システムの構成を簡略的に示したブロック図で
ある。本発明では、プラント機器の設置された現場側で
複数の無線端末を制御操作可能な場合に、プラント機器
を制御操作可能な無線端末を限定するために、特に、監
視制御システム102のサーバ190を改良したもので
ある。以下に詳細を説明する。
1 is a block diagram schematically showing the configuration of a supervisory control system according to an embodiment of the present invention. In the present invention, in order to limit the wireless terminals that can control and operate the plant equipment when a plurality of wireless terminals can be controlled and operated on the site side where the plant equipment is installed, in particular, the server 190 of the monitoring control system 102 is used. It is an improved version. The details will be described below.

【0043】図1に示したように、プラント機器80を
監視・制御する監視制御システム1は、中央監視制御手
段である中央監視制御盤10、無線制御手段である無線
端末20及び無線端末30、無線中継手段である無線基
地局40、管理手段であるサーバ50、非常時操作手段
である液晶タッチパネル60、並びに補助リレー盤70
により構成されている。なお、無線端末は、2つに限る
ものではなく、更に複数の無線端末を使用する構成であ
っても良い。
As shown in FIG. 1, the supervisory control system 1 for supervising and controlling the plant equipment 80 includes a central supervisory control board 10 which is a central supervisory control means, a radio terminal 20 and a radio terminal 30 which are radio control means, A wireless base station 40 that is a wireless relay unit, a server 50 that is a management unit, a liquid crystal touch panel 60 that is an emergency operation unit, and an auxiliary relay panel 70.
It is composed by. Note that the number of wireless terminals is not limited to two, and a configuration using a plurality of wireless terminals may be used.

【0044】中央監視制御盤10は、プラント機器80
を制御する操作スイッチ11、及び監視員へ伝達する情
報を表示する表示部12を備えている。
The central supervisory control board 10 is a plant equipment 80.
An operation switch 11 for controlling the display and a display unit 12 for displaying information to be transmitted to an observer are provided.

【0045】無線端末20は、プラント機器80を制御
するための操作スイッチ21、及びプラント機器80の
制御権を切り替える制御権切り替えスイッチ22を備え
ている。また、無線端末20は、無線基地局40と通信
するための通信部23、保守員へ伝達する情報を表示す
る表示部24、及び付与された管理番号を記憶する記憶
部25を備えている。
The wireless terminal 20 includes an operation switch 21 for controlling the plant equipment 80 and a control right changeover switch 22 for switching the control right of the plant equipment 80. The wireless terminal 20 also includes a communication unit 23 for communicating with the wireless base station 40, a display unit 24 for displaying information transmitted to maintenance personnel, and a storage unit 25 for storing the assigned management number.

【0046】無線端末30は、無線端末20と同様の構
成であり、プラント機器80を制御するための操作スイ
ッチ31、及びプラント機器80の制御権を切り替える
ための切り替えスイッチ32を備えている。また、無線
端末30は、無線基地局40と通信するための通信部3
3、保守員へ伝達する情報を表示する表示部34、及び
付与された管理番号を記憶する記憶部35を備えてい
る。
The wireless terminal 30 has the same configuration as the wireless terminal 20, and includes an operation switch 31 for controlling the plant equipment 80 and a changeover switch 32 for switching the control right of the plant equipment 80. The wireless terminal 30 also includes a communication unit 3 for communicating with the wireless base station 40.
3, a display unit 34 for displaying information transmitted to maintenance personnel, and a storage unit 35 for storing the assigned management number.

【0047】なお、無線端末20,30は、携帯可能な
大きさである。また、無線端末20、無線端末30に
は、各無線端末を管理するための管理番号が予め付与さ
れている。
The wireless terminals 20 and 30 are portable in size. In addition, a management number for managing each wireless terminal is given to the wireless terminals 20 and 30 in advance.

【0048】無線基地局40は、無線端末20及び無線
端末30から送信された信号をサーバ50へ伝達する中
継装置である。また、無線基地局40は、無線端末20
及び無線端末30と無線通信するための無線通信部41
を備えている。
The radio base station 40 is a relay device for transmitting the signals transmitted from the radio terminals 20 and 30 to the server 50. In addition, the wireless base station 40 is connected to the wireless terminal 20.
And a wireless communication unit 41 for wirelessly communicating with the wireless terminal 30.
Is equipped with.

【0049】サーバ50は、無線端末20,30からの
制御信号を、補助リレー盤70の制御信号に変換する装
置である。また、サーバ50は、プラント機器80を制
御可能な無線端末を制限する。さらに、サーバ50は、
無線端末の制御ロックを解除したり、監視制御システム
の保守を行ったりすることが可能である。サーバ50
は、制御優先テーブル51、優先テーブル管理部52、
制御ロックチェック部53、保守部54、事故検知手段
である監視部55、通知手段である通知部56、及び計
時手段であるタイマ57を備えている。
The server 50 is a device for converting control signals from the wireless terminals 20 and 30 into control signals for the auxiliary relay board 70. Further, the server 50 limits the wireless terminals that can control the plant equipment 80. Further, the server 50
It is possible to release the control lock of the wireless terminal and maintain the monitoring control system. Server 50
Is a control priority table 51, a priority table management unit 52,
A control lock check unit 53, a maintenance unit 54, a monitoring unit 55 that is an accident detection unit, a notification unit 56 that is a notification unit, and a timer 57 that is a time counting unit are provided.

【0050】制御優先テーブル51は、プラント機器8
0の制御権を現場側に切り替えた無線端末の管理番号な
どの情報を記録するテーブルである。優先テーブル管理
部52は、制御優先テーブル51を管理して、制御権を
切り替えた無線端末からの制御権切り替えを防止する。
また、通知部56へ信号を出力する。制御ロックチェッ
ク部53は、無線端末から送信されたプラント機器80
に対する操作の実行が可能か否かを確認して、可能な場
合は補助リレー盤70へ信号を出力し、不可の場合はそ
の旨を無線端末に返信する。保守部54は、液晶タッチ
パネル60に対して所定の内容を表示させる。また、保
守部54は、液晶タッチパネル60から制御ロックを解
除する操作があると、強制的に制御ロックを解除する。
監視部55は、プラント機器80の動作を監視し、プラ
ント機器80に事故など異常が発生した場合、通知部5
6へ信号を出力する。通知部56は、優先テーブル管理
部52、制御ロックチェック部53、及び監視部55か
らの信号に応じて無線端末20,30及び中央監視制御
盤10へ所定の通知を行う。タイマ57は、所定の一定
時間を計時するためのものである。
The control priority table 51 is used for the plant equipment 8
It is a table which records information such as a management number of a wireless terminal whose control right of 0 is switched to the site side. The priority table management unit 52 manages the control priority table 51 to prevent control right switching from a wireless terminal that has switched control right.
Also, it outputs a signal to the notification unit 56. The control lock check unit 53 uses the plant equipment 80 transmitted from the wireless terminal.
It is confirmed whether or not the operation can be executed, and if it is possible, a signal is output to the auxiliary relay panel 70, and if it is not possible, the fact is returned to the wireless terminal. The maintenance unit 54 causes the liquid crystal touch panel 60 to display predetermined contents. Further, the maintenance unit 54 forcibly releases the control lock when there is an operation for releasing the control lock from the liquid crystal touch panel 60.
The monitoring unit 55 monitors the operation of the plant equipment 80, and when an abnormality such as an accident occurs in the plant equipment 80, the notification unit 5
The signal is output to 6. The notification unit 56 makes a predetermined notification to the wireless terminals 20, 30 and the central monitoring control panel 10 in response to signals from the priority table management unit 52, the control lock check unit 53, and the monitoring unit 55. The timer 57 is for measuring a predetermined fixed time.

【0051】液晶タッチパネル60は、表示部61と操
作部62とを備え、表示部61に表示された内容に応じ
て操作部62を操作して入力を行うことができる。ま
た、液晶タッチパネル60は、表示部61にサーバ50
の保守部54から送信されたデータを表示する。さら
に、操作部62からの操作内容を保守部54へ送信す
る。
The liquid crystal touch panel 60 is provided with a display section 61 and an operation section 62, and the operation section 62 can be operated according to the contents displayed on the display section 61 to make an input. In addition, the liquid crystal touch panel 60 displays the server 50 on the display unit 61.
The data transmitted from the maintenance unit 54 is displayed. Further, the operation content from the operation unit 62 is transmitted to the maintenance unit 54.

【0052】補助リレー盤70は、中央監視制御盤10
の操作スイッチ11からのON/OFF信号をプラント
機器80に伝達するPOS71、無線端末20,30の
操作スイッチ21,31からのON/OFF信号をプラ
ント機器80に伝達するPOS72、及び無線端末2
0,30の操作スイッチ22,32からの中央/現場の
制御権切り替え信号に応じて、POS71からの信号
と、POS72からの信号と、を切り替えてプラント機
器80に伝達する制御権切り替え手段であるPOS73
を備えている。
The auxiliary relay board 70 is the central monitoring and control board 10.
POS 71 transmitting the ON / OFF signal from the operation switch 11 of the wireless communication terminal 20 to the plant equipment 80, the POS 72 transmitting the ON / OFF signal from the operation switches 21 and 31 of the wireless terminals 20 and 30 to the plant equipment 80, and the wireless terminal 2
Control right switching means for switching the signal from the POS 71 and the signal from the POS 72 according to the central / site control right switching signal from the operation switches 22 and 32 of 0 and 30 and transmitting the signal to the plant equipment 80. POS73
Is equipped with.

【0053】監視制御システム1において、無線端末2
0,30は、容易に持ち運び可能である。したがって、
電波の届く範囲であれば、任意の場所からプラント機器
80の運転や停止などの制御が可能である。また、中央
側と現場側との制御権の切り替えも容易に行うことがで
きる。
In the supervisory control system 1, the wireless terminal 2
0 and 30 can be easily carried. Therefore,
It is possible to control the operation and stop of the plant equipment 80 from any place within the range where radio waves can reach. Further, the control right between the central side and the site side can be easily switched.

【0054】なお、監視制御システム1では、メンテナ
ンス時などにおける事故防止のために、プラント機器8
0を中央監視制御盤10と、無線端末20,30と、の
いずれが制御権を持つことができるかは、無線端末2
0,30でのみ設定できるようになっている。また、監
視制御システム1では、説明を簡略化するために、操作
スイッチを最低限の数量にしているが、実際の監視制御
システムは複数の操作スイッチを備えている。
In the supervisory control system 1, the plant equipment 8 is used to prevent accidents during maintenance.
The wireless terminal 2 determines which of the central supervisory control panel 10 and the wireless terminals 20 and 30 can have the control right.
Only 0 and 30 can be set. Further, in the supervisory control system 1, the number of operation switches is set to the minimum number in order to simplify the description, but the actual supervisory control system includes a plurality of operation switches.

【0055】監視制御システム1は、従来の監視制御シ
ステム102が備えている機能に加えて、以下に述べる
各機能を備えている。すなわち、 1.プラント機器80の制御権が中央監視制御盤10側
(以下、中央側とも言う。)にある場合に、例えば無線
端末20から制御権を中央側から無線端末20,30側
(以下、現場側とも言う。)へ切り替える操作を行う
と、その操作が行われたことを他の無線端末30及び中
央監視制御盤10へ通知される。これにより、プラント
機器80の制御権を現場側が持つことを他の無線端末を
保持している保守員は把握できる。
The monitoring control system 1 has the following functions in addition to the functions of the conventional monitoring control system 102. That is, 1. When the control right of the plant equipment 80 is on the central monitoring control panel 10 side (hereinafter, also referred to as the central side), for example, the control right is given from the wireless terminal 20 from the central side to the wireless terminals 20, 30 side (hereinafter, both on-site side). When the operation to switch to () is performed, the fact that the operation has been performed is notified to the other wireless terminals 30 and the central monitoring and control panel 10. As a result, the maintenance personnel holding another wireless terminal can understand that the site side has the control right for the plant equipment 80.

【0056】2.プラント機器80の制御権を現場側に
切り替えた無線端末20のみが、制御権を放棄するまで
プラント機器80の制御・操作を行うことができるよう
に、制御権を限定する。これにより、誤って他の無線端
末からプラント機器80に対して操作を行っても事故発
生を防止できる。
2. The control right is limited so that only the wireless terminal 20 that has switched the control right of the plant equipment 80 to the site side can control and operate the plant equipment 80 until the control right is abandoned. Thus, even if the wireless device is accidentally operated on the plant equipment 80, an accident can be prevented.

【0057】3.無線端末20が制御権を保持している
時に、他の無線端末30からスイッチの操作があると、
他の無線端末30から操作があったことがその無線端末
30の管理番号とともに、無線端末20へ通知される
(制御権解放要求)。これにより、無線端末20の操作
者は、無線端末30の操作者に対して、プラント機器8
0の制御権の解放が必要か否か確認できる。
3. When the wireless terminal 20 holds the control right and another wireless terminal 30 operates a switch,
The operation from another wireless terminal 30 is notified to the wireless terminal 20 together with the management number of the wireless terminal 30 (control right release request). As a result, the operator of the wireless terminal 20 sends the operator of the wireless terminal 30 the plant equipment 8
It is possible to confirm whether the control right of 0 needs to be released.

【0058】4.無線端末20が制御権を保持している
時に、他の無線端末30がスイッチの操作を行うと、無
線端末20が制御権を保持していることを無線端末20
の管理番号とともに無線端末30へ通知される。これに
より、無線端末30の操作者は、無線端末20の操作者
が制御権を保持していることを確認できる。
4. When another wireless terminal 30 operates a switch while the wireless terminal 20 holds the control right, the wireless terminal 20 indicates that the wireless terminal 20 holds the control right.
The wireless terminal 30 is notified of the management number. As a result, the operator of the wireless terminal 30 can confirm that the operator of the wireless terminal 20 has the control right.

【0059】5.制御権を保持している無線端末20で
操作スイッチの操作があった場合、他の無線端末30、
及び中央監視制御盤10に対して、一定時間警報が通知
される。これにより、無線端末20でプラント機器80
の制御操作を行うことが把握できる。また、プラント機
器80の制御操作を実施しない方が良い場合は、無線端
末20の操作者に操作の中止を依頼することも可能であ
る。
5. When the operation switch is operated on the wireless terminal 20 that holds the control right, another wireless terminal 30,
Also, the central monitoring and control panel 10 is notified of an alarm for a certain period of time. As a result, the plant equipment 80
It can be understood that the control operation of is performed. If it is better not to control the plant equipment 80, the operator of the wireless terminal 20 can be requested to cancel the operation.

【0060】6.プラント機器80で事故が発生した場
合、サーバ50で解除されるまで、各無線端末、及び中
央監視制御盤10に対して、事故発生通知が行われる。
これにより、プラント機器80の監視員及び保守員など
の関係者が事故発生を直ちに把握でき、事故に対して迅
速に行動できる。
6. When an accident occurs in the plant equipment 80, an accident occurrence notification is given to each wireless terminal and the central monitoring and control panel 10 until it is canceled by the server 50.
As a result, a person concerned such as a monitoring person and a maintenance person of the plant equipment 80 can immediately grasp the occurrence of the accident and can quickly act on the accident.

【0061】また、上記の機能により、保守員が無線端
末を使用して現場でメンテナンスなどを実施する際に、
他の無線端末からの操作がロックされるので、他の無線
端末での誤操作による事故発生を防止できる。さらに、
上記の各種通知機能より、他の無線端末から操作要求が
あることや事故が発生したことなどがわかるので、保守
員は通知に応じて、迅速に対応することができる。
Further, by the above function, when the maintenance staff uses the wireless terminal to perform maintenance on site,
Since an operation from another wireless terminal is locked, it is possible to prevent an accident from occurring due to an erroneous operation on the other wireless terminal. further,
The various notification functions described above enable the maintenance staff to know that there is an operation request from another wireless terminal or that an accident has occurred, so that the maintenance staff can quickly respond to the notification.

【0062】次に、監視制御システム1の具体的な動作
について、現場で事故が発生し、その復旧を行う場合を
例に、図2、図3に基づいて説明する。図2、図3は、
監視制御システム1の動作を説明するためのフローチャ
ートである。
Next, a specific operation of the monitor control system 1 will be described with reference to FIGS. 2 and 3 by taking an example of a case where an accident occurs at the site and the recovery is performed. 2 and 3
3 is a flowchart for explaining the operation of the monitoring control system 1.

【0063】(1)事故発生通知 監視員は、事故発生前に、中央監視室の中央監視制御盤
10によってプラント機器80の監視制御を行ってい
た。また、保守員A及び保守員Bは、それぞれ無線端末
20、無線端末30を携帯して、プラント機器80のメ
ンテナンスを実施するために現場で待機していた。この
時、プラント機器80の制御権は、中央側にあり、この
状態では現場側からの操作はロックされている。
(1) Notification of Accident Occurrence Prior to the occurrence of an accident, the observer carried out supervisory control of the plant equipment 80 by means of the central supervisory control board 10 in the central supervisory room. Further, the maintenance personnel A and the maintenance personnel B carry the wireless terminal 20 and the wireless terminal 30, respectively, and stand by at the site to carry out maintenance of the plant equipment 80. At this time, the control right of the plant equipment 80 is on the center side, and in this state, the operation from the site side is locked.

【0064】図2に示したように、プラント機器80に
おいて事故が発生し動作を停止すると(s1)、プラン
ト機器80の監視部55が異常を検知し、通知部56に
異常検知信号を送信する(s2)。通知部56は、この
信号を受信すると、無線基地局40を介して全無線端末
へ事故が発生したことを通知する。また、中央監視制御
盤10へ事故が発生したことを通知する(s3)。無線
端末20の表示部24、無線端末30の表示部34、及
び中央監視制御盤10の表示部12には、この通知によ
り、プラント機器80で事故が発生したことが表示され
る(s4)。この表示は、表示部の事故発生表示が解除
されるまで行われる(s5)。
As shown in FIG. 2, when an accident occurs in the plant equipment 80 and the operation is stopped (s1), the monitoring unit 55 of the plant equipment 80 detects an abnormality and sends an abnormality detection signal to the notification unit 56. (S2). Upon receiving this signal, the notification unit 56 notifies all wireless terminals via the wireless base station 40 that an accident has occurred. Further, the central monitoring and control panel 10 is notified that an accident has occurred (s3). The display unit 24 of the wireless terminal 20, the display unit 34 of the wireless terminal 30, and the display unit 12 of the central monitoring and control panel 10 display that an accident has occurred in the plant equipment 80 by this notification (s4). This display is performed until the accident occurrence display on the display unit is canceled (s5).

【0065】(2)中央→現場制御権切り替え 中央監視室の監視員は、現場の保守員Aに通信機器で連
絡をとり、プラント機器80の復旧作業を行うように指
示する。この指示を受けた保守員Aは、まず、図3に示
したように、無線端末20の制御権切り替えスイッチ2
2を操作して、プラント機器80の制御権を現場側に切
り替える(s11)。この時、この情報が無線基地局4
0を介してサーバ50に伝達される。サーバ50では、
優先テーブル管理部52が制御優先テーブル51を確認
する(s12)。そして、優先テーブル管理部52は、
プラント機器80の制御権を付与された無線端末はな
く、他の無線端末が既に制御権切り替えスイッチを操作
していないことを確認する。
(2) Central-to-Site Control Right Switching The supervisor in the central monitoring room contacts the maintenance personnel A on the site by means of communication equipment, and instructs the maintenance personnel A on the site to restore the plant equipment 80. Upon receiving this instruction, the maintenance worker A first, as shown in FIG. 3, controls the control right changeover switch 2 of the wireless terminal 20.
2 is operated to switch the control right of the plant equipment 80 to the site side (s11). At this time, this information is transmitted to the wireless base station 4
It is transmitted to the server 50 via 0. In the server 50,
The priority table management unit 52 confirms the control priority table 51 (s12). Then, the priority table management unit 52
It is confirmed that there is no wireless terminal to which the control right of the plant device 80 is given and that another wireless terminal has not already operated the control right changeover switch.

【0066】また、操作されたのが制御権切り替えスイ
ッチ22であったので(s14)、優先テーブル管理部
52は、無線端末20に優先権を付与して制御優先テー
ブル51に記録する(s15)。これにより、プラント
機器80の制御権は無線端末20が保持することにな
る。
Since the control right changeover switch 22 was operated (s14), the priority table management unit 52 gives the wireless terminal 20 a priority and records it in the control priority table 51 (s15). . As a result, the wireless terminal 20 retains control of the plant equipment 80.

【0067】続いて、タイマ57を起動させて所定時間
の計時を開始させる(s16)。また、操作を行った無
線端末20の管理番号の情報を含む操作有効信号を通知
部56へ出力する(s17)。通知部56はこの信号を
受信すると、無線基地局40を介して他の無線端末であ
る無線端末30へ、また、中央監視制御盤10へ、無線
端末20の制御権切り替えスイッチが操作されて所定時
間後に制御権が無線端末20に移ることが伝達する。無
線端末30では、この通知を受けると表示部34に上記
の情報が表示される。また、中央監視制御盤10の表示
部12にも同様に通知部56から伝達された情報が表示
される(s18)。
Then, the timer 57 is activated to start counting a predetermined time (s16). Moreover, the operation valid signal including the information of the management number of the operated wireless terminal 20 is output to the notification unit 56 (s17). When the notification unit 56 receives this signal, the control right changeover switch of the wireless terminal 20 is operated by the wireless base station 40 to the wireless terminal 30, which is another wireless terminal, and to the central monitoring and control panel 10, so that a predetermined operation is performed. The transfer of control right to the wireless terminal 20 is transmitted after a lapse of time. Upon receiving this notification, the wireless terminal 30 displays the above information on the display unit 34. The information transmitted from the notification unit 56 is also displayed on the display unit 12 of the central monitoring and control panel 10 (s18).

【0068】優先テーブル管理部52は、タイマ57が
所定時間の計時を終了すると(s19)、補助リレー盤
70のPOS73へ信号を出力する。この信号により、
POS73は切り替えられて、制御権は現場側に切り替
えられる(s20)。
When the timer 57 finishes counting the predetermined time (s19), the priority table management unit 52 outputs a signal to the POS 73 of the auxiliary relay board 70. With this signal,
The POS 73 is switched and the control right is switched to the site side (s20).

【0069】(3)プラント機器制御 保守員A,Bは、プラント機器80の復旧作業を行い、
作業を完了した。この時、保守員Bがプラント機器80
の操作ができるものと勘違いして、無線端末30の操作
スイッチ31を操作した場合(s11)、無線端末30
の通信部33から、記憶部35に格納された管理番号の
情報を含んだ操作信号が出力されて、無線基地局40を
介して制御ロックチェック部53に伝達される。制御ロ
ックチェック部53は、制御優先テーブル51の情報を
確認して、プラント機器80の制御権を保持している無
線端末の管理番号を確認する(s12)。確認の結果、
無線端末20に制御権が有り、それ以外の他の無線端末
からの操作はロックされているため、操作は無効である
(s13)。そのため、制御ロックチェック部53は、
通知部56へ操作を行った無線端末30の管理番号の情
報を含む操作無効信号を出力する(s21)。通知部5
6は、この信号を受信すると、無線基地局40を介して
無線端末30の表示部24に操作が無効であることを表
示させるための信号を送信する(s22)。また、無線
端末20の表示部34に無線端末30から操作要求があ
ったことを表示させるように、信号を送信する(s2
3)。無線端末20及び無線端末30は、通知部56か
らの信号を受信すると、上記の内容の表示を表示部24
及び表示部34にそれぞれ表示する。また、保守員Aは
保守員Bに無線端末30からはプラント機器80の制御
操作ができないことを伝える。
(3) The plant equipment control maintenance personnel A and B perform the restoration work of the plant equipment 80,
The work is completed. At this time, the maintenance worker B makes the plant equipment 80
When the operation switch 31 of the wireless terminal 30 is operated by mistakenly assuming that the wireless terminal 30 can be operated (s11), the wireless terminal 30
An operation signal including information on the management number stored in the storage unit 35 is output from the communication unit 33, and is transmitted to the control lock check unit 53 via the wireless base station 40. The control lock check unit 53 confirms the information in the control priority table 51, and confirms the management number of the wireless terminal holding the control right of the plant equipment 80 (s12). As a result of confirmation,
Since the wireless terminal 20 has the control right and the operation from other wireless terminals is locked, the operation is invalid (s13). Therefore, the control lock check unit 53
An operation invalidation signal including information of the management number of the operated wireless terminal 30 is output to the notification unit 56 (s21). Notification unit 5
Upon receiving this signal, the 6 transmits a signal for displaying that the operation is invalid on the display unit 24 of the wireless terminal 30 via the wireless base station 40 (s22). Further, a signal is transmitted so that the display unit 34 of the wireless terminal 20 displays that there is an operation request from the wireless terminal 30 (s2).
3). When the wireless terminal 20 and the wireless terminal 30 receive the signal from the notification unit 56, the display unit 24 displays the above contents.
And are displayed on the display unit 34, respectively. Further, the maintenance person A notifies the maintenance person B that the control operation of the plant equipment 80 cannot be performed from the wireless terminal 30.

【0070】続いて、保守員Aは、プラント機器80の
動作確認を行うために、無線端末20の操作スイッチ2
1をOFFからONに切り替える。無線端末20は、記
憶部25に格納された管理番号の情報を含んだ操作信号
を、通信部23から出力する(s11)。この操作信号
は、無線基地局40を介して制御ロックチェック部53
に伝達される。制御ロックチェック部53は、制御優先
テーブル51の情報を確認して、プラント機器80の制
御権を保持している無線端末の管理番号を確認する(s
12)。確認の結果、無線端末20がプラント機器80
の制御権を保持しているため、操作は有効である(s1
3)。また、制御ロックチェック部53は、操作があっ
たのは無線端末20の優先権切り替えスイッチ22では
なかったので(s14)、タイマ57を起動して所定時
間の計時を開始させる(s16)さらに、操作を行った
無線端末20の管理番号の情報を含む操作有効信号を通
知部56へ出力する(s17)。通知部56は、この信
号を受信すると、無線基地局40を介して無線端末30
や図外の他の無線端末へ、また、中央監視制御盤10
へ、所定時間後にプラント機器80が停止状態から運転
状態になることを通知する。無線端末30では、この通
知を受けると表示部34に上記の情報が表示される。ま
た、中央監視制御盤10の表示部12にも同様に通知部
56から伝達された情報が表示される(s18)。
Subsequently, the maintenance worker A operates the operation switch 2 of the wireless terminal 20 in order to confirm the operation of the plant equipment 80.
Switch 1 from OFF to ON. The wireless terminal 20 outputs an operation signal including the information of the management number stored in the storage unit 25 from the communication unit 23 (s11). This operation signal is sent to the control lock check unit 53 via the wireless base station 40.
Be transmitted to. The control lock check unit 53 confirms the information in the control priority table 51, and confirms the management number of the wireless terminal holding the control right of the plant equipment 80 (s).
12). As a result of the confirmation, the wireless terminal 20 is the plant equipment 80.
The operation is valid because it holds the control right of (s1
3). Further, since the control lock check unit 53 was not operated by the priority changeover switch 22 of the wireless terminal 20 (s14), the timer 57 is activated to start counting a predetermined time (s16). An operation valid signal including information on the management number of the operated wireless terminal 20 is output to the notification unit 56 (s17). Upon receiving this signal, the notification unit 56 receives the wireless terminal 30 via the wireless base station 40.
And other wireless terminals not shown in the figure, and the central monitoring and control panel 10
Is notified that the plant device 80 will change from the stopped state to the operating state after a predetermined time. Upon receiving this notification, the wireless terminal 30 displays the above information on the display unit 34. The information transmitted from the notification unit 56 is also displayed on the display unit 12 of the central monitoring and control panel 10 (s18).

【0071】制御ロックチェック部53は、タイマ57
が所定時間の計時を終了すると(s19)、補助リレー
盤70のPOS72へ信号を出力する。この信号によ
り、POS72は切り替えられてPOS73を介してプ
ラント機器80を運転状態にする信号が送信される。プ
ラント機器80は、この信号により、停止状態から運転
状態へ切り替えられる(s20)。保守員Aは、プラン
ト機器140が運転状態になると、保守員Bとともにプ
ラント機器80の動作確認を実行する。
The control lock check unit 53 has a timer 57.
When the measurement of the predetermined time is completed (s19), a signal is output to the POS 72 of the auxiliary relay board 70. With this signal, the POS 72 is switched and a signal for putting the plant equipment 80 into an operating state is transmitted via the POS 73. The plant equipment 80 is switched from the stopped state to the operating state by this signal (s20). When the plant device 140 is in the operating state, the maintenance worker A executes an operation check of the plant device 80 together with the maintenance worker B.

【0072】(4)現場→中央制御権切り替え 保守員Aは、プラント機器80の動作確認を完了する
と、制御権を中央監視制御盤10に切り替えるために、
無線端末20の制御権切り替えスイッチ22を現場側か
ら中央側に切り替える(s11)。この時、この情報が
無線基地局40を介してサーバ50に伝達される。サー
バ50では、優先テーブル管理部52が制御優先テーブ
ル51を確認して、プラント機器80の制御権を保持し
ている無線端末の管理番号の情報を確認する(s1
2)。優先テーブル管理部52は、確認の結果、プラン
ト機器80の制御権を保持している無線端末の管理番号
と、制御権切り替えスイッチの操作があった無線端末の
管理番号と、が一致した(s13)。また、優先テーブ
ル管理部52は、制御権切り替えスイッチ22の操作が
有ったので(s14)、プラント機器80の制御権を中
央監視制御盤10に優先権を付与して制御優先テーブル
51に記録する(s15)。これにより、プラント機器
80の制御権は中央監視制御盤10が保持することにな
る。
(4) Switching from the site to the central control right When the maintenance worker A completes the operation confirmation of the plant equipment 80, in order to switch the control right to the central monitoring control panel 10,
The control right changeover switch 22 of the wireless terminal 20 is changed over from the site side to the center side (s11). At this time, this information is transmitted to the server 50 via the wireless base station 40. In the server 50, the priority table management unit 52 checks the control priority table 51 to check the information on the management number of the wireless terminal holding the control right of the plant equipment 80 (s1).
2). As a result of the confirmation, the priority table management unit 52 matches the management number of the wireless terminal holding the control right of the plant equipment 80 with the management number of the wireless terminal that operated the control right changeover switch (s13). ). Further, since the control right changeover switch 22 has been operated (s14), the priority table management unit 52 gives the control right of the plant equipment 80 to the central monitoring control panel 10 and records it in the control priority table 51. Yes (s15). As a result, the central supervisory control panel 10 holds the control right for the plant equipment 80.

【0073】続いて、タイマ57を起動させて所定時間
の計時を開始させる(s16)。また、操作を行った無
線端末20の管理番号の情報を含む操作有効信号を通知
部56へ出力する(s17)。通知部56はこの信号を
受信すると、無線基地局40を介して無線端末30や図
外の他の無線端末へ、また、中央監視制御盤10へ、所
定時間後にプラント機器80の制御権が中央監視制御盤
10へ移行されることを通知する。そして、通知部56
へ信号を出力する。通知部56はこの信号を受信する
と、他の無線端末である無線端末30へ無線基地局40
を介して、また、中央監視制御盤10へ直接、無線端末
20の制御権切り替えスイッチが操作されたことを伝達
する(s18)。
Then, the timer 57 is activated to start measuring a predetermined time (s16). Moreover, the operation valid signal including the information of the management number of the operated wireless terminal 20 is output to the notification unit 56 (s17). When the notification unit 56 receives this signal, the control right of the plant equipment 80 is centralized after a predetermined time to the wireless terminal 30 and other wireless terminals (not shown) via the wireless base station 40 and to the central monitoring control panel 10. Notify that the monitoring control panel 10 will be transferred. Then, the notification unit 56
Output signal to. When the notification unit 56 receives this signal, it notifies the wireless base station 40 to the wireless terminal 30 which is another wireless terminal.
The fact that the control right changeover switch of the wireless terminal 20 has been operated is transmitted to the central monitoring and control panel 10 directly via (s18).

【0074】無線端末30では、この通知を受けると表
示部34に上記の情報が表示される。また、中央監視制
御盤10の表示部12にも同様に通知部56から伝達さ
れた情報が表示される。
Upon receipt of this notification, the wireless terminal 30 displays the above information on the display unit 34. Further, the information transmitted from the notification unit 56 is also displayed on the display unit 12 of the central monitoring and control panel 10.

【0075】優先テーブル管理部52は、タイマ57が
所定時間の計時を終了すると(s19)、補助リレー盤
70のPOS73へ信号を出力する。この信号により、
POS73は切り替えられてプラント機器80の制御権
を中央監視制御盤10が保持する状態になる(s2
0)。これにより、中央監視制御盤10にてプラント機
器80の制御が可能になり、無線端末20,30からの
操作はロックされる。中央監視室の監視員は、これ以
降、中央監視制御盤10で、通常通りプラント機器80
の監視・制御を行う。
When the timer 57 finishes counting the predetermined time (s19), the priority table management section 52 outputs a signal to the POS 73 of the auxiliary relay board 70. With this signal,
The POS 73 is switched so that the central supervisory control panel 10 holds the control right of the plant equipment 80 (s2
0). As a result, the plant equipment 80 can be controlled by the central monitoring and control panel 10, and the operations from the wireless terminals 20 and 30 are locked. From this point onward, the supervisor in the central monitoring room will use the central monitoring and control panel 10 to operate the plant equipment 80 as usual.
Monitor and control

【0076】(5)無線端末故障時 監視制御システム1では、無線端末20がプラント機器
80の制御権を保持している場合に、もし、無線端末2
0が故障すると、プラント機器80の制御権切り替えが
できないという問題が発生してしまう。そのため、監視
制御システム1は、サーバ50に保守部54を、又、保
守部54に指示を出すための液晶タッチパネル60を備
えている。保守部54は、プラント機器80の制御権の
ロック解除、プラント機器80の制御権の現場側と中央
側との切り替え(POS73の制御)、プラント機器8
0の監視・制御を実施可能である。
(5) In the wireless terminal failure monitoring and control system 1, if the wireless terminal 20 holds the control right for the plant equipment 80, the wireless terminal 2
If 0 fails, the problem that the control right of the plant equipment 80 cannot be switched occurs. Therefore, the monitoring control system 1 includes a maintenance unit 54 in the server 50 and a liquid crystal touch panel 60 for issuing an instruction to the maintenance unit 54. The maintenance unit 54 unlocks the control right of the plant equipment 80, switches the control right of the plant equipment 80 between the site side and the central side (control of the POS 73), the plant equipment 8
It is possible to monitor and control 0.

【0077】したがって、プラント機器80の制御権を
保持している無線端末20が故障した場合は、液晶タッ
チパネル60を操作して、プラント機器80の制御権の
ロックを解除することで、強制的に制御優先テーブル5
1に記録された無線端末20に関する情報が削除される
ので、無線端末30の制御権切り替えスイッチ32を操
作することで、プラント機器80の制御権を無線端末3
0が保持することとなり、無線端末30を用いてプラン
ト機器80の操作を行うことができる。
Therefore, when the wireless terminal 20 that holds the control right of the plant equipment 80 fails, the liquid crystal touch panel 60 is operated to unlock the control right of the plant equipment 80, forcibly. Control priority table 5
Since the information regarding the wireless terminal 20 recorded in No. 1 is deleted, the control right of the plant equipment 80 is controlled by operating the control right changeover switch 32 of the wireless terminal 30.
Since 0 is held, the plant device 80 can be operated using the wireless terminal 30.

【0078】また、現場側でプラント機器80の操作を
行う必要がない場合などには、液晶タッチパネル60か
らプラント機器80の制御権を中央側へ切り替えるよう
に操作することで、中央監視制御盤10へプラント機器
80の制御権を移行することができる。
When it is not necessary to operate the plant equipment 80 on the site side, the central supervisory control panel 10 is operated by switching the control right of the plant equipment 80 from the liquid crystal touch panel 60 to the central side. The control right of the plant equipment 80 can be transferred to.

【0079】さらに、無線端末20が故障したが、現場
側でプラント機器80の操作を行う必要がある場合は、
液晶タッチパネル60を用いてプラント機器80の監視
・制御を行うことができるので、作業性は低下するが、
引き続き現場側でプラント機器80の復旧作業やメンテ
ナンスなどを実施することができる。
Further, when the wireless terminal 20 has broken down but the plant equipment 80 needs to be operated on the site side,
Since the plant equipment 80 can be monitored and controlled using the liquid crystal touch panel 60, workability is reduced, but
Subsequently, restoration work and maintenance of the plant equipment 80 can be carried out on the site side.

【0080】なお、サーバ50の制御優先テーブル51
には、プラント機器80の制御を実行可能な無線端末2
0,30や管理番号など他の無線端末の情報を登録して
おき、プラント機器80の制御権を保持可能な無線端末
は、登録した無線端末のみに設定しても良い。
The control priority table 51 of the server 50
Is a wireless terminal 2 capable of controlling the plant equipment 80.
The information of other wireless terminals such as 0, 30 and the management number may be registered, and the wireless terminals capable of holding the control right of the plant equipment 80 may be set only in the registered wireless terminals.

【0081】[0081]

【発明の効果】本発明によれば、以下の効果が得られ
る。
According to the present invention, the following effects can be obtained.

【0082】(1)監視制御システムは、複数の無線制
御手段から操作要求があっても、1つの無線制御手段の
みが該プラント機器を制御するように管理手段で管理す
るので、誤って他の無線端末からプラント機器に対して
操作を行った場合でも、事故の発生を防止できる。
(1) In the supervisory control system, even if there is an operation request from a plurality of wireless control means, only one wireless control means manages the plant equipment by the management means, so that the other erroneous operations are erroneously performed. Accidents can be prevented even when the plant equipment is operated from the wireless terminal.

【0083】(2)プラント機器の制御権を複数の無線
制御手段のいずれも保持していない時に、制御権切り替
え手段の操作があった無線制御手段のみに制御権を付与
し、該制御権付与後は他の無線制御手段の操作を無効に
する。これにより、制御権切り替え手段の操作があった
無線制御手段のみがプラント機器の制御権を保持するの
で、無線制御手段の操作者は、他の無線端末から操作が
あってもプラント機器は動作せず、事故などの発生を心
配することなく作業を行うことができる。
(2) When the control right of the plant equipment is not held by any of the plurality of wireless control means, the control right is given only to the wireless control means that has operated the control right switching means, and the control right is given. After that, the operation of other wireless control means is invalidated. As a result, only the wireless control means that has operated the control right switching means retains the control right of the plant equipment, so that the operator of the wireless control means does not operate the plant equipment even if there is an operation from another wireless terminal. Therefore, it is possible to work without worrying about an accident.

【0084】(3)非常時操作手段で無線制御手段に付
与した制御権を解除可能であるので、プラント機器の制
御権を保持している無線制御手段が故障した場合は、非
常時操作手段を操作して、プラント機器の制御権を解除
でき、監視制御システム全体をリセットすることなく、
他の無線制御手段でプラント機器の操作を行うことがで
きる。
(3) Since the control right given to the wireless control means can be released by the emergency operation means, when the wireless control means holding the control right of the plant equipment breaks down, the emergency operation means is operated. You can operate it to release the control right of the plant equipment, without resetting the entire supervisory control system,
Other wireless control means can operate the plant equipment.

【0085】(4)複数の無線制御手段のいずれもプラ
ント機器の制御権を保持していない時に、1つの前記無
線制御手段で操作を開始するための操作要求があった場
合、管理手段は、他の無線制御手段へその旨を通知す
る。これにより、プラント機器の制御権を操作要求があ
った無線制御手段がこれから保持することを他の無線制
御手段の操作者は把握できる。
(4) When none of the plurality of wireless control means has the control right of the plant equipment and there is an operation request for starting the operation by one of the wireless control means, the management means: This is notified to other wireless control means. As a result, the operator of the other wireless control means can understand that the wireless control means that has requested the operation holds the control right for the plant equipment.

【0086】(5)1つの無線制御手段がプラント機器
の制御権を保持している場合、管理手段は、他の無線制
御手段から操作要求があると、制御権を保持している無
線制御手段へ他の無線制御手段から操作要求があったこ
とを通知する。これにより、プラント機器の制御権を保
持している無線端末の操作者は、操作要求があった無線
端末の操作者に対して、プラント機器の制御権の解放が
必要か否か確認できる。
(5) When one radio control means holds the control right of the plant equipment, the management means holds the control right when there is an operation request from another radio control means. Notify that there is an operation request from another wireless control means. As a result, the operator of the wireless terminal holding the control right of the plant equipment can confirm with the operator of the wireless terminal that has made the operation request whether or not the control right of the plant equipment needs to be released.

【0087】(6)1つの無線制御手段がプラント機器
の制御権を保持している場合に、この無線制御手段がプ
ラント機器の操作要求を行うと、他の無線制御手段及び
中央監視制御手段へその旨を通知するとともに、計時手
段で計時を開始して、計時手段が計時を完了後に、前記
プラント機器の操作を行う。これにより、無線制御手段
によってプラント機器の操作が開始されることが把握で
きる。また、プラント機器の操作を実施しない方が良い
場合は、無線制御手段の操作者に操作の中止を依頼する
ことができる。
(6) When one wireless control means holds the control right of the plant equipment and this wireless control means issues an operation request for the plant equipment, the other wireless control means and the central supervisory control means are sent. Notifying that effect, the clocking means starts the clocking, and after the clocking means completes the clocking, the plant equipment is operated. Thereby, it can be understood that the operation of the plant equipment is started by the wireless control means. When it is better not to operate the plant equipment, the operator of the wireless control means can be requested to cancel the operation.

【0088】(7)プラント機器で事故が発生したこと
を事故検知手段で検知すると、通知手段によって全無線
制御手段及び中央監視制御手段へ事故が発生したことが
通知される。これにより、プラント機器の監視員や保守
員などの関係者が事故発生を直ちに把握でき、事故に対
して迅速に行動できる。
(7) When the accident detection means detects that an accident has occurred in the plant equipment, the notification means notifies all wireless control means and the central monitoring control means of the occurrence of the accident. As a result, a person involved such as a plant equipment monitor or a maintenance person can immediately grasp the occurrence of the accident and can quickly act on the accident.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施形態に係る監視制御システムの構
成を簡略的に示したブロック図である。
FIG. 1 is a block diagram schematically showing a configuration of a supervisory control system according to an embodiment of the present invention.

【図2】監視制御システム1の動作を説明するためのフ
ローチャートである。
FIG. 2 is a flowchart for explaining the operation of the supervisory control system 1.

【図3】監視制御システム1の動作を説明するためのフ
ローチャートである。
FIG. 3 is a flowchart for explaining the operation of the monitoring control system 1.

【図4】従来の監視制御システムの構成を簡略的に示し
たブロック図である。
FIG. 4 is a block diagram schematically showing a configuration of a conventional supervisory control system.

【図5】図4とは異なる従来の監視制御システムの構成
を簡略的に示したブロック図である。
FIG. 5 is a block diagram schematically showing a configuration of a conventional monitoring control system different from that of FIG.

【符号の説明】[Explanation of symbols]

1,101,102:監視制御システム 20,30,160,170:無線端末 50,190:サーバ 51:制御優先テーブル 52:優先テーブル管理部 53:制御ロックチェック部 54:保守部 55:監視部 56:通知部 57:タイマ 1, 101, 102: Supervisory control system 20, 30, 160, 170: Wireless terminals 50, 190: Server 51: Control priority table 52: Priority table management unit 53: Control lock check unit 54: Maintenance Department 55: Monitoring unit 56: Notification unit 57: Timer

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 プラント機器を設置場所で制御可能な複
数の無線制御手段と、 該プラント機器を監視・制御する中央監視制御手段と、 該無線制御手段と該中央監視制御手段とのどちらが該プ
ラント機器を制御するか制御権を切り替える制御権切り
替え手段と、 該複数の無線制御手段から操作要求があった場合に、1
つの無線制御手段のみが該プラント機器を制御するよう
に管理する管理手段と、 該無線制御手段と該管理手段との通信を中継する無線中
継手段と、を備えたことを特徴とする監視制御システ
ム。
1. A plurality of wireless control means capable of controlling plant equipment at an installation site, a central monitoring control means for monitoring and controlling the plant equipment, and which of the wireless control means and the central monitoring control means is the plant. Control right switching means for controlling the device or switching the control right, and 1 when there is an operation request from the plurality of wireless control means.
A supervisory control system comprising: a management unit that manages only one wireless control unit to control the plant device; and a wireless relay unit that relays communication between the wireless control unit and the management unit. .
【請求項2】 前記無線制御手段は、前記中央監視制御
手段から前記無線制御手段に制御権を切り替える制御権
切り替え手段を備え、 前記管理手段は、前記プラント機器の制御権を前記複数
の無線制御手段のいずれも保持していない時に、前記制
御権切り替え手段の操作があった無線制御手段のみに制
御権を付与し、該制御権付与後は他の無線制御手段の操
作を無効にすることを特徴とする請求項1に記載の監視
制御システム。
2. The wireless control means comprises control right switching means for switching control right from the central supervisory control means to the wireless control means, and the management means controls the control rights of the plant equipment to the plurality of wireless controls. When none of the means is held, it is possible to grant the control right only to the wireless control means that has operated the control right switching means, and invalidate the operation of the other wireless control means after the control right is given. The supervisory control system according to claim 1, wherein
【請求項3】 前記管理手段は、前記無線制御手段に付
与した制御権を解除可能な非常時操作手段を備えたこと
を特徴とする請求項1又は2に記載の監視制御システ
ム。
3. The supervisory control system according to claim 1, wherein the management unit includes an emergency operation unit capable of canceling the control right given to the wireless control unit.
【請求項4】 前記管理手段は、前記プラント機器の制
御権を前記複数の無線制御手段のいずれも保持していな
い時に、1つの前記無線制御手段で操作を開始するため
の操作要求を行うと、該無線制御手段から操作要求があ
ったことを他の無線制御手段へ通知することを特徴とす
る請求項1乃至3のいずれかに記載の監視制御システ
ム。
4. The management means issues an operation request for starting operation with one wireless control means when none of the plurality of wireless control means holds the control right of the plant equipment. The monitoring control system according to any one of claims 1 to 3, wherein the wireless control means notifies another wireless control means that an operation request has been made.
【請求項5】 前記管理手段は、1つの前記無線制御手
段が前記プラント機器の制御権を保持している時に、他
の前記無線制御手段から操作要求があると、該制御権を
保持している無線制御手段へ他の前記無線制御手段から
操作要求があったことを通知することを特徴とする請求
項1乃至4のいずれかに記載の監視制御システム。
5. The management unit holds the control right when one of the wireless control units holds the control right of the plant equipment and receives an operation request from another wireless control unit. 5. The supervisory control system according to claim 1, wherein the wireless control means is informed that there is an operation request from another wireless control means.
【請求項6】 前記管理手段は、所定の一定時間を計時
する計時手段を備え、1つの前記無線制御手段が前記プ
ラント機器の制御権を保持している時に、該無線制御手
段から前記プラント機器の操作要求があると、他の前記
無線制御手段及び前記中央監視制御手段へその旨を通知
するとともに、該計時手段で計時を開始し、該計時手段
が計時を完了後に、前記プラント機器の操作を行うこと
を特徴とする請求項1乃至5のいずれかに記載の監視制
御システム。
6. The managing means includes a clocking means for clocking a predetermined fixed time, and when one of the wireless control means holds the control right of the plant equipment, the wireless control means causes the plant equipment to operate. When the operation request is issued, the wireless control means and the central supervisory control means are notified of that fact, and the time counting means starts time counting, and after the time counting means completes the time counting, the operation of the plant equipment is started. The supervisory control system according to any one of claims 1 to 5, wherein
【請求項7】 前記管理手段は、前記プラント機器で事
故が発生したことを検知する事故検知手段と、 該事故検知手段が事故を検知すると全無線制御手段及び
中央監視制御手段へその旨を通知する通知手段と、を備
えたことを特徴とする請求項1乃至5のいずれかに記載
の監視制御システム。
7. The management means notifies an accident detection means for detecting the occurrence of an accident in the plant equipment, and notifies all wireless control means and central monitoring control means to that effect when the accident detection means detects an accident. The monitoring control system according to any one of claims 1 to 5, further comprising:
JP2002124471A 2002-04-25 2002-04-25 Watching control system Pending JP2003316401A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002124471A JP2003316401A (en) 2002-04-25 2002-04-25 Watching control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002124471A JP2003316401A (en) 2002-04-25 2002-04-25 Watching control system

Publications (1)

Publication Number Publication Date
JP2003316401A true JP2003316401A (en) 2003-11-07

Family

ID=29539501

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002124471A Pending JP2003316401A (en) 2002-04-25 2002-04-25 Watching control system

Country Status (1)

Country Link
JP (1) JP2003316401A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007299228A (en) * 2006-04-28 2007-11-15 Toshiba Corp Monitoring control system, monitoring control device, field operation terminal of same, and monitoring method of same system
JP2008123118A (en) * 2006-11-09 2008-05-29 Chugoku Electric Power Co Inc:The Operation support system
JP2008123063A (en) * 2006-11-08 2008-05-29 Chugoku Electric Power Co Inc:The Supervisory control system and method
JP2009022105A (en) * 2007-07-11 2009-01-29 Chugoku Electric Power Co Inc:The Ip-type remote monitoring controller and monitoring control system
JP2011113368A (en) * 2009-11-27 2011-06-09 Mitsubishi Electric Corp Monitor control system for water treatment plant

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007299228A (en) * 2006-04-28 2007-11-15 Toshiba Corp Monitoring control system, monitoring control device, field operation terminal of same, and monitoring method of same system
JP2008123063A (en) * 2006-11-08 2008-05-29 Chugoku Electric Power Co Inc:The Supervisory control system and method
JP2008123118A (en) * 2006-11-09 2008-05-29 Chugoku Electric Power Co Inc:The Operation support system
JP4722016B2 (en) * 2006-11-09 2011-07-13 中国電力株式会社 Operation support system
JP2009022105A (en) * 2007-07-11 2009-01-29 Chugoku Electric Power Co Inc:The Ip-type remote monitoring controller and monitoring control system
JP2011113368A (en) * 2009-11-27 2011-06-09 Mitsubishi Electric Corp Monitor control system for water treatment plant

Similar Documents

Publication Publication Date Title
JP2009230203A (en) Status information management system, method, and status information management server
JP2003316401A (en) Watching control system
JP4624772B2 (en) Disaster prevention monitoring system and operation display device for disaster prevention monitoring
KR101220092B1 (en) A management device for detector
JP2024045412A (en) Disaster prevention support system
JP2006271817A (en) Nurse call apparatus
JP2023054121A (en) Fire alarm facility
JP6366942B2 (en) Disaster prevention monitoring equipment and its remote operation method
JP3871919B2 (en) Fire monitoring device, return processing release device, portable terminal device, and fire alarm system
JPH10172078A (en) Image center device
US10139891B2 (en) Systems and methods of power-safe control panel installation
JP2000215369A (en) Alarm monitoring panel
JPH06119581A (en) Remote monitoring device
JP3967934B2 (en) Notification device with notification function
JP2001191921A (en) Maintenance work control device for railroad facilities
JPH11116154A (en) Remotely monitoring system for elevator
JPS6326147A (en) System state display system
JPH097085A (en) Monitor device
JP7475656B2 (en) Management device and management system
JP2000311153A (en) Method for testing duplex supervisory and control system
JPH11234221A (en) Operation control panel device for train radio equipment and control method therefor
JP2009074278A (en) Key management system with alarm function
JPH1052053A (en) Power supply unit for computer
JP2800157B2 (en) Building remote monitoring device
JP2001126167A (en) Alarm and monitor system for multiple dwelling house