JP2003298772A - Support system for disaster-preventing facilities - Google Patents
Support system for disaster-preventing facilitiesInfo
- Publication number
- JP2003298772A JP2003298772A JP2002098102A JP2002098102A JP2003298772A JP 2003298772 A JP2003298772 A JP 2003298772A JP 2002098102 A JP2002098102 A JP 2002098102A JP 2002098102 A JP2002098102 A JP 2002098102A JP 2003298772 A JP2003298772 A JP 2003298772A
- Authority
- JP
- Japan
- Prior art keywords
- information
- disaster prevention
- receiver
- support device
- central support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Telephonic Communication Services (AREA)
- Alarm Systems (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、自動火災報知設
備、消火設備等の防災設備の支援システムに関するもの
である。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a support system for disaster prevention equipment such as automatic fire alarm equipment and fire extinguishing equipment.
【0002】[0002]
【従来の技術】防災設備の火災受信機、総合操作盤また
は消火制御盤は防災センタや警備員室等に設けられてい
る場合が多く、火災時に、火災感知器が火災を検出する
と、火災受信機または総合操作盤の表示部、たとえばC
RT上に火災の発生した火災警戒地区が表示される。2. Description of the Related Art In many cases, a fire receiver, a general operation panel or a fire extinguishing control panel of a disaster prevention facility is installed in a disaster prevention center or a guard room, and when a fire detector detects a fire, it receives a fire notification. Display on the machine or integrated control panel, eg C
The fire warning area where the fire occurred is displayed on the RT.
【0003】また、スプリンクラヘッドが作動すると、
消火制御盤の表示部に放水の開始した箇所が表示され
る。防災センタの要員または警備員室の警備員等の監視
員は、この表示に基づき、火災の確認、操作部に設けら
れた各種スイッチを用いての防火や消火の制御処理操
作、消防署への通報等を行う。When the sprinkler head operates,
The point at which water has started is displayed on the display of the fire extinguisher control panel. Based on this display, the personnel of the disaster prevention center or the guards of the guard room, etc. can confirm the fire, control the fire and extinguish fire using various switches on the operation unit, and report to the fire department. And so on.
【0004】[0004]
【発明が解決しようとする課題】監視員は、ある程度の
訓練を受けているが、火災受信機、総合操作盤または消
火制御盤は、日常使用しているものではなく、火災時に
使用するものであり、いざというときに正しい操作手順
で操作できない事例がある。Surveillance personnel have undergone some training, but fire receivers, general control panels or fire extinguishing control panels should not be used on a daily basis, but should be used during a fire. Yes, there are cases in which operations cannot be performed with the correct operating procedure in an emergency.
【0005】本発明は、火災受信機、総合操作盤または
消火制御盤を、防災センタ要員や警備員等の監視員が日
常使用していなくても、火災時に、防災センタ要員や警
備員等の監視員が、それらを正しい操作手順で操作する
ことができる防災設備の支援システムを提供することを
目的とするものである。According to the present invention, even if a fire receiver, a general operation panel or a fire extinguishing control panel is not routinely used by monitoring personnel such as disaster prevention center personnel and security guards, it is possible to protect the disaster prevention center personnel and security guards during a fire. It is an object of the present invention to provide a support system for disaster prevention equipment, which enables an observer to operate them in a correct operating procedure.
【0006】つまり、本発明は、火災時に防災センタ要
員や警備員等の監視員の火災受信機、総合操作盤または
消火制御盤等の防災用受信機の操作を支援することを目
的とするものである。That is, an object of the present invention is to support the operation of a fire receiver of a supervisor such as a disaster prevention center staff member or a guard at the time of a fire, and a disaster prevention receiver such as a general operation panel or a fire extinguishing control panel. Is.
【0007】また、監視員の防災用受信機の訓練を支援
することを目的とするものである。Another object of the present invention is to support training of surveillance personnel for receivers for disaster prevention.
【0008】[0008]
【課題を解決するための手段】本発明の第1の発明は、
ビル、工場、地下街等の複数の建造物にそれぞれ設置さ
れる防災用受信機と支援センタの中央支援装置とを有線
または無線の通信回線で接続し、上記防災用受信機には
外防災用受信機に接続された被接続機器の作動または防
災用受信機が操作されたときに上記中央支援装置を呼び
出して通信可能状態にする第1の呼出手段と、防災用受
信機の状態の情報を上記中央支援装置に送信する第1の
送信手段とが設けられ、上記中央支援装置には、上記複
数の建造物の建造物情報および複数の建造物にそれぞれ
設置された防災用受信機の受信機情報(表示部情報、操
作部情報等)を記憶している第1の記憶手段と、いずれ
かの防災用受信機から呼出手段により呼び出されたとき
に、上記第1の記憶手段から当該建造物の建造物情報お
よび当該防災用受信機の受信機情報を表示部に表示する
とともに、当該受信機情報に追加して上記防災用受信機
から受信した状態の情報を上記表示部に表示させる第1
の表示手段とが設けられてなることを特徴とするもので
ある。The first invention of the present invention is as follows:
A disaster prevention receiver installed in each of multiple buildings such as buildings, factories, and underground malls is connected to the central support device of the support center via a wired or wireless communication line. Information about the status of the disaster prevention receiver and the first calling means for calling the central support device to make the communication possible when the connected equipment connected to the machine is operated or the disaster prevention receiver is operated. First transmitting means for transmitting to a central support device is provided, and the central support device has building information of the plurality of buildings and receiver information of disaster prevention receivers respectively installed in the plurality of buildings. A first storage unit that stores (display unit information, operation unit information, etc.) and, when called by any one of the disaster prevention receivers by the calling unit, the structure of the building from the first storage unit. Building information and receipt for the disaster prevention And displays the receiver information of the machine on the display unit, the cause information of the state where in addition to the receiver information received from the disaster prevention receiver is displayed on the display unit 1
The display means is provided.
【0009】第2の発明は、第1の発明において、上記
中央支援装置には、呼び出しを行った上記防災受信機に
対する制御命令を作成する第1の制御命令作成手段と、
上記第1の制御命令作成手段によって作成された制御命
令を当該防災受信機に送信する第2の送信手段とが設け
られ、上記防災用受信機には、上記中央支援装置から送
信される制御命令を受信して当該受信機を制御する第1
の制御手段が設けられてなることを特徴とするものであ
る。According to a second aspect of the present invention, in the first aspect of the present invention, the central support device includes a first control command creating means for creating a control command for the disaster prevention receiver that has called.
Second control means for transmitting the control command generated by the first control command generation means to the disaster prevention receiver is provided, and the disaster prevention receiver transmits the control command from the central support device. For receiving and controlling the receiver
The control means is provided.
【0010】第3の発明は、ビル、工場、地下街等の複
数の建造物にそれぞれ設置される防災用受信機と支援セ
ンタの中央支援装置とを有線または無線の通信回線で接
続し、上記防災用受信機にはシミュレーションを行うた
めに上記中央支援装置を呼び出して通信可能状態にする
第2の呼出手段と、上記中央支援装置から受信するシミ
ュレーション情報に基づきシミュレーションを行う実行
手段と、上記実行手段による実行中の当該防災受信機の
操作情報および状態情報を上記中央支援装置に送信する
第3の送信手段とが設けられ、上記中央支援装置には、
上記複数の建造物の建造物情報および複数の建造物にそ
れぞれ設置された防災用受信機の受信機情報およびシミ
ュレーション情報を記憶している第2の記憶手段と、い
ずれかの防災用受信機から第2の呼出手段により呼び出
されたときに、上記第2の記憶手段から当該防災用受信
機に対するシミュレーション情報を読み出して送信する
第4の送信手段と、上記第2の記憶手段から当該建造物
の建造物情報および当該防災用受信機の受信機情報を表
示部に表示するとともに、当該受信機情報に追加して上
記第3の送信手段から送信された操作情報および状態情
報を上記表示部に表示させる第2の表示手段とが設けら
れてなることを特徴とするものである。A third aspect of the present invention is to connect the disaster prevention receiver installed in each of a plurality of buildings such as buildings, factories, and underground malls with the central support device of the support center by a wired or wireless communication line to provide the disaster prevention. Second calling means for calling the central support device to make it in a communicable state in order to perform a simulation in the receiver for use, execution means for performing simulation based on simulation information received from the central support device, and the execution means. And a third transmitting means for transmitting operation information and status information of the disaster prevention receiver being executed by the central support device, the central support device comprising:
Second storage means for storing the building information of the plurality of buildings and the receiver information and the simulation information of the disaster prevention receivers respectively installed in the plurality of buildings, and one of the disaster prevention receivers. Fourth calling means for reading and transmitting simulation information for the disaster prevention receiver from the second storage means when called by the second calling means, and the building from the second storage means. The building information and the receiver information of the disaster prevention receiver are displayed on the display unit, and the operation information and the status information transmitted from the third transmitting unit in addition to the receiver information are displayed on the display unit. It is characterized in that it is provided with a second display means.
【0011】第4の発明は、ビル、工場、地下街等の複
数の建造物にそれぞれ設置される防災用受信機と支援セ
ンタの中央支援装置とを有線または無線の通信回線で接
続し、上記防災用受信機には外防災用受信機に接続され
た被接続機器の作動または防災用受信機が操作されたと
きに上記中央支援装置を呼び出して通信可能状態にする
第1の呼出手段と、防災用受信機の状態の情報を上記中
央支援装置に送信する第1の送信手段と、シミュレーシ
ョンを行うために上記中央支援装置を呼び出して通信可
能状態にする第2の呼出手段と、上記中央支援装置から
受信するシミュレーション情報に基づきシミュレーショ
ンを行う実行手段と、上記実行手段による実行中の当該
防災受信機の操作情報および状態情報を上記中央支援装
置に送信する第3の送信手段とが設けられ、上記中央支
援装置には、上記複数の建造物の建造物情報および複数
の建造物にそれぞれ設置された防災用受信機の受信機情
報(表示部情報、操作部情報を含む)を記憶している第
1の記憶手段と、上記複数の建造物の建造物情報および
複数の建造物にそれぞれ設置された防災用受信機の受信
機情報およびシミュレーション情報を記憶している第2
の記憶手段と、いずれかの防災用受信機から第1の呼出
手段により呼び出されたときに、上記第1の記憶手段か
ら当該建造物の建造物情報および当該防災用受信機の受
信機情報を表示部に表示するとともに、当該受信機情報
に追加して上記防災用受信機から受信した状態の情報を
上記表示部に表示させる第1の表示手段と、いずれかの
防災用受信機から第2の呼出手段により呼び出されたと
きに、上記第2の記憶手段から当該防災用受信機に対す
るシミュレーション情報を読み出して送信する第4の送
信手段と、いずれかの防災用受信機から、第1の呼出手
段により呼び出されたときに、上記第1の記憶手段から
当該建造物の建造物情報および当該防災用受信機の受信
機情報を表示部に表示するとともに、当該受信機情報に
追加して上記防災用受信機から受信した状態の情報を上
記表示部に表示させ、第2の呼出手段により呼び出され
たときに、上記第2の記憶手段から当該建造物の建造物
情報および当該防災用受信機の受信機情報を表示部に表
示するとともに、当該受信機情報に追加して上記第3の
送信手段から送信された操作情報および状態情報を上記
表示部に表示させる第3の表示手段とが設けられてなる
ことを特徴とするものである。A fourth aspect of the present invention is to connect a disaster prevention receiver installed in each of a plurality of buildings such as buildings, factories, and underground malls with a central support device of a support center by a wired or wireless communication line to provide the disaster prevention. And a disaster prevention receiver, a first calling means for calling the central support device to make it in a communicable state when the connected device connected to the external disaster prevention receiver is operated or the disaster prevention receiver is operated; Transmitting means for transmitting information on the state of the receiver for use to the central support device, second calling means for calling the central support device to make it in a communicable state for performing simulation, and the central support device A third means for executing a simulation based on the simulation information received from the third operation means, and transmitting the operation information and the status information of the disaster prevention receiver being executed by the execution means to the central support device. A transmitting means is provided, and the central support device stores building information of the plurality of buildings and receiver information (display section information, operation section information) of disaster prevention receivers respectively installed in the plurality of buildings. And a first storage means for storing the building information of the plurality of buildings and receiver information and simulation information of disaster prevention receivers respectively installed in the plurality of buildings. Two
Of the disaster prevention receiver and the disaster prevention receiver, the building information of the building and the receiver information of the disaster prevention receiver are read from the first storage means. First display means for displaying the information on the state displayed on the display unit and added to the receiver information and received from the disaster prevention receiver on the display unit; Fourth calling means for reading out and transmitting the simulation information for the disaster prevention receiver from the second storage means when called by the calling means, and any one of the disaster prevention receivers makes the first call. When called by the means, the building information of the building and the receiver information of the disaster prevention receiver are displayed on the display unit from the first storage means, and the disaster prevention is added to the receiver information. The state information received from the receiver is displayed on the display unit, and when called by the second calling unit, the building information of the building and the disaster prevention receiver are received from the second storage unit. Third display means for displaying the machine information on the display part and for displaying the operation information and the status information transmitted from the third transmitting means in addition to the receiver information on the display part. It is characterized by becoming.
【0012】第5の発明は、ビル、工場、地下街等の複
数の建造物にそれぞれ設置される防災用受信機と支援セ
ンタの中央支援装置とを有線または無線の通信回線で接
続し、上記防災用受信機にはシミュレーションを行うた
めに上記中央支援装置を呼び出して通信可能状態にする
第2の呼出手段と、当該防災用受信機のシミュレーショ
ン情報を記憶している第3の記憶手段と、上記第3の記
憶手段に記憶されているシミュレーション情報に基づき
シミュレーションを行う第2の実行手段と、上記第2の
実行手段による実行中の当該防災受信機の操作情報およ
び状態情報を上記中央支援装置に送信する第5の送信手
段とが設けられ、上記中央支援装置には、上記複数の建
造物の建造物情報および複数の建造物にそれぞれ設置さ
れた防災用受信機の受信機情報を記憶している第4の記
憶手段と、いずれかの防災用受信機から上記第2の呼出
手段により呼び出されたときに、上記第4の記憶手段か
ら当該建造物の建造物情報および当該防災用受信機の受
信機情報を表示部に表示するとともに、当該受信機情報
に追加して上記第5の送信手段から送信された操作情報
および状態情報を上記表示部に表示させる第3の表示手
段とが設けられてなることを特徴とするものである。A fifth aspect of the present invention is to connect a disaster prevention receiver installed in each of a plurality of buildings such as buildings, factories, and underground malls with a central support device of a support center by a wired or wireless communication line to prevent the disaster prevention. Second calling means for calling the central support device to make it in a communicable state in order to perform a simulation in the receiver for radio communication; third storage means for storing simulation information of the disaster prevention receiver; Second execution means for performing a simulation based on the simulation information stored in the third storage means, and operation information and status information of the disaster prevention receiver being executed by the second execution means to the central support device. Fifth transmission means for transmitting is provided, and the central support device includes building information of the plurality of buildings and a disaster prevention receiver installed in each of the plurality of buildings. Fourth storage means for storing receiver information and, when called by any one of the disaster prevention receivers by the second calling means, the building information of the building from the fourth storage means. And a third step of displaying the receiver information of the disaster prevention receiver on the display section and displaying the operation information and the status information transmitted from the fifth transmitting means on the display section in addition to the receiver information. The display means is provided.
【0013】第6の発明は、第1、第2または第4の発
明のいずれかにおいて、上記複数の建造物のそれぞれに
は上記第1の呼出手段により上記中央支援装置を呼び出
したときに上記支援センタと通話可能となる第1の通話
手段が設けられ、上記支援センタには、上記第1の呼出
手段による呼び出しを受けたときに上記第1の通話手段
と通話可能となる第2の通話手段が設けられてなること
を特徴とするものである。According to a sixth aspect of the present invention, in any one of the first, second or fourth aspects of the invention, when the central assistance device is called by the first calling means for each of the plurality of buildings. A first call means for making a call with the support center is provided, and the support center has a second call for making a call with the first call means when receiving a call by the first calling means. It is characterized in that means are provided.
【0014】第7の発明は、第3、第4または第5の発
明において、上記複数の建造物のそれぞれには上記第2
の呼出手段により上記中央支援装置を呼び出したときに
上記支援センタと通話可能となる第3の通話手段が設け
られ、上記支援センタには、上記第1の呼出手段による
呼び出しを受けたときに上記第1の通話手段と通話可能
となる第4の通話手段が設けられてなることを特徴とす
るものである。A seventh invention is the third, fourth or fifth invention, wherein each of the plurality of buildings has the second structure.
Is provided with a third call means capable of communicating with the support center when the central support device is called by the call means. It is characterized in that a fourth call means capable of making a call with the first call means is provided.
【0015】[0015]
【発明の実施の形態および実施例】図1は、本発明の一
実施例の系統図である。DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a system diagram of an embodiment of the present invention.
【0016】図1において、1は支援を受けるユーザの
ビル、2はビル1の防災センタ、3は防災センタ2に設
置されている防災用受信機の一例としての総合操作盤、
4は支援センタ5のあるビル、6は中央支援装置、7は
有線または無線の通信回線の一例としての公衆電話回線
である。なお、支援センタ5の中央支援装置6には、複
数のビル、工場、地下街等の建造物にそれぞれ設けられ
た火災受信機、総合操作盤、消火制御盤等の各種の防災
用受信機が通信回線7を介して接続されているが、図1
ではこれらを代表して1つのビル1、1台の総合操作盤
3のみを図示している。In FIG. 1, 1 is a building of a user who receives support, 2 is a disaster prevention center of the building 1, 3 is a general operation panel as an example of a disaster prevention receiver installed in the disaster prevention center 2,
Reference numeral 4 is a building with a support center 5, 6 is a central support device, and 7 is a public telephone line as an example of a wired or wireless communication line. The central support device 6 of the support center 5 communicates with various disaster prevention receivers such as a fire receiver, a general operation panel, a fire extinguisher control panel, etc., which are respectively installed in buildings such as buildings, factories, and underground malls. Although connected via line 7, FIG.
Then, as a representative of these, only one building 1 and one integrated operation panel 3 are shown.
【0017】総合操作盤3は、表示部であるCRT31
を有するとともに、図示を省略した、各種のスイッチを
有する操作部、各種の表示灯を有する表示部、中央支援
装置6とデータ等の情報を送受信するモデム、ダイアラ
等が設けられている。The general control panel 3 has a CRT 31 which is a display unit.
In addition to the above, an operation unit having various switches, a display unit having various indicator lights, a modem for transmitting and receiving information such as data to and from the central support device 6, and a dialer, which are not shown, are provided.
【0018】中央支援装置6は、本実施例では、主装置
61とサーバー63で構成されている。主装置61は、
表示部の主表示部である主CRT62を有するととも
に、図示を省略した、各種のスイッチを有する操作部、
各種の表示灯を有する表示部、総合操作盤3とデータ等
の情報を送受信するモデム、ダイアラ等が設けられてい
る。サーバ62は、表示部の副表示部である副CRT6
4を有するとともに、図示を省略した、各種のスイッチ
を有する操作部、各種の表示灯を有する表示部、各種の
物件データを記憶している記憶装置等が設けられてい
る。なお、主および副CRT62、64の代わりに液晶
ディスプレイ、プラズマディスプレイ等を用いるように
してもよい。The central support device 6 is composed of a main device 61 and a server 63 in this embodiment. The main device 61 is
An operation unit having a main CRT 62, which is a main display unit of the display unit, and various switches not shown,
A display unit having various kinds of indicator lights, a modem for transmitting and receiving information such as data to and from the general control panel 3, a dialer, and the like are provided. The server 62 has a sub CRT 6 which is a sub display unit of the display unit.
4, an operation unit having various switches, a display unit having various indicator lights, a storage device for storing various property data, and the like, which are not shown, are provided. A liquid crystal display, a plasma display or the like may be used instead of the main and sub CRTs 62 and 64.
【0019】図2は、総合操作盤3の動作を説明するフ
ローチャートである。FIG. 2 is a flow chart for explaining the operation of the general control panel 3.
【0020】なお、図示を省略した他の防災用受信機で
も同様の動作を行う。図3は中央支援装置6の動作を説
明するフローチャートである。The same operation is performed in other disaster prevention receivers (not shown). FIG. 3 is a flowchart explaining the operation of the central support device 6.
【0021】図4〜図6は、図2のフローチャートの詳
細な動作を説明するフローチャートである。4 to 6 are flowcharts for explaining the detailed operation of the flowchart of FIG.
【0022】図7〜図9は、図3のフローチャートの詳
細な動作を説明するフローチャートで有る。7 to 9 are flowcharts for explaining the detailed operation of the flowchart of FIG.
【0023】そして、図4と図7とが対応し、図5と図
8とが対応し、図6と図9とが対応している。FIGS. 4 and 7 correspond to each other, FIGS. 5 and 8 correspond to each other, and FIGS. 6 and 9 correspond to each other.
【0024】総合操作盤3は、図2に示すように、ビル
1内に配設された図示しない火災感知器や発信機の状態
を監視しており(S10)、火災が発生すると(S10
のY)、図4に詳細な動作フローを示す火災発生処理
(S100)を行う。また、総合操作盤3の図示しない
操作部のシミュレーション開始スイッチがオン操作され
ると(S20のY)、図5に詳細な動作フローを示すシ
ミュレーション処理(S200)を行う。また、中央支
援装置6から制御命令を受信すると(S30のY)、図
6に詳細な動作フローを示す制御実行処理(S300)
を行う。As shown in FIG. 2, the general control panel 3 monitors the states of fire detectors and transmitters (not shown) arranged in the building 1 (S10), and when a fire occurs (S10).
Y), the fire occurrence process (S100) whose detailed operation flow is shown in FIG. 4 is performed. When the simulation start switch of the operation unit (not shown) of the general control panel 3 is turned on (Y in S20), the simulation process (S200) showing the detailed operation flow in FIG. 5 is performed. Further, when the control command is received from the central support device 6 (Y of S30), the control execution process showing the detailed operation flow in FIG. 6 (S300).
I do.
【0025】中央支援装置6は、複数の防災用受信機の
いずれかから呼び出しを受けたかを常時監視している
(S40)。たとえばビル1の総合受信盤3から呼び出
しを受けると(S40のY)、総合操作盤3が火災発生
処理S100の中で送信した火災情報の受信か(S5
0)シミュレーション処理S200の中でシミュレーシ
ョン要求の受信か(S60)を判別する。火災情報の受
信であると(S50のY)、図7に詳細な動作フローを
示す火災時処理(S500)を行い、シミュレーション
要求の受信であると(S60のY)、図8に詳細な動作
フローを示すシミュレーション要求処理(S600)を
行う。また、中央支援装置6の主装置61の図示しない
操作部から制御入力があると(S70のY)、図9に詳
細な動作フローを示す制御処理(S700)を行う。The central support device 6 constantly monitors whether a call is received from any of the plurality of disaster prevention receivers (S40). For example, when a call is received from the general reception panel 3 of the building 1 (Y of S40), is the general operation panel 3 received the fire information transmitted in the fire occurrence processing S100 (S5).
0) In the simulation process S200, it is determined whether a simulation request is received (S60). If the fire information is received (Y of S50), the fire process (S500) whose detailed operation flow is shown in FIG. 7 is performed, and if the simulation request is received (Y of S60), the detailed operation is shown in FIG. A simulation request process (S600) showing a flow is performed. Further, when there is a control input from the operation unit (not shown) of the main device 61 of the central support device 6 (Y of S70), the control process (S700) whose detailed operation flow is shown in FIG. 9 is performed.
【0026】次に、上記実施例における火災時の動作、
を図2、図3、図4と図7で説明する。Next, the operation during a fire in the above embodiment,
Will be described with reference to FIGS. 2, 3, 4 and 7.
【0027】総合操作盤3は、接続された図示しない火
災感知器から受信した情報に基づき火災発生と判断する
と(S10のY)、図示しないダイアラ、モデムを起動
して支援センタ5の中央支援装置6を呼び出す(S10
2)。この総合操作盤3と中央支援装置6との間の呼び
出しおよび以後の通信は、インターネット形式、いわゆ
るパソコン通信形式、その他の形式のいずれでもよく、
総合操作盤3と中央支援装置6との間で各種情報の通信
が行うことができる方式であれば方式を問わない。When the general control panel 3 judges that a fire has occurred based on the information received from the connected fire detector (not shown) (Y in S10), it activates the dialer and modem (not shown) to activate the central support device of the support center 5. 6 is called (S10
2). Calling between the integrated operation panel 3 and the central support device 6 and subsequent communication may be performed in the Internet format, so-called personal computer communication format, or any other format.
Any method may be used as long as it can communicate various kinds of information between the general operation panel 3 and the central support device 6.
【0028】総合操作盤3は、中央支援装置6がこの呼
び出しに応答したら(S40)、ビル1および総合操作
盤3に関する物件情報、たとえば物件識別番号(ID番
号)を送信する(S104)とともに、火災信号の受信
状態、各種スイッチの状態、各種表示灯の状態等の総合
操作盤3の状態のデータを火災情報として送信するとと
もに、送信した火災情報を図示を省略した記憶装置(メ
モリ)に送信済み火災情報として記憶しておく(S10
6)。また、支援センタ5から呼び出しに対する応答が
あると(S40)、図示しないハンドフリーの電話機を
自動起動して支援センタ5の図示を省略した電話機を呼
び出し、防災センタ2にいる要員と支援センタ5に待機
している支援員との間の通話を確保し、以後の支援がス
ムーズに行えるようにする。なお、通常の電話機を用い
る代わりに、いわゆるインターネット電話を利用するよ
うにしてもよい。When the central support device 6 responds to this call (S40), the general operation panel 3 transmits property information about the building 1 and the general operation panel 3, for example, a property identification number (ID number) (S104), Data of the status of the general control panel 3 such as the status of receiving fire signals, the status of various switches, the status of various indicators, etc. is sent as fire information, and the sent fire information is sent to a storage device (memory) not shown. It is stored as completed fire information (S10).
6). In addition, when there is a response to the call from the support center 5 (S40), a hands-free telephone (not shown) is automatically activated to call a telephone (not shown) of the support center 5, and the personnel in the disaster prevention center 2 and the support center 5 are called. Securing a call with the waiting support staff so that future support can be carried out smoothly. Instead of using a normal telephone, a so-called Internet telephone may be used.
【0029】中央支援装置6の主装置61は、ビル1の
総合操作盤3から呼び出しを受けると応答信号を返送し
(S40のY)、続いて物件情報と火災情報を受信する
と(S50のY)、受信したID番号すなわち物件情報
から、サーバ63の図示を省略したハードディスク等の
記憶装置に記憶された物件データベース(DB)から対
応物件の物件データ、たとえば物件名(ビル1の名
称)、物件所在地、使用防災受信機の型名、本実施例の
場合は総合操作盤3の型名、総合操作盤3に接続されて
いる各種機器および警戒地区情報等を読み出すととも
に、総合操作盤3の型名に基づき、記憶装置の各種防災
用受信機の表示部画面や操作部画面等の機種情報を記憶
している機器DBから総合操作盤3の機種情報を読み出
す(S502)。そして、主CRT62に、物件DBか
ら読み出した物件データのうち必要な情報、たとえば物
件名、物件所在地、物件の規模、総合操作盤3に接続さ
れている火災感知器等の監視用機器や防火戸、排煙装置
等の被制御機器の接続状況等を表示するとともに、副C
RT64に、機器DBから読み出した総合操作盤3の表
示部画面情報と操作部画面情報、並びに総合操作盤3か
ら受信した火災情報とから、ビル1の総合操作盤3の表
示部および操作部の盤面状態の表示画面を作成して表示
する(S504)。When the main unit 61 of the central support unit 6 receives a call from the general operation panel 3 of the building 1, it returns a response signal (Y in S40), and subsequently receives property information and fire information (Y in S50). ), From the received ID number, that is, the property information, property data of the corresponding property from the property database (DB) stored in a storage device such as a hard disk (not shown) of the server 63, for example, property name (name of building 1), property The location, the model name of the disaster prevention receiver used, the model name of the integrated operation panel 3 in the present embodiment, various devices connected to the integrated operation panel 3 and the warning area information are read out, and the type of the integrated operation panel 3 is read out. Based on the name, the model information of the general control panel 3 is read from the device DB that stores the model information such as the display screens and operation screens of the disaster prevention receivers in the storage device (S502). Then, in the main CRT 62, necessary information of the property data read from the property DB, for example, property name, property location, property size, monitoring devices such as fire detectors connected to the general control panel 3, and fire doors. , The connection status of controlled devices such as smoke exhaust devices, etc.
The RT64 displays the display unit screen information and the operation unit screen information of the general operation panel 3 read from the device DB, and the fire information received from the general operation panel 3 from the display unit and the operation unit of the general operation panel 3 of the building 1. A display screen of the board state is created and displayed (S504).
【0030】これにより、総合操作盤3の盤面状態と中
央支援装置6の副CRT64の表示状態とが一致し、支
援員はビル1の防災センタ2の総合操作盤3の前にいる
のと同様の状態となり、防災センタ2の監視員に対し電
話機を通じて、または主装置61の操作部であるキーボ
ードを操作して総合操作盤3に情報を送りCRT31に
表示させること等により、適切なアドバイスを行うこと
が可能になる。As a result, the board surface state of the general operation panel 3 and the display state of the sub CRT 64 of the central support device 6 coincide with each other, and the support staff is in front of the general operation panel 3 of the disaster prevention center 2 of the building 1. In this state, appropriate advice is given to the monitoring staff of the disaster prevention center 2 through the telephone or by operating the keyboard that is the operation unit of the main device 61 to send information to the general operation panel 3 and display it on the CRT 31. It will be possible.
【0031】次に、総合操作盤3は、中央支援装置6か
ら制御命令を受信したか判別し(S108)、受信して
いなければ(S108のN)総合操作盤3の状態に変化
があったか、すなわち先に送った火災情報に対し変化し
た情報があるか、たとえば新たな火災警戒地区で火災が
発生したか、操作部の複数あるスイッチのいずれかのス
イッチ状態が変化したかを判別する(S112)。判別
の結果、総合操作盤3の状態に変化があると(S112
のY)、その状態変化の情報を新たな火災情報として中
央支援装置6に送信する(S114)。Next, the general operation panel 3 determines whether or not the control command is received from the central support device 6 (S108), and if not received (N of S108), the state of the general operation panel 3 has changed. That is, it is determined whether there is changed information with respect to the previously sent fire information, for example, whether a fire has occurred in a new fire caution area or the switch state of any of a plurality of switches of the operation unit has changed (S112). ). As a result of the determination, if there is a change in the state of the integrated operation panel 3 (S112
Y), the information on the state change is transmitted to the central support device 6 as new fire information (S114).
【0032】中央支援装置6は、新たな火災情報を受信
すると(S506のY)、副CRT64に現在表示中の
内容から変化があるか判別し(S508)、変化がある
と(S508のY)新たな火災情報に基づいて副CRT
64の表示内容を更新する(S510)。Upon receiving the new fire information (Y in S506), the central support device 6 determines whether or not there is a change from the contents currently displayed on the sub CRT 64 (S508), and if there is a change (Y in S508). Deputy CRT based on new fire information
The display content of 64 is updated (S510).
【0033】そして、中央支援装置6の主装置61は、
受信した火災情報と副CRT64の表示内容からサーバ
62の記憶装置のガイド用DBを参照してガイドが必要
か否か判別し(S512)、必要であれば(S512の
Y)ガイド内容を主CRT62に表示する(S51
4)。支援員はこの主CRT62のガイド表示と副CR
T64の表示内容をみて、防災センタ2の監視員に対し
支援する必要があると判断すると、通話状態にある電話
機を用いて必要なアドバイスを送る。なお、S514に
よる表示内容を総合操作盤3に自動的または支援員のス
イッチ操作により送信し、総合操作盤3のCRT31に
も表示させるようにしてもよい。The main device 61 of the central support device 6 is
From the received fire information and the display content of the sub CRT 64, it is determined whether or not a guide is necessary by referring to the guide DB of the storage device of the server 62 (S512), and if necessary (Y of S512), the guide content is set to the main CRT 62. Displayed on (S51
4). Supporters are the guide display of this main CRT62 and sub CR
When it is determined that the monitoring staff of the disaster prevention center 2 needs to be assisted by looking at the display content of T64, the necessary advice is sent using the telephone in the call state. The display contents in S514 may be transmitted to the general operation panel 3 automatically or by a switch operation of a support staff, and may be displayed on the CRT 31 of the general operation panel 3 as well.
【0034】また、中央支援装置6の主装置61は、受
信した火災情報と副CRT64の表示内容からサーバ6
2の記憶装置に設けられた制御用DBのビル1に対する
制御情報を参照して総合操作盤3に対する制御が必要か
否か判別し(S516)、必要であれば(S516の
Y)その制御内容を主CRT62に表示する(S51
6)。支援員はこの主CRT62の要制御内容の表示と
副CRT64の表示内容をみて、防災センタ2の監視員
に対し制御の支援をする必要があると判断して制御命令
送信スイッチを操作すると(S520のY)、制御命令
と制御データを送信する(S522)。一方、支援員が
主CRT62と副CRT64の表示内容から制御不要で
あると判断して制御不要スイッチを操作すると(S52
0のN、S524のY)、主CRT62に表示された要
制御内容をクリアするととも制御データ等をクリアする
(S526)。なお、S518による要制御内容に基づ
く制御命令と制御データを自動的に送信するようにして
もよく、また、自動的な送信と支援員の操作による送信
とを切り替えられるようにしてもよく、物件DBに物件
毎に自動的送信か支援員の操作による送信かをあらかじ
め記憶させておき、それに基づき行うようにしてもよ
く、この場合は送信が自動か手動かを主CRTに表示さ
せるようにするとよい。The main device 61 of the central support device 6 determines the server 6 from the received fire information and the display contents of the sub CRT 64.
It is determined whether or not the control for the integrated control panel 3 is necessary by referring to the control information for the building 1 in the control DB provided in the second storage device (S516), and if necessary (Y in S516), the control content Is displayed on the main CRT 62 (S51
6). Looking at the display of the required control contents of the main CRT 62 and the display contents of the sub CRT 64, the support staff operates the control command transmission switch when he / she determines that it is necessary to support the monitoring staff of the disaster prevention center 2 for control (S520). Y), the control command and control data are transmitted (S522). On the other hand, when the support staff judges that control is unnecessary from the display contents of the main CRT 62 and the sub CRT 64, he operates the control unnecessary switch (S52).
0, Y in S524), the required control contents displayed on the main CRT 62 are cleared, and the control data and the like are cleared (S526). It should be noted that the control command and control data based on the required control content in S518 may be automatically transmitted, or the automatic transmission and the transmission by the operation of the support staff may be switched. It may be possible to store in advance in the DB whether it is automatic transmission or transmission by operation of a support member, and to perform based on that, in this case, if the transmission is automatic or manual is displayed on the main CRT. Good.
【0035】総合操作盤3は、中央支援装置6から制御
命令を受信すると(S108のY)、制御命令とともに
受信した制御データに基づき必要な制御処理、たとえば
地区音響装置の制御、防排煙機器の制御、消火設備の制
御等を行う(S110)。そして、総合操作盤3は、こ
の制御命令の処理により生じる状態変化を新たな火災情
報として送信し(S112のY、S114)、中央支援
装置6は新たに受信した火災情報に基づき表示内容を更
新表示する(S506〜S510)。When the general operation panel 3 receives a control command from the central support device 6 (Y of S108), it performs necessary control processing based on the control data received together with the control command, for example, control of the district sound device, smoke proof equipment. And the control of fire extinguishing equipment (S110). Then, the general operation panel 3 transmits the state change caused by the processing of this control command as new fire information (Y of S112, S114), and the central support device 6 updates the display content based on the newly received fire information. It is displayed (S506 to S510).
【0036】そして、総合操作盤3の図示を省略した操
作部の火災復旧スイッチが操作されると(S116の
Y)、図示しない火災地区表示のクリア、主音響装置や
地区音響装置の鳴動解除その他の火災復旧動作が行われ
るとともに、復旧情報を中央支援装置6に送信し、その
後中央支援装置6との接続を遮断し(S118)、通常
の監視状態に戻る。When the fire recovery switch of the operation section (not shown) of the general operation panel 3 is operated (Y in S116), the display of the fire area (not shown) is cleared, and the ringing of the main sound device and the area sound device is canceled. The fire recovery operation is performed, the recovery information is transmitted to the central support device 6, the connection with the central support device 6 is then cut off (S118), and the normal monitoring state is restored.
【0037】中央監視装置6は、復旧情報を受信すると
(S528のY)、総合操作盤3と送受信した情報を記
憶装置の物件支援記録DBのビル1に対応する部分に履
歴情報として格納する(S530)とともに、主CRT
62および副CRT64の表示画面およびその情報をク
リアし(S532)、通常の監視状態に戻る。When the central monitoring device 6 receives the restoration information (Y in S528), the information transmitted / received to / from the general operation panel 3 is stored as history information in the portion corresponding to the building 1 of the property support record DB of the storage device ( S530) together with the main CRT
The display screens of 62 and the sub-CRT 64 and their information are cleared (S532), and the normal monitoring state is returned to.
【0038】次に、シミュレーション時の動作を図2、
図3、図5と図8を参照して説明する。Next, the operation during the simulation is shown in FIG.
This will be described with reference to FIGS. 3, 5 and 8.
【0039】総合操作盤3のシミュレーション開始スイ
ッチがオン操作されると(S20のY)、図示しないダ
イアラ、モデムを起動して中央支援装置6を呼び出す
(S202)。総合操作盤3は、中央支援装置6が呼び
出しに応答したら(S40のY)、物件情報としてたと
えばID番号を送信し(S204)、シミュレーション
要求情報を送信する(S206)とともに、現在の総合
操作盤3の状態の情報を開始時状態情報として図示しな
い記憶装置に記憶する。When the simulation start switch of the general control panel 3 is turned on (Y in S20), a dialer and a modem (not shown) are activated to call the central support device 6 (S202). When the central support device 6 responds to the call (Y in S40), the general operation panel 3 transmits, for example, an ID number as property information (S204) and simulation request information (S206), and the current general operation panel 3 The state information of No. 3 is stored in the storage device (not shown) as start state information.
【0040】中央支援装置6は、シミュレーション要求
情報を受信すると(S60のY)、物件情報に基づいて
サーバ63の物件DBからビル1の情報を検索して読み
出し、読み出した防災用受信機この場合は総合操作盤3
の型式その他の情報に基づいてシミュレーションDBか
ら必要なシミュレーションデータを読み出し(S60
2)、最初の実行データを作成して実行命令とともに総
合操作盤3に送信する(S604)。そして、主CRT
62に火災時と同様に必要な表示を行うとともに、機器
DBから総合操作盤3の表示部と操作部の画面情報を読
み出し、副CRT64に盤面表示を行う(S606)。Upon receiving the simulation request information (Y in S60), the central support device 6 searches the property DB of the server 63 for the information of the building 1 based on the property information and reads it out, and in this case the disaster prevention receiver Is the total control panel 3
Necessary simulation data is read from the simulation DB based on the model and other information (S60).
2) The first execution data is created and transmitted together with the execution command to the general operation panel 3 (S604). And the main CRT
The necessary display is performed on 62 as in the case of a fire, and the screen information of the display section and the operation section of the general control panel 3 is read from the device DB and the panel display is performed on the sub CRT 64 (S606).
【0041】総合操作盤3は、実行命令を受信すると
(S208のY)、実行命令とともに受信したシミュレ
ーションデータに基づき、火災感知器の疑似作動、被制
御機器に対する疑似制御処理等のシミュレーションを実
施処理する(S210)。この実施処理により、総合操
作盤3のCRT31の表示内容の状態に変化が生じた
り、または、監視員が操作部にあるスイッチを操作して
スイッチ内容の状態に変化が生じると(S212)、変
化内容の状態情報を送信する(S214)。When the general operation panel 3 receives the execution command (Y of S208), the simulation operation such as the pseudo operation of the fire detector and the pseudo control process for the controlled device is executed based on the simulation data received together with the execution command. Yes (S210). When the state of the display content of the CRT 31 of the general operation panel 3 is changed by this execution processing, or the state of the switch content is changed by the monitor operating the switch in the operation unit (S212), the change is made. The content status information is transmitted (S214).
【0042】中央支援装置6は、この状態情報を受信す
ると(S608のY)、状態情報に基づいて副CRT6
4の表示画面を総合操作盤3の状態と一致させるべく更
新する(S610)。そして、受信した状態情報、たと
えば監視員による操作結果が先に送信した実行データに
対し正解であれば(S612のY)、次の実行データを
送信する(S614)。受信した状態情報が正解でなけ
れば、正解のガイドデータを実行命令とともに総合操作
盤3に送信し(S616)、正しい操作等が行われるよ
うにする。When the central support device 6 receives this status information (Y in S608), the sub CRT 6 is based on the status information.
The display screen of No. 4 is updated to match the state of the general operation panel 3 (S610). Then, if the received status information, for example, the operation result by the observer is the correct answer to the previously transmitted execution data (Y of S612), the next execution data is transmitted (S614). If the received state information is not the correct answer, the correct guide data is transmitted to the general operation panel 3 together with the execution command (S616) so that the correct operation or the like is performed.
【0043】この実行命令を受信した総合操作盤3は、
ガイドデータに基づいてCRT31に正解を表示し、監
視員に次の操作を促す(S208のY、S210)。こ
れにより、間違った操作を行った監視員は正しい操作を
行うことができる。The general operation panel 3 which has received this execution command,
The correct answer is displayed on the CRT 31 based on the guide data, and the monitor is prompted to perform the next operation (Y in S208, S210). As a result, the observer who performed the wrong operation can perform the correct operation.
【0044】なお、シミュレーション要求情報の送信と
ともに、火災時の場合と同様に、防災センタ2と支援セ
ンタ5との間で電話機等による通話状態を形成し、支援
員が監視員に正しい対応を説明するようにしてもよい。At the same time as the transmission of the simulation request information, as in the case of a fire, a telephone call or the like is formed between the disaster prevention center 2 and the support center 5 so that the support staff can explain the correct response to the monitoring staff. You may do it.
【0045】そして、総合操作盤3のシミュレーション
終了スイッチが操作されると(S216のY)、シミュ
レーション終了情報を送信し、記憶している開始時状態
情報に基づき、総合操作盤3をシミュレーション開始直
前の状態に戻す処理を行うとともに、中央支援装置6と
の接続を遮断してシミュレーションを終了する(S21
8)。When the simulation end switch of the general operation panel 3 is operated (Y in S216), the simulation end information is transmitted, and the general operation panel 3 is set immediately before the simulation based on the stored start state information. The process of returning to the above state is performed, the connection with the central support device 6 is cut off, and the simulation ends (S21).
8).
【0046】中央支援装置6は、シミュレーション終了
情報を受信すると(S618のY)、主CRT62と副
CRT64の表示をクリアするとともに、物件支援記憶
DBにビル1の総合操作盤3のシミュレーション結果を
履歴情報として格納する(S620)。Upon receiving the simulation end information (Y in S618), the central support device 6 clears the display of the main CRT 62 and the sub CRT 64, and records the simulation results of the general operation panel 3 of the building 1 in the property support memory DB. It is stored as information (S620).
【0047】次に、中央支援装置6からユーザ側の防災
用受信機を呼び出して制御する場合の動作について、図
2、図3、図6および図9を参照して説明する。Next, the operation of calling and controlling the disaster prevention receiver on the user side from the central support device 6 will be described with reference to FIGS. 2, 3, 6 and 9.
【0048】支援センタ5からビル1の総合操作盤3に
対する制御が必要となった場合には、中央支援装置6の
主装置61の操作部から総合操作盤3の呼出番号を入力
するとともに制御内容を入力する。呼出番号と制御内容
が入力されると(S70のY)、呼出番号と制御内容を
読み込み(S702)、ダイアラとモデムを起動して総
合操作盤3を呼び出す(S704)。総合操作盤3から
呼び出しに対する応答があると(S706)、制御命令
と制御内容を送信する(S708)。When it becomes necessary to control the general operation panel 3 of the building 1 from the support center 5, the call number of the general operation panel 3 is input from the operation unit of the main unit 61 of the central support device 6 and the control contents are controlled. Enter. When the calling number and the control content are input (Y of S70), the calling number and the control content are read (S702), the dialer and the modem are activated, and the general operation panel 3 is called (S704). When there is a response to the call from the general operation panel 3 (S706), the control command and the control content are transmitted (S708).
【0049】総合操作盤3は、制御命令と制御内容を受
信すると(S30のY)、制御命令により制御内容を実
行処理し(S302)、その処理した結果の情報を送信
する(S304)。When the control panel 3 receives the control command and the control content (Y of S30), the control panel 3 executes the control content by the control command (S302) and transmits the information of the processed result (S304).
【0050】中央支援装置6は、処理結果情報を受信す
ると(S710のY)、処理結果を主CRT62に表示
する(S712)。そして、全ての制御内容の送信が行
われ(S714のY)、主装置61の操作部から制御終
了の入力が行われると(S716のY)、制御内容と処
理結果情報をビル1の総合操作盤3の履歴情報として物
件支援DBに記憶するとともに、総合操作盤3との通信
接続状態を遮断して制御処理を終了する。Upon receiving the processing result information (Y in S710), the central support device 6 displays the processing result on the main CRT 62 (S712). Then, when all the control contents are transmitted (Y in S714) and the control end is input from the operation unit of the main device 61 (Y in S716), the control contents and the processing result information are combined into the comprehensive operation of the building 1. The history information of the panel 3 is stored in the property support DB, the communication connection state with the general operation panel 3 is shut off, and the control process ends.
【0051】なお、上記各説明では、各防災用受信機の
表示部と操作部の盤面に関する表示用の基本データを中
央支援装置にデータベースとして記憶しているようにし
たが、各防災用受信機に自己の表示部と操作部の表示用
の基本データを記憶しておき、火災時またはシミュレー
ション時に防災用受信機から表示用基本データを中央支
援装置に送信するようにしてもよい。In the above explanations, the basic data for display concerning the display part of each disaster prevention receiver and the panel of the operation part are stored as a database in the central support device, but each disaster prevention receiver is stored. It is also possible to store basic data for display of its own display unit and operation unit, and transmit the basic display data from the disaster prevention receiver to the central support device at the time of fire or simulation.
【0052】また、上記のシミュレーションでは、各防
災用受信機に対するシミュレーションデータを中央支援
装置が記憶装置に記憶しているようにしたが、中央支援
装置に代わって各防災用受信機の記憶装置に記憶させる
ようにし、各防災用受信機ではシミュレーション開始ス
イッチがオン操作されたときに自己の記憶装置のデータ
に基づきシミュレーションを実行し、その実行内容とそ
のときの防災用受信機の状態情報を中央支援装置に送信
し表示させるようにしてもよい。In the above-mentioned simulation, the central support device stores the simulation data for each disaster prevention receiver in the storage device. However, instead of the central support device, the disaster prevention receiver storage device stores the simulation data. In each disaster prevention receiver, the simulation is executed based on the data of its own storage device when the simulation start switch is turned on, and the execution contents and the status information of the disaster prevention receiver at that time are stored in the center. It may be transmitted to the support device and displayed.
【0053】また、中央支援装置は1台の装置としても
よく、防災用受信機と中央支援装置との間はインターネ
ットで常時接続するようにしてもよく、このようにする
と、防災用受信機側で何らかの状態変化があったときに
直ちに中央支援装置側で知ることができ、適切な支援を
よりきめ細かく行うことができる。Further, the central support device may be a single device, and the disaster prevention receiver and the central support device may be always connected via the Internet. The central support device side can immediately know when there is any change in the state, so that appropriate support can be provided more finely.
【0054】[0054]
【発明の効果】本発明によれば、火災受信機、総合操作
盤または消火制御盤を、防災センタ要員や警備員等の監
視員が日常使用していなくても、火災時に、防災センタ
要員や警備員等の監視員が、それらを正しい操作手順で
操作することができるという効果を奏する。According to the present invention, even if the fire receiver, the general operation panel or the fire extinguishing control panel is not used daily by the monitoring personnel such as the disaster prevention center personnel and security guards, the disaster prevention center personnel and There is an effect that a guard such as a guard can operate them in a correct operation procedure.
【図1】本発明の一実施例の系統図である。FIG. 1 is a system diagram of an embodiment of the present invention.
【図2】防災用受信機の動作を説明するフローチャート
である。FIG. 2 is a flowchart illustrating an operation of the disaster prevention receiver.
【図3】中央支援装置の動作を説明するフローチャート
である。FIG. 3 is a flowchart illustrating an operation of the central support device.
【図4】防災用受信機の詳細な動作を説明するフローチ
ャートである。FIG. 4 is a flowchart illustrating a detailed operation of the disaster prevention receiver.
【図5】防災用受信機の詳細な動作を説明するフローチ
ャートである。FIG. 5 is a flowchart illustrating a detailed operation of the disaster prevention receiver.
【図6】防災用受信機の詳細な動作を説明するフローチ
ャートである。FIG. 6 is a flowchart illustrating a detailed operation of the disaster prevention receiver.
【図7】中央支援装置の詳細な動作を説明するフローチ
ャートである。FIG. 7 is a flowchart illustrating a detailed operation of the central support device.
【図8】中央支援装置の詳細な動作を説明するフローチ
ャートである。FIG. 8 is a flowchart illustrating a detailed operation of the central support device.
【図9】中央支援装置の詳細な動作を説明するフローチ
ャートである。FIG. 9 is a flowchart illustrating a detailed operation of the central support device.
1…ビル、 2…防災センタ、 3…総合操作盤、 5…支援センタ、 6…中央支援装置、 61…主装置、 62…主CRT、 63…サーバ、 64…副CRT、 7…通信回線。 1 ... Building, 2 ... Disaster prevention center 3 ... Comprehensive operation panel, 5 ... Support center, 6 ... Central support device, 61 ... Main device, 62 ... Main CRT, 63 ... server, 64 ... Sub CRT, 7 ... communication line.
Claims (7)
それぞれ設置される防災用受信機と、支援センターの中
央支援装置とを、有線または無線の通信回線で接続し、 上記防災用受信機には、外防災用受信機に接続された被
接続機器の作動または防災用受信機が操作されたとき
に、上記中央支援装置を呼び出し、通信可能状態にする
第1の呼出手段と;防災用受信機の状態の情報を上記中
央支援装置に送信する第1の送信手段と;を有し、 上記中央支援装置には、 上記複数の建造物の建造物情報と複数の建造物にそれぞ
れ設置されている防災用受信機の受信機情報(表示部情
報、操作部情報を含む)とを記憶している第1の記憶手
段と;いずれかの防災用受信機から呼出手段によって呼
び出されたときに、上記第1の記憶手段から、当該建造
物の建造物情報と当該防災用受信機の受信機情報とを表
示部に表示するとともに、当該受信機情報に追加して上
記防災用受信機から受信した状態の情報を、上記表示部
に表示させる第1の表示手段と;を有することを特徴と
する防災設備の支援システム。1. A disaster prevention receiver installed in each of a plurality of buildings such as buildings, factories, and underground malls, and a central support device of a support center are connected by a wired or wireless communication line to obtain the disaster prevention reception. And a first calling means for calling the central support device so as to be in a communicable state when the connected equipment connected to the external disaster prevention receiver is operated or the disaster prevention receiver is operated; First transmitting means for transmitting information on the state of the receiver for use to the central support device, wherein the central support device is installed in each of the building information of the plurality of buildings and the plurality of buildings. A first storage means for storing receiver information (including display section information and operation section information) of a disaster prevention receiver being provided; when called by any one of the disaster prevention receivers by the calling means From the first storage means, The building information of the building and the receiver information of the disaster prevention receiver are displayed on the display unit, and the state information received from the disaster prevention receiver in addition to the receiver information is displayed on the display unit. And a first display means for controlling the disaster prevention equipment.
成する第1の制御命令作成手段と;上記第1の制御命令
作成手段によって作成された制御命令を、当該防災受信
機に送信する第2の送信手段と;を有し、 上記防災用受信機は、 上記中央支援装置から送信される制御命令を受信し、当
該受信機を制御する第1の制御手段を有することを特徴
とする防災設備の支援システム。2. The central support device according to claim 1, wherein the central support device includes a first control command creating unit that creates a control command for the disaster prevention receiver that has called, and is created by the first control command creating unit. Second transmitting means for transmitting the control command to the disaster prevention receiver, and the disaster prevention receiver receives the control command transmitted from the central support device and controls the receiver. A support system for disaster prevention equipment, comprising a first control means.
それぞれ設置される防災用受信機と、支援センタの中央
支援装置とを、有線または無線の通信回線で接続し、 上記防災用受信機は、 シミュレーションを行うために上記中央支援装置を呼び
出し、通信可能状態にする第2の呼出手段と;上記中央
支援装置から、受信するシミュレーション情報に基づい
て、シミュレーションを行う実行手段と;上記実行手段
による実行中の当該防災受信機の操作情報と状態情報と
を、上記中央支援装置に送信する第3の送信手段と;を
有し、 上記中央支援装置は、 上記複数の建造物の建造物情報と複数の建造物にそれぞ
れ設置された防災用受信機の受信機情報とシミュレーシ
ョン情報とを記憶している第2の記憶手段と;いずれか
の防災用受信機から、第2の呼出手段によって呼び出さ
れたときに、上記第2の記憶手段から当該防災用受信機
に対するシミュレーション情報を読み出し、送信する第
4の送信手段と;上記第2の記憶手段から当該建造物の
建造物情報および当該防災用受信機の受信機情報を表示
部に表示するとともに、当該受信機情報に追加して上記
第3の送信手段から送信された操作情報および状態情報
を上記表示部に表示させる第2の表示手段と;を有する
ことを特徴とする防災設備の支援システム。3. A disaster prevention receiver installed in each of a plurality of buildings such as buildings, factories, and underground malls, and a central support device of a support center are connected by a wired or wireless communication line to provide the disaster prevention reception. A second calling means for calling the central support device to make it in a communicable state in order to perform a simulation; an execution means for performing a simulation based on simulation information received from the central support device; Third transmitting means for transmitting the operation information and the status information of the disaster prevention receiver being executed by the means to the central support device, wherein the central support device is a building of the plurality of buildings. Second storage means for storing information and receiver information and simulation information of disaster prevention receivers installed in a plurality of buildings respectively; from any disaster prevention receiver, Fourth calling means for reading out and transmitting the simulation information for the disaster prevention receiver from the second storage means when called by the second calling means; and constructing the building from the second storage means. The product information and the receiver information of the disaster prevention receiver are displayed on the display unit, and the operation information and the status information transmitted from the third transmitting unit in addition to the receiver information are displayed on the display unit. A support system for disaster prevention equipment, comprising: second display means;
それぞれ設置される防災用受信機と、支援センタの中央
支援装置とを、有線または無線の通信回線で接続し、 上記防災用受信機は、 外防災用受信機に接続された被接続機器の作動または防
災用受信機が操作されたときに、上記中央支援装置を呼
び出し、通信可能状態にする第1の呼出手段と;防災用
受信機の状態の情報を、上記中央支援装置に送信する第
1の送信手段と;シミュレーションを行うために、上記
中央支援装置を呼び出し、通信可能状態にする第2の呼
出手段と;上記中央支援装置から受信するシミュレーシ
ョン情報に基づいて、シミュレーションを行う実行手段
と;上記実行手段による実行中の当該防災受信機の操作
情報と状態情報とを、上記中央支援装置に送信する第3
の送信手段と;を有し、 上記中央支援装置は、 上記複数の建造物の建造物情報と、複数の建造物にそれ
ぞれ設置された防災用受信機の受信機情報(表示部情
報、操作部情報を含む)とを記憶している第1の記憶手
段と;上記複数の建造物の建造物情報と、複数の建造物
にそれぞれ設置された防災用受信機の受信機情報と、シ
ミュレーション情報とを記憶している第2の記憶手段
と;いずれかの防災用受信機から、第1の呼出手段によ
って呼び出されたときに、上記第1の記憶手段から当該
建造物の建造物情報と、当該防災用受信機の受信機情報
とを表示部に表示するとともに、当該受信機情報に追加
して、上記防災用受信機から受信した状態の情報を上記
表示部に表示させる第1の表示手段と;いずれかの防災
用受信機から、第2の呼出手段によって呼び出されたと
きに、上記第2の記憶手段から当該防災用受信機に対す
るシミュレーション情報を読み出して送信する第4の送
信手段と;いずれかの防災用受信機から、第1の呼出手
段によって呼び出されたときに、上記第1の記憶手段か
ら当該建造物の建造物情報と当該防災用受信機の受信機
情報とを表示部に表示するとともに、当該受信機情報に
追加して、上記防災用受信機から受信した状態の情報
を、上記表示部に表示させ、第2の呼出手段によって呼
び出されたときに、上記第2の記憶手段から当該建造物
の建造物情報と当該防災用受信機の受信機情報とを表示
部に表示するとともに、当該受信機情報に追加して、上
記第3の送信手段から送信された操作情報と状態情報と
を、上記表示部に表示させる第3の表示手段と;を有す
ることを特徴とする防災設備の支援システム。4. A plurality of structures such as a building, a factory, an underground mall, etc.
Disaster prevention receivers installed in each and the center of the support center
The support device is connected by a wired or wireless communication line, and the disaster prevention receiver operates or prevents the connected equipment connected to the external disaster prevention receiver.
When the disaster receiver is operated, the central support device is called.
First calling means to put out and make communication possible; for disaster prevention
Transmitting the receiver status information to the central support device
1 transmission means; above for performing a simulation
A second call that calls the central support device to enable communication
Output means; simulation received from the central support device
Execution means to perform simulation based on the simulation information
And; operation of the disaster prevention receiver being executed by the executing means.
Third, transmitting information and status information to the central support device
The central support device includes the building information of the plurality of buildings and the building information of the plurality of buildings.
Receiver information (display section information) of each disaster prevention receiver installed
Information, including operation unit information)
Steps; Building information of the above multiple buildings, and multiple buildings
The receiver information of the disaster prevention receivers installed in each
Second storage means for storing the simulation information
And; from any disaster prevention receiver, by the first calling means
Is called from the first storage means.
Building information of the building and receiver information of the disaster prevention receiver
And are displayed on the display and added to the receiver information.
Then, the information on the status received from the disaster prevention receiver is
First display means to be displayed on the display unit; either disaster prevention
Is called by the second calling means from the receiver for use.
First, from the second storage means to the disaster prevention receiver
The fourth transmission that reads and transmits the simulation information
Communication means; from one of the disaster prevention receivers to the first caller
The first storage means when called by the Dan
Building information of the building and the receiver of the disaster prevention receiver
Information is displayed on the display and
In addition, status information received from the disaster prevention receiver above
Is displayed on the display unit and the second calling means calls the
When the building is ejected from the second storage means,
Display building information and receiver information of the disaster prevention receiver
And add it to the receiver information,
The operation information and the status information transmitted from the third transmitting means.
And third display means for displaying on the display unit.
A support system for disaster prevention equipment that is characterized by:
それぞれ設置される防災用受信機と、支援センタの中央
支援装置とを、有線または無線の通信回線で接続し、 上記防災用受信機は、 シミュレーションを行うために上記中央支援装置を呼び
出し、通信可能状態にする第2の呼出手段と;当該防災
用受信機のシミュレーション情報を記憶している第3の
記憶手段と;上記第3の記憶手段に記憶されているシミ
ュレーション情報に基づいて、シミュレーションを行う
第2の実行手段と;上記第2の実行手段による実行中の
当該防災受信機の操作情報と状態情報とを上記中央支援
装置に送信する第5の送信手段と;を有し、 上記中央支援装置は、 上記複数の建造物の建造物情報と、複数の建造物にそれ
ぞれ設置された防災用受信機の受信機情報とを記憶して
いる第4の記憶手段と;いずれかの防災用受信機から、
上記第2の呼出手段によって、呼び出されたときに、上
記第4の記憶手段から、当該建造物の建造物情報と当該
防災用受信機の受信機情報とを表示部に表示するととも
に、当該受信機情報に追加して、上記第5の送信手段か
ら送信された操作情報と状態情報とを上記表示部に表示
させる第3の表示手段と;を有することを特徴とする防
災設備の支援システム。5. A disaster prevention receiver installed in each of a plurality of buildings such as a building, a factory, and an underground mall, and a central support device of a support center are connected by a wired or wireless communication line to obtain the disaster prevention reception. A second calling means that calls the central support device to perform a simulation to make it in a communicable state; a third storage means that stores simulation information of the disaster prevention receiver; and a third storage means. Second execution means for performing a simulation based on the simulation information stored in the storage means; and the central support device for the operation information and status information of the disaster prevention receiver being executed by the second execution means. And a fifth transmitting means for transmitting the information to the central support device, wherein the central support device has building information of the plurality of buildings and receiver information of disaster prevention receivers installed in the plurality of buildings. A fourth storage means for storing the bets; from any disaster prevention receiver,
When called by the second calling means, the building information of the building and the receiver information of the disaster prevention receiver are displayed on the display unit from the fourth storage means, and the reception is performed. A support system for disaster prevention equipment, comprising: third display means for displaying on the display section operation information and status information transmitted from the fifth transmission means, in addition to machine information.
か1項において、 上記複数の建造物のそれぞれには、上記第1の呼出手段
によって、上記中央支援装置を呼び出したときに、上記
支援センタと通話可能となる第1の通話手段が設けら
れ、上記支援センタには、上記第1の呼出手段による呼
び出しを受けたときに、上記第1の通話手段と通話可能
となる第2の通話手段が設けられていることを特徴とす
る防災設備の支援システム。6. The method according to claim 1, 2, or 4, wherein when the central support device is called by the first calling means for each of the plurality of buildings. First call means capable of making a call with the support center is provided, and when the support center receives a call by the first calling means, a first call means capable of making a call with the first call means is provided. A support system for disaster prevention equipment, which is provided with two calling means.
か1項において、 上記複数の建造物のそれぞれには、上記第2の呼出手段
によって、上記中央支援装置を呼び出したときに、上記
支援センタと通話可能となる第3の通話手段が設けら
れ、上記支援センタには、上記第1の呼出手段による呼
び出しを受けたときに、上記第1の通話手段と通話可能
となる第4の通話手段が設けられていることを特徴とす
る防災設備の支援システム。7. The method according to claim 3, claim 4, or claim 5, wherein when the central support device is called by the second calling means for each of the plurality of buildings. A third call means capable of communicating with the support center is provided, and when the support center receives a call by the first calling means, the third call means enables communication with the first call means. A support system for disaster prevention equipment, which is provided with four communication means.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002098102A JP3928932B2 (en) | 2002-03-29 | 2002-03-29 | Disaster prevention equipment support system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002098102A JP3928932B2 (en) | 2002-03-29 | 2002-03-29 | Disaster prevention equipment support system |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2003298772A true JP2003298772A (en) | 2003-10-17 |
JP2003298772A5 JP2003298772A5 (en) | 2005-03-03 |
JP3928932B2 JP3928932B2 (en) | 2007-06-13 |
Family
ID=29387855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002098102A Expired - Fee Related JP3928932B2 (en) | 2002-03-29 | 2002-03-29 | Disaster prevention equipment support system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3928932B2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005251053A (en) * | 2004-03-08 | 2005-09-15 | Nohmi Bosai Ltd | Customer service server |
JP2005301948A (en) * | 2004-03-19 | 2005-10-27 | Atsumi Electric Co Ltd | Transmitter of security system |
JP2008250850A (en) * | 2007-03-30 | 2008-10-16 | Nohmi Bosai Ltd | Disaster prevention system |
US7778863B2 (en) | 2005-02-09 | 2010-08-17 | Kabushiki Kaisha Toshiba | System and method for customer behavior movement frequency prediction in a store |
JP2017068294A (en) * | 2015-09-28 | 2017-04-06 | 能美防災株式会社 | Support system, support device, and terminal device |
-
2002
- 2002-03-29 JP JP2002098102A patent/JP3928932B2/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005251053A (en) * | 2004-03-08 | 2005-09-15 | Nohmi Bosai Ltd | Customer service server |
JP4548770B2 (en) * | 2004-03-08 | 2010-09-22 | 能美防災株式会社 | Customer service server |
JP2005301948A (en) * | 2004-03-19 | 2005-10-27 | Atsumi Electric Co Ltd | Transmitter of security system |
US7778863B2 (en) | 2005-02-09 | 2010-08-17 | Kabushiki Kaisha Toshiba | System and method for customer behavior movement frequency prediction in a store |
JP2008250850A (en) * | 2007-03-30 | 2008-10-16 | Nohmi Bosai Ltd | Disaster prevention system |
JP2017068294A (en) * | 2015-09-28 | 2017-04-06 | 能美防災株式会社 | Support system, support device, and terminal device |
Also Published As
Publication number | Publication date |
---|---|
JP3928932B2 (en) | 2007-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2221788B1 (en) | Method and apparatus for interfacing security systems via a remote facility | |
JP6126778B2 (en) | Fire alarm equipment support system | |
US20050001717A1 (en) | Security system | |
JP6280370B2 (en) | Support system | |
KR100927581B1 (en) | Remote disaster prevention management system | |
JP6352622B2 (en) | Support system | |
JP2018124954A (en) | Disaster prevention system | |
JP2003298772A (en) | Support system for disaster-preventing facilities | |
JP4624772B2 (en) | Disaster prevention monitoring system and operation display device for disaster prevention monitoring | |
JP2024029185A (en) | Disaster prevention support system | |
JP7158940B2 (en) | location information system | |
JP2003298772A5 (en) | ||
JP6322304B2 (en) | Fire alarm equipment support system | |
KR101815842B1 (en) | Method and system for emergency alert broadcasting | |
JP6228254B2 (en) | Fire alarm equipment support system | |
JP6245996B2 (en) | Support system | |
JPH10188177A (en) | Remote communication control system for disaster prevention receiver | |
JP2000331260A (en) | Disaster prevention system device | |
JP3967934B2 (en) | Notification device with notification function | |
JP6186285B2 (en) | Support system | |
JP6420875B2 (en) | Support system | |
CN107185143B (en) | Fire control system | |
JP3240571U (en) | disaster prevention system | |
JP3308109B2 (en) | Disaster prevention system with simulation function | |
JP4683448B2 (en) | Disaster prevention monitoring equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040329 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040329 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050715 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050722 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050920 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20051118 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060117 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060317 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060516 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070302 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070302 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 3928932 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100316 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110316 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110316 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120316 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130316 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140316 Year of fee payment: 7 |
|
LAPS | Cancellation because of no payment of annual fees |