JP2003263320A - Estimating operation support system, method and program - Google Patents

Estimating operation support system, method and program

Info

Publication number
JP2003263320A
JP2003263320A JP2002066771A JP2002066771A JP2003263320A JP 2003263320 A JP2003263320 A JP 2003263320A JP 2002066771 A JP2002066771 A JP 2002066771A JP 2002066771 A JP2002066771 A JP 2002066771A JP 2003263320 A JP2003263320 A JP 2003263320A
Authority
JP
Japan
Prior art keywords
estimation
development
man
cost
hour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002066771A
Other languages
Japanese (ja)
Inventor
Yoshiharu Soda
義春 曽田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2002066771A priority Critical patent/JP2003263320A/en
Publication of JP2003263320A publication Critical patent/JP2003263320A/en
Pending legal-status Critical Current

Links

Abstract

<P>PROBLEM TO BE SOLVED: To support a series of estimating operations entirely, including estimation of software scales, estimation of man hours for development, and estimation of development costs. <P>SOLUTION: A control part 2 outputs to a display part 4 or the like a screen urging an operator to designate the scale of software and techniques for the estimation of man hours for development, according to an estimating operation support program 10. Once the operator has designated the estimating techniques, the control part 2 outputs to the display part 4 or the like input screens for the information needed to do estimations using the designated techniques. The operator then inputs the information to the screens displayed one by one. The control part 2 estimates the scale of software and the man hours for development, using the input information and information previously retained in a management database 21. Further, the operator is also urged to input the information needed for the estimation of development costs, and the development costs are calculated from the input information. <P>COPYRIGHT: (C)2003,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、開発対象システム
の見積り作業を支援する見積り作業支援システム、見積
り作業支援方法、および見積り作業支援プログラムに関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a quotation work support system, a quotation work support method, and a quotation work support program for supporting a quotation work of a development target system.

【0002】[0002]

【従来の技術】ソフトウェアを用いたシステムの開発に
際しては、ソフトウェアの規模、開発工数、および開発
コストを見積る。しかし、高い精度で見積りを行えるか
否かは、見積りを行う者の経験に依るところが大きく、
経験を積んだ高度情報技術者でないと適切に見積ること
は困難であった。そのため、見積り作業を支援する種々
の装置や方法が提案されている。例えば、特開平4−6
0833号公報には、ソフトウェアの開発工数および開
発費用を見積るための装置が記載されている。また、特
開平7−191839号公報には、開発するプログラム
の総ステップ数を見積る方法が記載されている。特開平
11−203351号公報には、作業工数を見積る装置
や方法等が記載されている。
2. Description of the Related Art In developing a system using software, the scale of the software, the number of development steps, and the development cost are estimated. However, whether or not a highly accurate estimate can be made depends largely on the experience of the person making the estimate.
It was difficult to estimate properly unless you were an advanced information engineer with experience. Therefore, various devices and methods for supporting the estimation work have been proposed. For example, Japanese Patent Laid-Open No. 4-6
Japanese Patent No. 0833 describes an apparatus for estimating the man-hours and development costs of software development. Further, JP-A-7-191839 discloses a method of estimating the total number of steps of a program to be developed. Japanese Unexamined Patent Publication No. 11-203351 describes an apparatus, a method, and the like for estimating the number of work steps.

【0003】[0003]

【発明が解決しようとする課題】しかし、従来提案され
ていた装置や方法では、ソフトウェア規模の見積り、開
発工数の見積り、および開発コストの見積りという一連
の見積り作業全体を支援することはできなかった。例え
ば、特開平4−60833号公報に記載の装置では、ソ
フトウェア規模の見積りを支援することができなかっ
た。また、特開平7−191839号公報に記載の方法
では、プログラムの総ステップ数を見積るにすぎず、開
発コスト等を見積ることはできなかった。特開平11−
203351号公報に記載の装置や方法では、開発コス
トの見積りは行えなかった。
However, the conventionally proposed apparatus and method cannot support the entire series of estimation work such as estimation of software scale, estimation of development man-hours, and estimation of development cost. . For example, the device described in Japanese Patent Laid-Open No. 4-60833 cannot support the estimation of the software scale. Further, in the method described in Japanese Patent Laid-Open No. 7-191839, the total number of steps of the program is only estimated, and the development cost and the like cannot be estimated. JP-A-11-
The development cost cannot be estimated with the device and method described in Japanese Patent No. 203351.

【0004】このように、従来提案されていた装置や方
法では、ソフトウェア規模の見積りから開発コストの見
積りに至るまで見積り作業の一部を支援するだけあっ
た。従って、ソフトウェア規模、開発工数、および開発
コストの見積りの一部に、経験を積んだ者でないと高い
精度で見積ることができない部分が残っていた。
As described above, the conventionally proposed apparatus and method only support a part of the estimation work from estimation of software scale to estimation of development cost. Therefore, in the estimation of the software scale, the development man-hour, and the development cost, there is a portion that can be estimated with high accuracy only by an experienced person.

【0005】また、見積り作業を行う作業者は、見積り
を支援する装置から離れた場所に存在することもある。
作業者が遠隔地にいたとしても、共通のデータを用いて
作業を進められることが好ましい。
In addition, the worker who performs the estimation work may be present at a place distant from the device that supports the estimation.
Even if the worker is in a remote place, it is preferable to be able to proceed with the work by using the common data.

【0006】また、作業者が、見積り条件等を変更する
場合がある。しかし、作業者が最初から見積り作業をや
り直すと作業者の負担が大きくなってしまう。
Further, the operator may change the estimation conditions and the like. However, if the worker redoes the estimation work from the beginning, the burden on the worker will increase.

【0007】また、ソフトウェア規模や開発工数を見積
る手法は一つだけでなく、複数の手法がある。作業者に
とっては、複数の見積り手法の中から一つを選択し、そ
の手法による見積り作業の支援を受けられることが好ま
しい。
There is not only one method for estimating the software scale and development man-hours but also a plurality of methods. It is preferable for the operator to be able to select one from a plurality of estimation methods and receive assistance for the estimation work by that method.

【0008】本発明は、ソフトウェア規模の見積り、開
発工数の見積り、および開発コストの見積りという一連
の見積り作業全体を支援できるようにすることを目的と
する。また、作業者が遠隔地にいても見積り作業を進め
られるようにすることを目的とする。また、見積り条件
等に変更があった場合でも、作業者に負担をかけずに見
積り結果を修正できるようにすることを目的とする。ま
た、作業者が見積り手法を選択できるようにすることを
目的とする。
An object of the present invention is to be able to support the entire series of estimation work such as estimation of software scale, estimation of development man-hours, and estimation of development cost. It also aims to enable the worker to proceed with the estimation work even in a remote location. Further, it is an object of the present invention to enable the operator to correct the estimation result without burdening the operator even if the estimation conditions are changed. Moreover, it aims at enabling a worker to select an estimation method.

【0009】[0009]

【課題を解決するための手段】本発明による見積り作業
支援システムは、開発対象システムの見積り作業を支援
する見積り作業支援システムであって、開発対象システ
ムのソフトウェア規模を見積るための規模見積り条件を
入力し、規模見積り条件に基づいてソフトウェア規模を
見積るソフトウェア規模見積り手段と、開発工数を見積
るための工数見積り条件を入力し、工数見積り条件に基
づいて開発工数を見積る開発工数見積り手段と、開発コ
ストを見積るためのコスト見積り条件を入力し、コスト
見積り条件に基づいて開発コストを見積る開発コスト見
積り手段と、ソフトウェア規模の見積り結果、開発工数
の見積り結果、および開発コストの見積り結果を、見積
り作業を行う作業者に提示する見積り結果提示手段とを
備えたことを特徴とする。
A quotation work support system according to the present invention is a quotation work support system for supporting a quotation work of a development target system, and inputs a scale estimation condition for estimating the software scale of the development target system. Then, enter the software scale estimation means for estimating the software scale based on the scale estimation conditions and the man-hour estimation conditions for estimating the development man-hours, and the development man-hour estimation means for estimating the development man-hours based on the man-hour estimation conditions and the development cost. Enter the cost estimation conditions for estimation and estimate the development cost based on the cost estimation conditions. Estimate the software cost estimation result, software scale estimation result, development man-hour estimation result, and development cost estimation result. It is characterized by including an estimation result presenting means for presenting to an operator To.

【0010】通信ネットワークを介して規模見積り条
件、工数見積り条件、およびコスト見積り条件を入力
し、ソフトウェア規模の見積り結果、開発工数の見積り
結果、および開発コストの見積り結果を、通信ネットワ
ークを介して作業者に提示する構成であってもよい。そ
のような構成によれば、遠隔地にいる作業者の見積り作
業を支援することができる。
The scale estimation condition, the man-hour estimation condition, and the cost estimation condition are input through the communication network, and the software scale estimation result, the development man-hour estimation result, and the development cost estimation result are worked through the communication network. It may be configured to be presented to the person. With such a configuration, it is possible to support the estimation work of the worker at the remote place.

【0011】作業者から開発工数を見積る手法として、
ファンクションポイント法、ソフトウェア規模をライン
数で見積りライン数から開発工数を導出する手法、アク
ティビティ毎の工数から開発工数を導出する手法のいず
れかの指定を受け付ける見積り手法受付手段を備え、開
発工数見積り手段は、作業者が指定した手法に従って開
発工数を見積ることが好ましい。そのような構成によれ
ば、作業者は、複数の見積り手法の中から見積り手法を
選択できる。
As a method for estimating the development man-hours from the worker,
Equipped with an estimation method reception means that accepts any one of the function point method, the method of deriving the software scale by the number of lines and deriving the development man-hours from the number of lines, and the method of deriving the development man-hours from the man-hours for each activity. It is preferable to estimate the development man-hours according to the method specified by the worker. With such a configuration, the worker can select an estimation method from a plurality of estimation methods.

【0012】例えば、ソフトウェア規模見積り手段は、
ファンクションポイント法が指定された場合、開発対象
システムのソフトウェアが扱うデータの項目数と開発対
象システムのシステム特性の影響度とを規模見積り条件
として入力して、その項目数および影響度からソフトウ
ェア規模を表すファンクションポイント数を算出し、開
発工数見積り手段は、ファンクションポイント法が指定
された場合、開発に用いるプログラム言語の情報を工数
見積り条件として入力し、ファンクションポイント数を
プログラム言語の生産性を示す数値で除算することによ
って開発工数を導出する。
For example, the software scale estimating means is
When the function point method is specified, the number of items of data handled by the software of the development target system and the degree of influence of the system characteristics of the development target system are input as scale estimation conditions, and the software scale is calculated from the number of items and the degree of influence. The number of function points to be calculated is calculated, and when the function point method is specified, the development man-hour estimation means inputs the information of the programming language used for development as man-hour estimation conditions, and the number of function points is a numerical value indicating the productivity of the programming language. Derive the development man-hours by dividing by.

【0013】また、例えば、見積り手法受付手段は、少
なくとも開発対象システムに関する情報を入力し、ソフ
トウェア規模見積り手段は、ソフトウェア規模をライン
数で見積りライン数から開発工数を導出する手法が指定
された場合、開発対象システムの各サブシステムで見込
まれるソフトウェアのライン数を規模見積り条件として
入力して、各サブシステムのライン数から開発対象シス
テムのソフトウェア全体のライン数を算出し、開発工数
見積り手段は、ソフトウェア規模をライン数で見積りラ
イン数から開発工数を導出する手法が指定された場合、
開発に用いるプログラム言語の情報を工数見積り条件と
して入力し、ソフトウェア全体のライン数をプログラム
言語の生産性を示す数値で除算し、見積り手法受付手段
が入力した情報に応じた係数を乗じることによって開発
工数を導出する。
Further, for example, when the estimating method receiving means inputs at least information about the development target system, and the software scale estimating means designates a method for estimating the software scale by the number of lines and deriving the development man-hours from the number of lines is designated. , Input the number of software lines expected in each subsystem of the development target system as a scale estimation condition, calculate the total number of software lines of the development target system from the number of lines of each subsystem, and the development man-hour estimation means is When the method of deriving the development scale from the number of lines by estimating the software scale with the number of lines is specified,
Developed by inputting the information of the programming language used for development as the man-hour estimation condition, dividing the total number of lines of the software by the numerical value showing the productivity of the programming language, and multiplying by the coefficient according to the information input by the estimation method reception means Derive the man-hours.

【0014】また、例えば、見積り手法受付手段は、少
なくとも開発対象システムに関する情報を入力し、開発
工数見積り手段は、アクティビティ毎の工数から開発工
数を導出する手法が指定された場合、各アクティビティ
で見込まれる成果物の数量を工数見積り条件として入力
して、入力した成果物の数量と成果物一単位当たりの標
準作業工数との乗算をアクティビティ毎に行い、アクテ
ィビティ毎の乗算結果の合計に、見積り手法受付手段が
入力した情報に応じた係数を乗じることによって開発工
数を導出する。
Further, for example, the estimation method accepting means inputs at least information on the development target system, and the development man-hour estimating means is expected for each activity when a method for deriving the development man-hour from the man-hour for each activity is designated. Input the quantity of the delivered product as the man-hour estimation condition, multiply the entered product quantity by the standard work man-hour per product unit for each activity, and use the estimation method to calculate the total of the multiplication results for each activity. The development man-hours are derived by multiplying the coefficient according to the information input by the reception means.

【0015】開発コスト見積り手段は、例えば、費目毎
に見込まれる費用と開発担当者の熟練度の情報とをコス
ト見積り条件として入力し、その熟練度に応じた人件費
の単価に開発工数を乗じて人件費を算出し、人件費と入
力した各費用から開発コストを算出する。
The development cost estimation means inputs, for example, the expected cost for each cost item and information on the skill level of the person in charge of development as a cost cost estimation condition, and multiplies the unit cost of the personnel cost according to the skill level by the development man-hours. The personnel cost is calculated by calculating the development cost from the personnel cost and each cost entered.

【0016】また、入力した規模見積り条件、工数見積
り条件、およびコスト見積り条件を保持する見積り条件
保持手段と、規模見積り条件、工数見積り条件、または
コスト見積り条件に変更があるか否かを作業者に問い合
わせ、変更がある場合に変更内容を入力する変更情報取
得手段とを備え、見積り条件保持手段が保持する規模見
積り条件、工数見積り条件、およびコスト見積り条件
と、変更情報取得手段が入力した変更内容に基づいて、
ソフトウェア規模の見積り結果、開発工数の見積り結
果、および開発コストの見積り結果の一部または全部を
修正することが好ましい。そのような構成によれば、見
積り条件に変更があったとしても、最初から見積り条件
の入力をやり直す必要がなく、変更内容さえ入力すれば
よい。従って、作業者の負担が軽減される。
[0016] Further, the estimation condition holding means for holding the input scale estimation condition, man-hour estimation condition, and cost estimation condition, and whether or not the scale estimation condition, man-hour estimation condition, or cost estimation condition is changed The change information acquisition means for inquiring about the changes and inputting the changes when there is a change, and the size estimation conditions, the man-hour estimation conditions, and the cost estimation conditions held by the estimation condition holding means, and the changes input by the change information acquisition means. Based on the content
It is preferable to modify part or all of the software scale estimation result, the development man-hour estimation result, and the development cost estimation result. According to such a configuration, even if the estimation condition is changed, it is not necessary to input the estimation condition again from the beginning, and only the change content needs to be input. Therefore, the burden on the operator is reduced.

【0017】本発明による見積り作業支援方法は、開発
対象システムの見積り作業を支援する見積り作業支援方
法であって、見積り作業を行う作業者から開発工数を見
積る手法の指定を受け付ける見積り手法受付工程と、作
業者が指定した手法で開発工数を見積るための工数見積
り条件を入力して、作業者が指定した手法に従い、工数
見積り条件を用いて開発工数を見積る開発工数見積り工
程と、開発コストを見積るためのコスト見積り条件を入
力し、コスト見積り条件に基づいて開発コストを見積る
開発コスト見積り工程と、開発工数の見積り結果および
開発コストの見積り結果を、見積り作業を行う作業者に
提示する見積り結果提示工程とを含むことを特徴とす
る。
The estimate work support method according to the present invention is an estimate work support method for assisting the estimate work of the development target system, and includes an estimate method accepting step of accepting designation of a method for estimating the development man-hours from a worker who performs the estimate work. , Input the man-hour estimation condition for estimating the development man-hour by the method specified by the worker, and estimate the development man-hour using the man-hour estimation condition according to the method specified by the worker. Enter the cost estimation conditions for the development cost estimation process to estimate the development cost based on the cost estimation conditions, and present the estimation results of the development man-hours and the development cost estimation to the workers who perform the estimation work. And a process.

【0018】例えば、見積り手法受付工程で、開発工数
を見積る手法として、ファンクションポイント法、ソフ
トウェア規模をライン数で見積りライン数から開発工数
を導出する手法、アクティビティ毎の工数から開発工数
を導出する手法のいずれかの指定を受け付け、ファンク
ションポイント法またはソフトウェア規模をライン数で
見積りライン数から開発工数を導出する手法が指定され
た場合には、開発対象システムのソフトウェア規模を見
積るための規模見積り条件を入力し、規模見積り条件に
基づいてソフトウェア規模を見積るソフトウェア規模見
積り工程を含むようにする。
For example, as a method for estimating the development man-hour in the estimation method receiving step, a function point method, a method for estimating the software scale by the number of lines and a method for deriving the development man-hour from the number of lines, and a method for deriving the development man-hour from the man-hours for each activity If either the function point method or the method of estimating the software scale by the number of lines and deriving the development man-hours from the number of lines is specified, the scale estimation conditions for estimating the software scale of the development target system are specified. Input and include the software scale estimation process to estimate the software scale based on the scale estimation conditions.

【0019】例えば、ファンクションポイント法が指定
された場合、ソフトウェア規模見積り工程で、開発対象
システムのソフトウェアが扱うデータの項目数と開発対
象システムのシステム特性の影響度とを規模見積り条件
として入力して、その項目数および影響度からソフトウ
ェア規模を表すファンクションポイント数を算出し、開
発工数見積り工程で、開発に用いるプログラム言語の情
報を工数見積り条件として入力し、ファンクションポイ
ント数をプログラム言語の生産性を示す数値で除算する
ことによって開発工数を導出する。
For example, when the function point method is specified, the number of items of data handled by the software of the development target system and the degree of influence of the system characteristics of the development target system are input as the scale estimation conditions in the software scale estimation process. Calculate the number of function points, which represents the software scale, from the number of items and the degree of impact, and enter the information of the programming language used for development as the man-hour estimation condition in the development man-hour estimation process to determine the number of function points as the programming language productivity. The development man-hours are derived by dividing by the indicated value.

【0020】また、例えば、見積り手法受付工程で、少
なくとも開発対象システムに関する情報を入力し、ソフ
トウェア規模をライン数で見積りライン数から開発工数
を導出する手法が指定された場合、ソフトウェア規模見
積り工程で、開発対象システムの各サブシステムで見込
まれるソフトウェアのライン数を規模見積り条件として
入力して、各サブシステムのライン数から開発対象シス
テムのソフトウェア全体のライン数を算出し、開発工数
見積り工程で、開発に用いるプログラム言語の情報を工
数見積り条件として入力し、ソフトウェア全体のライン
数をプログラム言語の生産性を示す数値で除算し、見積
り手法受付工程で入力した情報に応じた係数を乗じるこ
とによって開発工数を導出する。
Further, for example, in the estimation method receiving step, if at least the information about the development target system is input and the method for estimating the software scale by the number of lines and deriving the development man-hour from the number of lines is specified, the software scale estimating step is performed. , Input the number of software lines expected in each subsystem of the development target system as the scale estimation condition, calculate the total number of software lines of the development target system from the number of lines of each subsystem, and in the development man-hour estimation process, Developed by inputting the information of the programming language used for development as the man-hour estimation condition, dividing the total number of lines of the software by the numerical value showing the productivity of the programming language, and multiplying by the coefficient according to the information input in the estimation method acceptance process Derive the man-hours.

【0021】また、例えば、見積り手法受付工程で、少
なくとも開発対象システムに関する情報を入力し、アク
ティビティ毎の工数から開発工数を導出する手法が指定
された場合、開発工数見積り工程で、各アクティビティ
で見込まれる成果物の数量を工数見積り条件として入力
して、入力した成果物の数量と成果物一単位当たりの標
準作業工数との乗算をアクティビティ毎に行い、アクテ
ィビティ毎の乗算結果の合計に、見積り手法受付工程で
入力した情報に応じた係数を乗じることによって開発工
数を導出する。
Further, for example, when the method for deriving the development man-hours from the man-hours for each activity is specified by inputting at least the information on the development target system in the estimation-method receiving step, it is estimated in each activity in the development man-hour estimating step. Input the quantity of the delivered product as the man-hour estimation condition, multiply the entered product quantity by the standard work man-hour per product unit for each activity, and use the estimation method to calculate the total of the multiplication results for each activity. The development man-hours are derived by multiplying by the coefficient according to the information input in the acceptance process.

【0022】開発コスト見積り工程では、例えば、費目
毎に見込まれる費用と開発担当者の熟練度の情報をコス
ト見積り条件として入力し、その熟練度に応じた人件費
の単価に開発工数を乗じて人件費を算出し、人件費と入
力した各費用から開発コストを算出する。
In the development cost estimation process, for example, information on the expected cost for each expense item and the skill level of the person in charge of development is input as a cost estimation condition, and the unit cost of the personnel cost corresponding to the skill level is multiplied by the development man-hours. The labor cost is calculated, and the development cost is calculated from the labor cost and each input cost.

【0023】通信ネットワークを介して情報を入力し、
通信ネットワークを介して各見積り結果を作業者に提示
することが好ましい。そのような方法によれば、遠隔地
にいる作業者の見積り作業を支援することができる。
Enter information via the communication network,
It is preferable to present each estimation result to the worker via the communication network. According to such a method, it is possible to support the estimation work of the worker at the remote place.

【0024】見積り結果提示工程の前に、開発コスト見
積り工程までに入力した情報に変更があるか否かを作業
者に問い合わせ、変更がある場合には変更内容を入力
し、入力した変更内容に基づいて少なくとも開発工数の
見積り結果および開発コストの見積り結果の一方または
双方を修正することが好ましい。そのような方法によれ
ば、作業者は、情報に変更があったとしても、最初から
作業ををやり直す必要がないので、作業負担が軽減され
る。
Before the estimation result presentation process, the operator is inquired whether there is a change in the information input up to the development cost estimation process. If there is a change, the change content is input and the input change content is entered. It is preferable to correct at least one or both of the estimation result of the development man-hour and the estimation result of the development cost based on the basis. According to such a method, the worker does not have to redo the work from the beginning even if the information is changed, so the work load is reduced.

【0025】また、本発明による見積り作業支援プログ
ラムは、コンピュータに、開発対象システムのソフトウ
ェア規模を見積るための規模見積り条件を入力し、規模
見積り条件に基づいてソフトウェア規模を見積る機能、
開発工数を見積るための工数見積り条件を入力し、工数
見積り条件に基づいて開発工数を見積る機能、開発コス
トを見積るためのコスト見積り条件を入力し、コスト見
積り条件に基づいて開発コストを見積る機能、およびソ
フトウェア規模の見積り結果、開発工数の見積り結果、
および開発コストの見積り結果を出力する機能を実現さ
せることを特徴とする。
The estimation work support program according to the present invention has a function of inputting a scale estimation condition for estimating the software scale of the development target system into a computer and estimating the software scale based on the scale estimation condition.
A function to input the man-hour estimation condition for estimating the development man-hour and to estimate the development man-hour based on the man-hour estimating condition, a function to enter the cost estimation condition to estimate the development cost and estimate the development cost based on the cost estimation condition, And software scale estimation results, development man-hour estimation results,
And the function of outputting the development cost estimation result.

【0026】[0026]

【発明の実施の形態】以下、本発明の実施の形態を図面
を参照して説明する。図1は、本発明による見積り作業
支援システムの実施の一形態を示すブロック図である。
本例の見積り作業支援システムは、見積り処理サーバ1
と、管理データベース21と、中間結果テーブル31
と、クライアントコンピュータ(以下、クライアントと
記す。)41とを備える。見積り処理サーバ1とクライ
アント41は、通信ネットワークを介して接続される。
本例では、インターネット51を介して接続されるもの
とする。管理データベース21は、見積り処理サーバ1
が各種見積り処理等を実行する際に必要となるデータ
や、作業者に入力された見積り条件等を管理する。中間
結果テーブル31は、見積り結果や、その見積りを行う
際に用いた条件等のデータを保管するための記憶領域で
ある。本例では、管理データベース21と中間結果テー
ブル31が見積り処理サーバ1とは異なる装置として設
けられている場合を示すが、管理データベース21と中
間結果テーブル31が見積り処理サーバ1の内部に設け
られる構成であってもよい。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram showing an embodiment of an estimation work support system according to the present invention.
The quotation work support system of this example is a quotation processing server 1.
, Management database 21, and intermediate result table 31
And a client computer (hereinafter referred to as a client) 41. The quotation processing server 1 and the client 41 are connected via a communication network.
In this example, it is assumed that the connection is made via the Internet 51. The management database 21 is the quotation processing server 1.
Manages the data required when the various estimation processes are executed, and the estimation conditions input by the operator. The intermediate result table 31 is a storage area for storing the estimation result and data such as the conditions used when the estimation is performed. In this example, the management database 21 and the intermediate result table 31 are provided as devices different from the estimation processing server 1, but the management database 21 and the intermediate result table 31 are provided inside the estimation processing server 1. May be

【0027】図2は、見積り処理サーバ1の処理の概要
を示す説明図である。見積り処理サーバ1は、開発対象
システム等に関する情報を作業者から取得する(ステッ
プS101)。このとき、見積り処理サーバ1は、作業
者の指示に応じて、ソフトウェア規模および開発工数を
見積る手法についても特定する。ソフトウェア規模およ
び開発工数を見積る手法には、例えば、ファンクション
ポイント法(以下、FP法と記す。)がある。また、ソ
フトウェア規模をプログラムのライン数(ステップ数)
によって見積り、その結果から開発工数を導く手法があ
る。また、開発工数を見積る手法として、アクティビテ
ィ積み上げ方式がある。
FIG. 2 is an explanatory diagram showing an outline of the processing of the estimation processing server 1. The quotation processing server 1 acquires information about the development target system and the like from the worker (step S101). At this time, the estimation processing server 1 also specifies a method for estimating the software scale and the development man-hours according to the instruction of the worker. As a method of estimating the software scale and the development man-hour, there is, for example, a function point method (hereinafter referred to as FP method). In addition, the software scale is the number of program lines (number of steps)
There is a method to estimate the number of man-hours and to derive the development man-hour from the result. As a method of estimating the development man-hour, there is an activity accumulation method.

【0028】FP法は、開発対象システムのソフトウェ
アが扱うデータの項目数と、システム特性による影響度
とに基づいてソフトウェア規模を示すファンクションポ
イント数(FP数)を算出し、FP数から開発工数を導
く手法である。FP法では、まず、「内部論理ファイ
ル」、「外部インタフェースファイル」、「外部入
力」、「外部出力」、および「外部参照」という5種類
の区分毎にデータの項目数を定め、この項目数から未調
整FP数を計算する。また、システム特性の影響度を
「データ通信機能」、「分散データ処理」等の14種類
の分野毎に評価し、評価結果から調整計数を決定する。
未調整FP数に調整計数を乗じた値がソフトウェア規模
を示すFP数となる。開発工数はFP数を用いて算出す
る。
In the FP method, the number of function points (FP number) indicating the software scale is calculated based on the number of data items handled by the software of the development target system and the degree of influence by the system characteristics, and the development man-hour is calculated from the FP number. It is a method to guide. In the FP method, first, the number of data items is determined for each of the five categories of "internal logic file", "external interface file", "external input", "external output", and "external reference". The unadjusted FP number is calculated from Also, the degree of influence of the system characteristics is evaluated for each of 14 types of fields such as “data communication function” and “distributed data processing”, and the adjustment count is determined from the evaluation result.
The value obtained by multiplying the unadjusted FP number by the adjusted count becomes the FP number indicating the software scale. Development man-hours are calculated using the FP number.

【0029】アクティビティ積み上げ方式は、ソフトウ
ェア開発における各作業項目(アクティビティ)毎に工
数を算出し、各アクティビティの工数の和を求めること
によって全体の工数を見積る手法である。各アクティビ
ティの工数は、各アクティビティの成果物の数量(例え
ば、ドキュメントの枚数)に、成果物一単位当たりの標
準作業工数(例えば、1枚のドキュメントを作成するた
めの標準作業工数)を乗じることによって算出する。
The activity stacking method is a method of estimating the total man-hours by calculating man-hours for each work item (activity) in software development and obtaining the sum of man-hours of each activity. For the effort of each activity, multiply the number of deliverables of each activity (for example, the number of documents) by the standard work effort for each unit of deliverable (for example, the standard work effort for creating one document). Calculate by

【0030】見積り処理サーバ1は、作業者に指定され
た見積り手法に従い、ライン数またはFP数でソフトウ
ェア規模の見積りを行い(ステップS102,S10
3)、その結果から開発工数を見積る(ステップS10
4)。アクティビティ積み上げ方式が指定された場合に
は、その方式に従って開発工数を見積る(ステップS1
05,S106)。続いて、見積り処理サーバ1は、開
発コストを見積る(ステップS107)。一連の見積り
を行ったならば、見積り条件に変更があるか否かを確認
し、変更がある場合には見積り結果の補正等を行う(ス
テップS108)。その後、見積り結果をレポートとし
て出力する(ステップS109)。
The estimation processing server 1 estimates the software scale by the number of lines or the number of FPs according to the estimation method designated by the operator (steps S102, S10).
3) Estimate the development man-hours from the result (step S10)
4). When the activity stacking method is specified, the development man-hour is estimated according to the method (step S1).
05, S106). Subsequently, the estimation processing server 1 estimates the development cost (step S107). After a series of quotations is made, it is confirmed whether or not the quoting conditions are changed, and if there is any change, the quoting result is corrected (step S108). After that, the estimation result is output as a report (step S109).

【0031】次に、見積り処理サーバ1の構成について
説明する。制御部2は、記憶部3が記憶する見積り作業
支援プログラム10に従って動作する。入力部4は、キ
ーボードやマウス等の入力装置によって構成され、作業
者から情報を入力される。表示部5は、ディスプレイ装
置等の出力装置によって構成され、作業者に情報を出力
する。ネットワークインタフェース部6は、インターネ
ット51を介してクライアント41と情報を送受信す
る。作業者は、入力部4と表示部5とを用いて見積り作
業を進める。また、クライアント41を用いて作業を進
めてもよい。
Next, the configuration of the estimation processing server 1 will be described. The control unit 2 operates according to the estimation work support program 10 stored in the storage unit 3. The input unit 4 is composed of an input device such as a keyboard and a mouse, and information is input by an operator. The display unit 5 includes an output device such as a display device, and outputs information to the worker. The network interface unit 6 transmits / receives information to / from the client 41 via the Internet 51. The worker uses the input unit 4 and the display unit 5 to proceed with the estimation work. Further, the work may be advanced using the client 41.

【0032】見積り作業支援プログラム10は、図1に
示すプログラム11〜19を含む。見積り作業ナビゲイ
トプログラム11は、制御部2に、作業者の指示に応じ
た見積り支援処理等を実行させるプログラムである。制
御部2は、見積り作業ナビゲイトプログラム11に従
い、どの手法で見積りを行うのかを定めて見積り支援処
理を進め、見積り結果を出力する。また、制御部2は、
見積り作業ナビゲイトプログラム11に従って、概算見
積りをするのか、詳細見積りをするのか等も決定する。
ヘルプ処理プログラム11は、制御部2に、作業者から
の問い合わせに対する回答を出力させるプログラムであ
る。
The estimation work support program 10 includes programs 11 to 19 shown in FIG. The estimate work navigation gate program 11 is a program that causes the control unit 2 to execute an estimate support process or the like according to an instruction from the operator. According to the estimation work navigation gate program 11, the control unit 2 determines which method should be used for estimation, advances the estimation support process, and outputs the estimation result. In addition, the control unit 2
Estimate work According to the navigation program 11, whether to make an approximate estimate or a detailed estimate is also determined.
The help processing program 11 is a program that causes the control unit 2 to output an answer to an inquiry from an operator.

【0033】FP法規模見積りプログラム13は、作業
者が入力した見積り条件に基づくFP数の算出処理を制
御部2に実行させるプログラムである。FP法工数見積
りプログラム15は、制御部2に、FP数から開発工数
を算出する処理を実行させるプログラムである。
The FP method scale estimation program 13 is a program that causes the control unit 2 to execute the calculation process of the FP number based on the estimation conditions input by the worker. The FP method man-hour estimation program 15 is a program that causes the control unit 2 to execute a process of calculating a development man-hour from the FP number.

【0034】ライン数規模見積りプログラム14は、制
御部2に、作業者が入力した見積り条件に基づいてソフ
トウェア規模を示すライン数を算出する処理を実行させ
るプログラムである。ライン数工数見積りプログラム1
6は、制御部2に、ライン数から開発工数を算出する処
理を実行させるプログラムである。
The line number scale estimation program 14 is a program that causes the control unit 2 to execute a process for calculating the number of lines indicating the software scale based on the estimation conditions input by the operator. Line man-hour estimation program 1
Reference numeral 6 is a program that causes the control unit 2 to execute processing for calculating the development man-hours from the number of lines.

【0035】アクティビティ積み上げ工数見積りプログ
ラム17は、アクティビティ積み上げ方式による開発工
数算出処理を制御部2に実行させるプログラムである。
The activity stacking man-hour estimation program 17 is a program for causing the control unit 2 to execute the development man-hour calculation process by the activity stacking method.

【0036】コスト見積りプログラム18は、制御部2
に、開発コスト算出処理を実行させるプログラムであ
る。補正処理プログラム19は、作業者に変更された見
積り条件等による見積りの補正(再見積)を制御部2に
実行させるプログラムである。
The cost estimation program 18 includes the control unit 2
Is a program for executing the development cost calculation process. The correction processing program 19 is a program that causes the control unit 2 to perform the correction (re-estimation) of the estimation based on the changed estimation conditions or the like by the worker.

【0037】続いて、管理データベース21について説
明する。ヘルプ情報テーブル22は、作業者からの問い
合わせに対して提示すべき回答を保持する。
Next, the management database 21 will be described. The help information table 22 holds an answer to be presented to the inquiry from the worker.

【0038】FP法機能数見積り要因及び各要素重み付
けテーブル23には、作業者によって入力された項目数
と、その項目数に応じた重み付けの情報が登録される。
図3は、FP法機能数見積り要因及び各要素重み付けテ
ーブル23に登録されるデータの例を示す。ここでは、
「外部出力」の場合の例を示す。例えば、開発対象シス
テムが外部に出力するデータとして「XXX一覧表」が
あり、「XXX一覧表」には3つの項目が含まれるとす
る。作業者が「XXX一覧表」の項目数として「3」を
入力した場合、制御部2は「XXX一覧表」に対応する
項目数として3を登録する。そして、制御部2は、項目
数に応じて、重み付けの区分が「低い」、「平均」、
「高い」のいずれに分類されるのかを判断し、その判断
結果も登録する。「XXY分析表」等の他の外部出力デ
ータについても同様に登録する。
In the FP method function number estimation factor and each element weighting table 23, the number of items input by the operator and the weighting information according to the number of items are registered.
FIG. 3 shows an example of the FP method function number estimation factor and data registered in each element weighting table 23. here,
An example of "external output" is shown. For example, it is assumed that there is a “XXX list” as data that the development target system outputs to the outside, and that the “XXX list” includes three items. When the operator inputs “3” as the number of items in the “XXX list”, the control unit 2 registers 3 as the number of items corresponding to the “XXX list”. Then, the control unit 2 determines that the weighting categories are “low”, “average”, and
It is judged whether it is classified as “high” and the judgment result is also registered. Similarly, other external output data such as the “XXY analysis table” is also registered.

【0039】また、FP法機能数見積り要因及び各要素
重み付けテーブル23には、「低い」、「平均」、「高
い」という重み付けの区分毎に、「XXX一覧表」等の
外部出力データがいくつあるのかも登録する。例えば、
「XXX一覧表」、「XXY分析表」のみが、「低い」
という区分に分類されたとする。この場合、図4に示す
ように、「低い」に対応する外部出力データの数として
2が登録される。
Further, in the FP method function number estimation factor and each element weighting table 23, how many external output data such as “XXX list” are stored for each weighting category of “low”, “average” and “high”. Register if there is any. For example,
Only "XXX list" and "XXY analysis table" are "low"
It is assumed that they are classified into the following categories. In this case, as shown in FIG. 4, 2 is registered as the number of external output data corresponding to “low”.

【0040】ここでは、「外部出力」の区分を例に説明
したが、「内部論理ファイル」、「外部インターフェー
スファイル」、「外部入力」、および「外部参照」に関
する情報も同様に、FP法機能数見積り要因及び各要素
重み付けテーブル23に登録される。
Although the "external output" section is described as an example here, the information regarding "internal logic file", "external interface file", "external input", and "external reference" is also the FP method function. The number estimation factor and each element weighting table 23 are registered.

【0041】さらに、FP法機能数見積り要因及び各要
素重み付けテーブル23には、図5に示すように、シス
テム特性による影響度も登録される。この影響度は、図
5に示す14種類の分野毎に作業者が評価する。作業者
は0点から5点までの点数で各分野の影響度を定め、こ
の点数は図5に示すように登録される。この得点の総和
によって、FP法で用いる調整係数が決定される。
Further, in the FP method function number estimation factor and each element weighting table 23, as shown in FIG. 5, the degree of influence by the system characteristic is also registered. This degree of influence is evaluated by the operator for each of the 14 types of fields shown in FIG. The worker determines the degree of influence of each field with a score of 0 to 5, and the score is registered as shown in FIG. The adjustment coefficient used in the FP method is determined by the sum of the scores.

【0042】図6は、FP数テーブル24の例を示す。
FP数テーブル24には、「内部論理ファイル」、「外
部インターフェースファイル」、「外部入力」、「外部
出力」、および「外部参照」の5つの区分について、
「低い」、「平均」、「高い」と分類されたデータの数
が登録される。また、「外部出力」等の各区分につい
て、重み付けされたデータの数に基づいて計算された未
調整FP数も登録される。「低い」、「平均」、「高
い」に対応して重み付け係数がそれぞれ、P,Q,Rと
定められているとする。「低い」、「平均」、「高い」
に該当するデータ数に、それぞれ重み付け係数P,Q,
Rを乗じた結果の和を求めることによって未調整FP数
は計算される。FP数テーブル24は、5つの区分の未
調整FP数も保持し、また、未調整FP数の合計も保持
する。各区分の未調整FP数の合計値に調整係数を乗じ
ることにより、FP数が得られる。
FIG. 6 shows an example of the FP number table 24.
In the FP number table 24, five categories of “internal logic file”, “external interface file”, “external input”, “external output”, and “external reference” are stored.
The number of data classified as “low”, “average”, and “high” is registered. In addition, the unadjusted FP number calculated based on the number of weighted data is also registered for each category such as “external output”. It is assumed that the weighting factors are defined as P, Q, and R, corresponding to "low", "average", and "high", respectively. "Low", "Average", "High"
The weighting factors P, Q, and
The unadjusted FP number is calculated by summing the results multiplied by R. The FP number table 24 holds the unadjusted FP numbers of the five sections, and also holds the total of the unadjusted FP numbers. The FP number is obtained by multiplying the total value of the unadjusted FP numbers of each section by the adjustment coefficient.

【0043】業種/業務別実績規模及び工数テーブル2
5は、過去に開発されたシステムにおけるソフトウェア
規模や開発工数の実績を保持する。図7は、業種/業務
別実績規模及び工数テーブル25が保持する情報の例を
示す。図7に示すように、ソフトウェア規模や開発工数
の実績は、そのソフトウェアが適用される業種および業
務毎に保持される。業種/業務別実績規模及び工数テー
ブル25は、作業者がライン数によるソフトウェア規模
の見積りを行う場合に使用される。
Actual scale and man-hour table 2 by industry / business
5 holds the results of the software scale and the development man-hours in the systems developed in the past. FIG. 7 shows an example of information held in the industry / business-specific achievement scale and man-hour table 25. As shown in FIG. 7, the results of the software scale and the development man-hours are held for each business type and business to which the software is applied. The industry / business-based actual scale and man-hour table 25 is used when the worker estimates the software scale based on the number of lines.

【0044】言語別生産性テーブル26は、システム開
発における生産性を示す数値をプログラム言語毎に保持
する。生産性を示す数値は、開発工数を算出するときに
使用される。図8は、FP数から開発工数を求めるとき
に使用される生産性の情報の例である。図8に示すよう
に、「Visual Basic」、「C」、「Jav
a(登録商標)」等の言語に応じて生産性を示す数値n
x,ny,nz等を保持する。また、FP数から開発工
数を求めるときに使用される生産性の数値は、「ソフト
ウェア要求分析」、「ソフトウェア方式設計」等の各作
業項目における生産性を考慮して求められる。FP数か
ら開発工数を見積る場合には、「FP数÷生産性=開発
工数」という関係式から開発工数を求める。
The language productivity table 26 holds numerical values indicating productivity in system development for each program language. The numerical value showing productivity is used when calculating development man-hours. FIG. 8 is an example of productivity information used when the development man-hours are obtained from the FP number. As shown in FIG. 8, "Visual Basic", "C", "Jav"
Numerical value n indicating productivity according to languages such as "a (registered trademark)"
Holds x, ny, nz, etc. The numerical value of the productivity used when the development man-hour is calculated from the FP number is calculated in consideration of the productivity in each work item such as “software requirement analysis” and “software system design”. When estimating the development man-hour from the FP number, the development man-hour is obtained from the relational expression “FP number / productivity = development man-hour”.

【0045】また、言語別生産性テーブル26は、プロ
グラムのライン数から開発工数を見積る場合に用いる生
産性の値も、プログラム言語毎に保持する。ライン数か
ら開発工数を見積る場合には、「見積もったライン数÷
生産性×変動計数=開発工数」という関係式から開発工
数を求める。
The language-specific productivity table 26 also holds, for each program language, the value of productivity used when estimating the development man-hours from the number of program lines. When estimating development man-hours from the number of lines, "Estimated number of lines ÷
The development man-hour is calculated from the relational expression "productivity x fluctuation count = development man-hour".

【0046】上述のように、「見積もったライン数÷生
産性×変動計数=開発工数」という関係が成立する。ま
た、アクティビティ積み上げ方式では、「各アクティビ
ティの積み上げによって求めた工数×変動係数=開発工
数」という関係が成立する。調整係数/変動係数テーブ
ル27は、これらの関係を成立させる変動係数を保持す
る。変動係数は、概算見積りの場合と詳細見積りの場合
とで異なるので、調整係数/変動係数テーブル27は、
概算見積りと詳細見積りのそれぞれに応じた変動係数を
保持する。また、変動係数は、開発規模、システムの複
雑性、要求品質、プログラマ等の経験度等に応じて定め
られるので、調整係数/変動係数テーブル27は、これ
らの条件の組み合わせ毎に変動係数を保持する。さら
に、調整係数/変動係数テーブル27は、ライン数によ
る見積りを行う場合に用いる変動係数と、アクティビテ
ィ積み上げ方式で用いる変動係数をそれぞれ保持する。
As described above, the relationship of "estimated number of lines / productivity * variable count = man-hours for development" is established. In addition, in the activity stacking method, the relationship “man-hours obtained by stacking each activity × variation coefficient = development man-hours” is established. The adjustment coefficient / variation coefficient table 27 holds the variation coefficient that establishes these relationships. Since the coefficient of variation differs between the case of rough estimation and the case of detailed estimation, the adjustment coefficient / variation coefficient table 27
The coefficient of variation for each rough estimate and detailed estimate is retained. Further, the coefficient of variation is determined according to the scale of development, the complexity of the system, the required quality, the degree of experience of the programmer, etc., so the adjustment coefficient / variation coefficient table 27 holds the coefficient of variation for each combination of these conditions. To do. Furthermore, the adjustment coefficient / variation coefficient table 27 holds the variation coefficient used when estimating by the number of lines and the variation coefficient used in the activity stacking method.

【0047】アクティビティ毎の標準工数テーブル28
は、アクティビティ毎に、成果物一単位当たりの標準作
業工数を保持する。例えば、「詳細設計」という作業項
目(アクティビティ)では、詳細設計書が成果物になる
とする。この場合、アクティビティ毎の標準工数テーブ
ル28は、「詳細設計」というアクティビティに対応さ
せて、詳細設計書を1枚作成するのに必要な工数を保持
する。他のアクティビティについても、同様に標準作業
工数を保持する。アクティビティ毎の標準工数テーブル
28は、作業者がアクティビティ積み上げ方式による見
積りを選択した場合に使用される。
Standard man-hour table 28 for each activity
Holds standard work man-hours per unit of deliverable for each activity. For example, in a work item (activity) called "detailed design", a detailed design document is a product. In this case, the standard man-hour table 28 for each activity holds the man-hour required to create one detailed design document in association with the activity "detailed design". For other activities as well, standard work man-hours are held similarly. The standard man-hour table 28 for each activity is used when the worker selects the estimation by the activity accumulation method.

【0048】ランク別平均単金テーブル29は、プログ
ラマやシステムエンジニア等の開発担当者の熟練度(ラ
ンク)に応じた人件費の単金の情報を保持する。単金と
は、人件費の単価であり、単位工数当たりの人件費であ
る。ランク別平均単価テーブル29は、人件費を見積る
際に使用される。コスト構成要素テーブル30は、作業
者にコストの入力を促す各費目の情報を保持する。例え
ば、材料費、マシン費、旅費交通費等の各費目の情報を
保持する。コスト構成要素テーブル30が保持する情報
の例を図9に示す。コスト構成要素テーブル30は、外
注費等の費目がさらに旅費交通費等の費目に分類される
ならば、その費目も中分類として保持する。後述するよ
うに、見積り処理サーバ1は、各費目を作業者に提示
し、見積りの対象になる費目の選択を促す。作業者は、
これらの費目毎にコスト等を入力する。そして、入力さ
れた情報に基づいて開発コストを見積る。なお、作業者
に費目の内容も示す場合には、コスト構成要素テーブル
30は、費目の内容を示す情報も保持する。
The rank-based average unit price table 29 holds information on unit price of personnel expenses according to the skill level (rank) of a person in charge of development such as a programmer or a system engineer. The unit price is the unit cost of labor cost, and is the labor cost per unit man-hour. The rank-based average unit price table 29 is used when estimating personnel costs. The cost component element table 30 holds information on each expense item that prompts the operator to input the cost. For example, information of each expense item such as material expense, machine expense, travel expense, and travel expense is held. FIG. 9 shows an example of information held by the cost component table 30. If the cost item such as the outsourcing cost is further classified into the expense item such as travel expenses and travel expenses, the cost component table 30 also holds the expense item as the middle classification. As will be described later, the estimation processing server 1 presents each expense item to the worker and prompts the operator to select an expense item to be estimated. The worker
Enter the cost etc. for each of these items. Then, the development cost is estimated based on the input information. When the operator also indicates the content of the expense item, the cost component table 30 also holds information indicating the content of the expense item.

【0049】次に、中間結果テーブル31について説明
する。規模見積り結果テーブル33は、ソフトウェア規
模の見積り結果を保持する記憶領域である。同様に、工
数見積り結果テーブル34およびコスト見積り結果テー
ブル35は、それぞれ開発工数、開発コストの見積り結
果を保持する記憶領域である。対象システム特定内容テ
ーブル31は、見積り条件としたデータを保持する記憶
領域である。
Next, the intermediate result table 31 will be described. The scale estimation result table 33 is a storage area for holding the estimation result of the software scale. Similarly, the man-hour estimation result table 34 and the cost estimation result table 35 are storage areas for holding the development man-hour and development cost estimation results, respectively. The target system specific content table 31 is a storage area that holds data used as estimation conditions.

【0050】クライアント41において、制御部42
は、記憶部43が保持するプログラムに従って動作す
る。入力部44および表示部45は、それぞれ見積り処
理サーバ1の入力部4および表示部5と同様の構成であ
る。ネットワークインタフェース部56は、インターネ
ット51を介して見積り処理サーバ1と情報を送受信す
る。
In the client 41, the control unit 42
Operates according to a program stored in the storage unit 43. The input unit 44 and the display unit 45 have the same configurations as the input unit 4 and the display unit 5 of the estimation processing server 1, respectively. The network interface unit 56 transmits / receives information to / from the estimation processing server 1 via the Internet 51.

【0051】記憶部43が記憶するツール起動プログラ
ム47は、見積り処理サーバ1に対する見積り支援処理
の開始要求を制御部42に行わせるプログラムである。
見積り結果ダウンロードプログラム48は、制御部2に
各見積り結果等を取得させるプログラムである。見積り
結果表示プログラム49は、制御部2に、各見積り結果
等を表示させるプログラムである。
The tool activation program 47 stored in the storage unit 43 is a program that causes the control unit 42 to make a request to start the estimation support process for the estimation processing server 1.
The estimation result download program 48 is a program that causes the control unit 2 to acquire each estimation result and the like. The estimation result display program 49 is a program for causing the control unit 2 to display each estimation result and the like.

【0052】上記の例において、ソフトウェア規模見積
り手段、開発工数見積り手段、開発コスト見積り手段、
見積り手法受付手段、変更情報取得手段は、制御部2お
よび入力部4によって実現される。見積り結果提示手段
は、制御部2および表示部5によって実現される。これ
らの各手段が制御部2、ネットワークインタフェース部
6、およびクライアント41によって実現されるものと
して捉えてもよい。また、見積り条件保持手段は、中間
結果テーブル31によって実現される。
In the above example, software scale estimating means, development man-hour estimating means, development cost estimating means,
The estimation method acceptance means and the change information acquisition means are realized by the control unit 2 and the input unit 4. The estimation result presenting means is realized by the control unit 2 and the display unit 5. Each of these means may be regarded as realized by the control unit 2, the network interface unit 6, and the client 41. The estimation condition holding means is realized by the intermediate result table 31.

【0053】また、記憶部3は、コンピュータに、開発
対象システムのソフトウェア規模を見積るための規模見
積り条件を入力し、規模見積り条件に基づいてソフトウ
ェア規模を見積る機能、開発工数を見積るための工数見
積り条件を入力し、工数見積り条件に基づいて開発工数
を見積る機能、開発コストを見積るためのコスト見積り
条件を入力し、コスト見積り条件に基づいて開発コスト
を見積る機能、およびソフトウェア規模の見積り結果、
開発工数の見積り結果、および開発コストの見積り結果
を出力する機能を実現させるための見積り作業支援プロ
グラムを保持する。
Further, the storage unit 3 inputs into the computer scale estimation conditions for estimating the software scale of the development target system, a function for estimating the software scale based on the scale estimation conditions, and a man-hour estimation for estimating the development man-hours. A function to input conditions and estimate development man-hours based on man-hour estimation conditions, a function to enter cost estimation conditions to estimate development costs, estimate development costs based on cost estimation conditions, and software scale estimation results.
Holds an estimation work support program for realizing the function of outputting the estimation results of development man-hours and the estimation results of development costs.

【0054】次に、動作について説明する。実際に動作
するのは制御部2であるが、以下の説明では各プログラ
ムの動作として説明する。また、作業者は、入力部4を
操作し、表示部5の表示を確認するものとする。図1
0,11は、見積り支援処理の処理経過の例を示す流れ
図である。まず、見積り作業ナビゲイトプログラム11
は、作業者の要求に応じて、作業支援の案内画面を表示
部10に表示する。図12は案内画面の例である。作業
者は、この画面によって作業の大まかな流れを確認す
る。次に見積り作業ナビゲイトプログラム11は、図1
3に例示する画面を表示して作業者に選択を促し、作業
者の選択に従って概算見積りか詳細見積りかを決定する
(ステップS111)。作業者は、選択ボタン61のい
ずれかをマウスクリックすることによって、選択結果を
入力する。
Next, the operation will be described. Although the control unit 2 actually operates, the operation of each program will be described below. Further, the operator operates the input unit 4 and confirms the display on the display unit 5. Figure 1
0 and 11 are flow charts showing an example of the processing progress of the estimation support processing. First, the Quotation Work Navigate Program 11
Displays a work support guidance screen on the display unit 10 in response to a worker's request. FIG. 12 is an example of the guidance screen. The operator confirms the rough flow of work on this screen. Next, the quotation work navigation gate program 11 is shown in FIG.
The screen illustrated in FIG. 3 is displayed to prompt the operator to make a selection, and it is determined whether the rough estimate or the detailed estimate is made according to the operator's selection (step S111). The operator inputs a selection result by clicking any one of the selection buttons 61 with a mouse.

【0055】続いて、見積り作業ナビゲイトプログラム
11は、開発対象システム等に関する情報を取得する
(ステップS112)。このとき、図14,15に例示
する画面を表示部10に表示して作業者に情報の入力を
促す。ステップS112では、開発対象システム等に関
する情報として、例えば、開発規模、システムの複雑
性、要求品質、開発者の経験度等に関する情報を取得す
る。また、作業者が指定する見積り手法に関する情報も
取得する。図14に示す「Q2」、「Q3」、「Q4」
は、それぞれFP法による見積り手法を採用するのか、
ライン数による見積り手法を採用するのか、アクティビ
ティ積み上げ方式を採用するのかを確認するための質問
であり、作業者は回答を入力して見積り手法を指定す
る。また、作業者は他の様々な質問に回答することによ
って、開発規模、システムの複雑性、要求品質、開発者
の経験度等も入力する。見積り作業ナビゲイトプログラ
ム11は、ステップS112で取得した情報に従って、
ソフトウェア規模や開発工数を見積る手法を定める(ス
テップS113)。ステップS113の後には、定めら
れた手法に従い見積り支援を進める。
Subsequently, the estimation work navigation gate program 11 acquires information on the development target system and the like (step S112). At this time, the screens illustrated in FIGS. 14 and 15 are displayed on the display unit 10 to prompt the operator to input information. In step S112, as the information on the development target system and the like, for example, information on the development scale, the complexity of the system, the required quality, the degree of experience of the developer, etc. is acquired. It also acquires information about the estimation method specified by the worker. "Q2", "Q3", "Q4" shown in FIG.
Each adopts the estimation method by the FP method,
This is a question for confirming whether to adopt the estimation method based on the number of lines or the activity accumulation method. The worker inputs an answer and specifies the estimation method. The worker also inputs the scale of development, the complexity of the system, the required quality, the degree of experience of the developer, etc. by answering various other questions. The estimation work navigation gate program 11 follows the information acquired in step S112.
A method for estimating the software scale and the development man-hours is determined (step S113). After step S113, the estimation support is advanced according to the determined method.

【0056】まず、FP法による見積りを行う場合につ
いて説明する。ステップS113で、FP法を採用する
ことが定められると、FP法規模見積りプログラム13
は、「内部論理ファイル」、「外部インタフェースファ
イル」、「外部入力」、「外部出力」、および「外部参
照」という5種類の区分毎に開発対象システムが扱うデ
ータの項目数を入力する(ステップS114)。
First, the case of making an estimation by the FP method will be described. If it is determined in step S113 that the FP method is adopted, the FP method scale estimation program 13
Inputs the number of items of data handled by the development target system for each of the five types of categories: "internal logic file", "external interface file", "external input", "external output", and "external reference" (step S114).

【0057】例えば、「外部出力」の区分について、F
P法規模見積りプログラム13は、図3に例示する「X
XX一覧表」等の出力データの名称や、そのデータに含
まれる項目数の入力を促す画面を出力する。作業者が
「XXX一覧表」等の名称や項目数を入力すると、FP
法規模見積りプログラム13は、入力された情報を、F
P法機能数見積り要因及び各要素重み付けテーブル23
に登録する。また、項目数によって、重み付けの区分が
「低い」、「平均」、「高い」のいずれに分類されるの
かを判断し、その判断結果も図3に例示するように登録
する。さらに、FP法規模見積りプログラム13は、
「低い」と判断された外部出力データの数、「平均」と
判断された外部出力データの数、「高い」と判断された
外部出力データの数を確認し、図4に例示するように登
録する。ここでは、「外部出力」の場合を例に説明した
が、「内部論理ファイル」等の他の区分についても同様
の処理を行う。
For example, for the category of "external output", F
The P method scale estimation program 13 uses the “X
A screen prompting the user to input the name of output data such as "XX list" and the number of items included in the data is output. When the operator inputs the name and the number of items such as "XXX list", the FP
The legal scale estimation program 13 converts the entered information into F
P-method function number estimation factor and each element weighting table 23
Register with. Further, it is determined whether the weighting category is classified into “low”, “average”, or “high” according to the number of items, and the determination result is also registered as illustrated in FIG. Furthermore, the FP method scale estimation program 13
Check the number of external output data determined as "low", the number of external output data determined as "average", the number of external output data determined as "high", and register as illustrated in FIG. To do. Here, the case of “external output” has been described as an example, but similar processing is performed for other categories such as “internal logical file”.

【0058】次に、FP法規模見積りプログラム13
は、未調整FP数を算出する(ステップS115)。F
P法規模見積りプログラム13は、図4に例示するよう
に登録した情報を、FP数テーブル24に登録する。そ
して、「内部論理ファイル」等の5種類の各区分につい
て以下のように未調整FPを算出し、FP数テーブル2
4に登録する。各区分では、「低い」と判断されたデー
タの数と「低い」に対応する重み付け係数とを乗じる。
「平均」および「高い」についても同様に計算を行う。
そして、「低い」、「平均」、および「高い」に関する
乗算結果の和を未調整FP数とする。さらに、5種類の
区分の未調整FP数の合計を求め、FP数テーブル24
に登録する。
Next, the FP method scale estimation program 13
Calculates the unadjusted FP number (step S115). F
The P-law scale estimation program 13 registers the information registered as illustrated in FIG. 4 in the FP number table 24. Then, the unadjusted FP is calculated as follows for each of the five types of divisions such as “internal logical file”, and the FP number table 2
Register in 4. In each category, the number of data determined as “low” is multiplied by the weighting coefficient corresponding to “low”.
The same calculation is performed for “average” and “high”.
Then, the sum of the multiplication results regarding “low”, “average”, and “high” is set as the unadjusted FP number. Furthermore, the total of the unadjusted FP numbers of the five types of sections is calculated, and the FP number table 24
Register with.

【0059】次に、FP法規模見積りプログラム13
は、「データ通信機能」等の14種類の分野について、
各分野の特性の影響度を取得する。FP法規模見積りプ
ログラム13は、影響度の入力を作業者に促す画面を出
力する。作業者は、各分野のシステム特性の影響度につ
いて0点から5点の点数で評価し、その点数を入力す
る。FP法規模見積りプログラム13は、入力された各
得点を図5に例示するように登録する。そして、14種
類の分野の得点の総和によって、調整係数を決定する。
さらに、ステップS115で算出した未調整FP数(5
種類の区分の未調整FP数の和)に調整係数を乗じてF
P数を算出する(ステップS116)。このFP数がソ
フトウェア規模の見積り結果であり、ソフトウェア規模
はFP数によって表される。FP法規模見積りプログラ
ム13は、ソフトウェア規模の見積り結果を規模見積り
結果テーブル33に保持させ、また、その見積りに用い
た情報(作業者が入力した見積り条件)を対象システム
特性内容テーブル32に保持させる。
Next, the FP method scale estimation program 13
About 14 kinds of fields such as "data communication function",
Obtain the degree of influence of the characteristics of each field. The FP method scale estimation program 13 outputs a screen prompting the operator to input the degree of influence. The operator evaluates the degree of influence of the system characteristics in each field with a score of 0 to 5 and inputs the score. The FP method scale estimation program 13 registers each input score as illustrated in FIG. Then, the adjustment coefficient is determined by the total sum of the scores of 14 fields.
Furthermore, the unadjusted FP number calculated in step S115 (5
Multiply the adjustment factor by the sum of the unadjusted FP numbers of the types of categories)
The P number is calculated (step S116). This FP number is the estimation result of the software scale, and the software scale is represented by the FP number. The FP method scale estimation program 13 stores the estimation result of the software scale in the scale estimation result table 33, and also stores the information used for the estimation (estimation condition input by the operator) in the target system characteristic content table 32. .

【0060】続いて、FP法工数見積りプログラム15
は、開発に用いるプログラム言語の入力を促す画面を表
示部5に表示し、プログラム言語の情報を取得する。そ
して、そのプログラミング言語における生産性を示す数
値を、言語別生産性テーブル26から抽出する(ステッ
プS117)。FP法工数見積りプログラム15は、ス
テップS116で求めたFP数を、生産性を示す数値で
除算することによって、開発工数を算出する(ステップ
S118)。FP法工数見積りプログラム15は、開発
工数の見積り結果を工数見積り結果テーブル34に保持
させ、その見積りに用いた情報を対象システム特性内容
テーブル32に保持させる。
Next, the FP method man-hour estimation program 15
Displays a screen for prompting the input of the programming language used for development on the display unit 5 to acquire the programming language information. Then, the numerical value indicating the productivity in the programming language is extracted from the language-specific productivity table 26 (step S117). The FP method man-hour estimation program 15 calculates the development man-hour by dividing the FP number obtained in step S116 by a numerical value indicating productivity (step S118). The FP method man-hour estimation program 15 causes the man-hour estimation result table 34 to hold the development man-hour estimation result, and causes the target system characteristic content table 32 to hold the information used for the estimation.

【0061】概算見積りの場合であっても詳細見積りの
場合であっても、ステップS114〜S118の処理の
流れは同じであるが、処理過程で用いる係数が異なる。
The process flow of steps S114 to S118 is the same in both the rough estimation and the detailed estimation, but the coefficients used in the process are different.

【0062】次に、ライン数によって見積る場合につい
て説明する。ステップS113でライン数による見積り
手法を採用することが定められると、ライン数規模見積
りプログラム14は、過去に開発されたシステムにおけ
るソフトウェア規模や開発工数の実績情報を表示部5に
表示する(ステップS119)。この実績情報は、業種
/業務別実績規模及び工数テーブル25から抽出する。
例えば、図7に例示する情報を業種/業務別実績規模及
び工数テーブル25から抽出して表示する。また、ライ
ン数規模見積りプログラム14は、開発対象システムの
サブシステム毎にプログラムのライン数の入力を促す画
面も表示部5に表示する。
Next, the case of estimating the number of lines will be described. When it is determined in step S113 that the estimation method based on the number of lines is adopted, the line number scale estimation program 14 displays the performance information of the software scale and the development man-hour in the system developed in the past on the display unit 5 (step S119). ). This performance information is extracted from the business / business-specific performance scale and man-hour table 25.
For example, the information illustrated in FIG. 7 is extracted from the industry / business-specific achievement scale and man-hour table 25 and displayed. The line number scale estimation program 14 also displays on the display unit 5 a screen prompting the user to input the number of lines of the program for each subsystem of the development target system.

【0063】作業者は、表示された情報を閲覧して、開
発対象システムに類似するシステムのソフトウェア規模
等を確認する。例えば、開発対象システムが金融システ
ムであり、預金や融資に関する処理を実現するのであれ
ば、図7に例示する情報から、過去に開発されたシステ
ムのライン数等を確認する。作業者は、類似するシステ
ムのライン数を参考にしてサブシステム毎のライン数を
入力する。ライン数規模見積りプログラム14は、入力
されたサブシステム毎のライン数を取得する(ステップ
S120)。そして、入力されたライン数の和を計算す
ることによって、開発対象システム全体でのライン数を
求める(ステップS121)。このライン数がソフトウ
ェア規模の見積り結果である。ライン数規模見積りプロ
グラム14は、ソフトウェア規模の見積り結果を規模見
積り結果テーブル33に保持させ、その見積りに用いた
情報を対象システム特性内容テーブル32に保持させ
る。
The worker browses the displayed information and confirms the software scale of the system similar to the development target system. For example, if the system to be developed is a financial system and a process related to deposits and loans is realized, the number of lines of the system developed in the past is confirmed from the information illustrated in FIG. The operator inputs the number of lines for each subsystem by referring to the number of lines of similar systems. The line number scale estimation program 14 acquires the input line number for each subsystem (step S120). Then, the total number of input lines is calculated to obtain the total number of lines in the development target system (step S121). This number of lines is the estimation result of the software scale. The line number scale estimation program 14 stores the software scale estimation result in the scale estimation result table 33, and stores the information used for the estimation in the target system characteristic content table 32.

【0064】続いて、ライン数工数見積りプログラム1
6は、ステップS117に示す場合と同様に、開発に用
いるプログラム言語の生産性を示す数値を抽出する(ス
テップS122)。また、調整係数/変動係数テーブル
27から変動係数を抽出する(ステップS123)。変
動係数は、開発規模、システムの複雑性、要求品質、プ
ログラマ等の経験度や、概算見積りか詳細見積りか等に
よって異なる。ライン数工数見積りプログラム16は、
ステップS111,S112で入力された条件(概算見
積りか詳細見積りか、開発規模、複雑性等)の組み合わ
せに対応する変動係数を抽出する。
Subsequently, the program for estimating the number of lines and man-hours 1
In the same way as in step S117, step 6 extracts a numerical value indicating the productivity of the programming language used for development (step S122). Further, the coefficient of variation is extracted from the adjustment coefficient / variation coefficient table 27 (step S123). The coefficient of variation differs depending on the scale of development, the complexity of the system, the required quality, the degree of experience of a programmer, etc., whether it is a rough estimate or a detailed estimate. The line man-hour estimation program 16
The coefficient of variation corresponding to the combination of the conditions (approximate estimation or detailed estimation, development scale, complexity, etc.) input in steps S111 and S112 is extracted.

【0065】ライン数工数見積りプログラム16は、ス
テップS121で求めたライン数を生産性を示す数値で
除算し、変動係数を乗じることによって、開発工数を算
出する(ステップS124)。ライン数工数見積りプロ
グラム16は、開発工数の見積り結果を工数見積り結果
テーブル34に保持させ、その見積りに用いた情報を対
象システム特性内容テーブル32に保持させる。
The line man-hour estimation program 16 calculates the development man-hour by dividing the number of lines obtained in step S121 by a numerical value indicating productivity and multiplying it by the coefficient of variation (step S124). The line-number man-hour estimation program 16 causes the man-hour estimation result table 34 to hold the estimation result of the development man-hour, and causes the target system characteristic content table 32 to hold the information used for the estimation.

【0066】次に、アクティビティ積み上げ方式を採用
する場合について説明する。ステップS113で、アク
ティビティ積み上げ方式を採用することが定められる
と、アクティビティ積み上げ工数見積りプログラム17
は、ソフトウェア開発における各アクティビティを表示
部5に表示し、表示したアクティビティの中から見積り
対象となるアクティビティを選択するように促す。例え
ば、「要求分析」「詳細設計」等の各アクティビティを
表示する。作業者は、見積り対象となるアクティビティ
を指定し、アクティビティ積み上げ工数見積りプログラ
ム17は指定されたアクティビティの情報を取得する
(ステップS125)。
Next, the case where the activity stacking method is adopted will be described. When it is determined in step S113 that the activity stacking method is adopted, the activity stacking man-hour estimation program 17
Displays each activity in software development on the display unit 5 and prompts the user to select an activity to be estimated from the displayed activities. For example, each activity such as “requirement analysis” and “detailed design” is displayed. The worker specifies an activity to be estimated, and the activity stacking man-hour estimation program 17 acquires information on the specified activity (step S125).

【0067】アクティビティ積み上げ工数見積りプログ
ラム17は、指定された各アクティビティについて成果
物の数量の入力を促す画面を表示部5に表示する。この
成果物の数量を要因数と記す。作業者は、アクティビテ
ィ毎に要因数を入力する。例えば、「詳細設計」の成果
物である詳細設計書が100枚になると見込まれるので
あれば、「詳細設計」というアクティビティについて
「100」という要因数を入力する。他のアクティビテ
ィについても同様に要因数を入力する。アクティビティ
積み上げ工数見積りプログラム17は、入力された要因
数を取得する(ステップS126)。
The activity accumulation man-hour estimation program 17 causes the display unit 5 to display a screen prompting the user to input the quantity of the product for each designated activity. The quantity of this product is referred to as the number of factors. The worker inputs the number of factors for each activity. For example, if it is expected that there will be 100 detailed design documents that are the products of the “detailed design”, the number of factors “100” is input for the activity “detailed design”. For other activities, enter the number of factors in the same way. The activity accumulation man-hour estimation program 17 acquires the number of input factors (step S126).

【0068】続いて、アクティビティ積み上げ工数見積
りプログラム17は、指定された各アクティビティにつ
いて、成果物一単位当たりの標準作業工数を抽出する。
標準作業工数は、アクティビティ毎の標準工数テーブル
28から抽出する。例えば、「詳細設計」というアクテ
ィビティについて、詳細設計書を1枚作成するのに必要
な工数を抽出する。そして、アクティビティ毎に、標準
作業工数に要因数を乗じて工数を算出する(ステップS
127)。さらに、各アクティビティの工数を積み上げ
る(ステップS128)。すなわち、各アクティビティ
の工数の和を求める。
Subsequently, the activity accumulation man-hour estimation program 17 extracts a standard work man-hour per unit of deliverable for each designated activity.
The standard man-hours are extracted from the standard man-hour table 28 for each activity. For example, for the activity “detailed design”, the number of man-hours required to create one detailed design document is extracted. Then, for each activity, the standard work man-hour is multiplied by the factor number to calculate the man-hour (step S
127). Further, the man-hours of each activity are accumulated (step S128). That is, the sum of man-hours of each activity is calculated.

【0069】アクティビティ積み上げ工数見積りプログ
ラム17は、ステップS123に示す場合と同様に、調
整係数/変動係数テーブル27から変動係数を抽出す
る。そして、各アクティビティの工数の和に変動係数を
乗じることによって開発工数を求める(ステップS12
9)。アクティビティ積み上げ工数見積りプログラム1
7は、開発工数の見積り結果を工数見積り結果テーブル
34に保持させ、その見積りに用いた情報を対象システ
ム特性内容テーブル32に保持させる。
The activity accumulation man-hour estimation program 17 extracts the coefficient of variation from the adjustment coefficient / variation coefficient table 27, as in the case shown in step S123. Then, the development man-hour is obtained by multiplying the sum of man-hours of each activity by the coefficient of variation (step S12).
9). Activity accumulated man-hour estimation program 1
7 stores the estimation result of the development man-hours in the man-hour estimation result table 34, and holds the information used for the estimation in the target system characteristic content table 32.

【0070】開発工数の見積り終了後、コスト見積りプ
ログラム18は、費目選択画面を表示部5に表示し、作
業者に見積りの対象になる費目の選択を促す(ステップ
S130)。図16は、費目選択画面の例を示す説明図
である。コスト見積りプログラム18は、コスト構成要
素テーブル30において分類される各費目の選択欄を費
目選択画面に含める。図16に示す例では、「人件
費」、「外注費」、「マシン費」等と表示された部分が
選択欄になる。図9に例示するように一つの費目がさら
に中分類として分類されるならば、中分類として分類さ
れる費目の選択欄も含める。
After the estimation of the development man-hours is completed, the cost estimation program 18 displays the expense item selection screen on the display unit 5 and prompts the operator to select the expense item to be estimated (step S130). FIG. 16 is an explanatory diagram showing an example of the expense item selection screen. The cost estimation program 18 includes a selection column for each expense item classified in the cost component table 30 in the expense item selection screen. In the example shown in FIG. 16, the portions displayed as “personnel cost”, “outsourcing cost”, “machine cost”, etc. are selection fields. If one expense item is further classified as a middle category as illustrated in FIG. 9, a selection column for expense items classified as a middle category is also included.

【0071】コスト構成要素テーブル30が費目の内容
を示す情報を保持している場合には、その情報も費目選
択画面上に示す。例えば、図9に示すように、コスト構
成要素テーブル30が「この人件費は社員の人件費で
す。」という情報を保持しているならば、この情報も費
目選択画面に表示する。また、「人件費=工数×単金」
という算定式を保持しているならば、この算定式の情報
に基づいて「工数と単金が必要になります。」という情
報を表示してもよい。
When the cost component element table 30 holds information indicating the contents of expense items, that information is also shown on the expense item selection screen. For example, as shown in FIG. 9, if the cost component table 30 holds the information "this personnel cost is the personnel cost of the employee.", This information is also displayed on the expense item selection screen. Also, "personnel cost = man-hour x unit price"
If the calculation formula is stored, information such as "man-hours and unit cost is required." May be displayed based on the information of this calculation formula.

【0072】作業者は、「人件費」等の各費目の選択欄
をマウスクリックした上で、決定ボタンをマウスクリッ
クする。また、中分類の費目全体を選択するときには、
その上位の費目を選択してもよい。例えば、「旅費交通
費」、「通信費」、「印刷費」、「その他」という選択
欄全てをマウスクリックする代わりに、その上位の「経
費」の選択欄をマウスクリックしてもよい。
The operator clicks the selection field of each expense item such as "personnel expenses" with the mouse, and then clicks the decision button with the mouse. In addition, when selecting the entire category of expenses,
You may select the higher expense item. For example, instead of mouse-clicking all the selection fields of “travel expenses”, “communication expenses”, “printing expenses”, and “others”, the higher-level “expenses” selection regions may be clicked.

【0073】コスト見積りプログラム18は、ステップ
S130で人件費(外注費でない人件費)が選択された
ならば、その人件費の見積り処理を行う(ステップS1
31)。コスト見積りプログラム18は、まず、開発を
担当するプログラマやシステムエンジニアの熟練度の入
力を促す画面を表示部5に表示する。そして、作業者か
ら熟練度の情報が入力されると、その熟練度に対応する
人件費の単金の情報をランク別平均単金テーブル29か
ら抽出する。そして、ステップS118(あるいはステ
ップS124またはステップS129)で求めた開発工
数に単金を乗じて人件費を算出する。
When the labor cost (non-outsourcing cost) is selected in step S130, the cost estimation program 18 estimates the labor cost (step S1).
31). The cost estimation program 18 first displays on the display unit 5 a screen prompting the programmer or system engineer in charge of development to input the skill level. Then, when the information of the skill level is input from the worker, the information of the unit cost of the labor cost corresponding to the skill level is extracted from the rank-based average unit price table 29. Then, the labor cost is calculated by multiplying the development man-hour obtained in step S118 (or step S124 or step S129) by the unit money.

【0074】次に、コスト見積りプログラム18は、選
択された費目のうち、人件費以外の各費目について、作
業者に費用を入力するように促す(ステップS13
2)。例えば、「人件費」の他に、「材料費」、「経
費」に含まれる「旅費交通費」および「通信費」が選択
されているとする。この場合、「材料費」、「経費」に
含まれる「旅費交通費」および「通信費」の費用の入力
を促す画面を表示する。そして、作業者が入力した各費
目の費用を取得する。
Next, the cost estimation program 18 prompts the operator to input a cost for each of the selected cost items other than the personnel cost (step S13).
2). For example, it is assumed that in addition to “personnel cost”, “material cost”, “travel expense” included in “expense”, and “communication expense” are selected. In this case, a screen prompting the user to input the costs of "travel expenses" and "communication expenses" included in "material expenses" and "expenses" is displayed. Then, the cost of each expense input by the worker is acquired.

【0075】なお、「外注費」に含まれる人件費が選択
された場合、ステップS131と同様に人件費を算出し
てもよい。あるいは、「材料費」等と同様に、ステップ
S132において作業者に費用の入力を促してもよい。
When the labor cost included in the "outsourcing cost" is selected, the labor cost may be calculated as in step S131. Alternatively, similarly to the “material cost” or the like, the operator may be prompted to input the cost in step S132.

【0076】コスト見積りプログラム18は、ステップ
S131で算出した人件費と、ステップS132で入力
された各費目の費用を合計して、開発全体に関するコス
トを見積る(ステップS133)。人件費等の各費目の
合計額がコストの見積り結果である。コスト見積りプロ
グラム18は、コストの見積り結果をコスト見積り結果
テーブル33に保持させ、その見積りに用いた情報を対
象システム特性内容テーブル32に保持させる。
The cost estimation program 18 totals the personnel cost calculated in step S131 and the cost of each expense input in step S132 to estimate the cost related to the entire development (step S133). The total amount of each item such as personnel expenses is the cost estimation result. The cost estimation program 18 stores the cost estimation result in the cost estimation result table 33, and stores the information used for the estimation in the target system characteristic content table 32.

【0077】コストの見積り結果を算出した後、補正処
理プログラム19は、見積り条件を変更して、既に求め
た見積り結果を補正、修正する必要があるかを作業者に
問い合わせる(ステップS134)。補正処理プログラ
ム19は、例えば、図17(a)に例示する条件変更確
認画面を表示して、見積り条件を変更するか否か、どの
条件を変更するか等の指定を促す。なお、条件変更確認
画面は図17(a)に示す画面に限定されない。例え
ば、概算見積り/詳細見積りの変更や、ステップS11
2で入力した情報の変更を指定できるようにしてもよ
い。図17(a)に例示する画面の場合、作業者は、変
更する見積り条件に対応する選択欄をマウスクリックす
る。また、変更がなければ、「見積り条件の変更なし」
の選択欄をマウスクリックする。
After calculating the cost estimation result, the correction processing program 19 changes the estimation condition and inquires of the operator whether it is necessary to correct or correct the already obtained estimation result (step S134). The correction processing program 19 displays, for example, a condition change confirmation screen illustrated in FIG. 17A, and prompts designation of whether or not to change the estimation condition, which condition is to be changed, and the like. The condition change confirmation screen is not limited to the screen shown in FIG. For example, changing the rough estimate / detailed estimate, or step S11.
The change of the information input in 2 may be designated. In the case of the screen illustrated in FIG. 17A, the operator mouse-clicks the selection field corresponding to the estimated condition to be changed. If there is no change, "No change in quotation conditions"
Click the selection field of.

【0078】見積り条件に変更がある場合、補正処理プ
ログラム19は、指定された選択欄に応じた見積り条件
の変更画面を表示する。例えば、「FP法における外部
出力の項目数の変更」が選択された場合、補正処理プロ
グラム19は、図17(b)に例示する画面を表示し、
変更後の項目数の入力を促す。変更後の見積り条件が入
力されたならば、補正処理プログラム19は、対象シス
テム特性内容テーブル32に保持されている見積り条件
の情報を更新する。そして、FP法規模見積りプログラ
ム13等を呼び出して、ソフトウェア規模の見積り、開
発工数の見積り、および開発コストの見積りの一部また
は全部をやり直す。このとき、対象システム特性内容テ
ーブル32に保持されている見積り条件を用いて見積り
をやり直す。補正後の見積り結果は、見積り結果の種類
に応じて、規模見積り結果テーブル33、工数見積り結
果テーブル34,コスト見積り結果テーブル35に保持
させる。
When the estimation condition is changed, the correction processing program 19 displays the estimation condition change screen according to the designated selection field. For example, when “change number of items of external output in FP method” is selected, the correction processing program 19 displays the screen illustrated in FIG.
Prompt for the number of items after the change. When the changed estimated condition is input, the correction processing program 19 updates the estimated condition information held in the target system characteristic content table 32. Then, the FP method scale estimation program 13 or the like is called, and part or all of the estimation of the software scale, the estimation of the development man-hour, and the estimation of the development cost are redone. At this time, the estimation is performed again using the estimation conditions held in the target system characteristic content table 32. The corrected estimation result is held in the scale estimation result table 33, the man-hour estimation result table 34, and the cost estimation result table 35 according to the type of the estimation result.

【0079】見積り作業ナビゲイトプログラム11は、
見積り結果のレポートを出力する(ステップS13
6)。ステップS136において見積り作業ナビゲイト
プログラム11は、対象システム特性内容テーブル3
2、規模見積り結果テーブル33、工数見積り結果テー
ブル33、およびコスト見積り結果テーブル35から、
それぞれ見積りの条件、ソフトウェア規模の見積り結
果、開発工数の見積り結果、開発コストの見積り結果を
抽出する。そして、抽出した各情報をまとめて表示でき
るように表示画面を編集して、その画面を表示部5に表
示する。ステップS134で、「見積り条件の変更な
し」が選択された場合には、ステップS135の処理を
行うことなく、レポート出力処理を行う。
Estimating work Navigate program 11
Output a report of the estimation result (step S13)
6). In step S136, the estimation work navigation gate program 11 determines the target system characteristic content table 3
2. From the scale estimation result table 33, the man-hour estimation result table 33, and the cost estimation result table 35,
Extract the estimation conditions, software scale estimation results, development man-hour estimation results, and development cost estimation results, respectively. Then, the display screen is edited so that the extracted information items can be collectively displayed, and the screen is displayed on the display unit 5. When "No change in estimation condition" is selected in step S134, the report output process is performed without performing the process of step S135.

【0080】なお、作業者が作業の途中で所定の問い合
わせ操作を行った場合、ヘルプ処理プログラム12は、
ヘルプ情報テーブル22から問い合わせの回答を抽出
し、表示部4に出力する。
When the worker performs a predetermined inquiry operation during the work, the help processing program 12
The answer to the inquiry is extracted from the help information table 22 and output to the display unit 4.

【0081】このような見積り作業支援システムによれ
ば、ソフトウェア規模の見積り、開発工数の見積り、お
よび開発コストの見積りという一連の見積り作業全体に
ついて作業支援することができる。そして、この作業支
援システムは、予め定められた事項について、順次入力
を促す。従って、高度情報技術者でなくても、表示され
た画面に応じて見積り条件を順次入力していくことによ
って、一連の見積り作業を進めていくことができる。
According to such an estimation work support system, it is possible to perform work support for the entire series of estimation work such as estimation of software scale, estimation of development man-hours, and estimation of development cost. Then, the work support system prompts the user to sequentially input predetermined items. Therefore, even a person who is not an advanced information engineer can proceed with a series of estimation work by sequentially inputting estimation conditions according to the displayed screen.

【0082】また、作業者は、FP法による見積り、ラ
イン数による見積り、アクティビティ積み上げ方式によ
る見積り等を選択することができる。従って、作業者
は、所望の手法に従って見積り作業を行える。
Further, the operator can select an estimate by the FP method, an estimate by the number of lines, an estimate by the activity stacking method, and the like. Therefore, the worker can perform the estimation work according to a desired method.

【0083】さらに、ソフトウェア規模、開発工数、お
よび開発コストを見積った後、見積り条件に変更がある
か否かを確認し、変更がある場合には、その変更内容
と、既に入力されている見積り条件とを用いて見積りを
やり直す。従って、作業者は、変更内容さえ入力すれば
よく、変更時の作業負担を抑えることができる。
Further, after estimating the software scale, the development man-hour, and the development cost, it is confirmed whether or not the estimation condition is changed. If there is a change, the changed content and the already input estimation are made. Re-estimate using conditions and. Therefore, the operator only needs to input the contents of the change and can reduce the work load at the time of the change.

【0084】上述の例で示した各表示画面は例示であ
り、表示される画面は上述の各画面に限定されない。
The display screens shown in the above example are examples, and the screens displayed are not limited to the above screens.

【0085】また、上述の例では、作業者が入力部4を
操作し、表示部5の表示を確認するものとして説明し
た。作業者は、クライアント41を操作してもよい。こ
の場合、クライアント41の制御部42は、ツール起動
プログラム47に従って、見積り処理サーバ1に対して
見積り支援処理の開始を要求する。見積り処理サーバ1
は、この要求に応じて図12に例示する案内画面の情報
を、インターネット51を介してクライアント41に送
信する。以降の動作は、ステップS111〜S136の
動作と同様である。ただし、作業者への情報の提示や、
作業者が入力した情報の取得を、インターネット51を
介して行う。
In the above example, the operator operates the input unit 4 and confirms the display on the display unit 5. The worker may operate the client 41. In this case, the control unit 42 of the client 41 requests the estimation processing server 1 to start the estimation support processing according to the tool activation program 47. Quotation processing server 1
In response to this request, transmits the information on the guide screen illustrated in FIG. 12 to the client 41 via the Internet 51. The subsequent operation is the same as the operation in steps S111 to S136. However, presenting information to workers,
The information input by the operator is acquired via the Internet 51.

【0086】また、ステップS136において、作業者
が、各見積り結果を確認しようとする場合、制御部42
は、見積り結果ダウンロードプログラム48に従って、
中間結果テーブル31が保持する情報の送信を見積り処
理サーバ1に要求する。見積り処理サーバ1は、この要
求に応じて、中間結果テーブル31から見積りの条件、
ソフトウェア規模の見積り結果、開発工数の見積り結
果、開発コストの見積り結果を抽出し、クライアント4
1に送信する。クライアント41は、見積り結果表示プ
ログラム49に従い、受信した各情報をまとめて表示で
きるように表示画面を編集して、その画面を表示部45
に表示する。
In step S136, when the operator wants to confirm each estimation result, the control unit 42
According to the estimate result download program 48,
The estimation processing server 1 is requested to transmit the information held in the intermediate result table 31. In response to this request, the estimation processing server 1 uses the intermediate result table 31 to estimate conditions,
Extract the software scale estimation result, development man-hour estimation result, development cost estimation result, and the client 4
Send to 1. The client 41 edits the display screen according to the estimation result display program 49 so that each received information can be displayed collectively, and displays the screen on the display unit 45.
To display.

【0087】見積り処理サーバ1とクライアント41と
がインターネット51を介して情報を送受信するので、
作業者は見積り処理サーバ1から離れた場所にいても、
見積り作業を進めることができる。そして、作業者が遠
隔地にいたとしても、業種/業務別実績規模及び工数テ
ーブル25のデータ等を作業者に提示することができ
る。
Since the quotation processing server 1 and the client 41 send and receive information via the Internet 51,
Even if the worker is away from the quotation processing server 1,
You can proceed with the estimation work. Then, even if the worker is in a remote place, it is possible to present the worker with the business / actual achievement scale, the data of the man-hour table 25, and the like.

【0088】遠隔地で見積り作業をする者がいない場合
には、クライアント41を備えていなくてもよい。一
方、作業者の所在地が遠隔地であることを前提にする場
合には、見積り処理サーバ1は、入力部4と表示部5を
備えていなくてもよい。
The client 41 may not be provided if there is no person who estimates at a remote location. On the other hand, when it is premised that the worker's location is a remote place, the estimation processing server 1 may not include the input unit 4 and the display unit 5.

【0089】[0089]

【発明の効果】本発明の見積り作業支援システムによれ
ば、開発対象システムのソフトウェア規模を見積るため
の規模見積り条件を入力し、規模見積り条件に基づいて
ソフトウェア規模を見積り、開発工数を見積るための工
数見積り条件を入力し、工数見積り条件に基づいて開発
工数を見積り、開発コストを見積るためのコスト見積り
条件を入力し、コスト見積り条件に基づいて開発コスト
を見積る。従って、ソフトウェア規模の見積り、開発工
数の見積り、および開発コストの見積りという一連の見
積り作業全体について作業支援することができる。その
結果、高度情報技術者でなくても、一連の見積り作業を
進めることができる。
According to the estimation work support system of the present invention, the scale estimation condition for estimating the software scale of the development target system is input, the software scale is estimated based on the scale estimation condition, and the development man-hours are estimated. The man-hour estimation condition is input, the development man-hour is estimated based on the man-hour estimation condition, the cost estimation condition for estimating the development cost is input, and the development cost is estimated based on the cost estimation condition. Therefore, it is possible to provide work support for the entire series of estimation work such as estimation of software scale, estimation of development man-hours, and estimation of development cost. As a result, even a person who is not an advanced information engineer can proceed with a series of estimation work.

【0090】本発明の見積り作業支援方法によれば、見
積り作業を行う作業者から開発工数を見積る手法の指定
を受け付ける見積り手法受付工程を含むので、作業者は
見積り手法を指定できる。
According to the estimation work support method of the present invention, since the estimation technique receiving step of receiving the designation of the technique for estimating the development man-hours from the worker performing the estimation work is included, the worker can designate the estimation technique.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の実施の一形態を示すブロック図であ
る。
FIG. 1 is a block diagram showing an embodiment of the present invention.

【図2】 見積り処理サーバの処理の概要を示す説明図
である。
FIG. 2 is an explanatory diagram showing an outline of processing of an estimation processing server.

【図3】 FP法機能数見積り要因及び各要素重み付け
テーブルが保持するデータの例を示す説明図である。
FIG. 3 is an explanatory diagram showing an example of data held in an FP method function number estimation factor and each element weighting table.

【図4】 重み付けの区分毎にまとめられたデータの例
を示す説明図である。
FIG. 4 is an explanatory diagram showing an example of data collected for each weighting category.

【図5】 システム特性による影響度の例を示す説明図
である。
FIG. 5 is an explanatory diagram showing an example of the degree of influence due to system characteristics.

【図6】 FP数テーブルの例を示す説明図である。FIG. 6 is an explanatory diagram showing an example of an FP number table.

【図7】 業種/業務別実績規模及び工数テーブルが保
持する情報の例を示す説明図である。
FIG. 7 is an explanatory diagram showing an example of information held in a business / actual performance scale and man-hour table.

【図8】 生産性の情報の例を示す説明図である。FIG. 8 is an explanatory diagram showing an example of productivity information.

【図9】 コスト構成要素テーブルが保持する情報の例
を示す説明図である。
FIG. 9 is an explanatory diagram showing an example of information held by a cost component element table.

【図10】 見積り支援処理の処理経過の例を示す流れ
図である。
FIG. 10 is a flowchart showing an example of the processing progress of the estimation support processing.

【図11】 見積り支援処理の処理経過の例を示す流れ
図である。
FIG. 11 is a flowchart showing an example of the processing progress of the estimation support processing.

【図12】 案内画面の例を示す説明図である。FIG. 12 is an explanatory diagram showing an example of a guide screen.

【図13】 見積りの種類の指定を促す画面の例を示す
説明図である。
FIG. 13 is an explanatory diagram showing an example of a screen that prompts the user to specify the type of estimate.

【図14】 開発対象システム等に関する情報の入力を
促す画面の例を示す説明図である。
FIG. 14 is an explanatory diagram illustrating an example of a screen that prompts the user to input information about a development target system and the like.

【図15】 開発対象システム等に関する情報の入力を
促す画面の例を示す説明図である。
FIG. 15 is an explanatory diagram illustrating an example of a screen that prompts the user to input information about a development target system and the like.

【図16】 費目選択画面の例を示す説明図である。FIG. 16 is an explanatory diagram showing an example of an expense item selection screen.

【図17】 条件の変更時に提示する画面の例を示す説
明図である。
FIG. 17 is an explanatory diagram showing an example of a screen presented when a condition is changed.

【符号の説明】 1 見積り処理サーバ 2 制御部 3 記憶部 10 見積り作業支援プログラム 21 管理データベース 31 中間結果テーブル 41 クライアントコンピュータ 51 インターネット[Explanation of symbols] 1 Quotation processing server 2 control unit 3 storage 10 Estimate work support program 21 Management database 31 Intermediate result table 41 Client computer 51 Internet

Claims (17)

【特許請求の範囲】[Claims] 【請求項1】 開発対象システムの見積り作業を支援す
る見積り作業支援システムであって、 開発対象システムのソフトウェア規模を見積るための規
模見積り条件を入力し、規模見積り条件に基づいてソフ
トウェア規模を見積るソフトウェア規模見積り手段と、 開発工数を見積るための工数見積り条件を入力し、工数
見積り条件に基づいて開発工数を見積る開発工数見積り
手段と、 開発コストを見積るためのコスト見積り条件を入力し、
コスト見積り条件に基づいて開発コストを見積る開発コ
スト見積り手段と、 ソフトウェア規模の見積り結果、開発工数の見積り結
果、および開発コストの見積り結果を、見積り作業を行
う作業者に提示する見積り結果提示手段とを備えたこと
を特徴とする見積り作業支援システム。
1. Software for estimating a software scale based on the scale estimating condition for estimating the software scale of the development target system by inputting a scale estimating condition for supporting the estimation work of the development target system. Enter the scale estimation means and the man-hour estimation conditions for estimating the development man-hours, enter the development man-hour estimation means for estimating the development man-hours based on the man-hour estimation conditions, and the cost estimation condition for estimating the development cost.
A development cost estimation means for estimating the development cost based on the cost estimation conditions, and an estimation result presentation means for presenting the software scale estimation result, the development man-hour estimation result, and the development cost estimation result to the worker who performs the estimation work. A quotation work support system characterized by having.
【請求項2】 通信ネットワークを介して規模見積り条
件、工数見積り条件、およびコスト見積り条件を入力
し、 ソフトウェア規模の見積り結果、開発工数の見積り結
果、および開発コストの見積り結果を、通信ネットワー
クを介して作業者に提示する請求項1に記載の見積り作
業支援システム。
2. A scale estimation condition, man-hour estimation condition, and cost estimation condition are input via a communication network, and the software scale estimation result, development man-hour estimation result, and development cost estimation result are transmitted via the communication network. The estimate work support system according to claim 1, which is presented to a worker.
【請求項3】 作業者から開発工数を見積る手法とし
て、ファンクションポイント法、ソフトウェア規模をラ
イン数で見積りライン数から開発工数を導出する手法、
アクティビティ毎の工数から開発工数を導出する手法の
いずれかの指定を受け付ける見積り手法受付手段を備
え、 開発工数見積り手段は、作業者が指定した手法に従って
開発工数を見積る請求項1または請求項2に記載の見積
り作業支援システム。
3. A function point method as a method for estimating development man-hours from an operator, a method for estimating software scale in number of lines and deriving development man-hours from the number of lines,
Claim 1 or claim 2 is provided with estimation method receiving means for accepting designation of any one of the methods for deriving development man-hours from the man-hours for each activity, and the development man-hour estimating means estimates the development man-hours according to the method specified by the worker. Estimated work support system described.
【請求項4】 ソフトウェア規模見積り手段は、ファン
クションポイント法が指定された場合、開発対象システ
ムのソフトウェアが扱うデータの項目数と開発対象シス
テムのシステム特性の影響度とを規模見積り条件として
入力して、前記項目数および影響度からソフトウェア規
模を表すファンクションポイント数を算出し、 開発工数見積り手段は、ファンクションポイント法が指
定された場合、開発に用いるプログラム言語の情報を工
数見積り条件として入力し、ファンクションポイント数
を前記プログラム言語の生産性を示す数値で除算するこ
とによって開発工数を導出する請求項3に記載の見積り
作業支援システム。
4. The software scale estimating means, when the function point method is designated, inputs the number of items of data handled by the software of the development target system and the degree of influence of the system characteristics of the development target system as scale estimation conditions. , The number of function points representing the software scale is calculated from the number of items and the degree of influence, and the development man-hour estimation means inputs the information of the programming language used for development as the man-hour estimation condition when the function point method is specified. The estimation work support system according to claim 3, wherein the development man-hours are derived by dividing the number of points by a numerical value indicating the productivity of the programming language.
【請求項5】 見積り手法受付手段は、少なくとも開発
対象システムに関する情報を入力し、 ソフトウェア規模見積り手段は、ソフトウェア規模をラ
イン数で見積りライン数から開発工数を導出する手法が
指定された場合、開発対象システムの各サブシステムで
見込まれるソフトウェアのライン数を規模見積り条件と
して入力して、各サブシステムのライン数から開発対象
システムのソフトウェア全体のライン数を算出し、 開発工数見積り手段は、ソフトウェア規模をライン数で
見積りライン数から開発工数を導出する手法が指定され
た場合、開発に用いるプログラム言語の情報を工数見積
り条件として入力し、ソフトウェア全体のライン数を前
記プログラム言語の生産性を示す数値で除算し、見積り
手法受付手段が入力した情報に応じた係数を乗じること
によって開発工数を導出する請求項3または請求項4に
記載の見積り作業支援システム。
5. The estimating method receiving means inputs at least information about the development target system, and the software scale estimating means develops the software scale by the number of lines, and when the method of deriving the development man-hours from the number of lines is specified, the development is performed. Input the number of software lines expected in each subsystem of the target system as the scale estimation condition, calculate the total number of lines of the software of the development target system from the number of lines of each subsystem. When the method of deriving the development man-hours from the estimated number of lines is specified as the number of lines, the information of the programming language used for development is input as the man-hour estimation condition, and the number of lines of the entire software is a numerical value indicating the productivity of the programming language Divide by and calculate according to the information entered by the estimation method reception means. Estimates work support system according to claim 3 or claim 4 derives the number of development processes by multiplying.
【請求項6】 見積り手法受付手段は、少なくとも開発
対象システムに関する情報を入力し、 開発工数見積り手段は、アクティビティ毎の工数から開
発工数を導出する手法が指定された場合、各アクティビ
ティで見込まれる成果物の数量を工数見積り条件として
入力して、入力した成果物の数量と成果物一単位当たり
の標準作業工数との乗算をアクティビティ毎に行い、ア
クティビティ毎の乗算結果の合計に、見積り手法受付手
段が入力した情報に応じた係数を乗じることによって開
発工数を導出する請求項3から請求項5のうちのいずれ
か1項に記載の見積り作業支援システム。
6. The estimation method receiving means inputs at least information on the development target system, and the development man-hour estimating means, when a method for deriving the development man-hours from the man-hours for each activity is designated, the expected result of each activity. Input the quantity of the product as the man-hour estimation condition, multiply the entered quantity of the product by the standard work man-hour per product unit for each activity, and add the estimation method acceptance means to the total of the multiplication results for each activity. The estimation work support system according to any one of claims 3 to 5, wherein the development man-hours are derived by multiplying by a coefficient according to the information input by.
【請求項7】 開発コスト見積り手段は、費目毎に見込
まれる費用と開発担当者の熟練度の情報とをコスト見積
り条件として入力し、前記熟練度に応じた人件費の単価
に開発工数を乗じて人件費を算出し、前記人件費と入力
した各費用から開発コストを算出する請求項1から請求
項6のうちのいずれか1項に記載の見積り作業支援シス
テム。
7. The development cost estimation means inputs the expected cost for each expense item and information on the skill level of the person in charge of development as a cost estimation condition, and multiplies the unit cost of the personnel cost according to the skill level by the development man-hour. The estimation work support system according to any one of claims 1 to 6, wherein a personnel cost is calculated by calculating the development cost from each cost input as the personnel cost.
【請求項8】 入力した規模見積り条件、工数見積り条
件、およびコスト見積り条件を保持する見積り条件保持
手段と、 規模見積り条件、工数見積り条件、またはコスト見積り
条件に変更があるか否かを作業者に問い合わせ、変更が
ある場合に変更内容を入力する変更情報取得手段とを備
え、 見積り条件保持手段が保持する規模見積り条件、工数見
積り条件、およびコスト見積り条件と、変更情報取得手
段が入力した変更内容に基づいて、ソフトウェア規模の
見積り結果、開発工数の見積り結果、および開発コスト
の見積り結果の一部または全部を修正する請求項1から
請求項7のうちのいずれか1項に記載の見積り作業支援
システム。
8. An operator for checking whether or not the estimated condition holding means for holding the entered scale estimating condition, man-hour estimating condition and cost estimating condition and whether the scale estimating condition, man-hour estimating condition or cost estimating condition is changed. Change information acquisition means for inquiring about the changes and inputting the changes when there is a change, and the size estimation conditions, man-hour estimation conditions, and cost estimation conditions held by the estimation condition holding means, and the changes input by the change information acquisition means. The estimation work according to any one of claims 1 to 7, which corrects part or all of the estimation result of the software scale, the estimation result of the development man-hour, and the estimation result of the development cost based on the contents. Support system.
【請求項9】 開発対象システムの見積り作業を支援す
る見積り作業支援方法であって、 見積り作業を行う作業者から開発工数を見積る手法の指
定を受け付ける見積り手法受付工程と、 作業者が指定した手法で開発工数を見積るための工数見
積り条件を入力して、作業者が指定した手法に従い、工
数見積り条件を用いて開発工数を見積る開発工数見積り
工程と、 開発コストを見積るためのコスト見積り条件を入力し、
コスト見積り条件に基づいて開発コストを見積る開発コ
スト見積り工程と、 開発工数の見積り結果および開発コストの見積り結果
を、見積り作業を行う作業者に提示する見積り結果提示
工程とを含むことを特徴とする見積り作業支援方法。
9. A quotation work support method for supporting a quotation work of a development target system, which comprises a quotation technique acceptance step for accepting designation of a technique for estimating development manpower from a worker performing the quotation work, and a technique designated by the worker. Input the man-hour estimation condition for estimating the development man-hours, and enter the development man-hour estimation process for estimating the development man-hour using the man-hour estimation condition and the cost estimation condition for estimating the development cost according to the method specified by the worker. Then
It is characterized by including the development cost estimation process for estimating the development cost based on the cost estimation condition, and the estimation result presentation process for presenting the estimation result of the development man-hour and the estimation result of the development cost to the worker who performs the estimation work. Estimate work support method.
【請求項10】 見積り手法受付工程で、開発工数を見
積る手法として、ファンクションポイント法、ソフトウ
ェア規模をライン数で見積りライン数から開発工数を導
出する手法、アクティビティ毎の工数から開発工数を導
出する手法のいずれかの指定を受け付け、 ファンクションポイント法またはソフトウェア規模をラ
イン数で見積りライン数から開発工数を導出する手法が
指定された場合には、開発対象システムのソフトウェア
規模を見積るための規模見積り条件を入力し、規模見積
り条件に基づいてソフトウェア規模を見積るソフトウェ
ア規模見積り工程を含む請求項9に記載の見積り作業支
援方法。
10. The method for estimating the development man-hours in the estimation method receiving step, the function point method, the method for estimating the software scale by the number of lines and the method for deriving the development man-hours from the number of lines, and the method for deriving the development man-hours from the man-hours for each activity. If either the function point method or the method of estimating the software scale by the number of lines and deriving the development man-hour from the number of lines is specified, the scale estimation conditions for estimating the software scale of the development target system are specified. The estimation work support method according to claim 9, further comprising a software scale estimation step of inputting and estimating the software scale based on the scale estimation condition.
【請求項11】 ファンクションポイント法が指定され
た場合、ソフトウェア規模見積り工程で、開発対象シス
テムのソフトウェアが扱うデータの項目数と開発対象シ
ステムのシステム特性の影響度とを規模見積り条件とし
て入力して、前記項目数および影響度からソフトウェア
規模を表すファンクションポイント数を算出し、 開発工数見積り工程で、開発に用いるプログラム言語の
情報を工数見積り条件として入力し、ファンクションポ
イント数を前記プログラム言語の生産性を示す数値で除
算することによって開発工数を導出する請求項10に記
載の見積り作業支援方法。
11. When the function point method is specified, the number of items of data handled by the software of the development target system and the degree of influence of the system characteristics of the development target system are input as the scale estimation conditions in the software scale estimation process. Calculate the number of function points, which represents the software scale, from the number of items and the degree of influence, and enter the information of the programming language used for development as the man-hour estimation condition in the development man-hour estimation process, and the number of function points is the productivity of the programming language. The estimation work support method according to claim 10, wherein the development man-hours are derived by dividing by a numerical value indicating.
【請求項12】 見積り手法受付工程で、少なくとも開
発対象システムに関する情報を入力し、 ソフトウェア規模をライン数で見積りライン数から開発
工数を導出する手法が指定された場合、ソフトウェア規
模見積り工程で、開発対象システムの各サブシステムで
見込まれるソフトウェアのライン数を規模見積り条件と
して入力して、各サブシステムのライン数から開発対象
システムのソフトウェア全体のライン数を算出し、 開発工数見積り工程で、開発に用いるプログラム言語の
情報を工数見積り条件として入力し、ソフトウェア全体
のライン数を前記プログラム言語の生産性を示す数値で
除算し、見積り手法受付工程で入力した情報に応じた係
数を乗じることによって開発工数を導出する請求項10
または請求項11に記載の見積り作業支援方法。
12. When a method of inputting at least information about a development target system and estimating a software scale by the number of lines and deriving development man-hours from the number of lines is specified in the estimation method acceptance step, development is performed in the software size estimation step. Enter the number of software lines expected in each subsystem of the target system as a scale estimation condition, calculate the total number of software lines of the development target system from the number of lines of each subsystem, and use the development man-hour estimation process for development. Information on the programming language to be used is input as the man-hour estimation condition, the number of lines of the entire software is divided by a numerical value indicating the productivity of the programming language, and the man-hours for development are multiplied by a coefficient according to the information input in the estimation method receiving step. 10. Derivation of
Alternatively, the estimation work support method according to claim 11.
【請求項13】 見積り手法受付工程で、少なくとも開
発対象システムに関する情報を入力し、 アクティビティ毎の工数から開発工数を導出する手法が
指定された場合、開発工数見積り工程で、各アクティビ
ティで見込まれる成果物の数量を工数見積り条件として
入力して、入力した成果物の数量と成果物一単位当たり
の標準作業工数との乗算をアクティビティ毎に行い、ア
クティビティ毎の乗算結果の合計に、見積り手法受付工
程で入力した情報に応じた係数を乗じることによって開
発工数を導出する請求項10から請求項12のうちのい
ずれか1項に記載の見積り作業支援方法。
13. When the method for deriving the development man-hours from the man-hours for each activity is specified in the estimation method receiving step and at least the information about the development target system is specified, the expected result of each activity in the development man-hour estimating step. Enter the quantity of the product as the man-hour estimation condition, multiply the entered quantity of the product by the standard work man-hour per unit of the product for each activity, and enter the estimation method acceptance process in the total of the multiplication results for each activity. The estimation work support method according to any one of claims 10 to 12, wherein the development man-hours are derived by multiplying by a coefficient according to the information input in.
【請求項14】 開発コスト見積り工程で、費目毎に見
込まれる費用と開発担当者の熟練度の情報をコスト見積
り条件として入力し、前記熟練度に応じた人件費の単価
に開発工数を乗じて人件費を算出し、前記人件費と入力
した各費用から開発コストを算出する請求項9から請求
項13のうちのいずれか1項に記載の見積り作業支援方
法。
14. In the development cost estimation process, information on expected cost for each cost item and skill level of the person in charge of development is input as a cost cost condition, and the unit cost of the personnel cost corresponding to the skill level is multiplied by the development man-hours. The estimation work support method according to any one of claims 9 to 13, wherein a labor cost is calculated, and a development cost is calculated from each cost input as the labor cost.
【請求項15】 通信ネットワークを介して情報を入力
し、 通信ネットワークを介して各見積り結果を作業者に提示
する請求項9から請求項14のうちのいずれか1項に記
載の見積り作業支援方法。
15. The estimation work support method according to claim 9, wherein information is input via a communication network, and each estimation result is presented to a worker via the communication network. .
【請求項16】 見積り結果提示工程の前に、開発コス
ト見積り工程までに入力した情報に変更があるか否かを
作業者に問い合わせ、変更がある場合には変更内容を入
力し、入力した変更内容に基づいて少なくとも開発工数
の見積り結果および開発コストの見積り結果の一方また
は双方を修正する請求項9から請求項15のうちのいず
れか1項に記載の見積り作業支援方法。
16. Before the estimation result presentation step, the operator is inquired whether or not the information input up to the development cost estimation step is changed, and if there is a change, the change content is input and the input change is made. The estimation work support method according to any one of claims 9 to 15, wherein at least one or both of the estimation result of the development man-hour and the estimation result of the development cost are corrected based on the content.
【請求項17】 コンピュータに、 開発対象システムのソフトウェア規模を見積るための規
模見積り条件を入力し、規模見積り条件に基づいてソフ
トウェア規模を見積る機能、 開発工数を見積るための工数見積り条件を入力し、工数
見積り条件に基づいて開発工数を見積る機能、 開発コストを見積るためのコスト見積り条件を入力し、
コスト見積り条件に基づいて開発コストを見積る機能、
およびソフトウェア規模の見積り結果、開発工数の見積
り結果、および開発コストの見積り結果を出力する機
能、 を実現させるための見積り作業支援プログラム。
17. A computer is provided with a scale estimation condition for estimating a software scale of a development target system, a function for estimating a software scale based on the scale estimation condition, and a man-hour estimation condition for estimating development man-hours, Input the function to estimate the development man-hour based on the man-hour estimation condition and the cost estimation condition to estimate the development cost,
A function to estimate the development cost based on the cost estimation conditions,
And a function to output the estimation result of the software scale, the estimation result of the development man-hour, and the estimation result of the development cost, and the estimation work support program.
JP2002066771A 2002-03-12 2002-03-12 Estimating operation support system, method and program Pending JP2003263320A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002066771A JP2003263320A (en) 2002-03-12 2002-03-12 Estimating operation support system, method and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002066771A JP2003263320A (en) 2002-03-12 2002-03-12 Estimating operation support system, method and program

Publications (1)

Publication Number Publication Date
JP2003263320A true JP2003263320A (en) 2003-09-19

Family

ID=29198407

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002066771A Pending JP2003263320A (en) 2002-03-12 2002-03-12 Estimating operation support system, method and program

Country Status (1)

Country Link
JP (1) JP2003263320A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007026435A1 (en) * 2005-08-31 2007-03-08 Jastec Co., Ltd. Software development production management system, computer program, and recording medium
JP2010231746A (en) * 2009-03-30 2010-10-14 Jr East Japan Information Systems Co Device and program for supporting function point calculation
JP2013190972A (en) * 2012-03-13 2013-09-26 Nomura Research Institute Ltd Project management support system and project management support program
US8799056B2 (en) 2008-04-28 2014-08-05 Infosys Limited Method and system for pricing software service requests
JP2018060477A (en) * 2016-10-07 2018-04-12 富士通エフ・アイ・ピー株式会社 Estimation device and program
JP2020061107A (en) * 2018-10-14 2020-04-16 株式会社スタビロ Approximate specification data creation program for rolling reducing water tank device of ship
JP2021117775A (en) * 2020-01-27 2021-08-10 Tis株式会社 Server device, program, and information processing method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007026435A1 (en) * 2005-08-31 2007-03-08 Jastec Co., Ltd. Software development production management system, computer program, and recording medium
US8418123B2 (en) 2005-08-31 2013-04-09 Jastec Co., Ltd. Software development production management system, computer program, and recording medium
US8799056B2 (en) 2008-04-28 2014-08-05 Infosys Limited Method and system for pricing software service requests
JP2010231746A (en) * 2009-03-30 2010-10-14 Jr East Japan Information Systems Co Device and program for supporting function point calculation
JP2013190972A (en) * 2012-03-13 2013-09-26 Nomura Research Institute Ltd Project management support system and project management support program
JP2018060477A (en) * 2016-10-07 2018-04-12 富士通エフ・アイ・ピー株式会社 Estimation device and program
JP2020061107A (en) * 2018-10-14 2020-04-16 株式会社スタビロ Approximate specification data creation program for rolling reducing water tank device of ship
JP2021117775A (en) * 2020-01-27 2021-08-10 Tis株式会社 Server device, program, and information processing method
JP7257979B2 (en) 2020-01-27 2023-04-14 Tis株式会社 Server device, program, and information processing method

Similar Documents

Publication Publication Date Title
US6324508B1 (en) Automated method for a takeoff estimate of construction drawings
JP3204063B2 (en) Schedule management system
US6347303B2 (en) System configuration proposal method and tool therefor
US20180181882A1 (en) Compensation data prediction
US5918219A (en) System and method for estimating construction project costs and schedules based on historical data
US20030070157A1 (en) Method and system for estimating software maintenance
US20150242914A1 (en) Method and system for managing sourcing program requests
US20090055142A1 (en) Method and apparatus for estimating man-hours
US20090024954A1 (en) Image providing apparatus
JP2003263320A (en) Estimating operation support system, method and program
US20030004768A1 (en) Online method and system for estimating the manufacturing cost of components
US8407430B2 (en) Analysis technique of computer system
JP2001312400A (en) Automatic customized program generation service method
JP5160773B2 (en) Information processing apparatus and method
JPH09101947A (en) Time series forcasting method
EP1376428A1 (en) Product sales support method and product sales support apparatus
JP2000268084A (en) Integral job package software introduction planning support system
US20040133822A1 (en) Program development support method
WO2020085374A1 (en) Skill index provision device, skill index provision method, and program
JPH07160762A (en) Estimation support device
JP4599010B2 (en) How to provide maintenance work estimates
KR20230056318A (en) System and method for providing average salary information of each company using public data
JP2001109622A (en) Device and method for supporting estimation of workload and storage medium storing program
JP2013210842A (en) Estimation creation method and system for software product, and program
JP2009070283A (en) Date specification method, date specification program and commodity order information processor

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20050830

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20051116

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20051116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060323

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060411

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060801