JP2003247315A - Fixture for guard fence for concrete building - Google Patents

Fixture for guard fence for concrete building

Info

Publication number
JP2003247315A
JP2003247315A JP2002050063A JP2002050063A JP2003247315A JP 2003247315 A JP2003247315 A JP 2003247315A JP 2002050063 A JP2002050063 A JP 2002050063A JP 2002050063 A JP2002050063 A JP 2002050063A JP 2003247315 A JP2003247315 A JP 2003247315A
Authority
JP
Japan
Prior art keywords
fence
shape
filling
support
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002050063A
Other languages
Japanese (ja)
Inventor
Koichi Nishiyama
幸一 西山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOA SHOJI KK
Original Assignee
TOA SHOJI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOA SHOJI KK filed Critical TOA SHOJI KK
Priority to JP2002050063A priority Critical patent/JP2003247315A/en
Publication of JP2003247315A publication Critical patent/JP2003247315A/en
Pending legal-status Critical Current

Links

Landscapes

  • Fencing (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a fixture for a guard fence, by which a structure is simplified and the term of works is shortened and a low cost is realized and each fence support can be levelled regardless of the finished state of the levelness or the like of a fence mounting section. <P>SOLUTION: The fixture for the guard fence for a concrete building has a supporting member 2 formed in an approximately T shape or an approximately Y shape of a combining head section 2-1 and a fixed leg section 2-2 projected towards a lower section from a center at the lower end of the combining head section 2-1 and a form block 3, on which the fence support 1 is erected on a fence mounting section B and which is set detachably to an outer periphery at the lower end of the fence support 1 and the fence mounting section B so as to close an opening P formed between the lower-end opening section of the fence support 1 and the fence mounting section B and is removed after the curing of filling curing material 6. The guard fence A can be installed to the fence mounting section B by injecting and filling adhesive fillers 6 into the fence support 1 and into a fixing hole 4 up to a filling level reaching a filler port 5 from the filler port 5 formed at a place in a proper height on the lower- end side of the fence support 1, from which the fixed leg section 2-2 of the supporting member 2 is projected, while removing the form block 3 after the curing of the fillers. <P>COPYRIGHT: (C)2003,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、コンクリート建築
物(躯体)やコンクリート擁壁等のコンクリート建造物
用防護柵の取付け方法及びその取付装置に係り、特にコ
ンクリート建造物のバルコニー、ベランダ、廊下等その
他安全対策上において必要とする場所に設置する手摺や
フェンス等の防護柵の取付装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for attaching a protective fence for concrete structures such as concrete buildings (frames) and concrete retaining walls, and an attachment device therefor, and more particularly to balconies, balconies, corridors of concrete structures, etc. The present invention also relates to a device for attaching a guard fence such as a handrail or a fence that is installed in a place necessary for safety measures.

【0002】[0002]

【従来の技術】従来から、この種の防護柵の取り付けに
は種々の施工例が提案されている。例えば、特開平3−
553449号公報等において公表されている取り付け
は、バルコニー等の柵設置部(パラペット)にドリル加
工等により穿孔した固定穴にアンカーナットを挿入し、
エボキシ樹脂等の接着充填剤を注入せしめて固定する一
方で、該アンカーナットにボルト、ナットを介して締結
する柵支持部材を柵支柱の下端内部に、ネジ止めや嵌着
により取り付け、該柵支持部材が埋設するまで柵支柱の
下端部側に設けた注入孔から同柵支柱内に前記接着充填
剤を注入せしめることで、柵支柱の下端を柵設置部に固
定するようにしていた。
2. Description of the Related Art Conventionally, various construction examples have been proposed for mounting a protective fence of this type. For example, JP-A-3-
For the mounting disclosed in Japanese Patent No. 5534449, an anchor nut is inserted into a fixing hole drilled by a drilling process in a fence installation portion (parapet) such as a balcony,
While fixing by injecting an adhesive filler such as epoxy resin, a fence support member that is fastened to the anchor nut with bolts and nuts is attached inside the lower end of the fence post by screwing or fitting to fix the fence support. The lower end of the fence pillar is fixed to the fence installation portion by injecting the adhesive filler into the fence pillar through an injection hole provided on the lower end side of the fence pillar until the member is buried.

【0003】[0003]

【発明が解決しようとする課題】しかし乍ら、前述の取
り付けは柵設置部の固定穴にアンカーナットをエポキシ
樹脂からなる接着充填剤により固定した後、ボルト、ナ
ットを用いて柵支持部材をアンカーナットに締結セット
せしめ、その後、該柵支持部材を柵支柱の下端内部に装
入内在させ尚且つネジ止めにより柵支柱を柵支持部材に
取り付け、最後に柵支柱の注入孔から該支柱内に接着充
填剤を注入する施工手順が必要となる。即ち、従来では
アンカーナットを柵設置部の固定穴に固着する接着充填
剤が硬化しないと、該アンカーナットへ柵支持部材をセ
ットすると共に柵支柱を直立させる等の次の作業を行う
ことができない。又、柵支持部材をボルト、ナットを用
いてアンカーナットにセットする面倒な作業に手間が掛
かり、施工性が悪く工期の遅れを来たす要因になってい
た。
However, in the above-mentioned mounting, the anchor nut is fixed to the fixing hole of the fence installation portion by the adhesive filler made of epoxy resin, and then the fence supporting member is anchored using the bolt and the nut. After tightening the nut, set the fence support member inside the lower end of the fence post, and attach the fence post to the fence support member by screwing, and finally bond it from the injection hole of the fence post into the post. A construction procedure for injecting the filler is required. That is, conventionally, unless the adhesive filler that fixes the anchor nut to the fixing hole of the fence installation portion is cured, the next work such as setting the fence support member to the anchor nut and erecting the fence support cannot be performed. . In addition, the troublesome work of setting the fence support member to the anchor nut using bolts and nuts is troublesome, which causes poor workability and delays the construction period.

【0004】又、従来では柵設置部の固定穴に打設する
アンカーナット、柵支柱の下端内部に内在させてビス止
めにより該柵支柱を連結支持させる柵支持部材、この柵
支持部材をアンカーナットに組込み連結するボルトやナ
ット、そして接着剤の漏れを防ぐチューブ、更には柵支
柱の根元を隠す足元カバーを必要とすることから、前述
のように取り付けに手間が掛かる等の施工性が悪く、し
かも全体的にコスト高になる問題がある。
Further, conventionally, an anchor nut placed in a fixing hole of a fence installation portion, a fence support member which is internally provided inside a lower end of the fence post and supports the fence post by screwing, and the fence support member is an anchor nut. Since it requires bolts and nuts to be built in and connected to, and a tube that prevents leakage of adhesive, and a foot cover that hides the base of the fence post, it is difficult to install as mentioned above, so workability is poor, Moreover, there is a problem that the cost becomes high as a whole.

【0005】本発明はこの様な従来事情に鑑みてなされ
たものであり、その目的とする処は、構造の簡素化と工
期の短縮化、そして低コストを実現し、更には柵設置部
の水平度等の仕上がり状態を問わず各柵支柱のレベル調
節を可能にしたコンクリート建造物用防護柵の取付装置
を提供することにある。
The present invention has been made in view of such conventional circumstances, and an object of the present invention is to realize a simplified structure, a shortened construction period, and a low cost. An object of the present invention is to provide a device for mounting a protective fence for a concrete structure, which makes it possible to adjust the level of each fence pillar regardless of the finished state such as the levelness.

【0006】[0006]

【課題を達成するための手段】課題を達成するために本
発明は、柵支柱の下端内部に固定的に挿入内在させる結
合頭部と、この結合頭部の下端中央より下方に向けて突
出させて柵設置部の固定穴に遊嵌状に挿入させる固定脚
部とからなる支持部材と、この支持部材を介して前記柵
支柱を柵設置部に直立させた状態で、該柵支柱の下端開
口部と柵設置部との間に生じる隙間を塞ぐように同柵支
柱の下端外周と柵設置部とに亘り着脱可能にセットする
型枠ブロックとを備え、前記結合頭部を柵支柱の下端内
部に固定的に挿入内在させると共に固定脚部が突出する
前記柵支柱の下端側適宜の高さ位置に設けた注入口から
該注入口に達する充填レベルまで柵支柱内、固定穴内へ
と少なくとも適宜の流動性を有する接着充填剤を注入充
填すると共に、該充填材が硬化した後に前記型枠ブロッ
クを撤去することにより、前記柵設置部に柵支柱を固着
立設するようにしたことである。ここで、上記柵支柱内
に支持部材の結合頭部を固定的に挿入内在させる方法と
しては特に限定されるものではない。例えば、結合頭部
の幅を柵支柱の両側壁間の内寸法によも僅かに大きめの
寸法に形成して、圧入方式により固定する。或いは前記
内寸法と同じか僅かに小さく結合頭部の幅を形成して、
柵支柱の下端内部に挿入内在させた後に、小ネジ等の固
定手段を用いたネジ止め方式により柵支柱に固定する
等、任意である。
SUMMARY OF THE INVENTION In order to achieve the object, the present invention relates to a coupling head fixedly inserted in the lower end of a fence post, and a projection downward from the center of the lower end of the coupling head. Support member consisting of a fixed leg portion that is inserted into a fixing hole of the fence installation portion in a loose fit manner, and a lower end opening of the fence support pillar in a state where the fence support pillar is upright to the fence installation portion through the support member. And a fence block for detachably setting the outer circumference of the fence post and the fence installation part so as to close a gap generated between the fence installation part and the fence installation part, and the coupling head is inside the lower end of the fence support. At the lower end side of the fence post, which is fixedly inserted into the fence post and at which the fixed leg portion projects, from the injection port provided at an appropriate height position to the filling level reaching the injection port, at least into the fence post and the fixing hole. Injecting and filling a flowable adhesive filler, By Hama material is removed the formwork block after curing, is that which is adapted to secure erected a fence post in the fence installation part. Here, there is no particular limitation on the method of fixedly inserting the coupling head portion of the support member into the fence post. For example, the width of the joint head is formed to be slightly larger than the inner dimension between the both side walls of the fence post, and is fixed by the press-fitting method. Or by forming the width of the coupling head that is the same as or slightly smaller than the inner dimension,
It is optional to insert the wire into the lower end of the fence post and fix it to the fence post by a screwing method using a fixing means such as a small screw.

【0007】又、上記支持部材の材質は特に限定される
ものではないが、例えばアルミ引抜き又は押出し成形型
材を用いて結合頭部と固定脚部とを一体に連設させた略
T字形や略Y字形に形成する。或いはアルミ材に比べて
値段が安い所定の厚さを有する金属製板材を用いた打ち
抜き加工(プレス加工)により結合頭部と固定脚部とを
一体に連設させた略T字形や略Y字形に形成する等に任
意である。又、この支持部材の表面全体、或いは少なく
とも固定脚部の根元部分を含む結合頭部の表面に防錆被
膜を施して、雨水等の浸入により錆びないようにするこ
とが好ましい。防錆被膜としてはエポキシ樹脂や溶融亜
鉛メッキ、更には無公害の無機系耐熱・防水・防触・結
露防止塗料(商標名:アプコン)等を用いて施すことが
好ましい。
The material of the supporting member is not particularly limited. For example, an aluminum drawing or extrusion molding material is used to form a substantially T-shape or a substantially T-shape in which the coupling head and the fixed leg are integrally connected. Form in a Y shape. Alternatively, a substantially T-shape or a substantially Y-shape in which the coupling head and the fixed leg are integrally connected by punching (pressing) using a metal plate material having a predetermined thickness that is cheaper than aluminum material It is optional to be formed into Further, it is preferable that a rust preventive coating is applied to the entire surface of the support member, or the surface of the joint head including at least the root portion of the fixed leg portion so as to prevent rust due to infiltration of rainwater or the like. The rust preventive coating is preferably applied using an epoxy resin, hot dip galvanizing, or a non-polluting inorganic heat-resistant, waterproof, touch-proof, anti-condensation paint (trade name: Upcon).

【0008】又、上記型枠ブロックを、シリコン又は発
泡ウレタンを用いて柵支柱の横断外面形状に略適合する
内面形状で適宜の高さと厚さを有する又はシリコン製内
枠と発泡ウレタン製外枠との双方から少なくとも柵支柱
の横断外面形状に略適合する内面形状で少なくとも適宜
の高さと厚さを有する例えば角形リング状に形成するこ
とが好ましい。又、この枠材ブロックの四辺の内、一辺
に輪切り目を入れておいて、この切れ目から枠材ブロッ
クを開き、この状態で柵支柱の下端外周と柵設置部に亘
りセット、そして接着充填材が硬化した後には撤去し得
るようにすることが好ましい。
Further, the above mold block is made of silicon or urethane foam and has an inner surface shape substantially conforming to the transverse outer surface shape of the fence post, and has an appropriate height and thickness, or a silicon inner frame and urethane foam outer frame. From both of the above, it is preferable to form, for example, a rectangular ring shape having at least an appropriate height and thickness with an inner surface shape that substantially matches the outer shape of the cross section of the fence column. In addition, one of the four sides of this frame material block has a circular cut, open the frame material block from this cut, and in this state, set it over the outer circumference of the lower end of the fence post and the fence installation part, and adhesive filling material It is preferable to be able to remove it after it has hardened.

【0009】又、本発明で使用する上記接着充填剤とし
ては特に限定されるものではないが、僅かな間隙にも充
填することができる優れた流動性を有し、しかも柵設置
部の固定穴に充填された時に、該固定穴に馴染む。つま
り、固定穴内周のコンクリートに一部が浸入せしめて該
コンクリートとの一体化が図られるように馴染むような
ミルクセメントが好ましく、特に無収縮モルタルが好ま
しい。又、この無収縮モルタルの望ましいコンシステン
シ−の範囲は7〜13(J14ロート・秒)である。
The adhesive filler used in the present invention is not particularly limited, but it has excellent fluidity so that it can fill even a small gap, and the fixing hole of the fence installation portion is When it is filled in, it fits into the fixing hole. That is, milk cement is preferable, which partly penetrates into the concrete in the inner periphery of the fixing hole and is adapted to be integrated with the concrete, and non-shrink mortar is particularly preferable. The desirable consistency range of this non-shrink mortar is 7 to 13 (J 14 funnel · second).

【0010】[0010]

【発明の実施の形態】本発明の実施の具体例を図面に基
づいて説明する。図1は、本発明の取付装置によりコン
クリート建築物のベランダ等の柵設置部B(パラペッ
ト)に防護柵A、所謂手摺を取り付け設置した実施形態
の一例を示す。図において、1は柵支柱、2は支持部
材、3は型枠ブロック、4は柵設置部Bに柵支柱1の立
設間隔をおいてドリル加工等により穿設した固定穴(ド
リル穴)を示し、前記柵支柱1の下端内部に支持部材2
の結合頭部2-1を固定的に挿入内在させて柵支柱1の下
端開口部から略同軸線上に突出させた支持部材2の固定
脚部2-2を、前記固定孔4に遊嵌状に挿入させて柵支柱
1を柵設置部Bに直立させる。そして、柵支柱1の下端
開口部と水切り勾配を有する柵設置部Bとの間に生じる
隙間Pを塞ぐように型枠ブロック3を柵支柱1の下端外
周から柵設置部Bに亘りセットする。次に、柵支柱1の
側壁に開口した注入口5から該注入口5の開口高さL1に
達する充填レベルまで柵支柱1内から固定穴4に少なく
とも適宜の流動性を有する接着充填剤6を注入充填する
ことにより、前記柵支柱1を柵設置部Bに直立固定し、
該柵設置部Bに防護柵Aを取り付け設置するようにして
ある。そして、接着充填材6が硬化した後において型枠
ブロック3は撤去する。又、図において、7は笠木、8
は下桟、9はこの笠木7と下桟8との間の格子を示す。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A specific example of the embodiment of the present invention will be described with reference to the drawings. FIG. 1 shows an example of an embodiment in which a protective fence A, so-called handrail, is attached and installed to a fence installation portion B (parapet) of a veranda or the like of a concrete building by the installation device of the present invention. In the figure, 1 is a fence post, 2 is a support member, 3 is a form block, and 4 is a fixing hole (drill hole) drilled in the fence installation section B at a standing interval of the fence post 1 by a drilling process or the like. The support member 2 is shown inside the lower end of the fence post 1.
The fixed leg portion 2-2 of the support member 2 having the coupling head 2-1 fixedly inserted therein and protruding from the lower end opening of the fence post 1 on the substantially coaxial line is loosely fitted into the fixing hole 4. And install the fence support 1 upright on the fence installation section B. Then, the formwork block 3 is set from the outer periphery of the lower end of the fence column 1 to the fence installation section B so as to close the gap P formed between the lower end opening of the fence column 1 and the fence installation section B having a draining slope. Next, an adhesive filler 6 having at least appropriate fluidity from the inside of the fence column 1 to the fixing hole 4 from the filling port 5 opened on the side wall of the fence column 1 to a filling level reaching the opening height L1 of the filling port 5. By injecting and filling, the fence support 1 is fixed upright on the fence installation section B,
The protective fence A is attached to and installed on the fence installation section B. Then, the mold block 3 is removed after the adhesive filler 6 is cured. Also, in the figure, 7 is Kasaki, 8
Is a lower rail, and 9 is a grid between the headboard 7 and the lower rail 8.

【0011】柵支柱1は、アルミ引抜き又は押出し成形
型材からなる適宜太さの角形で中空筒状を呈する周知の
構造を成し、その下端開口部から支持部材2の固定脚部
2-2を略同軸線上に突出させた状態で支持部材2を取り
付け具備し得るようにしてある。又、柵支柱1の下端
側、特に内在する支持部材2の結合頭部2-1の高さ方向
中途部位や図示したように結合頭部2-1が接着充填材6
内に完全に埋没される結合頭部2-1の上端より上方部位
等の所定の高さ位置に注入口5を開口し、この注入口5
の開口高さL1に達する充填レベルにて該注入口5から柵
支柱1内及び固定穴2へと亘り接着充填剤6を注入充填
し得るようにしてある。
The fence post 1 has a well-known structure which is made of aluminum drawn or extruded molding and has a square shape with an appropriate thickness and a hollow cylindrical shape, and a fixed leg portion of the supporting member 2 is provided from an opening at a lower end thereof.
The supporting member 2 can be attached and equipped in a state in which 2-2 is projected on a substantially coaxial line. In addition, the lower end side of the fence post 1, especially the middle portion in the height direction of the joint head 2-1 of the existing support member 2 or the joint head 2-1 as shown in the figure, is the adhesive filler 6.
The injection port 5 is opened at a predetermined height position such as a portion above the upper end of the coupling head 2-1 which is completely buried in the injection port 5.
The adhesive filler 6 can be injected and filled from the injection port 5 into the rail support 1 and the fixing hole 2 at a filling level reaching the opening height L1 of the above.

【0012】尚、図示を省略しているが、柵支柱1の内
部略全長に亘り柵支柱1自体を補強するためにアルミ引
抜き又は押出し成形型材、或いはその他の成形型材から
なる角型や丸型中空状の補強材が固定的に挿入内在され
ている。
Although not shown in the drawings, in order to reinforce the fence pillar 1 itself over substantially the entire length of the inside of the fence pillar 1, an aluminum drawing or extrusion molding material, or a square or round shape made of other molding material. A hollow reinforcing material is fixedly inserted in the housing.

【0013】支持部材2は、アルミ引抜き又は押出し成
形型材を用いて一体に形成するも良いが、アルミ材より
も安価で適宜の厚さを有するスチールやその他の金属製
板材を用いた打ち抜き加工(プレス加工)により結合頭
部2-1と固定脚部2-2とを一体に連設させた略Y字形又は
略T字形に形成する。又、この場合、結合頭部2-1の上
端から固定脚部2-2の下端部に至る幅を有する帯状板材
を用いて打ち抜き向きを交互に変えて打ち抜き加工する
ことが、材料の無駄をなくし、更に安く製作することが
できるものである。
The supporting member 2 may be integrally formed by using an aluminum drawing or extrusion molding die material, but it is cheaper than the aluminum material and punched using a steel or other metal plate material having an appropriate thickness ( By press working), the coupling head 2-1 and the fixed leg portion 2-2 are integrally formed to have a substantially Y shape or a substantially T shape. Further, in this case, it is wasteful to perform punching by alternately changing the punching direction using a strip-shaped plate material having a width from the upper end of the coupling head 2-1 to the lower end of the fixed leg 2-2. It can be made cheaper and cheaper.

【0014】結合頭部2-1は、柵支柱1との結合を図
り、該柵支柱1を支持する役目を成すもので、その幅は
柵支柱1の下端内部に圧入により固定的に内在し得るよ
うに柵支柱1の両側壁1-1間の内寸法よりも僅かに大き
めの寸法に打ち抜き形成する。
The joint head 2-1 serves to support the fence strut 1 by connecting with the fence strut 1, and the width thereof is fixed inside the lower end of the fence strut 1 by press fitting. In order to obtain it, it is punched and formed to have a size slightly larger than the inner size between both side walls 1-1 of the fence post 1.

【0015】固定脚部2-2は、結合頭部2-1と協同して柵
支柱を、所定の開口と深さにて柵設置部Bに穿設される
固定孔4に連結支持する役目を成すもので、その幅は固
定穴4に遊嵌状に挿入し得るように形成する。又、この
固定脚部2-2の結合頭部2-1の下端からの突出長さは、固
定穴2への挿入範囲、つまり固定孔4の深さ範囲L2に
合わせた適宜の長さにて打ち抜き形成すると共に、その
下端部に抜止部2-20を形成する。
The fixed leg 2-2 cooperates with the coupling head 2-1 to connect and support the fence post to the fixed hole 4 formed in the fence installation portion B at a predetermined opening and depth. The width is formed so that it can be loosely fitted into the fixing hole 4. The length of protrusion of the fixed leg portion 2-2 from the lower end of the coupling head 2-1 is set to an appropriate length in accordance with the insertion range into the fixing hole 2, that is, the depth range L2 of the fixing hole 4. It is formed by punching, and a retaining portion 2-20 is formed at the lower end thereof.

【0016】そして、以上の如き形状と寸法に打ち抜き
形成した支持部材2に、エポキシ樹脂液を塗布又は当該
液中に漬ける等の適宜の方法により表面全体又は抜止部
2-20を有する固定脚部2-2の下端側を除く当該脚部2-2と
結合頭部2-1の表面に防錆被膜10を形成することによ
り、雨水等の浸入による錆を防ぎ、錆による劣化防止を
図る(図2参照)。
The supporting member 2 punched and formed in the above-described shape and size is coated with an epoxy resin solution or dipped in the solution, or the like, and the whole surface or the retaining portion is removed.
By forming a rust-proof coating 10 on the surface of the leg 2-2 and the coupling head 2-1 except the lower end side of the fixed leg 2-2 having 2-20, rust due to infiltration of rainwater etc. is prevented. , To prevent deterioration due to rust (see Fig. 2).

【0017】尚、防錆被膜10を溶融亜鉛メッキにより施
すも、更には無公害の無機系耐熱・防水・防触・結露防
止塗料(商標名:アプコン)等の他の材料を用いて施す
も自由である。要するに、浸入する雨水等から支持部材
2を保護し得、しかも手軽に且つ低コストにより防錆被
膜10を支持部材2の表面に形成することができるもので
あれば良い。
The anticorrosive coating 10 may be applied by hot dip galvanizing, or may be applied by using other materials such as non-polluting inorganic heat-resistant, waterproof, touch-proof, anti-condensation paint (trade name: Upcon). Be free. In short, it is only necessary that the support member 2 can be protected from invading rainwater and the like, and the rust preventive coating 10 can be formed on the surface of the support member 2 easily and at low cost.

【0018】尚、支持部材2は製作工場において柵支柱
1に前述した圧入方式により具備されて施工現場へ搬入
されるものである。又、図示を要略しているが、柵支柱
1の下端内部に挿入内在される支持部材2の結合頭部2-
2の幅を前記内寸法より僅かに小さく形成して、柵支柱
1の下端内部に挿入内在させた後に柵支柱1の両側壁に
設けた止め孔から小ネジ等を固定手段を用いたネジ止め
方式により柵支柱1に固定する等、任意である。そし
て、この固定手段は柵支柱1を柵設置部Bに接着充填材
6により直立固定せしめた後に取り外すも勿論自由であ
る。
The supporting member 2 is mounted on the fence support 1 by the above-described press-fitting method at the manufacturing factory and is carried to the construction site. Although not shown in the figure, the coupling head 2 of the supporting member 2 inserted and incorporated in the lower end of the fence 1 is shown.
The width of 2 is formed to be slightly smaller than the above-mentioned inner size, and after being inserted and incorporated inside the lower end of the fence post 1, a small screw or the like is screwed from the fastening holes provided on both side walls of the fence post 1 using a fixing means. It is optional, such as fixing to the fence post 1 by a method. Of course, this fixing means can be freely removed after the fence support 1 is vertically fixed to the fence installation portion B with the adhesive filling material 6.

【0019】又、支持部材2の結合頭部2-1には接着充
填材6による繋ぎ窓11が開口されており、この繋ぎ窓11
により支持部材2と接着充填材6、つまり充填硬化材12
との一体化が図られる。換言すれば、柵支柱1に対する
支持部材2の結合強度が効果的に増強されるようにして
ある(図1(b)参照)。
Further, a connecting window 11 made of the adhesive filling material 6 is opened in the connecting head 2-1 of the supporting member 2, and the connecting window 11 is formed.
The supporting member 2 and the adhesive filling material 6, that is, the filling hardening material 12
Is integrated with. In other words, the coupling strength of the support member 2 to the fence support 1 is effectively increased (see FIG. 1 (b)).

【0020】型枠ブロック3は、柵支柱1の下端開口部
と柵設置部B面との間に生じる隙間Pを塞いで、該隙間
Pからの接着充填剤6の流出を防ぐと共に、該隙間Pを塞
いだ状態で各柵支柱1のレベル調節を可能にするもので
ある。即ち、柵設置部Bの水平度等の仕上がり状態を問
わず各柵支柱1のレベル調節を可能にする。この型枠ブ
ロック3は、適度の弾性を備え且つ接着充填材6が付着
し難い濡れ性を有する材質、例えばシリコンを用いて柵
支柱1の横断外周形状に略適合する内面形状で適宜の厚
さと高さを有する形成した内枠3-1と、この内枠3-1を包
囲するように適度の弾性を有する発泡ウレタン等を用い
て同じく適宜の厚さと高さに形成した外枠3-2とで角形
リング状に構成して(図3参照)、柵支柱1の下端開口
部から突出する支持部材2の固定脚部2-2を固定穴4に
挿し込んで柵支柱1を柵設置部Bに直立せしめた状態
で、該柵支柱1の下端開口部と柵設置部Bとの間に生じ
る隙間Pを塞ぐように尚且つ粗面(凸凹)な柵設置設部B
面にシリコンからなる内枠3-1を馴染ませるように該柵
設置部B側に押し付けた状態でセットするようにしてあ
る(図4(b)の拡大図参照)。
The formwork block 3 closes the gap P formed between the lower end opening of the fence post 1 and the face of the fence installation portion B,
The flow of the adhesive filler 6 from P is prevented, and the level of each fence column 1 can be adjusted while the gap P is closed. That is, the level of each fence support 1 can be adjusted regardless of the finished state such as the levelness of the fence installation section B. The mold block 3 is made of a material having a proper elasticity and a wettability to which the adhesive filler 6 is hard to adhere, for example, silicon, and has an inner surface shape that is substantially conformed to the transverse outer peripheral shape of the fence post 1 and has an appropriate thickness. An inner frame 3-1 formed to have a height, and an outer frame 3-2 similarly formed to have an appropriate thickness and height by using urethane foam having appropriate elasticity so as to surround the inner frame 3-1. And to form a square ring shape (see FIG. 3), insert the fixed leg portion 2-2 of the support member 2 protruding from the lower end opening of the fence post 1 into the fixing hole 4, and install the fence post 1 into the fence installation section. In a state in which it is upright on B, the fence installation part B is still rough (uneven) so as to close the gap P between the bottom opening of the fence post 1 and the fence installation part B.
The inner frame 3-1 made of silicon is set on the surface while being pressed against the fence installation section B (see the enlarged view of FIG. 4B).

【0021】尚、この枠材ブロック3の四辺の内、一辺
に輪切り目13を入れておいて、この輪切れ目13から枠材
ブロック3を開き、この状態で柵支柱1の下端開口部と
柵設置部Bとの間に生じる隙間Pを塞ぐようにセットす
るようにするも良い。そして、接着充填剤6を柵支柱1
の注入口5から注入せしめて同充填剤6を柵支柱1の下
端側内部から固定穴4へと充填し、該充填剤6が硬化せ
しめた後においては輪切れ目13から枠材ブロック3を開
いて撤去するものである(図4(d)参照)。
Incidentally, one of the four sides of the frame material block 3 is provided with a ring slit 13 and the frame material block 3 is opened from this ring slit 13, and in this state the lower end opening of the fence post 1 and the fence It is also possible to set so as to close the gap P generated between the installation portion B. Then, the adhesive filler 6 is added to the fence support 1
The filling material 6 is filled from the inside of the lower end side of the fence post 1 into the fixing hole 4 by injecting it from the filling port 5 of the above, and after the filling material 6 has hardened, the frame material block 3 is opened from the ring slit 13. To be removed (see FIG. 4 (d)).

【0022】尚、型枠ブロック4を、シリコン単体又は
発泡ウレタン単体にて四角リング状に形成するも勿論自
由であるが、水平荷重の対する強度の増強を図るために
柵支柱1への充填接着剤6の充填レベル(注入口5の開
口高さL1)を高くする場合においてはシリコン単体若し
くは前述のようにシリコンと発泡ウレタンとの複合によ
り形成することが好ましい。つまり、シリコンを用いる
ことで、表面が粗面(凸凹)な柵設置部Bに馴染むよう
に型枠ブロック3をセットすることができ、これによっ
て、充填接着剤6の充填レベルを上げることで柵支柱1
内における充填接着剤6の圧が高くなるものであるが、
この様な圧変化が生じても充填接着剤6の漏れを確実に
防ぐことができるからである。
The form block 4 may be formed of silicon or urethane foam in the shape of a square ring, but it is of course free, but in order to increase the strength against horizontal load, filling and adhering to the fence column 1 is performed. When the filling level of the agent 6 (the opening height L1 of the injection port 5) is increased, it is preferable that the agent 6 is formed of silicon alone or a composite of silicon and urethane foam as described above. That is, by using silicon, the mold block 3 can be set so that it fits into the fence installation portion B having a rough surface (unevenness), and thereby the filling level of the filling adhesive 6 is increased to increase the fence. Prop 1
Although the pressure of the filling adhesive 6 in the inside becomes high,
Even if such a pressure change occurs, the leakage of the filling adhesive 6 can be surely prevented.

【0023】又、本発明で使用する接着充填剤6として
は特に限定せれるものではないが、僅かな間隙にも充填
できる優れた流動性を有し、しかも柵設置部Bの固定穴
4に充填された時に、該固定穴4に馴染む。つまり、固
定穴2内周面のコンクリートに一部が浸入せしめて該コ
ンクリートとの一体化が図られるように馴染むようなミ
ルクセメントが望ましく、特に無収縮モルタルが望まし
い。因みに、この無収縮モルタルの望ましいコンシステ
ンシーの範囲は7〜13(J 14ロート・秒)である。
As the adhesive filler 6 used in the present invention,
Is not particularly limited, but fills even small gaps
Has excellent fluidity that can be achieved, and is also a fixing hole for the fence installation part B
When it is filled in 4, it fits in the fixing hole 4. That is,
Part of the concrete on the inner surface of the fixed hole 2 is allowed to penetrate and
Familiar type to be integrated with the interior
Luk cement is preferred, especially non-shrink mortar.
Yes. By the way, the desirable system of this non-shrink mortar
Range of 7 to 13 (J 14Funnel seconds).

【0024】次に、以上の如く構成した本実施例詳述の
取付装置による防護柵Aの取付方法(施工例)について
説明する。まず始めに、墨出しされたコンクリート建築
物の柵設置部Bに柵支柱1の設置間隔をおいて穿設され
ている固定穴4に柵支柱1の下端から突出する支持部材
2の固定脚部2-2を挿し込む(図4(a)の状態)。次
に、柵支柱1を直立せしめた状態で該柵支柱1の下端開
口部と柵設置部B面との隙間を塞ぐように型枠ブロック
3を輪切り目13から開いてセットする(図4(b)の状
態)。この時、型枠ブロック3を柵設置部B側に押え付
けることで、拡大図で示すように、シリコンからなる内
枠が粗面(凸凹)な柵設置部に馴染むようにセットさ
れ、接着充填剤6の漏れ防止を確実にするものである
(拡大図参照)。
Next, a method of mounting the protective fence A (construction example) by the mounting device having the above-described structure and detailed in this embodiment will be described. First of all, the fixed leg portion of the support member 2 protruding from the lower end of the fence post 1 into the fixing hole 4 formed at the installation interval of the fence post 1 at the fence installation portion B of the inscribed concrete building. Insert 2-2 (state of Figure 4 (a)). Next, the form block 3 is opened and set from the circular slit 13 so as to close the gap between the lower end opening of the fence column 1 and the plane B of the fence installation portion while the fence column 1 is upright (Fig. 4 ( State of b)). At this time, by pressing the mold block 3 to the side of the fence installation section B, the inner frame made of silicon is set so as to fit into the rough (uneven) fence installation section as shown in the enlarged view, and adhesive filling is performed. It ensures the prevention of leakage of the agent 6 (see the enlarged view).

【0025】その後、柵設置部Bに沿って並列直線的に
直立させた各柵支柱1の高さレベルを型枠ブロック3の
高さ(厚さ)範囲でレベル調節を行う。そして、無収縮
モルタル等からなる接着充填剤6を、注入容器C等を用
いて注入口5から注入せしめて柵支柱1内、そして支持
部材2の固定脚部2-2が挿入する固定穴4内へと注入口
5の開口高さL1に達する充填レベルまで充填する(図4
(c)から(d)の状態)。この時、優れた流動性を有
する接着充填剤6は固定脚部2-2と固定穴4との僅かな
隙間にも速やかに流入して該隙間に充填されると共に、
固定穴4の内面コンクリートに一部が浸入せしめて該内
面コンクリートとの一体化が図られるように馴染む。
After that, the height level of each of the fence supports 1 which are vertically erected in parallel along the fence installation portion B is adjusted within the height (thickness) range of the form block 3. Then, the adhesive filler 6 made of non-shrink mortar or the like is injected from the injection port 5 by using the injection container C or the like, and the fixing hole 4 into which the fixing leg portion 2-2 of the supporting member 2 is inserted in the fence support 1 is inserted. Fill into the interior to a filling level that reaches the opening height L1 of the injection port 5 (Fig. 4
(States from (c) to (d)). At this time, the adhesive filler 6 having excellent fluidity quickly flows into the small gap between the fixed leg portion 2-2 and the fixing hole 4 and is filled in the gap.
A part of the fixing hole 4 is made to penetrate into the inner concrete so that the fixing hole 4 can be integrated with the inner concrete.

【0026】接着充填剤6の注入作業が終了し、該充填
剤6が完全に硬化した後に型枠ブロック3を輪切り目13
から開いて撤去することで(図4(d)の状態)、防護
柵Aの柵設置部Bへの一連の取り付け設置作業が終了す
る。
After the injection work of the adhesive filler 6 is completed and the filler 6 is completely cured, the mold block 3 is cut into a circular cut 13
When the protective fence A is opened and removed (state of FIG. 4D), a series of installation work for the protective fence A on the fence installation section B is completed.

【0027】従って、以上の如く構成した取付装置によ
れば、柵設置部Bに穿設した固定穴4に、製作工場等に
おいて柵支柱1の下端内部に結合頭部2-1を圧入固着せ
しめて該下端開口部から突出させた支持部材2の固定脚
部2-2を挿入して柵設置部Bに直立させた柵支柱1内
に、結合頭部2-2の上端側を残して或いは図示のように
結合頭部2-1が完全に埋没する注入口5の開口高さL1に
達する充填レベルまで固定穴4へと亘り無収縮モルタル
等からなる接着充填剤6を注入充填することにより、柵
設置部Bに対する防護柵Aの取り付け設置作業が終了す
る。
Therefore, according to the mounting device constructed as described above, the coupling head 2-1 is press-fitted and fixed to the fixing hole 4 formed in the fence installation portion B inside the lower end of the fence post 1 in a manufacturing factory or the like. The fixed leg portion 2-2 of the support member 2 protruding from the lower end opening is inserted into the fence support 1 which is upright on the fence installation portion B, leaving the upper end side of the coupling head 2-2. As shown in the figure, by filling and filling the fixing hole 4 with the adhesive filler 6 made of non-shrinkable mortar or the like until the filling level reaches the opening height L1 of the filling port 5 in which the joint head 2-1 is completely buried. , Installation of protective fence A to fence installation section B is completed.

【0028】又、支持部材2は防錆被膜10により保護さ
れていることで、柵設置部Bとの間から仮に雨水等が浸
入したとしても錆等を引き起こすことがない。よって、
錆等により支持部材2の強度が劣化する心配がない。
又、充填硬化材12の天板は注入口5の開口位置に存在さ
せたことで、仮に笠木7との連結が行われている柵支柱
1の上端開口部等から該柵支柱1内に雨水等が浸入した
場合、注入口5が排水口として機能する。よって、雨水
等が柵支柱1内に溜まり、充填硬化材12に染み込むこと
により起る該充填硬化材12の劣化を防ぐことができるこ
とで、同充填硬化材12による柵支柱1の結合強度が長期
に亘り維持されることとなる。
Further, since the support member 2 is protected by the rust preventive film 10, even if rainwater or the like enters from between the fence installation portion B, it does not cause rust or the like. Therefore,
There is no concern that the strength of the support member 2 will deteriorate due to rust or the like.
In addition, since the top plate of the filling and hardening material 12 is made to exist at the opening position of the injection port 5, rainwater is introduced into the fence post 1 from the upper end opening of the fence post 1 that is temporarily connected to the headstock 7. The inlet 5 functions as a drainage port when infiltrating. Therefore, it is possible to prevent deterioration of the filling and hardening material 12 caused by rainwater or the like being accumulated in the fence and supporting pillar 1 and soaking into the filling and hardening material 12, so that the bonding strength of the filling and hardening material 12 with the filling and hardening material 12 is long-term. Will be maintained for the entire period.

【0029】[0029]

【発明の効果】本発明のコンクリート建造物用防護柵の
取付装置は叙上の如く構成してなることから下記の作用
効果を奏する。製作工場等において結合頭部を柵支柱の
下端内部に固定的に挿入内在させて防護柵の各柵支柱に
具備した支持部材の突出する固定脚部を、施工現場にお
いて柵設置部に穿設した固定穴に遊嵌状に挿入させて直
立させると共に、各柵支柱の下端外周と柵設置部とに亘
り型枠ブロックをセットして隙間を塞いだ後に、柵支柱
の注入孔から固定穴に亘り流動性に優れた例えば無収縮
モルタル等からなる接着充填剤を柵支柱内から固定穴へ
と亘り注入充填することにより、柵設置部に防護柵を設
置する設置作業が終了する。従って、本発明によれば、
固定穴に支持部材の固定脚部を挿入させて防護柵の各柵
支柱を直立させ、その後に、接着充填材を注入して防護
柵を柵設置部に取り付け設置するまでの一連の作業を連
続して行うことができる。即ち、固定穴にアンカーナッ
トを固着する接着充填材が硬化するまではアンカーナッ
トにボルト、ナットにより柵支持部材をセットする等の
次の作業に進むことができない従来装置に比べて本発明
の取付装置は防護柵の一連の設置作業を、時間を待たず
に順次連続的且つ迅速に行うことができる。又、ボル
ト、ナットにより柵支持部材をアンカーナットに連結す
る等の取り付け作業が不要になることで、施工業者に与
える手間と労力を軽減することができ、更には接着充填
剤の注入作業は一度で済む等から従来装置に比べて施工
の簡素化と工期の短縮化が期待できる。
Since the mounting device for the protective fence for concrete structures of the present invention is constructed as described above, it has the following operational effects. At the manufacturing plant, the connecting head was fixedly inserted inside the lower end of the fence post, and the fixed leg part of the supporting member provided on each fence post of the protective fence was projected at the fence installation part at the construction site. Insert it loosely into the fixing holes to make it stand upright, and set the formwork block between the lower end periphery of each fence post and the fence installation part to close the gap, then extend from the injection hole of the fence post to the fixing hole. The installation work of installing the protective fence in the fence installation section is completed by injecting and filling the adhesive filler having excellent fluidity, such as non-shrink mortar, from the inside of the fence post to the fixing holes. Therefore, according to the present invention,
Insert the fixed legs of the support member into the fixing holes to erect each fence post of the protective fence, and then inject a bonding filler and attach the protective fence to the fence installation part to continue the series of operations. You can do it. That is, the mounting of the present invention as compared with the conventional apparatus in which the next work such as setting the fence support member by the bolt and the nut on the anchor nut cannot proceed until the adhesive filler for fixing the anchor nut in the fixing hole is cured. The device can perform a series of installation work of the guard fence continuously and rapidly without waiting time. In addition, by eliminating the need for installation work such as connecting the fence support member to the anchor nut with bolts and nuts, it is possible to reduce the labor and labor required for the contractor. Therefore, the construction can be simplified and the construction period can be shortened compared to the conventional equipment.

【0030】又、支持部材は例えばスチール等の金属製
板材から打抜き加工され、柵支柱の下端内部に固定的に
内在させる結合頭部と、この結合頭部の下端中央から下
方に向けて突出させて固定穴に挿入させる固定脚部とを
一体に連設させた略Y字形又は略T字形に形成した単純
な構造であることから、安価に製作することができる。
又、支持部材は防錆被膜により保護されていることで、
柵設置部との間から仮に雨水等が浸入したとしても錆等
を引き起こすことがない。よって、錆等により支持部材
が劣化する心配がない。
Further, the support member is stamped from a metal plate material such as steel, and is fixed to the inside of the lower end of the fence post, and the connecting head is made to project downward from the center of the lower end of the connecting head. Since it has a simple structure in which a fixed leg portion to be inserted into the fixing hole is integrally connected and formed in a substantially Y shape or a substantially T shape, it can be manufactured at low cost.
Also, because the support member is protected by the rust-proof coating,
Even if rainwater enters from between the fence installation parts, it will not cause rust. Therefore, there is no concern that the support member will deteriorate due to rust or the like.

【0031】又、本発明は接着充填材の柵支柱内への充
填レベルを、柵支柱に設けた注入口の開口高さL1に位置
させたことで、仮に笠木との連結が行われている柵支柱
の上端開口部等から該柵支柱内に雨水等が浸入した場
合、注入口が排水口として機能する。よって、雨水等が
柵支柱内に溜まることはない。
According to the present invention, the filling level of the adhesive filling material into the fence column is set at the opening height L1 of the injection port provided in the fence column, so that it is temporarily connected to the headstock. When rainwater or the like enters the fence pillar from the upper end opening or the like, the inlet functions as a drainage port. Therefore, rainwater, etc. will not collect in the fence columns.

【0032】又、本発明はシリコン又は発泡ウレタン又
は双方を用いてリング状に形成した型枠ブロックを、排
水勾配を有する柵設置部と直立させる柵支柱の下端外周
に亘りセットすることで該下端開口部と柵設置部との間
に生じる隙間Pを塞ぎ、柵支柱内から固定穴へと亘り流
動性を有する接着充填剤を注入充填して行う防護柵の取
付設置を可能にした。即ち、前記隙間Pを完全に塞いで
流動性を有する接着充填剤の外部への流出を完全に防ぐ
ことができる型枠ブロックの開発により、前述のように
柵支柱内から固定穴へと亘り注入充填して柵支柱を柵設
置部に一体に固定する防護柵の取付設置を可能にした。
Further, according to the present invention, a ring-shaped form block made of silicon or urethane foam or both is set over the outer circumference of the lower end of the fence column which stands upright with the fence installation section having a drainage gradient. The gap P created between the opening and the fence installation part was closed, and it was possible to install and install a protective fence by injecting and filling a fluid adhesive filler from inside the fence post to the fixing hole. That is, by developing a form block capable of completely closing the gap P and completely preventing the flow of the adhesive filler having fluidity to the outside, as described above, injection is performed from the inside of the fence support to the fixing hole. It is possible to install and install a protective fence that fills and fixes the fence support to the fence installation unit.

【0033】又、型枠ブロックの開発により、柵設置部
に沿って並列直線的に直立させる各柵支柱の高さレベル
を、柵設置部の水平度等の仕上がり状態を問わずに型枠
ブロックの厚さ(高さ)範囲で調節し得る防護柵の取付
設置を可能にした。
Further, with the development of the form block, the height level of each of the fence pillars that are made to stand upright in parallel along the fence installation part can be adjusted regardless of the finished state such as the levelness of the fence installation part. It became possible to install and install a protective fence that can be adjusted within the thickness (height) range.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の取付装置により防護柵を柵設置部に
取付設置した状態の実施形態を示し、(a)は縦断面
図、(b)は(a)のb-b線横断拡大図
FIG. 1 shows an embodiment in which a protective fence is attached and installed on a fence installation section by the installation device of the present invention, (a) is a vertical cross-sectional view, and (b) is an enlarged cross-sectional view taken along line bb of (a).

【図2】 支持部材の一例を示す斜視図で、一部を切欠
断面して示す
FIG. 2 is a perspective view showing an example of a support member, with a part cut away in cross section.

【図3】 型枠ブロックの一例を示す斜視図で、一部を
切欠断面して示す
FIG. 3 is a perspective view showing an example of a mold block, showing a part in cutaway view.

【図4】 本発明取付装置を用いた施工手順の一例を示
す要部の縦断面図で、(a)は支持部材の固定脚部を固
定穴に挿入して柵支柱を柵設置部に直立せしめる状態を
示す、(b)は柵支柱を柵設置部に直立せしめて型枠ブ
ロックをセットした状態を示す、(c)は注入口から接
着充填剤を注入している状態を示す、(d)は注入作業
が終了し、接着充填剤が硬化した後に型枠ブロックを撤
去している状態を示す
FIG. 4 is a vertical cross-sectional view of an essential part showing an example of a construction procedure using the mounting device of the present invention, in which (a) inserts the fixing leg portion of the supporting member into the fixing hole and erects the fence support on the fence installation portion. (B) shows a state in which the fence support is upright on the fence installation portion and the form block is set, (c) shows a state in which the adhesive filler is injected from the injection port, (d) ) Indicates a state where the mold block is removed after the injection work is completed and the adhesive filler is cured.

【図5】 防護柵を柵設置部に取付設置した状態を示す
要部の斜視図で、一部を切欠して示す
[Fig. 5] Fig. 5 is a perspective view of a main part showing a state in which a protective fence is attached and installed on a fence installation part, with a part cut away.

【符号の説明】[Explanation of symbols]

A:防護柵 1:柵支柱 2:支持部材 2-1:結合頭部 2-2:固定脚部 3:型枠ブロック 4:固定穴 5:注入口 6:接着充填剤 7:笹木 8:下桟 9:格子 10:防錆被膜 12:充填硬化材 P:隙間 A: Protective fence 1: Fence post 2: Support member 2-1: Coupling head 2-2: Fixed leg 3: Form block 4: fixing hole 5: inlet 6: Adhesive filler 7: Sasaki 8: Lower bar 9: Lattice 10: Anticorrosion coating 12: Filling hardening material P: Gap

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 柵支柱の下端内部に固定的に挿入内在さ
せる結合頭部と、この結合頭部の下端中央より下方に向
けて突出させて柵設置部の固定穴に亘り遊嵌状に挿入さ
せる固定脚部とからなる支持部材と、この支持部材を介
して前記柵支柱を柵設置部に直立させた状態で、該柵支
柱の下端開口部と柵設置部との間に生じる隙間を塞ぐよ
うに同柵支柱の下端外周と柵設置部とに亘り着脱自在に
セットする型枠ブロックとを備え、前記結合頭部が挿入
内在される柵支柱の下端側所定の高さ位置に設けた注入
口から該注入口に達する充填レベルまで柵支柱内、固定
穴内へと少なくとも適宜の流動性を有する接着充填剤を
注入充填することにより、前記柵設置部に柵支柱を固着
立設するようにしたことを特徴とするコンクリート建造
物用防護柵の取付装置。
1. A coupling head fixedly inserted into the lower end of a fence post, and a coupling head inserted downwardly from the center of the lower end of the coupling head to be inserted loosely over a fixing hole of the fence installation portion. A support member composed of a fixed leg and a support member that is upright to the fence installation portion through the support member, and closes a gap generated between the lower end opening of the fence support and the fence installation portion. As described above, a fence block is provided at a predetermined height position on the lower end side of the fence post in which the coupling head is inserted and installed, and a form block that is detachably set over the outer periphery of the bottom end of the fence post and the fence installation portion. The fence pillar is fixedly erected on the fence installation portion by injecting and filling an adhesive filler having at least appropriate fluidity into the fence pillar and the fixing hole from the inlet to the filling level reaching the inlet. Mounting equipment for protective fences for concrete structures characterized by Place
【請求項2】 請求項1記載の支持部材は、適宜の厚さ
を有する金属製板材を用いた打ち抜き加工により結合頭
部と固定脚部とを一体に連設させた略Y字形又は略T字
形に形成すると共に、少なくとも固定脚部の根元部分を
含む結合頭部の表面に防錆被膜を施してなることを特徴
とするコンクリート建造物用防護策の取付装置。
2. The supporting member according to claim 1, wherein the connecting head and the fixed leg are integrally connected by punching using a metal plate material having an appropriate thickness, or a substantially Y-shape or a substantially T-shape. An attachment device for a protective measure for a concrete structure, which is formed in a letter shape and has a rust preventive coating on a surface of a joint head including at least a root portion of a fixed leg portion.
【請求項3】 請求項1又は2記載の型枠ブロックは、
シリコン又は発泡ウレタン又はシリコンと発泡ウレタン
との双方から少なくとも柵支柱の横断外面形状に略適合
する内面形状で少なくとも適宜の高さを有するリング状
に形成したことを特徴とするコンクリート建造物用防護
柵の取付装置。
3. The mold block according to claim 1 or 2,
Protective fence for concrete structure characterized by being formed from silicon or urethane foam or both silicone and urethane foam into a ring shape having at least an appropriate height with an inner surface shape that at least substantially conforms to the shape of the transverse outer surface of the fence post. Mounting device.
JP2002050063A 2002-02-26 2002-02-26 Fixture for guard fence for concrete building Pending JP2003247315A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002050063A JP2003247315A (en) 2002-02-26 2002-02-26 Fixture for guard fence for concrete building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002050063A JP2003247315A (en) 2002-02-26 2002-02-26 Fixture for guard fence for concrete building

Publications (1)

Publication Number Publication Date
JP2003247315A true JP2003247315A (en) 2003-09-05

Family

ID=28662413

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002050063A Pending JP2003247315A (en) 2002-02-26 2002-02-26 Fixture for guard fence for concrete building

Country Status (1)

Country Link
JP (1) JP2003247315A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006063544A (en) * 2004-08-25 2006-03-09 Hakusui Kosan Kk Support structure for handrail
JP2012067514A (en) * 2010-09-24 2012-04-05 Sekisui Chem Co Ltd Post-for-handrail support structure and construction method therefor
CN110905282A (en) * 2019-12-06 2020-03-24 义乌市鼎寒机械设备有限公司 Rail guard for construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006063544A (en) * 2004-08-25 2006-03-09 Hakusui Kosan Kk Support structure for handrail
JP2012067514A (en) * 2010-09-24 2012-04-05 Sekisui Chem Co Ltd Post-for-handrail support structure and construction method therefor
CN110905282A (en) * 2019-12-06 2020-03-24 义乌市鼎寒机械设备有限公司 Rail guard for construction

Similar Documents

Publication Publication Date Title
JP2019060110A (en) Mounting structure of handrail post and method for mounting the same
JP2003247315A (en) Fixture for guard fence for concrete building
JP2006225997A (en) Handrail support mounting method
JP5735243B2 (en) Handrail support structure and construction method
JP2619781B2 (en) Method and apparatus for installing handrails in concrete buildings
JP2005105549A (en) Attaching structure of precast concrete rising wall
JPH093913A (en) Column base fixing method for steel pipe column
JP3506379B2 (en) Mounting method and mounting device for protective fence for concrete buildings
JPS63184665A (en) Method for embedding anchor for mounting handrail support
JP2007177559A (en) Method for mounting handrail and its mounting structure
JPH0224447A (en) Method and device for fixing balustrade
KR200354124Y1 (en) Structure fixing plate
JPH11222928A (en) Steel frame column base part dropping-in construction method
JP2889840B2 (en) Construction method of underground outer peripheral wall
JP2003321913A (en) Method for repairing handrail and attachment device for new handrail
KR200315989Y1 (en) Facilities base
JPH04237755A (en) Method and device for mounting railing unit of concrete veranda
JPS5927458Y2 (en) Handrail installation device
JP4512615B2 (en) Handrail supporter mounting device
JP2719648B2 (en) Pillar foundation structure and pillar pier foundation method
JP2002147027A (en) Fixing construction method for safety fence column
JPH0326269B2 (en)
JP2018066158A (en) Foundation for supporting building attachment and its installation structure
JP4356020B2 (en) Balcony construction unit with handrails, installation method of handrails on balconies, core struts used for them, and temporary handrail bars
JPS5925969Y2 (en) basic hardware