JP2003187046A - Initial flow control method and system - Google Patents

Initial flow control method and system

Info

Publication number
JP2003187046A
JP2003187046A JP2001388690A JP2001388690A JP2003187046A JP 2003187046 A JP2003187046 A JP 2003187046A JP 2001388690 A JP2001388690 A JP 2001388690A JP 2001388690 A JP2001388690 A JP 2001388690A JP 2003187046 A JP2003187046 A JP 2003187046A
Authority
JP
Japan
Prior art keywords
information
initial flow
schedule
progress
department
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001388690A
Other languages
Japanese (ja)
Inventor
Kazutaka Yamaguchi
和隆 山口
Kazuyuki Nishimura
一幸 西村
Hidenori Yanagida
英徳 柳田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Ten Ltd
Original Assignee
Denso Ten Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Ten Ltd filed Critical Denso Ten Ltd
Priority to JP2001388690A priority Critical patent/JP2003187046A/en
Publication of JP2003187046A publication Critical patent/JP2003187046A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

<P>PROBLEM TO BE SOLVED: To speed up the implementation of a countermeasure against a problem caused in an initial flow period by reducing miscellaneous activities such as inquiries. <P>SOLUTION: A schedule planning system 1 make a basic schedule plan as a basic system, and department systems 11, 12, and 13 reduce inquiry business by commonly owning information via a common system 10. A supplier can be determined early by a new part control system 30 on a new part in the preparation for mass production of a product advanced stepwise in the initial flow period, and lead time is secured. <P>COPYRIGHT: (C)2003,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、工業製品を開発す
る際に、企画から量産の準備までの初期流動期間で進捗
管理を支援する初期流動管理方法およびシステムに関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an initial flow management method and system for supporting progress management during the initial flow period from planning to preparation for mass production when developing industrial products.

【0002】[0002]

【従来の技術】従来から、図13に示すような複数の段
階を経て、一般的な工業製品の開発が行われている。典
型的な開発の段階は、商品企画、試作、量試、PPおよ
び量産などに分けられる。商品企画は、市場のマーケテ
ィングなどに基づき、どのような工業製品を開発対象と
すべきかを決定する。通常は既に市場に投入されている
製品に改良等を施す場合が多いけれども、全くの新規製
品である場合もある。試作は、製品の性能等を確認した
り改善したりするために、試作用の図面等を用いる仕様
で少数個の試作品を先行して製作する。量試は、試作結
果に基づいて、可能な限り量産性を考慮した仕様で、製
品試験用などの試作を行う。PPは量産の先行であり、
製品を市場に導入するための展示サンプル用などを一定
数だけ生産する。量産は、市場に投入する製品を、生産
コストを抑えて、効率よく生産し続ける。
2. Description of the Related Art Conventionally, general industrial products have been developed through a plurality of steps as shown in FIG. Typical stages of development are divided into product planning, trial manufacture, quantity trial, PP and mass production. Product planning decides what kind of industrial product should be developed based on market marketing and the like. Usually, the product already on the market is often improved, but it may be a completely new product. In the trial production, a small number of prototypes are manufactured in advance in order to confirm and improve the performance of the product, etc. by using the drawings for trial production. The volume test is based on the results of the trial production, and the trial production such as for product testing is performed with the specifications considering mass productivity as much as possible. PP is a precursor to mass production,
Produce a certain number of products such as display samples for introducing products to the market. For mass production, we will continue to efficiently produce products to be put on the market at a low production cost.

【0003】図13に示す商品企画で開発すべき製品が
明確になって設計業務が開始される状態から、量試が終
了するまでの期間は、初期流動期間と呼ばれる。初期流
動期間では、事前審査、不具合発生、品質問題フォロ
ー、対策、および標準化などの業務が、関連する部門間
で、各開発段階毎に行われる。通常、各部門は、複数の
製品に関与している。
The period from the start of design work after the product to be developed in the product plan shown in FIG. 13 is started to the end of the volume test is called the initial flow period. During the initial flow period, tasks such as pre-screening, defect occurrence, quality problem follow-up, countermeasures, and standardization are carried out between related departments at each development stage. Typically, each department is involved in multiple products.

【0004】図14は、初期流動期間に行われている管
理業務の概要を示す。商品企画では、経営者や管理部門
用に日程計画書を作成する。なお、図14では、開発の
各段階、たとえば試作を「M」で略称し、量試を「G」
で略称している。設計部門や生産部門では、日程計画書
を転記して、それぞれの業務を行う。設計部門では、新
規部品を使用する必要があるか否かを検討し、使用する
必要がある場合は新規部品管理表を作成して、調達部門
や評価部門に知らせる。新規部品は、購買などの調達部
門が手配し、評価部門の試験に合格してから使用可能と
なるので、部品認定試験管理表が作成される。設計部門
や生産部門は、新規部品管理表の作成に際して日程計画
書の関連部分を転記し、作成された部品管理表の記載事
項は、経営者や管理部門からの問合せに応じて、日程計
画書に転記される。新規部品管理表には、部品認定の欄
が設けられ、調達部門や評価部門への問合せで情報の転
記が行われる。部品認定試験管理表を作成する際にも、
設計部門や生産部門への問合せが行われる。
FIG. 14 shows an outline of management work performed in the initial flow period. In product planning, a schedule plan is created for managers and management departments. In FIG. 14, each stage of development, for example, a prototype is abbreviated as “M”, and a volume test is “G”.
Is abbreviated. In the design department and the production department, the schedule is posted and each work is performed. The design department considers whether or not new parts need to be used, and if they need to be used, creates a new parts management table and informs the procurement department and the evaluation department. The new parts can be used after they are arranged by the purchasing department such as purchasing and have passed the test of the evaluation department, so that the parts certification test management table is created. The design department and the production department post the relevant parts of the schedule when creating a new parts management table, and the items described in the created parts management table are in accordance with the inquiry from the management or the management department. Will be posted to. In the new parts management table, a column for parts certification is provided, and information is posted by inquiries to the procurement department and the evaluation department. When creating a parts certification test management table,
Inquiries are made to the design department and production department.

【0005】量産段階への移行には、品質やコスト面で
の問題が解決され、しかも市場投入などのタイミングに
合せることが必要となる。量産段階に移行した後では、
たとえば特開2000−254838号公報などに開示
されているように、製品の生産要求である複数のオーダ
ーを適切に管理し、納期に余裕を持たせてかつ生産を効
率よく行うための管理が行われる。
In order to shift to the mass production stage, it is necessary to solve problems in terms of quality and cost, and to meet the timing of market introduction. After moving to the mass production stage,
For example, as disclosed in Japanese Unexamined Patent Publication No. 2000-254838, a plurality of orders, which are production demands for products, are appropriately managed, and management is performed to allow a sufficient delivery time and efficiently perform production. Be seen.

【0006】[0006]

【発明が解決しようとする課題】量産に移行する前の初
期流動期間では、図14に示すように多くの部門が関与
し、相互に連携を採って製品開発の進捗を図る必要があ
る。初期流動期間が長いと、製品が市場に投入される時
点で陳腐化してしまい、期待する売れ行きが得られなく
なってしまう可能性がある。初期流動期間では、できる
だけ多くの不具合を顕在化し、対策を施すことも必要と
なる。事前審査で、不具合の可能性を除去しておくこと
が必要なことはもちろんであるけれども、予期しない不
具合の発生は避けられない。避けられない不具合は、開
発段階のうちで可能な限り先行して顕在化させることが
対策の時間的余裕を得るために必要である。
In the initial flow period before shifting to mass production, as shown in FIG. 14, many departments are involved and it is necessary to cooperate with each other to promote the progress of product development. If the initial liquidity period is long, products may become obsolete when they are brought to the market, and the desired sales may not be obtained. During the initial flow period, it is necessary to expose as many defects as possible and take measures. Of course, it is necessary to eliminate the possibility of defects in the preliminary examination, but the occurrence of unexpected defects is inevitable. It is necessary to make unavoidable defects appear as early as possible in the development stage in order to secure time for countermeasures.

【0007】初期流動期間では、多くの部門が関係して
いるので、不具合の対策にも部門管での連携が必要とな
る。図14に示す日程計画書では、重要な項目について
充分なリードタイムを設定しておかないと、実施もれが
生じてしまうおそれがある。また、部門間では連携のた
めに問合せの頻度を高める必要がある。しかしながら、
問合せの頻度を高めることは、直接の業務ではなく、間
接業務でしかない問合せを多く行わなけばならないこと
を意味し、各部門の負担が大きくなる。この負担の軽減
が本発明の解決課題となる。
Since many departments are involved in the initial flow period, cooperation between departments is necessary for countermeasures against defects. In the schedule plan shown in FIG. 14, unless a sufficient lead time is set for an important item, there is a possibility that the implementation may be missed. In addition, it is necessary to increase the frequency of inquiries between departments for cooperation. However,
Increasing the frequency of inquiries means that many inquiries that are only indirect operations, rather than direct operations, must be made, which increases the burden on each department. The reduction of this burden is a problem to be solved by the present invention.

【0008】本発明の目的は、問合せ等の間接業務を削
減して、初期流動期間に発生する問題の対策の迅速化が
可能な初期流動管理方法およびシステムを提供すること
である。
An object of the present invention is to provide an initial flow management method and system capable of reducing indirect operations such as inquiries and speeding up countermeasures for problems occurring during the initial flow period.

【0009】[0009]

【課題を解決するための手段】本発明は、工業製品を開
発し、企画から量産の準備を行うまでの初期流動期間
に、必要となる複数業務の進捗を管理する初期流動管理
方法であって、図面出図および部品調達を含む日程進捗
情報、部品および試作品の評価を含む品質情報、ならび
に原価情報を収集し、情報を集計して、開発に関連する
複数の部門間で共有するデータベースを構築し、データ
ベースに基づいて、業務の進捗状況を、各部門に応じて
予め定められる複数の形態で表示することを特徴とする
初期流動管理方法である。
SUMMARY OF THE INVENTION The present invention is an initial flow management method for managing the progress of a plurality of operations required during the initial flow period from the development of an industrial product to the planning to the preparation for mass production. , Schedule information including drawing drawings and parts procurement, quality information including evaluation of parts and prototypes, and cost information, aggregate the information, and share the database among multiple departments related to development. It is an initial flow management method characterized by being constructed and displaying the progress status of work in a plurality of forms predetermined according to each department based on a database.

【0010】本発明に従えば、工業製品を開発し、企画
から量産の準備を行うまでの初期流動期間に、図面出図
および部品調達を含む日程進捗情報、部品および試作品
の評価を含む品質情報、ならびに原価情報を収集し、業
務の進捗状況を、各部門に応じて予め定められる複数の
形態で表示する。進捗状況の表示は、情報を集計して、
開発に関連する複数の部門間で共有するデータベースを
構築し、構築されたデータベースに基づいて行う。工業
製品の開発を計画通りに進めるためには、計画の進捗状
況や状態を確実にフォローすることが必要となる。進捗
状況や状態によっては、設計変更の大きな要因となり、
開発日程に大きな影響を与えることとなる。日程進捗情
報、品質情報および原価情報を収集して管理項目とし、
管理項目に関する詳細情報を部門間の連携で集計し、集
計情報をデータベース化して、部門間で共有する環境を
構築することができるので、問合せ等の間接業務を削減
して、初期流動期間に発生する問題の対策の迅速化が可
能となる。
According to the present invention, during the initial flow period from the development of industrial products to the preparation of mass production, schedule progress information including drawing drawings and parts procurement, and quality including evaluation of parts and prototypes. Information and cost information are collected, and the progress status of the work is displayed in a plurality of forms predetermined according to each department. To display the progress, collect information and
Build a database to be shared among multiple departments related to development, and perform based on the built database. In order to proceed with the development of industrial products as planned, it is necessary to reliably follow the progress and status of the plan. Depending on the progress and state, it may be a big factor of design change,
It will have a great impact on the development schedule. It collects schedule progress information, quality information and cost information and makes them management items.
Detailed information on management items can be aggregated by linking between departments, and the aggregated information can be compiled into a database to build an environment that can be shared between departments, reducing indirect operations such as inquiries, and occurring during the initial flow period. It is possible to speed up the countermeasure against the problem that occurs.

【0011】また本発明の前記進捗状況の表示では、情
報が付与されている最小単位としての品番に予め関連付
けられる管理階層別に集計して表現することを特徴とす
る。
Further, in the display of the progress status of the present invention, it is characterized in that it is expressed by summing up for each management hierarchy associated in advance with a product number as a minimum unit to which information is added.

【0012】本発明に従えば、情報の付与されている最
小単位としての品番と品番との関連付けに従って、プロ
ジェクト別、製品別、品番別など、管理対象毎に階層化
して進捗状況を管理することができる。品番に対して付
与されている新規部品や中間完成品などの情報に従え
ば、性能別に進捗状況を管理することができる。品番に
対して付与される必要か不要かの条件によって、要否別
に進捗状況を管理することもできる。
According to the present invention, according to the association between the product number and the product number as the minimum unit to which information is added, the progress status is managed by hierarchizing for each management object such as project, product, product number, etc. You can According to the information such as new parts or intermediate finished products given to the product number, the progress status can be managed for each performance. It is also possible to manage the progress status depending on whether it is necessary or not depending on the condition whether the product number is required or not.

【0013】また本発明で、前記管理階層は、前記日程
進捗情報、前記品質情報または前記原価情報を含む管理
対象に分けられることを特徴とする。
Further, in the invention, it is characterized in that the management hierarchy is divided into management targets including the schedule progress information, the quality information or the cost information.

【0014】本発明に従えば、日程進捗情報、品質情報
および原価情報をそれぞれ集計して管理するので、種々
の切り口で進捗状況や状態を表示して、迅速な問題解決
を図ることができる。
According to the present invention, the schedule progress information, the quality information and the cost information are totalized and managed, so that the progress status and state can be displayed in various ways to solve the problem quickly.

【0015】また本発明で、前記日程進捗情報の収集で
は、着手および完了の予定と、着手および完了の実績と
して詳細情報を取得し、前記進捗状況の表示では、日程
について幅を持って表現することを特徴とする。
Further, in the present invention, in the collection of the schedule progress information, detailed information is acquired as a start and completion schedule and a record of the start and completion, and in the display of the progress status, the schedule is expressed with a range. It is characterized by

【0016】本発明に従えば、各管理項目毎に、予定と
実績とを、着手および完了の時点でそれぞれ管理し、日
程について幅を持って進捗状況を表示するので、日程に
ずれが生じても、回復を図る余地を残すことができる。
According to the present invention, the schedule and the achievement are managed for each management item at the time of starting and completing, and the progress status is displayed with a range of schedules. Can leave room for recovery.

【0017】また本発明の前記品質情報の収集では、予
め定める管理項目毎に、少なくとも評価項目数、実施数
または結果のうちの一部を含む評価情報を取得し、前記
進捗状況の表示では、品質情報について、該管理項目毎
の評価情報を表現することを特徴とする。
Further, in the collection of the quality information of the present invention, the evaluation information including at least a part of the number of evaluation items, the number of evaluations or the results is acquired for each predetermined management item, and the progress status is displayed as follows. The quality information is characterized by expressing evaluation information for each management item.

【0018】本発明に従えば、予め定める管理項目毎の
評価情報を評価項目数、実施数、結果などの品質情報を
付与して表示するので、品質情報の評価についての進捗
状況を判りやすく表示することができる。
According to the present invention, the evaluation information for each predetermined management item is displayed with the quality information such as the number of evaluation items, the number of executions, and the result added, so that the progress of the evaluation of the quality information is displayed in an easy-to-understand manner. can do.

【0019】また本発明の前記原価情報の収集では、予
め定める管理項目毎に、少なくとも購入価格または見積
価格のいずれかを含む価格情報を取得し、前記進捗状況
の表示では、品質情報について、該管理項目毎の価格情
報を表現することを特徴とする。
In the collection of the cost information of the present invention, price information including at least either the purchase price or the estimated price is acquired for each predetermined management item, and the quality information is displayed in the progress status display. It is characterized by expressing price information for each management item.

【0020】本発明に従えば、購入価格や見積価格など
の価格情報を取得し、管理項目毎に表示するので、製品
製造に伴って発生する原価情報を判りやすいように表示
することができる。
According to the present invention, the price information such as the purchase price and the estimated price is acquired and displayed for each management item, so that the cost information that accompanies the manufacture of the product can be displayed in an easy-to-understand manner.

【0021】さらに本発明は、工業製品を開発し、企画
から量産の準備を行うまでの初期流動期間に、必要とな
る複数業務の進捗を管理する初期流動管理システムであ
って、前記複数の業務を担当する部門にそれぞれ配置さ
れ、情報の収集を行う複数の情報端末と、該複数の情報
端末間を接続する情報通信ネットワークと、該複数の情
報端末に該情報通信ネットワークを介して接続され、前
記データベースを構築するための情報記憶装置と、前記
進捗状況を表示するための表示装置と、該複数の情報端
末、該情報通信ネットワーク、該情報記憶装置および該
表示装置を制御して、前述のいずれかに記載の初期流動
管理方法を実行する処理を行う処理装置とを含むことを
特徴とする初期流動管理システムである。
Furthermore, the present invention is an initial flow management system for managing the progress of a plurality of operations required during the initial flow period from the development of an industrial product and the planning to preparation for mass production. A plurality of information terminals respectively arranged in the department in charge of collecting information, an information communication network connecting the plurality of information terminals, and a plurality of information terminals connected to the plurality of information terminals via the information communication network, The information storage device for constructing the database, the display device for displaying the progress status, the plurality of information terminals, the information communication network, the information storage device, and the display device are controlled, An initial flow management system, comprising: a processing device that performs a process of executing the initial flow management method according to any one of the above.

【0022】本発明に従えば、制御装置が複数の業務を
担当する部門にそれぞれ配置され、情報の収集を行う複
数の情報端末と、複数の情報端末間を接続する情報通信
ネットワークと、複数の情報端末に情報通信ネットワー
クを介して接続され、データベースを構築するための情
報記憶装置と、進捗状況を表示するための表示装置とを
制御して工業製品を開発し、企画から量産の準備を行う
までの初期流動期間に、図面出図および部品調達を含む
日程進捗情報、部品および試作品の評価を含む品質情
報、ならびに原価情報を自動的に収集し、業務の進捗状
況を、各部門に応じて予め定められる複数の形態で表示
することができる。進捗状況の表示は、情報を集計し
て、開発に関連する複数の部門間で共有するデータベー
スを構築し、構築されたデータベースに基づいて行う。
データベースに情報を収集して管理項目とし、管理項目
に関する詳細情報を部門間の連携で集計し、部門間で共
有する環境を構築して、問合せ等の間接業務の削減や初
期流動期間に発生する問題対策の迅速化を可能にするこ
とができる。
According to the present invention, the control device is arranged in each of the departments in charge of a plurality of jobs, a plurality of information terminals for collecting information, an information communication network for connecting the plurality of information terminals, and a plurality of information terminals. Connected to an information terminal via an information communication network, control an information storage device for constructing a database and a display device for displaying the progress status to develop industrial products and prepare for mass production from planning The schedule progress information including drawing drawings and parts procurement, quality information including parts and prototype evaluation, and cost information are automatically collected during the initial flow period until Can be displayed in a plurality of predetermined forms. The progress status is displayed by collecting information, constructing a database shared among a plurality of departments related to development, and based on the constructed database.
Information is collected in the database as management items, detailed information on management items is aggregated by cooperation between departments, and an environment is shared between departments to reduce indirect operations such as inquiries and occur during the initial flow period. It is possible to speed up problem countermeasures.

【0023】また本発明で、前記複数の情報端末および
前記情報通信ネットワークは、全部門を統括する基幹シ
ステムと、各部門毎の部門システムとを形成し、前記処
理装置は、該基幹システムおよび該部門システムに対し
てそれぞれ定期的にアクセスを行い、前記初期流動の管
理に必要な情報を取得して、各システム内で再集計を行
うことを特徴とする。
Further, according to the present invention, the plurality of information terminals and the information communication network form a basic system for controlling all departments and a department system for each department, and the processing device includes the basic system and the department system. It is characterized in that each department system is regularly accessed to obtain information necessary for managing the initial flow and re-counting is performed in each system.

【0024】本発明に従えば、基幹システムおよび部門
システムに対して定期的にアクセスを行い、初期流動管
理に必要な情報を自動的に取得して再集計を行うことが
できるので、各部門間の問合せなどの間接業務に要する
手間を削減することができる。
According to the present invention, it is possible to periodically access the core system and the department system, automatically acquire the information necessary for the initial flow management, and perform the re-counting. It is possible to reduce the labor required for indirect work such as inquiries.

【0025】また本発明で、前記処理装置は、前記情報
端末から入力される標準手番と期限とに基づき、該期限
から該標準手番を差し引いて、前記日程進捗情報の予定
を算出することを特徴とする。
Further, in the present invention, the processing device calculates the schedule of the schedule progress information by subtracting the standard turn from the deadline based on the standard turn and the deadline input from the information terminal. Is characterized by.

【0026】本発明に従えば、標準的な手番を設定し、
日程進捗情報の予定を決める際に、標準手番を期限から
差し引いて算出するので、期限を定めれば日程進捗情報
の予定を自動的に定めることができる。標準手番を修正
すれば、一括して日程進捗情報の予定を修正することが
できる。
According to the invention, a standard turn is set,
When determining the schedule of the schedule progress information, the standard turn is calculated by subtracting the standard turn from the deadline, so that the schedule of the schedule progress information can be automatically set if the deadline is set. By correcting the standard turn, it is possible to collectively revise the schedule of the schedule progress information.

【0027】また本発明で、前記処理装置は、前記日程
進捗の予定に基づき、該予定に対する先行または遅延に
応じて、各部門毎の情報端末にアラームを発信すること
を特徴とする。
Further, in the invention, it is characterized in that the processing device sends an alarm to the information terminal of each department based on the schedule progress schedule, according to the advance or delay of the schedule.

【0028】本発明に従えば、実施予定前に予定アラー
ムや、実施予定日に当日アラーム、さらには実施予定日
からの遅延に対して遅延アラーム、または遅延の日数や
度合いによる内容や範囲を変更しての遅延アラームな
ど、予定情報を担当部門等に通知し、日程進捗の確保を
図ることができる。
According to the present invention, a scheduled alarm before the scheduled implementation, a current day alarm, a delayed alarm for a delay from the scheduled implementation date, or the contents and range depending on the number and degree of delays are changed. Scheduled information such as a delay alarm can be notified to the department in charge and the schedule progress can be secured.

【0029】また本発明で、前記処理装置は、初期流動
に関する日程計画についての情報を、前記情報記憶装置
に登録し、登録履歴を参照可能なデータを生成すること
を特徴とする。
Further, in the present invention, the processing device is characterized in that information about a schedule plan regarding an initial flow is registered in the information storage device, and data that can refer to a registration history is generated.

【0030】本発明に従えば、初期流動に関する日程計
画やその元になる中日程計画などの情報を、情報記憶装
置に登録して、登録履歴を参照することができるので、
日程計画などの有効性などを確認することができる。
According to the present invention, it is possible to register information such as a schedule plan relating to the initial flow and a medium schedule plan based on the schedule in the information storage device and refer to the registration history.
You can check the validity of the schedule.

【0031】また本発明で、前記処理装置は、前記量産
の準備で必要となる新規部品についての情報を、該量産
の準備に先行して行う試作段階の準備情報を利用して作
成することを特徴とする。
Further, according to the present invention, the processing apparatus may create information about new parts required for the preparation for the mass production by using the preparation information of the trial production stage prior to the preparation for the mass production. Characterize.

【0032】本発明に従えば、量産の準備に先行して行
う試作段階の準備情報を利用して、量産の準備で必要と
なる新規部品についての情報を自動的に予想して作成
し、部品手配のためのリードタイムを大きくして、不具
合等が起きやすい新規部品の管理を有効に行うことがで
きる。
According to the present invention, by using the preparation information at the trial production stage which precedes the preparation for mass production, information about new parts required for preparation for mass production is automatically predicted and created. It is possible to increase the lead time for arrangement and effectively manage new parts that are prone to malfunctions.

【0033】また本発明で、前記処理装置は、予め定め
る特記事項を前記各情報端末に通知することが可能であ
り、該各情報端末では、該特記事項の通知を検知する
と、情報表示の画面を一時的に該特記事項の強調表示に
切換えることを特徴とする。
Further, in the present invention, the processing device can notify each information terminal of a predetermined special notice, and when each information terminal detects the notice of the special notice, the information display screen is displayed. Is temporarily switched to the highlighted display of the special note.

【0034】本発明に従えば、情報端末を利用する各部
門の担当者の注意を、特記事項の存在に引きつける強調
表現を自動的に行うことができる。
According to the present invention, it is possible to automatically perform the emphasized expression that attracts the attention of the person in charge of each department who uses the information terminal to the existence of the special item.

【0035】また本発明で、前記処理装置は、前記情報
記憶装置に構築されているデータベースを検索して、相
互に類似している情報を、主情報と類似情報とに区分
し、主情報のみ表示することを特徴とする。
Further, in the present invention, the processing device searches a database constructed in the information storage device and divides information similar to each other into main information and similar information, and only main information is obtained. It is characterized by displaying.

【0036】本発明に従えば、相互に類似している情報
について主情報のみ表示して類似情報を表示しないの
で、煩雑な表示を避けて管理の適正化を図ることができ
る。
According to the present invention, only the main information of the information similar to each other is displayed and the similar information is not displayed. Therefore, the complicated display can be avoided and the management can be optimized.

【0037】また本発明で、前記処理装置は、前記情報
記憶装置に構築されているデータベースに集約して記憶
している集約情報に対する詳細情報の存在場所について
の場所情報を保持し、該場所情報を利用する該詳細情報
の表示が可能であることを特徴とする。
Further, in the present invention, the processing device holds the location information about the location of the detailed information with respect to the aggregated information that is aggregated and stored in the database constructed in the information storage device. It is characterized in that the detailed information can be displayed by using the.

【0038】本発明に従えば、情報通信ネットワークを
介するハイパーリンクなどの場所情報で、進捗状況につ
いての全体状況と詳細情報とが、情報存在場所が離れて
いても表示可能となり、進捗状況を全体的かつ詳細に管
理することができる。
According to the present invention, the location information such as a hyperlink via the information communication network makes it possible to display the overall status and the detailed information about the progress status even if the information existing location is distant, and the progress status can be displayed as a whole. It can be managed in detail.

【0039】[0039]

【発明の実施の形態】図1は、本発明の実施の一形態で
ある初期流動管理システムの概略的な構成を示す。本実
施形態の初期流動管理システムでは、管理部門に配置さ
れる日程計画システム1が基幹システムとなり、工業製
品を開発し、企画から量産の準備を行うまでの初期流動
期間に、必要となる複数業務の進捗を管理するために、
大容量記憶装置にデータベース2を構築し、日程進捗状
況等の情報を集計して保管する。情報の検索、利用、修
正等は、ワークステーションやパーソナルコンピュータ
等の情報端末3,4を介して行われる。日程計画システ
ム1は、情報通信ケーブル5および通信インタフェース
(以下、「通信I/F」と略称する。)6を介して、共
有システム10に接続される。共有システム10には、
各部門に配置される複数の部門システム11,12,1
3が接続される。一つの部門システム11と共有システ
ム10との間は、情報通信ケーブル15と通信I/F1
6とを介して接続される。また、一つの部門システム1
1には、1または複数の情報端末21や大容量記憶装置
に構築するデータベース22などが接続される。他の部
門システム12,13も一つの部門システム11と同様
であるけれども、図面上は簡略化して示す。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows a schematic configuration of an initial flow management system which is an embodiment of the present invention. In the initial flow management system of the present embodiment, the schedule planning system 1 arranged in the management department serves as a basic system, and a plurality of operations required during the initial flow period from the development of industrial products to the planning to mass production preparation. To manage the progress of
The database 2 is constructed in a large-capacity storage device, and information such as schedule progress status is collected and stored. Information retrieval, use, correction, and the like are performed via information terminals 3 and 4 such as workstations and personal computers. The schedule planning system 1 is connected to a shared system 10 via an information communication cable 5 and a communication interface (hereinafter, abbreviated as “communication I / F”) 6. In the sharing system 10,
Multiple department systems 11, 12, 1 arranged in each department
3 are connected. An information communication cable 15 and a communication I / F 1 are provided between one department system 11 and the shared system 10.
And 6 through. Also, one department system 1
1, one or more information terminals 21 and a database 22 constructed in a mass storage device are connected. The other department systems 12 and 13 are similar to the one department system 11, but are shown in a simplified manner in the drawing.

【0040】本実施形態の初期流動管理システムでは、
新規部品管理システム30を設置し、新規部品の手配に
必要なリードタイムを確保する。新規部品管理システム
30の構成も部門システム11,12,13と同様であ
り、情報端末31やデータベース32が接続される。
In the initial flow management system of this embodiment,
A new parts management system 30 is installed to secure the lead time required for arranging new parts. The configuration of the new parts management system 30 is the same as that of the department systems 11, 12, and 13, and the information terminal 31 and the database 32 are connected.

【0041】以上のように、日程計画システム1、部門
システム11,12,13および新規部品管理システム
30で、情報端末3,4;21;31は、それぞれ情報
通信ネットワークで接続され、処理装置として初期流動
管理のための制御を行う。全部門を統括する基幹システ
ムである日程計画システム1と、各部門毎の部門システ
ム11,12,13とは情報通信ネットワークを形成
し、処理装置としての情報端末3,4;21;31は、
基幹システムおよび部門システムに対してそれぞれ定期
的にアクセスを行い、初期流動の管理に必要な情報を取
得して、各システム内で再集計を行う。基幹システムお
よび部門システムに対して定期的にアクセスを行い、初
期流動管理に必要な情報を自動的に取得して再集計を行
うことができるので、各部門間の問合せなどの間接業務
に要する手間を削減することができる。
As described above, in the schedule planning system 1, the department systems 11, 12, 13 and the new parts management system 30, the information terminals 3, 4; 21; 31 are respectively connected by the information communication network and serve as processing devices. Performs control for initial flow management. An information communication network is formed by the schedule planning system 1 which is a basic system for controlling all the departments and the department systems 11, 12, 13 for each department, and the information terminals 3, 4;
Regularly access each of the core system and departmental system, acquire the information necessary to manage the initial flow, and perform recounting within each system. Since it is possible to periodically access the core system and department system, automatically obtain the information required for initial flow management and re-aggregate, it is necessary to perform indirect operations such as inquiries between departments. Can be reduced.

【0042】図2は、図1の日程計画システム1および
部門システム11,12,13の概略的な処理手順をそ
れぞれ示す。図2(a)に示す日程計画システム1の処
理手順は、ステップa0から開始し、ステップa1で商
品企画が立てられる。商品企画では全体的な製品開発の
日程も決定される。ステップa2では、図面出図および
部品調達を含む日程進捗情報、部品および試作品の評価
を含む品質情報、ならびに原価情報を収集する。ステッ
プa3では、収集した情報を集計して、開発に関連する
複数の部門間で共有するデータベースを構築する。ステ
ップa4では、日程計画に従って開発が進捗していくよ
うに、日程計画システム1から共有システム10のデー
タベース20にアクセスして、日程管理を行う。ステッ
プa5では、共有システム10を介していずれかの情報
端末3,4;21;31から進捗に関する問合せがある
か否かを判断する。問合せがあれば、ステップa6で、
問合せに応じた進捗表示の情報を共有システム20を介
して提供する。ステップa6が終了した後、またはステ
ップa5で問合せがないと判断されるときは、ステップ
a4に戻り、以下ステップa6までの手順を繰返す。
FIG. 2 shows a schematic processing procedure of the schedule planning system 1 and the department systems 11, 12, and 13 of FIG. 1, respectively. The processing procedure of the schedule planning system 1 shown in FIG. 2A starts from step a0, and a product plan is made at step a1. Product planning also determines the overall product development schedule. In step a2, schedule progress information including drawing drawings and parts procurement, quality information including evaluation of parts and prototypes, and cost information are collected. In step a3, the collected information is aggregated and a database shared by a plurality of departments related to development is constructed. In step a4, the schedule management system 1 accesses the database 20 of the shared system 10 to manage the schedule so that the development progresses according to the schedule plan. At step a5, it is determined whether or not there is an inquiry about progress from any of the information terminals 3, 4; 21; 31 via the sharing system 10. If there is an inquiry, in step a6,
Information on the progress display in response to the inquiry is provided via the sharing system 20. After step a6 is completed, or when it is determined in step a5 that there is no inquiry, the process returns to step a4 and the procedure up to step a6 is repeated.

【0043】図2(b)は、各部門システム11,1
2,13の処理手順を示す。ステップb0から手順を開
始し、ステップb1では日程計画システム1から日程計
画を受領する。以下日程計画に従うように業務を遂行
し、ステップb2では日程計画システム1から実績の問
合せがあるか否かを判断する。ステップa4の日程管理
の一環として、実績の問合せが行われれば、ステップb
3で実績を共有システム10を介して日程計画システム
1に報告する。ステップb3が終了した後、またはステ
ップb2で実績問合せがないと判断されるときは、ステ
ップb4で情報端末21を介する進捗状況についての表
示要求がなされているか否かを判断する。表示要求がな
されていると判断されるときには、ステップb5で日程
計画システム1に対する要求を行い、ステップa6で進
捗表示の提供を受けると、その進捗表示を情報端末21
の画面に表示する。ステップb5が終了した後、または
ステップb4で表示要求がないと判断されるとき、ステ
ップb2に戻り、以下ステップb5までの手順を繰返
す。
FIG. 2B shows each department system 11, 1.
2 and 13 show processing procedures. The procedure is started from step b0, and the schedule is received from the schedule planning system 1 in step b1. The following operations are performed according to the schedule plan, and it is determined in step b2 whether or not there is an inquiry about the actual results from the schedule planning system 1. As a part of the schedule management in step a4, if an inquiry about the actual results is made, step b
In 3, the result is reported to the schedule planning system 1 via the sharing system 10. After step b3 is completed, or when it is determined in step b2 that there is no performance inquiry, it is determined in step b4 whether or not a display request regarding the progress status via the information terminal 21 is made. When it is determined that the display request is made, a request is made to the schedule planning system 1 in step b5, and when the progress display is provided in step a6, the progress display is displayed in the information terminal 21.
Displayed on the screen. After step b5 is completed, or when it is determined in step b4 that there is no display request, the process returns to step b2 and the procedure up to step b5 is repeated.

【0044】図3は、図1の初期流動管理システムで構
築されるデータベース2,20,22に関する情報の流
れを示す。まずステップc1では、日程計画システム1
のデータベースに対して日程計画が入力され、登録され
る。日程計画が登録されると、予定を共有システム10
のデータベース20に伝達する。共有システム10のデ
ータベース20には、新規部品システム30のデータベ
ース32から、新規に必要となる部品などの情報も供給
される。データベース20に伝達される予定は、ステッ
プc2として、日程計画システム1の情報端末3,4や
新規部品システム30の情報端末31などで予定を参照
することが可能となる。共有システム10のデータベー
ス20に記憶されている予定は、各部門システム11,
12,13に伝達され、データベース22に登録される
とともに、ステップc3で、部門システム11,12,
13の情報端末21で表示される。
FIG. 3 shows the flow of information regarding the databases 2, 20, 22 constructed by the initial flow management system of FIG. First, in step c1, the schedule planning system 1
The schedule is entered and registered in the database of. When the schedule is registered, the schedule sharing system 10
To the database 20 of. The database 20 of the shared system 10 is also supplied with information such as newly required parts from the database 32 of the new parts system 30. The schedule transmitted to the database 20 can be referred to in step c2 by the information terminals 3 and 4 of the schedule planning system 1 and the information terminal 31 of the new parts system 30. The schedules stored in the database 20 of the shared system 10 are:
12 and 13, and is registered in the database 22. At step c3, the department systems 11, 12,
13 information terminals 21 are displayed.

【0045】初期流動期間の経過とともに、ステップc
4では各部門システム11,12,13の情報端末22
から実績情報が入力され、データベース22に登録され
るとともに、共有システム10のデータベース22にも
転送される。共有システム10のデータベース22は、
部門システム11の情報端末21などに進捗状況を予定
と実績との対比の形態で表示する。ステップa6では、
実績情報を共有システム10のデータベース2に転送
し、日程計画システム1の情報端末3,4での表示を可
能にする。
As the initial flow period elapses, step c
4 is the information terminal 22 of each department system 11, 12, 13
The record information is input from, is registered in the database 22, and is also transferred to the database 22 of the shared system 10. The database 22 of the sharing system 10 is
The progress status is displayed on the information terminal 21 or the like of the department system 11 in the form of comparison between the schedule and the actual result. In step a6,
The record information is transferred to the database 2 of the shared system 10 and can be displayed on the information terminals 3 and 4 of the schedule planning system 1.

【0046】図4、図5、図6、図7および図8は、本
実施形態の初期流動管理システムを用いる効果の概要を
それぞれ示す。図4は、進捗状況の把握のリアルタイム
化が達成され、進捗遅延時にタイムリーな対策措置が可
能であることを示す。進捗管理の基本となる日程計画
は、製品開発プロジェクト全体の進捗を管理する。新規
部品については、図1の新規部品システム30で進捗管
理を行い、新規部品リストを作成する。新規部品リスト
には、中間親および新規部品について、情報の最小単位
としての品番と、出図、部品認定、生産準備、部品集約
などの予定や実績、また対象とする個数などの情報が設
定される。新規部品リストの情報は、各部門の詳細情報
へリンクし、それぞれの部門毎に予定と実績とに基づく
進捗管理が行われる。
FIGS. 4, 5, 6, 7 and 8 respectively show the outline of the effect of using the initial flow control system of this embodiment. FIG. 4 shows that the progress status can be grasped in real time, and timely countermeasures can be taken when the progress is delayed. The schedule, which is the basis for progress management, manages the progress of the entire product development project. For new parts, progress management is performed by the new parts system 30 of FIG. 1 and a new parts list is created. In the new parts list, the product number as the minimum unit of information about the intermediate parent and new parts, schedules and results such as drawing, parts qualification, production preparation, parts consolidation, etc., and information such as the number of objects are set. It The information of the new parts list is linked to the detailed information of each department, and the progress management based on the schedule and the actual result is performed for each department.

【0047】図5は、初期流動管理システムの導入で、
進捗管理業務の効率化を図り、問合せ等の重複作業が廃
止される状態を示す。共有システム10でデータベース
20を全社共通のデータベース(DB)として扱うの
で、各部門での転記作業が無くなり、部門毎の用途に応
じてデータを自由に利用することが可能になる。
FIG. 5 shows the introduction of the initial flow management system.
Shows a state where duplicate work such as inquiries is abolished in order to improve the efficiency of progress management work. Since the shared system 10 handles the database 20 as a database (DB) common to the entire company, the posting work in each department is eliminated, and the data can be freely used according to the use of each department.

【0048】また情報端末3,4は、日程進捗の予定に
基づき、予定に対する先行または遅延に応じて、各部門
毎の情報端末21にアラームを発信することもできる。
アラームとしては、実施予定前に予定アラームや、実施
予定日に当日アラーム、さらには実施予定日からの遅延
に対して遅延アラーム、または遅延の日数や度合いによ
る内容や範囲を変更しての遅延アラームなど、予定情報
を担当部門等に通知し、日程進捗の確保を図ることがで
きる。図5には、出図遅延アラームを設計部門に発信
し、生産予定アラームを製造技術部門に発信する例が示
されている。
The information terminals 3 and 4 can also send an alarm to the information terminals 21 of the respective departments based on the schedule progress schedule, in accordance with the advance or delay of the schedule.
As an alarm, a scheduled alarm before the implementation schedule, a current day alarm on the scheduled implementation date, a delay alarm for a delay from the scheduled implementation date, or a delay alarm by changing the content or range depending on the number and degree of delays For example, schedule information can be notified to the department in charge to ensure the progress of the schedule. FIG. 5 shows an example in which the output delay alarm is transmitted to the design department and the production scheduled alarm is transmitted to the manufacturing technology department.

【0049】図6は、新規部品手配などに必要なリード
タイムの確保が可能な効果を示す。従来の調達業務で
は、上段に示すように、たとえば1回目の試作(1M)
が終了して新規部品の仕入れ先を決定し、金型部品の調
達に合わせて設定される1回目の量産試作(1G)の開
始に納入を合せなければならない。このため、短納期を
強いられてしまう。仕入先の決定では、購買部門と仕入
先決定の調整を行い、仕入先とは金型関係の打合せを行
い、生産部門で出図管理と集約管理リストの作成を行う
必要がある。このように仕入先決定が遅れるのは、設計
部門からの正確な新規部品情報が遅いためである。本実
施形態では、下段に示すように、1回目の試作(1M)
の仕様を決める情報に基づいて、1回目の量産試作(1
G)以降に必要となる新規部品の仕様等を予測し、仕入
先の決定等を可能にする。このような後工程業務の前出
しで、リードタイムの確保を図ることができる。
FIG. 6 shows the effect that the lead time necessary for arranging new parts can be secured. In the conventional procurement work, as shown in the upper row, for example, the first trial production (1M)
After that, the supplier of new parts must be decided, and the delivery must be started at the start of the first mass production trial (1G), which is set according to the procurement of mold parts. Therefore, a short delivery time is forced. In the decision of the supplier, it is necessary to adjust the decision of the supplier with the purchasing department, to discuss the mold relation with the supplier, and to manage the drawing-out management and the aggregate management list in the production department. The reason why the supplier is delayed in this way is that accurate new part information from the design department is late. In this embodiment, as shown in the lower stage, the first trial production (1M)
Based on the information that determines the specifications of the first mass production trial (1
G) It is possible to predict the specifications of new parts and the like that will be required after that, and determine the supplier. It is possible to secure the lead time in advance of such post-process work.

【0050】図7は、進捗状況の表示で、情報が付与さ
れている最小単位としての品番に予め関連付けられる管
理階層別に集計して表現する例として、プロジェクト
別、および製品別に、管理対象毎に階層化して進捗状況
を管理する状態を示す。品番に対して付与されている新
規部品や中間完成品などの情報に従えば、性能別に進捗
状況を管理することができる。品番に対して付与される
必要か不要かの条件によって、要否別に進捗状況を管理
することもできる。製品別状況の表示では、海外工場の
状況も表示する。またソフトウエア開発の進捗管理も行
う。さらに、進捗状況だけでなく、品質問題のフォロー
状況も表示する。
FIG. 7 is a display of the progress status. As an example in which the management level associated with the product number as the minimum unit to which the information is added is aggregated and expressed, as an example, each project, each product, and each management target. The state of managing the progress status in layers is shown. According to the information such as new parts or intermediate finished products given to the product number, the progress status can be managed for each performance. It is also possible to manage the progress status depending on whether it is necessary or not depending on the condition whether the product number is required or not. In the status display by product, the status of overseas factories is also displayed. It also manages the progress of software development. Furthermore, not only the progress status but also the follow-up status of quality problems are displayed.

【0051】図8は、品質問題フォロー状況の表示を品
質問題フォローシステムと連動させ、進捗状況の詳細を
グラフィック表示したり、損益状況の内容を表示してい
る状態を示す。また進捗状況詳細では製品信頼性評価の
内容を、評価状況報告書として詳細に表示させることも
できる。
FIG. 8 shows a state in which the display of the quality problem follow-up status is interlocked with the quality problem follow-up system to display the details of the progress status graphically and the contents of the profit and loss status. Further, in the detailed progress status, the contents of the product reliability evaluation can be displayed in detail as an evaluation status report.

【0052】以上説明したように、本実施形態では、デ
ータベース2,20,22に基づいて、業務の進捗状況
を、各部門に応じて予め定められる複数の形態で表示す
ることができる。工業製品を開発し、企画から量産の準
備を行うまでの初期流動期間に、図面出図および部品調
達を含む日程進捗情報、部品および試作品の評価を含む
品質情報、ならびに原価情報を収集し、業務の進捗状況
を、各部門に応じて予め定められる複数の形態で表示す
る。進捗状況の表示は、情報を集計して、開発に関連す
る複数の部門間で共有するデータベース20を構築し、
構築されたデータベース20に基づいて行う。工業製品
の開発を計画通りに進めるためには、計画の進捗状況や
状態を確実にフォローすることが必要となる。進捗状況
や状態によっては、設計変更の大きな要因となり、開発
日程に大きな影響を与えることとなる。日程進捗情報、
品質情報および原価情報を収集して管理項目とし、管理
項目に関する詳細情報を部門間の連携で集計し、集計情
報をデータベース化して、部門間で共有する環境を構築
することができるので、問合せ等の間接業務を削減し
て、初期流動期間に発生する問題の対策の迅速化が可能
となる。
As described above, in the present embodiment, the progress status of the work can be displayed in a plurality of forms predetermined according to each department based on the databases 2, 20, 22. During the initial flow period from the development of industrial products to the preparation of mass production, schedule progress information including drawing drawings and parts procurement, quality information including parts and prototype evaluation, and cost information are collected. The progress status of the work is displayed in a plurality of forms predetermined according to each department. To display the progress status, collect information and build a database 20 that is shared among multiple departments related to development.
It is performed based on the constructed database 20. In order to proceed with the development of industrial products as planned, it is necessary to reliably follow the progress and status of the plan. Depending on the progress and status, it will be a major factor of design change, which will greatly affect the development schedule. Schedule progress information,
Quality information and cost information are collected as management items, detailed information about management items is aggregated by cooperation between departments, and the aggregated information can be stored in a database to build an environment for sharing between departments. It is possible to reduce the number of indirect operations and speed up countermeasures for problems that occur during the initial liquidation period.

【0053】また日程進捗情報、品質情報または原価情
報を含む管理対象に分けて階層化した進捗管理を行うこ
とができるので、種々の切り口で進捗状況や状態を表示
して、迅速な問題解決を図ることができる。また日程進
捗情報の収集では、着手および完了の予定と、着手およ
び完了の実績として詳細情報を取得し、進捗状況の表示
では、日程について幅を持って表現することができる。
各管理項目毎に、予定と実績とを、着手および完了の時
点でそれぞれ管理し、日程について幅を持って進捗状況
を表示するので、日程にずれが生じても、回復を図る余
地を残すことができる。また品質情報の収集では、予め
定める管理項目毎に、少なくとも評価項目数、実施数ま
たは結果のうちの一部を含む評価情報を取得する。進捗
状況の表示では、品質情報について、管理項目毎の評価
情報を表現する。評価情報を評価項目数、実施数、結果
などの品質情報を付与して表示するので、品質情報の評
価についての進捗状況を判りやすく表示することができ
る。また原価情報の収集では、予め定める管理項目毎
に、少なくとも購入価格または見積価格のいずれかを含
む価格情報を取得し、進捗状況の表示では、品質情報に
ついて、管理項目毎の価格情報を表現することもでき
る。購入価格や見積価格などの価格情報を取得し、管理
項目毎に表示するので、製品製造に伴って発生する原価
情報を判りやすいように表示することができる。
Further, since it is possible to perform hierarchical progress management by dividing into management objects including schedule progress information, quality information, or cost information, the progress status and state can be displayed at various points to promptly solve problems. Can be planned. Further, in the collection of the schedule progress information, detailed information is acquired as the start and completion schedules and the achievements of the start and completion, and the schedule can be expressed with a wide range in the display of the progress status.
Schedules and achievements are managed for each management item at the time of starting and completing each, and the progress status is displayed with a range of dates, so there is room for recovery even if there is a gap in the schedule. You can Further, in the collection of quality information, evaluation information including at least the number of evaluation items, the number of implementations, or a part of the results is acquired for each predetermined management item. In the display of the progress status, regarding the quality information, the evaluation information for each management item is expressed. Since the evaluation information is displayed with the quality information such as the number of evaluation items, the number of implementations, and the result added, the progress of the evaluation of the quality information can be easily displayed. In the collection of cost information, price information including at least either the purchase price or the estimated price is acquired for each predetermined management item, and the display of the progress status represents the price information for each management item for the quality information. You can also Since the price information such as the purchase price and the estimated price is acquired and displayed for each management item, it is possible to easily display the cost information generated by the product manufacturing.

【0054】図9は、図6に示すような新規部品のリー
ドタイム確保のために必要な製品構成一覧リストの考え
方を示す。製品構成一覧リストには、製品ストラクチャ
として、最低中間親と新規部品とを表示する。たとえば
「パネルS」は「スクリュー」と「サーキットS」との
中間親である。「サーキットS」は、「PCボード」、
「ダイオード」および「スイッチ」の中間親である。
「ダイオード」および「スイッチ」は新規部品であり、
出図および部品認定の予定、実績、完了、対象の数など
の管理が行われる。
FIG. 9 shows the concept of the product configuration list necessary for securing the lead time of the new part as shown in FIG. In the product configuration list, the lowest intermediate parent and new parts are displayed as the product structure. For example, "panel S" is an intermediate parent between "screw" and "circuit S". "Circuit S" is "PC board",
It is an intermediate parent of "diodes" and "switches".
"Diode" and "Switch" are new parts,
It manages plans, results, completion, number of objects, etc. for drawing and parts certification.

【0055】以上のように、新規部品管理システム30
の処理端末31は、量産の準備で必要となる新規部品に
ついての情報を、量産の準備に先行して行う試作段階の
準備情報を利用して作成する。量産の準備に先行して行
う試作段階の準備情報を利用して、量産の準備で必要と
なる新規部品についての情報を自動的に予想して作成す
るので、部品手配のためのリードタイムを大きくして、
不具合等が起きやすい新規部品の管理を有効に行うこと
ができる。
As described above, the new parts management system 30
The processing terminal 31 of (1) creates information about new parts required for mass production preparation by using the preparation information at the trial production stage performed prior to mass production preparation. By using the preparation information at the trial production stage, which precedes mass production preparation, to automatically predict and create information about new parts required for mass production preparation, the lead time for parts arrangement can be increased. do it,
It is possible to effectively manage new parts that are prone to malfunctions.

【0056】図10は、図1の初期流動管理システム
で、管理対象母数の明確化を図る効果を示す。新規マー
ク付与画面で、最小単位の情報である品番を付与する品
番発番の処理が行われる。要否判定欄にチェックを入れ
ると、初期流動項目として管理の対象となり、品番が図
9に示すような製品構成一覧リストに表示される。製品
構成一覧リストを用いて、部品毎の予定や実績を管理
し、管理対象母数の明確化を図ることができる。
FIG. 10 shows the effect of clarifying the parameter to be managed in the initial flow management system of FIG. On the new mark giving screen, a product number issuing process for giving a product number, which is the minimum unit information, is performed. If a check is put in the necessity determination column, the item is subject to management as an initial flow item, and the product number is displayed in the product configuration list as shown in FIG. By using the product configuration list, it is possible to manage schedules and achievements for each part and clarify the management target parameter.

【0057】図11は、図1の初期流動管理システムで
部門間を連携させる状態を示す。共用システムの日程情
報データベース(DB)を各部門が共用し、全社的な連
携を図ることができる。
FIG. 11 shows a state in which the departments are linked in the initial flow management system of FIG. Each department can share the schedule information database (DB) of the shared system to achieve company-wide cooperation.

【0058】図12は、図1の初期流動管理システムで
製品開発プロジェクトの進捗を管理する状態を示す。商
品企画でプロジェクトが設定されると、プロジェクト登
録を行って管理対象とする。プロジェクトメイトその対
象機種とを明確にすることによって、プロジェクト全体
の進捗を表現可能となる。また製品別、部品別の進捗状
況も表現して、階層化させた進捗管理を行うことができ
る。プロジェクトが終了すれば、進捗管理の対象からは
ずす。
FIG. 12 shows a state in which the progress of the product development project is managed by the initial flow management system of FIG. When a project is set in product planning, the project is registered and managed. Project mate By clarifying the target model, the progress of the entire project can be expressed. It is also possible to express the progress status of each product and each part and perform hierarchical progress management. When the project is completed, remove it from the targets of progress management.

【0059】プロジェクトの日程計画では、情報端末
3,4から入力される標準手番と期限とに基づき、期限
から標準手番を差し引いて、日程進捗情報の予定を算出
する。標準的な手番を設定し、日程進捗情報の予定を決
める際に、標準手番を期限から差し引いて算出するの
で、期限を定めれば日程進捗情報の予定を自動的に定め
ることができる。標準手番を修正すれば、一括して日程
進捗情報の予定を修正することができる。日程計画シス
テム1では、初期流動に関する日程計画についての情報
は、データベース2に登録し、登録履歴を参照可能なデ
ータを生成する。初期流動に関する日程計画やその元に
なる中日程計画などの情報を、データベース2に登録し
て、登録履歴を参照することができるので、日程計画な
どの有効性などを確認することができる。
In the schedule plan of the project, the standard turn is subtracted from the deadline based on the standard turn and the deadline input from the information terminals 3 and 4, and the schedule of the schedule progress information is calculated. When setting a standard turn and deciding the schedule of the schedule progress information, the standard turn is calculated by subtracting the standard turn from the deadline. Therefore, if the deadline is set, the schedule of the schedule progress information can be automatically set. By correcting the standard turn, it is possible to collectively revise the schedule of the schedule progress information. In the schedule planning system 1, the information about the schedule planning regarding the initial flow is registered in the database 2 and the data which can refer to the registration history is generated. Since it is possible to register information such as a schedule plan related to the initial flow and a medium schedule plan which is the basis thereof in the database 2 and refer to the registration history, it is possible to confirm the validity of the schedule plan and the like.

【0060】また日程計画システム1では、予め定める
特記事項を各部門システム11,12,13の情報端末
21に通知することが可能であり、各部門システム1
1,12,13情報端末21では、特記事項の通知を検
知すると、情報表示の画面を一時的に特記事項の強調表
示に切換える。これによって、情報端末21を利用する
各部門の担当者の注意を、特記事項の存在に引きつける
強調表現を自動的に行うことができる。
Further, in the schedule planning system 1, it is possible to notify the information terminal 21 of each department system 11, 12, 13 of a predetermined special note.
When the notice of the special notice is detected, the 1, 12, and 13 information terminals 21 temporarily switch the information display screen to the highlighted display of the special notice. With this, it is possible to automatically perform the emphasized expression that draws the attention of the person in charge of each department who uses the information terminal 21 to the existence of the special note.

【0061】また日程計画システム1は、データベース
2を検索して、相互に類似している情報を、主情報と類
似情報とに区分し、主情報のみ表示する。主情報のみ表
示して類似情報を表示しないので、煩雑な表示を避けて
管理の適正化を図ることができる。またデータベースに
集約して記憶している集約情報に対する詳細情報の存在
場所についての場所情報を保持し、該場所情報を利用す
る該詳細情報の表示を可能にしておく。情報通信ネット
ワークを介するハイパーリンクなどの場所情報で、部品
等の集約状況などについての全体状況と詳細情報とが、
情報存在場所が離れていても表示可能となり、進捗状況
を全体的かつ詳細に管理することができる。
Further, the schedule planning system 1 searches the database 2 and divides information similar to each other into main information and similar information, and displays only the main information. Since only the main information is displayed and the similar information is not displayed, it is possible to avoid complicated display and optimize the management. Further, the location information about the location of the detailed information with respect to the aggregated information aggregated and stored in the database is held, and the detailed information using the location information can be displayed. Location information such as hyperlinks via the information and communication network, and the overall status and detailed information about the status of aggregation of parts, etc.
It is possible to display information even if the information existing location is far away, and it is possible to manage the progress status as a whole and in detail.

【0062】[0062]

【発明の効果】以上のように本発明によれば、工業製品
を開発し、企画から量産の準備を行うまでの初期流動期
間に、日程進捗情報、品質情報、ならびに原価情報を収
集し、業務の進捗状況を、様々な切り口で表示し、問合
せ等の間接業務を削減して、進捗状況のリアルタイムの
把握を可能とすることができるように、各部門の担当者
を支援することができる。情報をデータベース化して、
部門間で共有する環境を構築することができ、初期流動
期間に発生する問題の対策の迅速化が可能となる。
As described above, according to the present invention, schedule progress information, quality information, and cost information are collected during the initial flow period from the development of industrial products to the preparation for mass production. It is possible to support the person in charge of each department so that the progress status can be displayed in various ways and the indirect work such as inquiries can be reduced to grasp the progress status in real time. Create a database of information,
It is possible to build an environment that can be shared between departments, and speed up measures for problems that occur during the initial liquidation period.

【0063】また本発明によれば、情報の付与されてい
る最小単位としての品番と品番との関連付けに従って、
管理対象毎に階層化して判りやすく進捗状況を管理する
ことができる。
Further, according to the present invention, according to the association between the product number and the product number as the minimum unit to which the information is added,
It is possible to manage the progress status in a hierarchy that is easy to understand for each management target.

【0064】また本発明によれば、日程進捗情報など
を、品種々の切り口で進捗状況や状態で表示して、迅速
な問題解決を図ることができる。
Further, according to the present invention, it is possible to promptly solve a problem by displaying the schedule progress information and the like in the progress situation and the state with various cuts of the product.

【0065】また本発明によれば、予定と実績との日程
について幅を持って進捗状況を表示するので、日程にず
れが生じても、回復を図る余地を残すことができる。
Further, according to the present invention, since the progress status is displayed with a wide range of schedules and actual schedules, it is possible to leave room for recovery even if the schedules are misaligned.

【0066】また本発明によれば、予め定める管理項目
毎の評価情報で、品質情報の評価の進捗状況を判りやす
く表示することができる。
Further, according to the present invention, the progress status of the quality information evaluation can be displayed in an easy-to-understand manner by the evaluation information for each predetermined management item.

【0067】また本発明によれば、製品製造に伴って発
生する原価情報を判りやすいように表示することができ
る。
Further, according to the present invention, it is possible to display the cost information generated by manufacturing the product in an easily understandable manner.

【0068】さらに本発明によれば、企画から量産の準
備を行うまでの初期流動期間に、日程進捗情報、品質情
報、ならびに原価情報を自動的に収集し、業務の進捗状
況を、各部門に応じて予め定められる複数の形態で自動
的に表示することができる。開発に関連する複数の部門
間で、管理項目に関する詳細情報を部門間の連携で集計
し、データベースとして部門間で共有する環境を構築し
て、問合せ等の間接業務の削減や初期流動期間に発生す
る問題対策の迅速化を可能にすることができる。
Furthermore, according to the present invention, schedule progress information, quality information, and cost information are automatically collected during the initial flow period from planning to preparation for mass production, and the progress status of work is reported to each department. Accordingly, it can be automatically displayed in a plurality of predetermined forms. Detailed information on management items is aggregated among multiple departments related to development by cooperation between departments, and an environment is shared among departments as a database to reduce indirect operations such as inquiries and occur during the initial flow period. It is possible to speed up the problem countermeasure to be taken.

【0069】また本発明によれば、基幹システムおよび
部門システムに対しての定期的にアクセスで、初期流動
管理に必要な情報を自動的に取得して再集計を行うこと
ができる。
Further, according to the present invention, it is possible to automatically obtain the information necessary for the initial flow management and re-aggregate by periodically accessing the backbone system and the department system.

【0070】また本発明によれば、期限を定めれば日程
進捗情報の予定を自動的に定めることができ、標準手番
を修正すれば、一括して日程進捗情報の予定を修正する
ことができる。
According to the present invention, the schedule of the schedule progress information can be automatically set if the deadline is set, and the schedule of the schedule progress information can be collectively corrected by correcting the standard turn. it can.

【0071】また本発明によれば、予定情報をアラーム
として担当部門等に通知し、日程進捗の確保を図ること
ができる。
Further, according to the present invention, schedule information can be notified to the department in charge as an alarm to ensure the progress of the schedule.

【0072】また本発明によれば、初期流動に関する日
程計画などの情報について、登録履歴を参照し、有効性
などを確認することができる。
Further, according to the present invention, it is possible to confirm the validity and the like by referring to the registration history for the information such as the schedule plan regarding the initial flow.

【0073】また本発明によれば、量産の準備で必要と
なる新規部品についての情報を自動的に予想して作成
し、部品手配のためのリードタイムを大きくして、新規
部品の管理を有効に行うことができる。
Further, according to the present invention, information about new parts required for mass production preparation is automatically predicted and created, the lead time for arranging parts is increased, and management of new parts is effective. Can be done.

【0074】また本発明によれば、情報端末での表示を
特記事項の存在に引きつける強調表現を、自動的に行う
ことができる。
Further, according to the present invention, it is possible to automatically perform the emphasized expression that attracts the display on the information terminal to the existence of the special item.

【0075】また本発明によれば、相互に類似している
情報について主情報のみ表示して、煩雑な表示を避けて
管理の適正化を図ることができる。
Further, according to the present invention, it is possible to display only the main information about the information similar to each other, avoid the complicated display, and optimize the management.

【0076】また本発明によれば、進捗状況についての
全体状況と詳細情報とを、情報存在場所によらずに表示
可能となり、進捗状況を全体的かつ詳細に管理すること
ができる。
Further, according to the present invention, it is possible to display the overall status and detailed information about the progress status regardless of the information existence place, and it is possible to manage the progress status overall and in detail.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の一形態である初期流動管理シス
テムの概略的な構成を示すブロック図である。
FIG. 1 is a block diagram showing a schematic configuration of an initial flow management system that is an embodiment of the present invention.

【図2】図1の日程計画システムおよび部門システムの
概略的な処理手順をそれぞれ示すフローチャートであ
る。
2 is a flow chart showing a schematic processing procedure of the schedule planning system and the department system of FIG. 1, respectively.

【図3】図1の初期流動管理システムで構築されるデー
タベースに対する情報の流れを示す図である。
FIG. 3 is a diagram showing a flow of information with respect to a database constructed by the initial flow management system of FIG.

【図4】図1の初期流動管理システムで得られる効果を
示す図表である。
FIG. 4 is a chart showing effects obtained by the initial flow management system of FIG. 1.

【図5】図1の初期流動管理システムで得られる効果を
示す図表である。
5 is a chart showing effects obtained by the initial flow management system of FIG. 1. FIG.

【図6】図1の初期流動管理システムで得られる効果を
示す図表である。
6 is a chart showing effects obtained by the initial flow control system of FIG. 1. FIG.

【図7】図1の初期流動管理システムで得られる効果を
示す図表である。
7 is a chart showing effects obtained by the initial flow management system of FIG. 1. FIG.

【図8】図1の初期流動管理システムで得られる効果を
示す図表である。
8 is a chart showing effects obtained by the initial flow management system of FIG. 1. FIG.

【図9】図1の初期流動管理システムで用いる製品構成
一覧リストの考え方を示す図である。
9 is a diagram showing the concept of a product configuration list used in the initial flow management system of FIG.

【図10】図1の初期流動管理システムへの入力画面を
示す図、および得られる効果を示す図表である。
FIG. 10 is a diagram showing an input screen to the initial flow management system of FIG. 1 and a chart showing the obtained effects.

【図11】図1の初期流動管理システムで部門間を連携
させる状態を示す図である。
11 is a diagram showing a state in which departments are linked in the initial flow management system of FIG. 1. FIG.

【図12】図1の初期流動管理システムで製品開発プロ
ジェクトの進捗を管理する状態を示す図表である。
FIG. 12 is a chart showing a state of managing the progress of a product development project in the initial flow management system of FIG. 1.

【図13】工業製品の開発時の初期流動期間を示す図で
ある。
FIG. 13 is a diagram showing an initial flow period during development of an industrial product.

【図14】従来の初期流動業務の解決課題を示す図であ
る。
FIG. 14 is a diagram showing a problem to be solved in a conventional initial flow operation.

【符号の説明】[Explanation of symbols]

1 日程計画システム 2,20,22,32 データベース 3,4,21,31 情報端末 5,15 情報通信ケーブル 6,16 通信I/F 10 共有システム 11,12,13 部門システム 30 新規部品管理システム 1 schedule planning system 2,20,22,32 database 3,4,21,31 Information terminal 5,15 Information communication cable 6,16 Communication I / F 10 shared system 11, 12, 13 department system 30 New parts management system

───────────────────────────────────────────────────── フロントページの続き (72)発明者 柳田 英徳 兵庫県神戸市兵庫区御所通1丁目2番28号 富士通テン株式会社内   ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Hidenori Yanagida             1-228 Goshodori, Hyogo-ku, Kobe-shi, Hyogo               Within Fujitsu Ten Limited

Claims (15)

【特許請求の範囲】[Claims] 【請求項1】 工業製品を開発し、企画から量産の準備
を行うまでの初期流動期間に、必要となる複数業務の進
捗を管理する初期流動管理方法であって、 図面出図および部品調達を含む日程進捗情報、部品およ
び試作品の評価を含む品質情報、ならびに原価情報を収
集し、 情報を集計して、開発に関連する複数の部門間で共有す
るデータベースを構築し、 データベースに基づいて、業務の進捗状況を、各部門に
応じて予め定められる複数の形態で表示することを特徴
とする初期流動管理方法。
1. An initial flow management method for managing the progress of a plurality of operations required during the initial flow period from the development of industrial products to the planning to preparation for mass production. Collecting schedule progress information, quality information including evaluation of parts and prototypes, and cost information, aggregating the information, and building a database shared among multiple departments related to development, based on the database, An initial flow management method characterized by displaying the progress status of work in a plurality of forms predetermined according to each department.
【請求項2】 前記進捗状況の表示では、情報が付与さ
れている最小単位としての品番に予め関連付けられる管
理階層別に集計して表現することを特徴とする請求項1
記載の初期流動管理方法。
2. The display of the progress status is summarized and expressed by management hierarchy associated in advance with a product number as a minimum unit to which information is added.
Initial flow management method described.
【請求項3】 前記管理階層は、前記日程進捗情報、前
記品質情報または前記原価情報を含む管理対象に分けら
れることを特徴とする請求項2記載の初期流動管理方
法。
3. The initial flow management method according to claim 2, wherein the management hierarchy is divided into management targets including the schedule progress information, the quality information, or the cost information.
【請求項4】 前記日程進捗情報の収集では、着手およ
び完了の予定と、着手および完了の実績として詳細情報
を取得し、 前記進捗状況の表示では、日程について幅を持って表現
することを特徴とする請求項3記載の初期流動管理方
法。
4. In the collection of the schedule progress information, detailed information is acquired as a start and completion schedule and a record of the start and completion, and in the display of the progress status, the schedule is expressed with a range. The initial flow control method according to claim 3.
【請求項5】 前記品質情報の収集では、予め定める管
理項目毎に、少なくとも評価項目数、実施数または結果
のうちの一部を含む評価情報を取得し、 前記進捗状況の表示では、品質情報について、該管理項
目毎の評価情報を表現することを特徴とする請求項3ま
たは4記載の初期流動管理方法。
5. In the collection of the quality information, the evaluation information including at least a part of the number of evaluation items, the number of implementations or the results is acquired for each predetermined management item, and the quality information is displayed in the progress status display. 5. The initial flow management method according to claim 3 or 4, wherein the evaluation information for each management item is expressed.
【請求項6】 前記原価情報の収集では、予め定める管
理項目毎に、少なくとも購入価格または見積価格のいず
れかを含む価格情報を取得し、 前記進捗状況の表示では、品質情報について、該管理項
目毎の価格情報を表現することを特徴とする請求項3〜
5のいずれかに記載の初期流動管理方法。
6. In the collection of the cost information, price information including at least either a purchase price or an estimated price is acquired for each predetermined management item, and in the display of the progress status, the quality information is managed by the management item. The price information for each is expressed, The claim 3 characterized by the above-mentioned.
The initial flow control method according to any one of 5 above.
【請求項7】 工業製品を開発し、企画から量産の準備
を行うまでの初期流動期間に、必要となる複数業務の進
捗を管理する初期流動管理システムであって、 前記複数の業務を担当する部門にそれぞれ配置され、情
報の収集を行う複数の情報端末と、 該複数の情報端末間を接続する情報通信ネットワーク
と、 該複数の情報端末に該情報通信ネットワークを介して接
続され、前記データベースを構築するための情報記憶装
置と、 前記進捗状況を表示するための表示装置と、 該複数の情報端末、該情報通信ネットワーク、該情報記
憶装置および該表示装置を制御して、請求項1〜6のい
ずれかに記載の初期流動管理方法を実行する処理を行う
処理装置とを含むことを特徴とする初期流動管理システ
ム。
7. An initial flow management system for managing the progress of a plurality of operations required during the initial flow period from the development of industrial products to the planning to the preparation for mass production, which is in charge of the plurality of operations. A plurality of information terminals, which are respectively arranged in departments, collect information, an information communication network connecting the plurality of information terminals, and a plurality of information terminals connected to the information terminals via the information communication network to store the database. An information storage device for construction, a display device for displaying the progress status, a plurality of information terminals, the information communication network, the information storage device, and the display device are controlled to control the information storage device. An initial flow management system comprising: a processing device that performs a process for executing the initial flow management method according to any one of 1.
【請求項8】 前記複数の情報端末および前記情報通信
ネットワークは、全部門を統括する基幹システムと、各
部門毎の部門システムとを形成し、 前記処理装置は、該基幹システムおよび該部門システム
に対してそれぞれ定期的にアクセスを行い、前記初期流
動の管理に必要な情報を取得して、各システム内で再集
計を行うことを特徴とする請求項7記載の初期流動管理
システム。
8. The plurality of information terminals and the information communication network form a basic system that controls all departments and a department system for each department, and the processing device includes the basic system and the department system. The initial flow management system according to claim 7, wherein the initial flow management system performs regular access to each of the systems, acquires information necessary for managing the initial flow, and performs recounting in each system.
【請求項9】 前記処理装置は、前記情報端末から入力
される標準手番と期限とに基づき、該期限から該標準手
番を差し引いて、前記日程進捗情報の予定を算出するこ
とを特徴とする請求項7または8記載の初期流動管理シ
ステム。
9. The processing device calculates the schedule of the schedule progress information by subtracting the standard turn from the deadline based on the standard turn and deadline input from the information terminal. The initial flow management system according to claim 7 or 8.
【請求項10】 前記処理装置は、前記日程進捗の予定
に基づき、該予定に対する先行または遅延に応じて、各
部門毎の情報端末にアラームを発信することを特徴とす
る請求項9記載の初期流動管理システム。
10. The initial stage according to claim 9, wherein the processing device issues an alarm to the information terminal of each department based on the schedule progress schedule, in accordance with the advance or delay of the schedule. Flow management system.
【請求項11】 前記処理装置は、初期流動に関する日
程計画についての情報を、前記情報記憶装置に登録し、
登録履歴を参照可能なデータを生成することを特徴とす
る請求項7〜10のいずれかに記載の初期流動管理シス
テム。
11. The processing device registers information about a schedule plan regarding an initial flow in the information storage device,
The initial flow management system according to any one of claims 7 to 10, wherein data that can refer to a registration history is generated.
【請求項12】 前記処理装置は、前記量産の準備で必
要となる新規部品についての情報を、該量産の準備に先
行して行う試作段階の準備情報を利用して作成すること
を特徴とする請求項7〜11のいずれかに記載の初期流
動管理システム。
12. The processing apparatus creates information on new parts required for the preparation for mass production by using preparation information of a trial production stage performed prior to the preparation for mass production. The initial flow management system according to any one of claims 7 to 11.
【請求項13】 前記処理装置は、予め定める特記事項
を前記各情報端末に通知することが可能であり、 該各情報端末では、該特記事項の通知を検知すると、情
報表示の画面を一時的に該特記事項の強調表示に切換え
ることを特徴とする請求項7〜12のいずれかに記載の
初期流動管理システム。
13. The processing device is capable of notifying each of the information terminals of a predetermined special note, and when each of the information terminals detects the notification of the special note, the information display screen is temporarily displayed. 13. The initial flow management system according to claim 7, wherein the highlighted items are switched to the highlighted items.
【請求項14】 前記処理装置は、前記情報記憶装置に
構築されているデータベースを検索して、相互に類似し
ている情報を、主情報と類似情報とに区分し、主情報の
み表示することを特徴とする請求項1〜13のいずれか
に記載の初期流動管理装置。
14. The processing device searches a database built in the information storage device, divides information similar to each other into main information and similar information, and displays only the main information. The initial flow control device according to any one of claims 1 to 13, characterized in that.
【請求項15】 前記処理装置は、前記情報記憶装置に
構築されているデータベースに集約して記憶している集
約情報に対する詳細情報の存在場所についての場所情報
を保持し、該場所情報を利用する該詳細情報の表示が可
能であることを特徴とする請求項1〜14のいずれかに
記載の初期流動管理システム。
15. The processing device holds location information about the location of detailed information for the aggregated information stored in a database built in the information storage device, and uses the location information. The initial flow management system according to claim 1, wherein the detailed information can be displayed.
JP2001388690A 2001-12-21 2001-12-21 Initial flow control method and system Pending JP2003187046A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001388690A JP2003187046A (en) 2001-12-21 2001-12-21 Initial flow control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001388690A JP2003187046A (en) 2001-12-21 2001-12-21 Initial flow control method and system

Publications (1)

Publication Number Publication Date
JP2003187046A true JP2003187046A (en) 2003-07-04

Family

ID=27597119

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001388690A Pending JP2003187046A (en) 2001-12-21 2001-12-21 Initial flow control method and system

Country Status (1)

Country Link
JP (1) JP2003187046A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106845859A (en) * 2017-02-21 2017-06-13 韦伯电梯有限公司 A kind of elevator manufacturing enterprise technique productions and working procedure states tracking system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106845859A (en) * 2017-02-21 2017-06-13 韦伯电梯有限公司 A kind of elevator manufacturing enterprise technique productions and working procedure states tracking system

Similar Documents

Publication Publication Date Title
KR102184182B1 (en) Project/Task Intelligent Goal Management Method and Platform based on Super Tree
EP1695282B1 (en) Data processing system and method
JP3991811B2 (en) Inventory control system and inventory control method
JP2000176799A (en) Production planning and manufacturing planning system
EP2045770A1 (en) Quality control system, quality control program, and client device
JP2006503352A (en) Systems and methods for improving planning, scheduling and supply chain management
JP2008299762A (en) Production management program
JP2003228410A (en) Work commencement management system
US20200125078A1 (en) Method and system for engineer-to-order planning and materials flow control and optimization
JP2004021364A (en) Management intention decision support system
JP2004102367A (en) Demand and supply planning method and system
JP2007323680A (en) Management decision support system
US20050096774A1 (en) System and method for integrating transactional and real-time manufacturing data
JP5468282B2 (en) Project management support device
CN110032154A (en) A kind of production control method and system of be pilot
US7082342B2 (en) System and method for management of mold design and production
JP2000039904A (en) Project management system
JP2018163436A (en) Plan evaluation system, plan evaluation method, plan evaluation method and program
JP2008052413A (en) Evaluation support system for sales plan
JP2003187046A (en) Initial flow control method and system
JP2012141788A (en) Project information management device and management method
JP6902162B2 (en) Information processing equipment and programs
Aksyonov et al. Development of an automated system for analysis, modeling, and decision-making for metallurgical enterprise
JP4239767B2 (en) Design change support system, design change method, design change support program, and recording medium recording the same
JPH10177596A (en) Product development project management system and method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040915

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061227

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070130

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070328

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070424