JP2003147936A - Guide plate for constructing brick wall, brick wall and brick wall constructing method - Google Patents

Guide plate for constructing brick wall, brick wall and brick wall constructing method

Info

Publication number
JP2003147936A
JP2003147936A JP2001274701A JP2001274701A JP2003147936A JP 2003147936 A JP2003147936 A JP 2003147936A JP 2001274701 A JP2001274701 A JP 2001274701A JP 2001274701 A JP2001274701 A JP 2001274701A JP 2003147936 A JP2003147936 A JP 2003147936A
Authority
JP
Japan
Prior art keywords
rail
shaped
tile
brick wall
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001274701A
Other languages
Japanese (ja)
Other versions
JP4099809B2 (en
Inventor
Hiroshi Kurose
洋 黒瀬
Kenichi Hasegawa
健一 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BRICK PRODUCTS TOKYO CO Ltd
HASEGAWA SEISAKUSHO KK
Hasegawa Manufacturing Co Ltd
Original Assignee
BRICK PRODUCTS TOKYO CO Ltd
HASEGAWA SEISAKUSHO KK
Hasegawa Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BRICK PRODUCTS TOKYO CO Ltd, HASEGAWA SEISAKUSHO KK, Hasegawa Manufacturing Co Ltd filed Critical BRICK PRODUCTS TOKYO CO Ltd
Priority to JP2001274701A priority Critical patent/JP4099809B2/en
Publication of JP2003147936A publication Critical patent/JP2003147936A/en
Application granted granted Critical
Publication of JP4099809B2 publication Critical patent/JP4099809B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a guide plate for constructing a brick wall, brick wall and a construction method, capable of well keeping the horizontal of multi-stage rail-like hardwares without especially heightening the bending accuracy of the rail-like hardware, eliminating the need of skill only by once drawing reference ink so that the rail-like hardwares arranged orderly without array error can be stuck and fixed by simple work, and constructing a beautiful brick wall having good parallel accuracy efficiently and inexpensively in a short time. SOLUTION: According to this construction method for the brick wall and a means for construction, the rail-like hardwares 4 are arranged and fixed in multi-stage to intersect furring strips 6, 6 fixed at designated spaces to a bed, tile-like bricks 1, 2 are arranged on the rail-like hardwares 4 to be born with upper grooves 10, 20 and a lower flat surface, and a joint 8 is coated on the rail-like hardwares 4 to fill up a gap between the tile-like bricks to constitute the brick wall. The guide plate has positioning projections 50, 50', 51, 51' at fixed intervals for leveling by abutting the bearing horizontal part of the rail-like hardware 4 in the direction of height from the lower end of a corrosion-resisting batten plate having the back to be fixed to the furring strips 6, 6.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明はレンガ壁施工用ガイ
ド板とこれを用いたレンガ壁よびレンガ壁の施工方法に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a brick wall construction guide plate, and a brick wall and a brick wall construction method using the same.

【0002】[0002]

【従来の技術】建家の外壁やその施工法として、高級感
や重厚感を醸し出すことができるうえに、多孔質である
ことによる適度の放湿性と高い蓄熱性によってかびの発
生等を防止できるメリットがあることから、外装化粧を
兼ねてレンガ張りが汎用されつつある。
2. Description of the Related Art As an exterior wall of a building and its construction method, it is possible to create a feeling of luxury and profoundness, and to prevent mold from occurring due to its moderate moisture release and high heat storage due to its porous nature. Because of its merits, brick upholstery is being widely used as an exterior makeup.

【0003】かかるレンガを用材とする壁状体の施工法
として、下地としてモルタル層を設け、このモルタル層
に20mmないし25mmの厚さの厚肉プレート状のレ
ンガを押し付けて圧着する方法が一般に採用されてい
た。
As a method of constructing a wall-shaped body using such bricks as a material, generally employed is a method in which a mortar layer is provided as an underlayer, and a thick plate-like brick having a thickness of 20 mm to 25 mm is pressed against the mortar layer and pressure-bonded. It had been.

【0004】しかし、この方法は、縦、横および前後の
レベル出しが難しく、施工に高い熟練度を必要としてし
かも非常に手間と時間がかかり、施工コストが高くなる
という問題があった。また、レンガの背面がモルタルに
圧着されているだけであるため、地震等によってレンガ
がモルタル層から剥離、滑落しやすいという問題があっ
た。また、モルタルを下地としているため、モルタル成
分中のいわゆる灰汁がレンガのポアを通して外部ににじ
み出るため、白華現象やいわゆる耳垂れが発生しやす
く、それによってレンガが汚損され、しかもそうした汚
れはレンガの表面を洗っても除去することができないた
め経時的に外観が劣化し、前述した滑落の改修とともに
高価なメンテナンス工事を必要とするという問題があっ
た。
However, this method has a problem in that it is difficult to set the level in the vertical, horizontal, and front and rear directions, requires a high degree of skill in construction, takes a lot of time and labor, and increases the construction cost. In addition, since the back surface of the brick is only pressure-bonded to the mortar, there is a problem that the brick is easily separated from the mortar layer and slips off due to an earthquake or the like. In addition, since the mortar is the base, so-called lye in the mortar component oozes out through the pores of the bricks, which easily causes the white flower phenomenon and so-called ear drooping, which causes the bricks to become soiled, and in addition, such dirt is the surface of the bricks. Since it cannot be removed even if washed, there is a problem that the appearance deteriorates over time, and expensive maintenance work is required along with the above-mentioned repair of sliding.

【0005】この対策として、下地に胴縁を所定間隔で
固定し、この胴縁と交差するようにレール状金物を多段
状に配列固定し、それらレール状金物にタイル状レンガ
を上部の溝と下部の平坦面をもって受支させるように配
置し、各タイル状レンガ間の隙間を埋める如くレール状
金物に目地を塗着することでレンガ壁面を築造する方法
が開発されている。
As a countermeasure against this, the furring strips are fixed to the base at predetermined intervals, and the rail-shaped metal fittings are arranged and fixed in a multi-step manner so as to intersect with the furring edges, and the tile-shaped bricks are formed on the rail-shaped fittings at the upper groove. A method of constructing a brick wall surface by arranging so as to support the lower flat surface and applying joints to the rail-shaped metal fitting so as to fill the gap between the tile-shaped bricks has been developed.

【0006】[0006]

【発明が解決しようとする課題】先行技術は、図18
(a)のようにプレート状レンガ1,2の高さに合致す
る幅の帯板状面部40の上縁部と下縁部にそれぞれ水平
部43,43とこれから直角状に屈曲した耳部42,4
4とを有するトップ用のレール4aと、図18(b)の
ように、プレート状レンガ1,2の高さに合致した幅の
帯板状面部40の上縁部にラップ用張り出し部45を屈
曲形成し、下縁部に前記張り出し部45よりも大きく張
出した受支用の水平部43とこれから直角状に屈曲した
耳部44とを有する標準用のレール4bと、図18
(c)のように、プレート状レンガ1,2の高さに合致
した幅の帯板状面部40の上縁部にラップ用の張り出し
部45を形成し、下縁部に壁下端基礎に当接可能な受支
用の水平部43を形成したスタート用(最下段用)のレ
ール4cを使用し、下地3に所要間隔で胴縁6,6を固
定した状態で、図19のようにスタート用レール4cを
胴縁6,6と交差するように配して固定し、スタート用
レル4cの上縁部のラップ用の張り出し部45に標準レ
ール4bの下縁の水平部43がラップするように配して
固定し、これを必要段数繰り返し、最上段の下の標準レ
ール4bの張り出し部45にトップ用レール4aのラッ
プ用の張り出し部43を重合して固定し、図19のよう
なレンガ壁を形成していた。
The prior art is shown in FIG.
As shown in (a), horizontal portions 43, 43 are formed at the upper and lower edges of the strip plate surface portion 40 having a width that matches the height of the plate bricks 1, 2, and an ear portion 42 bent at a right angle therefrom. , 4
As shown in FIG. 18 (b), a rail 4 a for the top having 4 and a projecting portion 45 for wrapping are provided at the upper edge of the band plate-like surface portion 40 having a width matching the height of the plate bricks 1 and 2. A standard rail 4b which is bent and has a horizontal portion 43 for receiving and supporting, which is extended more than the protruding portion 45 at the lower edge portion, and an ear portion 44 which is bent at a right angle from the horizontal portion 43, and FIG.
As shown in (c), the projecting portion 45 for wrapping is formed on the upper edge portion of the strip plate surface portion 40 having a width matching the height of the plate bricks 1 and 2, and the lower edge portion is attached to the wall lower end foundation. As shown in FIG. 19, using the starting (lowermost) rail 4c in which the horizontal portion 43 for receiving and supporting can be formed is used and the furring strips 6 and 6 are fixed to the base 3 at required intervals. The rail 4c is arranged so as to cross the furring strips 6 and 6, and is fixed, so that the horizontal portion 43 of the lower edge of the standard rail 4b wraps on the overhanging portion 45 of the upper edge of the starting rail 4c for wrapping. And fix it, and repeat this for the required number of steps. The wrapping overhanging portion 43 of the top rail 4a is superposed on the overhanging portion 45 of the standard rail 4b below the uppermost step, and fixed as shown in FIG. Had formed a wall.

【0007】[0007]

【発明が解決しようとする課題】しかし、この先行技術
は水平精度を出すことが難しく、誤差の累積により各段
が壁面ごとで異なったり、段差が生じてしまうことが多
いという問題があった。すなわち、先行技術は、スター
ト用レール4cを固定し、その上に次の標準用レールを
ラップさせて固定し、その標準用レール4bの上に次段
の標準用レール4bをラップさせて固定する作業を繰り
返して壁面を構成していくようにしているが、各レール
の帯板状面部の幅寸法を正確に出して上下縁にそれぞれ
水平部を曲げ加工することは難しく、各レール自体にか
なりの誤差が存在する。このため、そうした誤差のある
レールを水平部同士ラップするように重ねつつ胴縁にあ
てながらて釘打ちする際にずれることが多い。こうした
ことから、水平度を正しく出しにくく、積上げ誤差が累
積され、積上げが進むにつれて誤差が大きくなることが
避けられず、これにより、レール状金物に取り付けるタ
イル状レンガの配列間隔がずれることになり、壁の各面
でのレンガの並びが不揃いになるなど、見映えがよくな
くなる可能性があった。
However, this prior art has a problem in that it is difficult to obtain horizontal accuracy, and due to the accumulation of errors, each step is different from wall surface to wall surface or a step is often generated. That is, in the prior art, the start rail 4c is fixed, the next standard rail is wrapped and fixed thereon, and the standard rail 4b of the next stage is wrapped and fixed on the standard rail 4b. Although the wall surface is constructed by repeating the work, it is difficult to accurately determine the width dimension of the strip plate surface part of each rail and bend the horizontal parts to the upper and lower edges respectively, and it is quite difficult for each rail itself. There is an error of. For this reason, rails with such an error are often misaligned when nailing them while overlapping the horizontal portions so as to wrap the horizontal portions and applying them to the furring strip. For these reasons, it is unavoidable that the horizontality is difficult to obtain correctly, and the stacking error accumulates, and the error increases as the stacking progresses, which inevitably shifts the arrangement interval of the tile bricks attached to the rail-shaped hardware. , The bricks on each side of the wall could be out of order, and the appearance might not look good.

【0008】この対策としては、各段のレールを配置す
るたびにに細かく墨線を打って、その墨線にレールを合
わせて固定するほかないが、建物には最低でも四隅があ
り、隅の多い建物は墨線を曲げなくてはならないので、
水平出しの作業そのものに多大の時間と労力が必要であ
った。これを解消するためには、レール状金物の曲げ精
度を上げてベースレール自体に定規の役割を持たせ、レ
ール状金物をアゼ倉方式に積上げる方法が考えられる。
しかし、仮にレール状金物にかなりの水平精度を出して
も、これを取付ける際に前記したような配置の誤差が生
ずることは変わりがなく、やはり積上げが進むにつれて
誤差が大きくなることを解消できない。
As a measure against this, there is no choice but to strike a fine black line every time each rail of each stage is arranged and fix the rail by aligning the rail with the black line, but the building has at least four corners and a building with many corners. Has to bend the black line,
The leveling work itself required a lot of time and effort. In order to solve this problem, it is possible to increase the bending accuracy of the rail-shaped hardware so that the base rail itself has a role of a ruler, and the rail-shaped hardware is stacked in the Azekura method.
However, even if the rail-shaped metal piece is provided with a considerable level of horizontal accuracy, the above-mentioned error in the placement will still occur when the rail-shaped metal piece is mounted, and it cannot be resolved that the error increases as the stacking progresses.

【0009】本発明は前記のような問題点を解消するた
めになされたもので、その目的とするところは、レール
状金物の曲げ精度を特に高くせずとも多数段のレール状
金物の水平度がよく保たれ、基準墨を一回引くだけで熟
練度を必要とせず単純作業により配列誤差のない整然と
したレール状金物を張付け固定でき、これにより平行精
度がよく美麗なレンガ壁を能率良く短期間で安価に築造
することができるレンガ壁施工用ガイド板とれんが壁を
提供することにある。
The present invention has been made in order to solve the above-mentioned problems, and an object of the present invention is to level the level of a rail-shaped metal article in many stages without particularly increasing the bending accuracy of the rail-shaped metal article. Well-maintained, it is possible to stick and fix an orderly rail-shaped metal object with no alignment error by simple work without pulling the standard black ink once, and this makes it possible to efficiently and beautifully construct a beautiful brick wall with high parallel accuracy. It is to provide a brick wall construction guide plate and a brick wall that can be built at low cost.

【0010】本発明の第2の目的は、基準墨を一回引く
だけで熟練度を必要とせず単純作業により配列誤差のな
い整然とした平行精度のがよい美麗なレンガ壁を能率良
く短期間で安価に築造することができるレンガ壁施工法
を提供することにある。
A second object of the present invention is to draw a beautiful brick wall with good parallel accuracy without alignment error by simple work without pulling the skill by only drawing the reference black ink once, and in a short period of time efficiently. It is to provide a brick wall construction method that can be built at low cost.

【0011】本発明において、「レンガ壁」とは、一般
住宅の建家における本体やベランダなどの外壁のほか、
塀、門柱、あるいは建家の内装壁などを含む概念であ
る。
In the present invention, the "brick wall" means not only an outer wall such as a main body or a veranda in a building of a general house,
It is a concept that includes walls, gateposts, and interior walls of buildings.

【0012】[0012]

【課題を解決するための手段】上記目的を達成するため
本発明によるレンガ壁施工用ガイド板は、下地に胴縁を
所定間隔で固定し、この胴縁と交差するようにレール状
金物を多段状に配列固定し、それらレール状金物にタイ
ル状レンガを上部の溝と下部の平坦面をもって受支させ
るように配置し、各タイル状レンガ間の隙間を埋める如
くレール状金物に目地を塗着することで構成されるレン
ガ壁のための施工用手段であって、前記胴縁に固定され
るべき背面を有する耐食性帯板の下端から高さ方向に、
前記レール状金物の受支用水平部を当接させて水準出し
するための位置決め突起を一定間隔ごとに有しているこ
とを特徴としている。
In order to achieve the above object, a brick wall construction guide plate according to the present invention has a furring strip fixed to a base at predetermined intervals, and a rail-shaped metal object is multi-staged so as to intersect the furring strip. Arranged in a fixed shape, and arranged so that the tile-shaped bricks can be supported by the rail-shaped hardware with the groove on the top and the flat surface on the bottom, and the joints are applied to the rail-shaped hardware so as to fill the gaps between the tile-shaped hardware. A construction means for a brick wall constituted by, in the height direction from the lower end of the corrosion-resistant strip having a back surface to be fixed to the furring strip,
It is characterized in that it has positioning projections for abutting the horizontal portions for receiving and supporting the rail-shaped metal object and leveling them at regular intervals.

【0013】また、本発明によるレンガ壁は、下地に所
定間隔で固定された胴縁の所要間隔のものに固定され、
水準出し用の位置決め突起を下端から高さ方向で一定間
隔で形成している帯板状の施工用ガイド板と、上面に溝
を有し下端面がフラットな複数個のタイル状レンガと、
面部端縁にタイル状レンガを受支する水平部と下段のタ
イル状レンガの溝と係合する耳部を有し、それぞれ前記
施工用ガイド板の各段の位置決め突起に前記水平部を当
接させて配列された多段のレール状金物と、前記レール
状金物4の水平部と耳部によって各々が支持されたタイ
ル状レンガの隙間を埋める如くレール状金物に塗着され
た目地とを備えていることを特徴としている。
Further, the brick wall according to the present invention is fixed to a base material having a required interval of furring edges fixed at a predetermined interval,
A strip-shaped construction guide plate in which positioning projections for leveling are formed at a constant interval in the height direction from the lower end, and a plurality of tile-shaped bricks having a groove on the upper surface and a lower end surface being flat,
The surface edge has a horizontal portion that receives the tile-shaped brick and an ear portion that engages with the groove of the tile-shaped brick in the lower stage, and the horizontal portion abuts on the positioning protrusion of each stage of the construction guide plate. A multi-tiered rail-shaped hardware arranged in a row, and joints applied to the rail-shaped hardware so as to fill the gaps between the horizontal bricks of the rail-shaped hardware 4 and the tile bricks supported by the ears. It is characterized by being.

【0014】また、本発明によるレンガ壁の施工方法
は、防水性能を有する下地に所要間隔で胴縁を固定する
工程と、下端から位置決め突起が一定間隔ごとに突出し
た帯板状の施工用ガイド板を所定間隔ごとの胴縁に固定
する工程と、下端縁にタイル状レンガ受支用の水平部と
これに続き下向き屈曲した耳部を有する複数のレール状
金物を、前記水平部が施工用ガイド板の位置決め突起に
当接するように配置して胴縁に固定することを繰り返す
工程と、上端面に溝を有する多数のタイル状レンガを、
前記レール状金物の耳部に前記溝を係合させ下端面を水
平部にて支持させるように差し込んで配列する工程と、
配列済みのタイル状レンガ相互間の隙間にレール状金物
を下地として目地材を塗着する工程とからなることを特
徴としている。
Further, the brick wall construction method according to the present invention comprises a step of fixing the furring strips to a base material having a waterproof property at required intervals, and a strip-shaped construction guide in which positioning projections project from the lower end at regular intervals. A step of fixing the plate to the furring strip at predetermined intervals, and a plurality of rail-shaped metal fittings having horizontal portions for receiving tile-shaped bricks at the lower end edge and subsequently downwardly bent ears, the horizontal portion is for construction Repeating the step of arranging so as to abut the positioning protrusions of the guide plate and fixing to the furring strip, and a large number of tile-shaped bricks having grooves on the upper end surface,
A step of inserting and arranging so that the lower end surface is supported by a horizontal portion by engaging the groove with the ear portion of the rail-shaped metal object;
It is characterized in that it comprises a step of applying a joint material by using a rail-shaped metal fitting as a base in a gap between tile-shaped bricks which have been arranged.

【0015】[0015]

【発明の実施の形態】以下本発明の実施例を添付図面を
参照して説明する。図1は本発明を適用して得られたレ
ンガ壁を示しており、建家のコーナーを含む4つの外面
に第1れんが壁A1〜第4れんが壁A4が施工されてい
る。図2ないし図3はその詳細を示しており、1は標準
的なタイル状レンガ、2はコーナーのタイル状レンガで
あり、基礎面の近傍から多段状に一定間隔をおいて整然
と張設されている。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the accompanying drawings. FIG. 1 shows a brick wall obtained by applying the present invention, and first brick wall A1 to fourth brick wall A4 are installed on four outer surfaces including corners of a building. 2 to 3 show the details thereof, 1 is a standard tile brick, 2 is a corner tile brick, and they are stretched in order from the vicinity of the foundation surface in multiple steps at regular intervals. There is.

【0016】前記タイル状レンガ1,2は、背部が多数
列のレール状金物4によって支持されており、そのレー
ル状金物4は、トップレール4aと標準レール4bおよ
びボトムレール4cから構成されている。それらレール
状金物4は、下地3に一定のピッチで打ち付けた樹脂製
や木製の胴縁6,6の所要間隔ごとに固定した施工用ガ
イド板5によって水平出しされ、その状態で耐食性の釘
類7によって胴縁6,6に固定されている。そして、配
列した標準レンガ1やコーナーレンガ2の上下、左右間
のレール状金物4には目地材8が塗着されている。な
お、3’は前記下地3の表面の防水層であり、通常の場
合、防水シートからなっている。
The tile-shaped bricks 1 and 2 are supported at their backs by rail-shaped metal fittings 4 having a large number of rows, and the rail-shaped hardware 4 is composed of a top rail 4a, a standard rail 4b and a bottom rail 4c. . The rail-shaped hardware 4 is horizontally leveled by a construction guide plate 5 fixed at a required interval of resin or wooden furring strips 6 and 6 which are struck on the base 3 at a constant pitch, and in that state, corrosion-resistant nails It is fixed to the furring strips 6 and 6 by 7. A joint material 8 is applied to the rail-shaped metal fittings 4 between the upper and lower sides and the left and right sides of the arranged standard bricks 1 and corner bricks 2. In addition, 3'is a waterproof layer on the surface of the base 3, which is usually a waterproof sheet.

【0017】図4ないし図7は本発明のレンガ壁および
その施工法で使用するのに好適な部材を示している。 〔施工用ガイド板について〕施工用ガイド板は平面領域
用とコーナー用の2種からなり、いずれも耐食性の良好
な帯板を精密金型で板金加工されてなる。その例として
は、ステンレス、アルミニウムなどのほか、鋼板あるい
は亜鉛や亜鉛/アルミめっき鉄板などがあげられる。し
かし、場合によっては合成樹脂成形品などであってもよ
い。
4 to 7 show a brick wall of the present invention and a member suitable for use in the construction method. [Construction guide plate] The construction guide plate is composed of two types, one for a flat area and one for a corner, and both of them are strips having good corrosion resistance, which are processed with a precision mold. Examples include stainless steel, aluminum, etc., as well as steel plates or zinc or zinc / aluminized iron plates. However, in some cases, it may be a synthetic resin molded product or the like.

【0018】図4は平面領域用の施工用ガイド板5を示
している。この施工用ガイド板5はたとえば長さが2
m、横幅が100mm、厚さが0.30〜0.50mm
の帯板からなり、幅方向両側の下端縁に、前方に適度の
量で水平状に張り出す位置決め突起50,50’を有
し、この下端縁の位置決め突起50,50’から所定の
等間隔(たとえば95mmピッチ)で位置決め突起5
1,51’が順次形成されており、また、幅方向中央線
上には、所定の間隔で通孔53が穿設されている。この
多数の通孔53は釘類を打ち込むための孔として機能す
るほか、後述するコーナー用に屈曲する場合の曲げ基準
として機能する。
FIG. 4 shows a construction guide plate 5 for a flat area. This construction guide plate 5 has, for example, a length of 2
m, width 100 mm, thickness 0.30 to 0.50 mm
It has the positioning projections 50 and 50 ', which are formed by the strip plate of the above, and project horizontally in an appropriate amount at the lower edges on both sides in the width direction, and the predetermined distance from the positioning projections 50 and 50' on the lower edges. Positioning protrusion 5 (for example, 95 mm pitch)
1, 51 'are sequentially formed, and through holes 53 are formed at predetermined intervals on the center line in the width direction. The large number of through holes 53 function as holes for driving nails, and also serve as bending references when bending for corners, which will be described later.

【0019】前記位置決め突起51,51’はこの例で
は切り起しによって構成されている。すなわち、図4
(c)のように、素帯板5aの幅方向両側部分に一端が
側縁に達するL状カット線500,500’を所定ピッ
チで加工し、そのL状カット線500,500’の縦頂
点p1,p1を素帯板の板面と直角に屈曲することによ
り作られている。そして、必要な長さの位置で縦頂点p
1,p1を結ぶ線上(520は切断線)で切断してお
り、したがって、最上位には縦頂点p1,p1の高さに
相当する突辺52が形成される。この突辺52は高さ方
向の継ぎ足しの際の定規として機能する。
The positioning protrusions 51, 51 'are formed by cutting and raising in this example. That is, FIG.
As shown in (c), L-shaped cut lines 500 and 500 ′ each having one end reaching a side edge are processed at a predetermined pitch on both sides in the width direction of the strip 5a, and the vertical vertices of the L-shaped cut lines 500 and 500 ′ are processed. It is made by bending p1 and p1 at right angles to the plate surface of the strip plate. Then, at the position of the required length, the vertical vertex p
The cutting is performed on the line connecting 1 and p1 (520 is a cutting line), and therefore, the salient side 52 corresponding to the height of the vertical vertices p1 and p1 is formed at the uppermost position. The projecting side 52 functions as a ruler when adding in the height direction.

【0020】図5(a)(b)はコーナー用の施工用ガ
イド板5’の第1例(凸コーナー用)を示しており、図
4の施工用ガイド板5における中央線上の各通孔53を
基準として板幅方向中央に沿って外側方向に屈曲されて
なり、折り曲げ線55を境としてそれぞれの半部に位置
決め突起50,50’と位置決め突起51,51’が配
されている。図5(c)はコーナー用の施工用ガイド板
5’の第2例(凹コーナー用)を示しており、図4の施
工用ガイド板5における中央線上の通孔53を定規とし
て板幅方向中央に沿って内側方向に屈曲され、それぞれ
の半部に位置決め突起50,50’と位置決め突起5
1,51’が配されている。
FIGS. 5 (a) and 5 (b) show a first example (for convex corners) of the construction guide plate 5'for corners, and each through hole on the center line in the construction guide plate 5 of FIG. It is bent outward along the center of the plate width direction with reference to 53, and positioning protrusions 50, 50 'and positioning protrusions 51, 51' are arranged on each half of the folding line 55 as a boundary. FIG. 5C shows a second example (for concave corners) of the construction guide plate 5 ′ for corners, and the through hole 53 on the center line in the construction guide plate 5 of FIG. 4 is used as a ruler in the plate width direction. It is bent inward along the center, and the positioning protrusions 50, 50 'and the positioning protrusion 5 are provided on each half.
1,51 'are arranged.

【0021】〔レール状金物について〕使用するレール
状金物4は任意であるが、図6(a)ないし(e)はそ
の例を示しており、(a)(b)は最上列に使用するト
ップレール4aを、(c)(d)は標準レール(ベース
レール)4bを、(c)は最下位列に使用するスタータ
レール(ボトムレール)4cをそれぞれ示している。前
記トップレール4aと標準レール4bおよびスタータレ
ール4cは、それぞれ耐食性の良好な材料からなってい
る。その例としては、ステンレス、アルミニウムなどの
ほか、鋼板あるいは亜鉛や亜鉛/アルミめっき鉄板、合
成樹脂成形品などが選択的に用いられる。寸法として
は、たとえば長さが2000mm、幅(高さ)107m
m、厚さ0.30〜0.50mmである。
[Regarding Rail-Shaped Hardware] Although the rail-shaped hardware 4 to be used is arbitrary, FIGS. 6A to 6E show examples thereof, and FIGS. 6A and 6B are used for the uppermost row. Top rails 4a, (c) and (d) show standard rails (base rails) 4b, and (c) shows starter rails (bottom rails) 4c used in the lowest row. The top rail 4a, the standard rail 4b, and the starter rail 4c are each made of a material having good corrosion resistance. For example, in addition to stainless steel, aluminum, etc., a steel plate, zinc, zinc / aluminum plated iron plate, synthetic resin molded product, etc. are selectively used. For example, the length is 2000 mm and the width (height) is 107 m.
m and the thickness is 0.30 to 0.50 mm.

【0022】トップレール4aは、施工部分の最上位列
に使用するための部材であり、前記標準レンガ1やコー
ナーレンガ2の高さよりも適度に小さい幅(高さ)の面
板部40の上端に面板部40と直角状に張り出す水平部
41と、これの先端から下方に直角よりも適度に小さい
傾斜角度αたとえば85度に屈曲された耳部42を有し
ている。
The top rail 4a is a member for use in the uppermost row of the construction portion, and is provided on the upper end of the face plate portion 40 having a width (height) which is appropriately smaller than the height of the standard brick 1 or the corner brick 2. The face plate portion 40 has a horizontal portion 41 projecting at a right angle, and an ear portion 42 bent downward from the tip of the face plate portion 40 at an inclination angle α, for example, 85 degrees, which is appropriately smaller than the right angle.

【0023】標準レール4bは、トップレール4aより
下位の各列に使用する部材であり、前記標準レンガ1や
コーナーレンガ2の高さよりも適度に小さい幅(高さ)
の面板部40の下縁に、レンガ受支用の水平部43と、
これの先端から下方に直角よりも適度に小さい傾斜角度
αたとえば85度に屈曲された係合用の耳部44を有し
ている。
The standard rail 4b is a member used in each row below the top rail 4a, and has a width (height) that is appropriately smaller than the height of the standard brick 1 or the corner brick 2.
At the lower edge of the face plate portion 40 of, a horizontal portion 43 for brick support,
It has an engaging ear portion 44 that is bent downward from the tip thereof to be inclined at an inclination angle α that is appropriately smaller than a right angle, for example, 85 degrees.

【0024】スタータレール4cは、施工部分の最下位
部位に使用する部材である。該スタータレール4cは、
標準レンガ1やコーナーレンガ2の高さよりも適度に小
さい幅(高さ)の面板部40の下縁に、前記施工用ガイ
ド板5,5’の下端の位置決め突起50,50’に重ね
合わされる水平部43を有している。前記各レールの水
平部41,43の張出し寸法は、一般的に、標準レンガ
1やコーナーレンガ2の厚さの約半分程度とする。
The starter rail 4c is a member used at the lowest portion of the construction portion. The starter rail 4c is
The positioning protrusions 50, 50 'at the lower ends of the construction guide plates 5, 5'are superposed on the lower edge of the face plate portion 40 having a width (height) that is appropriately smaller than the height of the standard brick 1 or the corner brick 2. It has a horizontal portion 43. The overhanging dimension of the horizontal portions 41 and 43 of each rail is generally about half the thickness of the standard brick 1 or the corner brick 2.

【0025】〔タイル状レンガ〕本発明で使用するタイ
ル状レンガは、通常、標準レンガ1とコーナーレンガ2
の2種からなる。標準レンガ1は、図7(a)のよう
に、略長方形状をなし、上端面の略中央部位には、長手
方向に走る溝(スリット)10が形成されている。寸法
としては、たとえば幅(長さ)が230mm、高さ75
mm、厚さ25mmである。
[Tile Brick] The tile brick used in the present invention is usually a standard brick 1 and a corner brick 2.
It consists of two types. As shown in FIG. 7A, the standard brick 1 has a substantially rectangular shape, and a groove (slit) 10 running in the longitudinal direction is formed at a substantially central portion of the upper end surface. For example, the width (length) is 230 mm and the height is 75
mm and thickness 25 mm.

【0026】コーナーレンガ2は、図7(b)のよう
に、長辺2aと短辺2bとにより平面略L状をなし、上
端面には平面略L状をなすように溝(スリット)20が
形成されている。溝20は必ずしも連続している必要は
ない。寸法としては、たとえば長辺が230mm、短辺
が110mm、高さが75mm、厚さが25mmであ
る。 前記標準レンガ1とコーナーレンガ2の溝10,
20は、前記トップレール4a、標準レール4bおよび
スチーターレール4cにおける耳部42,44にはめら
れることにより外れないように支持させるためのもので
あり、下端面の約半分の厚さが水平部43によって受支
されている。
As shown in FIG. 7 (b), the corner brick 2 has a groove (slit) 20 having a long side 2a and a short side 2b, which is substantially L-shaped in a plane, and an upper end surface which is substantially L-shaped in a plane. Are formed. The groove 20 does not necessarily have to be continuous. As dimensions, for example, the long side is 230 mm, the short side is 110 mm, the height is 75 mm, and the thickness is 25 mm. Grooves 10 of the standard brick 1 and the corner brick 2,
Numeral 20 is for supporting the top rail 4a, the standard rail 4b and the steerer rail 4c so as not to come off by being fitted to the ears 42 and 44 of the steerer rail 4c. It is supported by 43.

【0027】次に、本発明の施工方法を説明すると、図
8ないし図12はそれを段階的に示している。まず、図
8のように、防水シート3’を張設するなどした防水性
の下地3に胴縁6を所定の間隔たとえば40〜50cm
で配し、釘類7で固定する。ついで、建物の下端付近面
に平面用とコーナー用の各施工用ガイド板5,5’を配
し、所要間隔ごとの胴縁6,6に施工用ガイド板5,
5’を固定する。
Next, the construction method of the present invention will be described. FIGS. 8 to 12 show it step by step. First, as shown in FIG. 8, the furring strips 6 are stretched on the waterproof base 3 and the furring strips 6 are arranged at predetermined intervals, for example, 40 to 50 cm.
And fix with nails 7. Next, the construction guide plates 5 and 5'for the flat surface and the corners are arranged on the surface near the lower end of the building, and the construction guide plates 5 and 5 are arranged on the furring strips 6 and 6 at the required intervals.
Fix 5 '.

【0028】詳しく述べると、建物の下端付近面に正し
く水平度を取った基準墨線HLを引き、これを建物周囲
に一回引く。そして、この基準墨線HLに平面用のガイ
ドレール板5の下端の位置決め突起50,50’を合
せ、各通孔53を通して釘類7を胴縁6,6に打ち込
む。また、建物の各隅にコーナー用ガイド板5’を同様
に配し、基準墨線HLに平面用のガイドレール板5の下
端の位置決め突起51,51’を合せ、各通孔53を通
して釘類7を胴縁6,6に打ち込む。各通孔53はちょ
うど屈曲縁に沿って配されているので、簡単に胴縁のコ
ーナーに釘類を打ち込み固定できる。これで、東西南北
の各面の水平基準ができあがる。図9と図10はこの状
態を示している。
More specifically, a reference black line HL having a correct level is drawn on the surface near the lower end of the building, and this is drawn once around the building. Then, the positioning protrusions 50, 50 ′ at the lower end of the flat guide rail plate 5 are aligned with the reference black line HL, and the nails 7 are driven into the furring strips 6, 6 through the through holes 53. In addition, corner guide plates 5'are similarly arranged at the respective corners of the building, the positioning protrusions 51, 51 'at the lower end of the flat guide rail plate 5 are aligned with the reference black line HL, and the nails 7 are passed through the through holes 53. Drive into the furring strips 6 and 6. Since each through hole 53 is arranged just along the bent edge, nails can be easily driven in and fixed to the corner of the furring strip. This completes the horizontal reference for the north, south, east, and west sides. 9 and 10 show this state.

【0029】なお、3階建てのような場合には、施工用
ガイド板5や5’をそれぞ複数本使用し、最下位の施工
用ガイド板の突辺52を次上位の施工用ガイド板の下縁
54と突合せるように直列に配して胴縁6に固定するこ
とで自在に対応できる。
In the case of a three-story building, a plurality of construction guide plates 5 and 5'are used, and the projecting edge 52 of the lowest construction guide plate is used as the next higher construction guide plate. This can be dealt with freely by arranging in series so as to abut the lower edge 54 and fixing it to the furring strip 6.

【0030】以上のように施工用ガイド板5,5’を固
定することにより東西南北各方面の水平基準ができるの
で、次に、施工用ガイド板5,5’の位置決め突起5
0,50’と中間の位置決め突起51,51’にレール
状金物の水平部が重なるように当接させ、壁下地の胴縁
6,6にくぎ類7で固定する。詳しく説明すると、レー
ル状金物4の配列固定は、施工部分の最下位のスタータ
ーレール4cから開始するもので、この作業は、図11
のように、スターターレール4cを、施工用ガイド板
5,5’と交差するように横に配し、下端縁の水平部4
3を施工用ガイド板5,5’の下端縁の位置決め突起5
0,50’に載せ、釘類7を胴縁6に打ち込むだけでよ
いから簡単であり、しかも、下端縁の位置決め突起5
0,50’は前端の工程で水平度が取られているから、
自動的にスタートレール4cは精度のよい水平配置とさ
れる。これは各4面とも同じである。
By fixing the construction guide plates 5 and 5'as described above, horizontal reference in each of the north, south, east, and west directions can be made.
The horizontal projections of the rail-shaped metal fittings are brought into contact with the positioning projections 51, 51 'in the middle so as to overlap with each other, and fixed to the furring edges 6, 6 of the wall base with nails 7. More specifically, the arrangement fixing of the rail-shaped hardware 4 is started from the lowest starter rail 4c of the construction portion, and this work is performed as shown in FIG.
, The starter rail 4c is laterally arranged so as to intersect the construction guide plates 5 and 5 ', and the horizontal portion 4 of the lower end edge is arranged.
3 is a positioning projection 5 on the lower edge of the construction guide plates 5 and 5 '.
It is simple since it only needs to be placed on 0, 50 'and the nails 7 are driven into the furring strip 6, and the positioning projections 5 on the lower edge are simple.
Since 0,50 'is leveled in the front end process,
The start rail 4c is automatically arranged horizontally with high accuracy. This is the same for each of the four sides.

【0031】ついで、前記最下位の位置決め突起50,
50’の一つ上(2番目)の位置決め突起51,51’
と2つ上(3番目)の位置決め突起51,51’との間
の面部に標準レール4bの面板部40が当接するように
挿入し、下端縁の水平部43の下面を2番目の位置決め
突起51,51’に載せる。これが図11(a)(b)
の状態であり、第1段目用の標準レール4bは上下の間
隔が正確に決められている位置決め突起51,51’に
載せられることにより自動的に水平出し状態での位置決
めがなされ、従前のような基準用の墨入れを要しない。
固定は、胴縁6,6に対応する部分の帯板状面部40か
ら耐食性の釘類7を打ち込むことにより行なう。
Next, the lowest positioning protrusion 50,
Positioning projections 51, 51 'one above (second) 50'
The face plate portion 40 of the standard rail 4b is inserted so as to abut on the surface portion between the first and second (third) positioning protrusions 51 and 51 ', and the lower surface of the horizontal portion 43 at the lower edge is the second positioning protrusion. 51, 51 '. This is Fig. 11 (a) (b)
In this state, the standard rail 4b for the first stage is automatically positioned in the leveling state by being mounted on the positioning protrusions 51 and 51 'whose vertical intervals are accurately determined. There is no need for inking for such standards.
The fixing is performed by driving the corrosion-resistant nails 7 from the strip plate-like surface portion 40 of the portion corresponding to the furring strips 6 and 6.

【0032】次に、第2番目と第3番目の位置決め突起
51,51’との間の面部に第2段用の標準レール4b
を挿入し、前記と同様に下縁の水平部43の下面を3番
目の位置決め突起51,51’に載せ、その状態で標準
レール4bを釘類7によって胴縁6,6に固定する。以
下同様の作業を繰り返すことにより図12(a)(b)
のように、レール状金物は施工用ガイド板5,5’の各
段の位置決め突起51,51’を基準として各コーナー
も含めて正しく水平度を保たれた状態に張設される。横
方向の端部においては、図13のように左右の標準レー
ル4b,4bは、施工用ガイド板5,5’の左右の位置
決め突起51,51’にそれぞれ受支されて水平位置決
めされる。
Next, the standard rail 4b for the second step is provided on the surface portion between the second and third positioning protrusions 51 and 51 '.
Then, the lower surface of the horizontal portion 43 at the lower edge is placed on the third positioning protrusions 51, 51 'as in the above, and the standard rail 4b is fixed to the furring strips 6, 6 by the nails 7 in this state. By repeating the same operation thereafter, FIG. 12 (a) (b)
As described above, the rail-shaped metal fitting is stretched in a state in which the levelness is properly maintained including the corners based on the positioning projections 51, 51 'of each step of the construction guide plates 5, 5'. At the lateral ends, the left and right standard rails 4b and 4b are horizontally supported by the left and right positioning protrusions 51 and 51 'of the construction guide plates 5 and 5', respectively, as shown in FIG.

【0033】こうして最上位に達したならば、トップレ
ール4aの面板部40を次位の標準レール4bの面板部
40に重ね、胴縁6,6に対応する部分の面板部40を
通して釘類7を打ち込むことにより固定すればよく、東
西南北4方のすべてのレール状金物の端部は水平面が一
致する。本発明は、レール状金物の端部同士(水平部と
耳部)がオーバーラップするように配列するのでなく、
施工用ガイド板5,5’の左右の位置決め突起51,5
1’に各段のレール状金物の水平部40を当接する方式
であるから、各レール状金物の面板部の高さ寸法に若干
のバラツキがあっても水平度には影響せず、かりにレー
ル状金物が若干の張り誤差が生じても、累積されること
がない。したがってタイル状レンガを後に嵌合した時に
タイル状レンガの水平度が正しく維持される。
When the top plate is reached in this way, the face plate portion 40 of the top rail 4a is superposed on the face plate portion 40 of the next standard rail 4b, and the nails 7 are passed through the face plate portion 40 corresponding to the furring strips 6 and 6. It suffices to fix it by tapping, and the ends of all the rail-shaped metal objects in the four directions of north, south, east, west and west coincide with each other. The present invention does not arrange the ends of the rail-shaped metal object (horizontal part and ear part) so as to overlap each other,
Left and right positioning protrusions 51, 5 of the construction guide plates 5, 5 '
Since the horizontal portion 40 of the rail-shaped metal object of each step is brought into contact with 1 ', even if the height dimension of the face plate portion of each rail-shaped metal object varies slightly, the levelness is not affected, and the rail Even if a slight tension error occurs in the metal parts, they will not be accumulated. Therefore, when the tile bricks are fitted later, the levelness of the tile bricks is correctly maintained.

【0034】なお、図示するものでは、ガイド板を効率
的に使用するため、レール状金物の長さ方向両端部だけ
をガイド板5,5’の位置決め突起50,50’、5
1,51’で受支して水平度を得ているが、もちろん、
レール状金物の長さ方向の中間部に対応する胴縁6にガ
イド板を固定し、それの位置決め突起50,50’、5
1,51’でレール状金物の長さ方向の中間部を受支し
て水平度をさらに良く確保するようにしてもよい。
In the illustrated example, in order to use the guide plate efficiently, only the longitudinal ends of the rail-shaped metal object are positioned by the positioning projections 50, 50 ', 5'of the guide plate 5, 5'.
It is supported by 1,51 'to obtain levelness, but of course,
A guide plate is fixed to the furring strip 6 corresponding to an intermediate portion in the lengthwise direction of the rail-shaped metal object, and the positioning protrusions 50, 50 ', 5
1, 51 ′ may support the intermediate portion in the lengthwise direction of the rail-shaped metal object to further secure the levelness.

【0035】本発明は、施工用ガイド板を使用すること
により、レール状金物の断面を小さくすることがてきる
ので、材料の使用量を節約することができる。すなわ
ち、ガイド板は原則として各レール状金物ベースの両端
部にあればよく、レール状金物の長さを2mとすると、
2mに1本ですむ。一方、本発明では、スターターレー
ル、標準レールにおいてオーバーラップ用の上縁の張出
しを省略することができ、トップレールにおいて下縁の
水平部を省略することができる。それら上縁の張出しと
水平部を合算した分の断面積は施工用ガイド板の使用材
料の合計よりもはるかに大きいから、材料費、加工費と
も少なくてすむ。また、1種類の施工用ガイド板を使っ
て平面用とコーナー用の2種を構成できるためコストが
安くなる。なお、コーナー用ガイド板5’の曲げ角度
は、90度に限らず、施工すべき壁のコーナー角度にあ
わせて任意な角度とすることができる。
According to the present invention, since the rail-shaped metal article can be made smaller in cross section by using the construction guide plate, the amount of material used can be saved. That is, as a general rule, the guide plates only need to be provided at both ends of each rail-shaped hardware base, and if the rail-shaped hardware length is 2 m,
You only need one for every 2m. On the other hand, in the present invention, it is possible to omit the overhang of the upper edge for overlapping in the starter rail and the standard rail, and to omit the horizontal portion of the lower edge in the top rail. Since the cross-sectional area of the sum of the overhang of the upper edge and the horizontal portion is much larger than the total of the materials used for the construction guide plate, both material cost and processing cost can be reduced. In addition, the cost can be reduced because one type of construction guide plate can be used to configure two types, one for a plane and one for a corner. The bending angle of the corner guide plate 5'is not limited to 90 degrees, but can be any angle according to the corner angle of the wall to be constructed.

【0036】以上でレール状金物の配列固定が終わるの
で、次に、配列固定したレール状金物にタイル状レンガ
を取り付ける工程に移る。この工程も、壁の底辺である
スターターレール4cから先に、しかもコーナーから先
に行うことが好ましい。コーナーにおいては、コーナー
レンガ2を斜めに挿入し、上端のL状の溝20を、スタ
ーターレール4cの直上に固定されている左右の標準レ
ール4b,4bの水平部43,43から下っている耳部
44,44に嵌めつつ垂直に姿勢を変化させ、レンガ背
面を左右のスタートレール4cの面板部40,40に接
触させるように押し込めばよい。これによりコーナーレ
ンガ2の下端面はスターターレール4cの水平部43,
43に受支される。
Since the arrangement and fixing of the rail-shaped metal objects are completed as described above, next, the process moves to the step of attaching the tile-shaped bricks to the rail-shaped metal objects that are fixed in arrangement. This step is also preferably performed first from the starter rail 4c, which is the bottom of the wall, and further from the corner. In the corner, the corner brick 2 is obliquely inserted, and the L-shaped groove 20 at the upper end descends from the horizontal portions 43, 43 of the left and right standard rails 4b, 4b fixed just above the starter rail 4c. It suffices to change the posture vertically while fitting into the portions 44, 44 and push the brick back surface so as to contact the face plate portions 40, 40 of the left and right start rails 4c. As a result, the lower end surface of the corner brick 2 has the horizontal portion 43 of the starter rail 4c,
43.

【0037】同様に次のコーナーレンガ2を次位の標準
レール4b,4bの耳部44,44にはめつつ垂直にす
ることにより上端部が溝20,20と耳部44,44と
の係合で支持され、下端が第2位の標準レール4b,4
bの水平部43,43で受支されるため安定した保持が
なされる。以下トップレール4aに最上位のコーナーレ
ンガ2が取り付けられるまで同様な作業を繰り返す。
Similarly, by fitting the next corner brick 2 vertically to the ears 44, 44 of the next standard rails 4b, 4b, the upper ends engage the grooves 20, 20 with the ears 44, 44. The standard rails 4b, 4 are supported by
Since it is supported by the horizontal portions 43, 43 of b, stable holding is performed. Hereinafter, the same work is repeated until the top corner brick 2 is attached to the top rail 4a.

【0038】かかる作業を終えたならば、標準レンガ1
を同様にスターターレール4cに所定の継目用すき間S
をもたせながら横配列して取り付けてゆく。かかる作業
は上縁の溝10を上位のレールから下る耳部44にはめ
合わせつつ下端を当該段のレールの水平部43に受支さ
せるだけであるため簡単である。かかる標準レンガ1も
トップレール4aに最上位の標準レンガ1が列状に取り
付けられるまで同様な作業を繰り返す。図14はこのよ
うなレンガ取付け工程が完了した状態を示している。
When this work is completed, the standard brick 1
Similarly, the starter rail 4c is provided with a predetermined joint gap S.
While holding it, it will be installed side by side. This operation is simple because the lower edge is only supported by the horizontal portion 43 of the rail of the step while fitting the groove 10 of the upper edge to the ear portion 44 that descends from the upper rail. With respect to the standard brick 1 as well, the same operation is repeated until the uppermost standard bricks 1 are attached to the top rails 4a in a row. FIG. 14 shows a state in which such a brick attaching process is completed.

【0039】この状態においては、各タイル状レンガ
1,2は溝10,20よりも前面側が約1/2の厚さ分
だけレール耳部表面から突出し、下端面も約1/2の厚
さ分がレールの水平部43から突出する。前記タイル状
レンガの取り付け時において、本発明の標準レール4a
とトツプレール4bの耳部42,44は水平部43に対
して垂直でなく、適度の傾斜角度αで内側に傾斜してい
る。したがって、溝10,20の幅を広くしても、傾斜
状の耳部42,44によって溝内側壁が付勢され、レー
ル状金物の面板部に向けて押しつけられるので、各タイ
ル状レンガ1,2は溝10,20を広めの幅にして耳部
42,44との係合を容易にしても、取り付けが終わる
とガタつかず安定している。そして、前段の作業でレー
ル状金物が建物全体に渡って正しく水平度を維持されて
いるので、タイル状レンガ1,2は自動的に上下間隔も
一定に揃い、整然とした配列とされる。
In this state, the tile-shaped bricks 1 and 2 project from the rail ear surface by a thickness of about 1/2 on the front side of the grooves 10 and 20, and the lower end surface also has a thickness of about 1/2. Minutes project from the horizontal portion 43 of the rail. When mounting the tile brick, the standard rail 4a of the present invention
The ears 42 and 44 of the top rail 4b are not perpendicular to the horizontal portion 43 but are inclined inward at an appropriate inclination angle α. Therefore, even if the width of the grooves 10 and 20 is widened, the inner walls of the grooves are urged by the inclined ears 42 and 44 and pressed against the face plate of the rail-shaped metal object. Even if the groove 2 has a wider width for the grooves 10 and 20 to facilitate the engagement with the ears 42 and 44, it is stable without rattling after the installation. Since the level of the rail-shaped metal fittings is correctly maintained over the entire building in the preceding work, the tile-shaped bricks 1 and 2 are automatically arranged with a constant vertical interval, and are arranged in an orderly manner.

【0040】以上のようにタイルレンガの取付けを行っ
たのち、レンガ1,2間の左右、上下のすき間に目地材
8を塗込む。かかる作業は目地材8をすき間に押し込む
ように塗付け、コテで仕上げるだけの操作で足りる。上
下のすき間については、この部分にレール4a,4bの
耳部42,44が位置していることにより耳部表面が塗
布基準面となるため簡単であり、目地材8の一部が溝1
0,20と耳部44,42のわずかな隙間に流入するた
め、レンガ1,2はより確実に固定される。左右は耳部
42,44の一部が基準面となるほか、各レンガの背面
が帯板状面部40に接している関係からレンガ左右端面
間に溝が形成され、したがって目地材はこれらの溝によ
って充填量が規制される。以上のようにして図1ないし
図3に示すように化粧レンガ壁が完成する。
After the tile bricks have been attached as described above, the joint material 8 is applied to the left and right gaps between the bricks 1 and 2 and the gaps above and below. Such work is sufficient by simply applying the joint material 8 so as to push it into the gap and finishing it with a trowel. The upper and lower gaps are easy because the ears 42, 44 of the rails 4a, 4b are located in this portion and the surfaces of the ears serve as application reference surfaces.
The bricks 1 and 2 are more reliably fixed because they flow into a slight gap between the ears 0 and 20 and the ears 44 and 42. On the left and right sides, a part of the ears 42, 44 serves as a reference surface, and because the back surface of each brick is in contact with the strip plate surface portion 40, a groove is formed between the left and right end surfaces of the brick. The filling amount is regulated by. As described above, the decorative brick wall as shown in FIGS. 1 to 3 is completed.

【0041】なお、図示するものは本発明の数例であ
り、これに限定されるものではない。 1)施工用ガイド板5の水準出し用の位置決め突起5
0,50’、51,51’はレール状金物4の水平を出
すことができればよいので、実施例のように板面から水
平面として突出させた切起し片に限らず、図15と図6
に例示するような各種態様を取り得る。
It should be noted that what is shown is only a few examples of the present invention, and the present invention is not limited to this. 1) Positioning protrusion 5 for leveling the guide plate 5 for construction
Since 0, 50 ', 51, 51' need only be able to make the rail-shaped metal piece 4 horizontal, it is not limited to the cut-and-raised pieces projected as a horizontal plane from the plate surface as in the embodiment, and FIGS.
It is possible to take various modes as illustrated in

【0042】図15(a)(b)は第1例であり、帯板
の幅方向両側に等間隔で切欠き54,54を形成し、そ
の切欠部で分離された部分を板厚方向に折り曲げること
により上端面が平らな屈折状の位置決め突起50,5
0’、51,51’を形成したものである。もちろん水
平レベルを出すために、各施工用ガイド板5はそれぞれ
同じ高さ位置に位置決め突起50,50’、51,5
1’があるように切断されている。
FIGS. 15A and 15B show a first example, in which notches 54, 54 are formed at equal intervals on both sides in the width direction of the strip plate, and the portions separated by the notches are formed in the plate thickness direction. Positioning protrusions 50 and 5 that are bent and have a flat top surface by bending
0 ', 51, 51' are formed. Of course, in order to obtain a horizontal level, each of the construction guide plates 5 has positioning protrusions 50, 50 ', 51, 5 at the same height position.
It has been cut so that there is a 1 '.

【0043】図16(a)は第2例であり、上下の切欠
き54,54間の部分全体を板厚方向に曲げ、上端面が
平らな屈折状の位置決め突起50,50’、51,5
1’を形成したものである。この例ではくの字状をなし
ているが、もちろん曲率状ををなしていてもよい。図1
6(b)は第3例であり、打出し加工によって位置決め
突起(ダボ)50,50’,51,51’を形成したも
のである。図示するものでは三角形であるがもちろん円
形など任意である。
FIG. 16 (a) shows a second example, in which the entire portion between the upper and lower cutouts 54, 54 is bent in the plate thickness direction, and the upper end surface is a refracting positioning projection 50, 50 ', 51, having a flat shape. 5
1'is formed. In this example, the shape is a dogleg, but of course, it may be a curvature. Figure 1
6 (b) is a third example, in which the positioning protrusions (doughs) 50, 50 ', 51, 51' are formed by stamping. The one shown in the drawing is a triangle, but it is of course arbitrary such as a circle.

【0044】図16(c)は第4例であり、ビード出し
加工により板幅方向に走る山形状の位置決め突起50,
50’,51,51’を形成したものである。図示する
ものでは位置決め突起50,50’,51,51’は全
幅にあるが、もちろん中間部分に設けないようにしても
よい。図16(d)は第5例であり、帯板に等間隔でリ
ベット類を打ち込むことにより位置決め突起50,5
0’,51,51’を形成したものである。
FIG. 16C shows a fourth example, which is a mountain-shaped positioning protrusion 50 that runs in the plate width direction by beading processing.
50 ', 51, 51' are formed. Although the positioning protrusions 50, 50 ', 51, 51' are shown in the full width in the illustrated example, it is of course not necessary to provide them in the middle portion. FIG. 16D shows a fifth example, in which rivets or the like are driven into the strip plate at equal intervals, so that the positioning projections 50, 5
0 ', 51, 51' are formed.

【0045】2)本発明の施工法において、一般的に
は、レール状金物4の受支用水平部43は、施工用ガイ
ド板5の位置決め突起50,50’、51,51’の上
面に当接させて水準出しをするが、場合によっては、位
置決め突起50,50’、51,51’の下面に当接さ
せて水準出しをしてもよい。
2) In the construction method of the present invention, generally, the horizontal portion 43 for receiving and supporting the rail-shaped hardware 4 is provided on the upper surface of the positioning projections 50, 50 ', 51, 51' of the construction guide plate 5. The leveling is carried out by abutting, but in some cases, the leveling may be carried out by abutting on the lower surface of the positioning projections 50, 50 ', 51, 51'.

【0046】図17はこの例を示しており、レール状金
物4の受支用水平部41の上面端部を施工用ガイド板5
の位置決め突起51,51’の下面に当接させる。施工
用ガイド板5の左右の位置決め突起51,51’は同一
高さにあるとともに上下方向で等間隔に配されており、
かつまた左右に間隔的に固定されている各施工用ガイド
板5において、各段の位置決め突起51,51’は整合
している。したがって、レール状金物4は自動的に水平
になり、この状態でレール状金物4を釘類によって胴縁
6に固定することにより、レール状金物4を各段ごとに
正確な水平度で配列することができ、それによりタイル
状レンガ1,2をきれいに上下の間隔が揃った状態に貼
ることができる。この図17の態様における施工法およ
び得られるレンガ壁は前記実施例の場合と同様であるか
ら、説明は援用するものとする。ただ、この図17の態
様によれば、図6のトップレール4aに相当するものを
標準レールとしても利用できるので、レール状金物4が
1種類あるいはスタートレール4cと2種類で足りるこ
とになり、コストを安くすることができる利点がある。
FIG. 17 shows this example, in which the upper end of the horizontal portion 41 for receiving and supporting the rail-shaped hardware 4 is attached to the construction guide plate 5.
It is brought into contact with the lower surfaces of the positioning protrusions 51, 51 '. The left and right positioning protrusions 51, 51 'of the construction guide plate 5 are at the same height and are arranged at equal intervals in the vertical direction.
Moreover, in each of the construction guide plates 5 fixed to the left and right at intervals, the positioning protrusions 51, 51 'of each step are aligned. Therefore, the rail-shaped metal fitting 4 automatically becomes horizontal, and by fixing the rail-shaped metal fitting 4 to the furring strip 6 with nails in this state, the rail-shaped metal fitting 4 is arranged at an accurate level for each step. Thus, the tile-shaped bricks 1 and 2 can be attached to each other in a state in which the upper and lower spaces are evenly arranged. The construction method and the brick wall obtained in the embodiment of FIG. 17 are the same as in the case of the above-described embodiment, and therefore the description will be incorporated. However, according to the aspect of FIG. 17, the one corresponding to the top rail 4a of FIG. 6 can be used as the standard rail, so that the rail-shaped metal piece 4 is sufficient with one type or two types including the start rail 4c. There is an advantage that the cost can be reduced.

【0047】2)下地3は必ずしもコンポーネントパネ
ルである場合に限らず、改修の場合などでは既設のモル
タル壁などであってもよい。下地が防水性能を有してい
る場合には、防水シートなどによる防水層を省略しても
よい。 3)コーナーレンガの取付けにおいて、L状の溝20が
左右のレールの耳部にはめにくい場合には、短辺側部分
の溝より内側部分を除去してもよい。 4)施工用ガイド板は合成樹脂で作られていてもよい。
その場合には、位置決め突起は成形時に一体成形された
ものでよい。なお、本発明はレンガだけでなくこれに類
するタイルなどの他の化粧材の施工にも適用することが
できる。
2) The base 3 is not necessarily a component panel, but may be an existing mortar wall or the like in the case of refurbishment. When the base has a waterproof property, a waterproof layer such as a waterproof sheet may be omitted. 3) In mounting a corner brick, if the L-shaped groove 20 is difficult to fit in the ears of the left and right rails, the inner side portion of the groove on the short side may be removed. 4) The construction guide plate may be made of synthetic resin.
In that case, the positioning protrusions may be integrally molded at the time of molding. The present invention can be applied not only to bricks but also to other decorative materials such as tiles similar thereto.

【0048】[0048]

【実施例の作用】本発明においては、従来のように胴縁
6,6にレール状金物をあてがってレール状金物の精度
を目安として配列するのでなく、胴縁6,6にあらかじ
め高さ方向で等間隔に位置決め突起50,50’、5
1,51’を形成したガイド板5,5’を固定してお
き、このガイド板5,5’の各段の位置決め突起50,
50’、51,51’にレール状金物4の水平部43,
43を当接させることで水平位置決めするので、ガイド
板5,5’の下端面を正しく水平出しておきさえすれ
ば、レール状金物4はコーナー部分も含め正確な水平度
と間隔で配列される。したがって、タイル状レンガの上
縁の溝10,20をレール状金物の耳部42,44には
め、下縁部を水平部43に受支させるだけでレンガはコ
ーナーでも食い違いを起さずに正確な水平度をもって配
列される。このため、何の熟練も要さず簡単、確実、迅
速に施工することができる。
In the present invention, the rail-shaped metal pieces are not applied to the furring strips 6 and 6 as in the prior art and the rail-shaped metal pieces are arranged with the accuracy as a guide, but the furring strips 6 and 6 are preliminarily arranged in the height direction. Positioning protrusions 50, 50 ', 5 at equal intervals with
The guide plates 5 and 5'on which the parts 51 and 51 'are formed are fixed, and the positioning protrusions 50 of each step of the guide plates 5 and 5'are fixed.
The horizontal parts 43 of the rail-shaped hardware 4 are attached to 50 ', 51, 51'.
Since the horizontal positioning is performed by abutting 43, the rail-shaped metal fittings 4 including the corner portions are arranged at the correct horizontality and intervals as long as the lower end surfaces of the guide plates 5 and 5'are correctly leveled. . Therefore, by fitting the grooves 10 and 20 at the upper edge of the tile-shaped brick to the ears 42 and 44 of the rail-shaped metal object and allowing the lower edge to be supported by the horizontal portion 43, the brick does not cause misalignment at the corners and is accurate. It is arranged with a high level of horizontality. Therefore, it is possible to carry out the construction easily, surely, and quickly without any skill.

【0049】取付け状態においては、タイル状レンガ
1,2は上端面の溝10,20がレール状金物4の内側
に傾斜した耳部42,44と係合して背方に押圧される
のでガタつくことなく安定して受支され、この状態で目
地とめされるので、地震などによっても剥落することは
なく、耐久性を高いものとすることができる。また、レ
ール状金物が下地壁面全面に張られるので、建物強度を
増すことができ、地震や強風に耐久力を高く保つことが
できる。
In the attached state, the tile-shaped bricks 1 and 2 are loosened because the grooves 10 and 20 on the upper end surfaces are engaged with the ears 42 and 44 inclined toward the inside of the rail-shaped metal fitting 4 and pressed backward. Since it is stably supported without hitting, and is jointed in this state, it does not fall off due to an earthquake or the like, and the durability can be improved. In addition, since the rail-shaped hardware is stretched over the entire surface of the base wall, the building strength can be increased and the durability can be kept high against earthquakes and strong winds.

【0050】レンガ1,2はモルタルを下地として接着
したものではなく、レール状金物によって保持固定され
ているので、モルタル成分中の灰汁による白華現象、耳
垂れ現象が皆無となり、変色や体裁の悪化が回避され、
埃などで汚れた場合に散水によって簡単に洗浄すること
ができ、経年によって自然の風格が創成される。また、
モルタルを下地とした場合のような手間と時間の係る補
修を要さないので、特別なメンテナンスも要さず、この
コストも節減できる。
Since the bricks 1 and 2 are not adhered by using mortar as a base, but are held and fixed by a rail-shaped metal object, there is no white flower phenomenon or sagging phenomenon due to lye in the mortar component, and discoloration or deterioration of appearance is avoided. Is avoided,
If it gets dirty with dust, it can be easily washed by sprinkling water, creating a natural appearance over time. Also,
Since there is no need for troublesome and time-consuming repairs as in the case of using mortar as a base, no special maintenance is required and this cost can be reduced.

【0051】タイル状レンガ1,2はポアを有している
ため雨水で濡れでも通気性によって放散し、水が浸透し
てもレンガ1,2の背面は耐水性のレール状金物が面状
に張られているから、これによる遮断作用で下地3に至
ることがない。そして胴縁6およびカイド板4によって
レール状金物 と下地3との間には適度のすき間が形成
されるので、良好な遮熱効果が得られるとともに湿気の
滞留を防ぐことができる。
Since the tile-shaped bricks 1 and 2 have pores, the tile-shaped bricks 1 and 2 dissipate due to breathability even when they are wet with rainwater, and even if water penetrates, the back surfaces of the bricks 1 and 2 are made of water-resistant rail-shaped metal objects. Since it is stretched, the blocking action by this does not reach the base 3. Since the furring strip 6 and the guide plate 4 form an appropriate gap between the rail-shaped metal object and the base 3, a good heat-shielding effect can be obtained and the retention of moisture can be prevented.

【0052】[0052]

【発明の効果】以上説明した本発明の請求項1によると
きには、下地に所定間隔で固定した胴縁と交差するよう
にレール状金物4を多段状に配列固定し、それらレール
状金物4にタイル状レンガ1,2を上部の溝と下部の平
坦面をもって受支させるように配置し、各タイル状レン
ガ間の隙間を埋める如くレール状金物4に目地8を塗着
することで構成されるレンガ壁の施工用手段が、前記胴
縁6,6に固定されるべき背面を有する耐食性帯板から
なっていて、それの下端から高さ方向に前記レール状金
物4の受支用水平部を当接させて水準出しするための位
置決め突起50,50’、51,51’を一定間隔ごと
に形成しているので、基準墨を建物などの四面に一回引
き、レール状金物4を単に位置決め突起に当接させつつ
胴縁に固定するだけの簡単で単純な作業により、レール
状金物4およびタイル状レンガ1,2を高い水平精度で
配列固定することが可能となり、仕上後の見映えがよ
く、品質を高いレンガ壁を作ることができる。また、熟
練度を必要とせず作業単純化により未熟練工でも作業効
率を上げることが出来るので、工期を短く、工費を安く
押さえることができるというすぐれた効果が得られる。
According to the first aspect of the present invention described above, the rail-shaped metal pieces 4 are arranged and fixed in a multi-step manner so as to intersect the furring strips fixed to the base at a predetermined interval, and the rail-shaped metal pieces 4 are tiled. Bricks 1 and 2 are arranged so as to be supported by a groove on the upper side and a flat surface on the lower side, and a joint 8 is applied to the rail-shaped metal fitting 4 so as to fill the gap between the tile-shaped bricks. The wall construction means is composed of a corrosion-resistant strip having a back surface to be fixed to the furring strips 6 and 6, and a horizontal portion for receiving and supporting the rail-shaped hardware 4 is applied in the height direction from the lower end of the strip. Since the positioning projections 50, 50 ', 51, 51' for contacting and leveling are formed at regular intervals, the reference black ink is drawn once to the four surfaces of the building or the like, and the rail-shaped hardware 4 is simply positioned. Just fix it to the furring while making it contact with The easy and simple work, it becomes possible to arrange fixing the rail-like hardware 4 and tiled brick 1,2 with high horizontal precision, appearance after finish is good, it is possible to make a high brick wall quality. In addition, the work efficiency can be improved even by an unskilled worker by simplifying the work without requiring the skill level, so that the excellent effect that the work period can be shortened and the work cost can be kept low can be obtained.

【0053】請求項2によれば、1種類の施工用ガイド
板を製作しておくだけで、平坦面用とコーナー用に共用
することができるので経済的であり、水平を保つ墨線は
建物下部に基準墨線を建物周囲一回引くだけでよく、幅
方向で折曲げたコーナー施工用ガイド板5’を建物の隅
々に固定することにより、東西南北各方面の水平基準が
簡単にでき上るので、施工用ガイド板5,5’にレール
状金物4を合わせて固定すれば、東西南北4方のレール
状金物4の端部は水平面が一致し、タイル状レンガ1,
2を嵌合した時にタイル状レンガ1,2の水平度が維持
されるというすぐれた効果が得られる。
According to the second aspect, it is economical because it can be used for both flat surfaces and corners only by producing one kind of construction guide plate, and it is economical. You only have to draw the reference black line once around the building, and by fixing the corner construction guide plates 5'folded in the width direction to the corners of the building, you can easily make horizontal references in the north, south, east, and west directions. If the rail-shaped metal fittings 4 are fixed to the construction guide plates 5 and 5 ', the ends of the rail-shaped metal fittings 4 on the north, south, east, and west sides have the same horizontal plane, and the tile-shaped bricks 1
An excellent effect is obtained that the levelness of the tile bricks 1 and 2 is maintained when the two are fitted.

【0054】請求項3によれば、特に下端から高さ方向
にレール状金物4の受支用水平部を当接させて水準出し
するための位置決め突起50,50’、51,51’を
一定間隔ごとに形成した施工用カイド板5,5’を用い
ているので、基準墨を建物などの四面に一回引くだけで
レール状金物4とタイル状レンガ1,2の各段の水平度
が正確に保たれコーナーを含めてきれいに各段の水平度
と間隔が形成された美麗なレンガ壁とすることができ、
施工も極めて単純で熟練を要さず、短期間で行なうこと
ができる。しかも、施工用ガイド板5,5’の使用によ
りレール状金物4はオーバラップ用部分を形成する必要
がなくなり、レール状金物の断面積を少なくすることが
できるので、トータルの材料使用量が節減され、かつレ
ール状金物4の断面形状変更により曲げ加工工数も減少
するので経済的であるなどのすぐれた効果が得られる。
According to the third aspect of the invention, the positioning projections 50, 50 ', 51, 51' for leveling the receiving horizontal portion of the rail-shaped metal object 4 in the height direction from the lower end are made constant. Since the construction guide boards 5 and 5'formed at intervals are used, the levelness of each step of the rail-shaped hardware 4 and the tile-shaped bricks 1 and 2 can be improved by simply drawing the standard black ink once on the four sides of the building. Precisely maintained, including the corners, it is possible to make a beautiful brick wall in which the levelness and intervals of each step are formed,
The construction is extremely simple, requires no skill, and can be done in a short period of time. Moreover, by using the construction guide plates 5 and 5 ', the rail-shaped metal article 4 does not need to form an overlapping portion, and the cross-sectional area of the rail-shaped metal article can be reduced, so that the total amount of material used is reduced. In addition, since the number of bending steps is reduced by changing the cross-sectional shape of the rail-shaped metal fitting 4, excellent effects such as being economical can be obtained.

【0055】請求項4によれば、レール状金物4の構造
が簡単で断面積が小さものとなるので、材料費、加工費
を節減することができ、しかも、レール状金物4の水平
部に続く耳部42,44が直角でなく内方に傾斜してい
るので、嵌め込みを容易にすべくタイル状レンガ1,2
の溝幅を広くとっても、タイル状レンガ1,2をしっか
りとレール状金物4の面板部方向に付勢し、ガタツキな
く安定して支持させることができるというすぐれた効果
が得られる。
According to the fourth aspect, the structure of the rail-shaped metal fitting 4 is simple and the cross-sectional area is small, so that the material cost and the processing cost can be reduced, and moreover, the rail-shaped metal fitting 4 has a horizontal portion. Since the continuous ears 42 and 44 are not inclined at right angles but inward, the tile-shaped bricks 1 and 2 are made to facilitate fitting.
Even if the groove width is wide, it is possible to obtain an excellent effect that the tile-shaped bricks 1 and 2 can be firmly urged in the direction of the face plate portion of the rail-shaped metal fitting 4 and can be stably supported without rattling.

【0056】請求項5によれば、特に下端から高さ方向
に位置決め突起50,50’、51,51’を一定間隔
ごとに形成した施工用ガイド板5,5’を胴縁6,6に
固定し、この施工用ガイド板5,5’の位置決め突起5
0,50’、51,51’にレール状金物4の受支用水
平部を当接させて水準出しするため、基準墨を建物など
の四面に一回引くだけで、レール状金物4とタイル状レ
ンガ1,2の各段の水平度が正確に保たれ、コーナーを
含めてきれいに各段の水平度と間隔が形成されたレンガ
壁を、熟練を要さず単純な作業により、短期間内で作る
ことができ、またレール状金物4として小型で簡単な構
造のものを使用できるので、材料費も安くなり、安価に
施工することができるというすぐれた効果が得られる。
According to the fifth aspect, the construction guide plates 5, 5'where the positioning projections 50, 50 ', 51, 51' are formed at regular intervals in the height direction from the lower end are provided on the furring strips 6, 6. Fixing and positioning protrusion 5 of this construction guide plate 5, 5 '
Since the horizontal part for receiving and supporting the rail-shaped metal fitting 4 is brought into contact with 0, 50 ', 51, 51' for leveling, it is only necessary to pull the standard black ink once on the four surfaces of the building or the like, and the rail-shaped hardware 4 and tile The level of each step of the bricks 1 and 2 is accurately maintained, and the level of each step including the corners and the interval between the brick walls are formed neatly. In addition, since the rail-shaped metal fitting 4 having a small size and a simple structure can be used, the material cost can be reduced, and an excellent effect that the construction can be performed at low cost can be obtained.

【図面の簡単な説明】[Brief description of drawings]

【図1】(a)は本発明による施工例を示す平面図、
(b)は(a)の部分的斜視図である。
FIG. 1 (a) is a plan view showing a construction example according to the present invention,
(B) is a partial perspective view of (a).

【図2】(a)は図1(b)のW−W線に沿う断面図、
(b)は(a)の一部拡大図である。
FIG. 2A is a cross-sectional view taken along the line WW of FIG.
(B) is a partially enlarged view of (a).

【図3】図1(b)のX−X線に沿う断面図である。FIG. 3 is a cross-sectional view taken along the line XX of FIG.

【図4】(a)は本発明における平坦部用の施工用ガイ
ド板の一例を示す正面図、(b)はその部分切欠拡大斜
視図、(c)は施工用ガイド板の製作時の素板を示す平
面図である。
4A is a front view showing an example of a construction guide plate for a flat portion according to the present invention, FIG. 4B is an enlarged perspective view of a partial cutout thereof, and FIG. 4C is an element at the time of manufacturing the construction guide plate. It is a top view which shows a board.

【図5】(a)は本発明におけるコーナー用の施工用ガ
イド板の一例を示す斜視図、(b)はその拡大断面図、
(c)は凹コーナー用とした施工用ガイド板の断面図で
ある。
FIG. 5A is a perspective view showing an example of a corner construction guide plate according to the present invention, and FIG. 5B is an enlarged sectional view thereof.
(C) is sectional drawing of the construction guide plate for concave corners.

【図6】(a)は本発明で使用するレール状金物のトッ
プレールを示す斜視図、(b)はその一部拡大側面図、
(c)はレール状金物の標準レールを示す斜視図、
(d)はその一部拡大側面図、(e)はレール状金物の
スターターレールを示す斜視図である。
6A is a perspective view showing a top rail of a rail-shaped metal article used in the present invention, FIG. 6B is a partially enlarged side view thereof, FIG.
(C) is a perspective view showing a standard rail of a rail-shaped metal object,
(D) is a partially enlarged side view thereof, and (e) is a perspective view showing a starter rail of the rail-shaped metal article.

【図7】(a)は本発明に使用するレンガの一例を示す
斜視図、(b)は他のレンガを示す斜視図である。
7A is a perspective view showing an example of a brick used in the present invention, and FIG. 7B is a perspective view showing another brick.

【図8】(a)は本発明の施工法の準備段階を示す部分
切欠正面図である。
FIG. 8A is a partially cutaway front view showing a preparatory stage of the construction method of the present invention.

【図9】胴縁への施工用ガイド板の固定完了状態を示す
斜視図である。
FIG. 9 is a perspective view showing a completed fixing state of the construction guide plate to the furring strip.

【図10】(a)は図9のY−Y線に沿う拡大断面図、
(b)は図9のZ−Z線に沿う拡大断面図である。
10A is an enlarged cross-sectional view taken along the line YY of FIG.
(B) is an enlarged sectional view taken along the line ZZ of FIG. 9.

【図11】(a)は施工用ガイド板にスターターレール
を配置固定した段階の正面図、(b)は施工用ガイド板
にスターターレールを配置固定し、次の標準レールを配
置した段階を示す部分的断面図である。
FIG. 11 (a) is a front view of a construction guide plate with a starter rail arranged and fixed, and FIG. 11 (b) shows a construction guide plate with a starter rail arranged and fixed and the next standard rail arranged. It is a partial sectional view.

【図12】(a)は施工用ガイド板にレール状金物を配
置固定した段階の正面図、(b)はその断面図である。
FIG. 12 (a) is a front view of a stage in which a rail-shaped metal object is arranged and fixed on a construction guide plate, and FIG. 12 (b) is a sectional view thereof.

【図13】(a)は施工用ガイド板にレール状金物を配
置固定した段階の部分的正面図、(b)は施工用ガイド
板にレール状金物を配置固定した段階のコーナー部分の
多段面である。
FIG. 13 (a) is a partial front view at the stage where the rail-shaped metal object is arranged and fixed on the construction guide plate, and (b) is a multi-step surface of the corner portion at the stage when the rail-shaped metal object is arranged and fixed on the construction guide plate. Is.

【図14】(a)はレール状金物にタイル状レンガを取
り付けた状態の正面図、(b)はその部分的断面図であ
る。
FIG. 14 (a) is a front view of a state where a tile brick is attached to a rail-shaped metal object, and FIG. 14 (b) is a partial cross-sectional view thereof.

【図15】(a)は本発明における施工用ガイド板の他
の例を示す部分切欠斜視図、(b)はおなじくその使用
状態を示す断面図である。
FIG. 15 (a) is a partially cutaway perspective view showing another example of the construction guide plate in the present invention, and FIG. 15 (b) is a sectional view showing the same usage state.

【図16】(a)は本発明における施工用ガイド板の他
の例を示す部分的斜視図、(b)は同じく他の例を示す
正面図、(c)は同じく他の例を示す正面図、(e)は
同じく他の例を示す断面図である。
16A is a partial perspective view showing another example of the construction guide plate in the present invention, FIG. 16B is a front view showing the other example, and FIG. 16C is a front view showing the other example. FIG. 6E is a sectional view showing another example.

【図17】本発明による施工用ガイド板を使用した別の
レンガ壁およびレンガ壁施工方法を示す部分的断面図で
ある。
FIG. 17 is a partial cross-sectional view showing another brick wall using the construction guide plate according to the present invention and a brick wall construction method.

【図18】(a)(b)(c)は従来のレンガ壁施工に
使用されたレール状金物の斜視図である。
18 (a), (b) and (c) are perspective views of a rail-shaped metal object used for conventional brick wall construction.

【図19】従来のレンガ壁施工状態を示す断面図であ
る。
FIG. 19 is a cross-sectional view showing a conventional brick wall construction state.

【符号の説明】[Explanation of symbols]

1,2 タイル状レンガ 3 下地 4 レール状金物 4a トップレール 4b 標準レール 4c スターターレール 5 施工用ガイド板 6 胴縁 8 目地材 10,20 溝 41,43 水平部 42,44 耳部 50,50’,51,51’ 位置決め突起 1,2 tile brick 3 groundwork 4 Rail-shaped hardware 4a Top rail 4b standard rail 4c starter rail 5 Construction guide plate 6 furry 8 joint materials 10, 20 groove 41,43 Horizontal part 42,44 ears Locating protrusions 50, 50 ', 51, 51'

───────────────────────────────────────────────────── フロントページの続き (72)発明者 長谷川 健一 埼玉県川越市下小坂52番地 株式会社長谷 川製作所内 Fターム(参考) 2E110 AB04 AB22 BA13 BD22 CA13 CC02 CC17 DC06 DD12 GB28   ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Kenichi Hasegawa             52 Shimokosaka, Kawagoe City, Saitama Prefecture Hase Co., Ltd.             Inside the Kawa Works F-term (reference) 2E110 AB04 AB22 BA13 BD22 CA13                       CC02 CC17 DC06 DD12 GB28

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】下地に胴縁を所定間隔で固定し、この胴縁
6,6と交差するようにレール状金物4を多段状に配列
固定し、それらレール状金物4にタイル状レンガ1,2
を上部の溝10,20と下部の平坦面をもって受支させ
るように配置し、各タイル状レンガ間の隙間を埋める如
くレール状金物4に目地8を塗着することで構成される
レンガ壁のための施工用手段であって、前記胴縁6,6
に固定されるべき背面を有する耐食性帯板の下端から高
さ方向に、前記レール状金物4の受支用水平部を当接さ
せて水準出しするための位置決め突起50,50’、5
1,51’を一定間隔ごとに有していることを特徴とす
るレンガ壁施工用ガイド板。
1. A furring strip is fixed to a base material at a predetermined interval, and rail-shaped metal fittings 4 are arranged and fixed in a multi-step manner so as to intersect these furring ribs 6 and 6. Two
Are arranged so as to be supported by the upper grooves 10 and 20 and the lower flat surface, and the joint 8 is applied to the rail-shaped metal fitting 4 so as to fill the gap between the tile-shaped bricks. Is a construction means for
Positioning projections 50, 50 ', 5 for abutting and leveling the horizontal portion for receiving and supporting the rail-shaped metal 4 in the height direction from the lower end of the corrosion-resistant strip having a back surface to be fixed to
A guide plate for brick wall construction, which has 1,51 'at regular intervals.
【請求項2】帯板が平坦状をなすものと、幅方向中央か
ら屈曲されたものからなっている請求項1に記載のレン
ガ壁施工用ガイド板。
2. The guide plate for brick wall construction according to claim 1, wherein the strip plate has a flat shape and is bent from the center in the width direction.
【請求項3】下地3に所定間隔で固定された胴縁6,6
の所要間隔のものに固定され、水準出し用の位置決め突
起50,50’、51,51’を下端から高さ方向で一
定間隔で形成している帯板状の施工用ガイド板5,5’
と、上面に溝10,20を有し下端面がフラットな複数
個のタイル状レンガ1,2と、面部端縁にタイル状レン
ガ1,2を受支する水平部43と下段のタイル状レンガ
の溝10,20と係合する耳部42,44を有し、それ
ぞれ前記施工用ガイド板5,5’の各段の位置決め突起
50,50’、51,51’に前記水平部を当接させて
配列された多段のレール状金物4と、前記レール状金物
4の水平部と耳部によって各々が支持されたタイル状レ
ンガ1,2の隙間を埋める如くレール状金物4に塗着さ
れた目地8とを備えていることを特徴とするレンガ壁。
3. Furnishings 6, 6 fixed to a base 3 at predetermined intervals.
, Which are fixed at the required intervals, and have leveling positioning projections 50, 50 ', 51, 51' formed at a constant interval in the height direction from the lower end, which are strip-shaped construction guide plates 5, 5 '.
And a plurality of tile-shaped bricks 1 and 2 having grooves 10 and 20 on the upper surface and a flat lower end surface, a horizontal portion 43 for supporting the tile-shaped bricks 1 and 2 on the edge of the surface portion, and a tile-shaped brick in the lower stage Of the positioning guides 50, 50 ', 51, 51' of each step of the construction guide plates 5, 5 ', and the horizontal portions are abutted, respectively. The rail-shaped metal fittings 4 arranged so as to be arranged, and the rail-shaped metal fittings 4 are coated so as to fill the gaps between the tile-shaped bricks 1 and 2 supported by the horizontal portions and the ears of the rail-shaped metal fittings 4, respectively. A brick wall having joints 8.
【請求項4】レール状金物4が、プレート状レンガ1,
2の高さにほぼ対応する幅を有する面板部40の端縁に
受支用水平部43とこれの先端から直角よりも適度に内
方に屈曲した耳部44とを有している請求項3に記載の
レンガ壁。
4. A rail-shaped hardware 4 is a plate-shaped brick 1,
2. The face plate portion 40 having a width substantially corresponding to the height of 2 has a support horizontal portion 43 and an ear portion 44 bent inward from the tip thereof at a proper angle rather than a right angle. Brick wall according to 3.
【請求項5】防水性能を有する下地3に所要間隔で胴縁
6,6を固定する工程と、下端から位置決め突起50,
50’、51,51’が一定間隔ごとに突出した帯板状
の施工用ガイド板5,5’を所定間隔ごとの胴縁6,6
に固定する工程と、下端縁にタイル状レンガ受支用の水
平部43とこれに続き下向き屈曲した耳部42,44を
有する複数のレール状金物4を、前記水平部が施工用ガ
イド板5,5’の位置決め突起50,50’、51,5
1’に当接するように配置して胴縁6,6に固定するこ
とを繰り返す工程と、上端面に溝10,20を有する多
数のタイル状レンガ1,2を、前記レール状金物4の耳
部42,44に前記溝1,20を係合させ下端面を水平
部43,43にて支持させるように差し込んで配列する
工程と、配列済みのタイル状レンガ相互間の隙間Sにレ
ール状金物4を下地として目地材8を塗着する工程とか
らなることを特徴とするレンガ壁の施工方法。
5. A step of fixing the furring strips 6, 6 to the base 3 having waterproof performance at required intervals, and positioning projections 50 from the lower end.
Band-shaped construction guide plates 5 and 5'in which 50 ', 51, and 51' project at regular intervals are furring strips 6 and 6 at predetermined intervals.
And a plurality of rail-shaped metal fittings 4 each having a horizontal portion 43 for receiving a tile-shaped brick at the lower end edge and ears 42, 44 that are bent downward after that, the horizontal portion being a guide plate 5 for construction. , 5'positioning protrusions 50, 50 ', 51, 5
Repeating the process of arranging so as to abut 1'and fixing to furring strips 6 and 6, and a large number of tile bricks 1 and 2 having grooves 10 and 20 on the upper end surface, The steps of engaging the grooves 1 and 20 with the portions 42 and 44 and inserting and arranging so that the lower end faces are supported by the horizontal portions 43 and 43, and the rail-shaped metal fitting in the gap S between the tile-shaped bricks that have been arranged. 4. A method of constructing a brick wall, which comprises a step of applying a joint material 8 using 4 as a base.
JP2001274701A 2001-08-31 2001-09-11 Brick wall and brick wall construction method Expired - Lifetime JP4099809B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001274701A JP4099809B2 (en) 2001-08-31 2001-09-11 Brick wall and brick wall construction method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2001263986 2001-08-31
JP2001-263986 2001-08-31
JP2001274701A JP4099809B2 (en) 2001-08-31 2001-09-11 Brick wall and brick wall construction method

Publications (2)

Publication Number Publication Date
JP2003147936A true JP2003147936A (en) 2003-05-21
JP4099809B2 JP4099809B2 (en) 2008-06-11

Family

ID=26621426

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001274701A Expired - Lifetime JP4099809B2 (en) 2001-08-31 2001-09-11 Brick wall and brick wall construction method

Country Status (1)

Country Link
JP (1) JP4099809B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569287A (en) * 2015-12-31 2016-05-11 青建集团股份公司 Imitation stone ET plate construction process for outer wall
CN108756120A (en) * 2018-07-30 2018-11-06 王圣保 Fixed component and its assembly method are stitched in a kind of assembled integrated wall brick system
CN109083356A (en) * 2018-07-30 2018-12-25 王圣保 A kind of assembled integrated wall brick system transverse direction integrated support structure and its assembly method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569287A (en) * 2015-12-31 2016-05-11 青建集团股份公司 Imitation stone ET plate construction process for outer wall
CN108756120A (en) * 2018-07-30 2018-11-06 王圣保 Fixed component and its assembly method are stitched in a kind of assembled integrated wall brick system
CN109083356A (en) * 2018-07-30 2018-12-25 王圣保 A kind of assembled integrated wall brick system transverse direction integrated support structure and its assembly method
CN109083356B (en) * 2018-07-30 2023-10-03 王圣保 Transverse integral component of assembled integrated wall tile system and assembling method thereof

Also Published As

Publication number Publication date
JP4099809B2 (en) 2008-06-11

Similar Documents

Publication Publication Date Title
US9879433B2 (en) Suspension rails for panel veneer systems
US6460311B1 (en) Fixture for boarding, and horizontal boarding method using the fixture
US8240099B2 (en) Architectural panel system
US4238915A (en) Tile setting assembly, tile wall and method for building a tile wall
US9140018B2 (en) Cladding element
US20130298489A1 (en) External and internal wall cladding system
US20110239578A1 (en) Prefabricated wall panel with interlocking structure
US9388565B2 (en) Siding and roofing panels and method for mounting same
CA2829410A1 (en) Clips for thin brick wall system
US8302360B2 (en) Wooden roof truss
US8522508B1 (en) Flashing support cant for a wall assembly and associated method
JP2003147936A (en) Guide plate for constructing brick wall, brick wall and brick wall constructing method
JP2004278224A (en) Wall surface construction assembly, decorative plate, decorative plate fixing member, joint member and wall surface construction method
EP1158110A2 (en) Roofing system
JP2004324119A (en) Wall structure using piece-shaped member such as brick or the like and its construction method
US10731357B2 (en) Ventilated thin brick panel system
JPH0628593Y2 (en) Wall decorative panel unit
JPS594110Y2 (en) Combination of tiles and panels for pasting them
JP2020148077A (en) Concrete form and insulation decorative plate, building and concrete structural skeleton forming method
US11466464B2 (en) Clip attachment for panel system
JP2002213063A (en) Brick wall and construction method thereof
JP2018071090A (en) Roof and exterior wall repair method, and roof and exterior wall repair structure
JP2517969Y2 (en) Flexible curved wall material
JP2007284908A (en) Brick wall surface using external facing substrate, and its construction method
JPH0421781B2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051005

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070801

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070904

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071102

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080212

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080307

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110328

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4099809

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120328

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130328

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130328

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140328

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term