JP2003138649A - Erection supporting body and method for installing beam in the same - Google Patents

Erection supporting body and method for installing beam in the same

Info

Publication number
JP2003138649A
JP2003138649A JP2001338289A JP2001338289A JP2003138649A JP 2003138649 A JP2003138649 A JP 2003138649A JP 2001338289 A JP2001338289 A JP 2001338289A JP 2001338289 A JP2001338289 A JP 2001338289A JP 2003138649 A JP2003138649 A JP 2003138649A
Authority
JP
Japan
Prior art keywords
flange
pedestal
flanges
longitudinal direction
erection support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001338289A
Other languages
Japanese (ja)
Inventor
Yasuhiko Kumagai
泰彦 熊谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2001338289A priority Critical patent/JP2003138649A/en
Publication of JP2003138649A publication Critical patent/JP2003138649A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily execute work for installing a beam. SOLUTION: An erection supporting body in equipped with; flanges 5b which can be bolted to both ends of the beam 1; pedestals 5 which are provided in accordance with positions for supporting both the ends of the beam 1 and to which the flanges 5b are welded; and guide members 6 which are fixed to the flanges 5b and engaged with the beam 1 in a longitudinally movable manner. The flanges 5b are engaged with both the ends of the beam 1 via the guide members 6; the beam 1 is transported so that both the ends of the beam 1 can be located extremely close to the pedestals 5; the respective flanges 5b are appropriately moved in the longitudinal direction of the beam 1 and bolted to both the ends of the beam 1; and the flanges 5b are welded for fixation to the pedestals 5.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は架設支持体及び該架
設支持体への梁の据付方法に関するものである。
TECHNICAL FIELD The present invention relates to a erection support and a method of installing a beam on the erection support.

【0002】[0002]

【従来の技術】図4及び図5は鉄筋コンクリート構造物
に組み込まれている従来の架設支持体の一例を示すもの
で、この架設支持体は、梁(長いH形鋼)1の両端支持
位置に対応して壁スラブ2から突出する一対の受台(短
いH形鋼)3を備えている。
2. Description of the Related Art FIGS. 4 and 5 show an example of a conventional erection support incorporated in a reinforced concrete structure. The erection support is located at both ends of a beam (long H-section steel). Correspondingly, a pair of pedestals (short H-shaped steel) 3 protruding from the wall slab 2 are provided.

【0003】梁1は、長ウエブ1a並びに上下の長フラ
ンジ1b,1cで構成され、下側の長フランジ1cの両
端部分に上下へ貫通する複数のボルト挿通用の孔1dを
穿設している。
The beam 1 is composed of a long web 1a and upper and lower long flanges 1b and 1c, and a plurality of bolt insertion holes 1d penetrating vertically are formed at both ends of the lower long flange 1c. .

【0004】受台3は、短ウエブ3a並びに上下の短フ
ランジ3b,3cで構成され、上側の短フランジ3bに
上下へ貫通する複数のボルト挿通用の孔3dを、短フラ
ンジ3bの上面に長フランジ1cを載置した際に、前記
の各孔1dに向き合うように穿設している。
The pedestal 3 is composed of a short web 3a and upper and lower short flanges 3b and 3c. A plurality of bolt insertion holes 3d vertically extending through the upper short flange 3b are provided on the upper surface of the short flange 3b. When the flange 1c is mounted, the flange 1c is provided so as to face each of the holes 1d.

【0005】受台3に梁1を据え付けるときには、クレ
ーンなどの揚重手段(図示せず)により、長フランジ1
cの孔1dが短フランジ孔3bの3dに一致するよう
に、梁1の両端部分を受台3に載置したうえ、これら孔
1d,3dにボルトを差し込んで、両フランジ1c,3
bを相互に締結している。
When installing the beam 1 on the pedestal 3, a long flange 1 is installed by a lifting means (not shown) such as a crane.
Both ends of the beam 1 are placed on the pedestal 3 so that the hole 1d of c coincides with the flange 3d of the short flange 3b.
b are mutually concluded.

【0006】また、壁スラブ2の仕上がり精度などに起
因して、受台3の間隔が設計通りにならない場合を考慮
し、長フランジ1cの孔1dの内径を、挿通すべきボル
トの外径に対して大きく設定している。
Considering the case where the spacing between the pedestals 3 is not as designed due to the finishing accuracy of the wall slab 2 and the like, the inner diameter of the hole 1d of the long flange 1c is set to the outer diameter of the bolt to be inserted. On the other hand, it is set large.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、設計値
に対する受台3の間隔の誤差が、想定される範囲を逸脱
している場合には、据付現場で孔1dを拡げなければな
らない。
However, if the error in the distance between the pedestal 3 and the design value deviates from the expected range, the hole 1d must be expanded at the installation site.

【0008】また、孔1dの内径があまり大きくなる
と、長フランジ1cの縦断面積が減少して、梁1の強度
が低下する。
Further, if the inner diameter of the hole 1d becomes too large, the longitudinal sectional area of the long flange 1c decreases, and the strength of the beam 1 decreases.

【0009】従って、梁1の据付作業を効率よく行なう
ために、たとえば、図6に示すように、放射状に配置す
べき複数の梁1を補助梁4で相互に固着して一体化した
後、壁スラブ2から突出している受台3に、各梁1の両
端部分をボルト締結することは、極めて困難である。
Therefore, in order to perform the installation work of the beam 1 efficiently, for example, as shown in FIG. 6, after a plurality of beams 1 to be radially arranged are fixed to each other by auxiliary beams 4 and integrated, It is extremely difficult to bolt both end portions of each beam 1 to the pedestal 3 protruding from the wall slab 2.

【0010】本発明は上述した実情に鑑みてなしたもの
で、梁の据付作業を容易に行なえるようにすることを目
的としている。
The present invention has been made in view of the above-mentioned circumstances, and an object of the present invention is to make it easy to install a beam.

【0011】[0011]

【課題を解決するための手段】上記目的を達成するため
に、本発明の請求項1に記載の架設支持体では、梁の両
端部分にボルト締結可能なフランジと、梁の両端支持位
置に対応して設けられ且つフランジが溶接される受台
と、フランジに固着され且つ梁の両端部分にその長手方
向へ移動可能に係合する案内部材とを備えている。
In order to achieve the above object, in the erection support according to the first aspect of the present invention, a flange which can be bolted to both ends of the beam and a position where both ends of the beam are supported are supported. And a guide member fixed to the flange and movably engaged with both end portions of the beam in the longitudinal direction thereof.

【0012】本発明の請求項2に記載の架設支持体で
は、一体化した複数の梁の両端部分にボルト締結可能な
フランジと、各梁の両端支持位置に対応して設けられ且
つフランジが溶接される受台と、フランジに固着され且
つ梁の両端部分にその長手方向へ移動可能に係合する案
内部材とを備えている。
In the erection support according to the second aspect of the present invention, flanges which can be bolted to both ends of a plurality of integrated beams, and flanges which are provided in correspondence with both-end supporting positions of the beams are welded. And a guide member fixed to the flange and engaged with both ends of the beam so as to be movable in its longitudinal direction.

【0013】本発明の請求項3に記載の架設支持体で
は、本発明の請求項1あるいは請求項2に記載の架設支
持体の構成に加えて、梁の一端部分にフランジを締結す
るためのボルト挿通用の孔の形状を、長径が梁長手方向
となる長円状に設定している。
According to a third aspect of the present invention, in addition to the construction of the first aspect of the present invention, a flange is fastened to one end of the beam. The shape of the hole for inserting the bolt is set to an elliptical shape whose major axis is in the beam longitudinal direction.

【0014】本発明の請求項4に記載の架設支持体への
梁の据付方法では、梁の両端部分に案内部材を介してフ
ランジを係合させ、当該梁をその両端部分が受台の至近
に位置するように運搬し、各フランジを梁の長手方向へ
適宜移動させ且つそれぞれ梁の両端部分にボルト締結し
た後、フランジを受台に溶接固着する。
According to a fourth aspect of the present invention, in the method of installing a beam on an erection support, flanges are engaged with both end portions of the beam through guide members, and the both end portions of the beam are close to a pedestal. After transporting each flange so as to be located in the beam, appropriately moving each flange in the longitudinal direction of the beam and fastening the bolts to both ends of each beam, the flange is welded and fixed to the pedestal.

【0015】本発明の請求項1に記載の架設支持体にお
いては、案内部材を介して梁に係合させたフランジを、
梁長手方向へ移動させて梁の両端部分にボルト締結した
後、受台に対してフランジを溶接し、梁の両端部分を支
持すべき受台の間隔の誤差を許容する。
In the erection support according to the first aspect of the present invention, the flange engaged with the beam via the guide member is
After being moved in the longitudinal direction of the beam and bolted to both end portions of the beam, flanges are welded to the pedestal to allow an error in the spacing of the pedestal to support both end portions of the beam.

【0016】本発明の請求項2に記載の架設支持体にお
いては、それぞれ案内部材を介して各梁に係合させたフ
ランジを、梁長手方向へ移動させて各梁の両端部分にボ
ルト締結した後、受台に対してフランジを溶接し、各梁
の両端部分を支持すべき受台の間隔の誤差を許容する。
In the erection support according to the second aspect of the present invention, the flanges engaged with the respective beams through the guide members are moved in the longitudinal direction of the beams and bolted to both ends of the respective beams. After that, the flange is welded to the pedestal to allow an error in the spacing of the pedestal to support both ends of each beam.

【0017】本発明の請求項3に記載の架設支持体にお
いては、ボルト挿通用の孔の形状を長円状に設定するこ
とにより、梁の長手方向への熱膨張を許容する。
In the erection support according to the third aspect of the present invention, the shape of the hole for inserting the bolt is set to be oval to allow thermal expansion in the longitudinal direction of the beam.

【0018】本発明の請求項4に記載の架設支持体への
梁の据付方法においては、フランジを案内部材により梁
に係合させて、当該梁とフランジを受台の至近まで一体
的に運搬し、フランジを梁の両端部分にボルト締結する
作業、及びフランジを受台に固着する作業を行なう。
In the method of installing the beam on the erection support according to claim 4 of the present invention, the flange is engaged with the beam by the guide member, and the beam and the flange are integrally conveyed to the vicinity of the pedestal. Then, the work of bolting the flange to both ends of the beam and the work of fixing the flange to the pedestal are performed.

【0019】[0019]

【発明の実施の形態】以下、本発明の実施の形態を、図
示例とともに説明する。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings.

【0020】図1乃至図3は本発明の架設支持体の実施
の形態の一例を示すもので、図中、図4及び図5と同一
の符号を付した部分は同一物を表わしている。
FIGS. 1 to 3 show an example of an embodiment of the erection support of the present invention. In the drawings, the same reference numerals as those in FIGS. 4 and 5 represent the same parts.

【0021】この架設支持体は、梁(長いH形鋼)1の
下側の長フランジ1cの両端部分にボルト締結可能な短
フランジ5bと、梁1の両端支持位置に対応して壁スラ
ブ2から突出する一対の受台5と、短フランジ5bを梁
1の両端部分にその長手方向へ移動可能に係止する案内
部材6とを備えている。
This erection support includes short flanges 5b which can be bolted to both ends of a lower long flange 1c of a beam (long H-section steel) 1 and a wall slab 2 corresponding to both end support positions of the beam 1. It is provided with a pair of pedestals 5 projecting from each other, and a guide member 6 for locking the short flanges 5b at both ends of the beam 1 so as to be movable in the longitudinal direction thereof.

【0022】下側の長フランジ1cの一端部分には、上
下へ貫通する複数のボルト挿通用の孔1eが穿設され、
また、当該長フランジ1cの他端部分には、上下へ貫通
する複数のボルト挿通用の孔1dが穿設されている。
A plurality of holes 1e for vertically inserting bolts are formed at one end of the lower long flange 1c.
In addition, a plurality of bolt insertion holes 1d that penetrate vertically are formed in the other end portion of the long flange 1c.

【0023】長フランジ1cの一端部分の孔1eの形状
は、長径が梁1長手方向となる長円状に設定されてい
る。
The shape of the hole 1e at one end of the long flange 1c is set to an elliptical shape whose major axis is in the longitudinal direction of the beam 1.

【0024】短フランジ5bには、上下へ貫通する複数
のボルト挿通用の孔5dが、前記の長フランジ1cの孔
1d,1eと同間隔で穿設されている。
The short flange 5b is provided with a plurality of vertically penetrating holes 5d for inserting bolts at the same intervals as the holes 1d and 1e of the long flange 1c.

【0025】受台5は、短ウエブ5a並びにその下縁に
連なる短フランジ5cで構成され、短ウエブ5aの上縁
に、前記の短フランジ5bが溶接固着されることによっ
て、短いH形鋼を形成する。
The pedestal 5 is composed of a short web 5a and a short flange 5c connected to the lower edge thereof, and the short flange 5b is welded and fixed to the upper edge of the short web 5a to form a short H-section steel. Form.

【0026】案内部材6は、短フランジ5bの左右両縁
部分に2個ずつ設けられ、基端部が短フランジ5bの左
右縁部に固着され、また、先端部が梁1の長フランジ1
cの上面を摺動し得るように折れ曲がっている。
Two guide members 6 are provided on each of the left and right edges of the short flange 5b, the base end portion is fixed to the left and right edge portions of the short flange 5b, and the tip end portion is the long flange 1 of the beam 1.
It is bent so that it can slide on the upper surface of c.

【0027】受台5に梁1を据え付けるときには、長フ
ランジ1cの両端部分に案内部材6を介して短フランジ
5bを、梁1長手方向へ移動し得るように装着する。
When installing the beam 1 on the pedestal 5, the short flanges 5b are attached to both ends of the long flange 1c via the guide members 6 so as to be movable in the longitudinal direction of the beam 1.

【0028】次いで、クレーンなどの揚重手段(図示せ
ず)によって、梁1をその両端部分が受台5の短ウエブ
5aの直上至近に位置するように吊り下げる。
Next, the beam 1 is suspended by a lifting means (not shown) such as a crane so that both end portions of the beam 1 are located immediately above the short web 5a of the pedestal 5.

【0029】この状態で、長フランジ1cに対する短フ
ランジ5bの相対位置を、各孔5dが孔1d,1eに向
き合うように調整し、これら孔1e,5d、並びに孔1
d,5dにボルトを差し込んで、両フランジ1c,5b
を相互に締結する。
In this state, the relative position of the short flange 5b to the long flange 1c is adjusted so that the holes 5d face the holes 1d and 1e, and the holes 1e and 5d and the hole 1 are adjusted.
Insert the bolts into d and 5d to insert both flanges 1c and 5b.
Conclude with each other.

【0030】更に、短フランジ5bを受台5の短ウエブ
5aに当接させて、短フランジ5bを短ウエブ5aに溶
接固着する。
Further, the short flange 5b is brought into contact with the short web 5a of the pedestal 5, and the short flange 5b is welded and fixed to the short web 5a.

【0031】このように、図1乃至図3に示す架設支持
体では、短フランジ5bを案内部材6により梁1に係合
させた状態で、これらを受台5の至近まで一体的に運搬
した後、短フランジ5bを梁1の両端部分にボルト締結
して受台5に溶接するので、梁1を支持すべき受台5の
間隔の誤差が生じていても、梁1の据付作業を容易に且
つ効率よく行なうことができる。
As described above, in the erection support shown in FIGS. 1 to 3, the short flange 5b is engaged with the beam 1 by the guide member 6 and they are integrally conveyed to the vicinity of the receiving table 5. After that, since the short flanges 5b are bolted to both ends of the beam 1 and welded to the pedestal 5, the installation work of the beam 1 is easy even if there is an error in the spacing of the pedestal 5 that should support the beam 1. In addition, it can be performed efficiently.

【0032】また、短フランジ5bを梁1長手方向へ移
動させることができるので、ボルト締結にあたって、孔
1d,1eを拡げる必要がなく、よって、長フランジ1
cの縦断面積の減少に起因した梁1の強度低下が生じな
い。
Further, since the short flange 5b can be moved in the longitudinal direction of the beam 1, it is not necessary to widen the holes 1d and 1e when fastening the bolts.
The decrease in the strength of the beam 1 due to the decrease in the vertical sectional area of c does not occur.

【0033】これに加えて、長フランジ1bの一端部分
の各孔1eの形状を、長円状に設定しているので、梁1
の長手方向への熱膨張を許容することができる。
In addition to this, since the shape of each hole 1e at one end of the long flange 1b is set to be an elliptical shape, the beam 1
Can be allowed to expand in the longitudinal direction.

【0034】また、梁1の長フランジ1cに案内部材6
を介して短フランジ5bを装着する構造を、図6に示す
ような複数の梁1を一体化したものに応用したならば、
複数の梁1を略同時に据え付けることが可能になる。
Further, the guide member 6 is provided on the long flange 1c of the beam 1.
If the structure in which the short flange 5b is attached via the above is applied to the one in which a plurality of beams 1 as shown in FIG. 6 are integrated,
It becomes possible to install a plurality of beams 1 substantially simultaneously.

【0035】なお、本発明の架設支持体及び該架設支持
体への梁の据付方法は上述した実施の形態のみに限定さ
れるものではなく、フランジに穿設する孔の形状を長円
状に設定すること、その他、本発明の要旨を逸脱しない
範囲において変更を加え得ることは勿論である。
The erection support and the method of installing the beam on the erection support according to the present invention are not limited to the above-described embodiments, and the shape of the hole to be bored in the flange is an ellipse. Of course, setting and other changes can be made without departing from the scope of the present invention.

【0036】[0036]

【発明の効果】以上述べたように、本発明の架設支持体
及び該架設支持体への梁の据付方法によれば、下記のよ
うな種々の優れた効果を奏し得る。
As described above, according to the erection support and the method of installing the beam on the erection support of the present invention, various excellent effects as described below can be obtained.

【0037】(1)本発明の請求項1に記載の架設支持
体においては、案内部材を介して梁に係合させたフラン
ジを、梁の両端部分にボルト締結した後、受台に対して
溶接するので、梁を支持する受台の間隔に誤差が生じて
いても、梁の据付作業を容易に行なうことができる。
(1) In the erection support according to the first aspect of the present invention, the flange engaged with the beam via the guide member is bolted to both ends of the beam, and then the pedestal is supported. Since the welding is performed, the installation work of the beam can be easily performed even if there is an error in the interval between the pedestals that support the beam.

【0038】(2)本発明の請求項2に記載の架設支持
体においては、それぞれ案内部材を介して各梁に係合さ
せたフランジを、各梁の両端部分にボルト締結した後、
受台に対して溶接するので、各梁を支持する受台の間隔
に誤差が生じていても、各梁の据付作業を容易に行なう
ことができる。
(2) In the erection support according to claim 2 of the present invention, after the flanges engaged with the respective beams through the guide members are bolted to both ends of the respective beams,
Since welding is performed on the pedestal, even if there is an error in the spacing between the pedestals that support the beams, the installation work of each beam can be easily performed.

【0039】(3)本発明の請求項1あるいは請求項2
に記載の架設支持体のいずれにおいても、受台に溶接す
べきフランジを梁長手方向へ移動させることができるの
で、フランジと梁との締結にあたって、ボルト挿通用に
孔を拡げる必要がなく、梁に孔の拡大に起因した強度低
下が生じない。
(3) Claim 1 or Claim 2 of the present invention
In any of the erection supports described in (1), since the flange to be welded to the pedestal can be moved in the beam longitudinal direction, it is not necessary to expand the hole for bolt insertion when fastening the flange and the beam. In addition, the strength does not decrease due to the enlargement of the holes.

【0040】(4)本発明の請求項3に記載の架設支持
体においては、一方のフランジを梁の一端部分に締結す
るためのボルト挿通用の孔の形状を、長円状に設定して
いるので、梁の長手方向への熱膨張を許容することがで
きる。
(4) In the erection support according to claim 3 of the present invention, the shape of the hole for inserting the bolt for fastening one flange to one end of the beam is set to be an ellipse. Therefore, thermal expansion in the longitudinal direction of the beam can be permitted.

【0041】(5)本発明の請求項4に記載の架設支持
体への梁の据付方法においては、梁にフランジを案内部
材を介して係合させたうえ、当該梁とフランジを受台の
至近まで一体的に運搬し、フランジを梁の両端部分にボ
ルト締結する作業、及びフランジを受台に固着する作業
を行なうので、梁の据付作業を効率よく行なうことがで
きる。
(5) In the method of installing the beam on the erection support according to the fourth aspect of the present invention, the beam and the flange are engaged with each other through the guide member, and the beam and the flange are attached to the pedestal. Since the work is integrally carried to the nearest place, the work of bolting the flange to both ends of the beam and the work of fixing the flange to the pedestal are performed, the work of installing the beam can be efficiently performed.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の架設支持体の実施の形態の一例への梁
の据付手順を示す概念図である。
FIG. 1 is a conceptual diagram showing a beam installation procedure in an example of an embodiment of a erection support of the present invention.

【図2】図1に関連する梁にフランジを装着する前の状
態を示す概念図である。
FIG. 2 is a conceptual diagram showing a state before mounting a flange on a beam related to FIG.

【図3】図1に関連する受台への梁の据付作業が完了し
た状態を示す概念図である。
FIG. 3 is a conceptual diagram showing a state where installation work of a beam on a pedestal related to FIG. 1 is completed.

【図4】従来の架設支持体の一例への梁の据付手順を示
す概念図である。
FIG. 4 is a conceptual diagram showing a procedure for installing a beam on an example of a conventional erection support.

【図5】図4に関連する受台への梁の据付作業が完了し
た状態を示す概念図である。
FIG. 5 is a conceptual diagram showing a state in which the installation work of the beam on the cradle related to FIG. 4 is completed.

【図6】複数の梁を一体化した状態を示す概念図であ
る。
FIG. 6 is a conceptual diagram showing a state in which a plurality of beams are integrated.

【符号の説明】[Explanation of symbols]

1 梁 1e 孔 5 受台 5b 短フランジ 6 案内部材 1 beam 1e hole 5 stand 5b short flange 6 guide members

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 梁の両端部分にボルト締結可能なフラン
ジと、梁の両端支持位置に対応して設けられ且つフラン
ジが溶接される受台と、フランジに固着され且つ梁の両
端部分にその長手方向へ移動可能に係合する案内部材と
を備えてなることを特徴とする架設支持体。
1. A flange that can be bolted to both ends of the beam, a pedestal provided corresponding to both ends of the beam and welded to the flange, and a flange fixed to the flange and extending to both ends of the beam. And a guide member that is movably engaged in the direction.
【請求項2】 一体化した複数の梁の両端部分にボルト
締結可能なフランジと、各梁の両端支持位置に対応して
設けられ且つフランジが溶接される受台と、フランジに
固着され且つ梁の両端部分にその長手方向へ移動可能に
係合する案内部材とを備えてなることを特徴とする架設
支持体。
2. A flange capable of being bolted to both end portions of a plurality of integrated beams, a pedestal provided corresponding to both end supporting positions of each beam and having the flange welded thereto, and a beam fixed to the flange and attached to the beam. A guide member which is provided at both ends of the guide member so as to be movable in the longitudinal direction thereof.
【請求項3】 梁の一端部分にフランジを締結するため
のボルト挿通用の孔の形状を、長径が梁長手方向となる
長円状に設定した請求項1あるいは請求項2のいずれか
に記載の架設支持体。
3. A bolt insertion hole for fastening a flange to one end portion of a beam, wherein the shape of the hole is set to be an elliptical shape whose major axis is in the beam longitudinal direction. Erection support.
【請求項4】 梁の両端部分に案内部材を介してフラン
ジを係合させ、当該梁をその両端部分が受台の至近に位
置するように運搬し、各フランジを梁の長手方向へ適宜
移動させ且つそれぞれ梁の両端部分にボルト締結した
後、フランジを受台に溶接固着することを特徴とする請
求項1乃至請求項3のいずれかに記載の架設支持体への
梁の据付方法。
4. A flange is engaged with both end portions of the beam via guide members, the beam is conveyed so that both end portions thereof are positioned close to the pedestal, and each flange is appropriately moved in the longitudinal direction of the beam. The method of installing a beam on a erection support according to any one of claims 1 to 3, wherein the flange is welded and fixed to the pedestal after being bolted to both ends of the beam.
JP2001338289A 2001-11-02 2001-11-02 Erection supporting body and method for installing beam in the same Pending JP2003138649A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001338289A JP2003138649A (en) 2001-11-02 2001-11-02 Erection supporting body and method for installing beam in the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001338289A JP2003138649A (en) 2001-11-02 2001-11-02 Erection supporting body and method for installing beam in the same

Publications (1)

Publication Number Publication Date
JP2003138649A true JP2003138649A (en) 2003-05-14

Family

ID=19152807

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001338289A Pending JP2003138649A (en) 2001-11-02 2001-11-02 Erection supporting body and method for installing beam in the same

Country Status (1)

Country Link
JP (1) JP2003138649A (en)

Similar Documents

Publication Publication Date Title
JP2019112811A (en) Main leg installation method and anchor frame installation jig
JP4884117B2 (en) Column and steel pipe pile positioning device and positioning method
JPH08151685A (en) Steel frame connection part structure
JP7385844B2 (en) Steel sheet pile wall construction jig
JP5280228B2 (en) Reinforcing bar assembly structure
JP2003138649A (en) Erection supporting body and method for installing beam in the same
EA003819B1 (en) A method for the production of a connector point on a travel way
JP2000291262A (en) Erection piece for column erection and column erection method
JP2007032098A (en) Method of connecting between large beam and small beam, and connection structure between the same
US11156326B2 (en) Device and method for use thereof for facilitating substantially leveled attachment of construction tool
JP2021195834A (en) Column base anchor structure, trestle, and design method for column base anchor structure
JP2001241188A (en) Construction method for structure and provitional frame base
JP5938275B2 (en) Seismic members and methods of attaching seismic members
JP7355246B2 (en) Lifting beam and manufacturing method of lifting beam
JP7181069B2 (en) Reversed strut positioning jig
JPH0953217A (en) Method of jacket construction of water-surface erected structure by h-steel bearing pile
JP2004060313A (en) Timbering for bridge
JP7229634B2 (en) Support jig for work scaffold in shaft, support jig unit, work scaffold in shaft, and method for constructing work scaffold in shaft
JP2006161274A (en) Bracket for temporary scaffold
JP3043894U (en) Support structure for mountain retaining wall
JPH10299004A (en) Positioning method and equipment for steel pipe column in erecting insertion type steel pipe column
JPH0953223A (en) Bearing-pile mounting structure of jacket for constructing water-surface erection structure
JP3701589B2 (en) Construction method of structure
JP2017120005A (en) Pile structure and pile assembling method
JP2000120936A (en) Fixing auxiliary tool for frame

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040628

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060516

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060919