JP2003113543A - Doffing system for false-twist textured yarn production plant and false-twist textured yarn production system - Google Patents

Doffing system for false-twist textured yarn production plant and false-twist textured yarn production system

Info

Publication number
JP2003113543A
JP2003113543A JP2001305306A JP2001305306A JP2003113543A JP 2003113543 A JP2003113543 A JP 2003113543A JP 2001305306 A JP2001305306 A JP 2001305306A JP 2001305306 A JP2001305306 A JP 2001305306A JP 2003113543 A JP2003113543 A JP 2003113543A
Authority
JP
Japan
Prior art keywords
false
doffing
false twisting
machine
yarn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001305306A
Other languages
Japanese (ja)
Inventor
Nobuo Sakamoto
信雄 坂本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Priority to JP2001305306A priority Critical patent/JP2003113543A/en
Publication of JP2003113543A publication Critical patent/JP2003113543A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a doffing system including doffers exclusive of respective false twisters so that the processing conditions of the respective false twisters are not affected each other. SOLUTION: This doffing system has the following scheme and advantage: in a false-twist textured yarn production plant where a plurality of false twisters 101, 102 and 103 each mounted with a plurality of spindles for producing false- twist textured yarns are installed, each of the false twisters is exclusively equipped with one doffer 15; therefore the doffer 15 is governed by only the processing conditions of the corresponding false twister and does not be affected by the processing conditions of the other false twisters 101-103; consequently, for each of the false twisters 101-103, a doffing can be performed independently at a proper timing, and optimum processing conditions (production rate) can be set for the respective false twisters, thus improving false-twist textured yarn productivity.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、複数錘を備えてな
る仮撚加工機が複数台並列配置された設備において、互
いに他の仮撚加工機の加工条件に影響を受けることのな
い玉揚システム及び仮撚加工糸生産システムに関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus in which a plurality of false twisting machines having a plurality of weights are arranged in parallel, and doffing is not affected by the processing conditions of other false twisting machines. System and false twisted yarn production system.

【0002】[0002]

【従来の技術】仮撚加工機は、図4の仮撚加工糸生産工
場の全体配置図に示すように、テイクアップワインダー
を複数錘備えてなる仮撚ユニット12が背中合わせで多
数連続して中央に配置され、それぞれの通路14,14
を挟んで一次ヒータ及びクリールスタンド1が配設され
て構成されている。各錘において、クリールスタンドか
らフィードローラによって繰り出された糸は、一次ヒー
タで延伸温度まで加熱され、ニップツイスター等の仮撚
装置で加撚状態にされ、更に二次ヒータで再熱処理が行
われた後、テイクアップワインダーによって仮撚加工糸
パッケージとして巻き取られる。テイクアップワインダ
ーによって満巻きとなった仮撚加工糸パッケージは、通
路14,14を往復して走行する玉揚装置15によって
取り出されると共に、空の紙管がテイクアップワインダ
ーに供給されて糸掛けされる。取り出されたパッケージ
は、例えばロータリーペグ16によって所定の位置まで
搬送され、取り出される。
2. Description of the Related Art A false twisting machine has a large number of false twisting units 12 each having a plurality of take-up winders arranged in a back-to-back center, as shown in the overall layout of the false twisting yarn production plant in FIG. Are located in the respective passages 14, 14
A primary heater and a creel stand 1 are arranged so as to sandwich it. In each weight, the yarn fed out from the creel stand by the feed roller was heated to a drawing temperature by a primary heater, put into a twisted state by a false twisting device such as a nip twister, and then reheated by a secondary heater. After that, it is wound into a false twisted yarn package by a take-up winder. The false-twisted yarn package that has been fully wound by the take-up winder is taken out by the doffing device 15 that travels back and forth in the passages 14, 14, and an empty paper tube is supplied to the take-up winder and threaded. It The taken out package is conveyed to a predetermined position by, for example, the rotary peg 16 and taken out.

【0003】仮撚加工糸生産工場においては、上述の構
成の仮撚加工機が、工場内に複数台並設されており、前
記玉揚装置15はこれらの複数台の仮撚加工機を受け持
つようになされている。そして、図4の実線で示すホー
ムポジションから玉揚制御装置19により、玉揚のタイ
ミングとなった仮撚加工機が指定され、その位置まで走
行する第1走行路Aと、該当する仮撚加工機の前後の通
路14,14に設けられた第2走行路Bとを往復移動
し、該当する仮撚加工機の全ての錘について順次玉揚を
するようになっている。
In a false twisting yarn production factory, a plurality of false twisting machines having the above-mentioned structure are installed side by side in the factory, and the doffing device 15 takes charge of these plural false twisting machines. It is done like this. Then, from the home position shown by the solid line in FIG. 4, the doffing control device 19 specifies the false twisting machine at the doffing timing, the first traveling path A that travels to that position, and the corresponding false twisting process. It reciprocates along a second traveling path B provided in the passages 14 and 14 in front of and behind the machine to sequentially doff all the weights of the corresponding false twisting machine.

【0004】1錘当たりの玉揚に要する時間は決まって
おり、仮撚加工機1台当たりの玉揚に要する時間も錘数
分であるので決まっている。この仮撚加工機1台当たり
の玉揚に要する時間に対し、仮撚加工糸パッケージを巻
き始めてから巻き上げるまでの時間(巻上時間)は極め
て長時間である。従来の玉揚システムは、この時間の差
を利用して工場内の仮撚加工機の玉揚タイミングを機台
毎にずらし、1台の玉揚装置で複数台の仮撚加工機を順
番に玉揚していくようにしている。
The time required for doffing one spindle is fixed, and the time required for doffing one false twisting machine is also determined by the number of spindles. In contrast to the time required for doffing one false twisting machine, the time from the start of winding the false twisted yarn package to the winding (winding time) is extremely long. The conventional doffing system uses this time difference to shift the doffing timing of the false twisting machine in the factory for each machine stand, and one doffing device is used to sequentially turn multiple false twisting machines. I try to doage.

【0005】[0005]

【発明が解決しようとする課題】ところが、上記玉揚シ
ステムが採用できるのは、各仮撚加工機における仮撚加
工糸パッケージの生産時間が全機台について一定である
場合に限られる。糸の種類等が異なり、パッケージの生
産時間が異なる機台が存在すると、複数機台間で玉揚タ
イミングが重複してしまうという問題があった。これを
防ぐためには、生産時間を最も生産時間の長い機台に合
わせるか、重複する仮撚加工機台の玉揚作業を作業員が
手助けでしなければならず、生産性の低下あるいは人的
パワーの増加という結果を招いていた。
However, the doffing system can be used only when the production time of the false twisting yarn package in each false twisting machine is constant for all machine bases. If there are machine bases having different types of yarns and different package production times, there is a problem in that doffing timings are duplicated among a plurality of machine bases. In order to prevent this, the production time must be adjusted to the machine with the longest production time, or the operator must assist the doffing work of the overlapping false-twisting machine bases. The result was an increase in power.

【0006】[0006]

【課題を解決するための手段】本発明は従来の前記課題
に鑑みてこれを改良除去したものであって、各仮撚加工
機に専用の玉揚装置を配設することにより、他の仮撚加
工機の加工条件の影響を受けない玉揚システム及び仮撚
加工糸生産システムを提供せんとするものである。
SUMMARY OF THE INVENTION The present invention has been made by improving and eliminating the conventional problems described above. By disposing a doffing device dedicated to each false twisting machine, other temporary twisting machines are provided. It is intended to provide a doffing system and a false twisting yarn production system which are not affected by the processing conditions of the twisting machine.

【0007】而して、前記課題を解決するために本発明
が採用した手段は、仮撚加工糸を生産する錘を複数備え
てなる仮撚加工機が複数台配置された設備において、各
仮撚加工機に対して一台の玉揚装置を専用的に配設した
ことを特徴とする仮撚加工糸生産工場の玉揚システムで
ある。玉揚装置は、対応する仮撚加工機の加工条件にの
み拘束されることになり、他の仮撚加工機の加工条件の
影響を受けることがない。そのため、それぞれの仮撚加
工機について、独立して自由なタイミングで玉揚を行う
ことができ、各機台について、最適な加工条件(生産速
度)を設定でき、生産性の向上が図れる。
The means adopted by the present invention in order to solve the above-mentioned problems are, in equipment provided with a plurality of false twisting machines, each of which is provided with a plurality of weights for producing false twisted yarns. This is a doffing system in a false twisting yarn production factory, characterized in that one doffing device is arranged exclusively for the twisting machine. The doffing device is restricted only by the processing conditions of the corresponding false twisting machine, and is not affected by the processing conditions of other false twisting machines. Therefore, each false twisting machine can perform doffing independently at free timing, and can set optimal processing conditions (production speed) for each machine stand, thereby improving productivity.

【0008】[0008]

【発明の実施の形態】以下に、本発明の構成を図面に示
す発明の実施の形態に基づいて説明すると次の通りであ
る。図1乃至図3は本発明の一実施の形態に係る仮撚加
工機の玉揚システムに関するものであり、図1は仮撚加
工糸生産工場の機器配置例を示す平面図、図2は仮撚加
工機の正面図、図3はその部分拡大正面図である。仮撚
加工糸生産工場は、図1に示すように、仮撚加工糸を生
産する錘を複数備えてなる仮撚加工機が複数台配置され
ている。図1では、仮撚加工機101,102,103
の3台を並列配置した場合を示している。仮撚加工機1
01〜103は、図2の正面図及び図3の部分拡大正面
図に示す通りであり、クリールスタンド1内の給糸パッ
ケージ2から繰り出された糸3は、第1フィードローラ
4と第2フィードローラ5とによって延伸可能な糸張力
に保持される。これら二組のフィードローラ4,5の間
の下流側には、ニップツイスター等の仮撚装置6が設け
られており、この仮撚装置6より上流の糸3は加撚状態
となっている。また第1及び第2フィードローラ4,5
の間の上流側には、熱固定用の一次ヒータ7が設けられ
ており、加撚状態の糸3を延伸温度まで加熱するように
なっている。
BEST MODE FOR CARRYING OUT THE INVENTION The structure of the present invention will be described below based on the embodiments of the invention shown in the drawings. 1 to 3 relate to a doffing system of a false twisting machine according to an embodiment of the present invention. FIG. 1 is a plan view showing an example of equipment arrangement in a false twisting yarn production factory, and FIG. A front view of the twisting machine, and FIG. 3 is a partially enlarged front view thereof. As shown in FIG. 1, a false twisting yarn production plant is provided with a plurality of false twisting machines each having a plurality of weights for producing false twisting yarns. In FIG. 1, false twisting machines 101, 102, 103
3 shows the case where three units are arranged in parallel. False twisting machine 1
01 to 103 are as shown in the front view of FIG. 2 and the partially enlarged front view of FIG. 3, and the yarn 3 delivered from the yarn supply package 2 in the creel stand 1 is the first feed roller 4 and the second feed. The roller tension is maintained by the roller 5 so that the yarn can be drawn. A false twisting device 6 such as a nip twister is provided on the downstream side between these two sets of feed rollers 4 and 5, and the yarn 3 upstream of the false twisting device 6 is in a twisted state. The first and second feed rollers 4, 5
A primary heater 7 for heat fixation is provided on the upstream side between the two so as to heat the twisted yarn 3 to the drawing temperature.

【0009】更に、第2フィードローラ5の下流側に
は、第3フィードローラ8が設けられており、これら二
組のフィードローラ5,8の間には、二次ヒータ9が設
けられていて、再熱処理を行うようになっている。再熱
処理後の糸3は、テイクアップワインダー10により仮
撚加工糸パッケージ11に仕上げられる。給糸パッケー
ジ2の糸3を仮撚加工して仮撚加工糸パッケージを生産
する一つの単位が錘であり、複数錘が横一列に並設され
ている。この実施の形態では、仮撚装置6以降のの機器
を含む本体ユニット13において3錘分のテイクアップ
ワインダー10が上下3段に配置されている。
Further, a third feed roller 8 is provided on the downstream side of the second feed roller 5, and a secondary heater 9 is provided between these two sets of feed rollers 5, 8. , Reheat treatment is performed. The yarn 3 after the reheat treatment is finished into a false twist textured yarn package 11 by the take-up winder 10. One unit for false twisting the yarn 3 of the yarn supplying package 2 to produce a false twisted yarn package is a weight, and a plurality of weights are arranged side by side in a row. In this embodiment, the take-up winders 10 for three spindles are arranged in upper and lower three stages in the main body unit 13 including the devices after the false twisting device 6.

【0010】而して、前記一次ヒータ7は、特に背が高
いため、一次ヒータ7を仮撚装置6以降の本体ユニット
13と区分して対向配置し、その間に通路14を設け、
糸掛け操作や保全作業をし易くしている。通路14に
は、玉揚装置15が本体ユニット13に沿って走行自在
に配置されている。また一次ヒータ7の通路14側と、
反対側のクリールスタンド1との間には、エンドレス状
に運転されるロータリーペグ16が配設されている。前
記玉揚装置15は、テイクアップワインダー10により
満巻きとなったパッケージ11をテイクアップワインダ
ー10から取り出すと共に、空の紙管をテイクアップワ
インダー10へ装着して糸掛けし、取り出したパッケー
ジ11をロータリーペグ16へ移載する。尚、ロータリ
ーペグ16のパッケージ11は、本体ユニット13の一
端側で抜き取られ、回収されるようになっている。
Since the primary heater 7 is particularly tall, the primary heater 7 is disposed separately from the main body unit 13 after the false twisting device 6 so as to face it, and the passage 14 is provided between them.
This makes threading operations and maintenance work easier. A doffing device 15 is arranged in the passage 14 so as to be movable along the main body unit 13. Also, with the passage 14 side of the primary heater 7,
Between the creel stand 1 on the opposite side, a rotary peg 16 that is operated in an endless manner is arranged. The doffing device 15 takes out the package 11 that has been fully wound by the take-up winder 10 from the take-up winder 10 and attaches an empty paper core to the take-up winder 10 to thread the package 11 and take out the package 11. Transferred to the rotary peg 16. The package 11 of the rotary peg 16 is pulled out at one end of the main body unit 13 and collected.

【0011】図2及び図3において、符号17は一次ヒ
ータ7の通路14側に取り付けられた給電用のトロリ線
であり、符号18はこのトロリ線17から必要な電力及
び信号を受け取る受電装置であり、玉揚装置15に付設
されている。
2 and 3, reference numeral 17 is a power supply trolley wire attached to the passage 14 side of the primary heater 7, and reference numeral 18 is a power receiving device for receiving necessary power and signals from the trolley wire 17. Yes, and is attached to the doffing device 15.

【0012】各仮撚加工機101〜103は、玉揚装置
15を除く以上の構成が本体ユニット13の背中合わせ
に対象配置されている。玉揚制御装置19は、機台毎に
本体ユニット13の端部(他端)に設けられている。こ
制御装置19は、対応する仮撚加工機に関する仮撚加工
糸パッケージの巻き始めから巻き上げに至るまでの巻き
上げ時間、玉揚開始から玉揚完了までの玉揚時間及び運
転開始時刻(第1回目の玉揚開始時刻)であるスタート
時刻を入力すると、対応する各仮撚加工機の次の玉揚時
刻を予測し、玉揚装置15に対し玉揚の準備をするよう
に命令するようになっている。
Each of the false twisting machines 101 to 103 has the above-mentioned configuration except for the doffing device 15 and is arranged so that the main unit 13 is back to back. The doffing control device 19 is provided at the end (the other end) of the main body unit 13 for each machine base. The control device 19 controls the winding time from the start of winding of the false twisted yarn package related to the corresponding false twisting machine to the winding time, the doffing time from the start of doffing to the completion of doffing, and the operation start time (first time). When inputting the start time which is the doffing start time), the next doffing time of the corresponding false twisting machine is predicted and the doffing device 15 is instructed to prepare for doffing. ing.

【0013】而して、この実施の形態にあっては、玉揚
装置15を各仮撚加工機101〜103にそれぞれ一台
ずつ配設し、専用的使用を行うようにしている。各玉揚
装置15は、トロリー線17及び受電装置18を介して
電力の供給を受けると共に、対応する仮撚加工機の玉揚
制御装置19との間で信号のやり取りを行っている。従
って、玉揚装置15の走行路は、対応する仮撚加工機の
前後面に走行路Bが往復可能に設けられるだけであり、
各仮撚加工機間を移動するための従来の走行路A(図4
参照)に相当するものはない。
In this embodiment, therefore, one doffing device 15 is provided for each false twisting machine 101-103 and dedicated use is performed. Each doffing device 15 is supplied with power via the trolley wire 17 and the power receiving device 18, and exchanges signals with the doffing control device 19 of the corresponding false twisting machine. Therefore, the runway of the doffing device 15 is only provided so that the runway B can reciprocate on the front and rear surfaces of the corresponding false twisting machine.
A conventional traveling path A for moving between the false twisting machines (see FIG. 4).
(See) there is no equivalent.

【0014】各玉揚装置15は、それぞれ対応する仮撚
加工機の玉揚制御装置19との間で信号のやり取りを行
い、玉揚のタイミングとなったときに、図1の実線で示
すホームポジションの位置から走行路Bへ進入する。そ
して、満巻きとなったテイクアップワインダー10の仮
撚加工糸パッケージ11を取り出すと共に、空の紙管を
テイクアップワインダー10へ供給し、満巻きのパッケ
ージ11をロータリーペッグ16へ移載する。順次、こ
のようにして手前側の錘から最後尾の錘までの玉揚を行
った後、走行路Bをターンしてホームポジションの位置
へ戻る。
Each doffing device 15 exchanges signals with the doffing control device 19 of the corresponding false twisting machine, and when the doffing timing comes, the home shown by the solid line in FIG. Enter the road B from the position. Then, the false-twisted yarn package 11 of the fully wound take-up winder 10 is taken out, an empty paper tube is supplied to the take-up winder 10, and the fully-wound package 11 is transferred to the rotary peg 16. In this way, after doffing from the weight on the front side to the weight on the rearmost side in this manner, the road B is turned to return to the home position.

【0015】図1に示す仮撚加工糸生産工場において
は、機台101で加工速度Xの糸を生産している。機台
102では加工速度Yであり、機台103では加工速度
Zである。各加工速度X,Y,Zは最適加工速度に設定
されている。仮撚加工糸パッケージの満巻径は、全機台
101,102,103共に同一で、従って各機台の巻
上時間は、加工速度X,Y,Zに対応して異なってい
る。各機台101,102,103の玉揚装置15の玉
揚インターバル(前回の玉揚から次回の玉揚までの時
間)は、各加工速度(各巻上時間)に対応して設定され
ている。各機台101,102,103では、相互に他
の玉揚装置15の影響を受けることがなく、個別的に加
工速度を設定できる。このため、各仮撚加工機では、加
工対象の糸の種類に応じた生産速度(加工生産)を設定
することができ、他の仮撚加工機における生産速度等と
の調整を考慮する必要がない。従って、各機台におい
て、最適に加工速度の設定が可能であり、加工速度を無
理やり低下させる必要がなく、生産性の向上が図れる。
In the false twist textured yarn production factory shown in FIG. 1, the machine base 101 produces the yarn at the processing speed X. The machine base 102 has a processing speed Y, and the machine base 103 has a processing speed Z. Each processing speed X, Y, Z is set to the optimum processing speed. The full winding diameter of the false twist textured yarn package is the same for all machine bases 101, 102 and 103, and therefore the winding time of each machine base differs depending on the processing speeds X, Y and Z. The doffing interval (time from the last doffing to the next doffing) of the doffing device 15 of each machine stand 101, 102, 103 is set corresponding to each processing speed (each hoisting time). In each of the machine bases 101, 102 and 103, the processing speed can be set individually without being influenced by the other doffing device 15 mutually. Therefore, in each false twisting machine, the production speed (processing production) can be set according to the type of yarn to be processed, and it is necessary to consider the adjustment with the production speed in other false twisting machines. Absent. Therefore, the processing speed can be optimally set on each machine base, and it is not necessary to forcibly reduce the processing speed, and the productivity can be improved.

【0016】[0016]

【発明の効果】以上説明したように本発明にあっては、
仮撚加工糸を生産する錘を複数備えてなる仮撚加工機が
複数台配置された設備において、各仮撚加工機に対して
一台の玉揚装置を専用的に配設している。玉揚装置は、
対応する仮撚加工機の加工条件にのみ拘束されることに
なり、他の仮撚加工機の加工条件の影響を受けることが
ない。そのため、それぞれの仮撚加工機について、独立
して適正なタイミングで玉揚を行うことができ、各機台
について、最適な加工条件(生産速度)を設定でき、生
産性の向上が図れる。
As described above, according to the present invention,
In a facility in which a plurality of false twisting machines including a plurality of weights for producing false twisted yarns are arranged, one doffing device is exclusively provided for each false twisting machine. The doffing device is
It is restricted only by the processing conditions of the corresponding false twisting machine, and is not affected by the processing conditions of other false twisting machines. Therefore, each false twisting machine can do the doffing independently at an appropriate timing, the optimum processing conditions (production speed) can be set for each machine stand, and the productivity can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施の形態に係る仮撚加工糸生産工
場における玉揚システムの機器の配置を示す平面図であ
る。
FIG. 1 is a plan view showing an arrangement of devices of a doffing system in a false twisting yarn production factory according to an embodiment of the present invention.

【図2】本発明の一実施の形態に係る仮撚加工機の正面
図である。
FIG. 2 is a front view of the false twisting machine according to the embodiment of the present invention.

【図3】本発明の一実施の形態に係る仮撚加工機の部分
拡大正面図である。
FIG. 3 is a partially enlarged front view of the false twisting machine according to the embodiment of the present invention.

【図4】従来の仮撚加工糸生産工場における玉揚システ
ムの機器の配置を示す平面図である。
FIG. 4 is a plan view showing an arrangement of devices of a doffing system in a conventional false twisting yarn production factory.

【符号の説明】[Explanation of symbols]

1…クリールスタンド、2…パッケージ、3…糸、4…
第1フィードローラ、5…第2フィードローラ、6…仮
撚装置、7…一次ヒータ、8…第3フィードローラ、9
…二次ヒータ、10…テイクアップワインダー、11…
パッケージ、13…仮撚加工機台、14…通路、15…
玉揚装置、16…ロータリーペッグ、17…トロリー
線、18…受電装置、B…走行路、101〜103…仮
撚加工機
1 ... creel stand, 2 ... package, 3 ... thread, 4 ...
First feed roller, 5 ... Second feed roller, 6 ... False twisting device, 7 ... Primary heater, 8 ... Third feed roller, 9
… Secondary heater, 10… Take-up winder, 11…
Package, 13 ... False twisting machine stand, 14 ... Passage, 15 ...
Doffing device, 16 ... Rotary peg, 17 ... Trolley wire, 18 ... Power receiving device, B ... Travel path, 101-103 ... False twisting machine

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】仮撚加工糸を生産する錘を複数備えてなる
仮撚加工機が複数台配置された設備において、各仮撚加
工機に対して一台の玉揚装置を専用的に配設したことを
特徴とする仮撚加工糸生産工場の玉揚システム。
1. In a facility having a plurality of false twisting machines, each of which is provided with a plurality of weights for producing false twisted yarns, one doffing device is exclusively allocated to each false twisting machine. The doffing system at the false twisted yarn production plant, which is characterized by being installed.
【請求項2】各仮撚加工機の玉揚装置を制御する玉揚制
御装置を各仮撚加工機毎に設けたことを特徴とする請求
項1に記載の仮撚加工糸生産工場の玉揚システム。
2. A ball for a false twisting yarn production plant according to claim 1, wherein a doffing control device for controlling the doffing device of each false twisting machine is provided for each false twisting machine. Lifting system.
【請求項3】仮撚加工糸を生産する錘を複数備えてなる
仮撚加工機が複数台配置され、各仮撚加工機において加
工対象の糸に対し、最適な生産速度で糸が生産され、複
数台のうちの少なくとも一台が他の機台と異なる生産速
度に設定された仮撚加工糸生産システムにおいて、仮撚
加工機毎に玉揚装置が配置され、各機台の玉揚げ装置の
玉揚タイミングが各機台の最適な生産速度に合わせて設
定されていることを特徴とする仮撚加工糸生産システ
ム。
3. A plurality of false twisting machines, each of which is provided with a plurality of weights for producing false twisted yarns, are arranged, and each false twisting machine produces a yarn at an optimum production speed for a yarn to be processed. In a false twisting yarn production system in which at least one of the plurality of false twisting machines is set to a production speed different from that of other machines, a doffing device is arranged for each false twisting machine, and a doffing device for each machine is provided. The false twisting yarn production system is characterized in that the doffing timing is set according to the optimal production speed of each machine stand.
JP2001305306A 2001-10-01 2001-10-01 Doffing system for false-twist textured yarn production plant and false-twist textured yarn production system Pending JP2003113543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001305306A JP2003113543A (en) 2001-10-01 2001-10-01 Doffing system for false-twist textured yarn production plant and false-twist textured yarn production system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001305306A JP2003113543A (en) 2001-10-01 2001-10-01 Doffing system for false-twist textured yarn production plant and false-twist textured yarn production system

Publications (1)

Publication Number Publication Date
JP2003113543A true JP2003113543A (en) 2003-04-18

Family

ID=19125117

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001305306A Pending JP2003113543A (en) 2001-10-01 2001-10-01 Doffing system for false-twist textured yarn production plant and false-twist textured yarn production system

Country Status (1)

Country Link
JP (1) JP2003113543A (en)

Similar Documents

Publication Publication Date Title
US6209302B1 (en) False twist texturizing machine
CN101437991B (en) Device for melt spinning, treating and winding synthetic threads
CN101336316B (en) Apparatus for melt spinning and winding synthetic threads
CN2903112Y (en) False twist elastic air covering machine
EP2188422B1 (en) Texturing-interlacing machine with double oven
JP2006519935A (en) Knitted fabric and method and apparatus for manufacturing the knitted fabric
JP4800550B2 (en) Textured machine control method and textured machine
JP2012097369A (en) False-twist texturing machine
US3903681A (en) Apparatus for connecting two or more working operations in the production, preparation or finishing of yarns
US4364225A (en) Machine for producing self-twisting yarns
CN102257196B (en) Device for texturing and winding a plurality of threads
JPH08226038A (en) Arrangement of drawing and crimp processing machine for synthetic fiber
JP4422615B2 (en) False twist textured machine
CN106319698A (en) Spinning station of a spinning machine and method for operating a spinning station
US6814828B1 (en) Method and device for producing melt-spun continuous threads
JPH07173729A (en) Method for winding thread in weaving machine and apparatus for practicing said method in use
US4201036A (en) False twist machine
EP0571974B1 (en) A false twist texturing machine
JP2003113543A (en) Doffing system for false-twist textured yarn production plant and false-twist textured yarn production system
US8468791B2 (en) Texturing machine
US3358432A (en) Spinning apparatus and method utilizing miniature carding rolls
CN100352985C (en) False twist texturing machine
JPH11315434A (en) Texturing machine comprising false twisting, spinning or the like
US4162607A (en) Entangled yarns
JP7389811B2 (en) ring spinning machine